1 2 3 4 5 6 7 8
I Ballast
II Baterry
Panasonic 9V /
1 Baterry pcs 20,400 21,700 21,700 24,200
6F22NT / 1S
Panasonic Alkaline
5 Baterry pcs 26,800 28,100 28,100 31,900
AAA2
Panasonic D UM-
6 Baterry pcs 21,700 23,000 23,000 25,500
1U/2S
7 Baterry ABC Type R6, kecil buah 7,700 7,700 7,700 8,900
9 Baterry ABC Type R20, besar buah 14,000 14,000 15,300 16,600
Baterai Alkaline AA - 4
10 Baterry Pcs 11,500 11,500 12,800 14,000
Pcs
Baterai Alkaline 9V
11 Baterry buah 11,500 11,500 12,800 14,000
6LR61
IV Kabel
Halaman_235
HARGA STANDAR KEGIATAN PEKERJAAN
PEMERINTAH KABUPATEN KUTAI TIMUR
TAHUN 2015
1 2 3 4 5 6 7 8
Kabel NYA, Standar 1 x 10 mm2 (@ 100
5 roll 1,862,300 1,946,500 1,983,500 2,206,700
SNI.04-02698, SPLN 42.1 meter)
Kabel NYM, Standar 2 X 1,5 mm2 (@ 100
6 roll 8,214,600 8,584,500 8,749,100 9,733,800
SNI.04-02698, SPLN 42.2 meter)
Kabel NYM, Standar 2 X 2,5 mm2 (@ 100
7 roll 1,594,500 1,665,900 1,697,800 1,889,100
SNI.04-02698, SPLN 42.2 meter)
Kabel NYM, Standar 3 X 1,5 mm2 (@ 50
8 roll 1,505,200 1,572,800 1,603,400 1,783,200
SNI.04-02698, SPLN 42.2 meter)
Kabel NYM, Standar 3 X 2,5 mm2 (@ 50
9 roll 2,155,700 2,252,600 2,296,000 2,554,900
SNI.04-02698, SPLN 42.2 meter)
Kabel NYM, Standar 3 X 4 mm2 (@ 50
10 roll 2,806,200 2,932,500 2,988,600 3,325,400
SNI.04-02698, SPLN 42.2 meter)
Kabel NYM, Standar 4 X 2,5 mm2 (@ 50
11 roll 2,155,700 2,252,600 2,296,000 2,554,900
SNI.04-02698, SPLN 42.2 meter)
Kabel NYM, Standar 4 X 4 mm2 (@ 50
12 roll 2,678,700 2,799,900 2,853,400 3,174,900
SNI.04-02698, SPLN 42.2 meter)
Kabel NYM, Standar 4 X 6 mm2 (@ 50
13 roll 3,099,600 3,238,600 3,301,100 3,673,600
SNI.04-02698, SPLN 42.2 meter)
Kabel NYM, Standar 4 X 10 mm2 (@ 50
14 roll 3,660,900 3,825,400 3,899,400 4,338,200
SNI.04-02698, SPLN 42.2 meter)
Kabel NYY, Standar 2 X 1,5 mm2 (@ 50
15 roll 816,400 853,300 869,900 966,900
SNI.04-02701, SPLN 43.1 meter)
Kabel NYY, Standar 2 X 2,5 mm2 (@ 50
16 roll 1,103,400 1,153,100 1,174,800 1,307,400
SNI.04-02701, SPLN 43.1 meter)
Kabel NYY, Standar 3 X 1,5 mm2 (@ 50
17 roll 982,200 1,026,800 1,046,000 1,163,300
SNI.04-02701, SPLN 43.1 meter)
Kabel NYY, Standar 3 X 2,5 mm2 (@ 50
18 roll 1,415,900 1,479,600 1,507,700 1,677,400
SNI.04-02701, SPLN 43.1 meter)
Kabel NYY, Standar 3 X 4 mm2 (@ 50
19 roll 1,722,000 1,799,800 1,834,300 2,040,900
SNI.04-02701, SPLN 43.1 meter)
Kabel NYY, Standar 3 X 6 mm2 (@ 50
20 roll 2,155,700 2,252,600 2,296,000 2,554,900
SNI.04-02701, SPLN 43.1 meter)
Kabel NYY, Standar 42.5 mm2 (@ 50
21 roll 91,800 95,700 98,200 108,400
SNI.04-02701, SPLN 43.1 meter)
Kabel NYY, Standar
22 4 x 35 mm Meter 216,800 227,000 230,900 256,400
SNI.04-02701, SPLN 43.1
Kabel NYY, Standar 44 mm2 (@ 50
23 roll 140,300 146,700 149,200 165,800
SNI.04-02701, SPLN 43.1 meter)
Kabel NYY, Standar 46 mm2 (@ 50
24 roll 178,600 186,200 190,100 211,700
SNI.04-02701, SPLN 43.1 meter)
Kabel NYY, Standar 410 mm2 (@ 50
25 roll 306,100 320,200 326,500 362,300
SNI.04-02701, SPLN 43.1 meter)
3 x 50 mm + 1 x 25
30 Kabel Twisted mtr 25,500 26,800 26,800 30,600
mm
Halaman_236
HARGA STANDAR KEGIATAN PEKERJAAN
PEMERINTAH KABUPATEN KUTAI TIMUR
TAHUN 2015
1 2 3 4 5 6 7 8
3 x 70 mm + 1 x 25
31 Kabel Twisted mtr 26,800 28,100 28,100 31,900
mm
V Kapasitor
VI Lampu
1 Lampu Hemat Listrik Philips 5 Watt buah 34,400 35,700 37,000 40,800
Philips, Essential 8
2 Lampu Hemat Listrik buah 45,900 48,500 48,500 54,800
watt
Philips, Esential 11
3 Lampu Hemat Listrik buah 48,500 51,000 51,000 57,400
watt
Philips, Essential 14
4 Lampu Hemat Listrik buah 58,700 61,200 62,500 70,200
watt
Philips, Essential 18
5 Lampu Hemat Listrik buah 61,200 63,800 65,100 72,700
watt
Philips, Essential 23
6 Lampu Hemat Listrik buah 70,200 72,700 75,300 82,900
watt
7 Lampu Hemat Listrik Philips, Genie 5 watt buah 47,200 49,700 49,700 56,100
8 Lampu Hemat Listrik Philips, Genie 8 watt buah 51,000 53,600 54,800 60,000
9 Lampu Hemat Listrik Philips, Genie 11 watt buah 53,600 56,100 57,400 63,800
10 Lampu Hemat Listrik Philips, Genie 18 watt buah 58,700 61,200 62,500 70,200
11 Lampu Hemat Listrik Tornado 5 Watt buah 58,700 61,200 62,500 70,200
12 Lampu Hemat Listrik Tornado 8 Watt buah 58,700 61,200 62,500 70,200
Philips, Tornado 12
13 Lampu Hemat Listrik buah 62,500 65,100 66,300 74,000
watt
Philips, Tornado 15
14 Lampu Hemat Listrik buah 67,600 70,200 71,400 80,400
watt
Philips, Tornado 20
15 Lampu Hemat Listrik buah 70,200 72,700 75,300 82,900
watt
TL-D 10w/54/Cool
18 Lampu TL buah 11,500 11,500 12,800 14,000
Daylight
TL-D 18w/54/Cool
19 Lampu TL buah 17,900 19,100 19,100 21,700
Daylight
TL-D 36w/54/Cool
20 Lampu TL buah 20,400 21,700 21,700 24,200
Daylight
Halaman_237
HARGA STANDAR KEGIATAN PEKERJAAN
PEMERINTAH KABUPATEN KUTAI TIMUR
TAHUN 2015
1 2 3 4 5 6 7 8
TL-D 18w Brightboost
21 Lampu TL buah 34,400 35,700 37,000 40,800
83-84-86
TL-D 36w Brightboost
22 Lampu TL buah 39,500 40,800 42,100 47,200
83-84-86
VII MCB
VIII NSFB
IX Klem Kabel
Halaman_238
HARGA STANDAR KEGIATAN PEKERJAAN
PEMERINTAH KABUPATEN KUTAI TIMUR
TAHUN 2015
1 2 3 4 5 6 7 8
Imundex no.17 (Isi
10 Klem Kabel pak 43,400 45,900 45,900 51,000
100 pcs/kotak + Paku)
Imundex no.19 (Isi
11 Klem Kabel pak 61,200 63,800 65,100 72,700
100 pcs/kotak + Paku)
Imundex no.22 (Isi
12 Klem Kabel pak 71,400 75,300 76,500 84,200
100 pcs/kotak + Paku)
X Saklar
XI Skring Kas
Halaman_239
HARGA STANDAR KEGIATAN PEKERJAAN
PEMERINTAH KABUPATEN KUTAI TIMUR
TAHUN 2015
1 2 3 4 5 6 7 8
XIII Terminal
XIV Steker
XV Solder
Energizer,
1 Rechargeable battery Rechargeable battery, pcs 178,600 186,200 190,100 211,700
Alkaline, 9 Volt 1 pcs
Sanyo, Rechargeable
batteries, NiMH, AAA,
2 Rechargeable battery pcs 118,600 123,700 126,300 140,300
800mAh, 1.2 Volt, 2
pcs
Sanyo, Rechargeable
batteries, NiMH, AA,
3 Rechargeable battery pcs 140,300 146,700 149,200 165,800
2000mAh, 1.2 Volt, 2
pcs
Powerex, Travel
Charger 204W for 4
4 Rechargeable battery pcs AA rechargeable pcs 714,300 746,200 760,200 847,000
batteries + Battery AA
4 pcs, NiMH, 2700mAh
Halaman_240
HARGA STANDAR KEGIATAN PEKERJAAN
PEMERINTAH KABUPATEN KUTAI TIMUR
TAHUN 2015
1 2 3 4 5 6 7 8
3 Charger AKI Coeppro 20 AHR buah 1,007,700 1,053,600 1,072,700 1,193,900
2 Travo Distribusi 3 Phase 100 kVA buah 95,424,600 99,718,200 101,627,700 113,078,400
3 Travo Distribusi 3 Phase 150 kVA buah 121,701,200 127,177,200 129,612,200 144,216,100
4 Travo Distribusi 3 Phase 200 kVA buah 139,826,900 146,119,200 148,915,300 165,695,200
XX Solar Sel
Halaman_241
HARGA STANDAR KEGIATAN PEKERJAAN
PEMERINTAH KABUPATEN KUTAI TIMUR
TAHUN 2015
1 2 3 4 5 6 7 8
Lampu Sehen (Super
4 set 3,150,600 3,292,200 3,356,000 3,733,600
Hemat) Tenaga Surya
Lampu Jalan Tenaga
5 Surya (Tanpa Tiang set 15,638,400 16,342,500 16,655,000 18,531,300
Lampu)
XXII Isolator
XXIII Liannya
2 Arm Tie Type 750 Pipe 3/4 " Pc 216,800 227,000 230,900 256,400
7 Cut Out Switch 22 KV-100A + Bracket Set 2,627,700 2,746,300 2,798,600 3,113,600
Halaman_242
HARGA STANDAR KEGIATAN PEKERJAAN
PEMERINTAH KABUPATEN KUTAI TIMUR
TAHUN 2015
1 2 3 4 5 6 7 8
15 Saklar Tunggal bh 14,500 15,950 18,850 24,650
36 Pipa PVC AW C uk. Dia 1" (4m) batang 42,300 44,600 44,600 50,300
38 Pipa PVC AW C uk. Dia 2" (4m) batang 96,100 100,700 101,800 114,400
40 Pipa PVC AW C uk. Dia 3" (4m) batang 178,500 186,500 189,900 211,600
Halaman_243
HARGA STANDAR KEGIATAN PEKERJAAN
PEMERINTAH KABUPATEN KUTAI TIMUR
TAHUN 2015
1 2 3 4 5 6 7 8
41 Pipa PVC AW C uk. Dia 4" (4m) batang 297,400 311,200 316,900 352,400
42 Pipa PVC AW C uk. Dia 6" (4m) batang 689,800 720,700 734,400 818,000
Halaman_244
HARGA STANDAR KEGIATAN PEKERJAAN
PEMERINTAH KABUPATEN KUTAI TIMUR
TAHUN 2015
PEKERJAAN ELEKTRICAL
I UPAH
Pekerja OH 0.3714 150,000 55,710 165,000 61,281 162,000 60,167 168,000 62,395
Mandor OH 175,000 - 193,000 - 189,000 - 196,000 -
Tukang Listrik OH 0.1065 160,000 17,040 176,000 18,744 173,000 18,425 179,000 19,064
Pembantu instalator OH 0.2306 150,000 34,590 165,000 38,049 162,000 37,357 168,000 38,741
II BAHAN
Fiting keramik 125 watt Bh ##### 10,600 290 11,660 319 14,310 392 18,020 494
NYM 3 x 2.5 mm2 m 10.000 10,650 106,500 11,715 117,150 14,378 143,775 18,105 181,050
Klem Bh 1.0000 750 750 825 825 1,013 1,013 1,275 1,275
Saklar Bh 0.0041 14,500 59 15,950 65 19,575 80 24,650 101
Pipa Conduit PVC klas D m 5.000 3,000 15,000 3,300 16,500 4,050 20,250 5,100 25,500
Jumlah Harga Per-satuan Pekerjaan 229,940 252,934 281,458 328,619
I UPAH
Pekerja OH 0.3123 150,000 46,845 165,000 51,530 162,000 50,593 168,000 52,466
Mandor OH 175,000 - 193,000 - 189,000 - 196,000 -
Tukang Listrik OH 0.1045 160,000 16,720 176,000 18,392 173,000 18,079 179,000 18,706
Pembantu instalator OH 0.2306 150,000 34,590 165,000 38,049 162,000 37,357 168,000 38,741
II BAHAN
Rumah lampu + lampu
Bh 1 410,100 410,100 451,110 451,110 553,635 553,635 697,170 697,170
TL 2 x 36 watt ( grill )
Jumlah Harga Per-satuan Pekerjaan 508,255 559,081 659,663 807,083
I UPAH
Pekerja OH 0.1045 150,000 15,675 165,000 17,243 162,000 16,929 168,000 17,556
Mandor OH 175,000 - 193,000 - 189,000 - 196,000 -
Tukang Listrik OH 0.1050 160,000 16,800 176,000 18,480 173,000 18,165 179,000 18,795
Pembantu instalator OH 0.2274 150,000 34,110 165,000 37,521 162,000 36,839 168,000 38,203
II BAHAN
Lampu baret 40 watt Bh 1 529,560 529,560 582,516 582,516 714,906 714,906 900,252 900,252
Jumlah Harga Per-satuan Pekerjaan 596,145 655,760 786,839 974,806
Halaman_245
HARGA STANDAR KEGIATAN PEKERJAAN
PEMERINTAH KABUPATEN KUTAI TIMUR
TAHUN 2015
PEKERJAAN ELEKTRICAL
I UPAH
Pekerja OH 0.1045 150,000 15,675 165,000 17,243 162,000 16,929 168,000 17,556
Mandor OH 175,000 - 193,000 - 189,000 - 196,000 -
Tukang Listrik OH 0.1050 160,000 16,800 176,000 18,480 173,000 18,165 179,000 18,795
Pembantu instalator OH 0.2321 150,000 34,815 165,000 38,297 162,000 37,600 168,000 38,993
II BAHAN
Lampu down light isi PL
Bh 1 106,080 106,080 116,688 116,688 143,208 143,208 180,336 180,336
2 x 9 watt
Jumlah Harga Per-satuan Pekerjaan 173,370 190,707 215,902 255,680
I UPAH
Pekerja OH 0.1045 150,000 15,675 165,000 17,243 162,000 16,929 168,000 17,556
Mandor OH 175,000 - 193,000 - 189,000 - 196,000 -
Tukang Listrik OH 0.1050 160,000 16,800 176,000 18,480 173,000 18,165 179,000 18,795
Pembantu instalator OH 0.2321 150,000 34,815 165,000 38,297 162,000 37,600 168,000 38,993
II BAHAN
Lampu PL 2 x 9 watt Bh 1 74,256 74,256 81,682 81,682 100,246 100,246 126,235 126,235
Jumlah Harga Per-satuan Pekerjaan 141,546 155,701 172,940 201,579
I UPAH
Pekerja OH 0.1052 150,000 15,780 165,000 17,358 162,000 17,042 168,000 17,674
Mandor OH 175,000 - 193,000 - 189,000 - 196,000 -
Tukang Listrik OH 0.1055 160,000 16,880 176,000 18,568 173,000 18,252 179,000 18,885
Pembantu instalator OH 0.2326 150,000 34,890 165,000 38,379 162,000 37,681 168,000 39,077
II BAHAN
Stop kontak 25A, 3
Bh 1 187,500 187,500 206,250 206,250 253,125 253,125 318,750 318,750
phase Brocco
Jumlah Harga Per-satuan Pekerjaan 255,050 280,555 326,100 394,385
Halaman_246
HARGA STANDAR KEGIATAN PEKERJAAN
PEMERINTAH KABUPATEN KUTAI TIMUR
TAHUN 2015
PEKERJAAN ELEKTRICAL
I UPAH
Pekerja OH 0.1052 150,000 15,780 165,000 17,358 162,000 17,042 168,000 17,674
Mandor OH 175,000 - 193,000 - 189,000 - 196,000 -
Tukang Listrik OH 0.1055 160,000 16,880 176,000 18,568 173,000 18,252 179,000 18,885
Pembantu instalator OH 0.2326 150,000 34,890 165,000 38,379 162,000 37,681 168,000 39,077
II BAHAN
Saklar hotel Bh 1 33,450 33,450 36,795 36,795 45,158 45,158 56,865 56,865
Jumlah Harga Per-satuan Pekerjaan 101,000 111,100 118,133 132,500
I UPAH
Pekerja OH 0.1052 150,000 15,780 165,000 17,358 162,000 17,042 168,000 17,674
Mandor OH 175,000 - 193,000 - 189,000 - 196,000 -
Tukang Listrik OH 0.1055 160,000 16,880 176,000 18,568 173,000 18,252 179,000 18,885
Pembantu instalator OH 0.2336 150,000 35,040 165,000 38,544 162,000 37,843 168,000 39,245
II BAHAN
Saklar tunggal Brocco Bh 1 15,750 15,750 17,325 17,325 21,263 21,263 26,775 26,775
Jumlah Harga Per-satuan Pekerjaan 83,450 91,795 94,400 102,578
I UPAH
Pekerja OH 0.1052 150,000 15,780 165,000 17,358 162,000 17,042 168,000 17,674
Mandor OH 175,000 - 193,000 - 189,000 - 196,000 -
Tukang Listrik OH 0.1055 160,000 16,880 176,000 18,568 173,000 18,252 179,000 18,885
Pembantu instalator OH 0.2336 150,000 35,040 165,000 38,544 162,000 37,843 168,000 39,245
II BAHAN
Saklar double Brocco Bh 1 21,750 21,750 23,925 23,925 29,363 29,363 36,975 36,975
Jumlah Harga Per-satuan Pekerjaan 89,450 98,395 102,500 112,778
Halaman_247
HARGA STANDAR KEGIATAN PEKERJAAN
PEMERINTAH KABUPATEN KUTAI TIMUR
TAHUN 2015
PEKERJAAN ELEKTRICAL
I UPAH
Pekerja OH ##### 150,000 75,000 165,000 82,500 162,000 81,000 168,000 84,000
Mandor OH 0.0500 175,000 8,750 193,000 9,650 189,000 9,450 196,000 9,800
Tukang Listrik OH 0.0500 160,000 8,000 176,000 8,800 173,000 8,650 179,000 8,950
II BAHAN
PHB induk uk. 80 x 60 x
bh 1 2,062,500 2,062,500 2,268,750 2,268,750 2,784,375 2,784,375 3,506,250 3,506,250
40
NFB 100 A bh 1 3,135,000 3,135,000 3,448,500 3,448,500 4,232,250 4,232,250 5,329,500 5,329,500
Kabel scunt (sepatu
bh 4 2,550 10,200 2,805 11,220 3,443 13,770 4,335 17,340
kabel) Cu 25, 35 mm
Kabel scunt (sepatu
bh 8 4,200 33,600 4,620 36,960 5,670 45,360 7,140 57,120
kabel) Cu 50 mm
MCB 32 A bh 1 43,500 43,500 47,850 47,850 58,725 58,725 73,950 73,950
NH Fuse 50 A bb 6 37,500 225,000 41,250 247,500 50,625 303,750 63,750 382,500
Holder fuse bh 6 24,750 148,500 27,225 163,350 33,413 200,475 42,075 252,450
Fiting keramik 250 watt bh 1 3,300 3,300 3,630 3,630 4,455 4,455 5,610 5,610
Saklar bh 1 32,250 32,250 35,475 35,475 43,538 43,538 54,825 54,825
Kabel 10 m m 4 164,850 659,400 181,335 725,340 222,548 890,190 280,245 1,120,980
Lampu indikator set 1 348,075 348,075 382,883 382,883 469,901 469,901 591,728 591,728
Plat tembaga 0.5 m set 1 140,250 140,250 154,275 154,275 189,338 189,338 238,425 238,425
Pas. Ground bh 1 305,250 305,250 335,775 335,775 412,088 412,088 518,925 518,925
Jumlah Harga Per-satuan Pekerjaan 7,238,575 7,962,458 9,747,314 12,252,353
Halaman_248
HARGA STANDAR KEGIATAN PEKERJAAN
PEMERINTAH KABUPATEN KUTAI TIMUR
TAHUN 2015
PEKERJAAN MEKANIKAL
Jenis Pekerjaan : Memasang Instalasi Pipa PVC type AW dia. 1/2 "
Kuantitas Pekerjaan : 1 Meter
Produksi Harian/Jam : Harian
I UPAH
Pekerja OH 0.036 150,000 5,400 165,000 5,940 162,000 5,832 168,000 6,048
Mandor OH 0.0018 175,000 315 193,000 347 189,000 340 196,000 353
Tukang pasang pipa OH 0.060 160,000 9,600 176,000 10,560 173,000 10,380 179,000 10,740
Kepala tukang pipa OH 0.006 165,000 990 182,000 1,092 178,000 1,068 185,000 1,110
II BAHAN
Pipa PVC m 1.2000 5,425 6,510 5,725 6,870 5,725 6,870 6,575 7,890
Perlengkapan 35 % harga
- 0.3500 2,279 - 2,405 - 2,405 - 2,762
pipa
Jumlah Harga Per-satuan Pekerjaan 25,094 27,214 26,895 28,902
Jenis Pekerjaan : Memasang Instalasi Pipa PVC type AW dia. 3/4 "
Kuantitas Pekerjaan : 1 Meter
Produksi Harian/Jam : Harian
I UPAH
Pekerja OH 0.036 150,000 5,400 165,000 5,940 162,000 5,832 168,000 6,048
Mandor OH 0.0018 175,000 315 193,000 347 189,000 340 196,000 353
Tukang pasang pipa OH 0.060 160,000 9,600 176,000 10,560 173,000 10,380 179,000 10,740
Kepala tukang pipa OH 0.006 165,000 990 182,000 1,092 178,000 1,068 185,000 1,110
II BAHAN
Pipa PVC m 1.2000 8,000 9,600 8,300 9,960 8,575 10,290 9,450 11,340
Perlengkapan 35 % harga
- 0.3500 3,360 - 3,486 - 3,602 - 3,969
pipa
Jumlah Harga Per-satuan Pekerjaan 29,265 31,385 31,512 33,560
I UPAH
Pekerja OH 0.036 150,000 5,400 165,000 5,940 162,000 5,832 168,000 6,048
Mandor OH 0.0018 175,000 315 193,000 347 189,000 340 196,000 353
Tukang pasang pipa OH 0.060 160,000 9,600 176,000 10,560 173,000 10,380 179,000 10,740
Kepala tukang pipa OH 0.006 165,000 990 182,000 1,092 178,000 1,068 185,000 1,110
II BAHAN
Pipa PVC m 1.2000 10,575 12,690 11,150 13,380 11,150 13,380 12,575 15,090
Perlengkapan 35 % harga
- 0.3500 4,442 - 4,683 - 4,683 - 5,282
pipa
Jumlah Harga Per-satuan Pekerjaan 33,437 36,002 35,683 38,622
Halaman _249
HARGA STANDAR KEGIATAN PEKERJAAN
PEMERINTAH KABUPATEN KUTAI TIMUR
TAHUN 2015
PEKERJAAN MEKANIKAL
Jenis Pekerjaan : Memasang Instalasi Pipa PVC type AW dia. 1 1/2 "
Kuantitas Pekerjaan : 1 Meter
Produksi Harian/Jam : Harian
I UPAH
Pekerja OH 0.036 150,000 5,400 165,000 5,940 162,000 5,832 168,000 6,048
Mandor OH 0.0018 175,000 315 193,000 347 189,000 340 196,000 353
Tukang pasang pipa OH 0.060 160,000 9,600 176,000 10,560 173,000 10,380 179,000 10,740
Kepala tukang pipa OH 0.006 165,000 990 182,000 1,092 178,000 1,068 185,000 1,110
II BAHAN
Pipa PVC m 1.2000 20,875 25,050 21,725 26,070 22,300 26,760 24,875 29,850
Perlengkapan 35 % harga
- 0.3500 8,768 - 9,125 - 9,366 - 10,448
pipa
Jumlah Harga Per-satuan Pekerjaan 50,123 53,134 53,746 58,548
I UPAH
Pekerja OH 0.054 150,000 8,100 165,000 8,910 162,000 8,748 168,000 9,072
Mandor OH 0.0027 175,000 473 193,000 521 189,000 510 196,000 529
Tukang pasang pipa OH 0.090 160,000 14,400 176,000 15,840 173,000 15,570 179,000 16,110
Kepala tukang pipa OH 0.009 165,000 1,485 182,000 1,638 178,000 1,602 185,000 1,665
II BAHAN
Pipa PVC m 1.2000 24,025 28,830 25,175 30,210 25,450 30,540 28,600 34,320
Perlengkapan 35 % harga
- 0.3500 10,091 - 10,574 - 10,689 - 12,012
pipa
Jumlah Harga Per-satuan Pekerjaan 63,378 67,693 67,659 73,708
Jenis Pekerjaan : Memasang Instalasi Pipa PVC type AW dia. 2 1/2 "
Kuantitas Pekerjaan : 1 Meter
Produksi Harian/Jam : Harian
I UPAH
Pekerja OH 0.054 150,000 8,100 165,000 8,910 162,000 8,748 168,000 9,072
Mandor OH 0.0027 175,000 473 193,000 521 189,000 510 196,000 529
Tukang pasang pipa OH 0.090 160,000 14,400 176,000 15,840 173,000 15,570 179,000 16,110
Kepala tukang pipa OH 0.009 165,000 1,485 182,000 1,638 178,000 1,602 185,000 1,665
II BAHAN
Pipa PVC m 1.2000 33,175 39,810 34,600 41,520 35,475 42,570 39,175 47,010
Perlengkapan 35 % harga
- 0.3500 13,934 - 14,532 - 14,900 - 16,454
pipa
Jumlah Harga Per-satuan Pekerjaan 78,201 82,961 83,900 90,840
Halaman _250
HARGA STANDAR KEGIATAN PEKERJAAN
PEMERINTAH KABUPATEN KUTAI TIMUR
TAHUN 2015
PEKERJAAN MEKANIKAL
I UPAH
Pekerja OH 0.0810 150,000 12,150 165,000 13,365 162,000 13,122 168,000 13,608
Mandor OH 0.0041 175,000 718 193,000 791 189,000 775 196,000 804
Tukang pasang pipa OH 0.1350 160,000 21,600 176,000 23,760 173,000 23,355 179,000 24,165
Kepala tukang pipa OH 0.0135 165,000 2,228 182,000 2,457 178,000 2,403 185,000 2,498
II BAHAN
Pipa PVC m 1.2000 44,625 53,550 46,625 55,950 47,475 56,970 52,900 63,480
Perlengkapan 35 % harga
- 0.3500 18,743 - 19,583 - 19,940 - 22,218
pipa
Jumlah Harga Per-satuan Pekerjaan 108,988 115,906 116,564 126,772
I UPAH
Pekerja OH 0.0810 150,000 12,150 165,000 13,365 162,000 13,122 168,000 13,608
Mandor OH 0.0041 175,000 718 193,000 791 189,000 775 196,000 804
Tukang pasang pipa OH 0.1350 160,000 21,600 176,000 23,760 173,000 23,355 179,000 24,165
Kepala tukang pipa OH 0.0135 165,000 2,228 182,000 2,457 178,000 2,403 185,000 2,498
II BAHAN
Pipa PVC m 1.2000 74,350 89,220 77,800 93,360 79,225 95,070 88,100 105,720
Perlengkapan 35 % harga
- 0.3500 31,227 - 32,676 - 33,275 - 37,002
pipa
Jumlah Harga Per-satuan Pekerjaan 157,142 166,409 167,999 183,796
I UPAH
Pekerja OH 0.0810 150,000 12,150 165,000 13,365 162,000 13,122 168,000 13,608
Mandor OH 0.0041 175,000 718 193,000 791 189,000 775 196,000 804
Tukang pasang pipa OH 0.1350 160,000 21,600 176,000 23,760 173,000 23,355 179,000 24,165
Kepala tukang pipa OH 0.0135 165,000 2,228 182,000 2,457 178,000 2,403 185,000 2,498
II BAHAN
Pipa PVC m 1.2000 172,450 206,940 180,175 216,210 183,600 220,320 204,500 245,400
Perlengkapan 35 % harga
- 0.3500 72,429 - 75,674 - 77,112 - 85,890
pipa
Jumlah Harga Per-satuan Pekerjaan 316,064 332,257 337,087 372,364
Halaman _251
RESUME ANALISA TEKNIS
HARGA SATUAN PEKERJAAN MEKANIKAL & ELEKTRIKAL
Halaman_252
RESUME ANALISA TEKNIS
HARGA SATUAN PEKERJAAN MEKANIKAL & ELEKTRIKAL
Halaman_253
RESUME ANALISA TEKNIS
HARGA SATUAN PEKERJAAN MEKANIKAL & ELEKTRIKAL
Halaman_254