A PEKERJAAN LANTAI I
I Pekerjaan Persiapan
1 Pembersihan Lokasi / lahan
Panjang = 20.00 m
Lebar = 12.00 m
Luas = 240 m²
2 Pemasangan Bowplank
Panjang = 20.00 m
Lebar = 12.00 m
Keliling = 64 m
II Pekerjaan Tanah
1 Galian Tanah
Panjang = 93.65 m
Lebar Atas = 1.4 m
Lebar Bawah = 1.04 m
Tinggi = 1.22 m
Volume = 139.38 m³
3 Galian Strous
r ( jari - jari ) = 0.15 m
π = 3.14
Tinggi = 4m
Jumlah Titik = 25
Volume = 7.06 m³
3 Urugan Pasir
Urugan Pasir = Vol.galian tanah - ( Vol.urugan 12.92 m³
sirtu + Vol.aanstampeng + Vol.batu kali )
IV Pekerjaan Beton
1 Beton Bertulang Poor Plat 60x60x30
Panjang = 0.60 m
Lebar = 0.60 m
Tinggi = 0.30 m
Jumlah Poor = 25 buah
Volume = 2.70 m³
2. Balok Bordes
Panjang = 0.20 m
Lebar = 0.30 m
Tinggi = 2.75 m
Volume = 0.16 m³
1. Panjang = 0.30 m
Lebar = 0.26 m
Tinggi = 1.00 m
Jumlah anak tangga = 18
Volume = 0.70 m³
2. Panjang atas = 3.00 m
Panjang bawah = 3.17 m
Tinggi = 0.14 m
Tinggi plat = 1.00 m
Jumlah plat tangga = 2
Volume = 0.86 m³
Volume 2.154 m³
7 Bekisting Tangga
Bekisting Bawah Tangga :
Panjang = 3m
Lebar = 1m
Volume = 3 m³
VolumeTotal = m³
Bekisting Bordes :
Panjang = 1.27 m³
Lebar = 2.6 m³
Volume = 3.302 m³
Bekisting Balok :
Panjang = 0.75 m
Lebar = 0.3 m
Volume = 0.225 m³
V Pekerjaan Dinding
1. Pas. Dinding Trasram ( 1 Pc : 2 Ps )
Luas Kotor :
Panjang = 93.65 m
Tinggi = 0.4 m
Luas = 37.46 m²
Luas Bersih :
Luas Kotor - Luas Kusen = 37.46 -18.34
Luas = 19.12 m²
5. Acian Dinding
Luas Kotor :
Panjang = 187.3 m
Tinggi = 2.9 m
Luas = 543.17 m²
Luas Bersih :
Luas Kotor - Luas Kusen = 543.17 -21.55
Luas = 521.62 m²
3. Cat Kusen
Kusen P1
Kusen Samping
Panjang (p) 2.30 m
Lebar (l) 0.06 m
Tinggi (h) 0.15 m
Luas 0.62 m
Kusen Atas
Panjang (p) 0.92 m
Lebar (l) 0.06 m
Tinggi (h) 0.15 m
Luas 0.25 m
Jumlah 4.00 buah
Volume Total Kusen P1 5.96 m³
Kusen P2
Kusen Samping
Panjang (p) 2.30 m
Lebar (l) 0.06 m
Tinggi (h) 0.15 m
Luas 0.62 m
Kusen Atas
Panjang (p) 0.82 m
Lebar (l) 0.06 m
Tinggi (h) 0.15 m
Luas 0.22 m
Jumlah 1.00 buah
Volume Total Kusen P2 1.46 m³
Kusen P3
Kusen Samping
Panjang (p) 2.80 m
Lebar (l) 0.06 m
Tinggi (h) 0.15 m
Luas 0.76 m
Kusen Atas
Panjang (p) 3.88 m
Lebar (l) 0.06 m
Tinggi (h) 0.15 m
Luas 1.05 m
Jumlah 1.00 buah
Volume Total Kusen P3 2.56 m³
Kusen J1
Kusen Samping
Panjang (p) 1.80 m
Lebar (l) 0.06 m
Tinggi (h) 0.15 m
Luas 0.49 m
Kusen Atas
Panjang (p) 0.82 m
Lebar (l) 0.06 m
Tinggi (h) 0.15 m
Luas 0.22 m
Jumlah 7.00 buah
Volume Total Kusen J1 8.35 m³
Volume Total Pengecatan Kusen 18.34 m³
14.31 m²
Volume Total Pengecatan Daun Jendela
6. Cat Plafon
Panjang = 74.00 m
Lebar = 1m
Luas = 74.000 m²
7. Cat Listplank
Panjang = 9.60 m
Lebar = 0.3 m
Luas = 2.880 m²
XI Pekerjaan Sanitasi 1
1. Closed Jongkok 2 Buah
2. Soap Holder 4 Buah
3. Kran Air 3/4" 2 Buah
4. Flood Drain 9.70 Buah
5. Air Bersih Pipa PVC Ø 3" 21.62 m
6. Air Kotor Pipa PVC Ø 4" m
B PEKERJAAN LANTAI II
I Pekerjaan Beton
1 Beton Bertulang Kolom K1 (20x20)
Panjang = 3.70 m
Lebar = 0.20 m
Tinggi = 0.20 m
Jumlah K1 = 8 buah
Volume = 1.18 m³
4 Bekisting Pelat
1. Panjang = 3.3 m
Lebar = 3.3 m
Volume = 10.89 m³
2. Panjang = 3.3 m
Lebar = 2.8 m
Volume = 9.24 m³
3. Panjang = 3.3 m
Lebar = 3.3 m
Volume = 10.89 m³
4. Panjang = 4.8 m
Lebar = 2.05 m
Volume = 9.84 m³
5. Panjang = 2.55 m
Lebar = 1.8 m
Volume = 4.59 m³
6. Panjang = 1.8 m
Lebar = 1.8 m
Volume = 3.24 m³
7. Panjang = 5.05 m
Lebar = 4.30 m
Volume = 21.72 m³
8. Panjang = 3.05 m
Lebar = 1.80 m
Volume = 5.49 m³
9. Panjang = 3.55 m
Lebar = 1.80 m
Volume = 6.39 m³
VOLUME TOTAL 82.28 m³
II Pekerjaan Dinding
1 Pas. Trasram (1Pc : 2Ps)
Luas Kotor :
Panjang = 63.75 m
Tinggi = 0.4 m
Luas = 25.5 m²
Luas Bersih :
Luas Kotor - Luas Kusen = 25.5 -3.21
Luas = 22.29 m²
5. Acian Dinding
Luas Kotor :
Panjang = 187.3 m
Tinggi = 2.9 m
Luas = 543.17 m²
Luas Bersih :
Luas Kotor - Luas Kusen = 543.17 -23.55
Luas = 519.62 m²
IV Pekerjaan Lantai
1 Lantai Keramik 30x30cm
Panjang = 74.99 m
Lebar = 1m
Luas = 74.99 m²
V Pekerjaan Pengecatan
1. Plamir
Luas = 183.66 m²
3. Cat Kusen
Kusen P1
Kusen Samping
Panjang (p) 2.30 m
Lebar (l) 0.06 m
Tinggi (h) 0.15 m
Luas 0.62 m
Kusen Atas
Panjang (p) 0.92 m
Lebar (l) 0.06 m
Tinggi (h) 0.15 m
Luas 0.25 m
Jumlah 4.00 buah
Volume Total Kusen P1 5.96 m²
Kusen P2
Kusen Samping
Panjang (p) 2.30 m
Lebar (l) 0.06 m
Tinggi (h) 0.15 m
Luas 0.62 m
Kusen Atas
Panjang (p) 0.82 m
Lebar (l) 0.06 m
Tinggi (h) 0.15 m
Luas 0.22 m
Jumlah 2.00 buah
Volume Total Kusen P2 2.93 m²
Kusen J1
Kusen Samping
Panjang (p) 1.80 m
Lebar (l) 0.06 m
Tinggi (h) 0.15 m
Luas 0.49 m
Kusen Atas
Panjang (p) 0.82 m
Lebar (l) 0.06 m
Tinggi (h) 0.15 m
Luas 0.22 m
Jumlah 14.00 buah
Volume Total Kusen J1 16.71 m²
Volume Total Pengecatan Kusen 25.596 m
6. Cat Plafon
Panjang = 75.00 m
Lebar = 1m
Luas = 75.000 m²
7. Cat Listplank
Panjang = 36.50 m
Lebar = 0.3 m
Luas = 10.950 m²
B PEKERJAAN LANTAI II
I Pekerjaan Beton Lantai II
1 Beton Bertulang Kolom K1 (20x20) 1.18 m³
2 Beton Bertulang Kolom KP (15x15) 1.41 m³
3 Beton Bertulang Plat 6.66 m³
4 Beton Bertulang Ringbalok (20x30) 5.61 m³
5 Bekisting 82.28 m³
II Pekerjaan Dinding
1 Pas. Trasram (1Pc : 2Ps) 22.29 m²
2 Pas. Dinding Bata (1Pc : 4Ps) 183.66 m²
3 Plesteran Dinding, kolom, balok (1Pc : 4Ps) 17.91 m²
4 Plesteran Trasram (1Pc : 2Ps) 44.57 m²
5 Acian dinding 519.62 m²
III Pekerjaan Pintu dan Jendela
1 Pemasangan Pintu P1 4.0000 buah
2 Pemasangan Pintu P2 2 buah
3 Pemasangan Pintu P3 0 buah
4 Pemasangan Jendela J1 14 buah
IV Pekerjaan Lantai
1 Lantai Keramik 30x30cm 74.99 m²
2 Lantai Keramik 20x20cm 16.47 m²
V Pekerjaan Pengecatan
1 Plamir 183.66 m²
2 Cat Dinding 17.91 m²
3 Cat Kusen 25.596 m²
4 Cat Daun Pintu 24.176 m²
5 Cat Daun Jendela 28.616 m²
6 Cat Plavon 75 m²
7 Cat Lisplank 10.95 m²
VI Pekerjaan Instalasi Listrik
1 Pemasangan Titik Lampu / Wiring 7.00 buah
2 Stop Kontak 2.00 buah
3 Saklar Tunggal 5.00 buah
4 Saklar Double 1.00 buah
5 Lampu SL 25 Watt 7.00 LS
6 Penyambungan 1300 Watt 1.00 buah
VII Pekerjaan Atap
1 Kuda - Kuda Konvensional 8/12 0.38 m³
2 Gording Kayu 8/12 + Nok 8/12 Kamper 0.38 m³
3 Usuk 5/7 + Reng 2/3 Kamper 195.74 m³
4 Genteng Karang Pilang (Bambe) 164.52 m²
5 Balok Tembok 6/12 Kamper 26.60 m³
6 Listplank 2x 2/15 Kamper 36.50 m³
7 Genteng Wuwung (Karang Pilang) 7.85 m³
8 Plavond KaLsiboard + Rangka 74.99 m²
5. Analisa Harga Satuan Pekerjaan (SNI, HSPK 2019, PERMEN PU)
PEKERJAAN LANTAI 1
I. PEKERJAAN PERSIAPAN
Jenis Pekerjaan : Pembersihan Lokasi / Lahan
Satuan : m²
Harga Satuan : Rp 12,375
No. Uraian Koefisien Satuan Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 = 3x5
A Tenaga Kerja
Mandor 0.0500 O.H 85,000.00 4,250.00
Pembantu Tukang/Pekerja 0.1000 O.H 70,000.00 7,000.00
Sub Total Upah 11,250.00
B Bahan
- - -
Sub Total Bahan -
C Peralatan
- - -
Sub Total Peralatan -
D. Jumlah Harga Tenaga Kerja, Bahan, Peralatan (A+B+C) Rp 11,250
E. Overhead + Profit (10% x D) Rp 1,125
F. Harga Satuan Pekerjaan (D+E) Rp 12,375
G. Dibulatkan Rp 12,375
Jenis Pekerjaan : Pembuatan Beton Mutu fc' = 19.3 Mpa (SNI 7394:2008 (6.7))
Satuan : m3
Harga Satuan : Lt.1 : Rp 804,815
Lt.2 : Rp 820,811
No. Uraian Koefisien Satuan Harga Satuan (Rp) Jumlah Harga (Rp)
(1) (2) (3) (4) (5) (6) = (3)x(5)
A. Tenaga Kerja
Mandor 0.0830 OH 85,000.00 7,055.00
Kepala Tukang Batu 0.0280 OH 80,000.00 2,240.00
Tukang Batu 0.2750 OH 75,000.00 20,625.00
Pembantu Tukang/Pekerja 1.6500 OH 70,000.00 115,500.00
Sub Total Upah Lt.1 145,420.00
Sub Total Upah Lt.2 159,962.00
B. Bahan
Semen PC (Portland Cement) 40kg 371.000 kg 1,100.00 408,100.00
Pasir Beton 698.000 kg 99.00 69,102.00
Kerikil 1047.000 kg 99.00 103,653.00
Air 215.000 Liter 25.00 5,375.00
Sub Total Bahan 586,230.00
C Peralatan
- - -
Sub Total Peralatan -
D. Jumlah Harga Tenaga Kerja, Bahan, Peralatan (A+B+C) Lt.1 Rp 731,650
Lt.2 Rp 746,192
E. Overhead + Profit (10% x D) Lt.1 Rp 73,165
Lt.2 Rp 74,619
F. Harga Satuan Pekerjaan (D+E) Lt.1 Rp 804,815
Lt.2 Rp 820,811
G. Dibulatkan Lt.1 Rp 804,815
Lt.2 Rp 820,811
PEKERJAAN BETON
Jenis Pekerjaan = Tangga
Satuan = kg
Harga Satuan = Rp 30,380,331
No Uraian Pekerjaan Koefisien Satuan Harga Satuan Jumlah Harga
1 2 3 4 5 6=3x5
A. Tenaga Kerja
Mandor 0.083 OH 85,000.00 Rp 7,055
Kepala Tukang 0.028 OH 80,000.00 Rp 2,240
Tukang Kayu 0.275 OH 75,000.00 Rp 20,625
Pekerja 1.650 OH 70,000.00 Rp 115,500
Sub Total Upah Rp 145,420
B. Bahan
Semen porland (Semen Gersik) 371.000 Kg 7,055.00 Rp 2,617,405
Pasir beton 0.698 m3 2,240.00 Rp 1,564
Koral beton 1.047 m3 20,625.00 Rp 21,594
air 215.000 ltr 115,500.00 Rp 24,832,500
Sub Total Bahan Rp 27,473,063
C Peralatan
- - -
Sub Total Peralatan -
D. Jumlah Harga Tenaga Kerja, Bahan, Peralatan (A+B+C) Rp 27,618,483
E. Overhead + Profit (10% x D) Rp 2,761,848
F. Harga Satuan Pekerjaan (D+E) Rp 30,380,331
G. Dibulatkan Rp 30,380,331
PEKERJAAN BESI
Jenis Pekerjaan = Tangga
Satuan = kg
Harga Satuan = Rp 9,062
No Uraian Pekerjaan Koefisien Satuan Harga Satuan Jumlah Harga
1 2 3 4 5 6=3x5
A. Tenaga Kerja
Mandor 0.0004 OH 85,000.00 Rp 34
Kepala Tukang 0.0007 OH 80,000.00 Rp 56
Tukang Kayu 0.0070 OH 75,000.00 Rp 525
Pekerja 0.0070 OH 70,000.00 Rp 490
Sub Total Upah Rp 1,105
B. Bahan
Besi beton ( polos/ulir ) 1.050 m3 6,565.00 Rp 6,893
Kawat beton 0.015 Kg 16,000.00 Rp 240
Sub Total Bahan Rp 7,133
C. Peralatan
- - -
Sub Total Peralatan -
D. Jumlah Harga Tenaga Kerja, Bahan, Peralatan (A+B+C) Rp 8,238
E. Overhead + Profit (10% x D) Rp 824
F. Harga Satuan Pekerjaan (D+E) Rp 9,062
G. Dibulatkan Rp 9,062
PEKERJAAN BEKISTING
Jenis Pekerjaan = Tangga
Satuan = m2
Harga Satuan = Rp 218,841
No Uraian Pekerjaan Koefisien Satuan Harga Satuan Jumlah Harga
1 2 3 4 5 6=3x5
A. Tenaga Kerja
Mandor 0.033 OH 85,000.00 Rp 2,805
Kepala Tukang 0.033 OH 80,000.00 Rp 2,640
Tukang Kayu 0.330 OH 75,000.00 Rp 24,750
Pekerja 0.660 OH 70,000.00 Rp 46,200
Sub Total Upah Rp 76,395
B. Bahan
Kayu Meranti 0.040 m3 4.00 Rp 0
Paku 0.400 Kg 78,660.00 Rp 31,464
Minyak bekisting 0.200 ltr 6,270.00 Rp 1,254
Balok kayu 5/7 0.018 m3 55,000.00 Rp 990
Plywood tebal 9 mm 0.350 lbr 85,500.00 Rp 29,925
Dolken kayu galam Ø 8-10 / 4 m 2.000 btg 29,459.50 Rp 58,919
Sub Total Bahan Rp 122,552
C Peralatan
- - -
Sub Total Peralatan -
D. Jumlah Harga Tenaga Kerja, Bahan, Peralatan (A+B+C) Rp 198,947
E. Overhead + Profit (10% x D) Rp 19,895
F. Harga Satuan Pekerjaan (D+E) Rp 218,842
G. Dibulatkan Rp 218,841
PEKERJAAN BETON
Jenis Pekerjaan = Plat
Satuan = m3
Harga Satuan = Rp 30,380,331
No Uraian Pekerjaan Koefisien Satuan Harga Satuan Jumlah Harga
1 2 3 4 5 6=3x5
A. Tenaga Kerja
Mandor 0.083 OH 85,000.00 Rp 7,055
Kepala Tukang 0.028 OH 80,000.00 Rp 2,240
Tukang Kayu 0.275 OH 75,000.00 Rp 20,625
Pekerja 1.650 OH 70,000.00 Rp 115,500
Sub Total Upah Rp 145,420
B. Bahan
Semen porland (Semen Gersik) 371.000 Kg 7,055.00 Rp 2,617,405
Pasir beton 0.698 m3 2,240.00 Rp 1,564
Koral beton 1.047 m3 20,625.00 Rp 21,594
air 215.000 ltr 115,500.00 Rp 24,832,500
Sub Total Bahan Rp 27,473,063
C. Peralatan
- - -
Sub Total Peralatan -
D. Jumlah Harga Tenaga Kerja, Bahan, Peralatan (A+B+C) Rp 27,618,483
E. Overhead + Profit (10% x D) Rp 2,761,848
F. Harga Satuan Pekerjaan (D+E) Rp 30,380,331
G. Dibulatkan Rp 30,380,331
PEKERJAAN BESI
Jenis Pekerjaan = Plat
Satuan = kg
Harga Satuan = Rp 9,062
No Uraian Pekerjaan Koefisien Satuan Harga Satuan Jumlah Harga
1 2 3 4 5 6=3x5
A. Tenaga Kerja
Mandor 0.0004 OH 85,000.00 Rp 34
Kepala Tukang 0.0007 OH 80,000.00 Rp 56
Tukang Kayu 0.0070 OH 75,000.00 Rp 525
Pekerja 0.0070 OH 70,000.00 Rp 490
Sub Total Upah Rp 1,105
B. Bahan
Besi beton ( polos/ulir ) 1.050 m3 6,565.00 Rp 6,893
Kawat beton 0.015 Kg 16,000.00 Rp 240
Sub Total Bahan Rp 7,133
C. Peralatan
- - -
Sub Total Peralatan Rp -
D. Jumlah Harga Tenaga Kerja, Bahan, Peralatan (A+B+C) Rp 8,238
E. Overhead + Profit (10% x D) Rp 824
F. Harga Satuan Pekerjaan (D+E) Rp 9,062
G. Dibulatkan Rp 9,062
PEKERJAAN BEKISTING
Jenis Pekerjaan = Plat
Satuan = m2
Harga Satuan = Rp 218,841
No Uraian Pekerjaan Koefisien Satuan Harga Satuan Jumlah Harga
1 2 3 4 5 6=3x5
A. Tenaga Kerja
Mandor 0.033 OH 85,000.00 Rp 2,805
Kepala Tukang 0.033 OH 80,000.00 Rp 2,640
Tukang Kayu 0.330 OH 75,000.00 Rp 24,750
Pekerja 0.660 OH 70,000.00 Rp 46,200
Sub Total Upah Rp 76,395
B. Bahan
Kayu Meranti 0.040 m3 4.00 Rp 0.16
Paku 0.400 Kg 78,660.00 Rp 31,464
Minyak bekisting 0.200 ltr 6,270.00 Rp 1,254
Balok kayu 5/7 0.018 m3 55,000.00 Rp 990
Plywood tebal 9 mm 0.350 lbr 85,500.00 Rp 29,925
Dolken kayu galam Ø 8-10 / 4 m 2.000 btg 29,459.50 Rp 58,919
Sub Total Bahan Rp 122,552
C. Peralatan
- - -
Sub Total Peralatan Rp -
D. Jumlah Harga Tenaga Kerja, Bahan, Peralatan (A+B+C) Rp 198,947
E. Overhead + Profit (10% x D) Rp 19,895
F. Harga Satuan Pekerjaan (D+E) Rp 218,842
G. Dibulatkan Rp 218,841
Jenis Pekerjaan : Pek. Plesteran Dinding, Kolom, Balok dan Ring Balok (1Pc:4Ps)
Satuan : m2
Harga Satuan : Rp 39,197
No Uraian Pekerjaan Koefisien Satuan Harga Satuan Jumlah Harga
1 2 3 4 5 6=3x5
A. Tenaga Kerja
Mandor 0.0100 O.H 85,000.00 Rp 850
Kepala Tukang Batu 0.0150 O.H 80,000.00 Rp 1,200
Tukang Batu 0.1500 O.H 75,000.00 Rp 11,250
Pembantu Tukang/Pekerja 0.2000 O.H 70,000.00 Rp 14,000
Sub Total Upah Rp 27,300
B. Bahan
Seman PC (Portland Cement) 50 Kg 0.1145 zak 52,000.00 Rp 5,954
Pasir pasang 0.0170 m3 140,000.00 Rp 2,380
Sub Total Bahan Rp 8,334
C. Peralatan
- - -
Sub Total Peralatan -
D. Jumlah Harga Tenaga Kerja, Bahan, Peralatan (A+B+C) Rp 35,634
E. Overhead + Profit (10% x D) Rp 3,563
F. Harga Satuan Pekerjaan (D+E) Rp 39,197
G. Dibulatkan Rp 39,197
X. PEKERJAAN KUSEN
PEKERJAAN LANTAI 2
I. PEKERJAAN PASANGAN
Jenis Pekerjaan = Pek. Plesteran Dinding, Kolom, Balok dan Ring Balk (1Pc:4Ps)
Satuan = m2
Harga Satuan = Rp 45,203
No. Uraian Koefisien Satuan Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6=5x3
A. Tenaga Kerja
Mandor 0.0120 O.H 85,000.00 1,020.00
Kepala Tukang Batu 0.0180 O.H 80,000.00 1,440.00
Tukang Batu 0.1800 O.H 75,000.00 13,500.00
Pembantu Tukang/Pekerja 0.2400 O.H 70,000.00 16,800.00
Sub total Upah 32,760.00
B. Bahan
Seman PC (Portland Cement) 50 Kg 0.1145 ZAK 52,000.00 5,954.00
Pasir pasang 0.0170 M3 140,000.00 2,380.00
Sub Total Bahan 8,334.00
C. Peralatan
- - -
Sub Total Peralatan -
D. Jumlah Harga Tenaga Kerja, Bahan, Peralatan (A+B+C) Rp 41,094
E. Overhead + Profit (10% x D) Rp 4,109
F. Harga Satuan Pekerjaan (D+E) Rp 45,203
G. Dibulatkan Rp 45,203
V. PEKERJAAN ATAP
Jenis Pekerjaan : Pemasangan 1 m3 rangka atap genteng keramik, kayu kelas II Berdasarkan
Satuan : m² Permen PU thn 2016
Harga Satuan Rp 322,599
No. Uraian Koefisien Satuan Harga Satuan (Rp) Jumlah Harga (Rp)
(1) (2) (3) (4 (5) (6) = '(3)x'(5)
A. Tenaga Kerja
Pekerja 0.1000 O.H 155000 Rp 15,500
Tukang Kayu 0.1000 O.H 165000 Rp 16,500
Kepala Tukang / Mandor 0.0100 O.H 180000 Rp 1,800
Mandor 0.0050 O.H 180000 Rp 900
Sub total Upah Rp 34,700
B Bahan
Kaso-Kaso 5x 7 cm 0.0140 m³ 7245000 Rp 101,430
Reng 2 x 3 cm 0.0360 m³ 4247000 Rp 152,892
paku 5 dan 10 cm 0.2500 kg 17000 Rp 4,250
Sub Total Bahan Rp 258,572
C Peralatan
- - - -
Sub Total Peralatan 0
D. Jumlah Harga Tenaga Kerja, Bahan, Peralatan (A+B+C) Rp 293,272
E. Overhead + Profit (10% x D) Rp 29,327
F. Harga Satuan Pekerjaan (D+E) Rp 322,599
G. Dibulatkan Rp 322,599
Rp2,970,000.00
Rp4,984,192.00
Rp7,954,192.00
Rp8,374,926.00
Rp11,602,067.00
Rp830,341.00
Rp20,807,334.00
Rp6,030,105.00
Rp25,646,464.00
Rp316,565.84
Rp31,993,134.84
Rp706,590.00
Rp6,653,718.00
Rp2,080,918.00
Rp6,614,701.00
Rp2,006,503.00
Rp178,158.00
Rp1,386,914.00
Rp65,444,094.00
Rp85,071,596.00
Rp18,347,106.00
Rp229,672,105.00
Rp20,571,824.00
Rp2,903,510.00
Rp15,334,110.00
Rp286,828,655.00
Rp9,278,012.00
Rp2,273,835.00
Rp9,291,611.00
Rp8,012,914.00
Rp28,856,372.00
Rp8,130,556.00
Rp1,091,691.00
Rp9,222,247.00
Rp4,816,258.00
Rp10,107,207.00
Rp1,440,830.00
Rp3,102,941.00
Rp1,124,165.00
Rp1,425,092.00
Rp51,569.00
Rp22,068,062.00
Rp245,245.00
Rp541,680.00
Rp160,760.00
Rp178,360.00
Rp138,640.00
Rp24,000,000.00
Rp30,000.00
Rp25,294,685.00
Rp226,050.00
Rp314,600.00
Rp272,800.00
Rp344,300.00
Rp976,606.00
Rp2,360,450.00
Rp4,494,806.00
Rp418,250.00
Rp627,547.00
Rp213,893,737.00
Rp6,614,701.00
Rp221,554,235.00
Rp20,137,652.00
Rp159,731,857.00
Rp809,586.00
Rp2,157,021.00
Rp16,598,614.00
Rp199,434,730.00
Rp9,278,012.00
Rp4,547,670.00
Rp0.00
Rp16,025,828.00
Rp29,851,510.00
Rp9,921,102.00
Rp24,616,317.00
Rp34,537,419.00
Rp3,331,409.00
Rp384,062.00
Rp2,382,706.00
Rp2,250,520.00
Rp2,663,835.00
Rp1,608,300.00
Rp248,740.00
Rp12,869,572.00
Rp1,716,715.00
Rp90,280.00
Rp200,950.00
Rp44,590.00
Rp350,000.00
Rp2,000,000.00
Rp2,394,590.00
Rp2,830,146.00
Rp2,830,146.00
Rp57,191,407.00
Rp25,755,120.00
Rp4,965,533.00
Rp1,228,870.00
Rp12,500,258.00
Rp18,694,661.00
6.2. Rekap Rencana Anggaran Biaya
B PEKERJAAN LANTAI II
I Pekerjaan Beton Rp221,554,235.00
II Pekerjaan Dinding Rp199,434,730.00
III Pekerjaan Kusen Rp29,851,510.00
IV Pekerjaan Lantai Rp34,537,419.00
V Pekerjaan Pengecatan Rp12,869,572.00
VI Pekerjaan Instalasi Listrik Rp2,394,590.00
VII Pekerjaan Atap Rp18,694,661.00
TOTAL Rp1,041,927,800.84
PPN (10%) Rp104,192,780.08
JUMLAH + PPN Rp1,146,120,580.92
DIBULATKAN Rp1,146,120,580.00
Terbilang: satu milyar seratus empat puluh enam juta seratus dua puluh ribu lima ratus enam puluh empat rupiah
uh empat rupiah
7.1 Daftar Harga Satuan Upah
IV Pekerjaan Beton
1 Poor 60X60X30
Semen portland 2.70 Kg 9.275
Pasir beton 2.70 m3 0.4363
Koral beton 2.70 m3 0.5511
Biaya Air Tawar 2.70 lt 215
Kayu Meranti 2.70 m3 0.04
Paku 2.70 kg 0.3
Minyak bekisting 2.70 lt 0.1
Besi beton ø 12 2.70 kg 1.05
Kawat beton 2.70 kg 0.015
2 Pek. strous ø 30 - 4 m
Semen portland 7.06 Kg 9.275
Pasir beton 7.06 m3 0.4363
Koral beton 7.06 m3 0.5511
Biaya Air Tawar 7.06 m3 215
Besi beton ø 12 7.06 kg 1.05
Kawat beton 7.06 kg 0.015
3 Pek. Sloof 15x20
Semen portland 2.80 Kg 9.275
Pasir beton 2.80 m3 0.4363
Koral beton 2.80 m3 0.5511
Biaya Air Tawar 2.80 m3 215
Kayu Meranti 2.80 m3 0.04
Paku 2.80 kg 0.3
Minyak bekisting 2.80 lt 0.1
Besi beton ø 12 2.80 kg 1.05
Kawat beton 2.80 kg 0.015
4 Pek. Balok (20x30)
Semen portland 5.61 Kg 9.275
Pasir beton 5.61 m3 0.4363
Koral beton 5.61 m3 0.5511
Biaya Air Tawar 5.61 m3 215
Kayu Meranti 5.61 m3 0.04
Paku 5.61 kg 0.3
Minyak bekisting 5.61 lt 0.1
Plywood tebal 9 mm 5.61 lbr 0.35
Dolken kayu galam Ø 8-10 / 4 m 5.61 btg 2
Balok kayu 5/7 5.61 m3 0.015
Besi beton ø 12 5.61 kg 1.05
Kawat beton 5.61 kg 0.015
5 Pek. Bekisting 3.58 m3
6 Pek. Kolom praktis 1(15x15)
Semen portland 1.47 Kg 9.275
Pasir beton 1.47 m3 0.4363
Koral beton 1.47 m3 0.5511
Biaya Air Tawar 1.47 m3 215
Kayu Meranti 1.47 m3 0.04
Paku 1.47 kg 0.3
Minyak bekisting 1.47 lt 0.1
Plywood tebal 9 mm 1.47 lbr 0.35
Dolken kayu galam Ø 8-10 / 4 m 1.47 btg 2
Balok kayu 5/7 1.47 m3 0.015
Besi beton ø 12 1.47 kg 1.05
Kawat beton 1.47 kg 0.015
7 Pek. Kolom struktur 1(20x20)
Semen portland 2.28 Kg 9.275
Pasir beton 2.28 m3 0.4363
Koral beton 2.28 m3 0.5511
Biaya Air Tawar 2.28 m3 215
Kayu Meranti 2.28 m3 0.04
Paku 2.28 kg 0.3
Minyak bekisting 2.28 lt 0.1
Plywood tebal 9 mm 2.28 lbr 0.35
Dolken kayu galam Ø 8-10 / 4 m 2.28 btg 2
Balok kayu 5/7 2.28 m3 0.015
Besi beton ø 12 2.28 kg 1.05
Kawat beton 2.28 kg 0.015
8 Pek. Kolom struktur 2(20x30)
Semen portland 0.456 Kg 9.275
Pasir beton 0.456 m3 0.4363
Koral beton 0.456 m3 0.5511
Biaya Air Tawar 0.456 m3 215
Kayu Meranti 0.456 m3 0.04
Paku 0.456 kg 0.3
Minyak bekisting 0.456 lt 0.1
Plywood tebal 9 mm 0.456 lbr 0.35
Dolken kayu galam Ø 8-10 / 4 m 0.456 btg 2
Balok kayu 5/7 0.456 m3 0.015
Besi beton ø 12 0.456 kg 1.05
Kawat beton 0.456 kg 0.015
9 pek. Tangga
Semen Portland 2.15416 kg 9.275
Pasir Beton 2.15416 m3 0.4363
Krikil Pecah Mesin 1/2cm 2.15416 m3 0.5511
Biaya Air Tawar 2.15416 m3 215
Kawat Beton 2.15416 m3 0.015
Besi Polos 2.15416 m3 1.05
Kayu Meranti 2.15416 m2 0.04
Paku 2.15416 m2 0.3
Minyak bekisting 2.15416 m2 0.1
Balok kayu 5/7 2.15416 m2 0.015
Plywood tebal 9 mm 2.15416 m2 0.35
Dolken kayu galam Ø 8-10 / 4 m 2.15416 m2 2
V Pekerjaan Dinding
1 Pas. Trasram (1Pc : 2Ps)
Seman PC (Portland Cement) 50 Kg 19.12 zak 3.6493
Pasir pasang 19.12 m³ 0.3318
Batu Merah uk. 23x10,5x4,5 cm 19.12 buah 490.0000
2 Pas. Dinding Bata (1Pc : 4Ps)
Seman PC (Portland Cement) 50 Kg 268.38 zak 2.225
Pasir pasang 268.38 m³ 0.405
Batu Merah uk. 23x10,5x4,5 cm 268.38 buah 490.000
3 Plesteran Dinding, kolom, balok (1Pc : 4Ps)
Seman PC (Portland Cement) 50 Kg 524.83 zak 0.1145
Pasir pasang 524.83 m³ 0.0170
4 Plesteran Trasram (1Pc : 2Ps)
Seman PC (Portland Cement) 50 Kg 68.50 zak 0.1700
Pasir pasang 68.50 m³ 0.0171
5 Acian Dinding
Portland Cement 521.62 kg 3.2500
VI Pekerjaan Pintu dan Jendela
1 Kusen 6/15 (Kamper)
Kayu Kamper Balok 6/15 2.65 m³ 1.1000
2 Daun Pintu Panil (Kamper)
Kayu Kamper (Papan) 14 m³ 0.0440
Skrup 50 buah 25.0000
3 Daun Jendela (Kamper)
Kayu Kamper (Papan) 3 m³ 0.0350
Kaca Polos/Bening 5mm 15 m2 0.8000
Paku 35 kg 0.1000
VII Pekerjaan Lantai
1 Lantai Keramik 30x30cm
Semen PC(Portland cement) 50 kg 68 zak 0.0200
Kapur Pasang 68 m³ 0.0220
Pasir Pasang 68 m³ 0.0320
Lantai Keramik 30 x 30 68 m2 1.0500
2 Lantai Keramik 20x20cm
Semen PC(Portland cement) 50 kg 9 zak 0.0200
Kapur Pasang 9 m³ 0.0220
Pasir Pasang 9 m³ 0.0320
Lantai Keramik 20 x 20 (KM/WC) 9 m2 1.0500
VIII Pekerjaan Pengecatan
1 Plamir
Plamur Tembok 268.38 kg 0.1000
Kertas Gosok no.150 268.38 lembar 0.5000
2 Cat Dinding, kolom, balok, dll
Cat Tembok DULUX 524.8316 kg 0.3000
Plamur Tembok Master 524.8316 kg 0.1200
Kertas Gosok No. 150 524.8316 lbr 0.1000
3 Cat Kusen
dulux 18.3384 kg 0.0340
Spirtus 18.3384 Liter 0.6500
Kertas Gosok no.150 18.3384 Lembar 0.5000
4 Cat Daun Pintu
dulux 39.4932 kg 0.0340
Spirtus 39.4932 Liter 0.6500
Kertas Gosok no.150 39.4932 Lembar 0.5000
5 Cat Daun Jendela
dulux 14.3080 kg 0.0340
Spirtus 14.3080 Liter 0.6500
Kertas Gosok no.150 14.3080 Lembar 0.5000
6 Cat Plavon
Cat Tembok Dulux 74 kg 0.3000
Plamur Tembok Master 74 kg 0.1200
Kertas Gosok No. 150 74 lbr 0.1000
7 Cat Lisplank
Cat Minyak (Emco) 2.88 kg 0.4250
Plamir dempul 2.88 kg 0.0840
Kertas Gosok No. 150 2.88 lbr 0.5000
IX Pekerjaan Instalasi Listrik
1 Pemasangan Titik Lampu / Wiring
Isolator 1.0000 Buah 4
Kabel NYA 500 Volt 2 x 1,5 mm2 1.0000 M1 15
Pipa Paralon 5/8 1.0000 Lonjor 1
T Dos PVC 1.0000 Buah 1
Las doof 1.0000 Buah 6
Fiting Plavond 1.0000 Buah 1
2 Stop Kontak
Stop Kontak (Broco) 12.00 Buah 1.0000
Kabel NYA 500 Volt 2 x 1,5 mm2 12.00 M1 0.0120
Pipa Paralon 5/8 12.00 Lonjor 1.0000
T Dos PVC 12.00 Buah 0.7500
3 Saklar Tunggal
Saklar tunggal (Broco) 4.00 Buah 1.0000
Kabel NYA 500 Volt 2 x 1,5 mm2 4.00 M1 0.0120
Pipa Paralon 5/8 4.00 Lonjor 1.0000
T Dos PVC 4.00 Buah 0.7500
4 Saklar Double
Saklar Ganda (Broco) 4.00 Buah 1.0000
Kabel NYA 500 Volt 2 x 1,5 mm2 4.00 M1 0.0120
Pipa Paralon 5/8 4.00 Lonjor 1.0000
T Dos PVC 4.00 Buah 0.7500
5 Lampu SL 25 Watt
6 Penyambungan 1300 Watt
7 Sekering Kas 1 Group MCB
X Pekerjaan Sanitasi
1 Closed Jongkok
Closed Jongkok porselen (warna putih) 1.0000 Buah 1
2 Soap Holder
Soap Holder 2.0000 Buah 1
3 Kran Air 3/4"
Kran Air Uk.3/4'' 4.00 Buah 1
Rol TBA 4.00 Rol 1
4 Flood Drain
Floor Drain 2.00 Buah 1
Lem Pipa PVC 2.00 Buah 1
6 Air Kotor Pipa PVC Ø 3"
Pipa PVC 3'' Type C 9.70 M1 1.1000
Lem Pipa PVC 9.70 Buah 0.4000
7 Air Kotor Pipa PVC Ø 4"
Pipa PVC 4'' Type C 21.62 M1 1.1000
Lem Pipa PVC 21.62 Buah 0.5000
B PEKERJAAN LANTAI II
I Pekerjaan Beton
1 Beton Bertulang Kolom K1 (20x20)
Semen portland 1.18 Kg 9.275
Pasir beton 1.18 m3 0.4363
Koral beton 1.18 m3 0.5511
Biaya Air Tawar 1.18 m3 215
Kayu Meranti 1.18 m3 0.04
Paku 1.18 kg 0.3
Minyak bekisting 1.18 lt 0.1
Plywood tebal 9 mm 1.18 lbr 0.35
Dolken kayu galam Ø 8-10 / 4 m 1.18 btg 2
Balok kayu 5/7 1.18 m3 0.015
Besi beton ø 12 1.18 kg 1.05
Kawat beton 1.18 kg 0.015
2 Beton Bertulang Kolom KP (15x15)
Semen portland 1.41 Kg 9.275
Pasir beton 1.41 m3 0.4363
Koral beton 1.41 m3 0.5511
Biaya Air Tawar 1.41 m3 215
Kayu Meranti 1.41 m3 0.04
Paku 1.41 kg 0.3
Minyak bekisting 1.41 lt 0.1
Plywood tebal 9 mm 1.41 lbr 0.35
Dolken kayu galam Ø 8-10 / 4 m 1.41 btg 2
Balok kayu 5/7 1.41 m3 0.015
Besi beton ø 12 1.41 kg 1.05
Kawat beton 1.41 kg 0.015
3 Beton Bertulang Plat (t=12cm)
Semen portland 6.66 Kg 9.275
Pasir beton 6.657 m3 0.4363
Koral beton 6.657 m3 0.5511
Biaya Air Tawar 6.657 m3 215
Kayu Meranti 6.657 m3 0.04
Paku 6.657 kg 0.3
Minyak bekisting 6.657 lt 0.1
Plywood tebal 9 mm 6.657 lbr 0.35
Dolken kayu galam Ø 8-10 / 4 m 6.657 btg 2
Balok kayu 5/7 6.657 m3 0.015
Besi beton ø 12 6.657 kg 1.05
Kawat beton 6.657 kg 0.015
4 Beton Bertulang Ringbalok (20x30)
Semen portland 5.61 Kg 9.275
Pasir beton 5.61 m3 0.4363
Koral beton 5.61 m3 0.5511
Biaya Air Tawar 5.61 m3 215
Kayu Meranti 5.61 m3 0.04
Paku 5.61 kg 0.3
Minyak bekisting 5.61 lt 0.1
Plywood tebal 9 mm 5.61 lbr 0.35
Dolken kayu galam Ø 8-10 / 4 m 5.61 btg 2
Balok kayu 5/7 5.61 m3 0.015
Besi beton ø 12 5.61 kg 1.05
Kawat beton 5.61 kg 0.015
5 Bekisting 82.28 m3
II Pekerjaan Dinding
1 Pas. Trasram (1Pc : 2Ps)
Seman PC (Portland Cement) 50 Kg 22.29 zak 3.6493
Pasir pasang 22.29 m³ 0.3318
Batu Merah uk. 23x10,5x4,5 cm 22.29 buah 490.0000
2 Pas. Dinding Bata (1Pc : 4Ps)
Seman PC (Portland Cement) 50 Kg 183.66 zak 2.225
Pasir pasang 183.66 m³ 0.405
Batu Merah uk. 23x10,5x4,5 cm 183.66 buah 490.000
3 Plesteran Dinding, kolom, balok (1Pc : 4Ps)
Seman PC (Portland Cement) 50 Kg 17.91 zak 0.1145
Pasir pasang 17.91 m³ 0.0170
4 Plesteran Trasram (1Pc : 2Ps)
Seman PC (Portland Cement) 50 Kg 44.57 zak 0.1700
Pasir pasang 44.57 m³ 0.0171
5 Acian Dinding
Portland Cement 519.62 kg 3.2500
III Pekerjaan Pintu dan Jendela
1 Kusen 6/15 (Kamper)
Kayu Kamper Balok 6/15 4 m³ 1.1000
2 Daun Pintu Panil (Kamper)
Kayu Kamper (Papan) 1 m³ 0.0440
Skrup 1 buah 25.0000
3 Daun Jendela (Kamper)
Kayu Kamper (Papan) 7.0000 m³ 0.0350
Kaca Polos/Bening 5mm 7.0000 m2 0.8000
Paku 7.0000 kg 0.1000
IV Pekerjaan Lantai
1 Lantai Keramik 30x30cm
Semen PC(Portland cement) 50 kg 74.99 zak 0.0200
Kapur Pasang 74.99 m³ 0.0220
Pasir Pasang 74.99 m³ 0.0320
Lantai Keramik 30 x 30 74.99 m2 1.0500
2 Lantai Keramik 20x20cm
Semen PC(Portland cement) 50 kg 16.47 zak 0.0200
Kapur Pasang 16.47 m³ 0.0220
Pasir Pasang 16.47 m³ 0.0320
Lantai Keramik 20 x 20 (KM/WC) 16.47 m2 1.0500
V Pekerjaan Pengecatan
1 Plamir
Plamur Tembok 183.66 kg 0.1000
Kertas Gosok no.150 183.66 lembar 0.5000
2 Cat Dinding, kolom, balok, dll
Cat Tembok DULUX 17.9100 kg 0.3000
Plamur Tembok Master 17.9100 kg 0.1200
Kertas Gosok No. 150 17.9100 lbr 0.1000
3 Cat Kusen
dulux 25.5960 kg 0.0340
Spirtus 25.5960 Liter 0.6500
Kertas Gosok no.150 25.5960 Lembar 0.5000
4 Cat Daun Pintu
dulux 24.1760 kg 0.0340
Spirtus 24.1760 Liter 0.6500
Kertas Gosok no.150 24.1760 Lembar 0.5000
5 Cat Daun Jendela
dulux 28.6160 kg 0.0340
Spirtus 28.6160 Liter 0.6500
Kertas Gosok no.150 28.6160 Lembar 0.5000
6 Cat Plavon
Cat Tembok Dulux 75 kg 0.3000
Plamur Tembok Master 75 kg 0.1200
Kertas Gosok No. 150 75 lbr 0.1000
7 Cat Lisplank
Cat Minyak (Emco) 10.95 kg 0.4250
Plamir dempul 10.95 kg 0.0840
Kertas Gosok No. 150 10.95 lbr 0.5000
VII Pekerjaan Instalasi Listrik
1 Pemasangan Titik Lampu / Wiring
Isolator 1.0000 Buah 4
Kabel NYA 500 Volt 2 x 1,5 mm2 1.0000 M1 15
Pipa Paralon 5/8 1.0000 Lonjor 1
T Dos PVC 1.0000 Buah 1
Las doof 1.0000 Buah 6
Fiting Plavond 1.0000 Buah 1
2 Stop Kontak
Stop Kontak (Broco) 12.00 Buah 1.0000
Kabel NYA 500 Volt 2 x 1,5 mm2 12.00 M1 0.0120
Pipa Paralon 5/8 12.00 Lonjor 1.0000
T Dos PVC 12.00 Buah 0.7500
3 Saklar Tunggal
Saklar tunggal (Broco) 4.00 Buah 1.0000
Kabel NYA 500 Volt 2 x 1,5 mm2 4.00 M1 0.0120
Pipa Paralon 5/8 4.00 Lonjor 1.0000
T Dos PVC 4.00 Buah 0.7500
4 Saklar Double
Saklar Ganda (Broco) 4.00 Buah 1.0000
Kabel NYA 500 Volt 2 x 1,5 mm2 4.00 M1 0.0120
Pipa Paralon 5/8 4.00 Lonjor 1.0000
T Dos PVC 4.00 Buah 0.7500
5 Lampu SL 25 Watt
6 Penyambungan 1300 Watt
VIII Pekerjaan Atap
1 Kuda - Kuda Konvensional 8/12
Kayu Kamper 8/12 0.38 m3 1.100
Paku 0.38 Kg 0.2000
2 Gording Kayu 8/12 + Nok 8/12 Kamper
Kayu Kamper 8/12 0.38 m3 1.100
Paku 0.38 Kg 0.2000
3 Usuk 5/7 + Reng 2/3 Kamper
Kayu Kamper Reng 2/3 0.2000 m3 0.0390
Kayu Kamper Usuk 5/7 0.2000 m3 0.0108
Paku 0.2000 Kg 0.2000
4 Genteng Karang Pilang (Bambe)
Semen PC (portland cement 50kg) 164.52 Zak 0.2370
Pasir Pasang 164.52 m3 0.0323
Genteng Wuwung karang pilang/wisma 164.52 Buah 3.0000
5 Balok Tembok 6/12 Kamper
Kayu Kamper 6/12 26.60 m3 1.100
Paku 26.60 Kg 0.2000
6 Listplank 2x 2/15 Kamper
Kayu Kamper Papan 2/25 36.50 m3 0.0108
Paku 36.50 Kg 0.0500
7 Genteng Wuwung (Karang Pilang)
Semen PC (portland cement 50kg) 7.85 Zak 0.2370
Pasir Pasang 7.85 m3 0.0323
Genteng Wuwung karang pilang/wisma 7.85 Buah 3.0000
8 Plavond KaLsiboard + Rangka
Kayu Kamper (Balok 5/7) 74.99 M3 0.0116
Kalsiboard (2,4x1,2m) ; t =3,5 mm 74.99 Lbr 0.3819
Paku 74.99 Kg 0.0308
Analisa Kebutuhan Bahan
Volume Satuan
6 = 3x5 7
0.448 m³
0.768 m³
1.28 kg
79.836 m³
22.476 m³
8.0914 m³
134.312 zak
49.44 m³
21.424 m³
25.0425 zak
1.17801 m3
1.48797 m3
580.5 lt
0.108 m3
0.81 kg
0.27 lt
2.835 kg
0.0405 kg
65.4815 zak
3.080278 m3
3.890766 m3
1517.9 m3
7.413 kg
0.1059 kg
25.97 zak
1.22164 m3
1.54308 m3
602 m3
0.112 m3
0.84 kg
0.28 lt
2.94 kg
0.042 kg
52.03275 zak
2.447643 m3
3.091671 m3
1206.15 m3
0.2244 m3
1.683 kg
0.561 lt
1.9635 lbr
11.22 btg
0.08415 m3
5.8905 kg
0.08415 kg
13.63425 zak
0.641361 m3
0.810117 m3
316.05 m3
0.0588 m3
0.441 kg
0.147 lt
0.5145 lbr
2.94 btg
0.02205 m3
1.5435 kg
0.02205 kg
21.147 zak
0.994764 m3
1.256508 m3
490.2 m3
0.0912 m3
0.684 kg
0.228 lt
0.798 lbr
4.56 btg
0.0342 m3
2.394 kg
0.0342 kg
4.2294 zak
0.1989528 m3
0.2513016 m3
98.04 m3
0.01824 m3
0.1368 kg
0.0456 lt
0.1596 lbr
0.912 btg
0.00684 m3
0.4788 kg
0.00684 kg
19.979834 zak
0.939860008 m3
1.187157576 m3
463.1444 m3
0.0323124 m3
2.261868 m3
0.0861664 m2
0.646248 m2
0.215416 m2
0.0323124 m2
0.753956 m2
4.30832 m2
69.7805 zak
6.3445 m³
9369.5840 buah
597.2417 zak
108.5845 m³
131503.7500 buah
60.0932 zak
8.9221 m³
11.6450 zak
1.1714 m³
1695.2702 kg
2.9150 m³
0.6160 m³
1250.0000 buah
0.1050 m³
12.0000 m2
3.5000 kg
1.36 zak
1.496 m³
2.176 m³
71.4 m2
0.18 zak
0.198 m³
0.288 m³
9.45 m2
26.8375 kg
134.1875 lembar
157.4495 kg
62.9798 kg
52.4832 lbr
0.6235 kg
11.9200 Liter
9.1692 Lembar
1.3428 kg
25.6706 Liter
19.7466 Lembar
0.4865 kg
9.3002 Liter
7.1540 Lembar
22.2000 kg
8.8800 kg
7.4000 lbr
1.2240 kg
0.2419 kg
1.4400 lbr
4 Buah
15 M1
1 Lonjor
1 Buah
6 Buah
1 Buah
12 Buah
0.144 M1
12 Lonjor
9 Buah
4 Buah
0.048 M1
4 Lonjor
3 Buah
4 Buah
0.048 M1
4 Lonjor
3 Buah
1 buah
2 buah
4 Buah
4 Rol
2 Buah
2 Buah
10.67 M1
3.88 Buah
23.782 M1
10.81 Buah
10.9445 zak
0.514834 m3
0.650298 m3
253.7 m3
0.0472 m3
0.354 kg
0.118 lt
0.413 lbr
2.36 btg
0.0177 m3
1.239 kg
0.0177 kg
13.07775 zak
0.615183 m3
0.777051 m3
303.15 m3
0.0564 m3
0.423 kg
0.141 lt
0.4935 lbr
2.82 btg
0.02115 m3
1.4805 kg
0.02115 kg
61.743675 zak
2.9044491 m3
3.6686727 m3
1431.255 m3
0.26628 m3
1.9971 kg
0.6657 lt
2.32995 lbr
13.314 btg
0.099855 m3
6.98985 kg
0.099855 kg
52.03275 zak
2.447643 m3
3.091671 m3
1206.15 m3
0.2244 m3
1.683 kg
0.561 lt
1.9635 lbr
11.22 btg
0.08415 m3
5.8905 kg
0.08415 kg
81.3283 zak
7.3945 m³
10920.1400 buah
408.7170 zak
74.3088 m³
89993.4000 buah
2.0507 zak
0.3045 m³
7.5774 zak
0.7622 m³
1688.7520 kg
4.4000 m³
0.0440 m³
25.0000 buah
0.2450 m³
5.6000 m2
0.7000 kg
1.4998 zak
1.64978 m³
2.39968 m³
78.7395 m2
0.3294 zak
0.36234 m³
0.52704 m³
17.2935 m2
18.366 kg
91.83 lembar
5.3730 kg
2.1492 kg
1.7910 lbr
0.8703 kg
16.6374 Liter
12.7980 Lembar
0.8220 kg
15.7144 Liter
12.0880 Lembar
0.9729 kg
18.6004 Liter
14.3080 Lembar
22.5000 kg
9.0000 kg
7.5000 lbr
4.6538 kg
0.9198 kg
5.4750 lbr
4 Buah
15 M1
1 Lonjor
1 Buah
6 Buah
1 Buah
12 Buah
0.144 M1
12 Lonjor
9 Buah
4 Buah
0.048 M1
4 Lonjor
3 Buah
4 Buah
0.048 M1
4 Lonjor
3 Buah
0.4174 m3
0.0759 Kg
0.4174 m3
0.0759 Kg
0.0078 m3
0.0022 m3
0.0400 Kg
38.9920 Zak
5.3141 m3
493.5696 Buah
29.2600 m3
5.3200 Kg
0.3942 m3
1.8250 Kg
1.8604 Zak
0.2536 m3
23.5500 Buah
0.8698 M3
28.6375 Lbr
2.3096 Kg
8.2. Rekapitulasi Kebutuhan Bahan
Material Alam
1 Air Tawar 1517.90 liter
2 Batu Kali Belah 15/20 21.424 m³
3 Balok kayu 5/7 2.394 m3
4 Balok kayu 8/12 0.417 m3
5 Besi Polos 2.835 kg
6 Dolken kayu galam Ø 8-10 / 4 m 11.220 batang
7 kawat beton 0.084 kg
8 Kayu Meranti 0.091 m3
9 Koral beton 3.89 m3
10 Minyak bekisting 0.56 liter
11 Paku 1.68 m3
12 pasir beton 2.45 m3
13 Pasir pasang 49.44 m3
14 Pasir urug 79.84 m3
15 Plywood tebal 9 mm 1.96 lbr
Lampiran Bar Bending Schedule ( Bestat )
HORIZONTAL
berat/ panjang jumlah total
ø besi
no skets m1 potongan potongan panjang
(m1) (kg) (m1) (bh) (m1)
0.319 0.663
0.12
0.662
total
0.319
0.12
0.06
total
0.06 0.06
9.6
total
berat/ panjang jumlah total
ø besi
no skets m1 potongan potongan panjang
(m1) (kg) (m1) (bh) (m1)
1.194 1.194
0.12 0.12
2.756
total
1.194
0.12
0.06
total
0.06 0.06
4.6
total
0.444 0.444
0.12 0.12
1.256
total
0.444
0.12
0.06
total
0.06 0.06
1.6
total
0.444 0.788
0.12
0.912
total
0.444
0.12
0.06
total
0.06 0.06
10.1
total
1.2565 1.2565
0.12 0.12
2.631
total
total
0.06 0.06
4.85
total
0.8815 0.8815
0.12 0.12
2.131
total
0.8815
0.12
0.06
total
0.06 0.06
3.35
total
sub total
VERTIKAL
berat/ panjang jumlah total
ø besi
no skets m1 potongan potongan panjang
(m1) (kg) (m1) (bh) (m1)
0.819 0.819
0.12 0.12
2.006
total
0.819
0.12
0.06
total
3 0.012 0.887 3.22 7.00 23
0.06 0.06
3.1
total
0.819 1.163
0.12
1.662
total
0.819
0.12
0.06
total
0.06 0.06
7.35
total
0.819 1.163
0.12
1.662
total
0.819
0.12
0.06
total
0.06 0.06
11.85
total
berat/ panjang jumlah total
ø besi
no skets m1 potongan potongan panjang
(m1) (kg) (m1) (bh) (m1)
0.819 0.819
0.12 0.12
2.006
total
0.819
0.12
0.06
total
0.06 0.06
3.1
total
0.12
2.162
total
1.069
0.12
0.06
total
0.06 0.06
6.1
total
1.069 1.069
0.12 0.12
2.506
total
1.069
0.12
0.06
total
0.06 0.06
4.1
total
0.444 0.444
0.12 0.12
1.256
total
0.444
0.12
0.06
total
0.06 0.06
1.6
total
0.444 0.788
0.12
0.912
total
0.444
0.12
0.06
total
0.6315
0.12
0.06
total
0.06 0.06
4.35
total
sub total
kg/m3
0.06 0.06
total
0.5
total
0.06 0.06
total
0.5
total
sub total
kg/m3
0.06
total
berat/ panjang jumlah total
ø besi
no skets m1 potongan potongan panjang
(m1) (kg) (m1) (bh) (m1)
total
sub total
kg/m3
total
0.11
2 0.010 0.620 0.64 3.00 2
0.16 0.16
0.05
0.11
total
total berat
total
0.11
2 0.010 0.620 0.64 3.00 2
0.16 0.16
0.05
0.11
total
total berat
2.788
1 0.012 0.887 3.148 4.00 13
0.12 0.12
0.06 0.06
total
0.11
2 0.010 0.620 0.64 3.00 2
0.16 0.16
0.05
0.11
total
total berat
2.288
1 0.012 0.887 2.648 4.00 11
0.12 0.12
0.06 0.06
total
0.11
2 0.010 0.620 0.64 3.00 2
0.16 0.16
0.05
0.11
total
total berat
1.538
1 0.012 0.887 1.898 4.00 8
0.12 0.12
0.06 0.06
total
0.11
2 0.010 0.620 0.64 3.00 2
0.16 0.16
0.05
0.11
total
total berat
4.788
1 0.012 0.887 5.148 4.00 21
0.12 0.12
0.06 0.06
total
0.11
2 0.010 0.620 0.64 3.00 2
0.16 0.16
0.05
0.11
total
total berat
3.788
1 0.012 0.887 4.148 4.00 17
0.12 0.12
0.06 0.06
total
0.11
2 0.010 0.620 0.64 3.00 2
0.16 0.16
0.05
0.11
total
total berat
11.64
1 0.012 0.887 12 4.00 48
0.12 0.12
0.06 0.06
total
0.11
2 0.010 0.620 0.64 3.00 2
0.16 0.16
0.05
0.11
total
total berat
3.938
1 0.012 0.887 4.298 4.00 18
0.12 0.12
0.06 0.06
total
0.11
2 0.010 0.620 0.64 3.00 2
0.16 0.16
0.05
0.11
total
total berat
sub total
kg/m3
VERTIKAL
berat/ panjang jumlah total
ø besi
no skets m1 potongan potongan panjang
(m1) (kg) (m1) (bh) (m1)
11.64
1 0.012 0.887 12 4.00 48
0.12 0.12
0.06 0.06
total
0.11
2 0.010 0.620 0.64 3.00 2
0.16 0.16
0.05
0.11
total
total berat
5.542
1 0.012 0.887 5.902 4.00 24
0.12 0.12
0.06 0.06
total
0.11
2 0.010 0.620 0.64 3.00 2
0.16 0.16
0.05
0.11
total
total berat
9.288
1 0.012 0.887 9.648 4.00 39
0.12 0.12
0.06 0.06
total
0.11
2 0.010 0.620 0.64 3.00 2
0.16 0.16
0.05
0.11
total
total berat
2.038
1 0.012 0.887 2.398 4.00 10
0.12 0.12
0.06 0.06
total
0.11
2 0.010 0.620 0.64 3.00 2
0.16 0.16
0.05
0.11
total
total berat
4.788
1 0.012 0.887 5.148 4.00 21
0.12 0.12
0.06 0.06
total
0.11
2 0.010 0.620 0.64 3.00 2
0.16 0.16
0.05
0.11
total
total berat
3.038
1 0.012 0.887 3.398 4.00 14
0.12 0.12
0.06 0.06
total
0.11
2 0.010 0.620 0.64 3.00 2
0.16 0.16
0.05
0.11
total
total berat
6.038
1 0.012 0.887 6.398 4.00 26
0.12 0.12
0.06 0.06
total
0.11
2 0.010 0.620 0.64 3.00 2
0.16 0.16
0.05
0.11
total
total berat
sub total
sub total berat sloof
kg/m3
Sub total Kg/m3
KOLOM 15/15
berat/ panjang jumlah total
ø besi
no skets m1 potongan potongan panjang
(m1) (kg) (m1) (bh) (m1)
5.994
0.18
total
0.11 0.11
0.11
total
Total berat
kg/m3
KOLOM 20/20
berat/ panjang jumlah total
ø besi
no skets m1 potongan potongan panjang
(m1) (kg) (m1) (bh) (m1)
5.994
0.18
total
0.16 0.16
0.16
total
Total berat
kg/m3
KOLOM 20/30
berat/ panjang jumlah total
ø besi
no skets m1 potongan potongan panjang
(m1) (kg) (m1) (bh) (m1)
5.994
0.18
total
berat/ panjang jumlah total
ø besi
no skets m1 potongan potongan panjang
(m1) (kg) (m1) (bh) (m1)
0.16
2 0.010 0.620 0.84 6.00 6
0.26 0.26
0.16
total
Total berat
kg/m3
KOLOM 15/15
berat/ panjang jumlah total
ø besi
no skets m1 potongan potongan panjang
(m1) (kg) (m1) (bh) (m1)
0.18
1 0.012 0.887 2.41 68.00 164
2.23
total
0.11 0.11
0.11
total
Total berat
kg/m3
KOLOM 20/20
berat/ panjang jumlah total
ø besi
no skets m1 potongan potongan panjang
no skets
(m1) (kg) (m1) (bh) (m1)
0.18
1 0.012 0.887 2.41 32.00 78
2.23
total
berat/ panjang jumlah total
ø besi
no skets m1 potongan potongan panjang
(m1) (kg) (m1) (bh) (m1)
0.16 0.16
0.16
total
Total berat
kg/m3
KOLOM 20/30
berat/ panjang jumlah total
ø besi
no skets m1 potongan potongan panjang
(m1) (kg) (m1) (bh) (m1)
0.18
1 0.012 0.887 2.41 6.00 15
2.23
total
0.16
2 0.010 0.620 0.84 3.00 3
0.26 0.26
0.16
total
Total berat
kg/m3
0.819 1.163
0.12
1.662
total
1.038
0.943
total
0.819
0.12
1.787
total
9.6
0.06 0.06
total
0.14
5 0.010 0.620 0.760 30.00 23.00
0.24 0.24
0.14
total
0.819 1.163
0.12
1.662
total
1.038
0.943
total
berat/ panjang jumlah total
ø besi
no skets m1 potongan potongan panjang
(m1) (kg) (m1) (bh) (m1)
0.819
0.12
1.787
total
9.6
0.06 0.06
total
0.14
5 0.010 0.620 0.760 30.00 23.00
0.24 0.24
0.14
total
1.194 1.538
0.12
2.412
total
berat/ panjang jumlah total
ø besi
no skets m1 potongan potongan panjang
(m1) (kg) (m1) (bh) (m1)
1.163
2.481
total
3 0.012 0.887 1.101 2.00 3
0.444
0.12
0.537
total
10.1
0.06 0.06
total
0.24 0.24
0.14
total
0.444 0.444
0.12 0.12
1.256
total
1.6
0.06 0.06
total
0.14
5 0.010 0.620 0.760 9.00 7.00
0.24 0.24
0.14
total
berat/ panjang jumlah total
ø besi
no skets m1 potongan potongan panjang
(m1) (kg) (m1) (bh) (m1)
0.319 0.319
0.12 0.12
1.006
total
1.1
0.06 0.06
total
0.14
5 0.010 0.620 0.760 6.00 5.00
0.24 0.24
0.14
total
0.444 0.444
0.12 0.12
1.256
total
berat/ panjang jumlah total
ø besi
no skets m1 potongan potongan panjang
(m1) (kg) (m1) (bh) (m1)
1.6
0.06 0.06
total
0.14
5 0.010 0.620 0.760 9.00 7.00
0.24 0.24
0.14
total
0.7565 0.7565
0.12 0.12
1.881
total
total
berat/ panjang jumlah total
ø besi
no skets m1 potongan potongan panjang
(m1) (kg) (m1) (bh) (m1)
0.14
5 0.010 0.620 0.760 12.00 10.00
0.24 0.24
0.14
total
1.2565 1.2565
0.12 0.12
0.881
total
4.85
0.06 0.06
total
0.14
5 0.010 0.620 0.760 11.00 9.00
0.24 0.24
0.14
total
berat/ panjang jumlah total
ø besi
no skets m1 potongan potongan panjang
(m1) (kg) (m1) (bh) (m1)
0.8815 0.8815
0.12 0.12
2.131
total
3.35
0.06 0.06
total
0.14
5 0.010 0.620 0.760 14.00 11.00
0.24 0.24
0.14
total
bTotal berat
2 VERTIKAL
berat/ panjang jumlah total
ø besi
no skets m1 potongan potongan panjang
(m1) (kg) (m1) (bh) (m1)
0.819 1.163
0.12
3.162
total
2 0.012 0.887 3.22 4.00 13
3.1
0.06 0.06
total
0.14
5 0.010 0.620 0.760 11.00 9.00
0.24 0.24
0.14
total
1.0065
0.12
2.2245
total
3.85
0.06 0.06
total
0.14
5 0.010 0.620 0.760 7.00 6.00
0.24 0.24
0.14
total
0.5065 0.8505
0.12
1.037
total
1.85
0.06 0.06
total
0.24 0.24
0.14
total
0.444
0.12
0.8495
total
total
0.14
5 0.010 0.620 0.760 7.00 6.00
0.24 0.24
0.14
total
0.819 0.819
0.12 0.12
2.006
total
3.1
0.06 0.06
total
0.14
5 0.010 0.620 0.760 11.00 9.00
0.24 0.24
0.14
total
0.444 0.788
0.12
0.912
total
1.6
0.06 0.06
total
0.14
5 0.010 0.620 0.760 6.00 5.00
0.24 0.24
0.14
total
0.569
0.12
1.287
total
2.1
0.06 0.06
total
0.24 0.24
0.14
total
0.819 1.163
0.12
1.662
total
3.1
0.06 0.06
total
0.14
5 0.010 0.620 0.760 9.00 7.00
0.24 0.24
0.14
total
berat/ panjang jumlah total
ø besi
no skets m1 potongan potongan panjang
(m1) (kg) (m1) (bh) (m1)
0.569
0.12
0.912
total
2.1
0.06 0.06
total
0.14
5 0.010 0.620 0.760 6.00 5.00
0.24 0.24
0.14
total
0.569 0.569
0.12 0.12
1.506
total
berat/ panjang jumlah total
ø besi
no skets m1 potongan potongan panjang
(m1) (kg) (m1) (bh) (m1)
total
0.14
5 0.010 0.620 0.760 6.00 5.00
0.24 0.24
0.14
total
0.819 1.163
0.12
1.662
total
3.1
0.06 0.06
total
berat/ panjang jumlah total
ø besi
no skets m1 potongan potongan panjang
(m1) (kg) (m1) (bh) (m1)
0.14
5 0.010 0.620 0.760 9.00 7.00
0.24 0.24
0.14
total
0.7245
total
1.85
0.06 0.06
total
0.14
5 0.010 0.620 0.760 6.00 5.00
0.24 0.24
0.14
total
0.6315 0.9755
0.12
1.287
total
2.35
0.06 0.06
total
0.14
5 0.010 0.620 0.760 7.00 6.00
0.24 0.24
0.14
total
0.444
0.12
0.7245
total
berat/ panjang jumlah total
ø besi
no skets m1 potongan potongan panjang
(m1) (kg) (m1) (bh) (m1)
1.6
0.06 0.06
total
0.14
5 0.010 0.620 0.760 5.00 4.00
0.24 0.24
0.14
total
0.444 0.444
0.12 0.12
1.256
total
1.6
0.06 0.06
total
berat/ panjang jumlah total
ø besi
no skets m1 potongan potongan panjang
(m1) (kg) (m1) (bh) (m1)
0.14
5 0.010 0.620 0.760 5.00 4.00
0.24 0.24
0.14
total
1
0.012 0.887 2.8 2.00 6
0.3 0.3
0 0
1.4
total
1.6
0.06 0.06
total
0.14
5 0.010 0.620 0.760 5.00 4.00
0.24 0.24
0.14
total
total berat
sub total
kg/m3
0.819 1.163
0.12
1.662
total
1.038
0.943
total
0.819
0.12
1.787
total
berat/ panjang jumlah total
ø besi
no skets m1 potongan potongan panjang
(m1) (kg) (m1) (bh) (m1)
9.6
0.06 0.06
total
0.14
5 0.010 0.620 0.760 30.00 23.00
0.24 0.24
0.14
total
0.819 1.163
0.12
1.662
total
1.038
0.943
total
berat/ panjang jumlah total
ø besi
no skets m1 potongan potongan panjang
(m1) (kg) (m1) (bh) (m1)
1.787
total
9.6
0.06 0.06
total
0.14
5 0.010 0.620 0.760 30.00 23.00
0.24 0.24
0.14
total
1.194 1.538
0.12
2.412
total
berat/ panjang jumlah total
ø besi
no skets m1 potongan potongan panjang
(m1) (kg) (m1) (bh) (m1)
1.163
2.481
total
0.444
0.12
0.537
total
10.1
0.06 0.06
total
0.24 0.24
0.14
total
0.444 0.444
0.12 0.12
1.256
total
1.6
0.06 0.06
total
0.14
5 0.010 0.620 0.760 9.00 7.00
0.24 0.24
0.14
total
berat/ panjang jumlah total
ø besi
no skets m1 potongan potongan panjang
(m1) (kg) (m1) (bh) (m1)
0.319 0.319
0.12 0.12
1.006
total
1.1
0.06 0.06
total
0.14
5 0.010 0.620 0.760 6.00 5.00
0.24 0.24
0.14
total
0.444 0.444
0.12 0.12
1.256
total
berat/ panjang jumlah total
ø besi
no skets m1 potongan potongan panjang
(m1) (kg) (m1) (bh) (m1)
1.6
0.06 0.06
total
0.14
5 0.010 0.620 0.760 9.00 7.00
0.24 0.24
0.14
total
0.7565 0.7565
0.12 0.12
1.881
total
2.85
0.06 0.06
total
berat/ panjang jumlah total
ø besi
no skets m1 potongan potongan panjang
(m1) (kg) (m1) (bh) (m1)
0.14
5 0.010 0.620 0.760 12.00 10.00
0.24 0.24
0.14
total
1.2565 1.2565
0.12 0.12
0.881
total
4.85
0.06 0.06
total
0.14
5 0.010 0.620 0.760 11.00 9.00
0.24 0.24
0.14
total
0.8815 0.8815
0.12 0.12
2.131
total
3.35
0.06 0.06
total
0.14
5 0.010 0.620 0.760 14.00 11.00
0.24 0.24
0.14
total
bTotal berat
blk vertikal
berat/ panjang jumlah total
ø besi
no skets m1 potongan potongan panjang
(m1) (kg) (m1) (bh) (m1)
0.819 1.163
0.12
3.162
total
3.1
0.06 0.06
total
0.14
5 0.010 0.620 0.760 11.00 9.00
0.24 0.24
0.14
total
1.0065
0.12
2.2245
total
3.85
0.06 0.06
total
0.14
5 0.010 0.620 0.760 7.00 6.00
0.24 0.24
0.14
total
0.5065 0.8505
0.12
1.037
total
1.85
0.06 0.06
total
0.24 0.24
0.14
total
0.444
0.12
0.8495
total
2 0.012 0.887 1.72 4.00 7
1.6
0.06 0.06
total
0.14
5 0.010 0.620 0.760 7.00 6.00
0.24 0.24
0.14
total
0.819 0.819
0.12 0.12
2.006
total
3.1
0.06 0.06
total
0.14
5 0.010 0.620 0.760 11.00 9.00
0.24 0.24
0.14
total
0.444 0.788
0.12
0.912
total
1.6
0.06 0.06
total
0.14
5 0.010 0.620 0.760 6.00 5.00
0.24 0.24
0.14
total
0.569
0.12
1.287
total
2.1
0.06 0.06
total
0.24 0.24
0.14
total
0.819 1.163
0.12
1.662
total
3.1
0.06 0.06
total
0.14
5 0.010 0.620 0.760 9.00 7.00
0.24 0.24
0.14
total
berat/ panjang jumlah total
ø besi
no skets m1 potongan potongan panjang
(m1) (kg) (m1) (bh) (m1)
0.569
0.12
0.912
total
2.1
0.06 0.06
total
0.14
5 0.010 0.620 0.760 6.00 5.00
0.24 0.24
0.14
total
0.569 0.569
0.12 0.12
1.506
total
berat/ panjang jumlah total
ø besi
no skets m1 potongan potongan panjang
(m1) (kg) (m1) (bh) (m1)
total
0.14
5 0.010 0.620 0.760 6.00 5.00
0.24 0.24
0.14
total
0.819 1.163
0.12
1.662
total
3.1
0.06 0.06
total
berat/ panjang jumlah total
ø besi
no skets m1 potongan potongan panjang
(m1) (kg) (m1) (bh) (m1)
0.14
5 0.010 0.620 0.760 9.00 7.00
0.24 0.24
0.14
total
0.7245
total
1.85
0.06 0.06
total
0.14
5 0.010 0.620 0.760 6.00 5.00
0.24 0.24
0.14
total
0.6315 0.9755
0.12
1.287
total
2.35
0.06 0.06
total
0.14
5 0.010 0.620 0.760 7.00 6.00
0.24 0.24
0.14
total
0.444
0.12
0.7245
total
berat/ panjang jumlah total
ø besi
no skets m1 potongan potongan panjang
(m1) (kg) (m1) (bh) (m1)
1.6
0.06 0.06
total
0.14
5 0.010 0.620 0.760 5.00 4.00
0.24 0.24
0.14
total
0.444 0.444
0.12 0.12
1.256
total
1.6
0.06 0.06
total
berat/ panjang jumlah total
ø besi
no skets m1 potongan potongan panjang
(m1) (kg) (m1) (bh) (m1)
0.14
5 0.010 0.620 0.760 5.00 4.00
0.24 0.24
0.14
total
1
0.012 0.887 2.8 2.00 6
0.3 0.3
0 0
1.4
total
1.6
0.06 0.06
total
0.14
5 0.010 0.620 0.760 5.00 4.00
0.24 0.24
0.14
total
total berat
sub total
kg/m3
BESTAT TANGGA
0.06
2 PLAT TANGGA BAWAH 2
0.06
0.012 0.887 2.97 60 179
2.85
0.06
3 TULANGAN MELINTANG
1.2
0.01 0.617 1.2 116 140
4 TULANGAN BORDES
1.85
0.012 0.887 1.97 20 40
0.06 0.06
5 TULANGAN MELINTANG BORDES
2.2
0.01 0.617 2.2 24 53
berat/ panjang jumlah total
ø besi
no skets m1 potongan potongan panjang
(m1) (kg) (m1) (bh) (m1)
6
0.235 0.008 0.395 0.59 160 95
0.04
0.275
0.04
7
0.06
0.012 0.887 0.345 60 21
0.225
0.06
8
0.06
0.012 0.887 0.345 60 21
0.225
0.06
total
kg/m3
berat keb. Keb. sisa koefisien
jumlah
besi besi besi besi/m3
(kg)
15.079
15.079
9.757
9.757
9.757
11.531
11.531
11.531
7.983
7.983
10.644
10.644
7.983
7.983
311.34 sub total 82
6.209
6.209
6.21 3.727 3 0.727 2.340 3.00
6.209
7.983
7.983
12.418
12.418
12.418
berat keb. Keb. sisa koefisien
jumlah
besi besi besi besi/m3
(kg)
9.757
9.757
9.757
6.209
6.209
2.661
2.661
5.322
5.322
7.983
7.983
110.875
110.875
7.983
340.608
4.00 sub total 1.780 4.00
183.609
berat
(kg)
45.195
45.195
228.804
104.00
3.548
1.86
10.816
3.548
1.86
5.408
3.548
1.86
5.408
3.548
1.86 18.750 18 0.750 0.480 1.00
1.86
5.408
3.548
1.86
5.408
3.548
3.548
1.86
5.408
3.548
1.86
5.408
3.548
1.86
5.408
3.548
3.548
1.86
5.408
3.548
3.548
1.86
5.408
3.548
1.86
5.408
3.548
1.86
5.408 Sub total 15.030 26.000
43.264
97.344
26.00
55.00
63.864
56.768
29.76
86.53
67.00 Sub total 6.306 67.000
3.72
14.36 Sub total 6.066 13.000
13.00
60.316
31.62
91.94
19.00 Sub total 2.480 19.000
28.384
berat keb. Keb. sisa koefisien
jumlah
besi besi besi besi/m3
(kg)
6.82
35.20 Sub total 2.840 9.000
9.00
5.322
1.774
1.774
1.774
3.548
18.600
1.774
1.774
berat keb. Keb. sisa koefisien
jumlah
besi besi besi besi/m3
(kg)
3.548
14.260
1.774
berat keb. Keb. sisa koefisien
jumlah
besi besi besi besi/m3
(kg)
1.774
1.77 10.899 10 0.899 0.990 1.00
1.774
3.548
15.500
3.548
4.340
berat keb. Keb. sisa koefisien
jumlah
besi besi besi besi/m3
(kg)
1.774
3.548
1.774
berat keb. Keb. sisa koefisien
jumlah
besi besi besi besi/m3
(kg)
3.548
4.340
1.774
6.200
1.774
3.548
5.580
berat keb. Keb. sisa koefisien
jumlah
besi besi besi besi/m3
(kg)
1.774
3.548
1.774
3.55 3.727 3 0.727 2.340 2.00
3.548
5.580
1.774
3.548
1.774
3.548
3.100
1.774
3.720
1.774
3.548
1.774
3.548
3.100
1.774
3.100
1.774
3.548
4.340
berat keb. Keb. sisa koefisien
jumlah
besi besi besi besi/m3
(kg)
1.774
3.548
3.100
1.774
berat keb. Keb. sisa koefisien
jumlah
besi besi besi besi/m3
(kg)
3.100
1.774
3.548
berat keb. Keb. sisa koefisien
jumlah
besi besi besi besi/m3
(kg)
4.340
3.548
3.100
1.774
3.720
1.774
berat keb. Keb. sisa koefisien
jumlah
besi besi besi besi/m3
(kg)
3.548
2.480
3.55
3.548
berat keb. Keb. sisa koefisien
jumlah
besi besi besi besi/m3
(kg)
2.480
1.774
3.548
1.774
1.774
1.774
berat keb. Keb. sisa koefisien
jumlah
besi besi besi besi/m3
(kg)
3.548
18.600
1.774
1.774
berat keb. Keb. sisa koefisien
jumlah
besi besi besi besi/m3
(kg)
3.548
14.260
1.774
berat keb. Keb. sisa koefisien
jumlah
besi besi besi besi/m3
(kg)
1.774
3.548
15.500
3.548
4.340
berat keb. Keb. sisa koefisien
jumlah
besi besi besi besi/m3
(kg)
1.774
3.548
1.774
berat keb. Keb. sisa koefisien
jumlah
besi besi besi besi/m3
(kg)
3.548
4.340
3.548
berat keb. Keb. sisa koefisien
jumlah
besi besi besi besi/m3
(kg)
6.200
1.774
3.548
1.774
3.548
3.548
5.580
1.774
3.548
1.774
3.548
3.100
1.774
3.55 6.977 6 0.977 1.680 1.00
3.548
3.720
1.774
3.548
1.774
3.548
3.100
1.774
3.100
1.774
3.548
4.340
berat keb. Keb. sisa koefisien
jumlah
besi besi besi besi/m3
(kg)
1.774
3.548
3.100
1.774
berat keb. Keb. sisa koefisien
jumlah
besi besi besi besi/m3
(kg)
3.100
1.774
3.548
berat keb. Keb. sisa koefisien
jumlah
besi besi besi besi/m3
(kg)
4.340
3.548
3.100
1.774
3.720
1.774
berat keb. Keb. sisa koefisien
jumlah
besi besi besi besi/m3
(kg)
3.548
2.480
3.55
3.548
berat keb. Keb. sisa koefisien
jumlah
besi besi besi besi/m3
(kg)
2.480
1.774
3.548
37.525
18.6270
Sketsa
Sketsa
Sketsa
Menghitung Koefisien Satuan
Kusen 0.04 m³
Daun Pintu 2 m³
Engsel 3 buah
Handle + Kunci 1 buah
Grendel 1 buah