Anda di halaman 1dari 16

KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT

DIREKTORAT JENDERAL BINA MARGA


BALAI PELAKSANAAN JALAN NASIONAL SULAWESI TENGGARA
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WIL I SULTRA
PPK 1.3 PROV. SULAWESI TENGGARA

REKAPITULASI LAPORAN KEMAJUAN PEKERJAAN


NAMA PAKET : PRESERVASI JALAN POMALAA - WOLULU
RUAS : POMALAA - WOLULU
KONTRAKTOR : PT. LINCE ROMAULI RAYA - PT. AGUNG SARANA PERSADA (KSO)
NO. KONTRAK : HK 0201-Bb21.1.3/286, Tanggal 17 Mei 2022
KONSULTAN : PT.UMUM
KEMENTERIAN PEKERJAAN TRIBINA MATRA CARYA
DAN PERUMAHAN RAKYAT CIPTA KSO PT. WINSOLUSI KONSULTAN -
PT. ARISTA CIPTA
DIREKTORAT JENDERAL BINA MARGA
BALAI PELAKSANAAN JALAN NASIONAL SULAWESI TENGGARA
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WIL I SULTRA
REALISASI
PPK 1.3 PROV. KEMAJUAN
PEKERJAAN MINGGU KE 63 (26 Agustus - 01 September 2023)
SULAWESI TENGGARA
BOBOT (%)
NO. OUTPUT PEKERJAAN
RENCANA REALISASI DEVIASI
I KONTRAK INDUK GABUNGAN 73.917 70.165 -3.752

1. PELEBARAN JALAN 73.997 70.084 -3.914

2. PEMELIHARAAN JALAN 67.350 76.117 8.767

3. PEMELIHARAAN JEMBATAN 76.329 71.629 -4.700

II KONTRAK TAHUN 2023 61.109 60.627 -0.481

1. PELEBARAN JALAN 61.313 62.726 1.413

2. PEMELIHARAAN JALAN 40.548 93.736 53.188

3. PEMELIHARAAN JEMBATAN 66.900 80.628 13.728

Disetujui Diperiksa Disiapkan


Direksi PUPR Konsultan Supervisi Kontraktor
PPK 1.3 Provinsi Sulawesi Tenggara PT. TRIBINA MATRA CARYA CIPTA KSO PT. WINSOLUSI PT. LINCE ROMAULI RAYA - PT.
KONSULTAN - PT. ARISTA CIPTA AGUNG SARANA PERSADA (KSO)

DOLLY HUMADA SIREGAR, ST Ir. MUHAMMAD IDRIS RAZAK RISKY KURNIAWAN, ST


NIP. : 19760106 201410 1 001 Supervision Engineer Manager Proyek
PROGRES BULAN SEPTEMBER 2023
NAMA PAKET : PRESERVASI JALAN POMALAA - WOLULU 16
RUAS : POMALAA - WOLULU
KONTRAKTOR : PT. LINCE ROMAULI RAYA - PT. AGUNG SARANA PERSADA (KSO) MINGGU KE : 63
KONSULTAN : PT. TRIBINA MATRA CARYA CIPTA KSO PT. WINSOLUSI KONSULTAN - PT. ARISTA CIPTA Periode : 26 Agustus - 01 September 2023
NO. KONTRAK : HK 0201-Bb21.1.3/286, Tanggal 17 Mei 2022

PRESTASI
HARGA JUMLAH
No. VOLUME BOBOT KUANTITAS BOBOT ( % )
URAIAN SAT JUMLAH
Item ADD-06 SATUAN HARGA ( %) S/D MINGGU MINGGU S/D MINGGU S/D MINGGU MINGGU S/D MINGGU
(Rp.) (Rp.) LALU INI INI LALU INI INI (Rp.)
1 2 3 4 5 6 7 8 9 10 11 12 13 14
15S/D BULAN 15BULAN 16INI 15INI
I DIVISI 1. UMUM
1.2 Mobilisasi Ls 1.00 500,000,000.00 500,000,000.00 0.4189 0.700 - 0.700 0.293 - 0.293 350,000,000.00
1.80 Manajemen dan Keselamatan Lalu Lintas Ls 1.00 100,000,000.00 100,000,000.00 0.0838 0.607 0.010 0.617 0.051 0.001 0.052 61,736,842.11
1.17 Pengamanan Lingkungan Hidup
1.17.(1a) Pengujian pH Buah 9.00 70,000.00 630,000.00 0.0005 6.000 - 6.000 0.000 - 0.000 420,000.00
1.17.(1b) Pengujian Oksigen Terlarut (DO) Buah 9.00 100,000.00 900,000.00 0.0008 6.000 - 6.000 0.001 - 0.001 600,000.00
1.17.(1c) Pengujian Zat Padat Terlarut (TDS) Buah 9.00 150,000.00 1,350,000.00 0.0011 6.000 - 6.000 0.001 - 0.001 900,000.00
1.17.(1d) Pengujian Zat Tersuspensi (TSS) Buah 9.00 100,000.00 900,000.00 0.0008 6.000 - 6.000 0.001 - 0.001 600,000.00
1.17.(1e) Pengujian Biological Oxygen Demand (BOD) Buah 9.00 140,000.00 1,260,000.00 0.0011 6.000 - 6.000 0.001 - 0.001 840,000.00
1.17.(1f) Pengujian Chemical Oxygen Demand (COD) Buah 9.00 140,000.00 1,260,000.00 0.0011 6.000 - 6.000 0.001 - 0.001 840,000.00
1.17.(2c) Pengujian Parameter Kebisingan dan/atau Getaran Lainnya ……… Buah 9.00 140,000.00 1,260,000.00 0.0011 6.000 - 6.000 0.001 - 0.001 840,000.00
1.17.(3b) Pengujian Sulfurdioksida (SO2) Buah 9.00 200,000.00 1,800,000.00 0.0015 6.000 - 6.000 0.001 - 0.001 1,200,000.00
1.17.(3f) Pengujian Total Partikulat (TSP) - Debu Buah 9.00 125,000.00 1,125,000.00 0.0009 6.000 - 6.000 0.001 - 0.001 750,000.00
1.19 Keselamatan dan Kesehatan Kerja
1.00 1. Penyiapan RKK Buah 1.00 3,000,000.00 3,000,000.00 0.0025 1.000 - 1.000 0.003 - 0.003 3,000,000.00
2.00 2. Sosialisasi dan Promosi Dan Pelatihan Buah 1.00 5,000,000.00 5,000,000.00 0.0042 - - - - - - -
3.00 3. Alat Pelindung Kerja (APK) dan Alat Pelindung Diri (APD) Buah 1.00 35,000,000.00 35,000,000.00 0.0293 0.532 0.007 0.538 0.016 0.000 0.016 18,845,171.16
4.00 4. Asuransi dan Perizinan Buah 1.00 20,000,000.00 20,000,000.00 0.0168 1.000 - 1.000 0.017 - 0.017 20,000,000.00
5.00 5. Personel K3 Konstruksi Buah 1.00 99,000,000.00 99,000,000.00 0.0829 0.513 0.007 0.520 0.043 0.001 0.043 51,469,014.13
6.00 6. Fasilitas sarana kesehatan Buah 1.00 15,000,000.00 15,000,000.00 0.0126 - - - - - - -
7.00 7. Rambu-rambu terdiri atas Buah 1.00 22,727,272.73 22,727,272.73 0.0190 0.544 0.006 0.550 0.010 0.000 0.010 12,504,284.88
8.00 8. Konsultasi dengan Ahli Terkait Keselamatan Konstruksi Buah 1.00 15,000,000.00 15,000,000.00 0.0126 - - - - - - -
9.00 9. Lain-lain terkait pengendalian risiko K3 Buah 1.00 5,000,000.00 5,000,000.00 0.0042 - - - - - - -
1.21 Manajemen Mutu Ls 1.00 200,000,000.00 200,000,000.00 0.1676 0.623 0.010 0.633 0.104 0.002 0.106 126,500,000.00
Sub Total ( 1 ) 1,030,212,272.73 0.8631 0.542 0.003 0.545 651,045,312.28
II DIVISI 2. DRAINASE 16,774.000 459.000 17,233.000
2.1.(1) Galian untuk Selokan Drainase dan Saluran Air M3 11,009.65 25,000.00 275,241,150.00 0.2306 9,091.508 248.778 9,340.286 0.190 0.005 0.196 233,507,150.00
2.2.(1) Pasangan Batu dengan Mortar M3 8,363.10 700,000.00 5,854,170,000.00 4.9047 6,178.193 209.763 6,387.956 3.623 0.123 3.746 4,471,569,207.00
2.3.(15) Gorong-gorong Kotak Beton Bertulang, ukuran dalam 100 cm x 100 cm M1 134.40 4,275,906.49 574,681,832.26 0.4815 78.000 18.000 96.000 0.279 0.064 0.344 410,487,023.04
2.3.(18) Gorong-gorong Kotak Beton Bertulang, ukuran dalam 150 cm x 150 cm M1 354.00 7,268,205.12 2,572,944,612.48 2.1556 331.200 - 331.200 2.017 - 2.017 2,407,229,535.74
2.3.(20) Gorong-gorong Kotak Beton Bertulang, ukuran dalam 250 cm x 250 cm M1 13.20 42,718,794.10 563,888,082.12 0.4724 13.200 13.200 26.400 0.472 0.472 0.945 1,127,776,164.24
2.3.(22) Saluran berbentuk U Tipe DS 1 (precast) M1 5,575.00 1,250,000.00 6,968,750,000.00 5.8385 4,512.000 121.000 4,633.000 4.725 0.127 4.852 5,791,250,000.00
Sub Total ( 2 ) 16,809,675,676.86 14.0833 11.308 0.792 12.100 14,441,819,080.02
III DIVISI 3. PEKERJAAN TANAH DAN GEOSINTETIK -
3.1.(1a) Galian Biasa M3 94,032.95 16,000.00 1,504,527,200.00 1.2605 59,409.191 346.500 59,755.691 0.796 0.005 0.801 956,091,060.27
3.2.(2a) Timbunan Pilihan dari Sumber Galian M3 15,331.32 100,000.00 1,533,132,000.00 1.2845 12,947.429 - 12,947.429 1.085 - 1.085 1,294,742,935.90
3.3.(1) Penyiapan Badan Jalan M2 88,172.79 5,000.00 440,863,950.00 0.3694 60,032.660 936.486 60,969.146 0.251 0.004 0.255 304,845,729.95
3.4.(2) Pemotongan Pohon Pilihan diameter 15 – 30 cm Buah 147.00 39,983.05 5,877,508.35 0.0049 140.000 24.000 164.000 0.005 0.001 0.005 6,557,220.20
3.4.(3) Pemotongan Pohon Pilihan diameter > 30 – 50 cm Buah 218.00 61,536.34 13,414,922.12 0.0112 60.000 - 60.000 0.003 - 0.003 3,692,180.40
3.4.(4) Pemotongan Pohon Pilihan diameter > 50 – 75 cm Buah 390.00 112,032.53 43,692,686.70 0.0366 226.000 14.000 240.000 0.021 0.001 0.023 26,887,807.20
3.4.(5) Pemotongan Pohon Pilihan diameter > 75 cm Buah 78.00 233,248.73 18,193,400.94 0.0152 52.000 3.000 55.000 0.010 0.001 0.011 12,828,680.15
Sub Total ( 3 ) 3,559,701,668.11 2.9824 2.172 0.011 2.183 2,605,645,614.07

2 / 16
PRESTASI
HARGA JUMLAH
No. VOLUME BOBOT KUANTITAS BOBOT ( % )
URAIAN SAT JUMLAH
Item ADD-06 SATUAN HARGA ( %) S/D MINGGU MINGGU S/D MINGGU S/D MINGGU MINGGU S/D MINGGU
(Rp.) (Rp.) LALU INI INI LALU INI INI (Rp.)
1 2 3 4 5 6 7 8 9 10 11 12 13 14
V DIVISI 5. PERKERASAN BERBUTIR DAN PERKERASAN BETON SEMEN #REF! #REF!
5.1.(1) Lapis Fondasi Agregat Kelas A M3 24,285.05 600,000.00 14,571,030,816.00 12.2078 20,780.500 627.300 21,407.800 10.446 0.315 10.761 12,844,680,000.00
5.1.(3a) Lapis Fondasi Agregat Kelas S M3 15,031.93 250,000.00 3,757,982,500.00 3.1485 5,191.410 - 5,191.410 1.087 - 1.087 1,297,852,500.00
Sub Total ( 5 ) 18,329,013,316.00 15.3562 11.533 0.315 11.849 14,142,532,500.00
VI DIVISI 6. PERKERASAN ASPAL
6.1 (1)(a) Lapis Resap Pengikat - Aspal Cair Liter 65,866.87 15,000.00 988,003,079.40 0.8278 48,149.240 3,466.068 51,615.308 0.605 0.044 0.649 774,229,618.29
6.1 (2)(a) Lapis Perekat - Aspal Cair Liter 68,220.25 13,000.00 886,863,250.00 0.7430 46,398.153 1,956.098 48,354.251 0.505 0.021 0.527 628,605,259.94
6.3.(8) Bahan anti pengelupasan Kg 3,983.28 75,000.00 298,745,827.03 0.2503 2,177.594 107.460 2,285.055 0.137 0.007 0.144 171,379,099.29
6.5.(1b) Laston Lapis Aus Asbuton Butir (AC-WC Asb Butir) Ton 22,538.67 1,425,000.00 32,117,602,968.75 26.9085 18,285.566 639.644 18,925.210 21.831 0.764 22.594 26,968,424,250.00
6.5.(2b) Laston Lapis Antara Asbuton Butir (AC-BC Asb Butir) Ton 12,814.17 1,350,000.00 17,299,127,228.88 14.4934 10,254.050 694.210 10,948.260 11.598 0.785 12.383 14,780,151,000.00

Sub Total ( 6 ) 51,590,342,354.06 43.2229 34.676 1.620 36.296 43,322,789,227.52


VII DIVISI 7. STRUKTUR
7.1 (5a) Beton struktur, fc’30 Mpa (Kubus 60 x 60 x 60) M3 438.48 3,557,765.22 1,560,008,893.67 1.3070 - - - - - - -
7.1 (6a) Beton struktur, fc’25 Mpa (untuk penutup saluran) M3 576.00 1,700,000.00 979,200,000.00 0.8204 - - - - - - -
7.1 (7a) Beton struktur, fc’20 MPa (untuk bahu diperkeras) M3 2,654.17 1,125,000.00 2,985,941,250.00 2.5017 - - - - - - -
7.1 (7d) Beton struktur, fc’20 Mpa (untuk pengaman pantai) M3 583.60 3,494,109.91 2,039,177,917.56 1.7084 - - - - - - -
7.1 (9) Beton Siklop, fc’15 Mpa (untuk pengaman pantai) M3 133.93 893,667.17 119,688,844.08 0.1003 - - - - - - -
7.1 (10) Beton, fc’10 Mpa M3 - 1,100,000.00 - - - - - - - - -
7.3 (1) Baja Tulangan Polos-BjTP 280 Kg 82,775.89 19,000.00 1,572,741,910.00 1.3177 - - - - - - -
7.3 (3) Baja Tulangan Ulir-BjTS 420 A Kg 27,677.40 20,934.10 579,401,459.34 0.4854 - - - - - - -
7.9.(1) Pasangan Batu M3 14,773.75 650,000.00 9,602,935,415.14 8.0454 9,984.678 462.120 10,446.798 5.437 0.252 5.689 6,790,418,700.00
7.10.(3a) Bronjong dengan kawat yang dilapisi Galvanis M3 500.00 725,000.00 362,500,000.00 0.3037 - - - - - - -
7.15.(1) Pembongkaran Pasangan Batu M3 869.00 304,690.52 264,776,061.88 0.2218 709.190 116.100 825.290 0.181 0.030 0.211 251,458,039.25
7.15.(2) Pembongkaran Beton M3 94.73 316,550.08 29,986,789.08 0.0251 40.620 12.000 52.620 0.011 0.003 0.014 16,656,865.21
Sub Total ( 7 ) 20,096,358,540.74 16.8369 5.629 0.284 5.914 7,058,533,604.46

IX DIVISI 9. PEKERJAAN HARIAN & PEKERJAAN LAIN-LAIN


9.1 Pekerjaan Harian
9.1.(2) Pekerja Biasa Jam 84.00 18,750.00 1,575,000.00 0.0013 - - - - - - -
9.1.(4) a Dump Truck, kapasitas 3 - 4 m³ Jam 84.00 200,000.00 16,800,000.00 0.0141 - - - - - - -
9.1.(6) Truk Tangki 3000 - 4500 Liter Jam 84.00 200,000.00 16,800,000.00 0.0141 - - - - - - -
9.1.(8) Motor Grader min 100 PK Jam 126.00 200,000.00 25,200,000.00 0.0211 5.000 - 5.000 0.001 - 0.001 1,000,000.00
9.1.(9) Loader Roda Karet 1.0 - 1.6 M3 Jam 126.00 200,000.00 25,200,000.00 0.0211 - - - - - - -
9.1.(13) Penggilas Roda Besi 6 - 9 Ton Jam 84.00 200,000.00 16,800,000.00 0.0141 5.000 - 5.000 0.001 - 0.001 1,000,000.00
9.2 Pekerjaan Lain-Lain
9.2.(1) Marka Jalan Termoplastik M2 12,284.04 120,000.00 1,474,084,800.00 1.2350 1,211.320 - 1,211.320 0.122 - 0.122 145,358,400.00
9.2.(3a) Rambu Jalan Tunggal dengan Permukaan Pemantul Engineering Grad Buah 144.00 450,000.00 64,800,000.00 0.0543 - - - - - - -
9.2.(5) Patok Pengarah, material Poly Ethylene (PE) Plastik murni/elastis Buah 1,490.00 300,000.00 447,000,000.00 0.3745 - - - - - - -
9.2.(6a) Patok Kilometer Buah 32.00 350,000.00 11,200,000.00 0.0094 - - - - - - -
9.2.(7) Rel Pengaman M1 4,072.80 850,000.00 3,461,880,000.00 2.9004 - - - - - - -
9.2(10a) Kerb Pracetak Jenis 1 (Peninggi/Mountable) M1 2,000.00 115,000.00 230,000,000.00 0.1927 - - - - - - -
9.2.(12a) Perkerasan Blok Beton pada Trotoar dan Median M2 2,400.00 135,000.00 324,000,000.00 0.2715 - - - - - - -
Sub Total ( 9 ) 6,115,339,800.00 5.1235 0.123 - 0.123 147,358,400.00

3 / 16
PRESTASI
HARGA JUMLAH
No. VOLUME BOBOT KUANTITAS BOBOT ( % )
URAIAN SAT JUMLAH
Item ADD-06 SATUAN HARGA ( %) S/D MINGGU MINGGU S/D MINGGU S/D MINGGU MINGGU S/D MINGGU
(Rp.) (Rp.) LALU INI INI LALU INI INI (Rp.)
1 2 3 4 5 6 7 8 9 10 11 12 13 14
X DIVISI10. PEKERJAAN PEMELIHARAAN
10.1 Pemeliharaan Jalan
10.1.(3) Perbaikan Pasangan Batu dengan Mortar M3 280.76 1,270,455.74 356,687,180.87 0.2988 - - - - - - -
10.1.(4) Perbaikan Lapis Fondasi Agregat Kelas A M3 130.61 600,000.00 78,366,000.00 0.0657 131.400 - 131.400 0.066 - 0.066 78,840,000.00
10.1.(10a) Perbaikan Campuran Aspal Panas dengan Asbuton M3 201.26 2,900,000.00 583,654,000.00 0.4890 214.095 - 214.095 0.520 - 0.520 620,874,129.18
10.1.(10b) Perbaikan Campuran Aspal Panas dengan Asbuton M3 29.80 3,200,000.00 95,359,994.13 0.0799 22.000 - 22.000 0.059 - 0.059 70,400,000.00
10.1.(21) Pembersihan Drainase dan Saluran Samping M1 29,383.09 5,500.00 161,606,995.00 0.1354 28,033.700 1,120.000 29,153.700 0.129 0.005 0.134 160,345,350.00
10.1.(22) Pengendalian Tanaman M2 519,937.66 500.00 259,968,830.00 0.2178 476,836.800 - 476,836.800 0.200 - 0.200 238,418,400.00
10.2 Pemeliharaan Jembatan
10.2.(1) Pemeliharaan Jembatan S SOPURA BOX Bentang 7 m LS 1.00 5,000,000.00 5,000,000.00 0.0042 0.645 0.071 0.716 0.003 0.000 0.003 3,581,428.57
10.2.(2) Pemeliharaan Jembatan S.SOPURA Bentang 20.8 m LS 1.00 22,000,000.00 22,000,000.00 0.0184 0.645 0.071 0.716 0.012 0.001 0.013 15,758,285.71
10.2.(3) Pemeliharaan Jembatan S.OKO-OKO I Bentang 9.8 m LS 1.00 12,500,000.00 12,500,000.00 0.0105 0.645 0.071 0.716 0.007 0.001 0.008 8,953,571.43
10.2.(4) Pemeliharaan Jembatan S.Oko-Oko II Bentang 8.9 m LS 1.00 10,000,000.00 10,000,000.00 0.0084 0.645 0.071 0.716 0.005 0.001 0.006 7,162,857.14
10.2.(5) Pemeliharaan Jembatan S.Oko-Ok0 III Bentang 20.8 m LS 1.00 25,000,000.00 25,000,000.00 0.0209 0.645 0.071 0.716 0.014 0.001 0.015 17,907,142.86
10.2.(6) Pemeliharaan Jembatan S.Oko-Oko IV Bentang 9.8 m LS 1.00 10,000,000.00 10,000,000.00 0.0084 0.645 0.071 0.716 0.005 0.001 0.006 7,162,857.14
10.2.(7) Pemeliharaan Jembatan S.Oko-Oko V Bentang 9.7 m LS 1.00 12,000,000.00 12,000,000.00 0.0101 0.645 0.071 0.716 0.006 0.001 0.007 8,595,428.57
10.2.(8) Pemeliharaan Jembatan S.Oko-Oko VI Bentang 6.8 m LS 1.00 9,000,000.00 9,000,000.00 0.0075 0.645 0.071 0.716 0.005 0.001 0.005 6,446,571.43
10.2.(9) Pemeliharaan Jembatan S.Lamedai I Bentang 8.9 m LS 1.00 11,500,000.00 11,500,000.00 0.0096 0.645 0.071 0.716 0.006 0.001 0.007 8,237,285.71
10.2.(10) Pemeliharaan Jembatan S.Lamedai II Bentang 8.9 m LS 1.00 11,500,000.00 11,500,000.00 0.0096 0.645 0.071 0.716 0.006 0.001 0.007 8,237,285.71
10.2.(11) Pemeliharaan Jembatan S.Box Tanggetada Bentang 6.9 m LS 1.00 6,000,000.00 6,000,000.00 0.0050 0.645 0.071 0.716 0.003 0.000 0.004 4,297,714.29
10.2.(12) Pemeliharaan Jembatan S.Tangketada Bentang 8.8 m LS 1.00 10,000,000.00 10,000,000.00 0.0084 0.645 0.071 0.716 0.005 0.001 0.006 7,162,857.14
10.2.(13) Pemeliharaan Jembatan S.Anaiwoi I Bentang 8.9 m LS 1.00 10,000,000.00 10,000,000.00 0.0084 0.645 0.071 0.716 0.005 0.001 0.006 7,162,857.14
10.2.(14) Pemeliharaan Jembatan S.Anaiwoi II Bentang 15.8 m LS 1.00 12,000,000.00 12,000,000.00 0.0101 0.645 0.071 0.716 0.006 0.001 0.007 8,595,428.57
10.2.(15) Pemeliharaan Jembatan S.Oneha I Bentang 10.3 m LS 1.00 10,000,000.00 10,000,000.00 0.0084 0.645 0.071 0.716 0.005 0.001 0.006 7,162,857.14
10.2.(16) Pemeliharaan Jembatan S.Oneha II Bentang 9.2 m LS 1.00 10,000,000.00 10,000,000.00 0.0084 0.645 0.071 0.716 0.005 0.001 0.006 7,162,857.14
10.2.(17) Pemeliharaan Jembatan S.Oneha III Bentang 8.7 m LS 1.00 10,000,000.00 10,000,000.00 0.0084 0.645 0.071 0.716 0.005 0.001 0.006 7,162,857.14
10.2.(18) Pemeliharaan Jembatan S.Oneha IV Bentang 12.8 m LS 1.00 13,000,000.00 13,000,000.00 0.0109 0.645 0.071 0.716 0.007 0.001 0.008 9,311,714.29
10.2.(19) Pemeliharaan Jembatan S.Oneha V Bentang 10.9 m LS 1.00 13,000,000.00 13,000,000.00 0.0109 0.645 0.071 0.716 0.007 0.001 0.008 9,311,714.29
10.2.(20) Pemeliharaan Jembatan S.Toengge Bentang 31.2 m LS 1.00 30,000,000.00 30,000,000.00 0.0251 0.645 0.071 0.716 0.016 0.002 0.018 21,488,571.43
10.2.(21) Pemeliharaan Jembatan S.Polewali Bentang 11 m LS 1.00 10,000,000.00 10,000,000.00 0.0084 0.645 0.071 0.716 0.005 0.001 0.006 7,162,857.14
10.2.(22) Pemeliharaan Jembatan S.Wolulu Bentang 30.3 m LS 1.00 30,000,000.00 30,000,000.00 0.0251 0.645 0.071 0.716 0.016 0.002 0.018 21,488,571.43
Sub Total ( 10 ) 1,828,143,000.00 1.5316 1.132 0.0226 1.155 1,378,391,450.61
TOTAL 119,358,786,628.49 100.000 PROGRESS REALISASI 67.116 3.049 70.165 83,748,115,188.96
Pajak Pertambahan Nilai (Ppn) 11% 13,129,466,529.13 PROGRESS RENCANA 72.682 1.236 73.917 9,212,292,670.79
TOTAL 132,488,253,157.63 DEVIASI (5.566) 1.814 (3.752) 92,960,407,859.74
DIBULATKAN 132,488,253,000.00 (1.814) 92,960,407,000.00

Disetujui Diperiksa Disiapkan


Direksi PUPR Konsultan Supervisi Kontraktor
PPK 1.3 Provinsi Sulawesi Tenggara PT. TRIBINA MATRA CARYA CIPTA KSO PT. WINSOLUSI PT. LINCE ROMAULI RAYA - PT.
KONSULTAN - PT. ARISTA CIPTA AGUNG SARANA PERSADA (KSO)

DOLLY HUMADA SIREGAR, ST Ir. MUHAMMAD IDRIS RAZAK RISKY KURNIAWAN, ST


NIP. : 19760106 201410 1 001 Supervision Engineer Manager Proyek

4 / 16
PROGRES BULAN SEPTEMBER 2023
NAMA PAKET : PRESERVASI JALAN POMALAA - WOLULU 16
RUAS : POMALAA - WOLULU
KONTRAKTOR : PT. LINCE ROMAULI RAYA - PT. AGUNG SARANA PERSADA (KSO) MINGGU KE : 63
KONSULTAN : PT. TRIBINA MATRA CARYA CIPTA KSO PT. WINSOLUSI KONSULTAN - PT. ARISTA CIPTA Periode : 26 Agustus - 01 September 2023
NO. KONTRAK : HK 0201-Bb21.1.3/286, Tanggal 17 Mei 2022

PRESTASI
HARGA JUMLAH
No. VOLUME BOBOT KUANTITAS BOBOT ( % )
URAIAN SAT JUMLAH
Item ADD-02 SATUAN HARGA ( %) S/D MINGGU MINGGU S/D MINGGU S/D MINGGU MINGGU S/D MINGGU
(Rp.) (Rp.) LALU INI INI LALU INI INI (Rp.)
1 2 3 4 5 6 7 8 9 10 11 12 13 14
15S/D BULAN 15BULAN 16INI INI
I DIVISI 1. UMUM
1.2 Mobilisasi Ls 1.00 500,000,000.00 500,000,000.00 0.4254 0.700 - 0.700 0.298 - 0.298 350,000,000.00
1.80 Manajemen dan Keselamatan Lalu Lintas Ls 1.00 100,000,000.00 100,000,000.00 0.0851 0.607 0.010 0.617 0.052 0.001 0.053 61,736,842.11
1.17 Pengamanan Lingkungan Hidup
1.17.(1a) Pengujian pH Buah 9.00 70,000.00 630,000.00 0.0005 6.000 - 6.000 0.000 - 0.000 420,000.00
1.17.(1b) Pengujian Oksigen Terlarut (DO) Buah 9.00 100,000.00 900,000.00 0.0008 6.000 - 6.000 0.001 - 0.001 600,000.00
1.17.(1c) Pengujian Zat Padat Terlarut (TDS) Buah 9.00 150,000.00 1,350,000.00 0.0011 6.000 - 6.000 0.001 - 0.001 900,000.00
1.17.(1d) Pengujian Zat Tersuspensi (TSS) Buah 9.00 100,000.00 900,000.00 0.0008 6.000 - 6.000 0.001 - 0.001 600,000.00
1.17.(1e) Pengujian Biological Oxygen Demand (BOD) Buah 9.00 140,000.00 1,260,000.00 0.0011 6.000 - 6.000 0.001 - 0.001 840,000.00
1.17.(1f) Pengujian Chemical Oxygen Demand (COD) Buah 9.00 140,000.00 1,260,000.00 0.0011 6.000 - 6.000 0.001 - 0.001 840,000.00
1.17.(2c) Pengujian Parameter Kebisingan dan/atau Getaran Lainnya ……… Buah 9.00 140,000.00 1,260,000.00 0.0011 6.000 - 6.000 0.001 - 0.001 840,000.00
1.17.(3b) Pengujian Sulfurdioksida (SO2) Buah 9.00 200,000.00 1,800,000.00 0.0015 6.000 - 6.000 0.001 - 0.001 1,200,000.00
1.17.(3f) Pengujian Total Partikulat (TSP) - Debu Buah 9.00 125,000.00 1,125,000.00 0.0010 6.000 - 6.000 0.001 - 0.001 750,000.00
1.19 Keselamatan dan Kesehatan Kerja
1.00 1. Penyiapan RKK Buah 1.00 3,000,000.00 3,000,000.00 0.0026 1.000 - 1.000 0.003 - 0.003 3,000,000.00
2.00 2. Sosialisasi dan Promosi Dan Pelatihan Buah 1.00 5,000,000.00 5,000,000.00 0.0043 - - - - - - -
3.00 3. Alat Pelindung Kerja (APK) dan Alat Pelindung Diri (APD) Buah 1.00 35,000,000.00 35,000,000.00 0.0298 0.532 0.007 0.538 0.016 0.000 0.016 18,845,171.16
4.00 4. Asuransi dan Perizinan Buah 1.00 20,000,000.00 20,000,000.00 0.0170 1.000 - 1.000 0.017 - 0.017 20,000,000.00
5.00 5. Personel K3 Konstruksi Buah 1.00 99,000,000.00 99,000,000.00 0.0842 0.513 0.007 0.520 0.043 0.001 0.044 51,469,014.13
6.00 6. Fasilitas sarana kesehatan Buah 1.00 15,000,000.00 15,000,000.00 0.0128 - - - - - - -
7.00 7. Rambu-rambu terdiri atas Buah 1.00 22,727,272.73 22,727,272.73 0.0193 0.544 0.006 0.550 0.011 0.000 0.011 12,504,284.88
8.00 8. Konsultasi dengan Ahli Terkait Keselamatan Konstruksi Buah 1.00 15,000,000.00 15,000,000.00 0.0128 - - - - - - -
9.00 9. Lain-lain terkait pengendalian risiko K3 Buah 1.00 5,000,000.00 5,000,000.00 0.0043 - - - - - - -
1.21 Manajemen Mutu Ls 1.00 200,000,000.00 200,000,000.00 0.1702 0.623 0.010 0.633 0.106 0.002 0.108 126,500,000.00

Sub Total ( 1 ) 1,030,212,272.73 0.8765 0.550 0.003 0.554 651,045,312.28


II DIVISI 2. DRAINASE
2.1.(1) Galian untuk Selokan Drainase dan Saluran Air M3 11,009.65 25,000.00 275,241,150.00 0.2342 9,091.508 248.778 9,340.286 0.193 0.005 0.199 233,507,150.00
2.2.(1) Pasangan Batu dengan Mortar M3 8,363.10 700,000.00 5,854,170,000.00 4.9810 6,178.193 209.763 6,387.956 3.680 0.125 3.805 4,471,569,207.00
2.3.(15) Gorong-gorong Kotak Beton Bertulang, ukuran dalam 100 cm x 100 cm (precast M1 134.40 4,275,906.49 574,681,832.26 0.4890 78.000 18.000 96.000 0.284 0.065 0.349 410,487,023.04
2.3.(18) Gorong-gorong Kotak Beton Bertulang, ukuran dalam 150 cm x 150 cm (precast M1 354.00 7,268,205.12 2,572,944,612.48 2.1892 331.200 - 331.200 2.048 - 2.048 2,407,229,535.74
2.3.(20) Gorong-gorong Kotak Beton Bertulang, ukuran dalam 250 cm x 250 cm (precast M1 13.20 42,718,794.10 563,888,082.12 0.4798 13.200 13.200 26.400 0.480 0.480 0.960 1,127,776,164.24
2.3.(22) Saluran berbentuk U Tipe DS 1 (precast) M1 5,575.00 1,250,000.00 6,968,750,000.00 5.9293 4,512.000 121.000 4,633.000 4.799 0.129 4.927 5,791,250,000.00
Sub Total ( 2 ) 16,809,675,676.86 14.3024 11.484 0.804 12.288 14,441,819,080.02
III DIVISI 3. PEKERJAAN TANAH DAN GEOSINTETIK
3.1.(1a) Galian Biasa M3 94,032.95 16,000.00 1,504,527,200.00 1.2801 59,409.191 346.500 59,755.691 0.809 0.005 0.813 956,091,060.27
3.2.(2a) Timbunan Pilihan dari Sumber Galian M3 15,331.32 100,000.00 1,533,132,000.00 1.3045 12,947.429 - 12,947.429 1.102 - 1.102 1,294,742,935.90
3.3.(1) Penyiapan Badan Jalan M2 88,172.79 5,000.00 440,863,950.00 0.3751 60,032.660 936.486 60,969.146 0.255 0.004 0.259 304,845,729.95
3.4.(2) Pemotongan Pohon Pilihan diameter 15 – 30 cm Buah 147.00 39,983.05 5,877,508.35 0.0050 140.000 24.000 164.000 0.005 0.001 0.006 6,557,220.20
3.4.(3) Pemotongan Pohon Pilihan diameter > 30 – 50 cm Buah 218.00 61,536.34 13,414,922.12 0.0114 60.000 - 60.000 0.003 - 0.003 3,692,180.40
3.4.(4) Pemotongan Pohon Pilihan diameter > 50 – 75 cm Buah 390.00 112,032.53 43,692,686.70 0.0372 226.000 14.000 240.000 0.022 0.001 0.023 26,887,807.20
3.4.(5) Pemotongan Pohon Pilihan diameter > 75 cm Buah 78.00 233,248.73 18,193,400.94 0.0155 52.000 3.000 55.000 0.010 0.001 0.011 12,828,680.15
Sub Total ( 3 ) 3,559,701,668.11 3.0287 2.206 0.011 2.217 2,605,645,614.07

5 / 16
PRESTASI
HARGA JUMLAH
No. VOLUME BOBOT KUANTITAS BOBOT ( % )
URAIAN SAT JUMLAH
Item ADD-02 SATUAN HARGA ( %) S/D MINGGU MINGGU S/D MINGGU S/D MINGGU MINGGU S/D MINGGU
(Rp.) (Rp.) LALU INI INI LALU INI INI (Rp.)
1 2 3 4 5 6 7 8 9 10 11 12 13 14
V DIVISI 5. PERKERASAN BERBUTIR DAN PERKERASAN BETON SEMEN 1,100.000 #REF!
5.1.(1) Lapis Fondasi Agregat Kelas A M3 24,285.05 600,000.00 14,571,030,816.00 12.3976 20,780.500 627.300 21,407.800 10.609 0.320 10.929 12,844,680,000.00
5.1.(3a) Lapis Fondasi Agregat Kelas S M3 15,031.93 250,000.00 3,757,982,500.00 3.1974 5,191.410 - 5,191.410 1.104 - 1.104 1,297,852,500.00
Sub Total ( 5 ) 18,329,013,316.00 15.5951 11.713 0.320 12.033 14,142,532,500.00
VI DIVISI 6. PERKERASAN ASPAL
6.1 (1)(a) Lapis Resap Pengikat - Aspal Cair Liter 65,866.87 15,000.00 988,003,079.40 0.8406 48,149.240 3,466.068 51,615.308 0.615 0.044 0.659 774,229,618.29
6.1 (2)(a) Lapis Perekat - Aspal Cair Liter 68,220.25 13,000.00 886,863,250.00 0.7546 46,398.153 1,956.098 48,354.251 0.513 0.022 0.535 628,605,259.94
6.3.(8) Bahan anti pengelupasan Kg 3,983.28 75,000.00 298,745,827.03 0.2542 2,177.594 107.460 2,285.055 0.139 0.007 0.146 171,379,099.29
6.5.(1b) Laston Lapis Aus Asbuton Butir (AC-WC Asb Butir) Ton 22,538.67 1,425,000.00 32,117,602,968.75 27.3270 18,285.566 639.644 18,925.210 22.170 0.776 22.946 26,968,424,250.00
6.5.(2b) Laston Lapis Antara Asbuton Butir (AC-BC Asb Butir) Ton 12,814.17 1,350,000.00 17,299,127,228.88 14.7188 10,254.050 694.210 10,948.260 11.778 0.797 12.576 14,780,151,000.00
Sub Total ( 6 ) 51,590,342,354.06 43.8952 35.215 1.646 36.861 43,322,789,227.52
VII DIVISI 7. STRUKTUR
7.1 (5a) Beton struktur, fc’30 Mpa (Kubus 60 x 60 x 60) M3 438.48 3,557,765.22 1,560,008,893.67 1.3273 - - - - - - -
7.1 (6a) Beton struktur, fc’25 Mpa (untuk penutup saluran) M3 576.00 1,700,000.00 979,200,000.00 0.8331 - - - - - - -
7.1 (7a) Beton struktur, fc’20 MPa (untuk bahu diperkeras) M3 2,654.17 1,125,000.00 2,985,941,250.00 2.5406 - - - - - - -
7.1 (7d) Beton struktur, fc’20 Mpa (untuk pengaman pantai) M3 583.60 3,494,109.91 2,039,177,917.56 1.7350 - - - - - - -
7.1 (9) Beton Siklop, fc’15 Mpa (untuk pengaman pantai) M3 133.93 893,667.17 119,688,844.08 0.1018 - - - - - - -
7.1 (10) Beton, fc’10 Mpa M3 - 1,100,000.00 - - - - - - - - -
7.3 (1) Baja Tulangan Polos-BjTP 280 Kg 82,775.89 19,000.00 1,572,741,910.00 1.3382 - - - - - - -
7.3 (3) Baja Tulangan Ulir-BjTS 420 A Kg 27,677.40 20,934.10 579,401,459.34 0.4930 - - - - - - -
7.9.(1) Pasangan Batu M3 14,773.75 650,000.00 9,602,935,415.14 8.1706 9,984.678 462.120 10,446.798 5.522 0.256 5.778 6,790,418,700.00
7.10.(3a) Bronjong dengan kawat yang dilapisi Galvanis M3 500.00 725,000.00 362,500,000.00 0.3084 - - - - - - -
7.15.(1) Pembongkaran Pasangan Batu M3 869.00 304,690.52 264,776,061.88 0.2253 709.190 116.100 825.290 0.184 0.030 0.214 251,458,039.25
7.15.(2) Pembongkaran Beton M3 94.73 316,550.08 29,986,789.08 0.0255 40.620 12.000 52.620 0.011 0.003 0.014 16,656,865.21
Sub Total ( 7 ) 20,096,358,540.74 17.0988 5.717 0.289 6.006 7,058,533,604.46

6 / 16
PRESTASI
HARGA JUMLAH
No. VOLUME BOBOT KUANTITAS BOBOT ( % )
URAIAN SAT JUMLAH
Item ADD-02 SATUAN HARGA ( %) S/D MINGGU MINGGU S/D MINGGU S/D MINGGU MINGGU S/D MINGGU
(Rp.) (Rp.) LALU INI INI LALU INI INI (Rp.)
1 2 3 4 5 6 7 8 9 10 11 12 13 14
IX DIVISI 9. PEKERJAAN HARIAN & PEKERJAAN LAIN-LAIN
9.1 Pekerjaan Harian
9.1.(2) Pekerja Biasa Jam 84.00 18,750.00 1,575,000.00 0.0013 - - - - - - -
9.1.(4) a Dump Truck, kapasitas 3 - 4 m³ Jam 84.00 200,000.00 16,800,000.00 0.0143 - - - - - - -
9.1.(6) Truk Tangki 3000 - 4500 Liter Jam 84.00 200,000.00 16,800,000.00 0.0143 - - - - - - -
9.1.(8) Motor Grader min 100 PK Jam 126.00 200,000.00 25,200,000.00 0.0214 5.000 - 5.000 0.001 - 0.001 1,000,000.00
9.1.(9) Loader Roda Karet 1.0 - 1.6 M3 Jam 126.00 200,000.00 25,200,000.00 0.0214 - - - - - - -
9.1.(13) Penggilas Roda Besi 6 - 9 Ton Jam 84.00 200,000.00 16,800,000.00 0.0143 5.000 - 5.000 0.001 - 0.001 1,000,000.00
9.2 Pekerjaan Lain-Lain
9.2.(1) Marka Jalan Termoplastik M2 12,284.04 120,000.00 1,474,084,800.00 1.2542 1,211.320 - 1,211.320 0.124 - 0.124 145,358,400.00
9.2.(3a) Rambu Jalan Tunggal dengan Permukaan Pemantul Engineering Grade Buah 144.00 450,000.00 64,800,000.00 0.0551 - - - - - - -
9.2.(5) Patok Pengarah, material Poly Ethylene (PE) Plastik murni/elastis Buah 1,490.00 300,000.00 447,000,000.00 0.3803 - - - - - - -
9.2.(6a) Patok Kilometer Buah 32.00 350,000.00 11,200,000.00 0.0095 - - - - - - -
9.2.(7) Rel Pengaman M1 4,072.80 850,000.00 3,461,880,000.00 2.9455 - - - - - - -
9.2(10a) Kerb Pracetak Jenis 1 (Peninggi/Mountable) M1 2,000.00 115,000.00 230,000,000.00 0.1957 - - - - - - -
9.2.(12a) Perkerasan Blok Beton pada Trotoar dan Median M2 2,400.00 135,000.00 324,000,000.00 0.2757 - - - - - - -
Sub Total ( 9 ) 6,115,339,800.00 5.2032 0.125 - 0.125 147,358,400.00
TOTAL 117,530,643,628.49 100.000 PROGRESS REALISASI 67.010 3.074 70.084 82,369,723,738.34
Pajak Pertambahan Nilai (Ppn) 11% 12,928,370,799.13 PROGRESS RENCANA 72.565 73.997 9,060,669,611.22
TOTAL 130,459,014,427.63 DEVIASI (5.555) 3.074 (3.914) 91,430,393,349.56
DIBULATKAN 130,459,014,000.00 (3.074) 91,430,393,000.00
Disetujui Diperiksa Disiapkan
Direksi PUPR Konsultan Supervisi Kontraktor
PPK 1.3 Provinsi Sulawesi Tenggara PT. TRIBINA MATRA CARYA CIPTA KSO PT. WINSOLUSI PT. LINCE ROMAULI RAYA - PT. AGUNG
KONSULTAN - PT. ARISTA CIPTA SARANA PERSADA (KSO)

SUKARDJO Ir. MUHAMMAD IDRIS RAZAK RISKY KURNIAWAN, ST


NIP. : 19750226 200312 1 002 Supervision Engineer Manager Proyek

7 / 16
PROGRES BULAN SEPTEMBER 2023
NAMA PAKET : PRESERVASI JALAN POMALAA - WOLULU 16
RUAS : POMALAA - WOLULU
KONTRAKTOR : PT. LINCE ROMAULI RAYA - PT. AGUNG SARANA PERSADA (KSO) MINGGU KE : 63
KONSULTAN : PT. TRIBINA MATRA CARYA CIPTA KSO PT. WINSOLUSI KONSULTAN - PT. ARISTA CIPTA Periode : 26 Agustus - 01 September 2023
NO. KONTRAK : HK 0201-Bb21.1.3/286, Tanggal 17 Mei 2022

PRESTASI
HARGA JUMLAH
No. VOLUME BOBOT KUANTITAS BOBOT ( % )
URAIAN SAT JUMLAH
Item ADD-02 SATUAN HARGA ( %) S/D MINGGU MINGGU S/D MINGGU S/D MINGGU MINGGU S/D MINGGU
(Rp.) (Rp.) LALU INI INI LALU INI INI (Rp.)
1 2 3 4 5 6 7 8 9 10 11 12 13 14
15S/D BULAN 15BULAN 16INI 15INI
X DIVISI10. PEKERJAAN PEMELIHARAAN
10.1 Pemeliharaan Jalan
10.1.(3) Perbaikan Pasangan Batu dengan Mortar M3 280.76 1,270,455.74 356,687,180.87 23.2272 - - - - - - -
10.1.(4) Perbaikan Lapis Fondasi Agregat Kelas A M3 130.61 600,000.00 78,366,000.00 5.1031 131.400 - 131.400 5.134 - 5.134 78,840,000.00
10.1.(10a) Perbaikan Campuran Aspal Panas dengan Asbuton M3 201.26 2,900,000.00 583,654,000.00 38.0071 214.095 - 214.095 40.431 - 40.431 620,874,129.18
10.1.(10b) Perbaikan Campuran Aspal Panas dengan Asbuton M3 29.80 3,200,000.00 95,359,994.13 6.2098 22.000 - 22.000 4.584 - 4.584 70,400,000.00
10.1.(21) Pembersihan Drainase dan Saluran Samping M1 29,383.09 5,500.00 161,606,995.00 10.5237 28,033.700 1,120.000 29,153.700 10.040 0.401 10.442 160,345,350.00
10.1.(22) Pengendalian Tanaman M2 519,937.66 500.00 259,968,830.00 16.9290 476,836.800 - 476,836.800 15.526 - 15.526 238,418,400.00
Sub Total ( 10 ) 1,535,643,000.00 100.0000 75.7154 0.4011 76.1165 1,168,877,879.18
TOTAL 1,535,643,000.00 100.000 PROGRESS REALISASI 75.715 0.401 76.117 1,168,877,879.18
Pajak Pertambahan Nilai (Ppn) 11% 168,920,730.00 PROGRESS RENCANA 80.909 67.350 128,576,566.71
TOTAL 1,704,563,730.00 DEVIASI (5.194) 0.401 8.767 1,297,454,445.89
DIBULATKAN 1,704,563,000.00 (0.401) 1,297,454,000.00

Disetujui Diperiksa Disiapkan


Direksi PUPR Konsultan Supervisi Kontraktor
PPK 1.3 Provinsi Sulawesi Tenggara PT. TRIBINA MATRA CARYA CIPTA KSO PT. WINSOLUSI PT. LINCE ROMAULI RAYA - PT.
KONSULTAN - PT. ARISTA CIPTA AGUNG SARANA PERSADA (KSO)

SUKARDJO Ir. MUHAMMAD IDRIS RAZAK RISKY KURNIAWAN, ST


NIP. : 19750226 200312 1 002 Supervision Engineer Manager Proyek

8 / 16
PROGRES BULAN SEPTEMBER 2023
NAMA PAKET : PRESERVASI JALAN POMALAA - WOLULU 16
RUAS : POMALAA - WOLULU
KONTRAKTOR : PT. LINCE ROMAULI RAYA - PT. AGUNG SARANA PERSADA (KSO) MINGGU KE : 63
KONSULTAN : PT. TRIBINA MATRA CARYA CIPTA KSO PT. WINSOLUSI KONSULTAN - PT. ARISTA CIPTA Periode : 26 Agustus - 01 September 2023
NO. KONTRAK : HK 0201-Bb21.1.3/286, Tanggal 17 Mei 2022

PRESTASI
HARGA JUMLAH
No. VOLUME BOBOT KUANTITAS BOBOT ( % )
URAIAN SAT JUMLAH
Item ADD-02 SATUAN HARGA ( %) S/D MINGGU MINGGU S/D MINGGU S/D MINGGU MINGGU S/D MINGGU
(Rp.) (Rp.) LALU INI INI LALU INI INI (Rp.)
1 2 3 4 5 6 7 8 9 10 11 12 13 14
15S/D BULAN 15BULAN 16INI INI
10.2 Pemeliharaan Jembatan
10.2.(1) Pemeliharaan Jembatan S SOPURA BOX Bentang 7 m LS 1.00 5,000,000.00 5,000,000.00 1.7094 0.645 0.071 0.716 1.103 0.121 1.224 3,581,428.57
10.2.(2) Pemeliharaan Jembatan S.SOPURA Bentang 20.8 m LS 1.00 22,000,000.00 22,000,000.00 7.5214 0.645 0.071 0.716 4.853 0.534 5.387 15,758,285.71
10.2.(3) Pemeliharaan Jembatan S.OKO-OKO I Bentang 9.8 m LS 1.00 12,500,000.00 12,500,000.00 4.2735 0.645 0.071 0.716 2.758 0.303 3.061 8,953,571.43
10.2.(4) Pemeliharaan Jembatan S.Oko-Oko II Bentang 8.9 m LS 1.00 10,000,000.00 10,000,000.00 3.4188 0.645 0.071 0.716 2.206 0.243 2.449 7,162,857.14
10.2.(5) Pemeliharaan Jembatan S.Oko-Ok0 III Bentang 20.8 m LS 1.00 25,000,000.00 25,000,000.00 8.5470 0.645 0.071 0.716 5.515 0.607 6.122 17,907,142.86
10.2.(6) Pemeliharaan Jembatan S.Oko-Oko IV Bentang 9.8 m LS 1.00 10,000,000.00 10,000,000.00 3.4188 0.645 0.071 0.716 2.206 0.243 2.449 7,162,857.14
10.2.(7) Pemeliharaan Jembatan S.Oko-Oko V Bentang 9.7 m LS 1.00 12,000,000.00 12,000,000.00 4.1026 0.645 0.071 0.716 2.647 0.291 2.939 8,595,428.57
10.2.(8) Pemeliharaan Jembatan S.Oko-Oko VI Bentang 6.8 m LS 1.00 9,000,000.00 9,000,000.00 3.0769 0.645 0.071 0.716 1.985 0.218 2.204 6,446,571.43
10.2.(9) Pemeliharaan Jembatan S.Lamedai I Bentang 8.9 m LS 1.00 11,500,000.00 11,500,000.00 3.9316 0.645 0.071 0.716 2.537 0.279 2.816 8,237,285.71
10.2.(10) Pemeliharaan Jembatan S.Lamedai II Bentang 8.9 m LS 1.00 11,500,000.00 11,500,000.00 3.9316 0.645 0.071 0.716 2.537 0.279 2.816 8,237,285.71
10.2.(11) Pemeliharaan Jembatan S.Box Tanggetada Bentang 6.9 m LS 1.00 6,000,000.00 6,000,000.00 2.0513 0.645 0.071 0.716 1.324 0.146 1.469 4,297,714.29
10.2.(12) Pemeliharaan Jembatan S.Tangketada Bentang 8.8 m LS 1.00 10,000,000.00 10,000,000.00 3.4188 0.645 0.071 0.716 2.206 0.243 2.449 7,162,857.14
10.2.(13) Pemeliharaan Jembatan S.Anaiwoi I Bentang 8.9 m LS 1.00 10,000,000.00 10,000,000.00 3.4188 0.645 0.071 0.716 2.206 0.243 2.449 7,162,857.14
10.2.(14) Pemeliharaan Jembatan S.Anaiwoi II Bentang 15.8 m LS 1.00 12,000,000.00 12,000,000.00 4.1026 0.645 0.071 0.716 2.647 0.291 2.939 8,595,428.57
10.2.(15) Pemeliharaan Jembatan S.Oneha I Bentang 10.3 m LS 1.00 10,000,000.00 10,000,000.00 3.4188 0.645 0.071 0.716 2.206 0.243 2.449 7,162,857.14
10.2.(16) Pemeliharaan Jembatan S.Oneha II Bentang 9.2 m LS 1.00 10,000,000.00 10,000,000.00 3.4188 0.645 0.071 0.716 2.206 0.243 2.449 7,162,857.14
10.2.(17) Pemeliharaan Jembatan S.Oneha III Bentang 8.7 m LS 1.00 10,000,000.00 10,000,000.00 3.4188 0.645 0.071 0.716 2.206 0.243 2.449 7,162,857.14
10.2.(18) Pemeliharaan Jembatan S.Oneha IV Bentang 12.8 m LS 1.00 13,000,000.00 13,000,000.00 4.4444 0.645 0.071 0.716 2.868 0.316 3.183 9,311,714.29
10.2.(19) Pemeliharaan Jembatan S.Oneha V Bentang 10.9 m LS 1.00 13,000,000.00 13,000,000.00 4.4444 0.645 0.071 0.716 2.868 0.316 3.183 9,311,714.29
10.2.(20) Pemeliharaan Jembatan S.Toengge Bentang 31.2 m LS 1.00 30,000,000.00 30,000,000.00 10.2564 0.645 0.071 0.716 6.618 0.728 7.347 21,488,571.43
10.2.(21) Pemeliharaan Jembatan S.Polewali Bentang 11 m LS 1.00 10,000,000.00 10,000,000.00 3.4188 0.645 0.071 0.716 2.206 0.243 2.449 7,162,857.14
10.2.(22) Pemeliharaan Jembatan S.Wolulu Bentang 30.3 m LS 1.00 30,000,000.00 30,000,000.00 10.2564 0.645 0.071 0.716 6.618 0.728 7.347 21,488,571.43
TOTAL 292,500,000.00 100.000 PROGRESS REALISASI 64.529 7.100 71.629 209,513,571.43
Pajak Pertambahan Nilai (Ppn) 11% 32,175,000.00 PROGRESS RENCANA 76.329 76.329 23,046,492.86
TOTAL 324,675,000.00 DEVIASI (11.800) 7.100 (4.700) 232,560,064.29
DIBULATKAN 324,675,000.00 (7.100) 232,560,000.00

Disetujui Diperiksa Disiapkan


Direksi PUPR Konsultan Supervisi Kontraktor
PPK 1.3 Provinsi Sulawesi Tenggara PT. TRIBINA MATRA CARYA CIPTA KSO PT. WINSOLUSI PT. LINCE ROMAULI RAYA - PT.
KONSULTAN - PT. ARISTA CIPTA AGUNG SARANA PERSADA (KSO)

SUKARDJO Ir. MUHAMMAD IDRIS RAZAK RISKY KURNIAWAN, ST


NIP. : 19750226 200312 1 002 Supervision Engineer Manager Proyek

9 / 16
PROGRES BULAN SEPTEMBER 2023
NAMA PAKET : PRESERVASI JALAN POMALAA - WOLULU 16
RUAS : POMALAA - WOLULU
KONTRAKTOR : PT. LINCE ROMAULI RAYA - PT. AGUNG SARANA PERSADA (KSO) MINGGU KE 63 (KONTRAK TAHUN 2023)
KONSULTAN : PT. TRIBINA MATRA CARYA CIPTA KSO PT. WINSOLUSI KONSULTAN - PT. ARISTA CIPTA Periode : 26 Agustus - 01 September 2023
NO. KONTRAK : HK 0201-Bb21.1.3/286, Tanggal 17 Mei 2022

PRESTASI
VOLUME HARGA JUMLAH
No. BOBOT KUANTITAS BOBOT ( % )
URAIAN SAT KONTRAK JUMLAH
Item SATUAN HARGA ( %) S/D MINGGU MINGGU S/D MINGGU S/D MINGGU MINGGU S/D MINGGU
ANAK ADD-02
(Rp.) (Rp.) LALU INI INI LALU INI INI (Rp.)
1 2 3 4 5 6 7 8 9 10 11 12 13 14
15S/D BULAN 15BULAN 16INI 63INI
I DIVISI 1. UMUM
1.2 Mobilisasi Ls 0.30 500,000,000.00 150,000,000.00 0.1658 - - - - - - -
1.80 Manajemen dan Keselamatan Lalu Lintas Ls 0.66 100,000,000.00 65,631,578.95 0.0725 0.264 0.010 0.274 0.029 0.001 0.030 27,368,421.05
1.17 Pengamanan Lingkungan Hidup
1.17.(1a) Pengujian pH Buah 6.00 70,000.00 420,000.00 0.0005 3.000 - 3.000 0.000 - 0.000 210,000.00
1.17.(1b) Pengujian Oksigen Terlarut (DO) Buah 6.00 100,000.00 600,000.00 0.0007 3.000 - 3.000 0.000 - 0.000 300,000.00
1.17.(1c) Pengujian Zat Padat Terlarut (TDS) Buah 6.00 150,000.00 900,000.00 0.0010 3.000 - 3.000 0.000 - 0.000 450,000.00
1.17.(1d) Pengujian Zat Tersuspensi (TSS) Buah 6.00 100,000.00 600,000.00 0.0007 3.000 - 3.000 0.000 - 0.000 300,000.00
1.17.(1e) Pengujian Biological Oxygen Demand (BOD) Buah 6.00 140,000.00 840,000.00 0.0009 3.000 - 3.000 0.000 - 0.000 420,000.00
1.17.(1f) Pengujian Chemical Oxygen Demand (COD) Buah 6.00 140,000.00 840,000.00 0.0009 3.000 - 3.000 0.000 - 0.000 420,000.00
1.17.(2c) Pengujian Parameter Kebisingan dan/atau Getaran Lainnya ……… Buah 6.00 140,000.00 840,000.00 0.0009 3.000 - 3.000 0.000 - 0.000 420,000.00
1.17.(3b) Pengujian Sulfurdioksida (SO2) Buah 6.00 200,000.00 1,200,000.00 0.0013 3.000 - 3.000 0.001 - 0.001 600,000.00
1.17.(3f) Pengujian Total Partikulat (TSP) - Debu Buah 6.00 125,000.00 750,000.00 0.0008 3.000 - 3.000 0.000 - 0.000 375,000.00
1.19 Keselamatan dan Kesehatan Kerja
1.00 1. Penyiapan RKK Buah 1.00 3,000,000.00 3,000,000.00 0.0033 - - - - - - -
2.00 2. Sosialisasi dan Promosi Dan Pelatihan Buah 1.00 5,000,000.00 5,000,000.00 0.0055 - - - - - - -
3.00 3. Alat Pelindung Kerja (APK) dan Alat Pelindung Diri (APD) Buah 0.64 35,000,000.00 22,449,291.24 0.0248 0.173 0.007 0.180 0.007 0.000 0.007 6,294,462.40
4.00 4. Asuransi dan Perizinan Buah 1.00 20,000,000.00 20,000,000.00 0.0221 - - - - - - -
5.00 5. Personel K3 Konstruksi Buah 0.67 99,000,000.00 66,050,649.96 0.0730 0.180 0.007 0.187 0.020 0.001 0.020 18,519,664.09
6.00 6. Fasilitas sarana kesehatan Buah 1.00 15,000,000.00 15,000,000.00 0.0166 - - - - - - -
7.00 7. Rambu-rambu terdiri atas Buah 0.63 22,727,272.73 14,206,206.32 0.0157 0.169 0.006 0.175 0.004 0.000 0.004 3,983,218.47
8.00 8. Konsultasi dengan Ahli Terkait Keselamatan Konstruksi Buah 1.00 15,000,000.00 15,000,000.00 0.0166 - - - - - - -
9.00 9. Lain-lain terkait pengendalian risiko K3 Buah 1.00 5,000,000.00 5,000,000.00 0.0055 - - - - - - -
1.21 Manajemen Mutu Ls 0.64 200,000,000.00 128,500,000.00 0.1420 0.265 0.010 0.275 0.059 0.002 0.061 55,000,000.00

Sub Total ( 1 ) 516,827,726.47 0.5713 0.122 0.004 0.127 114,660,766.02


II DIVISI 2. DRAINASE
2.1.(1) Galian untuk Selokan Drainase dan Saluran Air M3 6,099.13 25,000.00 152,478,150.00 0.1685 4,180.988 248.778 4,429.766 0.116 0.007 0.122 110,744,150.00
2.2.(1) Pasangan Batu dengan Mortar M3 5,710.20 700,000.00 3,997,143,493.00 4.4184 3,525.298 209.763 3,735.061 2.728 0.162 2.890 2,614,542,700.00
2.3.(15) Gorong-gorong Kotak Beton Bertulang, ukuran dalam 100 cm x 100 cm (p M1 134.40 4,275,906.49 574,681,832.26 0.6353 78.000 18.000 96.000 0.369 0.085 0.454 410,487,023.04
2.3.(18) Gorong-gorong Kotak Beton Bertulang, ukuran dalam 150 cm x 150 cm (p M1 296.40 7,268,205.12 2,154,295,997.57 2.3814 273.600 - 273.600 2.198 - 2.198 1,988,580,920.83
2.3.(20) Gorong-gorong Kotak Beton Bertulang, ukuran dalam 250 cm x 250 cm (p M1 13.20 42,718,794.10 563,888,082.12 0.6233 - 13.200 13.200 - 0.623 0.623 563,888,082.12
2.3.(22) Saluran berbentuk U Tipe DS 1 (precast) M1 4,575.00 1,250,000.00 5,718,750,000.00 6.3215 3,512.000 121.000 3,633.000 4.853 0.167 5.020 4,541,250,000.00

Sub Total ( 2 ) 13,161,237,554.95 14.5484 10.263 1.045 11.308 10,229,492,875.99


III DIVISI 3. PEKERJAAN TANAH DAN GEOSINTETIK
3.1.(1a) Galian Biasa M3 67,613.34 16,000.00 1,081,813,390.40 1.1958 32,989.578 346.500 33,336.078 0.583 0.006 0.590 533,377,250.67
3.2.(2a) Timbunan Pilihan dari Sumber Galian M3 11,144.96 100,000.00 1,114,496,000.00 1.2320 8,761.069 - 8,761.069 0.968 - 0.968 876,106,935.90
3.3.(1) Penyiapan Badan Jalan M2 64,166.26 5,000.00 320,831,300.00 0.3546 36,026.130 936.486 36,962.616 0.199 0.005 0.204 184,813,079.95
3.4.(2) Pemotongan Pohon Pilihan diameter 15 – 30 cm Buah 29.00 39,983.05 1,159,508.45 0.0013 125.000 24.000 149.000 0.006 0.001 0.007 5,957,474.45
3.4.(3) Pemotongan Pohon Pilihan diameter > 30 – 50 cm Buah 182.00 61,536.34 11,199,613.88 0.0124 60.000 - 60.000 0.004 - 0.004 3,692,180.40
3.4.(4) Pemotongan Pohon Pilihan diameter > 50 – 75 cm Buah 207.00 112,032.53 23,190,733.71 0.0256 218.000 14.000 232.000 0.027 0.002 0.029 25,991,546.96
3.4.(5) Pemotongan Pohon Pilihan diameter > 75 cm Buah 1.00 233,248.73 233,248.73 0.0003 50.000 3.000 53.000 0.013 0.001 0.014 12,362,182.69

Sub Total ( 3 ) 2,552,923,795.17 2.82 1.801 0.015 1.815 1,642,300,651.02

10 / 16
PRESTASI
VOLUME HARGA JUMLAH
No. BOBOT KUANTITAS BOBOT ( % )
URAIAN SAT KONTRAK JUMLAH
Item SATUAN HARGA ( %) S/D MINGGU MINGGU S/D MINGGU S/D MINGGU MINGGU S/D MINGGU
ANAK ADD-02
(Rp.) (Rp.) LALU INI INI LALU INI INI (Rp.)
1 2 3 4 5 6 7 8 9 10 11 12 13 14
V DIVISI 5. PERKERASAN BERBUTIR DAN PERKERASAN BETON SEMEN 1,100.000 #REF!
5.1.(1) Lapis Fondasi Agregat Kelas A M3 14,486.66 600,000.00 8,691,994,416.00 9.6081 10,982.106 627.300 11,609.406 7.284 0.416 7.700 6,965,643,600.00
5.1.(3a) Lapis Fondasi Agregat Kelas S M3 15,031.93 250,000.00 3,757,982,500.00 4.1541 5,191.410 - 5,191.410 1.435 - 1.435 1,297,852,500.00
Sub Total ( 5 ) 12,449,976,916.00 13.7622 8.718 0.416 9.134 8,263,496,100.00
VI DIVISI 6. PERKERASAN ASPAL
6.1 (1)(a) Lapis Resap Pengikat - Aspal Cair Liter 46,717.40 15,000.00 700,760,995.99 0.7746 28,999.768 3,466.068 32,465.836 0.481 0.057 0.538 486,987,534.88
6.1 (2)(a) Lapis Perekat - Aspal Cair Liter 48,419.05 13,000.00 629,447,646.02 0.6958 26,596.953 1,956.098 28,553.050 0.382 0.028 0.410 371,189,655.96
6.3.(8) Bahan anti pengelupasan Kg 3,891.90 75,000.00 291,892,571.00 0.3227 2,086.218 107.460 2,193.678 0.173 0.009 0.182 164,525,843.25
6.5.(1b) Laston Lapis Aus Asbuton Butir (AC-WC Asb Butir) Ton 16,063.68 1,425,000.00 22,890,738,656.25 25.3034 11,810.573 639.644 12,450.217 18.604 1.008 19.611 17,741,559,937.50
6.5.(2b) Laston Lapis Antara Asbuton Butir (AC-BC Asb Butir) Ton 8,976.25 1,350,000.00 12,117,934,751.65 13.3951 6,416.130 694.210 7,110.340 9.575 1.036 10.611 9,598,958,522.78

Sub Total ( 6 ) 36,630,774,620.92 40.4915 29.215 2.138 31.353 28,363,221,494.37


VII DIVISI 7. STRUKTUR
7.1 (5a) Beton struktur, fc’30 Mpa (Kubus 60 x 60 x 60) M3 438.48 3,557,765.22 1,560,008,893.67 1.7244 - - - - - - -
7.1 (6a) Beton struktur, fc’25 Mpa (untuk penutup saluran) M3 576.00 1,700,000.00 979,200,000.00 1.0824 - - - - - - -
7.1 (7a) Beton struktur, fc’20 MPa (untuk bahu diperkeras) M3 2,654.17 1,125,000.00 2,985,941,250.00 3.3007 - - - - - - -
7.1 (7d) Beton struktur, fc’20 Mpa (untuk pengaman pantai) M3 583.60 3,494,109.91 2,039,177,917.56 2.2541 - - - - - - -
7.1 (9) Beton Siklop, fc’15 Mpa (untuk pengaman pantai) M3 133.93 893,667.17 119,688,844.08 0.1323 - - - - - - -
7.1 (10) Beton, fc’10 Mpa M3 - 1,100,000.00 - - - - - - - - -
7.3 (1) Baja Tulangan Polos-BjTP 280 Kg 82,775.89 19,000.00 1,572,741,910.00 1.7385 - - - - - - -
7.3 (3) Baja Tulangan Ulir-BjTS 420 A Kg 25,549.07 20,934.10 534,846,777.78 0.5912 - - - - - - -
7.9.(1) Pasangan Batu M3 12,645.42 650,000.00 8,219,520,651.07 9.0858 7,856.348 462.120 8,318.468 5.645 0.332 5.977 5,407,003,935.94
7.10.(3a) Bronjong dengan kawat yang dilapisi Galvanis M3 500.00 725,000.00 362,500,000.00 0.4007 - - - - - - -
7.15.(1) Pembongkaran Pasangan Batu M3 529.49 304,690.52 161,330,583.43 0.1783 597.980 116.100 714.080 0.201 0.039 0.241 217,573,406.52
7.15.(2) Pembongkaran Beton M3 90.09 316,550.08 28,519,294.56 0.0315 35.984 12.000 47.984 0.013 0.004 0.017 15,189,370.69
Sub Total ( 7 ) 18,563,476,122.16 20.5200 5.8588 0.3753 6.2342 5,639,766,713.15

IX DIVISI 9. PEKERJAAN HARIAN & PEKERJAAN LAIN-LAIN


9.1 Pekerjaan Harian
9.1.(2) Pekerja Biasa Jam 84.00 18,750.00 1,575,000.00 0.0017 - - - - - - -
9.1.(4) a Dump Truck, kapasitas 3 - 4 m³ Jam 84.00 200,000.00 16,800,000.00 0.0186 - - - - - - -
9.1.(6) Truk Tangki 3000 - 4500 Liter Jam 84.00 200,000.00 16,800,000.00 0.0186 - - - - - - -
9.1.(8) Motor Grader min 100 PK Jam 121.00 200,000.00 24,200,000.00 0.0268 - - - - - - -
9.1.(9) Loader Roda Karet 1.0 - 1.6 M3 Jam 126.00 200,000.00 25,200,000.00 0.0279 - - - - - - -
9.1.(13) Penggilas Roda Besi 6 - 9 Ton Jam 79.00 200,000.00 15,800,000.00 0.0175 - - - - - - -
9.2 Pekerjaan Lain-Lain
9.2.(1) Marka Jalan Termoplastik M2 12,284.04 120,000.00 1,474,084,800.00 1.6294 1,211.320 - 1,211.320 0.161 - 0.161 145,358,400.00
9.2.(3a) Rambu Jalan Tunggal dengan Permukaan Pemantul Engineering Grade Buah 144.00 450,000.00 64,800,000.00 0.0716 - - - - - - -
9.2.(5) Patok Pengarah, material Poly Ethylene (PE) Plastik murni/elastis Buah 1,490.00 300,000.00 447,000,000.00 0.4941 - - - - - - -
9.2.(6a) Patok Kilometer Buah 32.00 350,000.00 11,200,000.00 0.0124 - - - - - - -
9.2.(7) Rel Pengaman M1 4,072.80 850,000.00 3,461,880,000.00 3.8268 - - - - - - -
9.2(10a) Kerb Pracetak Jenis 1 (Peninggi/Mountable) M1 2,000.00 115,000.00 230,000,000.00 0.2542 - - - - - - -
9.2.(12a) Perkerasan Blok Beton pada Trotoar dan Median M2 2,400.00 135,000.00 324,000,000.00 0.3581 - - - - - - -
Sub Total ( 9 ) 6,113,339,800.00 6.7577 0.161 - 0.161 145,358,400.00

11 / 16
PRESTASI
VOLUME HARGA JUMLAH
No. BOBOT KUANTITAS BOBOT ( % )
URAIAN SAT KONTRAK JUMLAH
Item SATUAN HARGA ( %) S/D MINGGU MINGGU S/D MINGGU S/D MINGGU MINGGU S/D MINGGU
ANAK ADD-02
(Rp.) (Rp.) LALU INI INI LALU INI INI (Rp.)
1 2 3 4 5 6 7 8 9 10 11 12 13 14
X DIVISI10. PEKERJAAN PEMELIHARAAN
10.1 Pemeliharaan Jalan
10.1.(3) Perbaikan Pasangan Batu dengan Mortar M3 280.76 1,270,455.74 356,687,180.87 0.3943 - - - - - - -
10.1.(4) Perbaikan Lapis Fondasi Agregat Kelas A M3 (0.79) 600,000.00 (474,000.00) (0.0005) 161.195 - 161.195 0.107 - 0.107 96,716,716.38
10.1.(10a) Perbaikan Campuran Aspal Panas dengan Asbuton M3 (12.83) 2,900,000.00 (37,220,129.18) (0.0411) 49.900 - 49.900 0.160 - 0.160 144,710,418.43
10.1.(10b) Perbaikan Campuran Aspal Panas dengan Asbuton M3 7.80 3,200,000.00 24,959,994.13 0.0276 - - - - - - -
10.1.(21) Pembersihan Drainase dan Saluran Samping M1 1,349.39 5,500.00 7,421,645.00 0.0082 10,617.600 1,120.000 11,737.600 0.065 0.007 0.071 64,556,800.00
10.1.(22) Pengendalian Tanaman M2 43,100.86 500.00 21,550,430.00 0.0238 117,600.100 - 117,600.100 0.065 - 0.065 58,800,050.00
10.2 Pemeliharaan Jembatan
10.2.(1) Pemeliharaan Jembatan S SOPURA BOX Bentang 7 m LS 0.35 5,000,000.00 1,773,571.43 0.0020 0.215 0.071 0.286 0.001 0.000 0.002 1,430,000.00
10.2.(2) Pemeliharaan Jembatan S.SOPURA Bentang 20.8 m LS 0.35 22,000,000.00 7,803,714.29 0.0086 0.215 0.071 0.286 0.005 0.002 0.007 6,292,000.00
10.2.(3) Pemeliharaan Jembatan S.OKO-OKO I Bentang 9.8 m LS 0.35 12,500,000.00 4,433,928.57 0.0049 0.215 0.071 0.286 0.003 0.001 0.004 3,575,000.00
10.2.(4) Pemeliharaan Jembatan S.Oko-Oko II Bentang 8.9 m LS 0.35 10,000,000.00 3,547,142.86 0.0039 0.215 0.071 0.286 0.002 0.001 0.003 2,860,000.00
10.2.(5) Pemeliharaan Jembatan S.Oko-Ok0 III Bentang 20.8 m LS 0.35 25,000,000.00 8,867,857.14 0.0098 0.215 0.071 0.286 0.006 0.002 0.008 7,150,000.00
10.2.(6) Pemeliharaan Jembatan S.Oko-Oko IV Bentang 9.8 m LS 0.35 10,000,000.00 3,547,142.86 0.0039 0.215 0.071 0.286 0.002 0.001 0.003 2,860,000.00
10.2.(7) Pemeliharaan Jembatan S.Oko-Oko V Bentang 9.7 m LS 0.35 12,000,000.00 4,256,571.43 0.0047 0.215 0.071 0.286 0.003 0.001 0.004 3,432,000.00
10.2.(8) Pemeliharaan Jembatan S.Oko-Oko VI Bentang 6.8 m LS 0.35 9,000,000.00 3,192,428.57 0.0035 0.215 0.071 0.286 0.002 0.001 0.003 2,574,000.00
10.2.(9) Pemeliharaan Jembatan S.Lamedai I Bentang 8.9 m LS 0.35 11,500,000.00 4,079,214.29 0.0045 0.215 0.071 0.286 0.003 0.001 0.004 3,289,000.00
10.2.(10) Pemeliharaan Jembatan S.Lamedai II Bentang 8.9 m LS 0.35 11,500,000.00 4,079,214.29 0.0045 0.215 0.071 0.286 0.003 0.001 0.004 3,289,000.00
10.2.(11) Pemeliharaan Jembatan S.Box Tanggetada Bentang 6.9 m LS 0.35 6,000,000.00 2,128,285.71 0.0024 0.215 0.071 0.286 0.001 0.000 0.002 1,716,000.00
10.2.(12) Pemeliharaan Jembatan S.Tanggetada Bentang 8.8 m LS 0.35 10,000,000.00 3,547,142.86 0.0039 0.215 0.071 0.286 0.002 0.001 0.003 2,860,000.00
10.2.(13) Pemeliharaan Jembatan S.Anaiwoi I Bentang 8.9 m LS 0.35 10,000,000.00 3,547,142.86 0.0039 0.215 0.071 0.286 0.002 0.001 0.003 2,860,000.00
10.2.(14) Pemeliharaan Jembatan S.Anaiwoi II Bentang 15.8 m LS 0.35 12,000,000.00 4,256,571.43 0.0047 0.215 0.071 0.286 0.003 0.001 0.004 3,432,000.00
10.2.(15) Pemeliharaan Jembatan S.Oneha I Bentang 10.3 m LS 0.35 10,000,000.00 3,547,142.86 0.0039 0.215 0.071 0.286 0.002 0.001 0.003 2,860,000.00
10.2.(16) Pemeliharaan Jembatan S.Oneha II Bentang 9.2 m LS 0.35 10,000,000.00 3,547,142.86 0.0039 0.215 0.071 0.286 0.002 0.001 0.003 2,860,000.00
10.2.(17) Pemeliharaan Jembatan S.Oneha III Bentang 8.7 m LS 0.35 10,000,000.00 3,547,142.86 0.0039 0.215 0.071 0.286 0.002 0.001 0.003 2,860,000.00
10.2.(18) Pemeliharaan Jembatan S.Oneha IV Bentang 12.8 m LS 0.35 13,000,000.00 4,611,285.71 0.0051 0.215 0.071 0.286 0.003 0.001 0.004 3,718,000.00
10.2.(19) Pemeliharaan Jembatan S.Oneha V Bentang 10.9 m LS 0.35 13,000,000.00 4,611,285.71 0.0051 0.215 0.071 0.286 0.003 0.001 0.004 3,718,000.00
10.2.(20) Pemeliharaan Jembatan S.Toengge Bentang 31.2 m LS 0.35 30,000,000.00 10,641,428.57 0.0118 0.215 0.071 0.286 0.007 0.002 0.009 8,580,000.00
10.2.(21) Pemeliharaan Jembatan S.Polewali Bentang 11 m LS 0.35 10,000,000.00 3,547,142.86 0.0039 0.215 0.071 0.286 0.002 0.001 0.003 2,860,000.00
10.2.(22) Pemeliharaan Jembatan S.Wolulu Bentang 30.3 m LS 0.35 30,000,000.00 10,641,428.57 0.0118 0.215 0.071 0.286 0.007 0.002 0.009 8,580,000.00
Sub Total ( 10 ) 476,679,049.39 0.5269 0.466 0.030 0.496 448,438,984.8097
TOTAL 90,465,235,585.05 100.000 PROGRESS REALISASI 56.604 4.023 60.627 54,846,735,985.36
Pajak Pertambahan Nilai (Ppn) 11% 9,951,175,914.36 PROGRESS RENCANA 59.206 1.902 61.109 6,033,140,958.39
TOTAL 100,416,411,499.40 DEVIASI (2.602) 2.121 (0.481) 60,879,876,943.75
DIBULATKAN 100,416,411,000.00 (2.121) 60,879,876,000.00

Disetujui Diperiksa Disiapkan


Direksi PUPR Konsultan Supervisi Kontraktor
PPK 1.3 Provinsi Sulawesi Tenggara PT. TRIBINA MATRA CARYA CIPTA KSO PT. WINSOLUSI PT. LINCE ROMAULI RAYA - PT.
KONSULTAN - PT. ARISTA CIPTA AGUNG SARANA PERSADA (KSO)

SUKARDJO Ir. MUHAMMAD IDRIS RAZAK RISKY KURNIAWAN, ST


NIP. : 19750226 200312 1 002 Supervision Engineer Manager Proyek

12 / 16
PROGRES BULAN SEPTEMBER 2023
NAMA PAKET : PRESERVASI JALAN POMALAA - WOLULU 16
RUAS : POMALAA - WOLULU
KONTRAKTOR : PT. LINCE ROMAULI RAYA - PT. AGUNG SARANA PERSADA (KSO) MINGGU KE 63 (KONTRAK TAHUN 2023)
KONSULTAN : PT. TRIBINA MATRA CARYA CIPTA KSO PT. WINSOLUSI KONSULTAN - PT. ARISTA CIPTA Periode : 26 Agustus - 01 September 2023
NO. KONTRAK : HK 0201-Bb21.1.3/286, Tanggal 17 Mei 2022

PRESTASI
HARGA JUMLAH
No. VOLUME BOBOT KUANTITAS BOBOT ( % )
URAIAN SAT JUMLAH
Item ADD-06 SATUAN HARGA ( %) S/D MINGGU MINGGU S/D MINGGU S/D MINGGU MINGGU S/D MINGGU
(Rp.) (Rp.) LALU INI INI LALU INI INI (Rp.)
1 2 3 4 5 6 7 8 9 10 11 12 13 14
15S/D BULAN 15BULAN 16INI INI
I DIVISI 1. UMUM
1.2 Mobilisasi Ls 0.30 500,000,000.00 150,000,000.00 0.1761 - - - - - - -
1.80 Manajemen dan Keselamatan Lalu Lintas Ls 0.66 100,000,000.00 65,631,578.95 0.0771 0.264 0.010 0.274 0.031 0.001 0.032 27,368,421.05
1.17 Pengamanan Lingkungan Hidup
1.17.(1a) Pengujian pH Buah 6.00 70,000.00 420,000.00 0.0005 3.000 - 3.000 0.000 - 0.000 210,000.00
1.17.(1b) Pengujian Oksigen Terlarut (DO) Buah 6.00 100,000.00 600,000.00 0.0007 3.000 - 3.000 0.000 - 0.000 300,000.00
1.17.(1c) Pengujian Zat Padat Terlarut (TDS) Buah 6.00 150,000.00 900,000.00 0.0011 3.000 - 3.000 0.001 - 0.001 450,000.00
1.17.(1d) Pengujian Zat Tersuspensi (TSS) Buah 6.00 100,000.00 600,000.00 0.0007 3.000 - 3.000 0.000 - 0.000 300,000.00
1.17.(1e) Pengujian Biological Oxygen Demand (BOD) Buah 6.00 140,000.00 840,000.00 0.0010 3.000 - 3.000 0.000 - 0.000 420,000.00
1.17.(1f) Pengujian Chemical Oxygen Demand (COD) Buah 6.00 140,000.00 840,000.00 0.0010 3.000 - 3.000 0.000 - 0.000 420,000.00
1.17.(2c) Pengujian Parameter Kebisingan dan/atau Getaran Lainnya ……… Buah 6.00 140,000.00 840,000.00 0.0010 3.000 - 3.000 0.000 - 0.000 420,000.00
1.17.(3b) Pengujian Sulfurdioksida (SO2) Buah 6.00 200,000.00 1,200,000.00 0.0014 3.000 - 3.000 0.001 - 0.001 600,000.00
1.17.(3f) Pengujian Total Partikulat (TSP) - Debu Buah 6.00 125,000.00 750,000.00 0.0009 3.000 - 3.000 0.000 - 0.000 375,000.00
1.19 Keselamatan dan Kesehatan Kerja
1.00 1. Penyiapan RKK Buah 1.00 3,000,000.00 3,000,000.00 0.0035 - - - - - - -
2.00 2. Sosialisasi dan Promosi Dan Pelatihan Buah 1.00 5,000,000.00 5,000,000.00 0.0059 - - - - - - -
3.00 3. Alat Pelindung Kerja (APK) dan Alat Pelindung Diri (APD) Buah 0.64 35,000,000.00 22,449,291.24 0.0264 0.173 0.007 0.180 0.007 0.000 0.007 6,294,462.40
4.00 4. Asuransi dan Perizinan Buah 1.00 20,000,000.00 20,000,000.00 0.0235 - - - - - - -
5.00 5. Personel K3 Konstruksi Buah 0.67 99,000,000.00 66,050,649.96 0.0776 0.180 0.007 0.187 0.021 0.001 0.022 18,519,664.09
6.00 6. Fasilitas sarana kesehatan Buah 1.00 15,000,000.00 15,000,000.00 0.0176 - - - - - - -
7.00 7. Rambu-rambu terdiri atas Buah 0.63 22,727,272.73 14,206,206.32 0.0167 0.169 0.006 0.175 0.005 0.000 0.005 3,983,218.47
8.00 8. Konsultasi dengan Ahli Terkait Keselamatan Konstruksi Buah 1.00 15,000,000.00 15,000,000.00 0.0176 - - - - - - -
9.00 9. Lain-lain terkait pengendalian risiko K3 Buah 1.00 5,000,000.00 5,000,000.00 0.0059 - - - - - - -
1.21 Manajemen Mutu Ls 0.64 200,000,000.00 128,500,000.00 0.1509 0.265 0.010 0.275 0.062 0.002 0.065 55,000,000.00
Sub Total ( 1 ) 516,827,726.47 0.6068 0.130 0.005 0.135 114,660,766.02
II DIVISI 2. DRAINASE
2.1.(1) Galian untuk Selokan Drainase dan Saluran Air M3 6,099.13 25,000.00 152,478,150.00 0.1790 4,180.988 248.778 4,429.766 0.123 0.007 0.130 110,744,150.00
2.2.(1) Pasangan Batu dengan Mortar M3 5,710.20 700,000.00 3,997,143,493.00 4.6931 3,525.298 209.763 3,735.061 2.897 0.172 3.070 2,614,542,700.00
2.3.(15) Gorong-gorong Kotak Beton Bertulang, ukuran dalam 100 cm x 100 cm (precast M1 134.40 4,275,906.49 574,681,832.26 0.6747 78.000 18.000 96.000 - - - 410,487,023.04
2.3.(18) Gorong-gorong Kotak Beton Bertulang, ukuran dalam 150 cm x 150 cm (precast M1 296.40 7,268,205.12 2,154,295,997.57 2.5294 273.600 - 273.600 2.335 - 2.335 1,988,580,920.83
2.3.(22) Saluran berbentuk U Tipe DS 1 (precast) M1 4,575.00 1,250,000.00 5,718,750,000.00 6.7144 3,512.000 121.000 3,633.000 5.154 0.178 5.332 4,541,250,000.00
Sub Total ( 2 ) 12,597,349,472.83 14.7907 10.509 0.357 10.867 9,665,604,793.87
III DIVISI 3. PEKERJAAN TANAH DAN GEOSINTETIK
3.1.(1a) Galian Biasa M3 67,613.34 16,000.00 1,081,813,390.40 1.2702 32,989.578 346.500 33,336.078 0.620 0.007 0.626 533,377,250.67
3.2.(2a) Timbunan Pilihan dari Sumber Galian M3 11,144.96 100,000.00 1,114,496,000.00 1.3085 8,761.069 - 8,761.069 1.029 - 1.029 876,106,935.90
3.3.(1) Penyiapan Badan Jalan M2 64,166.26 5,000.00 320,831,300.00 0.3767 36,026.130 936.486 36,962.616 0.211 0.005 0.217 184,813,079.95
3.4.(2) Pemotongan Pohon Pilihan diameter 15 – 30 cm Buah 29.00 39,983.05 1,159,508.45 0.0014 125.000 24.000 149.000 0.006 0.001 0.007 5,957,474.45
3.4.(3) Pemotongan Pohon Pilihan diameter > 30 – 50 cm Buah 182.00 61,536.34 11,199,613.88 0.0131 60.000 - 60.000 0.004 - 0.004 3,692,180.40
3.4.(4) Pemotongan Pohon Pilihan diameter > 50 – 75 cm Buah 207.00 112,032.53 23,190,733.71 0.0272 218.000 14.000 232.000 0.029 0.002 0.031 25,991,546.96
3.4.(5) Pemotongan Pohon Pilihan diameter > 75 cm Buah 1.00 233,248.73 233,248.73 0.0003 50.000 3.000 53.000 0.014 0.001 0.015 12,362,182.69
Sub Total ( 3 ) 2,552,923,795.17 2.9974 1.912 0.016 1.928 1,642,300,651.02

V DIVISI 5. PERKERASAN BERBUTIR DAN PERKERASAN BETON SEMEN 1,100.000 #REF!


5.1.(1) Lapis Fondasi Agregat Kelas A M3 14,486.66 600,000.00 8,691,994,416.00 10.2054 10,982.106 627.300 11,609.406 7.737 0.442 8.178 6,965,643,600.00
5.1.(3a) Lapis Fondasi Agregat Kelas S M3 15,031.93 250,000.00 3,757,982,500.00 4.4123 5,191.410 - 5,191.410 1.524 - 1.524 1,297,852,500.00
Sub Total ( 5 ) 12,449,976,916.00 14.6176 9.260 0.442 9.702 8,263,496,100.00

13 / 16
PRESTASI
HARGA JUMLAH
No. VOLUME BOBOT KUANTITAS BOBOT ( % )
URAIAN SAT JUMLAH
Item ADD-06 SATUAN HARGA ( %) S/D MINGGU MINGGU S/D MINGGU S/D MINGGU MINGGU S/D MINGGU
(Rp.) (Rp.) LALU INI INI LALU INI INI (Rp.)
1 2 3 4 5 6 7 8 9 10 11 12 13 14
VI DIVISI 6. PERKERASAN ASPAL
6.1 (1)(a) Lapis Resap Pengikat - Aspal Cair Liter 46,717.40 15,000.00 700,760,995.99 0.8228 28,999.768 3,466.068 32,465.836 0.511 0.061 0.572 486,987,534.88
6.1 (2)(a) Lapis Perekat - Aspal Cair Liter 48,419.05 13,000.00 629,447,646.02 0.7390 26,596.953 1,956.098 28,553.050 0.406 0.030 0.436 371,189,655.96
6.3.(8) Bahan anti pengelupasan Kg 3,891.90 75,000.00 291,892,571.00 0.3427 2,086.218 107.460 2,193.678 0.184 0.009 0.193 164,525,843.25
6.5.(1b) Laston Lapis Aus Asbuton Butir (AC-WC Asb Butir) Ton 16,063.68 1,425,000.00 22,890,738,656.25 26.8762 11,810.573 639.644 12,450.217 19.760 1.070 20.831 17,741,559,937.50
6.5.(2b) Laston Lapis Antara Asbuton Butir (AC-BC Asb Butir) Ton 8,976.25 1,350,000.00 12,117,934,751.65 14.2278 6,416.130 694.210 7,110.340 10.170 1.100 11.270 9,598,958,522.78
Sub Total ( 6 ) 36,630,774,620.92 43.0085 31.031 2.271 33.302 28,363,221,494.37
VII DIVISI 7. STRUKTUR
7.1 (6a) Beton struktur, fc’25 Mpa (untuk penutup saluran) M3 576.00 1,700,000.00 979,200,000.00 1.1497 - - - - - - -
7.1 (7a) Beton struktur, fc’20 MPa (untuk bahu diperkeras) M3 2,654.17 1,125,000.00 2,985,941,250.00 3.5058 - - - - - - -
7.1 (10) Beton, fc’10 Mpa M3 - 1,100,000.00 - - - - - - - - -
7.3 (1) Baja Tulangan Polos-BjTP 280 Kg 82,775.89 19,000.00 1,572,741,910.00 1.8466 - - - - - - -
7.9.(1) Pasangan Batu M3 12,645.42 650,000.00 8,219,520,651.07 9.6506 7,856.348 462.120 8,318.468 5.996 0.353 6.348 5,407,003,935.94
7.10.(3a) Bronjong dengan kawat yang dilapisi Galvanis M3 500.00 725,000.00 362,500,000.00 0.4256 - - - - - - -
7.15.(1) Pembongkaran Pasangan Batu M3 529.49 304,690.52 161,330,583.43 0.1894 597.980 116.100 714.080 0.214 0.042 0.255 217,573,406.52
7.15.(2) Pembongkaran Beton M3 90.09 316,550.08 28,519,294.56 0.0335 35.984 12.000 47.984 0.013 0.004 0.018 15,189,370.69
Sub Total ( 7 ) 14,309,753,689.07 16.8012 6.223 0.399 6.622 5,639,766,713.15
IX DIVISI 9. PEKERJAAN HARIAN & PEKERJAAN LAIN-LAIN
9.1 Pekerjaan Harian
9.1.(2) Pekerja Biasa Jam 84.00 18,750.00 1,575,000.00 0.0018 - - - - - - -
9.1.(4) a Dump Truck, kapasitas 3 - 4 m³ Jam 84.00 200,000.00 16,800,000.00 0.0197 - - - - - - -
9.1.(6) Truk Tangki 3000 - 4500 Liter Jam 84.00 200,000.00 16,800,000.00 0.0197 - - - - - - -
9.1.(8) Motor Grader min 100 PK Jam 121.00 200,000.00 24,200,000.00 0.0284 - - - - - - -
9.1.(9) Loader Roda Karet 1.0 - 1.6 M3 Jam 126.00 200,000.00 25,200,000.00 0.0296 - - - - - - -
9.1.(13) Penggilas Roda Besi 6 - 9 Ton Jam 79.00 200,000.00 15,800,000.00 0.0186 - - - - - - -
9.2 Pekerjaan Lain-Lain
9.2.(1) Marka Jalan Termoplastik M2 12,284.04 120,000.00 1,474,084,800.00 1.7307 1,211.320 - 1,211.320 0.171 - 0.171 145,358,400.00
9.2.(3a) Rambu Jalan Tunggal dengan Permukaan Pemantul Engineering Grade Buah 144.00 450,000.00 64,800,000.00 0.0761 - - - - - - -
9.2.(5) Patok Pengarah, material Poly Ethylene (PE) Plastik murni/elastis Buah 1,490.00 300,000.00 447,000,000.00 0.5248 - - - - - - -
9.2.(6a) Patok Kilometer Buah 32.00 350,000.00 11,200,000.00 0.0132 - - - - - - -
9.2.(7) Rel Pengaman M1 4,072.80 850,000.00 3,461,880,000.00 4.0646 - - - - - - -
9.2(10a) Kerb Pracetak Jenis 1 (Peninggi/Mountable) M1 2,000.00 115,000.00 230,000,000.00 0.2700 - - - - - - -
9.2.(12a) Perkerasan Blok Beton pada Trotoar dan Median M2 2,400.00 135,000.00 324,000,000.00 0.3804 - - - - - - -
Sub Total ( 9 ) 6,113,339,800.00 7.1777 0.171 - 0.171 145,358,400.00
TOTAL 85,170,946,020.45 100.000 PROGRESS REALISASI 59.236 3.489 62.726 53,834,408,918.43
Pajak Pertambahan Nilai (Ppn) 11% 9,368,804,062.25 PROGRESS RENCANA 59.122 61.313 5,921,784,981.03
TOTAL 94,539,750,082.70 DEVIASI 0.115 3.489 1.413 59,756,193,899.46
DIBULATKAN 94,539,750,000.00 (3.489) 59,756,193,000.00
Disetujui Diperiksa Disiapkan
Direksi PUPR Konsultan Supervisi Kontraktor
PPK 1.3 Provinsi Sulawesi Tenggara PT. TRIBINA MATRA CARYA CIPTA KSO PT. WINSOLUSI PT. LINCE ROMAULI RAYA - PT. AGUNG
KONSULTAN - PT. ARISTA CIPTA SARANA PERSADA (KSO)

SUKARDJO Ir. MUHAMMAD IDRIS RAZAK RISKY KURNIAWAN, ST


NIP. : 19750226 200312 1 002 Supervision Engineer Manager Proyek

14 / 16
PROGRES BULAN SEPTEMBER 2023
NAMA PAKET : PRESERVASI JALAN POMALAA - WOLULU 16
RUAS : POMALAA - WOLULU
KONTRAKTOR : PT. LINCE ROMAULI RAYA - PT. AGUNG SARANA PERSADA (KSO) MINGGU KE 63 (KONTRAK TAHUN 2023)
KONSULTAN : PT. TRIBINA MATRA CARYA CIPTA KSO PT. WINSOLUSI KONSULTAN - PT. ARISTA CIPTA Periode : 26 Agustus - 01 September 2023
NO. KONTRAK : HK 0201-Bb21.1.3/286, Tanggal 17 Mei 2022

PRESTASI
HARGA JUMLAH
No. VOLUME BOBOT KUANTITAS BOBOT ( % )
URAIAN SAT JUMLAH
Item ADD-06 SATUAN HARGA ( %) S/D MINGGU MINGGU S/D MINGGU S/D MINGGU MINGGU S/D MINGGU
(Rp.) (Rp.) LALU INI INI LALU INI INI (Rp.)
1 2 3 4 5 6 7 8 9 10 11 12 13 14
15S/D BULAN 15BULAN 16INI 15INI
X DIVISI10. PEKERJAAN PEMELIHARAAN
10.1 Pemeliharaan Jalan
10.1.(3) Perbaikan Pasangan Batu dengan Mortar M3 280.76 1,270,455.74 356,687,180.87 91.6558 - - - - - - -
10.1.(4) Perbaikan Lapis Fondasi Agregat Kelas A M3 1.00 600,000.00 600,000.00 0.1542 161.195 - 161.195 24.853 - 24.853 96,716,716.38
10.1.(10a) Perbaikan Campuran Aspal Panas dengan Asbuton M3 1.00 2,900,000.00 2,900,000.00 0.7452 49.900 - 49.900 37.185 - 37.185 144,710,418.43
10.1.(10b) Perbaikan Campuran Aspal Panas dengan Asbuton M3 - 3,200,000.00 - - - - - - - - -
10.1.(21) Pembersihan Drainase dan Saluran Samping M1 1,349.39 5,500.00 7,421,645.00 1.9071 10,617.600 1,120.000 11,737.600 15.006 1.583 16.589 64,556,800.00
10.1.(22) Pengendalian Tanaman M2 43,100.86 500.00 21,550,430.00 5.5377 117,600.100 - 117,600.100 15.110 - 15.110 58,800,050.00
TOTAL 389,159,255.87 100.000 PROGRESS REALISASI 92.154 1.583 93.736 364,783,984.81
Pajak Pertambahan Nilai (Ppn) 11% 42,807,518.15 PROGRESS RENCANA 65.239 40.548 40,126,238.33
TOTAL 431,966,774.02 DEVIASI 26.915 1.583 53.188 404,910,223.14
DIBULATKAN 431,966,000.00 (1.583) 404,910,000.00

Disetujui Diperiksa Disiapkan


Direksi PUPR Konsultan Supervisi Kontraktor
PPK 1.3 Provinsi Sulawesi Tenggara PT. TRIBINA MATRA CARYA CIPTA KSO PT. WINSOLUSI PT. LINCE ROMAULI RAYA - PT.
KONSULTAN - PT. ARISTA CIPTA AGUNG SARANA PERSADA (KSO)

SUKARDJO Ir. MUHAMMAD IDRIS RAZAK RISKY KURNIAWAN, ST


NIP. : 19750226 200312 1 002 Supervision Engineer Manager Proyek

15 / 16
PROGRES BULAN SEPTEMBER 2023
NAMA PAKET : PRESERVASI JALAN POMALAA - WOLULU 16
RUAS : POMALAA - WOLULU
KONTRAKTOR : PT. LINCE ROMAULI RAYA - PT. AGUNG SARANA PERSADA (KSO) MINGGU KE 63 (KONTRAK TAHUN 2023)
KONSULTAN : PT. TRIBINA MATRA CARYA CIPTA KSO PT. WINSOLUSI KONSULTAN - PT. ARISTA CIPTA Periode : 26 Agustus - 01 September 2023
NO. KONTRAK : HK 0201-Bb21.1.3/286, Tanggal 17 Mei 2022

PRESTASI
HARGA JUMLAH
No. VOLUME BOBOT KUANTITAS BOBOT ( % )
URAIAN SAT JUMLAH
Item ADD-02 SATUAN HARGA ( %) S/D MINGGU MINGGU S/D MINGGU S/D MINGGU MINGGU S/D MINGGU
(Rp.) (Rp.) LALU INI INI LALU INI INI (Rp.)
1 2 3 4 5 6 7 8 9 10 11 12 13 14
15S/D BULAN 15BULAN 16INI INI
10.2 Pemeliharaan Jembatan
10.2.(1) Pemeliharaan Jembatan S SOPURA BOX Bentang 7 m LS 0.35 5,000,000.00 1,773,571.43 1.7094 0.215 0.071 0.286 1.036 0.342 1.378 1,430,000.00
10.2.(2) Pemeliharaan Jembatan S.SOPURA Bentang 20.8 m LS 0.35 22,000,000.00 7,803,714.29 7.5214 0.215 0.071 0.286 4.559 1.505 6.064 6,292,000.00
10.2.(3) Pemeliharaan Jembatan S.OKO-OKO I Bentang 9.8 m LS 0.35 12,500,000.00 4,433,928.57 4.2735 0.215 0.071 0.286 2.590 0.855 3.446 3,575,000.00
10.2.(4) Pemeliharaan Jembatan S.Oko-Oko II Bentang 8.9 m LS 0.35 10,000,000.00 3,547,142.86 3.4188 0.215 0.071 0.286 2.072 0.684 2.757 2,860,000.00
10.2.(5) Pemeliharaan Jembatan S.Oko-Ok0 III Bentang 20.8 m LS 0.35 25,000,000.00 8,867,857.14 8.5470 0.215 0.071 0.286 5.181 1.711 6.891 7,150,000.00
10.2.(6) Pemeliharaan Jembatan S.Oko-Oko IV Bentang 9.8 m LS 0.35 10,000,000.00 3,547,142.86 3.4188 0.215 0.071 0.286 2.072 0.684 2.757 2,860,000.00
10.2.(7) Pemeliharaan Jembatan S.Oko-Oko V Bentang 9.7 m LS 0.35 12,000,000.00 4,256,571.43 4.1026 0.215 0.071 0.286 2.487 0.821 3.308 3,432,000.00
10.2.(8) Pemeliharaan Jembatan S.Oko-Oko VI Bentang 6.8 m LS 0.35 9,000,000.00 3,192,428.57 3.0769 0.215 0.071 0.286 1.865 0.616 2.481 2,574,000.00
10.2.(9) Pemeliharaan Jembatan S.Lamedai I Bentang 8.9 m LS 0.35 11,500,000.00 4,079,214.29 3.9316 0.215 0.071 0.286 2.383 0.787 3.170 3,289,000.00
10.2.(10) Pemeliharaan Jembatan S.Lamedai II Bentang 8.9 m LS 0.35 11,500,000.00 4,079,214.29 3.9316 0.215 0.071 0.286 2.383 0.787 3.170 3,289,000.00
10.2.(11) Pemeliharaan Jembatan S.Box Tanggetada Bentang 6.9 m LS 0.35 6,000,000.00 2,128,285.71 2.0513 0.215 0.071 0.286 1.243 0.411 1.654 1,716,000.00
10.2.(12) Pemeliharaan Jembatan S.Tangketada Bentang 8.8 m LS 0.35 10,000,000.00 3,547,142.86 3.4188 0.215 0.071 0.286 2.072 0.684 2.757 2,860,000.00
10.2.(13) Pemeliharaan Jembatan S.Anaiwoi I Bentang 8.9 m LS 0.35 10,000,000.00 3,547,142.86 3.4188 0.215 0.071 0.286 2.072 0.684 2.757 2,860,000.00
10.2.(14) Pemeliharaan Jembatan S.Anaiwoi II Bentang 15.8 m LS 0.35 12,000,000.00 4,256,571.43 4.1026 0.215 0.071 0.286 2.487 0.821 3.308 3,432,000.00
10.2.(15) Pemeliharaan Jembatan S.Oneha I Bentang 10.3 m LS 0.35 10,000,000.00 3,547,142.86 3.4188 0.215 0.071 0.286 2.072 0.684 2.757 2,860,000.00
10.2.(16) Pemeliharaan Jembatan S.Oneha II Bentang 9.2 m LS 0.35 10,000,000.00 3,547,142.86 3.4188 0.215 0.071 0.286 2.072 0.684 2.757 2,860,000.00
10.2.(17) Pemeliharaan Jembatan S.Oneha III Bentang 8.7 m LS 0.35 10,000,000.00 3,547,142.86 3.4188 0.215 0.071 0.286 2.072 0.684 2.757 2,860,000.00
10.2.(18) Pemeliharaan Jembatan S.Oneha IV Bentang 12.8 m LS 0.35 13,000,000.00 4,611,285.71 4.4444 0.215 0.071 0.286 2.694 0.890 3.583 3,718,000.00
10.2.(19) Pemeliharaan Jembatan S.Oneha V Bentang 10.9 m LS 0.35 13,000,000.00 4,611,285.71 4.4444 0.215 0.071 0.286 2.694 0.890 3.583 3,718,000.00
10.2.(20) Pemeliharaan Jembatan S.Toengge Bentang 31.2 m LS 0.35 30,000,000.00 10,641,428.57 10.2564 0.215 0.071 0.286 6.217 2.053 8.270 8,580,000.00
10.2.(21) Pemeliharaan Jembatan S.Polewali Bentang 11 m LS 0.35 10,000,000.00 3,547,142.86 3.4188 0.215 0.071 0.286 2.072 0.684 2.757 2,860,000.00
10.2.(22) Pemeliharaan Jembatan S.Wolulu Bentang 30.3 m LS 0.35 30,000,000.00 10,641,428.57 10.2564 0.215 0.071 0.286 6.217 2.053 8.270 8,580,000.00
TOTAL 103,753,928.57 100.000 PROGRESS REALISASI 60.612 20.016 80.628 83,655,000.00
Pajak Pertambahan Nilai (Ppn) 11% 11,412,932.14 PROGRESS RENCANA 66.900 66.900 9,202,050.00
TOTAL 115,166,860.71 DEVIASI (6.288) 20.016 13.728 92,857,050.00
DIBULATKAN 115,166,000.00 (20.016) 92,857,000.00

Disetujui Diperiksa Disiapkan


Direksi PUPR Konsultan Supervisi Kontraktor
PPK 1.3 Provinsi Sulawesi Tenggara PT. TRIBINA MATRA CARYA CIPTA KSO PT. WINSOLUSI PT. LINCE ROMAULI RAYA - PT.
KONSULTAN - PT. ARISTA CIPTA AGUNG SARANA PERSADA (KSO)

SUKARDJO Ir. MUHAMMAD IDRIS RAZAK RISKY KURNIAWAN, ST


NIP. : 19750226 200312 1 002 Supervision Engineer Manager Proyek

16 / 16

Anda mungkin juga menyukai