Pekerja
Rp.
20,000.00
Rp.
0.100 org/hr
Mandor
Rp.
37,500.00
Rp.
40,000.00
3,750.00
Jumlah
0.5 x
Rp.
Rp.
43,750.00
43,750.00 Rp.
4,375.00
Pekerja
Rp.
20,000.00
Rp.
0.100 org/hr
Mandor
Rp.
37,500.00
Rp.
0.25 x
20,000.00
3,750.00
Jumlah
Rp.
23,750.00
harga 1 m2
Rp.
2,375.00
2,375.00 Rp.
593.75
Rp.
0.500 org/hr
Pekerja
Rp.
20,000.00
Rp.
0.025 org/hr
Mandor
Rp.
37,500.00
Rp.
10,000.00
937.50
Jumlah
Rp.
10,937.50
harga 1 m2
Rp.
1,093.75
10 M2 Menurunkan atap genteng atau sirap jika hendak dipakai lagi (An.- L7)
Upah Kerja :
0.200 org/hr
Pekerja
Rp.
0.100 org/hr
Mandor
Rp.
20,000.00
#REF!
Rp.
Rp.
4,000.00
#REF!
Jumlah
Rp.
#REF!
harga 1 m2
Rp.
#REF!
Jumlah
Rp.
#REF!
harga 1 m2
Rp.
#REF!
Rp.
#REF!
Rp.
#REF!
Rp.
#REF!
10 M2 Menurunkan rangka atap/usuk reng jika hendak dipakai lagi (An.- L9)
Upah Kerja :
1.000 org/hr
Pekerja
Rp.
Rp.
0.250 org/hr
Tukang kayu
Rp.
20,000.00
#REF!
Rp.
20,000.00
#REF!
0.025 org/hr
Rp.
#REF!
Rp.
#REF!
0.050 org/hr
Mandor
Rp.
#REF!
Rp.
#REF!
1 M3 Membongkar kayu balok / kuda-kuda dan bongkaran dipakai lagi (An.- L12)
Upah Kerja :
6.000
Tukang Kayu
Rp.
#REF!
Rp.
0.600
Kepala Tukang
Rp.
#REF!
Rp.
4.000
Pekerja
Rp.
Rp.
0.200
Mandor
Rp.
20,000.00
#REF!
Rp.
#REF!
#REF!
80,000.00
#REF!
Jumlah
PEKERJAAN TANAH
7
Pekerja
Rp.
0.033 org/hr
Mandor
Rp.
20,000.00
#REF!
Rp.
Rp.
20,000.00
#REF!
Jumlah
8
Tanah Urug
Rp.
45,500.00
Rp.
54,600.00
0.3 org/hr
Pekerja
Rp.
20,000.00
Rp.
6,000.00
0.010 org/hr
Mandor
Rp.
Rp.
Upah Kerja :
#REF!
#REF!
Jumlah
9
Pasir Urug
Rp.
47,500.00
Rp.
57,000.00
0.300 org/hr
Pekerja
Rp.
20,000.00
Rp.
6,000.00
0.010 org/hr
Mandor
Rp.
Upah Kerja :
#REF!
Rp.
Jumlah
10
#REF!
Rp.
#REF!
Bahan :
Papan Bouwplank
Rp.
2,400,000.00
Rp.
7,200.00
0.003 m3
0.003 m3
Kayu Meranti
Rp.
2,400,000.00
Rp.
7,200.00
0.050 kg
Paku
Rp.
8,150.00
Dihitung
Rp.
1,500.00
Rp.
407.50
Rp.
1,500.00
Upah Kerja :
Jumlah
Rp.
16,307.50
Rp.
400,557.50
PEKERJAAN PEMBETONAN
11
Koral 2/3
Rp.
144,000.00
Rp.
0.48 M3
Pasir Cor
Rp.
76,000.00
Rp.
138,240.00
36,480.00
5.075 Zak
Pc 50 Kg
Rp.
44,500.00
Rp.
225,837.50
Jumlah
Upah Kerja :
Pekerja
Rp.
Rp.
1.000
Tk. Batu
Rp.
#REF!
Rp.
#REF!
0.300
Mandor
Rp.
#REF!
Rp.
#REF!
Kep. Tukang
Rp.
#REF!
Rp.
#REF!
0.1
12
20,000.00
120,000.00
Jumlah
Rp.
#REF!
Total
Rp.
#REF!
/m2 t 5 cm
#REF!
/m2 t 6 cm
#REF!
Koral 2/3
Rp.
144,000.00
Rp.
0.5 M3
Pasir Cor
Rp.
76,000.00
Rp.
38,000.00
Pc 50 Kg
Rp.
44,500.00
Rp.
160,378.00
3.604 Zak
144,000.00
Jumlah
Rp.
342,378.00
Upah Kerja :
6
13
Pekerja
Rp.
0.500
Tk. Batu
Rp.
20,000.00
#REF!
Rp.
Rp.
120,000.00
0.300
Mandor
Rp.
#REF!
Rp.
#REF!
0.050
Kep. Tukang
Rp.
#REF!
Rp.
#REF!
#REF!
Jumlah
Rp.
#REF!
Total
Rp.
#REF!
/m2 t 5 cm
#REF!
/m2 t 6 cm
#REF!
An.Spl V
1 M3 Beton Lantai Rabat Campuran 1Pc : 3Ps : 6Kr (An. G41,F8 dan I.2)
a. G.41 Spesi Beton Cor (1 Pc : 2Psr : 3Kr)
Bahan :
0.82 m3
Koral 2/3
Rp.
144,000.00
Rp.
0.54 M3
Pasir Cor
Rp.
76,000.00
Rp.
118,080.00
41,040.00
5.78 Zak
Pc 50 Kg
Rp.
44,500.00
Rp.
257,210.00
Jumlah
Rp.
416,330.00
Upah Kerja :
6.000
1
Pekerja
Rp.
20,000.00
=
=
Rp.
120,000.00
Tk. Batu
Rp.
#REF!
Rp.
#REF!
0.3
Mandor
Rp.
#REF!
Rp.
#REF!
0.1
Rp.
#REF!
Rp.
#REF!
Jumlah
Rp.
#REF!
Total
Rp.
#REF!
Besi Beton
Rp.
8,550.00
Kawat Beton
Rp.
8,750.00
Rp.
Rp.
940,500.00
17,500.00
Jumlah
Rp.
958,000.00
Upah Kerja :
6.750
Pekerja
Rp.
6.750
Tk. Besi
Rp.
#REF!
Rp.
#REF!
2.250
Rp.
#REF!
Rp.
#REF!
20,000.00
Rp.
135,000.00
Jumlah
Rp.
#REF!
Total
Rp.
#REF!
Bahan :
0.400 m3
Kayu Meranti
Rp.
2,400,000.00
Rp.
960,000.00
4.000 kg
Paku
Rp.
8,150.00
Rp.
32,600.00
Jumlah
Rp.
992,600.00
Upah Kerja :
2
Pekerja
Rp.
Tk. Kayu
Rp.
20,000.00
#REF!
=
=
Rp.
Rp.
40,000.00
#REF!
0.100
Mandor
Rp.
#REF!
Rp.
#REF!
0.500
Rp.
#REF!
Rp.
#REF!
Jumlah
Rp.
#REF!
Total
Rp.
#REF!
d. Bongkar Cetakan
Upah:
4
Pekerja
Rp.
20,000.00
Rp.
80,000.00
Jumlah
Rp.
80,000.00
Rp.
#REF!
Rp.
#REF!
Rp.
Rp.
#REF!
40,000.00
Jumlah
Rp.
#REF!
Rp.
#REF!
=
=
Rp.
#REF!
Rp.
#REF!
Rp.
Rp.
#REF!
80,000.00
Jumlah
Rekapitulasi untuk Beton Bertulang Konstruktif/Struktur (tidak bertingkat)
a
Rp.
#REF!
Rp.
#REF!
Rp.
Rp.
#REF!
80,000.00
Jumlah
Rp.
#REF!
Rp.
#REF!
Rp.
#REF!
Jumlah
Rp.
#REF!
PEKERJAAN PASANGAN
14
Bata Merah
Rp.
275.00
Rp.
123,750.00
PC 50 Kg
Rp.
44,500.00
Rp.
95,675.00
Pasir Pasang
Rp.
76,000.00
Rp.
28,728.00
Rp.
Jumlah
248,153.00
Upah Kerja :
4.5
15
Pekerja
Rp.
1.500
Tk. Batu
Rp.
20,000.00
#REF!
Rp.
Rp.
90,000.00
0.225
Mandor
Rp.
#REF!
Rp.
#REF!
0.150
Kep. Tukang
Rp.
#REF!
Rp.
#REF!
#REF!
Jumlah
Rp.
#REF!
Total
Rp.
#REF!
1 M3 Pasangan Bata Merah Spesi 1Pc : 3 Kp : 8 Ps. (An.G.IV + G.33.f. Zaenal Az + BOW)
Bahan :
Bata Merah
275.00
Rp.
123,750.00
1.100 Zak
450 Biji
PC 40 Kg
35,900.00
Rp.
39,490.00
0.130 m3
Kapur
375,000.00
Rp.
48,750.00
0.430 m3
Pasir Pasang
76,000.00
Rp.
32,680.00
Jumlah
Rp.
Upah Kerja :
4.5
Pekerja
Rp.
1.5
Tk. Batu
Rp.
20,000.00
#REF!
=
=
Rp.
Rp.
90,000.00
#REF!
244,670.00
0.225
0.15
Mandor
Rp.
#REF!
Rp.
#REF!
Kep. Tukang
Rp.
#REF!
Rp.
#REF!
Jumlah
Rp.
#REF!
Total
Rp.
#REF!
Jumlah
Rp.
#REF!
PEKERJAAN PLESTERAN
16
Pc 50 Kg
Rp.
44,500.00
0.013 m3
Pasir Pasang
Rp.
76,000.00
=
=
Rp.
Rp.
4,085.10
988.00
Jumlah
Rp.
5,073.10
Upah Kerja :
Pekerja
Rp.
Rp.
0.15
0.4
Tk. Batu
Rp.
#REF!
Rp.
#REF!
0.02
Mandor
Rp.
#REF!
Rp.
#REF!
Kep. Tukang
Rp.
#REF!
Rp.
#REF!
0.015
20,000.00
8,000.00
Jumlah
Rp.
Total
23
Rp.
#REF!
#REF!
1 M2 Plesteran dinding Campuran 1Pc : 3KP : 8Ps tebal 10 mm (An. - G.X.14. Zaenal. AZ)
Bahan :
0.095 Zak
Pc
Rp.
44,500.00
Rp.
4,227.50
0.004 m3
Kapur
Rp.
380,000.00
Rp.
1,520.00
0.014 m3
Pasir Pasang
Rp.
76,000.00
Rp.
1,064.00
Jumlah
Rp.
6,811.50
Upah Kerja :
0.330
18
Pekerja
Rp.
0.165
Tk Batu
Rp.
20,000.00
#REF!
0.0165
Mandor
Rp.
#REF!
0.0165
Kep. Tukang
Rp.
#REF!
=
=
Rp.
6,600.00
Rp.
#REF!
Rp.
#REF!
Rp.
#REF!
Jumlah
Rp.
#REF!
Total
Rp.
#REF!
Pc 50 Kg
Rp.
44,500.00
Pasir Pasang
Rp.
76,000.00
=
=
Rp.
Rp.
1,361.70
326.80
Jumlah
Rp.
1,688.50
Upah Kerja :
0.400
Pekerja
Rp.
0.150
Tk Batu
Rp.
#REF!
Mandor
Rp.
#REF!
Kep. Tukang
Rp.
#REF!
0.02
0.015
20,000.00
=
=
=
=
Jumlah
Upah
1/ x
Rp.
8,000.00
Rp.
#REF!
Rp.
#REF!
Rp.
#REF!
Rp.
#REF!
#REF!
Total
Rp.
#REF!
Rp.
#REF!
Kayu Kamper
Rp.
5,300,000.00
Rp.
5,830,000.00
Paku
Rp.
8,150.00
Rp.
16,300.00
Jumlah
Rp.
5,846,300.00
Upah Kerja :
9
Pekerja
Rp.
Rp.
Tk. Kayu
Rp.
#REF!
Rp.
#REF!
0.600
Mandor
Rp.
#REF!
Rp.
#REF!
2.300
Kep. Tukang
Rp.
#REF!
Rp.
#REF!
23
20
20,000.00
180,000.00
Jumlah
Rp.
#REF!
Total
Rp.
#REF!
1.100 m3
Kayu Kamper
Rp.
5,300,000.00
1.1 m3
Kayu Kruwing
Rp.
3,100,000.00
Rp.
Rp.
5,830,000.00
3,410,000.00
1.1 m3
Kayu bengkirai
Rp.
#REF!
Rp.
Rp.
#REF!
Pekerja
Rp.
Tk. Kayu
Rp.
#REF!
Rp.
#REF!
0.400
Mandor
Rp.
#REF!
Rp.
#REF!
2.400
Kep. Tukang
Rp.
#REF!
Rp.
#REF!
Upah Kerja :
8.000
24.000
20,000.00
160,000.00
Jumlah
#REF!
Rp.
#REF!
Rp.
#REF!
Rp.
#REF!
Jumlah
Rp.
#REF!
Rp.
#REF!
Rp.
#REF!
Rp.
#REF!
c
21
Rp.
1.1 m3
Kayu Kamper
Rp.
5,300,000.00
Rp.
5,830,000.00
1.1 m3
Kayu Kruwing
Rp.
3,100,000.00
Rp.
3,410,000.00
1.1 m3
Kayu bengkirai
Rp.
Rp.
#REF!
#REF!
Pekerja
Rp.
Tk. Kayu
Rp.
20,000.00
#REF!
Mandor
Rp.
#REF!
Kep. Tukang
Rp.
#REF!
a.
b.
c.
=
=
Rp.
Rp.
=
=
Rp.
Rp.
120,000.00
#REF!
#REF!
#REF!
m3
Rp.
2,300,000.00
Rp.
16,100.00
0.005
m3
Rp.
2,300,000.00
Rp.
11,730.00
0.250
kg
Paku
Rp.
8,150.00
Rp.
2,037.50
Jumlah
Rp.
29,867.50
Upah Kerja :
23
0.100
Pekerja
Rp.
20,000.00
Rp.
0.100
Tk. Kayu
Rp.
#REF!
Rp.
2,000.00
#REF!
0.005
Mandor
Rp.
#REF!
Rp.
#REF!
0.010
Kep. Tukang
Rp.
#REF!
Rp.
#REF!
Jumlah
Rp.
#REF!
Total
Rp.
#REF!
1 M2 Daun Pintu Panil memakai bingkai tebal 3,5 cm, isi papan tebal 2 cm ( An. F.30 + Spl perhitungan )
Bahan :
a
0.036
m3
Kayu Jati
Rp.
6,480,000.00
Rp.
233,280.00
0.036
m3
Kayu Kamper
Rp.
5,300,000.00
Rp.
190,800.00
20,000.00
Rp.
26,000.00
Upah Kerja :
Pekerja
Rp.
4.000
1.3
Tk. Kayu
Rp.
#REF!
=
=
Rp.
#REF!
0.065
Mandor
Rp.
#REF!
Rp.
#REF!
0.400
Kep. Tukang
Rp.
#REF!
Rp.
#REF!
Rp.
Jumlah
Upah diambil 3/4
24
Rp.
#REF!
#REF!
#REF!
#REF!
#REF!
m3
Kruing
Rp.
3,100,000.00
Rp.
93,000.00
0.200
Kg
Paku
Rp.
8,150.00
Rp.
1,630.00
Upah Kerja :
Jumlah
Rp.
94,630.00
0.280
0.8
0.014
0.08
25
Pekerja
Rp.
20,000.00
Tk. Kayu
Rp.
#REF!
Rp.
#REF!
Mandor
Rp.
#REF!
Rp.
#REF!
Kep. Tukang
Rp.
#REF!
Rp.
#REF!
Rp.
5,600.00
Jumlah
Rp.
#REF!
Total
Rp.
#REF!
Rp.
#REF!
Rp.
#REF!
m3
Kayu Meranti
Rp.
2,400,000.00
Rp.
79,200.00
0.200
Kg
Paku
Rp.
8,150.00
Rp.
1,630.00
Rp.
Jumlah
80,830.00
Upah Kerja :
0.28
0.8
0.014
0.08
26
Pekerja
Rp.
20,000.00
Rp.
Tk. Kayu
Rp.
#REF!
Rp.
#REF!
Mandor
Rp.
#REF!
Rp.
#REF!
Kep. Tukang
Rp.
#REF!
Rp.
5,600.00
#REF!
Jumlah
Rp.
#REF!
Total
Rp.
#REF!
m3
0.020 Kg
Kayu Kruing
Rp.
2,300,000.00
Paku
Rp.
8,150.00
=
=
Rp.
21,620.00
Rp.
163.00
1.000
lbr
6,000.00
Rp.
6,000.00
0.020
kg
Paku Eternit
8,550.00
Rp.
171.00
Rp.
Rp.
Jumlah
27,954.00
Upah Kerja :
27
0.5
Pekerja
Rp.
20,000.00
Rp.
0.025
Mandor
Rp.
#REF!
Rp.
10,000.00
#REF!
Jumlah
Rp.
#REF!
Total
Rp.
#REF!
m'
0.020 Kg
Kayu kamper
Rp.
2,100.00
Rp.
8,550.00
Upah Kerja
Rp.
=
=
Upah Kerja :
1.000
28
Rp.
1.26
Rp.
171.00
Rp.
Jumlah
Ls
500.00
Rp.
172.26
500.00
Jumlah
Rp.
500.00
Total
Rp.
672.26
bh
Rp.
500.00
Rp.
12,500.00
Rp.
Jumlah
12,500.00
Upah Kerja :
29
0.200
Pekerja
Rp.
20,000.00
Rp.
0.100
Tk. Batu
Rp.
#REF!
Rp.
4,000.00
0.01
Mandor
Rp.
#REF!
Rp.
#REF!
0.01
Kep. Tukang
Rp.
#REF!
Rp.
#REF!
#REF!
Jumlah
Rp.
#REF!
Total
Rp.
#REF!
1,600.00
Rp.
8,000.00
0.016
m3
Genteng bubunganRp.
Kapur Gamping
Rp.
380,000.00
Rp.
6,004.00
0.002
m3
Pasir pasang
Rp.
76,000.00
Rp.
114.00
Rp.
Jumlah
14,118.00
Upah Kerja :
0.4
Pekerja
Rp.
Rp.
0.2
Tk. Batu
Rp.
20,000.00
#REF!
Rp.
#REF!
0.02
Mandor
Rp.
#REF!
Rp.
#REF!
0.02
Kep. Tukang
Rp.
#REF!
Rp.
#REF!
Jumlah
8,000.00
Rp.
#REF!
Rp.
Total
#REF!
Tegel abu-abu
Rp.
17,000.00
Rp.
17,000.00
Kapur
Rp.
380,000.00
Rp.
4,940.00
Pasir Pasang
Rp.
76,000.00
Rp.
98.80
Jumlah
Rp.
22,038.80
Upah Kerja :
0.500
Pekerja
Rp.
Rp.
0.250
Tk. Batu
Rp.
20,000.00
#REF!
Rp.
10,000.00
#REF!
0.025
Mandor
Rp.
#REF!
Rp.
#REF!
0.025
Kep. Tukang
Rp.
#REF!
Rp.
#REF!
Jumlah
Rp.
#REF!
Total
Rp.
#REF!
1,900.00
Rp.
28,500.00
1.500 ljr
Rp.
17,000.00
Rp.
25,500.00
5.000 bh
isolator
Rp.
100.00
Rp.
500.00
6 bh
las doof
Rp.
50.00
Rp.
300.00
1 bh
fiting plafond
Rp.
3,000.00
Rp.
3,000.00
2 bh
T dor pvc
Rp.
200.00
Rp.
400.00
Jumlah
Rp.
58,200.00
Upah Kerja :
0.250
Pekerja
Rp.
20,000.00
Rp.
5,000.00
0.250
Tk. Listrik
Rp.
32,500.00
Rp.
8,125.00
0.050
Kepala Tukang
Rp.
Rp.
#REF!
#REF!
Jumlah
Rp.
#REF!
Total
Rp.
#REF!
Kg
Cat Emco
Rp.
39,100.00
Rp.
58,650.00
0.330
ltr
Minyak Cat
Rp.
6,100.00
Rp.
2,013.00
Jumlah
Rp.
60,663.00
Upah Kerja :
0.500
Pekerja
Rp.
20,000.00
Rp.
0.750
Tk. Cat
Rp.
#REF!
Rp.
10,000.00
#REF!
0.025
Mandor
Rp.
#REF!
Rp.
#REF!
0.075
Kep. Tukang
Rp.
#REF!
Rp.
#REF!
Jumlah
Rp.
#REF!
Total
Rp.
#REF!
Rp.
#REF!
Rp.
12,008.00
Jadi 1 M2
36
Kg
Cat meni
Rp.
11,100.00
0.440
ltr
Minyak Cat
Rp.
6,100.00
Rp.
9,324.00
Rp.
2,684.00
Jumlah
Upah Kerja :
0.500
Pekerja
Rp.
20,000.00
Rp.
0.750
Tk. Cat
Rp.
#REF!
Rp.
10,000.00
#REF!
0.025
Mandor
Rp.
#REF!
Rp.
#REF!
0.075
Kep. Tukang
Rp.
#REF!
Rp.
#REF!
Jumlah
Rp.
#REF!
Total
Rp.
#REF!
Rp.
#REF!
Jadi 1 M2
37
10 M2 Mengecat 2x serta menggosok dan mendempul (untuk Kayu) (An. K.8 + K.23 + K.30)
Bahan :
3.000
Kg
Cat Emco
Rp.
7,820.00
Rp.
23,460.00
1.200
ltr
Minyak Cat
Rp.
6,100.00
Rp.
7,320.00
0.800
Kg
Dempul
Rp.
10,600.00
Rp.
8,480.00
2.000
lbr
Kertas Gosok
Rp.
2,800.00
Rp.
5,600.00
Jumlah
Rp.
44,860.00
Upah Kerja :
1.000
Pekerja
Rp.
20,000.00
Rp.
1.500
Tk. Cat
Rp.
#REF!
Rp.
20,000.00
#REF!
0.050
Mandor
Rp.
#REF!
Rp.
#REF!
0.150
Kep. Tukang
Rp.
#REF!
Rp.
#REF!
Jumlah
Rp.
#REF!
Jumlah
Rp.
#REF!
Total
Rp.
#REF!
Rp.
#REF!
Rp.
43,412.00
Tk. Cat
Rp.
#REF!
Rp.
#REF!
0.040
Kep. Tukang
Rp.
#REF!
Rp.
#REF!
Jadi 1 M2
38
Kg
7,820.00
Rp.
20,332.00
1.600
Kg
Plamir tembok
Rp.
11,100.00
Rp.
17,760.00
1.900
lbr
Kertas Gosok
Rp.
2,800.00
Rp.
5,320.00
Jumlah
Upah Kerja :
0.100
Pekerja
Rp.
20,000.00
Rp.
1.500
Tk. Cat
Rp.
#REF!
Rp.
2,000.00
#REF!
0.050
Mandor
Rp.
#REF!
Rp.
#REF!
0.150
Kep. Tukang
Rp.
#REF!
Rp.
#REF!
Jumlah
Rp.
#REF!
Jumlah
Rp.
#REF!
Total
Rp.
#REF!
Jadi 1 M2
Rp.
#REF!
Rp.
53,402.00
39
0.400
Tk. Cat
Rp.
#REF!
Rp.
#REF!
0.040
Kep. Tukang
Rp.
#REF!
Rp.
#REF!
Kg
7,820.00
Rp.
20,332.00
2.500
Kg
Plamir tembok
Rp.
11,100.00
Rp.
27,750.00
1.900
lbr
Kertas Gosok
Rp.
2,800.00
Rp.
5,320.00
Jumlah
Upah Kerja :
0.100
Pekerja
Rp.
20,000.00
Rp.
1.500
Tk. Cat
Rp.
#REF!
Rp.
2,000.00
#REF!
0.050
Mandor
Rp.
#REF!
Rp.
#REF!
0.150
Kep. Tukang
Rp.
#REF!
Rp.
#REF!
Jumlah
Rp.
#REF!
Jumlah
Rp.
#REF!
Total
Rp.
#REF!
Jadi 1 M2
Rp.
#REF!
Rp.
20,332.00
40
0.400
Tk. Cat
Rp.
#REF!
Rp.
#REF!
0.040
Kep. Tukang
Rp.
#REF!
Rp.
#REF!
Kg
7,820.00
Rp.
20,332.00
Jumlah
Upah Kerja :
0.100
Pekerja
Rp.
20,000.00
Rp.
1.500
Tk. Cat
Rp.
#REF!
Rp.
2,000.00
#REF!
0.050
Mandor
Rp.
#REF!
Rp.
#REF!
0.150
Kep. Tukang
Rp.
#REF!
Rp.
#REF!
Jumlah
Rp.
#REF!
Total
Rp.
#REF!
Jadi 1 M2
Rp.
#REF!
Jenis Bahan
Satuan
I
1
2
3
4
5
6
II
1
2
3
4
5
6
7
8
9
10
11
12
III
1
2
3
4
5
IV
1
2
3
4
5
6
7
8
V
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
Bahan Pasir
Pasir urug Kabuh
Sirtu ( tidak diayak ), Ploso
Pasir pasang / cor
Tanah urug
Grosok
Abu batu
m
m
m
m
m
m
Bahan batu
Batu kali pecah 15/20 ( tangan )
Batu kali pecah 10/15 ( tangan )
Batu kali pecah 7/10 ( tangan )
Batu kali pecah 5/7 ( tangan )
Batu kali pecah 3/5 ( mesin )
Batu kali pecah 2/3 ( mesin )
Batu kali pecah 1/2 ( mesin )
Batu kali pecah 0,5 - 1 ( mesin )
Batu gunung atau quarry
Kerikil galian bukit
Batu kali
Kerikil sungai ayak tanpa pasir 0,5-1
m
m
m
m
m
m
m
m
m
m
m
m
bh
bh
bh
m
m
47,500.00
69,000.00
76,000.00
45,500.00
48,700.00
76,000.00
92,000.00
92,000.00
92,000.00
92,000.00
103,500.00
144,000.00
156,000.00
128,000.00
92,000.00
68,200.00
92,000.00
68,200.00
275.00
250.00
2,100.00
33,000.00
28,000.00
35,900.00
44,500.00
34,060.00
42,200.00
55,500.00
300.00
380,000.00
45,000.00
16,550.00
8,550.00
9,550.00
46,000.00
zak
zak
zak
zak
zak
kg
m3
zak
kg
kg
ljr
ljr
ljr
ljr
ljr
ljr
ljr
ljr
ljr
ljr
kg
kg
kg
kg
kg
135,000.00
70,000.00
85,000.00
115,000.00
140,000.00
245,000.00
375,000.00
8,750.00
15,050.00
9,450.00
8,150.00
8,550.00
VI
1
2
3
4
5
6
7
m
m
m
m
m
unit
unit
17,000.00
32,000.00
40,000.00
25,000.00
38,500.00
175,000.00
75,000.00
1
2
3
4
5
6
7
Buis beton
Buis beton bulat 15 cm
Buis beton bulat 20 cm
Buis beton bulat 30 cm
Buis beton bulat 40 cm
Buis beton bulat 50 cm
Buis beton U - 20 cm
Buis beton U - 30 cm
m
m
m
m
m
m
m
22,500.00
25,000.00
30,000.00
45,000.00
52,500.00
24,000.00
29,000.00
m
m
m3
m
m
m
m
m
m
m3
bt
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
m`
bt
bt
1
2
3
4
5
6
7
8
9
bh
bh
bh
bh
bh
lbr
lbr
ps
bj
1
2
3
4
5
6
ljr
ljr
ljr
ljr
ljr
ljr
VII
VIII
1
2
3
4
5
6
7
8
9
10
9
10
11
12
13
14
15
16
17
18
19
20
21
22
IX
A
XI
B
Bahan cat dan plitur
6,480,000.00
5,300,000.00
4,300,000.00
3,100,000.00
2,300,000.00
2,300,000.00
2,400,000.00
4,300,000.00
3,100,000.00
350,000.00
9,000.00
62,500.00
26,000.00
27,500.00
29,000.00
36,500.00
45,000.00
52,100.00
82,300.00
108,900.00
28,500.00
2,100.00
5,000.00
8,500.00
800.00
950.00
2,100.00
1,600.00
6,000.00
62,000.00
52,000.00
32,000.00
75,000.00
17,000.00
20,500.00
31,000.00
81,000.00
117,000.00
167,000.00
D
-
1
2
3
4
5
6
7
8
9
10
10
11
12
13
14
XII
1
2
3
4
5
XIII
1
2
3
4
5
6
7
8
9
10
XIV
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
XVI
1
2
3
4
5
6
7
8
9
10
11
Kertas gosok
Plamur tembok
Plamur kayu " PEDANG "
Cat kayu / besi " EMCO " / setara
Cat tembok " DECOLITH "
Cat tembok " PARAGON "
Cat meni " PEDANG "
Dempul kayu
Minyak cat / thiner B
Minyak cat / thiner A
Spiritus
Plitur jadi
Kolter
Lem kayu
Cherelag
Kaca polos dan rayben
Kaca bening 3mm
Kaca bening 5mm
Kaca rayband 3mm
Kaca rayband 5mm
Kaca nako " NIKY " ( rangka + daun )
lbr
kg
kg
kg
kg
kg
kg
kg
ltr
ltr
ltr
ltr
ltr
kg
kg
m
m
m
m
daun
bh
bh
bh
set
set
bh
bh
bh
psg
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
m`
m`
m`
unit
ttk
ls
org/hari
org/hari
org/hari
org/hari
org/hari
org/hari
org/hari
org/hari
org/hari
org/hari
org/hari
2,800.00
11,100.00
11,100.00
39,100.00
9,700.00
10,600.00
11,100.00
10,900.00
6,100.00
18,100.00
7,100.00
27,600.00
2,300.00
7,600.00
60,500.00
41,000.00
52,500.00
52,500.00
62,500.00
9,000.00
57,500.00
65,000.00
57,500.00
8,500.00
5,250.00
10,000.00
6,500.00
3,000.00
5,000.00
2,000.00
41,000.00
53,000.00
67,400.00
11,000.00
12,700.00
13,600.00
12,700.00
26,700.00
38,800.00
1,700.00
1,900.00
2,600.00
77,600.00
75,000.00
1,500,000.00
40,000.00
38,500.00
38,500.00
37,500.00
35,000.00
35,000.00
27,500.00
33,000.00
25,000.00
40,000.00
35,000.00
Volume Sat.
I PEKERJAAN PERSIAPAN
I Papan Nama Kegiatan
2 IMB
1.00 Ls
47.00 M2
Harga Satuan
Jumlah Harga
Total
1,000.00
SUB TOTAL
II
PEK.TANAH
1 Galian Tanah Pondasi
2 Urugan Kembali
3 Urugan Pasir bawah pondasi + Bawah lantai
26.93 m3
6.73 m3
9.09 m3
SUB TOTAL
III
PEK.PASANGAN PONDASI
1 Pas.Batu Kosong
2 Pas.Batu Pondasi 1 Pc : 6 Ps
8.55 m3
9.98 m3
SUB TOTAL
IV PEKERJAAN BETON
1 Pas.Sloof beton bertulang 15/20
2 Pas.Kolom beton bertulang 15/20
3 Pas.Kolom beton bertulang 15/15
4 Pas.Kolom beton bertulang 12/15
5 Pas.Kolom beton praktis 12/12
6 Pas.Balok Gantung 12/15
6 Pas.Balok Latei 12/12
7 Pas.Plat Lantai
8 Pas. ring balok beton bertulang ( 12 x 12 ) cm
1.28
0.45
0.14
0.41
7.50
0.15
0.18
0.53
60.87
m3
m3
m3
m3
m'
m3
m3
m3
m'
SUB TOTAL
V
1
2
3
4
5
13.58
110.18
0.43
0.16
219.74
m2
m2
m2
m2
m2
SUB TOTAL
VI PEKERJAAN LANTAI
1 Pas.Lantai Keramik polos 30 x 30 cm
2 Beton Tumbuk
55.56 m2
2.22 m3
SUB TOTAL
VII
1
2
3
4
5
VIII
1
2
3
4
5
6
0.17
9.25
4.62
40.12
40.12
m3
m2
m2
m'
m'
SUB TOTAL
SUB TOTAL
IX PEKERJAAN ATAP & PLAFOND
1 Pas. Usuk 5/7 & reng 3/4 Kayu Kelas Kuat II
2 Pas.Balok Gording 8/12 Kayu Kelas Kuat II
3 Pas.Balok Nok 8/12 Kayu Kelas Kuat II
4 Pas.Kuda - Kuda Kayu Kelas Kuat II
5 Pas.langit2 asbes ( 1.00x0.50 ) m,tbl 3.2 mm,(Rangka Kayu Kelas Kuat III )
6 Pas.jadi List Gipsum
7 Pas.jadi List Teritisan
8 Pas. Atap Genteng Lokal Plenthong Besar Gedangan Mojowarno
9 Pas. Atap Genteng Bubungan Lokal Gedangan Mojowarno
SUB TOTAL
X PEKERJAAN INSTALASI LISTRIK
1 Pas. lampu PLS 1x 25 w
2 Pas. Saklar Ganda " Broco"
3 Pas. Saklar Tunggal " Broco"
4 Pas.Stop kontak
5 Pas.Fitting Plafond
6 Pas. titik lampu
SUB TOTAL
10.00
10.00
20.00
2.00
4.50
2.00
bh
Ps
Ps
bh
Ps
bh
100.60
0.58
0.10
0.49
84.56
42.50
6.50
100.60
10.00
m2
m3
m3
m3
m2
m'
m'
m2
m'
5.00
1.00
2.00
2.00
5.00
5.00
bh
bh
bh
bh
bh
ttk
XI PEKERJAAN PENGECATAN
1 Pengecatan Tembok baru
2 Pengecatan kayu kusen Pintu & Jendela
3 Pengecatan daun Pintu & Jendela
4 Pengecatan Plafond
5 Pengecatan Lisplank
219.74
6.35
18.49
84.56
10.03
m2
m2
m2
m2
m2
SUB TOTAL
JUMLAH
PPN 10 %
JUMLAH TOTAL
PEMBULATAN
Jombang,
2010
Dibuat Oleh :
Penawar
CV/PT.
.
Direktur/Direktris
2.9925
6.1
9.0925
81,818,182
126.875
2.25
Latei
jendela dobel
jendela
Pintu Dobel
Pintu
Luasan
9
1.15
1.5
0.9
12.55
keliling
16.2
2.07
3.3
1.98
23.55
105.4
76.2
30.48
51.34
4.33
5.4847344111
4.22 1.154734411
#VALUE!
36.25
KUSEN
Jendela 2
JENDELA
PINTU 1
PINTU 2
PENGECATAN
60
8.4
5
5.6
0.54
0.0756
0.045
0.0504
0.171
4.75
2.85
14.4
19.15
14.4
17.25
Luas
Pintu kt
Pintu
Jendela
0.0236736
23.1
#DIV/0!
cos 30
0.866
Kuda 2
0.453696
0.03462
0.488316
y2
4.330254
y3
y4
luas atap
1.154734
4.330254
#VALUE!
132.1882
#VALUE!
total
LUAS PINTU
11.25
32400
20.34
3.645
1.275
1.425
6.345
KUDA KUDA
0.0173568
0.01644672
0.04315104
0.06026592
0.03275328
0.0347136
0.03289344
0.08630208
0.12053184
0.06550656
0.0473472
0.38729472
Luas Jendela
Luas jalusi
47.04
5.5125
63.8025
GWL
#VALUE!
105.4
#VALUE!
30100
-144,261,000.00
19.74
25.52
REKAPITULASI
RENCANA ANGGARAN BIAYA ( RAB )
BQ
KEGIATAN
LOKASI
SUMBER DANA
TAHUN ANGGARAN
NO
I
II
III
IV
V
VI
VII
VIII
IX
X
XI
JENIS PEKERJAAN
HARGA (Rp)
JUMLAH
PEKERJAAN PERSIAPAN
PEKERJAAN TANAH
PEKERJAAN PONDASI
PEKERJAAN BETON
PEKERJAAN PAS. DINDING
PEKERJAAN LANTAI
PEKERJAAN KAYU KUSEN
PEKERJAAN PENGANTUNG & KUNCI
PEKERJAAN ATAP & PLAFOND
PEKERJAAN INSTALASI LISTRIK
PEKERJAAN PENGECATAN
JUMLAH
PPN 10%
JUMLAH TOTAL
PEMBULATAN
Terbilang :
(..)
JOMBANG ,
2010
Direktur/Direktris
3
3
2
1.5
1.5
3.5
3
Keliling
Pas.Batu
Galian Tnh
Urug Kembali
Urug Tanah
Rabat
Batu kosong
Pasir Bwh
Sloof
Kolom
Ring
Pas.Bata 1;4
Pas.Bata 1:3:10
Atap
Plafond
Keramik
32
11.2
=1,2*0,95*32
=0,25*36,48
=0,13*((3*6)+(5*3)+(1*3)+3)
=0,05*39
=0,2*1*32
=1,2*0,05*32
=32*0,1*0,15
=12*3,5*0,1*0,1
39.12201
30
81.20275
10.15
11.2
36.48
9.12
5.07
1.95
6.4
1.92
0.48
0.525
39.12201
30
1.731
3
3.420753
4.420753
0.126
11.7805
6.154
5 12.28413
13.68301 20.52452
37.98176
16.5
5.58
8.8
3.5
Pas.Batu
Galian Tnh
Urug Kembali
Urug Tanah
Rabat
Batu kosong
Pasir Bwh
Sloof
Kolom
Ring
Pas.Bata 1;4
Pas.Bata 1:3:10
Atap
Plafond
Keramik
Kusen Pintu
33.87813
29.30753
Kusen Jend
Jalusi
Luas Pintu + Jendela
Lisplank
Pas.Pintu
Luas permukaan Kayu
2.16
5.7
4.56
12.4
1.4
4.7
0.32
2.4
14.02
34
=0,45*0,7*V16
=1,2*0,95*V16
=0,25*R19
=0,13*((3*2)+(3,5*3)+(4*3)+3)
=0,05*((3*2)+(3,5*3)+(4*3)+(1*3)
=0,2*0,8*V16
=1,2*0,05*V16
=0,1*0,15*V16
=12*3,5*0,1*0,1
=V16+((2,5/0,877)*2+((3/0,877))
=7,5+3+3+3+1,5+6+1,1+1,5+1
68.70275
43.32953
42.18301
31.5
0.17496
0.06696
0.01728
33.87813
16.76226
5.4
9.924
4
3
1.5
3
1.5
Keliling
3
=0,45*0,7*V16
8.9775
=1,2*0,95*V16
32.49
=0,25*R19
8.1225
=0,13*((3*2)+(3,5*3)+(4*3)+3)
4.095
=0,05*((3*2)+(3,5*3)+(4*3)+(1*3) 1.258425
=0,2*0,8*V16
3.76
=1,2*0,05*V16
1.41
=0,1*0,15*V16
0.3525
=12*3,5*0,1*0,1
0.504
=V16+((2,5/0,877)*2+((3/0,877)) 32.62201
=7,5+3+3+3+1,5+6+1,1+1,5+1
27.6
0.26568
33
23.5
=7,5+3+3+1,5+2+2+3+1,5
Volume
Sat.
Harga Satuan
PEKERJAAN PERSIAPAN
Papan Nama Proyek
Uizet Lapangan & Pembersihan Lapangan
IMB
1.00
39.00
Ls
Ls
m2
300,000.00
500,000.00
900.00
#REF!
60.87
m3
m'
2,344,252.50
52,308.75
110.18
23.00
#REF!
9.40
m2
m2
m2
m'
59,918.75
22,612.50
18,970.00
7,500.00
55.56
m2
87,668.75
0.13
2.28
1.80
9.42
0.75
m3
m2
m2
m'
m2
9,598,000.00
366,650.00
453,500.00
40,380.00
78,745.00
2.00
2.00
2.00
bh
Ps
Ps
24,660.00
15,745.00
19,245.00
100.60
0.58
#REF!
100.60
m2
m3
m2
m2
42,900.00
4,236,200.00
66,440.00
33,380.00
PEKERJAAN BETON
C
1
2
3
4
D
1
E
1
2
3
4
5
F
1
2
3
G
1
2
H
1
2
3
4
5
I
1
2
3
4
5
6.00
2.00
3.00
6.00
1.00
bh
bh
bh
ttk
ls
30,000.00
14,000.00
13,000.00
75,000.00
3,000,000.00
#REF!
7.49
2.16
#REF!
1.85
m2
m2
m2
m2
m2
9,937.00
14,582.00
14,582.00
17,107.00
14,582.00
SUB JUMLAH
II
PEKERJAAN PONDASI
Pas.Batu Kosong ( Anstamping )
Pas.Batu Kali 1 Pc : 4 Ps
Pas. bata merah tebal 1 Bata, 1 Pc : 4 Ps ( Teras )
3.76
#REF!
1.40
m3
m3
m2
173,790.00
417,462.50
129,000.63
PEKERJAAN TANAH
Galian tanah pondasi
Urug tanah kembali
Urugan Pasir Bawah Lantai
8.98
32.49
4.20
m3
m3
m3
22,470.00
6,900.00
75,600.00
4.10
1.41
0.35
0.50
m3
m3
m3
m'
487,385.00
1,975,672.50
2,344,252.50
52,308.75
32.36
,1+1,5+1
0.26
64.72
#VALUE!
m2
m2
m2
m2
m2
61,953.75
59,918.75
284,487.50
21,175.00
18,970.00
1
2
3
B
1
2
3
PEKERJAAN BETON
D
1
2
3
4
5
E
1
2
F
1
2
3
4
5
6
G
1
2
3
4
5
H
1
2
3
33.88
m'
7,000.00
PEKERJAAN LANTAI
Pas.Lantai Keramik polos 30 x 30 cm
Pas.Lantai Keramik Kamar mandi polos 20 x 20 cm
42.18
1.89
m2
m2
87,668.75
90,168.75
33.88
16.76
1.00
6.73
3.74
m3
m'
m2
Bh
m2
m2
9,598,000.00
40,380.00
453,500.00
450,000.00
366,650.00
78,745.00
3.00
3.00
7.00
7.00
7.00
bh
Ps
bh
Ps
Ps
81,100.00
19,245.00
24,660.00
15,745.00
19,245.00
0.18
0.03
68.70
43.33
68.70
3.00
m3
m3
m2
m2
m2
m'
4,236,200.00
4,236,200.00
42,900.00
66,440.00
33,380.00
48,260.00
4.00
1.00
2.00
4.00
bh
bh
bh
ttk
30,000.00
14,000.00
13,000.00
80,000.00
#VALUE!
5.40
19.80
43.33
13.55
m2
m2
m2
m2
m2
9,937.00
14,582.00
14,582.00
17,107.00
14,582.00
1.00
1.00
1.00
7.00
15.50
2.00
1.00
Bh
Bh
Bh
m'
m'
Bh
Ls
720,890.00
225,050.00
25,162.50
9,355.50
21,926.00
363,125.00
500,000.00
Pas.Pompa Air
1.00
Bh
400,000.00
SUB JUMLAH II
Jumlah I + II
PPN 10 %
Jumlah Total
Pembulatan
Ir.KADARYONO
Direktur
Poskesdes
Poskesdes Jogoroto
amatan Jogoroto
09
KABUPATEN JOMBANG
Jumlah Harga
Total
300,000.00
500,000.00
35,100.00
835,100.00
#REF!
3,184,033.61
#REF!
6,601,847.88
520,087.50
#REF!
70,500.00
#REF!
4,871,094.92
4,871,094.92
1,285,364.16
835,962.00
816,300.00
380,409.99
58,861.89
3,376,898.04
49,320.00
31,490.00
38,490.00
119,300.00
4,315,740.00
2,440,051.20
#REF!
3,358,028.00
#REF!
180,000.00
28,000.00
39,000.00
450,000.00
3,000,000.00
3,697,000.00
#REF!
109,190.02
31,497.12
#REF!
26,947.54
#REF!
#REF!
653,450.40
#REF!
180,600.88
#REF!
201,724.43
224,181.00
317,520.00
743,425.43
1,995,841.58
2,785,698.23
826,349.01
26,363.61
5,634,252.42
2,004,699.87
#VALUE!
75,104.70
1,370,361.59
#VALUE!
237,146.88
#VALUE!
3,698,131.78
170,418.94
3,868,550.72
1,367,998.69
7,601,683.87
450,000.00
2,465,721.25
294,309.44
12,179,713.24
243,300.00
57,735.00
172,620.00
110,215.00
134,715.00
718,585.00
772,682.88
122,002.56
2,947,347.98
2,878,814.14
2,293,297.80
144,780.00
9,158,925.35
120,000.00
14,000.00
26,000.00
320,000.00
480,000.00
#VALUE!
78,742.80
288,723.60
741,238.31
197,604.33
#VALUE!
720,890.00
225,050.00
25,162.50
65,488.50
339,853.00
726,250.00
500,000.00
400,000.00
3,002,694.00
#REF!
#REF!
#REF!
#REF!
#REF!
h I + II
0%
h Total
ulatan
Ir.KADARYONO
Direktur
panjang
jumlah
lebar
jumlah tinggi
jumlah
luas
jumlah
volume
56
pas.dinding 1:3:8
56
58.8
112
56
1.176
112
63
33.075
3.5
91.875
pas.dinding 1:4
63
0.6615
kusen jendela
kusen jendela+pintu
0,07
1.8375
1.5
2.3
0.8
1.8
1.2
2.64
50.4
18.48
68.88
10.332
plesteran 1:3:
56
112
63
0.5
175
gewel
24.5
plesteran 1:3:8
PEK.LANTAI
Pas.lantai tegel abu2
1197
panjang lebar
7.7
6.7
Pek.kayu kusen
Pas.Kusen Pintu 6/15 P
juml
7
luas
panjang
361.13
56
JML1
lebar
2
luas
112
total
473.13
JML2
1.8
0.8
0.15
0.15
0.06
0.06
2
1
7
7
0.2268
0.0504
Pas.kusen jend I
1.5
0.68
0.15
0.15
0.06
0.06
2
2
7
7
0.189
0.08568
Pas.kusen jend II
1.5
0.68
0.15
0.15
0.06
0.06
2
3
21
21
0.567
0.38556
1.8
0.8
0.03
0.3024
0.68
0.66
56 0.4488
11.28
85.323
1.8291
pas.dind
0.2772
0.27468
0.95256
1.32
U
8
2
7
Pasangan dinding
8
p=
l=
t=
panjang total=
8
7
3.5
175
Luas=
m
m
m
m
612.5 m2
2
7
8
alas=
sudut=
8
3.5 m
30
t
30
t=tg 30*3,5 =
tg 30=
3.5
7
2.020 m
0.577
luas=0.5 a*t*=
L total =2 luas segitiga* 4gewel=
Plesteran
1:3=0.5*612.5*2=
1:3:8=3*640,773*2612.5*2=
612.5 m2
3,844.64 m2
3.534
28.273 m2
Atap
c
c
c=cos30/3,5=
cos 30=0,866
t=2,020
30
4.042 m
teras=
2.5 m
3.5
7
panjang atap= (8*4)+1+1+(8*3)+1+1=
panjang teras =4,042+2,5
60 m
6.542 m
bongkar atap=60*6,542*2=
784.988 m2
STROUS
STROUS TENGAH
0,75
0,20
0,20
O,60
0
O,60
0
2,5m
3m
O 25
O 30
STROUS TERAS
0,20
O,60
0
2m
O 25
volume=phi*D*T=
63.585
V1=3,14*0,3*3,75*18buah
V2=3,14*0,25*3,25*37buah
V2=3,14*0,20*2,75*18buah
63.585 m3
94.396 m3
31.086 m3
Total strous=
189.067 m3
POUR
VOLUME = 0,2*0,60*0,60*73 BUAH
5.256 m3
TOTAL
SLOOP
20/30
VOL=0,20*0,30*175
15/25
VOL=0,15*0,25*194
10/15
VOL=0,10*0,15*56
194.323 m3
10.5 m3
7.275 m3
0.84 m3
18.615 m3
KOLOM STRUKTUR
15/25
VOL=0,15*0,25*3,5*18'
KOLOM PRAKTIS
15/25
VOL=0,15*0,25*3,5*37
BALOK RING BAWAH
20/30
VOL=0,20*0,30*175
GEWEL
12/12
VOL=0,12*0,12*4,04*8
BALOK RING ATAS
12/12
VOL=0,12*0,12*175
2.363 m3
4.856 m3
10.500 m3
0.465 m3
2.52 m3
2.985 m3