BILL OF QUANTITY (BOQ)

PEMBUATAN SYSTEM CLOSED SYSTEM UAP


Owner/User

: PT.PERTAMINA EP

Pekerjaan

: PEMBUATAN CLOSED SYSTEM

DAN TERMINAL BUATAN LIR


Lokasi

: ASSET 1 LIRIK FIELD

BILL OF QUANTITY JASA


NO

URAIAN

A
A.1
-

PEKERJAAN PERENCANAAN
Survey lokasi :
Survey Lay out
Survey Peralatan Eksisting
Survey Piping Line

A.2
-

Gambar Kerja :
Design Drawing & As Built Drawing

VOL

SATUAN

1.00

Ls

1.00

Ls

SUB TOTAL A
B
-

PEKERJAAN PERSIAPAN
Pekerjaan Pengurusan Izin Kerja
Ijin masuk lokasi Kerja
Surat Ijin kerja Aman (SIKA) & Job safety Analysis (JSA)

B.2

Project Manajemen Supervisi

B3

B.1

6.00
1.00

Bulan
Ls

Ls

Mobiliasasi Material,Peralatan dan Tenaga Kerja

1.00

Ls

B.4
-

Pembuatan Direksi Kit


Sewa Direksi Kit

6.00

bulan

B.5
-

Pembuatan Gudang Sementara


Sewa Gudang Sementara

6.00

Bulan

B.6

Penyediaan Tenaga Keamana (Walker)

6.00

Bulan

SUB TOTAL B
C
C.1
-

PEKERJAAN PENGGANTIAN STEAM LINE & HOT WATER LINE


Pergantian Steam Line & Hot Water Line area SPU UKUI,SPU&PPP Sei Karas ,PPP
Terminal Buatan
Pengangkutan dan Pengeceran pipa
Pembersihan bagian dalam Pipa
Pengelasan & Pemasangan Valve dan Fitting
Pembongkaran Pipa Eksisting
Pembutan Pipe Support

1.00

LS

SUB TOTAL C
D
D.1.

PEKERJAAN PEMASANGAN INSULASI PIPA


Pemasangan Insulasi Pipa dari bahan rockwoll + lapisan alumunium
cladding tebal (0,7 mm) dengan pengikat screw terdiri dari :

4.00

Line

NO

URAIAN

VOL

SATUAN

D.1.1
-

SPU Ukui :
Seluruh pipa Steam Line dan hot water line

D1.2
-

PPP Sei Karas


dari tie in dekat boiler ke Tanki no 01 dan 02

D.1.3
-

SPU Sei Karas


Pada pipa yang diganti pada tanki 02 dan 956 ke Header Steam Line
Pada Header Steamline
dari Hot water HRSG menuju Buffer tank dan dari buffer tank
menuju menuju Hot tank water Boiler

D.1.4

PPP Terminal Buatan


Dekat boiler hingga ke Tanki
SUB TOTAL D

Fabrikasi Hot Water Tank & Buffer tank

Ls

E.1
E.1.A
E.1.B

Termasuk proses pengelasan,consumable, NDT Test Cutter,rolling ,primer,&


Hydrotest Valve sand blasting
& Painting terdiri dari :
PPP & SPU Sei Karas :
Hot Water Tank Kapasitas 100 bbls
Buffer Tank Kapasitas 50 bbls

1
1

Unit
Unit

E.2
E.2.A

PPP Ukui :
Hot Water Tank Kapasitas 100 bbls

Unit

E.3
E.3.A
E.3.B

PPP Terminal Buatan


Hot Water Tank Kapasitas 100 bbls
Buffer Tank Kapasitas 50 bbls

1
1

Unit
Unit

E.4

Pembuatan Pondasi Tanki & Bungker Buffer Tank

Ls

E.5

Pemasangan Make Up Water Line

1
SUB TOTAL E

Ls

NO

URAIAN

F.
F.1
F1.1
F1.2
F1.3
F1.4

Penggantian Steam Coil


Tank Cleaning
PPP Sei Karas T01
PPP Sei Karas T02
SPU SeI Karas T-987
SPU SeI Karas T-815

F.2
F.2.1
F.2.2
F.2.3
F.2.4

Pembongkaran Steam Coil Existing :


PPP Sei Karas T01
PPP Sei Karas T02
SPU SeI Karas T-987
SPU SeI Karas T-815

F.3

Pemasangan Steam Coil :


as per design drawing

F.4

Pekerjaan Kalibrasi Tanki /Dimet

G.1.
G.1.
G.2

Pekerjaan Pemasangan Pompa :


Pembuatan Pondasi Pompa & Rumah Pompa
Pemasangan Pompa

H.1
H.1.2
H.1.3
H.1.4
H1.5

Pekerjaan Pengetesan dan Comissioing


Hydrostatic Test Piping System
Watertest Tank
Hydrostatic Steam Coil
Commisioning Pompa Baru

I
I.1
I.2

Penyelesaian Pekerjaan
Pekerjaan Pembersihan
Demobilisasi Peralatan

J.
J.1
J.1.A

Pengadaan Material Konstruksi


SPU UKUI :
A.Hot Water Tank :
Type Cylinder ,Cone Roof
Cap : 100 Bbls
Material :ASTM A 283 Gr C
Accessories :
1.Float Control Valve 2" Single Seated Flange Conn #150
2.Level Gauge & Float Board Type
3.Temp Gauge 4" SS,Center Back Mounth Conn 1/2 " NPT
Insulated
1. Insulation Rockwoll thickness 100 mm , with wire mesh
2. Alumanium Metal Jacket ing, Alloys 3033 or equal ,ASTM
B209 0,5 mm

J.1.B

Boiler Feed Water Pump


Type : Centrifugal , High Pressure Inline Pump
Cap : 7,5 m3/H
Head : 122 m
Temp : 100 C
Motor : 400V/60HZ
Include :
1.Pressure Gauge 4",SS,Lower Mount Conn 1/2" NPT

VOL

SATUAN

916.56
448.40
219.72
219.72

m2
m2
m2
m2

108
218
50
50

m2
m2
m2
m2

1.00

Ls

4.0
SUB TOTAL F

Unit

1
6
SUB TOTAL G

Ls
Unit

1
1
1
1
SUB TOTAL H

Ls
Ls
Ls
Ls

1
1
SUB TOTAL I

Ls
Ls

Ls

Unit

NO

URAIAN
2.Pressure Switch
3.Local Control Panel
4.Powe Cable
5.Pump Skid
6.Pondasi

VOL

SATUAN

NO

URAIAN

VOL

SATUAN

J.1.C

Piping ,Fitting & Insulation


1
1.Pipe 4 " Sch 40 ,Be : ASTM 106 Gr B -Erw @ 6 m
2.Elbow 90 4" Sch 40 , Be ASTM 234 WPB
3.Elbow 45 4" Sch 40 , Be ASTM 234 WPB
4.Tee Reducer 6" x 4 " Sch 40 , Be ASTM 234 WPB
5.Gate Valve 2",150 LB ,RF 216 WCB
6.Flange 2"150 LB WN -RF ASTM A-105
7.Gasket 2" 300 LB, RF Spiral Wound , 304 ASME SS B16.20
8.Bolt & Nut 5/8 x 3 + 1/2 for flange 2" 300 LB -RF ASTM A-193 GrB16./ASTM A194 Gr 2H Heavy hex
9.Rockwool 6" Pipe Thickness 50 mm @1m
10.Rockwool 4" Pipe Thickness 50 mm @1m
11.Rockwool 3" Pipe Thickness 50 mm @1m
12.Rockwool 2" Pipe Thickness 50 mm @1m
13.Elbow Rockwool 6" Thck 50 mm
14.Elbow Rockwool 4" Thck 50 mm
15.Elbow Rockwool 3" Thck 50 mm
16.Elbow Rockwool 2" Thck 50 mm
17.Valve Rockwool 6" Thck 50 mm
18Valve Rockwool 4" Thck 50 mm
19.Valve Rockwool 3" Thck 50 mm
20.Valve Rockwool 2" Thck 50 mm
21.Alumunium Sheet 6" Thck 50 mm
22.Alumunium Sheet 4" Thck 50 mm
23.Alumunium Sheet 3" Thck 50 mm
24.Alumunium Sheet 2" Thck 50 mm
25.Steam Trap , 2" Free Floating typ Flange Connection # 150 Cast Iron
26.Temprature Indicator Dual Range 4" 304 SS

Ls

J.2

SPU & PPP Sei Karas

J.2.1

1.Hot Water Tank


Type Cylinder ,Cone Roof
Cap : 100 bbls
Material :ASTM A 283 Gr C
Accessories :
1.Float Control Valve 2" Single Seated Flange Conn #150
2.Level Gauge & Float Board Type
3.Temp Gauge 4" SS,Center Back Mounth Conn 1/2 " NPT
Insulated
1.Insulation Rockwoll thickness 100 mm with wiremesh
2.Alumunium metal jacketing , Alloy 3022 or Equal ASTM 0,5 mm

Unit

J.2.2

2.Buffer Tank
Type : Veertikal Cylinder, Flat Head
Cap : 50 bbls
Material : ASTM A283 Gr C
Accesories :
1.Float Control Valve Single Seated Flange Conn #150
2.Level gauge float & board type
3.High & Low level switch C/W Modul connection to pump
insulated:
1.Insulation rockwoll thickness 100 mm with wire mesh
2.Alumunium metal Jacket alloy 3003 or equal ASTM B209 0,5 mm

Unit

J.2.3

3.Steam Condensate Transfer pump


Type : Centrifugal
Cap : 15 m3/h
Head : 15 m

Unit

NO

URAIAN

VOL

SATUAN

Temp : 100 C
Motor : 400v/60 Hz
include :
1.Pressure Gauge 4",SS,Lower Mount Conn 1/2" NPT
2.Pressure Switch
3.Local Control Panel
4.Powe Cable
5.Pump Skid
6.Pondasi
J.2.4

4.Steam coil
1.Pipe 3" sch 40 be ASTM A 106 GrB.ERW @ 6m
2.Pipe 2" sch 40 be ASTM A 106 GrB.ERW @ 6m
3.Elbow 90 3" sch 40 Be ASTM A234 WPB-.
4.Elbow 90 2" sch 40 Be ASTM A234 WPB-.
5.UNP , 150x75x6, 5x10 ASTM A36
6.Union Coupling 3"
7.Union Coupling 2"

Ls

J.2.5

5.Piping , Fitting , & Insulation


1.Pipe 4" Sch 40 - Be ASTM A106 Gr B ERW @ 6 m
2.Pipe 3" Sch 40 - Be ASTM A106 Gr B ERW @ 6 m
3.Pipe 2" Sch 40 - Be ASTM A106 Gr B ERW @ 6 m
4.Elbow 90 4" sch 40 Be ASTM A234 WPB-.
5.Elbow 90 3" sch 40 Be ASTM A234 WPB-.
6.Elbow 90 2" sch 40 Be ASTM A234 WPB-.
7.Elbow 45 2" sch 40 Be ASTM A234 WPB-.
8.Tee 2" sch 40 be ASTM A234 WPB
9.Tee 3" sch 40 be ASTM A234 WPB
10.Tee 4" sch 40 be ASTM A234 WPB
11.Tee Reducer 4" x 3 " sch 40 be ASTM A234 WPB
12.Tee Reducer 4" x 2 " sch 40 be ASTM A234 WPB
13.Gate Valve 4" 150 LB -RF A216WCB
14.Gate Valve 3" 150 LB -RF A216WCB
15.Gate Valve 2" 150 LB -RF A216WCB
16.Flange 2" 150 LB WN RF ASTM A-105
17.Flange 3" 150 LB WN RF ASTM A-105

Ls

NO

URAIAN

VOL

SATUAN

18.Flange 4" 150 LB WN RF ASTM A-105


19.Blind Flange 4" 150 LB RF ASTM A-105
20.Gasket 2" 300 LB -RF Spiral wound 304 SS ASME B16.20
21.Gasket 3" 300 LB -RF Spiral wound 304 SS ASME B16.20
22.Gasket 4" 300 LB -RF Spiral wound 304 SS ASME B16.20
23.Bolt and Nut 5/8 x 3+ 1/2 for flange 2" , 300 LB RF ASTM A193GR B16/ASTM A194 Gr 2H Heavy hex
24.Bolt and Nut 3/4 x 4+ 3/8 for flange 4" , 300 LB RF ASTM A193GR B16/ASTM A194 Gr 2H Heavy hex
25.Rockwoll 4" Pipe thickness 50 mm @1m
26.Rockwoll 3" Pipe thickness 50 mm @1m
27.Rockwoll 2" Pipe thickness 50 mm @1m
28.Elbow Rockwoll 4" Thickness 50 mm @1 m
29.Elbow Rockwoll 3" Thickness 50 mm @1 m
30..Elbow Rockwoll 2" Thickness 50 mm @1 m
31.Valve Rockwoll 4" Thickness 50 mm
32.Valve Rockwoll 3" Thickness 50 mm
33.Valve Rockwoll 2" Thickness 50 mm
32.Alumunium Sheet 4" Thck 50 mm @1m
33.Alumunium Sheet 3" Thck 50 mm @1m
34.Alumunium Sheet 2" Thck 50 mm @1m
J.3

PPP Terminal Buatan

J.3.1

1.Hot Water Tank


Type Cylinder ,Cone Roof
Cap : 100 bbls
Material :ASTM A 283 Gr C
Accessories :
1.Float Control Valve 2" Single Seated Flange Conn #150
2.Level Gauge & Float Board Type
3.Temp Gauge 4" SS,Center Back Mounth Conn 1/2 " NPT
Insulated
1.Insulation Rockwoll thickness 100 mm with wiremesh
2.Alumunium metal jacketing , Alloy 3003 or Equal ASTM 0,5 mm

Unit

J.3.2

2.Buffer Tank
Type : Veertikal Cylinder, Flat Head
Cap : 50 bbls
Material : ASTM A283 Gr C
Accesories :
1.Float Control Valve Single Seated Flange Conn #150
2.Level gauge float & board type
3.High & Low level switch C/W Modul connection to pump
insulated:
1.Insulation rockwoll thickness 100 mm with wire mesh
2.Alumunium metal Jacket alloy 3003 or equal ASTM B209 0,5 mm

Unit

J.3.3

3.Boiler Feed Water Pump


Type : Centrifugal , High Pressure Inline Pump
Cap : 7,5 m3/H
Head : 122 m
Temp : 100 C
Motor : 400V/60HZ
Include :
1.Pressure Gauge 4",SS,Lower Mount Conn 1/2" NPT
2.Pressure Switch
3.Local Control Panel
4.Powe Cable
5.Pump Skid
6.Pondasi

Unit

NO

URAIAN

VOL

SATUAN

Unit

J.3.4

4.Steam Condensate Transfer pump


Type : Centrifugal
Cap : 15 m3/h
Head : 15 m
Temp : 100 C
Motor : 400v/60 Hz
include :
1.Pressure Gauge 4",SS,Lower Mount Conn 1/2" NPT
2.Pressure Switch
3.Local Control Panel
4.Powe Cable
5.Pump Skid
6.Pondasi

J.3.5

5.Piping , Fitting , & Insulation


1
1.Pipe 4" Sch 40 - Be ASTM A106 Gr B ERW @ 6 m
2.Pipe 2" Sch 40 - Be ASTM A106 Gr B ERW @ 6 m
3.Elbow 90 4" sch 40 Be ASTM A234 WPB-.
4.Elbow 90 2" sch 40 Be ASTM A234 WPB-.
5.Elbow 45 4" sch 40 Be ASTM A234 WPB-.
6.Elbow 45 2" sch 40 Be ASTM A234 WPB-.
7.Tee 2" SCH 40 Be ASTM A234 WPB
8.Tee 4" SCH 40 Be ASTM A234 WPB
9.Tee Reducer 4x2" SCH 40 Be ASTM A234 WPB
10.Gate Valve 4" 150 LB -RF A216WCB
11.Gate Valve 2" 150 LB -RF A216WCB
12.Check Valve 4" 150 LB -RF A216WCB
13.Flange 2" 150 LB WN RF ASTM A-105
14.Flange 4" 150 LB WN RF ASTM A-105
15.Blind Flange 4" 150 LBRF ASTM A-105
16.Gasket 2" 300 LB , RF-Spial wound 304 SS ASME B16.20
17.Gasket 4" 300 LB , RF-Spial wound 304 SS ASME B16.20
18.Bolt and Nut 5/8 x 3+ 1/2 for flange 2" , 300 LB RF ASTM A193GR B16/ASTM A194 Gr 2H Heavy hex
19.Bolt and Nut 3/4 x 4+ 3/8 for flange 4" , 300 LB RF ASTM A193GR B16/ASTM A194 Gr 2H Heavy hex
20.Steam Trap , 4" Free Floating typ Flange Connection # 150 Cast Iron
21.Steam Trap , 2" Free Floating typ Flange Connection # 150 Cast Iron
22.Basket Strainer Flange Connection 150# Cast Iron
23.Temprature Indicator dual range 4" 304 SS

TOTAL (A+B+C+D+E+F+G+H+J) JASA + MATERIAL


JASA/RISIKO/KEUNTUNGAN X 10 %
TOTAL

Ls

NO

URAIAN

VOL

SATUAN

LL OF QUANTITY (BOQ)
YSTEM CLOSED SYSTEM UAP
: PT.PERTAMINA EP
: PEMBUATAN CLOSED SYSTEM UAP DISTRIK 1,2
DAN TERMINAL BUATAN LIRIK FIELD
: ASSET 1 LIRIK FIELD

F QUANTITY JASA
HARGA SATUAN

TOTAL HARGA

155,274,683.13

155,274,683.13

44,327,702.22

44327702.22

199,602,385.35

8,000,000.00
32,000,000.00

48,000,000.00
32,000,000.00

1,100,339,792.13

1,100,339,792.13

27,333,490.00

27,333,490.00

11,845,666.67

71,073,999.99

5,291,000.00

31,746,000.00

17,968,282.24

107,809,693.44
1,418,302,975.56

549,468,861.09

549,468,861.09

549,468,861.09
129,219,855.59

516,879,422.34

HARGA SATUAN

TOTAL HARGA

516,879,422.34
99,898,781.58

14,984,817.24
7,492,408.62

14,984,817.24

14,984,817.24
7,492,408.62
29,969,634.47
9,989,878.16
99,898,781.58

HARGA SATUAN

TOTAL HARGA

264,261.90
264,261.90
264,261.90
264,261.90

242,211,167.99
118,494,995.34
58,062,547.72
58,062,547.72

359,270.84
359,270.84
359,270.84
359,270.84

38,801,250.66
78,321,043.00
17,963,541.97
17,963,541.97

699,733,468.04

699,733,468.04

31,000,000.00

124,000,000.00
1,453,614,104.41

50,876,700.09
4,565,857.70

50,876,700.09
27,395,146.20
78,271,846.29

24,300,000.00
47,600,000.00
53,600,000.00
45,388,287.69

24,300,000.00
47,600,000.00
53,600,000.00
45,388,287.69
170,888,287.69

11,000,000.00
27,333,490.00

11,000,000.00
27,333,490.00
38,333,490.00

147,074,358.36

147,074,358.36

38,924,373.85

77,848,747.70

HARGA SATUAN

TOTAL HARGA

HARGA SATUAN

TOTAL HARGA

595,461,642.13

595,461,642.13

147,074,358.36

147,074,358.36

155,450,046.40

155,450,046.40

153,804,445.70

307,608,891.41

HARGA SATUAN

TOTAL HARGA

364,011,769.81

364,011,769.81

595,461,642.13

595,461,642.13

HARGA SATUAN

TOTAL HARGA

147,074,358.36

147,074,358.36

155,450,046.40

155,450,046.40

38,924,373.85

77,848,747.70

) JASA + MATERIAL
NGAN X 10 %

HARGA SATUAN

TOTAL HARGA

153,804,445.70

307,608,891.40

595,461,642.13

595,461,642.13

8,198,695,296.61
452,526,015.43
8,651,221,312.04

HARGA SATUAN

TOTAL HARGA

LOGO PT SINAR TAMIANG

Proyek
Lokasi
Owner
Contractor
Durasi

:
:
:
:
:

Pembuatan Closed System Uap Distrik I dan II , Field Lirik


Pekan Baru
PT.Pertamina EP
PT.Sinar Tamiang
170 Hari
BULAN1

No

Work Description

Volume

Satuan

Bobot

Rencana/Aktu
al

MG1

A.

Pekerjaan Perencanaan

A.1

Survey Lokasi

Ls

2%

Rencana

A.2

Gambar Kerja (Shop drawing & Asbuilt Drawing)

Ls

1%

Rencana

B.

Pekerjaan Persiapan

B.1

Pengurusan Izin Kerja

Ls

1%

Rencana

B.2

Project Manajemen Supervisi

Ls

13%

Rencana

B.3

Mobilisasi material & peralatan

Ls

0.3%

Rencana

B.4

Sewa Direksi Kit

Bulan

1%

Rencana

0.14%

B.5

Sewa Gudang Sementara

Bulan

Rencana

0.06%

B.6

Security area (Walker)

Bulan

Pekerjaan penggantian Steam & Hot line

C.1

Pekerjaan penggantian Steam & Hot line area

Ls

Ls

0.4%
1%

Rencana

7%

Rencana

6%

Rencana

0.95%

MG2

BULAN2

MG3

MG4

MG5

MG6

0.95%
0.27%
0.98%

0.56%

0.56%

0.56%

0.56%

0.56%

0.56%

0.33%
0.14%
0.06%
0.22%

0.22%

SPU & PPP Sei Karas,PPP Terminal Buatan


D

Pekerjaan Pemasangan Insulasi Pipa

D.1

Pekerjaan Pemasangan Insulasi Pipa


SPU & PPP Sei Karas,PPP Terminal Buatan

Fabrikasi Hot Water Tank & Buffer Tank

E.1.A

Hot Water Tank Kapasitas 100 bbls PPP& SPU Sei Karas

unit

0.2%

Rencana

E.1.B

Bufffer Tank Kapasitas 50 bbls PPP& SPU Sei Karas

unit

0.1%

Rencana

E.2.A

Hot Water Tank Kapasitas 100 bbls PPP UKUI

unit

0.2%

Rencana

E.3.A

Hot Water Tank Kapasitas 100 bbls PPP Terminal Buatan

unit

0.2%

Rencana

E.3B

Buffer Tank Kapasitas 50 bbls PPP Terminal Buatan

unit

0.1%

Rencana

E.4

Pondasi Tanki & Buffer Tank

Ls

0.4%

Rencana

E.5

Pemasangan Make up Water

unit

0.1%

Rencana

0.12%

0.12%

Penggantian Steam Coil

F1.1

Tank Cleaning PPP Sei Karas T01

916.5572865 m2

3%

Rencana

F1.2

Tank Cleaning PPP Sei Karas T02

448.39985 m2

1%

Rencana

F1.3

Tank Cleaning SPU SeI Karas T-987

219.7159265 m2

1%

Rencana

F1.4

Tank Cleaning SPU SeI Karas T-815

219.7159265 m2

1%

Rencana

F.2.1

Pembongkaran Steam coil eksisting PPP Sei Karas T01

108 m2

0.5%

Rencana

F.2.2

Pembongkaran Steam coil eksisting 'PPP Sei Karas T02

218 m2

1%

Rencana

F.2.3

Pembongkaran Steam coil eksisting SPU SeI Karas T-987

50 m2

0.2%

Rencana

F.2.4

Pembongkaran Steam coil eksisting SPU SeI Karas T-815

50 m2

0.2%

Rencana

F.3

Pemasangan Steam Coil T01,T02,T-987 & T815

Ls

9%

Rencana

F.4

Pekerjaan Kalibrasi Tanki /Dimet

Ls

2%

Rencana

Pekerjaan Pemasangan Pompa & Rumah Pompa

G.1.

Pembuatan Pondasi Pompa & Rumah Pompa

1 Ls

1%

Rencana

G.2

Pemasangan Pompa

6 Unit

0.3%

Rencana

Pekerjaan Pengetesan dan Commisioning

H.1.2

Hydrostatic Test Piping System

1 Ls

0.3%

Rencana

H.1.3

Watertest Tank

1 Ls

1%

Rencana

H.1.4

Hydrostatic Steam Coil

1 Ls

1%

Rencana

H1.5

Commisioning Pompa Baru

1 Ls

1%

Rencana

Penyelesaian Pekerjaan

I.1

Pekerjaan Pembersihan

1 Ls

0.1%

Rencana

I.2

Demobilisasi Peralatan

1 Ls

0.3%

Rencana

J.

Material Konstruksi

J.1

SPU UKUI

J.1.A

Hot Water Tank :

1 Unit

2%

Rencana

J.1.B

Boiler Feed Water Pump

2 Unit

1%

Rencana

J.1.C

Piping ,Fitting & Insulation

1 Ls

7%

Rencana

J.2

SPU & PPP Sei Karas

J.2.1

Hot Water Tank

1 Unit

2%

Rencana

J.2.2

Buffer Tank

1 Unit

2%

Rencana

J.2.3

Steam Condensate Transfer pump

2 Unit

4%

Rencana

J.2.4

Steam coil

1 Ls

4%

Rencana

J.2.5

Piping , Fitting , & Insulation

1 Ls

7%

Rencana

J.3

PPP Terminal Buatan

J.3.1

Hot Water Tank

1 Unit

2%

Rencana

J.3.2

Buffer Tank

1 Unit

2%

Rencana

J.3.3

Boiler Feed Water Pump

2 Unit

1%

Rencana

J.3.4

Steam Condensate Transfer pump

2 Unit

4%

Rencana

J.3.5

Piping , Fitting , & Insulation

1 Ls

7%

Rencana

7.2%
5.2%
3.4%
1.7%

5.8%

7.9%

8.6%

Progress Total

100%

Progress Mingguan % (A)

1.7%

1.7%

1.8%

0.6%

1.4%

0.7%

Cumulative Progress % (B)

1.7%

3.4%

5.2%

5.8%

7.2%

7.9%

Deviasi % (C)

BULAN2

BULAN3

MG7

MG8

MG9

MG10

BULAN4

MG11

MG12

MG13

MG14

BULAN5

MG15

MG16

MG17

MG18

BULAN6

MG19

MG20

MG21

MG22

MG23

10
96.6%
94.5%
0.56%

0.56%

0.06%

0.56%

0.56%

0.56%

0.56%

0.56%

0.56%

0.56%

0.56%

0.56%

0.56%

0.56%

0.56%

0.56%

0.14%

0.14%

0.14%

0.14%

0.06%

0.06%

0.06%

0.06%

0.22%

0.22%

0.22%

0.22%

0.06%

0.06%

0.03%

0.03%

0.03%

0.06%

0.06%

0.06%

0.06%

0.06%

0.06%

0.03%

0.03%

1.68%

1.68%

1.68%

1.68%

1.58%

1.58%

75.6%

1.58%

1.58%

65.9%
0.03%

0.12%
0.12%

0.56%

0.56%

2.95%

56.6%

1.45%
0.71%
0.71%
0.47%
0.96%
0.22%
0.22%

0.16%

0.16%

2.13%

2.13%

0.16%

40.3%
0.16%

2.13%

44.1%

2.13%

0.33%

35.5%

0.30%
0.58%
0.65%

30.0%

23.4%
22.1%
0.60%

0.60%

0.60%

19.8%

0.95%

17.2%
0.60%

0.60%
0.63%
12.1%

8.6%

1.82%

1.82%

1.82%

1.82%

14.7%

0.60%
0.63%

0.63%
3.75%

9.8%

1.11%

1.11%

1.11%

1.11%
1.82%

0.60%

0.60%

0.60%

0.63%

0.63%

1.82%

1.82%

1.82%

0.63%
0.95%
3.75%
1.82%

1.82%

1.82%

1.82%

0.7%

1.2%

2.3%

2.5%

2.5%

2.5%

2.3%

1.4%

6.5%

5.5%

4.8%

3.8%

12.5%

9.3%

9.7%

19.0%

2.1%

8.6%

9.8%

12.1%

14.7%

17.2%

19.8%

22.1%

23.4%

30.0%

35.5%

40.3%

44.1%

56.6%

65.9%

75.6%

94.5%

96.6%

.6%

MG24

100.0%

0.27%

0.56%

Keterangan

1.51%

0.55%
0.13%
0.33%

3.4%
100.0%