Anda di halaman 1dari 23

B

Lantai Papan

Bronjong Bronjong PROVINSI

KABUPATEN
A A
2 KECAMATAN

1 DESA

JENIS PRASARANA
balok Kayu JEMBATAN KAYU
B LOKASI
DUSUN BUTATO
Ps BT 1 : 3
JUDUL GAMBAR
DENAH - DENAH
6,0 m 6,0 m - POTONGAN
- DETAIL

atap seng Dibuat Oleh :

1,5 m 1,8 m
Buk Sandaran
Sandaran Kayu
0,71 m 0,8 m

0,6 m
Diperiksa Oleh
0,3 m MAB

2,5 m
MAN

0,15 m
5,4 m 0,5 m Diketahui Oleh,
1,3 m 1,3 m
Pasangan Bronjong

POTONGAN A - A POTONGAN B - B

Lembar ke ….. Dari …….

Gambar Jembatan Kayu Desa Monano Data: @dr


2.15 12 - 10 12 - 20

12 - 15
0,4 m 12 - 10 PROVINSI
12 -10
KABUPATEN
0,2 m 3,0 m
KECAMATAN
0,15 m 0,30 m
DESA

PONDASI BETON JENIS PRASARANA


6,0 m JEMBATAN KAYU

PENULANGAN PLAT LOKASI

JUDUL GAMBAR
PENULANGAN BALOK Tulangan Lapangan Dia 16 Tulangan Tumpuan Dia 16 - DENAH
A Tulangan Tumpuan Dia 16 B Beugel / Sengkang Dia 12 C Beugel Dia 12 - POTONGAN
- DETAIL

0,20 m Dibuat Oleh :

0,20 m
1/4 L 1/2 L 1/4 L

TUMPUAN LAPANGAN TUMPUAN


8 16 4 16 8 16 Diperiksa Oleh

12 - 15

0,40 m 2 16 0,40 m 2 16 0,40 m 2 16


12 - 10 12 - 10 Diketahui Oleh,

4 16 8 16 4 16
0,25 m 0,25 m 0,25 m

DETAIL BALOK A - A DETAIL BALOK B - B DETAIL BALOK C - C

Lembar ke ….. Dari …….

Gambar Jembatan Kayu Desa Monano Data: @dr


PROVINSI

0,10 m Plesteran KABUPATEN

0,05 m KECAMATAN

2 10 DESA
0,5 m
6 - 15 0,60 m JENIS PRASARANA
JEMBATAN KAYU

LOKASI

0,3 m 0,25 m
JUDUL GAMBAR
0,15 m 1,5 m - DENAH
- POTONGAN
SANDARAN BUK SANDARAN - DETAIL

Dibuat Oleh :

Diperiksa Oleh

Diketahui Oleh,

Lembar ke ….. Dari …….

Gambar Jembatan Kayu Desa Monano Data: @dr


DAFTAR HARGA SATUAN UPAH DAN BAHAN & ALAT

Harga Satuan
No Upah dan Bahan Satuan Keterangan
(Rp.)
1 2 3 4 5
I. UPAH
1 Pekerja OH Rp 35,000.00
3 Tukang OH Rp 50,000.00

II. BAHAN
a. BAHAN LOKAL
1 Pasir Urug M3 Rp 125,000.00
2 Pasir Pasang M3 Rp 125,000.00 1 RET 135000
3 Batu Kali/Batu Belah M 3
Rp 125,000.00
4 Kerikil M3 Rp 125,000.00
5 Tanah Timbunan M3 Rp 70,000.00
6 Papan Maal M3 Rp 900,000.00 /lbr Rp.20.000,-
7 Balok 4/6 M3 /lbr Rp.21.000,-
8 Balok 5/7 M3
9 Balok 8/12 M3
10 Balok jembatan 30/30 M3
11 Rp 20,000.00

b. BAHAN NON LOKAL (TOKO)


1 Semen @ 50 Kg Kg Rp 80,500.00
2 Seng lbr Rp 56,000.00
3 Bendrat kg Rp 22,000.00
4 Besi Dia. 10 mm (full) ujg
5 Besi Dia. 12 mm (full) ujg Rp 120,000.00
6 Gergaji Besi bh Rp 45,000.00
7 Ember Bh Rp 8,500.00
8 Sekop Bh Rp 45,000.00
9 Pakul Bh
10 Pakul Campuran kg Rp 20,000.00
11 Paku Perahu 12 cm kg Rp 15,000.00
12 Paku seng kg Rp 25,000.00
13 Behel bh Rp 4,500.00
14 Bout cm bh Rp 3,500.00
15 Kawat Bronjong 4mm Ball Rp 610,000.00
16 Kawat Bronjong 3mm Ball Rp 575,000.00
17
PENGHITUNGAN VOLUME
Provinsi : Nama Kegiatan : Prasarana Umum No RAB : 005
Kabupaten : Jenis Prasarana : Jembatan Kayu
Kecamatan : Jenis Penanganan : Baru
Desa : Lokasi :
Volume : 2 x 12 M
SKETSA PERHITUNGAN HASIL

1. Galian Tanah Koporan Abutmen


TYPE I: TYPE II :
A. GALIAN JEMBATAN P= 2 M' P= 0
PANJANG 2 METER L = 1.30 L = 0.00
T = 0.50 T = 0.00

Galian Tanah Volume = 2 x 1.30 x 0.50 x 3 3.90 M3


Volume = 0 x 0.00 X 0.00 = 0.00 M3
Total Volume Galian 3.90 M3
2. Timbunan Tanah
TYPE I: TYPE II :
P= 0 M' P= 0
L = 0.00 M' L= 0.00
T= 0 M' T= 0.00
0,50
Volume = 0 x 0.00 x 0 = 0.00 M3
Volume = 0 x 0.00 x 0.00 = 0.00 M3
Total Vol.Timbunan 0.00 M3
2,0
3. Urugan Pasir
Type I Type I : Type II :
P= 2 M' P= 0 M'
L = 1.30 M' L = 0.00 M'
T = 0.15 M' T= 0 M'

Volume 1= 2 x 1.30 x 0.15 x 3 1.17 M3


Volume 2= 0 x 0.00 x 0 = 0.00 M3
30 15 30
Papan Deck Total Vol.Timb. Pasir 1.17 M3
Balok 4. Pasangan Batu Kali
Koporan Abutmen
P= 2 M' P= 2 M'
0,06 Mtr
L = 1.30 M' L = 0.68 M'
T= 0.5 T= 3.1 M'
0,34

Volume = 2 x 1.30 x 0.5 x 3 bh 3.90 M3


0,20 mtr Volume = 2 x 0.68 x 3.1 x 2 bh 8.37 M3
Volume = 2 x 0.68 x 3.1 x 1 bh 4.22 M3
Pondasi Beton
Volume = 2 x 0.60 x 0.45 x 2 bh 1.08 M3

Total Vol.Pas. Batu kali 15.41 M3


Abutmen 1:3
5. Pondasi Beton 1: 2:3
I P= 2 M' Besi Dia. 12 mm Full 306.40 M'
L = 0.90 M' TL.P 16 x 2.1 x 4 134.40 M'
T = 0.15 M' Begel 20 x 2.15 x 4 172.00 M'
Volume = 2 x 0.90 x 0.15 x 4 bh 1.08 M3

6. Pek. Siaran ; 1: 3
II 0,50 Type I : Type II :
0,15
P= 3.8 M' P= 4.7 M'
1,30 MTR
T = 2.30 M' L = 2.30 M'

Luas = 3.8 x 2.3 x 2 17 M2


Luas = 4.7 x 2.3 x 1 11 M2
0,85
Total Luas Plesteran 28 M2
0,25 7. Pek. Buk Sandaran
P= 1.5 M'
1,5 Mtr
BUK SANDARAN L = 1.10 M'
T= 0.3 M'
Volume 1 = 1.5 x 1.10 x 0.3 x 4.00 1.98 M3
Total Pas. Batu kali Err:522 M3
Plesteran Buk 3.6 x 1 x 4 57.60 M2
Bouplank Lata 5/5 30.00 Ujg
Papan Maal : 1 m3 50.00 Lbr
Paku Campuran 2 Kg

Dibuat Oleh :
PENGHITUNGAN VOLUME
Provinsi : Nama Kegiatan : Jembatan No RAB : 007
Kabupaten : Jenis Prasarana : Prasarana
Kecamatan : Jenis Penanganan : Pembangunan Baru
Desa : Lokasi :
Volume : 2 x 6.00 x (1 Unit)
SKETSA PERHITUNGAN HASIL

Gelagar Kayu & Lantai Papan Balok Kayu


P= 12
L= 0.20
2.5 M
T= 0.20
Volume = 12 x 0.20 x 0.20 x 4 1.92 M3

Papan Kayu
14 Mtr P= 2.5
L= 0.20
T= 0.04
Lantai Kayu Volume = 2.5 x 0.20 x 0.04 x 60 1.20 M3

1 M = 5 Papan Untuk Lantai


jadi 12 M = 12 x 5 / 2 30 Lbr

1 Lbr Papan Menggunakan 2 Angker Bout 10 Ø 20 cm

Jadi 60 x 2 x 4 480.00 Buah


RENCANA ANGGARAN BIAYA (RAB)
PROPINSI NO RAB :
KABUPATEN KEGIATAN : JEMBATAN DESA
KECAMATAN JENIS KEGIATAN : JEMBATAN GELAGAR KAYU (12 X 2,5) m
DESA UKURAN / DIMENSI : 1 UNIT

HARGA SAT DANA 2 DANA 1 JUMLAH


NO JENIS KEGIATAN PERHITUNGAN VOLUME SAT
Rp. Rp. Rp. Rp.
I BAHAN Volume
BETON 1:2:3
1 Batu Pecah 2/3 / kerikil 0.82 x 1.080 = 0.89 m3 125,000 110,700 110,700
2 Pasir 0.54 x 1.080 = 0.58 m3 125,000 72,900 72,900
3 Semen / PC 6.80 x 1.080 = 7.34 zak 80,500 591,200 591,200

BEKISTING
1 Papan 0.40 x 1.080 = 0.43 m3 900,000 388,800 388,800
2 Paku 4.00 x 1.080 = 4.32 Kg 20,000 86,400 86,400

PEMBESIAN
1 Besi Dia 6 1.10 x / 9.00 = 0.00 0 0
2 Besi Dia 10 1.10 x / 9.00 = 0.00 0 0
3 Besi Dia 12 1.10 x 306.4 / 10.00 = 33.70 Ujung 120,000 4,044,500 4,044,500
4 Besi Dia 16 1.10 x / 10.00 = 0.00 0 0
5 Bendrat 2.00 x = 0.00 22,000 0 0

PS BATU KALI 1:4


1 Batu Gunung / Kali 1.20 x 17.386 = 20.86 m3 125,000 360,000 2,247,900 2,607,900
2 Pasir 0.52 x 17.386 = 9.08 m3 125,000 1,134,400 1,134,400
3 Semen / PC 2.60 x 17.386 = 45.20 zak 80,500 3,638,900 3,638,900

SIARAN 1:3
1 Pasir Pasang 0.010 x 28.290 = 0.28 m3 125,000 35,300 35,300
2 Semen / PC 0.084 x 28.290 = 2.38 zak 80,500 191,300 191,300

PLESTERAN 1:4
1 Pasir Pasang 0.030 x 57.60 = 1.73 m3 125,000 216,000 216,000
2 Semen / PC 0.105 x 57.60 = 6.05 zak 80,500 486,800 486,800

SANDARAN
1 Kayu 1.10 x 26.0 / 4.00 = 7.15 m3 70,000 500,500 500,500
Kuda-kuda Lbr

GELAGAR KAYU
1 Kayu (20/20) Kelas I 1.92 m3 3,000,000 5,760,000 5,760,000
2 Papan Lantai Kayu (4/20) P 30.00 Lbr 70,000 2,100,000 2,100,000
=5M 12.00 Lbr 90,000 1,080,000 1,080,000
3 Kayu Rell Gelagar (6/20) P =
6M
3 Angker Bout 480.00 Buah 12,000 5,760,000 5,760,000

TIMBUNAN
1 Tanah urug 1.34 x 54.00 = 72.36 m3 15,000 1,085,400 1,085,400
2 Sirtu 1.34 x 6.00 = 8.04 m3 35,000 281,400 281,400

Sub Total 29,812,400 30,172,400


II UPAH
BETON 1:2:3
1 Pekerja 6.00 x 1.080 = 6.48 Hok 35,000 226,800 226,800
2 Tukang 1.00 x 1.080 = 1.08 Hok 50,000 54,000 54,000

BEKISTING
1 Pekerja 2.00 x 1.080 = 2.16 Hok 35,000 75,600 75,600
2 Tukang 9.00 x 1.080 = 9.72 Hok 50,000 486,000 486,000

PEMBESIAN
1 Pekerja 6.75 x 1,795.69 / 100 = 121.21 Hok 35,000 4,242,300 4,242,300
2 Tukang 6.75 x 1,795.69 / 100 = 121.21 Hok 50,000 6,060,400 6,060,400

PS BATU KALI 1:4


1 Pekerja 2.00 x 17.386 = 34.77 Hok 35,000 1,217,000 1,217,000
2 Tukang 1.00 x 17.386 = 17.39 Hok 50,000 869,300 869,300

SIARAN 1:3
1 Pekerja 0.30 x 28.290 = 8.49 Hok 35,000 297,000 297,000
2 Tukang 0.13 x 28.290 = 3.68 Hok 50,000 183,900 183,900

PLESTERAN 1:4
1 Pekerja 0.24 x 57.600 = 13.82 Hok 35,000 483,800 483,800
2 Tukang 0.16 x 57.600 = 9.22 Hok 50,000 460,800 460,800

SANDARAN
1 Pekerja 5.00 x 7.150 = 35.75 Hok 35,000 1,251,250 1,251,250
2 Tukang 4.00 x 7.150 = 28.60 Hok 50,000 1,430,000 1,430,000

LANTAI GELAGAR
1 Pekerja 5.00 x 30.000 = 150.00 Hok 35,000 5,250,000 5,250,000
2 Tukang 4.00 x 30.000 = 120.00 Hok 50,000 6,000,000 6,000,000

GELAGAR KAYU
1 Pekerja 5.00 x 1.920 = 9.60 Hok 35,000 336,000 336,000
2 Tukang 4.00 x 1.920 = 7.68 Hok 50,000 384,000 384,000

ANGKER JEMBATAN
1 Pekerja 0.03 x 480.000 = 12.00 Hok 35,000 420,000 420,000
2 Tukang 0.01 x 480.000 = 4.80 Hok 50,000 240,000 240,000

PEMBERSIHAN
GALIAN TANAH
- Tanah Keras 0 0
- Tanah Biasa 2.00 x 6.40 x 1 / 2.00 = 6.4 Hok 35,000 224,000 224,000
724.05 Sub Total 0 30,192,150 30,192,150
III ALAT
1 Ganco 2.0 bh 30,000 0 60,000 60,000
2 Cangkul 3.0 bh 30,000 25,000 65,000 90,000
Linggis 60,000
3 Cek Dam (karung pasir) 30.0 ls 3,000 90,000 90,000
Sekop 80,000
4 Molen 7.0 hr 20,000 0 140,000 140,000
Paku well 30,000
5 Benang 8.0 roll 2,500 0 20,000 20,000
6 Ember 20.0 bh 5,000 15,000 85,000 100,000

Sub Total 210,000 460,000 500,000


TOTAL 210,000 60,464,550
TOTAL DANA 1 60,464,550
Catatan : TOTAL DANA 2 210,000
JUMLAH TOTAL 60,674,550
REKAPITULASI ANGGARAN BIAYA
KECAMATAN
DESA

KEGIATAN : Jembatan Kayu


UKURAN : ……………...Mtr
BOBOT
NO URAIAN JUMLAH : 1 Unit
NO RAB :
Dana 1 Dana 2 %
I BAHAN
29,812,399.78 360,000.00 49.31
(tidak perlu dirinci)
II PERALATAN
460,000.00 210,000.00 0.76
(tidak perlu dirinci)
III UPAH
30,192,150.00 - 49.93
(tidak perlu dirinci)
IV LAIN - LAIN - -

JUMLAH (Rp) 60,464,549.78 570,000.00 100.00


V Operasional 1
VI Operasional 2
JUMLAH (Rp)
JUMLAH TOTAL(Rp) 60,464,549.78 200.00
Jumlah Biaya Upah 30,192,150.00
Jumlah HOK Konstrksi 724.05
Lokasi Jembatan Kayu

PAB

Gunung Provinsi

Kecamatan

Desa

Lokasi
Rencana Drainase

Judul Gambar
Peta Situasi, Denah , Potongan

Di Buat Oleh :

Kantor Desa
SMA I BONE

P0

P4 Diperiksa Oleh :
bengkel
Bengkel
Pasar 2007
P5

Legenda : MCK & SGL


Mesjid Sal Air
Rumah Penduduk Jalan Desa
Sekolah MI & TK Renc.Drainase Lembar Dari : 001
Kantor Desa Batas Desa
Pos Yandu Drainase PNPM-MP
JADWAL PELAKSANAAN
Provinsi : Nama Kegiatan : Jembatan Kayu
Kabupaten : Volume : 12 x 2,5 Meter
Kecamatan : Lokasi :
Desa : Jangka Waktu pelaksanaan : 60 (enam puluh) hari Kalender

BOBOT BULAN
NO JENIS PEKERJAAN VOLUME SATUAN PEK. I II III %
(%) 1 2 3 4 1 2 3 4 1

1 Pek. Galian Tanah Koporan Abutmen 3.90 M3 0.73 0.73

2 Pekerjaan Timbunan Tanah 0.00 M3 - 0.00 0.00

3 Pekerjaan Urugan Pasir 1.17 M3 0.22 0.22

4 Pekerjaan Pasangan Batu Kali 15.41 M3 2.88 1.44 1.44

5 Pekerjaan Pondasi Beton 1.08 M3 0.20 0.20

6 Pekerjaan Siaran 28.29 M2 5.29 5.29

7 pekerjaan Buk Sandaran 1.98 M3 0.37 0.37

8 Pekerjaan Balok Kayu 1.92 M3 0.36 0.36

9 Pekerjaan lantai Gelagar 1.20 M3 0.22 0.22

10 Pek Pemasangan Anker Lantai Gelagar 480.00 Buah 89.73 89.73

JUMLAH BOBOT PEKERJAAN 534.95 - 100 0.73 0.22 1.44 1.44 0.20 5.29 0.73 0.22 89.73
KEMAJUAN PEKERJAAN (%) 0.73 0.95 2.39 3.83 4.03 9.32 10.05 10.27 100.00
KUMULATIF KEMAJUAN (%)
8,0 Meter

Muka Air Banjir

MAN

12 7,7-8,50
2,0 Meter

1.9

Muka Air Banjir


0.9

0
DAFTAR HARGA SATUAN UPAH DAN BAHAN
PROPINSI NO RAB : 002
KABUPATEN KEGIATAN : PRASARANA KESEHATAN
KECAMATAN JENIS KEGIATAN : JEMBATAN KAYU
DESA UKURAN / DIMENSI : Meter

HARGA HARGA DI LOKASI


NO URAIAN SAT Toko Karya Agung KEGIATAN KETERANGAN
BIAYA TRANSPORT
Rp. RP.
A BAHAN
1 Semen / PC zak Rp 62,500.00 Rp. 85,000.00
2 Pasir m3 Rp 130,000.00 Rp. 96,000.00 1Ret isi 1,3 M3 Rp. 125.000,-
3 Batu Gunung m3 Rp 100,000.00 Rp. 100,000.00
4 Batu Pecah 2/3 / Kerikil m3 Rp 130,000.00 Rp. 80,000.00
5 Besi Dia 12" (full) 12 Meter ujung Rp 85,000.00 Rp. 132,500.00
6 Besi Dia 10" (full) 12 Meter ujung Rp 60,000.00 Rp. 90,000.00
7 Besi Dia 8" (full) 12 Meter ujung Rp 40,000.00 Rp. 70,000.00
8 Besi Dia 6" (full) 12 Meter ujung Rp 22,500.00 Rp. 42,500.00
9 Bendrat Kg Rp 22,000.00 Rp. 20,000.00
10 Seng Gelombang Lbr
11 Kawat Brojong Ball
12 Ijuk Glg
13 Paku Campuran kg Rp. 20,000.00
14 Papan Mall lbr Rp 20,000.00 Rp.
15 KAYU m3 Rp 1,400,000.00 150000/M3
16

SUB TOTAL A
B UPAH
1 Pekerja hok Rp 40,000.00 Rp. 35,000.00
2 Tukang hok Rp 60,000.00 Rp. 50,000.00
3 Ketua Kelompok / Mandor Rp 40,000.00
SUB TOTAL B
C ALAT
1 Linggis bh Rp. 50,000.00
2 Pacul bh Rp 50,000.00 Rp. 45,000.00
3 Sekop bh Rp 70,000.00 Rp. 50,000.00
4 Ember bh Rp. 7,500.00
5 Parang bh Rp 27,500.00 Rp. 17,500.00
6 Martel bh Rp 37,500.00
7 Gergaji bh Rp 60,000.00

SUB TOTAL C

TOTAL A+B+C
DANa 1 -
SUMBER DANA
Dana 2 -
Catatan :
PENGHITUNGAN VOLUME
Provinsi : Nama Kegiatan : Prasarana Umum No RAB : 005
Kabupaten : Jenis Prasarana : Jembatan Kayu
Kecamatan : Jenis Penanganan : Baru
Desa : Lokasi :
Volume : 2 x 12 M
SKETSA PERHITUNGAN HASIL

1. Galian Tanah Koporan Abutmen


TYPE I: TYPE II :
A. GALIAN JEMBATAN P= 2 M' P= 0
PANJANG 2 METER L = 1.30 L = 0.00
T = 0.50 T = 0.00

Galian Tanah Volume = 2 x 1.30 x 0.50 x 3 3.90 M3


Volume = 0 x 0.00 X 0.00 = 0.00 M3
Total Volume Galian 3.90 M3
2. Timbunan Tanah
TYPE I: TYPE II :
P= 0 M' P= 0
L = 0.00 M' L= 0.00
T= 0 M' T= 0.00
0,50
Volume = 0 x 0.00 x 0 = 0.00 M3
Volume = 0 x 0.00 x 0.00 = 0.00 M3
2,0 Total Vol.Timbunan 0.00 M3
3. Urugan Pasir
Type I Type I : Type II :
P= 2 M' P= 0 M'
L = 1.30 M' L = 0.00 M'
T = 0.15 M' T= 0 M'

Volume 1= 2 x 1.30 x 0.15 x 3 1.17 M3


Volume 2= 0 x 0.00 x 0 = 0.00 M3
30 15 30
Papan Deck Total Vol.Timb. Pasir 1.17 M3
Balok 4. Pasangan Batu Kali
Koporan Abutmen
P= 2 M' P= 2 M'
0,06 Mtr
L = 1.30 M' L = 0.68 M'
T= 0.5 T= 3.1 M'
0,34

Volume = 2 x 1.30 x 0.5 x 3 bh 3.90 M3


0,20 mtr Volume = 2 x 0.68 x 3.1 x 2 bh 8.37 M3
Volume = 2 x 0.68 x 3.1 x 1 bh 4.22 M3
Pondasi Beton
Volume = 2 x 0.60 x 0.45 x 2 bh 1.08 M3

Total Vol.Pas. Batu kali 15.41 M3


Abutmen 1:3
5. Pondasi Beton 1: 2:3
I P= 2 M' Besi Dia. 12 mm Full 306.40 M'
L = 0.90 M' TL.P 16 x 2.1 x 4 134.40 M'
T = 0.15 M' Begel 20 x 2.15 x 4 172.00 M'
Volume = 2 x 0.90 x 0.15 x 4 bh 1.08 M3

6. Pek. Siaran ; 1: 3
II 0,50 Type I : Type II :
0,15
P= 3.8 M' P= 4.7 M'
1,30 MTR
T = 2.30 M' L = 2.30 M'

Luas = 3.8 x 2.3 x 2 17 M2


Luas = 4.7 x 2.3 x 1 11 M2
0,85
Total Luas Plesteran 28 M2
0,25 7. Pek. Buk Sandaran
P= 1.5 M'
1,5 Mtr
BUK SANDARAN L = 1.10 M'
T= 0.3 M'
Volume 1 = 1.5 x 1.10 x 0.3 x 4.00 1.98 M3
Total Pas. Batu kali Err:522 M3
Plesteran Buk 3.6 x 1x 4 57.60 M2
Bouplank Lata 5/5 30.00 Ujg
Papan Maal : 1 m3 50.00 Lbr
Paku Campuran 2 Kg
PENGHITUNGAN VOLUME
Provinsi : Nama Kegiatan : Jembatan No RAB : 007
Kabupaten : Jenis Prasarana : Prasarana
Kecamatan : Jenis Penanganan : Pembangunan Baru
Desa : Lokasi :
Volume : 2 x 6.00 x (1 Unit)
SKETSA PERHITUNGAN HASIL

Gelagar Kayu Balok Kayu


P= 6.5
L = 0.30
T = 0.30
Volume = 6.5 x 0.30 x 0.30 x 6 3.51 M3
Tiang +Kuda2
Bubungan 14 m'
6,50 Seng 18.67 56 Lbr
Bubungan
Balok 5/7 Ujg
Seng
Balok 4/6
Balok 8/12 Ujg
Kuda-Kuda 5/7 Tiang +Kuda2 8/12 Ujg
Tiang raja 8/12

1,20 mtr

2,50 mtr

Anda mungkin juga menyukai