NO
I.
URAIAN PEKERJAAN
PEKERJAAN PERSIAPAN
1. Sewa Pondok Kerja
2. Uitzet/Pasang Profil
3. Pembersihan Lapangan
II.
1.
2.
3.
4.
5.
VOLUME
1.00 Unit
Ls
Ls
17.20
20.12
17.2
10.16
71.92
m3
m3
m3
m3
m2
ANALISA
HARGA
SATUAN
(Rp)
JUMLAH
HARGA
(Rp)
Taksir
Taksir
Taksir
800,000.00
500,000.00
500,000.00
Jumlah
800,000.00
500,000.00
500,000.00
1,800,000.00
A.1
A.18
G.32.h
Supl. V
G.50.k
#REF!
#REF!
-
#REF!
#REF!
#REF!
Jumlah
III.
2,677.10 m3
669.02 m3
A.1
1/4 A.1
Jumlah
IV.
1.
2.
3.
4.
5.
7.30
11.20
0.28
8.53
1.00
m3
m3
m3
m2
bh
A.1
G.32.h
Supl. V
G. 50.k
Taksir
#REF!
1,000,000.00
Jumlah
#REF!
1,000,000.00
#REF!
1.
2.
3.
4.
PEK. GORONG-GORONG
Galian Tanah
Pasangan Batu Kali 1:4
Plesteran 1:3
Gorong-Gorong o 30 cm
4.56
3.11
6.00
5.00
m3
m3
m2
bh
A.1
G. 32.h
G. 50.k
Taksir
50,000.00
Jumlah
250,000.00
250,000.00
167.83 m3
167.83 m3
621.25 m2
A.1
G. 32. H
G. 50. K
150,000.00
300,000.00
100,000.00
100,000.00
Jumlah
150,000.00
300,000.00
100,000.00
100,000.00
650,000.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
1,800,000.00
#REF!
#REF!
250,000.00
650,000.00
#REF!
178,000,000.00
V.
VI.
PEKERJAAN TALUD
SEP. 517.5 M'
1. Galian Tanah
2. Pasangan Batu Kali 1:4
3. Plesteran 1:3
Jumlah
VII.
1.
2.
3.
4.
PEKERJAAN LAIN-LAIN
Administrasi Kontrak
Adm. Progres dan Pelaporan
Adm. Photo Dokumentasi
P3K /Keamanan
Ls
Ls
Ls
Ls
Taksir
Taksir
Taksir
Taksir
REKAPITULASI :
I.
II.
III.
IV.
V.
VI.
VII.
PEKERJAAN PERSIAPAN
PEKERJAAN PLAT BETON 2 BUAH
PEK. GALIAN SALURAN PEMBAWA/PEMBUANGAN SEP. 2.677
PEKERJAAN PINTU AIR 1 BUAH
PEKERJAAN GORONG-GORONG
PEKERJAAN TALUD SEP.517,5 M'
PEKERJAAN LAIN-LAIN
JUMLAH
DIBULATKAN
Terbilang : ( Seratus Tujuh Puluh Delapan Juta Rupiah,- )
RIDWAN KARIM,SE.
Direktur
DAFTAR ANALISA
Anl.A.1
Anl.A.2
Anl.A.18 a
@
@
Rp.
Rp.
25,000.00
42,000.00
Jumlah..
Dibulatkan
=
=
=
=
Rp.
Rp.
Rp.
Rp.
18,750.00
1,050.00
19,800.00
20,850.00
@
@
Rp.
Rp.
42,000.00
Jumlah..
Dibulatkan
=
=
=
=
Rp.
Rp.
Rp.
Rp.
1,386.00
1,386.00
2,772.00
@
@
@
Rp.
Rp.
Rp.
70,000.00
42,000.00
42,000.00
Jumlah..
Dibulatkan
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
84,000.00
12,600.00
420.00
96,600.00
97,020.00
1 m2 Cetakan Beton :
0.200 Org Pekerja
0.010 Org Mandor
0.050 Org Kepala Tukang
0.500 Org Tukang Kayu
0.400 Kg
Paku
0.040 M3
Papan Bakesting
@
@
@
@
@
@
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
25,000.00
37,000.00
40,000.00
37,000.00
7,000.00
23,000.00
Jumlah..
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
5,000.00
370.00
2,000.00
18,500.00
2,800.00
920.00
29,590.00
Rp.
25,000.00 = Rp.
100,000.00
@
@
@
@
Rp.
Rp.
Rp.
Rp.
4
Anl. F.8
Anl.F.8a
Anl. F.8b
4.000 Kg
0.455 m3
Anl.G.1
Anl.G.14
Anl.G.32.m :
10 Anl.G.41
#REF!
#REF!
#REF!
#REF!
Jumlah..
#REF!
Rp.
#REF!
Rp.
#REF!
Jumlah..
Dibulatkan
=
=
=
=
Rp.
Rp.
Rp.
Rp.
=
=
=
=
Rp.
Rp.
Rp.
Rp.
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
@
@
@
Rp.
Rp.
Rp.
711.00
80,000.00
Jumlah..
Dibulatkan
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
1,066.50
96,000.00
97,066.50
97,066.50
1 m3 Bahan perekat
8.500 Org Mandor
0.540 m3
m3 Batu kali
@
@
Rp.
Rp.
10,000.00
Jumlah..
Dibulatkan
=
=
=
=
Rp.
Rp.
Rp.
Rp.
85,000.00
85,000.00
85,000.00
@
@
@
@
@
@
@
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
25,000.00
37,000.00
37,000.00
40,000.00
80,000.00
28,000.00
45,000.00
Jumlah..
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
90,000.00
6,660.00
44,400.00
4,800.00
96,000.00
141,736.00
23,490.00
407,086.00
@
@
@
@
@
@
@
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
25,000.00
37,000.00
40,000.00
37,000.00
70,000.00
45,000.00
28,000.00
Jumlah..
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
150,000.00
11,100.00
4,000.00
37,000.00
57,400.00
24,300.00
224,000.00
507,800.00
- = Rp.
Jumlah.. = Rp.
Dibulatkan
= Rp.
380,850.00
888,650.00
1,269,500.00
0.750
11 Anl.G.41.a
0.750
12 Anl.G 44
13 Anl.G 50h
14 Anl.G.50.k
15 Anl.G 50n
16 Anl.I.2
1 m3 Beton Cor
6.000 Org
0.300 Org
0.050 Org
0.500 Org
1.000 m3
0.500 m3
4.240 Zak
10,000.00
Jumlah..
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
60,000.00
60,000.00
25,000.00 = Rp.
Jumlah.. = Rp.
Dibulatkan
= Rp.
45,000.00
105,000.00
150,000.00
1:3:5
Pekerja
Mandor
Kepala Tukang
Tukang Batu
Kerikil
Pasir Pasangan
semen
@
@
@
@
@
@
@
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Jumlah..
Dibulatkan
=
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
1 m2 Plasteran 1 : 2
0.400 Org Pekerja
0.020 Org Mandor
0.015 Org Kepala Tukang
0.150 Org Tukang Batu
0.017 m3
Pasir Pasangan
0.215 Zak semen
@
@
@
@
@
@
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Jumlah..
Dibulatkan
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
1 m2 Plesteran 1 : 3 :
0.400 Org Pekerja
0.020 Org Mandor
0.150 Org Tukang
0.015 Org Kepala Tukang
0.134 Zak Semen
0.013 M3
Pasir Pasangan
@
@
@
@
@
@
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
25,000.00
37,000.00
37,000.00
40,000.00
28,000.00
45,000.00
Jumlah..
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
1 m2 Plasteran 1 : 4
0.400 Org Pekerja
0.020 Org Mandor
0.015 Org Kepala Tukang
0.150 Org Tukang Batu
0.021 m3
Pasir Pasangan
0.130 Zak semen
@
@
@
@
@
@
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Jumlah..
Dibulatkan
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
@
@
@
Rp.
Rp.
Rp.
37,000.00 = Rp.
40,000.00 = Rp.
25,000.00 = Rp.
333,000.00
120,000.00
225,000.00
@
@
Rp.
Rp.
6,200.00 = Rp.
7,000.00 = Rp.
Jumlah.. = Rp.
620,000.00
14,000.00
1,312,000.00
= Rp.
13,120.00
Untuk 1 m2 =
18 Anl.Supl. V
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
@
@
@
@
@
@
@
1/10
1,312,000.00
@
@
@
@
@
@
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Jumlah..
Dibulatkan
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
10,000.00
740.00
5,550.00
600.00
3,752.00
585.00
21,227.00
Rp.
1,269,500.00 = Rp.
1,269,500.00
222.000 kg
6.000 m2
0.125 Org
19 Anl.Supl. V a.
Analisa I.2
Analisa F.8
Analisa F.8a
@
@
@
Rp.
Rp.
Rp.
13,120.00
29,590.00
100,000.00
Jumlah..
Dibulatkan
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
2,912,640.00
177,540.00
12,500.00
190,040.00
202,540.00
@
@
@
@
Rp.
Rp.
Rp.
Rp.
1,269,500.00
13,120.00
29,590.00
100,000.00
Jumlah..
Dibulatkan
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
1,269,500.00
2,938,880.00
177,540.00
12,500.00
190,040.00
202,540.00
RIDWAN KARIM,SE.
Direktur
I. UPAH :
1.
2.
3.
4.
Pekerja
Tukang
Mandor
Kepala Tukang
Rp.
Rp.
Rp.
Rp.
50,000.00
75,000.00
75,000.00
150,000.00
/hari
/hari
/hari
/hari
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
600
110,000.00
3,500.00
4,500.00
35,000.00
12,000.00
80,000.00
5,000.00
2,500.00
/bh
/m3
/bh
/kg
/kg
/kg
/bh
/bh
/bh
Batu bata
Batu Kali
Baut kuda-kuda
Besi Beton
Cat minyak
Cat Polimik
Floor drain
Grendel jendela
Hak angin
NO
URAIAN PEKERJAAN
I.
1.
2.
3.
PEKERJAAN PERSIAPAN
Sewa Pondok Kerja
Uitzet/Pasang Profil
Pembersihan Lapangan
II.
1.
2.
3.
4.
5.
VOLUME
1.00 Unit
Ls
Ls
17.20
20.12
17.2
10.16
71.92
m3
m3
m3
m3
m2
ANALISA
Taksir
Taksir
Taksir
HARGA
SATUAN
(Rp)
JUMLAH
HARGA
(Rp)
800,000.00
500,000.00
500,000.00
Jumlah
800,000.00
500,000.00
500,000.00
1,800,000.00
#REF!
#REF!
-
#REF!
#REF!
#REF!
A.1
A.18
G.32.h
Supl. V
G.50.k
Jumlah
2,677.10 m3
669.02 m3
A.1
1/4 A.1
Jumlah
IV.
1.
2.
3.
4.
5.
7.30
11.20
0.28
8.53
1.00
m3
m3
m3
m2
bh
A.1
G.32.h
Supl. V
G. 50.k
Taksir
#REF!
#REF!
### 1,000,000.00
Jumlah
#REF!
V.
1.
2.
3.
4.
PEK. GORONG-GORONG
Galian Tanah
Pasangan Batu Kali 1:4
Plesteran 1:3
Gorong-Gorong o 30 cm
4.56
3.11
6.00
5.00
m3
m3
m2
bh
A.1
G. 32.h
G. 50.k
Taksir
50,000.00
Jumlah
250,000.00
250,000.00
167.83 m3
167.83 m3
621.25 m2
A.1
G. 32. H
G. 50. K
150,000.00
150,000.00
Jumlah
VII.PEKERJAAN LAIN-LAIN
1. Administrasi Kontrak
Ls
Taksir
Ls
Ls
Ls
Taksir
Taksir
Taksir
300,000.00
100,000.00
100,000.00
Jumlah
300,000.00
100,000.00
100,000.00
650,000.00
REKAPITULASI :
I. PEKERJAAN PERSIAPAN
II. PEKERJAAN PLAT BETON 2 BUAH
III. PEK. GALIAN SALURAN PEMBAWA/PEMBUANGAN SEP. 2.677
IV. PEKERJAAN PINTU AIR 1 BUAH
V. PEKERJAAN GORONG-GORONG
VI. PEKERJAAN TALUD SEP.517,5 M'
VII.PEKERJAAN LAIN-LAIN
JUMLAH
DIBULATKAN
Terbilang : ( Seratus Tujuh Puluh Delapan Juta Rupiah,- )
Rp. 1,800,000.00
Rp.
#REF!
Rp.
Rp.
#REF!
Rp.
250,000.00
Rp.
Rp.
650,000.00
Rp.
#REF!
Rp.
###
RIDWAN KARIM,SE.
Direktur
Oktober 2002
NO
URAIAN PEKERJAAN
PEKERJAAN TAMBAH
A
1
2
3
4
5
6
7
8
9
B
1
2
3
4
5
Pekerjaan Selasar
Batu bata
Tanah timbun
Pasir pasang
Semen
Ongkos kerja
C
1
2
3
4
5
6
7
8
1
2
3
4
5
E
1
2
3
4
5
6
7
F
1
2
3
4
5
6
VOLUME
65.00
235.00
8.00
2.00
8.00
8.00
123.00
65.00
608.00
Lbr
kg
btg
ktk
bh
bh
btg
m2
m2
2,560.00
76.00
4.00
15.00
Ls
Bh
m3
m3
Zak
260.00
16.00
40.00
15.00
5.00
12.00
10.00
910.00
Kg
kg
kg
kg
bh
ltr
lbr
m2
18.00
3.00
16.00
6.00
18.00
m2
m3
m3
zak
m2
8,540.00
16.00
70.00
14.00
15.00
10.00
85.80
Bh
m3
zak
btg
btg
lbr
m2
250.00
5.00
2.00
6.00
1.00
1.00
m'
bh
bh
btg
unit
paket
I. UPAH :
1.
2.
3.
4.
Pekerja
Tukang
Mandor
Kepala Tukang
Rp.
Rp.
Rp.
Rp.
50,000.00
75,000.00
75,000.00
120,000.00
/hari
/hari
/hari
/hari
Batu bata
Batu Kali
Baut kuda-kuda
Besi Beton
Cat minyak
Cat dasar
Cat Polimik
Dempul
Floor drain
Grendel jendela
Hak angin
Kawat Beton
Kawat Beton
Kayu klas I
Kayu klas II
Kayu perancah
Kerikil Bersih
Kertas pasir
Kloset jongkok
Kunci pintu Lesa
Keramik 30x30 cm
Keramik 20x20 cm
Paku Kayu 2" - 5"
Papan Bekesting
Papan Lesplank
Pasir Pasangan
Rabung seng
Semen
Seng spordex
Tanah Timbun
Triplek 4 mm
Pasir urug
Les Profil
Paku seng
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
600
150,000.00
3,500.00
4,500.00
35,000.00
35,000.00
15,000.00
12,000.00
80,000.00
5,000.00
2,500.00
7,000.00
7,500.00
3,100,000.00
2,700,000.00
1,500,000.00
90,000.00
2,000.00
123,000.00
150,000.00
7,500.00
2,500.00
5,800.00
23,000.00
1,500,000.00
100,000.00
12,000.00
27,500.00
65,000.00
34,000.00
45,000.00
100,000.00
2,500.00
14,000.00
/bh
/m3
/bh
/kg
/kg
/kg
/kg
/kg
/bh
/bh
/bh
/kg
/kg
/m3
/m3
/m3
/m3
/lbr
/bh
/bh
/bh
/bh
/kg
/m2
/m2
/m3
/lbr
/zak
/lbr
/m3
/lbr
/m3
/m'
/kg
RIDWAN KARIM,SE.
Direktur
NO
I.
URAIAN PEKERJAAN
II.
VOLUME
122.40 m3
24.48 m3
ANALISA
HARGA
SATUAN
(Rp)
Taksir
Taksir
27,000.00
46,000.00
Jumlah
1.
a
b
c
d
21.12
14.78
8.45
13.73
20.69
m3
m3
m3
m3
Zak
Taksir
Taksir
Taksir
Taksir
92,000.00
46,000.00
83,000.00
23,000.00
Jumlah
III.
a
b
c
d
e
f
g
h
Sloof 20x30 cm
Kerikil
Pasir beton
Semen
Besi 14 mm
Besi 8 mm
Papan
Lat 2x5cm
Paku 2"-3"
3.618
2.89
1.77
36.18
37.00
52.00
39.00
22.00
15.00
m3
m3
m3
Zak
btg
btg
lbr
btg
kg
Taksir
Taksir
Taksir
536.5
232.44
Taksir
Taksir
Taksir
83,000.00
46,000.00
23,000.00
4,000.00
4,000.00
23,000.00
7,000.00
4,500.00
Jumlah
IV
a
b
c
d
f
g
h
i
j
21.60
17.28
10.58
194.40
230.00
153.00
56.00
25.00
30.00
56.00
m3
m3
m3
Zak
btg
btg
lbr
btg
kg
btg
Taksir
Taksir
Taksir
8234
725.22
Taksir
Taksir
Taksir
Taksir
83,000.00
46,000.00
23,000.00
4,000.00
4,000.00
23,000.00
7,000.00
4,500.00
20,000.00
Jumlah
V
a
b
c
d
f
g
h
i
1.79
1.43
0.88
12.14
28.00
25.00
25.00
35.00
20.00
m3
m3
m3
Zak
btg
btg
btg
lbr
kg
Taksir
Taksir
Taksir
Taksir
299.6
118.5
Taksir
Taksir
Taksir
1.72 m3
83,000.00
46,000.00
23,000.00
4,000.00
4,000.00
7,000.00
23,000.00
4,500.00
Jumlah
a
b
c
d
f
g
i
Kerikil
Pasir beton
Semen
Besi 12 mm
Besi 8 mm
Papan
Paku 2"-3"
1.38
0.84
11.72
76.00
42.00
25.00
15.00
m3
m3
Zak
btg
btg
lbr
kg
Taksir
Taksir
Taksir
820.8
199.08
Taksir
Taksir
83,000.00
83,000.00
23,000.00
4,000.00
4,000.00
23,000.00
4,500.00
Jumlah
Pondasi tangga
Kerikil
Pasir beton
Semen
Besi 16 mm
Besi 19 mm
Papan
Paku 2"-3"
0.50
0.40
0.25
3.40
6.00
9.00
25.00
15.00
m3
m3
m3
Zak
btg
btg
lbr
kg
Taksir
Taksir
Taksir
114
240.3
Taksir
Taksir
83,000.00
46,000.00
23,000.00
4,000.00
4,000.00
23,000.00
4,500.00
Jumlah
VIII.
a
b
c
d
f
h
i
j
3.58
2.86
1.75
32.18
59.00
31.00
25.00
25.00
25.00
m3
m3
m3
Zak
btg
btg
btg
lbr
kg
Taksir
Taksir
Taksir
1121
146.94
Taksir
Taksir
Taksir
83,000.00
46,000.00
23,000.00
4,000.00
4,000.00
7,000.00
23,000.00
4,500.00
Jumlah
IX.
a
b
c
d
e
f
g
h
i
j
1.86
1.49
0.91
16.77
31.00
3.00
2.00
25.00
20.00
8.00
10.00
m3
m3
m3
Zak
btg
btg
btg
btg
btg
lbr
kg
Taksir
Taksir
Taksir
589
32.1
9.48
Taksir
Taksir
Taksir
Taksir
83,000.00
46,000.00
23,000.00
4,000.00
4,000.00
4,000.00
7,000.00
23,000.00
23,000.00
4,500.00
Jumlah
X.
a
b
c
d
e
f
22.44
17.95
11.00
201.96
125.00
28.00
165.00
m3
m3
m3
Zak
btg
btg
btg
Taksir
Taksir
Taksir
4475
299.6
782.1
83,000.00
46,000.00
23,000.00
4,000.00
4,000.00
4,000.00
VII
a
b
c
d
f
g
i
g Papan
h Lat 2x5cm
i Paku 2"-3"
121.00 lbr
81.00 btg
60.00 kg
Taksir
Taksir
Taksir
23,000.00
7,000.00
4,500.00
Jumlah
XI.
a
b
c
d
f
g
h
i
10.26
8.21
5.03
92.34
65.00
118.00
88.00
85.00
60.00
m3
m3
m3
Zak
btg
btg
lbr
btg
kg
Taksir
Taksir
Taksir
1735.5
559.32
Taksir
Taksir
Taksir
83,000.00
46,000.00
23,000.00
4,000.00
4,000.00
23,000.00
7,000.00
4,500.00
Jumlah
XII.
a
b
c
d
d
f
g
h
i
1.70
1.36
0.83
15.30
12.00
4.00
17.00
15.00
8.00
10.00
m3
m3
m3
Zak
btg
btg
btg
lbr
btg
kg
Taksir
Taksir
Taksir
228
42.8
80.58
Taksir
Taksir
Taksir
83,000.00
46,000.00
23,000.00
4,000.00
4,000.00
4,000.00
23,000.00
7,000.00
4,500.00
XIII.
a
b
c
d
f
g
h
i
3.71
2.96
1.82
33.35
34.00
51.00
38.00
7.00
15.00
m3
m3
m3
Zak
btg
btg
lbr
btg
kg
Taksir
Taksir
Taksir
907.8
241.74
Taksir
Taksir
Taksir
83,000.00
46,000.00
23,000.00
4,000.00
4,000.00
23,000.00
7,000.00
4,500.00
Jumlah
XIV.
a
b
c
d
d
f
g
h
i
0.57
0.46
0.28
5.13
5.00
4.00
7.00
3.00
2.00
3.00
m3
m3
m3
Zak
btg
btg
btg
lbr
btg
kg
Taksir
Taksir
Taksir
133.5
42.8
33.18
Taksir
Taksir
Taksir
83,000.00
46,000.00
23,000.00
4,000.00
4,000.00
4,000.00
23,000.00
7,000.00
4,500.00
58.15 m3
a
b
c
d
d
f
g
h
i
j
k
Kerikil
Pasir beton
Semen
Besi 10 mm
Kayu stut dolken
Gelagar kayu 5x10 cm
Kayu 5x7 cm
Papan
Triplek t= 4 mm
Lat 2x5cm
Paku 2"-3"
46.52
28.49
523.33
1,120.00
1,100.00
205.00
100.00
598.00
190.00
837.00
100.00
m3
m3
Zak
btg
btg
btg
btg
lbr
lbr
btg
kg
Taksir
Taksir
Taksir
8288
Taksir
Taksir
Taksir
Taksir
Taksir
Taksir
Taksir
119.29
7,900.00
5.33
54.02
m2
bh
m3
zak
Taksir
Taksir
Taksir
Taksir
238.58 m2
2.62 m3
33.40 zak
Taksir
Taksir
46,000.00
23,000.00
Jumlah
m2
bh
m3
zak
Taksir
Taksir
Taksir
200.00
46,000.00
23,000.00
Jumlah
859.06 m2
2.58 m3
61.85 zak
Taksir
Taksir
46,000.00
23,000.00
Jumlah
3,500.00
46,000.00
23,000.00
Jumlah
439.61
31,860.00
19.63
33.46
300.00
3,333.00
8.40
147.00
m2
bh
m3
zak
Taksir
Taksir
Taksir
53.50
44.00
32.00
2.00
2.00
100.00
38.00
4.00
6.00
68.00
btg
btg
unit
unit
unit
m2
bh
bh
bh
bh
Taksir
Taksir
Taksir
Taksir
Taksir
Taksir
Taksir
Taksir
Taksir
Taksir
83,000.00
46,000.00
23,000.00
4,000.00
8,000.00
35,000.00
20,000.00
23,000.00
24,000.00
7,000.00
4,500.00
Jumlah
200.00
46,000.00
23,000.00
Jumlah
5.00 unit
3.00 unit
Taksir
Taksir
310.00
155.00
31.00
20.00
10.00
4.00
50.00
6.00
25.00
188.00
250.00
lbr
btg
btg
kg
kg
ktk
btg
ktk
kg
kg
kg
Taksir
Taksir
Taksir
Taksir
Taksir
Taksir
Taksir
Taksir
Taksir
Taksir
Taksir
9,000.00
20,000.00
15,000.00
4,500.00
4,500.00
15,000.00
7,000.00
25,000.00
16,000.00
11,000.00
11,000.00
Jumlah
TOTAL
Pekerja
Tukang
Mandor
Kepala Tukang
25,000.00
37,000.00
37,000.00
40,000.00
BAHAN - BAHAN :
1.
2
3
4
5
6
7
8
9
10
11
12
Batu Kali
Besi Beton
Kawat Beton
Kerikil Bersih
Paku Kayu 2" - 5"
Papan Bekesting
Pasir Pasangan
Semen
Tanah Timbun
Pasir urug
Kayu perancah
Lat kayu 2x5 cm
92,000.00
4,000.00
5,000.00
83,000.00
4,500.00
23,000.00
46,000.00
23,000.00
27,000.00
46,000.00
20,000.00
7,000.00
8,000.00
20,000.00
35,000.00
24,000.00
200.00
3,500.00
JUMLAH
HARGA
(Rp)
3,304,800.00
1,126,080.00
4,430,880.00
1,360,128.00
388,608.00
1,139,424.00
475,870.00
3,364,030.00
240,235.20
81,549.72
832,140.00
2,146,000.00
929,760.00
897,000.00
154,000.00
67,500.00
5,348,184.92
1,434,240.00
486,864.00
4,471,200.00
32,936,000.00
2,900,880.00
1,288,000.00
175,000.00
135,000.00
1,120,000.00
44,947,184.00
118,590.40
40,256.44
279,330.40
1,198,400.00
474,000.00
175,000.00
805,000.00
90,000.00
3,180,577.24
114,473.60
70,115.08
269,633.60
3,283,200.00
796,320.00
575,000.00
67,500.00
5,176,242.28
33,200.00
11,270.00
78,200.00
456,000.00
961,200.00
575,000.00
67,500.00
2,182,370.00
237,446.40
80,603.04
740,232.00
4,484,000.00
587,760.00
175,000.00
575,000.00
112,500.00
6,992,541.44
123,703.20
41,992.02
385,641.00
2,356,000.00
128,400.00
37,920.00
175,000.00
460,000.00
184,000.00
45,000.00
3,937,656.22
1,490,016.00
505,797.60
4,645,080.00
17,900,000.00
1,198,400.00
3,128,400.00
2,783,000.00
567,000.00
270,000.00
32,487,693.60
681,264.00
231,260.40
2,123,820.00
6,942,000.00
2,237,280.00
2,024,000.00
595,000.00
270,000.00
15,104,624.40
112,880.00
38,318.00
351,900.00
912,000.00
171,200.00
322,320.00
345,000.00
56,000.00
45,000.00
2,354,618.00
246,012.00
83,510.70
766,935.00
3,631,200.00
966,960.00
874,000.00
49,000.00
67,500.00
6,685,117.70
37,848.00
12,847.80
117,990.00
534,000.00
171,200.00
132,720.00
69,000.00
14,000.00
13,500.00
1,103,105.80
3,861,027.20
1,310,655.92
12,036,636.00
33,152,000.00
8,800,000.00
7,175,000.00
2,000,000.00
13,754,000.00
4,560,000.00
5,859,000.00
450,000.00
92,958,319.12
1,580,000.00
245,064.60
1,242,525.83
3,067,590.44
120,721.48
768,227.60
888,949.08
6,372,000.00
903,117.20
769,599.44
8,044,716.63
118,550.28
1,422,603.36
1,541,153.64
11,665,500.00
386,400.00
3,381,000.00
15,432,900.00
2,790,000.00
3,100,000.00
465,000.00
90,000.00
45,000.00
60,000.00
350,000.00
150,000.00
400,000.00
2,068,000.00
2,750,000.00
12,268,000.00
271,496,454.51
/hari
/hari
/hari
/hari
/m3
/kg
/kg
/kg
/kg
/lbr
/m2
/m3
/zak
/m3
/btg
/btg
/btg
/btg
/btg
/lbr
/bh
/bh
1
VI
1
2
3
2
PEKERJAAN KANOPY
Rangka kuda-kuda kayu kanopy
Baut kuda-kuda 1/2" x 7 inci
Seng Spordex
VII
1
2
3
4
5
6
7
1.25 m3
35 bh
101.5 m2
F.22
Taksir
H.8
5,929,160.00
7,500.00
68,695.00
Jumlah
7,411,450.00
262,500.00
6,972,542.50
14,646,492.50
5,929,160.00
7,500.00
68,695.00
300,000.00
15,000.00
190,810.00
7,000,000.00
Jumlah
26,621,928.40
262,500.00
24,043,250.00
4,680,000.00
3,975,000.00
50,373,840.00
14,000,000.00
123,956,518.40
VIII
1.
2.
3.
4.
5.
PEKERJAAN PENGECATAN
Cat dinding batu bata
Cat kosen pintu dan jendela
Cat plafon
Cat lesplank dan kanopy
Cat pagar besi atas dan lening tangga
A.1
G.32.h
Supl. V
G. 50.k
Taksir
36,625.00
32,170.00
36,625.00
32,170.00
32,170.00
Jumlah
38,925,050.00
3,218,608.50
9,669,000.00
2,605,448.30
935,181.90
55,353,288.70
Taksir
Taksir
500,000.00
150,000.00
Jumlah
4,500,000.00
3,750,000.00
8,250,000.00
Supl. III
Supl. IIIa
149,912.50
154,862.50
Jumlah
22,486,875.00
25,617,354.75
48,104,229.75
75,000.00
100,000.00
65,000.00
80,000.00
150,000.00
65,000.00
123,000.00
75,000.00
2,000,000.00
Jumlah
825,000.00
100,000.00
325,000.00
480,000.00
150,000.00
520,000.00
984,000.00
900,000.00
2,000,000.00
6,284,000.00
3,000.00
4,000.00
6,000.00
45,000.00
5,400.00
15,000.00
12,500.00
15,000.00
500.00
1,500.00
1,000.00
300.00
100.00
9,000.00
400,000.00
15,000.00
3,000.00
Jumlah
4,500,000.00
1,000,000.00
600,000.00
3,915,000.00
64,800.00
210,000.00
237,500.00
210,000.00
23,500.00
345,000.00
55,000.00
22,500.00
100,000.00
72,000.00
400,000.00
150,000.00
36,000.00
11,941,300.00
1062.80
100.05
264.00
80.99
29.07
m2
m2
m2
m2
m2
150.00 m3
165.42 m3
Taksir
11.00
LS
5.00
6.00
LS
8.00
8.00
12.00
1.00
btg
bh
bh
bh
Unit
Taksir
Taksir
Taksir
Taksir
Taksir
Taksir
Taksir
Taksir
Taksir
1500.00
250.00
100.00
87.00
12.00
14.00
19.00
14.00
47.00
230.00
55.00
75.00
1000.00
8.00
1.00
10.00
12.00
m'
m'
m'
bh
bh
bh
bh
bh
bh
m'
bh
bh
bh
glg
bh
bh
bh
Taksir
Taksir
Taksir
Taksir
Taksir
Taksir
Taksir
Taksir
Taksir
Taksir
Taksir
Taksir
Taksir
Taksir
Taksir
Taksir
Taksir
btg
btg
TIME SCHEDULE
PEKERJAAN
aaasddsd
NO
URAIAN PEKERJAAN
1
I.
II.
III.
IV.
V.
VI.
VII.
OKTOBER
2
3
NOPEMBER
2
3
DESEMBER
2
3
JANUARI
2
3
KETERANGAN
4
PEKERJAAN PERSIAPAN
PEKERJAAN PLAT BETON 2 BUAH
PEK. GALIAN SALURAN PEMBAWA/PEMBUANGAN SEP. 2.677
PEKERJAAN PINTU AIR 1 BUAH
PEKERJAAN GORONG-GORONG
PEKERJAAN TALUD SEP.517,5 M'
PEKERJAAN LAIN-LAIN
Kontraktor/pemborong
CV. BUKET UTAMA
RIDWAN KARIM,SE.
Direktur
JUMLAH
HARGA
(Rp)
6
NO
URAIAN PEKERJAAN
VOLUME
ANALISA
1.00 Unit
Ls
Ls
Taksir
Taksir
Taksir
500,000.00
1,500,000.00
500,000.00
Jumlah
500,000.00
1,500,000.00
500,000.00
2,500,000.00
A.1
1/4 A1
A.18 a
39,375.00
9,843.75
135,750.00
Jumlah
3,543,750.00
177,187.50
1,221,750.00
4,942,687.50
G.41
G.33 m
1,325,275.00
813,100.00
Jumlah
3,313,187.50
7,317,900.00
10,631,087.50
Supl. III
149,912.50
Jumlah
22,486,875.00
22,486,875.00
Taksir
Taksir
300,000.00
200,000.00
Jumlah
I.
1.
2.
3.
PEKERJAAN PERSIAPAN
Sewa Pondok Kerja
Pasang Bowplank
Pembersihan Lapangan
II.
1
2
3
PEKEKERJAAN TANAH
Galian Tanah pondasi
Timbunan Tanah kembali
Timbunan Tanah urugan
1
2
V PEKERJAAN LAIN-LAIN
1. Administrasi Kontrak
4. P3K /Keamanan
90.00 m3
18 m3
9 m3
150.00 m3
3
Ls
Ls
REKAPITULASI :
I. PEKERJAAN PERSIAPAN
II. PEKEKERJAAN TANAH
III. PEKEKERJAAN PASANGAN DAN PLASTERAN
IV. PEKERJAAN LANTAI TERAS
V PEKERJAAN LAIN-LAIN
XI KECAMATAN PERMATA, KABUPATEN BENER MERIAH
XII Pembersihan Lapangan
XIII PEKERJAAN LAIN-LAIN
JUMLAH
DIBULATKAN
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
300,000.00
200,000.00
500,000.00
2,500,000.00
4,942,687.50
10,631,087.50
22,486,875.00
500,000.00
1,500,000.00
22,486,875.00
500,000.00
65,547,525.00
65. 550.000.00,-
Terbilang : ( Enam Puluh Lima Juta Lima Ratus Lima Puluh Ribu Rupiah,- )
### m
2 m
3 anak tangga teras
teras
22 m x 2 m
2 m
20m x 2m
RUANG SHALAT
teras
### m
SAWAH PENDUDUK
teras
22m x 2 m
2 m
3 anak tangga teras
### m
2 m
ke buntul
ke simpang tiga
I-02
I-03
I-04
I-05
URAIAN
HARGA
(Rp)
362,250.00
13,778.80
5,018.10
20,410.00
10,500.00
7,800.00
900.00
1,000.00
421,656.90
421,657.00
338,940.00
14,060.00
5,018.10
23,550.00
10,920.00
8,125.00
937.50
1,040.00
402,590.60
402,591.00
73,140.00
1,687.20
700.20
1,570.00
2,520.00
1,950.00
225.00
240.00
82,032.40
82,032.00
86,247.00
2,319.90
746.88
1,570.00
3,780.00
5,850.00
675.00
360.00
101,548.78
101,549.00
56,000.00
11,248.00
I-06
I-07
I-08
I-09
I-10
Pasir pasang
M3
0.0215
233,400.00
Semen warn
Kg
0.0130
15,700.00
Pekerja
Oh
0.2500
42,000.00
Tukang batu
Oh
0.1200
65,000.00
Kepala tuka
Oh
0.0120
75,000.00
Mandor
Oh
0.0125
80,000.00
Jumlah
Dibulatkan
1 M2 Lantai Keramik corak 20 x 20 cm setara Mulia
Keramik cor
m2
1.0000
62,500.00
Semen portl
Kg
8.0000
1,406.00
Pasir pasang
M3
0.0215
233,400.00
Semen warn
Kg
0.0130
15,700.00
Pekerja
Oh
0.2500
42,000.00
Tukang batu
Oh
0.1200
65,000.00
Kepala tuka
Oh
0.0120
75,000.00
Mandor
Oh
0.0125
80,000.00
Jumlah
Dibulatkan
1 M2 Lantai Keramik polos 30 x 30 cm setara Mulia
Keramik pol
m2
1.0000
53,000.00
Semen portl
Kg
8.0000
1,406.00
Pasir pasang
M3
0.0215
233,400.00
Semen warn
Kg
0.0130
15,700.00
Pekerja
Oh
0.2500
42,000.00
Tukang batu
Oh
0.1200
65,000.00
Kepala tuka
Oh
0.0120
75,000.00
Mandor
Oh
0.0125
80,000.00
Jumlah
Dibulatkan
1 M2 Lantai Keramik corak 30 x 30 cm Setara Mulia
Keramik cor
m2
1.0000
58,000.00
Semen portl
Kg
8.0000
1,406.00
Pasir pasang
M3
0.0215
233,400.00
Semen warn
Kg
0.0130
15,700.00
Pekerja
Oh
0.2500
42,000.00
Tukang batu
Oh
0.1200
65,000.00
Kepala tuka
Oh
0.0120
75,000.00
Mandor
Oh
0.0125
80,000.00
Jumlah
Dibulatkan
1 M2 Lantai Keramik polos 40 x 40 cm Setara Mulia
Keramik pol
m2
1.0000
56,800.00
Semen portl
Kg
8.0000
1,406.00
Pasir pasang
M3
0.0215
233,400.00
Semen warn
Kg
0.0130
15,700.00
Pekerja
Oh
0.2500
42,000.00
Tukang batu
Oh
0.1200
65,000.00
Kepala tuka
Oh
0.0120
75,000.00
Mandor
Oh
0.0125
80,000.00
Jumlah
Dibulatkan
1 M2 Lantai Keramik corak 40 x 40 cm Setara Mulia
5,018.10
204.10
10,500.00
7,800.00
900.00
1,000.00
92,670.20
92,670.00
62,500.00
11,248.00
5,018.10
204.10
10,500.00
7,800.00
900.00
1,000.00
99,170.20
99,170.00
53,000.00
11,248.00
5,018.10
204.10
10,500.00
7,800.00
900.00
1,000.00
89,670.20
89,670.00
58,000.00
11,248.00
5,018.10
204.10
10,500.00
7,800.00
900.00
1,000.00
94,670.20
94,670.00
56,800.00
11,248.00
5,018.10
204.10
10,500.00
7,800.00
900.00
1,000.00
93,470.20
93,470.00
I-11
I-12
I-13
I-14
Keramik cor
m2
1.0000
65,500.00
Semen portl
Kg
8.0000
1,406.00
Pasir pasang
M3
0.0215
233,400.00
Semen warn
Kg
0.0130
15,700.00
Pekerja
Oh
0.2500
42,000.00
Tukang batu
Oh
0.1200
65,000.00
Kepala tuka
Oh
0.0120
75,000.00
Mandor
Oh
0.0125
80,000.00
Jumlah
Dibulatkan
1 M2 Lantai Keramik Corak 10 x 20 cm setara Roman
Keramik cor
m2
1.0000
72,200.00
Semen portl
Kg
8.0000
1,406.00
Pasir pasang
M3
0.0215
233,400.00
Semen warn
Kg
0.0130
15,700.00
Pekerja
Oh
0.2500
42,000.00
Tukang batu
Oh
0.1200
65,000.00
Kepala tuka
Oh
0.0120
75,000.00
Mandor
Oh
0.0125
80,000.00
Jumlah
Dibulatkan
1 M2 Lantai Keramik corak 20 x 20 cm setara Roman
Keramik cor
m2
1.0000
75,200.00
Semen portl
Kg
8.0000
1,406.00
Pasir pasang
M3
0.0215
233,400.00
Semen warn
Kg
0.0130
15,700.00
Pekerja
Oh
0.2500
42,000.00
Tukang batu
Oh
0.1200
65,000.00
Kepala tuka
Oh
0.0120
75,000.00
Mandor
Oh
0.0125
80,000.00
Jumlah
Dibulatkan
1 M2 Lantai Keramik polos 30 x 30 cm setara Roman
Keramik pol
m2
1.0000
68,900.00
Semen portl
Kg
8.0000
1,406.00
Pasir pasang
M3
0.0215
233,400.00
Semen warn
Kg
0.0130
15,700.00
Pekerja
Oh
0.2500
42,000.00
Tukang batu
Oh
0.1200
65,000.00
Kepala tuka
Oh
0.0120
75,000.00
Mandor
Oh
0.0125
80,000.00
Jumlah
Dibulatkan
1 M2 Lantai Keramik corak 30 x 30 cm Setara Roman
Keramik cor
M2
1.0000
76,600.00
Semen portl
Kg
8.0000
1,406.00
Pasir pasang
M3
0.0215
233,400.00
Semen warn
Kg
0.0130
15,700.00
Pekerja
Oh
0.2500
42,000.00
Tukang batu
Oh
0.1200
65,000.00
Kepala tuka
Oh
0.0120
75,000.00
Mandor
Oh
0.0125
80,000.00
Jumlah
65,500.00
11,248.00
5,018.10
204.10
10,500.00
7,800.00
900.00
1,000.00
102,170.20
102,170.00
72,200.00
11,248.00
5,018.10
204.10
10,500.00
7,800.00
900.00
1,000.00
108,870.20
108,870.00
75,200.00
11,248.00
5,018.10
204.10
10,500.00
7,800.00
900.00
1,000.00
111,870.20
111,870.00
68,900.00
11,248.00
5,018.10
204.10
10,500.00
7,800.00
900.00
1,000.00
105,570.20
105,570.00
76,600.00
11,248.00
5,018.10
204.10
10,500.00
7,800.00
900.00
1,000.00
113,270.20
I-15
I-16
I-17
I-18
I-19
Dibulatkan
1 M2 Lantai Keramik polos 40 x 40 cm setara Roman
Keramik pol
m2
1.0000
72,500.00
Semen portl
Kg
8.0000
1,406.00
Pasir pasang
M3
0.0215
233,400.00
Semen warn
Kg
0.0130
15,700.00
Pekerja
Oh
0.2500
42,000.00
Tukang batu
Oh
0.1200
65,000.00
Kepala tuka
Oh
0.0120
75,000.00
Mandor
Oh
0.0125
80,000.00
Jumlah
Dibulatkan
1 M2 Lantai Keramik corak 40 x 40 cm Setara Roman
Keramik cor
m2
1.0000
77,000.00
Semen portl
Kg
8.0000
1,406.00
Pasir pasang
M3
0.0215
233,400.00
Semen warn
Kg
0.0130
15,700.00
Pekerja
Oh
0.2500
42,000.00
Tukang batu
Oh
0.1200
65,000.00
Kepala tuka
Oh
0.0120
75,000.00
Mandor
Oh
0.0125
80,000.00
Jumlah
Dibulatkan
1 M2 Lantai Marmer
Marmer
m2
1.0600
550,000.00
Semen portl
Kg
8.1900
1,406.00
Pasir pasang
M3
0.0450
233,400.00
Semen warn
Kg
0.6500
15,700.00
Pekerja
Oh
0.7000
42,000.00
Tukang batu
Oh
0.3500
65,000.00
Kepala tuka
Oh
0.0350
75,000.00
Mandor
Oh
0.0350
80,000.00
Jumlah
Dibulatkan
1 M2 Lantai Parquet Jati
Parquet jati
M2
1.0500
375,400.00
Lem vinyl
Kg
0.6000
44,000.00
Pekerja
Oh
0.6500
42,000.00
Tukang
Oh
0.3500
65,000.00
Kepala tuka
Oh
0.0350
75,000.00
Mandor
Oh
0.0325
80,000.00
Jumlah
Dibulatkan
1 M Plint Keramik ukuran (10 x 40) cm
Plint kerami
Bh
2.6500
4,000.00
Semen portl
Kg
1.2000
1,406.00
Pasir pasang
M3
0.0030
233,400.00
Semen warn
Kg
0.1000
15,700.00
Pekerja
Oh
0.0600
42,000.00
Tukang batu
Oh
0.0300
65,000.00
Kepala tuka
Oh
0.0030
75,000.00
Mandor
Oh
0.0030
80,000.00
Jumlah
113,270.00
72,500.00
11,248.00
5,018.10
204.10
10,500.00
7,800.00
900.00
1,000.00
109,170.20
109,170.00
77,000.00
11,248.00
5,018.10
204.10
10,500.00
7,800.00
900.00
1,000.00
113,670.20
113,670.00
583,000.00
11,515.14
10,503.00
10,205.00
29,400.00
22,750.00
2,625.00
2,800.00
672,798.14
672,798.00
394,170.00
26,400.00
27,300.00
22,750.00
2,625.00
2,600.00
475,845.00
475,845.00
10,600.00
1,687.20
700.20
1,570.00
2,520.00
1,950.00
225.00
240.00
19,492.40
I-20
I-21
I-22
I-23
I-24
I-25
Dibulatkan
1 M Plint Keramik ukuran (10 x 30) cm
Plint kerami
Bh
3.5000
3,500.00
Semen portl
Kg
1.6500
1,406.00
Pasir pasang
M3
0.0032
233,400.00
Semen warn
Kg
0.1000
15,700.00
Pekerja
Oh
0.0900
42,000.00
Tukang batu
Oh
0.0900
65,000.00
Kepala tuka
Oh
0.0090
75,000.00
Mandor
Oh
0.0045
80,000.00
Jumlah
Dibulatkan
1 M' Plint kayu kamper Samarinda (2 x 10) cm
Papan kayu
M3
0.0024 8,724,300.00
Paku
Kg
0.0500
23,800.00
Pekerja
Oh
0.1200
42,000.00
Tukang batu
Oh
0.1200
65,000.00
Kepala tuka
Oh
0.0120
75,000.00
Mandor
Oh
0.0060
80,000.00
Jumlah
Dibulatkan
1 M' Plint keramik ukuran (10 x 20) cm
Plint kerami
Bh
5.3000
3,000.00
Semen abuKg
1.1400
1,406.00
Pasir pasang
M3
0.0030
233,400.00
Semen warn
Kg
0.0250
15,700.00
Pekerja
Oh
0.0900
42,000.00
Tukang batu
Oh
0.0900
65,000.00
Kepala tuka
Oh
0.0090
75,000.00
Mandor
Oh
0.0050
80,000.00
Jumlah
Dibulatkan
1 M2 Lantai karpet
Karpet
M2
1.0500
353,500.00
Lem
Kg
0.3500
35,700.00
Pekerja
Oh
0.1700
42,000.00
Tukang batu
Oh
0.1700
65,000.00
Kepala tuka
Oh
0.0170
75,000.00
Mandor
Oh
0.0085
80,000.00
Jumlah
Dibulatkan
1 M2 Paving block natural 8 cm
81,100.00
Paving block M2
1.050
Kg
233,400.00
Pasir pasang
0.100
Pekerja
Oh
42,000.00
0.2500
Tukang batu
Oh
65,000.00
0.5000
Kepala tuka
Oh
75,000.00
0.0250
Mandor
Oh
80,000.00
0.00250
Jumlah
Dibulatkan
1 M2 Paving block warna 8 cm
M2
108,600.00
Paving bloc
1.050
Kg
233,400.00
Pasir pasang
0.100
19,492.00
12,250.00
2,319.90
746.88
1,570.00
3,780.00
5,850.00
675.00
360.00
27,551.78
27,552.00
20,938.32
1,190.00
5,040.00
7,800.00
900.00
480.00
36,348.32
36,348.00
15,900.00
1,602.84
700.20
392.50
3,780.00
5,850.00
675.00
400.00
29,300.54
29,301.00
371,175.00
12,495.00
7,140.00
11,050.00
1,275.00
680.00
403,815.00
403,815.00
85,155.00
23,340.00
10,500.00
32,500.00
1,875.00
200.00
153,570.00
153,570.00
114,030.00
23,340.00
I-26
I-27
I-28
I-29
Pekerja
Oh
Tukang batu
Oh
Kepala tuka
Oh
Mandor
Oh
Jumlah
Dibulatkan
1 M2 Paving block natural 6 cm
Paving block M2
Kg
Pasir pasang
Pekerja
Oh
Tukang batu
Oh
Kepala tuka
Oh
Mandor
Oh
Jumlah
Dibulatkan
1 M2 Paving block warna 6 cm
M2
Paving bloc
Kg
Pasir pasang
Pekerja
Oh
Tukang batu
Oh
Kepala tuka
Oh
Mandor
Oh
Jumlah
Dibulatkan
1 M2 Grass Block 20 x 20
Bh
Grass block
Kg
Pasir pasang
Pekerja
Oh
Tukang batu
Oh
Kepala tuka
Oh
Mandor
Oh
Jumlah
Dibulatkan
1 M2 Grass Block 30 x 30
Bh
Grass block
Kg
Pasir pasang
Pekerja
Oh
Tukang batu
Oh
Kepala tuka
Oh
Mandor
Oh
Jumlah
Dibulatkan
0.2500
0.5000
0.0250
0.00250
42,000.00
65,000.00
75,000.00
80,000.00
10,500.00
32,500.00
1,875.00
200.00
182,445.00
182,445.00
1.050
0.100
0.2500
0.5000
0.0250
0.00250
76,000.00
233,400.00
42,000.00
65,000.00
75,000.00
80,000.00
79,800.00
23,340.00
10,500.00
32,500.00
1,875.00
200.00
148,215.00
148,215.00
1.050
0.100
0.2500
0.5000
0.0250
0.00250
86,000.00
233,400.00
42,000.00
65,000.00
75,000.00
80,000.00
90,300.00
23,340.00
10,500.00
32,500.00
1,875.00
200.00
158,715.00
158,715.00
26.250
0.100
0.2500
0.5000
0.0250
0.00250
9,700.00
233,400.00
42,000.00
65,000.00
75,000.00
80,000.00
254,625.00
23,340.00
10,500.00
32,500.00
1,875.00
200.00
323,040.00
323,040.00
11.670
0.100
0.2500
0.5000
0.0250
0.00250
22,500.00
233,400.00
42,000.00
65,000.00
75,000.00
80,000.00
262,575.00
23,340.00
10,500.00
32,500.00
1,875.00
200.00
330,990.00
330,990.00
C-02
C-03
C-04
C-05
URAIAN
C-06
C-07
C-08
C-09
Kepala Tuk
Oh
0.0850
75,000.00
6,375.00
Mandor
Oh
0.1500
80,000.00
12,000.00
Jumlah
2,020,939.00
Dibulatkan
2,020,939.00
1 M3 Pasang Pondasi Sumuran adk 1pc:2ps:3kr + 40 % Batu Belah (D= 1m)
Batu Belah
M3
0.4500
205,500.00
92,475.00
Semen Portl
Kg
280.0000
1,406.00
393,680.00
Pasir Beton
M3
0.4500
255,400.00
114,930.00
Koral Beton
M3
0.6700
211,100.00
141,437.00
Pekerja
Oh
2.3800
42,000.00
99,960.00
Tukang Bat
Oh
0.3000
65,000.00
19,500.00
Kepala Tuk
Oh
0.0300
75,000.00
2,250.00
Mandor
Oh
0.0800
80,000.00
6,400.00
Jumlah
870,632.00
Dibulatkan
870,632.00
1 M3 Pondasi siklop adk 1pc:2ps:3kr + 40 % Batu Belah
Batu Belah
M3
0.4500
205,500.00
92,475.00
Semen Portl
Kg
202.0000
1,406.00
284,012.00
Pasir Beton
M3
0.3200
255,400.00
81,728.00
Koral Beton
M3
0.4900
211,100.00
103,439.00
Pekerja
Oh
3.0000
42,000.00
126,000.00
Tukang Bat
Oh
0.8500
65,000.00
55,250.00
Kepala Tuk
Oh
0.0850
75,000.00
6,375.00
Mandor
Oh
0.1500
80,000.00
12,000.00
Jumlah
761,279.00
Dibulatkan
761,279.00
1 M' Pembuatan Tiang Pancang (40x40) cm, Beton Tulang
Pasir Urug
M3
0.0190
175,300.00
3,330.70
Pasir Beton
M3
0.0940
255,400.00
24,007.60
Koral Beton
M3
0.1500
211,100.00
31,665.00
Semen Portl
Kg
60.5000
1,406.00
85,063.00
Besi Beton
Kg
45.0000
16,500.00
742,500.00
Kawat Beto
Kg
0.9000
27,700.00
24,930.00
Kayu balok
M3
0.0320 2,640,000.00
84,480.00
Paku
Kg
0.1200
23,400.00
2,808.00
Minyak Beki
Ltr
0.0900
55,000.00
4,950.00
Plamir Tem
Kg
0.2400
25,000.00
6,000.00
Pekerja
Oh
1.0000
42,000.00
42,000.00
Tukang Bat
Oh
0.6700
65,000.00
43,550.00
Kepala Tuk
Oh
0.0670
75,000.00
5,025.00
Mandor
Oh
0.0500
80,000.00
4,000.00
Jumlah
1,104,309.30
Dibulatkan
1,104,309.00
1 M' Pembuatan Tiang Pancang (35x35) cm, Beton Tulang
Pasir Urug
M3
0.0160
175,300.00
2,804.80
Pasir Beton
M3
0.0800
255,400.00
20,432.00
Koral Beton
M3
0.1250
211,100.00
26,387.50
Semen Portl
Kg
49.0000
1,406.00
68,894.00
Besi Beton
Kg
34.5000
16,500.00
569,250.00
Kawat Beto
Kg
0.7000
27,700.00
19,390.00
Kayu balok
M3
0.0270 2,640,000.00
71,280.00
Paku
Kg
0.1200
23,400.00
2,808.00
Minyak Beki
Ltr
0.0900
55,000.00
4,950.00
C-10
C-11
C-12
C-13
Plamir Tem
Kg
0.2000
25,000.00
Pekerja
Oh
0.8000
42,000.00
Tukang Bat
Oh
0.5000
65,000.00
Kepala Tuk
Oh
0.0500
75,000.00
Mandor
Oh
0.0400
80,000.00
Jumlah
Dibulatkan
1 M' Pembuatan Tiang Pancang40 cm, Beton Tulang
Pasir Urug
M3
0.0149
175,300.00
Pasir Beton
M3
0.0738
255,400.00
Koral Beton
M3
0.1178
211,100.00
Semen Portl
Kg
47.4925
1,406.00
Besi Beton
Kg
45.0000
16,500.00
Kawat Beto
Kg
0.9000
27,700.00
Kayu balok
M3
0.0320 2,640,000.00
Paku
Kg
0.1200
23,400.00
Minyak Beki
Ltr
0.0900
55,000.00
Plamir Tem
Kg
0.2400
25,000.00
Pekerja
Oh
1.0000
42,000.00
Tukang Bat
Oh
0.6700
65,000.00
Kepala Tuk
Oh
0.0670
75,000.00
Mandor
Oh
0.0500
80,000.00
Jumlah
Dibulatkan
1 M' Memancang Tiang Pancang Beton Tulang
Crawler cra
jam
0.1170 1,078,774.00
Pekerja
Oh
42,000.00
0.0400
Mandor
Oh
80,000.00
0.0020
Jumlah
Dibulatkan
1 Buah Memotong Tiang Pancang (40x40) cm Beton Tulang
Pekerja
42,000.00
jam
3.3200
Kepala Tuk
75,000.00
jam
0.0700
Mandor
80,000.00
jam
0.2000
Alat bantu
160,690.00
lot
0.3500
Jumlah
Dibulatkan
1 M' Menyambung Tiang Pancang Beton Bertulang
14,100.00
Besi pelat
kg
18.3700
16,500.00
Besi beton
kg
6.06
Kawat las
kg
2.20
23,600.00
Tukang las
org
1.00
65,000.00
Pembantu tu
org
2.0000
42,000.00
80,000.00
Mandor
org
0.2000
26,325.00
Mesin las
jam
2.0000
Jumlah
Dibulatkan
5,000.00
33,600.00
32,500.00
3,750.00
3,200.00
864,246.30
864,246.00
2,614.60
18,845.97
24,857.03
66,774.46
742,500.00
24,930.00
84,480.00
2,808.00
4,950.00
6,000.00
42,000.00
43,550.00
5,025.00
4,000.00
1,073,335.05
1,073,335.00
126,216.56
1,680.00
160.00
128,056.56
128,057.00
139,440.00
5,250.00
16,000.00
56,241.50
216,931.50
216,932.00
259,017.00
99,990.00
51,920.00
65,000.00
84,000.00
16,000.00
52,650.00
628,577.00
628,577.00
B-02
B-03
B-04
B-05
B-06
B-07
B-08
B-09
B-10
URAIAN
SATUAN VOLUME
HARGA SATUAN HARGA
(Rp)
(Rp)
1 M3 Galian Tanah Biasa sedalam 1 m
Pekerja
Oh
0.4000 42,000.00
16,800.00
Mandor
Oh
0.0400 80,000.00
3,200.00
Jumlah
20,000.00
Dibulatkan
20,000.00
1 M3 Galian Tanah Biasa Sedalam 2 m
Pekerja
Oh
0.5260 42,000.00
22,092.00
Mandor
Oh
0.0520 80,000.00
4,160.00
Jumlah
26,252.00
Dibulatkan
26,252.00
1 M3 Galian Tanah Biasa Sedalam 3 m
Pekerja
Oh
0.7350 42,000.00
30,870.00
Mandor
Oh
0.0730 80,000.00
5,840.00
Jumlah
36,710.00
Dibulatkan
36,710.00
1 M3 Galian Tanah Keras Sedalam 1 m
Pekerja
Oh
0.6250 42,000.00
26,250.00
Mandor
Oh
0.0620 80,000.00
4,960.00
Jumlah
31,210.00
Dibulatkan
31,210.00
1 M3 Galian Tanah Lumpur Sedalam 1 m
Pekerja
Oh
0.8230 42,000.00
34,566.00
Mandor
Oh
0.0830 80,000.00
6,640.00
Jumlah
41,206.00
Dibulatkan
41,206.00
1 M2 Pekerjaan Stripping Setinggi 10 cm
Pekerja
Oh
0.0500 42,000.00
2,100.00
Mandor
Oh
0.0050 80,000.00
400.00
Jumlah
2,500.00
Dibulatkan
2,500.00
1 M3 Pembuangan Tanah sejauh 150 m
Pekerja
Oh
0.5160 42,000.00
21,672.00
Mandor
Oh
0.0500 80,000.00
4,000.00
Jumlah
25,672.00
Dibulatkan
25,672.00
1 M3 Urugan Kembali
Pekerja
Oh
0.1920 42,000.00
8,064.00
Mandor
Oh
0.0190 80,000.00
1,520.00
Jumlah
9,584.00
Dibulatkan
9,584.00
1 M3 Pemadatan Tanah
Pekerja
Oh
0.5000 42,000.00
21,000.00
Mandor
Oh
0.0500 80,000.00
4,000.00
Jumlah
25,000.00
Dibulatkan
25,000.00
1 M3 Urugaan Pasir
Pasir Urug
M3
1.2000
###
210,360.00
Pekerja
Oh
0.3000 42,000.00
12,600.00
B-11
B-12
B-13
B-14
Mandor
Oh
0.0100
Jumlah
Dibulatkan
1 M2 Pemasangan Lapisan Ijuk Tebal 10 cm
Ijuk
m2
1.2000
Pekerja
Oh
0.1500
Mandor
Oh
0.0150
Jumlah
Dibulatkan
1 M3 Urugan Sirtu
Sirtu
M3
1.2000
Pekerja
Oh
0.2500
Mandor
Oh
0.0250
Jumlah
Dibulatkan
1 M3 Urugan Tanah Pilihan
Tanah urug p M3
1.2000
Pekerja
Oh
0.2500
Mandor
Oh
0.0250
Jumlah
Dibulatkan
1 M2 Pembuatan jalan sementara, tebal 25 cm
Batu belah
M3
0.2750
Kerikil
M3
0.0300
Pasir Urug
M3
0.0500
Pekerja
Oh
1.0000
Mandor
Oh
0.1000
Jumlah
Dibulatkan
80,000.00
800.00
223,760.00
223,760.00
22,000.00
42,000.00
80,000.00
26,400.00
6,300.00
1,200.00
33,900.00
33,900.00
###
42,000.00
80,000.00
244,200.00
10,500.00
2,000.00
256,700.00
256,700.00
89,200.00
42,000.00
80,000.00
107,040.00
10,500.00
2,000.00
119,540.00
119,540.00
###
###
###
42,000.00
80,000.00
56,512.50
5,178.00
8,765.00
42,000.00
8,000.00
120,455.50
120,456.00
NO
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
URAIAN SATUAN
Mandor
Kepala T
Kepala T
Kepala T
Kepala T
Kepala T
Kepala T
Tukang B
Tukang
Tukang B
Tukang C
Tukang L
Tukang P
Tukang P
Tukang
Tukang
Pembant
Pekerja
Penjaga
Sopir
Operator
Mekanik
Pembantu
Pembantu
Pembant
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
80,000.00
75,000.00
75,000.00
75,000.00
75,000.00
75,000.00
75,000.00
65,000.00
65,000.00
65,000.00
65,000.00
65,000.00
65,000.00
65,000.00
65,000.00
65,000.00
42,000.00
42,000.00
42,000.00
65,000.00
75,000.00
65,000.00
42,000.00
50,000.00
42,000.00
NO
A.
MATERIAL
SAT
HARGA (Rp)
175,300.00
89,200.00
203,500.00
174,200.00
233,400.00
255,400.00
259,000.00
29,600.00
223,600.00
211,100.00
205,000.00
196,000.00
205,500.00
180,800.00
172,600.00
96,600.00
14,100.00
73,700.00
97,800.00
2,000.00
2,400.00
5,400.00
775.00
675.00
1,800.00
14,800.00
15,500.00
9,700.00
22,500.00
81,100.00
108,600.00
76,000.00
86,000.00
34,900.00
70,300.00
1,406.00
92,700.00
58,900.00
1,105,000.00
903,500.00
877,500.00
925,000.00
850,000.00
825,000.00
Pasir Urug
Tanah Urug Pilihan
Sirtu
Pasir Teras
Pasir Pasang Kali
Pasir Beton
Abu Batu
Batu Gosok ( Apung )
Batu Pecah Mesin 1/2
Batu Pecah Mesin 2/3
Batu Pecah Mesin 3/5
Batu Pecah Mesin 5/7
Batu Belah Pondasi
Batu Bronjol ( Untuk Bronjong )
Batu Koral Beton Kali
Batu Tempel Hitam
Batu Pinggir Beton 10 x 20 x 35
Batu Pinggir Beton 15 x 35 x 50 ( K-225 )
Batu Telor
Batako Kecil 8 x 10 x 20
Batako Besar 8 x 20 x 30
Con Blok 8 x 20 x 40
Bata Merah Bakar kelas I
Bata Merah Bakar kelas II
Bata Merah Oven ( Klingker )
Roster Beton 20 x 20
Roster Beton 30 x 30
Grass Blok 20 x 20
Grass Blok 30 x 30
Paving Blok Natural 8 cm
Paving Blok Warna 8 cm
Paving Blok Natural 6 cm
Paving Blok Warna 6 cm
Canstin Paving Blok
Semen PC /50 kg
m3
m3
m3
m3
m3
m3
m3
kg
m3
m3
m3
m3
m3
m3
m3
m3
bh
bh
m3
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
m2
m2
m2
m2
m1
zak
36
37
38
39
40
41
42
43
Semen Putih
Kanstin Jalan Ukuran Besar ( Bina Marga ) 1bh =60cm
Readymix Beton K500, Tanpa Pompa ( Selang )
Readymix Beton K400, Tanpa Pompa ( Selang )
Readymix Beton K350, Tanpa Pompa ( Selang )
Readymix Beton K300, Tanpa Pompa ( Selang )
Readymix Beton K225, Tanpa Pompa ( Selang )
Readymix Beton K175, Tanpa Pompa ( Selang )
zak
bh
m3
m3
m3
m3
m3
m3
44
45
46
47
48
49
50
51
52
B
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
m3
kg
kg
m3
ltr
bh
bh
bh
bh
353,300.00
18,300.00
15,700.00
31,300.00
3.00
2,500.00
5,000.00
4,000.00
3,000.00
kg
lt
lt
kg
lt
kg
kg
lt
kg
kg
ml
bh
bh
bh
5 lt
kg
m3
m3
bh
bh
bks
bks
lt
kg
kg
kg
kg
lt
kg
lt
lt
kg
kg
kg
lbr
kg
kg
kg
lbr
kg
kg
kg
25,000.00
120,000.00
75,000.00
25,000.00
75,000.00
20,000.00
30,000.00
40,000.00
90,000.00
185,000.00
70,000.00
62,500.00
32,500.00
8,500.00
10,000.00
25,000.00
29,000.00
382,600.00
370,000.00
16,000.00
22,000.00
5,200.00
5,500.00
15,000.00
110,000.00
34,200.00
37,700.00
37,700.00
35,800.00
48,000.00
112,700.00
19,500.00
23,900.00
21,400.00
30,800.00
52,500.00
39,200.00
35,800.00
5,000.00
24,400.00
30,400.00
40,900.00
43
44
45
46
47
48
49
50
lt
lt
bh
kg
bh
kg
kg
lt
41,700.00
44,000.00
76,300.00
67,700.00
3,300.00
38,400.00
50,100.00
8,100.00
C
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
bt
bt
bt
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
bt
bt
m1
m1
m1
m1
m1
m1
m1
m3
m3
m1
m1
m3
m3
m3
bt
kg
m2
m2
m2
17,700.00
25,000.00
37,200.00
7,094,450.00
5,280,000.00
5,595,800.00
5,692,600.00
5,823,400.00
6,363,600.00
6,645,300.00
8,633,700.00
8,724,300.00
2,658,000.00
20,772,000.00
22,188,400.00
13,625,400.00
12,736,100.00
2,069,800.00
1,870,500.00
2,071,700.00
22,600.00
28,000.00
8,900.00
10,000.00
14,300.00
17,200.00
29,400.00
160,100.00
122,500.00
2,772,000.00
3,356,800.00
2,500.00
3,300.00
4,000.00
2,850,000.00
2,640,000.00
139,500.00
23,400.00
22,000.00
537,300.00
351,200.00
1
2
3
4
5
6
7
8
9
10
11
12
Plafond Enternit 4 mm
Plafond hardpleks 5 mm 120 x 240
Plafond Asbes Semen 5 mm
Plafond Asbes Semen 3,5 mm
Gypsum 120 x 240 t= 9 mm ex DN
Gypsum 120 x 240 t= 9 mm ex Luar
Tepung gypsum
Acustik Amstrong 60 x 120
Cotton Plester
GRC (120 x 240) cm, t = 4 mm
Cornice Coumpound
List gypsum
m2
lbr
m2
m2
lbr
lbr
kg
lbr
bh
lbr
zak
m'
17,400.00
62,400.00
22,500.00
19,500.00
79,800.00
83,800.00
12,500.00
132,800.00
15,000.00
67,500.00
75,000.00
8,500.00
E
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
lbr
lbr
lbr
lbr
lbr
lbr
m2
m2
m2
m2
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
m2
m2
lbr
lbr
lbr
lbr
lbr
61,700.00
64,400.00
56,200.00
92,000.00
166,600.00
119,000.00
19,800.00
22,700.00
34,200.00
55,700.00
151,100.00
195,000.00
255,400.00
323,900.00
235,000.00
140,000.00
129,100.00
131,700.00
127,200.00
114,700.00
128,200.00
57,900.00
89,200.00
133,400.00
170,000.00
132,900.00
238,100.00
F
1
2
3
4
5
6
7
8
9
10
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
3,400.00
2,400.00
3,400.00
2,800.00
3,600.00
3,400.00
5,700.00
6,300.00
3,200.00
2,500.00
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
Tegel Badak PC 30 x 30
Poslin 11 x 11 Warna Standar DN
Poslin 11 x 11 Warna khusus DN
Keramik 10 x 20 dan 20 x 20 KW I DN Putih / Polos Mulia
Keramik 10 x 20 KW I DN Corak/Warna/Anti Slip Mulia
Keramik 20 x 20 (KM) KW I DN Corak/Warna /Anti Slip Mulia
Keramik 20 x 20 (KM) KW I DN Putih Polos Mulia
Keramik 20 x 25 Dinding KM KW I DN Corak Mulia
Keramik 30 x 30 KWI DN Putih Polos Mulia
Keramik 30 x 30 KWI DN Warna/Corak (ANTI SLIP) Mulia
Keramik 40 x 40 KWI DN Putih Polos Mulia
Keramik 40 x 40 KWI DN Warna/Corak (ANTI SLIP) Mulia
Keramik 10 x 20 dan 20 x 20 KW I DN Putih / Polos Roman
Keramik 10 x 20 KW I DN Corak/Warna/Anti Slip Roman
Keramik 20 x 20 (KM) KW I DN Corak/Warna/Anti Slip Roman
Keramik 20 x 20 (KM) KW I DN Putih Polos Roman
Keramik 20 x 25 Dinding KM KW I DN Corak Roman
Keramik 20 x 25 KW I DN Putih Polos Roman
Keramik 30 x 30 KW I DN Polos Roman
Keramik 30 x 30 KW I DN Warna/Corak (ANTI SLIP) Roman
Keramik 40 x 40 KW I DN Polos Roman
Keramik 40 x 40 KW I DN Warna/Corak (ANTI SLIP) Roman
Vinyl Lantai Standar
Karpet Kelas Baik LN
Karpet Kelas Sedang LN
Parquet Jati
Stairnosing Keramik 10/20
Stairnosing Fiber
Taraso Kerang 30 x 30
Plin Taraso 10 x 30
Granit Alam LN Ukuran Besar
Granit Alam LN Ukuran Kecil
Granit Alam DN Ukuran Besar
Granit Alam DN Ukuran Kecil
Granito Tile Essenza Ukuran 40 x 40 Polis
Granito Tile Essenza Ukuran 30 x 30
Granito Tile Essenza Ukuran 40 x 40 UnPolis
Marmer
Marmer Alam Lampung Ukuran Besar
Marmer Alam Lampung Ukuran kecil
Marmer Alam Citatah Ukuran Besar
Marmer Alam Citatah Ukuran Kecil
Marmer Sintetis
Granito Tile Essenza 60 x 60 Polis
Granito Tile Essenza 60 x 60 UnPolis
Batu Tempel Hitam
Bata Karawang
Campuran untuk Kedap Air ( AM )
Plint keramik 10 x 20
Plint keramik 10 x 25
Plint keramik 10 x 30
Plint keramik 10 x 40
Plint keramik 15 x 30
bh
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
bh
m
m2
bh
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
bh
ltr
bh
bh
bh
bh
bh
4,100.00
63,300.00
67,300.00
54,500.00
56,000.00
62,500.00
54,500.00
62,500.00
53,000.00
58,000.00
56,800.00
65,500.00
64,400.00
72,200.00
75,200.00
72,900.00
75,200.00
72,900.00
68,900.00
76,600.00
72,500.00
77,000.00
56,000.00
1,025,500.00
353,500.00
375,400.00
13,700.00
25,000.00
31,800.00
13,500.00
1,848,400.00
1,612,900.00
1,331,100.00
1,299,400.00
345,000.00
322,800.00
204,900.00
550,000.00
550,200.00
345,700.00
340,800.00
237,600.00
157,900.00
358,100.00
231,800.00
96,500.00
600.00
37,600.00
3,000.00
3,250.00
3,500.00
4,000.00
4,500.00
64
65
66
67
68
Plint keramik 15 x 40
Plint granito 10 x 30
Plint granito 10 x 40
Plint granito 15 x 30
Plint granito 15 x 40
bh
bh
bh
bh
bh
5,250.00
25,900.00
27,600.00
31,100.00
41,300.00
G
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
m1
m1
m1
m1
m1
m1
stk
stk
stk
stk
stk
stk
stk
stk
kg
44,300.00
56,400.00
74,200.00
49,200.00
61,700.00
80,900.00
94,300.00
130,900.00
299,800.00
298,500.00
9,600.00
12,700.00
16,800.00
22,800.00
17,400.00
H
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
kg
kg
m2
m2
kg
kg
kg
kg
kg
kg
kg
kg
m1
kg
kg
m2
m2
m2
m2
m2
m2
kg
m2
m2
kg
kg
m2
bt
bt
16,500.00
20,700.00
171,300.00
185,000.00
24,000.00
23,900.00
18,300.00
21,600.00
19,200.00
10,600.00
27,700.00
63,500.00
1,000.00
28,200.00
41,400.00
13,400.00
15,300.00
14,900.00
32,100.00
35,900.00
28,600.00
23,600.00
51,900.00
38,700.00
46,300.00
43,300.00
32,400.00
33,000.00
33,100.00
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
Plat Strip
Besi Strip
Plat Alumunium 0.2 mm
Plat Alumunium 0.3 mm
Plat Alumunium 0.4 mm
Plat Alumunium 0.5 mm
Plat Alumunium 0.6 mm
Plat Alumunium 0.1 mm
Kusen Alumunium Natural 1.3 mm t= 1,3 mm ( 4 " )
Kusen Alumunium Warna 1.3 mm t= 1,3 mm ( 4 " )
Kusen Alumunium Natural 1.3 mm t= 1,3 mm ( 3 " )
Kusen Alumunium Warna 1.3 mm t= 1,3 mm ( 3 " )
Daun Jendela Alumunium Natural ( tanpa kaca dan accessories )
Daun Jendela Alumunium Warna ( tanpa kaca dan accessories )
Daun Pintu Alumunium Natural ( tanpa kaca dan accessories )
Daun Pintu Alumunium Warna ( tanpa kaca dan accessories )
Handle Alumunium ( Tarikan Pintu Alumunium )
Kait Angin Alumunium
Karet Asisoris Kusen / Pintu Alumunium
Jalusi Alluminium
Sunscreen Almunium
Seng Plat BJLS 30 60 cm ( 100 m1 )
Seng Plat BJLS 30 90 cm ( 100 m1 )
Plat Besi Tipis 1 mm
Plat Besi Tipis 0.5 mm
Plat Besi 2 mm s/d 5 mm
Plat Besi 6 mms/d 10 mm
Plat Besi 10 mm keatas
Kabel presstressed polos
Jaring Kawat Baja
Lem Kuning ( Aibond )
Lem Fox
Lem Vinyl
Besi Strip Kaca Nako
Profil alumunium "T"
Besi Hallow ( 2 x 4 x 4) cm (400cm)
Besi Hallow ( 4 x 4) cm (400 cm)
Besi Rail Pengamanan
Jendela Besi
Jendela Besi tahan api
Pintu gulung besi
Pintu Roliing Door
Jendela nako kaca ryben + tralis 6 klips
Jendela nako kaca ryben + tralis 7 klips
Jendela nako kaca ryben + tralis 8 klips
Jendela nako kaca ryben + tralis 10 klips
Jendela nako kaca bening + tralis 4 klips
Jendela nako kaca bening + tralis 5 klips
Jendela nako kaca bening + tralis 6 klips
Jendela nako kaca bening + tralis 7 klips
Jendela nako kaca bening + tralis 8 klips
Jendela nako kaca bening + tralis 10 klips
bt
kg
m2
m2
m2
m2
m2
m2
m1
m1
m1
m1
m2
m2
m2
m2
bh
ps
m1
m'
m2
roll
roll
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
m1
btg
btg
kg
m2
m2
m2
m2
set
set
set
set
set
set
set
set
set
set
18,200.00
26,800.00
89,800.00
110,500.00
141,400.00
143,100.00
171,800.00
56,300.00
151,100.00
163,000.00
81,000.00
102,000.00
98,800.00
148,800.00
211,800.00
207,500.00
345,200.00
104,500.00
7,500.00
35,000.00
380,200.00
1,581,500.00
2,080,100.00
16,800.00
17,700.00
14,100.00
14,100.00
14,700.00
26,700.00
28,900.00
35,700.00
23,900.00
44,000.00
11,000.00
12,200.00
22,600.00
29,200.00
459,300.00
390,200.00
501,700.00
501,700.00
306,600.00
170,000.00
200,000.00
230,000.00
290,000.00
120,000.00
140,000.00
170,000.00
210,000.00
230,000.00
300,000.00
I
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
BAHAN KACA
Kaca Polos 2 mm ( ASAHI )
Kaca Polos 3 mm ( ASAHI )
Kaca Polos 5 mm ( ASAHI )
Kaca Polos 8 mm ( ASAHI )
Kaca Rayband 5 mm ( ASAHI )
Kaca Rayband 8 mm ( ASAHI )
Kaca Rayband 12 mm ( ASAHI )
Kaca cermin 5 mm
Kaca cermin 6 mm
Kaca cermin 8 mm
Kaca Patri Lokal Terpasang ( ASAHI )
Kaca Patri Ex Luar Negeri Terpasang
Kaca 6 mm Gravver
Glass Block DN 20 x 20 ( Kedawung )
Glass Block DN 20 x 20 Ex LN
Sealant
Jendela Nako
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
bh
bh
kg
bh
69,000.00
87,400.00
111,000.00
183,100.00
148,700.00
323,400.00
627,000.00
150,500.00
186,400.00
234,300.00
1,621,100.00
3,425,700.00
1,263,900.00
22,000.00
125,700.00
211,800.00
109,200.00
J
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
kg
kg
kg
bh
bh
kg
kg
bh
bh
bh
bh
bh
bh
bh
bh
bh
kg
kg
bh
23,800.00
23,400.00
20,000.00
1,600.00
900.00
57,100.00
21,700.00
7,500.00
71,800.00
15,900.00
9,300.00
5,300.00
800.00
7,200.00
600.00
300.00
35,000.00
17,500.00
250.00
K
1
2
3
4
5
6
7
8
9
10
11
12
BAHAN PERPIPAAN
Besi Pipa Untuk Hydrant BSP 1"
Besi Pipa Untuk Hydrant BSP 1.25"
Besi Pipa Untuk Hydrant BSP 1.5"
Besi Pipa Untuk Hydrant BSP 2"
Besi Pipa Untuk Hydrant BSP 2.5"
Besi Pipa Untuk Hydrant BSP 3"
Besi Pipa Untuk Hydrant BSP 4"
Besi Pipa Untuk Hydrant BSP 6"
Besi Pipa Hitam 1" t = 2 mm
Besi Pipa Hitam 2" t = 2 mm
Besi Pipa Hitam 3" t = 2mm
Besi Pipa Hitam 4" t = 2 mm
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
166,700.00
210,200.00
298,000.00
351,800.00
439,300.00
595,000.00
869,600.00
1,423,400.00
172,300.00
227,900.00
365,800.00
573,100.00
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
tb
772,400.00
109,100.00
159,400.00
181,500.00
259,300.00
280,500.00
326,400.00
467,400.00
672,100.00
849,900.00
920,300.00
6,300.00
8,600.00
16,700.00
19,800.00
20,700.00
22,700.00
51,200.00
60,400.00
75,900.00
118,600.00
40,100.00
52,200.00
63,200.00
79,900.00
105,900.00
110,700.00
167,100.00
205,100.00
347,900.00
640,000.00
818,300.00
22,500.00
27,800.00
40,500.00
58,500.00
60,200.00
75,800.00
126,300.00
145,700.00
256,800.00
4,400.00
4,700.00
4,900.00
7,200.00
9,500.00
13,500.00
15,800.00
26,400.00
29,700.00
34,000.00
89,900.00
10,100.00
66
67
68
69
70
71
72
73
Solatip Ledeng
Pipa PVC 4" Berlobang Jenis AW
PVC Waterstop lebar 150
PVC Waterstop lebar 200
PVC Waterstop lebar 230
PVC Waterstop lebar 250
PVC Waterstop lebar 300
PVC Waterstop lebar 320
gl
m1
m1
m1
m1
m1
m1
m1
4,200.00
36,700.00
53,500.00
57,900.00
65,700.00
74,700.00
83,600.00
92,500.00
L
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
BAHAN SANITAIR
Stop Kran 3/4" KIT
Stop Kran 1" KIT
Stop Kran 1 1/2" KIT
Stop Kran 2" KIT
Stop Kran 2 1/2" KIT
Stop Kran 3" KIT
Check Valve 1/2"
Double Neple 1/2"
Water Mur 1/2"
Gate walve 1/2"
Saringan Air Lt. KM Stainless Steel
Apooer Bath Tube
Kran Stainless Lokal Kait
Shower Dengan Tiang
Shower Tanpa Tiang
Kran Tembok Sun Eui dia. 1/2"
Kran Tembok ITAP dia. 1/2"
Kran Bebek Sun Eui 1/2"
Kran Bebek ITAP 1/2"
Kran Panas Dingin San Eui Standard
Bath Cape Washteren
Tempat Sabun Poslin
Wastafel Lengkap TOTO LW 230
Wastafel Lengkap INA
Closet Jongkok Poslin Warna TOTO
Closet Jongkok Standard Putih Poslin TOTO
Closet Jongkok Lengkap Sistem Jet TOTO
Closet Duduk Warna Standard TOTO C 240 Lengkap
Wastafel Bulat Warna Standard Lengkap
Closet Duduk Warna Standard INA Lengkap
Urinoir Lengkap TOTO Warna Standard Lengkap
Penyekat Poslin Urinoar TOTO
Kitchen Zink Stainless Standard Lokal ( 1 Lubang )
Kitchen Zink Stainless Non Standard Franke ( 1 Lubang )
Kitchen Zink Stainless Non Standard Franke ( 2 Lubang )
Talang PVC U - 15 cm
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
unit
bh
unit
unit
unit
unit
unit
unit
unit
bh
unit
lbr
bh
bh
bh
btng
103,900.00
124,200.00
208,000.00
267,900.00
713,200.00
830,300.00
86,400.00
32,400.00
40,200.00
55,500.00
66,600.00
267,800.00
46,100.00
221,000.00
134,800.00
86,900.00
40,900.00
144,600.00
51,500.00
228,400.00
2,098,700.00
46,300.00
1,012,700.00
699,900.00
205,600.00
188,200.00
2,032,900.00
1,724,700.00
910,800.00
1,272,100.00
1,773,400.00
495,900.00
397,800.00
1,272,300.00
1,650,200.00
60,000.00
M
1
2
3
4
5
lbr
lbr
lbr
m2
m2
33,100.00
47,100.00
100,000.00
140,600.00
164,700.00
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
m2
m2
m2
bh
bh
bh
bh
bh
bh
m2
m2
lbr
lbr
lbr
lbr
lbr
lbr
m2
bh
m2
m2
m2
m2
m2
bh
bh
bh
bh
bh
bh
bh
bh
bh
lbr
lbr
m2
lbr
lbr
m1
m1
m1
m1
77,200.00
111,100.00
62,900.00
83,100.00
73,300.00
65,900.00
58,500.00
42,300.00
78,500.00
97,200.00
80,000.00
487,100.00
283,600.00
19,600.00
1,900.00
2,700.00
2,300.00
7,500.00
4,800.00
10,500.00
203,100.00
172,700.00
138,500.00
80,900.00
105,300.00
100,800.00
83,900.00
88,700.00
96,700.00
8,500.00
26,400.00
112,400.00
142,200.00
139,300.00
145,100.00
2,700.00
4,000.00
7,500.00
10,700.00
10,000.00
3,000.00
4,500.00
6,000.00
7,500.00
38,100.00
37,500.00
75,000.00
21,000.00
16,400.00
34,500.00
22,000.00
11,000.00
7,200.00
59
60
61
bh
m1
bh
2,200.00
1,700.00
7,200.00
N
1
2
3
4
5
6
7
8
9
10
11
12
13
BAHAN MEKANIKAL
Jockey Pump kap. 80 gln/menit 100 m1 ( 18.6 kW )
Electrical Pump kap. 750 gln/menit 120 m1 ( 90 kW )
Diesel Pump kap. 750 gln/menit 120 m1 ( 105 kW )
Presure Tank kap. 500 liter lengkap
Hydran Box dlm Gedung ( Lengkap )
Fire House 1.5 x 30 m + nose
Exhose Fan H 360 W 60 x 60 cm
Exhose Fan H 380 W CFM 55 x 55 cm
Exhose Fan H 100 W 40 x 40 cm
AC Split 3 PK Setara TOSHIBA
AC Split 2 PK Setara TOSHIBA
AC Split 1 PK Setara TOSHIBA
Mesin AC Split DAIKIN ( Indoor / Outdoor Unit )
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
1 BTU
71,396,400.00
O
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
BAHAN ELEKTRIKAL
Kabel NYA 1 x 1.5 Prima ( 1 rol = 50 m' )
Kabel NYA 1 x 2.5 Prima ( 1 rol = 50 m' )
Kabel NYM 2 x 1.5 Prima ( 1 rol = 50 m' )
Kabel NYM 3 x 1.5 Prima ( 1 rol = 50 m' )
Kabel NYM 2 x 2.5 Prima ( 1 rol = 50 m' )
Kabel NYM 3 x 2.5 Prima ( 1 rol = 50 m' )
Kabel NYM 4 x 2.5 Prima ( 1 rol = 50 m' )
Kabel NYM 2 x 4 Prima ( 1 rol = 50 m' )
Kabel NYM 3 x 4 Prima ( 1 rol = 50 m' )
Kabel NYM 4 x 4 Prima ( 1 rol = 50 m' )
Kabel NYM 2 x 6 Supreme ( 1 rol = 50 m' )
Kabel NYM 3 x 6 Supreme ( 1 rol = 50 m' )
Kabel NYM 4 x 6 Supreme ( 1 rol = 50 m' )
Kabel NYM 2 x 10 Supreme ( 1 rol = 50 m' )
Kabel NYM 3 x 10 Supreme ( 1 rol = 50 m' )
Kabel NYM 4 x 10 Supreme ( 1 rol = 50 m' )
Kabel NYM 4 x 16 Supreme ( 1 rol = 50 m' )
Kabel NYY 2 x 4 Supreme ( 1 rol = 50 m' )
Kabel NYY 3 x 4 Supreme ( 1 rol = 50 m' )
Kabel NYY 4 x 4 Supreme ( 1 rol = 50 m' )
Kabel NYY 2 x 6 Supreme ( 1 rol = 50 m' )
Kabel NYY 3 x 6 Supreme ( 1 rol = 50 m' )
Kabel NYY 4 x 6 Supreme ( 1 rol = 50 m' )
Kabel NYY 2 x 10 Supreme ( 1 rol = 50 m' )
Kabel NYY 3 x 10 Supreme ( 1 rol = 50 m' )
Kabel NYY 4 x 10 Supreme ( 1 rol = 50 m' )
Kabel NYY 4 x 16 Supreme ( 1 rol = 50 m' )
NSFB FUJI EA - 100 A
NSFB FUJI EA - 150 A
Rumah Panel 30 x 60 cm ( Kosong )
Skring Kas 2 grop Biasa
Skring Kas 3 grop Biasa
Skring Kas 5 grop Biasa
ROLL
ROLL
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
bh
bh
unt
unt
unt
unt
102,700.00
151,700.00
6,600.00
7,600.00
4,900.00
10,900.00
7,600.00
6,300.00
15,400.00
20,700.00
11,800.00
13,700.00
18,600.00
17,600.00
119,700.00
26,500.00
29,700.00
12,000.00
19,300.00
23,800.00
14,500.00
19,200.00
18,500.00
20,400.00
25,800.00
35,500.00
41,900.00
841,900.00
2,182,600.00
153,500.00
204,800.00
222,600.00
468,800.00
216,358,900.00
591,647,100.00
36,997,300.00
6,854,400.00
4,866,100.00
6,862,900.00
5,491,100.00
1,092,600.00
30,791,800.00
21,926,500.00
5,174,100.00
4,200,000.00
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
MCB 1 PAS
MCB 3 PAS
Tahanan 50 A Merk Fuji
Saklar Broko Tunggal Standard ( 1 Phase )
Saklar Broko Seri Standard ( 1 Phase )
Stop Kontak Broko Standard ( 1 Phase )
Stop Kontak Broko 3 Phase (Out Bow)
Stop Kontak Broko 3 Phase ( In Bow)
Stop Kontak Handle 3 Phase
Instalas Titik Lampu / Stop Kontak (Upah dan Alat)
Lampu pijar 25 Watt s/d 100 Watt
Lampu Neon Phillips 20 Watt
Lampu Neon Phillips 40 Watt
Trapo TL 20 W (Phillips)
Trapo TL 40 W (Phillips)
Trapo TL 20 W (Sinar)
Trapo TL 40 W (sinar)
Stater Neon Phillips
Stater Neon Biasa
Rumah TL In Bow / Out Bow 2 x 20 W (kosongan)
Down Light + SL 25 W
Lampu SL Philip 25 W
Lampu Sirkel TL 20 W Lengkap
Lampu Mercuri 80 W
Lampu Taman + Tiang + Lampu 1 Buah
Lampu Baret 30 cm + Neon
Lampu Neon Arcrilik 2 x 40 W Lengkap
Jarum Penangkal Petir 16
Kawat BC ( Tembaga )
Pentanahan Penangkal Petir
Pentanahan Panel
bh
bh
bh
bh
bh
bh
bh
bh
bh
ttk
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
kg
ttk
ttk
55,100.00
106,000.00
521,100.00
23,800.00
26,300.00
23,800.00
87,700.00
144,900.00
87,800.00
179,600.00
61,200.00
29,700.00
35,200.00
41,800.00
37,900.00
40,600.00
41,300.00
8,300.00
6,500.00
144,000.00
306,900.00
306,900.00
67,900.00
147,400.00
307,600.00
221,700.00
738,000.00
101,500.00
65,100.00
423,700.00
296,100.00
P
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
bh
bh
bh
bh
unt
bh
bh
bh
bh
bh
bh
bh
bh
bh
ps
bh
bh
ps
ps
bh
410,900.00
408,600.00
126,500.00
864,300.00
193,100.00
335,900.00
165,300.00
207,300.00
54,400.00
102,700.00
586,600.00
85,200.00
94,500.00
46,800.00
51,600.00
49,800.00
5,500.00
7,100.00
29,000.00
32,200.00
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
bh
bh
ps
ps
ps
m1
unt
unt
unt
unt
unt
bh
m1
m1
lbr
lbr
m1
31,500.00
33,000.00
21,000.00
15,000.00
13,700.00
9,100.00
420,000.00
597,500.00
200,000.00
205,400.00
255,500.00
19,500.00
43,500.00
53,500.00
86,900.00
50,100.00
57,900.00
Q
1
2
3
4
5
6
kg
kg
kg
ton
ton
ton
12,459.00
12,459.00
10,890.00
1,348,300.00
1,200,200.00
1,666,900.00
R
1
2
3
4
5
6
7
8
9
10
11
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
172,600.00
243,800.00
718,500.00
1,100,200.00
1,890,700.00
4,961,500.00
7,878,000.00
27,151,200.00
15,702,700.00
172,052,500.00
5,195,300.00
S
1
2
3
4
5
6
bh
bh
bh
bh
bh
bh
1,172,500.00
1,316,400.00
1,954,200.00
255,300.00
118,500.00
161,100.00
T
1
2
3
4
5
ALAT TUKANG
Palu 0.5 kg
Cangkul
Singkup
Sekrop
Pengki
bh
bh
bh
bh
bh
39,300.00
24,500.00
41,400.00
50,100.00
12,300.00
6
7
8
9
10
Linggis
Rool Meter 30 meter ( Bahan Plastik )
Rool Meter 5 meter ( Bahan Besi )
Selang Plastik untuk Water Pas dia. 0.5 cm
Water Pas Alumunium 60 cm
U
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
V
1
2
BAHAN PAGAR
Panel Beton Pracetak
Kolom Beton Pracetak
B.
1
2
3
4
5
6
7
8
9
10
BIDANG PERTAMANAN
Aglonema
Bambu krisik/jepang
Furadan
Kompos/pupuk kandang
M atoa (2 m)
Palm (botol, ekor tupai, putri, dll) tinggi 2 m
Philo
Pohon pelindung (angsana, mahoni, kamboja dll) tinggi 2m
Pohon perdu (kaca piring, puring, mawar, melati, dll)
Rumput gajah mini
bh
bh
bh
m
bh
41,700.00
101,000.00
37,800.00
1,600.00
88,200.00
lt
m3
lt
lt
lt
lt
lt
15 kg
15.1 kg btl
btl
kg
ltr
Gln
kg
kg
kg
bh
18,000.00
151,100.00
28,435.00
7,150.00
7,800.00
3,300.00
55,000.00
104,600.00
88,900.00
66,400.00
19,400.00
40,500.00
15,700.00
35,600.00
2,400.00
11,100.00
1,400.00
lbr
btg
199,200.00
264,000.00
batang
batang
kg
karung
batang
batang
batang
batang
batang
m2
50,000.00
50,000.00
24,000.00
25,000.00
40,000.00
100,000.00
75,000.00
25,000.00
10,000.00
15,000.00
50
40
33.3
25
22.2
16.7
33.33333
25
22.22222
16.66667
= kurang angka 0
107200
###