A PEKERJAAN PERSIAPAN
1. Pembersihan Lokasi
panjang = 15 m
12 m
lebar = 12 m
L = 15 x 12
2
180 1 180 m
15 m
L = 10 x 12
2
120 1 120 m
12 m
b. Luas Lantai 2
panjang = 10 m
10 m
lebar = 12 m
L = 10 x 12
120 1 120 m2
12 m
c. Pemasangan Bowplank
panjang = 10 m
10 m
lebar = 12 m
keliling = 2 x ( 10 + 12 ) 1 44 m2
12 m
3. Direksi Keet
panjang = 3 m
3m
lebar = 3 m
L=3x3
3m 3m =9 1 24 m2
0.8m
Volume galian
1.05 x 50.2 = 52.71 m 3 1 52.71 m3
Panjang galian tanah pondasi
0.05 0.2
52.71 m 3
1m
luas urugan
1.05 m
batu kali
3. Pondasi Footplate
jumlah footplate= 15
1.8 m
0 15 buah
0.15 0.1
5. Galian footplate
Luas galian
0.75 m
2
0.75 x 1 = 0.75 m
Volume galian
1m
0.75 x 1 = 0.75 m 3
15 11.25 m3
1m
3
6. Perhitungan footplate
Luas footplate
L1 = (( 0.15 + 1 ) / 2 ) x 0.1 2
= 0.144 m 2 2
Volume 2
2 m
0.144 x 1=0.144 m 3
0.25
2m
15 2.16 m3
urugan
1.55 m
Urugan
Volume urugan
V = (1.65+1.55)/2)x0.43
0.15 0.1
Poer
= 0.688 x 1 x 2
= 1.38 m 3 15 20.64 m3
1m
Volume urugan
0.07 x 97 1 6.8 m3
C PEKERJAAN PASANGAN
1. Pasangan Batu Kosong
tinggi pasangan = 0.2 m
lebar pasangan = 1 m
panjang pasangan = 50.2 m
volume pasangan
V = 0.2 x 1 x 50.2
=10.04 m 3 1 149.58 m3
2. Pasangan Batu kali
total lt 1 + lt 2 =816.46 m 2
2
pengurangan kusen= 22.6 m
pengurangan trasram= 101.67 m 2
5. Plesteran Transram
Luas transram keseluruhan
L = 101.67m 2 1 101.67 m2
c. Pintu tunggal
lebar = 0.86 m
tinggi = 2.09 m
2.09 m
tebal = 0.035 m
V = 0.86 x 2.09 x 0.035
0.86 m = 0.07 m 3 9 6.3 m3
d. Pintu Tunggal
lebar = 0.7 m
tinggi = 2.09 m
2.09 m
tebal = 0.035 m
V = 0.7 x 2.09 x 0.035
0.7 m = 0.06 m 3 4 0.24 m3
d. Pintu Garasi
lebar = 3,2 m
tinggi = 2.56 m
tebal = 0.035 m
2.56 m
3,2 m
2. Daun Jendela
a. jendela tunggal
lebar = 0.54 m
tinggi = 1.9 m
1.9 m
V = 0.54 x 1.9
0.54 m pengurangan kaca 8 1.5104 m3
= 1.026-0.8372
0.188 m2
b. jendela tunggal
lebar = 1.27 m
tinggi = 0.23 m
0.23 m
V = 1.27 x 0.23 3
2. Kaca Jendela
a. Jendela tunggal
lebar = 0.46 m
tinggi = 1.82m
1.82m
V = 0.46 x 1.82
0.46 m = 0.8372m 3 8 6.6976 m3
b. Jendela Tunggal
lebar = 1.19 m
tinggi = 0.15 m
0.15 m
V = 1.19 x 0.15
1.19 m
= 0.1785 m3 1 0.1785 m3
3. Kusen Pintu
a. Pintu Ganda
0.15 0.15
lebar = 0.06 m 2 0.28026 m3
0.06
tebal = 0.15 m
panjang = 5.82 m
2.36
V = 0.06 x 0.15 x 5.82
= 0.06 m 3
1.89
0.06 0.06
c. Pintu Tunggal
0.15 0.15 0.06 lebar = 0.06 m 9 0.45 m3
tebal = 0.15 m
panjang = 5.46 m
2.09 m
tebal = 0.15 m
2.09 m
panjang = 5.3 m
V = 0.06 x 0.15 x 5.3
= 0.048 m 3
0.7 m
0.06 0.06
4. Kusen Jendela
a. Jendela Tunggal
0.15 0.15 lebar = 0.06 m 1 0.325 m3
0.06
tebal = 0.15 m
panjang = 3.61 m
0.23 m
= 0.325 m 3
1.27 m
0.06 0.06
b. Jendela Tunggal
0.15 0.15
lebar = 0.06 m 8 0.15 m3
0.06
tebal = 0.15 m
0.23 m
panjang = 2.08 m
V = 0.06 x 0.15 x 2.08
0.06
= 0.187 m 3
0.54 3
0.06 0.06
E PEKERJAAN BETON
1. Perhitungan footplate
Luas footplate
L1 = (( 0.15 + 1 ) / 2 ) x 0.1 2
= 0.144 m 2 2
Volume 2
0.144 x 1=0.144 m 3
2 m
0.25
2m 15 2.16 m3
2. sloof
panjang = 96.2 m V = 0.2 x 0.15 x 96.2 2.886 m3
lebar = 0.15m =2.886m 3 1
tinggi = 0.2 m
a. bekisting (19.24x2)+(14.43+2) 67.34 m3
3. Balok Ring
panjang = 277 m V = 0.15 x 0.2 x 36
tinggi = 0.20 m = 1.08 m 3 1 1.08 m3
lebar = 0.15 m
a. bekisting (5.4 x 2)+(7.2 x 2) 36 m2
4. KOLOM
a.Kolom Praktis 15x15 lt 1
panjang = 0.15 m V = 0.15 x 0.15 x 3.35
lebar = 0.15 m v = 0.075 m 3 18 1.356 m3
tinggi = 3.35 m
a. bekisting (0.5025x4) 37.8
b. Kolom 15x15 lt 1
panjang = 0.15 m V = 0.15 x 0.15 x 4.72
lebar = 0.15 m v = 0.1062 m3 14 1.4868 m3
tinggi = 4.72 m
a. bekisting (0.705x2) 39.48 m2
a.Kolom 15x30 lt 1
panjang = 0.15 m V = 0.15 x0.30 x 3.35
lebar = 0.30 m v = 0.150 m 3 16 2.41 m3
tinggi = 3.35 m
a. bekisting (0.15x3.35x2)+(0.3x3.35x2) 48.24 m2
b. Kolom 15x30lt 2
panjang = 0.15 m V = 0.15 x 0.30 x 4.72
3
lebar = 0.30 m v = 0.212 m 3 13 2.76 m3
tinggi = 4.72 m
a. bekisting (0.15x3.35x2)+(0.3x4.72x2) 55.224 m2
5. Balo Induk
panjang = 63.5 m V = 0.4 x 0.25 x 63.5
lebar = 0.4 m = 6.35 m 3 1 6.35 m3
tinggi = 0.25m
a. bekisting (0.25x63.5x2)+(0.4x63.5x2) 82.55 m2
6. Balok Anak
panjang = 27.5 m V = 0.3 x 0.15 x 27.5 1.24 m3
lebar = 0.3 m = 1.24 m 3 1
tinggi = 0.15
a. bekisting (0.3x27.5x2)+(0.15x27.5x2) 24.75 m2
7. Tangga
Tinggi tiap lantai = 3.5 m Volume plat tangga
Tebal plat = 0.12 m V = 0.12 x 0.9x 6 0.648 m3
Lebar Tangga = 0.9 m = 0.648 m 3
Jumlah anak tangga = 18 buah
Lebar anak tangga = 0.3 m Volume Bordes
Tinggi anak tangga = 0.2 m V = 0.12 x 0.9 x2 0.216 m3
= 0.216 m 3 1
Balok Tangga
V = 0.2 x 0.2 x 6 0.24 m3
= 0.24 1
8. Plat Lantai
tebal plat = 0.12 m V = 0.12 x 98.86
Luas lantai = 98.86 m 2
= 11.86 m 3 1 11.86 m3
a.bekisting 98.86 98.86 m2
F PASANGAN TEGEL
1. Lantai Keramik ( 40 x 40 ) cm
a. Lantai 1
luas lantai = 92,95 m 2 L = 92,95 m 2 1
92.95 m2
b. Lantai 2 L = 82,32 m
luas lantai =82.32 m 2 1
82.32 m2
2. Lantai Keramik ( 30 x 30 ) cm
a. Lantai 1 dan 2 L = 3,96+16,54
luas lantai = 3,96+16,54=20,5 = 20,5 m2 1
20.5 m2
G PEKERJAAN ATAP
2. Pemasangan usuk
Panjang = 40 m L = (2.6+9)/2)x6.45 = 37.41 m 2
5. Pemasangan Plafon
Lantai 1 Luas = 96.91 m 2
1 96.91 m2
Lantai 2 Luas = 98.86 m 2
1 98.86 m2
No Jenis Pekerjaan Uraian Perhitungan Banyak Total Satuan
H PEKERJAAN PENGECETAN
1. Pengecetan Tembok Luas tembok = 692.19 m 2
2 1384.38 m2
I PEKERJAAN GANTUNGAN
1. Pemasangan Engsel Pintu Tiap daun pintu 3 engsel 21 63 buah
HARGA 2021
Kode Nama Tenaga / Barang Satuan PROFIT
datar
1 2 3 4 5
TENAGA
1 Tukang batu/cat Org 82,000.00
2 Tukang kayu Org 82,000.00
3 Tukang besi Org 82,000.00
4 Pekerja Org 80,500.00
5 Kepala Tukang Org 85,000.00
6 Mandor Org 87,000.00
2. 2. BAHAN MATERIAL
2. 2. BAHAN BANGUNAN
2. 2. 1. BAHAN ALAM: PASIR, BATU, KERIKIL, BATA, ASPAL, SEMEN
2. 2. 1. 6 Batu andesit bakar M2 165,000.00
2. 2. 1. 14 Batu Bata / Merah Bj 600.00
2. 2. 1. 32 Batu pecah 2-3 cm M3 175,000.00
2. 2. 1. 36 Batu pecah 10-15 cm (15-20) M3 130,000.00
2. 2. 1. 50 Pasir pasang / beton M3 160,000.00
2. 2. 1. 51 Pasir Urug M3 100,000.00
2. 2. 1. 52 PC / Portland cement Kg 1,050.00
2. 2. 1. 54 Semen Putih / warna Kg 2,100.00
2. 2. 1. 62 Tanah urug M3 50,000.00
1
2. 2. 4. 10 Besi Beugel/Baut Kg 19,000.00
2. 2. 4. 30 Kawat Beton / bendraat Bh 11,000.00
2. 2. 4. 36 Kisi - kisi almunium Unit 415,000.00
2. 2. 4. 50 Pintu aluminium coklat / hitam 4" ( 2 sisi ) M2/Psg 765,000.00 780,300.00
2. 2. 4. 105 Teralis Besi M2 240,000.00
2. 2. 8. BAHAN SANITAIR :
2. 2. 8. 1 Avor plastik / floor drain Bh 11,000.00
2. 2. 8. 30 Kran Dia 1/2 " Bh 32,500.00
2. 2. 8. 31 Kran Dia 3/4 " Bh 36,500.00
2. 2. 8. 57 PVC AW Dia 0.5 " ( abu - abu ) M' / bhn 4,500.00
2. 2. 8. 58 PVC AW Dia 0.75 " ( abu - abu ) M' / bhn 6,300.00
2. 2. 8. 59 PVC AW Dia 1 " ( abu - abu ) M' / bhn 10,100.00
2. 2. 8. 61 PVC AW Dia 1,5 " ( abu - abu ) M' / bhn 16,140.00
2
2. 2. 8. 64 PVC AW Dia 3 " ( abu - abu ) M' / bhn 48,000.00
2. 2. 8. 65 PVC AW Dia 4 " ( abu - abu ) M' / bhn 63,000.00
2. 2. 8. 124 Tandon Air fiberglass ex.Grand Kap.1.100 Ltr (Profil Tank) Bh 1,500,000.00 1,545,000.00
2. 2. 8. 125 Tandon Air Fiberglass ex.Grand Kap.800 Ltr (Profil Tank) Bh 1,220,000.00 1,256,600.00
2. 2. 8. 126 Tandon air stainlees steel kap. 1.000 ltr Bh 2,750,000.00 2,832,500.00
2. 2. 8. 127 Tandon air stainlees steel kap. 550 ltr Bh 1,650,000.00 1,699,500.00
2. 2. 8. 137 Urinoir Bh 950,000.00 978,500.00
3
ANALISA HARGA SATUAN PEKERJAAN
(koefisien tetap)
A.2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN
A.2.2.1.1 Pembuatan 1m2 pagar sementara dari kayu tinggi 2 meter
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
( Rp) ( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 0.400 80,500.00 32,200.00
Tukang Kayu L.02 OH 0.200 82,000.00 16,400.00
Kepala Tukang L.03 OH 0.020 85,000.00 1,700.00
Mandor L.04 OH 0.020 87,000.00 1,740.00
JUMLAH TENAGA KERJA 52,040.00
B BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 251,356.00
E Overhead & Profit ( maks 14 % ) 5%xD 7,540.68
F Harga Satuan Pekerja (D + E ) 258,896.68
A.2.2.1.2 Pembuatan 1m2 pagar sementara dari Seng Gelombang Bjls 30 uk 180x90x0,03 cm tinggi 2 meter
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
( Rp) ( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 0.400 80,500.00 32,200.00
Tukang Kayu L.02 OH 0.200 82,000.00 16,400.00
Kepala Tukang L.03 OH 0.020 85,000.00 1,700.00
Mandor L.04 OH 0.020 87,000.00 1,740.00
JUMLAH TENAGA KERJA 52,040.00
B BAHAN
Dolken Kayu jati lokal dia 10cm -15 cm, pjg = 3 m Batang 1.250 0.00 -
PC / Portland cement Kg 2.500 1,050.00 2,625.00
Seng Gelombang Bjls 30 uk 180x90x0,03 cm Lbr 1.200 0.00 -
Pasir pasang / beton m3 0.005 160,000.00 800.00
Batu pecah 2-3 cm m3 0.009 175,000.00 1,575.00
Kayu Tahun Balok ( Mauni/ Akasia ) m3 0.072 2,650,000.00 190,800.00
Paku biasa Kg 0.060 14,850.00 891.00
Meni besi Liter 0.450 34,700.00 15,615.00
JUMLAH HARGA BAHAN 212,306.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 264,346.00
E Overhead & Profit ( maks 14 % ) 5%xD 7,930.38
F Harga Satuan Pekerja (D + E ) 272,276.38
B BAHAN
Dolken Kayu jati lokal dia 10cm -15 cm, pjg = 3 m m3 0.120 0.00 -
Paku biasa Kg 0.020 14,850.00 297.00
Kayu bekisting m3 0.007 1,950,000.00 13,650.00
JUMLAH HARGA BAHAN 13,947.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 31,482.00
E Overhead & Profit ( maks 14 % ) 5%xD 944.46
F Harga Satuan Pekerja (D + E ) 32,426.46
B BAHAN
Dolken Kayu jati lokal dia 10cm -15 cm, pjg = 3 m Batang 1.250 0.00 -
Kayu Tahun Balok ( Mauni/ Akasia ) m3 0.180 2,650,000.00 477,000.00
Paku biasa Kg 0.080 14,850.00 1,188.00
Besi plat strip / Strip plate Kg 1.100 0.00 -
PC / Portland cement Kg 35.000 1,050.00 36,750.00
Pasir pasang / beton m3 0.150 160,000.00 24,000.00
Pasir pasang / beton m3 0.100 160,000.00 16,000.00
Batu pecah 2-3 cm 1 m3 0.150 175,000.00 26,250.00
Batu Bata / Merah bh 30.000 600.00 18,000.00
Seng Plat BJLS 30 lebar 0,90 m lbr 0.250 0.00 -
Naco (Kerangka dan Daun ) bh 0.200 0.00 -
Kaca Bening t= 5 mm m2 0.080 105,000.00 8,400.00
Slot ( Kunci-kunci pintu ) lokal bh 0.150 0.00 -
Tripleks 122 x 244 tbl = 4 mm lbr 0.060 79,000.00 4,740.00
JUMLAH HARGA BAHAN 612,328.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 1,049,178.00
E Overhead & Profit ( maks 14 % ) 5%xD 31,475.34
F Harga Satuan Pekerja (D + E ) 1,080,653.34
A.2.3.1 HARGA SATUAN PEKERJAAN TANAH
A.2.3.1.1 Pengalian Tanah 1m3 tanah biasa sedalam 1 m
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
( Rp) ( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 0.750 80,500.00 60,375.00
Mandor L.04 OH 0.025 87,000.00 2,175.00
JUMLAH TENAGA KERJA 62,550.00
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 62,550.00
E Overhead & Profit 0.03 1,876.50
F Harga Satuan Pekerja (D + E ) 64,426.50
A.2.3.1.9 Pengurugan Kembali 1m3 galian tanah
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
( Rp) ( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 0.500 80,500.00 40,250.00
Mandor L.04 OH 0.050 87,000.00 4,350.00
JUMLAH TENAGA KERJA 44,600.00
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 44,600.00
E Overhead & Profit 0.03 1,338.00
F Harga Satuan Pekerja (D + E ) 45,938.00
A.2.3.1.11 Pengurugan 1m3 dengan Pasir urug
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
( Rp) ( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 0.300 80,500.00 24,150.00
Mandor L.04 OH 0.010 87,000.00 870.00
JUMLAH TENAGA KERJA 25,020.00
B BAHAN
Pasir urug m3 1.200 100,000.00 120,000.00
JUMLAH HARGA BAHAN 120,000.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 145,020.00
E Overhead & Profit 0.03 4,350.60
F Harga Satuan Pekerja (D + E ) 149,370.60
A.2.3.1.15 Pengurugan 1m3 dengan tanah urug
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
( Rp) ( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 0.250 80,500.00 20,125.00
Mandor L.04 OH 0.025 87,000.00 2,175.00
JUMLAH TENAGA KERJA 22,300.00
B BAHAN
Tanah urug m3 1.200 50,000.00 60,000.00
JUMLAH HARGA BAHAN 60,000.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 82,300.00
E Overhead & Profit 0.03 2,469.00
F Harga Satuan Pekerja (D + E ) 84,769.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 781,944.00
E Overhead & Profit 0.03 23,458.32
F Harga Satuan Pekerja (D + E ) 805,402.32
A.4.1.1.9 Membuat 1m3 beton mutu f'c = 24 Mpa (K275) slump (12 ± 2)cm w/c = 0.53
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
( Rp) ( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 1.650 80,500.00 132,825.00
Tukang Batu L.02 OH 0.275 82,000.00 22,550.00
Kepala Tukang L.033 OH 0.028 85,000.00 2,380.00
Mandor L.04 OH 0.083 87,000.00 7,221.00
JUMLAH TENAGA KERJA 164,976.00
B BAHAN
PC / Portland cement kg 406.000 1,050.00 426,300.00
Pasir pasang / beton m3 0.4886 160,000.00 78,176.00
Batu pecah 2-3 cm m3 0.7600 175,000.00 133,000.00
Air bersih Liter 215.000 0.00 -
JUMLAH HARGA BAHAN 637,476.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 802,452.00
E Overhead & Profit 0.03 24,073.56
F Harga Satuan Pekerja (D + E ) 826,525.56
A.4.1.1.17 Pembesian 10 Kg dengan Besi polos atau ulir
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
( Rp) ( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 0.070 80,500.00 5,635.00
Tukang Besi L.02 OH 0.070 82,000.00 5,740.00
Kepala Tukang L.03 OH 0.007 85,000.00 595.00
Mandor L.04 OH 0.004 87,000.00 348.00
JUMLAH TENAGA KERJA 12,318.00
B BAHAN
Besi Beton / tulangan beton kg 10.500 11,200.00 117,600.00
Kawat Beton / bendraat kg 0.150 11,000.00 1,650.00
JUMLAH HARGA BAHAN 119,250.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 131,568.00
E Overhead & Profit 0.03 3,947.04
F Harga Satuan Pekerja (D + E ) 135,515.04
A.4.1.1.20 Pemasangan 1m2 Bekisting untuk pondasi
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
( Rp) ( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 0.520 80,500.00 41,860.00
Tukang Kayu L.02 OH 0.260 82,000.00 21,320.00
Kepala Tukang L.03 OH 0.026 85,000.00 2,210.00
Mandor L.04 OH 0.026 87,000.00 2,262.00
JUMLAH TENAGA KERJA 67,652.00
B BAHAN
Kayu bekisting m3 0.040 1,950,000.00 78,000.00
Paku biasa kg 0.300 14,850.00 4,455.00
Minyak bekisting liter 0.100 5,800.00 580.00
JUMLAH HARGA BAHAN 83,035.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 150,687.00
E Overhead & Profit 0.03 4,520.61
F Harga Satuan Pekerja (D + E ) 155,207.61
A.4.1.1.21 Pemasangan 1m2 Bekisting untuk sloof
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
( Rp) ( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 0.520 80,500.00 41,860.00
Tukang Kayu L.02 OH 0.260 82,000.00 21,320.00
Kepala Tukang L.03 OH 0.026 85,000.00 2,210.00
Mandor L.04 OH 0.026 87,000.00 2,262.00
JUMLAH TENAGA KERJA 67,652.00
B BAHAN
Kayu bekisting m3 0.045 1,950,000.00 87,750.00
Paku biasa kg 0.300 14,850.00 4,455.00
Minyak bekisting liter 0.100 5,800.00 580.00
JUMLAH HARGA BAHAN 92,785.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 160,437.00
E Overhead & Profit 0.03 4,813.11
F Harga Satuan Pekerja (D + E ) 165,250.11
A.4.1.1.22 Pemasangan 1m2 Bekisting untuk kolom
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
( Rp) ( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 0.660 80,500.00 53,130.00
Tukang Kayu L.02 OH 0.330 82,000.00 27,060.00
Kepala Tukang L.03 OH 0.033 85,000.00 2,805.00
Mandor L.04 OH 0.033 87,000.00 2,871.00
JUMLAH TENAGA KERJA 85,866.00
B BAHAN
Kayu bekisting m3 0.040 1,950,000.00 78,000.00
Paku biasa kg 0.400 14,850.00 5,940.00
Minyak bekisting liter 0.200 5,800.00 1,160.00
Kayu bekisting m3 0.015 1,950,000.00 29,250.00
Multiplek 9 mm, uk. 1,20 x 2,40 m lbr 0.350 115,000.00 40,250.00
Bambu (Dia 6 - 8 cm x 600cm) btg 2.000 12,500.00 25,000.00
JUMLAH HARGA BAHAN 179,600.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 265,466.00
E Overhead & Profit 0.03 7,963.98
F Harga Satuan Pekerja (D + E ) 273,429.98
A.4.1.1.23 Pemasangan 1m2 Bekisting untuk balok
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
( Rp) ( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 0.660 80,500.00 53,130.00
Tukang Kayu L.02 OH 0.330 82,000.00 27,060.00
Kepala Tukang L.03 OH 0.033 85,000.00 2,805.00
Mandor L.04 OH 0.033 87,000.00 2,871.00
JUMLAH TENAGA KERJA 85,866.00
B BAHAN
Kayu bekisting 4 m3 0.040 1,950,000.00 78,000.00
Paku biasa kg 0.400 14,850.00 5,940.00
Minyak bekisting liter 0.200 5,800.00 1,160.00
Kayu bekisting m3 0.018 1,950,000.00 35,100.00
Multiplek 9 mm, uk. 1,20 x 2,40 m lbr 0.350 115,000.00 40,250.00
Bambu (Dia 6 - 8 cm x 600cm) btg 2.000 12,500.00 25,000.00
JUMLAH HARGA BAHAN 185,450.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 271,316.00
E Overhead & Profit 0.03 8,139.48
F Harga Satuan Pekerja (D + E ) 279,455.48
A.4.1.1.24 Pemasangan 1m2 Bekisting untuk lantai
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
( Rp) ( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 0.660 80,500.00 53,130.00
Tukang Kayu L.02 OH 0.330 82,000.00 27,060.00
Kepala Tukang L.03 OH 0.033 85,000.00 2,805.00
Mandor L.04 OH 0.033 87,000.00 2,871.00
JUMLAH TENAGA KERJA 85,866.00
B BAHAN
Kayu bekisting m3 0.040 1,950,000.00 78,000.00
Paku biasa kg 0.400 14,850.00 5,940.00
Minyak bekisting liter 0.200 5,800.00 1,160.00
Kayu bekisting m3 0.015 1,950,000.00 29,250.00
Multiplek 9 mm, uk. 1,20 x 2,40 m lbr 0.350 115,000.00 40,250.00
Bambu (Dia 6 - 8 cm x 600cm) btg 6.000 12,500.00 75,000.00
JUMLAH HARGA BAHAN 229,600.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 315,466.00
E Overhead & Profit 0.03 9,463.98
F Harga Satuan Pekerja (D + E ) 324,929.98
A.4.1.1.26 Pemasangan 1m2 Bekisting untuk tangga
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
( Rp) ( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 0.660 80,500.00 53,130.00
Tukang Kayu L.02 OH 0.330 82,000.00 27,060.00
Kepala Tukang L.03 OH 0.033 85,000.00 2,805.00
Mandor L.04 OH 0.033 87,000.00 2,871.00
JUMLAH TENAGA KERJA 85,866.00
B BAHAN
Kayu bekisting m3 0.030 3,811,500.00 114,345.00
Paku biasa kg 0.400 14,850.00 5,940.00
Minyak bekisting liter 0.150 6,300.00 945.00
Kayu bekisting m3 0.015 3,811,500.00 57,172.50
Multiplek 9 mm, uk. 1,20 x 2,40 m lbr 0.350 154,800.00 54,180.00
Bambu (Dia 6 - 8 cm x 600cm) btg 2.000 15,000.00 30,000.00
JUMLAH HARGA BAHAN 262,582.50
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 348,448.50
E Overhead & Profit ( maks 14 % ) 14 % x D 10,453.46
F Harga Satuan Pekerja (D + E ) 358,901.96
D Jumlah( A + B + C ) 29,432.50
E Overhead & Profit 0.03 882.98
F Harga Satuan Pekerja (D + E ) 30,315.48
A.4.4.2.27a 1m' Benangan 7
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
( Rp) ( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 0.015 80,500.00 1,207.50
Tukang Batu L.02 OH 0.050 82,000.00 4,100.00
JUMLAH TENAGA KERJA 5,307.50
B BAHAN
PC / Portland cement kg 3.750 1,050.00 3,937.50
Pasir pasang / beton m3 0.030 160,000.00 4,800.00
JUMLAH HARGA BAHAN 8,737.50
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 14,045.00
E Overhead & Profit 0.03 421.35
F Harga Satuan Pekerja (D + E ) 14,466.35
B BAHAN
Paving Stone segi 6 merah t= 6 cm m2 1.100 0.00 -
Pasir pasang / beton m3 0.035 160,000.00 5,600.00
JUMLAH HARGA BAHAN 5,600.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 71,088.10
E Overhead & Profit ( maks 14 % ) 0.03 2,132.64
F Harga Satuan Pekerja (D + E ) 73,220.74
B BAHAN
Topi uskup/ stoper bh 3.340 4,000.00 13,360.00
Pasir pasang / beton m3 0.001 160,000.00 160.00
JUMLAH HARGA BAHAN 13,520.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 37,820.00
E Overhead & Profit ( maks 14 % ) 0.03 1,134.60
F Harga Satuan Pekerja (D + E ) 38,954.60
B BAHAN
Asbes Gelombang Kecil Uk. 180x105x0,4 Cm lbr 0.51 62,900.00 32,079.00
Paku Kait ( pancing ) kg 0.12 0.00 -
JUMLAH HARGA BAHAN 32,079.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 50,293.00
E Overhead & Profit ( maks 14 % ) 0.03 1,508.79
F Harga Satuan Pekerja (D + E ) 51,801.79
A.4.6.1.6b Pembuatan dan Pemasangan 1m2 daun pintu dan jendela Kaca kayu kamper
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
( Rp) ( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 0.800 80,500.00 64,400.00
Tukang Kayu L.02 OH 2.400 82,000.00 196,800.00
Kepala Tukang L.03 OH 0.240 85,000.00 20,400.00
Mandor L.04 OH 0.040 87,000.00 3,480.00
JUMLAH TENAGA KERJA 285,080.00
B BAHAN
Kayu Kamper papan m3 0.024 0.00 -
Lem ( Kayu + Tembok ) kg 0.300 11,500.00 3,450.00
JUMLAH HARGA BAHAN 3,450.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 288,530.00
E Overhead & Profit 0.03 8,655.90
F Harga Satuan Pekerja (D + E ) 297,185.90
A.4.6.1.8 Pembuatan dan Pemasangan 1m2 daun tekwood rangkap isi Kaca rangka kayu balau
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
( Rp) ( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 0.800 80,500.00 64,400.00
Tukang Kayu L.02 OH 2.400 82,000.00 196,800.00
Kepala Tukang L.03 OH 0.240 85,000.00 20,400.00
Mandor L.04 OH 0.040 87,000.00 3,480.00
JUMLAH TENAGA KERJA 285,080.00
B BAHAN
Kayu Balau Papan m3 0.025 6,200,000.00 155,000.00
Kaca Bening t= 5 mm m2 0.170 105,000.00 17,850.00
Paku biasa kg 0.030 14,850.00 445.50
Lem ( Kayu + Tembok ) kg 0.500 11,500.00 5,750.00
Teakwood 122 x 244 tbl = 3 mm lbr 1.000 0.00 -
JUMLAH HARGA BAHAN 179,045.50
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 464,125.50
E Overhead & Profit 0.03 13,923.77
F Harga Satuan Pekerja (D + E ) 478,049.27
A.4.6.1.13 Pemasangan 1m3 konstruksi kuda-kuda kayu kruing
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
( Rp) ( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 4.000 80,500.00 322,000.00
Tukang Kayu L.02 OH 12.000 82,000.00 984,000.00
Kepala Tukang L.03 OH 1.200 85,000.00 102,000.00
Mandor L.04 OH 0.200 87,000.00 17,400.00
JUMLAH TENAGA KERJA 1,425,400.00
B BAHAN
Kayu Kruing Balok m3 1.100 4,700,000.00 5,170,000.00
Besi Beugel/Baut kg 15.000 19,000.00 285,000.00
Paku biasa kg 5.600 14,850.00 83,160.00
JUMLAH HARGA BAHAN 5,538,160.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 6,963,560.00
E Overhead & Profit 0.03 208,906.80
F Harga Satuan Pekerja (D + E ) 7,172,466.80
A.4.6.1.19 Pemasangan 1m2 rangka langit langit (50 x 100) cm Kayu Tahun Balok ( Mauni/ Akasia )
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
( Rp) ( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 0.150 80,500.00 12,075.00
Tukang Kayu L.02 OH 0.300 82,000.00 24,600.00
Kepala Tukang L.03 OH 0.030 85,000.00 2,550.00
Mandor L.04 OH 0.075 87,000.00 6,525.00
JUMLAH TENAGA KERJA 45,750.00
B BAHAN
Kayu Tahun Balok ( Mauni/ Akasia ) m3 0.015 2,650,000.00 40,810.00
Paku biasa kg 0.200 14,850.00 2,970.00
JUMLAH HARGA BAHAN 43,780.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 89,530.00
E Overhead & Profit 0.03 2,685.90
F Harga Satuan Pekerja (D + E ) 92,215.90
A.4.6.1.19b Pemasangan 1m2 rangka langit langit (50 x 100) cm Kayu Tahun Balok ( Mauni/ Akasia )
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
( Rp) ( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 0.150 80,500.00 12,075.00
Tukang Kayu L.02 OH 0.300 82,000.00 24,600.00
Kepala Tukang L.03 OH 0.030 85,000.00 2,550.00
Mandor L.04 OH 0.008 87,000.00 652.50
JUMLAH TENAGA KERJA 39,877.50
B BAHAN
m3 0.015 -
Paku biasa kg 0.200 14,850.00 2,970.00
JUMLAH HARGA BAHAN 2,970.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 42,847.50
E Overhead & Profit 0.03 1,285.43
F Harga Satuan Pekerja (D + E ) 44,132.93
A.4.6.1.20 Pemasangan 1m2 rangka langit langit (60 x 60) cm Kayu Tahun Balok ( Mauni/ Akasia )
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
( Rp) ( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 0.200 80,500.00 16,100.00
Tukang Kayu L.02 OH 0.300 82,000.00 24,600.00
Kepala Tukang L.03 OH 0.030 85,000.00 2,550.00
Mandor L.04 OH 0.010 87,000.00 870.00
JUMLAH TENAGA KERJA 44,120.00
B BAHAN
Kayu Tahun Balok ( Mauni/ Akasia ) m3 0.0163 2,650,000.00 43,195.00
Paku biasa kg 0.250 14,850.00 3,712.50
JUMLAH HARGA BAHAN 46,907.50
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 91,027.50
E Overhead & Profit 0.03 2,730.83
F Harga Satuan Pekerja (D + E ) 93,758.33
A.4.6.1.20b Pemasangan 1m2 rangka langit langit (60 x 60) cm Kayu lama
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
( Rp) ( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 0.200 80,500.00 16,100.00
Tukang Kayu L.02 OH 0.300 82,000.00 24,600.00
Kepala Tukang L.03 OH 0.030 85,000.00 2,550.00
Mandor L.04 OH 0.010 87,000.00 870.00
JUMLAH TENAGA KERJA 44,120.00
B BAHAN
Paku biasa kg 0.250 14,850.00 3,712.50
JUMLAH HARGA BAHAN 3,712.50
15
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 47,832.50
E Overhead & Profit 0.03 1,434.98
F Harga Satuan Pekerja (D + E ) 49,267.48
A.4.6.1.20b Pemasangan 1m2 rangka langit langit (60 x 60) cm Kayu meranti
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
( Rp) ( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 0.200 80,500.00 16,100.00
Tukang Kayu L.02 OH 0.300 82,000.00 24,600.00
Kepala Tukang L.03 OH 0.030 85,000.00 2,550.00
Mandor L.04 OH 0.010 87,000.00 870.00
JUMLAH TENAGA KERJA 44,120.00
B BAHAN
Kayu Meranti Balok m3 0.0163 3,800,000.00 61,940.00
Paku biasa kg 0.250 14,850.00 3,712.50
JUMLAH HARGA BAHAN 65,652.50
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 109,772.50
E Overhead & Profit ( maks 14 % ) 0.03 3,293.18
F Harga Satuan Pekerja (D + E ) 113,065.68
A.4.6.1.21 Pemasangan 1m2 rangka langit langit (60 x 60) cm Kayu Kruing
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
( Rp) ( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 0.200 80,500.00 16,100.00
Tukang Kayu L.02 OH 0.300 82,000.00 24,600.00
Kepala Tukang L.03 OH 0.030 85,000.00 2,550.00
Mandor L.04 OH 0.010 87,000.00 870.00
JUMLAH TENAGA KERJA 44,120.00
B BAHAN
Kayu kruing Balok m3 0.0163 4,700,000.00 76,610.00
Paku biasa kg 0.250 14,850.00 3,712.50
JUMLAH HARGA BAHAN 80,322.50
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 124,442.50
E Overhead & Profit 0.03 3,733.28
F Harga Satuan Pekerja (D + E ) 128,175.78
A.4.6.1.22 Pemasangan 1m' Lisplank ukuran (3 x 20 cm ) kayu kruing
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
( Rp) ( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 0.100 80,500.00 8,050.00
Tukang Kayu L.02 OH 0.200 82,000.00 16,400.00
Kepala Tukang L.03 OH 0.020 85,000.00 1,700.00
Mandor L.04 OH 0.005 87,000.00 435.00
JUMLAH TENAGA KERJA 26,585.00
B BAHAN
Kayu Kruing Papan m3 0.0108 4,950,000.00 53,460.00
Paku biasa kg 0.100 14,850.00 1,485.00
JUMLAH HARGA BAHAN 54,945.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 81,530.00
E Overhead & Profit 0.03 2,445.90
F Harga Satuan Pekerja (D + E ) 83,975.90
22
RAB
,
KODE HARGA SATUAN PPN JUMLAH
No URAIAN PEKERJAAN VOLUME SAT.
ANALISA (Rp) 10% ( Rp)
1 2 3 4 5 6 7 8
A PEMBANGUNAN RUMAH 2 LANTAI
I PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi Hs 1.00 Ls 577,488.24 57,748.82 635,237.06
2 Pengukuran / Bouwplank Hs 1.00 Ls 500,000.00 50,000.00 550,000.00
3 Pembuatan direksi keet/kantor sementara Hs 1.00 Ls 1,080,653.34 108,065.33 1,188,718.67
4 Dokumentasi dan Pelaporan Hs 1.00 Ls 850,000.00 85,000.00 935,000.00
5 Pas. Papan nama Hs 1.00 Ls 350,000.00 35,000.00 385,000.00
JUMLAH 3,058,718.67
II PEKERJAAN TANAH
1 Galian tanah pondasi A.2.3.1.1 52.71 m3 64,426.50 6,442.65 3,735,512.90
3 Urugan Tanah Samping Pondasi A.2.3.1.9 15.64 m3 45,938.00 4,593.80 790,317.35
5 Urugan Pasir Bawah Pondasi A.2.3.1.11 4.89 m3 149,370.60 14,937.06 802,642.92
6 Galian footplate A.2.3.1.1 11.25 m3 64,426.50 6,442.65 797,277.94
7 Urugan pada Footplate A.2.3.1.15 20.64 m3 84,769.00 8,476.90 1,924,595.38
8 Urugan Pasir Bawah A.2.3.1.11 6.80 m3 149,370.60 14,937.06 1,117,292.09
JUMLAH 9,167,638.57
III PEKERJAAN PASANGAN
1 Pasangan Batu Kosong A.3.2.1.9 149.58 m3 336,395.94 33,639.59 55,349,915.18
2 Pasangan Batu kali A.3.2.1.3 365.64 m3 598,419.70 59,841.97 240,686,797.02
3 Pasangan Batu Kosong pond. 2 A.3.2.1.9 9.50 m3 336,395.94 33,639.59 3,515,337.57
4 Pasangan Batu kali A.3.2.1.3 22.80 m3 598,419.70 59,841.97 15,008,366.08
5 Pasangan Transram bata merah 1S : 3PP A.4.4.1.8 15.26 m2 100,933.31 10,093.33 1,694,044.40
6 Pasangan Dinding Tembok A.4.4.1.10 692.19 m2 96,685.07 9,668.51 73,616,882.46
JUMLAH 389,871,342.71
IV PEKERJAAN PLESTERAN
1 Plesteran Transram A.4.4.2.3 101.67 m2 39,030.00 3,903.00 4,364,998.11
2 Acian A.4.4.2.27 1,485.67 m2 30,315.48 3,031.55 49,542,670.92
3 Plesteran Tembok Dinding A.4.4.2.5 1,384.38 m2 50,092.20 5,009.22 76,281,297.73
JUMLAH 130,188,966.76
V PEKERJAAN PINTU DAN JENDELA
1 Pas. Kusen pintu dan jendela kayu balau A.4.6.1.2 1.40 m3 9,171,647.88 917,164.79 14,096,694.38
2 Pas. Daun pintu panil kayu balau A.4.6.1.5b 7.04 m2 623,072.75 62,307.28 4,825,075.38
3 Pas. Daun jendela kayu balau A.4.6.1.6b 1.80 m2 450,449.90 45,044.99 893,079.99
JUMLAH 19,814,849.75
VI PEKERJAAN BETON
1 Tiang Pancang (K250) A.4.1.1.8 2.16 m2 483,000.00 48,300.00 1,147,608.00
2 Sloof (K250) A.4.1.1.8 2.89 m2 805,402.32 80,540.23 2,556,830.21
3 Balok Ring (K225) A.4.1.1.7 1.08 m2 793,132.96 79,313.30 942,241.96
4 Kolom (K250) A.4.1.1.8 8.01 m2 805,402.32 80,540.23 7,098,880.48
5 Balok induk dan Anak (K250) A.4.1.1.8 7.59 m2 805,402.32 80,540.23 6,724,303.97
6 Tangga A.4.1.1.8 2.72 M3 805,402.32 80,540.23 2,413,307.51
7 Plat Lantai (K250) A.4.1.1.8 11.86 m2 805,402.32 80,540.23 10,507,278.67
JUMLAH 31,390,450.79
BEKISTING BETON
1 Bekisting sloof A.4.1.1.21 67.34 m2 165,250.11 16,525.01 12,240,736.65
2 Bekisting kolom A.4.1.1.22 180.74 m2 273,429.98 27,343.00 54,362,911.14
3 Bekisting Balok Ring A.4.1.1.23 36.00 m2 279,455.48 27,945.55 11,066,437.01
4 Bekisting Balok Induk dan Anak A.4.1.1.23 107.30 m2 279,455.48 27,945.55 32,984,130.30
5 Bekisting Tangga A.4.1.1.26 6.21 m3 358,901.96 35,890.20 2,451,659.25
6 Bekisting Plat Lantai A.4.1.1.24 98.86 m2 324,929.98 32,493.00 35,334,835.61
JUMLAH 148,440,709.96
VII PASANGAN TEGEL
1 Lantai Keramik ( 40 x 40 ) cm A.4.4.3.4b 175.27 m2 186,298.16 18,629.82 35,917,726.35
2 Lantai Keramik ( 30 x 30 ) cm A.4.4.3.35b 20.50 m2 159,291.56 15,929.16 3,592,024.68
3 Dinding Keramik (25x40) A.4.4.3.54B 76.05 m2 190,229.67 19,022.97 15,913,663.04
JUMLAH 55,423,414.08
VIII PEKERJAAN ATAP
1 Kuda-kuda Baja Ringan A.4.2.1.19 150.00 m2 146,776.03 14,677.60 24,218,044.95
2 Pemasangan reng galvalume Hs 113.50 m2 146,776.03 14,677.60 18,324,987.35
3 Pemasangan Genting mantili A.4.5.2.1 113.50 m2 71,645.26 7,164.53 8,944,910.09
4 Pemasangan Bubungan A.4.5.2.4 28.20 m' 81,569.82 8,156.98 2,530,295.82
5 Pemasangan Plafon Gypsum indo board A.4.5.1.7 195.77 M2 60,471.30 6,047.13 13,022,313.04
JUMLAH 67,040,551.24
IX PEKERJAAN LISTRIK
1 Pas. Instalasi lampu Hs 35.00 titik 141,750.00 14,175.00 5,457,375.00
2 Pemasangan Listrik PLN Hs 1.00 titik 1,218,000.00 121,800.00 1,339,800.00
3 Pas. Instalasi stop kontak Hs 20.00 titik 141,750.00 14,175.00 3,118,500.00
4 Pas. Saklar ganda panasonic Hs 6.00 bh 25,525.50 2,552.55 168,468.30
5 Pas. Saklar tunggal panasonic Hs 12.00 bh 15,823.50 1,582.35 208,870.20
6 Pas. Lampu led 12 w philips Hs 10.00 bh 43,540.00 4,354.00 478,940.00
7 Pas. Lampu led 20 w philips Hs 11.00 bh 55,000.00 5,500.00 665,500.00
JUMLAH 11,437,453.50
X PEKERJAAN SANITASI
1 Closet duduk toto Hs 4.00 bh 3,162,500.00 316,250.00 13,915,000.00
1
2 Wastafel Hs 1.00 bh 568,500.00 56,850.00 625,350.00
3 Tandon Penguin 500L Hs 1.00 bh 1,680,000.00 168,000.00 1,848,000.00
4 Pompa SANYO PH-130B Hs 1.00 bh 1,685,700.00 168,570.00 1,854,270.00
5 Bio Septictank Hs 1.00 bh 4,000,000.00 400,000.00 4,400,000.00
6 Biopori pipa Hs 1.00 bh 50,000.00 5,000.00 55,000.00
7 Shower Hs 4.00 bh 680,000.00 68,000.00 2,992,000.00
8 Pas. Pipa air bersih 1/2" A.5.1.1.25 40.00 m' 10,873.71 1,087.37 478,443.24
9 Pas. Pipa air kotor 3" A.5.1.1.31 25.00 m' 84,888.48 8,488.85 2,334,433.20
10 Pas. Kran angsa 1/2" Hs 8.00 bh 117,300.00 11,730.00 1,032,240.00
JUMLAH 29,534,736.44
XI PEKERJAAN PENGECATAN
1 Cat dinding A.4.7.1.10 1384.38 m2 16,111.78 1,611.18 24,535,300.98
2 Cat plafond A.4.7.1.10d 195.77 m2 15,030.28 1,503.03 3,236,724.63
3 Cat kayu A.4.7.1.4 70.75 m2 29,417.83 2,941.78 2,289,442.62
JUMLAH 30,061,468.23
2
REKAPITULASI HARGA