Anda di halaman 1dari 28

Data Induk

Desa …....... Kec…..........2023


Desa = …......................
Kecamatan = …......................
Volume = …............ M Kedalaman 80 m
Lokasi = Kp. …............RT 0…. RW 0….
Kepala Desa = …...............
Kasi. Pemb = …...............
Sekdes = …...............
Kepala Desa…............
Volume :
P 2
L 2
Kabupaten : Tangerang Jenis Prasarana : SAB
Kecamatan : …...................... Take Of Sheet Lokasi : Kp. …............RT 0…. RW 0….
Desa : …...................... Volume : …............ M Kedalaman 80 m

→ PEKERJAAN PERSIAPAN
↘ BOWPALANK

L = 2m
P = 2m
P=2+2+1m
L= 2 + 2 + 1 m
Panjang Bowplang = ( L x 2 ) + ( P x 2 ) = 10 meter

→ PEKERJAAN TANAH
↘ GALIAN TANAH
2m

0.7 m

0.45 m
2m

Panjang Galian = ((2 + 2)X 2 Lebar Galian = 0.45 m


= 8m Tinggi Galian = 0.7 m
Volume Galian = 2.52 m3
↘ URUGAN TANAH KEMBALI (Ex. GALIAN PONDASI)
P= 8 m
T= 0.55 m
L= 0.125 m
VOLUME TIMBUNAN = (( 0.55 x 0.125 ) / 2 ) x 2 x 8 = 0.60 m3

→ PEKERJAAN PASANGAN
↘ PASANGAN PONDASI

0.2 m
Urugan
Tanah
Panjang Pondasi = 8 m
Pas. Pondasi 1:4 0.55 m Tinggi Pondasi = 0.55 m
Lebar Pondasi Bawah = 0.4 m
Batu Kosong Lebar Pondasi Atas = 0.2 m
0.15 m
Batu Kosong Pondasi = 0.15 m
0.4 m
0.45 m

Tanggal Survey Dibuat Oleh:

ANALISA

(………………….) (……………………..)
Kabupaten : Tangerang Jenis Prasarana : SAB
Kecamatan : …...................... Take Of Sheet Lokasi : Kp. …............RT 0…. RW 0….
Desa : …...................... Volume : …............ M Kedalaman 80 m

VOLUME
Pasangan Batu Kosong = (0.15 x 0.45 x 8)
= 0.54 m3
Pasangan Batu Pondasi = (( 0.2 + 0.4 ) / 2 ) x 0.55 x 8
= 1.30 m3

↘ PASANGAN SLOOF 0.25 m


P= 8 m
T= 0.25 m 0.25 m
L= 0.25 m

Volume = 8 x 0.25 x 0.25 = 0.50 m3

↘ PASANGAN KOLOM
kolom dinding 25 x 25 CM Balok Pengaku 20 x 20 CM
0.25 m 0.2 m
0.25 m 0.2 m

2m
2.8 m

Banyaknya Kolom = 4 bh Banyaknya Balok = 4 bh

Volume kolom dinding = ( 0.25 x 0.25 x 2.8 ) x 4 = 0.70 m3


Volume Balok = ( 0.2 x 0.2 x 2 ) x 4 = 0.32 m3

Total Volume kolom + Balok = ( 0.7 + 0.32 ) = 1.02 m3

↘ PASANGAN RING BALOK ↘ Beton Dak Atap


0.2 m
P= 8 m P= 2.0 m
T= 0.2 m 0.2 m T= 0.25 m
L= 0.2 m L= 2.0 m

Volume = 8 x 0.2 x 0.2 = 0.30 m3 Volume = 2 x 0.25 x 2 = 1.00 m3

TOTAL VOLUME BETON = ( 0.5 + 1.02 + 0.3 + 1 ) = 2.82 m3

Tanggal Survey Dibuat Oleh:

ANALISA

(………………….) (……………………..)
Kabupaten : Tangerang Jenis Prasarana : SAB
Kecamatan : …...................... Take Of Sheet Lokasi : Kp. …............RT 0…. RW 0….
Desa : …...................... Volume : …............ M Kedalaman 80 m

↘ VOLUME DINDING

2.00 M

Panjang Dinding 2.0 2.0 m


Tinggi Dinding = 2.00 m
Luas Dinding = ( 2 x 2 ) = 4.00 m2

↘ PASANGAN BATA
Luas dinding = 4.00 m2

Tanggal Survey Dibuat Oleh:

ANALISA

(………………….) (……………………..)
Kabupaten : Tangerang Jenis Prasarana : SAB
Kecamatan : …...................... Take Of Sheet Lokasi : Kp. …............RT 0…. RW 0….
Desa : …...................... Volume : …............ M Kedalaman 80 m

@ Luas pasangan dinding rumah pompa


Panjang = 2.4 m 0.8

Tinggi = 0.9 bh 0.8


Volume = 2.16 m2
0.8
TOTAL PASANGAN BATA = 2.16
= 2.16 m2

↘ PLESTERAN + ACIAN TEBAL 1,5 CM


Plesteran + Acian Luar dalam
Plesteran + Acian = Luas Pasangan Bata x 2 (luar dan dalam)
= 8.32 m2
Plesteran + Acian Pekerjaan Bet = 15.2 m2
Total Pekerjaan Plesteran + Acian 23.52 m2

↘ PEMASANGAN KERAMIK
@ Pekerjaan Keramik Lantai
Luas Lantai = 2 x 2 = 4 m2
@ Pekerjaan Keramik dinding
Luas Dinding = {( 2 x 1.2) )} = 1.44 m2

Luas yang akan di keramik = 5.44 m2


→ PEKERJAAN PENGECATAN
Pengecatan Dinding = Luas Pelesteran dinding = 42.72 m2

Tanggal Survey Dibuat Oleh:

ANALISA

(………………….) (……………………..)
Kabupaten : Tangerang Jenis Prasarana : SAB
Kecamatan : …...................... Take Of Sheet Lokasi : Kp. …............RT 0…. RW 0….
Desa : …...................... Volume : …............ M Kedalaman 80 m

→ PEKERJAAN PEMBESIAN (BETON)


↘ BEGISTING
Begisting (papan 2/25) Sloof
Panjang Pondasi = ( 8 x 2 x 0.02 x 0.25 ) /2 = 0.04 m3 (2 kali pakai)
Begisting (papan 2/25) Kolom
Tinggi Kolom = ((2.8 x 0.02 x 0.25 x 2 x 6 ) + (2 x 0.02 x 0.25 x 4 x 2 ))/2 = 0.13 m3 (2 kali pakai)
Begisting (papan 2/30) Ring Balok
Panjang Sloof = ( 8 x 2 x 0.02 x 0.2 )/2 = 0.03 m3 (2 kali pakai)
Begisting (papan 2/20) Dak Beton Tebal 15 cm
Luas Dak Beton = ( 2 x 2 x 0.02 x 0.2 )/2 = 0.1 m3 (2 kali pakai)

→ KEBUTUHAN BESI 0.30 m3 36.875 M2


↘ BESI SLOOF, KOLOM, RING BALOK
Besi Ø 12 mm, pjg 12 m = 22.00 btg
Besi Ø 8 mm, pjg 12 m = 15.00 btg

↘ BESI DAK BETON


Besi Ø 12 mm, pjg 12 m = 3.00 btg

Tanggal Survey Dibuat Oleh:

ANALISA

(………………….) (……………………..)
ANALISA BANGUNAN SAB

Desa : …......................
Kecamatan : …......................

KEBUTUHAN
NO URAIAN PEKERJAAN VOLUME SAT KOEFISIEN
BAHAN UPAH

SNI.DT 91-0006-2007.6.1
1 GALIAN TANAH 2.52 M3
Pekerja 0.750 1.890 hok

SNI.DT 91-0006-2007.6.9
2 URUGAN TANAH KEMBALI (Ex. GALIAN PONDASI)
URUGAN TANAH 0.60 M3
Pekerja 0.250 0.15 hok

SNI.DT 91-0007-2006.6.2
3 PASANGAN PONDASI ( adukan 1:4 )
Batu Kosong 0.54 M3
Batu Belah 1.200 0.65 m3
Pasangan Batu Pondasi 1.30 M3
Batu Belah 1.1 1.43 m3
Pasir Pasang 0.48287425 0.63 m3
Semen 50 kg 161 209.30 kg
Pekerja 1.09375 1.42 hok
Tukang 0.21875 0.28 hok

SNI.DT 91-0008-2007.6.5 (mutu beton K-175)


4 Beton (Sloof, Kolom, Ring Balok) 2.82 M3
Batu pecah 2/3 1.029 2.90 m3
Pasir 0.760 2.14 m3
Semen 50 kg 326.000 919.32 kg
Pekerja 1.650 4.65 hok
Tukang 0.275 0.78 hok

SNI.BSN 6897 2008 6.10


5 PASANGAN BATA Adukan 1:5 2.16 m2
Batu Bata 70.000 150.00 bh
Semen 50 kg 9.680 20.91 kg
Pasir Pasang 0.045 - m3
Pekerja 0.300 0.65 hok
Tukang 0.100 0.22 hok

(SNI.DT 91-0010-2007.6.4 & SNI.DT 91-0010-2007.6.27 )

analisa 7 / 28
KEBUTUHAN
NO URAIAN PEKERJAAN VOLUME SAT KOEFISIEN
BAHAN UPAH
6 PLESTERAN + ACIAN t=1.5 cm 23.52 m2
Semen 50 kg 9.490 223.20 kg
Pasir Pasang 0.024 0.56 m3
Pekerja 0.500 11.76 hok
Tukang 0.250 5.88 hok

analisa 8 / 28
KEBUTUHAN
NO URAIAN PEKERJAAN VOLUME SAT KOEFISIEN
BAHAN UPAH

SNI.DT 91-0012-2007.6.13
7 PEKERJAAN KERAMIK
Keramik 20 x 20 (25 bh) 4.00 m2 4.00 dus
Keramik 20 x 25 (20 bh) 1.44 m2 2.00 dus
Keramik 20 x 25 (20 bh) 5.44 m2 6.00 dus
TOTAL LUAS KERAMIK 10.88 m2

Semen 50 kg 10.400 113.15 kg


Pasir Pasang 0.045 0.49 m3
Pekerja 0.700 7.62 hok
Tukang 0.350 3.81 hok

SNI.DT 91-0011-2007.6.16
15 PEKERJAAN CAT TEMBOK 42.72 m2
Cat tembok setara Catylac 0.370 15.81 kg
Plamur 0.100 4.27 kg
Pekerja 0.020 0.85 hok
Tukang 0.063 2.69 hok

17 PEKERJAAN PEMBESIAN 152.36 kg


Besi Ø 12 mm, pjg 12 m 279.64 m 0.40 110.96 kg
Besi Ø 8 mm, pjg 12 m 188.08 m 0.22 41.40 kg
Kawat beton 152.36 0.02 3.00 kg
Papan Cor 2/20 36.88 m2 0.004 0.15 m3
Paku 36.88 m2 0.040 1.48 kg
Pekerja 0.070 2.99 hok
Tukang 0.070 2.99 hok

analisa 9 / 28
Kabupaten : Tangerang Jenis Prasarana : SAB
Kecamatan : …...................... Take Of Sheet Lokasi : Kp. …............RT 0…. RW 0….
Desa : …...................... Volume : …............ M Kedalaman 80 m
A. Sarana Air Bersih
Socked Drat Dalam 1 1/4"

Socked Drat Dalam 1" Pasangan bata 1:4

Sibel V Sok PVC


Knie Elbow 1"
Boll Valf 1/2"
Knie Elbow 1 1/4"

80
50
Pipa inlet 1/2"

SocketDrat dalam Dia. 3/4"


MT

10
50
Beton tumbuk 1:2:3
Pipa PVC Dia 1 1/4" Pipa Udara
Socket Drat Luar 1 1/4"

Pipa PVC Dia. 1" Pipa Isap

Socket Drat Luar Dia. 1"

MA
55 m

Pipa PVC Dia. 4" (cassing)

Mata Zet

Klep
5m

Tanggal Survey Dibuat oleh :


Tim Penyusun RKP Desa
/ Kader Teknik
ANALISA
12 Januari 2013

( .............. ) ( ................. )
PEMBESIAN BANGUNAN SAB
1 UNIT

JUMLAH TOTAL
NO ITEM PEKERJAAN BENTUK DIAMETER PANJANG JUMLAH (btg) BERAT / M BERAT (KG)
(unit) PANJANG (m)

1 SLOOF ; P = 2 M 4 0.03 12 2.06 24 49.44 0.89 43.90


2.00

4 0.22 8 0.93 56 52.08 0.40 20.73


0.025
0.025

0.22

0.03

2 KOLOM ; P = 2.8 M 4 2.80 12 2.86 32 91.52 0.89 81.27

4 0.22 8 0.93 80 74.40 0.40 29.61


0.025
0.025

0.22

3 BALOK ; P = 2 M 4 0.03 12 2.06 24 49.44 0.89 43.90


2.00

4 0.15 8 0.55 56 30.80 0.40 12.26


0.025
0.025

0.10

BALOK PENGAKU ; P = 2 M 4 0.03 12 2.06 16 32.96 0.89 29.27


2.00

4 0.15 8 0.55 56 30.80 0.40 12.26


0.025
0.025

0.10

4 DAK BETON
0.03
1 1.95 12 2.01 14.00 28.14 0.89 24.99

0.03
1 1.95 12 2.01 14.00 28.14 0.89 24.99

TOTAL DIA 8 MM 279.64 248.32


TOTAL DIA 6 MM 188.08 74.86

KEBUTUHAN BESI :
btg btg
DIAMETER 12 MM = 280 M = 23 pjg 10 m/btg 23.00 pjg 12 m/btg
DIAMETER 8 MM = 188 M = 16 pjg 10 m/btg 15.00 pjg 12 m/btg

TOTAL (kg) 323.18

pembesian 11 - 28
Harga Satuan Material, Upah dan Alat Kerja Pendukung Tahun Anggaran 2023
Kabupaten Tangerang
No.
: Jenis / Item Material Satuan Harga Satuan (Rp.)
:
A. : BAHAN MATERIAL
1 Paving Block K-250 Type bata tebal 6 cm m² 88,000
2 Topi Uskup K-250 Tebal 6 cm buah 9,000
3 Kansteen Ukuran 10 x 20 x 40cm buah 19,000
4 Abu Batu (Filler) m³ 340,000
5 Sirtu / Material Pilihan m³ 290,000
6 Macadam / Agregat Kasar m³ 300,000
7 Agregat Halus/Filler m³ 285,000
8 Koral Kali / Koral Beton m³ 330,000
9 Tanah Merah (galian C /hanya tanah saja) m³ 140,000
10 Batu Belah Pondasi / Batu Kali m³ 320,000
11 Batu Bata Merah uk. Besar Kelas I buah 1,200
12 Batu Bata merah, uk. 20x10x5 cm bata buah 900
13 Bata Beton Ringan Setara CELCON Blok, uk. 60 x 20 x 10 cm m³ 670,000
14 Bata Beton Ringan Setara CELCON Blok, uk. 60 x 20 x 7,5 cm m³ 670,000
15 Roster Pasir 20X20 bh 25,000
16 Roster Press/warna 20X20 bh 30,000
17 Grassblok 20 X 20 bh 30,000
18 Pasir Beton/Kasar/Hitam m³ 370,000
19 Pasir Pasang m³ 360,000
20 Pasir urug darat (Pasir Laut) m³ 310,000
21 Tanah Urug / Puing Timbunan m³ 90,000
22 Semen Tiga Roda 50 kg zak 80,000
23 @Semen Tiga Roda 50 kg kg 1,600
24 Batu Pecah 2 - 3 cm (Split/Chipping) m³ 320,000
25 Semen Khusus Untuk Pasangan Blok Beton Ringan, MORTAR UTAMA, type MU-380 (10- zak 130,000
26 16
Catm²/zak,
Tembok1(Exterior)
zak = 40 kg), uk. 40WeatherShield
ICI/Dulux kg Flash- A929 Semua Warna liter 120,000
27 Cat Dasar Tembok ICI/Dulux Wall Filler liter 55,000
28 waterproofing Klg 140,000
29 Cat Epoxy m² 75,000
30 Minyak Cat Setara ICI/Dulux - Thinner liter 35,000
31 Plamur Tembok ICI/Dulux Catylac kg 45,000
32 Cat Kayu/Besi Setara Nippon Paint - Pelatone 8000 liter 95,000
33 Plamur Tembok Setara Nippon Paint - Matex kg 55,000
Putty

34 Wastafel, LW 240 CJ Setara Toto, Komplit kran unit 2,210,000


& acc

35 Closet Jongkok/Squatting, Setara TOTO, pcs 490,000


type CE7, W & PIV
36 Closet Jongkok type CE6 Setara TOTO unit 810,000
37 Bak Mandi fiber Glass Standar 0,3 m³ pcs 550,000
38 Kusen & Pintu PVC Toilet Maspion pcs 750,000
39 Pintu Kaca 12 mm Teampered Uk. 800 X 2100 + Floor Henk + Handle (1 Daun terpasang) Unit 7,500,000
40 Closet Jongkok Biasa Unit 450,000
41 Closet Duduk + assesories Setara/SNI Unit 1,850,000
42 Urinoar (Type Moslem) Setara/SNI Unit 2,550,000
43 Kusen Jendela dan Tiga Daun Aluminium Uk. 1,8 X 1,5 M Terpasang Unit 3,554,000
44 Kusen Jendela dan Dua Daun Aluminium Uk. 1,2 X 1,5 M Terpasang Unit 2,636,000
45 Kusen Jendela dan Satu Daun Aluminium Uk. 0,6 X 1,5 M Terpasang Unit 1,318,000
46 Kusen dan Daun Pintu Aluminium Uk. 1,0 X 2,2 M Terpasang Unit 3,250,000
47 Kusen dan Dua Daun Pintu Aluminium Uk. 2 X 2,2 M Terpasang Unit 5,060,000
48 Kusen dan Daun Jendela alumunium 3 Inch m² 1,250,000
49 Kusen dan Daun Jendela alumunium 4 Inch m² 1,400,000
50 Bouvent Light 400X600 (Kaca Silang) Unit 500,000
51 Kusen Jendela Kayu + Daun Unit 450,000
52 Kusen Pintu Kayu + Daun Unit 750,000
53 HOTMIX AC-LASTON 3 ton 1,550,000
54 Aspal Emulsi, LAE - ARS-1, curah (Tack Coat) kg 22,000
55 Batu Pecah 0.5 - 1 cm (Screening) m³ 320,000
56 U-Ditch 300 x 300 x 1000 mm Pcs 305,000
57 U-Ditch 400 x 400 x 1000 mm Pcs 455,000
58 U-Ditch 500 x 500 x 1000 mm Pcs 675,000
59 U-Ditch 600 x 600 x 1000 mm Pcs 813,000
60 U-Ditch 300 x 300 x 1200 mm Pcs 365,000
61 U-Ditch 400 x 400 x 1200 mm Pcs 545,000
62 U-Ditch 500 x 500 x 1200 mm Pcs 810,000
63 U-Ditch 600 x 600 x 1200 mm Pcs 975,000
64 Tutup U-Ditch 300 - 60/500 mm, Light Duty Full/Lubang Pcs 145,000
65 Tutup U-Ditch 400 - 60/500 mm, Light Duty Full/Lubang Pcs 150,000
66 Tutup U-Ditch 500 - 60/500 mm, Light Duty Full/Lubang Pcs 165,000
67 Tutup U-Ditch 600 - 60/500 mm, Light Duty Full/Lubang Pcs 180,000
68 Tutup U-Ditch 300 - 60/600 mm, Light Duty Full/Lubang Pcs 149,000
69 Tutup U-Ditch 400 - 60/600 mm, Light Duty Full/Lubang Pcs 155,000
70 Tutup U-Ditch 500 - 60/600 mm, Light Duty Full/Lubang Pcs 175,000
71 Tutup U-Ditch 600 - 50/600 mm, Light Duty Full/Lubang Pcs 190,000
72 Box culvert 600X600X70mm unit 1,550,000
73 Box culvert 800X800X70mm unit 3,150,000
74 Box culvert 1000X1000X80mm unit 4,650,000
75 Gorong-gorong/Buis Beton Ø30 unit 120,000

76 ACP (Alumunium Composit Panel) m² 650,000


77 Rangka ACP m² 185,000
78 Selant Bh 60,000
79 Paku Segala Ukuran Kg 32,000
80 Membran white m² 1,200,000
81 Rangka Pipa 3inch + Cat (Atap membran) m² 750,000
82 Rangka Atap Baja Ringan Zincalume per m², untuk pemasangan genteng metal m² 220,000

83 Rangka Atap Baja Ringan Zincalume per m², untuk pemasangan genteng Keramik m² 237,000
84 Baja Ringan Canal C-Galvanish T. 0,75mm Batang 125,000
85 Renk Baja Ringan - Galvanish T. 0,35mm Batang 45,000
86 Hollow 20X40 Galvanish Batang 25,000
87 Hollow 40X40 Galvanish Batang 35,000
88 Alumunium Foil Single Roll 450,000
89 Alumunium Foil Double Roll 550,000
90 Genteng Metal PERKASA ROOFTILE, type PT 300 MM, uk. 750x600 mm (2 susun 8 daun), module 2.23 Lembar 110,000
lembar/m²

91 Genteng Spandec tebel 2,8mm m² 45,000


92 Genteng Onduline Lembar 145,000
93 Genteng Keramik glazuur Bh 12,000
94 Genteng Morando Glazuur buah 7,500
95 Genteng Jatiwangi, Plentong Natural buah 6,000
96 Nok Keramik glazuur Bh 45,000
97 Nok Super Bulat (Super Ridge Capping), type 3, PERKASAROOFTILE m 45,000

98 Sekrup, Box Kecil, Berat 1,8 kg/box isi 1000 pcs Dus 132,000

99 Lisplank Versa Wood Plank 8 Tekstur Jati Uk. 2400 x 200 x 4 mm Lembar 50,000
100 Rangka Plafond Metal Furing termasuk Paku Ripet & acc m² 80,000

101 GRC Board m² 45,000


102 Gypsum SHEETROCK' JAYABOARD, Uk. Tebal 9mm x P. 2400mm x L. 1200mm Lembar 75,000
103 Plafond PVC, Uk. Tebal 3mm x P. 6000mm x L. 200mm M 18,000
104 List Profil 5 cm Gypsum M 7,500
105 List PVC M 25,000
106 Besi Kanal "U" (Channel) kg 19,000
107 Besi Kanal "C" (Channel) kg 19,000
108 Besi Siku/Profil kg 19,000
109 Besi Profil H Beam kg 19,000
110 Wiremesh Dia. M8 lembar 950,000
111 Wiremesh Dia. M10 lembar 1,100,000
112 Bondek/FloorDeck (Galvanil) CBM, BJLS 0.75 mm m 172,000
113 Kawat Beton kg 32,000
114 Ready Mix K-250 m³ 980,000
115 Ready Mix K-300 m³ 1,250,000
116 Klem t = 4 mm buah 25,000
117 Kabel Listrik NYM 300/500 V, SNI, 2 X 1,5 mm² m 19,000
118 Lampu Downlight/Setara 3 Watt LED buah 45,000
119 Lampu Downlight/Setara 5 Watt LED buah 65,000
120 Lampu Downlight/Setara 7 Watt LED buah 85,000
121 Lampu Downlight/Setara 12 Watt LED buah 180,000
122 Fitting Lampu buah 15,000
123 Lampu Pijar/Bohlam buah 45,000
124 Hexhause Fan 8 in buah 550,000
125 Box MCB buah 120,000
126 MCB 3 Amper buah 75,000
127 MCB 7 Amper buah 90,000
128 MCB 10 Amper buah 120,000
129 Pemasangan Jaringan Baru (KWH baru 1300) LS 2,500,000
130 Pemasangan Jaringan Baru (KWH baru 2200) LS 4,500,000
131 Multiplex uk. 4 x 8 ft (120 x 240 cm), 8 mm Lembar 125,000
132 Multiplex uk. 4 x 8 ft (120 x 240 cm), 10 mm Lembar 165,000
133 Multiplex uk. 4 x 8 ft (120 x 240 cm), 12 mm Lembar 185,000
134 Multiplex uk. 4 x 8 ft (120 x 240 cm), 18 mm Lembar 325,000
135 Melaminto White uk. 4 x 8 ft (120 x 240 cm), 18 mm Lembar 345,000
136 HPL m² 225,000
137 Tacosheet m² 60,000
138 Wallpaper Roll 215,000
139 Lem Kuning (1 Blek) bh 480,000
140 Kaso Kaso Kelas III uk. 4/6 m³ 3,500,000
400 cm

141 Kaso Kaso Kelas III uk. 4/6 batang 45,000


400 cm

142 Kaso Kaso Kelas III uk. 5/7 m³ 3,500,000


400 cm

143 Kaso Kaso Kelas III uk. 5/7 batang 75,000


400 cm

144 Papan Cor Kelas III uk. 2/20 batang 30,000


145 Dolken Ø 5-7 x 300-400 cm batang 70,000
146 Bambu Ø 6-8 / 600 cm batang 17,000
147 Cat kayu/Besi Kuda Terbang kaleng 65,000
148 Ampelas Kayu/Besi Halus Lembar 10,000
149 Kuas 3" buah 18,000
150 Roll Cat Tembok Lokal buah 45,000
151 Bak Cat buah 35,000
152 Kran Tembok 1/2" Plastik buah 27,000
153 Floor Drain 3" Plastik buah 50,000
154 Plastik Cor m² 6,500
155 Stop Kontak buah 35,000
156 Saklar Engkel buah 30,000
157 Saklar Seri buah 35,000
158 Pipa Condouit 1/2 Inch (Pipa Listrik) Batang 25,000
159 Isolatipe bh 45,000
160 Besi 6 Polos Full Batang 55,000
161 Besi 8 Polos Full Batang 82,000
162 Besi 10 Polos Full Batang 95,000
163 Besi 12 Polos Full Batang 125,000
164 Besi 13 Ulir Full Batang 170,000
165 Besi 16 Ulir Full Batang 248,000
166 Pipa PVC 1/2 inch AW-SNI Batang 28,000
167 Pipa PVC 3/4 inch AW-SNI Batang 35,000
168 Pipa PVC 1 inch AW-SNI Batang 50,000
169 Pipa PVC 2 inch AW-SNI Batang 100,000
170 Pipa PVC 3 inch AW-SNI Batang 210,000
171 Pipa PVC 4 inch AW-SNI Batang 350,000
172 Knee PVC 1/2 inch SNI Bh 5,000
173 Knee PVC 3/4 inch SNI Bh 8,000
174 Knee PVC 1 inch SNI Bh 15,000
175 Knee PVC 2 inch SNI Bh 25,000
176 Knee PVC 3 inch SNI Bh 40,000
177 Knee PVC 4 inch SNI Bh 45,000
178 T PVC 1/2 inch SNI Bh 5,000
179 T PVC 3/4 inch SNI Bh 8,000
180 T PVC 1 inch SNI Bh 15,000
181 T PVC 2 inch SNI Bh 25,000
182 T PVC 3 inch SNI Bh 40,000
183 T PVC 4 inch SNI Bh 65,000
184 T PVC 1/2 inch SNI Bh 5,000
185 T PVC 3/4 inch SNI Bh 8,000
186 T PVC 1 inch SNI Bh 15,000
187 T PVC 2 inch SNI Bh 25,000
188 T PVC 3 inch SNI Bh 40,000
189 T PVC 4 inch SNI Bh 45,000
190 Stop Kran 1/2 Inch PVC (Valve) Bh 45,000
191 Stop Kran 3/4 Inch PVC (Valve) Bh 60,000
192 Sock Drat 1/2 PVC Bh 5,000
193 Lem Pipa PVC bh 15,000
194 Sealtipe bh 10,000
195 Kitchent Zink 1 (Lubang) Bh 450,000
196 Kitchent Zink 2 (Lubang) Bh 700,000
197 Granit Setara GRANITO, type Salsa Pearl White, uk. 60x60 cm - Box m² 225,000
198 Granit Setara GRANITO, KW 1, Type White Sand, Ukuran 60 x 60 m² 265,000
199 Keramik Lantai Setara KIA, type Standard m²
(S), uk. 20x20 cm, KW I, warna White, Blue, Pink, Ivory 85,000

200 Keramik Lantai Setara KIA, type Standard m²


(S), uk. 30x30 cm, KW I, warna White, Blue, Pink, Ivory 90,000

201 Keramik Lantai Setara KIA, type Standard m²


(S), uk. 40x40 cm, KW I, warna White, Blue, Pink, Ivory 125,000

202 Batu Alam Andesit m² 215,000


203 Batu Alam Tempel Hitam m² 180,000
204 Semen Nad /Warna Kg 25,000
205 Tangki/Toren SNI/Setara 600 Liter Unit 1,300,000
206 Tangki/Toren SNI/Setara 1000 Liter Unit 2,500,000
207 Tangki Biofil SNI/Setara 800 Liter Unit 2,100,000
208 Pompa Jet Pump kap.250 watt 32 bit Unit 750,000
209 Pompa Submersible KP-Basic 600A Unit 3,780,000
210 Paket Pengerjaan Pompa Jet Pump 500 W, kedalaman 50-60 Mtr, Casing : 7-10 pipa 4" Paket 17,700,000
211 Paket Pengerjaan Pompa Submersible; kedalaman 60-80 Mtr; Casing 10-15 pipa 4"; 2 pipa 2" Paket 25,200,000
212 Realing Tangga Besi Hollow 40X40X1,2mm Finish Cat m² 900,000
213 Pagar Besi Hollow (Variable 1,2mm) Finish Cat m² 900,000
214 Kanopy Rangka Hollow + Cat + Penutup PVC alderon (Terpasang) m² 750,000
215 Pintu Pagar Besi Finish Cat m² 1,200,000
216 Huruf Timbul Akrilic cm 15,000
217 Huruf Timbul Akrilic + Lampu cm 25,000
218 Huruf Timbul Stainless cm 18,000
219 Logo Stainless + Sticker (Kabupaten In door) Unit 750,000
220 Logo Stainless + Sticker (Kabupaten out door) Unit 1,500,000
B. UPAH KERJA
1 Pekerja / PKTD org/hr 75,000
2 Pekerja / knek org/hr 150,000
3 Tukang Batu org/hr 175,000
C ALAT KERJA PENDUKUNG
1 Prasasti unit 300,000
2 Papan Proyek unit 200,000
3 Concrete Mixer 0.3-0.6 m³, 15 HP, Kap. 0,425 Hari 650,000
Liter

4 Pedestrian Roller, 11 HP, Kap. 0.98 ton Hari 300,000


5 Stamper, 5 HP, Kap. 6 ton Hari 250,000
6 Baby Walles, 2-4 T Hari 450,000
7 Concrete Pump Hari 4,500,000
Liter

8 Sewa Grobak Hari 50,000


9 Sewa Mobil Pick UP Hari 500,000
10 Ember Plastik Bh 15,000
13 Pengki Plastik Bh 25,000
11 Benang Roll 20,000
12 Selang Water Pass M 8,000
D BIAYA
1 Tenaga Ahli Perencanaan Bersertifikat OB 7,500,000
2 Tenaga Ahli Pengawasan Bersertifikat OB 7,500,000
3 Tenaga Ahli Perencanaan Non Bersertifikat OB 4,500,000
4 Tenaga Ahli Pengawasan Non Bersertifikat OB 4,500,000
PROGRAM PEMBANGUNAN DAN PEMBERDAYAAN MASYARAKAT DESA TA 2023

RENCANA ANGGARAN BIAYA SAB

Propinsi : Banten No. RAB ….


Kabupaten : Tangerang Program P3MD
Kecamatan : …...................... Jenis Kegiatan SAB
Desa : …...................... ran / Dimensi …............ M Kedalaman 80 m
Lokasi Kegiatan 1 Unit
VOLUME Harga JUMLAH
URAIAN Dana Sat Satuan TOTAL
Total
Desa ( Rp. ) (Rp)
I BAHAN
1 Batu Bata 200.00 200.00 Buah 1,200 240,000
2 Batu belah 2.00 2.00 M3 320,000 640,000
3 Semen 50 Kg 29.00 29.00 Zak 80,000 2,320,000
4 Pasir 2.00 2.00 M3 360,000 720,000
5 Batu pecah 2/3 3.00 3.00 M3 320,000 960,000
6 Besi Ø 12 mm, pjg 12 m 23.00 23.00 Batang 125,000 2,875,000
7 Besi Ø 8 mm, pjg 12 m 15.0 15.00 Batang 82,000 1,230,000
8 Kawat beton 3.0 3.00 Kg 32,000 96,000
9 Papan cor 12.00 12.00 Lbr 30,000 360,000
10 Paku 1 1/ 2" 1.475 1.48 Kg 32,000 47,000
11 Keramik 20 x 20 (25 bh) 4.00 4.00 Dus 85,000 340,000
12 Keramik 20 x 25 (20 bh) 8.00 8.00 Dus 85,000 680,000
13 Cat tembok 16.00 16.00 liter 55,000 880,000
14 Plamur 4.00 4.00 Kg 45,000 180,000
15 Pipa PVC 4" AW 8.0 8.00 Btg 350,000 2,800,000
16 Pipa PVC 3/4" AW 12.0 12.00 Btg 35,000 420,000
17 Pipa PVC 1" 12.0 12.00 Btg 50,000 600,000
18 Pipa Inlet PVC 1/2" AW 5.0 5.00 Btg 28,000 140,000
19 Tambang 9 mm 60.0 60.00 m 2,000 120,000
20 Elbow 4" 6.0 6.00 bh 45,000 270,000
21 Elbow 1/2 10.0 10.00 bh 5,000 50,000
22 Elbow 1" 5.0 5.00 bh 15,000 75,000
23 T 4" 2.0 2.00 bh 65,000 130,000
24 T 1" 2.0 2.00 bh 15,000 30,000
25 Sockdrat 1" 4.0 4.00 bh 10,000 40,000
26 Sockdrat 1/2" 2.0 2.00 bh 5,000 10,000
27 Stopkran 2.0 2.00 bh 60,000 120,000
28 Kran 4.0 4.00 bh 27,000 108,000
29 Lem Pipa 6.0 6.00 bh 15,000 90,000
30 Selotip 4.0 4.00 bh 10,000 40,000
31 Floordrain 1.0 1.00 bh 50,000 50,000
32 Klep 1.0 1.00 bh 25,000 25,000
33 Pompa Submersible KP-Basic 600A 1.0 1.00 Unit 3,780,000 3,780,000
34 Tangki/Toren SNI/Setara 1000 Li 1.0 1.00 bh 2,500,000 2,500,000
Sub Total 1) 22,966,000
III ALAT
1 Papan Proyek 1.0 1.00 buah 200,000 200,000
2 Prasasti 1.0 1.00 buah 300,000 300,000
Sub Total 2) 500,000
UPAH
1 Pekerja 32.00 32.00 HOK 150,000 4,800,000
2 Tukang 17.00 17.00 HOK 175,000 2,975,000
3 Paket Pengerjaan Pompa Submersib 1.00 1.00 HOK 25,200,000 25,200,000
Sub Total 3) 32,975,000

SUMBER DANA Total Biaya 56,441,000

Di Ketahui Oleh : Diferivikasi Oleh : Dibuat oleh


Kepala Desa Sekertaris Desa Pelaksana Kegiatan

…............... …............... …...............

RAB 1 unit SAB 17 - 28


RENCANA ANGGARAN BIAYA (RAB)

Propinsi : Banten No. RAB : 02


Kabupaten : Tangerang Program : P3MD
Kecamatan …...................... Jenis Kegiatan : SAB
Desa …...................... Ukuran / Dimensi : -
Jumlah : 1 Unit
VOLUME Harga JUMLAH JUMLAH
URAIAN Dari Dana Sat Katagori Satuan SWADAYA TOTAL
Total
Swadaya Desa Biaya ( Rp. ) (Rp) (Rp)
BAHAN
1 Pipa PVC 4" AW 8 0.00 8 Btg I.b 80,000 - 640,000
2 Pipa PVC 1 1/4" AW 12 0.00 12 Btg I.b 50,000 - 600,000
3 Pipa PVC 1" 12 0.00 12 Btg I.b 35,000 - 420,000
4 Pipa Inlet PVC 1/2" AW 5 0.00 5 Btg I.b 25,000 - 125,000
5 Tambang 9 mm 60 0.00 60 m I.b 2,000 - 120,000
6 Elbow 4" 6 0.00 6 bh I.b 15,000 - 90,000
7 Elbow 1/2 10 0.00 10 bh I.b 5,000 - 50,000
8 Elbow 1" 5 0.00 5 bh I.b 5,000 - 25,000
9 T 4" 2 0.00 2 bh I.b 15,000 - 30,000
10 T 1" 2 0.00 2 bh I.b 5,000 - 10,000
11 Sockdrat 1" 4 0.00 4 bh I.b 10,000 - 40,000
12 Sockdrat 1/2" 2 0.00 2 bh I.b 10,000 - 20,000
13 Stopkran 2 0.00 2 bh I.b 20,000 - 40,000
14 Kran 3 0.00 3 bh I.b 15,000 - 45,000
15 Lem Pipa 6 0.00 6 bh I.b 7,000 - 42,000
16 Selotip 4 0.00 4 bh I.b 5,000 - 20,000
17 Floordrain 2 0.00 2 bh I.b 20,000 - 40,000
18 Klep 1 0.00 1 bh I.b 25,000 - 25,000
19 Mesin Sibel 1 0.00 1 Unit I.b 3,750,000 - 3,750,000
20 Tower Air ( 5x5x50mm) 1 0.00 1 bh I.b 1,500,000 - 1,500,000
21 Torn Air 500 Liter 1 0.00 1 bh I.b 600,000 - 600,000

Sub Total 1) - 8,232,000


ALAT

Sub Total 2) - -
UPAH
1 Upah Pengeboran 1.00 1.00 HOK III.a 3,500,000 - 3,500,000

Sub Total 3) - 3,500,000


TOTAL BIAYA - 11,732,000
Dari Desa 11,732,000
Dari Swadaya -
Katagori :
I.a Pembelian bahan hasil tenaga manusia II.a Pembelian alat tangan III.a Pembayaran tenaga kerja untuk konstruksi
I.b Pembelian bahan hasil industri II.b Pembelian/ sewa alat mesin III.b Pembayaran tenaga untuk pengumpulan bahan
I.c Pembelian bahan administrasi II.c Pembeliat alat administrasi

Kota Raja, 12 Februari 2015


mengetahui : : Dibuat oleh :
Kepala Desa Tim Penyusun RKP Desa

(………………………) (………………………)
Propinsi : Banten
Kabupaten : Tangerang
Kecamatan : …......................
Desa : …......................
Jenis Prasarana
SAB

Lokasi :
Kp. …............RT 0…. RW 0….

JUDUL GAMBAR
DENAH

Dibuat oleh :
Juru Gambar

Tim Teknis
Diperiksa Oleh :
Pendamping Desa

………………….
Disetujui Oleh :
Kasi Pembangunan Desa
…......................

…...............
Di Ketahui Oleh :
Kepala Desa…............

…...............
Propinsi : Banten
Kabupaten : Tangerang
Kecamatan : …......................
Desa : …......................
Jenis Prasarana
SAB

Lokasi :
Kp. …............RT 0…. RW 0….

JUDUL GAMBAR
DENAH PONDASI

Dibuat oleh :
Juru Gambar

Tim Teknis
Diperiksa Oleh :
Pendamping Desa

………………….
Disetujui Oleh :
Kasi Pembangunan Desa
…......................

…...............
Di Ketahui Oleh :
Kepala Desa…............

…...............
Propinsi : Banten
Kabupaten : Tangerang
Kecamatan : …......................
Desa : …......................
Jenis Prasarana
SAB

Lokasi :
Kp. …............RT 0…. RW 0….

JUDUL GAMBAR
TAMPAK BELAKANG

Dibuat oleh :
Juru Gambar

Tim Teknis
Diperiksa Oleh :
Pendamping Desa

………………….
Disetujui Oleh :
Kasi Pembangunan Desa
…......................

…...............
Di Ketahui Oleh :
Kepala Desa…............

…...............
Propinsi : Banten
Kabupaten : Tangerang
Kecamatan : …......................
Desa : …......................
Jenis Prasarana
SAB

Lokasi :
Kp. …............RT 0…. RW 0….

JUDUL GAMBAR
TAMPAK DEPAN

Dibuat oleh :
Juru Gambar

Tim Teknis
Diperiksa Oleh :
Pendamping Desa

………………….
Disetujui Oleh :
Kasi Pembangunan Desa
…......................

…...............
Di Ketahui Oleh :
Kepala Desa…............

…...............
Propinsi : Banten
Kabupaten : Tangerang
Kecamatan : …......................
Desa : …......................
Jenis Prasarana
SAB

Lokasi :
Kp. …............RT 0…. RW 0….

JUDUL GAMBAR
TAMPAK SAMPING KIRI

Dibuat oleh :
Juru Gambar

Tim Teknis
Diperiksa Oleh :
Pendamping Desa

………………….
Disetujui Oleh :
Kasi Pembangunan Desa
…......................

…...............
Di Ketahui Oleh :
Kepala Desa…............

…...............
Propinsi : Banten
Kabupaten : Tangerang
Kecamatan : …......................
Desa : …......................
Jenis Prasarana
SAB

Lokasi :
Kp. …............RT 0…. RW 0….

JUDUL GAMBAR
DENAH RENCANA DAK BETON

Dibuat oleh :
Juru Gambar

Tim Teknis
Diperiksa Oleh :
Pendamping Desa

………………….
Disetujui Oleh :
Kasi Pembangunan Desa
…......................

…...............
Di Ketahui Oleh :
Kepala Desa…............

…...............
Propinsi : Banten
Kabupaten : Tangerang
Kecamatan : …......................
Desa : …......................
Jenis Prasarana
SAB

Lokasi :
Kp. …............RT 0…. RW 0….

JUDUL GAMBAR
POTONGAN A - A

Dibuat oleh :
Juru Gambar

Tim Teknis
Diperiksa Oleh :
Pendamping Desa

………………….
Disetujui Oleh :
Kasi Pembangunan Desa
…......................

…...............
Di Ketahui Oleh :
Kepala Desa…............

…...............
Propinsi : Banten
Kabupaten : Tangerang
Kecamatan : …......................
Desa : …......................
Jenis Prasarana
SAB

Lokasi :
Kp. …............RT 0…. RW 0….

JUDUL GAMBAR
POTONGAN B - B

Dibuat oleh :
Juru Gambar

Tim Teknis
Diperiksa Oleh :
Pendamping Desa

………………….
Disetujui Oleh :
Kasi Pembangunan Desa
…......................

…...............
Di Ketahui Oleh :
Kepala Desa…............

…...............
Propinsi : Banten
Kabupaten : Tangerang
Kecamatan : …......................
Desa : …......................
Jenis Prasarana
SAB

Lokasi :
Kp. …............RT 0…. RW 0….

JUDUL GAMBAR
DETAIL BALOK

Dibuat oleh :
Juru Gambar

Tim Teknis
Diperiksa Oleh :
Pendamping Desa

………………….
Disetujui Oleh :
Kasi Pembangunan Desa
…......................

…...............
Di Ketahui Oleh :
Kepala Desa…............

…...............
Propinsi : Banten
Kabupaten : Tangerang
Kecamatan : …......................
Desa : …......................
Jenis Prasarana
SAB

Lokasi :
Kp. …............RT 0…. RW 0….

JUDUL GAMBAR
DETAIL BALOK

Dibuat oleh :
Juru Gambar

Tim Teknis
Diperiksa Oleh :
Pendamping Desa

………………….
Disetujui Oleh :
Kasi Pembangunan Desa
…......................

…...............
Di Ketahui Oleh :
Kepala Desa…............

GAMBAR 3 DIMENSI
…...............

Anda mungkin juga menyukai