Ktr Partai
Lokasi Pasar
Mesjid
Rumah
Penduduk
Sekolah
Kantor Desa
Provinsi
Kecamatan
Desa
Lokasi
Judul Gambar
Peta Situasi, Denah , Potongan
Di Buat Oleh :
Diperiksa Oleh :
1. Galian Tanah
TYPE I:
A. GALIAN TANAH P = 0.00 M'
Panjang :584,5 meter' L = 0.00
T = 0.00
Volume = 0 x 0.00 x 0 =
Volume = 0 x 0.00 x 0.00 =
80 Total Vol.Timbunan
0 3. Urugan Pasir
Type I : Type II :
P= 0 M' P= 0 M'
L = 1.00 M' L = 0.80 M'
T = 0.02 M' T = 0.02 M'
PENGHITUNGAN VOLUME
Provinsi : Nama Kegiatan : Plat Duiker
Kabupaten : Jenis Prasarana : Prasarana
Kecamatan : Jenis Penanganan : Pembangunan Baru
Desa : Lokasi :
Volume : 1.25 x 1.00 x
SKETSA PERHITUNGAN
1. Galian Tanah
P= 4
L = 1.70
T = 1.25
Volume = 4 x 1.70 x 1.25 =
2. Timbunan Bekas Galian
P= 4
1,25 L = 0.15
T = 1.25
Volume = 4 x 0.15 x 1.25 x 2
3. Urugan Pasir
P= 4
1,7
L = 1.70
T = 0.05
Volume = 4 x 1.7 x 0.05 =
4. Pasangan Batu Kali
a. Pondasi (2 unit)
V1= 4 x 0.4 x 0.8 x 2 =
b. Sayap Plat Duiker (4 unit)
200
V 2 = 0.3 x 0.5 x 0.75 x 4 =
50 c. Kepala Plat Duiker ( 2 Unit)
12 V 2 = 0.3 x 0.5 x 2 x 2 =
80
1,2 Total Volume Pasangan Batu
0.53
5. Beton Tak Bertulang (lantai Plat dekker)
V1= 4 x 0.15 x 0.7 =
15
6. Beton Bertulang
V1= 4 x 1.2 x 0.12 =
50 70 3050
75
7. Pek. Plesteran
a. Pondasi (dalam Pelat Deker )
0.75 L1= 4 x 0.53 x 2 = 4.24 M2
8. Pek. Plesteran
a. Kepala Plat Duiker
L 2 = 1.3 x 2 x 2 = 5.2 M2
b. Sayap Plat Duiker
L 3 = 0.8 x 0.75 x 4 = 2.4 M2
Total Luas Siaran
Dibuat Oleh :
No RAB : 04
M
HASIL
1. Galian Tanah
P= 530 M'
L= 0.9
T= 0.25
P= 530 M'
L= 0.2 M'
T= 0.15
P= 530 M'
L= 0.9 M'
T= 0.05
P= 530 M'
L= 0.2 M'
T= 0.85
P= 530 M'
L= 0.68 M'
P= 530 M'
L= 0.3 M'
No RAB : 02
4 (4 Unit)
HASIL
8.50 M3
1.50 M3
0.34 M3
2.56
0.45
0.6
3.61 M3
0.42 M3
0.58 M3
53
11.84 M2
SELASAR
= 1X50X0,10 = 2.5 m3
= 0,20x0,05x50 = 0.5 M3
8.7
5.7 TIMBUNAN PASIR BAWAH LANTAI (TGGI=0,10 M) =(M3)
= 8x15x0,25 = 30 M3 15 20
9X3X2 = 54 M2
15X3X2 = 90 M2 30
1/2X1,50X2 = 9 M2
TOTAL = ### M2 , -L pintu +vent.
= 99 - 7.2 5
= 91.8 m2
= 11.0 M3 50
PLESETERAN =
KOLOM 20/20 = 34 M2
RING BLOK 20/20 = 37 M2
DRAINASE = 44 M2
### M2
PPK POPAYATO
653124282.xls
= 0.1302 m'
GORDING 5/7 = 15X0,05X0,07X17
= 0.8925 M3
BUBUNGAN 6/12 = 0,06X0,12X6
= 0.0432 M3
Total = 1.9 M3
PPK POPAYATO
653124282.xls
PEKERJAAN PENGECATAN :
TEMBOK = 0 M2
PINTU = 0 M2
KOSEN PINTU = 0 M2
VENTILASI = 0 M2
LISTPLANK = 14 M2
SENG = 187 M2
LAIN-LAIN
-
-
PPK POPAYATO
653124282.xls
20
Rabat beton 5
25
50
M' TP BHL P
M' 1400 BH 0.56 784
M' TP
M' 17.5 BH 1.22 21.35 M' 1.78 UJG
PPK POPAYATO
653124282.xls
tul.pokok
PPK POPAYATO
653124282.xls
53.7264 134.626
ujg
ujg
PPK POPAYATO
653124282.xls
DAFTAR HARGA SATUAN BAHAN DAN UPAH KERJA
Desa
Kecamatan
Provinsi
A UPAH KERJA
1 Pekerja HOK 40,000
2 Tukang HOK 60,000
B BAHAN
1 Semen /PC zak 64,000.00
2 Pasir m3 50,000.00
3 batu gunung m3 100,000.00
4 Batu Pecah 2-3 cm m3 85,000.00
5 Batu Bata bh 550.00
6 kayu 6/12 btg 69,500.00 2,000,000
7 Kayu 5/7 btg 21,800.00 1,700,000
8 Kayu Papan 20/20 lisplank Lbr 38,500.00 1,500,000
9 Tripleks Lbr 41,000.00
10 Besi Dia. 12 Pjg 12 Mtr full ujung 87,000.00
11 Besi Dia. 10 Pjg 12 full ujung 61,000.00
12 Besi Dia. 8 Pjg 12 Full ujung 39,000.00
13 Besi Dia. 6 Pjg 12 full ujung 22,500.00
14 Bendrat kg 20,000.00
15 Seng Gelombang Uk. 1,84x0.8 lbr 43,000.00
16 Paku Seng kg 22,000.00
17 Paku Campuran kg 20,000.00
18 Cat Kayu kg 38,000.00
19 Cat Meni @ 5 Kg Kg 19,000.00
20 Cat minyak/Tinner Klg 18,000.00
21 Kuas Besar Bh 11,000.00
22 Plamur kg 20,000.00
ALAT
1 Pacul Bh 50,000.00
2 Sekop Bh 65,000.00
3 Parang Bh 30,000.00
4 Tropol Bh 15,000.00
5 Waterpass Bh 17,500.00
6 Gergaji besi Bh 37,500.00
7 Gergaji Kayu Bh 55,000.00
8 Martel Bh 27,500.00
9 Benang/ nilon roll 2,500.00
10 Behel Kuda2 + Bout 2 lgkp bh 25,000.00
11 Ember bh 8,500.00
12 Linggis bh 50,000.00
3,5
5,5 meter 6/12 2,20 meter
PASAR PADENGO
2,0
PROVINSI
KABUPATEN
Lisplank 2,70 Meter
15 mETER
1 6,0 mtr 1 JENIS PRASARANA
8 Meter
Selasar PASAR SORE
POTONGAN MEMANJANG
LOKASI
### POTONGAN MELINTANG
30 6 meter
5 Diperiksa Oleh
DETAIL SALURAN
5 cm 80 CM
65 Diketahui Oleh,
50 CM
50
TOTAL BIAYA
HARGA SATUAN
NO URAIAN VOLUME SAT UPAH BAHAN DANA 1 DANA 2 TOTAL
Rp. Rp. Rp. RP. Rp.
A BAHAN
1 Semen / PC 82.0 zak 64,000.0 5,024,000 224,000 5,248,000
2 Pasir 48.0 m3 50,000.0 2,125,000 275,000 2,400,000
3 Batu Gunung / Kali 16.0 m3 100,000.0 1,600,000 1,600,000
4 Batu Pecah 2/3 / Kerikil 5.0 m3 85,000.0 425,000 425,000
5 Batu Bata 4,838.0 bh 550.0 2,660,150 2,660,900
6 Kayu 6/12 30.0 btg 69,500.0 2,085,000 2,085,000
7 Kayu 5/7 85.0 btg 21,800.0 1,853,000 1,853,000
8 Kayu Papan 2/20 Lisplank 20.0 Lbr 38,500.0 770,000 770,000
9 Papan Maal 1.5 m3 1,500,000.0 2,250,000 2,250,000
10 Papan Samping 18.0 Lbr 38,500.0 693,000 693,000
11 Besi Dia 12 full 12 meter 65.0 ujung 87,000.0 5,655,000 5,655,000
12 Besi Dia 6 Full 12 meter 152.0 ujung 22,500.0 3,420,000 3,420,000
13 Bendrat 7.0 Kg 20,000.0 157,400 140,000
14 Behel + Bout 5/8 P , 21 cm 5.0 Bh 25,000.0 142,400 125,000
15 Seng Gelombang Uk. 1,84x0.8 190.0 lbr 43,000.0 8,187,400 8,170,000
16 Paku Seng 15.0 kg 22,000.0 350,100 330,000
17 Paku Campuran 3.0 kg 20,000.0 60,000 60,000
18 Cat Meni seng 3x warna merah 30.0 kg 19,000.0 570,000 570,000
19 Cat Kayu 14.0 kg 38,000.0 532,000 532,000
20 Timbunan sirtu:23x16x50 184.0 m3 50,000.0 9,200,000 9,200,000
21
12000
27000
27000
27000
24000
28000
214000 120000
146,858,900