→ PEKERJAAN PERSIAPAN
↘ BOWPALANK
L = 2m
P = 2m
P=2+2+1m
L= 2 + 2 + 1 m
Panjang Bowplang = ( L x 2 ) + ( P x 2 ) = 10 meter
→ PEKERJAAN TANAH
↘ GALIAN TANAH
2m
0.7 m
0.45 m
2m
→ PEKERJAAN PASANGAN
↘ PASANGAN PONDASI
0.2 m
Urugan
Tanah
Panjang Pondasi = 8 m
Pas. Pondasi 1:4 0.55 m Tinggi Pondasi = 0.55 m
Lebar Pondasi Bawah = 0.4 m
Batu Kosong Lebar Pondasi Atas = 0.2 m
0.15 m
Batu Kosong Pondasi = 0.15 m
0.4 m
0.45 m
ANALISA
(………………….) (……………………..)
Kabupaten : Tangerang Jenis Prasarana : SAB
Kecamatan : …...................... Take Of Sheet Lokasi : Kp. …............RT 0…. RW 0….
Desa : …...................... Volume : …............ M Kedalaman 80 m
VOLUME
Pasangan Batu Kosong = (0.15 x 0.45 x 8)
= 0.54 m3
Pasangan Batu Pondasi = (( 0.2 + 0.4 ) / 2 ) x 0.55 x 8
= 1.30 m3
↘ PASANGAN KOLOM
kolom dinding 25 x 25 CM Balok Pengaku 20 x 20 CM
0.25 m 0.2 m
0.25 m 0.2 m
2m
2.8 m
ANALISA
(………………….) (……………………..)
Kabupaten : Tangerang Jenis Prasarana : SAB
Kecamatan : …...................... Take Of Sheet Lokasi : Kp. …............RT 0…. RW 0….
Desa : …...................... Volume : …............ M Kedalaman 80 m
↘ VOLUME DINDING
2.00 M
↘ PASANGAN BATA
Luas dinding = 4.00 m2
ANALISA
(………………….) (……………………..)
Kabupaten : Tangerang Jenis Prasarana : SAB
Kecamatan : …...................... Take Of Sheet Lokasi : Kp. …............RT 0…. RW 0….
Desa : …...................... Volume : …............ M Kedalaman 80 m
↘ PEMASANGAN KERAMIK
@ Pekerjaan Keramik Lantai
Luas Lantai = 2 x 2 = 4 m2
@ Pekerjaan Keramik dinding
Luas Dinding = {( 2 x 1.2) )} = 1.44 m2
ANALISA
(………………….) (……………………..)
Kabupaten : Tangerang Jenis Prasarana : SAB
Kecamatan : …...................... Take Of Sheet Lokasi : Kp. …............RT 0…. RW 0….
Desa : …...................... Volume : …............ M Kedalaman 80 m
ANALISA
(………………….) (……………………..)
ANALISA BANGUNAN SAB
Desa : …......................
Kecamatan : …......................
KEBUTUHAN
NO URAIAN PEKERJAAN VOLUME SAT KOEFISIEN
BAHAN UPAH
SNI.DT 91-0006-2007.6.1
1 GALIAN TANAH 2.52 M3
Pekerja 0.750 1.890 hok
SNI.DT 91-0006-2007.6.9
2 URUGAN TANAH KEMBALI (Ex. GALIAN PONDASI)
URUGAN TANAH 0.60 M3
Pekerja 0.250 0.15 hok
SNI.DT 91-0007-2006.6.2
3 PASANGAN PONDASI ( adukan 1:4 )
Batu Kosong 0.54 M3
Batu Belah 1.200 0.65 m3
Pasangan Batu Pondasi 1.30 M3
Batu Belah 1.1 1.43 m3
Pasir Pasang 0.48287425 0.63 m3
Semen 50 kg 161 209.30 kg
Pekerja 1.09375 1.42 hok
Tukang 0.21875 0.28 hok
analisa 7 / 28
KEBUTUHAN
NO URAIAN PEKERJAAN VOLUME SAT KOEFISIEN
BAHAN UPAH
6 PLESTERAN + ACIAN t=1.5 cm 23.52 m2
Semen 50 kg 9.490 223.20 kg
Pasir Pasang 0.024 0.56 m3
Pekerja 0.500 11.76 hok
Tukang 0.250 5.88 hok
analisa 8 / 28
KEBUTUHAN
NO URAIAN PEKERJAAN VOLUME SAT KOEFISIEN
BAHAN UPAH
SNI.DT 91-0012-2007.6.13
7 PEKERJAAN KERAMIK
Keramik 20 x 20 (25 bh) 4.00 m2 4.00 dus
Keramik 20 x 25 (20 bh) 1.44 m2 2.00 dus
Keramik 20 x 25 (20 bh) 5.44 m2 6.00 dus
TOTAL LUAS KERAMIK 10.88 m2
SNI.DT 91-0011-2007.6.16
15 PEKERJAAN CAT TEMBOK 42.72 m2
Cat tembok setara Catylac 0.370 15.81 kg
Plamur 0.100 4.27 kg
Pekerja 0.020 0.85 hok
Tukang 0.063 2.69 hok
analisa 9 / 28
Kabupaten : Tangerang Jenis Prasarana : SAB
Kecamatan : …...................... Take Of Sheet Lokasi : Kp. …............RT 0…. RW 0….
Desa : …...................... Volume : …............ M Kedalaman 80 m
A. Sarana Air Bersih
Socked Drat Dalam 1 1/4"
80
50
Pipa inlet 1/2"
10
50
Beton tumbuk 1:2:3
Pipa PVC Dia 1 1/4" Pipa Udara
Socket Drat Luar 1 1/4"
MA
55 m
Mata Zet
Klep
5m
( .............. ) ( ................. )
PEMBESIAN BANGUNAN SAB
1 UNIT
JUMLAH TOTAL
NO ITEM PEKERJAAN BENTUK DIAMETER PANJANG JUMLAH (btg) BERAT / M BERAT (KG)
(unit) PANJANG (m)
0.22
0.03
0.22
0.10
0.10
4 DAK BETON
0.03
1 1.95 12 2.01 14.00 28.14 0.89 24.99
0.03
1 1.95 12 2.01 14.00 28.14 0.89 24.99
KEBUTUHAN BESI :
btg btg
DIAMETER 12 MM = 280 M = 23 pjg 10 m/btg 23.00 pjg 12 m/btg
DIAMETER 8 MM = 188 M = 16 pjg 10 m/btg 15.00 pjg 12 m/btg
pembesian 11 - 28
Harga Satuan Material, Upah dan Alat Kerja Pendukung Tahun Anggaran 2023
Kabupaten Tangerang
No.
: Jenis / Item Material Satuan Harga Satuan (Rp.)
:
A. : BAHAN MATERIAL
1 Paving Block K-250 Type bata tebal 6 cm m² 88,000
2 Topi Uskup K-250 Tebal 6 cm buah 9,000
3 Kansteen Ukuran 10 x 20 x 40cm buah 19,000
4 Abu Batu (Filler) m³ 340,000
5 Sirtu / Material Pilihan m³ 290,000
6 Macadam / Agregat Kasar m³ 300,000
7 Agregat Halus/Filler m³ 285,000
8 Koral Kali / Koral Beton m³ 330,000
9 Tanah Merah (galian C /hanya tanah saja) m³ 140,000
10 Batu Belah Pondasi / Batu Kali m³ 320,000
11 Batu Bata Merah uk. Besar Kelas I buah 1,200
12 Batu Bata merah, uk. 20x10x5 cm bata buah 900
13 Bata Beton Ringan Setara CELCON Blok, uk. 60 x 20 x 10 cm m³ 670,000
14 Bata Beton Ringan Setara CELCON Blok, uk. 60 x 20 x 7,5 cm m³ 670,000
15 Roster Pasir 20X20 bh 25,000
16 Roster Press/warna 20X20 bh 30,000
17 Grassblok 20 X 20 bh 30,000
18 Pasir Beton/Kasar/Hitam m³ 370,000
19 Pasir Pasang m³ 360,000
20 Pasir urug darat (Pasir Laut) m³ 310,000
21 Tanah Urug / Puing Timbunan m³ 90,000
22 Semen Tiga Roda 50 kg zak 80,000
23 @Semen Tiga Roda 50 kg kg 1,600
24 Batu Pecah 2 - 3 cm (Split/Chipping) m³ 320,000
25 Semen Khusus Untuk Pasangan Blok Beton Ringan, MORTAR UTAMA, type MU-380 (10- zak 130,000
26 16
Catm²/zak,
Tembok1(Exterior)
zak = 40 kg), uk. 40WeatherShield
ICI/Dulux kg Flash- A929 Semua Warna liter 120,000
27 Cat Dasar Tembok ICI/Dulux Wall Filler liter 55,000
28 waterproofing Klg 140,000
29 Cat Epoxy m² 75,000
30 Minyak Cat Setara ICI/Dulux - Thinner liter 35,000
31 Plamur Tembok ICI/Dulux Catylac kg 45,000
32 Cat Kayu/Besi Setara Nippon Paint - Pelatone 8000 liter 95,000
33 Plamur Tembok Setara Nippon Paint - Matex kg 55,000
Putty
83 Rangka Atap Baja Ringan Zincalume per m², untuk pemasangan genteng Keramik m² 237,000
84 Baja Ringan Canal C-Galvanish T. 0,75mm Batang 125,000
85 Renk Baja Ringan - Galvanish T. 0,35mm Batang 45,000
86 Hollow 20X40 Galvanish Batang 25,000
87 Hollow 40X40 Galvanish Batang 35,000
88 Alumunium Foil Single Roll 450,000
89 Alumunium Foil Double Roll 550,000
90 Genteng Metal PERKASA ROOFTILE, type PT 300 MM, uk. 750x600 mm (2 susun 8 daun), module 2.23 Lembar 110,000
lembar/m²
98 Sekrup, Box Kecil, Berat 1,8 kg/box isi 1000 pcs Dus 132,000
99 Lisplank Versa Wood Plank 8 Tekstur Jati Uk. 2400 x 200 x 4 mm Lembar 50,000
100 Rangka Plafond Metal Furing termasuk Paku Ripet & acc m² 80,000
m²
102 Gypsum SHEETROCK' JAYABOARD, Uk. Tebal 9mm x P. 2400mm x L. 1200mm Lembar 75,000
103 Plafond PVC, Uk. Tebal 3mm x P. 6000mm x L. 200mm M 18,000
104 List Profil 5 cm Gypsum M 7,500
105 List PVC M 25,000
106 Besi Kanal "U" (Channel) kg 19,000
107 Besi Kanal "C" (Channel) kg 19,000
108 Besi Siku/Profil kg 19,000
109 Besi Profil H Beam kg 19,000
110 Wiremesh Dia. M8 lembar 950,000
111 Wiremesh Dia. M10 lembar 1,100,000
112 Bondek/FloorDeck (Galvanil) CBM, BJLS 0.75 mm m 172,000
113 Kawat Beton kg 32,000
114 Ready Mix K-250 m³ 980,000
115 Ready Mix K-300 m³ 1,250,000
116 Klem t = 4 mm buah 25,000
117 Kabel Listrik NYM 300/500 V, SNI, 2 X 1,5 mm² m 19,000
118 Lampu Downlight/Setara 3 Watt LED buah 45,000
119 Lampu Downlight/Setara 5 Watt LED buah 65,000
120 Lampu Downlight/Setara 7 Watt LED buah 85,000
121 Lampu Downlight/Setara 12 Watt LED buah 180,000
122 Fitting Lampu buah 15,000
123 Lampu Pijar/Bohlam buah 45,000
124 Hexhause Fan 8 in buah 550,000
125 Box MCB buah 120,000
126 MCB 3 Amper buah 75,000
127 MCB 7 Amper buah 90,000
128 MCB 10 Amper buah 120,000
129 Pemasangan Jaringan Baru (KWH baru 1300) LS 2,500,000
130 Pemasangan Jaringan Baru (KWH baru 2200) LS 4,500,000
131 Multiplex uk. 4 x 8 ft (120 x 240 cm), 8 mm Lembar 125,000
132 Multiplex uk. 4 x 8 ft (120 x 240 cm), 10 mm Lembar 165,000
133 Multiplex uk. 4 x 8 ft (120 x 240 cm), 12 mm Lembar 185,000
134 Multiplex uk. 4 x 8 ft (120 x 240 cm), 18 mm Lembar 325,000
135 Melaminto White uk. 4 x 8 ft (120 x 240 cm), 18 mm Lembar 345,000
136 HPL m² 225,000
137 Tacosheet m² 60,000
138 Wallpaper Roll 215,000
139 Lem Kuning (1 Blek) bh 480,000
140 Kaso Kaso Kelas III uk. 4/6 m³ 3,500,000
400 cm
Sub Total 2) - -
UPAH
1 Upah Pengeboran 1.00 1.00 HOK III.a 3,500,000 - 3,500,000
(………………………) (………………………)
Propinsi : Banten
Kabupaten : Tangerang
Kecamatan : …......................
Desa : …......................
Jenis Prasarana
SAB
Lokasi :
Kp. …............RT 0…. RW 0….
JUDUL GAMBAR
DENAH
Dibuat oleh :
Juru Gambar
Tim Teknis
Diperiksa Oleh :
Pendamping Desa
………………….
Disetujui Oleh :
Kasi Pembangunan Desa
…......................
…...............
Di Ketahui Oleh :
Kepala Desa…............
…...............
Propinsi : Banten
Kabupaten : Tangerang
Kecamatan : …......................
Desa : …......................
Jenis Prasarana
SAB
Lokasi :
Kp. …............RT 0…. RW 0….
JUDUL GAMBAR
DENAH PONDASI
Dibuat oleh :
Juru Gambar
Tim Teknis
Diperiksa Oleh :
Pendamping Desa
………………….
Disetujui Oleh :
Kasi Pembangunan Desa
…......................
…...............
Di Ketahui Oleh :
Kepala Desa…............
…...............
Propinsi : Banten
Kabupaten : Tangerang
Kecamatan : …......................
Desa : …......................
Jenis Prasarana
SAB
Lokasi :
Kp. …............RT 0…. RW 0….
JUDUL GAMBAR
TAMPAK BELAKANG
Dibuat oleh :
Juru Gambar
Tim Teknis
Diperiksa Oleh :
Pendamping Desa
………………….
Disetujui Oleh :
Kasi Pembangunan Desa
…......................
…...............
Di Ketahui Oleh :
Kepala Desa…............
…...............
Propinsi : Banten
Kabupaten : Tangerang
Kecamatan : …......................
Desa : …......................
Jenis Prasarana
SAB
Lokasi :
Kp. …............RT 0…. RW 0….
JUDUL GAMBAR
TAMPAK DEPAN
Dibuat oleh :
Juru Gambar
Tim Teknis
Diperiksa Oleh :
Pendamping Desa
………………….
Disetujui Oleh :
Kasi Pembangunan Desa
…......................
…...............
Di Ketahui Oleh :
Kepala Desa…............
…...............
Propinsi : Banten
Kabupaten : Tangerang
Kecamatan : …......................
Desa : …......................
Jenis Prasarana
SAB
Lokasi :
Kp. …............RT 0…. RW 0….
JUDUL GAMBAR
TAMPAK SAMPING KIRI
Dibuat oleh :
Juru Gambar
Tim Teknis
Diperiksa Oleh :
Pendamping Desa
………………….
Disetujui Oleh :
Kasi Pembangunan Desa
…......................
…...............
Di Ketahui Oleh :
Kepala Desa…............
…...............
Propinsi : Banten
Kabupaten : Tangerang
Kecamatan : …......................
Desa : …......................
Jenis Prasarana
SAB
Lokasi :
Kp. …............RT 0…. RW 0….
JUDUL GAMBAR
DENAH RENCANA DAK BETON
Dibuat oleh :
Juru Gambar
Tim Teknis
Diperiksa Oleh :
Pendamping Desa
………………….
Disetujui Oleh :
Kasi Pembangunan Desa
…......................
…...............
Di Ketahui Oleh :
Kepala Desa…............
…...............
Propinsi : Banten
Kabupaten : Tangerang
Kecamatan : …......................
Desa : …......................
Jenis Prasarana
SAB
Lokasi :
Kp. …............RT 0…. RW 0….
JUDUL GAMBAR
POTONGAN A - A
Dibuat oleh :
Juru Gambar
Tim Teknis
Diperiksa Oleh :
Pendamping Desa
………………….
Disetujui Oleh :
Kasi Pembangunan Desa
…......................
…...............
Di Ketahui Oleh :
Kepala Desa…............
…...............
Propinsi : Banten
Kabupaten : Tangerang
Kecamatan : …......................
Desa : …......................
Jenis Prasarana
SAB
Lokasi :
Kp. …............RT 0…. RW 0….
JUDUL GAMBAR
POTONGAN B - B
Dibuat oleh :
Juru Gambar
Tim Teknis
Diperiksa Oleh :
Pendamping Desa
………………….
Disetujui Oleh :
Kasi Pembangunan Desa
…......................
…...............
Di Ketahui Oleh :
Kepala Desa…............
…...............
Propinsi : Banten
Kabupaten : Tangerang
Kecamatan : …......................
Desa : …......................
Jenis Prasarana
SAB
Lokasi :
Kp. …............RT 0…. RW 0….
JUDUL GAMBAR
DETAIL BALOK
Dibuat oleh :
Juru Gambar
Tim Teknis
Diperiksa Oleh :
Pendamping Desa
………………….
Disetujui Oleh :
Kasi Pembangunan Desa
…......................
…...............
Di Ketahui Oleh :
Kepala Desa…............
…...............
Propinsi : Banten
Kabupaten : Tangerang
Kecamatan : …......................
Desa : …......................
Jenis Prasarana
SAB
Lokasi :
Kp. …............RT 0…. RW 0….
JUDUL GAMBAR
DETAIL BALOK
Dibuat oleh :
Juru Gambar
Tim Teknis
Diperiksa Oleh :
Pendamping Desa
………………….
Disetujui Oleh :
Kasi Pembangunan Desa
…......................
…...............
Di Ketahui Oleh :
Kepala Desa…............