Summary Bill of Quantity

PEKERJAAN : ELEKTRONIK (FA & CCTV)


ALAMAT : KAWASAN INDUSTRI OLIMPIX, SENTUL BOGOR
OWNER : PT. AGRINESIA RAYA
KONTRAKTOR :
PRIODE : 2019
REVISI : R0

TOTAL HARGA
NO Description
Rp.

ELEKTRONIK (FA & CCTV)

I PRELIMINARIES/PERSIAPAN 28,500,000

II DAFTAR NO. 3 - PEKERJAAN CCTV ANALOG 291,050,928

III DAFTAR NO. 2 - PEKERJAAN FIRE ALARM 126,079,926

SUB. TOTAL 445,630,854

PEMBULATAN HARGA 445,630,000

PPN 10% 44,563,000

GRAND TOTAL 490,193,000


BILL of QUANTITY `
PEKERJAAN : EXTENTION PRODUCTION LINE
ALAMAT : KAWASAN INDUSTRI OLIMPIX, SENTUL BOGOR
OWNER : PT. AGRINESIA RAYA
KONTRAKTOR :
PRIODE : 2019
REVISI : R0

HARGA
TOTAL HARGA
No. URAIAN VOL SAT SATUAN
( RP ) ( RP )

A. PRELIMINARIES/PERSIAPAN

PRELIUM
CATATAN :
Sebelum mengisi harga Pemborong wajib membaca Dokumen Tender
dan Catatan Harga dengan seksama agar sudah mengetahui kondisi
yang di minta.

PEKERJAAN PERSIAPAN, PRASARANA DAN PENUNJANG

1 Proyek Menejemen dan Biaya-biaya Administrasi Lapangan 1 lot 2,500,000 2,500,000


Biaya-biaya mengadakan staf di lapangan yang akan mengelola
pelaksanaan Pekerjaan dan Mengurus segala hal yang berhubungan
dengan tanggung jawabnya terhadap Kontrak ini termasuk semua biaya-
biaya yang dikeluarkan untuk administrasi yang menjadi beban
Pemborong ( Pemborong harus melampirkan perinciannya ).

2 Kontrak Kerja 1 lot -


a. Kontraktor atau pemborong harus membuat draf kontak
kerja yang disepakati oleh kedua belah pihak.

b. Kontaktor harus memperbanyak sebanyak 5 (lima ) rangkap


lengkap dengan segala lampiran-lampiran yang dibutuhkan
sesuai dari direksi lapangan atau pemberi tugas.

c. Semua biaya item (a) dan (b) menjadi tanggung jawab


kontraktor atau pemborong.

3 Gambar Shop Drawing (Gambar kerja yang dilaksanakan ) 1 lot 5,000,000 5,000,000
a. Sebelum kontraktor bekerja wajib membuat gambar kerja
ukuran A1 yang menyangkut semua aspek dalam
pelaksanaan dimana gambar tersebut harus di setujui
direksi lapangan atau pemberi tugas dalam rangkap 3 set
( dalam Blue Print ).
b. Setelah Selesai pekerjaan maka kontraktor harus membuat
gambar As-Built Drawing ukuran A1, dimana gambar
tersebut menunjukan segala sesuatunya harus sesuai
dengan kondisi material atau unit terpasang dan diserahkan
kepada Direksi Lapangan atau Pemberi Tugas dalam bentuk
: 1 (satu) buah Disket Master, 3 (tiga) set Blue Print yang
telah disetujui.
c. Dalam pembuatan gambar harus menggunakan sistem Auto
Cad R.12 atau setara.

d. Semua biaya item (a),(b) dan (c) menjadi tanggung jawab


kontraktor atau pemborong.

4 Contoh Bahan ( Material ) dan Brosure 1 lot -


a. Sebelum kontraktor bekerja harus membuat persetujuan
material yang menyangkut semua aspek dalam
material yang menyangkut semua aspek dalam
pelaksanaan dimana sample atau contoh tersebut harus
disetujui Direksi Lapangan untuk material yang bersifat unit
cukup dengan Brosur saja.

b. Surat persetujuan material dibuat rangkap 3 (tiga) untuk di


setujui oleh Direksi Lapangan atau Pemberi Tugas.

c. Semua biaya item (a) dan (b) menjadi tanggung jawab


kontraktor atau pemborong.

5 Pemeriksaan dan Pengujian Bahan 1 lot -


a. Semua barang atau unit harus dari Distributor Utama dan
harus mendapatkan sertifikat unit atau sertifikat lainnya
yang menyatakan keaslian dari unit itu sendiri.

b. Direksi lapangan berhak untuk memeriksa keaslian dari unit


dan berhak atas menolak dan menerima semua material
disebabkan ketidaksesuaian dengan persetujuan material.

c. Semua biaya item (a) dan (b) menjadi tanggung jawab


kontraktor atau pemborong.

6 Photo-photo Progress Kemajuan Pekerjaan 1 lot 3,000,000 3,000,000


a. Kontaktor wajib membuat photo progeres yang dilakukan
tiap bulannya dalam papan board untuk diserahkan dengan
Direksi lapangan hingga masa menyerahan pertama.

b. Photo kemajuan pekerjaan dibuat photo minimal 5 (lima)


lembar untuk setiap sub bidang pekerjaan atau sesuai
dengan keperluan Direksi Lapangan atau Pemberi tugas.

c. Kontaktor wajib membuat daftar laporan progress tertulis


sesuai dengan progres pekerjaan.

d. Direksi lapangan berhak untuk memeriksa progress dari


kontraktor dan berhak menolak atau menerima yang
disebabkan ketidaksesuaian dengan kondisi progress yang
diajukan.

e. Semua biaya item (a), (b) dan (c) menjadi tanggung jawab
kontraktor atau pemborong.

7 Kebersihan dan Kerapihan 1 lot -


a. Kontraktor wajib menjaga kebersihan lokasi bekerja.

b. Kontraktor harus secara teratur membuang sampah keluar


proyek ke lokasi yang telah ditentukan oleh pemerintah.

c. Pemborong berkewajiban dan bertanggung jawab menjaga


jalan umum disekitar proyek dari kotoran dan kerusakan.

d. Semua biaya item (a),(b) dan (c) menjadi tanggung jawab


kontraktor atau pemborong.

8 Pertanggungan Biaya 1 lot 1,500,000 1,500,000


Pemborong bertanggung jawab semua pengeluaran biaya atas
peninjauan lokasi ( Kunjungan Pabrik), ( Hanya Wilayah Indonesia ), Ijin
pemasukan peralatan ke lokasi lengkap dengan team yang
bersangkutan.

9 Kantor dan Gudang Sementara Pemborong 1 lot 4,500,000 4,500,000


Kontraktor harus membuat kantor, gudang menyimpanan alat dan
material dan harus dibongkar kembali pada saat setelah selesai atau
material dan harus dibongkar kembali pada saat setelah selesai atau
setelah ada perintah dari Direksi Proyek.

10 Alat Komunikasi 1 lot 1,500,000 1,500,000


Kontraktor harus menyediakan fasilitas 1(satu) set alat komunikasi
berupa telepon atau HT (Handly Talky) bila diperlukan.

11 P 3 K dan Pemadam Kebakaran 1 lot -


Kontraktor wajib mengadakan kotak P3K dan alat pemadam kebakaran
portable guna untuk pencegahan kebakaran. Sesuai dengan anjuran
atau saran dari perusahaan asuransi dan instansi yang berwenang.

12 Keamanan Proyek, Perlindungan pekerjaan 1 lot 1,000,000 1,000,000


Pemborong bertanggung jawab atas keamanan, penerangan dan
perlindungan terhadap pekerjaan baik sebelum dan sesudah dikerjakan
terutama pekerjaan yang penting dan dapat membahayakan selama
pelaksanaan Kontrak siang dan malam. Pemberi Tugas tidak
bertanggung jawab terhadap Pemborong dan Sub-Pemborong atas
keselamatan pekerja dan pekerjaan, kehilangan atau kerusakan bahan-
bahan bangunan atau peralatan atau pekerjaan yang sedang dalam
pelaksaan. Pengadaan jaring pengaman pada sekeliling bangunan
Koordinasi Keamanan di lokasi Bangunan tanggung jawab Pemborong.

13 Perlindungan terhadap Kabel dan Instalasi Pipa 1 lot -


Pemborong bertanggung jawab untuk melindungi, memindahkan atau
mengambil tindakan lain yang diperlukan untuk menghindari kerusakan
ataupun gangguan terhadap jaringan/instalasi yang ada.
14 Pengadaan Sumber Air Bersih 1 lot -
Air untuk keperluan pekerjaan Pemborong harus diadakan Pemborong
dan apabila mungkin di dapat dari sumber yang sudah ada dintiap lokasi
Proyek tersebut. Pemborong harus membuat sambungan sementara
yang diperlukan atau cara lain untuk mengalirkan air dan mencabutnya
kembali pada waktu pekerjaan selesai dan membetulkan segala
pekerjaan lain yang terganggu. Tidak diperbolehkan menyambung dan
saluran induk, lubang penyedot (tap point), resevoir dsb, tanpa terlebih
dahulu mendapat persetujuan tertulis dari Direktur Lembaga yang
berssangkutan (PDAM). Apabila air di dapat dari sumber lain,
Pemborong harus membayar segala ongkos penyambungan, air yang
dipakai, dan pembongkarannya kembali, Pemberi Tugas dalam hal ini
tidak bertanggung jawab atau mengganti biaya yang dikeluarkan oleh
Pemborong untuk keperluan itu.
15 Pengadaan Tenaga Listrik 1 lot 3,000,000 3,000,000
Pengadaan Penerangan sementara/buatan yang dipergunakan oleh
Pemborong untuk penerangan dalam bekerja termasuk pemindahan &
perijinan materan PLN (bila digunakan) disediakan oleh Pemborong.
Kabel-kabel peralatan serta lampu & perapihan kembali pada waktu
pekerjaan selesai atas bebean Pemborong.

16 Peralatan dan Perlengkapan Kerja 1 lot 4,500,000 4,500,000


Peralatan dan perlengkapan kerja yang lengkap serta pengukuran
(kalibrasi) alat-alat, kelancaran pelaksanaan pekerjaan termasuk
pemeliharaan dan pemindahan dalam lokasi pekerjaan serta
mengeluarkan setelah penyelesaian pekerjaan (Pemborong harus
melampirkan perinciannya).

17 Topi Pengaman (helm) Bagi Pekerja 1 lot 2,000,000 2,000,000


Penyediaan topi pengaman bagi para pekerja lapangan sebanyak lot
karyawan yang dipekerjakan.

18 Asuransi
a. Pemberi Tugas mengasuransikan pekerjaan (CAR) sesuai 1 lot BY OWNER
Dokumen Kontrak tetapi deductible sesuai nilai dalam
dokumen kontrak di tanggung oleh Pemborong.
b. Pemberi Tugas mengasuransikan pekerjaan terhadap pihak 1 lot BY OWNER
ketiga (TPL) sesuai Dokumen Kontrak tetapi deductible
sesuai nilai dalam dokumen kontrak ditanggung oleh
Pemborong.
c. Pemborong wajib mengasuransikan seluruh tenaga 1 lot -
kerjanya/Astek/Jamsostek (Hanya yang tercantum pada
daftar karyawan lapangan proyek yang bersangkutan).

19 Perijinan
a. SLO 1 lot -
b. Ijin Penangkal Petir 1 lot
20 Mobilisasi atau transportasi peralatan ke lokasi. 1 lot -

20 Biaya Kordinasi dan Konsolidasi Terhadap Lingkungan/Oraganisasi Masra 1 lot -

TOTAL BIAYA PEKERJAAN PERSIAPAN & PENUNJANG 28,500,000


BOQ PENAWARAN PROYEK HOTEL STARLET
PAKET PEKERJAAN ELEKTRIKAL & ELEKTRONIK
DAFTAR NO. 2 - PEKERJAAN FIRE ALARM
HARGA
QTY TOTAL
NO URAIAN PEKERJAAN KETERANGAN SAT QTY SATUAN
+/- (Rp.) (Rp.)

DAFTAR NO. 2 - PEKERJAAN FIRE ALARM


Pengadaan dan pemasangan system TATA SUARA lengkap dengan alat bantu pasang lainnya
sesuai gambar dan spesifikasi teknis

DAFTAR NO. 2.1 - PERALATAN UTAMA


MCPFA semi addressable kap. 1 loop, maks.124 Address lengkap terminal 1 45,097,789 45,097,789
UPS c/w Arrester, rectifier, Back-up Battery 4 jam 1 2,648,473 2,648,473
Handset Intercom 1 4,121,638 4,121,638
Annunciator 1 11,046,344 11,046,344
Rak peralatan 1 5,562,287 5,562,287
Pengkabelan untuk peralatan utama 1 3,785,077 3,785,077
Pekerjaan grounding sistem seluruh Peralatan fire alarm 1 3,586,310 3,586,310
Marterial bantu 1 6,458,333 6,458,333

JBFA (Juntion Box Fire Alarm)


Lengkap dengan Module Zone dan aksesories lainya
TBFA-Office 1 3,297,769 3,297,769
TBFA-Warehouse 1 3,297,769 3,297,769
TBFA - Utility 1 3,297,769 3,297,769
TBFA- Cake 1 3,297,769 3,297,769
TBFA-Donuts 1 3,297,769 3,297,769
TBFA - Chese 1 3,297,769 3,297,769
TBFA - Jalur Insfeksi 1 3,297,769 3,297,769

DAFTAR NO. 2.2 - KABEL INSTALASI UTAMA


Pengkabelan untuk peralatan utama fire alarm 1 7,350,765 7,350,765
Kabel FRC 2 x 1,5 mm² + konduit dari MCPFA ke :
- Panel Pompa Hidrant 120 27,821 3,338,569
- PDTR 120 27,821 3,338,569
Kabel AWG 18 x 2 Pairs+ KABEL FRC 3 x 1,5 mm2 + konduit dari MCPFA ke
- Annunciator 50 62,834 3,141,681
- JBFA (Maing - masing area) 500 62,834 31,416,808
Ke Penjumlahan Rp. 153,977,028

DAFTAR NO. 2.3 - AREA OFFICE LT-1 & 2


Material
PHOTO ELECTRIC SMOKE DTECTOR 15 387,360 5,810,395
ROR heat Detector c/w alarm response lamp / detektor panas 6 581,526 3,489,158
Fixed Temperatur Heat Detector c/w Alarm response Lamp 0 301,183 -
MANUAL PUSH BUTTON 1 358,209 358,209
ALARM BELL 1 273,714 273,714
FLASER LAMP 1 240,381 240,381
OUTLET INTERCOM 1 273,072 273,072
END OF LINE 5 5,417 27,083

Kabel Instalasi
NYA 2x1,5mm + PIPA CONDUIT 20mm UNTUK DETECTOR 21 414,348 8,701,304
FRC 2x1,5mm PIPA CONDUIT 20mm UNTUK MANUAL PUSH BUTTON 1 716,381 716,381
FRC 2x1,5mm PIPA CONDUIT 20mm UNTUK ALARM BELL 1 716,381 716,381
FRC 2x1,5mm PIPA CONDUIT 20mm UNTUK FLASER LAMP 1 716,381 716,381
ITC 2 x 2 x 0,6 mm PIPA CONDUIT 20mm UNTUK HEADSET INTERCOM 1 394,717 394,717
Ke Penjumlahan Rp. 21,717,178

DAFTAR NO. 2.4 - AREA WAREHOUSE


Material
PHOTO ELECTRIC SMOKE DTECTOR 15 387,360 5,810,395
ROR heat Detector c/w alarm response lamp / detektor panas 6 581,526 3,489,158
Fixed Temperatur Heat Detector c/w Alarm response Lamp 0 301,183 -
MANUAL PUSH BUTTON 1 358,209 358,209
ALARM BELL 1 273,714 273,714
FLASER LAMP 1 240,381 240,381
OUTLET INTERCOM 1 273,072 273,072
END OF LINE 5 5,417 27,083

Kabel Instalasi
NYA 2x1,5mm + PIPA CONDUIT 20mm UNTUK DETECTOR 21 414,348 8,701,304
FRC 2x1,5mm PIPA CONDUIT 20mm UNTUK MANUAL PUSH BUTTON 1 716,381 716,381
FRC 2x1,5mm PIPA CONDUIT 20mm UNTUK ALARM BELL 1 716,381 716,381
FRC 2x1,5mm PIPA CONDUIT 20mm UNTUK FLASER LAMP 1 716,381 716,381
ITC 2 x 2 x 0,6 mm PIPA CONDUIT 20mm UNTUK HEADSET INTERCOM 1 394,717 394,717
Ke Penjumlahan Rp. 21,717,178

DAFTAR NO. 2.5 - Area Production Cake


Material
PHOTO ELECTRIC SMOKE DTECTOR 15 387,360 5,810,395
ROR heat Detector c/w alarm response lamp / detektor panas 6 581,526 3,489,158
Fixed Temperatur Heat Detector c/w Alarm response Lamp 0 301,183 -
MANUAL PUSH BUTTON 1 358,209 358,209
ALARM BELL 1 273,714 273,714
FLASER LAMP 1 240,381 240,381
OUTLET INTERCOM 1 273,072 273,072
END OF LINE 5 5,417 27,083

Kabel Instalasi
NYA 2x1,5mm + PIPA CONDUIT 20mm UNTUK DETECTOR 21 414,348 8,701,304
FRC 2x1,5mm PIPA CONDUIT 20mm UNTUK MANUAL PUSH BUTTON 1 716,381 716,381
FRC 2x1,5mm PIPA CONDUIT 20mm UNTUK ALARM BELL 1 716,381 716,381
FRC 2x1,5mm PIPA CONDUIT 20mm UNTUK FLASER LAMP 1 716,381 716,381
ITC 2 x 2 x 0,6 mm PIPA CONDUIT 20mm UNTUK HEADSET INTERCOM 1 394,717 394,717
Ke Penjumlahan Rp. 21,717,178

DAFTAR NO. 2.6 - Area Production Donut


Material
PHOTO ELECTRIC SMOKE DTECTOR 15 387,360 5,810,395
ROR heat Detector c/w alarm response lamp / detektor panas 6 581,526 3,489,158
Fixed Temperatur Heat Detector c/w Alarm response Lamp 0 301,183 -
MANUAL PUSH BUTTON 1 358,209 358,209
ALARM BELL 1 273,714 273,714
FLASER LAMP 1 240,381 240,381
OUTLET INTERCOM 1 273,072 273,072
END OF LINE 5 5,417 27,083

Kabel Instalasi
NYA 2x1,5mm + PIPA CONDUIT 20mm UNTUK DETECTOR 21 414,348 8,701,304
FRC 2x1,5mm PIPA CONDUIT 20mm UNTUK MANUAL PUSH BUTTON 1 716,381 716,381
FRC 2x1,5mm PIPA CONDUIT 20mm UNTUK ALARM BELL 1 716,381 716,381
FRC 2x1,5mm PIPA CONDUIT 20mm UNTUK FLASER LAMP 1 716,381 716,381
ITC 2 x 2 x 0,6 mm PIPA CONDUIT 20mm UNTUK HEADSET INTERCOM 1 394,717 394,717
Ke Penjumlahan Rp. 21,717,178

DAFTAR NO. 2.7 - Area Production Chesse


Material
PHOTO ELECTRIC SMOKE DTECTOR 15 387,360 5,810,395
ROR heat Detector c/w alarm response lamp / detektor panas 6 581,526 3,489,158
Fixed Temperatur Heat Detector c/w Alarm response Lamp 0 301,183 -
MANUAL PUSH BUTTON 1 358,209 358,209
ALARM BELL 1 273,714 273,714
FLASER LAMP 1 240,381 240,381
OUTLET INTERCOM 1 273,072 273,072
END OF LINE 5 5,417 27,083

Kabel Instalasi
NYA 2x1,5mm + PIPA CONDUIT 20mm UNTUK DETECTOR 21 414,348 8,701,304
FRC 2x1,5mm PIPA CONDUIT 20mm UNTUK MANUAL PUSH BUTTON 1 716,381 716,381
FRC 2x1,5mm PIPA CONDUIT 20mm UNTUK ALARM BELL 1 716,381 716,381
FRC 2x1,5mm PIPA CONDUIT 20mm UNTUK FLASER LAMP 1 716,381 716,381
ITC 2 x 2 x 0,6 mm PIPA CONDUIT 20mm UNTUK HEADSET INTERCOM 1 394,717 394,717
Ke Penjumlahan Rp. 21,717,178

DAFTAR NO. 2.8 - Area Utility


Material
PHOTO ELECTRIC SMOKE DTECTOR 15 387,360 5,810,395
ROR heat Detector c/w alarm response lamp / detektor panas 6 581,526 3,489,158
Fixed Temperatur Heat Detector c/w Alarm response Lamp 0 301,183 -
MANUAL PUSH BUTTON 1 358,209 358,209
ALARM BELL 1 273,714 273,714
FLASER LAMP 1 240,381 240,381
OUTLET INTERCOM 1 273,072 273,072
END OF LINE 5 5,417 27,083

Kabel Instalasi
NYA 2x1,5mm + PIPA CONDUIT 20mm UNTUK DETECTOR 21 414,348 8,701,304
FRC 2x1,5mm PIPA CONDUIT 20mm UNTUK MANUAL PUSH BUTTON 1 716,381 716,381
FRC 2x1,5mm PIPA CONDUIT 20mm UNTUK ALARM BELL 1 716,381 716,381
FRC 2x1,5mm PIPA CONDUIT 20mm UNTUK FLASER LAMP 1 716,381 716,381
ITC 2 x 2 x 0,6 mm PIPA CONDUIT 20mm UNTUK HEADSET INTERCOM 1 394,717 394,717
Ke Penjumlahan Rp. 21,717,178

Testing & Commisioning 1 6,770,833 6,770,833


Ke Penjumlahan Rp. 6,770,833
PENJUMLAHA
DAFTAR NO. 2 - PEKERJAAN FIRE ALARM

DAFTAR NO. 2.1 - PERALATAN UTAMA Rp. 153,977,028


DAFTAR NO. 2.3 - AREA OFFICE LT-1 & 2 Rp. 21,717,178
DAFTAR NO. 2.4 - AREA WAREHOUSE Rp. 21,717,178
DAFTAR NO. 2.5 - Area Production Cake Rp. 21,717,178
DAFTAR NO. 2.6 - Area Production Donut Rp. 21,717,178
DAFTAR NO. 2.7 - Area Production Chesse Rp. 21,717,178
DAFTAR NO. 2.8 - Area Utility Rp. 21,717,178
Testing & Commisioning Rp. 6,770,833

TOTAL 291,050,928
BOQ PENAWARAN PROYEK HOTEL STARLET
PAKET PEKERJAAN ELEKTRIKAL & ELEKTRONIK
DAFTAR NO. 3 - PEKERJAAN CCTV ANALOG
HARGA
QTY TOTAL
NO URAIAN PEKERJAAN KETERANGAN SAT QTY SATUAN
+/- (Rp.) (Rp.)

DAFTAR NO. 3 - PEKERJAAN CCTV ANALOG


Pengadaan dan pemasangan system TATA SUARA lengkap dengan alat bantu pasang lainnya
sesuai gambar dan spesifikasi teknis

DAFTAR NO. 3.1 - PERALATAN UTAMA


CC1 DVR kapasitas hardist 24 TB 1 8,811,650 8,811,650
CC2 DVR KAP 16 CHANNEL 4 5,059,099 20,236,395
CC3 MONITOR 22 INCH 2 1,848,852 3,697,704
CC4 Rak peralatan (Provisional) 1 3,399,983 3,399,983
CC5 Pengkabelan untuk peralatan utama 1 2,735,539 2,735,539
CC6 Pekerjaan grounding sistem seluruh Peralatan CCTV 1 3,665,348 3,665,348
CC7 UPS 3 kVA c/w power suply 220 v/ 50 h2, batteray general CCTV 1 10,749,362 10,749,362
CC8 Testing Commisioning 1 3,333,333 3,333,333
CC9 Power Suplay 4 1,309,675 5,238,699
Ke Penjumlahan Rp. 61,868,014

DAFTAR NO. 3.2 - AREA OFFICE LT-1 & 2


CC13 Dome Fix Colour Camera 4 663,317 2,653,269
CC14 Colour Fix Camera 4 663,317 2,653,269
CC15 Kbl. Data Coaxial RG 6 In PVC Conduit Ø 20 mm + 8 801,977 6,415,816
CC16 Kbl. Power NYM 3 x 1,5 mm2 In PVC Conduit Ø 20 mm -
Ke Penjumlahan Rp. 11,722,355

DAFTAR NO. 3.4 - AREA WAREHOUSE


CC13 Dome Fix Colour Camera 2 663,317 1,326,635
CC15 Kbl. Data Coaxial RG 6 In PVC Conduit Ø 20 mm + 2 801,977 1,603,954
CC16 Kbl. Power NYM 3 x 1,5 mm2 In PVC Conduit Ø 20 mm -
Ke Penjumlahan Rp. 2,930,589

DAFTAR NO. 3.5 - Jalur Insfeksi


CC17 Colour Fix Outdoor Camera c/w Housing 4 1,911,192 7,644,766
CC15 Kbl. Data Coaxial RG 6 In PVC Conduit Ø 20 mm + 4 801,977 3,207,908
CC16 Kbl. Power NYM 3 x 1,5 mm2 In PVC Conduit Ø 20 mm -
Ke Penjumlahan Rp. 10,852,674

DAFTAR NO. 3.6 - Area Utility


CC17 Colour Fix Outdoor Camera c/w Housing 2 1,911,192 3,822,383
CC15 Kbl. Data Coaxial RG 6 In PVC Conduit Ø 20 mm + 2 801,977 1,603,954
CC16 Kbl. Power NYM 3 x 1,5 mm2 In PVC Conduit Ø 20 mm -
Ke Penjumlahan Rp. 5,426,337

DAFTAR NO. 3.7 - Site Plant/Outdoor


CC17 Colour Fix Outdoor Camera c/w Housing 4 1,911,192 7,644,766
CC15 Kbl. Data Coaxial RG 6 In PVC Conduit Ø 20 mm + 4 801,977 3,207,908
CC16 Kbl. Power NYM 3 x 1,5 mm2 In PVC Conduit Ø 20 mm -
Ke Penjumlahan Rp. 10,852,674

DAFTAR NO. 3.8 - Area Production Cake


CC13 Dome Fix Colour Camera 2 663,317 1,326,635
CC14 Colour Fix Camera 2 663,317 1,326,635
CC15 Kbl. Data Coaxial RG 6 In PVC Conduit Ø 20 mm + 4 801,977 3,207,908
CC16 Kbl. Power NYM 3 x 1,5 mm2 In PVC Conduit Ø 20 mm -
Ke Penjumlahan Rp. 5,861,178

DAFTAR NO. 3.9 - Area Production Donut


CC13 Dome Fix Colour Camera 2 663,317 1,326,635
CC14 Colour Fix Camera 2 663,317 1,326,635
CC15 Kbl. Data Coaxial RG 6 In PVC Conduit Ø 20 mm + 4 801,977 3,207,908
CC16 Kbl. Power NYM 3 x 1,5 mm2 In PVC Conduit Ø 20 mm -
Ke Penjumlahan Rp. 5,861,178

DAFTAR NO. 3.10 - Area Production Chesse


CC13 Dome Fix Colour Camera 2 663,317 1,326,635
CC14 Colour Fix Camera 2 663,317 1,326,635
CC15 Kbl. Data Coaxial RG 6 In PVC Conduit Ø 20 mm + 4 801,977 3,207,908
CC16 Kbl. Power NYM 3 x 1,5 mm2 In PVC Conduit Ø 20 mm -
Ke Penjumlahan Rp. 5,861,178

CC19 Testing & Commisioning 1 4,843,750 4,843,750


Ke Penjumlahan Rp. 4,843,750
PENJUMLAHA
DAFTAR NO. 3 - PEKERJAAN CCTV ANALOG

DAFTAR NO. 3.1 - PERALATAN UTAMA Rp. 61,868,014


DAFTAR NO. 3.2 - AREA OFFICE LT-1 & 2 Rp. 11,722,355
DAFTAR NO. 3.4 - AREA WAREHOUSE Rp. 2,930,589
DAFTAR NO. 3.5 - Jalur Insfeksi Rp. 10,852,674
DAFTAR NO. 3.6 - Area Utility Rp. 5,426,337
DAFTAR NO. 3.7 - Site Plant/Outdoor Rp. 10,852,674
DAFTAR NO. 3.8 - Area Production Cake Rp. 5,861,178
DAFTAR NO. 3.9 - Area Production Donut Rp. 5,861,178
DAFTAR NO. 3.10 - Area Production Chesse Rp. 5,861,178
Testing & Commisioning Rp. 4,843,750

TOTAL 126,079,926
BILL of QUANTITY
PEKERJAAN : EXTENTION PRODUCTION LINE
ALAMAT : KAWASAN INDUSTRI OLIMPIX, SENTUL BOGOR
OWNER : PT. AGRINESIA RAYA
KONTRAKTOR :
PRIODE : 2019
REVISI : R0

HARGA SUPLAYER Total Harga


NO Description Unit Qty.
Material Jasa Rp.
VI. ELEKTRONIKA
A. MATERIAL PEKERJAAN FIRE ALARM
Sistem semi addresible
1 Peralatan Utama
MCPFA semi addressable kap. 1 loop, maks.124 Address lengkap
- FA1 Unit 1 38,200,000 5,200,000 43,400,000
terminal, controller, master handset intercome dan asesoris lainnya
- FA2 UPS c/w Arrester, rectifier, Back-up Battery 4 jam Unit 1 1,968,493 586,000 2,554,493
- FA3 Handset Intercom Unit 1 3,613,916 350,000 3,963,916
- FA4 Annunciator Unit 1 9,380,000 1,250,000 10,630,000
- FA5 Rak peralatan Unit 1 4,850,000 500,000 5,350,000
- FA6 Pengkabelan untuk peralatan utama Lot 1 2,850,000 800,000 3,650,000
- FA7 Pekerjaan grounding sistem seluruh Peralatan fire alarm Lot 1 3,100,000 350,000 3,450,000
- FA8 Marterial bantu Lot 1 6,200,000 6,200,000
FA9
- FA10 JBFA (Juntion Box Fire Alarm)
FA11 Lengkap dengan Module Zone dan aksesories lainya
a FA12 TBFA-Office Unit 1 2,847,491 325,000 3,172,491
b FA13 TBFA-Warehouse Unit 1 2,847,491 325,000 3,172,491
c FA14 TBFA - Utility Unit 1 2,847,491 325,000 3,172,491
d FA15 TBFA- Cake Unit 1 2,847,491 325,000 3,172,491
f FA16 TBFA-Donuts Unit 1 2,847,491 325,000 3,172,491
g FA17 TBFA - Chese Unit 1 2,847,491 325,000 3,172,491
h FA18 TBFA - Jalur Insfeksi Unit 1 2,847,491 325,000 3,172,491
FA19
FA20 SUB TOTAL
2 FA21 Kabel Instalasi
- FA22 Pengkabelan untuk peralatan utama fire alarm lot 1 6,420,000 650,000 7,070,000
a. FA23 Kabel FRC 2 x 1,5 mm² + konduit dari MCPFA ke :
- FA24 Panel Pompa Hidrant m 120 20,047 6,800 26,847
- FA25 PDTR m 120 20,047 6,800 26,847
b FA26 Kabel AWG 18 x 2 Pairs+ KABEL FRC 3 x 1,5 mm2 + konduit
FA27 dari MCPFA ke
FA28 Annunciator m 50 47,781 12,800 60,581
FA29 JBFA (Maing - masing area) m 500 47,781 12,800 60,581
FA30
FA31 SUB TOTAL
4 FA32 Area Production Donut
- FA33 PHOTO ELECTRIC SMOKE DTECTOR Unit 15 288,600 85,000 373,600
- FA34 ROR heat Detector c/w alarm response lamp / detektor panas Unit 6 475,000 85,000 560,000
- FA35 Fixed Temperatur Heat Detector c/w Alarm response Lamp Unit 0 205,871 85,000 290,871
- FA36 MANUAL PUSH BUTTON Unit 1 260,615 85,000 345,615
- FA37 ALARM BELL Unit 1 179,500 85,000 264,500
- FA38 FLASER LAMP Unit 1 147,500 85,000 232,500
- FA39 OUTLET INTERCOM Unit 1 178,884 85,000 263,884
- FA40 END OF LINE Unit 5 5,200 5,200
FA41
FA42 KABEL INSTALASI
- FA43 NYA 2x1,5mm + PIPA CONDUIT 20mm UNTUK DETECTOR Titik 21 244,958 156,000 400,958
- FA44 FRC 2x1,5mm PIPA CONDUIT 20mm UNTUK MANUAL PUSH BUTTON Titik 1 467,318 225,000 692,318
- FA45 FRC 2x1,5mm PIPA CONDUIT 20mm UNTUK ALARM BELL Titik 1 467,318 225,000 692,318
- FA46 FRC 2x1,5mm PIPA CONDUIT 20mm UNTUK FLASER LAMP Titik 1 467,318 225,000 692,318
- FA47 ITC 2 x 2 x 0,6 mm PIPA CONDUIT 20mm UNTUK HEADSET INTERCOM Titik 1 271,173 110,000 381,173
FA48 SUB TOTAL
FA49
FA50 SUB TOTAL
FA51 TOTAL
7 FA52 Testing & Commisioning lot 1 6,500,000 6,500,000
TOTAL PEKERJAAN FIRE ALARM

B PEKERJAAN CCTV
1. Peralatan Utama
- CC1 DVR kapasitas hardist 24 TB Unit 1 6,500,000 2,000,000 8,500,000
- CC2 DVR KAP 16 CHANNEL Unit 4 4,220,000 650,000 4,870,000
- CC3 MONITOR 22 INCH Unit 2 1,530,000 250,000 1,780,000
- CC4 Rak peralatan (Provisional) Unit 1 2,774,188 500,000 3,274,188
- CC5 Pengkabelan untuk peralatan utama Unit 1 1,793,465 850,000 2,643,465
- CC6 Pekerjaan grounding sistem seluruh Peralatan CCTV Unit 1 2,343,224 1,200,000 3,543,224
- CC7 UPS 3 kVA c/w power suply 220 v/ 50 h2, batteray general CCTV Unit 1 8,850,000 1,500,000 10,350,000
- CC8 Testing Commisioning Lot 1 3,200,000 3,200,000
CC9 Power supplay Cctv 24 volt unit 4 1,012,390 250,000 1,262,390
CC10
CC11 SUB TOTAL
2 CC12 Office Lt. 1 & 2
- CC13 Dome Fix Colour Camera unit 4 489,846 150,000 639,846
- CC14 Colour Fix Camera unit 4 489,846 150,000 639,846
- CC15 Kbl. Data Coaxial RG 6 In PVC Conduit Ø 20 mm + Titik 8 525,000 250,000 775,000
CC16 Kbl. Power NYM 3 x 1,5 mm2 In PVC Conduit Ø 20 mm
CC17 Colour Fix Outdoor Camera c/w Housing 1,589,846 250,000 1,839,846
CC18
7 CC19 Testing & Commisioning lot 1 4,650,000 4,650,000
SUB TOTAL
TOTAL PEKERJAAN CCTV
TOTAL PEKERJAAN EKLEKTRONIKA
AREA LAHAN PEKERJAAN FIRE ALARM
RUANG
NO DICRPTIONS TOTAL SAT Area
CONTROL Area Office Area Area Production Area Production
Production Area Utility
Lt 1 & 2 Warehouse Cake Chesse
Donut

1 PAKET PEKERJAAN FIRE ALARM


MATERIAL UTAMA
MCPFA semi addressable kap. 1 loop, maks.124 Address lengkap terminal,
1 unit 1
controller, master handset intercome dan asesoris lainnya
UPS c/w Arrester, rectifier, Back-up Battery 4 jam 1 unit 1
Handset Intercom 1 unit 1
Annunciator 1 unit 1
Rak peralatan 1 unit 1
Pengkabelan untuk peralatan utama 1 lot 1
Pekerjaan grounding sistem seluruh Peralatan fire alarm 1 lot 1
Marterial bantu 1 lot 1
JBFA (Juntion Box Fire Alarm) 7 unit 1 1 1 1 1 1 1

EQUITMEN
PHOTO ELECTRIC SMOKE DTECTOR 90 unit 15 15 15 15 15 15
ROR heat Detector c/w alarm response lamp / detektor panas 36 unit 6 6 6 6 6 6
Fixed Temperatur Heat Detector c/w Alarm response Lamp 0 unit 0 0 0 0 0 0
MANUAL PUSH BUTTON 6 unit 1 1 1 1 1 1
ALARM BELL 6 unit 1 1 1 1 1 1
FLASER LAMP 6 unit 1 1 1 1 1 1
OUTLET INTERCOM 6 unit 1 1 1 1 1 1
END OF LINE 30 unit 5 5 5 5 5 5

KABEL INSTALASI
NYA 2x1,5mm + PIPA CONDUIT 20mm UNTUK DETECTOR 126 unit 21 21 21 21 21 21
FRC 2x1,5mm PIPA CONDUIT 20mm UNTUK MANUAL PUSH BUTTON 6 unit 1 1 1 1 1 1
FRC 2x1,5mm PIPA CONDUIT 20mm UNTUK ALARM BELL 6 unit 1 1 1 1 1 1
FRC 2x1,5mm PIPA CONDUIT 20mm UNTUK FLASER LAMP 6 unit 1 1 1 1 1 1
ITC 2 x 2 x 0,6 mm PIPA CONDUIT 20mm UNTUK HEADSET INTERCOM 6 unit 1 1 1 1 1 1

Pengkabelan untuk peralatan utama fire alarm 1 lot 1


Kabel FRC 2 x 1,5 mm² + konduit dari MCPFA ke :
Panel Pompa Hidrant 120 mtr 120
PDTR 120 mtr 120
Kabel AWG 18 x 2 Pairs+ KABEL FRC 3 x 1,5 mm2 + konduit
dari MCPFA ke
Annunciator 50 mtr 50
JBFA (Maing - masing area) 500 mtr 500

AREA LAHAN PEKERJAAN CCTV ANALOG


RUANG
NO DICRPTIONS TOTAL SAT Area Office Are Site Production
CONTROL Jalur Insfeksi Utility
Lt 1 & 2 Warehouse Plant/Outdoor Cake,Donut,Chesse

1 PAKET PEKERJAAN CCTV


MATERIAL UTAMA
DVR kapasitas hardist 24 TB 1 unit 1
DVR KAP 16 CHANNEL 4 unit 4
MONITOR 22 INCH 2 unit 2
Rak peralatan (Provisional) 1 unit 1
Pengkabelan untuk peralatan utama 1 unit 1
Pekerjaan grounding sistem seluruh Peralatan CCTV 1 unit 1
UPS 3 kVA c/w power suply 220 v/ 50 h2, batteray general CCTV 1 unit 1
Testing Commisioning 1 lot 1
Power supplay Cctv 24 volt 4 unit 4

EQUITMEN
Dome Fix Colour Camera 12 unit 4 2 6
Colour Fix Camera 10 unit 4 6
Colour Fix Outdoor Camera c/w Housing 10 unit 4 2 4

KABEL INSTALASI
Kbl. Data Coaxial RG 6 In PVC Conduit Ø 20 mm + 32 mtr 8 2 4 2 4 12
Kbl. Power NYM 3 x 1,5 mm2 In PVC Conduit Ø 20 mm 32 mtr 8 2 4 2 4 12

Anda mungkin juga menyukai