Tamansari Equine Pulomas, Urbantown Sudimara, Gas Development Project for JTB, Plaza
Telkom Mataram, Apartemen Westonia Cilejit, Rusun PUPR, Pabrik Biodiesel Jhonlin, dll.
q = 12 kN/m
A B
6 meter
12 x 6
RA = RB = = 36 kN
36 kN
2
X = 2 m; Mx=2 = 36 x 2 − 12 x 2 1 = 48 kN. m
36 kN
X = 4 m; Mx=3 = 36 x 4 − 12 x 4 2 = 48 kN. m
48 kN.m 48 kN.m
54 kN.m
P1 = 6 t P2 = 6 t P3 = 6 t
q = 3 t/m
D
A 2 EI B 1.5 EI C
1m 3m 1m 2m 2m 1m
Model
Momen
(Ton.m)
Lintang
(Ton)
q = 4 kN/m
1. Momen Primer
qL2 8 6 2
E F MCD = −
12
=−
12
= −24 kN. m ; MDC = 24 kN. m
qL2 4 6 2
MEF = − =− = −12 kN. m ; MDC = 12 kN. m
12 12
3.5 m 2. Faktor Kekakuan Balok
4EI 4EI
q = 8 kN/m k AC = k BD = k CE = k DF = = = 1.143 EI
L 3.5
4EI 4EI
k CB = k EF = = = 0.667 EI
C D
L 6
0.667EI
A B μCD =
0.667EI+1.143EI+1.143EI
= 0.226
6m 1.143EI 0.667EI
μEC = = 0.631 μEF = = 0.369
1.143EI+0.667EI 0.667EI+1.143EI
M. Final 4.56 9.18 -21.30 12.12 10.34 -10.34 10.34 -10.34 -12.12 21.30 -9.18 -4.56
1.72 1.72
E F 6.41 3.46 2.95 6.41 3.46 2.95
12 12
12.12 12.12
3.5 m
12 12
q = 8 kN/m
FREE BODY DIAGRAM
12 12
C D
24 24
21.30 q = 8 kN/m 21.30
9.18 9.18
3.5 m
6m 3.55 3.55
24 24
4.56 4.56
36 36
Manual..???
Jenis satuan yang digunakan: Metric SI, Metric MKS, U.S Customary
Database baja struktural
Peraturan desain struktur baja (AISC 360-16 : SNI 1729-2020)
Peraturan desain struktur beton bertulang (ACI 318-14 : SNI 2847-2019)
Grid model
Model explorer
massa
drawing model
define material
MODELING AND
STRUCTURAL ANALYSIS WITH ETABS
Martinus Nifotuho Fau
- Structural Engineer -
martinusnfau@gmail.com 0852-1401-3273
PERTEMUAAN 2
(Minggu, 6 Desember 2020)
story data
grid X dan Y
SNI 2847-2019
load patterns
load combination
drawing model
SNI 1727:2020
Bordes W2 Wall 1.2DL + 1.6LL -3.081 -67.38 7.653 2.299 15.136 0.047
Jarak (S) = 150 mm Bordes W2 Wall 1.2DL + 1.6LL -11.381 -69.039 -2.134 2.894 14.815 -0.09
= Bordes W2 Wall 1.2DL + 1.6LL -4.651 -64.962 -0.343 1.005 14.542 0.576
Fy 420 Mpa
Bordes W2 Wall 1.2DL + 1.6LL -15.218 -100.828 4.854 2.56 14.493 0.206
d = 125 mm Bordes W2 Wall 1.2DL + 1.6LL -13.685 -93.163 6.359 2.667 14.474 0.157
= (As/s)*Fy*0,85*d Bordes W2 Wall 1.2DL + 1.6LL -13.428 -93.614 7.263 2.456 14.387 -0.069
Mn
Bordes W2 Wall 1.2DL + 1.6LL -13.323 -93.091 6.645 2.501 14.379 0.179
= 23353.75 N mm/mm Bordes W2 Wall 1.2DL + 1.6LL -16.415 -94.211 3.081 2.526 14.33 0.085
= Bordes W2 Wall 1.2DL + 1.6LL -11.683 -100.12 6.741 1.418 14.16 0.04
23.35 KNm/m
LT 2 W3 Wall 1.2DL + 1.6LL 0.481 108.739 0.962 0.351 13.835 0.067
Mmaks SAP2000 = 16.18 KNm/m LT 2 W3 Wall 1.2DL + 1.6LL 0.307 107.119 1.701 0.347 13.826 0.133
LT 2 W3 Wall 1.2DL + 1.6LL 0.177 106.468 0.524 0.345 13.819 0.04
Mn > Mmaks ==> OK
LT 2 W3 Wall 1.2DL + 1.6LL -0.288 104.895 0.123 0.351 13.813 -0.019
Jadi dipakai tulangan utama slab tangga D10 - 150 mm LT 2 W3 Wall 1.2DL + 1.6LL -1.009 106.627 1.463 0.816 13.542 0.108
LT 2 W3 Wall 1.2DL + 1.6LL -0.453 109.04 1.002 0.813 13.541 0.078
LT 2 W3 Wall 1.2DL + 1.6LL -1.169 105.462 2.146 0.82 13.539 0.003
Perhitungan tulangan susut LT 2 W3 Wall 1.2DL + 1.6LL -0.791 107.715 2.88 0.814 13.534 0.037
= 10 mm LT 2 W3 Wall 1.2DL + 1.6LL 0.583 109.248 0.4 0.36 13.457 -0.004
Dicoba tulangan dia.
LT 2 W3 Wall 1.2DL + 1.6LL 0.259 106.88 0.647 0.353 13.451 0.025
Rasio Minimun 0.002 = 750 mm2 LT 2 W3 Wall 1.2DL + 1.6LL 0.477 107.969 2.064 0.353 13.446 0.116
LT 2 W3 Wall 1.2DL + 1.6LL -0.133 105.669 1.544 0.353 13.442 0.081
As = 78.54 mm2
LT 2 W3 Wall 1.2DL + 1.6LL -0.439 106.922 3.47 0.968 13.401 0.092
Jumlah tulangan = As Perlu / As LT 2 W3 Wall 1.2DL + 1.6LL -0.542 106.405 2.135 0.974 13.396 0.017
= LT 2 W3 Wall 1.2DL + 1.6LL 0.12 109.715 3.098 0.969 13.392 0.084
9.55
LT 2 W3 Wall 1.2DL + 1.6LL 0.017 109.202 2.405 0.97 13.389 0.026
= 10 buah LT 2 W3 Wall 1.2DL + 1.6LL -0.971 106.816 3.282 0.826 13.375 0.027
= LT 2 W3 Wall 1.2DL + 1.6LL -0.337 109.624 2.511 0.826 13.37 0.016
Jarak antar tulangan 333 mm
LT 2 W3 Wall 1.2DL + 1.6LL -0.63 106.307 0.62 0.342 13.364 -0.26
Jadi dipakai tulangan susut D10 - 200 mm LT 2 W3 Wall 1.2DL + 1.6LL -0.226 111.455 -0.286 0.33 13.362 0.459
Persyaratan material baja tulangan untuk SRPMK dan SDSK (Pasal 20.2.2.5):
Spesifikasi BjTS 420B dalam
SNI 2052:2017 memenuhi
ketiga persyaratan pada
20.2.2.5.b)
fy max=545
TS/YS ≥1,25
SNI 2052:2017
es minimum
14% untuk D10-D19
12% untuk D22-D36
10% untuk D43-D57
SNI 2847-2019
SNI 2847-2019
load combination
drawing model
releases frame
load combination
MODELING AND
STRUCTURAL ANALYSIS WITH ETABS
Martinus Nifotuho Fau
- Structural Engineer -
martinusnfau@gmail.com 0852-1401-3273
PERTEMUAAN 3
(Sabtu, 12 Desember 2020)
perkiraan berat efektif bangunan per m2 mutu beton yang diperhitungkan hanya
berdasarkan pengalaman 30% untuk prelimimary desain
100 mm (c)
Terbesar
Bukun tumpu
dari 1/30 nilai terkecil dari panjang dan tinggi tidak tertumpu (d)
Basemen dan
fondasi 190 mm (e)
eksterior
* Hanya berlaku untuk dinding yang didesain sesuai dengan metode desain sederhana pada 11.5.3.
Persyaratan material baja tulangan untuk SRPMK dan SDSK (Pasal 20.2.2.5):
Spesifikasi BjTS 420B dalam
SNI 2052:2017 memenuhi
ketiga persyaratan pada
20.2.2.5.b)
fy max=545
TS/YS ≥1,25
SNI 2052:2017
es minimum
14% untuk D10-D19
12% untuk D22-D36
10% untuk D43-D57
SS S1
Fa Fv
SMS SM1
Peta MCER untuk Periode Pendek 𝟐 𝟐 Peta MCER untuk Periode 1 detik
𝟑 𝟑
SDS SD1
Parameter S1
Lokasi = Jakarta
Parameter Ss = 0.9 g
Parameter S1 = 0.5 g
Kondisi Tanah = Tanah lunak
𝐓
1. Untuk periode < T0, spektrum respons percepatan desain, 𝐒𝐚 = 𝐒𝐃𝐒 𝟎. 𝟒 + 𝟎. 𝟔
𝐓𝟎
𝐒𝐃𝟏
𝐓𝟎 = 𝟎. 𝟐
𝐒𝐃𝐒
𝐒𝐃𝟏
𝐓𝐒 =
𝐒𝐃𝐒
𝐒𝐃𝐒
• Cs hitung = 𝐑
PERS. 31 𝐈𝐞
𝐒𝐃𝟏 𝐒𝐃𝟏 𝐓𝐋
• Pers. 31 tidak perlu melebihi = 𝐑 (untuk T ≤ TL) dan 𝐑 (untuk T > TL)
PERS. 32 & 𝐓 𝐈 𝐓𝟐 𝐈
𝐞 𝐞
PERS. 33
𝟎.𝟓 𝐒𝟏
• Cs minimum = 𝟎. 𝟎𝟒𝟒 𝐒𝐃𝐒 𝐈𝐞 ≥ 𝟎. 𝟎𝟏 dan 𝐑 (untuk S1 ≥ 0.6g)
PERS. 34 & 𝐈𝐞
PERS. 35
𝐀𝐋𝐓𝐄𝐑𝐍𝐀𝐓𝐈𝐅
Ta = 0.1 N
𝟎.𝟎𝟎𝟎𝟓𝟖
𝐓𝐚 = 𝐡𝐧
𝐂𝐰
𝐓𝐚 = 𝐂𝐭 𝐡𝐧𝐱
ARAH Y
Story Load VY, kN T MX MY
SDS r= Ω0
0.708 1.3 2.5
COMBO 1 1.4 D
COMBO 2 1.2 D + 1.6 L
COMBO 3 1.34 D + 1 L 1.30 Eqx 0.39 Eqy
COMBO 4 1.34 D + 1 L 1.30 Eqx -0.39 Eqy
COMBO 5 1.34 D + 1 L -1.30 Eqx -0.39 Eqy
COMBO 6 1.34 D + 1 L -1.30 Eqx 0.39 Eqy
Tulangan Geser
martinusnfau@gmail.com @fau_consultant / @martinusnfau
LATIHAN
PEMODELAN & DESAIN BANGUNAN BERTINGKAT
STRUKTUR BETON BERTULANG
MODELING AND
STRUCTURAL ANALYSIS WITH ETABS
Martinus Nifotuho Fau
- Structural Engineer -
martinusnfau@gmail.com 0852-1401-3273
PERTEMUAAN 4
(Minggu, 13 Desember 2020)
𝐀𝐋𝐓𝐄𝐑𝐍𝐀𝐓𝐈𝐅
Ta = 0.1 N
𝟎.𝟎𝟎𝟎𝟓𝟖
𝐓𝐚 = 𝐡𝐧
𝐂𝐰
𝐓𝐚 = 𝐂𝐭 𝐡𝐧𝐱
ARAH X
Story Load VX, kN T MX MY
ARAH Y
Story Load VY, kN T MX MY
2 • Pasal 26.5 - Menentukan kecepatan angin dasar untuk kategori resiko yang sesuai, V
SELF WEIGHT
COMB6 (GRAVITASI+GEMPA)