Pekerjaan : Perencanaan Pagar Uptd Wilayah II


Lokasi : Kab. Kolaka
Tahun Anggaran : 2019

NO SKETSA GAMBAR DIMENSI


a b c
a PEKERJAAN PONDASI
1 Pondasi Pagar Samping Galian
p = 55.00
l = 0.80
t = 0.55
Urugan Tanah
p = 55.00
l = 0.29
t = 0.30
Pasir Urug
p = 55.00
l = 0.80
t = 0.10
Pas Batu Kosong
p = 55
l = 0.80
t = 0.15
Pas Pondasi Batu Gunung
La = 0.25
Lb = 0.60
t = 0.70
p = 55
2 Pondasi depan Galian
p = 27.00
l = 0.80
t = 0.55
Urugan Tanah
p = 27.00
l = 0.14
t = 0.30
Pasir Urug
p = 27.00
l = 0.80
t = 0.10
Pas Batu Kosong
p = 27.00
l = 0.80
t = 0.15
Pas Pondasi Batu Gunung
La = 0.25
Lb = 0.60
t = 0.70
p = 27.00
Pas Batu Pondasi Landasan Pintu Pagar
t 0.50
p 2.69
l 0.25

20
15 16
9

26
30
16
20
2 PEKERJAAN BETON
a Sloof 150/200 mm
1 Bekisting Sloof p = 82.00
l = 0.40
Jmlh = 1.00

2 Besi Beton Polos


D10 P = 82.00
jmlh besi/K = 4.00
jmlh = 1.00

D8 P. Sengkang = 0.64
jmlh besi/K = 820.00
jmlh = 1.00

3 beton p = 82.00
l = 0.20
t = 0.15
Jmlh = 1.00
b Kolom 200/ 300 mm
1 Bekisting Kolom T = 1.65
l = 1.00
Jmlh = 18.00

2 Besi Beton Polos


D10 P = 1.53
jmlh besi/K = 8.00
jmlh = 18.00

D8 P. Sengkang = 0.93
jmlh besi/K = 10.20
jmlh = 18.00

3 Beton p = 0.20
l = 0.30
t = 1.65
Jmlh = 18.00
3. PEKERJAAN DINDING
a PAGAR DEPAN

1 Pasangan Batu Bata p = 3.60


l = 1.25
Jmlh = 5.00

2 Plesteran Batu Bata p = 3.60


l = 1.25
Jumlh = 10.00

3 Pasangan Batu Bata Papannama p = 3.60


l = 1.65
Jmlh = 1.00

4 PEKERJAAN DINDING
a PAGAR SAMPING
1 Pasangan Batu Bata p = 3.60
t = 1.25
Jmlh = 14.00

2 Plesteran Batu Bata p = 3.60


l = 1.25
Jumlh = 28.00

3 Plesteran Pondasi Samping p = 55.00


t = 0.41
Jmlh = 2.00

4 Plesteran Pondasi Depan p = 27.00


t = 0.41
Jmlh = 1.00

5 Plesteran Kolom p = 1.65


l = 0.70
Jmlh = 23.00
6 Acian 253.74

7 Pek. Tegel Granit p = 2.80


t = 1.20
5 PEKERJAAN PAGAR HOLLOW
a Pintu Pagar
p = 1.45
l = 3.42
Jmlah = 1.00

b Besi Pengaman Pagar


p = 3.60
l = 0.40
Jmlh = 19.00
BACK UP DATA

SAT. URAIAN PERHITUNGAN


d e

M' v = (pxlxt)
M'
M' Total Volume = 24.20 M³

v = (pxlxt)

Total Volume = 4.79 M³

M' v = (pxlxt)
M'
M' Total Volume = 4.40 M³

M' v = (pxlxt)
M'
M' Total Volume = 6.60 M³

M' v = (( L.a+L.b) / 2 x t x p
M'
M' Total Volume = 16.36 M³

M' v = (pxlxt)
M'
M' Total Volume = 11.88 M³

v = (pxlxt)
Total Volume = 1.13 M³

M' v = (pxlxt)
M'
M' Total Volume = 2.16 M³

M' v = (pxlxt)
M'
M' Total Volume = 3.24 M³

M' v = (( L.a+L.b) / 2 x t x p
M'
M' Total Volume = 8.03 M³

v = (pxt)

Total Volume = 1.345 M³

20
16
26
30
M' v = (pxl )
M'
M' Total Volume = 32.80 M2

Berat Nominal ( D 10= 0,617 Kg/M)


M' V - D 10 = 328.00 M1
btng
ttk V = 202.376 Kg

Berat Nominal ( D 8= 0,395Kg/M)


V - D8 = 524.80 M1

V = 207.296 Kg
Total Volume = 409.672 Kg

M' v = (pxlxt)
M'
M'
M' Total Volume = 2.46 M³

M' v = (pxl )
M'
M' Total Volume = 29.70 M2

Berat Nominal ( D 10= 0,617Kg/M)


M' V - D10 = 220.32 M1
btng
ttk V = 135.93744 Kg

Berat Nominal ( D8= 0,395Kg/M)


M' V-D8 = 170.75 M1
btng
ttk V = 67.44546 Kg
Total Volume = 203.3829 Kg

M' v = (pxlxt)
M'
M'
M' Total Volume = 1.78 M³
M' v = (pxl )
M'
M' Total Volume = 22.50 M2

v = (pxl )

Total Volume = 45.00 M2

M' v = (pxl )
M'
M' Total Volume = 5.94 M2

Ttl Vol A+B+C = 28.44 M2


M' v = (pxl )
M'
M' Total Volume = 63.00 M2

v = (pxl )

Total Volume = 126.00 M2

M' v = (pxl )
M'
M' Total Volume = 45.10 M2

M' v = (pxl )
M'
M' Total Volume = 11.07 M2

Ttl Vol A+B = 56.17 M2

M' v = (pxl )
M'
M' Total Volume = 26.57 M2

Total Volume = 253.74 M2


M' v = (pxl )

Total Volume = 3.36 M2


M' v = (pxl )
M'
M' Total Volume = 4.96 M2

M' v = (pxl )
M'
M' Total Volume = 27.36 M2

Dibuat Oleh,
KONSULTANT PERENCANA
CV. MEGA KONSULTAN
SYAMSUL ALAM, ST
Direktur
REKAPITULASI RENCANA ANGARAN BIAYA (RAB)

Pekerjaan : Perencanaan Pagar Uptd Wilayah II


Lokasi : Kab. Kolaka
Tahun Anggaran : 2019

NO. URAIAN

I PEKERJAAN PERSIAPAN / PENDAHULUAN


II PEKERJAAN PONDASI DAN TANAH
III PEKERJAAN BETON BERTULANG
IV PEKERJAAN DINDING PAGAR
V PEKERJAAN PEMASANGAN INSTALASI LAMPU KACA DAN BATU ANGIN
VI PEKERJAAN PAGAR DAN PINTU BESI HOLLOW
VII PEKERJAAN PENGECATAN PAGAR
VIII PEKERJAAN AKHIR

A REAL COST ( I+II+III+IV+V+VI+VII)


B PPN 10 % x A
C JUMLAH TOTAL
D DIBULATKAN
Terbilang : "Seratus Sembilan Puluh Sembilan Juta Seratus Delapan Belas Ribu Rupiah"

Kendari, 29 Mei, 201

Mengetahui, Dibuat Oleh,


PENGGUNA ANGGARAN KONSULTANT PERENC
CV. MEGA KONSULT

H.ABDUL RAHIM,SE.M.SI SYAMSUL ALAM. ST


NIP:19650308 199503 1 002 Direktur
RENCANA ANGARAN BIAYA (RAB)

layah II

JUMLAH (Rp)

Rp 2,750,000.00
Rp 35,960,986.38
Rp 33,069,709.69
Rp 45,337,861.83
Rp 6,454,116.00
Rp 20,940,886.39
Rp 7,703,394.60
Rp 28,800,000.00

Rp 181,016,954.89
Rp 18,101,695.49
Rp 199,118,650.38
Rp 199,118,000.00
mbilan Juta Seratus Delapan Belas Ribu Rupiah"

Kendari, 29 Mei, 2019

Dibuat Oleh,
KONSULTANT PERENCANA
CV. MEGA KONSULTAN

SYAMSUL ALAM. ST
Direktur
RENCANA ANGGARAN BIAYA ( RAB )

Pekerjaan : Perencanaan Pagar Uptd Wilayah II


Lokasi : Kab. Kolaka
Tahun Anggaran : 2019

NO. URAIAN PEKERJAAN VOL.

I PEKERJAAN PERSIAPAN / PENDAHULUAN


1 Pekerjaan Persiapan Dan Pembersihan Lokasi 1.00
2 Memasangan Blouwplank 1.00
3 Administrasi Proyek 1.00
4 Pembuatan Papan Nama Proyek 1.00

II PEKERJAAN PONDASI DAN TANAH


A PEKERJAAN PAGAR DEPAN
1 Pek. Galian Pondasi 11.88
2 Pek. Urugan Tanah Kembali 1.13
3 Pek. Urugan Pasir 2.16
4 Pek. Pas Batu Kosong 3.24
5 Pek. Pas Batu Gunung 1 : 4 8.03
6 Pek. Pas Batu Pondasi Landasan Pintu Pagar 1.35
B PEKERJAAN PAGAR SAMPING
1 Pek. Galian Pondasi 24.20
2 Pek. Urugan Tanah Kembali 4.79
3 Pek. Urugan Pasir 4.40
4 Pek. Pas Batu Kosong 6.60
5 Pek. Pas Batu Gunung 1 : 4 16.36

III PEKERJAAN BETON BERTULANG


a PAGAR DEPAN DAN SAMPING
1 Pekerjaan Sloof (150 x 200) mm
Bekisting 32.80
Pembesian 409.67
Beton k225 2.46
2 Pekerjaan Kolom Utama 200 x 300) mm
Bekisting 29.70
Pembesian 203.38
Beton k225 1.78
IV PEKERJAAN DINDING PAGAR
a Pek. Pagar Depan
1 Pek. Pas. Batu Bata 1 : 5 22.50
2 Pek. Plasteran Dinding Bata 1 : 4 45.00
b Pek. Pagar Samping
1 Pek. Pas. Batu Bata 1 : 4 63.00
2 Pek. Plasteran Dinding 1 : 4 126.00
c Pek. Pondasi Dan Sloof Kolom
1 Pek. Plasteran Pondasi 1 : 4 56.17
2 Pek. Pelsteran Kolom 1 : 4 26.57
d 1 Acian 253.74
e 1 Pek. Tegel Geranit (60 X 60 )cm 3.36

V PEKERJAAN PEMASANGAN INSTALASI LAMPU KACA DAN BATU ANGIN


1 Pemasangan Titik Instalasi Listrik 8.00
2 Pemasangan Lampu SL 5 Watt 8.00
3 Pemasangan Kaca 4.50
4 Pemasangan Roster/Batu Angin 24.00

VI PEKERJAAN PAGAR DAN PINTU BESI HOLLOW


1 Pintu Gerbang Rangka Besi Hollow+ plat Baja . t= 1,2 mm Fin. Cat Besi 4.96
2 Rell Pintu Gerbang+ Assesories Perlengkapan 1.00
3 Pagar Rangka Besi Hollow t=1,2 mm Fin. Cat Besi 27.36
4 Pas Pipa Galpanis = dia 3" 1.50

VII PEKERJAAN PENGECATAN PAGAR


a Pekerjaan Pengecatan
1 Pek. Pengecatan Pagar Depan & Samping 253.74

VIII PEKERJAAN AKHIR


1 Pek. Pemasangan Huruf Acrylic 119.00
2 Pek. Pemasangan Logo/Simbol 2.00
3 Pek. Pembersihan Akhir 1.00
A ANGGARAN BIAYA ( RAB )

II

HARGA JUMLAH
SAT. SATUAN HARGA
(Rp) (Rp)

Ls 500,000.00 500,000.00
Ls 500,000.00 500,000.00
Ls 1,500,000.00 1,500,000.00
Ls 250,000.00 250,000.00
Jumlah 2,750,000.00

M3 79,781.00 947,798.28
M3 30,618.00 34,720.81
M3 234,197.00 505,865.52
M3 530,523.00 1,718,894.52
M3 1,015,718.00 8,158,754.84
M3 1,015,718.00 1,366,140.71

M3 79,781.00 1,930,700.20
M3 30,618.00 146,507.13
M3 234,197.00 1,030,466.80
M3 530,523.00 3,501,451.80
M3 1,015,718.00 16,619,685.78
Jumlah 35,960,986.38

M2 178,641.00 5,859,424.80
Kg 25,864.60 10,596,002.41
M3 1,266,472.00 3,115,521.12

M2 201,397.00 5,981,490.90
Kg 25,864.60 5,260,417.36
M3 1,266,472.00 2,256,853.10
Jumlah 33,069,709.69
M2 148,428.00 3,339,630.00
M2 77,422.00 3,483,990.00

M2 148,428.00 9,350,964.00
M2 77,422.00 9,755,172.00

M2 77,422.00 4,348,793.74
M2 77,422.00 2,056,715.43
M2 46,028.00 11,678,914.58
M2 393,953.00 1,323,682.08
Jumlah 45,337,861.83
PU KACA DAN BATU ANGIN
Ls 266,365.00 2,130,920.00
Ls 62,480.00 499,840.00
M2 155,256.00 698,652.00
Ls 130,196.00 3,124,704.00
Jumlah 6,454,116.00
OW
M2 539,689.00 2,676,317.75
Ls 5,000,000.00 5,000,000.00
M2 457,349.00 12,513,068.64
M1 501,000.00 751,500.00
Jumlah 20,940,886.39

M2 30,360.00 7,703,394.60
Jumlah 7,703,394.60

Bh 200,000.00 23,800,000.00
Bh 2,000,000.00 4,000,000.00
Ls 1,000,000.00 1,000,000.00
Jumlah 28,800,000.00

Kendari, 29 Mei 2019

Dibuat Oleh,
KONSULTANT PERENCANA
CV. MEGA KONSULTAN
SYAMSUL ALAM. ST
Direktur
ANALISA SATUAN PEKERJAAN

A.2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN


A.2.3.1 HARGA SATUAN PEKERJAAN TANAH
A.2.3.1.1. Penggalian 1 m3 tanah biasa sedalam 1 m

No Uraian Kode Satuan


A TENAGA
Pekerja L.01.01 OH
Mandor L.04.01 OH
Jum
B BAHAN
Jum
C PERALATAN
Ju
D Jumlah (A+B+C)
E Overhead & Profit 15%
F Harga Satuan Pekerjaan (D+E)

A.2.3.1.9. Pengurugan kembali 1 m3 galian tanah Tanah Biasa Sedalam 1 M


Pengurugan kembali 1 m3 galian dihitung dari 1/3 kali dari koefisien pekerjaan galian

No Uraian Kode Satuan


A TENAGA
Pekerja L.01.01 OH
Mandor L.04.01 OH
Jum
B BAHAN
Jum
C PERALATAN
Ju
D Jumlah (A+B+C)
E Overhead & Profit 15%

F Harga Satuan Pekerjaan (D+E)

A.2.3.1.11. Pengurugan 1 m3 dengan pasir urug


No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Mandor L.04.01 OH
Jum
B BAHAN
Pasir urug M3
Jum
C PERALATAN
Ju
D Jumlah (A+B+C)
E Overhead & Profit 15%
F Harga Satuan Pekerjaan (D+E)
A.3.2.1 HARGA SATUAN PEKERJAAN PONDASI
A.3.2.1.2. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 4PP

No Uraian Kode Satuan


A TENAGA
Pekerja L.01.01 OH
Tukang Batu L.02.03 OH
Kepala Tukang L.03.01 OH
Mandor L.04.01 OH
Jum
B BAHAN
Batu belah m3
Semen portland Kg
Pasir Pasang m3
Jum
C PERALATAN
Ju
D Jumlah (A+B+C)
E Overhead & Profit 15%
F Harga Satuan Pekerjaan (D+E)

A.3.2.1.9. Pemasangan 1 m3 batu kosong (anstamping)

No Uraian Kode Satuan


A TENAGA
Pekerja L.01.01 OH
Tukang Batu L.02.03 OH
Kepala Tukang L.03.01 OH
Mandor L.04.01 OH
Jum
B BAHAN
Batu belah m3
Pasir urug m3
Jum
C PERALATAN
Ju
D Jumlah (A+B+C)
E Overhead & Profit 15%
F Harga Satuan Pekerjaan (D+E)

A.4.1.1 HARGA SATUAN PEKERJAAN BETON


A.4.1.1.7. Membuat 1 m3 beton mutu f’ = 19,3 MPa (K 225), slump (120 ± 20) mm, w/c = 0,58

No Uraian Kode Satuan


A TENAGA
Pekerja L.01.01 OH
Tukang Batu L.02.03 OH
Kepala Tukang L.03.01 OH
Mandor L.04.01 OH
Jum
B BAHAN
Semen portland kg
Pasir Beton kg
Kerikil (Maks 30 mm) kg
Air Liter
Jum
C PERALATAN
Ju
D Jumlah (A+B+C)
E Overhead & Profit 15%
F Harga Satuan Pekerjaan (D+E)
A.4.1.1.17 Pembesian 10 kg dengan besi polos atau besi ulir

No Uraian Kode Satuan


A TENAGA
Pekerja L.01.01 OH
Tukang Besi L.02.05 OH
Kepala Tukang L.03.01 OH
Mandor L.04.01 OH
Jum
B BAHAN
Besi beton (polos/ulir) kg
Kawat beton kg
Jum
C PERALATAN
Ju
D Jumlah (A+B+C)
E Overhead & Profit 15%
F Harga Satuan Pekerjaan (D+E)
G Harga Suatu pekerjaan Pembesian Untuk 1 Kg

A.4.2.1.9. a Pemasangan 1 m2 sunscreen Pintu Pagar Besi Hollow

No Uraian Kode Satuan


A TENAGA
Pekerja L.01.01 OH
Tukang L.02.01 OH
Kepala tukang L.03.01 OH
Mandor L.04.01 OH
Jum
B BAHAN

Rangka Metal hollow 40.40.1,2mm M1


Rangka Metal hollow 40.60. 1,2mm M1
plat Baja 1 M2 M2
Pengelasan cm
Kawat las listrik Kg
Solar Liter
Minyak pelumas Liter
Cat Menie besi Kg
Kuas Bh

Jum
C PERALATAN
Ju
D Jumlah (A+B+C)
E Overhead & Profit 15%
F Harga Satuan Pekerjaan (D+E)

A.4.2.1.9. b Pemasangan 1 m2 sunscreen Pagar Besi Hollow

No Uraian Kode Satuan


A TENAGA
Pekerja L.01.01 OH
Tukang L.02.01 OH
Kepala tukang L.03.01 OH
Mandor L.04.01 OH
Jum
B BAHAN

Rangka Metal hollow 40.40.1,2mm M1


Pengelasan cm
Kawat las listrik Kg
Solar Liter
Minyak pelumas Liter
Cat Menie besi Kg
Kuas Bh

Jum
C PERALATAN
Ju
D Jumlah (A+B+C)
E Overhead & Profit 15%
F Harga Satuan Pekerjaan (D+E)
A.4.1.1.21 (K3) Pemasangan 1 m2 bekisting untuk sloof

No Uraian Kode Satuan


A TENAGA
Pekerja L.01.01 OH
Tukang Kayu L.02.04 OH
Kepala Tukang L.03.01 OH
Mandor L.04.01 OH
Jum
B BAHAN
Papan Bekisting m3
Paku 5 - 10 cm kg
Minyak bekisting Liter
Jum
C PERALATAN
Ju
D Jumlah (A+B+C)
E Overhead & Profit 15%
F Harga Satuan Pekerjaan (D+E)

A.4.1.1.22 (K3) Pemasangan 1 m2 bekisting untuk kolom

No Uraian Kode Satuan


A TENAGA
Pekerja L.01.01 OH
Tukang Kayu L.02.04 OH
Kepala Tukang L.03.01 OH
Mandor L.04.01 OH
Jum
B BAHAN
Papan Bekisting m3
Paku 5 - 12 cm kg
Minyak bekisting Liter

Jum
C PERALATAN
Ju
D Jumlah (A+B+C)
E Overhead & Profit 15%
F Harga Satuan Pekerjaan (D+E)

A.4.1.1.23 a (K4) Pemasangan 1 m2 bekisting Balok Beton Tak Bertulang

No Uraian Kode Satuan


A TENAGA
Pekerja L.01.01 OH
Tukang Kayu L.02.04 OH
Kepala Tukang L.03.01 OH
Mandor L.04.01 OH
Jum
B BAHAN
Papan Bekisting m3
Paku 5 - 12 cm kg
Minyak bekisting Liter
Jum
C PERALATAN
Ju
D Jumlah (A+B+C)
E Overhead & Profit 15%
F Harga Satuan Pekerjaan (D+E)
A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING
A.4.4.1.10 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1 SP : 5 PP

No Uraian Kode Satuan


A TENAGA
Pekerja L.01.01 OH
Tukang Batu L.02.03 OH
Kepala Tukang L.03.01 OH
Mandor L.04.01 OH
Jum
B BAHAN
Bata merah m3
Semen portland Kg
Pasir Pasang m3
Jum
C PERALATAN
Ju
D Jumlah (A+B+C)
E Overhead & Profit 15%
F Harga Satuan Pekerjaan (D+E)

A.4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN


A.4.4.2.4. Pemasangan 1 m2 plesteran 1SP : 4PP tebal 15 mm

No Uraian Kode Satuan


A TENAGA
Pekerja L.01.01 OH
Tukang Batu L.02.03 OH
Kepala Tukang L.03.01 OH
Mandor L.04.01 OH
Jum
B BAHAN
Semen portland Kg
Pasir Pasang m3
Jum
C PERALATAN
Ju
D Jumlah (A+B+C)
E Overhead & Profit 15%
F Harga Satuan Pekerjaan (D+E)

A.4.4.2.27. Pemasangan 1 m2 acian.


No Uraian Kode Satuan
A TENAGA
Pekerja L.01.01 OH
Tukang Batu L.02.03 OH
Kepala Tukang L.03.01 OH
Mandor L.04.01 OH
Jum
B BAHAN
Semen portland Kg
Jum
C PERALATAN
Ju
D Jumlah (A+B+C)
E Overhead & Profit 15%
F Harga Satuan Pekerjaan (D+E)
A.4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN
A.4.7.1.10a. Pengecatan 1 m2 tembok baru ( 1 lapis cat dasar, 2 lapis cat penutup)

No Uraian Kode Satuan


A TENAGA
Pekerja L.01.01 OH
Tukang cat L.02.08 OH
Kepala tukang L.03.01 OH
Mandor L.04.01 OH
Jum
B BAHAN
Plamur Kg
Cat dasar Tembok Kg
Cat Penutup Tembok Kg
Jum
C PERALATAN
Ju
D Jumlah (A+B+C)
E Overhead & Profit 15%
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.13. Pemasangan 1m2 lantai ubin teralux Biasa ukuran 60cm x60cm

No Uraian Kode Satuan


A TENAGA
Pekerja L.01.01 OH
Tukang Batu L.02.03 OH
Kepala tukang L.03.01 OH
Mandor L.04.01 OH
Jum
B BAHAN
ubin Geranit ukuran 60cm x60cm Bh
Semen portland kg
Semen Warna Kg
Pasir Pasang M3
Jum
C PERALATAN
Ju
D Jumlah (A+B+C)
E Overhead & Profit 15%
F Harga Satuan Pekerjaan (D+E)
A.8.4.6 HARGA SATUAN PEKERJAAN ELEKTRIKAL
A.4.7.2.1 (K3) Pemasangan 1 buah titik lampu

No Uraian Kode Satuan


A TENAGA
Pekerja OH
Tukang listrik OH
Mandor OH
Jum
B BAHAN
Kabel NYA (3x2,5) mm M1
Klem Kabel No. 10 Bh
Pipa PVC 1/2" btg
Inbow Dos Bh
Las Dop Bh
Isolasi Bh
T - Dos 5/8" Bh
Alat Bantu Ls
Jum
C PERALATAN
Ju
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
A.4.7.2.6 Pemasangan 1 Buah Lampu 5 Watt

No Uraian Kode Satuan


A TENAGA
Pekerja OH
Tukang listrik OH
Mandor OH
Jum
B BAHAN
Lampu 5 watt M1
Jum
C PERALATAN
Ju
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)

A.4.6.2.16. Pemasangan 1 m2 kaca tebal 5 mm

No Uraian Kode Satuan


A TENAGA
Pekerja L.01.01 OH
Tukang kayu L.02.04 OH
Kepala tukang L.03.01 OH
Mandor L.04.01 OH
Jum
B BAHAN
Kaca tebal 5mm m2
SEalant Kg
Jum
C PERALATAN
Ju
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)

A.4.6.6.22. Pemasangan 1 m2 dinding terawang / roster

No Uraian Kode Satuan


A TENAGA
Pekerja L.01.01 OH
Tukang kayu L.02.04 OH
Kepala tukang L.03.01 OH
Mandor L.04.01 OH
Jum
B BAHAN
Dinding Terawang/roster Bh
Pasir Pasang M3
Portland Cement Kg
Jum
C PERALATAN
Ju
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
LISA SATUAN PEKERJAAN

Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)


Err:509 -
0.7000 95,000 66,500.00
0.0250 115,000 2,875.00
Jumlah Tenaga Kerja 69,375.00
Err:509 -
Jumlah Harga Bahan -
Err:509 -
Jumlah Harga Alat -
Err:509 69,375.00
15% 10,406.25
Err:509 79,781.00

Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)


Err:509 -
0.2500 95,000 23,750.00
0.0250 115,000 2,875.00
Jumlah Tenaga Kerja 26,625.00
Err:509 -
Jumlah Harga Bahan -
Err:509 -
Jumlah Harga Alat -
Err:509 26,625.00
15% 3,993.75

Err:509 30,618.00
Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
Err:509 -
0.3000 95,000 28,500.00
0.0100 115,000 1,150.00
Jumlah Tenaga Kerja 29,650.00
Err:509 -
1.2000 145,000 174,000.00
Jumlah Harga Bahan 174,000.00
Err:509 -
Jumlah Harga Alat -
Err:509 203,650.00
15% 30,547.50
Err:509 234,197.00
Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

1.5000 95,000 142,500.00


0.7500 135,000 101,250.00
0.0750 150,000 11,250.00
0.0750 115,000 8,625.00
Jumlah Tenaga Kerja 263,625.00
- -
1.2000 218,000 261,600.00
163.0000 1,500 244,500.00
0.5200 218,286 113,508.72
Jumlah Harga Bahan 619,608.72
- -
Jumlah Harga Alat -
- 883,233.72
15% 132,485.06
- 1,015,718.00

Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

0.7800 95,000 74,100.00


0.3900 135,000 52,650.00
0.0390 150,000 5,850.00
0.0390 115,000 4,485.00
Jumlah Tenaga Kerja 137,085.00

1.2000 218,000 261,600.00


0.4320 145,000 62,640.00
Jumlah Harga Bahan 324,240.00
Err:509 -
Jumlah Harga Alat -
Err:509 461,325.00
15% 69,198.75
Err:509 530,523.00

K 225), slump (120 ± 20) mm, w/c = 0,58

Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)


1.6500 95,000 156,750.00
0.2750 135,000 37,125.00
0.0280 150,000 4,200.00
0.0830 115,000 9,545.00
Jumlah Tenaga Kerja 207,620.00

371.0000 1,500 556,500.00


698.0000 156 108,831.16
1047.0000 199 207,904.29
215.0000 95 20,425.00
Jumlah Harga Bahan 893,660.45
Err:509 -
Jumlah Harga Alat -
Err:509 1,101,280.45
15% 165,192.07
Err:509 1,266,472.00
Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

0.0700 95,000 6,650.00


0.0700 135,000 9,450.00
0.0070 150,000 1,050.00
0.0040 115,000 460.00
Jumlah Tenaga Kerja 17,610.00

10.5000 19,500 204,750.00


0.1500 17,000 2,550.00
Jumlah Harga Bahan 207,300.00
Err:509 -
Jumlah Harga Alat -
Err:509 224,910.00
15% 33,736.50
Err:509 258,646.00
- 25,864.60

Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

0.0800 95,000 7,600.00


0.8000 135,000 108,000.00
0.0800 150,000 12,000.00
0.0040 115,000 460.00
Jumlah Tenaga Kerja 128,060.00

1.0000 47,080 47,080.00


1.0000 36,600 36,600.00
1.0000 35,000 35,000.00
20.0000 10,300 206,000.00
0.4000 24,300 9,720.00
0.3000 9,650 2,895.00
0.0400 48,000 1,920.00
0.10 18,400 1,840.00
0.01 18,000 180.00
-
Jumlah Harga Bahan 341,235.00
- -
Jumlah Harga Alat -
- 469,295.00
15% 70,394.25
- 539,689.00

Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

0.0800 95,000 7,600.00


0.8000 135,000 108,000.00
0.0800 150,000 12,000.00
0.0040 115,000 460.00
Jumlah Tenaga Kerja 128,060.00

1.0000 47,080 47,080.00


20.0000 10,300 206,000.00
0.4000 24,300 9,720.00
0.3000 9,650 2,895.00
0.0400 48,000 1,920.00
0.10 18,400 1,840.00
0.01 18,000 180.00
-
Jumlah Harga Bahan 269,635.00
- -
Jumlah Harga Alat -
- 397,695.00
15% 59,654.25
- 457,349.00
Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

0.5200 95,000 49,400.00


0.2600 135,000 35,100.00
0.0260 150,000 3,900.00
0.0260 115,000 2,990.00
Jumlah Tenaga Kerja 91,390.00

0.0450 2,000,000 90,000.00


0.3000 15,750 4,725.00
0.1000 12,000 1,200.00
Jumlah Harga Bahan 31,975.00
Err:509 -
Jumlah Harga Alat
Err:509 155,340.00
15% 23,301.00
Err:509 178,641.00

Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

0.6600 95,000 62,700.00


0.3300 135,000 44,550.00
0.0330 150,000 4,950.00
0.0330 115,000 3,795.00
Jumlah Tenaga Kerja 115,995.00

0.0400 2,000,000 80,000.00


0.4000 15,750 6,300.00
0.2000 12,000 2,400.00

Jumlah Harga Bahan 29,566.67


Err:509 -
Jumlah Harga Alat -
Err:509 175,128.33
15% 26,269.25
Err:509 201,397.00

Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)


0.6600 95,000 62,700.00
0.3300 135,000 44,550.00
0.0330 150,000 4,950.00
0.0330 115,000 3,795.00
Jumlah Tenaga Kerja 115,995.00

0.0400 2,000,000 80,000.00


0.4000 15,750 6,300.00
0.2000 12,000 2,400.00
Jumlah Harga Bahan 22,175.00
Err:509 -
Jumlah Harga Alat -
Err:509 171,432.50
15% 25,714.88
Err:509 197,147.00
1x22)cm tebal ½ batu campuran 1 SP : 5 PP

Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

0.3000 95,000 28,500.00


0.1000 135,000 13,500.00
0.0100 150,000 1,500.00
0.0150 115,000 1,725.00
Jumlah Tenaga Kerja 45,225.00

70.0000 850 59,500.00


9.6800 1,500 14,520.00
0.0450 218,286 9,822.87
Jumlah Harga Bahan 83,842.87
Err:509 -
Jumlah Harga Alat -
Err:509 129,067.87
15% 19,360.18
Err:509 148,428.00

Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

0.3000 95,000 28,500.00


0.1500 135,000 20,250.00
0.0150 150,000 2,250.00
0.0150 115,000 1,725.00
Jumlah Tenaga Kerja 52,725.00

6.2400 1,500 9,360.00


0.0240 218,286 5,238.86
Jumlah Harga Bahan 14,598.86
- -
Jumlah Harga Alat -
- 67,323.86
15% 10,098.58
- 77,422.00
Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

0.2000 95,000 19,000.00


0.1000 135,000 13,500.00
0.0100 150,000 1,500.00
0.0100 115,000 1,150.00
Jumlah Tenaga Kerja 35,150.00

3.2500 1,500 4,875.00


Jumlah Harga Bahan 4,875.00
- -
Jumlah Harga Alat -
- 40,025.00
15% 6,003.75
- 46,028.00
Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

0.020 95,000 1,900.00


0.063 135,000 8,505.00
0.006 150,000 945.00
0.003 115,000 345.00
Jumlah Tenaga Kerja 11,695.00

0.100 20,500 2,050.00


0.100 38,000 3,800.00
0.260 38,000 9,880.00
Jumlah Harga Bahan 13,680.00
- -
Jumlah Harga Alat
- 26,400.00
15% 3,960.00
- 30,360.00

Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

0.2400 95,000 22,800.00


0.1200 135,000 16,200.00
0.0120 150,000 1,800.00
0.0120 115,000 1,380.00
Jumlah Tenaga Kerja 42,180.00

3.1000 77,400 239,940.00


9.6000 1,500 14,400.00
1.5000 24,150 36,225.00
0.0450 218,286 9,822.87
Jumlah Harga Bahan 300,387.87
- -
Jumlah Harga Alat -
- 342,567.87
15% 51,385.18
- 393,953.00
Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

0.2250 95,000.00 21,375.00


0.7500 135,000.00 101,250.00
0.0750 115,000.00 8,625.00
Jumlah Tenaga Kerja 131,250.00

4.0000 11,000.00 44,000.00


24.0000 100.00 2,400.00
2.0000 13,750.00 27,500.00
1.0000 5,000.00 5,000.00
2.0000 2,500.00 5,000.00
1.0000 7,000.00 7,000.00
2.0000 7,500.00 15,000.00
1.0000 5,000.00 5,000.00
Jumlah Harga Bahan 110,900.00
- -
Jumlah Harga Alat -
- 242,150.00
10% 24,215.00
- 266,365.00
Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

0.0050 95,000.00 475.00


0.0500 135,000.00 6,750.00
0.0050 115,000.00 575.00
Jumlah Tenaga Kerja 7,800.00

1.0000 49,000.00 49,000.00


Jumlah Harga Bahan 49,000.00
- -
Jumlah Harga Alat -
- 56,800.00
10% 5,680.00
- 62,480.00

Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

0.015 95,000.00 1,425.00


0.150 135,000.00 20,250.00
0.015 150,000.00 2,250.00
0.001 115,000.00 92.00
Jumlah Tenaga Kerja 24,017.00

1.100 105,000.00 115,500.00


0.050 32,500.00 1,625.00
Jumlah Harga Bahan 117,125.00
- -
Jumlah Harga Alat -
- 141,142.00
10% 14,114.20
- 155,256.00

Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

0.300 95,000.00 28,500.00


0.100 135,000.00 13,500.00
0.011 150,000.00 1,650.00
0.015 115,000.00 1,725.00
Jumlah Tenaga Kerja 45,375.00

1.000 57,000.00 57,000.00


0.032 218,286.00 6,985.15
6.000 1,500.00 9,000.00
Jumlah Harga Bahan 72,985.15
- -
Jumlah Harga Alat -
- 118,360.15
10% 11,836.02
- 130,196.00
Harga Satuan Upah
Kode Uraian Satuan Harga
L.01.01 PEKERJA OH 85,000 85,000 85,000 85,000
L.02.01 TUKANG OH 2 2 2 2
L.02.02 TUKANG ALUMUNIUM OH 3 3 3 3
L.02.03 TUKANG BATU OH 130,000 130,000 130,000 130,000
L.02.04 TUKANG KAYU OH 130,000 130,000 130,000 130,000
L.02.05 TUKANG BESI OH 130,000 130,000 130,000 130,000
L.02.06 Tukang Besi Konstruksi OH 7 7 7 7
L.02.07 TUKANG BESI PROFIL OH 8 8 8 8
L.02.08 TUKANG CAT OH 130,000 130,000 130,000 130,000
L.02.09 Tukang ereksi OH 10 10 10 10
L.02.10 Tukang Las Konstruksi OH 11 11 11 11
L.02.11 Tukang Las OH 12 12 12 12
L.02.12 TUKANG LISTRIK OH 13 13 13 13
L.02.13 TUKANG PIPA OH 14 14 14 14
L.02.14 TUKANG VIBRATOR OH 15 15 15 15
L.03.01 KEPALA TUKANG OH 150,000 150,000 150,000 150,000
L.04.01 MANDOR OH 110,000 110,000 110,000 110,000
L.08.01 Operator Alat Berat OH 18 18 18 18
L.08.02 Supir Truk OH 19 19 19 19
L.09.01 Pembantu Operator Alat Berat OH 20 20 20 20
L.09.02 Kenek Truk OH 21 21 21 21
L.10.01 Operator Crane OH 22 22 22 22
L.10.02 Pembantu operator crane OH 23 23 23 23
L.11.01 Operator Alat Pipa OH 24 24 24 24
L.11.02 Pembantu Operator Alat Pipa OH 25 25 25 25
L.13 Operator Alat Elektronik OH 26 26 26 26
PENJAGA MALAM OH 27 27 27 27
TUKANG PASANG KERAMIK OH 28 28 28 28

Kendari, 2018
:Konsultan Perencana

CV. CITRA JAYA KONSULTAN :Dibuat Oleh

.CITRA Y.S, S.Kom


.INDRASANTO, S.T
Direktur
Estimator
DAFTAR UPAH KERJA DAN HARGA BAHAN

Pekerjaan : Perencanaan Pagar Uptd Wilayah II


Lokasi : Kab. Kolaka
Tahun Anggaran : 2019

NO. U R A I A N SATUAN

I UPAH TENAGA KERJA


1 Pekerja OH
2 Tukang OH
3 Kepala Tukang OH
4 Mandor OH
II HARGA BAHAN
1 Tanah Timbunan Biasa M3
2 Air Ltr
3 Pasir Urug M3
4 Pasir Pasang M3
5 Pasir Beton M3
6 Pasir Beton kg Kg
7 Kerikil Kali/Gunung M3
8 Kerikil Kali/Gunung Kg Kg
9 Portland Cement (PC) 50 Kg Kg
10 Semen Warna (Neut untuk tegel) Kg
11 Kerikil Beton/Suplit 1 - 2 cm M3
12 Pasir Beton kg Kg
13 Kerikil Kali/Gunung M3
14 Kaca 5 mm M2
15 Batu Angin/Roster Bh
16 Batu Kali M3
17 Batu Bata Bh
18 Geranit 60 x 60 cm Bh
19 Besi Beton Polos Kg
20 Kawat Bindrat/Kawat Beton Kg
21 Paku 5 - 12 cm Kg
22 Paku Tripleks Kg
III BAHAN BESI
1 Besi Metal hollow 40.40.1,2mm M1
2 Besi Metal hollow 20.40.1,2 mm M1
3 Plat Baja 1,2 mm M2
4 Pengelasan CM
5 Kawat Listrik Kg
6 Solar Ltr
7 Minyak Pelumas Ltr
IV BAHAN KAYU
1 Papan Kayu Klas IV (Papan Bekesting) M3
2 Balok Kayu 5/7 M3
3 Dolken dia. 8 - 10 cm Btg
4 Minyak Bekisting Ltr
5 Multipleks 3 mm Lbr
V BAHAN INSTALASI LISTRIK
1 Lampu 5 watt ex. Philips /setara Bh
2 Kabel NYM 3 x 2,5 mm2 Eterna M1
3 Pipa Listrik 1/2 inchi, Ex Clipsal Btg
4 Klem Kabel No. 10 Bh
5 Inbow Dos Bh
6 Las Dop Bh
7 Isolasi Bh
8 T - Dos 5/8" Bh
VI BAHAN FINISHING
1 Plamir Tembok Kg
2 Cat Meni Kg
3 Amplas Lbr
4 Kuas bh
5 Pengencer kg
6 Cat Residu Kg
7 Cat Tembok Metrolight Kg
8 Cat Kayu (Avian) Kg
9 Cat Meny seng/besi Kg
10 Minyak Cat Ltr
11 Kuas Biasa 3 " Bh
12 Kuas Roll Bh
13 SealLant Bh
14 Pipa PVC Ø 4" AW M1
UPAH KERJA DAN HARGA BAHAN

canaan Pagar Uptd Wilayah II


Kolaka

HARGA
SATUAN

Rp 95,000.00
Rp 135,000.00
Rp 150,000.00
Rp 115,000.00

Rp 40,000.00
Rp 95.00
Rp 145,000.00
Rp 218,286.00
Rp 218,286.00
Rp 155.92
Rp 278,000.00
Rp 198.57
Rp 1,500.00
Rp 24,150.00
Rp 475,000.00
Rp 339.29
Rp 278,000.00
Rp 105,000.00
Rp 57,000.00
Rp 218,000.00
Rp 850.00
Rp 77,400.00
Rp 19,500.00
Rp 17,000.00
Rp 15,750.00
Rp 28,750.00
Rp 47,080
Rp 36,600
Rp 35,000
Rp 10,300
Rp 24,300
Rp 9,650
Rp 48,000

Rp 2,000,000.00
Rp 3,500,000.00
Rp 10,500.00
Rp 12,000.00
Rp 73,000.00

Rp 49,000.00
Rp 11,000.00
Rp 13,750.00
Rp 100.00
Rp 5,000.00
Rp 2,500.00
Rp 7,000.00
Rp 7,500.00

Rp 20,500.00
Rp 19,500.00
Rp 13,000.00
Rp 18,500.00
Rp 32,500.00
Rp 28,750.00
Rp 38,000.00
Rp 65,000.00
Rp 18,400.00
Rp 12,000.00
Rp 18,000.00
Rp 35,000.00
Rp 32,500.00
Rp 56,250.00
STANDARISASI HARGA SATUAN BARANG DAN JASA
PEMERINTAH KOTA KENDARI TAHUN ANGGARAN 2018
BIDANG CIPTA KARYA DINAS PEKERJAAN UMUM DAN PENATAAN

NO. N A M A / JENIS BARANG MEREK/TYPE

1 2 3

DINAS PEKERJAAN UMUM

1 Harga Satuan Dasar Upah


- Pekerja

- Tukang Bongkar

- Tukang Kayu

- Tukang Batu

- Tukang Besi

- Tukang Khusus alluminium

- Tukang Las

- Tukang Cat

- Tukang Pipa

- Kepala Tukang

- Mandor

- Operator
- Pembantu Operator
- Sopir/driver
- Pembantu Sopir
- Mekanik
- Pembantu Mekanik

2 Harga Satuan Bangunan Gedung


- Gedung Bertingkat
- Khusus
- Non Sederhana
- Sederhana
- Gedung Bertingkat
- Khusus
- Non Sederhana
- Sederhana
- Rumah Dinas
- Type A
- Type B
- Type C, D, E
- Pagar
- Depan
- Samping/Belakang
- Gedung Kelas Tidak Sederhana Depan
- Gedung Kelas Tidak Sederhana Samping

55
NO. N A M A / JENIS BARANG MEREK/TYPE

1 2 3
- Rumah Negara Type C Depan
- Rumah Negara Type C Samping
- Rumah Negara Type B Depan
- Rumah Negara Type B Samping
- Rumah Negara Type A Depan
- Rumah Negara Type A Samping

3 Harga Satuan Dasar Bahan Bangunan


a. Bahan Pasangan
- Pasir Pasang/Beton
- Pasir Urug
- Portland Cement
- Portland Cement 50 Kg
- Semen Warna (Nak untuk tegel)
- Urugan Tanah Pilihan
- Urugan Tanah Biasa
- Batu Gunung
- Batu Bata
- Batu Pecah 1-2 cm
- Batu Pecah 2-3 cm
- Kerikil
- Sirtu Gunung
- Sirtu Kali
- Kapur
- Paving Blok K.300 (ukuran 10 cm x 20 cm, tebal 8 cm)
- Paving Blok K.250 (ukuran 10 cm x 20 cm, tebal 8 cm)
- Topi Uskup (pengancing paving blok)
- Cansteen (ukuran 20 cm x 60 cm)
- Cansteen (ukuran 30 cm x 60 cm)
- Asphalt Cair
- Abu Batu/Filler
- Bahan Anti Pengelupasan
- Agregat Pengunci (Cipping)
- Cat Marka (Non Thermoplas)
- Cat Marka (Thermoplastic)
- Agregat Kasar
- Agregat Halus
- Air Bersih
- Bensin

56
NO. N A M A / JENIS BARANG MEREK/TYPE

1 2 3
- Solar
- Minyak Tanah
- Minyak Pelumas
- Kawat Las
- Minyak Begisting

b Bahan Penggantung
- Kunci Tanam 2 x Putar
- Kunci Tanam Antik
- Grendel Jendela
- Grendel Tanam
- Engsel Kupu-Kupu
- Engsel Pintu
- Engsel Antik 3 x 4
- Door Closer
- Kait Angin

c Bahan Lantai
- Tegel Keramik KIA Putih ukuran 30 x 30 cm
Tegel Keramik Akura Putih ukuran 30 x 30 cm
- Tegel Keramik KIA ukuran 40 x 40 cm
Tegel Keramik Paltinum Uk. 40 x 40 cm
- Tegel Keramik Anti Slip ukuran 20 x 20 cm
- Tegel Dinding Keramik ukuran 20 x 25 cm
- Tegel Keramik Motif Penyandang Cacat
- Tegel Keramik 30x30 cm (Brico Teracota)
- Batu granit
- Tegel Kuku/Sudut
- Tempat Sabun Keramik
- Semen Warna

d Bahan Dinding
- Batako Ukuran 20 x 40 x 10
- Batu Bata Ukuran 5.5 x 11 x 23
- Beton Roster / Kerawang

e Bahan Penutup Langit - Langit


- Asbes 3 mm, Ukuran 100 x 100
- Tripleks Tebal 3 mm
- Teakwood
- List Plafond Kayu Kelas II
- Multipleks 4 mm
- Multiplek 6 mm
- Multiplek 9 mm
- Eternit 3 mm
- Gipsumboard 240 x 120 x 0,4 cm
- Kalsiboard
- Kayu Lapis 4 mm Ukuran 8 " x 4 "
- Kayu Lapis 12 mm Ukuran 8 " x 4 "
- Lapisan Bahan Taco HPL

f Bahan penutup Atap


- Genteng Kodok
- Asbes Gelombang
- Genteng Metal
- Atap Sirap
- Alimunium
- Nok Bumbongan Genteng Kodok
- Nok Bubungan Asbes
- Nok Bubungan Genteng Metel
- Bumbungan Genteng plenttong " S "
- Genteng plentong " S "
- Seng Datar BJL.S 0.3
- Seng Gelombang Kecil

57
NO. N A M A / JENIS BARANG MEREK/TYPE

1 2 3
- Atap Sakura Roof
- Nok Sakura Roof
- Karet Talang Air
- Talang Air Fiber
- Lem Seng Atap Multi Roof
- Lem Seng Nok Multi Roof
- Genteng Atap Zincalume
- Nok Genteng Metal
- Nok C Rad : 9-9.5 P: 40 CM
- Nok Putri P: 109 Cm Ef: 80 Cm
- Nok Ratu P: 91 Cm Ef: 80 Cm
- Nok Raja P: 104 Cm Ef: 80 Cm
- Nok U P: 110 Cm
- Nok Samping P : 110 Cm
- Nok Zincalume

g Bahan Kayu
- Kayu Balok Klas I
- Kayu Balok Klas II
- Kayu Balok Klas III
- Kayu Balok Kalapi untuk Kusen
- Kayu Balok 7/15 Silae/Bisulo/Bitti (Klas II) untuk kuda-kuda
- Papan Kayu Kelas I
- Papan Kayu Kelas II
- Papan Kayu Kelas III
- Papan Kayu Kelas IV untuk papan begisting/mall
- Balok Kayu Biti
- Kayu Besi Dia 20 cm
- Kayu Besi Dia 30 cm
- Dolken

58
NO. N A M A / JENIS BARANG MEREK/TYPE

1 2 3
h Bahan Besi dan Aluminium
- Baja Tulangan U24 Polos
- Baja Tulangan U32 Polos
- Baja Tulangan U32 Ulir
- Baja Tulangan U39 Ulir
- Baja Tulangan U48 Ulir
- Besi Struktur
- Kawat beton
- Kawat Bronjong
- Kawat Bronjong Pabrikasi dia 2,6 - 2,8 cm
- Angker/Baut/Plat Pengikat untuk Kuda-Kuda / Konsol
- Paku Campur
- Paku Seng
- Paku Biasa
- Paku Anti Karat
- Paku Tripleks / Plafond
- Paku Gipsunbord
- Paku Kalsiboar
- Pagar BRC Jadi ( Tinggi 1M )
- Besi Profil C a Pipa Besi Dia. 2 "
- Top/Bottom Chord 0.8 mm
- Web 0.75 mm
- Profil Reng 0.60 mm
- Screw Truss/Reng
- Dynabold
- Besi Hollow Galvalume 0,2cm x 0,4cm
- Besi Beton dia 4mm
- Ramset
- Paper Tape
- Profil M Aluminium
- Skrup Fixer
- Sealant
- Galvalume HI100 CI 75.75
- Paku Skrup
- Baja Profil Siku
- Baja Profil UNP
- Besi Pengaku
- Kawat Las Listrik

i Bahan Cat
- Cat besi
- Plamur Tembok
- Plamir Kayu
- Cat Tembok
Avitex
Vinilex Nippon Paint
Metroligh
- Cat Kayu
Glotex
Avian
Platone
Politur
- Cat Minyak
- Cat Meni Kayu
- Cat Atap Seng (Merk Yoko)
- Car Vernis
- Meni Besi
- Politur
- Dempul Kayu
- Residu
- Kuas Biasa 3 cm
- Kuas Roll
- Amplas Kasar
- Amplas Halus

59
NO. N A M A / JENIS BARANG MEREK/TYPE

1 2 3

j Bahan Sanitair / Saluran Air


- Pipa PVC dia 3/4 Inci
- Pipa PVC dia 1 Inci
- Pipa PVC dia 1½ Inci
- Pipa PVC dia 2 Inci
- Pipa PVC dia 3 Inci (RR z-join)
- Pipa PVC dia 4 Inci (RR z-join)
- Pipa PVC dia 6 Inci (RR z-join)
- Pipa PVC dia 8 Inci (RR z-join)
- Pipa PVC dia 10 Inci (RR z-join)
- Pipa GI dia 1½ Inci
- Pipa GI dia 2 Inci
- Pipa GI dia 3 Inci
- Pipa GI dia 4 Inci
- Pipa GI dia 6 Inci
- Pipa GI dia 8 Inci
- Pipa GI dia 10 Inci
- Reducer Tee PVC Dia 10 Inci x 8 Inci
- Reducer Tee PVC Dia 8 Inci x 6 Inci
- Reducer Tee PVC Dia 6 Inci x 4 Inci
- Reducer Tee PVC Dia 4 Inci x 3 Inci
- Reducer PVC Dia 10 Inci x 4 Inci
- Reducer PVC Dia 8 Inci x 6 Inci
- Reducer PVC Dia 6 Inci x 4 Inci
- Reducer PVC Dia 4 Inci x 3 Inci
- Bend PVC Dia 4 Inci x 22.5º
- Bend PVC Dia 6 Inci x 45º
- Bend PVC Dia 6 Inci x 90º
- Bend PVC Dia 8 Inci x 22.5º
- Bend PVC Dia 8 Inci x 45º
- Bend PVC Dia 8 Inci x 90º
- Bend PVC Dia 10 Inci x 45º
- Tee Flange GI Dia 8 Inci x 8 Inci

60
NO. N A M A / JENIS BARANG MEREK/TYPE

1 2 3
- Tee Flange GI Dia 14 Inci x 6 Inci
- Tee Flange GI Dia 14 Inci x 10 Inci
- Tee Flange GI Dia 20 Inci x 10 Inci
- Tee PVC (RR) Dia 12 Inci x 10 Inci x 12 Inci
- Tee PVC (RR) Dia 12 Inci x 6 Inci x 12 Inci
- Tee PVC (RR) Dia 12 Inci x 12 Inci x 12 Inci
- Tee PVC (RR) Dia 12 Inci x 8 Inci x 12 Inci
- Tee PVC (RR) Dia 8 Inci x 6 Inci x 8 Inci
- Tee PVC (RR) Dia 8 Inci x 4 Inci x 8 Inci
- Tee PVC (RR) Dia 6 Inci x 6 Inci x 6 Inci
- Tee PVC (RR) Dia 6 Inci x 4 Inci x 6 Inci
- Tee PVC (RR) Dia 4 Inci x 4 Inci x 4 Inci
- Tee PVC (RR) Dia 4 Inci x 3 Inci x 4 Inci
- Tee PVC (RR) Dia 3 Inci x 3 Inci x 3 Inci
- Flange GI Dia 6 Inci
- Flange GI Dia 8 Inci
- Flange GI Dia 10 Inci
- Flange GI Dia 12 Inci
- Flange GI Dia 14 Inci
- Flange GI Dia 16 Inci
- Flange GI Dia 20 Inci
- Flange Spigot Dia 4 Inci
- Flange Spigot Dia 6 Inci
- Flange Spigot Dia 8 Inci
- Flange Spigot Dia 10 Inci
- Gate Valve Dia 3 Inci
- Gate Valve Dia 4 Inci
- Gate Valve Dia 6 Inci
- Gate Valve Dia 8 Inci
- Gate Valve Dia 10 Inci
- Air Valve Dia 2 Inci x Dia ¾ Inci
- Air Valve Dia 3 Inci x Dia 0.8 Inci
- Air Valve Dia 4 Inci x Dia 0.8 Inci
- Air Valve Dia 6 Inci x Dia 1 Inci
- Air Valve Dia 8 Inci x Dia 1 Inci
- Air Valve Dia 10 Inci x Dia 1 Inci
- Dop GI Dia 8 Inci
- Dop PVC Dia 10 Inci
- Dop PVC Dia 8 Inci
- Dop PVC Dia 6 Inci
- Dop PVC Dia 4 Inci
- Dop PVC Dia 3 Inci
- Dreser Joint Dia 20 Inci
- Dreser Joint Dia 14 Inci
- Dreser Joint Dia 12 Inci
- Dreser Joint Dia 10 Inci
- Dreser Joint Dia 8 Inci
- Dreser Joint Dia 6 Inci
- Water Meter Dia 6 Inci
- Water Meter Dia 8 Inci
- Water Meter Dia 10 Inci
- Seal Tipe/Isolasi Pipa
- Multiplek 4 mm
- Seal Tape/Isolasi Pipa
- Multipleks 4 mm
- Pasangan Baik Air 0,40 M3 (ditegel 10x20)+sumbat bak
- Kloset Duduk Toto
- Kloset Duduk KIA
- Kloset Jongkok Porselin
- Wastafel
- Bak Cuci Logam 1 lubang
- Bak Mandi Fiber Glass
- Kran Air
- Floor Drain

61
NO. N A M A / JENIS BARANG MEREK/TYPE

1 2 3
- Urinoir
- Buis Beton dia 20 cm
- Kran Kuning dia 1/2"
- Kran Kuning dia 3/4"
- Jetwesher
- Penyambung Pipa PVC
- Soker dia 1/2" s/d 3/4"
- Knee dia 1/2" s/d 3/4"
- Elbow dia 1/2" s/d 3/4"
- Tee Stuk dia 1/2" s/d 3/4"
- Lem Pipa PVC
- Lem Alteco

k Bahan Lain - Lain


- Kaca. Bening 5 mm
- Pompa Tangan
- Kaca Bening 5 mm
- Kaca Rasa (Cermin) Lembar
- Glass Block
- Instalasi Listrik
- Pipa Union untuk Kabel
- 5/8 inci - 4 m
- 3/4 inci -4 m
- 1 inci - 4 m
- Type NYA
- 2 x 2.5 mm
- Type NYB
- 2 x 1.1/2 mm
- 2 x 2. 1/2 mm
- 2 x 4 mm
- Pipa Listrik PVC / 5/8
- Saklar Tunggal Broco
- Saklar Double / Broco
- Stop Kontak
- Sekring Kast 1 Group/ Asli
- Sekring Kast 2 Group / Asli

62
NO. N A M A / JENIS BARANG MEREK/TYPE

1 2 3
- Sekring Kast 1 Group/ Biasa
- Sekring Kast 2 Group / Biasa
- Fitting Gantung Broko
- Fitting Plafon Broko
- Bola Lampu 15 s/d 75 watt Pijar
- Bola Lampu 100 watt
- Lampu TL Philips 1 x 20W
- Lampu TL Philips 2 x 20W
- Lampu TL Philips 1 x 40W
- Lampu TL Philips 2 x 40W
- Lampu TL Lingkar 22 W
- Lampu TL Lingkar 20 W
- Lampu PLC 5 Watt Philips
- Lampu PLC 8 Watt
- Lampu PLC 11 Watt
- Lampu PLC 14 Watt
- Lampu PLC 18 Watt
- Lampu PLC 23 Watt
- Lampu PLC 24 Watt
- Lampu Pijar 52 W
- Lampu Pijar 42 W
- Lampu Pijar 60 W
- Lampu Pijar 100 W
- Lampu Taman Mercury
- Lampu RM 2 x 20
- Lampu RM 2 x 40
- Lampu Down Light
- Panel Listrik

A. BIDANG KECIPTAKARYAAN

a. Harga Satuan Pekerjaan Pondasi


- Pondasi batu Gunung, campuran 1 Pc : 3 Ps
- Pondasi batu gunung, campuran 1 Pc : 4 Ps
- Pondasi batu gunung, campuran 1 Pc : 5 Ps
- Batu kosong (aanstamping)
- Pondasi siklop, 60% beton campuran 1 Pc : 2 Ps : 3 Kr dan 40% batu
- Pondasi sumuran, diameter 100 cm

b. Harga Satuan Pekerjaan Beton


- Lantai Kerja Beton mutu K 125
- Beton mutu K 175
- Beton mutu K 250
- Beton mutu K 300
- Beton mutu K 400
- Bekisting untuk sloof
- Bekisting untuk kolom
- Bekisting untuk balok
- Bekisting untuk lantai

c. Harga Satuan Pekerjaan Tanah


- Papan Nama Kegiatan
- Menggali tanah biasa sedalam 1 meter
- Menggali tanah biasa sedalam 2 meter
- Menggali tanah biasa sedalam 3 meter
- Menggali tanah keras sedalam 1 meter
- Menggali tanah cadas sedalam 1 meter
- Menggali tanah lumpur sedalam 1 meter
- Pembongkaran Aspal
- Mengurug kembali galian
- Urugan Tanah Dengan Tanah Didatangkan (Urugan Piliha)
- Memadatkan tanah (per 20 cm)
- Mengurug pasir urug

63
NO. N A M A / JENIS BARANG MEREK/TYPE

1 2 3
- Pek. Pembuangan Tanah Sejauh 150 M

d. Harga Satuan Pekerjaan Dinding


- Pas. bata merah tebal 1/2 bata, camp.1 PC : 2 Ps
- Pas. bata merah tebal 1/2 bata, camp.1 PC : 4 Ps
- Pas. bata merah tebal 1/2 bata, camp.1 PC : 5 Ps

e. Harga Satuan Pekerjaan Plesteran


- Plesteran 1 PC : 2 Ps, tebal 15mm
- Plesteran 1 PC : 3 Ps, tebal 15mm
- Plesteran 1 PC : 4 Ps, tebal 15mm
- Plesteran 1 PC : 5 Ps, tebal 15mm
- Plesteran 1 PC : 3 Ps, tebal 15 dilicin
- Plesteran Skoning 1 PC : 2 Ps, lebar 10 mm
- Plesteran Ciprat 1 PC : 2 Ps
- Memasang 1 m2 acian

f. Harga Satuan Pekerjaan Kayu


- Kusen pintu dan kusen jendela, kayu kelas I
- Kusen pintu dan kusen jendela, kayu kelas II atau III
- Pintu klamp standar, kayu kelas II
- Pintu klamp sederhana, kayu kelas III
- Daun pintu panel, kayu kelas I atau II
- Pintu dan jendela kaca, kayu kelas I atau II
- Daun pintu kayu lapis (plywood) rangkap,
- Pintu plywood rangkap, rangka expose kayu kelas II
- Jalusi kusen, kayu kelas II
- Teakwood rangkap, rangka expose kayu kelas I
- Konstruksi kuda-kuda konvensional, kayu kelas II bentang 6 m
- Konstruksi kuda-kuda expose, kayu kelas I
- Konstruksi gordeng, kayu kelas II
- Rangka atap genteng keramik, kayu kelas II
- Rangka langit-langit kayu kelas III
- Lisplank ukuran kayu kelas kelas II (2.2 cm x 20 cm)
- Rangka dinding pemisah (60 x 120) cm kayu kelas II atau III
- Dinding lambriziring dari papan kayu kelas I
- Dinding lambriziring dari plywood ukuran (120 x 240) cm

64
NO. N A M A / JENIS BARANG MEREK/TYPE

1 2 3

g. Harga satuan Pekerjaan Penutup Lantai dan Dinding


- Tegel Keramik Anti Slip (KM/WC) ukuran 40 x 40 cm
- Tegel Dinding Keramik ukuran 20 x 25 cm
- Tegel Kuku/Sudut
Tempat Sabun Keramik
- Lantai ubin warna ukuran (30 x 30) cm
- Lantai ubin warna ukuran (20 x 20) cm
- Lantai ubin teraso ukuran (40 x 40) cm
- Lantai ubin teraso ukuran (30 x 30) cm
- Lantai keramik ukuran (40 x 40) cm
- Lantai keramik ukuran (30 x 30) cm
- Lantai keramik ukuran (20 x 20) cm
- Lantai keramik ukuran (10 x 40) cm, variasi/border
- Lantai Kramik Anti Slip ukuran (20 x 20) cm,
- Plint keramik ukuran (10 x 20) cm
- Memasang lantaiTegel Pengarah ukuran (30 x 30) cm
- Memasang lantai Tegel Brico Taracota ukuran (30 x 30) cm
- Memasang Dinding Granik ukuran (60 x 60) cm

g. Harga Satuan Pekerjaan Langit - Langit


- Memasang langit-langit asbes semen
- Memasang langit-langit akustik
- Memasang langit-langit tripleks
- Memasang langit-langit lambriziring kayu, tebal 9 mm
- Memasang langit-langit gypsum board
- Memasang list langit-langit kayu profil

h. Harga Satuan Pekerjaan Besi dan Aluminium


- Pasang Rangka Atap Baja Ringan
- Pasang Rangka Plafond Baja Ringan (60cm x 120cm)
- Pas. Kusen Jendela Kaca Bahan Aluminium
- Pas. Rangka Dinding Pemisah Bahan Aluminium

i. Harga Satuan Pekerjaan Kap dan Atap


- Pasang Atap Genteng Kodok / Glazzur
- Pasang Genteng Bubung Kodok Glazzur
- Pasang Rooflight Fiberglass ( 180 x 90 ) cm
- Pasang Atap Asbes Gelombang
- Pasang Nok Stel Gelombang 1.08m
- Pasang Nok Paten 1.05m
- Pasang Nok Stel rata 1.05m
- Pasang Atap Genteng Metal
- Pasang Atap Sirap
- Pasang Nok Genteng Metal
- Pasang Atap Seng Gelombang
- Pasang Atap Nok Seng
- Pasang Atap Alluminium
- Pasang Nok Alluminium
- Memasang Kembali atap Seng Lama
- Talang Patahan Atap

j. Harga Satuan Pekerjaan Sanitair


Memasang Pipa Galvanis Ø 1½" (dibawah permukaan jln beraspal dan pengembalian
- kondisi)
Memasang Pipa Galvanis Ø 2" (dibawah permukaan jln beraspal dan pengembalian
- kondisi)
Memasang Pipa Galvanis Ø 3" (dibawah permukaan jln beraspal dan pengembalian
- kondisi)
Memasang Pipa Galvanis Ø 4" (dibawah permukaan jln beraspal dan pengembalian
- kondisi)
Memasang Pipa Galvanis Ø 6" (dibawah permukaan jln beraspal dan pengembalian
- kondisi)

65
NO. N A M A / JENIS BARANG MEREK/TYPE

1 2 3
Memasang Pipa Galvanis Ø 8" (dibawah permukaan jln beraspal dan pengembalian
- kondisi)
Memasang Pipa Galvanis Ø 10" (dibawah permukaan jln beraspal dan pengembalian
- kondisi)
- Memasang Pipa PVC Ø ½"
- Memasang Pipa PVC Ø ¾"
- Memasang Pipa PVC Ø 1"
- Memasang Pipa PVC Ø 1½"
- Memasang Pipa PVC Ø 2" (RR z-join)
- Memasang Pipa PVC Ø 2½" (RR z-join)
- Memasang Pipa PVC Ø 3" (RR z-join)
- Memasang Pipa PVC Ø 4" (RR z-join)
- Memasang Pipa PVC Ø 6" (RR z-join)
- Memasang Pipa PVC Ø 8" (RR z-join)
- Memasang Pipa PVC Ø 10" (RR z-join)
- Pengetesan Jaringan Pipa 10 Inci dan 8 Inci
- Pengetesan Jaringan Pipa 6 Inci dan 4 Inci mm
- Pengetesan Jaringan Pipa 3 Inci
- Pas. Bak Valve, Wash Out dan Ventil untuk Valve Dia 10 Inci
- Pas.Bak Valve, Wash Out dan Ventil untuk Valve Dia 8 Inci
- Pas.Bak Valve, Wash Out dan Ventil untuk Valve Dia 6 Inci
- Pas. Bak Valve, Wash Out dan Ventil untuk Valve Dia 3 dan 4 Inci
- Pemasangan Water Meter Dia 6 s/d 10 Inci
- Gate Valve Dia 3 Inci - 6 inci
- Pemasangan Gate Valve Dia 8 inci - 10 Inci
- Pemasangan Flange GI Dia 6 Inci - 8 Inci
- Pemasangan Flange GI Dia 10 Inci- 20 Inci
- Pemasangan Flange Tee GI
- Pemasangan Tee Flange PVC (RR) dia 3 Inci - 4 Inci
- Pemasangan Tee Flange PVC (RR) dia 6 Inci - 8 Inci
- Pemasangan Tee Flange PVC (RR) dia 10 Inci - 20 Inci
- Pemasangan Tee GI
- Pemasangan Bend Pipa PVC dia 3 Inci - 6 Inci
- Pemasangan Bend Pipa PVC dia 8 Inci - 10 Inci
- Pemasangan Flange Spigot Dia 3 Inci - 6 Inci
- Pemasangan Flange Spigot Dia 8 Inci - 10 Inci
- Pemasangan Dreser Joint Pipa PVC Dia 6 Inci - 10 Inci
- Pemasangan Dreser Joint Pipa PVC Dia 12 Inci - 20 Inci

66
NO. N A M A / JENIS BARANG MEREK/TYPE

1 2 3
- Pemasangan Reduser Tee Pipa PVC
- Pemasangan Reduser Pipa PVC
- Pemasangan Dop Pipa PVC
- Pemasangan Dop Pipa GI
- Pemasangan Air Valve
- Pemasangan Socket Valve
- Kran Air Diameter 1/2"
- Kloset Jongkok Standard INA/Global

k. Harga Satuan Pekerjaan Pengecatan


- Mendempul dan Menggosok Kayu
- Pengecatan Kayu Baru (1 x Plamir ,1 x Cat Dasar, 2 xCat Penutup)
- Pelaburan Bidang Kayu dengan Teak Oil
- Pelaburan Bidang Kayu dengan Cat Residu dan Ter
- Pelaburan Bidang Kayu dengan Vernis
- Pengecatan Tembok Baru ( 1 x Plamir, 1 x Cat Dasar, 2 x Cat Penutup )

Kendari, 19

Kepala Bidang Cipta Kary


dan Penataan Ru

Ir. YOHANIS

Nip. 1961010

67
G DAN JASA
GGARAN 2018
AN PENATAAN RUANG

SATUAN HARGA SATUAN


(Rp)
4 6

Hari (7 jam) Rp 85,000


Jam Rp 12,143
Hari (7 jam) Rp 130,000
Jam Rp 18,571
Hari (7 jam) Rp 130,000
Jam Rp 18,571
Hari (7 jam) Rp 130,000
Jam Rp 18,571
Hari (7 jam) Rp 130,000
Jam Rp 18,571
Hari (7 jam) Rp 130,000
Jam Rp 18,571
Hari (7 jam) Rp 130,000
Jam Rp 18,571
Hari (7 jam) Rp 130,000
Jam Rp 18,571
Hari (7 jam) Rp 130,000
Jam Rp 18,571
Hari (7 jam) Rp 150,000
Jam Rp 21,429
Hari (7 jam) Rp 110,000
Jam Rp 15,714
Org/Jam Rp 21,429
Org/Jam Rp 17,143
Org/Jam Rp 21,429
Org/Jam Rp 17,143
Org/Jam Rp 21,429
Org/Jam Rp 17,143

M2 Rp 7,381,000
M2 Rp 6,594,000
M2 Rp 6,162,500

M2 Rp 6,065,100
M2 Rp 5,418,000
M2 Rp 4,503,600

M2 Rp 4,424,300
M2 Rp 3,848,400
M2 Rp 3,731,500

M2 Rp 2,269,700
M2 Rp 1,367,300
M2 Rp 2,268,900
M2 Rp 1,496,700

68
SATUAN HARGA SATUAN
(Rp)
4 6
M2 Rp 1,944,800
M2 Rp 1,171,400
M2 Rp 2,053,500
M2 Rp 1,236,200
M2 Rp 2,118,300
M2 Rp 1,275,600

M3 Rp 214,286
M3 Rp 151,429
Kg Rp 1,700
Zak Rp 85,000
Kg Rp 24,150
M3 Rp 84,000
M3 Rp 47,250
M3 Rp 218,571
Buah Rp 750
M3 Rp 470,068
M3 Rp 427,870
M3 Rp 290,745
M3 Rp 182,500
M3 Rp 182,500
M3 Rp 482,790
Bh Rp 3,410
Bh Rp 2,900
Bh Rp 7,000
Bh Rp 75,000
Bh Rp 100,000
Kg Rp 14,438
Kg Rp 1,706
Kg Rp 110,000
Kg Rp 1,811
Kg Rp 97,020
Kg Rp 124,740
M3 Rp 421,667
M3 Rp 498,333
M3 Rp 78,750
Liter Rp 8,500

69
SATUAN HARGA SATUAN
(Rp)
4 6
Liter Rp 9,650
Liter Rp 12,500
Liter Rp 48,000
Kg Rp 21,500
Liter Rp 12,500

Buah Rp 172,500
Buah Rp 402,500
Buah Rp 27,038
Buah Rp 40,250
Buah Rp 31,625
Buah Rp 34,500
Buah Rp 24,150
Buah Rp 181,125
Buah Rp 23,000

Dos Rp 63,250
Dos Rp 57,500
Dos Rp 85,000
Dos Rp 100,000
Dos Rp 69,000
Dos Rp 99,200
Dos Rp 114,490
Dos Rp 97,750
Buah Rp 15,000
Dos Rp 188,100
Buah Rp 48,300
Kg Rp 24,550

Buah Rp 5,564
Buah Rp 750
Buah Rp 7,849

Lembar Rp 72,450
Lembar Rp 72,700
Lembar Rp 104,500
Mtr Rp 5,775
Lbr Rp 107,321
Lbr Rp 149,100
Lbr Rp 192,600
Lbr Rp 21,000
Lbr Rp 81,500
Lbr Rp 74,750
Lembar Rp 56,319
Lembar Rp 159,858
Lembar Rp 251,557

M2 Rp 27,927
Kaki Rp 26,964
Meter Rp 89,452
M2 Rp 83,781
M2 Rp 110,638
M' Rp 19,950
M' Rp 25,725
M' Rp 42,000
Buah Rp 4,095
Buah Rp 2,573
Lembar Rp 72,450
Kaki Rp 10,593

70
SATUAN HARGA SATUAN
(Rp)
4 6
Lembar Rp 46,500
M1 Rp 49,100
M1 Rp 16,100
M1 Rp 12,600
Kg Rp 77,805
Kg Rp 77,805
Lbr Rp 56,117
Lbr Rp 45,000
Buah Rp 28,083
Buah Rp 49,055
Buah Rp 56,117
Buah Rp 62,809
Buah Rp 23,415
Buah Rp 32,100
Buah Rp 45,796

M3 Rp 5,980,000
M3 Rp 4,000,000
M3 Rp 3,200,000
M3 Rp 4,025,000
M3 Rp 4,000,000
M3 Rp 4,702,500
M3 Rp 4,000,000
M3 Rp 3,500,000
M3 Rp 2,100,000
M3 Rp 4,000,000
Mtr Rp 67,410
Mtr Rp 134,820
Bh Rp 8,900

71
SATUAN HARGA SATUAN
(Rp)
4 6

Kg Rp 24,000
Kg Rp 27,000
Kg Rp 32,000
Kg Rp 35,500
Kg Rp 38,500
Kg Rp 19,367
Kg Rp 26,100
Kg Rp 52,800
Bh Rp 270,000
Kg Rp 23,100
Kg Rp 15,750
Kg Rp 28,750
Kg Rp 19,800
Kg Rp 31,625
Kg Rp 28,750
Kg Rp 28,750
Kg Rp 28,750
M Rp 493,710
M Rp 70,350
M1 Rp 25,725
M2 Rp 14,044
M3 Rp 11,655
Kg Rp 28,088
BH Rp 2,247
M1 Rp 19,845
Kg Rp 14,044
Kg Rp 24,570
Roll Rp 52,805
M' Rp 105,525
Bh Rp 2,140
Tube Rp 29,295
M' Rp 52,710
Kg Rp 29,295
Kg Rp 20,500
Kg Rp 20,500
Kg Rp 19,367
Kg Rp 24,750

Kg Rp 13,000
Kg Rp 19,320
Kg Rp 19,320

Kg Rp 21,735
Kg Rp 102,795
Kg Rp 27,313

Kg Rp 59,850
Kg Rp 63,250
Kg Rp 48,300
Kg Rp 8,038
Kg Rp 18,113
Kg Rp 20,475
Kg Rp 21,735
Kg Rp 12,075
Kg Rp 19,320
Ltr Rp 60,375
Kg Rp 21,000
Kg Rp 30,188
Buah Rp 17,500
Buah Rp 40,250
Lbr Rp 13,000
Lbr Rp 12,600

72
SATUAN HARGA SATUAN
(Rp)
4 6

Meter Rp 28,750
Meter Rp 35,700
Meter Rp 74,750
Meter Rp 86,250
Meter Rp 172,500
Meter Rp 287,500
Meter Rp 598,000
Meter Rp 994,750
Meter Rp 1,495,000
Meter Rp 207,900
Meter Rp 277,200
Meter Rp 414,120
Meter Rp 562,065
Meter Rp 1,308,182
Meter Rp 1,492,650
Meter Rp 1,928,782
Buah Rp 1,589,378
Buah Rp 993,281
Buah Rp 827,645
Buah Rp 614,180
Buah Rp 1,299,836
Buah Rp 667,787
Buah Rp 350,318
Buah Rp 153,973
Buah Rp 1,023,990
Buah Rp 1,228,360
Buah Rp 1,551,393
Buah Rp 4,096,281
Buah Rp 2,100,624
Buah Rp 2,199,920
Buah Rp 3,223,375
Buah Rp 2,767,341

73
SATUAN HARGA SATUAN
(Rp)
4 6
Buah Rp 3,388,797
Buah Rp 5,083,035
Buah Rp 7,624,606
Buah Rp 4,087,614
Buah Rp 3,679,944
Buah Rp 3,541,165
Buah Rp 2,937,792
Buah Rp 1,832,161
Buah Rp 1,627,898
Buah Rp 1,417,215
Buah Rp 1,289,029
Buah Rp 815,661
Buah Rp 736,267
Buah Rp 638,255
Buah Rp 805,817
Buah Rp 1,151,213
Buah Rp 1,465,151
Buah Rp 1,779,196
Buah Rp 2,093,134
Buah Rp 2,407,072
Buah Rp 3,139,701
Buah Rp 847,333
Buah Rp 1,346,381
Buah Rp 2,253,516
Buah Rp 3,156,923
Buah Rp 2,197,791
Buah Rp 4,818,242
Buah Rp 7,650,136
Buah Rp 9,890,171
Buah Rp 13,186,969
Buah Rp 164,817
Buah Rp 197,736
Buah Rp 329,635
Buah Rp 384,574
Buah Rp 549,392
Buah Rp 769,148
Buah Rp 969,131
Buah Rp 1,394,713
Buah Rp 676,347
Buah Rp 353,116
Buah Rp 17,250
Buah Rp 31,080
Buah Rp 4,085,383
Buah Rp 3,063,897
Buah Rp 2,297,895
Buah Rp 1,723,337
Buah Rp 1,292,474
Buah Rp 969,131
Buah Rp 14,835,368
Buah Rp 17,802,419
Buah Rp 21,362,903
Buah Rp 12,600
Lbr Rp 120,696
Buah Rp 9,600
Lembar Rp 92,234
Buah Rp 252,338
Buah Rp 3,700,000
Buah Rp 1,700,000
Buah Rp 550,000
M3 Rp 500,000
Buah Rp 350,000
Buah Rp 345,000
Buah Rp 47,000
Buah Rp 48,750

74
SATUAN HARGA SATUAN
(Rp)
4 6
Buah Rp 1,677,225
Buah Rp 46,962
Buah Rp 38,750
Buah Rp 53,800
Buah Rp 350,000

Buah Rp 7,500
Buah Rp 7,500
Buah Rp 6,500
Buah Rp 7,000
Ltr Rp 33,256
Buah Rp 15,000

M2 Rp 93,240
Buah Rp 4,109,201
M2 Rp 122,943
M2 Rp 46,962
Buah Rp 23,000
Titik Rp 178,904
Titik Rp 178,904
Btg Rp 8,395
Btg Rp 29,325
Btg Rp 39,675

Roll Rp 294,400

Roll Rp 726,744
Roll Rp 973,807
Roll Rp 1,495,000
Btg Rp 11,500
Buah Rp 20,125
Buah Rp 23,000
Buah Rp 17,250
Buah Rp 39,162
Buah Rp 54,463

75
SATUAN HARGA SATUAN
(Rp)
4 6
Buah Rp 19,046
Buah Rp 28,141
Buah Rp 5,750
Buah Rp 14,375
Buah Rp 5,750
Buah Rp 7,169
Buah Rp 109,250
Buah Rp 129,950
Buah Rp 118,680
Buah Rp 180,780
Buah Rp 38,755
Buah Rp 35,880
Buah Rp 40,250
Buah Rp 29,800
Buah Rp 31,250
Buah Rp 33,235
Buah Rp 34,155
Buah Rp 41,515
Buah Rp 51,750
Buah Rp 104,650
Buah Rp 74,750
Buah Rp 95,750
Buah Rp 107,475
Buah Rp 152,582
Buah Rp 396,750
Buah Rp 579,600
Buah Rp 64,400
Buah Rp 2,180,339

M3 Rp 1,050,700
M3 Rp 992,100
M3 Rp 951,400
M3 Rp 617,497
M3 Rp 4,586,824
M3 Rp 1,182,842

M3 Rp 1,248,750
M3 Rp 1,408,971
M3 Rp 1,843,228
M3 Rp 1,934,274
M3 Rp 2,385,899
M2 Rp 269,900
M2 Rp 443,700
M2 Rp 457,500
M2 Rp 483,000

Buah Rp 606,000
M3 Rp 71,369
M3 Rp 87,278
M3 Rp 103,404
M3 Rp 95,014
M3 Rp 143,828
M3 Rp 187,957
M2 Rp 87,665
M3 Rp 55,200
M3 Rp 175,341
M3 Rp 55,200
M3 Rp 337,632

76
SATUAN HARGA SATUAN
(Rp)
4 6
M3 Rp 33,500

M2 Rp 160,462
M2 Rp 145,356
M2 Rp 141,910

M2 Rp 78,700
M2 Rp 75,300
M2 Rp 72,900
M2 Rp 71,500
M2 Rp 60,504
M' Rp 65,458
M2 Rp 67,100
M2 Rp 43,000

M3 Rp 12,197,639
M3 Rp 9,353,477
M2 Rp 485,442
M2 Rp 343,122
M2 Rp 712,292
M2 Rp 525,927
M2 Rp 628,079
M2 Rp 680,529
M2 Rp 689,400
M2 Rp 749,500
M3 Rp 8,297,208
M3 Rp 12,095,200
M3 Rp 9,558,883
M2 Rp 294,003
M2 Rp 148,235
M' Rp 95,860
M2 Rp 225,366
M2 Rp 399,400
M2 Rp 102,425

77
SATUAN HARGA SATUAN
(Rp)
4 6

M2 Rp 316,900
M2 Rp 357,100
M' Rp 17,538
Buah Rp 51,750
M2 Rp 273,900
M2 Rp 261,500
M2 Rp 163,500
M2 Rp 166,500
M2 Rp 316,900
M2 Rp 273,900
M2 Rp 261,500
M2 Rp 122,400
M2 Rp 319,300
M' Rp 125,700
M2 Rp 286,498
M2 Rp 267,412
M2 Rp 439,952

M2 Rp 113,175
M2 Rp 158,710
M2 Rp 59,300
M2 Rp 218,000
M2 Rp 65,035
M' Rp 20,700

M2 Rp 201,383
M2 Rp 280,545
M2 Rp 65,720
M2 Rp 232,608

M2 Rp 116,898
M' Rp 219,905
M' Rp 32,108
M2 Rp 152,902
M' Rp 50,168
M' Rp 66,596
M' Rp 61,600
M2 Rp 250,546
M2 Rp 157,439
M' Rp 105,484
M2 Rp 88,727
M2 Rp 52,435
M2 Rp 248,438
M2 Rp 215,973
M2 Rp 12,501
M' Rp 70,898

M1 Rp 317,077

M1 Rp 392,427

M1 Rp 602,140

M1 Rp 813,984

M1 Rp 1,935,614

78
SATUAN HARGA SATUAN
(Rp)
4 6
M1 Rp 2,218,138

M1 Rp 2,851,310
M1 Rp 64,990
M1 Rp 73,024
M1 Rp 85,343
M1 Rp 177,291
M1 Rp 201,929
M1 Rp 186,343
M1 Rp 395,232
M1 Rp 641,614
M1 Rp 311,869
M1 Rp 512,567
M1 Rp 790,689
M' Rp 6,176
M' Rp 4,017
M' Rp 2,296
Buah Rp 9,851,853
Buah Rp 8,772,918
Buah Rp 6,932,970
Buah Rp 4,282,671
Buah Rp 1,370,131
Buah Rp 274,002
Buah Rp 1,252,976
Buah Rp 136,941
Buah Rp 751,835
Buah Rp 782,898
Buah Rp 44,134
Buah Rp 50,015
Buah Rp 93,920
Buah Rp 187,839
Buah Rp 45,552
Buah Rp 78,218
Buah Rp 60,868
Buah Rp 137,895
Buah Rp 56,123
Buah Rp 125,223

79
SATUAN HARGA SATUAN
(Rp)
4 6
Buah Rp 62,606
Buah Rp 53,703
Buah Rp 57,927
Buah Rp 107,405
Buah Rp 47,676
Buah Rp 47,676
Unit Rp 116,706
Buah Rp 509,439

M2 Rp 7,296
M2 Rp 54,009
M2 Rp 26,075
M2 Rp 23,114
M2 Rp 47,182
M2 Rp 46,659

Kendari, 19 Februari 2018

pala Bidang Cipta Karya Dinas Pekerjaan Umum


dan Penataan Ruang Kota Kendari

Ir. YOHANIS TULAK, MM


Pembina, Gol. IV/a
Nip. 19610105 199803 1 002