Durasi

No Deskripsi Pekerjaan Mei


(hari)
1 2

1 Dead End Tower


Pondasi (Pembesian, Bekisting, Pengecoran) 21 1 1
Erection Tower 14
2 T.01R
Pondasi (Pembesian, Bekisting, Pengecoran) 21 1 1
Erection Tower 14
3 T.01A
Pondasi (Pembesian, Bekisting, Pengecoran) 21 1 1
Erection Tower 14
4 T.02
Pondasi (Pembesian, Bekisting, Pengecoran) 21
Erection Tower 14
5 T.03
Pondasi (Pembesian, Bekisting, Pengecoran) 21
Erection Tower 14
6 T.04
Pondasi (Pembesian, Bekisting, Pengecoran) 21
Erection Tower 14
7 T.05
Pondasi (Pembesian, Bekisting, Pengecoran) 21
Erection Tower 14
8 T.06
Pondasi (Pembesian, Bekisting, Pengecoran) 21
Erection Tower 14
9 T.07
Pondasi (Pembesian, Bekisting, Pengecoran) 21
Erection Tower 14
10 T.11
Pondasi (Pembesian, Bekisting, Pengecoran) 21
Erection Tower 14

11 Final Check 4
12 Stringing (Insulator + Aksesoris) 60

Note:
- Tim Pondasi ada 3 Tim
- Tim Erection ada 1 Tim
- Pekerjaan Erection dilaksanakan Paralel dengan Pondasi
- Final Check dilakukan sebelum stringing
- Stringing dilakukan sekaligus setelah erection selesai
Estimasi Jadwal Pelaksanaan P
Pekerjaan SUTT GI Bolok -

Mei Juni Juli


3 4 1 2 3 4 1 2 3 4

1
1 1

1
1 1

1
1 1

1 1 1
1 1

1 1 1
1 1

1 1 1

1 1 1

1 1 1

1 1 1

1 1 1
al Pelaksanaan Pekerjaan Sisa Tower
SUTT GI Bolok - GI tenau 150 kV
2021
Agustus September Oktober
1 2 3 4 1 2 3 4 1 2

1 1

1 1

1 1

1 1

1 1
Oktober November Desember
3 4 1 2 3 4 1 2 3 4

1
1 1 1 1 1 1 1 1