Lantai Papan
KABUPATEN
A A
2 KECAMATAN
1 DESA
JENIS PRASARANA
balok Kayu JEMBATAN KAYU
B LOKASI
DUSUN BUTATO
Ps BT 1 : 3
JUDUL GAMBAR
DENAH - DENAH
6,0 m 6,0 m - POTONGAN
- DETAIL
1,5 m 1,8 m
Buk Sandaran
Sandaran Kayu
0,71 m 0,8 m
0,6 m
Diperiksa Oleh
0,3 m MAB
2,5 m
MAN
0,15 m
5,4 m 0,5 m Diketahui Oleh,
1,3 m 1,3 m
Pasangan Bronjong
POTONGAN A - A POTONGAN B - B
12 - 15
0,4 m 12 - 10 PROVINSI
12 -10
KABUPATEN
0,2 m 3,0 m
KECAMATAN
0,15 m 0,30 m
DESA
JUDUL GAMBAR
PENULANGAN BALOK Tulangan Lapangan Dia 16 Tulangan Tumpuan Dia 16 - DENAH
A Tulangan Tumpuan Dia 16 B Beugel / Sengkang Dia 12 C Beugel Dia 12 - POTONGAN
- DETAIL
0,20 m
1/4 L 1/2 L 1/4 L
12 - 15
4 16 8 16 4 16
0,25 m 0,25 m 0,25 m
0,05 m KECAMATAN
2 10 DESA
0,5 m
6 - 15 0,60 m JENIS PRASARANA
JEMBATAN KAYU
LOKASI
0,3 m 0,25 m
JUDUL GAMBAR
0,15 m 1,5 m - DENAH
- POTONGAN
SANDARAN BUK SANDARAN - DETAIL
Dibuat Oleh :
Diperiksa Oleh
Diketahui Oleh,
Harga Satuan
No Upah dan Bahan Satuan Keterangan
(Rp.)
1 2 3 4 5
I. UPAH
1 Pekerja OH Rp 35,000.00
3 Tukang OH Rp 50,000.00
II. BAHAN
a. BAHAN LOKAL
1 Pasir Urug M3 Rp 125,000.00
2 Pasir Pasang M3 Rp 125,000.00 1 RET 135000
3 Batu Kali/Batu Belah M 3
Rp 125,000.00
4 Kerikil M3 Rp 125,000.00
5 Tanah Timbunan M3 Rp 70,000.00
6 Papan Maal M3 Rp 900,000.00 /lbr Rp.20.000,-
7 Balok 4/6 M3 /lbr Rp.21.000,-
8 Balok 5/7 M3
9 Balok 8/12 M3
10 Balok jembatan 30/30 M3
11 Rp 20,000.00
6. Pek. Siaran ; 1: 3
II 0,50 Type I : Type II :
0,15
P= 3.8 M' P= 4.7 M'
1,30 MTR
T = 2.30 M' L = 2.30 M'
Dibuat Oleh :
PENGHITUNGAN VOLUME
Provinsi : Nama Kegiatan : Jembatan No RAB : 007
Kabupaten : Jenis Prasarana : Prasarana
Kecamatan : Jenis Penanganan : Pembangunan Baru
Desa : Lokasi :
Volume : 2 x 6.00 x (1 Unit)
SKETSA PERHITUNGAN HASIL
Papan Kayu
14 Mtr P= 2.5
L= 0.20
T= 0.04
Lantai Kayu Volume = 2.5 x 0.20 x 0.04 x 60 1.20 M3
BEKISTING
1 Papan 0.40 x 1.080 = 0.43 m3 900,000 388,800 388,800
2 Paku 4.00 x 1.080 = 4.32 Kg 20,000 86,400 86,400
PEMBESIAN
1 Besi Dia 6 1.10 x / 9.00 = 0.00 0 0
2 Besi Dia 10 1.10 x / 9.00 = 0.00 0 0
3 Besi Dia 12 1.10 x 306.4 / 10.00 = 33.70 Ujung 120,000 4,044,500 4,044,500
4 Besi Dia 16 1.10 x / 10.00 = 0.00 0 0
5 Bendrat 2.00 x = 0.00 22,000 0 0
SIARAN 1:3
1 Pasir Pasang 0.010 x 28.290 = 0.28 m3 125,000 35,300 35,300
2 Semen / PC 0.084 x 28.290 = 2.38 zak 80,500 191,300 191,300
PLESTERAN 1:4
1 Pasir Pasang 0.030 x 57.60 = 1.73 m3 125,000 216,000 216,000
2 Semen / PC 0.105 x 57.60 = 6.05 zak 80,500 486,800 486,800
SANDARAN
1 Kayu 1.10 x 26.0 / 4.00 = 7.15 m3 70,000 500,500 500,500
Kuda-kuda Lbr
GELAGAR KAYU
1 Kayu (20/20) Kelas I 1.92 m3 3,000,000 5,760,000 5,760,000
2 Papan Lantai Kayu (4/20) P 30.00 Lbr 70,000 2,100,000 2,100,000
=5M 12.00 Lbr 90,000 1,080,000 1,080,000
3 Kayu Rell Gelagar (6/20) P =
6M
3 Angker Bout 480.00 Buah 12,000 5,760,000 5,760,000
TIMBUNAN
1 Tanah urug 1.34 x 54.00 = 72.36 m3 15,000 1,085,400 1,085,400
2 Sirtu 1.34 x 6.00 = 8.04 m3 35,000 281,400 281,400
BEKISTING
1 Pekerja 2.00 x 1.080 = 2.16 Hok 35,000 75,600 75,600
2 Tukang 9.00 x 1.080 = 9.72 Hok 50,000 486,000 486,000
PEMBESIAN
1 Pekerja 6.75 x 1,795.69 / 100 = 121.21 Hok 35,000 4,242,300 4,242,300
2 Tukang 6.75 x 1,795.69 / 100 = 121.21 Hok 50,000 6,060,400 6,060,400
SIARAN 1:3
1 Pekerja 0.30 x 28.290 = 8.49 Hok 35,000 297,000 297,000
2 Tukang 0.13 x 28.290 = 3.68 Hok 50,000 183,900 183,900
PLESTERAN 1:4
1 Pekerja 0.24 x 57.600 = 13.82 Hok 35,000 483,800 483,800
2 Tukang 0.16 x 57.600 = 9.22 Hok 50,000 460,800 460,800
SANDARAN
1 Pekerja 5.00 x 7.150 = 35.75 Hok 35,000 1,251,250 1,251,250
2 Tukang 4.00 x 7.150 = 28.60 Hok 50,000 1,430,000 1,430,000
LANTAI GELAGAR
1 Pekerja 5.00 x 30.000 = 150.00 Hok 35,000 5,250,000 5,250,000
2 Tukang 4.00 x 30.000 = 120.00 Hok 50,000 6,000,000 6,000,000
GELAGAR KAYU
1 Pekerja 5.00 x 1.920 = 9.60 Hok 35,000 336,000 336,000
2 Tukang 4.00 x 1.920 = 7.68 Hok 50,000 384,000 384,000
ANGKER JEMBATAN
1 Pekerja 0.03 x 480.000 = 12.00 Hok 35,000 420,000 420,000
2 Tukang 0.01 x 480.000 = 4.80 Hok 50,000 240,000 240,000
PEMBERSIHAN
GALIAN TANAH
- Tanah Keras 0 0
- Tanah Biasa 2.00 x 6.40 x 1 / 2.00 = 6.4 Hok 35,000 224,000 224,000
724.05 Sub Total 0 30,192,150 30,192,150
III ALAT
1 Ganco 2.0 bh 30,000 0 60,000 60,000
2 Cangkul 3.0 bh 30,000 25,000 65,000 90,000
Linggis 60,000
3 Cek Dam (karung pasir) 30.0 ls 3,000 90,000 90,000
Sekop 80,000
4 Molen 7.0 hr 20,000 0 140,000 140,000
Paku well 30,000
5 Benang 8.0 roll 2,500 0 20,000 20,000
6 Ember 20.0 bh 5,000 15,000 85,000 100,000
PAB
Gunung Provinsi
Kecamatan
Desa
Lokasi
Rencana Drainase
Judul Gambar
Peta Situasi, Denah , Potongan
Di Buat Oleh :
Kantor Desa
SMA I BONE
P0
P4 Diperiksa Oleh :
bengkel
Bengkel
Pasar 2007
P5
BOBOT BULAN
NO JENIS PEKERJAAN VOLUME SATUAN PEK. I II III %
(%) 1 2 3 4 1 2 3 4 1
JUMLAH BOBOT PEKERJAAN 534.95 - 100 0.73 0.22 1.44 1.44 0.20 5.29 0.73 0.22 89.73
KEMAJUAN PEKERJAAN (%) 0.73 0.95 2.39 3.83 4.03 9.32 10.05 10.27 100.00
KUMULATIF KEMAJUAN (%)
8,0 Meter
MAN
12 7,7-8,50
2,0 Meter
1.9
0
DAFTAR HARGA SATUAN UPAH DAN BAHAN
PROPINSI NO RAB : 002
KABUPATEN KEGIATAN : PRASARANA KESEHATAN
KECAMATAN JENIS KEGIATAN : JEMBATAN KAYU
DESA UKURAN / DIMENSI : Meter
SUB TOTAL A
B UPAH
1 Pekerja hok Rp 40,000.00 Rp. 35,000.00
2 Tukang hok Rp 60,000.00 Rp. 50,000.00
3 Ketua Kelompok / Mandor Rp 40,000.00
SUB TOTAL B
C ALAT
1 Linggis bh Rp. 50,000.00
2 Pacul bh Rp 50,000.00 Rp. 45,000.00
3 Sekop bh Rp 70,000.00 Rp. 50,000.00
4 Ember bh Rp. 7,500.00
5 Parang bh Rp 27,500.00 Rp. 17,500.00
6 Martel bh Rp 37,500.00
7 Gergaji bh Rp 60,000.00
SUB TOTAL C
TOTAL A+B+C
DANa 1 -
SUMBER DANA
Dana 2 -
Catatan :
PENGHITUNGAN VOLUME
Provinsi : Nama Kegiatan : Prasarana Umum No RAB : 005
Kabupaten : Jenis Prasarana : Jembatan Kayu
Kecamatan : Jenis Penanganan : Baru
Desa : Lokasi :
Volume : 2 x 12 M
SKETSA PERHITUNGAN HASIL
6. Pek. Siaran ; 1: 3
II 0,50 Type I : Type II :
0,15
P= 3.8 M' P= 4.7 M'
1,30 MTR
T = 2.30 M' L = 2.30 M'
1,20 mtr
2,50 mtr