JUMLAH
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME SATUAN
1 2 3 4 5
I PEKERJAAN PERSIAPAN
1 Pembersihan Awal Panjang Lebar 200.00 m2
= 20 m x 10.00 m 200.00 m2
II PEKERJAAN TANAH
1 Pek urugan tanah lokasi kegiatan Panjang Lebar Tebal 218.55 m3
= 20 m x 20.00 m x 0.50 m = 200.00 m3
Depan jembatan = 5.5 m x 6.00 m x 0.35 m = 11.55 m3
Jalan masuk = 4 m x 5.00 m x 0.35 m = 7.00 m3
4 Pek. Urugan Pasir bawah lantai Panjang Lebar Tebal Jumlah 44.84 m3
Lantai Hanggar TPS3R = 13.42 m x 11.80 m x 0.20 m x 1 = 31.67 m3
= 3.23 m x 2.83 m x 0.20 m x 2 = 3.66 m3
= 5.83 m x 3.23 m x 0.20 m x 2 = 7.53 m3
Lantai Kantor = 3.33 m x 2.85 m x 0.15 m x 1 = 1.42 m3
Lantai WC = 2.30 m x 1.60 m x 0.15 m x 1 = 0.55 m3
5 Pek. Pemancangan Cerucuk Kayu Galam Jumlah cerucuk Panjang Jumlah Pondasi 372.00 m
Pondasi P1 = 9 Bh x 2 m x 21 Bh / 2 = 189.00 m
Pondasi P2 = 9 Bh x 2 m x 19 Bh / 2 = 171.00 m
Pondasi P3 = 12 Bh x 2 m x 1 Bh / 2 = 12.00 m
b Pek. Lantai Kerja Beton K.100 t=5 cm Panjang Lebar Tebal Jumlah Pondasi 0.67 m3
= 0.80 m x 0.80 m x 0.05 m x 21 = 0.67 m3
d Cor Beton Mutu k.200 Panjang Lebar Tebal Jumlah Pondasi 2.69 m3
= 0.80 m x 0.80 m x 0.20 m x 21 = 2.69 m3
JUMLAH
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME SATUAN
1 2 3 4 5
2 Pondasi Footplat P2 (60 cm x 60 cm x 20 cm)
a Pek. Pembesian Panjang Berat jenis Jumlah Besi Jumlah Pondasi 217.59 Kg
ø 12 = 1.29 m x 0.888 kg/m x 10.00 bh x 19 = 217.59 Kg
b Pek. Lantai Kerja Beton K.100 t=5 cm Panjang Lebar Tebal Jumlah Pondasi 0.34 m3
= 0.60 m x 0.60 m x 0.05 m x 19 = 0.34 m3
d Cor Beton Mutu k.200 Panjang Lebar Tebal Jumlah Pondasi 1.37 m3
= 0.60 m x 0.60 m x 0.20 m x 19 = 1.37 m3
b Pek. Lantai Kerja Beton K.100 t=5 cm Panjang Lebar Tebal Jumlah Pondasi 0.05 m3
= 1.20 m x 0.80 m x 0.05 m x 1 = 0.05 m3
d Cor Beton Mutu k.200 Panjang Lebar Tebal Jumlah Pondasi 0.19 m3
= 1.20 m x 0.80 m x 0.20 m x 1 = 0.19 m3
2 Pek Kolom K1
a Pek. Pembesian Panjang Berat jenis Jumlah Besi Jumlah Kolom 484.00 Kg
Hanggar TPS3R ø 12 = 4.60 m x 0.888 kg/m x 4.00 bh x 18 = 294.03 Kg
WC ø 12 = 3.85 m x 0.888 kg/m x 4.00 bh x 4 = 54.69 Kg
Pagar ø 12 = 3.40 m x 0.888 kg/m x 4.00 bh x 1 = 12.07 Kg
ø 12 = 4.10 m x 0.888 kg/m x 4.00 bh x 1 = 14.56 Kg
ø8 = 0.52 m x 0.395 kg/m x 529.00 bh = 108.66 Kg
c Cor Beton Mutu k.200 Panjang Lebar Tinggi Jumlah Kolom 4.23 m3
Hanggar TPS3R bawah sloof = 0.20 m x 0.20 m x 0.80 m x 18 = 0.58 m3
Atas sloof = 0.20 m x 0.20 m x 3.80 m x 18 = 2.74 m3
WC bawah sloof = 0.20 m x 0.20 m x 0.80 m x 4 = 0.13 m3
Atas sloof = 0.20 m x 0.20 m x 3.05 m x 4 = 0.49 m3
Pagar bawah sloof = 0.20 m x 0.20 m x 0.80 m x 1 = 0.03 m3
Atas sloof = 0.20 m x 0.20 m x 2.60 m x 1 = 0.10 m3
bawah sloof = 0.20 m x 0.20 m x 0.80 m x 1 = 0.03 m3
Atas sloof = 0.20 m x 0.20 m x 3.30 m x 1 = 0.13 m3
3 Pek Kolom K2
a Pek. Pembesian Panjang Berat jenis Jumlah Besi Jumlah Kolom 147.98 Kg
Kantor ø 12 = 3.85 m x 0.888 kg/m x 4.00 bh x 3 = 41.01 Kg
Pagar ø 12 = 2.50 m x 0.888 kg/m x 4.00 bh x 8 = 71.02 Kg
ø 12 = 3.40 m x 0.888 kg/m x 4.00 bh x 1 = 12.07 Kg
ø 12 = 4.10 m x 0.888 kg/m x 4.00 bh x 1 = 14.56 Kg
ø8 = 0.65 m x 0.395 kg/m x 196.00 bh = 50.32 Kg
c Cor Beton Mutu k.200 Panjang Lebar Tinggi Jumlah Kolom 1.76 m3
Kantor bawah sloof = 0.30 m x 0.15 m x 0.80 m x 3 = 0.11 m3
Atas sloof = 0.30 m x 0.15 m x 3.05 m x 3 = 0.41 m3
Pagar bawah sloof = 0.30 m x 0.15 m x 0.80 m x 8 = 0.29 m3
Atas sloof = 0.30 m x 0.15 m x 1.70 m x 8 = 0.61 m3
bawah sloof = 0.30 m x 0.15 m x 0.80 m x 1 = 0.04 m3
Atas sloof = 0.30 m x 0.15 m x 2.60 m x 1 = 0.12 m3
bawah sloof = 0.30 m x 0.15 m x 0.80 m x 1 = 0.04 m3
Atas sloof = 0.30 m x 0.15 m x 3.30 m x 1 = 0.15 m3
4 Pek Kolom K3
a Pek. Pembesian Panjang Berat jenis Jumlah Besi Jumlah Kolom 66.65 Kg
Pagar ø 10 = 3.40 m x 0.617 kg/m x 8.00 bh x 1 = 16.78 Kg
ø 10 = 4.10 m x 0.617 kg/m x 8.00 bh x 2 = 40.48 Kg
ø8 = 0.41 m x 0.395 kg/m x 58.00 bh = 9.39 Kg
c Cor Beton Mutu k.200 Panjang Lebar Tinggi Jumlah Kolom 0.26 m3
Pagar bawah sloof = 0.15 m x 0.15 m x 0.80 m x 1 = 0.02 m3
Atas sloof = 0.15 m x 0.15 m x 2.60 m x 1 = 0.06 m3
bawah sloof = 0.15 m x 0.15 m x 0.80 m x 2 = 0.04 m3
Atas sloof = 0.15 m x 0.15 m x 3.30 m x 2 = 0.15 m3
JUMLAH
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME SATUAN
1 2 3 4 5
3 Pekerjaan Sloof 20x30
a Pek. Pembesian Panjang Berat jenis Jumlah Besi Jumlah sisi 392.56 Kg
Hanggar TPS3R ø 12 = 17.00 m x 0.888 kg/m x 6.00 bh x 2 = 181.10 Kg
ø 12 = 12.00 m x 0.888 kg/m x 6.00 bh x 2 = 127.84 Kg
ø8 = 0.73 m x 0.395 kg/m x 290.00 bh = 83.62 Kg
c Cor Beton Mutu k.200 Panjang Lebar Tinggi Jumlah sisi 3.48 m3
= 17.00 m x 0.20 m x 0.30 m x 2 = 2.04 m3
= 12.00 m x 0.20 m x 0.30 m x 2 = 1.44 m3
c Cor Beton Mutu k.200 Panjang Lebar Tinggi Jumlah sisi 2.03 m3
Hanggar TPS3R = 12.00 m x 0.15 m x 0.20 m x 1 = 0.36 m3
Kantor = 3.50 m x 0.15 m x 0.20 m x 2 = 0.21 m3
= 3.00 m x 0.15 m x 0.20 m x 2 = 0.18 m3
WC = 2.45 m x 0.15 m x 0.20 m x 1 = 0.07 m3
= 1.75 m x 0.15 m x 0.20 m x 2 = 0.11 m3
Pagar Kiri = 2.57 m x 0.15 m x 0.20 m x 1 = 0.08 m3
Kanan = 20.00 m x 0.15 m x 0.20 m x 1 = 0.60 m3
Belakang = 2.83 m x 0.15 m x 0.20 m x 1 = 0.08 m3
Depan = 11.20 m x 0.15 m x 0.20 m x 1 = 0.34 m3
JUMLAH
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME SATUAN
1 2 3 4 5
10 Pekerjaan Ring Balok 20x20
a Pek. Pembesian Panjang Berat jenis Jumlah Besi Jumlah sisi 275.43 Kg
Hanggar TPS3R ø 10 = 17.00 m x 0.617 kg/m x 6.00 bh x 2 = 125.87 Kg
TPS ø 10 = 12.00 m x 0.617 kg/m x 6.00 bh x 2 = 88.85 Kg
ø8 = 0.53 m x 0.395 kg/m x 290.00 bh = 60.71 Kg
b Pek. Bekisting Ring Balok Panjang Lebar Jumlah Jumlah sisi 11.60 m2
= 17 m x 0.20 m x 2.00 Bh x 2 x 1/2 = 6.80 m2
= 12 m x 0.20 m x 2.00 Bh x 2 x 1/2 = 4.80 m2
c Cor Beton Mutu k.200 Panjang Lebar Tinggi Jumlah sisi 2.32 m3
= 17.00 m x 0.20 m x 0.20 m x 2 = 1.36 m3
= 12.00 m x 0.20 m x 0.20 m x 2 = 0.96 m3
b Pek. Bekisting Ring Balok Panjang Lebar Jumlah Jumlah sisi 3.36 m2
= 2.45 m x 0.20 m x 2.00 Bh x 2 = 1.96 m2
= 1.75 m x 0.20 m x 2.00 Bh x 2 = 1.40 m2
c Cor Beton Mutu k.200 Panjang Lebar Tinggi Jumlah sisi 0.25 m3
= 2.45 m x 0.15 m x 0.20 m x 2 = 0.15 m3
= 1.75 m x 0.15 m x 0.20 m x 2 = 0.11 m3
b Pek. Bekisting Ring Balok Panjang Lebar Jumlah Jumlah sisi 17.79 m2
= 12.00 m x 0.15 m x 2.00 Bh x 1 = 3.60 m2
= 2.45 m x 0.15 m x 2.00 Bh x 2 x 1/2 = 0.74 m2
= 1.75 m x 0.15 m x 2.00 Bh x 2 x 1/2 = 0.53 m2
= 3.50 m x 0.15 m x 2.00 Bh x 2 x 1/2 = 1.05 m2
= 3.00 m x 0.15 m x 2.00 Bh x 1 = 0.90 m2
= 2.57 m x 0.15 m x 2.00 Bh x 1 = 0.77 m2
= 20.00 m x 0.15 m x 2.00 Bh x 1 = 6.00 m2
= 2.83 m x 0.15 m x 2.00 Bh x 1 = 0.85 m2
= 11.20 m x 0.15 m x 2.00 Bh x 1 = 3.36 m2
c Cor Beton Mutu k.200 Panjang Lebar Tinggi Jumlah sisi 0.62 m3
Hanggar TPS3R = 12.00 m x 0.15 m x 0.15 m x 1 = 0.27 m3
WC = 2.45 m x 0.15 m x 0.15 m x 2 = 0.11 m3
= 1.75 m x 0.15 m x 0.15 m x 2 = 0.08 m3
Kantor = 3.50 m x 0.15 m x 0.15 m x 2 = 0.16 m3
= 3.00 m x 0.15 m x 0.15 m x 1 = 0.07 m3
Pagar Kiri = 2.57 m x 0.15 m x 0.15 m x 1 = 0.06 m3
Kanan = 20.00 m x 0.15 m x 0.15 m x 1 = 0.45 m3
Belakang = 2.83 m x 0.15 m x 0.15 m x 1 = 0.06 m3
Depan = 11.20 m x 0.15 m x 0.15 m x 1 = 0.25 m3
1 2 3 4 5
Luas
IV PEKERJAAN DINDING, LANTAI DAN PLESTERAN pintu/
Jendela/
1 Pek. Pasangan dinding Bataco kerawang/
a Bangunan Hanggar TPS3R Panjang Lebar Jumlah sisi Glasblok 142.96 m2
Samping Kanan = 3.8 m x 2.8 m x 4 - 1.87 = 40.69 m2
Depan = 3.8 m x 3.2 m x 1 - 1.69 = 10.48 m2
Area Dalam = 3.8 m x 2.8 m x 4 - 13.48 = 29.08 m2
Samping Kiri = 2.8 m x 2.0 m x 4 = 22.40 m2
Bawah Sloof Kiri = 2.8 m x 0.8 m x 4 = 8.96 m2
Kanan = 2.8 m x 0.8 m x 4 = 8.96 m2
Belakang = 2.8 m x 0.8 m x 5 = 11.20 m2
Depan = 2.8 m x 0.8 m x 5 = 11.20 m2
Luas pintu/
Jendela/
kerawang/G
b Kantor Lebar Tinggi lasblok sisi 60.60 m2
Depan = 3.35 m x 3.05 m - 3.47 = 13.69 m2
Samping Kiri = 2.28 m x 3.05 m = 6.95 m2
= 0.37 m x 3.05 m = 1.13 m2
Samping Kanan = 2.85 m x 3.05 m = 8.69 m2
= 1.35 m x 3.05 m = 4.12 m2
Belakang = 3.35 m x 4.2 m - 1.11 = 15.18 m2
Bawah Sloof Kiri = 2.28 m x 0.8 m = 1.82 m2
= 0.37 m x 0.8 m = 0.30 m2
Kanan = 2.85 m x 0.8 m = 2.28 m2
= 1.35 m x 0.8 m = 1.08 m2
Belakang = 3.35 m x 0.8 m = 2.68 m2
Depan = 3.35 m x 0.8 m = 2.68 m2
Luas pintu/
Jendela/
kerawang/G
c WC Lebar Tinggi lasblok 23.50 m2
Depan = 1.60 m x 3.05 m - 2.33 = 7.21 m2
Samping Kanan = 2.30 m x 3.05 m = 7.02 m2
Belakang = 1.60 m x 3.05 m = 4.88 m2
Bawah Sloof Kanan = 2.30 m x 0.8 m = 1.84 m2
Belakang = 1.60 m x 0.8 m = 1.28 m2
Depan = 1.60 m x 0.8 m = 1.28 m2
89.03 m2
b Kantor Depan = 13.69 m2 x 2 Bh luar-dalam = 27.38 m2
Samping Kiri = 6.95 m2 x 2 Bh luar-dalam = 13.91 m2
Samping Kanan = 8.69 m2 x 2 Bh luar-dalam = 17.39 m2
Belakang = 15.18 m2 x 2 Bh luar-dalam = 30.36 m2
38.21 m2
c WC Depan = 7.21 m2 x 2 Bh = 14.42 m2
Samping Kanan = 7.02 m2 x 2 Bh = 14.03 m2
Belakang = 4.88 m2 x 2 Bh = 9.76 m2
93.01 m2
d Pagar Depan = 9.00 m2 x 2 Bh = 18.00 m2
Samping Kiri = 30.20 m2 x 2 Bh = 60.39 m2
Samping Kanan = 3.93 m2 x 2 Bh = 7.85 m2
Belakang = 3.38 m2 x 2 Bh = 6.77 m2
3 Cor Beton Lantai Beton Mutu k.200 Panjang Lebar Tebal 5.04 m3
Hanggar TPS3R Gudang = 5.83 m x 3.23 m x 0.10 m = 1.88 m3
Area Penyimpanan = 2.85 m x 3.23 m x 0.10 m = 0.92 m3
Tempat Barang Lapak = 2.85 m x 3.23 m x 0.10 m = 0.92 m3
KM/WC = 2.30 m x 1.60 m x 0.10 m = 0.37 m3
Kantor = 3.33 m x 2.85 m x 0.10 m = 0.95 m3
JUMLAH
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME SATUAN
1 2 3 4 5
4 Pek Keramik lantai Uk.40x40 Panjang Lebar 46.73 m2
Kantor = 3.33 m x 2.85 m = 9.49 m2
Gudang = 5.83 m x 3.23 m = 18.83 m2
Area Penyimpanan = 2.85 m x 3.23 m = 9.21 m2
Tempat Barang Lapak = 2.85 m x 3.23 m = 9.21 m2
Derajat
V PEKERJAAN ATAP, PLAFOND, LISPLANK Panjang+ Lebar + Kemiringan
1 Rangka Atap Baja Ringan overstek overstek (Cos15) 242.24 m2
a Hanggar TPS3R = 18 m x 13 m / 0.966 = 242.24 m2
Derajat
Panjang+ Lebar + Kemiringan
overstek overstek (Cos15) 18.63 m2
b Kantor = 4.5 m x 4 m / 0.966 = 18.63 m2
Derajat
Panjang+ Lebar + Kemiringan
overstek overstek (Cos15) 9.96 m2
c WC = 2.75 m x 3.5 m / 0.966 = 9.96 m2
b Kantor Panjang Lebar Panjang Kusen Jumlah Kusen Jumlah P/J 0.06 m3
P1 = 0.1 m x 0.05 m x 2.1 m x 2 x 1 = 0.02 m3
= 0.1 m x 0.05 m x 1.05 m x 1 x 1 = 0.01 m3
J1 = 0.1 m x 0.05 m x 1.45 m x 3 x 1 = 0.02 m3
= 0.1 m x 0.05 m x 1 m x 2 x 1 = 0.01 m3
3 Pek. Rangka Jendela Kaca Kayu Klas II Lebar Panjang Jumlah Rangka Jumlah Jendela 2.26 m2
J1 = 0.1 m x 1.45 m x 4 Bh x 3 = 1.74 m2
= 0.1 m x 0.43 m x 4 Bh x 3 = 0.52 m2
JUMLAH
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME SATUAN
1 2 3 4 5
4 Pek.Pemasangan Kaca Tebal 5 mm Panjang Lebar Jumlah Kaca Jumlah Jendela 7.48 m3
J1 = 1.45 m x 0.43 m x 4 Bh x 3 = 7.48 m3
VI PEKERJAAN PENGECATAN
1 Pengecatan dinding = volume pekerjaan plesteran
a Hanggar TPS3R = 205.28 = 205.28 m2
b Kantor = 89.03 = 89.03 m2
c WC = 38.21 = 38.21 m2
d Pagar = 93.01 = 93.01 m2
3 Pengecatan Kusen Pintu dan Jendela Panjang Kusen Lebar Jumlah Kusen Jumlah P/J 10.08 m2
P1 = 2.05 m x 0.2 m x 2 Bh x 5 = 4.10 m2
= 0.9 m x 0.2 m x 1 Bh x 5 = 0.90 m2
J1 = 1.45 m x 0.2 m x 3 Bh x 4 = 3.48 m2
= 1 m x 0.2 m x 2 Bh x 4 = 1.60 m2
5 Pengecatan Rangka Jendela Kaca Panjang Lebar Jumlah Rangka Jumlah Jendela 3.20 m2
J1 = 0.1 m x 1.55 m x 4 Bh x 4 = 2.48 m2
= 0.1 m x 0.45 m x 4 Bh x 4 = 0.72 m2
c Pek Cor Beton K.175 tebal 10 cm Panjang Lebar Tinggi Jumlah 0.53 m3
2.20 m x 1.2 m x 0.1 x 2 unit = 0.53 m3
d Pek. Sloof 15/15 Panjang Berat jenis Jumlah Besi Sisi Jumlah unit 56.55 Kg
- Pek. Pembesian ø 10 = 2.5 m x 0.617 kg/m x 4.00 bh x 2 x 2 = 24.68 Kg
ø 10 = 1.5 m x 0.617 kg/m x 4.00 bh x 2 x 2 = 14.81 Kg
ø8 = 0.40 m x 0.395 kg/m x 54.00 bh x 2 = 17.06 Kg
- Pek. bekisting Panjang Lebar Jumlah Jumlah sisi Jumlah unit 4.80 m2
= 2.5 m x 0.15 m x 2.00 Bh x 2 x 2 = 3.00 m2
= 1.5 m x 0.15 m x 2.00 Bh x 2 x 2 = 1.80 m2
- Pek cor beton K.175 Panjang Lebar Tinggi Jumlah sisi Jumlah unit 0.36 m3
= 2.5 m x 0.15 m x 0.15 m x 2 x 2 = 0.23 m3
= 1.5 m x 0.15 m x 0.15 m x 2 x 2 = 0.14 m3
e Pek. Kolom 15/15 Panjang Berat jenis Jumlah Besi Jumlah Kolom Jumlah unit 48.46 Kg
- Pek. Pembesian ø 10 = 1.70 m x 0.617 kg/m x 4.00 bh x 4 x 2 = 33.56 Kg
ø8 = 0.41 m x 0.395 kg/m x 46.00 bh x 2 = 14.90 Kg
- Pek. bekisting Panjang Lebar Jumlah Jumlah sisi Jumlah unit 8.16 m2
= 1.70 m x 0.15 m x 4.00 Bh x 4 x 2 = 8.16 m2
- Pek cor beton K.175 Panjang Lebar Tinggi Jumlah sisi Jumlah unit 0.31 m3
= 1.70 m x 0.15 m x 0.15 m x 4 x 2 = 0.31 m3
JUMLAH
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME SATUAN
1 2 3 4 5
f Pek. Pas. Batako Panjang Lebar Jumlah sisi Jumlah unit 23.12 m2
= 2.2 m x 1.7 m x 2 x 2 = 14.96 m2
= 1.2 m x 1.7 m x 2 x 2 = 8.16 m2
h Pek. Ring Balk 15/15 Panjang Berat jenis Jumlah Besi Sisi Jumlah unit 56.55 Kg
- Pek. Pembesian ø 10 = 2.5 m x 0.617 kg/m x 4.00 bh x 2 x 2 = 24.68 Kg
ø 10 = 1.5 m x 0.617 kg/m x 4.00 bh x 2 x 2 = 14.81 Kg
ø8 = 0.40 m x 0.395 kg/m x 54.00 bh x 2 = 17.06 Kg
- Pek. bekisting Panjang Lebar Jumlah Jumlah sisi Jumlah unit 4.80 m2
= 2.5 m x 0.15 m x 2.00 Bh x 2 x 2 = 3.00 m2
= 1.5 m x 0.15 m x 2.00 Bh x 2 x 2 = 1.80 m2
- Pek cor beton K.175 Panjang Lebar Tinggi Jumlah sisi Jumlah unit 0.36 m3
= 2.5 m x 0.15 m x 0.15 m x 2 x 2 = 0.23 m3
= 1.5 m x 0.15 m x 0.15 m x 2 x 2 = 0.14 m3
i Pek. Plat penutup septictank tebal 10 cm Panjang Berat jenis Jumlah Besi Jumlah unit 9.32 m3
- Pek. Pembesian ø 8-15 = 2.2 m x 0.395 kg/m x 4.00 bh x 2 = 6.95 Kg
ø 8-15 = 0.3 m x 0.395 kg/m x 8.00 bh x 2 = 1.90 Kg
ø 8-15 = 0.15 m x 0.395 kg/m x 4.00 bh x 2 = 0.47 Kg
Volume
tutup
- Pek cor beton K.175 Panjang Lebar Tinggi mainhole Jumlah unit 0.17 m3
= 2.5 m x 1.50 m x 0.10 m - 0.098 x 2 = 0.55 m3
j Pek. Tutup mainhole Panjang Berat jenis Jumlah Besi Jumlah unit 6.00 m3
- Pek. Pembesian ø 8-15 = 0.7 m x 0.395 kg/m x 5.00 bh x 2 = 2.77 Kg
ø 8-15 = 0.7 m x 0.395 kg/m x 5.00 bh x 2 = 2.77 Kg
ø 8-15 = 0.15 m x 0.395 kg/m x 4.00 bh x 2 = 0.47 Kg
- Pek cor beton K.175 Panjang Lebar Tinggi Jumlah unit 0.10 m3
= 0.7 m x 0.70 m x 0.10 m x 2 = 0.10 m3
Volume
l Urugan Pasir dalam septictank Panjang Lebar Tinggi Biofil Jumlah unit = 0.34 Bh
= 2.2 m x 1.2 m x 1.2 m - 3 x 2 = 0.34 m3
1 2 3 4 5
b Pek. Bekisting Kolom Panjang Lebar Jumlah Papan Jumlah Kolom 2.40 m2
= 1.00 m x 0.15 m x 4 m x 8x 50% = 2.40 m2
X PEKERJAAN LISTRIK
1 Penyambungan Daya Baru PLN = 1.00 1.00 Unit
2 Instalasi Titik Lampu = 13.00 13.00 Titik
3 Lampu SL 18 Watt = 13.00 13.00 Bh
4 Saklar Tunggal = 4.00 4.00 Bh
5 Saklar Ganda = 4.00 4.00 Bh
6 Pek. Pas. Panel Listrik = 1.00 1.00 Bh
7 Pek. Instalasi stop kontak = 6.00 6.00 Titik
8 Stop Kontak = 6.00 6.00 Bh
XI PEKERJAAN LAIN-LAIN
1 Pekerjaan Pagar Besi BRC Panjang Lebar Jumlah 16.30 m2
= 2.00 m x 2.85 m x 2 .= 11.40 m2
= 2.00 m x 2.45 m x 1 .= 4.90 m2
X PERALATAN TPS3R
1 Mesin Pencacah Plastik = 1.00 1.00 Unit
2 Mesin Pencacah Kompos = 1.00 1.00 Unit
3 Mesin Pengayak = 1.00 1.00 Unit
1 2 3 4 5
1 Alat ukur suhu badan nir-sentuh (Thermoscan) = 2.00 2.00 Bh
2 Vitamin C (1 Box isi 100 tablet) = 20.00 20.00 Bh
3 Tempat Cuci Tangan = 2.00 2.00 Bh
4 Sabun Cuci Tangan (Cair) 200ml/btl = 4.00 4.00 Bh
5 Masker kain = 20.00 20.00 Bh
6 Alat penyemprot desinfektan = 2.00 2.00 Bh
7 Cairan Desinfektan 5L = 3.00 3.00 Bh
6.00
XII ADMINISTRASI KEGIATAN
1 Pelaporan KSM = 1.00 1.00 Ls
2 Photo Copy / Penggandaan = 1.00 1.00 Ls
3 Biaya Alat Tulis Kantor (ATK) = 1.00 1.00 Ls
4 Materai = 8.00 8.00 Bh
5 Pengujian Lab = 1.00 1.00 Paket
6 Papan Nama Kegiatan = 1.00 1.00 Paket
Form - RAB1
BANTUAN PEMERINTAH UNTUK MASYARAKAT ( BPM ) DFAT PROGRAM KOTA TANPA KUMUH (KOTAKU)
HASIL KESEPAKATAN HARGA SATUAN UPAH/BAHAN/ALAT
BULAN :
Provinsi : Kalimantan Tengah Kecamatan : Sebangau
Kota : Palangka Raya Kelurahan : Kereng Bangkirai
HARGA SATUAN
SESUAI
No. Uraian Tenaga Kerja Satuan STANDAR
KOTA/KABUPAT
EN
I. TENAGA KERJA
1 Mandor HOK 225,000 L.04
2 Kepala Tukang HOK 170,000
3 Tukang Batu HOK 155,000
4 Tukang Kayu HOK 150,000
5 Tukang Besi HOK 150,000
6 Tukang Cat HOK 150,000
7 Pekerja HOK 140,000 L.01
REKOMENDASI HARGA
HARGA SATUAN HARGA SATUAN HASIL SURVEY*) TERENDAH YANG DIPILIH
SESUAI UNTUK BULAN INI
No. Uraian Tenaga Kerja Satuan STANDAR Toko/Pemasok -1 Toko/Pemasok - 2 Toko/Pemasok - 3
KABUPATEN/KO Nama: Nama: Nama: HARGA
Nama Toko/Pemasok
TA Almt : Almt : Almt : SATUAN*)
Telp : Telp : Telp :
II. BAHAN/MATERIAL :
1 Cat Menie Kayu Platone Kg 62,400 60,000 60,000 A1
2 Cat dasar kayu platone Kg 62,400 60,000 60,000 A2
3 Cat penutup kayu platone Kg 62,400 60,000 60,000 A3
4 Cat tembok Kg 120,000 110,000 110,000 A4
5 Kwas 4" Bh 45,000 45,000 45,000 A5
6 Paku 5 - 12 cm Kg 22,000 22,000 22,000 A6
7 Pasir beton m3 200,000 180,000 180,000 A7
8 Pasir Pasang m3 190,000 180,000 150,000 A8
9 Semen Portland Kg 1,325 1,275 1,275 A9
10 Semen Portland Gresik 40 Kg/zak 53,000 51,000 51,000 A10
11 Minyak Cat/Thinner Cemerlang Kg 28,100 28,100 28,100 A11
12 Ampelas Kayu Flexigo Lbr 10,000 10,000 10,000 A12
13 Kran air stainless Duffi Bh 65,000 65,000 65,000 A13
14 Seal Tape Onda Kg 12,000 12,000 12,000 A14
15 Papan Informasi Kegiatan Lbr 200,000 200,000 200,000 A15
16 Kunci Tanam Bh 195,000 195,000 195,000 A16
17 Engsel Pintu Bh 26,000 26,000 26,000 A17
18 Lem Kayu Kg 33,000 33,000 33,000 A18
19 Bata Merah Bh 800 800 800 A19
20 Pipa PVC 4" AW Btg 295,000 295,000 295,000 A20
21 Pipa PVC 3/4" AW Btg 42,000 42,000 42,000 A21
22 Pipa PVC 2" AW Btg 127,500 127,500 127,500 A22
23 Elboh/Knee Bh 25,000 25,000 25,000 A23
25 Stop Kran 3/4 Bh 65,000 65,000 65,000 A25
26 TanahUrug m3 100,000 100,000 100,000 A26
27 Besi Beton Polos Kg 12,000 12,000 12,000 A27
Besi beton polos dia. 8 Batang 47,000 45,000
Besi beton polos dia. 10 Batang 70,500 70,000
Besi beton polos dia. 12 Batang 101,500 101,000
28 Kawat Beton/Bendrat Kg 25,000 25,000 25,000 A28
29 Plywood 9 mm Lbr 130,000 130,000 130,000 A29
30 Batako Bh 3,000 2,800 2,800 A30
31 Keramik lantai uk.40x40 Doz 75,000 75,000 75,000 A31
32 Semen Warna Kg 5,000 5,000 5,000 A32
33 Keramik lantai uk.20x20 Doz 65,000 65,000 65,000 A33
34 Keramik dinding uk.10x20 Doz 65,400 65,400 65,400 A34
35 Baja ringan 75x35x0,75 MM Batang 82,000 82,000 125,000 A35
36 Hollow 30x30x0,3 MM Batang 50,000 50,000 50,000 A36
37 Paku Skrup Bh 3,500 3,500 3,500 A37
38 Atap Metal Zincalume Spandek (106x600) Lbr 255,000 250,000 250,000 A38
39 Paku Anti Karat Kg 35,000 35,000 35,000 A39
41 Papan Plank Kalsiboard tbl.8 mm (30x240mm Lbr 155,000 155,000 155,000 A41
42 Besi Hollow Plafond 1,3x 3,3 mm Batang 15,000 15,000 15,000 A42
43 Kalsiboard tebal 6 mm Lbr 110,000 110,000 110,000 A43
44 Paku Kalsiboard Kg 25,000 25,000 25,000 A44
45 Kaca Bening 5 mm m2 135,000 135,000 135,000 A45
46 Sealant Kaca Kg 47,500 47,500 47,500 A46
47 Engsel Pintu 4" Bh 35,000 35,000 35,000 A47
48 Engsel Jendela Bh 41,000 41,000 41,000 A48
49 Kunci pintu tanam lengkap Bh 95,000 95,000 95,000 A49
50 Hak/Kait Angin Bh 20,800 20,800 20,800 A50
51 Gerendel/Kunci slot Bh 35,000 35,000 35,000 A51
52 Handel Jendela Bh 8,000 8,000 8,000 A52
53 Bioseptictank BF-08 Bh 10,643,500 10,643,500 10,643,500 A53
54 Profil tank 1200 L Bh 1,600,000 1,600,000 1,600,000 A54
55 Closed duduk Unit 1,828,300 1,800,000 1,800,000 A55
56 Batu Belah (Tangkiling-Dalam Kota) m3 400,000 400,000 400,000 A56
57 Roster/Kerawang uk. 30cmx30cm Bh 25,000 25,000 25,000 A57
58 Glasblock uk. 20x20 Bh 27,000 27,000 26,000 A58
59 KalsiBoard tebal 8 mm (120x240) Bh 190,000 190,000 190,000 A59
60 Wastafel lengkap+cermin putih Unit 940,000 940,000 940,000 A60
61 Box panel 20x80x60 Bh 760,000 760,000 760,000 A61
62 Penyambungan Daya Baru PLN Unit 4,000,000 4,000,000 4,500,000 A62
63 Instalasi Titik Lampu Titik 325,000 325,000 325,000 A63
REKOMENDASI HARGA
HARGA SATUAN HARGA SATUAN HASIL SURVEY*) TERENDAH YANG DIPILIH
SESUAI UNTUK BULAN INI
No. Uraian Tenaga Kerja Satuan STANDAR Toko/Pemasok - 1 Toko/Pemasok - 2 Toko/Pemasok - 3
KABUPATEN/KO Nama: Nama: Nama: HARGA
Nama Toko/Pemasok
TA Almt : Almt : Almt : SATUAN*)
Telp : Telp : Telp :
64 Lampu SL 18 Watt Bh 35,000 35,000 35,000 A64
65 Saklar Tunggal Bh 20,000 20,000 20,000 A65
66 Saklar Ganda Bh 20,000 20,000 20,000 A66
67 Pek. Pas. Panel Listrik Bh 760,000 760,000 760,000 A67
68 Pek. Instalasi stop kontak Titik 325,000 325,000 325,000 A68
69 Stop Kontak Bh 20,000 20,000 20,000 A69
70 Pipa Besi Galvanis tbl 1,2 mm P=6 m Batang 179,500 179,500 179,500 A70
71 Rolling door manual m2 500,000 500,000 500,000 A71
72 Pagar BRC Hot Deep Galvanized T.90-P.240 Lembar 577,500 577,500 577,500 A72
Pagar BRC Hot Deep Galvanized M2 320,000
73 Pipa Stainless Steel 2" btg/6m 206,000 205,800 308,700 A73
Pipa Stainless Steel 2" m 52,000
75 Glassblock Bh 26,000 26,000
76 Sumur Bor+Pompa Unit 2,500,000 2,500,000 A75
A76
REKOMENDASI HARGA
HARGA SATUAN HARGA SATUAN HASIL SURVEY*) TERENDAH YANG DIPILIH
SESUAI UNTUK BULAN INI
No. Uraian Tenaga Kerja Satuan STANDAR Toko/Pemasok - 1 Toko/Pemasok - 2 Toko/Pemasok - 3
KABUPATEN/KO Nama: Nama: Nama: HARGA
Nama Toko/Pemasok
TA Almt : Almt : Almt : SATUAN*)
Telp : Telp : Telp :
1 Balok Kayu Klas II (Lanan) m3 4,000,000.00 4,000,000.00 1 4,000,000.00 1
2 Papan Kayu Klas II (Lanan) m3 5,000,000.00 5,000,000.00 1 5,000,000.00 1
3 Papan Kayu Klas II (Benuas) m3 6,500,000.00 6,000,000.00 1 6,000,000.00 1
4 Balok Kayu Klas III m3 2,250,000.00 2,200,000.00 1 2,200,000.00 1
5 Papan Kayu Klas III m3 2,500,000.00 2,450,000.00 1 2,450,000.00 1
6 Kerikil (Maks 30mm) m3 475,000.00 450,000.00 1 450,000.00 1
7 Kayu Galam diameter 10-12 cm P=4 m Batang 35,000.00 35,000.00 1 35,000.00 1
8 Kayu Galam diameter 6-10 cm P=4 m Batang 30,000.00 30,000.00 1 30,000.00 1
REKOMENDASI HARGA
HARGA SATUAN HARGA SATUAN HASIL SURVEY*) TERENDAH YANG DIPILIH
SESUAI Toko/Pemasok - 1 Toko/Pemasok - 2 Toko/Pemasok - 3 UNTUK BULAN INI
No. Uraian Tenaga Kerja Satuan STANDAR Nama: Nama: Nama: HARGA
KABUPATEN/KO Almt : Nama Toko/Pemasok
Almt : Almt : SATUAN*)
TA Telp : Telp : Telp :
REKOMENDASI HARGA
HARGA SATUAN HARGA SATUAN HASIL SURVEY*) TERENDAH YANG DIPILIH
SESUAI Toko/Pemasok - 1 Toko/Pemasok - 2 Toko/Pemasok - 3 UNTUK BULAN INI
No. Uraian Tenaga Kerja Satuan STANDAR Nama: Nama: Nama: HARGA
KABUPATEN/KO Almt : Nama Toko/Pemasok
Almt : Almt : SATUAN*)
TA Telp : Telp : Telp :
BANTUAN PEMERINTAH UNTUK MASYARAKAT ( BPM ) DFAT PROGRAM KOTA TANPA KUMUH (KOTAKU)
DAFTAR KUANTITAS PEKERJAAN
PAKET : PEMBANGUNAN TPS3R
I PEKERJAAN PERSIAPAN
1 Pembersihan Awal m2 200.00
2 Pengukuran dan Pemasangan Bowplank m 66.00
II PEKERJAAN TANAH
1 Pek urugan tanah lokasi kegiatan m3 218.55
2 Pek. Galian Tanah Pondasi m3 11.68
3 Pek. Urugan Bekas Galian m3 2.92
4 Pek. Urugan Pasir bawah lantai m3 44.84
5 Pek. Pemancangan Cerucuk Kayu Galam btg 372.00
IX PEKERJAAN JEMBATAN
1 Pekerjaan Pondasi Batu Belah m3 14.67
2 Pekerjaan Sloof 20/30
a Pek. Pembesian kg 102.56
b Pekerjaan Bekisting Sloof m2 12.44
c Cor Beton k.200 m3 1.09
3 Pekerjaan Balok 20/30
a Pek. Pembesian kg 51.28
b Pekerjaan Bekisting Balok m2 7.28
c Cor Beton k.200 m3 0.55
4 Pekerjaan Plat beton
a Pek. Pembersian kg 250.87
b Pekerjaan Bekisting Plat m2 11.89
c Cor Beton K200 tebal 20 cm m3 4.03
5 Pekerjaan Reling jembatan
a Pembesian Kolom 15/15 Kg 22.59
b Pek. Bekisting Kolom m2 2.40
c Cor Beton k.200 m3 0.18
d Pek. Pas Batako m2 3.10
e Pek. Plesteran m2 6.60
f Pek Besi Galvanis 2" m 7.40
X PEKERJAAN LISTRIK
1 Penyambungan Daya Baru PLN Unit 1.00
2 Instalasi Titik Lampu Titik 13.00
3 Lampu SL 18 Watt Bh 13.00
4 Saklar Tunggal Bh 4.00
5 Saklar Ganda Bh 4.00
6 Pek. Pas. Panel Listrik Bh 1.00
7 Pek. Instalasi stop kontak Titik 6.00
8 Stop Kontak Bh 6.00
XI PEKERJAAN LAIN-LAIN
1 Pekerjaan Pagar Besi BRC m2 16.30
2 Pekerjaan Pintu Pagar Besi m2 9.45
3 Pekerjaan Handrail difabel stainless
a Hanggar TPS3R panjang 2 m m 13.54
b Kantor panjang 0,95 m m 4.75
c WC Panjang 0,75 m 4.29
d Biaya pengelasan (100% fisik) m 22.58
4 Pekerjaan Rolling door m2 7.27
5 Pek. Handrail WC m 1.20
6 Pekerjaan ukiran kayu m2 19.20
7 Pek. Plesteran letter timbul Paket 1.00
NO. URAIAN PEKERJAAN SATUAN VOLUME
Jumlah Bahan -
C. Peralatan - -
Jumlah Peralatan -
D. Harga Satuan Pekerjaan (A+B+C) 70,000.00
Pekerjaan : Pembesian 10 kg dengan besi polos atau besi ulir Kode Analisa
Satuan Pembayaran : Kg A.4.1.1.17
Pekerjaan : Membuat 1 m3 beton mutu f’c = 14,5 Mpa (K.175) Kode Analisa
Satuan Pembayaran : M3 A.4.1.1.5.
Pekerjaan : Pemasangan 1 cm2 dinding conblock HB10/Batako 1SP : 4PP Kode Analisa
Satuan Pembayaran : M2 A.4.4.1.21a.
Pekerjaan : Pemasangan 1 m2 genteng metal ukuran 80 x 100 atap pelana Kode Analisa
Satuan Pembayaran : M2 A.4.5.2.32.
Pekerjaan : Pembuatan dan pemasangan 1 m2 daun pintu panel, Kayu Klas II Kode Analisa
Satuan Pembayaran : M2 A.4.6.1.5.
Pekerjaan : Pembuatan dan pemasangan 1 m2 pintu jendela kaca, Kayu Klas II Kode Analisa
Satuan Pembayaran : M2 A.4.6.1.6.
Pekerjaan : Pemasangan 1 m3 pondasi batu belah campuran 1SP : 4PP Kode Analisa
Satuan Pembayaran : m3 A.3.2.1.2.
HARGA
NO. JENIS PEKERJAAN SATUAN
(Rp.)
I PEKERJAAN PERSIAPAN
1. Pembersihan Awal m2 Rp 14,000.00
2. Pengukuran dan Pemasangan Bowplank m Rp 74,690.00
II PEKERJAAN TANAH
1. Pek urugan tanah lokasi kegiatan m3 Rp 162,000.00
2. Pek. Galian Tanah Pondasi m3 Rp 105,000.00
3. Pek. Urugan Bekas Galian m3 Rp 70,000.00
4. Pek. Urugan Pasir bawah lantai m3 Rp 222,000.00
5. Pek. Pemancangan Cerucuk Kayu Galam btg Rp 50,100.00
IX PEKERJAAN JEMBATAN
1. Pekerjaan Pondasi Batu Belah m3 Rp 1,104,825.00
2. Pekerjaan Sloof 20/30
a Pek. Pembesian kg Rp 15,124.00
b Pekerjaan Bekisting Sloof m2 Rp 223,020.00
c Cor Beton k.200 m3 Rp 1,078,920.71
3. Pekerjaan Balok 20/30
a Pek. Pembesian kg Rp 15,124.00
b Pekerjaan Bekisting Balok m2 Rp 386,310.00
c Cor Beton k.200 m3 Rp 1,078,920.71
HARGA
NO. JENIS PEKERJAAN SATUAN
(Rp.)
4. Pekerjaan Plat beton
a Pek. Pembersian kg Rp 15,124.00
b Pekerjaan Bekisting Plat m2 Rp 539,810.00
c Cor Beton K200 tebal 20 cm m3 Rp 1,078,920.71
5. Pekerjaan Reling jembatan
a Pembesian Kolom 15/15 Kg Rp 15,124.00
b Pek. Bekisting Kolom m2 Rp 374,310.00
c Cor Beton k.200 m3 Rp 1,078,920.71
d Pek. Pas Batako m2 Rp 167,865.75
e Pek. Plesteran m2 Rp 79,356.00
f Pek Besi Galvanis 2" m Rp 29,916.67
X PEKERJAAN LISTRIK
1. Penyambungan Daya Baru PLN Unit Rp 4,500,000.00
2. Instalasi Titik Lampu Titik Rp 325,000.00
3. Lampu SL 18 Watt Bh Rp 35,000.00
4. Saklar Tunggal Bh Rp 20,000.00
5. Saklar Ganda Bh Rp 20,000.00
6. Pek. Pas. Panel Listrik Bh Rp 760,000.00
7. Pek. Instalasi stop kontak Titik Rp 325,000.00
8. Stop Kontak Bh Rp 20,000.00
XI PEKERJAAN LAIN-LAIN
1. Pekerjaan Pagar Besi BRC m2 Rp 320,000.00
2. Pekerjaan Pintu Pagar Besi m2 Rp 600,000.00
3. Pekerjaan Handrail difabel stainless
a Hanggar TPS3R panjang 2 m m Rp 52,000.00
b Kantor panjang 0,95 m m Rp 52,000.00
c WC Panjang 0,75 m Rp 52,000.00
d Biaya pengelasan (100% fisik) m Rp 52,000.00
4. Pekerjaan Rolling door m2 Rp 810,400.00
5. Pek. Handrail WC m Rp 52,000.00
6. Pekerjaan ukiran kayu m2 Rp 625,000.00
7. Pek. Plesteran letter timbul Paket Rp 800,000.00
I PEKERJAAN PERSIAPAN
1 Pembersihan Awal m2 200.00 A.2.2.1.9 Rp 14,000.00 Rp 2,800,000.00
2 Pengukuran dan Pemasangan Bowplank m 66.00 A. 2.2.1.4. Rp 74,690.00 Rp 4,929,540.00
Jumlah I Rp 7,729,540.00
II PEKERJAAN TANAH
1 Pek urugan tanah lokasi kegiatan m3 218.55 A.2.3.1.11.a Rp 162,000.00 Rp 35,405,100.00
2 Pek. Galian Tanah Pondasi m3 11.68 A. 2.3.1.1 Rp 105,000.00 Rp 1,226,610.00
3 Pek. Urugan Bekas Galian m3 2.92 A.2.3.1.9. Rp 70,000.00 Rp 204,435.00
4 Pek. Urugan Pasir bawah lantai m3 44.84 A.2.3.1.11. Rp 222,000.00 Rp 9,953,479.89
5 Pek. Pemancangan Cerucuk Kayu Galam btg 372.00 P.07.a Rp 50,100.00 Rp 18,637,200.00
Jumlah II Rp 65,426,824.89
III PEKERJAAN BETON BERTULANG
1 Pondasi Footplat P1 (80 cm x 80 cm x 20 cm)
a Pek. Pembesian Kg 316.93 A.4.1.1.17 Rp 15,124.00 Rp 4,793,254.16
b Pek. Lantai Kerja Beton K.100 t=5 cm m3 0.67 A.4.1.1.1 Rp 954,788.57 Rp 641,617.92
c Pek. Bekisting Pondasi m2 2.24 A.4.1.1.20 Rp 220,820.00 Rp 494,636.80
d Cor Beton Mutu k.200 m3 2.69 A.4.1.1.7. Rp 1,078,920.71 Rp 2,900,138.88
2 Pondasi Footplat P2 (60 cm x 60 cm x 20 cm)
a Pek. Pembesian Kg 217.59 A.4.1.1.17 Rp 15,124.00 Rp 3,290,830.80
b Pek. Lantai Kerja Beton K.100 t=5 cm m3 0.34 A.4.1.1.1 Rp 954,788.57 Rp 326,537.69
c Pek. Bekisting Pondasi m2 1.52 A.4.1.1.20 Rp 220,820.00 Rp 335,646.40
d Cor Beton Mutu k.200 m3 1.37 A.4.1.1.7. Rp 1,078,920.71 Rp 1,475,963.54
3 Pondasi Footplat P3 (60 cm x 60 cm x 20 cm)
a Pek. Pembesian Kg 39.77 A.4.1.1.17 Rp 15,124.00 Rp 601,506.40
b Pek. Lantai Kerja Beton K.100 t=5 cm m3 0.05 A.4.1.1.1 Rp 954,788.57 Rp 45,829.85
c Pek. Bekisting Pondasi m2 1.92 A.4.1.1.20 Rp 220,820.00 Rp 423,974.40
d Cor Beton Mutu k.200 m3 0.19 A.4.1.1.7. Rp 1,078,920.71 Rp 207,152.78
4 Pek Kolom K1
a Pek. Pembesian Kg 484.00 A.4.1.1.17 Rp 15,124.00 Rp 7,320,039.11
b Pek. Bekisting Kolom m2 40.40 A.4.1.1.22 Rp 374,310.00 Rp 15,122,124.00
c Cor Beton Mutu k.200 m3 4.23 A.4.1.1.7. Rp 1,078,920.71 Rp 4,561,676.78
5 Pek Kolom K2
a Pek. Pembesian Kg 147.98 A.4.1.1.17 Rp 15,124.00 Rp 2,237,998.10
b Pek. Bekisting Kolom m2 15.43 A.4.1.1.22 Rp 374,310.00 Rp 5,775,603.30
c Cor Beton Mutu k.200 m3 1.76 A.4.1.1.7. Rp 1,078,920.71 Rp 1,895,933.43
6 Pek Kolom K3
a Pek. Pembesian Kg 66.65 A.4.1.1.17 Rp 15,124.00 Rp 1,008,025.19
b Pek. Bekisting Kolom m2 6.96 A.4.1.1.22 Rp 374,310.00 Rp 2,605,197.60
c Cor Beton Mutu k.200 m3 0.26 A.4.1.1.7. Rp 1,078,920.71 Rp 281,598.31
7 Pekerjaan Sloof 20x30
a Pek. Pembesian Kg 392.56 A.4.1.1.17 Rp 15,124.00 Rp 5,937,107.39
b Pek. Bekisting Sloof m2 11.60 A.4.1.1.21 Rp 223,020.00 Rp 2,587,032.00
c Cor Beton Mutu k.200 m3 3.48 A.4.1.1.7. Rp 1,078,920.71 Rp 3,754,644.09
8 Pekerjaan Sloof 15x20
a Pek. Pembesian Kg 302.62 A.4.1.1.17 Rp 15,124.00 Rp 4,576,861.96
b Pek. Bekisting Sloof m2 23.72 A.4.1.1.21 Rp 223,020.00 Rp 5,290,034.40
c Cor Beton Mutu k.200 m3 2.03 A.4.1.1.7. Rp 1,078,920.71 Rp 2,186,432.83
9 Pekerjaan Ring Balok 20x20
a Pek. Pembesian Kg 275.43 A.4.1.1.17 Rp 15,124.00 Rp 4,165,565.51
b Pek. Bekisting Ring Balok m2 11.60 A.4.1.1.23 Rp 386,310.00 Rp 4,481,196.00
c Cor Beton Mutu k.200 m3 2.32 A.4.1.1.7. Rp 1,078,920.71 Rp 2,503,096.06
10 Pekerjaan Balok 15x20
a Pek. Pembesian Kg 44.67 A.4.1.1.17 Rp 15,124.00 Rp 675,542.20
b Pek. Bekisting Ring Balok m2 3.36 A.4.1.1.23 Rp 386,310.00 Rp 1,298,001.60
c Cor Beton Mutu k.200 m3 0.25 A.4.1.1.7. Rp 1,078,920.71 Rp 271,888.02
11 Pekerjaan Ring Balok 15/15
a Pek. Pembesian Kg 281.95 A.4.1.1.17 Rp 15,124.00 Rp 4,264,274.02
b Pek. Bekisting Ring Balok m2 17.79 A.4.1.1.23 Rp 386,310.00 Rp 6,872,454.90
c Cor Beton Mutu k.200 m3 0.62 A.4.1.1.7. Rp 1,078,920.71 Rp 665,154.62
12 Pekerjaan lantai beton bertulang
a Pek. Pembesian Kg 1101.59 A.4.1.1.17 Rp 15,124.00 Rp 16,660,432.64
b Cor Beton Mutu k.175 m3 42.55 A.4.1.1.7. Rp 1,048,999.29 Rp 44,636,361.98
HARGA SATUAN JUMLAH HARGA
NO JENIS PEKERJAAN SATUANVOLUME ANALISA
(Rp) (Rp)
13 Pek. Plat /Dak Beton
a Pembesian Kg 36.50 A.4.1.1.17 Rp 15,124.00 Rp 551,958.70
b Pek. Bekisting m2 4.29 A.4.1.1.24 Rp 539,810.00 Rp 2,314,435.38
c Cor Beton Mutu k.200 m3 0.64 A.4.1.1.7. Rp 1,078,920.71 Rp 693,880.88
Jumlah III Rp 170,731,640.59
IV PEKERJAAN DINDING, PLESTERAN DAN KERAMIK
1 Pek. Pasangan dinding Bataco
a Bangunan Hanggar TPS3R m2 142.96 A.4.4.1.21a. Rp 167,865.75 Rp 23,998,020.47
b Kantor m2 60.60 A.4.4.1.21a. Rp 167,865.75 Rp 10,173,168.05
c WC m2 23.50 A.4.4.1.21a. Rp 167,865.75 Rp 3,945,348.72
d Pagar m2 73.61 A.4.4.1.21a. Rp 167,865.75 Rp 12,356,346.06
2 Pek. Plesteran Dinding
a Bangunan Hanggar TPS3R m2 205.28 A.4.4.2.4. Rp 79,356.00 Rp 16,290,136.20
b Kantor m2 89.03 A.4.4.2.4. Rp 79,356.00 Rp 7,065,382.10
c WC m2 38.21 A.4.4.2.4. Rp 79,356.00 Rp 3,031,875.34
d Pagar m2 93.01 A.4.4.2.4. Rp 79,356.00 Rp 7,380,822.20
3 Cor Beton Lantai Beton Mutu k.200 m3 5.04 A.4.1.1.7. Rp 1,078,920.71 Rp 5,439,098.26
4 Pek Keramik lantai Uk.40x40 m2 46.73 A.4.4.3.35.a Rp 258,950.00 Rp 12,101,354.98
5 Pek Keramik lantai WC Uk.20x20 m2 3.68 A.4.4.3.36. Rp 248,960.00 Rp 916,172.80
6 Pek Keramik dinding WC Uk.10x20 m2 8.16 A.4.4.3.53. Rp 324,677.50 Rp 2,649,368.40
7 Pek. Tawing layar m2 45.05 A.4.6.1.25.a Rp 213,650.00 Rp 9,624,932.50
Jumlah III Rp 114,972,026.08
V PEKERJAAN ATAP, PLAFOND, LISPLANK
1 Rangka Atap Baja Ringan
a Hanggar TPS3R m2 242.24 A.4.2.1.2 d Rp 139,086.67 Rp 33,691,801.24
b Kantor m2 18.63 A.4.2.1.2 d Rp 139,086.67 Rp 2,591,677.02
c WC m2 9.96 A.4.2.1.2 d Rp 139,086.67 Rp 1,385,827.29
2 Pek Atap Genteng Metal Zincalume
a Hanggar TPS3R m2 242.24 A.4.5.2.32. Rp 91,794.34 Rp 22,235,895.93
b Kantor m2 18.63 A.4.5.2.32. Rp 91,794.34 Rp 1,710,453.53
c WC m2 9.96 A.4.5.2.32. Rp 91,794.34 Rp 914,617.51
3 Pek. Lisplank Superplank Eksterior m 57.34 A.4.6.1.21.a Rp 120,641.67 Rp 6,918,162.66
4 Rangka Hollow Plafond Kantor m2 9.55 A.4.2.1.21. Rp 127,450.00 Rp 1,216,828.88
5 Pek. Pas. Plafond Kalsiboard m2 9.55 A.4.5.1.1a Rp 72,700.00 Rp 694,103.25
Jumlah IV Rp 71,359,367.32
VI PEKERJAAN PINTU, JENDELA, KUNCI & PENGGANTUNG
1 Pek. Kusen Pintu dan Jendela Kayu Klas II
a Hanggar TPS3R m3 0.12 A.4.6.1.2. Rp 8,706,500.00 Rp 1,007,342.05
b Kantor m3 0.06 A.4.6.1.2. Rp 8,706,500.00 Rp 504,977.00
c WC m3 0.02 A.4.6.1.2. Rp 8,706,500.00 Rp 182,836.50
2 Pek. Daun Pintu Panel Kayu Klas II
a Hanggar TPS3R m2 3.60 A.4.6.1.5. Rp 841,000.00 Rp 3,027,600.00
b Kantor m2 1.80 A.4.6.1.5. Rp 841,000.00 Rp 1,513,800.00
c WC m2 1.80 A.4.6.1.5. Rp 841,000.00 Rp 1,513,800.00
3 Pek. Rangka Jendela Kaca Kayu Klas II m2 2.26 A.4.6.1.6. Rp 632,800.00 Rp 1,427,596.80
4 Pek.Pemasangan Kaca Tebal 5 mm m2 7.48 A.4.6.2.17 Rp 175,650.00 Rp 1,314,213.30
5 Pek. Engsel Pintu bh 12.00 A.4.6.2.5 Rp 62,150.00 Rp 745,800.00
6 Pek. Engsel Jendela bh 12.00 A.4.6.2.6. Rp 59,100.00 Rp 709,200.00
7 Kunci Tanam bh 4.00 A.4.6.2.2. Rp 179,900.00 Rp 719,600.00
8 Hak angin Jendela bh 6.00 A.4.6.2.9. Rp 47,950.00 Rp 287,700.00
9 Gerendel Jendela bh 6.00 A.4.6.2.11. Rp 62,150.00 Rp 372,900.00
10 Handel Jendela bh 6.00 A.4.6.2.8.a Rp 35,150.00 Rp 210,900.00
11 Pekerjaan Ventilasi Kerawang m2 16.20 A. 4.4.1.23 Rp 378,475.00 Rp 6,131,295.00
12 Pekerjaan glasblock m2 8.92 Ls Rp 650,000.00 Rp 5,798,000.00
Jumlah V Rp 25,467,560.65
VII PEKERJAAN PENGECATAN
1 Pengecatan dinding
a Hanggar TPS3R m2 205.28 A.4.7.1.10. Rp 46,321.00 Rp 9,508,737.82
b Kantor m2 89.03 A.4.7.1.10. Rp 46,321.00 Rp 4,124,143.91
c WC m2 38.21 A.4.7.1.10. Rp 46,321.00 Rp 1,769,740.13
d Pagar m2 93.01 A.4.7.1.10. Rp 46,321.00 Rp 4,308,269.89
2 Pengecatan Plafond Kantor m2 9.55 A.4.7.1.10. Rp 46,321.00 Rp 442,249.75
3 Pengecatan Kusen Pintu dan Jendela m2 10.08 A.4.7.1.4. Rp 53,263.00 Rp 536,891.04
4 Pengecatan Pintu Panel
a Hanggar TPS3R m2 10.80 A.4.7.1.4. Rp 53,263.00 Rp 575,240.40
b Kantor m2 3.60 A.4.7.1.4. Rp 53,263.00 Rp 191,746.80
c WC m2 3.60 A.4.7.1.4. Rp 53,263.00 Rp 191,746.80
5 Pengecatan Rangka Jendela Kaca m2 3.20 A.4.7.1.4. Rp 53,263.00 Rp 170,441.60
Jumlah VI Rp 21,819,208.14
HARGA SATUAN JUMLAH HARGA
NO JENIS PEKERJAAN SATUANVOLUME ANALISA
(Rp) (Rp)
VIII PEKERJAAN SANITASI
1 Pekerjaan Septictank 2 unit
a Galian Septictank m3 13.88 A. 2.3.1.1 Rp 105,000.00 Rp 1,456,875.00
b Pek. Urugan Pasir t=5 cm m2 0.38 A.2.3.1.11. Rp 222,000.00 Rp 83,250.00
c Pek Cor Beton K.175 tebal 10 cm m3 0.53 A.4.1.1.5. Rp 1,048,999.29 Rp 553,871.62
d Pek. Sloof 15/15
- Pek. Pembesian Kg 56.55 A.4.1.1.17 Rp 15,124.00 Rp 855,292.45
- Pek. bekisting m2 4.80 A.4.1.1.21 Rp 223,020.00 Rp 1,070,496.00
- Pek cor beton K.175 m3 0.36 A.4.1.1.5. Rp 1,048,999.29 Rp 377,639.74
e Pek. Kolom 15/15
- Pek. Pembesian Kg 48.46 A.4.1.1.17 Rp 15,124.00 Rp 732,972.56
- Pek. bekisting m2 8.16 A.4.1.1.22 Rp 374,310.00 Rp 3,054,369.60
- Pek cor beton K.175 m3 0.31 A.4.1.1.5. Rp 1,048,999.29 Rp 320,993.78
f Pek. Pas. Batako m2 23.12 A.4.4.1.21a. Rp 167,865.75 Rp 3,881,056.14
g Pek. Plesteran m2 23.12 A.4.4.2.4. Rp 79,356.00 Rp 1,834,710.72
h Pek. Ring Balk 15/15
- Pek. Pembesian Kg 56.55 A.4.1.1.17 Rp 15,124.00 Rp 855,292.45
- Pek. bekisting m2 4.80 A.4.1.1.21 Rp 223,020.00 Rp 1,070,496.00
- Pek cor beton K.175 m3 0.36 A.4.1.1.5. Rp 1,048,999.29 Rp 377,639.74
i Pek. Plat penutup septictank tebal 10 cm
- Pek. Pembesian Kg 9.32 A.4.1.1.17 Rp 15,124.00 Rp 140,985.93
- Pek. bekisting m2 2.40 A.4.1.1.24 Rp 539,810.00 Rp 1,295,544.00
- Pek cor beton K.175 m3 0.17 A.4.1.1.5. Rp 1,048,999.29 Rp 176,231.88
j Pek. Tutup mainhole
- Pek. Pembesian Kg 6.00 A.4.1.1.17 Rp 15,124.00 Rp 90,804.50
- Pek. bekisting m2 0.84 A.4.1.1.24 Rp 539,810.00 Rp 453,440.40
- Pek cor beton K.175 m3 0.10 A.4.1.1.5. Rp 1,048,999.29 Rp 102,801.93
k Bioseptictank Kapasitas 3000L Bh 2.00 Ls Rp 10,643,500.00 Rp 21,287,000.00
l Urugan Pasir dalam septictank m3 0.34 A.2.3.1.11. Rp 222,000.00 Rp 74,592.00
2 Pekerjaan Pipa 4" m 3.50 A.5.1.1 32. Rp 148,872.50 Rp 521,053.75
3 Pekerjaan Pipa 2" m 1.93 A.5.1.1 29. Rp 72,446.25 Rp 139,821.26
4 Pekerjaan Pipa 3/4" (Air Bersih) m 36.66 A.5.1.1 26. Rp 31,635.00 Rp 1,159,739.10
5 Pek. Sumur Bor+pompa Bh 1.00 Ls Rp 2,500,000.00 Rp 2,500,000.00
6 Pekerjaan kran air Bh 2.00 A.5.1.1 19. Rp 135,500.00 Rp 271,000.00
7 Pekerjaan stop kran Bh 1.00 A.5.1.1 19.a Rp 135,500.00 Rp 135,500.00
8 Profil tank 1200 L Bh 1.00 Ls Rp 1,600,000.00 Rp 1,600,000.00
9 Pek. Closed Duduk Bh 1.00 A.5.1.1.1. Rp 2,542,200.00 Rp 2,542,200.00
10 Pek. Wastafel+cermin Unit 1.00 A.5.1.1 5. Rp 1,668,200.00 Rp 1,668,200.00
11 Pek. Grill besi penutup saluran m2 3.75 Ls Rp 340,000.00 Rp 1,275,000.00
Jumlah VII Rp 51,958,870.55
IX PEKERJAAN JEMBATAN
1 Pekerjaan Pondasi Batu Belah m3 14.67 A.3.2.1.2. Rp 1,104,825.00 Rp 16,207,782.75
2 Pekerjaan Sloof 20/30
a Pek. Pembesian kg 102.56 A.4.1.1.17 Rp 15,124.00 Rp 1,551,043.33
b Pekerjaan Bekisting Sloof m2 12.44 A.4.1.1.21 Rp 223,020.00 Rp 2,774,368.80
c Cor Beton k.200 m3 1.09 A.4.1.1.7. Rp 1,078,920.71 Rp 1,178,181.42
3 Pekerjaan Balok 20/30
a Pek. Pembesian kg 51.28 A.4.1.1.17 Rp 15,124.00 Rp 775,521.67
b Pekerjaan Bekisting Balok m2 7.28 A.4.1.1.23 Rp 386,310.00 Rp 2,812,336.80
c Cor Beton k.200 m3 0.55 A.4.1.1.7. Rp 1,078,920.71 Rp 589,090.71
4 Pekerjaan Plat beton
a Pek. Pembersian kg 250.87 A.4.1.1.17 Rp 15,124.00 Rp 3,794,191.15
b Pekerjaan Bekisting Plat m2 11.89 A.4.1.1.24 Rp 539,810.00 Rp 6,418,340.90
c Cor Beton K200 tebal 20 cm m3 4.03 A.4.1.1.7. Rp 1,078,920.71 Rp 4,345,892.64
5 Pekerjaan Reling jembatan
a Pembesian Kolom 15/15 Kg 22.59 A.4.1.1.17 Rp 15,124.00 Rp 341,620.91
b Pek. Bekisting Kolom m2 2.40 A.4.1.1.22 Rp 374,310.00 Rp 898,344.00
c Cor Beton k.200 m3 0.18 A.4.1.1.7. Rp 1,078,920.71 Rp 194,205.73
d Pek. Pas Batako m2 3.10 A.4.4.1.21a. Rp 167,865.75 Rp 520,383.83
e Pek. Plesteran m2 6.60 A.4.4.2.4. Rp 79,356.00 Rp 523,749.60
f Pek Besi Galvanis 2" m 7.40 Ls Rp 29,916.67 Rp 221,383.33
Jumlah VIII Rp 43,146,437.57
HARGA SATUAN JUMLAH HARGA
NO JENIS PEKERJAAN SATUANVOLUME ANALISA
(Rp) (Rp)
X PEKERJAAN LISTRIK
1 Penyambungan Daya Baru PLN Unit 1.00 Ls Rp 4,500,000.00 Rp 4,500,000.00
2 Instalasi Titik Lampu Titik 13.00 Ls Rp 325,000.00 Rp 4,225,000.00
3 Lampu SL 18 Watt Bh 13.00 Ls Rp 35,000.00 Rp 455,000.00
4 Saklar Tunggal Bh 4.00 Ls Rp 20,000.00 Rp 80,000.00
5 Saklar Ganda Bh 4.00 Ls Rp 20,000.00 Rp 80,000.00
6 Pek. Pas. Panel Listrik Bh 1.00 Ls Rp 760,000.00 Rp 760,000.00
7 Pek. Instalasi stop kontak Titik 6.00 Ls Rp 325,000.00 Rp 1,950,000.00
8 Stop Kontak Bh 6.00 Ls Rp 20,000.00 Rp 120,000.00
Jumlah IX Rp 12,170,000.00
XI PEKERJAAN LAIN-LAIN
1 Pekerjaan Pagar Besi BRC m2 16.30 Ls Rp 320,000.00 Rp 5,216,000.00
2 Pekerjaan Pintu Pagar Besi m2 9.45 Ls Rp 600,000.00 Rp 5,670,000.00
3 Pekerjaan Handrail difabel stainless
a Hanggar TPS3R panjang 2 m m 13.54 Ls Rp 52,000.00 Rp 704,080.00
b Kantor panjang 0,95 m m 4.75 Ls Rp 52,000.00 Rp 247,000.00
c WC Panjang 0,75 m 4.29 Ls Rp 52,000.00 Rp 223,080.00
d Biaya pengelasan (100% fisik) m 22.58 Ls Rp 52,000.00 Rp 1,174,160.00
4 Pekerjaan Rolling door m2 7.27 A.4.2.1.10 Rp 810,400.00 Rp 5,889,582.00
5 Pek. Handrail WC m 1.20 Ls Rp 52,000.00 Rp 62,400.00
6 Pekerjaan ukiran kayu m2 19.20 Ls Rp 625,000.00 Rp 12,000,000.00
7 Pek. Plesteran letter timbul Paket 1.00 Ls Rp 800,000.00 Rp 800,000.00
Jumlah IX Rp 31,986,302.00
XII PERALATAN TPS3R
1 Mesin Pencacah Plastik kap 400 Kg/hari Diesel 16 HP Unit 1.00 Ls Rp 36,130,000.00 Rp 36,130,000.00
2 Mesin Pencacah Kompos kapasitas 500 kg/jam Diesel 8HP Unit 1.00 Ls Rp 22,650,000.00 Rp 22,650,000.00
3 Mesin Pengayak Kapasitas 500 Kg/Jam Unit 1.00 Ls Rp 18,150,000.00 Rp 18,150,000.00
Jumlah IX Rp 76,930,000.00
XIII KEBUTUHAN K3 DAN PROKES PENCEGAHAN COVID - 19
A KEBUTUHAN KESEHATAN DAN KESELAMATAN KERJA
1 Sosialisasi K3 dan Prokes (Spanduk) Bh 4.00 Ls Rp 75,000.00 Rp 300,000.00
2 Helm Keselamatan Bh 21.00 Ls Rp 100,000.00 Rp 2,100,000.00
3 Rompi Kerja Bh 21.00 Ls Rp 60,000.00 Rp 1,260,000.00
4 Sarung Tangan (Safety Glove) Bh 21.00 Ls Rp 5,000.00 Rp 105,000.00
5 Sepatu Keselamatan (Rubber Shoes) Bh 21.00 Ls Rp 100,000.00 Rp 2,100,000.00
6 Tali Pengaman Bh 3.00 Ls Rp 231,500.00 Rp 694,500.00
7 Kotak P3K Bh 2.00 Ls Rp 40,000.00 Rp 80,000.00
8 Asuransi Tenaga Kerja Paket 1.00 Ls Rp 912,000.00 Rp 912,000.00
B KEBUTUHAN PROTOKOL KESEHATAN PENCEGAHAN COVID-19
1 Alat ukur suhu badan nir-sentuh (Thermoscan) Bh 2.00 Ls Rp 350,000.00 Rp 700,000.00
2 Vitamin C (1 Box isi 100 tablet) Bh 20.00 Ls Rp 25,000.00 Rp 500,000.00
3 Tempat Cuci Tangan Bh 2.00 Ls Rp 250,000.00 Rp 500,000.00
4 Sabun Cuci Tangan (Cair) 200ml/btl Bh 4.00 Ls Rp 25,000.00 Rp 100,000.00
5 Masker kain Bh 20.00 Ls Rp 5,000.00 Rp 100,000.00
6 Alat penyemprot desinfektan Bh 2.00 Ls Rp 65,000.00 Rp 130,000.00
7 Cairan Desinfektan 5L Bh 3.00 Ls Rp 75,000.00 Rp 225,000.00
Jumlah X Rp 9,806,500.00
XIV ADMINISTRASI KEGIATAN
1 Pelaporan KSM Ls 1.00 Ls Rp 270,000.00 Rp 270,000.00
2 Photo Copy / Penggandaan Ls 1.00 Ls Rp 250,000.00 Rp 250,000.00
3 Biaya Alat Tulis Kantor (ATK) Ls 1.00 Ls Rp 150,000.00 Rp 150,000.00
4 Materai Ls 8.00 Ls Rp 10,000.00 Rp 80,000.00
5 Pengujian Lab Bh 1.00 Ls Rp 500,000.00 Rp 500,000.00
6 Papan Nama Kegiatan Paket 1.00 Ls Rp 250,000.00 Rp 250,000.00
Jumlah IX Rp 1,500,000.00
TOTAL Rp 705,004,278
DIBULATKAN Rp 705,000,000
JUMLAH HARGA
NO. NAMA PAKET PEKERJAAN SATUAN VOLUME
(Rp.)
HARGA SATUAN
JUMLAH BIAYA
NO. URAIAN SATUAN VOLUME (Rp.)
(Rp.)
(1) (2) (4) (5) 6 = (4) X (5)
TENAGA KERJA
1. Kepala Tukang HOK 51.00 170,000.00 8,670,000.00
2. Tukang Batu HOK 149.00 155,000.00 23,095,000.00
1. 3. Tukang Kayu HOK 132.00 150,000.00 19,800,000.00
4. Tukang Besi HOK 135.00 150,000.00 20,250,000.00
5. Tukang Cat HOK 25.00 150,000.00 3,750,000.00
6. Pekerja HOK 900.00 140,000.00 126,000,000.00
JUMLAH 201,565,000.00
BAHAN
1. Kayu balok 5/7 Klas III Batang 57.00 31,250.00 1,781,250.00
2. Paku 5 -10 cm Kg 76.00 22,000.00 1,672,000.00
3. Kayu papan 2/20 Klas III Batang 687.00 39,700.00 27,273,900.00
4. Tanah Urug m3 281.00 100,000.00 28,100,000.00
5. Pasir Urug m3 53.00 150,000.00 7,950,000.00
6. Kayu Galam ø 10-12 m Batang 195.00 35,000.00 6,825,000.00
7. Besi Beton Kg 4,528.00 12,000.00
Besi beton polos dia. 8 Batang 445.00 45,000.00 20,025,000.00
Besi beton polos dia. 10 Batang 100.00 70,000.00 7,000,000.00
Besi beton polos dia. 12 Batang 206.00 101,000.00 20,806,000.00
8. Kawat Beton Kg 70.00 25,000.00 1,750,000.00
9. Semen Portland Zak 796.00 51,000.00 40,596,000.00
10. Pasir Beton m3 34.00 180,000.00 6,120,000.00
11. Split m3 32.00 450,000.00 14,400,000.00
13. Balok Kayu Klas II uk.5/7 Batang 143.00 56,000.00 8,008,000.00
14. Dolken Kayu ø8-10 Batang 308.00 30,000.00 9,240,000.00
15. Plywood 9 mm Lembar 8.00 130,000 1,040,000.00
16. Batako Bh 4,100.00 2,800.00 11,480,000.00
17. Pasir Pasang m3 149.00 150,000.00 22,350,000.00
18. Ubin Keramik 40x40 Doz 49.00 75,000.00 3,675,000.00
19. Semen Warna Kg 48.00 5,000.00 240,000.00
20. Ubin Keramik 20x20 Doz 4.00 65,000.00 260,000.00
21. Ubin Keramik 10x20 Doz 9.00 65,400.00 588,600.00
22. Paku GRC Kg 7.00 25,000.00 175,000.00
23. Kalsiboard Tebal 9 mm Lbr 19.00 190,000.00 3,610,000.00
24. Baja Ringan 75x35x0,75 MM Batang 193.00 125,000.00 24,125,000.00
25. Baja Ringan 30x30x0,3 MM Batang 67.00 50,000.00 3,350,000.00
26. Paku Skrup Kg 1,200.00 3,500.00 4,200,000.00
27. Genteng Metal Lembar 44.00 250,000.00 11,000,000.00
28. Paku Genteng Metal Kg 54.00 35,000.00 1,890,000.00
29. Papan Plank Kalsiboard Lembar 27.00 155,000.00 4,185,000.00
HARGA SATUAN
JUMLAH BIAYA
NO. URAIAN SATUAN VOLUME (Rp.)
(Rp.)
JUMLAH 415,152,232.00
ALAT
1. Mesin Pencacah Plastik kap 400 Kg/hari Diesel 16 HP Unit 1.00 36,130,000 36,130,000.00
3. 2. Mesin Pencacah Kompos kapasitas 500 kg/jam Diesel Unit 1.00 22,650,000 22,650,000.00
3. Mesin Pengayak Kapasitas 500 Kg/Jam Unit 1.00 18,150,000 18,150,000.00
JUMLAH 76,930,000
TOTAL 693,647,232
TOTAL 693,600,000
*)Rincian Kebutauhan Tenaga Kerja/bahan/alat untuk masing-masing Kegiatan
**) Mandor tidak diperhitungkan pada dana BPM, namun dapat diakomodir pada komponen swadaya
HARGA SATUAN
JUMLAH BIAYA
NO. URAIAN SATUAN VOLUME (Rp.)
(Rp.)
(1) (2) (4) (5) 6 = (4) X (5)
TENAGA KERJA
1. Kepala Tukang HOK 51.00 170,000.00 8,670,000.00
2. Tukang Batu HOK 149.00 155,000.00 23,095,000.00
1. 3. Tukang Kayu HOK 132.00 150,000.00 19,800,000.00
4. Tukang Besi HOK 135.00 150,000.00 20,250,000.00
5. Tukang Cat HOK 25.00 150,000.00 3,750,000.00
6. Pekerja HOK 900.00 140,000.00 126,000,000.00
JUMLAH 201,565,000.00
BAHAN
1. Kayu balok 5/7 Klas III Batang 57.00 31,250.00 1,781,250.00
2. Paku 5 -10 cm Kg 76.00 22,000.00 1,672,000.00
3. Kayu papan 2/20 Klas III Batang 687.00 39,700.00 27,273,900.00
4. Tanah Urug m3 281.00 100,000.00 28,100,000.00
5. Pasir Urug m3 53.00 150,000.00 7,950,000.00
6. Kayu Galam ø 10-12 m Batang 195.00 35,000.00 6,825,000.00
7. Besi Beton Kg 4,528.00 12,000.00
Besi beton polos dia. 8 Batang 445.00 45,000.00 20,025,000.00
Besi beton polos dia. 10 Batang 100.00 70,000.00 7,000,000.00
Besi beton polos dia. 12 Batang 206.00 101,000.00 20,806,000.00
8. Kawat Beton Kg 70.00 25,000.00 1,750,000.00
9. Semen Portland Zak 796.00 51,000.00 40,596,000.00
10. Pasir Beton m3 34.00 180,000.00 6,120,000.00
11. Split m3 32.00 450,000.00 14,400,000.00
13. Balok Kayu Klas II uk.5/7 Batang 143.00 56,000.00 8,008,000.00
14. Dolken Kayu ø8-10 Batang 308.00 30,000.00 9,240,000.00
15. Plywood 9 mm Lembar 8.00 130,000 1,040,000.00
16. Batako Bh 4,100.00 2,800.00 11,480,000.00
17. Pasir Pasang m3 149.00 150,000.00 22,350,000.00
18. Ubin Keramik 40x40 Doz 49.00 75,000.00 3,675,000.00
19. Semen Warna Kg 48.00 5,000.00 240,000.00
20. Ubin Keramik 20x20 Doz 4.00 65,000.00 260,000.00
21. Ubin Keramik 10x20 Doz 9.00 65,400.00 588,600.00
22. Paku GRC Kg 7.00 25,000.00 175,000.00
23. Kalsiboard Tebal 9 mm Lbr 19.00 190,000.00 3,610,000.00
24. Baja Ringan 75x35x0,75 MM Batang 193.00 125,000.00 24,125,000.00
25. Baja Ringan 30x30x0,3 MM Batang 67.00 50,000.00 3,350,000.00
26. Paku Skrup Kg 1,200.00 3,500.00 4,200,000.00
27. Genteng Metal Lembar 44.00 250,000.00 11,000,000.00
28. Paku Genteng Metal Kg 54.00 35,000.00 1,890,000.00
29. Papan Plank Kalsiboard Lembar 27.00 155,000.00 4,185,000.00
HARGA SATUAN
JUMLAH BIAYA
NO. URAIAN SATUAN VOLUME (Rp.)
(Rp.)
JUMLAH 415,152,232.00
ALAT
1. Mesin Pencacah Plastik kap 400 Kg/hari Diesel 16 HP Unit 1.00 36,130,000 36,130,000.00
3. 2. Mesin Pencacah Kompos kapasitas 500 kg/jam Diesel Unit 1.00 22,650,000 22,650,000.00
3. Mesin Pengayak Kapasitas 500 Kg/Jam Unit 1.00 18,150,000 18,150,000.00
JUMLAH 76,930,000
KEBUTUHAN KESEHATAN DAN KESELAMATAN KERJA
1. Sosialisasi K3 dan Prokes (Spanduk) Bh 4.00 75,000.00 300,000.00
2. Helm Keselamatan Bh 21.00 100,000.00 2,100,000.00
3. Rompi Kerja Bh 21.00 60,000.00 1,260,000.00
4. Sarung Tangan (Safety Glove) Bh 21.00 5,000.00 105,000.00
5. Sepatu Keselamatan (Rubber Shoes) Bh 21.00 100,000.00 2,100,000.00
6. Tali Pengaman Bh 3.00 231,500.00 694,500.00
7. Kotak P3K Bh 2.00 40,000.00 80,000.00
4.
8. Asuransi Tenaga Kerja Paket 1.00 912,000.00 912,000.00
9. Alat ukur suhu badan nir-sentuh (Thermoscan) Bh 2.00 350,000.00 700,000.00
10. Vitamin C (1 Box isi 100 tablet) Bh 25.00 25,000.00 625,000.00
11. Tempat Cuci Tangan Bh 2.00 250,000.00 500,000.00
12. Sabun Cuci Tangan (Cair) 200ml/btl Bh 4.00 25,000.00 100,000.00
13. Masker kain Bh 20.00 5,000.00 100,000.00
14. Alat penyemprot desinfektan Bh 2.00 65,000.00 130,000.00
15. Cairan Desinfektan 5L Bh 3.00 75,000.00 225,000.00
JUMLAH 9,931,500
ADMINISTRASI
1. Pelaporan KSM Ls 1.00 270,000.00 270,000.00
2. Photo Copy / Penggandaan Ls 1.00 250,000.00 250,000.00
4. 3. Biaya Alat Tulis Kantor (ATK) Ls 1.00 150,000.00 150,000.00
4. Materai Ls 8.00 10,000.00 80,000.00
5. Pengujian Lab Bh 1.00 500,000.00 500,000.00
6. Papan Nama Kegiatan Paket 1.00 250,000.00 250,000.00
JUMLAH 1,500,000
TOTAL 705,078,732
TOTAL 705,000,000
*)Rincian Kebutauhan Tenaga Kerja/bahan/alat untuk masing-masing Kegiatan
**) Mandor tidak diperhitungkan pada dana BPM, namun dapat diakomodir pada komponen swadaya
I PEKERJAAN PERSIAPAN
1 Pembersihan Awal 200.00 m2 14,000
2 Pengukuran dan Pemasangan Bowplank 66.00 m 74,690
II PEKERJAAN TANAH
1 Pek urugan tanah lokasi kegiatan 218.55 m3 162,000
2 Pek. Galian Tanah Pondasi 11.68 m3 105,000
3 Pek. Urugan Bekas Galian 2.92 m3 70,000
4 Pek. Urugan Pasir bawah lantai 44.84 m3 222,000
5 Pek. Pemancangan Cerucuk Kayu Galam 372.00 btg 50,100
IX PEKERJAAN JEMBATAN
1 Pekerjaan Pondasi Batu Belah 14.67 m3 1,104,825
2 Pekerjaan Sloof 20/30
a Pek. Pembesian 102.56 kg 15,124
b Pekerjaan Bekisting Sloof 12.44 m2 223,020
c Cor Beton k.200 1.09 m3 1,078,921
3 Pekerjaan Balok 20/30
a Pek. Pembesian 51.28 kg 15,124
b Pekerjaan Bekisting Balok 7.28 m2 386,310
c Cor Beton k.200 0.55 m3 1,078,921
4 Pekerjaan Plat beton
a Pek. Pembersian 250.87 kg 15,124
b Pekerjaan Bekisting Plat 11.89 m2 539,810
c Cor Beton K200 tebal 20 cm 4.03 m3 1,078,921
5 Pekerjaan Reling jembatan
a Pembesian Kolom 15/15 22.59 Kg 15,124
b Pek. Bekisting Kolom 2.40 m2 374,310
c Cor Beton k.200 0.18 m3 1,078,921
d Pek. Pas Batako 3.10 m2 167,866
e Pek. Plesteran 6.60 m2 79,356
f Pek Besi Galvanis 2" 7.40 m 29,917
X PEKERJAAN LISTRIK
1 Penyambungan Daya Baru PLN 1.00 Unit 4,500,000
2 Instalasi Titik Lampu 13.00 Titik 325,000
3 Lampu SL 18 Watt 13.00 Bh 35,000
4 Saklar Tunggal 4.00 Bh 20,000
5 Saklar Ganda 4.00 Bh 20,000
6 Pek. Pas. Panel Listrik 1.00 Bh 760,000
7 Pek. Instalasi stop kontak 6.00 Titik 325,000
8 Stop Kontak 6.00 Bh 20,000
XI PEKERJAAN LAIN-LAIN
1 Pekerjaan Pagar Besi BRC 16.30 m2 320,000
2 Pekerjaan Pintu Pagar Besi 9.45 m2 600,000
3 Pekerjaan Handrail difabel stainless
a Hanggar TPS3R panjang 2 m 13.54 m 52,000
b Kantor panjang 0,95 m 4.75 m 52,000
c WC Panjang 0,75 4.29 m 52,000
d Biaya pengelasan (100% fisik) 22.58 m 52,000
4 Pekerjaan Rolling door 7.27 m2 810,400
5 Pek. Handrail WC 1.20 m 52,000
6 Pekerjaan ukiran kayu 19.20 m2 625,000
7 Pek. Plesteran letter timbul 1.00 Paket 800,000
TOTAL
DIBULATKAN
Pekerjaan Tambah Kurang
I PEKERJAAN PERSIAPAN
2,800,000 1 Pembersihan Awal 200.00 m2 14,000
4,929,540 2 Pengukuran dan Pemasangan Bowplank 66.00 m 74,690
II PEKERJAAN TANAH
35,405,100 1 Pek urugan tanah lokasi kegiatan 218.55 m3 162,000
1,226,610 2 Pek. Galian Tanah Pondasi 11.68 m3 105,000
204,435 3 Pek. Urugan Bekas Galian 2.92 m3 70,000
9,953,480 4 Pek. Urugan Pasir bawah lantai 45.49 m3 222,000
18,637,200 5 Pek. Pemancangan Cerucuk Kayu Galam (p. 2m) 372.00 Btg 50,100
IX PEKERJAAN JEMBATAN
16,207,783 1 Pekerjaan Pondasi Batu Belah 19.18 m3 1,104,825
2 Pekerjaan Sloof 20/30
1,551,043 a Pek. Pembesian 102.56 kg 15,124
2,774,369 b Pekerjaan Bekisting Sloof 12.44 m2 223,020
1,178,181 c Cor Beton K.200 1.09 m3 1,078,921
3 Pekerjaan Balok 20/30
775,522 a Pek. Pembesian 51.28 kg 15,124
2,812,337 b Pekerjaan Bekisting Balok 7.28 m2 386,310
589,091 c Cor Beton K.200 0.55 m3 1,078,921
4 Pekerjaan Plat beton
3,794,191 a Pek. Pembersian 250.87 kg 15,124
6,418,341 b Pekerjaan Bekisting Plat 11.89 m2 539,810
4,345,893 c Cor Beton K200 tebal 20 cm 4.03 m3 1,078,921
5 Pekerjaan Reling jembatan
341,621 a Pembesian Kolom 15/15 22.59 Kg 15,124
898,344 b Pek. Bekisting Kolom 2.40 m2 374,310
194,206 c Cor Beton K.200 0.18 m3 1,078,921
520,384 d Pek. Pas Batako 3.10 m2 167,866
523,750 e Pek. Plesteran 6.60 m2 79,356
221,383 f Pek Besi Galvanis 2" 0.00 m 29,917
X PEKERJAAN LISTRIK
4,500,000 1 Penyambungan Daya Baru PLN 1.00 Unit 4,500,000
4,225,000 2 Instalasi Titik Lampu 13.00 Titik 325,000
455,000 3 Lampu SL 18 Watt 13.00 Bh 35,000
80,000 4 Saklar Tunggal 4.00 Bh 20,000
80,000 5 Saklar Ganda 4.00 Bh 20,000
760,000 6 Pek. Pas. Panel Listrik 1.00 Bh 760,000
1,950,000 7 Pek. Instalasi stop kontak 6.00 Titik 325,000
120,000 8 Stop Kontak 6.00 Bh 20,000
XI PEKERJAAN LAIN-LAIN
5,216,000 1 Pekerjaan Pagar Besi BRC 16.30 m2 320,000
5,670,000 2 Pekerjaan Pintu Pagar Besi 9.45 m2 600,000
3 Pekerjaan Handrail difabel stainless
704,080 a Hanggar TPS3R panjang 2 m 13.54 m 52,000
247,000 b Kantor panjang 0,95 m 4.75 m 52,000
223,080 c WC Panjang 0,75 4.29 m 52,000
1,174,160 d Biaya pengelasan & pemasangan (100% fisik) 22.58 m 52,000
5,889,582 4 Pekerjaan Rolling door 7.27 m2 810,400
62,400 5 Pek. Handrail closet 1.20 m 52,000
12,000,000 6 Pekerjaan ukiran kayu 19.20 m2 625,000
800,000 7 Pek. Plesteran letter timbul 1.00 Paket 830,000
705,004,278 TOTAL
705,000,000 DIBULATKAN
Pekerjaan tambah
Jumlah Harga kurang
2,800,000 - 1
4,929,540 - 1
35,405,100 - 1
1,226,610 - 1
204,435 - 1
10,099,672 146,193 1
18,637,200 - 1
4,814,347 21,093 1
641,618 - 1
494,637 - 1
2,900,139 - 1
3,305,312 14,482 1
326,538 - 1
335,646 - 1
1,475,964 - 1
604,153 2,647 1
45,830 - 1
423,974 - 1
207,153 - 1
7,345,020 24,981 1
15,122,124 - 1
4,561,677 - 1
2,244,497 6,499 1
5,775,603 - 1
1,895,933 - 1
1,007,557 (468) 1
2,605,198 - 1
281,598 - 1
5,957,669 20,561 1
2,587,032 - 1
3,754,644 - 1
4,592,827 15,965 1
5,290,034 - 1
2,186,433 - 1
4,165,566 - 1
4,481,196 - 1
2,503,096 - 1
675,542 - 1
1,298,002 - 1
271,888 - 1
4,272,924 8,650 1
6,872,455 - 1
665,155 - 1
15,935,374 (725,058) 1
51,102,918 6,466,556 1
1
551,959 - 1
2,314,435 - 1
693,881 - 1
23,998,020 - 1
10,173,168 - 1
3,945,349 - 1
12,356,346 - 1
16,290,136 - 1
7,065,382 - 1
3,031,875 - 1
7,380,822 - 1
5,439,098 - 1
11,964,785 (136,570) 1
916,173 - 1
2,649,368 - 1
13,716,330 4,091,398 1
33,691,801 - 1
2,591,677 - 1
1,385,827 - 1
22,235,896 - 1
1,710,454 - 1
914,618 - 1
6,918,163 - 1
1,216,829 - 1
694,103 - 1
1,007,342 - 1
504,977 - 1
182,837 - 1
3,027,600 - 1
1,513,800 - 1
1,513,800 - 1
1,427,597 - 1
1,314,213 - 1
745,800 - 1
709,200 - 1
719,600 - 1
287,700 - 1
372,900 - 1
210,900 - 1
6,131,295 - 1
5,798,000 - 1
9,508,738 - 1
4,124,144 - 1
1,769,740 - 1
4,308,270 - 1
442,250 - 1
536,891 - 1
575,240 - 1
191,747 - 1
191,747 - 1
170,442 - 1
728,438 (728,438) 1
41,625 (41,625) 1
276,936 (276,936) 1
394,192 (461,101) 1
535,248 (535,248) 1
188,820 (188,820) 1
366,486 (366,486) 1
1,527,185 (1,527,185) 1
160,497 (160,497) 1
1,940,528 (1,940,528) 1
917,355 (917,355) 1
427,646 (427,646) 1
535,248 (535,248) 1
188,820 (188,820) 1
70,493 (70,493) 1
647,772 (647,772) 1
176,232 - 1
45,402 (45,402) 1
226,720 (226,720) 1
51,401 (51,401) 1
12,287,000 (9,000,000) 0
74,592 - 1
521,054 - 1
139,821 - 1
1,159,739 - 1
2,500,000 - 1
271,000 - 1
135,500 - 1
1,600,000 - 1
2,542,200 - 1
1,668,200 - 1
3,352,500 2,077,500 0
1,360,000 1,360,000 0
21,190,544 4,982,761 1
1,551,043 - 1
2,774,369 - 1
1,178,181 - 1
775,522 - 1
2,812,337 - 1
589,091 - 1
3,794,191 - 1
6,418,341 - 1
4,345,893 - 1
341,621 - 1
898,344 - 1
194,206 - 1
520,384 - 1
523,750 - 1
- (221,383) 1
4,500,000 - 1
4,225,000 - 1
455,000 - 1
80,000 - 1
80,000 - 1
760,000 - 1
1,950,000 - 1
120,000 - 1
5,216,000 - 1
5,670,000 - 1
704,080 - 1
247,000 - 1
223,080 - 1
1,174,160 - 1
5,889,582 - 1
62,400 - 1
12,000,000 - 1
830,000 30,000 0
36,130,000 - 1
22,650,000 - 1
18,150,000 - 1
300,000 - 1
2,100,000 - 1
1,260,000 - 1
105,000 - 1
2,100,000 - 1
694,500 - 1
80,000 - 1
912,000 - 1
700,000 - 1
625,000 125,000 1
500,000 - 1
100,000 - 1
125,000 25,000 1
130,000 - 1
225,000 - 1
270,000 - 1
250,000 - 1
150,000 - 1
80,000 - 1
500,000 - 1
250,000 - 1
705,002,362 (1,915)
705,000,000 -
PERHITUNGAN VOLUME PEKERJAAN
JUMLAH
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME SATUAN
1 2 3 4 5
I PEKERJAAN PERSIAPAN
1 Pembersihan Awal Panjang Lebar 200.00 m2
= 20 m x 10.00 m 200.00 m2
II PEKERJAAN TANAH
1 Pek urugan tanah lokasi kegiatan Panjang Lebar Tebal 218.55 m3
= 20.00 m x 20.00 m x 0.50 m = 200.00 m3
Depan jembatan = 5.50 m x 6.00 m x 0.35 m = 11.55 m3
Jalan masuk = 4.00 m x 5.00 m x 0.35 m = 7.00 m3
4 Pek. Urugan Pasir bawah lantai Panjang Lebar Tebal Jumlah 45.49 m3
Lantai Hanggar TPS3R = 13.42 m x 11.80 m x 0.20 m x 1 = 31.67 m3
= 3.23 m x 2.83 m x 0.20 m x 2 = 3.66 m3
= 5.83 m x 3.23 m x 0.20 m x 2 = 7.53 m3
Lantai Kantor = 3.33 m x 2.85 m x 0.20 m x 1 = 1.90 m3
Lantai WC = 2.30 m x 1.60 m x 0.20 m x 1 = 0.74 m3
5 Pek. Pemancangan Cerucuk Kayu Galam (p. 2m) Jumlah cerucuk Panjang Jumlah Pondasi 372.00 Btg
Pondasi P1 = 9 Bh x 2 m x 21 Bh / 2 = 189.00 Btg
Pondasi P2 = 9 Bh x 2 m x 19 Bh / 2 = 171.00 Btg
Pondasi P3 = 12 Bh x 2 m x 1 Bh / 2 = 12.00 Btg
b Pek. Lantai Kerja Beton K.100 t=5 cm Panjang Lebar Tebal Jumlah Pondasi 0.67 m3
= 0.80 m x 0.80 m x 0.05 m x 21 = 0.67 m3
d Cor Beton Mutu K.200 Panjang Lebar Tebal Jumlah Pondasi 2.69 m3
= 0.80 m x 0.80 m x 0.20 m x 21 = 2.69 m3
JUMLAH
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME SATUAN
1 2 3 4 5
2 Pondasi Footplat P2 (60 cm x 60 cm x 20 cm)
a Pek. Pembesian Panjang Berat jenis Jumlah Besi Jumlah Pondasi 218.55 Kg
ø 12 = 1.29 m x 0.892 kg/m x 10.00 bh x 19 = 218.55 Kg
b Pek. Lantai Kerja Beton K.100 t=5 cm Panjang Lebar Tebal Jumlah Pondasi 0.34 m3
= 0.60 m x 0.60 m x 0.05 m x 19 = 0.34 m3
d Cor Beton Mutu K.200 Panjang Lebar Tebal Jumlah Pondasi 1.37 m3
= 0.60 m x 0.60 m x 0.20 m x 19 = 1.37 m3
b Pek. Lantai Kerja Beton K.100 t=5 cm Panjang Lebar Tebal Jumlah Pondasi 0.05 m3
= 1.20 m x 0.80 m x 0.05 m x 1 = 0.05 m3
d Cor Beton Mutu K.200 Panjang Lebar Tebal Jumlah Pondasi 0.19 m3
= 1.20 m x 0.80 m x 0.20 m x 1 = 0.19 m3
2 Pek Kolom K1
a Pek. Pembesian Panjang Berat jenis Jumlah Besi Jumlah Kolom 485.65 Kg
Hanggar TPS3R ø 12 = 4.60 m x 0.892 kg/m x 4.00 bh x 18 = 295.32 Kg
WC ø 12 = 3.85 m x 0.892 kg/m x 4.00 bh x 4 = 54.93 Kg
Pagar ø 12 = 3.40 m x 0.892 kg/m x 4.00 bh x 1 = 12.13 Kg
ø 12 = 4.10 m x 0.892 kg/m x 4.00 bh x 1 = 14.62 Kg
ø8 = 0.52 m x 0.395 kg/m x 529.00 bh = 108.66 Kg
c Cor Beton Mutu K.200 Panjang Lebar Tinggi Jumlah Kolom 4.23 m3
Hanggar TPS3R bawah sloof = 0.20 m x 0.20 m x 0.80 m x 18 = 0.58 m3
Atas sloof = 0.20 m x 0.20 m x 3.80 m x 18 = 2.74 m3
WC bawah sloof = 0.20 m x 0.20 m x 0.80 m x 4 = 0.13 m3
Atas sloof = 0.20 m x 0.20 m x 3.05 m x 4 = 0.49 m3
Pagar bawah sloof = 0.20 m x 0.20 m x 0.80 m x 1 = 0.03 m3
Atas sloof = 0.20 m x 0.20 m x 2.60 m x 1 = 0.10 m3
bawah sloof = 0.20 m x 0.20 m x 0.80 m x 1 = 0.03 m3
Atas sloof = 0.20 m x 0.20 m x 3.30 m x 1 = 0.13 m3
3 Pek Kolom K2
a Pek. Pembesian Panjang Berat jenis Jumlah Besi Jumlah Kolom 148.41 Kg
Kantor ø 12 = 3.85 m x 0.892 kg/m x 4.00 bh x 3 = 41.20 Kg
Pagar ø 12 = 2.50 m x 0.892 kg/m x 4.00 bh x 8 = 71.33 Kg
ø 12 = 3.40 m x 0.892 kg/m x 4.00 bh x 1 = 12.13 Kg
ø 12 = 4.10 m x 0.892 kg/m x 4.00 bh x 1 = 14.62 Kg
ø8 = 0.65 m x 0.395 kg/m x 196.00 bh = 50.32 Kg
c Cor Beton Mutu K.200 Panjang Lebar Tinggi Jumlah Kolom 1.76 m3
Kantor bawah sloof = 0.30 m x 0.15 m x 0.80 m x 3 = 0.11 m3
Atas sloof = 0.30 m x 0.15 m x 3.05 m x 3 = 0.41 m3
Pagar bawah sloof = 0.30 m x 0.15 m x 0.80 m x 8 = 0.29 m3
Atas sloof = 0.30 m x 0.15 m x 1.70 m x 8 = 0.61 m3
bawah sloof = 0.30 m x 0.15 m x 0.80 m x 1 = 0.04 m3
Atas sloof = 0.30 m x 0.15 m x 2.60 m x 1 = 0.12 m3
bawah sloof = 0.30 m x 0.15 m x 0.80 m x 1 = 0.04 m3
Atas sloof = 0.30 m x 0.15 m x 3.30 m x 1 = 0.15 m3
4 Pek Kolom K3
a Pek. Pembesian Panjang Berat jenis Jumlah Besi Jumlah Kolom 66.62 Kg
Pagar ø 10 = 3.40 m x 0.617 kg/m x 8.00 bh x 1 = 16.77 Kg
ø 10 = 4.10 m x 0.617 kg/m x 8.00 bh x 2 = 40.45 Kg
ø8 = 0.41 m x 0.395 kg/m x 58.00 bh = 9.39 Kg
c Cor Beton Mutu K.200 Panjang Lebar Tinggi Jumlah Kolom 0.26 m3
Pagar bawah sloof = 0.15 m x 0.15 m x 0.80 m x 1 = 0.02 m3
Atas sloof = 0.15 m x 0.15 m x 2.60 m x 1 = 0.06 m3
bawah sloof = 0.15 m x 0.15 m x 0.80 m x 2 = 0.04 m3
Atas sloof = 0.15 m x 0.15 m x 3.30 m x 2 = 0.15 m3
JUMLAH
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME SATUAN
1 2 3 4 5
3 Pekerjaan Sloof 20x30
a Pek. Pembesian Panjang Berat jenis Jumlah Besi Jumlah sisi 393.92 Kg
Hanggar TPS3R ø 12 = 17.00 m x 0.892 kg/m x 6.00 bh x 2 = 181.90 Kg
ø 12 = 12.00 m x 0.892 kg/m x 6.00 bh x 2 = 128.40 Kg
ø8 = 0.73 m x 0.395 kg/m x 290.00 bh = 83.62 Kg
c Cor Beton Mutu K.200 Panjang Lebar Tinggi Jumlah sisi 3.48 m3
= 17.00 m x 0.20 m x 0.30 m x 2 = 2.04 m3
= 12.00 m x 0.20 m x 0.30 m x 2 = 1.44 m3
c Cor Beton Mutu K.200 Panjang Lebar Tinggi Jumlah sisi 2.03 m3
Hanggar TPS3R = 12.00 m x 0.15 m x 0.20 m x 1 = 0.36 m3
Kantor = 3.50 m x 0.15 m x 0.20 m x 2 = 0.21 m3
= 3.00 m x 0.15 m x 0.20 m x 2 = 0.18 m3
WC = 2.45 m x 0.15 m x 0.20 m x 1 = 0.07 m3
= 1.75 m x 0.15 m x 0.20 m x 2 = 0.11 m3
Pagar Kiri = 2.57 m x 0.15 m x 0.20 m x 1 = 0.08 m3
Kanan = 20.00 m x 0.15 m x 0.20 m x 1 = 0.60 m3
Belakang = 2.83 m x 0.15 m x 0.20 m x 1 = 0.08 m3
Depan = 11.20 m x 0.15 m x 0.20 m x 1 = 0.34 m3
JUMLAH
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME SATUAN
1 2 3 4 5
10 Pekerjaan Ring Balok 20x20
a Pek. Pembesian Panjang Berat jenis Jumlah Besi Jumlah sisi 275.43 Kg
Hanggar TPS3R ø 10 = 17.00 m x 0.617 kg/m x 6.00 bh x 2 = 125.87 Kg
TPS ø 10 = 12.00 m x 0.617 kg/m x 6.00 bh x 2 = 88.85 Kg
ø8 = 0.53 m x 0.395 kg/m x 290.00 bh = 60.71 Kg
b Pek. Bekisting Ring Balok Panjang Lebar Jumlah Jumlah sisi 11.60 m2
= 17 m x 0.20 m x 2.00 Bh x 2 x 1/2 = 6.80 m2
= 12 m x 0.20 m x 2.00 Bh x 2 x 1/2 = 4.80 m2
c Cor Beton Mutu K.200 Panjang Lebar Tinggi Jumlah sisi 2.32 m3
= 17.00 m x 0.20 m x 0.20 m x 2 = 1.36 m3
= 12.00 m x 0.20 m x 0.20 m x 2 = 0.96 m3
b Pek. Bekisting Ring Balok Panjang Lebar Jumlah Jumlah sisi 3.36 m2
= 2.45 m x 0.20 m x 2.00 Bh x 2 = 1.96 m2
= 1.75 m x 0.20 m x 2.00 Bh x 2 = 1.40 m2
c Cor Beton Mutu K.200 Panjang Lebar Tinggi Jumlah sisi 0.25 m3
= 2.45 m x 0.15 m x 0.20 m x 2 = 0.15 m3
= 1.75 m x 0.15 m x 0.20 m x 2 = 0.11 m3
b Pek. Bekisting Ring Balok Panjang Lebar Jumlah Jumlah sisi 17.79 m2
= 12.00 m x 0.15 m x 2.00 Bh x 1 = 3.60 m2
= 2.45 m x 0.15 m x 2.00 Bh x 2 x 1/2 = 0.74 m2
= 1.75 m x 0.15 m x 2.00 Bh x 2 x 1/2 = 0.53 m2
= 3.50 m x 0.15 m x 2.00 Bh x 2 x 1/2 = 1.05 m2
= 3.00 m x 0.15 m x 2.00 Bh x 1 = 0.90 m2
= 2.57 m x 0.15 m x 2.00 Bh x 1 = 0.77 m2
= 20.00 m x 0.15 m x 2.00 Bh x 1 = 6.00 m2
= 2.83 m x 0.15 m x 2.00 Bh x 1 = 0.85 m2
= 11.20 m x 0.15 m x 2.00 Bh x 1 = 3.36 m2
c Cor Beton Mutu K.200 Panjang Lebar Tinggi Jumlah sisi 0.62 m3
Hanggar TPS3R = 12.00 m x 0.15 m x 0.15 m x 1 = 0.27 m3
WC = 2.45 m x 0.15 m x 0.15 m x 2 = 0.11 m3
= 1.75 m x 0.15 m x 0.15 m x 2 = 0.08 m3
Kantor = 3.50 m x 0.15 m x 0.15 m x 2 = 0.16 m3
= 3.00 m x 0.15 m x 0.15 m x 1 = 0.07 m3
Pagar Kiri = 2.57 m x 0.15 m x 0.15 m x 1 = 0.06 m3
Kanan = 20.00 m x 0.15 m x 0.15 m x 1 = 0.45 m3
Belakang = 2.83 m x 0.15 m x 0.15 m x 1 = 0.06 m3
Depan = 11.20 m x 0.15 m x 0.15 m x 1 = 0.25 m3
1 2 3 4 5
Luas
IV PEKERJAAN DINDING, LANTAI DAN PLESTERAN pintu/
Jendela/
1 Pek. Pasangan dinding Bataco kerawang/
a Bangunan Hanggar TPS3R Panjang Lebar Jumlah sisi Glasblok 142.96 m2
Samping Kanan = 3.8 m x 2.8 m x 4 - 1.87 = 40.69 m2
Depan = 3.8 m x 3.2 m x 1 - 1.69 = 10.48 m2
Area Dalam = 3.8 m x 2.8 m x 4 - 13.48 = 29.08 m2
Samping Kiri = 2.8 m x 2.0 m x 4 = 22.40 m2
Bawah Sloof Kiri = 2.8 m x 0.8 m x 4 40.32 = 8.96 m2
Kanan = 2.8 m x 0.8 m x 4 = 8.96 m2
Belakang = 2.8 m x 0.8 m x 5 = 11.20 m2
Depan = 2.8 m x 0.8 m x 5 = 11.20 m2
Luas pintu/
Jendela/
kerawang/G
b Kantor Lebar Tinggi lasblok sisi 60.60 m2
Depan = 3.35 m x 3.05 m - 3.47 = 13.69 m2
Samping Kiri = 2.28 m x 3.05 m = 6.95 m2
= 0.37 m x 3.05 m = 1.13 m2
Samping Kanan = 2.85 m x 3.05 m = 8.69 m2
= 1.35 m x 3.05 m = 4.12 m2
Belakang = 3.35 m x 4.2 m - 1.11 = 15.18 m2
Bawah Sloof Kiri = 2.28 m x 0.8 m = 1.82 m2
= 0.37 m x 0.8 m = 0.30 m2
Kanan = 2.85 m x 0.8 m = 2.28 m2
= 1.35 m x 0.8 m = 1.08 m2
Belakang = 3.35 m x 0.8 m = 2.68 m2
Depan = 3.35 m x 0.8 m = 2.68 m2
Luas pintu/
Jendela/
kerawang/G
c WC Lebar Tinggi lasblok 23.50 m2
Depan = 1.60 m x 3.05 m - 2.33 = 7.21 m2
Samping Kanan = 2.30 m x 3.05 m = 7.02 m2
Belakang = 1.60 m x 3.05 m = 4.88 m2
Bawah Sloof Kanan = 2.30 m x 0.8 m = 1.84 m2
Belakang = 1.60 m x 0.8 m = 1.28 m2
Depan = 1.60 m x 0.8 m = 1.28 m2
89.03 m2
b Kantor Depan = 13.69 m2 x 2 Bh luar-dalam = 27.38 m2
Samping Kiri = 6.95 m2 x 2 Bh luar-dalam = 13.91 m2
Samping Kanan = 8.69 m2 x 2 Bh luar-dalam = 17.39 m2
Belakang = 15.18 m2 x 2 Bh luar-dalam = 30.36 m2
38.21 m2
c WC Depan = 7.21 m2 x 2 Bh = 14.42 m2
Samping Kanan = 7.02 m2 x 2 Bh = 14.03 m2
Belakang = 4.88 m2 x 2 Bh = 9.76 m2
93.01 m2
d Pagar Depan = 9.00 m2 x 2 Bh = 18.00 m2
Samping Kiri = 30.20 m2 x 2 Bh = 60.39 m2
Samping Kanan = 3.93 m2 x 2 Bh = 7.85 m2
Belakang = 3.38 m2 x 2 Bh = 6.77 m2
3 Cor Beton Lantai Beton Mutu K.200 Panjang Lebar Tebal 5.04 m3
Hanggar TPS3R Gudang = 5.83 m x 3.23 m x 0.10 m = 1.88 m3
Area Penyimpanan = 2.85 m x 3.23 m x 0.10 m = 0.92 m3
Tempat Barang Lapak = 2.85 m x 3.23 m x 0.10 m = 0.92 m3
KM/WC = 2.30 m x 1.60 m x 0.10 m = 0.37 m3
Kantor = 3.33 m x 2.85 m x 0.10 m = 0.95 m3
JUMLAH
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME SATUAN
1 2 3 4 5
4 Pek Keramik lantai Uk.40x40 Panjang Lebar 46.21 m2
Kantor = 3.3 m x 2.85 m = 9.41 m2
Gudang = 5.8 m x 3.2 m = 18.56 m2
Area Penyimpanan = 2.85 m x 3.2 m = 9.12 m2
Tempat Barang Lapak = 2.85 m x 3.2 m = 9.12 m2
Derajat
V PEKERJAAN ATAP, PLAFOND, LISPLANK Panjang+ Lebar + Kemiringan
1 Rangka Atap Baja Ringan overstek overstek (Cos15) 242.24 m2
a Hanggar TPS3R = 18 m x 13 m / 0.966 = 242.24 m2
Derajat
Panjang+ Lebar + Kemiringan
overstek overstek (Cos15) 18.63 m2
b Kantor = 4.5 m x 4 m / 0.966 = 18.63 m2
Derajat
Panjang+ Lebar + Kemiringan
overstek overstek (Cos15) 9.96 m2
c WC = 2.75 m x 3.5 m / 0.966 = 9.96 m2
b Kantor Panjang Lebar Panjang Kusen Jumlah Kusen Jumlah P/J 0.06 m3
P1 = 0.1 m x 0.05 m x 2.1 m x 2 x 1 = 0.02 m3
= 0.1 m x 0.05 m x 1.05 m x 1 x 1 = 0.01 m3
J1 = 0.1 m x 0.05 m x 1.45 m x 3 x 1 = 0.02 m3
= 0.1 m x 0.05 m x 1 m x 2 x 1 = 0.01 m3
3 Pek. Rangka Jendela Kaca Kayu Klas II Lebar Panjang Jumlah Rangka Jumlah Jendela 2.26 m2
J1 = 0.1 m x 1.45 m x 4 Bh x 3 = 1.74 m2
= 0.1 m x 0.43 m x 4 Bh x 3 = 0.52 m2
JUMLAH
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME SATUAN
1 2 3 4 5
4 Pek.Pemasangan Kaca Tebal 5 mm Panjang Lebar Jumlah Kaca Jumlah Jendela 7.48 m3
J1 = 1.45 m x 0.43 m x 4 Bh x 3 = 7.48 m3
VI PEKERJAAN PENGECATAN
1 Pengecatan dinding = volume pekerjaan plesteran
a Hanggar TPS3R = 205.28 = 205.28 m2
b Kantor = 89.03 = 89.03 m2
c WC = 38.21 = 38.21 m2
d Pagar = 93.01 = 93.01 m2
3 Pengecatan Kusen Pintu dan Jendela Panjang Kusen Lebar Jumlah Kusen Jumlah P/J 10.08 m2
P1 = 2.05 m x 0.2 m x 2 Bh x 5 = 4.10 m2
= 0.9 m x 0.2 m x 1 Bh x 5 = 0.90 m2
J1 = 1.45 m x 0.2 m x 3 Bh x 4 = 3.48 m2
= 1 m x 0.2 m x 2 Bh x 4 = 1.60 m2
5 Pengecatan Rangka Jendela Kaca Panjang Lebar Jumlah Rangka Jumlah Jendela 3.20 m2
J1 = 0.1 m x 1.55 m x 4 Bh x 4 = 2.48 m2
= 0.1 m x 0.45 m x 4 Bh x 4 = 0.72 m2
c Pek Cor Beton K.175 tebal 10 cm Panjang Lebar Tinggi Jumlah 0.26 m3
2.20 m x 1.2 m x 0.1 x 1 unit = 0.26 m3
d Pek. Sloof 15/15 Panjang Berat jenis Jumlah Besi Sisi Jumlah unit 26.06 Kg
- Pek. Pembesian ø 10 = 2.5 m x 0.617 kg/m x 4.00 bh x 2 x 1 = 12.34 Kg
ø 10 = 1.5 m x 0.617 kg/m x 4.00 bh x 2 x 1 = 7.40 Kg
ø8 = 0.40 m x 0.395 kg/m x 40.00 bh x 1 = 6.32 Kg
- Pek. bekisting Panjang Lebar Jumlah Jumlah sisi Jumlah unit 2.40 m2
= 2.5 m x 0.15 m x 2.00 Bh x 2 x 1 = 1.50 m2
= 1.5 m x 0.15 m x 2.00 Bh x 2 x 1 = 0.90 m2
- Pek cor beton K.175 Panjang Lebar Tinggi Jumlah sisi Jumlah unit 0.18 m3
= 2.5 m x 0.15 m x 0.15 m x 2 x 1 = 0.11 m3
= 1.5 m x 0.15 m x 0.15 m x 2 x 1 = 0.07 m3
e Pek. Kolom 15/15 Panjang Berat jenis Jumlah Besi Jumlah Kolom Jumlah unit 24.23 Kg
- Pek. Pembesian ø 10 = 1.70 m x 0.617 kg/m x 4.00 bh x 4 x 1 = 16.78 Kg
ø8 = 0.41 m x 0.395 kg/m x 46.00 bh x 1 = 7.45 Kg
- Pek. bekisting Panjang Lebar Jumlah Jumlah sisi Jumlah unit 4.08 m2
= 1.70 m x 0.15 m x 4.00 Bh x 4 x 1 = 4.08 m2
- Pek cor beton K.175 Panjang Lebar Tinggi Jumlah sisi Jumlah unit 0.15 m3
= 1.70 m x 0.15 m x 0.15 m x 4 x 1 = 0.15 m3
JUMLAH
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME SATUAN
1 2 3 4 5
f Pek. Pas. Batako Panjang Lebar Jumlah sisi Jumlah unit 11.56 m2
= 2.2 m x 1.7 m x 2 x 1 = 7.48 m2
= 1.2 m x 1.7 m x 2 x 1 = 4.08 m2
h Pek. Ring Balk 15/15 Panjang Berat jenis Jumlah Besi Sisi Jumlah unit 28.28 Kg
- Pek. Pembesian ø 10 = 2.5 m x 0.617 kg/m x 4.00 bh x 2 x 1 = 12.34 Kg
ø 10 = 1.5 m x 0.617 kg/m x 4.00 bh x 2 x 1 = 7.40 Kg
ø8 = 0.40 m x 0.395 kg/m x 54.00 bh x 1 = 8.53 Kg
- Pek. bekisting Panjang Lebar Jumlah Jumlah sisi Jumlah unit 2.40 m2
= 2.5 m x 0.15 m x 2.00 Bh x 2 x 1 = 1.50 m2
= 1.5 m x 0.15 m x 2.00 Bh x 2 x 1 = 0.90 m2
- Pek cor beton K.175 Panjang Lebar Tinggi Jumlah sisi Jumlah unit 0.18 m3
= 2.5 m x 0.15 m x 0.15 m x 2 x 1 = 0.11 m3
= 1.5 m x 0.15 m x 0.15 m x 2 x 1 = 0.07 m3
i Pek. Plat penutup septictank tebal 10 cm Panjang Berat jenis Jumlah Besi Jumlah unit 4.66 m3
- Pek. Pembesian ø 8-15 = 2.2 m x 0.395 kg/m x 4.00 bh x 1 = 3.48 Kg
ø 8-15 = 0.3 m x 0.395 kg/m x 8.00 bh x 1 = 0.95 Kg
ø 8-15 = 0.15 m x 0.395 kg/m x 4.00 bh x 1 = 0.24 Kg
Volume
tutup
- Pek cor beton K.175 Panjang Lebar Tinggi mainhole Jumlah unit 0.17 m3
= 2.5 m x 1.50 m x 0.10 m - 0.098 x 1 = 0.28 m3
j Pek. Tutup mainhole Panjang Berat jenis Jumlah Besi Jumlah unit 3.00 m3
- Pek. Pembesian ø 8-15 = 0.7 m x 0.395 kg/m x 5.00 bh x 1 = 1.38 Kg
ø 8-15 = 0.7 m x 0.395 kg/m x 5.00 bh x 1 = 1.38 Kg
ø 8-15 = 0.15 m x 0.395 kg/m x 4.00 bh x 1 = 0.24 Kg
- Pek cor beton K.175 Panjang Lebar Tinggi Jumlah unit 0.05 m3
= 0.7 m x 0.70 m x 0.10 m x 1 = 0.05 m3
Volume
l Urugan Pasir dalam septictank Panjang Lebar Tinggi Biofil Jumlah unit = 0.34 Bh
= 2.2 m x 1.2 m x 1.2 m - 3 x 2 = 0.34 m3
1 2 3 4 5
b Pek. Bekisting Kolom Panjang Lebar Jumlah Papan Jumlah Kolom 2.40 m2
= 1.00 m x 0.15 m x 4 m x 8x 50% = 2.40 m2
X PEKERJAAN LISTRIK
1 Penyambungan Daya Baru PLN = 1.00 1.00 Unit
2 Instalasi Titik Lampu = 13.00 13.00 Titik
3 Lampu SL 18 Watt = 13.00 13.00 Bh
4 Saklar Tunggal = 4.00 4.00 Bh
5 Saklar Ganda = 4.00 4.00 Bh
6 Pek. Pas. Panel Listrik = 1.00 1.00 Bh
7 Pek. Instalasi stop kontak = 6.00 6.00 Titik
8 Stop Kontak = 6.00 6.00 Bh
XI PEKERJAAN LAIN-LAIN
1 Pekerjaan Pagar Besi BRC Tinggi Panjang Jumlah 16.30 m2
= 2.00 m x 2.85 m x 2 .= 11.40 m2
= 2.00 m x 2.45 m x 1 .= 4.90 m2
X PERALATAN TPS3R
1 Mesin Pencacah Plastik = 1.00 1.00 Unit
2 Mesin Pencacah Kompos = 1.00 1.00 Unit
JUMLAH
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME SATUAN
1 2 3 4 5
3 Mesin Pengayak = 1.00 1.00 Unit
HARGA SATUAN
SESUAI
No. Uraian Tenaga Kerja Satuan STANDAR
KOTA/KABUPAT
EN
I. TENAGA KERJA
1 Mandor HOK 225,000
2 Kepala Tukang HOK 170,000
3 Tukang Batu HOK 155,000
4 Tukang Kayu HOK 150,000
5 Tukang Besi HOK 150,000
6 Tukang Cat HOK 150,000
7 Pekerja HOK 140,000
REKOMENDASI HARGA
HARGA SATUAN HARGA SATUAN HASIL SURVEY*) TERENDAH YANG DIPILIH
SESUAI UNTUK BULAN INI
No. Uraian Tenaga Kerja Satuan STANDAR Toko/Pemasok -1 Toko/Pemasok - 2 Toko/Pemasok - 3
KABUPATEN/KO Nama: Nama: Nama: HARGA
Nama Toko/Pemasok
TA Almt : Almt : Almt : SATUAN*)
Telp : Telp : Telp :
II. BAHAN/MATERIAL :
1 Cat Menie Kayu Platone Kg 62,400 60,000
2 Cat dasar kayu platone Kg 62,400 60,000
3 Cat penutup kayu platone Kg 62,400 60,000
4 Cat tembok Kg 120,000 110,000
5 Kwas 4" Bh 45,000 45,000
6 Paku 5 - 12 cm Kg 22,000 22,000
7 Pasir beton m3 200,000 180,000
8 Pasir Pasang m3 190,000 150,000
9 Semen Portland Kg 1,325 1,275
10 Semen Portland Gresik 40 Kg/zak 53,000 51,000
11 Minyak Cat/Thinner Cemerlang Kg 28,100 28,100
12 Ampelas Kayu Flexigo Lbr 10,000 10,000
13 Kran air stainless Duffi Bh 65,000 65,000
14 Seal Tape Onda Kg 12,000 12,000
15 Papan Informasi Kegiatan Lbr 200,000 200,000
16 Kunci Tanam Bh 195,000 195,000
17 Engsel Pintu Bh 26,000 26,000
18 Lem Kayu Kg 33,000 33,000
19 Bata Merah Bh 800 800
20 Pipa PVC 4" AW Btg 295,000 295,000
21 Pipa PVC 3/4" AW Btg 42,000 42,000
22 Pipa PVC 2" AW Btg 127,500 127,500
23 Elboh/Knee Bh 25,000 25,000
25 Stop Kran 3/4 Bh 65,000 65,000
26 TanahUrug m3 100,000 100,000
27 Besi Beton Polos Kg 12,000 12,000
Besi beton polos dia. 8 Batang 47,000 45,000
Besi beton polos dia. 10 Batang 70,500 70,000
Besi beton polos dia. 12 Batang 101,500 101,000
28 Kawat Beton/Bendrat Kg 25,000 25,000
29 Plywood 9 mm Lbr 130,000 130,000
30 Batako Bh 3,000 2,800
31 Keramik lantai uk.40x40 Doz 75,000 75,000
32 Semen Warna Kg 5,000 5,000
33 Keramik lantai uk.20x20 Doz 65,000 65,000
34 Keramik dinding uk.10x20 Doz 65,400 65,400
35 Baja ringan 75x35x0,75 MM Batang 82,000 125,000
36 Hollow 30x30x0,3 MM Batang 50,000 50,000
37 Paku Skrup Bh 3,500 3,500
38 Atap Metal Zincalume Spandek (106x600) Lbr 255,000 250,000
39 Paku Anti Karat Kg 35,000 35,000
40 Papan Plank Kalsiboard tbl.8 mm (30x240mm) Lbr 155,000 155,000
41 Besi Hollow Plafond 1,3x 3,3 mm Batang 15,000 15,000
42 Kalsiboard tebal 6 mm Lbr 110,000 110,000
43 Paku Kalsiboard Kg 25,000 25,000
44 Kaca Bening 5 mm m2 135,000 135,000
45 Sealant Kaca Kg 47,500 47,500
46 Engsel Pintu 4" Bh 35,000 35,000
47 Engsel Jendela Bh 41,000 41,000
48 Kunci pintu tanam lengkap Bh 95,000 95,000
49 Hak/Kait Angin Bh 20,800 20,800
50 Gerendel/Kunci slot Bh 35,000 35,000
51 Handel Jendela Bh 8,000 8,000
52 Bioseptictank BF-08 Bh 10,643,500 10,643,500
53 Profil tank 1200 L Bh 1,600,000 1,600,000
54 Closed duduk Unit 1,828,300 1,800,000
55 Batu Belah (Tangkiling-Dalam Kota) m3 400,000 400,000
56 Roster/Kerawang uk. 30cmx30cm Bh 25,000 25,000
57 Glasblock uk. 20x20 Bh 27,000 26,000
58 KalsiBoard tebal 8 mm (120x240) Bh 190,000 190,000
59 Wastafel lengkap+cermin putih Unit 940,000 940,000
60 Box panel 20x80x60 Bh 760,000 760,000
61 Penyambungan Daya Baru PLN Unit 4,500,000 4,500,000
62 Instalasi Titik Lampu Titik 325,000 325,000
REKOMENDASI HARGA
HARGA SATUAN HARGA SATUAN HASIL SURVEY*) TERENDAH YANG DIPILIH
SESUAI UNTUK BULAN INI
No. Uraian Tenaga Kerja Satuan STANDAR Toko/Pemasok - 1 Toko/Pemasok - 2 Toko/Pemasok - 3
KABUPATEN/KO Nama: Nama: Nama: HARGA
Nama Toko/Pemasok
TA Almt : Almt : Almt : SATUAN*)
Telp : Telp : Telp :
63 Lampu SL 18 Watt Bh 35,000 35,000
64 Saklar Tunggal Bh 20,000 20,000
65 Saklar Ganda Bh 20,000 20,000
66 Pek. Pas. Panel Listrik Bh 760,000 760,000
67 Pek. Instalasi stop kontak Titik 325,000 325,000
68 Stop Kontak Bh 20,000 20,000
69 Pipa Besi Galvanis tbl 1,2 mm P=6 m Batang 179,500 179,500
70 Rolling door manual m2 500,000 500,000
71 Pagar BRC Hot Deep Galvanized T.90-P.240 Lembar 577,500 577,500
Pagar BRC Hot Deep Galvanized M2 320,000
73 Pipa Stainless Steel 2" btg/6m 206,000 308,700
Pipa Stainless Steel 2" m 52,000
74 Glassblock Bh 26,000
75 Sumur Bor+Pompa Unit 2,500,000
REKOMENDASI HARGA
HARGA SATUAN HASIL SURVEY*) TERENDAH YANG DIPILIH
HARGA SATUAN UNTUK BULAN INI
SESUAI Toko/Pemasok -1 Toko/Pemasok - 2 Toko/Pemasok - 3
No. Uraian Tenaga Kerja Satuan STANDAR HARGA
KABUPATEN/KO Nama: Nama: Nama: Nama Toko/Pemasok
SATUAN*)
TA Almt : Almt : Almt :
Telp : Telp : Telp :
1 Balok Kayu Klas II (Lanan) m3 4,000,000.00 4,000,000.00 4,000,000.00
2 Papan Kayu Klas II (Lanan) m3 5,000,000.00 5,000,000.00 5,000,000.00
3 Papan Kayu Klas II (Benuas) m3 6,500,000.00 6,000,000.00 6,000,000.00
4 Balok Kayu Klas III m3 2,250,000.00 2,200,000.00 2,200,000.00
5 Papan Kayu Klas III m3 2,500,000.00 2,450,000.00 2,450,000.00
6 Kerikil (Maks 30mm) m3 475,000.00 450,000.00 450,000.00
7 Kayu Galam diameter 10-12 cm P=4 m Batang 35,000.00 35,000.00 35,000.00
8 Kayu Galam diameter 6-10 cm P=4 m Batang 30,000.00 30,000.00 30,000.00
REKOMENDASI HARGA
HARGA SATUAN HARGA SATUAN HASIL SURVEY*) TERENDAH YANG DIPILIH
SESUAI Toko/Pemasok - 1 Toko/Pemasok - 2 Toko/Pemasok - 3 UNTUK BULAN INI
No. Uraian Tenaga Kerja Satuan STANDAR Nama: Nama: Nama: HARGA
KABUPATEN/KO Almt : Nama Toko/Pemasok
Almt : Almt : SATUAN*)
TA Telp : Telp : Telp :
REKOMENDASI HARGA
HARGA SATUAN HARGA SATUAN HASIL SURVEY*) TERENDAH YANG DIPILIH
SESUAI Toko/Pemasok - 1 Toko/Pemasok - 2 Toko/Pemasok - 3 UNTUK BULAN INI
No. Uraian Tenaga Kerja Satuan STANDAR Nama: Nama: Nama: HARGA
KABUPATEN/KO Almt : Nama Toko/Pemasok
Almt : Almt : SATUAN*)
TA Telp : Telp : Telp :
BANTUAN PEMERINTAH UNTUK MASYARAKAT ( BPM ) DFAT PROGRAM KOTA TANPA KUMUH (KOTAKU)
DAFTAR KUANTITAS PEKERJAAN
PAKET : PEMBANGUNAN TPS3R
I PEKERJAAN PERSIAPAN
1 Pembersihan Awal m2 200.00
2 Pengukuran dan Pemasangan Bowplank m 66.00
II PEKERJAAN TANAH
1 Pek urugan tanah lokasi kegiatan m3 218.55
2 Pek. Galian Tanah Pondasi m3 11.68
3 Pek. Urugan Bekas Galian m3 2.92
4 Pek. Urugan Pasir bawah lantai m3 45.49
5 Pek. Pemancangan Cerucuk Kayu Galam (p. 2m) Btg 372.00
IX PEKERJAAN JEMBATAN
1 Pekerjaan Pondasi Batu Belah m3 19.18
2 Pekerjaan Sloof 20/30
a Pek. Pembesian kg 102.56
b Pekerjaan Bekisting Sloof m2 12.44
c Cor Beton K.200 m3 1.09
3 Pekerjaan Balok 20/30
a Pek. Pembesian kg 51.28
b Pekerjaan Bekisting Balok m2 7.28
c Cor Beton K.200 m3 0.55
4 Pekerjaan Plat beton
a Pek. Pembersian kg 250.87
b Pekerjaan Bekisting Plat m2 11.89
c Cor Beton K200 tebal 20 cm m3 4.03
5 Pekerjaan Reling jembatan
a Pembesian Kolom 15/15 Kg 22.59
b Pek. Bekisting Kolom m2 2.40
c Cor Beton K.200 m3 0.18
d Pek. Pas Batako m2 3.10
e Pek. Plesteran m2 6.60
### ### Err:509 Err:509
X PEKERJAAN LISTRIK
1 Penyambungan Daya Baru PLN Unit 1.00
2 Instalasi Titik Lampu Titik 13.00
3 Lampu SL 18 Watt Bh 13.00
4 Saklar Tunggal Bh 4.00
5 Saklar Ganda Bh 4.00
6 Pek. Pas. Panel Listrik Bh 1.00
7 Pek. Instalasi stop kontak Titik 6.00
8 Stop Kontak Bh 6.00
NO. URAIAN PEKERJAAN SATUAN VOLUME
XI PEKERJAAN LAIN-LAIN
1 Pekerjaan Pagar Besi BRC m2 16.30
3 Pekerjaan Handrail difabel stainless 0.00 0.00
4 Pekerjaan Rolling door m2 7.27
5 Pek. Handrail closet m 1.20
6 Pekerjaan ukiran kayu m2 19.20
Jumlah Bahan -
C. Peralatan - -
Jumlah Peralatan -
D. Harga Satuan Pekerjaan (A+B+C) 70,000.00
Pekerjaan : 1 Btg Pancang Cerucuk Kayu atau Dolken dia. 8 - 10 Cm (panjang Kode Analisa
Satuan Pembayaran :M P.07.a
Pekerjaan : Membuat 1 m3 beton mutu f’c = 7,4 Mpa (K.100) Kode Analisa
Satuan Pembayaran : M3 A.4.1.1.1
Pekerjaan : Membuat 1 m3 beton mutu f’c = 14,5 Mpa (K.175) Kode Analisa
Satuan Pembayaran : M3 A.4.1.1.5.
Pekerjaan : Pembuatan dan pas 1 m3 kusen pintu dan kusen jendela Kayu Klas Kode Analisa
Satuan Pembayaran : M3 A.4.6.1.2.
Pekerjaan : Pembuatan dan pemasangan 1 m2 pintu jendela kaca, Kayu Klas I Kode Analisa
Satuan Pembayaran : M2 A.4.6.1.6.
HARGA
NO. JENIS PEKERJAAN SATUAN
(Rp.)
I PEKERJAAN PERSIAPAN
1. Pembersihan Awal m2 Rp 14,000.00
2. Pengukuran dan Pemasangan Bowplank m Rp 74,690.00
II PEKERJAAN TANAH
1. Pek urugan tanah lokasi kegiatan m3 Rp 162,000.00
2. Pek. Galian Tanah Pondasi m3 Rp 105,000.00
3. Pek. Urugan Bekas Galian m3 Rp 70,000.00
4. Pek. Urugan Pasir bawah lantai m3 Rp 222,000.00
5. Pek. Pemancangan Cerucuk Kayu Galam (p. 2m) Btg Rp 50,100.00
IX PEKERJAAN JEMBATAN
1. Pekerjaan Pondasi Batu Belah m3 Rp 1,104,825.00
2. Pekerjaan Sloof 20/30
a Pek. Pembesian kg Rp 15,124.00
b Pekerjaan Bekisting Sloof m2 Rp 223,020.00
c Cor Beton K.200 m3 Rp 1,078,920.71
3. Pekerjaan Balok 20/30
a Pek. Pembesian kg Rp 15,124.00
b Pekerjaan Bekisting Balok m2 Rp 386,310.00
c Cor Beton K.200 m3 Rp 1,078,920.71
4. Pekerjaan Plat beton
a Pek. Pembersian kg Rp 15,124.00
b Pekerjaan Bekisting Plat m2 Rp 539,810.00
c Cor Beton K200 tebal 20 cm m3 Rp 1,078,920.71
5. Pekerjaan Reling jembatan
a Pembesian Kolom 15/15 Kg Rp 15,124.00
b Pek. Bekisting Kolom m2 Rp 374,310.00
c Cor Beton K.200 m3 Rp 1,078,920.71
d Pek. Pas Batako m2 Rp 167,865.75
e Pek. Plesteran m2 Rp 79,356.00
### Err:509 Err:509 Rp Err:509
X PEKERJAAN LISTRIK
1. Penyambungan Daya Baru PLN Unit Rp 4,500,000.00
2. Instalasi Titik Lampu Titik Rp 325,000.00
3. Lampu SL 18 Watt Bh Rp 35,000.00
4. Saklar Tunggal Bh Rp 20,000.00
5. Saklar Ganda Bh Rp 20,000.00
6. Pek. Pas. Panel Listrik Bh Rp 760,000.00
7. Pek. Instalasi stop kontak Titik Rp 325,000.00
8. Stop Kontak Bh Rp 20,000.00
HARGA
NO. JENIS PEKERJAAN SATUAN
(Rp.)
XI PEKERJAAN LAIN-LAIN
1. Pekerjaan Pagar Besi BRC m2 Rp 320,000.00
3. Pekerjaan Handrail difabel stainless 0.00 Rp -
4. Pekerjaan Rolling door m2 Rp 810,400.00
5. Pek. Handrail closet m Rp 52,000.00
6. Pekerjaan ukiran kayu m2 Rp 625,000.00
I PEKERJAAN PERSIAPAN
1 Pembersihan Awal m2 200.00 A.2.2.1.9 Rp 14,000.00 Rp 2,800,000.00
2 Pengukuran dan Pemasangan Bowplank m 66.00 A. 2.2.1.4. Rp 74,690.00 Rp 4,929,540.00
Jumlah I Rp 7,729,540.00
II PEKERJAAN TANAH
1 Pek urugan tanah lokasi kegiatan m3 218.55 A.2.3.1.11.a Rp 162,000.00 Rp 35,405,100.00
2 Pek. Galian Tanah Pondasi m3 11.68 A. 2.3.1.1 Rp 105,000.00 Rp 1,226,610.00
3 Pek. Urugan Bekas Galian m3 2.92 A.2.3.1.9. Rp 70,000.00 Rp 204,435.00
4 Pek. Urugan Pasir bawah lantai m3 45.49 A.2.3.1.11. Rp 222,000.00 Rp 10,099,672.44
5 Pek. Pemancangan Cerucuk Kayu Galam (p. 2m) Btg 372.00 P.07.a Rp 50,100.00 Rp 18,637,200.00
Jumlah II Rp 65,573,017.44
III PEKERJAAN BETON BERTULANG
1 Pondasi Footplat P1 (80 cm x 80 cm x 20 cm)
a Pek. Pembesian Kg 318.33 A.4.1.1.17 Rp 15,124.00 Rp 4,814,347.30
b Pek. Lantai Kerja Beton K.100 t=5 cm m3 0.67 A.4.1.1.1 Rp 954,788.57 Rp 641,617.92
c Pek. Bekisting Pondasi m2 2.24 A.4.1.1.20 Rp 220,820.00 Rp 494,636.80
d Cor Beton Mutu K.200 m3 2.69 A.4.1.1.6. Rp 1,078,920.71 Rp 2,900,138.88
2 Pondasi Footplat P2 (60 cm x 60 cm x 20 cm)
a Pek. Pembesian Kg 218.55 A.4.1.1.17 Rp 15,124.00 Rp 3,305,312.39
b Pek. Lantai Kerja Beton K.100 t=5 cm m3 0.34 A.4.1.1.1 Rp 954,788.57 Rp 326,537.69
c Pek. Bekisting Pondasi m2 1.52 A.4.1.1.20 Rp 220,820.00 Rp 335,646.40
d Cor Beton Mutu K.200 m3 1.37 A.4.1.1.6. Rp 1,078,920.71 Rp 1,475,963.54
3 Pondasi Footplat P3 (120 cm x 80 cm x 20 cm)
a Pek. Pembesian Kg 39.95 A.4.1.1.17 Rp 15,124.00 Rp 604,153.39
b Pek. Lantai Kerja Beton K.100 t=5 cm m3 0.05 A.4.1.1.1 Rp 954,788.57 Rp 45,829.85
c Pek. Bekisting Pondasi m2 1.92 A.4.1.1.20 Rp 220,820.00 Rp 423,974.40
d Cor Beton Mutu K.200 m3 0.19 A.4.1.1.6. Rp 1,078,920.71 Rp 207,152.78
4 Pek Kolom K1
a Pek. Pembesian Kg 485.65 A.4.1.1.17 Rp 15,124.00 Rp 7,345,020.01
b Pek. Bekisting Kolom m2 40.40 A.4.1.1.22 Rp 374,310.00 Rp 15,122,124.00
c Cor Beton Mutu K.200 m3 4.23 A.4.1.1.6. Rp 1,078,920.71 Rp 4,561,676.78
5 Pek Kolom K2
a Pek. Pembesian Kg 148.41 A.4.1.1.17 Rp 15,124.00 Rp 2,244,497.39
b Pek. Bekisting Kolom m2 15.43 A.4.1.1.22 Rp 374,310.00 Rp 5,775,603.30
c Cor Beton Mutu K.200 m3 1.76 A.4.1.1.6. Rp 1,078,920.71 Rp 1,895,933.43
6 Pek Kolom K3
a Pek. Pembesian Kg 66.62 A.4.1.1.17 Rp 15,124.00 Rp 1,007,557.35
b Pek. Bekisting Kolom m2 6.96 A.4.1.1.22 Rp 374,310.00 Rp 2,605,197.60
c Cor Beton Mutu K.200 m3 0.26 A.4.1.1.6. Rp 1,078,920.71 Rp 281,598.31
7 Pekerjaan Sloof 20x30
a Pek. Pembesian Kg 393.92 A.4.1.1.17 Rp 15,124.00 Rp 5,957,668.77
b Pek. Bekisting Sloof m2 11.60 A.4.1.1.21 Rp 223,020.00 Rp 2,587,032.00
c Cor Beton Mutu K.200 m3 3.48 A.4.1.1.6. Rp 1,078,920.71 Rp 3,754,644.09
8 Pekerjaan Sloof 15x20
a Pek. Pembesian Kg 303.68 A.4.1.1.17 Rp 15,124.00 Rp 4,592,826.58
b Pek. Bekisting Sloof m2 23.72 A.4.1.1.21 Rp 223,020.00 Rp 5,290,034.40
c Cor Beton Mutu K.200 m3 2.03 A.4.1.1.6. Rp 1,078,920.71 Rp 2,186,432.83
9 Pekerjaan Ring Balok 20x20
a Pek. Pembesian Kg 275.43 A.4.1.1.17 Rp 15,124.00 Rp 4,165,565.51
b Pek. Bekisting Ring Balok m2 11.60 A.4.1.1.23 Rp 386,310.00 Rp 4,481,196.00
c Cor Beton Mutu K.200 m3 2.32 A.4.1.1.6. Rp 1,078,920.71 Rp 2,503,096.06
10 Pekerjaan Balok 15x20
a Pek. Pembesian Kg 44.67 A.4.1.1.17 Rp 15,124.00 Rp 675,542.20
b Pek. Bekisting Ring Balok m2 3.36 A.4.1.1.23 Rp 386,310.00 Rp 1,298,001.60
c Cor Beton Mutu K.200 m3 0.25 A.4.1.1.6. Rp 1,078,920.71 Rp 271,888.02
11 Pekerjaan Ring Balok 15/15
a Pek. Pembesian Kg 282.53 A.4.1.1.17 Rp 15,124.00 Rp 4,272,923.98
b Pek. Bekisting Ring Balok m2 17.79 A.4.1.1.23 Rp 386,310.00 Rp 6,872,454.90
c Cor Beton Mutu K.200 m3 0.62 A.4.1.1.6. Rp 1,078,920.71 Rp 665,154.62
12 Pekerjaan lantai beton bertulang
a Pek. Pembesian Kg 1053.65 A.4.1.1.17 Rp 15,124.00 Rp 15,935,374.47
b Cor Beton Mutu K.175 m3 48.72 A.4.1.1.6. Rp 1,048,999.29 Rp 51,102,918.08
HARGA SATUAN JUMLAH HARGA
NO JENIS PEKERJAAN SATUANVOLUME ANALISA
(Rp) (Rp)
13 Pek. Plat /Dak Beton
a Pembesian Kg 36.50 A.4.1.1.17 Rp 15,124.00 Rp 551,958.70
b Pek. Bekisting m2 4.29 A.4.1.1.24 Rp 539,810.00 Rp 2,314,435.38
c Cor Beton Mutu K.200 m3 0.64 A.4.1.1.6. Rp 1,078,920.71 Rp 693,880.88
Jumlah III Rp 176,587,548.53
IV PEKERJAAN DINDING, PLESTERAN DAN KERAMIK
1 Pek. Pasangan dinding Bataco
a Bangunan Hanggar TPS3R m2 142.96 A.4.4.1.21a. Rp 167,865.75 Rp 23,998,020.47
b Kantor m2 60.60 A.4.4.1.21a. Rp 167,865.75 Rp 10,173,168.05
c WC m2 23.50 A.4.4.1.21a. Rp 167,865.75 Rp 3,945,348.72
d Pagar m2 73.61 A.4.4.1.21a. Rp 167,865.75 Rp 12,356,346.06
2 Pek. Plesteran Dinding
a Bangunan Hanggar TPS3R m2 205.28 A.4.4.2.4. Rp 79,356.00 Rp 16,290,136.20
b Kantor m2 89.03 A.4.4.2.4. Rp 79,356.00 Rp 7,065,382.10
c WC m2 38.21 A.4.4.2.4. Rp 79,356.00 Rp 3,031,875.34
d Pagar m2 93.01 A.4.4.2.4. Rp 79,356.00 Rp 7,380,822.20
3 Cor Beton Lantai Beton Mutu K.200 m3 5.04 A.4.1.1.6. Rp 1,078,920.71 Rp 5,439,098.26
4 Pek Keramik lantai Uk.40x40 m2 46.21 A.4.4.3.35.a Rp 258,950.00 Rp 11,964,784.75
5 Pek Keramik lantai WC Uk.20x20 m2 3.68 A.4.4.3.36. Rp 248,960.00 Rp 916,172.80
6 Pek Keramik dinding WC Uk.10x20 m2 8.16 A.4.4.3.53. Rp 324,677.50 Rp 2,649,368.40
7 Pek. Dinding Tawing layar m2 64.20 A.4.6.1.25.a Rp 213,650.00 Rp 13,716,330.00
Jumlah III Rp 118,926,853.35
V PEKERJAAN ATAP, PLAFOND, LISPLANK
1 Rangka Atap Baja Ringan
a Hanggar TPS3R m2 242.24 A.4.2.1.2 d Rp 139,086.67 Rp 33,691,801.24
b Kantor m2 18.63 A.4.2.1.2 d Rp 139,086.67 Rp 2,591,677.02
c WC m2 9.96 A.4.2.1.2 d Rp 139,086.67 Rp 1,385,827.29
2 Pek Atap Genteng Metal Zincalume
a Hanggar TPS3R m2 242.24 A.4.5.2.32. Rp 91,794.34 Rp 22,235,895.93
b Kantor m2 18.63 A.4.5.2.32. Rp 91,794.34 Rp 1,710,453.53
c WC m2 9.96 A.4.5.2.32. Rp 91,794.34 Rp 914,617.51
3 Pek. Lisplank Superplank Eksterior m 57.34 A.4.6.1.21.a Rp 120,641.67 Rp 6,918,162.66
4 Rangka Hollow Plafond Kantor m2 9.55 A.4.2.1.21. Rp 127,450.00 Rp 1,216,828.88
5 Pek. Pas. Plafond Kalsiboard m2 9.55 A.4.5.1.1a Rp 72,700.00 Rp 694,103.25
Jumlah IV Rp 71,359,367.32
VI PEKERJAAN PINTU, JENDELA, KUNCI & PENGGANTUNG
1 Pek. Kusen Pintu dan Jendela Kayu Klas II
a Hanggar TPS3R m3 0.12 A.4.6.1.2. Rp 8,706,500.00 Rp 1,007,342.05
b Kantor m3 0.06 A.4.6.1.2. Rp 8,706,500.00 Rp 504,977.00
c WC m3 0.02 A.4.6.1.2. Rp 8,706,500.00 Rp 182,836.50
2 Pek. Daun Pintu Panel Kayu Klas II
a Hanggar TPS3R m2 3.60 A.4.6.1.5. Rp 841,000.00 Rp 3,027,600.00
b Kantor m2 1.80 A.4.6.1.5. Rp 841,000.00 Rp 1,513,800.00
c WC m2 1.80 A.4.6.1.5. Rp 841,000.00 Rp 1,513,800.00
3 Pek. Rangka Jendela Kaca Kayu Klas II m2 2.26 A.4.6.1.6. Rp 632,800.00 Rp 1,427,596.80
4 Pek.Pemasangan Kaca Tebal 5 mm m2 7.48 A.4.6.2.17 Rp 175,650.00 Rp 1,314,213.30
5 Pek. Engsel Pintu bh 12.00 A.4.6.2.5 Rp 62,150.00 Rp 745,800.00
6 Pek. Engsel Jendela bh 12.00 A.4.6.2.6. Rp 59,100.00 Rp 709,200.00
7 Kunci Tanam bh 4.00 A.4.6.2.2. Rp 179,900.00 Rp 719,600.00
8 Hak angin Jendela bh 6.00 A.4.6.2.9. Rp 47,950.00 Rp 287,700.00
9 Gerendel Jendela bh 6.00 A.4.6.2.11. Rp 62,150.00 Rp 372,900.00
10 Handel Jendela bh 6.00 A.4.6.2.8.a Rp 35,150.00 Rp 210,900.00
11 Pekerjaan Ventilasi Kerawang m2 16.20 A. 4.4.1.23 Rp 378,475.00 Rp 6,131,295.00
12 Pekerjaan glasblock m2 8.92 Ls Rp 650,000.00 Rp 5,798,000.00
Jumlah V Rp 25,467,560.65
VII PEKERJAAN PENGECATAN
1 Pengecatan dinding
a Hanggar TPS3R m2 205.28 A.4.7.1.10. Rp 46,321.00 Rp 9,508,737.82
b Kantor m2 89.03 A.4.7.1.10. Rp 46,321.00 Rp 4,124,143.91
c WC m2 38.21 A.4.7.1.10. Rp 46,321.00 Rp 1,769,740.13
d Pagar m2 93.01 A.4.7.1.10. Rp 46,321.00 Rp 4,308,269.89
2 Pengecatan Plafond Kantor m2 9.55 A.4.7.1.10. Rp 46,321.00 Rp 442,249.75
3 Pengecatan Kusen Pintu dan Jendela m2 10.08 A.4.7.1.4. Rp 53,263.00 Rp 536,891.04
4 Pengecatan Pintu Panel
a Hanggar TPS3R m2 10.80 A.4.7.1.4. Rp 53,263.00 Rp 575,240.40
b Kantor m2 3.60 A.4.7.1.4. Rp 53,263.00 Rp 191,746.80
c WC m2 3.60 A.4.7.1.4. Rp 53,263.00 Rp 191,746.80
5 Pengecatan Rangka Jendela Kaca m2 3.20 A.4.7.1.4. Rp 53,263.00 Rp 170,441.60
Jumlah VI Rp 21,819,208.14
HARGA SATUAN JUMLAH HARGA
NO JENIS PEKERJAAN SATUANVOLUME ANALISA
(Rp) (Rp)
VIII PEKERJAAN SANITASI
1 Pekerjaan Septictank 1 unit
a Galian Septictank m3 6.94 A. 2.3.1.1 Rp 105,000.00 Rp 728,437.50
b Pek. Urugan Pasir t=5 cm m2 0.19 A.2.3.1.11. Rp 222,000.00 Rp 41,625.00
c Pek Cor Beton K.175 tebal 10 cm m3 0.26 A.4.1.1.5. Rp 1,048,999.29 Rp 276,935.81
d Pek. Sloof 15/15
- Pek. Pembesian Kg 26.06 A.4.1.1.17 Rp 15,124.00 Rp 394,191.94
- Pek. bekisting m2 2.40 A.4.1.1.21 Rp 223,020.00 Rp 535,248.00
- Pek cor beton K.175 m3 0.18 A.4.1.1.5. Rp 1,048,999.29 Rp 188,819.87
e Pek. Kolom 15/15
- Pek. Pembesian Kg 24.23 A.4.1.1.17 Rp 15,124.00 Rp 366,486.28
- Pek. bekisting m2 4.08 A.4.1.1.22 Rp 374,310.00 Rp 1,527,184.80
- Pek cor beton K.175 m3 0.15 A.4.1.1.5. Rp 1,048,999.29 Rp 160,496.89
f Pek. Pas. Batako m2 11.56 A.4.4.1.21a. Rp 167,865.75 Rp 1,940,528.07
g Pek. Plesteran m2 11.56 A.4.4.2.4. Rp 79,356.00 Rp 917,355.36
h Pek. Ring Balk 15/15
- Pek. Pembesian Kg 28.28 A.4.1.1.17 Rp 15,124.00 Rp 427,646.22
- Pek. bekisting m2 2.40 A.4.1.1.21 Rp 223,020.00 Rp 535,248.00
- Pek cor beton K.175 m3 0.18 A.4.1.1.5. Rp 1,048,999.29 Rp 188,819.87
i Pek. Plat penutup septictank tebal 10 cm
- Pek. Pembesian Kg 4.66 A.4.1.1.17 Rp 15,124.00 Rp 70,492.96
- Pek. bekisting m2 1.20 A.4.1.1.24 Rp 539,810.00 Rp 647,772.00
- Pek cor beton K.175 m3 0.17 A.4.1.1.5. Rp 1,048,999.29 Rp 176,231.88
j Pek. Tutup mainhole
- Pek. Pembesian Kg 3.00 A.4.1.1.17 Rp 15,124.00 Rp 45,402.25
- Pek. bekisting m2 0.42 A.4.1.1.24 Rp 539,810.00 Rp 226,720.20
- Pek cor beton K.175 m3 0.05 A.4.1.1.5. Rp 1,048,999.29 Rp 51,400.97
k Bioseptictank Kapasitas 3000L Bh 1.00 Ls Rp 12,287,000.00 Rp 12,287,000.00
l Urugan Pasir dalam septictank m3 0.34 A.2.3.1.11. Rp 222,000.00 Rp 74,592.00
2 Pekerjaan Pipa 4" m 3.50 A.5.1.1 32. Rp 148,872.50 Rp 521,053.75
3 Pekerjaan Pipa 2" m 1.93 A.5.1.1 29. Rp 72,446.25 Rp 139,821.26
4 Pekerjaan Pipa 3/4" (Air Bersih) m 36.66 A.5.1.1 26. Rp 31,635.00 Rp 1,159,739.10
5 Pek. Sumur Bor+pompa Bh 1.00 Ls Rp 2,500,000.00 Rp 2,500,000.00
6 Pekerjaan kran air Bh 2.00 A.5.1.1 19. Rp 135,500.00 Rp 271,000.00
7 Pekerjaan stop kran Bh 1.00 A.5.1.1 19.a Rp 135,500.00 Rp 135,500.00
8 Profil tank 1200 L Bh 1.00 Ls Rp 1,600,000.00 Rp 1,600,000.00
9 Pek. Closed Duduk Bh 1.00 A.5.1.1.1. Rp 2,542,200.00 Rp 2,542,200.00
10 Pek. Wastafel+cermin Unit 1.00 A.5.1.1 5. Rp 1,668,200.00 Rp 1,668,200.00
11 Pek. Grill besi penutup saluran m 37.50 Ls Rp 89,400.00 Rp 3,352,500.00
12 Pek. Bak air lindi & resapan unit 1.00 Ls Rp 1,360,000.00 Rp 1,360,000.00
Jumlah VII Rp 37,058,649.98
IX PEKERJAAN JEMBATAN
1 Pekerjaan Pondasi Batu Belah m3 19.18 A.3.2.1.2. Rp 1,104,825.00 Rp 21,190,543.50
2 Pekerjaan Sloof 20/30
a Pek. Pembesian kg 102.56 A.4.1.1.17 Rp 15,124.00 Rp 1,551,043.33
b Pekerjaan Bekisting Sloof m2 12.44 A.4.1.1.21 Rp 223,020.00 Rp 2,774,368.80
c Cor Beton K.200 m3 1.09 A.4.1.1.6. Rp 1,078,920.71 Rp 1,178,181.42
3 Pekerjaan Balok 20/30
a Pek. Pembesian kg 51.28 A.4.1.1.17 Rp 15,124.00 Rp 775,521.67
b Pekerjaan Bekisting Balok m2 7.28 A.4.1.1.23 Rp 386,310.00 Rp 2,812,336.80
c Cor Beton K.200 m3 0.55 A.4.1.1.6. Rp 1,078,920.71 Rp 589,090.71
4 Pekerjaan Plat beton
a Pek. Pembersian kg 250.87 A.4.1.1.17 Rp 15,124.00 Rp 3,794,191.15
b Pekerjaan Bekisting Plat m2 11.89 A.4.1.1.24 Rp 539,810.00 Rp 6,418,340.90
c Cor Beton K200 tebal 20 cm m3 4.03 A.4.1.1.6. Rp 1,078,920.71 Rp 4,345,892.64
5 Pekerjaan Reling jembatan
a Pembesian Kolom 15/15 Kg 22.59 A.4.1.1.17 Rp 15,124.00 Rp 341,620.91
b Pek. Bekisting Kolom m2 2.40 A.4.1.1.22 Rp 374,310.00 Rp 898,344.00
c Cor Beton K.200 m3 0.18 A.4.1.1.6. Rp 1,078,920.71 Rp 194,205.73
d Pek. Pas Batako m2 3.10 A.4.4.1.21a. Rp 167,865.75 Rp 520,383.83
e Pek. Plesteran m2 6.60 A.4.4.2.4. Rp 79,356.00 Rp 523,749.60
TOTAL Rp 705,002,362
DIBULATKAN Rp 705,000,000
JADWAL PELAKSANAAN PEKERJAAN
PAKET : PEMBANGUNAN TPS3R
II PEKERJAAN TANAH
1 Pek urugan tanah lokasi kegiatan m3 218.55 35,405,100.00 5.02 2
2 Pek. Galian Tanah Pondasi m3 11.68 1,226,610.00 0.17 0
3 Pek. Urugan Bekas Galian m3 2.92 204,435.00 0.03 0
4 Pek. Urugan Pasir bawah lantai m3 45.49 10,099,672.44 1.43 0
5 Pek. Pemancangan Cerucuk Kayu Galam (p. 2m) Btg 372.00 18,637,200.00 2.64 0
IX PEKERJAAN JEMBATAN
1 Pekerjaan Pondasi Batu Belah m3 19.18 21,190,543.50 3.01 0
2 Pekerjaan Sloof 20/30
a Pek. Pembesian kg 102.56 1,551,043.33 0.22 0
b Pekerjaan Bekisting Sloof m2 12.44 2,774,368.80 0.39 0
c Cor Beton K.200 m3 1.09 1,178,181.42 0.17 0
3 Pekerjaan Balok 20/30
a Pek. Pembesian kg 51.28 775,521.67 0.11 0
b Pekerjaan Bekisting Balok m2 7.28 2,812,336.80 0.40 0
c Cor Beton K.200 m3 0.55 589,090.71 0.08 0
4 Pekerjaan Plat beton
a Pek. Pembersian kg 250.87 3,794,191.15 0.54 0
b Pekerjaan Bekisting Plat m2 11.89 6,418,340.90 0.91 0
c Cor Beton K200 tebal 20 cm m3 4.03 4,345,892.64 0.62 0
5 Pekerjaan Reling jembatan
a Pembesian Kolom 15/15 Kg 22.59 341,620.91 0.05 0
b Pek. Bekisting Kolom m2 2.40 898,344.00 0.13 0
c Cor Beton K.200 m3 0.18 194,205.73 0.03 0
d Pek. Pas Batako m2 3.10 520,383.83 0.07 0
e Pek. Plesteran m2 6.60 523,749.60 0.07 0
### Err:509 Err:509 Err:509 Err:509 Err:509 0
X PEKERJAAN LISTRIK
1 Penyambungan Daya Baru PLN Unit 1.00 4,500,000.00 0.64 0
2 Instalasi Titik Lampu Titik 13.00 4,225,000.00 0.60 0
3 Lampu SL 18 Watt Bh 13.00 455,000.00 0.06 0
4 Saklar Tunggal Bh 4.00 80,000.00 0.01 0
5 Saklar Ganda Bh 4.00 80,000.00 0.01 0
6 Pek. Pas. Panel Listrik Bh 1.00 760,000.00 0.11 0
7 Pek. Instalasi stop kontak Titik 6.00 1,950,000.00 0.28 0
8 Stop Kontak Bh 6.00 120,000.00 0.02 0
XI PEKERJAAN LAIN-LAIN
1 Pekerjaan Pagar Besi BRC m2 16.30 5,216,000.00 0.74 0
2 Pekerjaan Pintu Pagar Besi m2 9.45 5,670,000.00 0.80 0
3 Pekerjaan Handrail difabel stainless
a Hanggar TPS3R panjang 2 m m 13.54 704,080.00 0.10 0
b Kantor panjang 0,95 m m 4.75 247,000.00 0.04 0
c WC Panjang 0,75 m 4.29 223,080.00 0.03 0
d Biaya pengelasan & pemasangan (100% fisik) m 22.58 1,174,160.00 0.17 0
4 Pekerjaan Rolling door m2 7.27 5,889,582.00 0.84 0
5 Pek. Handrail closet m 1.20 62,400.00 0.01 0
6 Pekerjaan ukiran kayu m2 19.20 12,000,000.00 1.70 0
7 Pek. Plesteran letter timbul Paket 1.00 830,000.00 0.12 0
JUMLAH HARGA
NO. NAMA PAKET PEKERJAAN SATUAN VOLUME
(Rp.)
JUMLAH HARGA
RPD TAHAP-I RPD TAHAP-II
NO. URAIAN SESUAI SPPD-L
(70%) (30%)
(Rp.)
(1) (2) (4) (5)
TENAGA KERJA
1. Kepala Tukang 8,670,000 6,069,000 2,601,000
2. Tukang Batu 23,095,000 16,166,500 6,928,500
1. 3. Tukang Kayu 19,800,000 13,860,000 5,940,000
4. Tukang Besi 20,250,000 14,175,000 6,075,000
5. Tukang Cat 3,750,000 2,625,000 1,125,000
6. Pekerja 126,000,000 88,200,000 37,800,000
JUMLAH 201,565,000 141,095,500 60,469,500
BAHAN
1. Kayu balok 5/7 Klas III 1,781,250 1,246,875 534,375
2. Paku 5 -10 cm 1,672,000 1,170,400 501,600
3. Kayu papan 2/20 Klas III 27,273,900 19,091,730 8,182,170
4. Tanah Urug 28,100,000 19,670,000 8,430,000
5. Pasir Urug 7,950,000 5,565,000 2,385,000
6. Kayu Galam ø 10-12 m 6,825,000 4,777,500 2,047,500
7. Besi Beton - - -
Besi beton polos dia. 8 20,025,000 14,017,500 6,007,500
Besi beton polos dia. 10 7,000,000 4,900,000 2,100,000
Besi beton polos dia. 12 20,806,000 14,564,200 6,241,800
8. Kawat Beton 1,750,000 1,225,000 525,000
9. Semen Portland 40,596,000 28,417,200 12,178,800
10. Pasir Beton 6,120,000 4,284,000 1,836,000
11. Split 14,400,000 10,080,000 4,320,000
13. Balok Kayu Klas II uk.5/7 8,008,000 5,605,600 2,402,400
14. Dolken Kayu ø8-10 9,240,000 6,468,000 2,772,000
15. Plywood 9 mm 1,040,000 728,000 312,000
16. Batako 11,480,000 8,036,000 3,444,000
17. Pasir Pasang 22,350,000 15,645,000 6,705,000
18. Ubin Keramik 40x40 3,675,000 2,572,500 1,102,500
19. Semen Warna 240,000 168,000 72,000
20. Ubin Keramik 20x20 260,000 182,000 78,000
21. Ubin Keramik 10x20 588,600 412,020 176,580
22. Paku GRC 175,000 122,500 52,500
23. Kalsiboard Tebal 9 mm 3,610,000 2,527,000 1,083,000
24. Baja Ringan 75x35x0,75 MM 24,125,000 16,887,500 7,237,500
25. Baja Ringan 30x30x0,3 MM 3,350,000 2,345,000 1,005,000
26. Paku Skrup 4,200,000 2,940,000 1,260,000
27. Genteng Metal 11,000,000 7,700,000 3,300,000
28. Paku Genteng Metal 1,890,000 1,323,000 567,000
JUMLAH HARGA
RPD TAHAP-I RPD TAHAP-II
NO. URAIAN SESUAI SPPD-L (30%)
(70%)
(Rp.)
JUMLAH HARGA
REALISASI s/d SISA s/d SAAT INI
NO. URAIAN SESUAI SPPD-L
SAAT INI (Rp.) (Rp.)
(Rp.)
(1) (2) (4) (5)
TENAGA KERJA
1. Kepala Tukang 8,670,000 4,420,000 4,250,000
2. Tukang Batu 23,095,000 13,640,000 9,455,000
1. 3. Tukang Kayu 19,800,000 12,600,000 7,200,000
4. Tukang Besi 20,250,000 13,500,000 6,750,000
5. Tukang Cat 3,750,000 - 3,750,000
6. Pekerja 126,000,000 71,400,000 54,600,000
BAHAN
1. Kayu balok 5/7 Klas III 1,781,250 1,781,250 -
2. Paku 5 -10 cm 1,672,000 1,320,000 352,000
3. Kayu papan 2/20 Klas III 27,273,900 26,003,500 1,270,400
4. Tanah Urug 28,100,000 26,200,000 1,900,000
5. Pasir Urug 7,950,000 7,950,000 -
6. Kayu Galam ø 10-12 m 6,825,000 6,825,000 -
7. Besi Beton - - -
Besi beton polos dia. 8 20,025,000 6,660,000 13,365,000
Besi beton polos dia. 10 7,000,000 7,000,000 -
Besi beton polos dia. 12 20,806,000 20,806,000 -
8. Kawat Beton 1,750,000 1,250,000 500,000
9. Semen Portland 40,596,000 20,196,000 20,400,000
10. Pasir Beton 6,120,000 2,880,000 3,240,000
11. Split 14,400,000 5,850,000 8,550,000
13. Balok Kayu Klas II uk.5/7 8,008,000 6,440,000 1,568,000
14. Dolken Kayu ø8-10 9,240,000 6,600,000 2,640,000
15. Plywood 9 mm 1,040,000 520,000 520,000
16. Batako 11,480,000 11,480,000 -
17. Pasir Pasang 22,350,000 19,200,000 3,150,000
18. Ubin Keramik 40x40 3,675,000 - 3,675,000
19. Semen Warna 240,000 - 240,000
20. Ubin Keramik 20x20 260,000 - 260,000
JUMLAH HARGA
REALISASI s/d SISA s/d SAAT INI
NO. URAIAN SESUAI SPPD-L
SAAT INI (Rp.) (Rp.)
(Rp.)
21. Ubin Keramik 10x20 588,600 - 588,600
22. Paku GRC 175,000 - 175,000
23. Kalsiboard Tebal 9 mm 3,610,000 3,610,000 -
24. Baja Ringan 75x35x0,75 MM 24,125,000 24,375,000 - 250,000
25. Baja Ringan 30x30x0,3 MM 3,350,000 3,350,000 -
26. Paku Skrup 4,200,000 1,750,000 2,450,000
27. Genteng Metal 11,000,000 11,000,000 -
28. Paku Genteng Metal 1,890,000 1,890,000 -
29. Papan Plank Kalsiboard 4,185,000 - 4,185,000
30. Besi Hollow Plafond 1,3x3,3 90,000 - 90,000
32. Kalsiboard 6 mm 660,000 - 660,000
33. Paku Kalsiboard 75,000 - 75,000
34. Balok kayu kelas II 5/10 untuk kusen 9,360,000 9,360,000 -
35. Lem Kayu 33,000 - 33,000
36. Papan Kayu Klas II Benuas 1,680,000 - 1,680,000
37. Kaca Tebal 5 mm 1,120,500 - 1,120,500
38. Sealant 47,500 - 47,500
39. Engsel pintu 420,000 - 420,000
40. Engsel jendela 492,000 - 492,000
2.
41. Kunci tanam biasa 380,000 - 380,000
42. Kait angin 124,800 - 124,800
43. Grendel/Kunci Slot 210,000 - 210,000
44. Handel Jendela 48,000 - 48,000
45. Roster/Kerawang 4,875,000 4,875,000 -
46. Glassblock 5,798,000 5,798,000 -
47. Cat tembok 12,100,000 - 12,100,000
49. Cat Menie kayu 180,000 - 180,000
50. Cat dasar Kayu 300,000 - 300,000
51. Cat Penutup Kayu 480,000 - 480,000
52. Kuas 45,000 - 45,000
53. Pengencer 28,100 - 28,100
54. Ampelas 80,000 - 80,000
55. Closet Duduk 1,800,000 - 1,800,000
57. Kran air 130,000 - 130,000
59. Stop Kran 3/4 65,000 - 65,000
60. Pipa PVC 4” 295,000 - 295,000
62. Pipa PVC 3/4” 294,000 - 294,000
64. Pipa PVC 2” 127,500 - 127,500
66. Wastafel+cermin 940,000 - 940,000
68. Bioseptictank Kapasitas 3000L 21,287,000 21,287,000 -
69. Profil Tank 1200 L 1,600,000 - 1,600,000
70. Sumur bor+pompa 2,500,000 2,500,000 -
71. Grill besi penutup saluran 3,352,500 - 3,352,500
72. Batu belah 7,200,000 9,200,000 - 2,000,000
74. Penyambungan Daya Baru PLN 4,500,000 - 4,500,000
JUMLAH HARGA
REALISASI s/d SISA s/d SAAT INI
NO. URAIAN SESUAI SPPD-L
SAAT INI (Rp.) (Rp.)
(Rp.)
75. Instalasi Titik Lampu 4,225,000 - 4,225,000
76. Lampu SL 18 Watt 455,000 - 455,000
77. Saklar Tunggal 80,000 - 80,000
78. Saklar Ganda 80,000 - 80,000
79. Pek. Pas Panel Listrik 760,000 - 760,000
80. Pek. Instalasi Stop Kontak 1,950,000 - 1,950,000
81. Stop Kontak 120,000 - 120,000
82. Pagar Besi BRC 5,232,000 - 5,232,000
83. Pekerjaan Pintu Pagar Besi 4,725,000 - 4,725,000
84. Pekerjaan Handrailing difabel stainless 1,170,000 - 1,170,000
85. Biaya pengelasan 1,170,000 - 1,170,000
86. Pekerjaan Rolling door 5,889,582 - 5,889,582
87. Pek. Handrail WC 62,000 - 62,000
88. Pekerjaan ukiran kayu 12,000,000 12,000,000 -
89. Pek. Plesteran letter timbul 800,000 - 800,000
ALAT
1. Mesin Pencacah Plastik kap 400 Kg/hari Diesel 16 HP 36,130,000 36,130,000 -
3. 2. Mesin Pencacah Kompos kapasitas 500 kg/jam Diesel 8 22,650,000 22,650,000 -
3. Mesin Pengayak Kapasitas 500 Kg/Jam 18,150,000 18,150,000 -
JUMLAH HARGA
REALISASI s/d SISA s/d SAAT INI
NO. URAIAN SESUAI SPPD-L
SAAT INI (Rp.) (Rp.)
(Rp.)
(1) (2) (4) (5)
TENAGA KERJA
1. Kepala Tukang 8,670,000 8,500,000 170,000
2. Tukang Batu 23,095,000 23,095,000 -
1. 3. Tukang Kayu 19,800,000 19,800,000 -
4. Tukang Besi 20,250,000 21,750,000 - 1,500,000
5. Tukang Cat 3,750,000 3,750,000 -
6. Pekerja 126,000,000 128,100,000 - 2,100,000
BAHAN
1. Kayu balok 5/7 Klas III 1,781,250 1,781,250 -
2. Paku 5 -10 cm 1,672,000 1,672,000 -
3. Kayu papan 2/20 Klas III 27,273,900 27,273,900 -
4. Tanah Urug 28,100,000 28,200,000 - 100,000
5. Pasir Urug 7,950,000 7,950,000 -
6. Kayu Galam ø 10-12 m 6,825,000 6,825,000 -
7. Besi Beton - - -
Besi beton polos dia. 8 20,025,000 20,025,000 -
Besi beton polos dia. 10 7,000,000 7,000,000 -
Besi beton polos dia. 12 20,806,000 20,806,000 -
8. Kawat Beton 1,750,000 1,750,000 -
9. Semen Portland 40,596,000 40,596,000 -
10. Pasir Beton 6,120,000 6,120,000 -
11. Split 14,400,000 14,850,000 - 450,000
13. Balok Kayu Klas II uk.5/7 8,008,000 8,008,000 -
14. Dolken Kayu ø8-10 9,240,000 9,240,000 -
15. Plywood 9 mm 1,040,000 1,040,000 -
16. Batako 11,480,000 11,480,000 -
17. Pasir Pasang 22,350,000 22,350,000 -
18. Ubin Keramik 40x40 3,675,000 3,675,000 -
19. Semen Warna 240,000 240,000 -
20. Ubin Keramik 20x20 260,000 260,000 -
JUMLAH HARGA
REALISASI s/d SISA s/d SAAT INI
NO. URAIAN SESUAI SPPD-L
SAAT INI (Rp.) (Rp.)
(Rp.)
21. Ubin Keramik 10x20 588,600 588,600 -
22. Paku GRC 175,000 175,000 -
23. Kalsiboard Tebal 9 mm 3,610,000 5,320,000 - 1,710,000
24. Baja Ringan 75x35x0,75 MM 24,125,000 24,375,000 - 250,000
25. Baja Ringan 30x30x0,3 MM 3,350,000 3,350,000 -
26. Paku Skrup 4,200,000 3,500,000 700,000
27. Genteng Metal 11,000,000 11,000,000 -
28. Paku Genteng Metal 1,890,000 1,890,000 -
29. Papan Plank Kalsiboard 4,185,000 4,185,000 -
30. Besi Hollow Plafond 1,3x3,3 90,000 90,000 -
32. Kalsiboard 6 mm 660,000 660,000 -
33. Paku Kalsiboard 75,000 75,000 -
34. Balok kayu kelas II 5/10 untuk kusen 9,360,000 9,360,000 -
35. Lem Kayu 33,000 33,000 -
36. Papan Kayu Klas II Benuas 1,680,000 1,680,000 -
37. Kaca Tebal 5 mm 1,120,500 1,120,500 -
38. Sealant 47,500 47,500 -
39. Engsel pintu 420,000 420,000 -
40. Engsel jendela 492,000 492,000 -
2.
41. Kunci tanam biasa 380,000 380,000 -
42. Kait angin 124,800 124,800 -
43. Grendel/Kunci Slot 210,000 210,000 -
44. Handel Jendela 48,000 48,000 -
45. Roster/Kerawang 4,875,000 4,875,000 -
46. Glassblock 5,798,000 5,798,000 -
47. Cat tembok 12,100,000 13,200,000 - 1,100,000
49. Cat Menie kayu 180,000 180,000 -
50. Cat dasar Kayu 300,000 300,000 -
51. Cat Penutup Kayu 480,000 480,000 -
52. Kuas 45,000 45,000 -
53. Pengencer 28,100 28,100 -
54. Ampelas 80,000 80,000 -
55. Closet Duduk 1,800,000 1,800,000 -
57. Kran air 130,000 130,000 -
59. Stop Kran 3/4 65,000 65,000 -
60. Pipa PVC 4” 295,000 590,000 - 295,000
62. Pipa PVC 3/4” 294,000 294,000 -
64. Pipa PVC 2” 127,500 255,000 - 127,500
66. Wastafel+cermin 940,000 1,668,200 - 728,200
68. Bioseptictank Kapasitas 3000L 21,287,000 12,287,000 9,000,000
69. Profil Tank 1200 L 1,600,000 1,600,000 -
70. Sumur bor+pompa 2,500,000 2,500,000 -
71. Grill besi penutup saluran 3,352,500 3,352,500 -
72. Batu belah 7,200,000 9,200,000 - 2,000,000
74. Penyambungan Daya Baru PLN 4,500,000 4,500,000 -
JUMLAH HARGA
REALISASI s/d SISA s/d SAAT INI
NO. URAIAN SESUAI SPPD-L
SAAT INI (Rp.) (Rp.)
(Rp.)
75. Instalasi Titik Lampu 4,225,000 4,225,000 -
76. Lampu SL 18 Watt 455,000 455,000 -
77. Saklar Tunggal 80,000 80,000 -
78. Saklar Ganda 80,000 80,000 -
79. Pek. Pas Panel Listrik 760,000 760,000 -
80. Pek. Instalasi Stop Kontak 1,950,000 1,950,000 -
81. Stop Kontak 120,000 120,000 -
82. Pagar Besi BRC 5,232,000 5,232,300 - 300
83. Pekerjaan Pintu Pagar Besi 4,725,000 6,032,500 - 1,307,500
84. Pekerjaan Handrailing difabel stainless 1,170,000 1,175,200 - 5,200
85. Biaya pengelasan 1,170,000 1,175,200 - 5,200
86. Pekerjaan Rolling door 5,889,582 3,632,500 2,257,082
87. Pek. Handrail WC 62,000 - 62,000
88. Pekerjaan ukiran kayu 12,000,000 12,000,000 -
89. Pek. Plesteran letter timbul 800,000 700,000 100,000
ALAT
1. Mesin Pencacah Plastik kap 400 Kg/hari Diesel 16 HP 36,130,000 36,130,000 -
3. 2. Mesin Pencacah Kompos kapasitas 500 kg/jam Diesel 8 22,650,000 22,650,000 -
3. Mesin Pengayak Kapasitas 500 Kg/Jam 18,150,000 18,150,000 -
ADMINISTRASI
1. Pelaporan KSM 270,000 270,000 -
2. Photo Copy / Penggandaan 250,000 250,000 -
4. 3. Biaya Alat Tulis Kantor (ATK) 150,000 150,000 -
4. Materai 80,000 80,000 -
5. Pengujian Lab 500,000 500,000 -
6. Papan Nama Kegiatan 250,000 250,000 -
7. Biaya transfer - 58,000 - 58,000