REKAPITULASI TOTAL

RENCANA ANGGARAN BIAYA(RAB)


PROYEK : PEMBANGUNAN LANJUTAN GEDUNG PENDIDIKAN
FAKULTAS PERTANIAN UNIVERSITAS HASANUDDIN (TAHAP 02)
LOKASI : KAMPUS TAMALANREA MAKASSAR
TAHUN ANGGARA : 2016

No. URAIAN JUMLAH HARGA

I PEKERJAAN PERSIAPAN Rp. 115,168,788.00

II PEKERJAAN STRUKTUR Rp. 1,395,455,596.66

III PEKERJAAN ARSITEKTUR Rp. 7,705,993,517.28

IV PEKERJAAN ELEKTRIKAL & MEKANIKAL Rp. 1,628,533,689.50

REAL COST Rp. 10,845,151,591.43


PPN 10% Rp. 1,084,515,159.14
TOTAL COST Rp. 11,929,666,750.58
DIBULATKAN Rp. 11,929,666,000.00
Terbilang

SEBELAS MILYAR SEMBILAN RATUS DUA PULUH SEMBILAN JUTA ENAM RATUS ENAM PULUH ENAM RIBU RUPIAH,-

MAKASSAR, 25 APRIL 2016


PT. BANGUN BUMI INDAH

JULIANUS S LELEPADANG
DIREKTUR
RENCANA ANGGARAN BIAYA(RAB)
PROYEK : PEMBANGUNAN LANJUTAN GEDUNG PENDIDIKAN
FAKULTAS PERTANIAN UNIVERSITAS HASANUDDIN (TAHAP 02)
LOKASI : KAMPUS TAMALANREA MAKASSAR
TAHUN ANGGARAN : 2016

I. PEKERJAAN PERSIAPAN

No. URAIAN VOL. SAT. HARGA SATUAN JUMLAH HARGA

I PEKERJAAN PENDAHULUAN
1.1 Papan nama proyek 1.00 ls Rp. 1,500,000.00 Rp. 1,500,000.00
1.2 Pekerjaan Pembersihan & Persiapan existing 1.00 ls Rp. 4,000,000.00 Rp. 4,000,000.00
1.3 Pengukuran kembali 1.00 ls Rp. 1,500,000.00 Rp. 1,500,000.00
1.4 Pemasangan Bowplank 54.40 m1 Rp. 64,457.50 Rp. 3,506,488.00
1.5 Direksi keet 1.00 ls Rp. 20,000,000.00 Rp. 20,000,000.00
1.6 Pembuatan gudang bahan 32.00 m2 Rp. 1,020,696.88 Rp. 32,662,300.00
1.7 Mobilisasi dan Demobilisasi 1.00 ls Rp. 20,000,000.00 Rp. 20,000,000.00
1.8 Air dan listrik kerja 1.00 ls Rp. 15,000,000.00 Rp. 15,000,000.00
1.9 Administrasi proyek 1.00 ls Rp. 15,000,000.00 Rp. 15,000,000.00
1.10 Asbuild Drawing 1.00 ls Rp. 2,000,000.00 Rp. 2,000,000.00

Jumlah Rp. 115,168,788.00


Sub Total I Rp. 115,168,788.00

MAKASSAR, 25 APRIL 2016


PT. BANGUN BUMI INDAH

JULIANUS S LELEPADANG
DIREKTUR
RENCANA ANGGARAN BIAYA(RAB)
PROYEK : PEMBANGUNAN LANJUTAN GEDUNG PENDIDIKAN
FAKULTAS PERTANIAN UNIVERSITAS HASANUDDIN (TAHAP 02)
LOKASI : KAMPUS TAMALANREA MAKASSAR
TAHUN ANGGARAN : 2016

II. PEKERJAAN STRUKTUR

No. URAIAN VOL. SAT. HARGA SATUAN JUMLAH HARGA

I PEKERJAAN PENDAHULUAN
1.1 Pekerjaan Persiapan Struktur Lanjutan (bobok & pembersihan 1.00 ls Rp. 2,500,000.00 Rp. 2,500,000.00
1.2 Pekerjaan Timbunan 94.66 m3 Rp. 132,825.00 Rp. 12,573,493.43
1.3 Pekerjaan Pemadatan Timbunan 94.66 m3 Rp. 58,650.00 Rp. 5,551,932.17

Jumlah Rp. 20,625,425.60


Sub Total I Rp. 20,625,425.60
II PEKERJAAN STRUKTUR
2.1. Pekerjaan Dasar
2.1.1 Rumah lift
2.1.1. Dinding Lift
2.1.1.1.1 Beton f'c =21.7 Mpa (K.250 42.70 m3 Rp. 963,567.29 Rp. 41,144,323.44
2.1.1.1.2 Bakesting 341.60 m2 Rp. 196,638.50 Rp. 67,171,711.60
2.1.1.1.3 Besi beton 3,297.89 kg Rp. 12,282.00 Rp. 40,504,660.42

2.1.2 Shear Wall (2 Titik)


2.1.2. Dinding Shear Wall
2.1.2.1.1 Beton f'c =21.7 Mpa (K.250 23.52 m3 Rp. 963,567.29 Rp. 22,663,102.75
2.1.2.1.2 Bakesting 196.00 m2 Rp. 196,638.50 Rp. 38,541,146.00
2.1.2.1.3 Besi beton 786.21 kg Rp. 12,282.00 Rp. 9,656,275.44

2.1.3 Pondasi Batu Bata (PBT) 35.68 m2 Rp. 105,991.19 Rp. 3,781,765.57

2.1.4 Slab beton 0,00


2.1.4. Lantai Kerja Beton K.100 (f'c =7,4 Mpa) 72.82 m3 Rp. 723,441.27 Rp. 52,678,822.95
2.1.4. Beton K.175 (f'c =14.5 Mpa) tebal 10 cm 145.63 m3 Rp. 893,818.88 Rp. 130,170,418.91
2.1.4. Wiremesh M6 1,413.67 m2 Rp. 122,026.85 Rp. 172,505,689.97
2.1.4. Ramp (Drop Off) 317.46 kg Rp. 12,282.00 Rp. 3,899,102.67
2.1.4.4.1 Beton f'c =21.7 Mpa (K.250 15.90 m 3
Rp. 963,567.29 Rp. 15,320,719.97
2.1.4.4.2 Bakesting 9.00 m2 Rp. 196,638.50 Rp. 1,769,746.50
2.1.4.4.3 Besi beton 1,272.00 kg Rp. 12,282.00 Rp. 15,622,704.00

2.1.5 Peninggian Tanah Bawah Slab


2.1.5. Urugan Sirtu 145.63 m3 Rp. 181,125.00 Rp. 26,377,958.25

Jumlah Rp. 641,808,148.43


2.2 Kolom
2.2.1 Kolom Lt. 01 0,00
2.2.1. Kolom type BE (25X25) 4 Titik, T : 5,25m
2.2.1.1.1 Beton f'c =21.7 Mpa (K.250 1.31 m3 Rp. 963,567.29 Rp. 1,262,273.15
2.2.1.1.2 Bakesting 21.00 m2 Rp. 196,638.50 Rp. 4,129,408.50
2.2.1.1.3 Besi beton 255.20 kg Rp. 12,282.00 Rp. 3,134,366.40

2.2.1. Kolom type KP (13X13) 91 Titik, T : 5,25m


2.2.1.2.1 Beton f'c =21.7 Mpa (K.250 6.15 m3 Rp. 963,567.29 Rp. 5,927,480.56
No. URAIAN VOL. SAT. HARGA SATUAN JUMLAH HARGA

2.2.1.2.2 Bakesting 189.28 m2 Rp. 196,638.50 Rp. 37,219,735.28


2.2.1.2.3 Besi beton 736.73 kg Rp. 12,282.00 Rp. 9,048,517.86

2.2.2 Kolom Lt. 02 +4,00


2.2.2. Kolom type BE (25X25) 4 Titik, T : 4m
2.2.2.1.1 Beton f'c =21.7 Mpa (K.250 1.00 m3 Rp. 963,567.29 Rp. 963,567.29
2.2.2.1.2 Bakesting 16.00 m 2
Rp. 196,638.50 Rp. 3,146,216.00
2.2.2.1.3 Besi beton 194.44 kg Rp. 12,282.00 Rp. 2,388,112.08

2.2.2. Kolom type KP (13X13) 100 Titik, T : 4m


2.2.2.2.1 Beton f'c =21.7 Mpa (K.250 6.76 m3 Rp. 963,567.29 Rp. 6,513,714.91
2.2.2.2.2 Bakesting 208.00 m2 Rp. 196,638.50 Rp. 40,900,808.00
2.2.2.2.3 Besi beton 809.60 kg Rp. 12,282.00 Rp. 9,943,507.20

2.2.3 Kolom Lt. 03 +8,00


2.2.3. Kolom type BE (25X25) 4 Titik, T : 4m
2.2.3.1.1 Beton f'c =21.7 Mpa (K.250 1.00 m3 Rp. 963,567.29 Rp. 963,567.29
2.2.3.1.2 Bakesting 16.00 m 2
Rp. 196,638.50 Rp. 3,146,216.00
2.2.3.1.3 Besi beton 194.44 kg Rp. 12,282.00 Rp. 2,388,112.08

2.2.3. Kolom type KP (13X13) 67 Titik, T : 4m


2.2.3.2.1 Beton f'c =21.7 Mpa (K.250 4.52 m3 Rp. 963,567.29 Rp. 4,355,324.17
2.2.3.2.2 Bakesting 139.36 m2 Rp. 196,638.50 Rp. 27,403,541.36
2.2.3.2.3 Besi beton 542.43 kg Rp. 12,282.00 Rp. 6,662,125.26

2.2.4 Kolom Elev. +12.00


2.2.4. Kolom type KP (13X13) 7 Titik,
2.2.4.1.1 Beton f'c =21.7 Mpa (K.250 0.50 m3 Rp. 963,567.29 Rp. 481,783.65
2.2.4.1.2 Bakesting 15.70 m2 Rp. 196,638.50 Rp. 3,087,224.45
2.2.4.1.3 Besi beton 61.20 kg Rp. 12,282.00 Rp. 751,658.40

Jumlah Rp. 173,817,259.89


2.3 Balok
2.3.1 Balok Lantai 01 00,00 TOC
2.3.1. Balok Latai 15x15
2.3.1.1.1 Beton f'c =21.7 Mpa (K.250 3.01 m3 Rp. 963,567.29 Rp. 2,896,266.48
2.3.1.1.2 Bakesting 60.12 m 2
Rp. 196,638.50 Rp. 11,821,021.75
2.3.1.1.3 Besi beton 547.82 kg Rp. 12,282.00 Rp. 6,728,368.47

2.3.1. Balok Latai 15x20


2.3.1.2.1 Beton f'c =21.7 Mpa (K.250 0.50 m3 Rp. 963,567.29 Rp. 480,217.85
2.3.1.2.2 Bakesting 9.97 m2 Rp. 196,638.50 Rp. 1,959,994.25
2.3.1.2.3 Besi beton 105.94 kg Rp. 12,282.00 Rp. 1,301,132.97

2.3.2 Balok Lantai 02 +04,00 TOC


2.3.2. Balok Latai 15x15
2.3.2.1.1 Beton f'c =21.7 Mpa (K.250 3.55 m3 Rp. 963,567.29 Rp. 3,423,096.90
2.3.2.1.2 Bakesting 71.05 m2 Rp. 196,638.50 Rp. 13,971,263.74
2.3.2.1.3 Besi beton 647.47 kg Rp. 12,282.00 Rp. 7,952,274.69

2.3.2. Balok Latai 15x20


2.3.2.2.1 Beton f'c =21.7 Mpa (K.250 0.33 m3 Rp. 963,567.29 Rp. 320,867.91
2.3.2.2.2 Bakesting 6.66 m2 Rp. 196,638.50 Rp. 1,309,612.41
2.3.2.2.3 Besi beton 70.78 kg Rp. 12,282.00 Rp. 869,324.87
No. URAIAN VOL. SAT. HARGA SATUAN JUMLAH HARGA
No. URAIAN VOL. SAT. HARGA SATUAN JUMLAH HARGA

2.3.3 Balok Lantai 03 +08,00 TOC


2.3.3. Balok Latai 15x15
2.3.3.1.1 Beton f'c =21.7 Mpa (K.250 2.87 m3 Rp. 963,567.29 Rp. 2,767,702.52
2.3.3.1.2 Bakesting 57.45 m2 Rp. 196,638.50 Rp. 11,296,291.91
2.3.3.1.3 Besi beton 523.51 kg Rp. 12,282.00 Rp. 6,429,706.59

2.3.3. Balok Latai 15x20


2.3.3.2.1 Beton f'c =21.7 Mpa (K.250 0.33 m3 Rp. 963,567.29 Rp. 320,867.91
2.3.3.2.2 Bakesting 6.66 m2 Rp. 196,638.50 Rp. 1,309,612.41
2.3.3.2.3 Besi beton 278.27 kg Rp. 12,282.00 Rp. 3,417,754.39

2.3.4 Balok Lantai Top Floor +12,00 TOC


2.3.4. Balok Latai 15x15
2.3.4.1.1 Beton f'c =21.7 Mpa (K.250 0.05 m3 Rp. 963,567.29 Rp. 49,864.61
2.3.4.1.2 Bakesting 1.04 m 2
Rp. 196,638.50 Rp. 203,520.85
2.3.4.1.3 Besi beton 9.42 kg Rp. 12,282.00 Rp. 115,750.48

Jumlah Rp. 78,944,513.95


2.3 Pekerjaan Tangga
2.3.1 Tangga A
2.3.1. Beton f'c =21.7 Mpa (K.250) 17.34 m3 Rp. 963,567.29 Rp. 16,709,702.22
2.3.1. Bakesting 111.23 m2 Rp. 338,376.00 Rp. 37,637,393.29
2.3.1. Besi beton 2,270.98 kg Rp. 12,282.00 Rp. 27,892,176.36

2.3.2 Tangga C
2.3.2. Beton f'c =21.7 Mpa (K.250) 52.83 m3 Rp. 963,567.29 Rp. 50,907,669.04
2.3.2. Bakesting 78.62 m2 Rp. 338,376.00 Rp. 26,604,136.25
2.3.2. Besi beton 1,789.42 kg Rp. 12,282.00 Rp. 21,977,703.11

Jumlah Rp. 181,728,780.28


2.4 Pekerjaan Atap
2.4.1 Rangka Atap Baja Ringan 1,593.69 m2 Rp. 180,000.00 Rp. 286,864,200.00
2.4.2 Pek.Baja kanal C 80.45.6.8 w= 8.64 kg/m 329.18 kg Rp. 35,443.00 Rp. 11,667,268.51

Jumlah Rp. 298,531,468.51


Sub Total II Rp. 1,374,830,171.06

MAKASSAR, 25 APRIL 2016


PT. BANGUN BUMI INDAH

JULIANUS S LELEPADANG
DIREKTUR
RENCANA ANGGARAN BIAYA(RAB)
PROYEK : PEMBANGUNAN LANJUTAN GEDUNG PENDIDIKAN
: FAKULTAS PERTANIAN UNIVERSITAS HASANUDDIN (TAHAP 02)
LOKASI : KAMPUS TAMALANREA MAKASSAR
T.A 2016
III. PEKERJAAN ARSITEKTUR

No. URAIAN VOL. SAT. HARGA SATUAN JUMLAH HARGA

I PEKERJAAN PENDAHULUAN
1.1 Pekerjaan Persiapan Lanjutan (perapihan struktur) 1.00 ls Rp. 12,500,000.00 Rp. 12,500,000.00

Jumlah Rp. 12,500,000.00


Sub Total I Rp. 12,500,000.00
II PEKERJAAN ARSITEKTUR
2.1. Pekerjaan Lantai
2.1.1 Lantai 01 TOC 0.00
2.1.1.1 Urugan pasir bawah lantai, t = 15 cm 207.25 m3 Rp. 184,230.00 Rp. 38,180,811.75
2.1.1.2 Homogeneus Tile 60X60 1,339.95 m2 Rp. 316,878.33 Rp. 424,600,457.31
2.1.1.3 Homogeneus Tile 40X40 24.37 m2 Rp. 299,842.38 Rp. 7,308,298.08
2.1.1.4 Homogeneus Tile 20X20 17.31 m2 Rp. 198,830.00 Rp. 3,442,542.62
2.1.1.5 Granit Alam 60X60 (top table wastafel) 5.36 m2 Rp. 325,832.50 Rp. 1,745,484.70
2.1.1.6 Lantai fin. Plester (rabat keliling bangunan) 139.01 m2 Rp. 35,034.75 Rp. 4,870,075.49

2.1.2 Lantai 02 TOC +4.00


2.1.2.1 Pekerjaan waterproofing bawah lantai lavatory 54.86 m2 Rp. 45,093.00 Rp. 2,473,914.71
2.1.2.2 Homogeneus Tile 60X60 964.18 m2 Rp. 316,878.33 Rp. 305,528,860.51
2.1.2.3 Homogeneus Tile 40X40 31.97 m2 Rp. 299,842.38 Rp. 9,586,710.33
2.1.2.4 Homogeneus Tile 20X20 22.89 m2 Rp. 198,830.00 Rp. 4,551,218.70
2.1.2.5 Granit Alam 60X60 (top table wastafel) 7.17 m2 Rp. 325,832.50 Rp. 2,336,365.65

2.1.3 Lantai 03 TOC +8.00


2.1.3.1 Pekerjaan waterproofing bawah lantai lavatory 43.27 m2 Rp. 45,093.00 Rp. 1,951,196.66
2.1.3.2 Homogeneus Tile 60X60 938.66 m2 Rp. 316,878.33 Rp. 297,440,382.61
2.1.3.3 Homogeneus Tile 40X40 24.12 m2 Rp. 299,842.38 Rp. 7,231,748.32
2.1.3.4 Homogeneus Tile 20X20 19.15 m2 Rp. 198,830.00 Rp. 3,807,992.16
2.1.3.5 Granit Alam 60X60 (top table wastafel) 3.57 m2 Rp. 325,832.50 Rp. 1,162,879.90
2.1.3.6 Pekerjaan finishing top floor dan dak tangga ( waterproofing + 245.78 m2 Rp. 45,093.00 Rp. 11,083,137.91
membrane + secred)

2.1.4 Top Floor TOC +12.00


2.1.4.1 Pekerjaan finishing top floor dan dak tangga ( waterproofing + 249.44 m2 Rp. 45,093.00 Rp. 11,247,907.73
membrane + secred)
2.1.4.2 Keramik Tile 30X30 364.35 m2 Rp. 198,830.00 Rp. 72,443,710.50

2.1.5 Top Floor TOC +14.25


2.1.5.1 Pekerjaan finishing top floor dan dak tangga ( waterproofing + 96.18 m2 Rp. 45,093.00 Rp. 4,337,044.74
membrane + secred)

2.1.6 Tangga
2.1.6.1 Tangga Entrance Pasangan tegel tangga, termasuk pengerjaan
stepnossing gurat pada lantai tangga
2.1.6.1.1 Pasangan tegel antrede dan optrede 30.29 m2 Rp. 252,250.00 Rp. 7,641,283.13
2.1.6.2 Tangga 01 Pasangan tegel tangga, termasuk pengerjaan
stepnossing gurat pada lantai tangga
2.1.6.2.1 Pasangan tegel antrede dan optrede 48.81 m2 Rp. 252,250.00 Rp. 12,313,079.25
2.1.6.2.2 Homogeneus Tile 60X60 28.25 m2 Rp. 316,878.33 Rp. 8,951,179.16
2.1.6.2.3 Plint dinding tangga 72.49 m1 Rp. 32,005.00 Rp. 2,320,042.45
2.1.6.2.4 Pekerjaan tali air di atas plint dinding tangga 72.49 m1 Rp. 14,608.13 Rp. 1,058,942.98
2.1.6.3 Tangga 02 Pasangan tegel tangga, termasuk pengerjaan
stepnossing gurat pada lantai tangga
2.1.6.3.1 Pasangan tegel antrede dan optrede 57.75 m2 Rp. 252,250.00 Rp. 14,567,437.50
2.1.6.3.2 Homogeneus Tile 60X60 21.35 m2 Rp. 316,878.33 Rp. 6,765,669.30
2.1.6.3.3 Plint dinding tangga 60.79 m1 Rp. 32,005.00 Rp. 1,945,455.93
2.1.6.3.4 Pekerjaan tali air di atas plint dinding 60.79 m1 Rp. 14,608.13 Rp. 887,969.49
2.1.6.4 Tangga 03 Pasangan tegel tangga, termasuk pengerjaan
stepnossing gurat pada lantai tangga
2.1.6.4.1 Pasangan tegel antrede dan optrede 38.50 m2 Rp. 252,250.00 Rp. 9,711,625.00
No. URAIAN VOL. SAT. HARGA SATUAN JUMLAH HARGA

2.1.6.4.2 Homogeneus Tile 60X60 14.12 m2 Rp. 316,878.33 Rp. 4,475,589.58


2.1.6.4.3 Plint dinding tangga 19.86 m1 Rp. 32,005.00 Rp. 635,459.28
2.1.6.4.4 Pekerjaan tali air di atas plint dinding 19.86 m1 Rp. 14,608.13 Rp. 290,044.32

Jumlah Rp. 1,286,894,517.75


2.2. Pekerjaan dinding dan pelapis dinding
2.2.1 Lantai 01
2.2.2.1 Pasangan dinding batu bata 1/2 bt camp.1:5 794.60 m2 Rp. 100,584.75 Rp. 79,924,700.69
2.2.2.2 Pas. dinding batu bata 1/2 bt camp. 1:3, t=40 cm darimuka lantai 289.89 m2 Rp. 105,991.19 Rp. 30,725,480.09
2.2.2.3 Plesteran dinding + Kolom 1 : 5 2,468.37 m2 Rp. 51,372.80 Rp. 126,806,885.17
2.2.2.4 Plesteran dinding + kolom 1 : 3 206.96 m2 Rp. 54,329.45 Rp. 11,244,077.30
2.2.2.5 Acian dinding dan kolom 2,826.05 m2 Rp. 33,598.69 Rp. 94,951,646.07
2.2.2.6 Pasangan Keramik 40X40 cm, dinding KM/WC 186.93 m2 Rp. 299,842.38 Rp. 56,048,035.95
2.2.2.7 Pasangan Granit fasad lift 8.00 m2 Rp. 316,878.33 Rp. 2,535,026.67
2.2.2.8 Pasangan plint untuk dinding 405.34 m1 Rp. 40,784.75 Rp. 16,531,853.70
2.2.2.9 Pekerjaan tali air di atas pasangan plint dinding 455.02 m1 Rp. 14,608.13 Rp. 6,647,047.47
2.2.2.9 Pekerjaan tali air pada dinding eksterior (profil dinding) m1 Rp. - Rp. -

Dinding Partisi
2.2.2.10 Dinding partisi, sudah termasuk: 117.36 m2 Rp. 211,300.00 Rp. 24,798,643.43
- Wall Stud 76, 0,45 mm
- Wall Track 76, 0,45 mm
- Gypsumboard 12 mm
- Pengomponan pada sambungan nat
2.2.2.11 Pasangan plint Kalsi untuk dinding 78.78 m1 Rp. 40,784.75 Rp. 3,213,022.61

2.2.2 Lantai 02
2.2.2.1 Pasangan dinding batu bata 1/2 bt camp.1:5 1378.33 m2 Rp. 100,584.75 Rp. 138,639,089.11
2.2.2.2 Pasangan dinding batu bata 1/2 bt camp. 1:3, t=40 cm dari lantai 176.50 m2 Rp. 105,991.19 Rp. 18,707,614.18
2.2.2.3 Plesteran dinding 1 : 5 + kolom 3,217.59 m2 Rp. 51,372.80 Rp. 165,296,566.45
2.2.2.4 Plesteran dinding + kolom 1 : 3 474.15 m2 Rp. 54,329.45 Rp. 25,760,417.38
2.2.2.5 Acian dinding dan kolom 3,838.82 m2 Rp. 33,598.69 Rp. 128,979,185.87
2.2.2.6 Pasangan homogeneus tile 40X40 cm, dinding KM/WC 263.18 m2 Rp. 299,842.38 Rp. 78,911,017.04
2.2.2.7 Pasangan Granit fasad lift 8.00 m2 Rp. 316,878.33 Rp. 2,535,026.67
2.2.2.8 Pasangan plint dinding 552.42 m1 Rp. 40,784.75 Rp. 22,530,474.73
2.2.2.9 Pekerjaan tali air di atas pasangan plint dinding 623.86 m1 Rp. 14,608.13 Rp. 9,113,483.30

Dinding Partisi
2.2.2.10 Dinding partisi, sudah termasuk: 492.08 m2 Rp. 211,300.00 Rp. 103,976,081.40
- Wall Stud 76, 0,45 mm
- Wall Track 76, 0,45 mm
- Gypsumboard 12 mm
- Pengomponan pada sambungan nat
2.2.2.11 Pasangan plint Kalsi untuk dinding 340.52 m1 Rp. 40,784.75 Rp. 13,888,023.07

2.2.3 Lantai 03
2.2.3.1 Pasangan dinding batu bata 1/2 bt camp.1:5 650.36 m2 Rp. 100,584.75 Rp. 65,416,257.78
2.2.3.2 Pasangan dinding batu bata 1/2 bt camp. 1:3, t=40 cm dari lantai 105.47 m2 Rp. 105,991.19 Rp. 11,178,424.18
2.2.3.3 Plesteran dinding 1 : 5 1,388.44 m2 Rp. 51,372.80 Rp. 71,327,844.94
2.2.3.4 Plesteran dinding + kolom 1 : 3 318.06 m2 Rp. 54,329.45 Rp. 17,279,807.55
2.2.3.5 Acian dinding dan kolom 1,706.49 m2 Rp. 33,598.69 Rp. 57,335,891.43
2.2.3.6 Pasangan homogeneus tile 40X40 cm, dinding KM/WC 188.93 m2 Rp. 299,842.38 Rp. 56,647,720.70
2.2.3.7 Pasangan Granit fasad lift 8.00 m2 Rp. 316,878.33 Rp. 2,535,026.67
2.2.3.8 Pasangan plint dinding 889.72 m1 Rp. 40,784.75 Rp. 36,287,089.34
2.2.3.9 Pekerjaan tali air di atas pasangan plint dinding 889.72 m1 Rp. 14,608.13 Rp. 12,997,170.19

Dinding Partisi
2.2.3.10 Dinding partisi, sudah termasuk: 551.09 m2 Rp. 211,300.00 Rp. 116,444,894.40
- Wall Stud 76, 0,45 mm
- Wall Track 76, 0,45 mm
- Gypsumboard 12 mm
- Pengomponan pada sambungan nat
2.2.3.11 Pasangan plint kalsi untuk dinding 391.04 m1 Rp. 40,784.75 Rp. 15,948,468.64

2.2.4 Topfloor
2.2.4.1 Pasangan dinding batu bata 1/2 bt camp.1:5 448.63 m2 Rp. 100,584.75 Rp. 45,125,215.69
2.2.4.2 Plesteran dinding 1 : 5 97.92 m2 Rp. 51,372.80 Rp. 5,030,424.58
2.2.4.3 Plesteran dinding + kolom 1 : 3 799.34 m2 Rp. 54,329.45 Rp. 43,427,572.17
No. URAIAN VOL. SAT. HARGA SATUAN JUMLAH HARGA

2.2.4.4 Acian dinding dan kolom 897.26 m2 Rp. 33,598.69 Rp. 30,146,677.71

2.2.5 Tangga Luar Bangunan


2.2.5.1 Pasangan dinding batu bata 1/2 bt camp.1:5 272.38 m2 Rp. 100,584.75 Rp. 27,397,475.37
2.2.5.2 Plesteran dinding 1 : 5 272.38 m2 Rp. 51,372.80 Rp. 13,993,026.01
2.2.5.3 Acian dinding dan kolom 196.96 m2 Rp. 33,598.69 Rp. 6,617,463.10
2.2.5.4 Pek. Batu Templek 79.20 m2 Rp. 325,832.50 Rp. 25,805,054.25
2.2.5.4 Coating Batu Templek 79.20 m2 Rp. 14,293.00 Rp. 1,131,967.01

2.2.6 Penebalan batu alam Bangunan


2.2.6.1 Dinding Batu alam templek 260.21 m2 Rp. 325,832.50 Rp. 84,784,516.41
2.2.6.2 Kolom Depan batu templek 31.36 m2 Rp. 325,832.50 Rp. 10,218,563.37
2.2.6.2 Sisi Ramp 10.68 m2 Rp. 325,832.50 Rp. 3,479,891.10
2.2.6.2 Coating Batu templek 302.25 m2 Rp. 14,293.00 Rp. 4,320,063.54

Jumlah Rp. 1,926,639,904.46


2.3 Pekerjaan Plafond
2.3.1 Lantai 01
2.3.1.1 Rangka metal furing (gypsumboard & Kalsiboard) 1,045.60 m2 Rp. 204,240.00 Rp. 213,554,303.93
2.3.1.2 Plafond Kalsiboard 233.89 m2 Rp. 68,084.60 Rp. 15,924,136.88
2.3.1.3 Plafond Gypsumboard 811.72 m2 Rp. 68,084.60 Rp. 55,265,440.88

2.3.2 Lantai 02
2.3.2.1 Rangka Cross tee main tee (akustik) 204.39 m2 Rp. 204,240.00 Rp. 41,744,368.51
2.3.2.2 Rangka metal furing (gypsumboard & Kalsiboard) 1,024.78 m2 Rp. 204,240.00 Rp. 209,300,862.96
2.3.2.3 Plafond akustik 204.39 m2 Rp. 68,084.60 Rp. 13,915,729.69
2.3.2.4 Plafond Gypsumboard 978.94 m2 Rp. 68,084.60 Rp. 66,650,465.99
2.3.2.5 Plafond Kalsiboard (wet area) 45.84 m2 Rp. 78,020.60 Rp. 3,576,698.37

2.3.3 Lantai 03
2.3.3.1 Rangka metal furing (gypsumboard & Kalsiboard) 1,019.92 m2 Rp. 204,240.00 Rp. 208,307,950.20
2.3.3.2 Plafond Gypsumboard 974.07 m2 Rp. 68,084.60 Rp. 66,319,472.70
2.3.3.3 Plafond Kalsiboard (wet area) 45.84 m2 Rp. 78,020.60 Rp. 3,576,698.37

2.3.4 Top Floor TOC +12.00


2.3.4.1 Rangka metal furing (gypsumboard & Kalsiboard) 358.30 m2 Rp. 204,240.00 Rp. 73,179,192.00
2.3.4.2 Plafond Gypsumboard 358.30 m2 Rp. 68,084.60 Rp. 24,394,712.18

2.3.5 Plafond luar bawah atap


2.3.4.1 Rangka metal furing (gypsumboard & Kalsiboard) 280.12 m2 Rp. 204,240.00 Rp. 57,212,565.79
2.3.4.2 Plafond Kalsiboard (wet area) 280.12 m2 Rp. 78,020.60 Rp. 21,855,457.85

Jumlah Rp. 1,074,778,056.29


2.4 Pekerjaan Kusen Pintu Dan Jendela
2.4.1 Lantai 01
2.4.1.1 Type PJK1 1.00 unit
2.4.1.1.1 Kaca tempered 12 mm 16.50 m2 Rp. 797,697.50 Rp. 13,162,008.75
2.4.1.1.2 Patch fitting(atas) 3.00 bh Rp. 818,090.00 Rp. 2,454,270.00
2.4.1.1.3 Patch fitting(bawah) 3.00 bh Rp. 818,090.00 Rp. 2,454,270.00
2.4.1.1.4 Handle pintu type Pull handle 3.00 bh Rp. 1,560,300.00 Rp. 4,680,900.00
2.4.1.1.5 Kunci tanam 3.00 bh Rp. 218,090.00 Rp. 654,270.00
2.4.1.1.6 Lock case tanam 3.00 bh Rp. 552,600.00 Rp. 1,657,800.00
2.4.1.1.7 Engsel tanam 3.00 bh Rp. 562,135.00 Rp. 1,686,405.00
2.4.1.1.8 Alat bantu dan perlengkapan 1.00 ls Rp. 4,500,000.00 Rp. 4,500,000.00

2.4.1.2 Type PJK2 1.00 unit


2.4.1.2.1 Kaca tempered 12 mm 4.36 m2 Rp. 797,697.50 Rp. 3,474,770.31
2.4.1.2.2 Patch fitting(atas) 1.00 bh Rp. 818,090.00 Rp. 818,090.00
2.4.1.2.3 Patch fitting(bawah) 1.00 bh Rp. 818,090.00 Rp. 818,090.00
2.4.1.2.4 Handle pintu type Pull handle 1.00 bh Rp. 1,560,300.00 Rp. 1,560,300.00
2.4.1.2.5 Kunci tanam 1.00 bh Rp. 218,090.00 Rp. 218,090.00
2.4.1.2.6 Lock case tanam 1.00 bh Rp. 552,600.00 Rp. 552,600.00
2.4.1.2.7 Engsel tanam 1.00 bh Rp. 562,135.00 Rp. 562,135.00
2.4.1.2.8 Alat bantu dan perlengkapan 1.00 ls Rp. 4,500,000.00 Rp. 4,500,000.00

2.4.1.3 Type PK1 3.00 unit


2.4.1.3.1 Kaca tempered 12 mm 14.26 m2 Rp. 797,697.50 Rp. 11,371,975.56
2.4.1.3.2 Patch fitting(atas) 6.00 bh Rp. 818,090.00 Rp. 4,908,540.00
2.4.1.3.3 Patch fitting(bawah) 6.00 bh Rp. 818,090.00 Rp. 4,908,540.00
2.4.1.3.4 Handle pintu type Pull handle 6.00 bh Rp. 1,560,300.00 Rp. 9,361,800.00
2.4.1.3.5 Kunci tanam 6.00 bh Rp. 218,090.00 Rp. 1,308,540.00
No. URAIAN VOL. SAT. HARGA SATUAN JUMLAH HARGA

2.4.1.3.6 Lock case tanam 6.00 bh Rp. 552,600.00 Rp. 3,315,600.00


2.4.1.3.7 Engsel tanam 6.00 bh Rp. 562,135.00 Rp. 3,372,810.00
2.4.1.3.8 Alat bantu dan perlengkapan 1.00 ls Rp. 4,500,000.00 Rp. 4,500,000.00

2.4.1.4 Type PK2 1.00 unit


2.4.1.4.1 Kaca tempered 12 mm 2.38 m2 Rp. 797,697.50 Rp. 1,895,329.26
2.4.1.4.2 Patch fitting(atas) 1.00 bh Rp. 818,090.00 Rp. 818,090.00
2.4.1.4.3 Patch fitting(bawah) 1.00 bh Rp. 818,090.00 Rp. 818,090.00
2.4.1.4.4 Handle pintu type Pull handle 1.00 bh Rp. 1,560,300.00 Rp. 1,560,300.00
2.4.1.4.5 Kunci tanam 1.00 bh Rp. 218,090.00 Rp. 218,090.00
2.4.1.4.6 Lock case tanam 1.00 bh Rp. 552,600.00 Rp. 552,600.00
2.4.1.4.7 Engsel tanam 1.00 bh Rp. 562,135.00 Rp. 562,135.00
2.4.1.4.8 Alat bantu dan perlengkapan 1.00 ls Rp. 4,500,000.00 Rp. 4,500,000.00

2.4.1.5 Type P1u 2.00 unit


2.4.1.5.1 Kusen aluminium 20.33 m1 Rp. 103,595.00 Rp. 2,105,879.16
2.4.1.5.2 Daun pintu (material lihat detail) 7.52 m2 Rp. 650,900.00 Rp. 4,894,794.04
2.4.1.5.3 Daun jendela aluminium 10.16 m1 Rp. 102,095.00 Rp. 1,037,693.58
2.4.1.5.4 Kaca bening 5 mm 1.08 m2 Rp. 168,396.00 Rp. 181,604.98
2.4.1.5.5 Engsel pintu 12.00 psg Rp. 58,090.00 Rp. 697,080.00
2.4.1.5.6 Casement 12" 8.00 psg Rp. 47,060.00 Rp. 376,480.00
2.4.1.5.7 Lock case + handle 2.00 bh Rp. 402,600.00 Rp. 805,200.00
2.4.1.5.8 Grendel jendela 4.00 bh Rp. 63,090.00 Rp. 252,360.00
2.4.1.5.9 Grendel tanam 2.00 set Rp. 193,090.00 Rp. 386,180.00
2.4.1.5.10 Cat melamin fin. Daun pintu 15.04 m2 Rp. 115,975.00 Rp. 1,744,273.28
2.4.1.5.11 Fisher 12.00 bh Rp. 12,545.00 Rp. 150,540.00

2.4.1.6 Type P1 1.00 unit


2.4.1.6.1 Kusen aluminium 10.16 m1 Rp. 103,595.00 Rp. 1,052,939.58
2.4.1.6.2 Daun pintu (material lihat detail) 3.44 m2 Rp. 650,900.00 Rp. 2,236,895.96
2.4.1.6.3 Daun jendela aluminium 5.08 m1 Rp. 102,095.00 Rp. 518,846.79
2.4.1.6.4 Kaca bening 5 mm 0.76 m2 Rp. 168,396.00 Rp. 128,220.08
2.4.1.6.5 Engsel pintu 6.00 psg Rp. 58,090.00 Rp. 348,540.00
2.4.1.6.6 Casement 12" 4.00 psg Rp. 47,060.00 Rp. 188,240.00
2.4.1.6.7 Lock case + handle 1.00 bh Rp. 402,600.00 Rp. 402,600.00
2.4.1.6.8 Grendel jendela 2.00 bh Rp. 63,090.00 Rp. 126,180.00
2.4.1.6.9 Grendel tanam 1.00 set Rp. 193,090.00 Rp. 193,090.00
2.4.1.6.10 Cat melamin fin. Daun pintu 6.87 m2 Rp. 115,975.00 Rp. 797,124.01
2.4.1.6.11 Fisher 6.00 bh Rp. 12,545.00 Rp. 75,270.00

2.4.1.7 Type P1a 1.00 unit


2.4.1.7.1 Kusen aluminium 9.70 m1 Rp. 103,595.00 Rp. 1,005,078.69
2.4.1.7.2 Daun pintu (material lihat detail) 3.30 m2 Rp. 650,900.00 Rp. 2,145,249.24
2.4.1.7.3 Daun jendela aluminium 4.69 m1 Rp. 102,095.00 Rp. 478,417.17
2.4.1.7.4 Kaca bening 5 mm 0.76 m2 Rp. 168,396.00 Rp. 128,220.08
2.4.1.7.5 Engsel pintu 6.00 psg Rp. 58,090.00 Rp. 348,540.00
2.4.1.7.6 Casement 12" 4.00 psg Rp. 47,060.00 Rp. 188,240.00
2.4.1.7.7 Lock case + handle 1.00 bh Rp. 402,600.00 Rp. 402,600.00
2.4.1.7.8 Grendel jendela 2.00 bh Rp. 63,090.00 Rp. 126,180.00
2.4.1.7.9 Grendel tanam 1.00 set Rp. 193,090.00 Rp. 193,090.00
2.4.1.7.10 Cat melamin fin. Daun pintu 6.59 m2 Rp. 115,975.00 Rp. 764,465.45
2.4.1.7.11 Fisher 6.00 bh Rp. 12,545.00 Rp. 75,270.00

2.4.1.8 Type P2 1.00 unit


2.4.1.8.1 Kusen aluminium 9.68 m1 Rp. 103,595.00 Rp. 1,002,799.60
2.4.1.8.2 Daun pintu (material lihat detail) 3.25 m2 Rp. 650,900.00 Rp. 2,115,034.46
2.4.1.8.3 Daun jendela aluminium 4.64 m1 Rp. 102,095.00 Rp. 473,924.99
2.4.1.8.4 Kaca bening 5 mm 0.56 m2 Rp. 168,396.00 Rp. 94,025.59
2.4.1.8.5 Engsel pintu 6.00 psg Rp. 58,090.00 Rp. 348,540.00
2.4.1.8.6 Casement 12" 4.00 psg Rp. 47,060.00 Rp. 188,240.00
2.4.1.8.7 Lock case + handle 1.00 bh Rp. 402,600.00 Rp. 402,600.00
2.4.1.8.8 Grendel jendela 2.00 bh Rp. 63,090.00 Rp. 126,180.00
2.4.1.8.9 Grendel tanam 1.00 set Rp. 193,090.00 Rp. 193,090.00
2.4.1.8.10 Cat melamin fin. Daun pintu 6.50 m2 Rp. 115,975.00 Rp. 753,698.33
2.4.1.8.11 Fisher 6.00 bh Rp. 12,545.00 Rp. 75,270.00

2.4.1.9 Type P3 6.00 unit


2.4.1.9.1 Kusen aluminium 50.42 m1 Rp. 103,595.00 Rp. 5,223,674.28
2.4.1.9.2 Daun pintu (material lihat detail) 11.42 m2 Rp. 650,900.00 Rp. 7,432,835.39
2.4.1.9.3 Daun jendela aluminium 15.84 m1 Rp. 102,095.00 Rp. 1,617,184.80
2.4.1.9.4 Kaca bening 5 mm 2.37 m2 Rp. 168,396.00 Rp. 399,442.05
2.4.1.9.5 Engsel pintu 18.00 psg Rp. 58,090.00 Rp. 1,045,620.00
2.4.1.9.6 Casement 12" 12.00 psg Rp. 47,060.00 Rp. 564,720.00
2.4.1.9.7 Lock case + handle 6.00 bh Rp. 402,600.00 Rp. 2,415,600.00
2.4.1.9.8 Grendel jendela 12.00 bh Rp. 63,090.00 Rp. 757,080.00
2.4.1.9.9 Cat melamin fin. Daun pintu 22.84 m2 Rp. 115,975.00 Rp. 2,648,711.27
2.4.1.9.10 Fisher 36.00 bh Rp. 12,545.00 Rp. 451,620.00
No. URAIAN VOL. SAT. HARGA SATUAN JUMLAH HARGA

2.4.1.10 Type P4 4.00 unit


2.4.1.10.1 Kusen aluminium 22.66 m1 Rp. 103,595.00 Rp. 2,347,462.70
2.4.1.10.2 Daun pintu (material lihat detail) 6.93 m2 Rp. 650,900.00 Rp. 4,510,737.00
2.4.1.10.3 Engsel pintu 12.00 psg Rp. 58,090.00 Rp. 697,080.00
2.4.1.10.4 Lock case + handle 4.00 bh Rp. 402,600.00 Rp. 1,610,400.00
2.4.1.10.5 Cat melamin fin. Daun pintu 13.86 m2 Rp. 115,975.00 Rp. 1,607,413.50
2.4.1.10.6 Fisher 24.00 bh Rp. 12,545.00 Rp. 301,080.00

2.4.1.11 Type P5 8.00 unit


2.4.1.11.1 Kusen aluminium 44.88 m1 Rp. 103,595.00 Rp. 4,649,343.60
2.4.1.11.2 Daun pintu (material lihat detail) 12.94 bh Rp. 650,900.00 Rp. 8,420,042.40
2.4.1.11.3 Engsel pintu 24.00 psg Rp. 58,090.00 Rp. 1,394,160.00
2.4.1.11.4 Cat melamin fin. Daun pintu 25.87 m2 Rp. 115,975.00 Rp. 3,000,505.20
2.4.1.11.5 Handle kunci pintu KW.1 8.00 bh Rp. 211,300.00 Rp. 1,690,400.00
2.4.1.11.6 Fisher 48.00 bh Rp. 12,545.00 Rp. 602,160.00

2.4.1.12 Type PL1 2.00 unit


2.4.1.12.1 Rail Pintu Geser 2.00 unit Rp. 1,000,000.00 Rp. 2,000,000.00
2.4.1.12.2 Daun pintu (material lihat detail) 43.89 m2 Rp. 650,900.00 Rp. 28,568,001.00
2.4.1.12.3 Engsel pintu 48.00 psg Rp. 58,090.00 Rp. 2,788,320.00
2.4.1.12.4 Cat melamin fin. Daun pintu 87.78 m2 Rp. 115,975.00 Rp. 10,180,285.50
2.4.1.12.5 Handle kunci pintu KW.1 4.00 bh Rp. 211,300.00 Rp. 845,200.00
2.4.1.12.6 Grendel 12.00 bh Rp. 45,000.00 Rp. 540,000.00

2.4.1.13 Type PL2 1.00 unit


2.4.1.12.1 Rail Pintu Geser 2.00 unit Rp. 1,000,000.00 Rp. 2,000,000.00
2.4.1.12.2 Daun pintu (material lihat detail) 8.42 m2 Rp. 650,900.00 Rp. 5,477,323.50
2.4.1.12.3 Engsel pintu 6.00 psg Rp. 58,090.00 Rp. 348,540.00
2.4.1.12.4 Cat melamin fin. Daun pintu 16.83 m2 Rp. 115,975.00 Rp. 1,951,859.25
2.4.1.12.5 Handle kunci pintu KW.1 2.00 bh Rp. 211,300.00 Rp. 422,600.00
2.4.1.12.6 Grendel 2.00 bh Rp. 45,000.00 Rp. 90,000.00

2.4.1.14 Type Ps 1.00 unit


2.4.1.14.1 Kusen aluminium 5.61 m1 Rp. 103,595.00 Rp. 581,167.95
2.4.1.14.2 Daun pintu (material lihat detail) 2.30 m2 Rp. 650,900.00 Rp. 1,495,130.32
2.4.1.14.3 Engsel pintu 3.00 psg Rp. 58,090.00 Rp. 174,270.00
2.4.1.14.4 Lock case + handle 1.00 bh Rp. 402,600.00 Rp. 402,600.00
2.4.1.14.5 Grendel tanam 2.00 set Rp. 193,090.00 Rp. 386,180.00
2.4.1.14.6 Cat melamin fin. Daun pintu 9.19 m2 Rp. 115,975.00 Rp. 1,065,587.58
2.4.1.14.7 Fisher 6.00 bh Rp. 12,545.00 Rp. 75,270.00

2.4.1.15 Type Ps3 2.00 unit


2.4.1.15.1 Kusen aluminium 11.66 m1 Rp. 103,595.00 Rp. 1,207,917.70
2.4.1.15.2 Daun pintu (material lihat detail) 4.16 m2 Rp. 650,900.00 Rp. 2,706,442.20
2.4.1.15.3 Engsel pintu 6.00 psg Rp. 58,090.00 Rp. 348,540.00
2.4.1.15.4 Lock case + handle 2.00 bh Rp. 402,600.00 Rp. 805,200.00
2.4.1.15.5 Cat melamin fin. Daun pintu 8.32 m2 Rp. 115,975.00 Rp. 964,448.10
2.4.1.15.6 Fisher 12.00 bh Rp. 12,545.00 Rp. 150,540.00

2.4.1.16 Type J1 2.00 unit


2.4.1.16.1 Kusen aluminium 49.83 m1 Rp. 103,595.00 Rp. 5,162,138.85
2.4.1.16.2 Daun jendela aluminum 47.87 m1 Rp. 102,095.00 Rp. 4,887,491.84
2.4.1.16.3 Kaca stopsol 6 mm 9.28 m2 Rp. 432,396.00 Rp. 4,011,320.40
2.4.1.16.4 Casement 12" 16.00 psg Rp. 47,060.00 Rp. 752,960.00
2.4.1.16.5 Casement 20" 16.00 psg Rp. 110,000.00 Rp. 1,760,000.00
2.4.1.16.6 Grendel jendela 16.00 bh Rp. 63,090.00 Rp. 1,009,440.00
2.4.1.16.7 Fisher 12.00 bh Rp. 12,545.00 Rp. 150,540.00

2.4.1.17 Type JK1 6.16 m1 Rp. 797,697.50 Rp. 4,913,816.60

2.4.1.18 Type J2 5.00 unit


2.4.1.18.1 Kusen aluminium 97.35 m1 Rp. 103,595.00 Rp. 10,084,973.25
2.4.1.18.2 Daun jendela aluminum 89.76 m1 Rp. 102,095.00 Rp. 9,164,047.20
2.4.1.18.3 Kaca stopsol 6 mm 17.39 m2 Rp. 432,396.00 Rp. 7,521,225.74
2.4.1.18.4 Casement 12" 30.00 psg Rp. 47,060.00 Rp. 1,411,800.00
2.4.1.18.5 Casement 20" 30.00 psg Rp. 110,000.00 Rp. 3,300,000.00
2.4.1.18.6 Grendel jendela 30.00 bh Rp. 63,090.00 Rp. 1,892,700.00
2.4.1.18.7 Fisher 30.00 bh Rp. 12,545.00 Rp. 376,350.00

2.4.1.19 Type J3 4.00 unit


2.4.1.17.1 Kusen aluminium 55.22 m1 Rp. 103,595.00 Rp. 5,720,515.90
2.4.1.17.2 Daun jendela aluminum 47.87 m1 Rp. 102,095.00 Rp. 4,887,491.84
2.4.1.17.3 Kaca stopsol 6 mm 8.43 m2 Rp. 432,396.00 Rp. 3,646,654.91
2.4.1.17.4 Casement 12" 16.00 psg Rp. 47,060.00 Rp. 752,960.00
2.4.1.17.5 Casement 20" 16.00 psg Rp. 110,000.00 Rp. 1,760,000.00
2.4.1.17.6 Grendel jendela 16.00 bh Rp. 63,090.00 Rp. 1,009,440.00
2.4.1.17.7 Fisher 24.00 bh Rp. 12,545.00 Rp. 301,080.00
No. URAIAN VOL. SAT. HARGA SATUAN JUMLAH HARGA

2.4.1.20 Type J5 16.00 unit


2.4.1.20.1 Kusen aluminium 105.60 m1 Rp. 103,595.00 Rp. 10,939,632.00
2.4.1.20.2 Kaca stopsol 6 mm 24.60 m2 Rp. 432,396.00 Rp. 10,635,212.02
2.4.1.20.3 Fisher 96.00 bh Rp. 12,545.00 Rp. 1,204,320.00

2.4.1.21 Type Jb1 3.00 unit


2.4.1.21.1 Kusen aluminium 13.83 m1 Rp. 103,595.00 Rp. 1,432,408.07
2.4.1.21.2 Kaca stopsol 6 mm 2.70 m2 Rp. 432,396.00 Rp. 1,167,209.76
2.4.1.21.3 Engineering wood 0.54 m2 Rp. 55,000.00 Rp. 29,683.50
2.4.1.21.4 Besi Siku penahan multipleks sisi luar 9.00 unit Rp. 30,000.00 Rp. 270,000.00
2.4.1.21.5 Engsel jendela 6.00 bh Rp. 20,000.00 Rp. 120,000.00
2.4.1.21.6 Tali ring besi penahan daun jendela 6.00 bh Rp. 63,090.00 Rp. 378,540.00
2.4.1.21.7 Grendel jendela 6.00 bh Rp. 63,090.00 Rp. 378,540.00
2.4.1.21.8 Fisher 18.00 bh Rp. 12,545.00 Rp. 225,810.00

2.4.1.22 Type V2 4.00 unit


2.4.1.22.1 Kusen aluminium 37.84 m1 Rp. 103,595.00 Rp. 3,920,034.80
2.4.1.22.2 Daun jendela aluminum 42.24 m1 Rp. 102,095.00 Rp. 4,312,492.80
2.4.1.22.3 Kaca stopsol 6 mm 4.05 m2 Rp. 432,396.00 Rp. 1,750,339.01
2.4.1.22.4 Casement 12" 32.00 psg Rp. 47,060.00 Rp. 1,505,920.00
2.4.1.22.5 Grendel jendela 16.00 bh Rp. 63,090.00 Rp. 1,009,440.00
2.4.1.22.6 Fisher 24.00 bh Rp. 12,545.00 Rp. 301,080.00

2.4.2 Lantai 02
2.4.2.1 Type P1u 2.00 unit
2.4.2.1.1 Kusen aluminium 20.33 m1 Rp. 103,595.00 Rp. 2,105,879.16
2.4.2.1.2 Daun pintu (material lihat detail) 7.52 m2 Rp. 650,900.00 Rp. 4,894,794.04
2.4.2.1.3 Daun jendela aluminium 10.16 m1 Rp. 102,095.00 Rp. 1,037,693.58
2.4.2.1.4 Kaca bening 5 mm 1.08 m2 Rp. 168,396.00 Rp. 181,604.98
2.4.2.1.5 Engsel pintu 12.00 psg Rp. 58,090.00 Rp. 697,080.00
2.4.2.1.6 Casement 12" 8.00 psg Rp. 47,060.00 Rp. 376,480.00
2.4.2.1.7 Lock case + handle 2.00 bh Rp. 552,600.00 Rp. 1,105,200.00
2.4.2.1.8 Grendel jendela 4.00 bh Rp. 63,090.00 Rp. 252,360.00
2.4.2.1.9 Grendel tanam 2.00 set Rp. 193,090.00 Rp. 386,180.00
2.4.2.1.10 Cat melamin fin. Daun pintu 15.04 m2 Rp. 115,975.00 Rp. 1,744,273.28
2.4.2.1.11 Fisher 12.00 bh Rp. 12,545.00 Rp. 150,540.00

2.4.2.2 Type P1 4.00 unit


2.4.2.2.1 Kusen aluminium 40.66 m1 Rp. 103,595.00 Rp. 4,211,758.32
2.4.2.2.2 Daun pintu (material lihat detail) 13.75 m2 Rp. 650,900.00 Rp. 8,947,583.83
2.4.2.2.3 Daun jendela aluminium 20.33 m1 Rp. 102,095.00 Rp. 2,075,387.16
2.4.2.2.4 Kaca bening 5 mm 3.05 m2 Rp. 168,396.00 Rp. 512,880.33
2.4.2.2.5 Engsel pintu 24.00 psg Rp. 58,090.00 Rp. 1,394,160.00
2.4.2.2.6 Casement 12" 16.00 psg Rp. 47,060.00 Rp. 752,960.00
2.4.2.2.7 Lock case + handle 4.00 bh Rp. 552,600.00 Rp. 2,210,400.00
2.4.2.2.8 Grendel jendela 8.00 bh Rp. 63,090.00 Rp. 504,720.00
2.4.2.2.9 Grendel tanam 4.00 set Rp. 193,090.00 Rp. 772,360.00
2.4.2.2.10 Cat melamin fin. Daun pintu 27.49 m2 Rp. 115,975.00 Rp. 3,188,496.04
2.4.2.2.11 Fisher 24.00 bh Rp. 12,545.00 Rp. 301,080.00

2.4.2.3 Type P1a 1.00 unit


2.4.2.3.1 Kusen aluminium 9.70 m1 Rp. 103,595.00 Rp. 1,005,078.69
2.4.2.3.2 Daun pintu (material lihat detail) 3.30 m2 Rp. 650,900.00 Rp. 2,145,249.24
2.4.2.3.3 Daun jendela aluminium 4.69 m1 Rp. 102,095.00 Rp. 478,417.17
2.4.2.3.4 Kaca bening 5 mm 0.76 m2 Rp. 168,396.00 Rp. 128,220.08
2.4.2.3.5 Engsel pintu 6.00 psg Rp. 58,090.00 Rp. 348,540.00
2.4.2.3.6 Casement 12" 4.00 psg Rp. 47,060.00 Rp. 188,240.00
2.4.2.3.7 Lock case + handle 1.00 bh Rp. 552,600.00 Rp. 552,600.00
2.4.2.3.8 Grendel jendela 2.00 bh Rp. 63,090.00 Rp. 126,180.00
2.4.2.3.9 Grendel tanam 1.00 set Rp. 193,090.00 Rp. 193,090.00
2.4.2.3.10 Cat melamin fin. Daun pintu 6.59 m2 Rp. 115,975.00 Rp. 764,465.45
2.4.2.3.11 Fisher 6.00 bh Rp. 12,545.00 Rp. 75,270.00

2.4.2.4 Type P2 5.00 unit


2.4.2.4.1 Kusen aluminium 48.40 m1 Rp. 103,595.00 Rp. 5,013,998.00
2.4.2.4.2 Daun pintu (material lihat detail) 16.25 m2 Rp. 650,900.00 Rp. 10,575,172.30
2.4.2.4.3 Daun jendela aluminium 23.21 m1 Rp. 102,095.00 Rp. 2,369,624.95
2.4.2.4.4 Kaca bening 5 mm 2.79 m2 Rp. 168,396.00 Rp. 470,127.95
2.4.2.4.5 Engsel pintu 30.00 psg Rp. 58,090.00 Rp. 1,742,700.00
2.4.2.4.6 Casement 12" 20.00 psg Rp. 47,060.00 Rp. 941,200.00
2.4.2.4.7 Lock case + handle 5.00 bh Rp. 552,600.00 Rp. 2,763,000.00
2.4.2.4.8 Grendel jendela 10.00 bh Rp. 63,090.00 Rp. 630,900.00
2.4.2.4.9 Grendel tanam 1.00 set Rp. 193,090.00 Rp. 193,090.00
2.4.2.4.10 Cat melamin fin. Daun pintu 6.50 m2 Rp. 115,975.00 Rp. 753,698.33
2.4.2.4.11 Fisher 30.00 bh Rp. 12,545.00 Rp. 376,350.00

2.4.2.5 Type P3 6.00 unit


2.4.2.5.1 Kusen aluminium 50.42 m1 Rp. 103,595.00 Rp. 5,223,674.28
No. URAIAN VOL. SAT. HARGA SATUAN JUMLAH HARGA

2.4.2.5.2 Daun pintu (material lihat detail) 11.42 m2 Rp. 650,900.00 Rp. 7,432,835.39
2.4.2.5.3 Daun jendela aluminium 15.84 m1 Rp. 102,095.00 Rp. 1,617,184.80
2.4.2.5.4 Kaca bening 5 mm 2.37 m2 Rp. 168,396.00 Rp. 399,442.05
2.4.2.5.5 Engsel pintu 18.00 psg Rp. 58,090.00 Rp. 1,045,620.00
2.4.2.5.6 Casement 12" 12.00 psg Rp. 47,060.00 Rp. 564,720.00
2.4.2.5.7 Lock case + handle 6.00 bh Rp. 552,600.00 Rp. 3,315,600.00
2.4.2.5.8 Grendel jendela 12.00 bh Rp. 63,090.00 Rp. 757,080.00
2.4.2.5.9 Cat melamin fin. Daun pintu 22.84 m2 Rp. 115,975.00 Rp. 2,648,711.27
2.4.2.5.10 Fisher 36.00 bh Rp. 12,545.00 Rp. 451,620.00

2.4.2.6 Type P4 7.00 unit


2.4.2.6.1 Kusen aluminium 39.66 m1 Rp. 103,595.00 Rp. 4,108,059.73
2.4.2.6.2 Daun pintu (material lihat detail) 12.13 m2 Rp. 650,900.00 Rp. 7,893,789.75
2.4.2.6.3 Engsel pintu 21.00 psg Rp. 58,090.00 Rp. 1,219,890.00
2.4.2.6.4 Lock case + handle 7.00 bh Rp. 552,600.00 Rp. 3,868,200.00
2.4.2.6.5 Cat melamin fin. Daun pintu 24.26 m2 Rp. 115,975.00 Rp. 2,812,973.63
2.4.2.6.6 Fisher 42.00 bh Rp. 12,545.00 Rp. 526,890.00

2.4.2.7 Type P5 11.00 unit


2.4.2.7.1 Kusen aluminium 61.71 m1 Rp. 103,595.00 Rp. 6,392,847.45
2.4.2.7.2 Daun pintu (material lihat detail) 17.79 bh Rp. 650,900.00 Rp. 11,577,558.30
2.4.2.7.3 Engsel pintu 33.00 psg Rp. 58,090.00 Rp. 1,916,970.00
2.4.2.7.4 Handle kunci pintu KW.1 11.00 bh Rp. 211,300.00 Rp. 2,324,300.00
2.4.2.7.5 Cat melamin fin. Daun pintu 35.57 m2 Rp. 115,975.00 Rp. 4,125,694.65
2.4.2.7.6 Fisher 66.00 bh Rp. 12,545.00 Rp. 827,970.00

2.4.2.8 Type Ps 2.00 unit


2.4.2.8.1 Kusen aluminium 11.22 m1 Rp. 103,595.00 Rp. 1,162,335.90
2.4.2.8.2 Daun pintu (material lihat detail) 4.59 m2 Rp. 650,900.00 Rp. 2,990,260.64
2.4.2.8.3 Engsel pintu 6.00 psg Rp. 58,090.00 Rp. 348,540.00
2.4.2.8.4 Lock case + handle 2.00 bh Rp. 552,600.00 Rp. 1,105,200.00
2.4.2.8.5 Grendel tanam 2.00 set Rp. 193,090.00 Rp. 386,180.00
2.4.2.8.6 Cat melamin fin. Daun pintu 9.19 m2 Rp. 115,975.00 Rp. 1,065,587.58
2.4.2.8.7 Fisher 12.00 bh Rp. 12,545.00 Rp. 150,540.00

2.4.2.9 Type Ps3 2.00 unit


2.4.2.9.1 Kusen aluminium 11.66 m1 Rp. 103,595.00 Rp. 1,207,917.70
2.4.2.9.2 Daun pintu (material lihat detail) 4.16 m2 Rp. 650,900.00 Rp. 2,706,442.20
2.4.2.9.3 Engsel pintu 6.00 psg Rp. 58,090.00 Rp. 348,540.00
2.4.2.9.4 Lock case + handle 2.00 bh Rp. 552,600.00 Rp. 1,105,200.00
2.4.2.9.5 Cat melamin fin. Daun pintu 8.32 m2 Rp. 115,975.00 Rp. 964,448.10
2.4.2.9.6 Fisher 12.00 bh Rp. 12,545.00 Rp. 150,540.00

2.4.2.10 Type J1 5.00 unit


2.4.2.10.1 Kusen aluminium 124.58 m1 Rp. 103,595.00 Rp. 12,905,347.13
2.4.2.10.2 Daun jendela aluminum 119.68 m1 Rp. 102,095.00 Rp. 12,218,729.60
2.4.2.10.3 Kaca stopsol 6 mm 23.19 m2 Rp. 432,396.00 Rp. 10,028,300.99
2.4.2.10.4 Casement 12" 40.00 psg Rp. 47,060.00 Rp. 1,882,400.00
2.4.2.10.5 Casement 20" 40.00 psg Rp. 110,000.00 Rp. 4,400,000.00
2.4.2.10.6 Grendel jendela 40.00 bh Rp. 63,090.00 Rp. 2,523,600.00
2.4.2.10.7 Fisher 30.00 bh Rp. 12,545.00 Rp. 376,350.00

2.4.2.11 Type J2 7.00 unit


2.4.2.11.1 Kusen aluminium 136.29 m1 Rp. 103,595.00 Rp. 14,118,962.55
2.4.2.11.2 Daun jendela aluminum 125.66 m1 Rp. 102,095.00 Rp. 12,829,666.08
2.4.2.11.3 Kaca stopsol 6 mm 24.35 m2 Rp. 432,396.00 Rp. 10,529,716.04
2.4.2.11.4 Casement 12" 42.00 psg Rp. 47,060.00 Rp. 1,976,520.00
2.4.2.11.5 Casement 20" 42.00 psg Rp. 110,000.00 Rp. 4,620,000.00
2.4.2.11.6 Grendel jendela 42.00 bh Rp. 63,090.00 Rp. 2,649,780.00
2.4.2.11.7 Fisher 42.00 bh Rp. 12,545.00 Rp. 526,890.00

2.4.2.12 Type J3 6.00 unit


2.4.2.12.1 Kusen aluminium 82.83 m1 Rp. 103,595.00 Rp. 8,580,773.85
2.4.2.12.2 Daun jendela aluminum 71.81 m1 Rp. 102,095.00 Rp. 7,331,237.76
2.4.2.12.3 Kaca stopsol 6 mm 12.65 m2 Rp. 432,396.00 Rp. 5,469,982.36
2.4.2.12.4 Casement 12" 24.00 psg Rp. 47,060.00 Rp. 1,129,440.00
2.4.2.12.5 Casement 20" 24.00 psg Rp. 110,000.00 Rp. 2,640,000.00
2.4.2.12.6 Grendel jendela 24.00 bh Rp. 63,090.00 Rp. 1,514,160.00
2.4.2.12.7 Fisher 36.00 bh Rp. 12,545.00 Rp. 451,620.00

2.4.2.13 Type J4 6.00 unit


2.4.2.13.1 Kusen aluminium 45.87 m1 Rp. 103,595.00 Rp. 4,751,902.65
2.4.2.13.2 Daun jendela aluminum 25.08 m1 Rp. 102,095.00 Rp. 2,560,542.60
2.4.2.13.3 Kaca stopsol 6 mm 8.12 m2 Rp. 432,396.00 Rp. 3,510,190.73
2.4.2.13.4 Casement 20" 12.00 psg Rp. 110,000.00 Rp. 1,320,000.00
2.4.2.13.5 Grendel jendela 6.00 bh Rp. 63,090.00 Rp. 378,540.00
2.4.2.13.6 Fisher 36.00 bh Rp. 12,545.00 Rp. 451,620.00
No. URAIAN VOL. SAT. HARGA SATUAN JUMLAH HARGA

2.4.2.14 Type J5 15.00 unit


2.4.2.14.1 Kusen aluminium 99.00 m1 Rp. 103,595.00 Rp. 10,255,905.00
2.4.2.14.2 Kaca stopsol 6 mm 23.06 m2 Rp. 432,396.00 Rp. 9,970,511.27
2.4.2.14.3 Fisher 90.00 bh Rp. 12,545.00 Rp. 1,129,050.00

2.4.2.15 Type J6 5.00 unit


2.4.2.15.1 Kaca 12 mm 9.90 m2 Rp. 797,697.50 Rp. 7,897,205.25

2.4.2.16 Type J7 1.00 unit


2.4.2.16.1 Kusen aluminium 9.46 m1 Rp. 103,595.00 Rp. 980,008.70
2.4.2.16.2 Kaca stopsol 6 mm 4.49 m2 Rp. 432,396.00 Rp. 1,940,593.25
2.4.2.16.3 Fisher 6.00 bh Rp. 12,545.00 Rp. 75,270.00

2.4.2.17 Type V1 4.00 unit


2.4.2.17.1 Kusen aluminium 21.12 m1 Rp. 103,595.00 Rp. 2,187,926.40
2.4.2.17.2 Daun jendela aluminum 21.12 m1 Rp. 102,095.00 Rp. 2,156,246.40
2.4.2.17.3 Kaca stopsol 6 mm 2.02 m2 Rp. 432,396.00 Rp. 875,169.50
2.4.2.17.4 Casement 12" 16.00 psg Rp. 47,060.00 Rp. 752,960.00
2.4.2.17.5 Grendel jendela 8.00 bh Rp. 63,090.00 Rp. 504,720.00
2.4.2.17.6 Fisher 24.00 bh Rp. 12,545.00 Rp. 301,080.00

2.4.2.18 Type V2 4.00 unit


2.4.2.18.1 Kusen aluminium 37.84 m1 Rp. 103,595.00 Rp. 3,920,034.80
2.4.2.18.2 Daun jendela aluminum 42.24 m1 Rp. 102,095.00 Rp. 4,312,492.80
2.4.2.18.3 Kaca stopsol 6 mm 4.05 m2 Rp. 432,396.00 Rp. 1,750,339.01
2.4.2.18.4 Casement 12" 32.00 psg Rp. 47,060.00 Rp. 1,505,920.00
2.4.2.18.5 Grendel jendela 16.00 bh Rp. 63,090.00 Rp. 1,009,440.00
2.4.2.18.6 Fisher 24.00 bh Rp. 12,545.00 Rp. 301,080.00

2.4.3 Lantai 03
2.4.3.1 Type P1u 2.00 unit
2.4.3.1.1 Kusen aluminium 20.33 m1 Rp. 103,595.00 Rp. 2,105,879.16
2.4.3.1.2 Daun pintu (material lihat detail) 7.52 m2 Rp. 650,900.00 Rp. 4,894,794.04
2.4.3.1.3 Daun jendela aluminium 10.16 m1 Rp. 102,095.00 Rp. 1,037,693.58
2.4.3.1.4 Kaca bening 5 mm 1.08 m2 Rp. 168,396.00 Rp. 181,604.98
2.4.3.1.5 Engsel pintu 12.00 psg Rp. 58,090.00 Rp. 697,080.00
2.4.3.1.6 Casement 12" 8.00 psg Rp. 47,060.00 Rp. 376,480.00
2.4.3.1.7 Lock case + handle 2.00 bh Rp. 552,600.00 Rp. 1,105,200.00
2.4.3.1.8 Grendel jendela 4.00 bh Rp. 63,090.00 Rp. 252,360.00
2.4.3.1.9 Grendel tanam 2.00 set Rp. 193,090.00 Rp. 386,180.00
2.4.3.1.10 Cat melamin fin. Daun pintu 15.04 m2 Rp. 115,975.00 Rp. 1,744,273.28
2.4.3.1.11 Fisher 12.00 bh Rp. 12,545.00 Rp. 150,540.00

2.4.3.2 Type P1a 1.00 unit


2.4.3.2.1 Kusen aluminium 9.70 m1 Rp. 103,595.00 Rp. 1,005,078.69
2.4.3.2.2 Daun pintu (material lihat detail) 3.30 m2 Rp. 650,900.00 Rp. 2,145,249.24
2.4.3.2.3 Daun jendela aluminium 4.69 m1 Rp. 102,095.00 Rp. 478,417.17
2.4.3.2.4 Kaca bening 5 mm 0.76 m2 Rp. 168,396.00 Rp. 128,220.08
2.4.3.2.5 Engsel pintu 6.00 psg Rp. 58,090.00 Rp. 348,540.00
2.4.3.2.6 Casement 12" 4.00 psg Rp. 47,060.00 Rp. 188,240.00
2.4.3.2.7 Lock case + handle 1.00 bh Rp. 552,600.00 Rp. 552,600.00
2.4.3.2.8 Grendel jendela 2.00 bh Rp. 63,090.00 Rp. 126,180.00
2.4.3.2.9 Grendel tanam 1.00 set Rp. 193,090.00 Rp. 193,090.00
2.4.3.2.10 Cat melamin fin. Daun pintu 6.59 m2 Rp. 115,975.00 Rp. 764,465.45
2.4.3.2.11 Fisher 6.00 bh Rp. 12,545.00 Rp. 75,270.00

2.4.3.3 Type P2 4.00 unit


2.4.3.3.1 Kusen aluminium 38.72 m1 Rp. 103,595.00 Rp. 4,011,198.40
2.4.3.3.2 Daun pintu (material lihat detail) 13.00 m2 Rp. 650,900.00 Rp. 8,460,137.84
2.4.3.3.3 Daun jendela aluminium 18.57 m1 Rp. 102,095.00 Rp. 1,895,699.96
2.4.3.3.4 Kaca bening 5 mm 2.23 m2 Rp. 168,396.00 Rp. 376,102.36
2.4.3.3.5 Engsel pintu 24.00 psg Rp. 58,090.00 Rp. 1,394,160.00
2.4.3.3.6 Casement 12" 16.00 psg Rp. 47,060.00 Rp. 752,960.00
2.4.3.3.7 Lock case + handle 4.00 bh Rp. 552,600.00 Rp. 2,210,400.00
2.4.3.3.8 Grendel jendela 8.00 bh Rp. 63,090.00 Rp. 504,720.00
2.4.3.3.9 Grendel tanam 4.00 set Rp. 193,090.00 Rp. 772,360.00
2.4.3.3.10 Cat melamin fin. Daun pintu 26.00 m2 Rp. 115,975.00 Rp. 3,014,793.32
2.4.3.3.11 Fisher 24.00 bh Rp. 12,545.00 Rp. 301,080.00

2.4.3.4 Type P3 20.00 unit


2.4.3.4.1 Kusen aluminium 168.08 m1 Rp. 103,595.00 Rp. 17,412,247.60
2.4.3.4.2 Daun pintu (material lihat detail) 38.06 m2 Rp. 650,900.00 Rp. 24,776,117.96
2.4.3.4.3 Daun jendela aluminium 52.80 m1 Rp. 102,095.00 Rp. 5,390,616.00
2.4.3.4.4 Kaca bening 5 mm 7.91 m2 Rp. 168,396.00 Rp. 1,331,473.49
2.4.3.4.5 Engsel pintu 60.00 psg Rp. 58,090.00 Rp. 3,485,400.00
2.4.3.4.6 Casement 12" 40.00 psg Rp. 47,060.00 Rp. 1,882,400.00
2.4.3.4.7 Lock case + handle 20.00 bh Rp. 552,600.00 Rp. 11,052,000.00
2.4.3.4.8 Grendel jendela 40.00 bh Rp. 63,090.00 Rp. 2,523,600.00
No. URAIAN VOL. SAT. HARGA SATUAN JUMLAH HARGA

2.4.3.4.9 Cat melamin fin. Daun pintu 76.13 m2 Rp. 115,975.00 Rp. 8,829,037.58
2.4.3.4.10 Fisher 120.00 bh Rp. 12,545.00 Rp. 1,505,400.00

2.4.3.5 Type P4 4.00 unit


2.4.3.5.1 Kusen aluminium 22.66 m1 Rp. 103,595.00 Rp. 2,347,462.70
2.4.3.5.2 Daun pintu (material lihat detail) 6.93 m2 Rp. 650,900.00 Rp. 4,510,737.00
2.4.3.5.3 Engsel pintu 12.00 psg Rp. 58,090.00 Rp. 697,080.00
2.4.3.5.4 Lock case + handle 4.00 bh Rp. 552,600.00 Rp. 2,210,400.00
2.4.3.5.5 Cat melamin fin. Daun pintu 13.86 m2 Rp. 115,975.00 Rp. 1,607,413.50
2.4.3.5.6 Fisher 24.00 bh Rp. 12,545.00 Rp. 301,080.00

2.4.3.6 Type P5 8.00 unit


2.4.3.6.1 Kusen aluminium 44.88 m1 Rp. 103,595.00 Rp. 4,649,343.60
2.4.3.6.2 Daun pintu (material lihat detail) 12.94 bh Rp. 650,900.00 Rp. 8,420,042.40
2.4.3.6.3 Engsel pintu 24.00 psg Rp. 58,090.00 Rp. 1,394,160.00
2.4.3.6.4 Handle kunci pintu KW.1 8.00 bh Rp. 211,300.00 Rp. 1,690,400.00
2.4.3.6.5 Cat melamin fin. Daun pintu 25.87 m2 Rp. 115,975.00 Rp. 3,000,505.20
2.4.3.6.6 Fisher 48.00 bh Rp. 12,545.00 Rp. 602,160.00

2.4.3.7 Type Ps 2.00 unit


2.4.3.7.1 Kusen aluminium 11.22 m1 Rp. 103,595.00 Rp. 1,162,335.90
2.4.3.7.2 Daun pintu (material lihat detail) 4.59 m2 Rp. 650,900.00 Rp. 2,990,260.64
2.4.3.7.3 Engsel pintu 6.00 psg Rp. 58,090.00 Rp. 348,540.00
2.4.3.7.4 Lock case + handle 2.00 bh Rp. 552,600.00 Rp. 1,105,200.00
2.4.3.7.5 Grendel tanam 2.00 set Rp. 193,090.00 Rp. 386,180.00
2.4.3.7.6 Cat melamin fin. Daun pintu 9.19 m2 Rp. 115,975.00 Rp. 1,065,587.58
2.4.3.7.7 Fisher 12.00 bh Rp. 12,545.00 Rp. 150,540.00

2.4.3.8 Type J1 14.00 unit


2.4.3.8.1 Kusen aluminium 348.81 m1 Rp. 103,595.00 Rp. 36,134,971.95
2.4.3.8.2 Daun jendela aluminum 335.10 m1 Rp. 650,900.00 Rp. 218,119,193.60
2.4.3.8.3 Kaca stopsol 6 mm 64.94 m2 Rp. 58,090.00 Rp. 3,772,290.24
2.4.3.8.4 Casement 12" 112.00 psg Rp. 47,060.00 Rp. 5,270,720.00
2.4.3.8.5 Casement 20" 112.00 psg Rp. 110,000.00 Rp. 12,320,000.00
2.4.3.8.6 Grendel jendela 112.00 bh Rp. 63,090.00 Rp. 7,066,080.00
2.4.3.8.7 Fisher 84.00 bh Rp. 12,545.00 Rp. 1,053,780.00

2.4.3.9 Type J2 7.00 unit


2.4.3.9.1 Kusen aluminium 136.29 m1 Rp. 103,595.00 Rp. 14,118,962.55
2.4.3.9.2 Daun jendela aluminum 125.66 m1 Rp. 650,900.00 Rp. 81,794,697.60
2.4.3.9.3 Kaca stopsol 6 mm 24.35 m2 Rp. 58,090.00 Rp. 1,414,608.84
2.4.3.9.4 Casement 12" 42.00 psg Rp. 47,060.00 Rp. 1,976,520.00
2.4.3.9.5 Casement 20" 42.00 psg Rp. 110,000.00 Rp. 4,620,000.00
2.4.3.9.6 Grendel jendela 42.00 bh Rp. 63,090.00 Rp. 2,649,780.00
2.4.3.9.7 Fisher 42.00 bh Rp. 12,545.00 Rp. 526,890.00

2.4.3.10 Type J3 8.00 unit


2.4.3.10.1 Kusen aluminium 110.44 m1 Rp. 103,595.00 Rp. 11,441,031.80
2.4.3.10.2 Daun jendela aluminum 95.74 m1 Rp. 650,900.00 Rp. 62,319,769.60
2.4.3.10.3 Kaca stopsol 6 mm 16.87 m2 Rp. 58,090.00 Rp. 979,815.65
2.4.3.10.4 Casement 12" 32.00 psg Rp. 47,060.00 Rp. 1,505,920.00
2.4.3.10.5 Casement 20" 32.00 psg Rp. 110,000.00 Rp. 3,520,000.00
2.4.3.10.6 Grendel jendela 32.00 bh Rp. 63,090.00 Rp. 2,018,880.00
2.4.3.10.7 Fisher 48.00 bh Rp. 12,545.00 Rp. 602,160.00

2.4.3.11 Type V2 4.00 unit


2.4.3.11.1 Kusen aluminium 37.84 m1 Rp. 103,595.00 Rp. 3,920,034.80
2.4.3.11.2 Daun jendela aluminum 42.24 m1 Rp. 650,900.00 Rp. 27,494,016.00
2.4.3.11.3 Kaca stopsol 6 mm 4.05 m2 Rp. 58,090.00 Rp. 235,148.32
2.4.3.11.4 Casement 12" 32.00 psg Rp. 47,060.00 Rp. 1,505,920.00
2.4.3.11.5 Grendel jendela 16.00 bh Rp. 63,090.00 Rp. 1,009,440.00
2.4.3.11.6 Fisher 24.00 bh Rp. 12,545.00 Rp. 301,080.00

2.4.4 Lantai Topfloor


2.4.4.1 Type Ps 1.00 unit
2.4.4.4.1 Kusen aluminium 5.61 m1 Rp. 103,595.00 Rp. 581,167.95
2.4.4.4.2 Daun pintu (material lihat detail) 2.30 m2 Rp. 650,900.00 Rp. 1,495,130.32
2.4.4.4.3 Engsel pintu 3.00 psg Rp. 58,090.00 Rp. 174,270.00
2.4.4.4.4 Lock case + handle 1.00 bh Rp. 552,600.00 Rp. 552,600.00
2.4.4.4.5 Grendel tanam 1.00 set Rp. 193,090.00 Rp. 193,090.00
2.4.4.4.6 Cat melamin fin. Daun pintu 4.59 m2 Rp. 115,975.00 Rp. 532,793.79
2.4.4.4.7 Fisher 6.00 bh Rp. 12,545.00 Rp. 75,270.00

2.4.4.2 Type Ps2 1.00 unit


2.4.4.2.1 Kusen aluminium 5.16 m1 Rp. 103,595.00 Rp. 534,446.61
2.4.4.2.2 Daun pintu (material lihat detail) 2.06 m2 Rp. 650,900.00 Rp. 1,337,755.72
2.4.4.2.3 Engsel pintu 6.00 psg Rp. 58,090.00 Rp. 348,540.00
2.4.4.2.4 Lock case + handle 1.00 bh Rp. 552,600.00 Rp. 552,600.00
No. URAIAN VOL. SAT. HARGA SATUAN JUMLAH HARGA

2.4.4.2.5 Grendel tanam 1.00 set Rp. 193,090.00 Rp. 193,090.00


2.4.4.2.6 Cat melamin fin. Daun pintu 4.11 m2 Rp. 115,975.00 Rp. 476,712.92
2.4.4.2.7 Fisher 6.00 bh Rp. 12,545.00 Rp. 75,270.00

2.4.4.3 Type Ps3 1.00 unit


2.4.4.3.1 Kusen aluminium 5.83 m1 Rp. 103,595.00 Rp. 603,958.85
2.4.4.3.2 Daun pintu (material lihat detail) 2.08 m2 Rp. 650,900.00 Rp. 1,353,221.10
2.4.4.3.3 Engsel pintu 3.00 psg Rp. 58,090.00 Rp. 174,270.00
2.4.4.3.4 Lock case + handle 1.00 bh Rp. 552,600.00 Rp. 552,600.00
2.4.4.3.5 Cat melamin fin. Daun pintu 4.16 m2 Rp. 115,975.00 Rp. 482,224.05
2.4.4.3.6 Fisher 6.00 bh Rp. 12,545.00 Rp. 75,270.00

2.4.3.11 Type V2 4.00 unit


2.4.3.11.1 Kusen aluminium 37.84 m1 Rp. 103,595.00 Rp. 3,920,034.80
2.4.3.11.2 Daun jendela aluminum 42.24 m1 Rp. 650,900.00 Rp. 27,494,016.00
2.4.3.11.3 Kaca stopsol 6 mm 4.05 m2 Rp. 58,090.00 Rp. 235,148.32
2.4.3.11.4 Casement 12" 32.00 psg Rp. 47,060.00 Rp. 1,505,920.00
2.4.3.11.5 Grendel jendela 16.00 bh Rp. 63,090.00 Rp. 1,009,440.00
2.4.3.11.6 Fisher 24.00 bh Rp. 12,545.00 Rp. 301,080.00
No. URAIAN VOL. SAT. HARGA SATUAN JUMLAH HARGA

2.4.4.4 Type K1 Pada Tangga luar 1.00 unit


2.4.4.4.1 Kisi Kisi Hollow 22.74 m1 Rp. 1,995,813.04 Rp. 45,384,788.53
2.4.4.4.6 Fisher 6.00 bh Rp. 12,545.00 Rp. 75,270.00

2.4.4.5 Type Jalusi Atap 01 2.00 unit


2.4.4.5.1 Frame Aluminium 60.82 m1 Rp. 103,595.00 Rp. 6,300,647.90
2.4.4.5.2 Blade Sirip Kisi kisi Aluminium 28.30 m2 Rp. 123,095.00 Rp. 3,483,588.50

2.4.4.6 Type Jalusi Atap 02 2.00 unit


2.4.4.6.1 Frame Aluminium 45.20 m1 Rp. 103,595.00 Rp. 4,682,494.00
2.4.4.6.2 Blade Sirip kisi kisi aluminium 18.87 m2 Rp. 123,095.00 Rp. 2,322,236.41

Jumlah Rp. 1,473,189,624.09


2.5 Pekerjaan finishing Atap
2.5.1 Atap metal, t=0,45 mm 1,625.47 m2 Rp. 220,000.00 Rp. 357,603,840.00
2.5.2 Lapisan bawah atap (Aluminium foil + wiremesh) 1,625.47 m2 Rp. 142,595.21 Rp. 231,784,518.48
2.5.3 Atap metal, t=0,45 mm Sunscreen 274.86 m2 Rp. 220,000.00 Rp. 60,468,540.00
2.5.4 Rangka Pipa Gip 2" Fin. Cat (Sunscreen) 877.27 m1 Rp. 562,135.00 Rp. 493,144,171.45
2.5.5 Reng baja ringan atap suncreen 274.86 m2 Rp. 60,000.00 Rp. 16,491,420.00
2.5.6 Lisplank 305.81 m1 Rp. 116,820.83 Rp. 35,725,095.86
2.5.7 Bubungan 135.12 m1 Rp. 150,000.00 Rp. 20,268,150.00
2.5.8 Jurai 24.00 m1 Rp. 150,000.00 Rp. 3,600,000.00

Jumlah Rp. 1,219,085,735.79


2.6 Pekerjaan Pengecatan
2.6.1 Lantai 01
2.6.1.1 Pekerjan cat dinding Interior 1010.16 m2 Rp. 23,943.00 Rp. 24,186,189.05
2.6.1.2 Pekerjan cat dinding eksterior 838.67 m2 Rp. 35,643.00 Rp. 29,892,607.88
2.6.1.3 Pekerjan cat dinding Partisi 234.72 m2 Rp. 23,943.00 Rp. 5,620,008.70
2.6.1.4 Pekerjan cat plafond gypsum 1,045.60 m2 Rp. 23,943.00 Rp. 25,034,913.33

2.6.2 Lantai 02
2.6.2.1 Pekerjan cat dinding Interior 1586.52 m2 Rp. 23,943.00 Rp. 37,986,048.36
2.6.2.2 Pekerjan cat dinding eksterior 898.79 m2 Rp. 35,643.00 Rp. 32,035,607.61
2.6.2.3 Pekerjan cat dinding Partisi 984.16 m2 Rp. 23,943.00 Rp. 23,563,647.11
2.6.2.4 Pekerjan cat plafond gypsum 1,229.17 m2 Rp. 23,943.00 Rp. 29,429,964.64

2.6.3 Lantai 03
2.6.3.1 Pekerjan cat dinding Interior 744.58 m2 Rp. 23,943.00 Rp. 17,827,455.00
2.6.3.2 Pekerjan cat dinding eksterior 626.23 m2 Rp. 35,643.00 Rp. 22,320,680.25
2.6.3.3 Pekerjan cat dinding Partisi 1102.18 m2 Rp. 23,943.00 Rp. 26,389,399.97
2.6.3.4 Pekerjan cat plafond gypsum 1,019.92 m2 Rp. 23,943.00 Rp. 24,419,884.70

2.6.4 Topfloor
2.6.4.1 Pekerjan cat dinding Interior 283.68 m2 Rp. 23,943.00 Rp. 6,792,030.53
2.6.4.2 Pekerjan cat dinding eksterior 404.97 m2 Rp. 35,643.00 Rp. 14,434,331.45
2.6.4.3 Pekerjan cat plafond gypsum 358.30 m2 Rp. 23,943.00 Rp. 8,578,776.90

2.6.5 Tangga luar bangunan


2.6.5.1 Pekerjan cat dinding Interior 272.38 m2 Rp. 23,943.00 Rp. 6,521,642.23
2.6.5.2 Pekerjan cat dinding eksterior 272.38 m2 Rp. 35,643.00 Rp. 9,708,511.63

2.6.6 Finishing dinding batu alam


2.6.6.1 Cat Coating Batu alam Templek pada tangga luar 79.20 m2 Rp. 14,293.00 Rp. 1,131,967.01
2.6.6.2 Cat Coating Batu alam Templek pada bangunan 302.25 m2 Rp. 14,293.00 Rp. 4,320,063.54

Jumlah Rp. 350,193,729.88


No. URAIAN VOL. SAT. HARGA SATUAN JUMLAH HARGA

2.70 Pekerjaan Lain-lain


2.7.1 Pek Tangga 04 (tangga Besi UNP + Besi Siku + Plat Besi) 8.00 m2 Rp. 1,000,000.00 Rp. 8,000,000.00
2.7.2 Railing tangga Luar Fin. Cat (Tangga 01) 28.10 m1 Rp. 652,452.04 Rp. 18,333,902.32
2.7.3 Railing tangga dalam (tangga 02) 25.30 m1 Rp. 1,199,220.00 Rp. 30,340,266.00
2.7.4 Railing tangga dalam (tangga 03) 40.50 m1 Rp. 1,199,220.00 Rp. 48,568,410.00
2.7.5 Railing tangga Belakang Panggung Fin. Cat (Tangga 04) 7.00 m1 Rp. 652,452.04 Rp. 4,567,164.28
2.7.6 Railling Void Lt.1 (Tempered Glass 10 mm With Spider + Handrail ) 10.10 m1 Rp. 2,000,000.00 Rp. 20,200,000.00
2.7.7 Railling Void Lt.2 (Tempered Glass 10 mm With Spider + Handrail ) 20.46 m1 Rp. 2,000,000.00 Rp. 40,920,000.00
2.7.8 Railling Luar Lt.2 Pipa Gip Fin. Cat 9.82 m1 Rp. 652,452.04 Rp. 6,407,079.03
2.7.9 Railling Luar Lt.3 Pipa Gip Fin. Cat 9.82 m1 Rp. 652,452.04 Rp. 6,407,079.03
2.7.10 Pekerjaan Panggung / Stage + Backdrop, Finish Hpl 1.00 Ls Rp. 15,000,000.00 Rp. 15,000,000.00
2.7.11 Pek. Saluran Keliling Bangunan + Pondasi Keliling Bangunan 168.35 m1 Rp. 909,716.59 Rp. 153,150,787.25
2.7.12 Pek.Bak Kontrol Saluran Keliling Bangunan 12.00 unit Rp. 901,438.43 Rp. 10,817,261.10

Jumlah Rp. 362,711,949.02

Sub Total II Rp. 7,693,493,517.28

MAKASSAR, 25 APRIL 2016


PT. BANGUN BUMI INDAH

JULIANUS S LELEPADANG
DIREKTUR
RENCANA ANGGARAN BIAYA(RAB)

PROYEK : PEMBANGUNAN LANJUTAN GEDUNG PENDIDIKAN


FAKULTAS PERTANIAN UNIVERSITAS HASANUDDIN (TAHAP 02)
LOKASI : KAMPUS TAMALANREA MAKASSAR
T.A : 2016

IV. PEKERJAAN ELEKTRIKAL & MEKANIKAL

No. URAIAN VOL. SAT. HARGA SATUAN JUMLAH HARGA

I PEKERJAAN ELEKTRIKAL (EL)


1.1. Panel dan Peralatan
1.1.1 - LVLVMDP + ATS 1.00 Unit Rp. 70,000,000.00 Rp. 70,000,000.00
1.1.2 - PP AC Lt.1 1.00 Unit Rp. 4,250,000.00 Rp. 4,250,000.00
1.1.3 - PP Lt.1 1.00 Unit Rp. 4,250,000.00 Rp. 4,250,000.00
1.1.4 - PP AC Lt.2 1.00 Unit Rp. 4,250,000.00 Rp. 4,250,000.00
1.1.5 - PP Lt.2 1.00 Unit Rp. 4,250,000.00 Rp. 4,250,000.00
1.1.6 - PP AC Lt.3 1.00 Unit Rp. 4,250,000.00 Rp. 4,250,000.00
1.1.7 - PP Lt.3 1.00 Unit Rp. 4,250,000.00 Rp. 4,250,000.00
1.1.8 - PP Lt.4 1.00 Unit Rp. 4,250,000.00 Rp. 4,250,000.00
1.1.9 - Alat bantu instalasi 1.00 Lot Rp. 4,500,000.00 Rp. 4,500,000.00

Jumlah Rp. 104,250,000.00


1.2 Kabel Feeder & Tray Kabel
1.2.1 - Dari LVMDP ke PP AC Lt1, NYY 4X10 mm ex Supreme 10.00 Mtr Rp. 150,000.00 Rp. 1,500,000.00
1.2.2 - Dari LVMDP ke PP Lt1, NYY 4X10 mm ex Supreme 10.00 Mtr Rp. 150,000.00 Rp. 1,500,000.00
1.2.3 - Dari LVMDP ke PP AC Lt2, NYY 4X10 mm ex Supreme 20.00 Mtr Rp. 150,000.00 Rp. 3,000,000.00
1.2.4 - Dari LVMDP ke PP Lt2, NYY 4X10 mm ex Supreme 20.00 Mtr Rp. 150,000.00 Rp. 3,000,000.00
1.2.5 - Dari LVMDP ke PP AC Lt3, NYY 4X10 mm ex Supreme 30.00 Mtr Rp. 150,000.00 Rp. 4,500,000.00
1.2.6 - Dari LVMDP ke PP Lt3, NYY 4X10 mm ex Supreme 30.00 Mtr Rp. 150,000.00 Rp. 4,500,000.00
1.2.7 - Dari LVMDP ke PP Lt4, NYY 4X10 mm ex Supreme 60.00 Mtr Rp. 150,000.00 Rp. 9,000,000.00
1.2.8 - Kabel Tray U (300 x 100 x 2400 x 1.2 mm) 300.00 Mtr Rp. 125,000.00 Rp. 37,500,000.00
1.2.9 - Kabel Tray U (500 x 100 x 2400 x 1.2 mm) 100.00 Mtr Rp. 90,000.00 Rp. 9,000,000.00
1.2.10 - Cable Ladder U (1000 x 100 x 2400 x 1.8 mm) 30.00 Mtr Rp. 160,000.00 Rp. 4,800,000.00
1.2.11 - Material bantu 1.00 Lot Rp. 1,500,000.00 Rp. 1,500,000.00

Jumlah Rp. 79,800,000.00


1.3 Elektrikal Lighting
1.3.1 Lantai 01
1.3.1.1 - Instalasi penerangan 173.00 Ttk Rp. 150,000.00 Rp. 25,950,000.00
1.3.1.2 - Instalasi Stop Kontak & Saklar 98.00 Ttk Rp. 150,000.00 Rp. 14,700,000.00
1.3.1.3 - Instalasi Stop Kontak AC 16.00 Ttk Rp. 165,000.00 Rp. 2,640,000.00
1.3.1.4 - Instalasi Exhaust Fan 25W 12.00 Ttk Rp. 165,000.00 Rp. 1,980,000.00
1.3.1.5 - Instalasi AC cassete 6.00 Ttk Rp. 165,000.00 Rp. 990,000.00
1.3.1.6 - Lampu Down light 18W 127.00 Bh Rp. 150,000.00 Rp. 19,050,000.00
1.3.1.7 - Lampu Down light 18W Outbow 2.00 Bh Rp. 125,000.00 Rp. 250,000.00
1.3.1.8 - Lampu SL 18W 19.00 Bh Rp. 100,000.00 Rp. 1,900,000.00
1.3.1.9 - Lampu RM 2x36W 23.00 Bh Rp. 380,000.00 Rp. 8,740,000.00
1.3.1.10 - Lampu RM 2x18W 2.00 Bh Rp. 300,000.00 Rp. 600,000.00
1.3.1.11 - AC Type Split 1 PK 16.00 Unit Rp. 3,500,000.00 Rp. 56,000,000.00
1.3.1.12 - AC Type Cassete 2 PK 6.00 Unit Rp. 15,000,000.00 Rp. 90,000,000.00
1.3.1.13 - Exhaust Fan 25W 12.00 Bh Rp. 365,000.00 Rp. 4,380,000.00
1.3.1.14 - Sakelar tunggal ex. Clipsal 10.00 Bh Rp. 12,500.00 Rp. 125,000.00
1.3.1.15 - Sakelar Seri ex. Clipsal 27.00 Bh Rp. 20,000.00 Rp. 540,000.00
1.3.1.16 - Stop kontak AC ex. Clipsal 16.00 Bh Rp. 25,000.00 Rp. 400,000.00
1.3.1.17 - Stop kontak ex. Clipsal 61.00 Bh Rp. 25,000.00 Rp. 1,525,000.00
1.3.1.18 - Material bantu 1.00 Lot Rp. 450,000.00 Rp. 450,000.00
1.3.1.19 - Commisioning test 1.00 Lot Rp. 750,000.00 Rp. 750,000.00
Jumlah Rp. 230,970,000.00
1.3.2 Lantai 02
1.3.2.1 - Instalasi penerangan 149.00 Ttk Rp. 150,000.00 Rp. 22,350,000.00
1.3.2.2 - Instalasi Stop Kontak & Saklar 96.00 Ttk Rp. 150,000.00 Rp. 14,400,000.00
1.3.2.3 - Instalasi Stop Kontak AC 14.00 Ttk Rp. 165,000.00 Rp. 2,310,000.00
1.3.2.4 - Instalasi Exhaust Fan 25W 12.00 Ttk Rp. 165,000.00 Rp. 1,980,000.00
1.3.2.5 - Lampu Down light 18W 116.00 Bh Rp. 165,000.00 Rp. 19,140,000.00
1.3.2.6 - Lampu SL 18W 15.00 Bh Rp. 100,000.00 Rp. 1,500,000.00
1.3.2.7 - Lampu RM 2x36W 12.00 Bh Rp. 380,000.00 Rp. 4,560,000.00
1.3.2.8 - Lampu RM 2x18W 6.00 Bh Rp. 300,000.00 Rp. 1,800,000.00
1.3.2.9 - Exhaust Fan 25W 12.00 Bh Rp. 365,000.00 Rp. 4,380,000.00
1.3.2.10 - AC Type Split 1 PK 14.00 Bh Rp. 3,500,000.00 Rp. 49,000,000.00
1.3.2.11 - Sakelar tunggal ex. Clipsal 13.00 Bh Rp. 12,500.00 Rp. 162,500.00
1.3.2.12 - Sakelar Seri ex. Clipsal 29.00 Bh Rp. 20,000.00 Rp. 580,000.00
1.3.2.13 - Stop kontak AC ex. Clipsal 14.00 Bh Rp. 25,000.00 Rp. 350,000.00
1.3.2.14 - Stop kontak ex. Clipsal 54.00 Bh Rp. 25,000.00 Rp. 1,350,000.00
1.3.2.15 - Material bantu 1.00 Lot Rp. 450,000.00 Rp. 450,000.00
1.3.2.16 - Commisioning test 1.00 Lot Rp. 750,000.00 Rp. 750,000.00

Jumlah Rp. 125,062,500.00


1.3.3 Lantai 03
1.3.3.1 - Instalasi penerangan 93.00 Ttk Rp. 150,000.00 Rp. 13,950,000.00
1.3.3.2 - Instalasi Stop Kontak & Sakelar 109.00 Ttk Rp. 150,000.00 Rp. 16,350,000.00
1.3.3.3 - Instalasi Stop Kontak AC 24.00 Ttk Rp. 165,000.00 Rp. 3,960,000.00
1.3.3.4 - Instalasi Exhaust Fan 25W 12.00 Ttk Rp. 165,000.00 Rp. 1,980,000.00
1.3.3.5 - Lampu Down light 18W 40.00 Bh Rp. 165,000.00 Rp. 6,600,000.00
1.3.3.6 - Lampu SL 18W 13.00 Bh Rp. 100,000.00 Rp. 1,300,000.00
1.3.3.7 - Lampu RM 2x36W 14.00 Bh Rp. 380,000.00 Rp. 5,320,000.00
1.3.3.8 - Lampu RM 2x18W 26.00 Bh Rp. 300,000.00 Rp. 7,800,000.00
1.3.3.9 - Exhaust Fan 25W 12.00 Bh Rp. 365,000.00 Rp. 4,380,000.00
1.3.3.10 - AC Type Split 1 PK 24.00 Bh Rp. 3,500,000.00 Rp. 84,000,000.00
1.3.3.11 - Sakelar tunggal ex. Clipsal 26.00 Bh Rp. 12,500.00 Rp. 325,000.00
1.3.3.12 - Sakelar Seri ex. Clipsal 13.00 Bh Rp. 20,000.00 Rp. 260,000.00
1.3.3.13 - Stop kontak AC ex. Clipsal 24.00 Bh Rp. 25,000.00 Rp. 600,000.00
1.3.3.14 - Stop kontak ex. Clipsal 70.00 Bh Rp. 25,000.00 Rp. 1,750,000.00
1.3.3.15 - Material bantu 1.00 Lot Rp. 450,000.00 Rp. 450,000.00
1.3.3.16 - Commisioning test 1.00 Lot Rp. 750,000.00 Rp. 750,000.00

Jumlah Rp. 149,775,000.00


1.3.4 Lantai 04 topfloor
1.3.4.1 - Instalasi penerangan 4.00 Ttk Rp. 150,000.00 Rp. 600,000.00
1.3.4.2 - Instalasi Stop Kontak & Sakelar 6.00 Ttk Rp. 150,000.00 Rp. 900,000.00
1.3.4.3 - Lampu SL 18W 4.00 Bh Rp. 100,000.00 Rp. 400,000.00
1.3.4.4 - Sakelar Seri ex. Clipsal 2.00 Bh Rp. 20,000.00 Rp. 40,000.00
1.3.4.5 - Stop kontak ex. Clipsal 4.00 Bh Rp. 25,000.00 Rp. 100,000.00
1.3.4.6 - Material bantu 1.00 Lot Rp. 450,000.00 Rp. 450,000.00
1.3.4.7 - Commisioning test 1.00 Lot Rp. 750,000.00 Rp. 750,000.00

Jumlah Rp. 3,240,000.00


Jumlah Armature Rp. 509,047,500.00
1.4 Pekerjaan Fire Alarm
1.4.1 Peralatan Utama
1.4.1.1 - Main Control Panel - Fire Alarm ( MCFA ) 20 Zon 1.00 unit Rp. 15,000,000.00 Rp. 15,000,000.00
1.4.1.2 - Main Distribution Frame - Fire ( MDF - FA ) Al 1.00 bh Rp. 4,500,000.00 Rp. 4,500,000.00
1.4.1.3 - Terminal Box - Fire Alarm ( TB - FA - 1 s/d 2 ) 1.00 bh Rp. 1,500,000.00 Rp. 1,500,000.00
1.4.1.4 - Material Bantu 1.00 lot Rp. 1,500,000.00 Rp. 1,500,000.00
1.4.1.5 - Testing dan Kommisioning 1.00 lot Rp. 1,500,000.00 Rp. 1,500,000.00

Jumlah Rp. 24,000,000.00


1.4.2 Instalasi fire alarm Lantai 1
1.4.2.1 Rate of Rise Heat Detector 20.00 bh Rp. 75,000.00 Rp. 1,500,000.00
1.4.2.2 Smoke Detector 20.00 bh Rp. 300,000.00 Rp. 6,000,000.00
1.4.2.3 Manual Break Glass Switch 5.00 bh Rp. 275,000.00 Rp. 1,375,000.00
1.4.2.4 Alarm bell 5.00 bh Rp. 250,000.00 Rp. 1,250,000.00
1.4.2.5 Lampu Indikator 5.00 bh Rp. 50,000.00 Rp. 250,000.00
1.4.2.6 Instalasi fire alarm 20.00 ttk Rp. 150,000.00 Rp. 3,000,000.00
1.4.2.7 Material Bantu 1.00 lot Rp. 450,000.00 Rp. 450,000.00
1.4.2.8 Testing dan Kommisioning 1.00 lot Rp. 750,000.00 Rp. 750,000.00

Jumlah Rp. 14,575,000.00


1.4.3 Instalasi fire alarm Lantai 2
1.4.3.1 Rate of Rise Heat Detector 15.00 bh Rp. 75,000.00 Rp. 1,125,000.00
1.4.3.2 Smoke Detector 15.00 bh Rp. 300,000.00 Rp. 4,500,000.00
1.4.3.3 Manual Break Glass Switch 5.00 bh Rp. 275,000.00 Rp. 1,375,000.00
1.4.3.4 Alarm bell 5.00 bh Rp. 250,000.00 Rp. 1,250,000.00
1.4.3.5 Lampu Indikator 5.00 bh Rp. 50,000.00 Rp. 250,000.00
1.4.3.6 Instalasi fire alarm 15.00 ttk Rp. 150,000.00 Rp. 2,250,000.00
1.4.3.7 Material Bantu 1.00 lot Rp. 450,000.00 Rp. 450,000.00
1.4.3.8 Testing dan Kommisioning 1.00 lot Rp. 750,000.00 Rp. 750,000.00

Jumlah Rp. 11,950,000.00


1.4.4 Instalasi fire alarm Lantai 3
1.4.4.1 Rate of Rise Heat Detector 15.00 bh Rp. 75,000.00 Rp. 1,125,000.00
1.4.4.2 Smoke Detector 15.00 bh Rp. 300,000.00 Rp. 4,500,000.00
1.4.4.3 Manual Break Glass Switch 5.00 bh Rp. 275,000.00 Rp. 1,375,000.00
1.4.4.4 Alarm bell 5.00 bh Rp. 250,000.00 Rp. 1,250,000.00
1.4.4.5 Lampu Indikator 5.00 bh Rp. 50,000.00 Rp. 250,000.00
1.4.4.6 Instalasi fire alarm 15.00 ttk Rp. 150,000.00 Rp. 2,250,000.00
1.4.4.7 Material Bantu 1.00 lot Rp. 450,000.00 Rp. 450,000.00
1.4.4.8 Testing dan Kommisioning 1.00 lot Rp. 750,000.00 Rp. 750,000.00

Jumlah Rp. 11,950,000.00


Jumlah Fire Alarm Rp. 62,475,000.00
1.4. Pekerjaan Telephone System
1.4.1 Peralatan Utama
1.4.1.1 - PABX telephone cap.200 ext 8 PTT ex.panasonic 1.00 unit Rp. 40,000,000.00 Rp. 40,000,000.00
1.4.1.2 - Key Set telephone ex.panasonic 1.00 bh Rp. 1,250,000.00 Rp. 1,250,000.00
1.4.1.3 - TB Telkom 1.00 bh Rp. 450,000.00 Rp. 450,000.00
1.4.1.4 - MDF Telkom 1.00 bh Rp. 2,500,000.00 Rp. 2,500,000.00
1.4.1.5 - ITC cable 0,75 (50 pair) MDF ke PABX 12.00 mtr Rp. 30,000.00 Rp. 360,000.00
1.4.1.6 - ITC cable 0,75 (15 pair) MDF ke JB Telp.lt 1 s/d2 30.00 mtr Rp. 30,000.00 Rp. 900,000.00
1.4.1.7 - Material bantu 1.00 lot Rp. 450,000.00 Rp. 450,000.00
1.4.1.8 - Testing dan Commisioning 1.00 lot Rp. 750,000.00 Rp. 750,000.00

Jumlah Rp. 46,660,000.00


1.4.2 Pek.Telephone Lantai 01
1.4.2.1 Single Line Telephone ex.panasonic 23.00 bh Rp. 175,000.00 Rp. 4,025,000.00
1.4.2.2 Outlet Telephone 23.00 bh Rp. 13,500.00 Rp. 310,500.00
1.4.2.3 JB Telephone 2.00 bh Rp. 800,000.00 Rp. 1,600,000.00
1.4.2.4 Instalasi Telephone 23.00 ttk Rp. 150,000.00 Rp. 3,450,000.00
1.4.2.5 Material bantu 1.00 lot Rp. 300,000.00 Rp. 300,000.00

Jumlah Rp. 9,685,500.00


1.4.3 Pek.Telephone Lantai 02
1.4.3.1 Single Line Telephone ex.panasonic 15.00 bh Rp. 175,000.00 Rp. 2,625,000.00
1.4.3.2 Outlet Telephone 15.00 bh Rp. 13,500.00 Rp. 202,500.00
1.4.3.3 JB Telephone 2.00 bh Rp. 800,000.00 Rp. 1,600,000.00
1.4.3.4 Instalasi Telephone 15.00 ttk Rp. 150,000.00 Rp. 2,250,000.00
1.4.3.5 Material bantu 1.00 lot Rp. 300,000.00 Rp. 300,000.00

Jumlah Rp. 6,977,500.00


1.4.4 Pek.Telephone Lantai 03
1.4.4.1 Single Line Telephone ex.panasonic 21.00 bh Rp. 175,000.00 Rp. 3,675,000.00
1.4.4.2 Outlet Telephone 21.00 bh Rp. 13,500.00 Rp. 283,500.00
1.4.4.3 JB Telephone 2.00 bh Rp. 800,000.00 Rp. 1,600,000.00
1.4.4.4 Instalasi Telephone 21.00 ttk Rp. 150,000.00 Rp. 3,150,000.00
1.4.4.5 Material bantu 1.00 lot Rp. 300,000.00 Rp. 300,000.00

Jumlah Rp. 9,008,500.00


Jumlah Telephone Rp. 72,331,500.00
1.5 Pek.Instalasi Data
1.5.1 Peralatan Utama
1.5.1.1 Antena 1.00 bh Rp. 1,500,000.00 Rp. 1,500,000.00
1.5.1.2 Router 1.00 bh Rp. 5,500,000.00 Rp. 5,500,000.00
1.5.1.3 Server 1.00 bh Rp. 10,250,000.00 Rp. 10,250,000.00

Jumlah Rp. 17,250,000.00


1.5.2 Pek. Instalasi data Lt.1
1.5.2.1 Switch Hub 20 port 2.00 bh Rp. 7,500,000.00 Rp. 15,000,000.00
1.5.2.2 Instalasi data 21.00 ttk Rp. 500,000.00 Rp. 10,500,000.00
1.5.2.3 Outlet data 21.00 bh Rp. 75,000.00 Rp. 1,575,000.00
1.5.2.4 Material bantu 1.00 lot Rp. 350,000.00 Rp. 350,000.00
1.5.2.5 Commisioning test 1.00 lot Rp. 550,000.00 Rp. 550,000.00

Jumlah Rp. 27,975,000.00


1.5.3 Pek. Instalasi data Lt.2
1.5.3.1 Switch Hub 20 port 1.00 bh Rp. 7,500,000.00 Rp. 7,500,000.00
1.5.3.2 Istalasi data 14.00 ttk Rp. 500,000.00 Rp. 7,000,000.00
1.5.3.3 Outlet data 14.00 bh Rp. 75,000.00 Rp. 1,050,000.00
1.5.3.4 Material bantu 1.00 lot Rp. 350,000.00 Rp. 350,000.00
1.5.3.5 Commisioning test 1.00 lot Rp. 550,000.00 Rp. 550,000.00

Jumlah Rp. 16,450,000.00


1.5.4 Pek. Instalasi data Lt.3
1.5.4.1 Switch Hub 20 port 2.00 bh Rp. 7,500,000.00 Rp. 15,000,000.00
1.5.4.2 Istalasi data 24.00 ttk Rp. 500,000.00 Rp. 12,000,000.00
1.5.4.3 Outlet data 24.00 bh Rp. 75,000.00 Rp. 1,800,000.00
1.5.4.4 Material bantu 1.00 lot Rp. 350,000.00 Rp. 350,000.00
1.5.4.5 Commisioning test 1.00 lot Rp. 550,000.00 Rp. 550,000.00

Jumlah Rp. 29,700,000.00


Jumlah Instalasi Data Rp. 91,375,000.00
1.6 Instalasi MATV
1.6.1 Peralatan Utama
1.6.1.1 Antena UHF 22 Elemen Irco 2.00 bh Rp. 165,000.00 Rp. 330,000.00
1.6.1.2 Antena VHF 10 Elemen Irco 2.00 bh Rp. 135,000.00 Rp. 270,000.00
1.6.1.3 Master Head Amplifier Irco 2.00 bh Rp. 2,500,000.00 Rp. 5,000,000.00
1.6.1.4 Coaxial 7C/2V, dari Antena ke Mixer 100.00 mtr Rp. 8,500.00 Rp. 850,000.00
1.6.1.5 Coaxial 7C/2V, dari mixer ke TB-Spliter-TV/lt.2 100.00 mtr Rp. 8,500.00 Rp. 850,000.00
1.6.1.6 Coaxial 7C/2V, dari mixer ke TB-Spliter-TV/lt.3 100.00 mtr Rp. 8,500.00 Rp. 850,000.00
1.6.1.7 Termination & supporting material 1.00 lot Rp. 400,000.00 Rp. 400,000.00
1.6.1.8 Testing dan Commisioning 1.00 lot Rp. 500,000.00 Rp. 500,000.00

Jumlah Rp. 9,050,000.00


1.6.2 Instalasi TV Lantai 1
1.6.2.1 Outlet TV 5.00 bh Rp. 55,000.00 Rp. 275,000.00
1.6.2.2 Splitter 1 x 6 Port 1.00 bh Rp. 75,000.00 Rp. 75,000.00
1.6.2.3 TB-Splitter-TV/lt.1 1.00 bh Rp. 450,000.00 Rp. 450,000.00
1.6.2.4 Coaxial Cable 7C-2V Dari Mixer ke TB-Spliter-TV 30.00 mtr Rp. 8,500.00 Rp. 255,000.00
1.6.2.5 Instalasi Outlet TV 5.00 bh Rp. 155,000.00 Rp. 775,000.00
1.6.2.6 Material Bantu 1.00 lot Rp. 350,000.00 Rp. 350,000.00
1.6.2.7 Testing dan Commisioning 1.00 lot Rp. 500,000.00 Rp. 500,000.00

Jumlah Rp. 2,680,000.00


1.6.3 Instalasi TV Lantai 2
1.6.3.1 Outlet TV 11.00 bh Rp. 55,000.00 Rp. 605,000.00
1.6.3.2 Splitter 1 x 6 Port 2.00 bh Rp. 75,000.00 Rp. 150,000.00
1.6.3.3 TB-Splitter-TV/lt.2 1.00 bh Rp. 450,000.00 Rp. 450,000.00
1.6.3.4 Coaxial Cable 7C-2V Dari Mixer ke ke TB-Spliter- 30.00 mtr Rp. 8,500.00 Rp. 255,000.00
1.6.3.5 Instalasi Outlet TV 11.00 bh Rp. 155,000.00 Rp. 1,705,000.00
1.6.3.6 Material Bantu 1.00 lot Rp. 350,000.00 Rp. 350,000.00
1.6.3.7 Testing dan Commisioning 1.00 lot Rp. 500,000.00 Rp. 500,000.00

Jumlah Rp. 4,015,000.00


1.6.4 Instalasi TV Lantai 3
1.6.4.1 Outlet TV 20.00 bh Rp. 55,000.00 Rp. 1,100,000.00
1.6.4.2 Splitter 1 x 6 Port 3.00 bh Rp. 75,000.00 Rp. 225,000.00
1.6.4.3 TB-Splitter-TV/lt.3 1.00 bh Rp. 450,000.00 Rp. 450,000.00
1.6.4.4 Coaxial Cable 7C-2V Dari Mixer ke TB-Spliter-TV/ 60.00 mtr Rp. 8,500.00 Rp. 510,000.00
1.6.4.5 Instalasi Outlet TV 20.00 bh Rp. 155,000.00 Rp. 3,100,000.00
1.6.4.6 Material Bantu 1.00 lot Rp. 350,000.00 Rp. 350,000.00
1.6.4.7 Testing dan Commisioning 1.00 lot Rp. 500,000.00 Rp. 500,000.00

Jumlah Rp. 6,235,000.00


Jumlah Instalasi MATV Rp. 21,980,000.00
1.7 Pekerjaan Sound System
1.7.1 Peralatan utama Sound system
1.7.1.1 Cabinet Rack w / Acc 1.00 set Rp. 8,500,000.00 Rp. 8,500,000.00
1.7.1.2 DVD / CD / MP3 Player ex LG 1.00 set Rp. 700,000.00 Rp. 700,000.00
1.7.1.3 Mixer Frame W / Module ex TOA 1.00 set Rp. 8,500,000.00 Rp. 8,500,000.00
1.7.1.4 1 / 1 OCT Equalizer ex TOA 1.00 set Rp. 1,500,000.00 Rp. 1,500,000.00
1.7.1.5 Power Amplifier 240 W ex TOA 2.00 set Rp. 2,850,000.00 Rp. 5,700,000.00
1.7.1.6 Paging Microphone ex TOA 1.00 set Rp. 1,800,000.00 Rp. 1,800,000.00
1.7.1.7 Emergency Paging Mic ex TOA 1.00 set Rp. 550,000.00 Rp. 550,000.00
1.7.1.8 Speaker Selector ex TOA 2.00 set Rp. 5,000,000.00 Rp. 10,000,000.00
1.7.1.9 MDF - SS 1.00 set Rp. 2,500,000.00 Rp. 2,500,000.00
1.7.1.10 TB - SS 3.00 set Rp. 850,000.00 Rp. 2,550,000.00
1.7.1.11 Testing dan Commisioning 1.00 set Rp. 4,000,000.00 Rp. 4,000,000.00
1.7.1.12 Kabel dari MDF-SS ke TB-SS 01 Kabel NYMHY 3 10.00 meter Rp. 100,000.00 Rp. 1,000,000.00
1.7.1.13 Kabel dari MDF-SS ke TB-SS 02 Kabel NYMHY 3 20.00 meter Rp. 100,000.00 Rp. 2,000,000.00
1.7.1.14 Kabel dari MDF-SS ke TB-SS 03 Kabel NYMHY 3 30.00 meter Rp. 100,000.00 Rp. 3,000,000.00

Jumlah Rp. 52,300,000.00


1.7.2 Lantai 01
1.7.2.1 Instalasi Ceiling Speaker 18.00 titik Rp. 200,000.00 Rp. 3,600,000.00
1.7.2.2 Instalasi Volume Control 12.00 titik Rp. 185,000.00 Rp. 2,220,000.00
1.7.2.3 Ceiling Speaker ex TOA 18.00 buah Rp. 100,000.00 Rp. 1,800,000.00
1.7.2.4 Attenuator ex TOA 12.00 buah Rp. 125,000.00 Rp. 1,500,000.00

Jumlah Rp. 9,120,000.00


1.7.3 Lantai 02
1.7.3.1 Instalasi Ceiling Speaker 25.00 titik Rp. 200,000.00 Rp. 5,000,000.00
1.7.3.2 Instalasi Volume Control 17.00 titik Rp. 185,000.00 Rp. 3,145,000.00
1.7.3.3 Ceiling Speaker TOA 25.00 buah Rp. 100,000.00 Rp. 2,500,000.00
1.7.3.4 Attenuator ex TOA 17.00 buah Rp. 125,000.00 Rp. 2,125,000.00

Jumlah Rp. 12,770,000.00


1.7.4 Lantai 03
1.7.4.1 Instalasi Ceiling Speaker 15.00 titik Rp. 200,000.00 Rp. 3,000,000.00
1.7.4.2 Instalasi Volume Control 8.00 titik Rp. 185,000.00 Rp. 1,480,000.00
1.7.4.3 Ceiling Speaker TOA 15.00 buah Rp. 100,000.00 Rp. 1,500,000.00
1.7.4.4 Attenuator ex TOA 8.00 buah Rp. 125,000.00 Rp. 1,000,000.00

Jumlah Rp. 6,980,000.00


Jumlah Pekerjaan Tata Suara Rp. 81,170,000.00
1.8 Pekerjaan CCTV
1.9.1 Peralatan Utama
1.9.1.1 Digital Multiplexer Recorder ex Panasonic 1.00 unit Rp. 9,500,000.00 Rp. 9,500,000.00
1.9.1.2 Monitor Multiscreen 19" ex LG 1.00 unit Rp. 3,000,000.00 Rp. 3,000,000.00
1.9.1.3 CPU PC type M3970, Core I3 ex Acer 1.00 unit Rp. 5,500,000.00 Rp. 5,500,000.00
1.9.1.4 UPS 2000 VA ex ICA 1.00 unit Rp. 8,450,000.00 Rp. 8,450,000.00
1.9.1.5 Cabinet Rack 1.00 unit Rp. 4,500,000.00 Rp. 4,500,000.00
1.9.1.6 Testing dan Commisioning 1.00 ls Rp. 3,000,000.00 Rp. 3,000,000.00

Jumlah Rp. 33,950,000.00


1.9.2 Lantai 01
1.9.2.1 Dome camera ex Panasonic 6.00 bh Rp. 1,650,000.00 Rp. 9,900,000.00
1.9.2.2 Instalasi CCTV 6.00 ttk Rp. 1,200,000.00 Rp. 7,200,000.00
1.9.2.3 Instalasi Power CCTV 6.00 ttk Rp. 120,000.00 Rp. 720,000.00

Jumlah Rp. 17,820,000.00


1.9.3 Lantai 02
1.9.3.1 Dome camera ex Panasonic 6.00 bh Rp. 1,650,000.00 Rp. 9,900,000.00
1.9.3.2 Instalasi CCTV 6.00 ttk Rp. 1,200,000.00 Rp. 7,200,000.00
1.9.3.3 Instalasi Power CCTV 6.00 ttk Rp. 120,000.00 Rp. 720,000.00

Jumlah Rp. 17,820,000.00


1.9.4 Lantai 03
1.9.4.1 Dome camera ex Panasonic 6.00 bh Rp. 1,650,000.00 Rp. 9,900,000.00
1.9.4.2 Instalasi CCTV 6.00 ttk Rp. 1,200,000.00 Rp. 7,200,000.00
1.9.4.3 Instalasi Power CCTV 6.00 ttk Rp. 120,000.00 Rp. 720,000.00

Jumlah Rp. 17,820,000.00


Jumlah Pekerjaan Pengadaan dan Pemasangan CCTV Rp. 87,410,000.00
1.10 Penangkal Petir
1.10.1 Air Terminal elektro statik H=3000 mm 2 bh Rp. 10,000,000.00 Rp. 20,000,000.00
1.10.2 BC 50 mm2 menuju ke Bak Kontrol dalam Pipa PVC dia 2" 120 mtr Rp. 80,000.00 Rp. 9,600,000.00
1.10.3 Peralatan penunjang pendukung Air terminal 1 lot Rp. 800,000.00 Rp. 800,000.00
Klem-klem , Wire Rope 3/8", Trekskur, Isolator Telor,
Bracket, Seal , Test Box , dls
1.10.4 Bak Kontrol 400 x 400 x 400 mm, dari Beton Bertulang, leng 1 unit Rp. 1,750,000.00 Rp. 1,750,000.00
1.10.5 terminal dari plat tembaga electrode pentanahan sesuai dgn 1 unit Rp. 2,400,000.00 Rp. 2,400,000.00
perencana.
1.10.6 Biaya Instalasi 1 lot Rp. 600,000.00 Rp. 600,000.00
1.10.7 Testing & Comissioning included perijinan dari DEPNAKER 1 lot Rp. 2,200,000.00 Rp. 2,200,000.00
1.10.8 Material Bantu 1 lot Rp. 500,000.00 Rp. 500,000.00

Jumlah Rp. 37,850,000.00


Sub Total I Rp. 1,147,689,000.00
II PEKERJAAN PLUMBING
2.1 Pekerjaan Plumbing & Sanitary
2.1.1 Peralatan Utama
2.1.1.1 Pompa 1.00 Unit Rp. 15,000,000.00 Rp. 15,000,000.00
Kapasitas 150 Liter/Menit
Head 27 Meter
Putaran 2900 RPM
c/w Panel Control Automatic Lift Pump
2.1.1.2 Roof Tank Cap.3m3 1.00 unit Rp. 5,000,000.00 Rp. 5,000,000.00
2.1.1.3 Header dia 80 mm 6.00 M Rp. 90,000.00 Rp. 540,000.00
2.1.1.4 Gate Valve dia. 50 mm2 4.00 bh Rp. 450,000.00 Rp. 1,800,000.00
2.1.1.5 Check Valve dia 50 mm2 2.00 bh Rp. 400,000.00 Rp. 800,000.00
2.1.1.6 Floating Valve dia 50 mm2 2.00 bh Rp. 300,000.00 Rp. 600,000.00
2.1.1.7 Fleksible Joint dia 50 mm2 4.00 bh Rp. 320,000.00 Rp. 1,280,000.00
2.1.1.8 Strainer dia 50 mm2 2.00 bh Rp. 700,000.00 Rp. 1,400,000.00
2.1.1.9 Pressure gauge 2.00 bh Rp. 100,000.00 Rp. 200,000.00
2.1.1.10 Pipa dia 50 mm 20.00 mtr Rp. 75,000.00 Rp. 1,500,000.00
2.1.1.11 Fitting - fitting 1.00 Lot Rp. 7,500,000.00 Rp. 7,500,000.00
2.1.1.12 Material Bantu 1.00 Lot Rp. 400,000.00 Rp. 400,000.00
2.1.1.13 Testing dan Kommisioning 1.00 ls Rp. 400,000.00 Rp. 400,000.00
2.1.1.14 Ground Tank 2X3X2 m3 1.00 unit Rp. 35,000,000.00 Rp. 35,000,000.00

Jumlah Rp. 71,420,000.00

2.2 Pekerjaan Instalasi Air Lt. 01


2.2.1 Pemipaan
2.2.1.1 Pipa Distribusi PVC 1" AW 55.00 mtr Rp. 7,500.00 Rp. 412,500.00
2.2.1.2 Pipa Distribusi PVC 3/4" AW 82.02 mtr Rp. 6,500.00 Rp. 533,104.00
2.2.1.3 Gate Valve dia. 40 mm 1.00 bh Rp. 300,000.00 Rp. 300,000.00
2.2.1.4 Fitting - fitting 1.00 lot Rp. 4,500,000.00 Rp. 4,500,000.00
2.2.1.5 Material Bantu 1.00 lot Rp. 400,000.00 Rp. 400,000.00
2.2.1.6 Testing dan Kommisioning 1.00 lot Rp. 400,000.00 Rp. 400,000.00

Jumlah Rp. 6,545,604.00


2.2.2 Sanitary dan Fixture
2.2.2.1 Closed duduk 8.00 bh Rp. 3,500,000.00 Rp. 28,000,000.00
2.2.2.2 Washtafel 7.00 bh Rp. 1,000,000.00 Rp. 7,000,000.00
2.2.2.3 Urinal type muslim 3.00 bh Rp. 3,000,000.00 Rp. 9,000,000.00
2.2.2.4 sekat urinal 2.00 bh Rp. 800,000.00 Rp. 1,600,000.00
2.2.2.5 Floor drain 2" 8.00 bh Rp. 100,000.00 Rp. 800,000.00
2.2.2.6 Clean Out 4" 2.00 bh Rp. 100,000.00 Rp. 200,000.00
2.2.2.7 Jett Shower 8.00 bh Rp. 250,000.00 Rp. 2,000,000.00
2.2.2.8 Kran Air Stainless Steel 8.00 bh Rp. 250,000.00 Rp. 2,000,000.00
2.2.2.9 Kran Air Wastafel Stainless Steel 8.00 bh Rp. 850,000.00 Rp. 6,800,000.00
2.2.2.10 Cermin Wastafel 8.00 bh Rp. 1,000,000.00 Rp. 8,000,000.00
2.2.2.11 Material bantu 1.00 lot Rp. 400,000.00 Rp. 400,000.00
2.2.2.12 Testing dan Kommisioning 1.00 lot Rp. 800,000.00 Rp. 800,000.00

Jumlah Rp. 66,600,000.00


2.2.3 Air Bekas Disposal cair
2.2.3.1 Pipa PVC AW 4" 28.00 mtr Rp. 120,000.00 Rp. 3,360,000.00
2.2.3.2 Pipa PVC AW 3" 44.50 mtr Rp. 80,000.00 Rp. 3,560,000.00
2.2.3.3 fitting PVC 1.00 lot Rp. 3,300,000.00 Rp. 3,300,000.00
2.2.3.4 Material bantu 1.00 lot Rp. 400,000.00 Rp. 400,000.00
2.2.3.5 Testing & Commisioning 1.00 lot Rp. 450,000.00 Rp. 450,000.00

Jumlah Rp. 11,070,000.00


2.2.4 Air Kotor disposal padat dan cair
2.2.4.1 Pipa PVC AW 4" 105.82 mtr Rp. 120,000.00 Rp. 12,698,400.00
2.2.4.2 Pipa PVC AW 3" 8.50 mtr Rp. 80,000.00 Rp. 680,000.00
2.2.4.3 fitting PVC 1.00 lot Rp. 3,300,000.00 Rp. 3,300,000.00
2.2.4.4 Material bantu 1.00 lot Rp. 400,000.00 Rp. 400,000.00
2.2.4.5 Testing & Commisioning 1.00 lot Rp. 450,000.00 Rp. 450,000.00

Jumlah Rp. 17,528,400.00


Jumlah Pekerjaan Instalasi Air Lt. 01 Rp. 173,164,004.00

2.3 Pekerjaan Instalasi Air Lt. 02


2.3.1 Pemipaan
2.3.1.1 Pipa Distribusi PVC 1" AW 11.00 mtr Rp. 7,500.00 Rp. 82,500.00
2.3.1.2 Pipa Distribusi PVC 3/4" AW 116.20 mtr Rp. 6,500.00 Rp. 755,326.00
2.3.1.3 Gate Valve dia. 40 mm 1.00 bh Rp. 300,000.00 Rp. 300,000.00
2.3.1.4 Fitting - fitting 1.00 lot Rp. 4,500,000.00 Rp. 4,500,000.00
2.3.1.5 Material Bantu 1.00 lot Rp. 400,000.00 Rp. 400,000.00
2.3.1.6 Testing dan Kommisioning 1.00 lot Rp. 450,000.00 Rp. 450,000.00

Jumlah Rp. 6,487,826.00


2.3.2 Sanitary dan Fixture
2.3.2.1 Closed duduk 11.00 bh Rp. 2,500,000.00 Rp. 27,500,000.00
2.3.2.2 Washtafel 10.00 bh Rp. 1,000,000.00 Rp. 10,000,000.00
2.3.2.3 Urinal type muslim 3.00 bh Rp. 3,000,000.00 Rp. 9,000,000.00
2.3.2.4 sekat urinal 2.00 bh Rp. 780,000.00 Rp. 1,560,000.00
2.3.2.5 Floor drain 2" 11.00 bh Rp. 85,000.00 Rp. 935,000.00
2.3.2.6 Clean Out 4" 2.00 bh Rp. 85,000.00 Rp. 170,000.00
2.3.2.7 Jett Shower 11.00 bh Rp. 250,000.00 Rp. 2,750,000.00
2.3.2.8 Kran Air Stainless Steel 11.00 bh Rp. 250,000.00 Rp. 2,750,000.00
2.3.2.9 Kran Air Wastafel Stainless Steel 11.00 bh Rp. 750,000.00 Rp. 8,250,000.00
2.3.2.10 Cermin Wastafel 11.00 bh Rp. 960,000.00 Rp. 10,560,000.00
2.3.2.11 Material bantu 1.00 lot Rp. 500,000.00 Rp. 500,000.00
2.3.2.12 Testing dan Kommisioning 1.00 lot Rp. 800,000.00 Rp. 800,000.00

Jumlah Rp. 74,775,000.00


2.3.3 Air Bekas Disposal cair
2.3.3.1 Pipa PVC AW 4" 15.00 mtr Rp. 120,000.00 Rp. 1,800,000.00
2.3.3.2 Pipa PVC AW 3" 64.61 mtr Rp. 80,000.00 Rp. 5,168,800.00
2.3.3.3 fitting PVC 1.00 lot Rp. 3,300,000.00 Rp. 3,300,000.00
2.3.3.4 Material bantu 1.00 lot Rp. 400,000.00 Rp. 400,000.00
2.3.3.5 Testing & Commisioning 1.00 lot Rp. 450,000.00 Rp. 450,000.00

Jumlah Rp. 11,118,800.00


2.3.4 Air Kotor disposal padat & cair
2.3.4.1 Pipa PVC AW 4" 30.54 mtr Rp. 120,000.00 Rp. 3,664,800.00
2.3.4.2 Pipa PVC AW 3" 9.60 mtr Rp. 80,000.00 Rp. 768,000.00
2.3.4.3 fitting PVC 1.00 lot Rp. 3,300,000.00 Rp. 3,300,000.00
2.3.4.4 Material bantu 1.00 lot Rp. 400,000.00 Rp. 400,000.00
2.3.4.5 Testing & Commisioning 1.00 lot Rp. 450,000.00 Rp. 450,000.00

Jumlah Rp. 8,582,800.00


Jumlah Pekerjaan Instalasi Air Lt. 02 Rp. 100,964,426.00

2.4 Pekerjaan Instalasi Air Lt. 03


2.4.1 Pemipaan
2.4.1.1 Pipa Distribusi PVC 1" 11.00 mtr Rp. 7,500.00 Rp. 82,500.00
2.4.1.2 Pipa Distribusi PVC 3/4" 120.26 mtr Rp. 6,500.00 Rp. 781,709.50
2.4.1.3 Gate Valve dia. 40 mm 1.00 bh Rp. 300,000.00 Rp. 300,000.00
2.4.1.4 Fitting - fitting 1.00 lot Rp. 4,500,000.00 Rp. 4,500,000.00
2.4.1.5 Material Bantu 1.00 lot Rp. 400,000.00 Rp. 400,000.00
2.4.1.6 Testing dan Kommisioning 1.00 lot Rp. 450,000.00 Rp. 450,000.00

Jumlah Rp. 6,514,209.50


2.4.2 Sanitary dan Fixture
2.4.2.1 Closed duduk 8.00 bh Rp. 2,500,000.00 Rp. 20,000,000.00
2.4.2.2 Washtafel 7.00 bh Rp. 1,000,000.00 Rp. 7,000,000.00
2.4.2.3 Urinal type muslim 3.00 bh Rp. 3,000,000.00 Rp. 9,000,000.00
2.4.2.4 sekat urinal 2.00 bh Rp. 780,000.00 Rp. 1,560,000.00
2.4.2.5 Floor drain 2" 2.00 bh Rp. 85,000.00 Rp. 170,000.00
2.4.2.6 Clean Out 4" 8.00 bh Rp. 85,000.00 Rp. 680,000.00
2.4.2.7 Jett Shower 8.00 bh Rp. 250,000.00 Rp. 2,000,000.00
2.4.2.8 Kran Air Stainless Steel 8.00 bh Rp. 250,000.00 Rp. 2,000,000.00
2.4.2.9 Kran Air Wastafel Stainless Steel 8.00 bh Rp. 750,000.00 Rp. 6,000,000.00
2.4.2.10 Cermin Wastafel 8.00 bh Rp. 960,000.00 Rp. 7,680,000.00
2.4.2.11 Material bantu 1.00 lot Rp. 500,000.00 Rp. 500,000.00
2.4.2.12 Testing dan Kommisioning 1.00 lot Rp. 800,000.00 Rp. 800,000.00

Jumlah Rp. 57,390,000.00


2.4.3 Air Bekas
2.4.3.1 Pipa PVC AW 4" 9.00 mtr Rp. 120,000.00 Rp. 1,080,000.00
2.4.3.2 Pipa PVC AW 3" 47.70 mtr Rp. 80,000.00 Rp. 3,816,000.00
2.4.3.3 fitting PVC 1.00 lot Rp. 3,300,000.00 Rp. 3,300,000.00
2.4.3.4 Material bantu 1.00 lot Rp. 400,000.00 Rp. 400,000.00
2.4.3.5 Testing & Commisioning 1.00 lot Rp. 450,000.00 Rp. 450,000.00

Jumlah Rp. 9,046,000.00


2.4.4 Air Kotor disposal padat & cair
2.4.4.1 Pipa PVC AW 4" 28.97 mtr Rp. 120,000.00 Rp. 3,476,400.00
2.4.4.2 Pipa PVC AW 3" 9.60 mtr Rp. 80,000.00 Rp. 768,000.00
2.4.4.3 fitting PVC 1.00 lot Rp. 3,300,000.00 Rp. 3,300,000.00
2.4.4.4 Material bantu 1.00 lot Rp. 400,000.00 Rp. 400,000.00
2.4.4.5 Testing & Commisioning 1.00 lot Rp. 450,000.00 Rp. 450,000.00

Jumlah Rp. 8,394,400.00


Jumlah Pekerjaan Instalasi Air Lt. 03 Rp. 81,344,609.50
2.5 Pekerjaan Instalasi Air Lt.Topfloor
2.5.1 Pemipaan
2.5.1.1 Pipa Distribusi PVC 1" 30.82 mtr Rp. 7,500.00 Rp. 231,150.00
2.5.1.2 Gate Valve dia. 40 mm 1.00 bh Rp. 300,000.00 Rp. 300,000.00
2.5.1.3 Fitting - fitting 1.00 lot Rp. 4,500,000.00 Rp. 4,500,000.00
2.5.1.4 Material Bantu 1.00 lot Rp. 400,000.00 Rp. 400,000.00
2.5.1.5 Testing dan Kommisioning 1.00 lot Rp. 450,000.00 Rp. 450,000.00
Jumlah Rp. 5,881,150.00
Jumlah Pekerjaan Instalasi Air Topfloor Rp. 5,881,150.00
2.6. Pekerjaan Instalasi Air Hujan
2.6.1 Pemipaan Topfloor +14.25
2.6.1.1 Pipa PVC AW dia 4"di roof 23.20 mtr Rp. 200,000.00 Rp. 4,640,000.00
2.6.1.2 Roof Drain dia 4" mm di roof 2.00 bh Rp. 315,000.00 Rp. 630,000.00
2.6.2 Pemipaan Topfloor +12.00
2.6.1.1 Pipa PVC AW dia 4"di roof 28.20 mtr Rp. 200,000.00 Rp. 5,640,000.00
2.6.1.2 Roof Drain dia 4" mm di roof 11.00 bh Rp. 315,000.00 Rp. 3,465,000.00
2.6.3 Pemipaan lantai 3
2.6.3.1 Pipa PVC AW dia 4"di roof 30.00 mtr Rp. 315,000.00 Rp. 9,450,000.00
2.6.3.2 Pipa PVC AW dia 3" mm di roof 24.67 mtr Rp. 150,000.00 Rp. 3,700,500.00
2.6.3.3 Roof Drain dia 3" mm di roof 13.00 bh Rp. 250,000.00 Rp. 3,250,000.00
2.6.4 Pemipaan lantai 2
2.6.4.1 Pipa PVC AW dia 4"di roof 91.00 mtr Rp. 315,000.00 Rp. 28,665,000.00
2.6.4.2 Pipa PVC AW dia 3" mm di roof 11.00 mtr Rp. 150,000.00 Rp. 1,650,000.00
2.6.4.3 Roof Drain dia 3" mm di roof 11.00 bh Rp. 250,000.00 Rp. 2,750,000.00
2.6.5 Fitting-fitting & Klem klem 1.00 lot Rp. 3,500,000.00 Rp. 3,500,000.00
2.6.6 Material Bantu 1.00 lot Rp. 1,350,000.00 Rp. 1,350,000.00
2.6.7 Testing dan Commisioning 1.00 lot Rp. 800,000.00 Rp. 800,000.00
Jumlah Rp. 69,490,500.00
Jumlah Pekerjaan Air Hujan Rp. 69,490,500.00
2.7 Pekerjaan Seftic Tank - BIO
2.7.1 Kapasitas : 5 m3/hr Type Cylinder. 2.00 bh Rp. 17,500,000.00 Rp. 35,000,000.00
c/w : Unit Blower, Control Panel, Material Pemasangan
Kondisi terpasang dan beroperasi

2.7.2 Dudukan untuk Septic tank - Bio (Beton+Pas batu bata difini 2.00 bh Rp. 7,500,000.00 Rp. 15,000,000.00
Jumlah Rp. 50,000,000.00
Jumlah Pekerjaan Septik Tank Rp. 50,000,000.00
Sub Total II Rp. 552,264,689.50

MAKASSAR, 25 APRIL 2016


PT. BANGUN BUMI INDAH

JULIANUS S LELEPADANG
DIREKTUR
DAFTAR ANALISA
1 B.4 1 M' Pengukuran dan pemasangan bouplank
B.4.1 Bahan :
0.012 m3 Kayu 5/7 @ Rp. 1,750,000.00 Rp. 21,000.00
0.020 kg Paku Biasa 2" - 5" @ Rp. 17,500.00 Rp. 350.00
0.007 m3 Kayu Papan 3/20 @ Rp. 2,000,000.00 Rp. 14,000.00
Jumlah (1) Rp. 35,350.00
B.4.2 Tenaga :
0.100 org/hr Tukang kayu @ Rp. 100,000.00 Rp. 10,000.00
0.010 org/hr Kepala Tukang kayu @ Rp. 110,000.00 Rp. 1,100.00
0.100 org/hr Pekerja @ Rp. 90,000.00 Rp. 9,000.00
0.005 org/hr Mandor @ Rp. 120,000.00 Rp. 600.00
Jumlah (2) Rp. 20,700.00
Jumlah (1) + (2) Rp. 56,050.00
Overhead + Profit (3) Rp. 8,407.50
Jumlah (1) + (2) + (3) Rp. 64,457.50

2 B.6 1 M2 Pembuatan gudang semen dan alat-alat


B.6.1 Bahan :
1.700 btg Dolken kayu n 8-10/400 cm @ Rp. 15,000.00 Rp. 25,500.00
0.210 m3 Kayu @ Rp. 2,000,000.00 Rp. 420,000.00
0.300 kg Paku biasa @ Rp. 17,500.00 Rp. 5,250.00
10.500 kg Semen portland @ Rp. 1,125.00 Rp. 11,812.50
0.030 m3 Pasir beton @ Rp. 125,000.00 Rp. 3,750.00
0.050 m3 Koral beton @ Rp. 265,000.00 Rp. 13,250.00
1.500 lbr Seng gelombang bjls 32 @ Rp. 60,000.00 Rp. 90,000.00
Jumlah (1) Rp. 569,562.50
B.6.2 Tenaga :
2.000 org/hr Tukang kayu @ Rp. 100,000.00 Rp. 200,000.00
0.200 org/hr Kepala Tukang @ Rp. 110,000.00 Rp. 22,000.00
1.000 org/hr Pekerja @ Rp. 90,000.00 Rp. 90,000.00
0.050 org/hr Mandor @ Rp. 120,000.00 Rp. 6,000.00
Jumlah (2) Rp. 318,000.00
Jumlah (1) + (2) Rp. 887,562.50
Overhead + Profit (3) Rp. 133,134.38
Jumlah (1) + (2) + (3) Rp. 1,020,696.88

3 6.10. Memadatkan 1 m3 tanah (per 20 cm)


6.10.1 Tenaga :
0.500 org/hr Pekerja @ Rp. 90,000.00 Rp. 45,000.00
0.050 org/hr Mandor @ Rp. 120,000.00 Rp. 6,000.00
Jumlah (1) Rp. 51,000.00
Overheat + Profit (2) Rp. 7,650.00
Jumlah (1) + (2) Rp. 58,650.00

4 6.11. Mengurug 1 m3 pasir urug


6.11.1 Bahan :
1.200 m3 Pasir timbunan @ Rp. 110,000.00 Rp. 132,000.00
Jumlah (1) Rp. 132,000.00
6.11.2 Tenaga :
0.300 org/hr Pekerja @ Rp. 90,000.00 Rp. 27,000.00
0.010 org/hr Mandor @ Rp. 120,000.00 Rp. 1,200.00
Jumlah (2) Rp. 28,200.00
Jumlah (1) + (2) Rp. 160,200.00
Overhead + Profit (3) Rp. 24,030.00
Jumlah (1) + (2) + (3) Rp. 184,230.00

5 6.15. Mengurung Sirtu padat untuk peninggian lantai bangunan


6.15.1 Bahan :
1.200 m3 Sirtu @ Rp. 110,000.00 Rp. 132,000.00
Jumlah (1) Rp. 132,000.00
6.15.2 Tenaga :
0.250 org/hr Pekerja @ Rp. 90,000.00 Rp. 22,500.00
0.025 org/hr Mandor @ Rp. 120,000.00 Rp. 3,000.00
Jumlah (2) Rp. 25,500.00
Jumlah (1) + (2) Rp. 157,500.00
Overhead + Profit (3) Rp. 23,625.00
Jumlah (1) + (2) + (3) Rp. 181,125.00
DAFTAR ANALISA
6 SPL.6.15. Mengurung tanah timbunan pilihan
SPL.6.15.1 Bahan :
1.200 m3 Tanah timbunan @ Rp. 75,000.00 Rp. 90,000.00
Jumlah (1) Rp. 90,000.00
SPL.6.15.2 Tenaga :
0.250 org/hr Pekerja @ Rp. 90,000.00 Rp. 22,500.00
0.025 org/hr Mandor @ Rp. 120,000.00 Rp. 3,000.00
Jumlah (2) Rp. 25,500.00
Jumlah (1) + (2) Rp. 115,500.00
Overhead + Profit (3) Rp. 17,325.00
Jumlah (1) + (2) + (3) Rp. 132,825.00

Analisa Biaya Konstruksi Pekerjaan Dinding


7 6.8. Memasang 1 m2 dinding bata merah ukuran (5X11X22) cm, tebal 1/2 bata, campuran 1 PC : 3 PP
6.8.1 Bahan :
70.000 bh Bata merah 5X11X22 cm @ Rp. 450.00 Rp. 31,500.00
14.370 kg Semen portland @ Rp. 1,125.00 Rp. 16,166.25
0.040 m3 Pasir pasang @ Rp. 115,000.00 Rp. 4,600.00
Jumlah (1) Rp. 52,266.25
6.8.2 Tenaga :
0.100 org/hr Tukang batu @ Rp. 100,000.00 Rp. 10,000.00
0.010 org/hr Kepala tukang @ Rp. 110,000.00 Rp. 1,100.00
0.300 org/hr Pekerja @ Rp. 90,000.00 Rp. 27,000.00
0.015 org/hr Mandor @ Rp. 120,000.00 Rp. 1,800.00
Jumlah (2) Rp. 39,900.00
Jumlah (1) + (2) Rp. 92,166.25
Overhead + Profit (3) Rp. 13,824.94
Jumlah (1) + (2) + (3) Rp. 105,991.19

8 6.10. 1 M2 Pasangan bata merah tebal 1/2 bata, 1 Pc :5 Ps


6.10.1 Bahan :
70.000 bh Bata merah 5X11X22 cm @ Rp. 450.00 Rp. 31,500.00
9.680 kg Semen portland @ Rp. 1,125.00 Rp. 10,890.00
0.045 m3 Pasir pasang @ Rp. 115,000.00 Rp. 5,175.00
Jumlah (1) Rp. 47,565.00
6.10.2 Tenaga :
0.100 org/hr Tukang batu @ Rp. 100,000.00 Rp. 10,000.00
0.010 org/hr Kepala tukang @ Rp. 110,000.00 Rp. 1,100.00
0.300 org/hr Pekerja @ Rp. 90,000.00 Rp. 27,000.00
0.015 org/hr Mandor @ Rp. 120,000.00 Rp. 1,800.00
Jumlah (2) Rp. 39,900.00
Jumlah (1) + (2) Rp. 87,465.00
Overhead + Profit (3) Rp. 13,119.75
Jumlah (1) + (2) + (3) Rp. 100,584.75

Analisa Biaya Konstruksi Pekerjaan Plesteran


9 6.3. Memasang 1 m2 plesteran 1 PC : 3 PP, tebal 15 mm
6.3.1 Bahan :
7.776 kg Semen portland @ Rp. 1,125.00 Rp. 8,748.00
0.023 m3 Pasir pasangan @ Rp. 115,000.00 Rp. 2,645.00
Jumlah (1) Rp. 11,393.00
6.3.2 Tenaga :
0.150 org/hr Tukang Batu @ Rp. 100,000.00 Rp. 15,000.00
0.015 org/hr Kepala Tukang @ Rp. 110,000.00 Rp. 1,650.00
0.200 org/hr Pekerja @ Rp. 90,000.00 Rp. 18,000.00
0.010 org/hr Mandor @ Rp. 120,000.00 Rp. 1,200.00
Jumlah (2) Rp. 35,850.00
Jumlah (1) + (2) Rp. 47,243.00
Overhead + Profit (3) Rp. 7,086.45
Jumlah (1) + (2) + (3) Rp. 54,329.45

10 6.5. Memasang 1 m2 plesteran 1 PC : 5 PP, tebal 15 mm


6.5.1 Bahan :
5.184 kg Semen portland @ Rp. 1,125.00 Rp. 5,832.00
0.026 m3 Pasir pasangan @ Rp. 115,000.00 Rp. 2,990.00
Jumlah (1) Rp. 8,822.00
6.5.2 Tenaga :
0.150 org/hr Tukang Batu @ Rp. 100,000.00 Rp. 15,000.00
DAFTAR ANALISA
0.015 org/hr Kepala Tukang @ Rp. 110,000.00 Rp. 1,650.00
0.200 org/hr Pekerja @ Rp. 90,000.00 Rp. 18,000.00
0.010 org/hr Mandor @ Rp. 120,000.00 Rp. 1,200.00
Jumlah (2) Rp. 35,850.00
Jumlah (1) + (2) Rp. 44,672.00
Overhead + Profit (3) Rp. 6,700.80
Jumlah (1) + (2) + (3) Rp. 51,372.80

11 6.27. Memasang 1 m2 Acian


6.27.1 Bahan :
3.250 kg Semen PC @ Rp. 1,125.00 Rp. 3,656.25
Jumlah (1) Rp. 3,656.25
6.27.2 Tenaga :
0.100 org/hr Tukang Batu @ Rp. 100,000.00 Rp. 10,000.00
0.010 org/hr Kepala Tukang @ Rp. 110,000.00 Rp. 1,100.00
0.150 org/hr Pekerja @ Rp. 90,000.00 Rp. 13,500.00
0.008 org/hr Mandor @ Rp. 120,000.00 Rp. 960.00
Jumlah (2) Rp. 25,560.00
Jumlah (1) + (2) Rp. 29,216.25
Overhead + Profit (3) Rp. 4,382.44
Jumlah (1) + (2) + (3) Rp. 33,598.69

Analisa Biaya Konstruksi Pekerjaan Kayu


12 6.5. Membuat dan memasang 1 m2 daun pintu panel, kayu klas I atau klas II
6.5.1 Bahan :
0.040 m3 Papan Kayu @ Rp. 4,500,000.00 Rp. 180,000.00
0.500 kg Lem kayu @ Rp. 25,000.00 Rp. 12,500.00
Jumlah (1) Rp. 192,500.00
6.5.2 Tenaga :
2.500 org/hr Tukang Kayu @ Rp. 100,000.00 Rp. 250,000.00
0.250 org/hr Kepala Tukang Kayu @ Rp. 110,000.00 Rp. 27,500.00
1.000 org/hr Pekerja @ Rp. 90,000.00 Rp. 90,000.00
0.050 org/hr Mandor @ Rp. 120,000.00 Rp. 6,000.00
Jumlah (2) Rp. 373,500.00
Jumlah (1) + (2) Rp. 566,000.00
Overhead + Profit (3) Rp. 84,900.00
Jumlah (1) + (2) + (3) Rp. 650,900.00

13 6.6. Membuat dan memasang 1 m2 pintu dan jendela kaca, kayu klas I atau klas II
6.6.1 Bahan :
0.024 m3 Papan Kayu @ Rp. 11,500,000.00 Rp. 276,000.00
0.300 kg Lem kayu @ Rp. 25,000.00 Rp. 7,500.00
Jumlah (1) Rp. 283,500.00
6.6.2 Tenaga :
2.000 org/hr Tukang kayu @ Rp. 100,000.00 Rp. 200,000.00
0.200 org/hr Kepala tukang kayu @ Rp. 110,000.00 Rp. 22,000.00
0.800 org/hr Pekerja @ Rp. 90,000.00 Rp. 72,000.00
0.040 org/hr Mandor @ Rp. 120,000.00 Rp. 4,800.00
Jumlah (2) Rp. 298,800.00
Jumlah (1) + (2) Rp. 582,300.00
Overhead + Profit (3) Rp. 87,345.00
Jumlah (1) + (2) + (3) Rp. 669,645.00

14 6.8. Membuat 1 m2 daun pintu kayu lapis (plywood) rangkap, rangka tertutup kayu klas II (lebar sampai 90 cm)
6.8.1 Bahan :
0.025 m3 Papan Kayu Kls. I @ Rp. 11,500,000.00 Rp. 287,500.00
0.030 kg Paku biasa 1/2"-1" @ Rp. 20,000.00 Rp. 600.00
0.500 kg Lem kayu @ Rp. 25,000.00 Rp. 12,500.00
1.000 lbr Playwood tebal 4 mm ukuran (90x220) cm @ Rp. 80,000.00 Rp. 80,000.00
Jumlah (1) Rp. 380,600.00
6.6.2 Tenaga :
2.000 org/hr Tukang Kayu @ Rp. 100,000.00 Rp. 200,000.00
0.200 org/hr Kepala Tukang Kayu @ Rp. 110,000.00 Rp. 22,000.00
0.200 org/hr Pekerja @ Rp. 90,000.00 Rp. 18,000.00
0.030 org/hr Mandor @ Rp. 120,000.00 Rp. 3,600.00
Jumlah (2) Rp. 243,600.00
Jumlah (1) + (2) Rp. 624,200.00
Overhead + Profit (3) Rp. 93,630.00
Jumlah (1) + (2) + (3) Rp. 717,830.00
DAFTAR ANALISA
15 SPL 6.8.a Membuat 1 m2 daun pintu kayu lapis rangkap, rangka tertutup kayu klas II
SPL 6.8.a.1 Bahan :
0.019 m3 Papan Kayu Kls. II @ Rp. 4,500,000.00 Rp. 84,645.00
0.030 kg Paku biasa 1/2"-1" @ Rp. 20,000.00 Rp. 600.00
0.750 kg Lem kayu @ Rp. 25,000.00 Rp. 18,750.00
0.694 lbr Multipleks 6 mm @ Rp. 75,000.00 Rp. 52,083.33
0.694 lbr Multipleks 3 mm @ Rp. 50,000.00 Rp. 34,722.22
Jumlah (1) Rp. 190,800.56
6.6.2 Tenaga :
2.000 org/hr Tukang Kayu @ Rp. 100,000.00 Rp. 200,000.00
0.200 org/hr Kepala Tukang Kayu @ Rp. 110,000.00 Rp. 22,000.00
0.200 org/hr Pekerja @ Rp. 90,000.00 Rp. 18,000.00
0.030 org/hr Mandor @ Rp. 120,000.00 Rp. 3,600.00
Jumlah (2) Rp. 243,600.00
Jumlah (1) + (2) Rp. 434,400.56
Overhead + Profit (3) Rp. 65,160.08
Jumlah (1) + (2) + (3) Rp. 499,560.64

Analisa Biaya Konstruksi Pekerjaan Beton


16 6.4. Membuat 1 m3 lantai kerja beton mutu f'c =7,4 Mpa (K100), slump (3-6 ) cm, w/c = 0.87
6.4.1 Bahan :
230.000 kg Semen portland @ Rp 1,125.00 Rp. 258,750.00
893.000 kg Pasir beton @ Rp 89.29 Rp. 79,732.14
1027.000 kg Kerikil beton @ Rp 147.22 Rp. 151,197.22
200.000 ltr Air @ Rp 10.00 Rp. 2,000.00
Jumlah (1) Rp. 491,679.37
6.4.2 Tenaga :
0.200 org/hr Tukang batu @ Rp 100,000.00 Rp. 20,000.00
0.020 org/hr Kepala tukang @ Rp 110,000.00 Rp. 2,200.00
1.200 org/hr Pekerja @ Rp 90,000.00 Rp. 108,000.00
0.060 org/hr Mandor @ Rp 120,000.00 Rp. 7,200.00
Jumlah (2) Rp. 137,400.00
Jumlah (1) + (2) Rp. 629,079.37
Overhead + Profit (3) Rp. 94,361.90
Jumlah (1) + (2) + (3) Rp. 723,441.27

17 6.5. Membuat 1 m3 beton mutu f'c =14.5 Mpa (K.175), slump (122) cm, w/c = 0.66
6.5.1 Bahan :
326.000 kg Semen portland @ Rp 1,125.00 Rp. 366,750.00
760.000 kg Pasir beton @ Rp 89.29 Rp. 67,857.14
1029.000 kg Kerikil beton (maksimum 30 mm) @ Rp 147.22 Rp. 151,491.67
215.000 ltr Air @ Rp 10.00 Rp. 2,150.00
Jumlah (1) Rp. 588,248.81
6.5.2 Tenaga :
0.275 org/hr Tukang batu @ Rp 100,000.00 Rp. 27,500.00
0.028 org/hr Kepala tukang @ Rp 110,000.00 Rp. 3,025.00
1.650 org/hr Pekerja @ Rp 90,000.00 Rp. 148,500.00
0.083 org/hr Mandor @ Rp 120,000.00 Rp. 9,960.00
Jumlah (2) Rp. 188,985.00
Jumlah (1) + (2) Rp. 777,233.81
Overhead + Profit (3) Rp. 116,585.07
Jumlah (1) + (2) + (3) Rp. 893,818.88

18 6.8. Membuat 1 m3 beton mutu f'c =21.7 Mpa (K.250), slump (122) cm, w/c = 0.56
6.8.1 Bahan :
384.000 kg Semen portland @ Rp 1,125.00 Rp. 432,000.00
692.000 kg Pasir beton @ Rp 89.29 Rp. 61,785.71
1039.000 kg Kerikil beton (maksimum 30 mm) @ Rp 147.22 Rp. 152,963.89
215.000 ltr Air @ Rp 10.00 Rp. 2,150.00
Jumlah (1) Rp. 648,899.60
6.8.2 Tenaga :
0.275 org/hr Tukang batu @ Rp 100,000.00 Rp. 27,500.00
0.028 org/hr Kepala tukang @ Rp 110,000.00 Rp. 3,025.00
1.650 org/hr Pekerja @ Rp 90,000.00 Rp. 148,500.00
0.083 org/hr Mandor @ Rp 120,000.00 Rp. 9,960.00
Jumlah (2) Rp. 188,985.00
Jumlah (1) + (2) Rp. 837,884.60
Overhead + Profit (3) Rp. 125,682.69
DAFTAR ANALISA
Jumlah (1) + (2) + (3) Rp. 963,567.29

19 6.17. Pembesian 10 kg dengan besi polos atau besi ulir


6.17.1 Bahan :
10.500 kg Besi beton @ Rp 8,500.00 Rp. 89,250.00
0.150 kg Kawat beton @ Rp 20,000.00 Rp. 3,000.00
Jumlah (1) Rp. 92,250.00
6.17.2 Tenaga :
0.070 org/hr Tukang besi @ Rp 100,000.00 Rp. 7,000.00
0.007 org/hr Kepala tukang @ Rp 110,000.00 Rp. 770.00
0.070 org/hr Pekerja @ Rp 90,000.00 Rp. 6,300.00
0.004 org/hr Mandor @ Rp 120,000.00 Rp. 480.00
Jumlah (2) Rp. 14,550.00
Jumlah (1) + (2) Rp. 106,800.00
Overhead + Profit (3) Rp. 16,020.00
Jumlah (1) + (2) + (3) Rp. 122,820.00
Harga 1 kg besi Rp. 12,282.00

20 6.17. Memasang 1 M2 wire mesh M6 (3,065 Kg / m2)


6.17.1 Bahan :
1.020 kg Wiremesh @ Rp 11,000.00 Rp. 11,220.00
0.050 kg Kawat beton @ Rp 20,000.00 Rp. 1,000.00
Jumlah (1) Rp. 12,220.00
6.17.2 Tenaga :
0.025 org/hr Tukang besi @ Rp 100,000.00 Rp. 2,500.00
0.002 org/hr Kepala tukang @ Rp 110,000.00 Rp. 220.00
0.025 org/hr Pekerja @ Rp 90,000.00 Rp. 2,250.00
0.001 org/hr Mandor @ Rp 120,000.00 Rp. 120.00
Jumlah (2) Rp. 5,090.00
Jumlah (1) + (2) Rp. 17,310.00
Overhead + Profit (3) Rp. 2,596.50
Jumlah Harga Rp. 19,906.50
Harga Pasang wiremesh 1 lapis / m2 Rp. 61,013.42
Harga Pasang wiremesh 2 lapis / m2 Rp. 122,026.85

21 6.22. Memasang 1 m2 bekisting untuk Kolom


6.22.1 Bahan :
0.040 m3 Kayu klas III @ Rp 1,750,000.00 Rp. 70,000.00
0.400 kg Paku biasa 5 cm - 12 cm @ Rp 15,000.00 Rp. 6,000.00
0.200 ltr Minyak bakesting @ Rp 25,000.00 Rp. 5,000.00
0.015 m3 Balok kayu Kls II @ Rp 4,000,000.00 Rp. 60,000.00
0.350 lbr Plywood 9 mm @ Rp 120,000.00 Rp. 42,000.00
2.000 btg Dolken kayu galam (8-10) cm, panjang 4 mete @ Rp 15,000.00 Rp. 30,000.00
Jumlah (1) Rp. 213,000.00
digunakan 3x (3) Rp. 71,000.00
6.22.2 Tenaga :
0.330 org/hr Tukang kayu @ Rp 100,000.00 Rp. 33,000.00
0.033 org/hr Kepala tukang @ Rp 110,000.00 Rp. 3,630.00
0.660 org/hr Pekerja @ Rp 90,000.00 Rp. 59,400.00
0.033 org/hr Mandor @ Rp 120,000.00 Rp. 3,960.00
Jumlah (2) Rp. 99,990.00
Jumlah (1) + (2) Rp. 312,990.00
Jumlah (2) + (3) Rp. 170,990.00
Overhead + Profit (4) Rp. 25,648.50
Jumlah (2) + (3) + (4) Rp. 196,638.50

22 6.26. Memasang 1 m2 bekisting untuk tangga


6.26.1 Bahan :
0.030 m3 Kayu klas III @ Rp 1,750,000.00 Rp. 52,500.00
0.400 kg Paku biasa 5 cm - 12 cm @ Rp 15,000.00 Rp. 6,000.00
0.150 ltr Minyak bakesting @ Rp 25,000.00 Rp. 3,750.00
0.015 m3 Balok kayu Kls II @ Rp 4,000,000.00 Rp. 60,000.00
0.350 lbr Plywood 9 mm @ Rp 120,000.00 Rp. 42,000.00
2.000 btg Dolken kayu galam (8-10) cm, panjang 4 mete @ Rp 15,000.00 Rp. 30,000.00
Jumlah (1) Rp. 194,250.00
6.26.2 Tenaga :
0.330 org/hr Tukang kayu @ Rp 100,000.00 Rp. 33,000.00
0.033 org/hr Kepala tukang @ Rp 110,000.00 Rp. 3,630.00
DAFTAR ANALISA
0.660 org/hr Pekerja @ Rp 90,000.00 Rp. 59,400.00
0.033 org/hr Mandor @ Rp 120,000.00 Rp. 3,960.00
Jumlah (2) Rp. 99,990.00
Jumlah (1) + (2) Rp. 294,240.00
Overhead + Profit (3) Rp. 44,136.00
Jumlah (1) + (2) + (3) Rp. 338,376.00

23 SPL. Atap. 05 1 M' Lisplank Kalsiplank


SPL. Atap. 05.1 Bahan :
0.275 lbr Lisplank kalsiplank 2X200X4000X20 mm @ Rp. 30,000.00 Rp. 8,250.00
0.807 btg rangka baja ringan type C @ Rp. 65,000.00 Rp. 52,433.33
15.000 bj Paku rivet @ Rp. 1,200.00 Rp. 18,000.00
Jumlah (1) Rp. 78,683.33
SPL. Atap.05.2 Tenaga :
0.100 org/hr Tukang @ Rp. 100,000.00 Rp. 10,000.00
0.010 org/hr Pekerja @ Rp. 90,000.00 Rp. 900.00
0.100 org/hr Mandor @ Rp. 120,000.00 Rp. 12,000.00
Jumlah (2) Rp. 22,900.00
Jumlah (1) + (2) Rp. 101,583.33
Overhead + Profit (3) Rp. 15,237.50
Jumlah (1) + (2) + (3) Rp. 116,820.83

24 SPL. Atap. 06 1 M2 Lapisan bawah atap (multipleks + aluminium foil + glasswool)


SPL. Atap. 06.1 Bahan :
0.382 lbr Multipleks 9 mm @ Rp. 135,000.00 Rp. 51,562.50
0.013 roll Aluminium foil @ Rp. 230,000.00 Rp. 3,066.67
0.061 roll Glasswool @ Rp. 330,000.00 Rp. 20,166.67
Jumlah (1) Rp. 74,795.83
SPL. Atap.06.1 Tenaga :
0.300 org/hr Tukang @ Rp. 100,000.00 Rp. 30,000.00
0.200 org/hr Pekerja @ Rp. 90,000.00 Rp. 18,000.00
0.010 org/hr Mandor @ Rp. 120,000.00 Rp. 1,200.00
Jumlah (2) Rp. 49,200.00
Jumlah (1) + (2) Rp. 123,995.83
Overhead + Profit (3) Rp. 18,599.38
Jumlah (1) + (2) + (3) Rp. 142,595.21

Analisa Biaya Konstruksi Pekerjaan Plafond


25 SPL. Plaf. 01 1 M2 Memasang rangka metal furing, modul 60X120 cm
SPL.Paf. 01.1 Bahan :
1.8216 btg Furring channel @ Rp 40,000.00 Rp. 72,864.00
1.1781 btg Top cross rail @ Rp 10,000.00 Rp. 11,781.00
2.1780 pcs Connector clip @ Rp 5,000.00 Rp. 10,890.00
0.6490 btg Suspention rod @ Rp 17,500.00 Rp. 11,357.50
1.0890 pcs Suspention clip @ Rp 27,500.00 Rp. 29,947.50
0.2200 btg Angel bracket @ Rp 2,000.00 Rp. 440.00
Jumlah (1) Rp. 137,280.00
SPL.Plaf. 01.1 Tenaga :
0.2000 org Tukang @ Rp. 100,000.00 Rp. 20,000.00
0.020 org/hr Kepala tukang @ Rp. 110,000.00 Rp. 2,200.00
0.2000 org Pekerja @ Rp. 90,000.00 Rp. 18,000.00
0.0010 org Mandor @ Rp. 120,000.00 Rp. 120.00
Jumlah (2) Rp. 40,320.00
Jumlah (1) + (2) Rp. 177,600.00
Overhead + Profit (3) Rp. 26,640.00
Jumlah (1) + (2) + (3) Rp. 204,240.00

26 SPL. Plaf. 02 1 M2 Memasang plafond gypsumboard


SPL.Plaf. 02.1 Bahan :
0.4320 lbr Gypsumboard 9 mm @ Rp 60,000.00 Rp. 25,920.00
0.0400 dos Drywall Screw @ Rp 45,000.00 Rp. 1,800.00
0.0340 zak Cornice Adhesive @ Rp 65,000.00 Rp. 2,210.00
0.0520 roll Catton Tape @ Rp 12,000.00 Rp. 624.00
Jumlah (1) Rp. 30,554.00
SPL.Plaf. 02.2 Tenaga :
0.1500 org/hr Tukang @ Rp. 100,000.00 Rp. 15,000.00
0.015 org/hr Kepala tukang @ Rp. 110,000.00 Rp. 1,650.00
0.1250 org/hr Pekerja @ Rp. 90,000.00 Rp. 11,250.00
0.00625 org/hr Mandor @ Rp. 120,000.00 Rp. 750.00
DAFTAR ANALISA
Jumlah (2) Rp. 28,650.00
Jumlah (1) + (2) Rp. 59,204.00
Overhead + Profit (3) Rp. 8,880.60
Jumlah (1) + (2) + (3) Rp. 68,084.60

27 SPL. Plaf. 03 1 M2 Memasang plafond gypsumboard wet area, t=9 mm


SPL.Plaf. 03.1 Bahan :
0.4320 lbr Gypsumboard wet area,9 mm @ Rp 80,000.00 Rp. 34,560.00
0.0400 dos Drywall Screw @ Rp 45,000.00 Rp. 1,800.00
0.0340 zak Cornice Adhesive @ Rp 65,000.00 Rp. 2,210.00
0.0520 roll Catton Tape @ Rp 12,000.00 Rp. 624.00
Jumlah (1) Rp. 39,194.00
SPL.Plaf. 03.2 Tenaga :
0.1500 org/hr Tukang @ Rp. 100,000.00 Rp. 15,000.00
0.015 org/hr Kepala tukang @ Rp. 110,000.00 Rp. 1,650.00
0.1250 org/hr Pekerja @ Rp. 90,000.00 Rp. 11,250.00
0.00625 org/hr Mandor @ Rp. 120,000.00 Rp. 750.00
Jumlah (2) Rp. 28,650.00
Jumlah (1) + (2) Rp. 67,844.00
Overhead + Profit (3) Rp. 10,176.60
Jumlah (1) + (2) + (3) Rp. 78,020.60

Analisa Biaya Konstruksi Pekerjaan Pipa dan Saniter


28 B.1. Memasang Kloset Duduk
B.1.1 Bahan :
1.000 bh Kloset duduk ex. TOTO Type CW660NPJ/SW6 @ Rp. 2,500,000.00 Rp. 2,500,000.00
6.00% hrg Perlengkapan @ Rp. 2,500,000.00 Rp. 150,000.00
Jumlah (1) Rp. 2,650,000.00
B.1.2 Tenaga :
1.100 org/hr Tukang batu @ Rp. 100,000.00 Rp. 110,000.00
0.001 org/hr Kepala tukang @ Rp. 110,000.00 Rp. 110.00
3.300 org/hr Pekerja @ Rp. 90,000.00 Rp. 297,000.00
0.160 org/hr Mandor @ Rp. 120,000.00 Rp. 19,200.00
Jumlah (2) Rp. 426,310.00
Jumlah (1) + (2) Rp. 3,076,310.00
Overhead + Profit (3) Rp. 461,446.50
Jumlah (1) + (2) + (3) Rp. 3,537,756.50

29 B.2. Memasang 1 buah kloset jongkok porselen


B.2.1 Bahan :
1.000 bh Kloset jongkok ex. TOTO type CE9/TV150 NW @ Rp. 2,700,000.00 Rp. 2,700,000.00
1.000 bh Kloset jongkok ex. American Standard @ Rp. 210,000.00 Rp. 210,000.00
6.000 kg Semen portland @ Rp 1,125.00 Rp. 6,750.00
0.010 m3 Pasir pasangan @ Rp. 115,000.00 Rp. 1,150.00
Jumlah (1) type CE9/TV150 NWV 12 Rp. 2,917,900.00
Jumlah (3) ex. American Standard Rp. 217,900.00
B.5.2 Tenaga :
1.500 org/hr Tukang batu @ Rp. 100,000.00 Rp. 150,000.00
1.500 org/hr Kepala tukang @ Rp. 110,000.00 Rp. 165,000.00
1.000 org/hr Pekerja @ Rp. 90,000.00 Rp. 90,000.00
0.160 org/hr Mandor @ Rp. 120,000.00 Rp. 19,200.00
Jumlah (2) Rp. 424,200.00
Jumlah (1) + (2) Rp. 3,132,100.00
Overhead + Profit (4) Rp. 469,815.00
Jumlah (1) + (2) + (4) Rp. 3,601,915.00
Jumlah (2) + (3) Rp. 642,100.00
Overhead + Profit (5) Rp. 96,315.00
Jumlah (2) + (3) + (5) Rp. 738,415.00

30 B.4. Memasang 1 buah Urinoir


B4.1 Bahan :
1.000 bh Urinoir ex. American Standard @ Rp. 2,100,000.00 Rp. 2,100,000.00 (a)
5.00% hrg Perlengkapan @ Rp. 2,100,000.00 Rp. 105,000.00
1.000 bh Urinoir @ Rp. 2,500,000.00 Rp. 2,500,000.00 (b)
5.00% hrg Perlengkapan @ Rp. 2,500,000.00 Rp. 125,000.00
6.000 kg Semen portland @ Rp 1,125.00 Rp. 6,750.00
0.010 m3 Pasir pasangan @ Rp. 115,000.00 Rp. 1,150.00
Jumlah (1)(a) Rp. 2,212,900.00
DAFTAR ANALISA
Jumlah (1)(b) Rp. 2,632,900.00
B.5.2 Tenaga :
1.000 org/hr Tukang batu @ Rp. 100,000.00 Rp. 100,000.00
0.100 org/hr Kepala tukang @ Rp. 110,000.00 Rp. 11,000.00
1.000 org/hr Pekerja @ Rp. 90,000.00 Rp. 90,000.00
0.100 org/hr Mandor @ Rp. 120,000.00 Rp. 12,000.00
Jumlah (2) Rp. 213,000.00
Jumlah (1)(a) + (2) Rp. 2,425,900.00
Overhead + Profit (3) Rp. 363,885.00
Jumlah (1)(a) + (2) + (3) Rp. 2,789,785.00
Jumlah (1)(b) + (2) Rp. 2,845,900.00
Overhead + Profit (4) Rp. 426,885.00
Jumlah (1)(b) + (2) + (4) Rp. 3,272,785.00

31 B.5. Memasang 1 buah Wastafel


B.5.1 Bahan :
1.000 bh Wastafel ex. American standard @ Rp. 800,000.00 Rp. 800,000.00 (a)
15.00% hrg Perlengkapan @ Rp. 800,000.00 Rp. 120,000.00
1.000 bh Wastafel ex. TOTO Type LW530J + aksesories @ Rp. 600,000.00 Rp. 600,000.00 (b)
15.00% hrg Perlengkapan @ Rp. 600,000.00 Rp. 90,000.00
6.000 kg Semen portland @ Rp 1,125.00 Rp. 6,750.00
0.010 m3 Pasir pasangan @ Rp. 115,000.00 Rp. 1,150.00
Jumlah (1) (a) Rp. 927,900.00
Jumlah (1) (b) Rp. 697,900.00
B.5.2 Tenaga :
1.450 org/hr Tukang batu @ Rp. 100,000.00 Rp. 145,000.00
0.150 org/hr Kepala tukang @ Rp. 110,000.00 Rp. 16,500.00
1.200 org/hr Pekerja @ Rp. 90,000.00 Rp. 108,000.00
0.100 org/hr Mandor @ Rp. 120,000.00 Rp. 12,000.00
Jumlah (2) Rp. 281,500.00
Jumlah (1)(a) + (2) Rp. 1,209,400.00
Jumlah (1)(b) + (2) Rp. 979,400.00
Overhead + Profit (4) Rp. 146,910.00
Jumlah (1)(b) + (2) + (4) Rp. 1,126,310.00

32 B.26. Memasang 1 m' pipa PVC tipe AW diameter 3/4" (air bersih)
B.26.1 Bahan :
1.200 m' Pipa PVC @ Rp. 6,500.00 Rp. 7,800.00
35.00% hrg Perlengkapan @ Rp. 6,500.00 Rp. 2,275.00
Jumlah (1) Rp. 10,075.00
B.26.2 Tenaga :
0.060 org/hr Tukang @ Rp. 100,000.00 Rp. 6,000.00
0.006 org/hr Kepala tukang @ Rp. 110,000.00 Rp. 660.00
0.035 org/hr Pekerja @ Rp. 90,000.00 Rp. 3,150.00
0.002 org/hr Mandor @ Rp. 120,000.00 Rp. 216.00
Jumlah (2) Rp. 10,026.00
Jumlah (1) + (2) Rp. 20,101.00
Overhead + Profit (3) Rp. 3,015.15
Jumlah (1) + (2) + (3) Rp. 23,116.15

33 B.27. Memasang 1 m' pipa PVC tipe AW diameter 1" (air bersih)
B.27.1 Bahan :
1.200 m' Pipa PVC @ Rp. 7,500.00 Rp. 9,000.00
35.00% hrg Perlengkapan @ Rp. 7,500.00 Rp. 2,625.00
Jumlah (1) Rp. 11,625.00
B.27.2 Tenaga :
0.060 org/hr Tukang @ Rp. 100,000.00 Rp. 6,000.00
0.006 org/hr Kepala tukang @ Rp. 110,000.00 Rp. 660.00
0.035 org/hr Pekerja @ Rp. 90,000.00 Rp. 3,150.00
0.002 org/hr Mandor @ Rp. 120,000.00 Rp. 216.00
Jumlah (2) Rp. 10,026.00
Jumlah (1) + (2) Rp. 21,651.00
Overhead + Profit (3) Rp. 3,247.65
Jumlah (1) + (2) + (3) Rp. 24,898.65

34 B.31. Memasang 1 m' pipa PVC tipe AW diameter 3"


B.31.1 Bahan :
1.200 m' Pipa PVC @ Rp. 80,000.00 Rp. 96,000.00
35.00% hrg Perlengkapan @ Rp. 80,000.00 Rp. 28,000.00
DAFTAR ANALISA
Jumlah (1) Rp. 124,000.00
B.31.2 Tenaga :
0.135 org/hr Tukang @ Rp. 100,000.00 Rp. 13,500.00
0.0135 org/hr Kepala tukang @ Rp. 110,000.00 Rp. 1,485.00
0.081 org/hr Pekerja @ Rp. 90,000.00 Rp. 7,290.00
0.0041 org/hr Mandor @ Rp. 120,000.00 Rp. 492.00
Jumlah (2) Rp. 22,767.00
Jumlah (1) + (2) Rp. 146,767.00
Overhead + Profit (3) Rp. 22,015.05
Jumlah (1) + (2) + (3) Rp. 168,782.05

35 B.31. Memasang 1 m' pipa PVC tipe AW diameter 4"


B.31.1 Bahan :
1.200 m' Pipa PVC @ Rp. 120,000.00 Rp. 144,000.00
35.00% hrg Perlengkapan @ Rp. 120,000.00 Rp. 42,000.00
Jumlah (1) Rp. 186,000.00
B.31.2 Tenaga :
0.135 org/hr Tukang @ Rp. 100,000.00 Rp. 13,500.00
0.0135 org/hr Kepala tukang @ Rp. 110,000.00 Rp. 1,485.00
0.081 org/hr Pekerja @ Rp. 90,000.00 Rp. 7,290.00
0.0041 org/hr Mandor @ Rp. 120,000.00 Rp. 492.00
Jumlah (2) Rp. 22,767.00
Jumlah (1) + (2) Rp. 208,767.00
Overhead + Profit (3) Rp. 31,315.05
Jumlah (1) + (2) + (3) Rp. 240,082.05

36 B.35. Memasang 1 buah kran air


B.35.1 Bahan :
1.000 bh Kran Dinding TOTO Type T23B13V7N @ Rp. 225,000.00 Rp. 225,000.00
0.025 bh Seal tape @ Rp. 25,000.00 Rp. 625.00
Jumlah (1) Rp. 225,625.00
B.35.2 Tenaga :
0.100 org/hr Tukang @ Rp. 100,000.00 Rp. 10,000.00
0.010 org/hr Kepala tukang @ Rp. 110,000.00 Rp. 1,100.00
0.010 org/hr Pekerja @ Rp. 90,000.00 Rp. 900.00
0.005 org/hr Mandor @ Rp. 120,000.00 Rp. 600.00
Jumlah (2) Rp. 12,600.00
Jumlah (1) + (2) Rp. 238,225.00
Overhead + Profit (3) Rp. 35,733.75
Jumlah (1) + (2) + (3) Rp. 273,958.75

37 B.35. Memasang 1 buah kran air Wastafel


B.35.1 Bahan :
1.000 bh Kran air Wastafel Ex. Toto TX 109 LRR @ Rp. 750,000.00 Rp. 750,000.00
0.025 bh Seal tape @ Rp. 25,000.00 Rp. 625.00
Jumlah (1) Rp. 750,625.00
B.35.2 Tenaga :
0.100 org/hr Tukang @ Rp. 100,000.00 Rp. 10,000.00
0.010 org/hr Kepala tukang @ Rp. 110,000.00 Rp. 1,100.00
0.010 org/hr Pekerja @ Rp. 90,000.00 Rp. 900.00
0.005 org/hr Mandor @ Rp. 120,000.00 Rp. 600.00
Jumlah (2) Rp. 12,600.00
Jumlah (1) + (2) Rp. 763,225.00
Overhead + Profit (3) Rp. 114,483.75
Jumlah (1) + (2) + (3) Rp. 877,708.75

38 SPL B.35.a Memasang 1 buah jet spray


B.35.a.1 Bahan :
1.000 bh Jet spray @ Rp. 250,000.00 Rp. 250,000.00
0.025 bh Seal tape @ Rp. 25,000.00 Rp. 625.00
Jumlah (1) Rp. 250,625.00
B.35.a.2 Tenaga :
0.100 org/hr Tukang @ Rp. 100,000.00 Rp. 10,000.00
0.010 org/hr Kepala tukang @ Rp. 110,000.00 Rp. 1,100.00
0.010 org/hr Pekerja @ Rp. 90,000.00 Rp. 900.00
0.005 org/hr Mandor @ Rp. 120,000.00 Rp. 600.00
Jumlah (2) Rp. 12,600.00
Jumlah (1) + (2) Rp. 263,225.00
Overhead + Profit (3) Rp. 39,483.75
DAFTAR ANALISA
Jumlah (1) + (2) + (3) Rp. 302,708.75

39 B.36. Memasang 1 buah floor drain


B.35.1 Bahan :
1.000 bh Floor drain @ Rp. 75,000.00 Rp. 75,000.00
Jumlah (1) Rp. 75,000.00
B.35.2 Tenaga :
0.100 org/hr Tukang @ Rp. 100,000.00 Rp. 10,000.00
0.010 org/hr Kepala tukang @ Rp. 110,000.00 Rp. 1,100.00
0.010 org/hr Pekerja @ Rp. 90,000.00 Rp. 900.00
0.005 org/hr Mandor @ Rp. 120,000.00 Rp. 600.00
Jumlah (2) Rp. 12,600.00
Jumlah (1) + (2) Rp. 87,600.00
Overhead + Profit (3) Rp. 13,140.00
Jumlah (1) + (2) + (3) Rp. 100,740.00

40 B.35.a. Memasang 1 buah roof drain 4'


B.35.a.1 Bahan :
1.000 bh Roof drain Stainless 4 ' @ Rp. 275,000.00 Rp. 275,000.00
Jumlah (1) Rp. 275,000.00
B.35.a.2 Tenaga :
0.100 org/hr Tukang @ Rp. 100,000.00 Rp. 10,000.00
0.010 org/hr Kepala tukang @ Rp. 110,000.00 Rp. 1,100.00
0.010 org/hr Pekerja @ Rp. 90,000.00 Rp. 900.00
0.005 org/hr Mandor @ Rp. 120,000.00 Rp. 600.00
Jumlah (2) Rp. 12,600.00
Jumlah (1) + (2) Rp. 287,600.00
Overhead + Profit (3) Rp. 43,140.00
Jumlah (1) + (2) + (3) Rp. 330,740.00

41 SPL Sanitasi 01 Membuat Ground reservoir 2X3X2 m3


Bahan :
21.875 m3 Galian tanah @ Rp. - Rp. -
0.875 m3 Pasir urug @ Rp. 100,000.00 Rp. 87,500.00
3.472 lbr Multipleks 9 mm @ Rp. 135,000.00 Rp. 468,750.00
0.050 m3 Kayu @ Rp. 4,000,000.00 Rp. 200,000.00
5.200 m3 Beton K.250 @ Rp. 837,884.60 Rp. 4,356,999.94
572.000 kg Besi beton @ Rp. 9,225.00 Rp. 5,276,700.00
26.000 m2 Plesteran 1:3 @ Rp. 11,393.00 Rp. 296,218.00
26.000 m2 Pasangan tegel 20X20 @ Rp 103,375.00 Rp. 2,687,750.00
1.000 unit Tangga @ Rp. 650,000.00 Rp. 650,000.00
1.000 unit Mainhole @ Rp. 350,000.00 Rp. 350,000.00
Jumlah (1) Rp. 14,373,917.94
Tenaga :
21.875 m3 Galian tanah @ Rp. 76,500.00 Rp. 1,673,437.50
0.875 m3 Pasir urug @ Rp. 28,200.00 Rp. 24,675.00
5.200 m3 Beton K.250 @ Rp. 188,985.00 Rp. 982,722.00
572.000 kg Besi beton @ Rp. 1,455.00 Rp. 832,260.00
26.000 m2 Pekerjaan plesteran 1:3 @ Rp. 35,850.00 Rp. 932,100.00
26.000 m2 Pasangan tegel 20X20 @ Rp. 98,250.00 Rp. 2,554,500.00
Jumlah (2) Rp. 6,999,694.50
Jumlah (1) + (2) Rp. 21,373,612.44
Overhead + Profit (3) Rp. 3,206,041.87
Jumlah (1) + (2) + (3) Rp. 24,579,654.30

42 SPL Sanitasi 04 1 M' Saluran luar bangunan ( terbuka)


0.517 m3 Galian tanah @ Rp. 76,500.00 Rp. 39,550.50
0.141 m3 Urugan pasir @ Rp. 128,200.00 Rp. 18,050.56
0.890 m2 Pas. batu bata, tebal 1/2bt 1 pc:3 ps @ Rp. 105,991.19 Rp. 94,332.16
0.620 m3 Pas. batu Kali @ Rp. 650,000.00 Rp. 403,000.00
1.000 bh Buis beton 1/2 dia. 30 cm @ Rp. 180,000.00 Rp. 180,000.00
1.188 m2 Pekerjaan plesteran @ Rp 47,243.00 Rp. 56,124.68
Jumlah Harga Bahan + Upah Rp. 791,057.90
Overhead + Profit (3) Rp. 118,658.69
Jumlah (1) + (2) + (3) Rp. 909,716.59

43 SPL Sanitasi 08 Membuat 1 buah bak kontrol pasangan batu bata ukuran (60x60) cm, tinggi 65 cm
110.000 bh Batu bata @ Rp. 450.00 Rp. 49,500.00
114.000 kg Semen portland @ Rp. 1,125.00 Rp. 128,250.00
DAFTAR ANALISA
0.184 m3 Pasir urug @ Rp. 100,000.00 Rp. 18,400.00
0.033 m3 Batu kerikil @ Rp 265,000.00 Rp. 8,745.00
4.850 kg Besi beton @ Rp 8,500.00 Rp. 41,225.00
0.120 m3 Pasir beton @ Rp 125,000.00 Rp. 15,000.00
14.400 kg Kawat beton @ Rp 20,000.00 Rp. 288,000.00
0.500 org/hr Tukang batu @ Rp. 100,000.00 Rp. 50,000.00
0.050 org/hr Kepala tukang @ Rp. 110,000.00 Rp. 5,500.00
1.500 org/hr Pekerja @ Rp. 90,000.00 Rp. 135,000.00
0.150 org/hr Mandor @ Rp. 120,000.00 Rp. 18,000.00
0.343 m3 Upah galian @ Rp. 76,500.00 Rp. 26,239.50
Jumlah harga satuan bahan Rp. 549,120.00
Jumlah harga satuan upah Rp. 234,739.50
Jumlah (1) + (2) Rp. 783,859.50
Overhead + Profit (3) Rp. 117,578.93
Jumlah harga bahan + upah Rp. 901,438.43

Analisa Pekerjaan Kunci Dan Kaca


44 B.2. Pasang 1 buah kunci tanam biasa
B.2.1 Bahan :
1.000 bh Kunci Tanam Biasa @ Rp. 350,000.00 Rp. 350,000.00
Jumlah (1) Rp. 350,000.00
B.2.2 Tenaga :
0.500 org/hr Tukang Kayu @ Rp. 100,000.00 Rp. 50,000.00
0.010 org/hr Kepala Tukang @ Rp. 110,000.00 Rp. 1,100.00
0.010 org/hr Pekerja @ Rp. 90,000.00 Rp. 900.00
0.005 org/hr Mandor @ Rp. 120,000.00 Rp. 600.00
Jumlah (2) Rp. 52,600.00
Jumlah (1) + (2) Rp. 402,600.00

45 SPL B.2.c. Pasang 1 buah lock case tanam


SPL. B.2.c.1 Bahan :
1.000 bh Lock case tanam @ Rp. 500,000.00 Rp. 500,000.00
Jumlah (1) Rp. 500,000.00
SPL.B.2.b.2 Tenaga :
0.500 org/hr Tukang Kayu @ Rp. 100,000.00 Rp. 50,000.00
0.010 org/hr Kepala Tukang @ Rp. 110,000.00 Rp. 1,100.00
0.010 org/hr Pekerja @ Rp. 90,000.00 Rp. 900.00
0.005 org/hr Mandor @ Rp. 120,000.00 Rp. 600.00
Jumlah (2) Rp. 52,600.00
Jumlah (1) + (2) Rp. 552,600.00

46 B.3. Pasang 1 buah kunci tanam kamar mandi


B.1.1 Bahan :
1.000 bh Kunci Silinder @ Rp. 160,000.00 Rp. 160,000.00
Jumlah (1) Rp. 160,000.00
B.1.2 Tenaga :
0.500 org/hr Tukang Kayu @ Rp. 100,000.00 Rp. 50,000.00
0.005 org/hr Kepala Tukang @ Rp. 110,000.00 Rp. 550.00
0.005 org/hr Pekerja @ Rp. 90,000.00 Rp. 450.00
0.0025 org/hr Mandor @ Rp. 120,000.00 Rp. 300.00
Jumlah (2) Rp. 51,300.00
Jumlah (1) + (2) Rp. 211,300.00

47 B.5. Pasang 1 buah engsel pintu


B.5.1 Bahan :
1.000 bh Engsel Pintu @ Rp. 40,000.00 Rp. 40,000.00
Jumlah (1) Rp. 40,000.00
B.5.2 Tenaga :
0.150 org/hr Tukang Kayu @ Rp. 100,000.00 Rp. 15,000.00
0.015 org/hr Kepala Tukang @ Rp. 110,000.00 Rp. 1,650.00
0.015 org/hr Pekerja @ Rp. 90,000.00 Rp. 1,350.00
0.00075 org/hr Mandor @ Rp. 120,000.00 Rp. 90.00
Jumlah (2) Rp. 18,090.00
Jumlah (1) + (2) Rp. 58,090.00

48 SPL B.5.d. Pasang 1 buah engsel tanam


SPL B.5.d.1 Bahan :
1.000 bh Engsel tanam @ Rp. 535,000.00 Rp. 535,000.00
Jumlah (1) Rp. 535,000.00
DAFTAR ANALISA
SPL B.5.c.2 Tenaga :
0.225 org/hr Tukang Kayu @ Rp. 100,000.00 Rp. 22,500.00
0.0225 org/hr Kepala Tukang @ Rp. 110,000.00 Rp. 2,475.00
0.023 org/hr Pekerja @ Rp. 90,000.00 Rp. 2,025.00
0.00113 org/hr Mandor @ Rp. 120,000.00 Rp. 135.00
Jumlah (2) Rp. 27,135.00
Jumlah (1) + (2) Rp. 562,135.00

49 B.6.c Pasang 1 buah casement


B.6.c.1 Bahan :
1.000 bh Casement 12" @ Rp. 35,000.00 Rp. 35,000.00
1.000 bh Casement 16" @ Rp. 55,000.00 Rp. 55,000.00
1.000 bh Casement 20" @ Rp. 110,000.00 Rp. 110,000.00
Casement 12" Jumlah (1a) Rp. 35,000.00
Casement 16" Jumlah (1b) Rp. 55,000.00
Casement 20" Jumlah (1c) Rp. 110,000.00
B.6.c.2 Tenaga :
0.100 org/hr Tukang Kayu @ Rp. 100,000.00 Rp. 10,000.00
0.010 org/hr Kepala Tukang @ Rp. 110,000.00 Rp. 1,100.00
0.010 org/hr Pekerja @ Rp. 90,000.00 Rp. 900.00
0.0005 org/hr Mandor @ Rp. 120,000.00 Rp. 60.00
Jumlah (2) Rp. 12,060.00
Jumlah (1a) + (2) Rp. 47,060.00
Jumlah (1b) + (2) Rp. 67,060.00
Jumlah (1c) + (2) Rp. 122,060.00

50 B.8. Pasang 1 buah grendel jendela


B.8.1 Bahan :
1.000 bh Grendel jendela @ Rp. 45,000.00 Rp. 45,000.00
Jumlah (1) Rp. 45,000.00
B.8.2 Tenaga :
0.150 org/hr Tukang Kayu @ Rp. 100,000.00 Rp. 15,000.00
0.015 org/hr Kepala Tukang @ Rp. 110,000.00 Rp. 1,650.00
0.015 org/hr Pekerja @ Rp. 90,000.00 Rp. 1,350.00
0.00075 org/hr Mandor @ Rp. 120,000.00 Rp. 90.00
Jumlah (2) Rp. 18,090.00
Jumlah (1) + (2) Rp. 63,090.00

51 SPL B.8.a. Pasang 1 buah grendel tanam bawah


SPL B.8.a.1 Bahan :
1.000 bh Grendel jendela Tanam @ Rp. 175,000.00 Rp. 175,000.00
Jumlah (1) Rp. 175,000.00
SPL B.8.a.2 Tenaga :
0.150 org/hr Tukang Kayu @ Rp. 100,000.00 Rp. 15,000.00
0.015 org/hr Kepala Tukang @ Rp. 110,000.00 Rp. 1,650.00
0.015 org/hr Pekerja @ Rp. 90,000.00 Rp. 1,350.00
0.00075 org/hr Mandor @ Rp. 120,000.00 Rp. 90.00
Jumlah (2) Rp. 18,090.00
Jumlah (1) + (2) Rp. 193,090.00

52 SPL B.8.d. Pasang 1 buah fisher


SPL B.8.d.1 Bahan :
1.000 bh Fisher @ Rp. 3,500.00 Rp. 3,500.00
Jumlah (1) Rp. 3,500.00
SPL B.8.d.2 Tenaga :
0.075 org/hr Tukang Kayu @ Rp. 100,000.00 Rp. 7,500.00
0.0075 org/hr Kepala Tukang @ Rp. 110,000.00 Rp. 825.00
0.0075 org/hr Pekerja @ Rp. 90,000.00 Rp. 675.00
0.000375 org/hr Mandor @ Rp. 120,000.00 Rp. 45.00
Jumlah (2) Rp. 9,045.00
Jumlah (1) + (2) Rp. 12,545.00

53 SPL B.8.e. Pasang 1 buah patch atas


SPL B.8.e.1 Bahan :
1.000 bh Pacth fitting atas @ Rp. 800,000.00 Rp. 800,000.00
Jumlah (1) Rp. 800,000.00
SPL B.8.e.2 Tenaga :
0.150 org/hr Tukang Kayu @ Rp. 100,000.00 Rp. 15,000.00
0.015 org/hr Kepala Tukang @ Rp. 110,000.00 Rp. 1,650.00
DAFTAR ANALISA
0.015 org/hr Pekerja @ Rp. 90,000.00 Rp. 1,350.00
0.00075 org/hr Mandor @ Rp. 120,000.00 Rp. 90.00
Jumlah (2) Rp. 18,090.00
Jumlah (1) + (2) Rp. 818,090.00

54 SPL B.8.f. Pasang 1 buah patch bawah


SPL B.8.f.1 Bahan :
1.000 bh Pacth fitting bawah @ Rp. 800,000.00 Rp. 800,000.00
Jumlah (1) Rp. 800,000.00
SPL B.8.f.2 Tenaga :
0.150 org/hr Tukang Kayu @ Rp. 100,000.00 Rp. 15,000.00
0.015 org/hr Kepala Tukang @ Rp. 110,000.00 Rp. 1,650.00
0.015 org/hr Pekerja @ Rp. 90,000.00 Rp. 1,350.00
0.00075 org/hr Mandor @ Rp. 120,000.00 Rp. 90.00
Jumlah (2) Rp. 18,090.00
Jumlah (1) + (2) Rp. 818,090.00

55 SPL B.8.g. Pasang 1 buah kunci tanam


SPL B.8.g.1 Bahan :
1.000 bh Kunci tanam @ Rp. 200,000.00 Rp. 200,000.00
Jumlah (1) Rp. 200,000.00
SPL B.8.g.2 Tenaga :
0.150 org/hr Tukang Kayu @ Rp. 100,000.00 Rp. 15,000.00
0.015 org/hr Kepala Tukang @ Rp. 110,000.00 Rp. 1,650.00
0.015 org/hr Pekerja @ Rp. 90,000.00 Rp. 1,350.00
0.00075 org/hr Mandor @ Rp. 120,000.00 Rp. 90.00
Jumlah (2) Rp. 18,090.00
Jumlah (1) + (2) Rp. 218,090.00

56 SPL.B.12.c Pasang 1 buah pegangan pintu type Pull Handle


SPL. B.12.a.1 Bahan :
1.000 bh Pegangan pintu @ Rp. 1,500,000.00 Rp. 1,500,000.00
Jumlah (1) Rp. 1,500,000.00
SPL.B.12.a.2 Tenaga :
0.500 org/hr Tukang Kayu @ Rp. 100,000.00 Rp. 50,000.00
0.050 org/hr Kepala Tukang @ Rp. 110,000.00 Rp. 5,500.00
0.050 org/hr Pekerja @ Rp. 90,000.00 Rp. 4,500.00
0.0025 org/hr Mandor @ Rp. 120,000.00 Rp. 300.00
Jumlah (2) Rp. 60,300.00
Jumlah (1) + (2) Rp. 1,560,300.00

57 B.18. Pasang 1 m2 kaca, tebal 6 mm


B.18.1 Bahan :
1.100 bh Kaca @ Rp. 135,000.00 Rp. 148,500.00
Jumlah (1) Rp. 148,500.00
B.18.2 Tenaga :
0.165 org/hr Tukang Kayu @ Rp. 100,000.00 Rp. 16,500.00
0.0165 org/hr Kepala Tukang @ Rp. 110,000.00 Rp. 1,815.00
0.0165 org/hr Pekerja @ Rp. 90,000.00 Rp. 1,485.00
0.0008 org/hr Mandor @ Rp. 120,000.00 Rp. 96.00
Jumlah (2) Rp. 19,896.00
Jumlah (1) + (2) Rp. 168,396.00

58 B.18.a Pasang 1 m2 kaca, tebal 6 mm


B.18.a.1 Bahan :
1.100 bh Kaca stopsol @ Rp. 375,000.00 Rp. 412,500.00
Jumlah (1) Rp. 412,500.00
B.18.a.2 Tenaga :
0.165 org/hr Tukang Kayu @ Rp. 100,000.00 Rp. 16,500.00
0.0165 org/hr Kepala Tukang @ Rp. 110,000.00 Rp. 1,815.00
0.0165 org/hr Pekerja @ Rp. 90,000.00 Rp. 1,485.00
0.0008 org/hr Mandor @ Rp. 120,000.00 Rp. 96.00
Jumlah (2) Rp. 19,896.00
Jumlah (1) + (2) Rp. 432,396.00

59 B.19 Pasang 1 m2 kaca buram, tebal 12 mm


B.19.a Bahan :
1.100 bh Kaca buram @ Rp. 185,000.00 Rp. 203,500.00
0.050 kg Sealent @ Rp. 70,000.00 Rp. 3,500.00
DAFTAR ANALISA
Jumlah (1) Rp. 207,000.00
B.19.b Tenaga :
0.250 org/hr Tukang Kayu @ Rp. 100,000.00 Rp. 25,000.00
0.0250 org/hr Kepala Tukang @ Rp. 110,000.00 Rp. 2,750.00
0.0250 org/hr Pekerja @ Rp. 90,000.00 Rp. 2,250.00
0.00125 org/hr Mandor @ Rp. 120,000.00 Rp. 150.00
Jumlah (2) Rp. 30,150.00
Jumlah (1) + (2) Rp. 237,150.00

60 SPL. B.19.a Pasang 1 m2 kaca tempered, tebal 12 mm


SPL. B.19.a.1 Bahan :
1.100 bh Kaca @ Rp. 600,000.00 Rp. 660,000.00
0.050 kg Sealent @ Rp. 70,000.00 Rp. 3,500.00
Jumlah (1) Rp. 663,500.00
B.12.2 Tenaga :
0.250 org/hr Tukang Kayu @ Rp. 100,000.00 Rp. 25,000.00
0.0250 org/hr Kepala Tukang @ Rp. 110,000.00 Rp. 2,750.00
0.0250 org/hr Pekerja @ Rp. 90,000.00 Rp. 2,250.00
0.00125 org/hr Mandor @ Rp. 120,000.00 Rp. 150.00
Jumlah (2) Rp. 30,150.00
Jumlah (1) + (2) Rp. 693,650.00
Overhead + Profit (3) Rp. 104,047.50
Jumlah (1) + (2) + (3) Rp. 797,697.50

Analisa Biaya Konstruksi Pekerjaan Penutup Lantai dan Dinding


61 6.35. Memasang 1 m2 lantai keramik ukuran (30X30) cm
6.35.1 Bahan :
11.870 buah Ubin keramik @ Rp. 5,500.00 Rp. 65,285.00
10.000 kg Semen portland @ Rp. 1,125.00 Rp. 11,250.00
0.045 m3 Pasir pasangan @ Rp. 115,000.00 Rp. 5,175.00
1.500 kg Semen warna @ Rp. 12,500.00 Rp. 18,750.00
Jumlah (1) Rp. 100,460.00
6.35.2 Tenaga :
0.350 org/hr Tukang @ Rp. 100,000.00 Rp. 35,000.00
0.035 org/hr Kepala tukang @ Rp. 110,000.00 Rp. 3,850.00
0.620 org/hr Pekerja @ Rp. 90,000.00 Rp. 55,800.00
0.031 org/hr Mandor @ Rp. 120,000.00 Rp. 3,720.00
Jumlah (2) Rp. 98,370.00
Jumlah (1) + (2) Rp. 198,830.00

62 SPL 6.35.a Memasang 1 m2 lantai keramik ukuran (40X40) cm


SPL 6.35.a.1 Bahan :
6.875 buah Ubin keramik @ Rp. 18,500.00 Rp. 127,187.50
10.000 kg Semen portland @ Rp. 1,125.00 Rp. 11,250.00
0.045 m3 Pasir pasangan @ Rp. 115,000.00 Rp. 5,175.00
1.500 kg Semen warna @ Rp. 12,500.00 Rp. 18,750.00
Jumlah (1) Rp. 162,362.50
SPL 6.35.a.2 Tenaga :
0.350 org/hr Tukang @ Rp. 100,000.00 Rp. 35,000.00
0.035 org/hr Kepala tukang @ Rp. 110,000.00 Rp. 3,850.00
0.620 org/hr Pekerja @ Rp. 90,000.00 Rp. 55,800.00
0.031 org/hr Mandor @ Rp. 120,000.00 Rp. 3,720.00
Jumlah (2) Rp. 98,370.00
Jumlah (1) + (2) Rp. 260,732.50
Overhead + Profit (3) Rp. 39,109.88
Jumlah (1) + (2) + (3) Rp. 299,842.38

63 SPL 6.35.c Memasang 1 m2 lantai keramik ukuran (60X60) cm, polish


SPL 6.35.c.1 Bahan :
3.056 buah Ubin keramik @ Rp. 60,000.00 Rp. 183,333.33
10.000 kg Semen portland @ Rp. 1,125.00 Rp. 11,250.00
0.045 m3 Pasir pasangan @ Rp. 115,000.00 Rp. 5,175.00
1.500 kg Semen warna @ Rp. 12,500.00 Rp. 18,750.00
Jumlah (1) Rp. 218,508.33
SPL 6.35.c.2 Tenaga :
0.350 org/hr Tukang @ Rp. 100,000.00 Rp. 35,000.00
0.035 org/hr Kepala tukang @ Rp. 110,000.00 Rp. 3,850.00
0.620 org/hr Pekerja @ Rp. 90,000.00 Rp. 55,800.00
0.031 org/hr Mandor @ Rp. 120,000.00 Rp. 3,720.00
DAFTAR ANALISA
Jumlah (2) Rp. 98,370.00
Jumlah (1) + (2) Rp. 316,878.33

64 6.36. Memasang 1 m2 lantai keramik ukuran (20X20) cm, teksture


6.36.1 Bahan :
26.500 bh Tegel keramik @ Rp. 2,500.00 Rp. 66,250.00
10.400 kg Semen portland @ Rp. 1,125.00 Rp. 11,700.00
0.045 m3 Pasir pasangan @ Rp. 115,000.00 Rp. 5,175.00
1.620 kg Semen warna @ Rp. 12,500.00 Rp. 20,250.00
Jumlah (1) Rp. 103,375.00
6.36.2 Tenaga :
0.350 org/hr Tukang @ Rp. 100,000.00 Rp. 35,000.00
0.035 org/hr Kepala tukang @ Rp. 110,000.00 Rp. 3,850.00
0.620 org/hr Pekerja @ Rp. 90,000.00 Rp. 55,800.00
0.030 org/hr Mandor @ Rp. 120,000.00 Rp. 3,600.00
Jumlah (2) Rp. 98,250.00
Jumlah (1) + (2) Rp. 201,625.00

65 SPL6.36b Memasang 1 m2 lantai keramik ukuran (20X40) cm, polish


SPL 6.36b.1 Bahan :
13.750 bh Tegel keramik @ Rp. 8,500.00 Rp. 116,875.00
10.400 kg Semen portland @ Rp. 1,125.00 Rp. 11,700.00
0.045 m3 Pasir pasangan @ Rp. 115,000.00 Rp. 5,175.00
1.620 kg Semen warna @ Rp. 12,500.00 Rp. 20,250.00
Jumlah (1) Rp. 154,000.00
SPL 6.35b.2 Tenaga :
0.350 org/hr Tukang @ Rp. 100,000.00 Rp. 35,000.00
0.035 org/hr Kepala tukang @ Rp. 110,000.00 Rp. 3,850.00
0.620 org/hr Pekerja @ Rp. 90,000.00 Rp. 55,800.00
0.030 org/hr Mandor @ Rp. 120,000.00 Rp. 3,600.00
Jumlah (2) Rp. 98,250.00
Jumlah (1) + (2) Rp. 252,250.00

66 SPL. 6.39.a Memasang 1 m' plint keramik ukuran (10X40) cm


SPL. 6.39.a.1 Bahan :
3.250 bh Plint keramik @ Rp. 3,500.00 Rp. 11,375.00
1.140 kg Semen portland @ Rp. 1,125.00 Rp. 1,282.50
0.003 m3 Pasir pasangan @ Rp. 115,000.00 Rp. 345.00
0.025 kg Semen warna @ Rp. 12,500.00 Rp. 312.50
Jumlah (1) Rp. 13,315.00
SPL. 6.39.a.2 Tenaga :
0.090 org/hr Tukang @ Rp. 100,000.00 Rp. 9,000.00
0.009 org/hr Kepala tukang @ Rp. 110,000.00 Rp. 990.00
0.090 org/hr Pekerja @ Rp. 90,000.00 Rp. 8,100.00
0.005 org/hr Mandor @ Rp. 120,000.00 Rp. 600.00
Jumlah (2) Rp. 18,690.00
Jumlah (1) + (2) Rp. 32,005.00

67 6.63 Memasang 1 m' plint kayu klas II (2X10) cm


6.63.1 Bahan :
0.003 m3 Papan kayu klas II @ Rp. 4,500,000.00 Rp. 13,500.00
0.050 kg Paku skrup 5 cm @ Rp. 20,000.00 Rp. 1,000.00
Jumlah (1) Rp. 14,500.00
6.63.2 Tenaga :
0.120 org/hr Tukang @ Rp. 100,000.00 Rp. 12,000.00
0.012 org/hr Kepala tukang @ Rp. 110,000.00 Rp. 1,320.00
0.120 org/hr Pekerja @ Rp. 90,000.00 Rp. 10,800.00
0.006 org/hr Mandor @ Rp. 120,000.00 Rp. 720.00
Jumlah (2) Rp. 24,840.00
Jumlah (1) + (2) Rp. 39,340.00

68 SPL 6.63.a Memasang 1 m' plint kalsiplank


SPL 6.63.a.1 Bahan :
0.275 lbr Kalsiplank @ Rp. 35,000.00 Rp. 9,625.00
0.050 kg Paku skrup 5 cm @ Rp. 20,000.00 Rp. 1,000.00
Jumlah (1) Rp. 10,625.00
SPL. 6.63.a.2 Tenaga :
0.120 org/hr Tukang @ Rp. 100,000.00 Rp. 12,000.00
0.012 org/hr Kepala tukang @ Rp. 110,000.00 Rp. 1,320.00
DAFTAR ANALISA
0.120 org/hr Pekerja @ Rp. 90,000.00 Rp. 10,800.00
0.006 org/hr Mandor @ Rp. 120,000.00 Rp. 720.00
Jumlah (2) Rp. 24,840.00
Jumlah (1) + (2) Rp. 35,465.00
Overhead + Profit (3) Rp. 5,319.75
Jumlah (1) + (2) + (3) Rp. 40,784.75

69 SPL.6.54.b 1 M2 Pasang dinding batu alam


SPL 6.54.b.1 Bahan :
1.100 m2 Pasangan batu alam @ Rp. 165,000.00 Rp. 181,500.00
9.300 kg Semen portland @ Rp. 1,125.00 Rp. 10,462.50
0.018 m3 Pasir pasangan @ Rp. 115,000.00 Rp. 2,070.00
1.940 kg Semen warna @ Rp. 12,500.00 Rp. 24,250.00
Jumlah (1) Rp. 218,282.50
SPL 6.54.b.2 Tenaga :
0.450 org/hr Tukang @ Rp. 100,000.00 Rp. 45,000.00
0.045 org/hr Kepala tukang @ Rp. 110,000.00 Rp. 4,950.00
0.600 org/hr Pekerja @ Rp. 90,000.00 Rp. 54,000.00
0.030 org/hr Mandor @ Rp. 120,000.00 Rp. 3,600.00
Jumlah (2) Rp. 107,550.00
Jumlah (1) + (2) Rp. 325,832.50

70 6.61 Memasang 1 m2 Floor hardenner


6.61.1 Bahan :
5.000 kg Semen PC @ Rp. 1,125.00 Rp. 5,625.00
Jumlah (1) Rp. 5,625.00
6.61.1 Tenaga :
0.120 org/hr Tukang Batu @ Rp. 100,000.00 Rp. 12,000.00
0.012 org/hr Kepala Tukang @ Rp. 110,000.00 Rp. 1,320.00
0.120 org/hr Pekerja @ Rp. 90,000.00 Rp. 10,800.00
0.006 org/hr Mandor @ Rp. 120,000.00 Rp. 720.00
Jumlah (2) Rp. 24,840.00
Jumlah (1) + (2) Rp. 30,465.00
Overhead + Profit (3) Rp. 4,569.75
Jumlah (1) + (2) + (3) Rp. 35,034.75

71 SPL. Lantai 02 1 M' Tali air model U, 1 cm


SPL. Lantai 02. 1 Bahan :
1.625 kg Semen PC @ Rp. 1,125.00 Rp. 1,828.13
Jumlah (1) Rp. 1,828.13
SPL. Lantai 02. 2 Tenaga :
0.050 org/hr Tukang Batu @ Rp. 100,000.00 Rp. 5,000.00
0.005 org/hr Kepala Tukang @ Rp. 110,000.00 Rp. 550.00
0.075 org/hr Pekerja @ Rp. 90,000.00 Rp. 6,750.00
0.0040 org/hr Mandor @ Rp. 120,000.00 Rp. 480.00
Jumlah (2) Rp. 12,780.00
Jumlah (1) + (2) Rp. 14,608.13

72 SPL. Lantai 03 1 M' Tali air model U, 3 cm


SPL. Lantai 03. 1 Bahan :
2.167 kg Semen PC @ Rp. 1,125.00 Rp. 2,437.50
Jumlah (1) Rp. 2,437.50
SPL. Lantai 02. 2 Tenaga :
0.067 org/hr Tukang Batu @ Rp. 100,000.00 Rp. 6,666.67
0.0067 org/hr Kepala Tukang @ Rp. 110,000.00 Rp. 733.33
0.100 org/hr Pekerja @ Rp. 90,000.00 Rp. 9,000.00
0.005 org/hr Mandor @ Rp. 120,000.00 Rp. 640.00
Jumlah (2) Rp. 17,040.00
Jumlah (1) + (2) Rp. 19,477.50

Analisa Biaya Konstruksi Pekerjaan Pengecatan


73 B.14 Pengecatan 1 m2 tembok baru (1 lapis plamur, 1 lapis cat dasar, 3 lapis cat penutup)/Interior
B.14.a Bahan :
0.100 kg Plamir @ Rp. 7,500.00 Rp. 750.00
0.100 kg Cat dasar @ Rp. 50,000.00 Rp. 5,000.00
0.260 kg Cat penutup 2X @ Rp. 35,000.00 Rp. 9,100.00
Jumlah (1) Rp. 14,850.00
B.14.b Tenaga :
0.063 org/hr Tukang cat @ Rp. 100,000.00 Rp. 6,300.00
DAFTAR ANALISA
0.0063 org/hr Kapala tukang @ Rp. 110,000.00 Rp. 693.00
0.020 org/hr Pekerja @ Rp. 90,000.00 Rp. 1,800.00
0.0025 org/hr Mandor @ Rp. 120,000.00 Rp. 300.00
Jumlah (2) Rp. 9,093.00
Jumlah (1) + (2) Rp. 23,943.00

74 B.14 Pengecatan 1 m2 Coating batu alam


B.14.a Bahan :
0.130 kg Cat Coating @ Rp. 40,000.00 Rp. 5,200.00
Jumlah (1) Rp. 5,200.00
B.14.b Tenaga :
0.063 org/hr Tukang cat @ Rp. 100,000.00 Rp. 6,300.00
0.0063 org/hr Kapala tukang @ Rp. 110,000.00 Rp. 693.00
0.020 org/hr Pekerja @ Rp. 90,000.00 Rp. 1,800.00
0.0025 org/hr Mandor @ Rp. 120,000.00 Rp. 300.00
Jumlah (2) Rp. 9,093.00
Jumlah (1) + (2) Rp. 14,293.00

75 B.14 Pengecatan 1 m2 tembok baru (1 lapis plamur, 1 lapis cat dasar, 3 lapis cat penutup)/Eksterior
B.14.a Bahan :
0.100 kg Plamir @ Rp. 7,500.00 Rp. 750.00
0.100 kg Cat dasar @ Rp. 50,000.00 Rp. 5,000.00
0.260 kg Cat penutup 2X @ Rp. 80,000.00 Rp. 20,800.00
Jumlah (1) Rp. 26,550.00
B.14.b Tenaga :
0.063 org/hr Tukang cat @ Rp. 100,000.00 Rp. 6,300.00
0.0063 org/hr Kapala tukang @ Rp. 110,000.00 Rp. 693.00
0.020 org/hr Pekerja @ Rp. 90,000.00 Rp. 1,800.00
0.0025 org/hr Mandor @ Rp. 120,000.00 Rp. 300.00
Jumlah (2) Rp. 9,093.00
Jumlah (1) + (2) Rp. 35,643.00

76 SPL. Cat.02 1 M2 Pekerjaan water proofing sistem coating bawah lantai kamar mandi dan tempat wudhu
SPL. Cat. 02.a Bahan :
0.300 kg Cat anti bocor lapis I @ Rp 40,000.00 Rp. 12,000.00
0.300 kg Cat anti bocor lapis II @ Rp 40,000.00 Rp. 12,000.00
0.300 kg Cat anti bocor lapis III @ Rp 40,000.00 Rp. 12,000.00
Jumlah (1) Rp. 36,000.00
SPL. Cat. 02.b Tenaga :
0.063 org/hr Tukang cat @ Rp. 100,000.00 Rp. 6,300.00
0.0063 org/hr Kepala tukang cat @ Rp. 110,000.00 Rp. 693.00
0.020 org/hr Pekerja @ Rp. 90,000.00 Rp. 1,800.00
0.0025 org/hr Mandor @ Rp. 120,000.00 Rp. 300.00
Jumlah (2) Rp. 9,093.00
Jumlah (1) + (2) Rp. 45,093.00

77 SPL. Cat.04 1 M2 Pengecatan bidang kayu baru dengan sistem melamin


SPL. Cat. 04.a Bahan :
0.150 kg Thenner @ Rp. 35,000.00 Rp. 5,250.00
0.150 kg Dempul @ Rp. 20,000.00 Rp. 3,000.00
0.150 kg Kertas gosok @ Rp. 1,500.00 Rp. 225.00
0.170 kg Cat dasar @ Rp. 50,000.00 Rp. 8,500.00
0.390 kg Cat melamin @ Rp. 50,000.00 Rp. 19,500.00
Jumlah (1) Rp. 36,475.00
SPL. Cat. 04.b Tenaga :
0.500 org/hr Tukang cat @ Rp. 100,000.00 Rp. 50,000.00
0.050 org/hr Kepala tukang @ Rp. 110,000.00 Rp. 5,500.00
0.250 org/hr Pekerja @ Rp. 90,000.00 Rp. 22,500.00
0.013 org/hr Mandor @ Rp. 120,000.00 Rp. 1,500.00
Jumlah (2) Rp. 79,500.00
Jumlah (1) + (2) Rp. 115,975.00

Analisa Biaya Konstruksi Besi dan Aluminium


78 6.2. 1 kg rangka kuda-kuda Baja IWF
6.2.1. Bahan :
1.150 kg Besi profil @ Rp 16,000.00 Rp. 18,400.00
Jumlah (1) Rp. 18,400.00
DAFTAR ANALISA
6.2.2 Tenaga :
0.060 org/hr Tukang las @ Rp. 100,000.00 Rp. 6,000.00
0.006 org/hr Kepala tukang @ Rp. 110,000.00 Rp. 660.00
0.060 org/hr Pekerja @ Rp. 90,000.00 Rp. 5,400.00
0.003 org/hr Mandor @ Rp. 120,000.00 Rp. 360.00
Jumlah (2) Rp. 12,420.00
Jumlah (1) + (2) Rp. 30,820.00
Overhead + Profit (3) Rp. 4,623.00
Jumlah (1) + (2) + (3) Rp. 35,443.00

79 6.11. Memasang 1 m kusen pintu alluminium


6.11.1 Bahan :
1.100 m Profil aluminium @ Rp 80,000.00 Rp. 88,000.00
2.000 bh Skrup fixer @ Rp 1,250.00 Rp. 2,500.00
0.060 tube Sealant @ Rp 70,000.00 Rp. 4,200.00
Jumlah (1) Rp. 94,700.00
6.11.2 Tenaga :
0.043 org/hr Tukang besi @ Rp. 100,000.00 Rp. 4,300.00
0.0043 org/hr Kepala tukang @ Rp. 110,000.00 Rp. 473.00
0.043 org/hr Pekerja @ Rp. 90,000.00 Rp. 3,870.00
0.0021 org/hr Mandor @ Rp. 120,000.00 Rp. 252.00
Jumlah (2) Rp. 8,895.00
Jumlah (1) + (2) Rp. 103,595.00

80 SPL 6.11.b. Memasang 1 m daun jendela alluminium


SPL 6.11.b.1 Bahan :
1.050 m Profil aluminium @ Rp 80,000.00 Rp. 84,000.00
4.000 bh Skrup fixer @ Rp 1,250.00 Rp. 5,000.00
0.060 tube Sealant @ Rp 70,000.00 Rp. 4,200.00
Jumlah (1) Rp. 93,200.00
SPL 6.11.b.2 Tenaga :
0.043 org/hr Tukang besi @ Rp. 100,000.00 Rp. 4,300.00
0.0043 org/hr Kepala tukang @ Rp. 110,000.00 Rp. 473.00
0.043 org/hr Pekerja @ Rp. 90,000.00 Rp. 3,870.00
0.0021 org/hr Mandor @ Rp. 120,000.00 Rp. 252.00
Jumlah (2) Rp. 8,895.00
Jumlah (1) + (2) Rp. 102,095.00

81 SPL 6.11.c. Memasang 1 m2 kisi-kisi aluminium


SPL 6.11.c.1 Bahan :
1.050 m2 Kisi-kisi aluminium @ Rp 100,000.00 Rp. 105,000.00
4.000 bh Skrup fixer @ Rp 1,250.00 Rp. 5,000.00
0.060 tube Sealant @ Rp 70,000.00 Rp. 4,200.00
Jumlah (1) Rp. 114,200.00
6.11.c.2 Tenaga :
0.043 org/hr Tukang besi @ Rp 100,000.00 Rp. 4,300.00
0.0043 org/hr Kepala tukang @ Rp 110,000.00 Rp. 473.00
0.043 org/hr Pekerja @ Rp 90,000.00 Rp. 3,870.00
0.0021 org/hr Mandor @ Rp 120,000.00 Rp. 252.00
Jumlah (2) Rp. 8,895.00
Jumlah (1) + (2) Rp. 123,095.00

Analisa Biaya Konstruksi Pekerjaan Lain-Lain


82 L.Lain-Lain 06.1 Bahan :
0.5000 btg besi hollow 50X10 cm @ Rp 1,200,000.00 Rp. 600,000.00
1.2000 btg besi hollow 40X40 cm @ Rp 400,000.00 Rp. 480,000.00
0.2000 btg besi hollow 60X40 cm @ Rp 550,000.00 Rp. 110,000.00
1.0000 ls Perlengkapan @ Rp 215,000.00 Rp. 215,000.00
0.8263 kg Cat besi @ Rp 30,000.00 Rp. 24,789.60
Jumlah (1) Rp. 1,429,789.60
SPL.Lain-Lain 06.2 Tenaga :
1.0000 org/hr Tukang besi @ Rp. 100,000.00 Rp. 100,000.00
0.5000 org/hr Tukang las @ Rp. 100,000.00 Rp. 50,000.00
1.2000 org/hr Pekerja @ Rp. 90,000.00 Rp. 108,000.00
0.6000 m2 Upah cat @ Rp. 79,500.00 Rp. 47,700.00
Jumlah (2) Rp. 305,700.00
Jumlah (1) + (2) Rp. 1,735,489.60
Overhead + Profit (3) Rp. 260,323.44
Jumlah (1) + (2) + (3) Rp. 1,995,813.04
DAFTAR ANALISA
83 PL. Lain-Lain 09 I m' Pekerjaan railing Pipa Besi
SPL.Lain-Lain 09.1 Bahan :
2.5080 m' Pipa GIP dia 2" @ Rp 90,000.00 Rp. 225,720.00
1.8810 m' Pipa GIP dia 1" @ Rp 40,000.00 Rp. 75,240.00
2.8125 kg Plat baja @ Rp 20,000.00 Rp. 56,250.00
1.0000 ls Perlengkapan @ Rp 7,500.00 Rp. 7,500.00
0.8263 m2 Cat besi @ Rp 30,000.00 Rp. 24,789.60
Jumlah (1) Rp. 389,499.60
SPL.Lain-Lain 09.2 Tenaga :
0.5000 org/hr Tukang besi @ Rp. 100,000.00 Rp. 50,000.00
0.5000 org/hr Tukang las @ Rp. 100,000.00 Rp. 50,000.00
0.6000 org/hr Pekerja @ Rp. 90,000.00 Rp. 54,000.00
0.3000 m2 Upah cat @ Rp. 79,500.00 Rp. 23,850.00
Jumlah (2) Rp. 177,850.00
Jumlah (1) + (2) Rp. 567,349.60
Overhead + Profit (3) Rp. 85,102.44
Jumlah (1) + (2) + (3) Rp. 652,452.04
84 PL. Lain-Lain 09 I m' Pekerjaan railing Pipa Stainless
SPL.Lain-Lain 09.1 Bahan :
3.7620 m' Pipa Stainless dia 2" @ Rp 135,000.00 Rp. 507,870.00
2.5080 m' Pipa Stainless dia 1" @ Rp 85,000.00 Rp. 213,180.00
2.8125 kg Plat baja @ Rp 20,000.00 Rp. 56,250.00
1.0000 ls Perlengkapan @ Rp 7,500.00 Rp. 7,500.00
Jumlah (1) Rp. 784,800.00
SPL.Lain-Lain 09.2 Tenaga :
1.0000 org/hr Tukang besi @ Rp. 100,000.00 Rp. 100,000.00
0.5000 org/hr Tukang las @ Rp. 100,000.00 Rp. 50,000.00
1.2000 org/hr Pekerja @ Rp. 90,000.00 Rp. 108,000.00
Jumlah (2) Rp. 258,000.00
Jumlah (1) + (2) Rp. 1,042,800.00
Overhead + Profit (3) Rp. 156,420.00
Jumlah (1) + (2) + (3) Rp. 1,199,220.00
85 PL. Lain-Lain 09 I m' Pekerjaan Sunscreen
SPL.Lain-Lain 09.1 Bahan :
1.5048 m' Pipa Blacksteel dia 2" @ Rp 120,000.00 Rp. 180,576.00
2.8125 kg Plat baja @ Rp 20,000.00 Rp. 56,250.00
1.0000 ls Perlengkapan @ Rp 7,500.00 Rp. 7,500.00
0.8263 m2 Cat besi @ Rp 30,000.00 Rp. 24,789.60
Jumlah (1) Rp. 269,115.60
SPL.Lain-Lain 09.2 Tenaga :
1.0000 org/hr Tukang besi @ Rp. 100,000.00 Rp. 100,000.00
0.5000 org/hr Tukang las @ Rp. 100,000.00 Rp. 50,000.00
1.2000 org/hr Pekerja @ Rp. 90,000.00 Rp. 108,000.00
0.6000 m2 Upah cat @ Rp. 79,500.00 Rp. 47,700.00
Jumlah (2) Rp. 305,700.00
Jumlah (1) + (2) Rp. 574,815.60
Overhead + Profit (3) Rp. 86,222.34
Jumlah (1) + (2) + (3) Rp. 661,037.94
86 A Memasang 1 m1 Talang dan lisplank GRC
B Bahan :
3.780 m2 GRC Pracetak @ Rp. 95,000.00 Rp. 359,100.00
7.750 m1 Besi Siku 40.40.4 @ Rp. 40,000.00 Rp. 310,000.00
0.278 bh Sparing Pipa Buang & Roof Drain @ Rp. 300,000.00 Rp. 83,333.33
6.00% hrg Perlengkapan @ Rp. 30,000.00 Rp. 1,800.00
Jumlah (1) Rp. 754,233.33
A Tenaga :
1.100 org/hr Tukang batu @ Rp. 100,000.00 Rp. 110,000.00
0.001 org/hr Kepala tukang @ Rp. 110,000.00 Rp. 110.00
3.300 org/hr Pekerja @ Rp. 90,000.00 Rp. 297,000.00
0.160 org/hr Mandor @ Rp. 120,000.00 Rp. 19,200.00
Jumlah (2) Rp. 426,310.00
Jumlah (1) + (2) Rp. 1,180,543.33

MAKASSAR, 25 APRIL 2016


PT. BANGUN BUMI INDAH
DAFTAR ANALISA

JULIANUS S LELEPADANG
DIREKTUR
DAFTAR HARGA BAHAN / MATERIAL
TAHUN ANGGARAN 2016

NO JENIS BAHAN/ TENAGA SAT HARGA KET. HARGA


1 Koral Beton M3 265,000.00
2 Kerikil M 3
265,000.00
3 Batu Merah Bh 450.00
4 Pasir Timbunan/Gunung M 3
110,000.00
5 Pasir Beton M3 125,000.00
6 Pasir Urug M3 100,000.00
7 Tanah Timbunan M 3
75,000.00
8 Sirtu M 3
110,000.00
9 Pasir Pasangan M 3
115,000.00
10 Air Ltr 10.00
11 Semen Portland PC, @40 kg Kg 1,125.00
12 Semen Warna Kg 12,500.00
13 Beton K250 m3 760,000.00
14 Batu Alam m2 165,000.00
15 Kayu kelas I Balok M 3
11,000,000.00
16 Kayu kelas I Papan M 3
11,500,000.00
17 Kayu kelas II Balok M 3
4,000,000.00
18 Kayu kelas II Papan M 3
4,500,000.00
19 Kayu kelas III Balok Bekisting M 3
1,750,000.00
20 Kayu kelas III Papan Bekisting M 3
2,000,000.00
21 Kayu dolken dia 8-10 / 400 cm btg 15,000.00
22 Plywood T. 9 mm lbr 120,000.00
23 Plywood T. 6 mm lbr 75,000.00
24 Plywood T. 3 mm lbr 50,000.00
25 Minyak bekisting ltr 25,000.00
26 Lem kayu kg 25,000.00
27 Multipleks T.9 lbr 135,000.00
28 Kalsiplank lbr 35,000.00
29 Besi Polos / Ulir kg 8,500.00
30 Wiremesh kg 11,000.00
31 Kawat beton kg 20,000.00
32 Baja Profil kg 16,000.00
33 Paku biasa 5 cm - 12 cm kg 15,000.00
34 Paku Biasa 2" - 5" kg 17,500.00
35 Paku biasa 1/2"-1" kg 20,000.00
36 Paku rivet bj 1,200.00
37 Buis Beton bh 180,000.00
38 Paku skrup 5 cm kg 20,000.00
39 Pipa PVC tipe AW diameter 3/4" m' 6,500.00
40 Pipa PVC tipe AW diameter 1" m' 7,500.00
41 Pipa PVC tipe AW diameter 3" m' 80,000.00
42 Pipa PVC tipe AW diameter 4" m' 120,000.00
43 Pipa GIP dia 2" m' 90,000.00
44 Pipa GIP dia 1" m' 40,000.00
45 Plat baja kg 20,000.00
46 Pipa Stainless dia 2" m' 135,000.00
47 Pipa Stainless dia 1" m' 85,000.00
48 Pipa Blacksteel dia 2" m' 120,000.00
49 GRC Pracetak m2 95,000.00
50 Besi Siku 40.40.4 m1 40,000.00
51 Sparing Pipa Buang & Roof Drain bh 300,000.00
52 Kran Dinding TOTO Type T23B13V7N bh 225,000.00
53 Kran air Wastafel Ex. Toto TX 109 LRR bh 750,000.00
54 Jet spray bh 250,000.00
55 Seal tape bh 25,000.00
56 Flooer Drain bh 75,000.00
57 Roof drain Stainless 4 ' bh 275,000.00
58 Plamir kg 7,500.00
59 Cat dasar kg 50,000.00
60 Cat penutup 2X kg 35,000.00
61 Cat Coating kg 40,000.00
62 Cat Besi kg 30,000.00
63 Thenner kg 35,000.00
64 Dempul kg 20,000.00
65 Kertas gosok kg 1,500.00
66 Lisplank kalsiplank 2X200X4000X20 mm lbr 30,000.00
67 Seng Gelombang BJLS 32 lbr 60,000.00
68 rangka baja ringan type C btg 65,000.00
69 Aluminium foil roll 230,000.00
70 Glasswool roll 330,000.00
71 Furring channel btg 40,000.00
72 Top cross rail btg 10,000.00
73 Connector clip pcs 5,000.00
74 Suspention rod btg 17,500.00
75 Suspention clip pcs 27,500.00
76 Angel bracket btg 2,000.00
77 Gypsumboard 9 mm lbr 60,000.00
78 Drywall Screw dos 45,000.00
79 Cornice Adhesive zak 65,000.00
80 Catton Tape roll 12,000.00
81 Gypsumboard wet area,9 mm lbr 80,000.00
82 Kloset duduk ex. TOTO Type CW660NPJ/SW660J bh 2,500,000.00
83 Kloset jongkok ex. TOTO type CE9/TV150 NWV 12 bh 2,700,000.00
84 Kloset jongkok ex. American Standard bh 210,000.00
85 Urinoir ex. American Standard bh 2,100,000.00
86 Urinoir bh 2,500,000.00
87 Wastafel ex. American standard bh 800,000.00
88 Wastafel ex. TOTO Type LW530J + aksesories bh 600,000.00
89 Ubin Keramik 60x60 bh 60,000.00
90 Ubin Keramik 30x30 bh 5,500.00
91 Ubin Keramik 40x40 bh 18,500.00
92 Tegel Keramik 20x20 bh 2,500.00
93 Tegel Keramik 20x40 bh 8,500.00
94 Plint keramik bh 3,500.00
95 besi hollow 50X10 cm btg 1,200,000.00
96 besi hollow 40X40 cm btg 400,000.00
97 besi hollow 60X40 cm btg 550,000.00
98 Sekrup fixer bj 1,250.00
99 Kunci Tanam Biasa bh 350,000.00
100 Lock case tanam bh 500,000.00
101 Kunci Silinder bh 160,000.00
102 Engsel Pintu bh 40,000.00
103 Engsel tanam bh 535,000.00
104 Casement 12" bh 35,000.00
105 Casement 16" bh 55,000.00
106 Casement 20" bh 110,000.00
107 Grendel jendela bh 45,000.00
108 Grendel jendela Tanam bh 175,000.00
109 Fisher bh 3,500.00
110 Pacth fitting atas bh 800,000.00
111 Kunci tanam bh 200,000.00
112 Pegangan pintu bh 1,500,000.00
113 Kaca bh 135,000.00
114 Kaca stopsol bh 375,000.00
115 Kaca buram bh 185,000.00
116 Kaca tempered bh 600,000.00
117 Sealent kg 70,000.00
118 Profil aluminium m 80,000.00
119 Kisi-kisi aluminium m 100,000.00
120 Cat Dinding Weathershield Eksterior kg 80,000.00

MAKASSAR, 25 APRIL 2016


PT. BANGUN BUMI INDAH

JULIANUS S LELEPADANG
DIREKTUR
DAFTAR HARGA UPAH KERJA
TAHUN ANGGARAN 2016

NO. UPAH KERJA SAT. HARGA SATUAN KET. HARGA

1 Pekerja Org/Hr 90,000.00


2 Tukang Kayu Org/Hr 100,000.00
3 Tukang Batu Org/Hr 100,000.00
4 Tukang Cat Org/Hr 100,000.00
5 Tukang Listrik Org/Hr 100,000.00
6 Tukang Pipa Org/Hr 100,000.00
7 Tukang Besi Org/Hr 100,000.00
8 Tukang Kaca/Allumunium Org/Hr 100,000.00
9 Kepala Tukang Kayu Org/Hr 110,000.00
10 Kepala Tukang Batu Org/Hr 110,000.00
11 Kepala Tukang Listrik Org/Hr 110,000.00
12 Kepala Tukang Cat Org/Hr 110,000.00
13 Kepala Tukang Pipa Org/Hr 110,000.00
14 Kepala Tukang Besi Org/Hr 110,000.00
15 Kepala Tukang Kaca/Allumunium Org/Hr 110,000.00
16 Mandor Org/Hr 120,000.00

MAKASSAR, 25 APRIL 2016


PT. BANGUN BUMI INDAH

JULIANUS S LELEPADANG
DIREKTUR
DAFTAR ANALISA HARGA SATUAN
I. ANALISA BIAYA KONSTRUKSI PEKERJAAN PERSIAPAN
6.2 1 M' PAGAR SEMENTARA DARI SENG GELOMBANG TINGG 2 M
6.4 1 M' PENGUKURAN DAN PEMASANGAN BOWPLANK
6.8 1 M2 MEMBERSIHKAN LAPANGAN DAN PERATAAN
6.13 1 M3 BONGKARAN BETON BERTULANG
6.14 1 M3 BONGKARAN DINDING BATU BATA MERAH
II ANALISA BIAYA KONSTRUKSI PEKERJAAN TANAH
6.1 MEMASANG 1 M3 GALIAN TANAH BIASA SEDALAM 1 M1
6.2 MEMASANG 1 M3 GALIAN TANAH BIASA SEDALAM 2 M1
6.4 MEMASANG 1 M3 GALIAN TANAH KERAS SEDALAM 1 M1
6.5 MEMASANG 1 M3 GALIAN TANAH CADAS SEDALAM 1 M1
6.6 MEMASANG 1 M3 GALIAN TANAH LUMPUR SEDALAM 1 M1
6.7 MEMASANG 1M2 PEK. STRUKTUR SETINGGI 1 M
6.8 MEMASANG 1 M3 PEK. PEMBUANGAN TANAH SEJAUH 30 M
6.9 MEMASANG 1 M3 URUGAN KEMBALI
6.1 MEMASANG 1 M3 PEK. PEMADATAN TANAH (per 20 cm)
6.11 MEMASANG 1 M3 URUGAN PASIR
6.11a MEMASANG 1 M3 PEK. URUGAN TANAH PADAS
6.15 MEMASANG 1 M3 PEK. URUGAN SIRTU PADAT UNTUK PENINGGIAN LANTAI
III ANALISA BIAYA KONSTRUKSI PEKERJAAN PONDASI
6.1 MEMASANG 1 M3 PASANGAN PONDASI BATU KALI 1PC : 3 PP
6.2 MEMASANG 1 M3 PASANGAN PONDASI BATU KALI 1PC : 4 PP
6.3 MEMASANG 1 M3 PASANGAN PONDASI BATU KALI 1PC : 5 PP
6.4 MEMASANG 1 M3 PASANGAN PONDASI BATU KALI 1PC : 6 PP
6.5 MEMASANG 1 M3 PASANGAN PONDASI BATU KALI 1PC : 8 PP
6.9 MEMASANG 1 M3 PASANGAN PONDASI BATU KOSONG (ANSTAMPING)
IV ANALISA BIAYA KONSTRUKSI PEKERJAAN DINDING
6.7 MEMASANG 1 M2 DINDING BATA MERAH TEBAL 1/2 BATA, CAMPURAN SPESI 1 PC : 2 PP
6.8 MEMASANG 1 M2 DINDING BATA MERAH TEBAL 1/2 BATA, CAMPURAN SPESI 1 PC : 3 PP
6.9 MEMASANG 1 M2 DINDING BATA MERAH TEBAL 1/2 BATA, CAMPURAN SPESI 1 PC : 4 PP
6.1 MEMASANG 1 M2 DINDING BATA MERAH TEBAL 1/2 BATA, CAMPURAN SPESI 1 PC : 5 PP
6.11 MEMASANG 1 M2 DINDING BATA MERAH TEBAL 1/2 BATA, CAMPURAN SPESI 1 PC : 6 PP
V ANALISA BIAYA KONSTRUKSI PEKERJAAN PLESTERAN
6.1 MEMASANG 1 M2 PLESTERAN 1 PC : 1 PP, TEBAL 15 MM
6.2 MEMASANG 1 M2 PLESTERAN 1 PC : 2 PP, TEBAL 15 MM
6.3 MEMASANG 1 M2 PLESTERAN 1 PC : 3 PP, TEBAL 15 MM
6.4 MEMASANG 1 M2 PLESTERAN 1 PC : 4 PP, TEBAL 15 MM
6.5 MEMASANG 1 M2 PLESTERAN 1 PC : 5 PP, TEBAL 15 MM
6.6 MEMASANG 1 M2 PLESTERAN 1 PC : 6 PP, TEBAL 15 MM
6.2 MEMASANG 1 M1 PLESTERAN SKONING 1 PC : 2 PP, LEBAR 10 MM
6.21 MEMASANG 1 M2 PLESTERAN BETON 1 PC : 2 PP, TEBAL 15 MM
6.22 MEMASANG 1 M2 PLESTERAN BETON 1 PC : 3 PP, TEBAL 15 MM
6.23 MEMASANG 1 M2 PLESTERAN CIPRAT 1 PC : 2 PP
6.26 MEMASANG 1 M2 FINISHING SIAR PASANGAN BATU KALI ADUKAN 1 PC : 2 PP
6.27 MEMASANG 1 M2 ACIAN
VI ANALISA BIAYA KONSTRUKSI PEKERJAAN KAYU
6.1 MEMBUAT DAN MEMASANG 1 M3 KUSEN PINTU DAN KUSEN JENDELA, KAYU KELAS I
6.2 MEMBUAT DAN MEMASANG 1 M3 KUSEN PINTU DAN KUSEN JENDELA, KAYU KELAS II DAN III
6.3 MEMBUAT DAN MEMASANG 1 M2 PASANG PINTU KLAMP STANDART, KAYU KELAS II
6.6 MEMBUAT DAN MEMASANG 1 M2 PINTU DAN JENDELA KACA,, KAYU KELAS I atau II
6.7 MEMBUAT DAN MEMASANG 1 M2 PINTU DAN JENDELA JALUSI,, KAYU KELAS I atau II
6.8 MEMBUAT DAN MEMASANG 1 M2 DAUN PINTU KAYU LAPIS (PLYWOOD) RANGKAP,
RANGKA TERTUTUP I
6.9 MEMBUAT DAN MEMASANG 1 M2 PINTU PLYWOOD RANGKAP,
RANGKA EXPOSE KAYU KELAS I DAN II
6.9.a MEMBUAT DAN MEMASANG 1 M2 PINTU MULTIPLEKS 9 MM,
RANGKA EXPOSE KAYU KELAS I DAN II
6.1 1 M2 JALUSI KUSEN, KAYU KELAS I atau II
6.11 1 M2 TEAKWOOD RANGKAP, RANGKA EXPOSE KAYU KELAS I
6.12 1 M2 TEAKWOOD RANGKAP LAPIS FORMIKA, RANGKA EXPOSE KAYU KELAS II
6.13 1 M3 KONSTRUKSIKUDA-KUDA KONVENSIONAL, KAYU KELAS I, II DAN III BENTANG 6 M
6.14 1 M3 KONSTRUKSI KUDA-KUDA EXPOSE, KAYU KELAS I
6.15 1 M3 PASANG KONSTRUKSI GORDING, KAYU KELAS II
6.15.a 1 M3 PASANG KONSTRUKSI GORDING, KAYU KELAS II (MATERIAL EKSISITING)
6.16 1 M2 RANGKA ATAP GENTENG KERAMIK, KAYU KELAS II
6.16.a 1 M2 RANGKA ATAP GENTENG KERAMIK, KAYU KELAS II ( MATERIAL USUK BARU )
6.16.b 1 M2 RANGKA ATAP GENTENG KERAMIK, KAYU KELAS II ( MATERIAL USUK EKSISTING )
6.16.c 1 M2 RANGKA ATAP GENTENG KERAMIK, KAYU KELAS II ( MATERIAL RENG BARU )
6.17 1 M2 RANGKA ATAP GENTENG BETON, KAYU KELAS II
6.17.a 1 M' PAPAN RUITER UKURAN ( 2 X 20 ) CM, KAYU BENGKIRAI
6.19 1 M2 RANGKA LANGIT-LANGIT ( 100 X 100 ) CM, KAYU KELAS II DAN III
6.2 1 M2 RANGKA LANGIT-LANGIT ( 60 X 60 ) CM, KAYU KELAS II DAN III
6.21 1 M' LISTPLANK UKURAN ( 3 X 20 ) CM, KAYU KELAS I atau KELAS II
6.22 1 M' LISTPLANK UKURAN ( 3 X 30 ) CM, KAYU KELAS I atau KELAS II
6.23 1 M2 RANGKA DINDING PEMISAH ( 60 X 120 ) KAYU KELAS II atau III
6.24 1 M2 DINDING PEMISAH TEAKWOOD RANGKAP, RANGKA KAYU KELAS II
6.24.a 1 M2 DINDING PEMISAH KALSIBOARD 6 MM RANGKAP, RANGKA KAYU KELAS II
6.24.b 1 M2 DINDING PEMISAH KALSIBOARD 9 MM RANGKAP, RANGKA METAL STUD
VII ANALISA BIAYA KONSTRUKSI PEKERJAAN BETON
6.1 MEMBUAT 1 M3 BETON MUTU f'C = 7.4 Mpa ( K 100 ), slump ( 12 2 ) CM, W/C = 0.87
6.2 MEMBUAT 1 M3 BETON MUTU f'C = 9.8 Mpa ( K 125 ), slump ( 12 2 ) CM, W/C = 0.78
6.3 MEMBUAT 1 M3 BETON MUTU f'C = 12.2 Mpa ( K 150 ), slump ( 12 2 ) CM, W/C = 0.72
6.4 MEMBUAT 1 M3 BETON MUTU f'C = 7.4 Mpa ( K 100 ), slump ( 3 - 6 ) CM, W/C = 0.87
6.5 MEMBUAT 1 M3 BETON MUTU f'C = 14.5 Mpa ( K 175 ), slump ( 12 2 ) CM, W/C = 0.66
6.6 MEMBUAT 1 M3 BETON MUTU f'C = 16.9 Mpa ( K 200 ), slump ( 12 2 ) CM, W/C = 0.61
6.7 MEMBUAT 1 M3 BETON MUTU f'C = 19.3 Mpa ( K 225 ), slump ( 12 2 ) CM, W/C = 0.58
6.8 MEMBUAT 1 M3 BETON MUTU f'C = 21.7 Mpa ( K 250 ), slump ( 12 2 ) CM, W/C = 0.56
6.9 MEMBUAT 1 M3 BETON MUTU f'C = 24 Mpa ( K 275 ), slump ( 12 2 ) CM, W/C = 0.53
6.1 MEMBUAT 1 M3 BETON MUTU f'C = 26.4 Mpa ( K 300 ), slump ( 12 2 ) CM, W/C = 0.52
6.11 MEMBUAT 1 M3 BETON MUTU f'C = 28.8 Mpa ( K 325 ), slump ( 12 2 ) CM, W/C = 0.49
6.12 MEMBUAT 1 M3 BETON MUTU f'C = 31.2 Mpa ( K 350 ), slump ( 12 2 ) CM, W/C = 0.48
6.17 PEMBESIAN 10 KG DENGAN BESI POLOS ATAU BESI ULIR ( jadi 1 kg )
6.18 MEMASANG 10 KG KABEL PRESSTRESSED POLOS / STRANDS ( jadi 1 kg )
6.19 MEMASANG 10 KG JARING KAWAT BAJA/WIRE MESH
6.2 MEMASANG 1 M2 BEKISTING UNTUK PONDASI
6.21 MEMASANG 1 M2 BEKISTING UNTUK SLOOF
6.22 MEMASANG 1 M2 BEKISTING UNTUK KOLOM
6.23 MEMASANG 1 M2 BEKISTING UNTUK BALOK
6.24 MEMASANG 1 M2 BEKISTING UNTUK LANTAI
6.25 MEMASANG 1 M2 PASANG BEKISTING UNTUK DINDING
AWAL

IDR 949,495.00 IDR 949,495.00


IDR 202,100.00 IDR 202,100.00
IDR 17,500.00 IDR 17,500.00
IDR 716,650.00 IDR 716,650.00
IDR 671,650.00 IDR 671,650.00

IDR 78,750.00 IDR 78,750.00


IDR 96,750.00 IDR 96,750.00
IDR 104,800.00 IDR 104,800.00
IDR 159,000.00 IDR 159,000.00
IDR 126,750.00 IDR 126,750.00
IDR 5,750.00 IDR 5,750.00
IDR 34,500.00 IDR 34,500.00
IDR 26,250.00 IDR 26,250.00
IDR 57,500.00 IDR 57,500.00
IDR 211,500.00 IDR 211,500.00
IDR 161,250.00 IDR 161,250.00
IDR 316,750.00 IDR 316,750.00

IDR 1,102,750.00 IDR 1,102,750.00


IDR 1,026,600.00 IDR 1,026,600.00
IDR 973,830.00 IDR 973,830.00
IDR 936,720.00 IDR 936,720.00
IDR 885,880.00 IDR 885,880.00
IDR 522,375.00 IDR 522,375.00

IDR 160,602.50 IDR 160,602.50


IDR 151,195.50 IDR 151,195.50
IDR 145,685.00 IDR 145,685.00
IDR 142,212.00 IDR 142,212.00
IDR 140,168.00 IDR 140,168.00

IDR 88,228.60 IDR 88,228.60


IDR 77,756.60 IDR 77,756.60
IDR 73,153.40 IDR 73,153.40
IDR 70,071.00 IDR 70,071.00
IDR 68,240.60 IDR 68,240.60
IDR 66,809.40 IDR 66,809.40
IDR 63,535.00 IDR 63,535.00
IDR 77,405.00 IDR 77,405.00
IDR 73,270.50 IDR 73,270.50
IDR 55,608.00 IDR 55,608.00
IDR 67,646.00 IDR 67,646.00
IDR 41,237.50 IDR 41,237.50

IDR 42,007,500.00 IDR 42,007,500.00


IDR 15,017,500.00 IDR 15,017,500.00
IDR 613,075.00 IDR 613,075.00
IDR 668,000.00 IDR 668,000.00
IDR 3,070,000.00 IDR 3,070,000.00
IDR 752,900.00 IDR 752,900.00
IDR 808,500.00 IDR 808,500.00

IDR 708,388.00 IDR 708,388.00

IDR 1,036,750.00 IDR 1,036,750.00


IDR 1,518,900.00 IDR 1,518,900.00
IDR 859,675.00 IDR 859,675.00
IDR 18,973,000.00 IDR 18,973,000.00
IDR 45,796,000.00 IDR 45,796,000.00
IDR 18,111,000.00 IDR 18,111,000.00
IDR 1,611,000.00 IDR 1,611,000.00
IDR 277,000.00 IDR 277,000.00
IDR 225,500.00 IDR 225,500.00
IDR 15,500.00 IDR 15,500.00
IDR 51,500.00 IDR 51,500.00
IDR 313,000.00 IDR 313,000.00
IDR 101,750.00 IDR 101,750.00
IDR 224,500.00 IDR 224,500.00
IDR 230,250.00 IDR 230,250.00
IDR 158,050.00 IDR 158,050.00
IDR 158,750.00 IDR 158,750.00
IDR 358,075.00 IDR 358,075.00
IDR 478,515.00 IDR 478,515.00
IDR 579,135.00 IDR 579,135.00
IDR 662,275.00 IDR 662,275.00

IDR 1,156,930.00 IDR 949,084.64


IDR 1,211,533.70 IDR 1,007,172.34
IDR 1,254,696.67 IDR 1,053,234.64
IDR 1,065,342.59 IDR 851,892.46
IDR 1,304,932.78 IDR 1,106,822.73
IDR 1,354,342.96 IDR 1,159,443.37
IDR 1,390,024.44 IDR 1,197,354.88
IDR 1,414,933.70 IDR 1,223,800.91
IDR 1,457,730.00 IDR 1,268,888.21
IDR 1,467,367.04 IDR 1,279,397.34
IDR 1,474,802.22 IDR 1,394,010.43
IDR 1,492,868.89 IDR 1,412,430.67
IDR 21,212.50 IDR 21,212.50
IDR 33,122.50 IDR 33,122.50
IDR 39,410.00 IDR 39,410.00
IDR 126,050.00 IDR 126,050.00
IDR 129,300.00 IDR 129,300.00
IDR 303,525.00 IDR 303,525.00
IDR 315,525.00 IDR 315,525.00
IDR 375,525.00 IDR 375,525.00
IDR 340,075.00 IDR 340,975.00
PENJUMLAHAN TOTAL
DAFTAR NO. 1 : PEKERJAAN PERSIAPAN, PRASARANA
DAN PENUNJANG
SUB TOTAL I
DAFTAR NO. 2 : PEKERJAAN PONDASI
DAFTAR NO. 3 : PEKERJAAN TANAH
DAFTAR NO. 4 : PEKERJAAN BETON BERTULANG
DAFTAR NO. 5 : PEKERJAAN ATAP
DAFTAR NO. 6 : PEKERJAAN DINDING DAN PELAPIS DINDING
DAFTAR NO. 7 : PEKERJAAN KOSEN PINTU, JENDELA DAN PARTISI
DAFTAR NO. 8 : PEKERJAAN PELAPIS LANTAI DAN WATER PROOFING
DAFTAR NO. 9 : PEKERJAAN PLAFOND
DAFTAR NO. 10 : PEKERJAAN CAT
DAFTAR NO. 11 : PEKERJAAN SANITARY
SUB TOTAL II
DAFTAR NO. 13 PEKERJAAN MEKANIKAL DAN ELE
DAFTAR NO. 13.1 : PEKERJAAN PLUMBING
DAFTAR NO. 13.2 : PEKERJAAN ELEKTRIKAL
DAFTAR NO. 13.3 : PEKERJAAN PENANGKAL PETIR
DAFTAR NO. 13.4 PEKERJAAN ELEKTRONIK
DAFTAR NO. 13.4.1 : PEKERJAAN TELEPON
DAFTAR NO. 13.4.2 : PEKERJAAN SOUND SYSTEM
DAFTAR NO. 13.4.3 : PEKERJAAN FIRE ALARM & FIRE EXTINGUISHER
DAFTAR NO. 13.4.4 : PEKERJAAN MA TV DAN INSTALASI KABEL DATA
DAFTAR NO. 13.5 : PEKERJAAN TATA UDARA ( AC & EXHAUST FAN )
DAFTAR NO. 13.6 : PEKERJAAN HYDRANT & SPRINGKLER
DAFTAR NO. 13.7 : PEKERJAAN PENGADAAN LIFT
DAFTAR NO. 13.8 PEKERJAAN MEKANIKAL DAN ELE
DAFTAR NO. 13.9.1 : PEKERJAAN ELEKTRIKAL
DAFTAR NO. 13.9.2 : PEKERJAAN PLUMBING
DAFTAR NO. 13.9.3 : PEKERJAAN HYDRANT
SUB TOTAL III
DAFTAR NO. 14 : PEKERJAAN SELASAR PENGHUBUNG
SUB TOTAL IV
=============================================================
TOTAL I :
DIBULATKAN :
Terbilang : " Enam Puluh Milyar Rupia
Rp. IDR 337,760,000.00 IDR 337,760,000.00

SUB TOTAL I IDR 337,760,000.00 IDR 337,760,000.00


Rp. IDR 3,945,343,154.47 IDR 3,876,106,340.88
Rp. IDR 117,680,400.83 IDR 114,842,792.36
Rp. IDR 20,802,936,699.07 IDR 19,362,768,139.17
Rp. IDR 1,171,407,686.59 IDR 1,171,409,124.00
Rp. IDR 9,742,685,571.81 IDR 9,742,667,672.42
Rp. IDR 1,117,160,108.28 IDR 1,117,160,108.56
Rp. IDR 6,450,424,287.01 IDR 6,335,739,175.84
Rp. IDR 1,526,451,665.00 IDR 1,526,451,665.00
Rp. IDR 1,024,568,915.15 IDR 1,024,569,247.26
Rp. IDR 870,199,084.79 IDR 839,515,691.00
SUB TOTAL II IDR 47,444,377,572.99 IDR 45,111,229,956.50
JAAN MEKANIKAL DAN ELEKTRIKAL
Rp. IDR 863,887,672.41 IDR 863,887,671.13
Rp. IDR 540,932,559.20 IDR 540,932,559.20
Rp. IDR 49,660,000.00 IDR 49,660,000.00
JAAN ELEKTRONIK
Rp. IDR 265,753,950.00 IDR 265,753,950.00
Rp. IDR 187,175,327.00 IDR 187,175,327.00
Rp. IDR 279,986,822.00 IDR 279,986,822.00
Rp. IDR 116,672,600.00 IDR 116,672,600.00
Rp. IDR 605,552,810.26 IDR 605,552,810.26
Rp. IDR 341,431,352.96 IDR 341,431,353.97
Rp. IDR 5,262,000,000.00 IDR 5,262,000,000.00
JAAN MEKANIKAL DAN ELEKTRIKAL SITE PLAN
Rp. IDR 2,730,463,447.00 IDR 2,730,463,447.00
Rp. IDR 391,022,630.49 IDR 391,022,630.58
Rp. IDR 2,051,342,038.66 IDR 2,051,342,049.99
SUB TOTAL III IDR 13,685,881,209.98 IDR 13,685,881,221.13
Rp. IDR 865,254,665.15 IDR 865,232,778.64
SUB TOTAL IV IDR 865,254,665.15 IDR 865,232,778.64
===========================
Rp. IDR 62,333,273,448.12 IDR 60,000,103,956.27
Rp. IDR 60,000,000,000.00 IDR 60,000,000,000.00
" Enam Puluh Milyar Rupiah "