PERHITUNGAN VOLUME PEKERJAAN

PROGRAM : KOTA TANPA KUMUH (KOTAKU)


KEGIATAN : BPM-DFAT
LOKASI : KERENG BANGKIRAI
KEGIATAN : TPS3R
TAHUN ANGGARAN : 2021

JUMLAH
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME SATUAN

1 2 3 4 5

I PEKERJAAN PERSIAPAN
1 Pembersihan Awal Panjang Lebar 200.00 m2
= 20 m x 10.00 m 200.00 m2

2 Pengukuran dan Pemasangan Bowplank Panjang m + 1 m kiri + 1 m kanan 66.00 m


= 12.00 m + 1 m + 1 m = 14.00 m
= 12.00 m + 1 m + 1 m = 14.00 m
= 17.00 m + 1 m + 1 m = 19.00 m
= 17.00 m + 1 m + 1 m = 19.00 m

II PEKERJAAN TANAH
1 Pek urugan tanah lokasi kegiatan Panjang Lebar Tebal 218.55 m3
= 20 m x 20.00 m x 0.50 m = 200.00 m3
Depan jembatan = 5.5 m x 6.00 m x 0.35 m = 11.55 m3
Jalan masuk = 4 m x 5.00 m x 0.35 m = 7.00 m3

2 Pek. Galian Tanah Pondasi Panjang Lebar Tebal Jumlah 11.68 m3


Pondasi P1 = 0.8 m x 0.80 m x 0.55 m x 21 = 7.39 m3
Pondasi P2 = 0.60 m x 0.60 m x 0.55 m x 19 = 3.76 m3
Pondasi P3 = 1.20 m x 0.80 m x 0.55 m x 1 = 0.53 m3

3 Pek. Urugan Bekas Galian = Volume galian x 1/4 2.92 m3


= 11.68 x 0.25 = 2.92 m3

4 Pek. Urugan Pasir bawah lantai Panjang Lebar Tebal Jumlah 44.84 m3
Lantai Hanggar TPS3R = 13.42 m x 11.80 m x 0.20 m x 1 = 31.67 m3
= 3.23 m x 2.83 m x 0.20 m x 2 = 3.66 m3
= 5.83 m x 3.23 m x 0.20 m x 2 = 7.53 m3
Lantai Kantor = 3.33 m x 2.85 m x 0.15 m x 1 = 1.42 m3
Lantai WC = 2.30 m x 1.60 m x 0.15 m x 1 = 0.55 m3

5 Pek. Pemancangan Cerucuk Kayu Galam Jumlah cerucuk Panjang Jumlah Pondasi 372.00 m
Pondasi P1 = 9 Bh x 2 m x 21 Bh / 2 = 189.00 m
Pondasi P2 = 9 Bh x 2 m x 19 Bh / 2 = 171.00 m
Pondasi P3 = 12 Bh x 2 m x 1 Bh / 2 = 12.00 m

III PEKERJAAN BETON BERTULANG


1 Pondasi Footplat P1 (80 cm x 80 cm x 20 cm)
a Pek. Pembesian Panjang Berat jenis Jumlah Besi Jumlah Pondasi 316.93 Kg
ø 12 = 1.70 m x 0.888 kg/m x 10.00 bh x 21 = 316.93 Kg

b Pek. Lantai Kerja Beton K.100 t=5 cm Panjang Lebar Tebal Jumlah Pondasi 0.67 m3
= 0.80 m x 0.80 m x 0.05 m x 21 = 0.67 m3

c Pek. Bekisting Pondasi Panjang Lebar Jumlah Jumlah Pondasi 2.24 m2


= 0.8 m x 0.20 m x 2.00 Bh x 21 x 1/3 = 2.24 m2

d Cor Beton Mutu k.200 Panjang Lebar Tebal Jumlah Pondasi 2.69 m3
= 0.80 m x 0.80 m x 0.20 m x 21 = 2.69 m3
JUMLAH
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME SATUAN

1 2 3 4 5
2 Pondasi Footplat P2 (60 cm x 60 cm x 20 cm)
a Pek. Pembesian Panjang Berat jenis Jumlah Besi Jumlah Pondasi 217.59 Kg
ø 12 = 1.29 m x 0.888 kg/m x 10.00 bh x 19 = 217.59 Kg

b Pek. Lantai Kerja Beton K.100 t=5 cm Panjang Lebar Tebal Jumlah Pondasi 0.34 m3
= 0.60 m x 0.60 m x 0.05 m x 19 = 0.34 m3

c Pek. Bekisting Pondasi Panjang Lebar Jumlah Jumlah Pondasi 1.52 m2


= 0.6 m x 0.20 m x 2.00 Bh x 19 x 1/3 = 1.52 m2

d Cor Beton Mutu k.200 Panjang Lebar Tebal Jumlah Pondasi 1.37 m3
= 0.60 m x 0.60 m x 0.20 m x 19 = 1.37 m3

3 Pondasi Footplat P3 (60 cm x 60 cm x 20 cm)


a Pek. Pembesian Panjang Berat jenis Jumlah Besi Jumlah Pondasi 39.77 Kg
ø 12 = 2.80 m x 0.888 kg/m x 16.00 bh x 1 = 39.77 Kg

b Pek. Lantai Kerja Beton K.100 t=5 cm Panjang Lebar Tebal Jumlah Pondasi 0.05 m3
= 1.20 m x 0.80 m x 0.05 m x 1 = 0.05 m3

c Pek. Bekisting Pondasi Panjang Lebar Jumlah Jumlah Pondasi 1.92 m2


= 1.2 m x 0.80 m x 2.00 Bh x 1 = 1.92 m2

d Cor Beton Mutu k.200 Panjang Lebar Tebal Jumlah Pondasi 0.19 m3
= 1.20 m x 0.80 m x 0.20 m x 1 = 0.19 m3

2 Pek Kolom K1
a Pek. Pembesian Panjang Berat jenis Jumlah Besi Jumlah Kolom 484.00 Kg
Hanggar TPS3R ø 12 = 4.60 m x 0.888 kg/m x 4.00 bh x 18 = 294.03 Kg
WC ø 12 = 3.85 m x 0.888 kg/m x 4.00 bh x 4 = 54.69 Kg
Pagar ø 12 = 3.40 m x 0.888 kg/m x 4.00 bh x 1 = 12.07 Kg
ø 12 = 4.10 m x 0.888 kg/m x 4.00 bh x 1 = 14.56 Kg
ø8 = 0.52 m x 0.395 kg/m x 529.00 bh = 108.66 Kg

b Pek. Bekisting Kolom Panjang Lebar Jumlah Jumlah Kolom 40.40 m2


Hanggar TPS3R = 4.60 m x 0.20 m x 4.00 Bh x 18 x 1/3 = 22.08 m2
WC = 3.85 m x 0.20 m x 4.00 Bh x 4 = 12.32 m2
Pagar = 3.40 m x 0.20 m x 4.00 Bh x 1 = 2.72 m2
= 4.10 m x 0.20 m x 4.00 Bh x 1 = 3.28 m2

c Cor Beton Mutu k.200 Panjang Lebar Tinggi Jumlah Kolom 4.23 m3
Hanggar TPS3R bawah sloof = 0.20 m x 0.20 m x 0.80 m x 18 = 0.58 m3
Atas sloof = 0.20 m x 0.20 m x 3.80 m x 18 = 2.74 m3
WC bawah sloof = 0.20 m x 0.20 m x 0.80 m x 4 = 0.13 m3
Atas sloof = 0.20 m x 0.20 m x 3.05 m x 4 = 0.49 m3
Pagar bawah sloof = 0.20 m x 0.20 m x 0.80 m x 1 = 0.03 m3
Atas sloof = 0.20 m x 0.20 m x 2.60 m x 1 = 0.10 m3
bawah sloof = 0.20 m x 0.20 m x 0.80 m x 1 = 0.03 m3
Atas sloof = 0.20 m x 0.20 m x 3.30 m x 1 = 0.13 m3

3 Pek Kolom K2
a Pek. Pembesian Panjang Berat jenis Jumlah Besi Jumlah Kolom 147.98 Kg
Kantor ø 12 = 3.85 m x 0.888 kg/m x 4.00 bh x 3 = 41.01 Kg
Pagar ø 12 = 2.50 m x 0.888 kg/m x 4.00 bh x 8 = 71.02 Kg
ø 12 = 3.40 m x 0.888 kg/m x 4.00 bh x 1 = 12.07 Kg
ø 12 = 4.10 m x 0.888 kg/m x 4.00 bh x 1 = 14.56 Kg
ø8 = 0.65 m x 0.395 kg/m x 196.00 bh = 50.32 Kg

b Pek. Bekisting Kolom Panjang Lebar Jumlah Jumlah Kolom 15.43 m2


= 3.85 m x 0.15 m x 4.00 Bh x 3 = 6.93 m2
= 2.50 m x 0.15 m x 4.00 Bh x 8 x 1/3 = 4.00 m2
= 3.40 m x 0.15 m x 4.00 Bh x 1 = 2.04 m2
= 4.10 m x 0.15 m x 4.00 Bh x 1 = 2.46 m2

c Cor Beton Mutu k.200 Panjang Lebar Tinggi Jumlah Kolom 1.76 m3
Kantor bawah sloof = 0.30 m x 0.15 m x 0.80 m x 3 = 0.11 m3
Atas sloof = 0.30 m x 0.15 m x 3.05 m x 3 = 0.41 m3
Pagar bawah sloof = 0.30 m x 0.15 m x 0.80 m x 8 = 0.29 m3
Atas sloof = 0.30 m x 0.15 m x 1.70 m x 8 = 0.61 m3
bawah sloof = 0.30 m x 0.15 m x 0.80 m x 1 = 0.04 m3
Atas sloof = 0.30 m x 0.15 m x 2.60 m x 1 = 0.12 m3
bawah sloof = 0.30 m x 0.15 m x 0.80 m x 1 = 0.04 m3
Atas sloof = 0.30 m x 0.15 m x 3.30 m x 1 = 0.15 m3

4 Pek Kolom K3
a Pek. Pembesian Panjang Berat jenis Jumlah Besi Jumlah Kolom 66.65 Kg
Pagar ø 10 = 3.40 m x 0.617 kg/m x 8.00 bh x 1 = 16.78 Kg
ø 10 = 4.10 m x 0.617 kg/m x 8.00 bh x 2 = 40.48 Kg
ø8 = 0.41 m x 0.395 kg/m x 58.00 bh = 9.39 Kg

b Pek. Bekisting Kolom Panjang Lebar Jumlah Jumlah Kolom 6.96 m2


= 3.40 m x 0.15 m x 4.00 Bh x 1 = 2.04 m2
= 4.10 m x 0.15 m x 4.00 Bh x 2 = 4.92 m2

c Cor Beton Mutu k.200 Panjang Lebar Tinggi Jumlah Kolom 0.26 m3
Pagar bawah sloof = 0.15 m x 0.15 m x 0.80 m x 1 = 0.02 m3
Atas sloof = 0.15 m x 0.15 m x 2.60 m x 1 = 0.06 m3
bawah sloof = 0.15 m x 0.15 m x 0.80 m x 2 = 0.04 m3
Atas sloof = 0.15 m x 0.15 m x 3.30 m x 2 = 0.15 m3
JUMLAH
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME SATUAN

1 2 3 4 5
3 Pekerjaan Sloof 20x30
a Pek. Pembesian Panjang Berat jenis Jumlah Besi Jumlah sisi 392.56 Kg
Hanggar TPS3R ø 12 = 17.00 m x 0.888 kg/m x 6.00 bh x 2 = 181.10 Kg
ø 12 = 12.00 m x 0.888 kg/m x 6.00 bh x 2 = 127.84 Kg
ø8 = 0.73 m x 0.395 kg/m x 290.00 bh = 83.62 Kg

b Pek. Bekisting Sloof Panjang Lebar Jumlah Jumlah sisi 11.60 m2


= 17 m x 0.20 m x 2.00 Bh x 2 x 1/2 = 6.80 m2
= 12 m x 0.20 m x 2.00 Bh x 2 x 1/2 = 4.80 m2

c Cor Beton Mutu k.200 Panjang Lebar Tinggi Jumlah sisi 3.48 m3
= 17.00 m x 0.20 m x 0.30 m x 2 = 2.04 m3
= 12.00 m x 0.20 m x 0.30 m x 2 = 1.44 m3

7 Pekerjaan Sloof 15x20


a Pek. Pembesian Panjang Berat jenis Jumlah Besi Jumlah sisi 302.62 Kg
Hanggar TPS3R ø 12 = 12.00 m x 0.888 kg/m x 4.00 bh x 1 = 42.61 Kg
Kantor ø 12 = 3.50 m x 0.888 kg/m x 4.00 bh x 2 = 24.86 Kg
ø 12 = 3.00 m x 0.888 kg/m x 4.00 bh x 2 = 21.31 Kg
WC ø 12 = 2.45 m x 0.888 kg/m x 4.00 bh x 1 = 8.70 Kg
ø 12 = 1.75 m x 0.888 kg/m x 4.00 bh x 2 = 12.43 Kg
Pagar Kiri ø 12 = 2.57 m x 0.888 kg/m x 4.00 bh x 1 = 9.13 Kg
Kanan ø 12 = 20.00 m x 0.888 kg/m x 4.00 bh x 1 = 71.02 Kg
Belakang ø 12 = 2.83 m x 0.888 kg/m x 4.00 bh x 1 = 10.05 Kg
Depan ø 12 = 11.20 m x 0.888 kg/m x 4.00 bh x 1 = 39.77 Kg
ø8 = 0.47 m x 0.395 kg/m x 338 bh = 62.75 Kg

b Pek. Bekisting Sloof Panjang Lebar Jumlah Jumlah sisi 23.72 m2


= 12.00 m x 0.20 m x 2.00 Bh x 1 = 4.80 m2
= 3.50 m x 0.20 m x 2.00 Bh x 2 x 1/2 = 1.40 m2
= 3.00 m x 0.20 m x 2.00 Bh x 2 x 1/2 = 1.20 m2
= 2.45 m x 0.20 m x 2.00 Bh x 1 = 0.98 m2
= 1.75 m x 0.20 m x 2.00 Bh x 2 x 1/2 = 0.70 m2
= 2.57 m x 0.20 m x 2.00 Bh x 1 = 1.03 m2
= 20.00 m x 0.20 m x 2.00 Bh x 1 = 8.00 m2
= 2.83 m x 0.20 m x 2.00 Bh x 1 = 1.13 m2
= 11.20 m x 0.20 m x 2.00 Bh x 1 = 4.48 m2

c Cor Beton Mutu k.200 Panjang Lebar Tinggi Jumlah sisi 2.03 m3
Hanggar TPS3R = 12.00 m x 0.15 m x 0.20 m x 1 = 0.36 m3
Kantor = 3.50 m x 0.15 m x 0.20 m x 2 = 0.21 m3
= 3.00 m x 0.15 m x 0.20 m x 2 = 0.18 m3
WC = 2.45 m x 0.15 m x 0.20 m x 1 = 0.07 m3
= 1.75 m x 0.15 m x 0.20 m x 2 = 0.11 m3
Pagar Kiri = 2.57 m x 0.15 m x 0.20 m x 1 = 0.08 m3
Kanan = 20.00 m x 0.15 m x 0.20 m x 1 = 0.60 m3
Belakang = 2.83 m x 0.15 m x 0.20 m x 1 = 0.08 m3
Depan = 11.20 m x 0.15 m x 0.20 m x 1 = 0.34 m3
JUMLAH
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME SATUAN

1 2 3 4 5
10 Pekerjaan Ring Balok 20x20
a Pek. Pembesian Panjang Berat jenis Jumlah Besi Jumlah sisi 275.43 Kg
Hanggar TPS3R ø 10 = 17.00 m x 0.617 kg/m x 6.00 bh x 2 = 125.87 Kg
TPS ø 10 = 12.00 m x 0.617 kg/m x 6.00 bh x 2 = 88.85 Kg
ø8 = 0.53 m x 0.395 kg/m x 290.00 bh = 60.71 Kg

b Pek. Bekisting Ring Balok Panjang Lebar Jumlah Jumlah sisi 11.60 m2
= 17 m x 0.20 m x 2.00 Bh x 2 x 1/2 = 6.80 m2
= 12 m x 0.20 m x 2.00 Bh x 2 x 1/2 = 4.80 m2

c Cor Beton Mutu k.200 Panjang Lebar Tinggi Jumlah sisi 2.32 m3
= 17.00 m x 0.20 m x 0.20 m x 2 = 1.36 m3
= 12.00 m x 0.20 m x 0.20 m x 2 = 0.96 m3

11 Pekerjaan Balok 15x20


a Pek. Pembesian Panjang Berat jenis Jumlah Besi Jumlah sisi 44.67 Kg
WC ø 10 = 2.45 m x 0.617 kg/m x 6.00 bh x 1 = 9.07 Kg
ø 10 = 3.00 m x 0.617 kg/m x 6.00 bh x 1 = 11.11 Kg
ø 10 = 1.75 m x 0.617 kg/m x 6.00 bh x 2 = 12.96 Kg
ø8 = 0.73 m x 0.395 kg/m x 40.00 bh = 11.53 Kg

b Pek. Bekisting Ring Balok Panjang Lebar Jumlah Jumlah sisi 3.36 m2
= 2.45 m x 0.20 m x 2.00 Bh x 2 = 1.96 m2
= 1.75 m x 0.20 m x 2.00 Bh x 2 = 1.40 m2

c Cor Beton Mutu k.200 Panjang Lebar Tinggi Jumlah sisi 0.25 m3
= 2.45 m x 0.15 m x 0.20 m x 2 = 0.15 m3
= 1.75 m x 0.15 m x 0.20 m x 2 = 0.11 m3

12 Pekerjaan Ring Balok 15/15


a Pek. Pembesian Panjang Berat jenis Jumlah Besi Jumlah sisi 281.95 Kg
Hanggar TPS3R ø 10 = 12.00 m x 0.617 kg/m x 4.00 bh x 1 = 29.62 Kg
WC ø 10 = 2.45 m x 0.617 kg/m x 6.00 bh x 2 = 18.14 Kg
ø 10 = 1.75 m x 0.617 kg/m x 6.00 bh x 2 = 12.96 Kg
Kantor ø 10 = 3.50 m x 0.617 kg/m x 6.00 bh x 2 = 25.91 Kg
ø 10 = 3.00 m x 0.617 kg/m x 6.00 bh x 1 = 11.11 Kg
Pagar Kiri ø 12 = 2.57 m x 0.888 kg/m x 4.00 bh x 1 = 9.13 Kg
Kanan ø 12 = 20.00 m x 0.888 kg/m x 4.00 bh x 1 = 71.02 Kg
Belakang ø 12 = 2.83 m x 0.888 kg/m x 4.00 bh x 1 = 10.05 Kg
Depan ø 12 = 11.20 m x 0.888 kg/m x 4.00 bh x 1 = 39.77 Kg
ø8 = 0.41 m x 0.395 kg/m x 335.00 bh = 54.25 Kg

b Pek. Bekisting Ring Balok Panjang Lebar Jumlah Jumlah sisi 17.79 m2
= 12.00 m x 0.15 m x 2.00 Bh x 1 = 3.60 m2
= 2.45 m x 0.15 m x 2.00 Bh x 2 x 1/2 = 0.74 m2
= 1.75 m x 0.15 m x 2.00 Bh x 2 x 1/2 = 0.53 m2
= 3.50 m x 0.15 m x 2.00 Bh x 2 x 1/2 = 1.05 m2
= 3.00 m x 0.15 m x 2.00 Bh x 1 = 0.90 m2
= 2.57 m x 0.15 m x 2.00 Bh x 1 = 0.77 m2
= 20.00 m x 0.15 m x 2.00 Bh x 1 = 6.00 m2
= 2.83 m x 0.15 m x 2.00 Bh x 1 = 0.85 m2
= 11.20 m x 0.15 m x 2.00 Bh x 1 = 3.36 m2

c Cor Beton Mutu k.200 Panjang Lebar Tinggi Jumlah sisi 0.62 m3
Hanggar TPS3R = 12.00 m x 0.15 m x 0.15 m x 1 = 0.27 m3
WC = 2.45 m x 0.15 m x 0.15 m x 2 = 0.11 m3
= 1.75 m x 0.15 m x 0.15 m x 2 = 0.08 m3
Kantor = 3.50 m x 0.15 m x 0.15 m x 2 = 0.16 m3
= 3.00 m x 0.15 m x 0.15 m x 1 = 0.07 m3
Pagar Kiri = 2.57 m x 0.15 m x 0.15 m x 1 = 0.06 m3
Kanan = 20.00 m x 0.15 m x 0.15 m x 1 = 0.45 m3
Belakang = 2.83 m x 0.15 m x 0.15 m x 1 = 0.06 m3
Depan = 11.20 m x 0.15 m x 0.15 m x 1 = 0.25 m3

13 Pekerjaan lantai beton bertulang


a Pek. Pembesian Panjang Berat jenis Jumlah Besi 1,101.59 Kg
Hanggar TPS3R ø 8-20 = 13.4 m x 0.395 kg/m x 59.00 bh = 312.29 Kg
ø 8-20 = 11.8 m x 0.395 kg/m x 67.00 bh = 312.29 Kg
Halaman ø 10-30 = 13.8 m x 0.617 kg/m x 25.00 bh = 212.87 Kg
ø 10-30 = 7.3 m x 0.617 kg/m x 46.00 bh = 207.19 Kg
ø 10-30 = 1.5 m x 0.617 kg/m x 2.00 bh = 1.85 Kg
ø 10-30 = 0.35 m x 0.617 kg/m x 5.00 bh = 1.08 Kg
ø 10-30 = 1.75 m x 0.617 kg/m x 3.00 bh = 3.24 Kg
ø 10-30 = 0.77 m x 0.617 kg/m x 6.00 bh = 2.85 Kg
ø 10-30 = 19.35 m x 0.617 kg/m x 2.00 bh = 23.88 Kg
ø 10-30 = 0.6 m x 0.617 kg/m x 65.00 bh = 24.06 Kg

b Cor Beton Mutu k.175 Panjang Lebar Tebal 42.55 m3


Hanggar TPS3R = 13.4 m x 11.8 m x 0.15 m = 23.72 m3
Halaman = 13.8 m x 7.3 m x 0.15 m = 15.11 m3
= 1.5 m x 0.35 m x 0.15 m = 0.08 m3
= 1.75 m x 0.77 m x 0.15 m = 0.20 m3
= 19.35 m x 0.6 m x 0.15 m = 1.74 m3
Area Ram = 8.5 m x 2 m x 0.20 m x 1/2 = 1.70 m3

14 Pek. Plat /Dak Beton


a Pembesian Panjang Berat jenis Jumlah Besi 36.50 m3
WC ø 10-15 = 2.45 m x 0.617 kg/m x 12.00 bh = 18.14 m3
ø 10-15 = 1.75 m x 0.617 kg/m x 17.00 bh = 18.36 m3

b Pek. Bekisting Panjang Lebar 4.29 m2


= 2.45 m x 1.75 m 4.29 m2

c Cor Beton Mutu k.200 Panjang Lebar Tebal 0.64 m3


= 2.45 m x 1.75 m x 0.15 m = 0.64 m3
JUMLAH
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME SATUAN

1 2 3 4 5
Luas
IV PEKERJAAN DINDING, LANTAI DAN PLESTERAN pintu/
Jendela/
1 Pek. Pasangan dinding Bataco kerawang/
a Bangunan Hanggar TPS3R Panjang Lebar Jumlah sisi Glasblok 142.96 m2
Samping Kanan = 3.8 m x 2.8 m x 4 - 1.87 = 40.69 m2
Depan = 3.8 m x 3.2 m x 1 - 1.69 = 10.48 m2
Area Dalam = 3.8 m x 2.8 m x 4 - 13.48 = 29.08 m2
Samping Kiri = 2.8 m x 2.0 m x 4 = 22.40 m2
Bawah Sloof Kiri = 2.8 m x 0.8 m x 4 = 8.96 m2
Kanan = 2.8 m x 0.8 m x 4 = 8.96 m2
Belakang = 2.8 m x 0.8 m x 5 = 11.20 m2
Depan = 2.8 m x 0.8 m x 5 = 11.20 m2

Luas pintu/
Jendela/
kerawang/G
b Kantor Lebar Tinggi lasblok sisi 60.60 m2
Depan = 3.35 m x 3.05 m - 3.47 = 13.69 m2
Samping Kiri = 2.28 m x 3.05 m = 6.95 m2
= 0.37 m x 3.05 m = 1.13 m2
Samping Kanan = 2.85 m x 3.05 m = 8.69 m2
= 1.35 m x 3.05 m = 4.12 m2
Belakang = 3.35 m x 4.2 m - 1.11 = 15.18 m2
Bawah Sloof Kiri = 2.28 m x 0.8 m = 1.82 m2
= 0.37 m x 0.8 m = 0.30 m2
Kanan = 2.85 m x 0.8 m = 2.28 m2
= 1.35 m x 0.8 m = 1.08 m2
Belakang = 3.35 m x 0.8 m = 2.68 m2
Depan = 3.35 m x 0.8 m = 2.68 m2

Luas pintu/
Jendela/
kerawang/G
c WC Lebar Tinggi lasblok 23.50 m2
Depan = 1.60 m x 3.05 m - 2.33 = 7.21 m2
Samping Kanan = 2.30 m x 3.05 m = 7.02 m2
Belakang = 1.60 m x 3.05 m = 4.88 m2
Bawah Sloof Kanan = 2.30 m x 0.8 m = 1.84 m2
Belakang = 1.60 m x 0.8 m = 1.28 m2
Depan = 1.60 m x 0.8 m = 1.28 m2

d Pagar Panjang Lebar Jumlah sisi 73.61 m2


Depan = 3 m x 1.35 m x 1 = 4.05 m2
Box tanaman = 2.85 m x 0.5 m x 2 = 2.85 m2
= 2.45 m x 0.5 m x 1 = 1.23 m2
= 0.5 m x 0.35 m x 5 = 0.88 m2
Samping Kiri = 2.35 m x 1.65 m x 7 = 27.14 m2
= 1.85 m x 1.65 m x 1 = 3.05 m2
Samping Kanan = 2.38 m x 1.65 m x 1 = 3.93 m2
Belakang = 2.05 m x 1.65 m x 1 = 3.38 m2
Bawah Sloof Kiri = 2.35 m x 0.8 m x 7 = 13.16 m2
= 1.85 m x 0.8 m x 1 = 1.48 m2
Kanan = 2.38 m x 0.8 m x 1 = 1.90 m2
Belakang = 2.05 m x 0.8 m x 1 = 1.64 m2
Depan = 3 m x 0.8 m x 1 = 2.40 m2
= 2.85 m x 0.8 m x 2 = 4.56 m2
= 2.45 m x 0.8 m x 1 = 1.96 m2
2 Pek. Plesteran Dinding
a Bangunan Hanggar TPS3R Luas bidang Sisi 205.28 m2
Samping Kanan = 40.69 m2 x 2 Bh luar-dalam = 81.37 m2
Samping Kiri = 22.40 m2 x 2 Bh luar-dalam = 44.80 m2
Depan = 10.48 m2 x 2 Bh luar-dalam = 20.95 m2
Area Dalam = 29.08 m2 x 2 Bh luar-dalam = 58.16 m2

89.03 m2
b Kantor Depan = 13.69 m2 x 2 Bh luar-dalam = 27.38 m2
Samping Kiri = 6.95 m2 x 2 Bh luar-dalam = 13.91 m2
Samping Kanan = 8.69 m2 x 2 Bh luar-dalam = 17.39 m2
Belakang = 15.18 m2 x 2 Bh luar-dalam = 30.36 m2

38.21 m2
c WC Depan = 7.21 m2 x 2 Bh = 14.42 m2
Samping Kanan = 7.02 m2 x 2 Bh = 14.03 m2
Belakang = 4.88 m2 x 2 Bh = 9.76 m2

93.01 m2
d Pagar Depan = 9.00 m2 x 2 Bh = 18.00 m2
Samping Kiri = 30.20 m2 x 2 Bh = 60.39 m2
Samping Kanan = 3.93 m2 x 2 Bh = 7.85 m2
Belakang = 3.38 m2 x 2 Bh = 6.77 m2

3 Cor Beton Lantai Beton Mutu k.200 Panjang Lebar Tebal 5.04 m3
Hanggar TPS3R Gudang = 5.83 m x 3.23 m x 0.10 m = 1.88 m3
Area Penyimpanan = 2.85 m x 3.23 m x 0.10 m = 0.92 m3
Tempat Barang Lapak = 2.85 m x 3.23 m x 0.10 m = 0.92 m3
KM/WC = 2.30 m x 1.60 m x 0.10 m = 0.37 m3
Kantor = 3.33 m x 2.85 m x 0.10 m = 0.95 m3
JUMLAH
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME SATUAN

1 2 3 4 5
4 Pek Keramik lantai Uk.40x40 Panjang Lebar 46.73 m2
Kantor = 3.33 m x 2.85 m = 9.49 m2
Gudang = 5.83 m x 3.23 m = 18.83 m2
Area Penyimpanan = 2.85 m x 3.23 m = 9.21 m2
Tempat Barang Lapak = 2.85 m x 3.23 m = 9.21 m2

5 Pek Keramik lantai WC Uk.20x20 Panjang Lebar 3.68 m2


= 2.30 m x 1.60 m = 3.68 m2

6 Pek Keramik dinding WC Uk.10x20 Panjang Lebar sisi 8.16 m2


= 2.3 m x 1.2 m x 2 = 5.52 m2
= 1.6 m x 1.2 m x 1 = 1.92 m2
= 0.6 m x 1.2 m x 1 = 0.72 m2

7 Pek. Tawing layar Panjang Lebar 45.05 m2


Hanggar TPS3R T.Layar kanan = 12.2 m x 3.25 m x 1/2 = 19.83 m2
T. Layar kiri = 12.2 m x 3.25 m x 1/2 = 19.83 m2
Kantor T. Layar kiri = 2.7 m x 1 m x 1/2 = 1.35 m2
T. Layar kanan = 2.7 m x 1 m x 1/2 = 1.35 m2
WC T. Layar kiri = 2.7 m x 1 m x 1/2 = 1.35 m2
T. Layar kanan = 2.7 m x 1 m x 1/2 = 1.35 m2

Derajat
V PEKERJAAN ATAP, PLAFOND, LISPLANK Panjang+ Lebar + Kemiringan
1 Rangka Atap Baja Ringan overstek overstek (Cos15) 242.24 m2
a Hanggar TPS3R = 18 m x 13 m / 0.966 = 242.24 m2

Derajat
Panjang+ Lebar + Kemiringan
overstek overstek (Cos15) 18.63 m2
b Kantor = 4.5 m x 4 m / 0.966 = 18.63 m2

Derajat
Panjang+ Lebar + Kemiringan
overstek overstek (Cos15) 9.96 m2
c WC = 2.75 m x 3.5 m / 0.966 = 9.96 m2

2 Pek Atap Genteng Metal Zincalume


a Hanggar TPS3R = Volume Rangka Atap = 242.24 m2
= 242.24 = 242.24 m2

b Kantor = Volume Rangka Atap = 18.63 m2


= 18.63 = 18.63 m2

d WC = Volume Rangka Atap = 9.96 m2


= 9.96 = 9.96 m2

3 Pek. Lisplank Superplank Eksterior Panjang/


cos15 Panjang sisi = 57.34 m
Hanggar TPS3R = 13.46 m + 18 = 31.46 m
Kantor = 4.14 m + 4.5 m x 2 = 13.14 m
WC = 3.62 m + 2.75 m x 2 = 12.75 m

4 Rangka Hollow Plafond Kantor Panjang Lebar 9.55 m2


= 3.35 m x 2.85 m = 9.55 m2

5 Pek. Pas. Plafond Kalsiboard Panjang Lebar 9.55 m2


= 3.35 m x 2.85 m = 9.55 m2

V PEKERJAAN PINTU, JENDELA, KUNCI & PENGGANTUNG


1 Pek. Kusen Pintu dan Jendela Kayu Klas II
a Hanggar TPS3R Panjang Lebar Panjang Kusen Jumlah Kusen Jumlah P/J 0.12 m3
P1 = 0.1 m x 0.05 m x 2.1 m x 2 x 2 = 0.04 m3
= 0.1 m x 0.05 m x 1.02 m x 1 x 2 = 0.01 m3
J1 = 0.1 m x 0.05 m x 1.45 m x 3 x 2 = 0.04 m3
= 0.1 m x 0.05 m x 1 m x 2 x 2 = 0.02 m3

b Kantor Panjang Lebar Panjang Kusen Jumlah Kusen Jumlah P/J 0.06 m3
P1 = 0.1 m x 0.05 m x 2.1 m x 2 x 1 = 0.02 m3
= 0.1 m x 0.05 m x 1.05 m x 1 x 1 = 0.01 m3
J1 = 0.1 m x 0.05 m x 1.45 m x 3 x 1 = 0.02 m3
= 0.1 m x 0.05 m x 1 m x 2 x 1 = 0.01 m3

c WC Panjang Lebar Panjang Kusen Jumlah Kusen Jumlah P/J 0.02 m3


P1 = 0.1 m x 0.05 m x 2.1 m x 2 x 1 = 0.02 m3
2 Pek. Daun Pintu Panel Kayu Klas II
a Hanggar TPS3R Panjang Lebar Jumlah 3.60 m3
P1 = 2 m x 0.9 m x 2 = 3.60 m3

b Kantor Panjang Lebar Jumlah 1.80 m3


P1 = 2 m x 0.9 m x 1 = 1.80 m3

c WC Panjang Lebar Jumlah 1.80 m3


P1 = 2 m x 0.9 m x 1 = 1.80 m3

3 Pek. Rangka Jendela Kaca Kayu Klas II Lebar Panjang Jumlah Rangka Jumlah Jendela 2.26 m2
J1 = 0.1 m x 1.45 m x 4 Bh x 3 = 1.74 m2
= 0.1 m x 0.43 m x 4 Bh x 3 = 0.52 m2
JUMLAH
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME SATUAN

1 2 3 4 5

4 Pek.Pemasangan Kaca Tebal 5 mm Panjang Lebar Jumlah Kaca Jumlah Jendela 7.48 m3
J1 = 1.45 m x 0.43 m x 4 Bh x 3 = 7.48 m3

5 Pek. Engsel Pintu Jumlah engsel banyak pintu 12.00 Bh


= 3 bh x 4 = 12.00

6 Pek. Engsel Jendela Jumlah engsel banyak jendela 12.00 Bh


= 4 bh x 3 = 12.00

7 Kunci Tanam = 4.00 = 4.00 Bh

8 Hak angin Jendela = 6.00 = 6.00 Bh

9 Gerendel Jendela = 6.00 = 6.00 Bh

10 Handel Jendela = 6.00 = 6.00 Bh

11 Pekerjaan Ventilasi Kerawang Panjang Lebar Jumlah 16.20 m2


V3 = 2.7 m x 1.5 m x 4 = 16.20 m2

12 Pekerjaan Pas. Glasblock Panjang Lebar Jumlah 8.92 m2


Hanggar 1 = 2.8 m x 0.6 m x 4 = 6.72 m2
Hanggar 2 = 3.2 m x 0.6 m x 1 = 1.92 m2
Kantor = 1.4 m x 0.2 m x 1 = 0.28 m2

VI PEKERJAAN PENGECATAN
1 Pengecatan dinding = volume pekerjaan plesteran
a Hanggar TPS3R = 205.28 = 205.28 m2
b Kantor = 89.03 = 89.03 m2
c WC = 38.21 = 38.21 m2
d Pagar = 93.01 = 93.01 m2

2 Pengecatan Plafond Kantor = 9.55 = 9.55 m2

3 Pengecatan Kusen Pintu dan Jendela Panjang Kusen Lebar Jumlah Kusen Jumlah P/J 10.08 m2
P1 = 2.05 m x 0.2 m x 2 Bh x 5 = 4.10 m2
= 0.9 m x 0.2 m x 1 Bh x 5 = 0.90 m2
J1 = 1.45 m x 0.2 m x 3 Bh x 4 = 3.48 m2
= 1 m x 0.2 m x 2 Bh x 4 = 1.60 m2

4 Pengecatan Pintu Panel


a Hanggar TPS3R Panjang Lebar Jumlah sisi Jumlah Pintu 10.80 m3
P1 = 2 m x 0.9 m x 2 Bh x 3 = 10.80 m3

b Kantor Panjang Lebar Jumlah Jumlah Pintu 3.60 m3


P1 = 2 m x 0.9 m x 2 Bh x 1 = 3.60 m3

c WC Panjang Lebar Jumlah Jumlah Pintu 3.60 m3


P1 = 2 m x 0.9 m x 2 Bh x 1 = 3.60 m3

5 Pengecatan Rangka Jendela Kaca Panjang Lebar Jumlah Rangka Jumlah Jendela 3.20 m2
J1 = 0.1 m x 1.55 m x 4 Bh x 4 = 2.48 m2
= 0.1 m x 0.45 m x 4 Bh x 4 = 0.72 m2

VII PEKERJAAN SANITASI


1 Pekerjaan Septictank 2 unit
a. Galian Septictank Panjang Lebar Tinggi Jumlah 13.88 m3
= 2.50 m x 1.5 m x 1.85 x m 2 unit = 13.88 m3

b Pek. Urugan Pasir t=5 cm Panjang Lebar Tinggi Jumlah 0.38 m3


= 2.50 m x 1.5 m x 0.05 x 2 unit = 0.38 m3

c Pek Cor Beton K.175 tebal 10 cm Panjang Lebar Tinggi Jumlah 0.53 m3
2.20 m x 1.2 m x 0.1 x 2 unit = 0.53 m3

d Pek. Sloof 15/15 Panjang Berat jenis Jumlah Besi Sisi Jumlah unit 56.55 Kg
- Pek. Pembesian ø 10 = 2.5 m x 0.617 kg/m x 4.00 bh x 2 x 2 = 24.68 Kg
ø 10 = 1.5 m x 0.617 kg/m x 4.00 bh x 2 x 2 = 14.81 Kg
ø8 = 0.40 m x 0.395 kg/m x 54.00 bh x 2 = 17.06 Kg

- Pek. bekisting Panjang Lebar Jumlah Jumlah sisi Jumlah unit 4.80 m2
= 2.5 m x 0.15 m x 2.00 Bh x 2 x 2 = 3.00 m2
= 1.5 m x 0.15 m x 2.00 Bh x 2 x 2 = 1.80 m2

- Pek cor beton K.175 Panjang Lebar Tinggi Jumlah sisi Jumlah unit 0.36 m3
= 2.5 m x 0.15 m x 0.15 m x 2 x 2 = 0.23 m3
= 1.5 m x 0.15 m x 0.15 m x 2 x 2 = 0.14 m3

e Pek. Kolom 15/15 Panjang Berat jenis Jumlah Besi Jumlah Kolom Jumlah unit 48.46 Kg
- Pek. Pembesian ø 10 = 1.70 m x 0.617 kg/m x 4.00 bh x 4 x 2 = 33.56 Kg
ø8 = 0.41 m x 0.395 kg/m x 46.00 bh x 2 = 14.90 Kg

- Pek. bekisting Panjang Lebar Jumlah Jumlah sisi Jumlah unit 8.16 m2
= 1.70 m x 0.15 m x 4.00 Bh x 4 x 2 = 8.16 m2

- Pek cor beton K.175 Panjang Lebar Tinggi Jumlah sisi Jumlah unit 0.31 m3
= 1.70 m x 0.15 m x 0.15 m x 4 x 2 = 0.31 m3
JUMLAH
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME SATUAN

1 2 3 4 5
f Pek. Pas. Batako Panjang Lebar Jumlah sisi Jumlah unit 23.12 m2
= 2.2 m x 1.7 m x 2 x 2 = 14.96 m2
= 1.2 m x 1.7 m x 2 x 2 = 8.16 m2

9 Pek. Plesteran Panjang Lebar Jumlah sisi Jumlah unit 23.12 m2


= 2.2 m x 1.7 m x 2 x 2 = 14.96 m2
= 1.2 m x 1.7 m x 2 x 2 = 8.16 m2

h Pek. Ring Balk 15/15 Panjang Berat jenis Jumlah Besi Sisi Jumlah unit 56.55 Kg
- Pek. Pembesian ø 10 = 2.5 m x 0.617 kg/m x 4.00 bh x 2 x 2 = 24.68 Kg
ø 10 = 1.5 m x 0.617 kg/m x 4.00 bh x 2 x 2 = 14.81 Kg
ø8 = 0.40 m x 0.395 kg/m x 54.00 bh x 2 = 17.06 Kg

- Pek. bekisting Panjang Lebar Jumlah Jumlah sisi Jumlah unit 4.80 m2
= 2.5 m x 0.15 m x 2.00 Bh x 2 x 2 = 3.00 m2
= 1.5 m x 0.15 m x 2.00 Bh x 2 x 2 = 1.80 m2

- Pek cor beton K.175 Panjang Lebar Tinggi Jumlah sisi Jumlah unit 0.36 m3
= 2.5 m x 0.15 m x 0.15 m x 2 x 2 = 0.23 m3
= 1.5 m x 0.15 m x 0.15 m x 2 x 2 = 0.14 m3

i Pek. Plat penutup septictank tebal 10 cm Panjang Berat jenis Jumlah Besi Jumlah unit 9.32 m3
- Pek. Pembesian ø 8-15 = 2.2 m x 0.395 kg/m x 4.00 bh x 2 = 6.95 Kg
ø 8-15 = 0.3 m x 0.395 kg/m x 8.00 bh x 2 = 1.90 Kg
ø 8-15 = 0.15 m x 0.395 kg/m x 4.00 bh x 2 = 0.47 Kg

- Pek. bekisting Panjang Lebar Jumlah Jumlah unit 2.40 m2


= 2.5 m x 0.15 m x 2.00 Bh x 2 = 1.50 m2
= 1.5 m x 0.15 m x 2.00 Bh x 2 = 0.90 m2

Volume
tutup
- Pek cor beton K.175 Panjang Lebar Tinggi mainhole Jumlah unit 0.17 m3
= 2.5 m x 1.50 m x 0.10 m - 0.098 x 2 = 0.55 m3

j Pek. Tutup mainhole Panjang Berat jenis Jumlah Besi Jumlah unit 6.00 m3
- Pek. Pembesian ø 8-15 = 0.7 m x 0.395 kg/m x 5.00 bh x 2 = 2.77 Kg
ø 8-15 = 0.7 m x 0.395 kg/m x 5.00 bh x 2 = 2.77 Kg
ø 8-15 = 0.15 m x 0.395 kg/m x 4.00 bh x 2 = 0.47 Kg

- Pek. bekisting Panjang Lebar Jumlah Jumlah unit 0.84 m2


= 0.7 m x 0.15 m x 2.00 Bh x 2 = 0.42 m2
= 0.7 m x 0.15 m x 2.00 Bh x 2 = 0.42 m2

- Pek cor beton K.175 Panjang Lebar Tinggi Jumlah unit 0.10 m3
= 0.7 m x 0.70 m x 0.10 m x 2 = 0.10 m3

k. Bioseptictank BF-08 = 2 = 2.00 Bh

Volume
l Urugan Pasir dalam septictank Panjang Lebar Tinggi Biofil Jumlah unit = 0.34 Bh
= 2.2 m x 1.2 m x 1.2 m - 3 x 2 = 0.34 m3

2 Pekerjaan Pipa 4" Panjang Pipa Air Lindi


= 1.7 m + 1.8 = 3.50 m

3 Pekerjaan Pipa 2" Panjang


= 0.5 m + 0.78 m + 0.65 = 1.93 m

4 Pekerjaan Pipa 3/4" (Air Bersih) Panjang


= 4.1 m + 13.42 m + 4.84 m + 6.6 + 7.7 = 36.66 m

5 Pek. Sumur Bor+pompa = 1.00 = 1.00 Bh

6 Pekerjaan kran air = 2.00 = 2.00 Bh

7 Pekerjaan stop kran = 1.00 = 1.00 Bh

8 Profil tank 1200 L = 1.00 = 1.00 Bh

9 Pek. Closed Duduk = 1.00 = 1.00 Bh

10 Pek. Wastafel+cermin = 1.00 = 1.00 Bh

VIII PEKERJAAN JEMBATAN


(Lebar
atas+lebar
1 Pekerjaan Pondasi Batu Belah Panjang bawah)/2 Tinggi 14.67 m3
A = 5.70 m x 0.75 m x 1.6 = 6.84 m3
B = 5.30 m x 0.75 m x 1.6 = 6.36 m3
= 1.40 m x 0.75 m x 0.7 x m 2 = 1.47 m3
2 Pekerjaan Sloof 20/30
a Pek. Pembesian Panjang Berat jenis Jumlah Besi Jumlah sisi 102.56 Kg
ø 10 = 5.30 m x 0.617 kg/m x 6.00 bh x 2 = 39.24 Kg
ø 10 = 3.80 m x 0.617 kg/m x 6.00 bh x 2 = 28.14 Kg
ø8 = 0.73 m x 0.395 kg/m x 122.00 bh = 35.18 Kg

b Pekerjaan Bekisting Sloof Panjang Lebar Jumlah 12.44 m2


= 5.30 m x 0.3 m x 4 Bh = 6.36 m2
= 3.80 m x 0.3 m x 4 Bh = 4.56 m2
= 3.80 m x 0.2 m x 2 Bh = 1.52 m2

c Cor Beton k.200 Panjang Lebar Tebal Jumlah sisi 1.09 m2


= 5.30 m x 0.3 m x 0.2 m x 2 = 0.64 m2
= 3.80 m x 0.3 m x 0.2 m x 2 = 0.46 m2
JUMLAH
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME SATUAN

1 2 3 4 5

3 Pekerjaan Balok 20/30


a Pek. Pembesian Panjang Berat jenis Jumlah Besi Jumlah 51.28 Kg
ø 10 = 5.30 m x 0.617 kg/m x 6.00 bh x 1 = 19.62 Kg
ø 10 = 3.80 m x 0.617 kg/m x 6.00 bh x 1 = 14.07 Kg
ø8 = 0.73 m x 0.395 kg/m x 61.00 bh = 17.59 Kg

b Pekerjaan Bekisting Balok Panjang Lebar Jumlah 7.28 m2


= 5.30 m x 0.3 m x 2 Bh = 3.18 m2
= 5.30 m x 0.2 m x 1 Bh = 1.06 m2
= 3.80 m x 0.3 m x 2 Bh = 2.28 m2
= 3.80 m x 0.2 m x 1 Bh = 0.76 m2

c Cor Beton k.200 Panjang Lebar Tebal Jumlah 0.55 m2


= 5.30 m x 0.3 m x 0.2 m x 1 = 0.32 m2
= 3.80 m x 0.3 m x 0.2 m x 1 = 0.23 m2

4 Pekerjaan Plat beton


a Pek. Pembersian Panjang Berat jenis Jumlah Besi Banyak Besi 250.87 Kg
ø 10 = 5.3 m x 0.617 kg/m x 2.00 bh x 19.00 bh = 124.26 Kg
ø 10 = 3.8 m x 0.617 kg/m x 2.00 bh x 27.00 bh = 126.61 Kg

b Pekerjaan Bekisting Plat Panjang Lebar Jumlah 11.89 m2


= 5.30 m x 3.8 m x 1 m x 50% = 10.07 m2
= 5.30 m x 0.2 m x 2 m x 50% = 1.06 m2
= 3.80 m x 0.2 m x 2 m x 50% = 0.76 m2

c Cor Beton K200 tebal 20 cm Panjang Lebar Tebal 4.03 m2


= 5.30 m x 3.8 m x 0.2 m = 4.03 m2

5 Pekerjaan Reling jembatan


a Pembesian Kolom 15/15 Panjang Berat jenis Jumlah Besi Jumlah Kolom 22.59 Kg
ø 10 = 1.00 m x 0.617 kg/m x 4.00 bh x 8 = 19.74 Kg
ø8 = 0.36 m x 0.395 kg/m x 20.00 bh = 2.84 Kg

b Pek. Bekisting Kolom Panjang Lebar Jumlah Papan Jumlah Kolom 2.40 m2
= 1.00 m x 0.15 m x 4 m x 8x 50% = 2.40 m2

c Cor Beton k.200 Panjang Lebar Tebal Jumlah Kolom 0.18 m2


= 1.00 m x 0.15 m x 0.15 m x 8 = 0.18 m2

d Pek. Pas Batako Panjang Lebar Jumlah 3.10 m2


= 3.10 m x 0.5 m x 2 Bh = 3.10 m2

e Pek. Plesteran Panjang Lebar Jumlah Sisi Jumlah 6.60 m2


= 3.10 m x 0.5 m x 2 Bh x 2 = 6.20 m2
= 0.20 m x 0.5 m x 2 Bh x 2 = 0.40 m2

f Pek Besi Galvanis 2" = 3.70 x 2 7.40 M

X PEKERJAAN LISTRIK
1 Penyambungan Daya Baru PLN = 1.00 1.00 Unit
2 Instalasi Titik Lampu = 13.00 13.00 Titik
3 Lampu SL 18 Watt = 13.00 13.00 Bh
4 Saklar Tunggal = 4.00 4.00 Bh
5 Saklar Ganda = 4.00 4.00 Bh
6 Pek. Pas. Panel Listrik = 1.00 1.00 Bh
7 Pek. Instalasi stop kontak = 6.00 6.00 Titik
8 Stop Kontak = 6.00 6.00 Bh

XI PEKERJAAN LAIN-LAIN
1 Pekerjaan Pagar Besi BRC Panjang Lebar Jumlah 16.30 m2
= 2.00 m x 2.85 m x 2 .= 11.40 m2
= 2.00 m x 2.45 m x 1 .= 4.90 m2

2 Pekerjaan Pintu Pagar Besi Panjang Lebar 9.45 m2


= 5.00 m x 1.89 .= 9.45 m2

3 Pekerjaan Handrailing Pintu Masuk Panjang Jumlah


Hanggar TPS3R = 1.96 m 2 .= 2.00 Bh
Kantor = 0.95 m 1 .= 1.00 Bh
WC = 0.75 m 1 .= 1.00 Bh

4 Pekerjaan Rolling door Panjang Lebar 7.27 m2


= 2.85 m x 2.55 .= 7.27 m2

5 Pek. Handrail WC = 4.00 = 4.00 Bh

6 Pekerjaan ukiran kayu Luas ukiran jumlah 19.20 m2


Depan = 2.64 m2 x 4 10.56 m2
Samping Kiri = 2.16 m2 x 4 8.64 m2

7 Pek. Plesteran letter timbul = 1.00 = 1.00 Paket

X PERALATAN TPS3R
1 Mesin Pencacah Plastik = 1.00 1.00 Unit
2 Mesin Pencacah Kompos = 1.00 1.00 Unit
3 Mesin Pengayak = 1.00 1.00 Unit

XI KEBUTUHAN K3 DAN PROKES PENCEGAHAN COVID - 19


A KEBUTUHAN KESEHATAN DAN KESELAMATAN KERJA
1 Sosialisasi K3 dan Prokes (Spanduk) = 4.00 4.00 Bh
2 Helm Keselamatan = 21.00 21.00 Bh
3 Rompi Kerja = 21.00 21.00 Bh
4 Sarung Tangan (Safety Glove) = 21.00 21.00 Bh
5 Sepatu Keselamatan (Rubber Shoes) = 21.00 21.00 Bh
6 Tali Pengaman = 3.00 3.00 Bh
7 Kotak P3K = 2.00 2.00 Bh
8 Asuransi Tenaga Kerja = 1.00 1.00 Paket
B KEBUTUHAN PROTOKOL KESEHATAN PENCEGAHAN COVID-19
JUMLAH
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME SATUAN

1 2 3 4 5
1 Alat ukur suhu badan nir-sentuh (Thermoscan) = 2.00 2.00 Bh
2 Vitamin C (1 Box isi 100 tablet) = 20.00 20.00 Bh
3 Tempat Cuci Tangan = 2.00 2.00 Bh
4 Sabun Cuci Tangan (Cair) 200ml/btl = 4.00 4.00 Bh
5 Masker kain = 20.00 20.00 Bh
6 Alat penyemprot desinfektan = 2.00 2.00 Bh
7 Cairan Desinfektan 5L = 3.00 3.00 Bh
6.00
XII ADMINISTRASI KEGIATAN
1 Pelaporan KSM = 1.00 1.00 Ls
2 Photo Copy / Penggandaan = 1.00 1.00 Ls
3 Biaya Alat Tulis Kantor (ATK) = 1.00 1.00 Ls
4 Materai = 8.00 8.00 Bh
5 Pengujian Lab = 1.00 1.00 Paket
6 Papan Nama Kegiatan = 1.00 1.00 Paket
Form - RAB1
BANTUAN PEMERINTAH UNTUK MASYARAKAT ( BPM ) DFAT PROGRAM KOTA TANPA KUMUH (KOTAKU)
HASIL KESEPAKATAN HARGA SATUAN UPAH/BAHAN/ALAT
BULAN :
Provinsi : Kalimantan Tengah Kecamatan : Sebangau
Kota : Palangka Raya Kelurahan : Kereng Bangkirai

HARGA SATUAN
SESUAI
No. Uraian Tenaga Kerja Satuan STANDAR
KOTA/KABUPAT
EN
I. TENAGA KERJA
1 Mandor HOK 225,000 L.04
2 Kepala Tukang HOK 170,000
3 Tukang Batu HOK 155,000
4 Tukang Kayu HOK 150,000
5 Tukang Besi HOK 150,000
6 Tukang Cat HOK 150,000
7 Pekerja HOK 140,000 L.01

REKOMENDASI HARGA
HARGA SATUAN HARGA SATUAN HASIL SURVEY*) TERENDAH YANG DIPILIH
SESUAI UNTUK BULAN INI
No. Uraian Tenaga Kerja Satuan STANDAR Toko/Pemasok -1 Toko/Pemasok - 2 Toko/Pemasok - 3
KABUPATEN/KO Nama: Nama: Nama: HARGA
Nama Toko/Pemasok
TA Almt : Almt : Almt : SATUAN*)
Telp : Telp : Telp :

II. BAHAN/MATERIAL :
1 Cat Menie Kayu Platone Kg 62,400 60,000 60,000 A1
2 Cat dasar kayu platone Kg 62,400 60,000 60,000 A2
3 Cat penutup kayu platone Kg 62,400 60,000 60,000 A3
4 Cat tembok Kg 120,000 110,000 110,000 A4
5 Kwas 4" Bh 45,000 45,000 45,000 A5
6 Paku 5 - 12 cm Kg 22,000 22,000 22,000 A6
7 Pasir beton m3 200,000 180,000 180,000 A7
8 Pasir Pasang m3 190,000 180,000 150,000 A8
9 Semen Portland Kg 1,325 1,275 1,275 A9
10 Semen Portland Gresik 40 Kg/zak 53,000 51,000 51,000 A10
11 Minyak Cat/Thinner Cemerlang Kg 28,100 28,100 28,100 A11
12 Ampelas Kayu Flexigo Lbr 10,000 10,000 10,000 A12
13 Kran air stainless Duffi Bh 65,000 65,000 65,000 A13
14 Seal Tape Onda Kg 12,000 12,000 12,000 A14
15 Papan Informasi Kegiatan Lbr 200,000 200,000 200,000 A15
16 Kunci Tanam Bh 195,000 195,000 195,000 A16
17 Engsel Pintu Bh 26,000 26,000 26,000 A17
18 Lem Kayu Kg 33,000 33,000 33,000 A18
19 Bata Merah Bh 800 800 800 A19
20 Pipa PVC 4" AW Btg 295,000 295,000 295,000 A20
21 Pipa PVC 3/4" AW Btg 42,000 42,000 42,000 A21
22 Pipa PVC 2" AW Btg 127,500 127,500 127,500 A22
23 Elboh/Knee Bh 25,000 25,000 25,000 A23
25 Stop Kran 3/4 Bh 65,000 65,000 65,000 A25
26 TanahUrug m3 100,000 100,000 100,000 A26
27 Besi Beton Polos Kg 12,000 12,000 12,000 A27
Besi beton polos dia. 8 Batang 47,000 45,000
Besi beton polos dia. 10 Batang 70,500 70,000
Besi beton polos dia. 12 Batang 101,500 101,000
28 Kawat Beton/Bendrat Kg 25,000 25,000 25,000 A28
29 Plywood 9 mm Lbr 130,000 130,000 130,000 A29
30 Batako Bh 3,000 2,800 2,800 A30
31 Keramik lantai uk.40x40 Doz 75,000 75,000 75,000 A31
32 Semen Warna Kg 5,000 5,000 5,000 A32
33 Keramik lantai uk.20x20 Doz 65,000 65,000 65,000 A33
34 Keramik dinding uk.10x20 Doz 65,400 65,400 65,400 A34
35 Baja ringan 75x35x0,75 MM Batang 82,000 82,000 125,000 A35
36 Hollow 30x30x0,3 MM Batang 50,000 50,000 50,000 A36
37 Paku Skrup Bh 3,500 3,500 3,500 A37
38 Atap Metal Zincalume Spandek (106x600) Lbr 255,000 250,000 250,000 A38
39 Paku Anti Karat Kg 35,000 35,000 35,000 A39
41 Papan Plank Kalsiboard tbl.8 mm (30x240mm Lbr 155,000 155,000 155,000 A41
42 Besi Hollow Plafond 1,3x 3,3 mm Batang 15,000 15,000 15,000 A42
43 Kalsiboard tebal 6 mm Lbr 110,000 110,000 110,000 A43
44 Paku Kalsiboard Kg 25,000 25,000 25,000 A44
45 Kaca Bening 5 mm m2 135,000 135,000 135,000 A45
46 Sealant Kaca Kg 47,500 47,500 47,500 A46
47 Engsel Pintu 4" Bh 35,000 35,000 35,000 A47
48 Engsel Jendela Bh 41,000 41,000 41,000 A48
49 Kunci pintu tanam lengkap Bh 95,000 95,000 95,000 A49
50 Hak/Kait Angin Bh 20,800 20,800 20,800 A50
51 Gerendel/Kunci slot Bh 35,000 35,000 35,000 A51
52 Handel Jendela Bh 8,000 8,000 8,000 A52
53 Bioseptictank BF-08 Bh 10,643,500 10,643,500 10,643,500 A53
54 Profil tank 1200 L Bh 1,600,000 1,600,000 1,600,000 A54
55 Closed duduk Unit 1,828,300 1,800,000 1,800,000 A55
56 Batu Belah (Tangkiling-Dalam Kota) m3 400,000 400,000 400,000 A56
57 Roster/Kerawang uk. 30cmx30cm Bh 25,000 25,000 25,000 A57
58 Glasblock uk. 20x20 Bh 27,000 27,000 26,000 A58
59 KalsiBoard tebal 8 mm (120x240) Bh 190,000 190,000 190,000 A59
60 Wastafel lengkap+cermin putih Unit 940,000 940,000 940,000 A60
61 Box panel 20x80x60 Bh 760,000 760,000 760,000 A61
62 Penyambungan Daya Baru PLN Unit 4,000,000 4,000,000 4,500,000 A62
63 Instalasi Titik Lampu Titik 325,000 325,000 325,000 A63
REKOMENDASI HARGA
HARGA SATUAN HARGA SATUAN HASIL SURVEY*) TERENDAH YANG DIPILIH
SESUAI UNTUK BULAN INI
No. Uraian Tenaga Kerja Satuan STANDAR Toko/Pemasok - 1 Toko/Pemasok - 2 Toko/Pemasok - 3
KABUPATEN/KO Nama: Nama: Nama: HARGA
Nama Toko/Pemasok
TA Almt : Almt : Almt : SATUAN*)
Telp : Telp : Telp :
64 Lampu SL 18 Watt Bh 35,000 35,000 35,000 A64
65 Saklar Tunggal Bh 20,000 20,000 20,000 A65
66 Saklar Ganda Bh 20,000 20,000 20,000 A66
67 Pek. Pas. Panel Listrik Bh 760,000 760,000 760,000 A67
68 Pek. Instalasi stop kontak Titik 325,000 325,000 325,000 A68
69 Stop Kontak Bh 20,000 20,000 20,000 A69
70 Pipa Besi Galvanis tbl 1,2 mm P=6 m Batang 179,500 179,500 179,500 A70
71 Rolling door manual m2 500,000 500,000 500,000 A71
72 Pagar BRC Hot Deep Galvanized T.90-P.240 Lembar 577,500 577,500 577,500 A72
Pagar BRC Hot Deep Galvanized M2 320,000
73 Pipa Stainless Steel 2" btg/6m 206,000 205,800 308,700 A73
Pipa Stainless Steel 2" m 52,000
75 Glassblock Bh 26,000 26,000
76 Sumur Bor+Pompa Unit 2,500,000 2,500,000 A75
A76

REKOMENDASI HARGA
HARGA SATUAN HARGA SATUAN HASIL SURVEY*) TERENDAH YANG DIPILIH
SESUAI UNTUK BULAN INI
No. Uraian Tenaga Kerja Satuan STANDAR Toko/Pemasok - 1 Toko/Pemasok - 2 Toko/Pemasok - 3
KABUPATEN/KO Nama: Nama: Nama: HARGA
Nama Toko/Pemasok
TA Almt : Almt : Almt : SATUAN*)
Telp : Telp : Telp :
1 Balok Kayu Klas II (Lanan) m3 4,000,000.00 4,000,000.00 1 4,000,000.00 1
2 Papan Kayu Klas II (Lanan) m3 5,000,000.00 5,000,000.00 1 5,000,000.00 1
3 Papan Kayu Klas II (Benuas) m3 6,500,000.00 6,000,000.00 1 6,000,000.00 1
4 Balok Kayu Klas III m3 2,250,000.00 2,200,000.00 1 2,200,000.00 1
5 Papan Kayu Klas III m3 2,500,000.00 2,450,000.00 1 2,450,000.00 1
6 Kerikil (Maks 30mm) m3 475,000.00 450,000.00 1 450,000.00 1
7 Kayu Galam diameter 10-12 cm P=4 m Batang 35,000.00 35,000.00 1 35,000.00 1
8 Kayu Galam diameter 6-10 cm P=4 m Batang 30,000.00 30,000.00 1 30,000.00 1

REKOMENDASI HARGA
HARGA SATUAN HARGA SATUAN HASIL SURVEY*) TERENDAH YANG DIPILIH
SESUAI Toko/Pemasok - 1 Toko/Pemasok - 2 Toko/Pemasok - 3 UNTUK BULAN INI
No. Uraian Tenaga Kerja Satuan STANDAR Nama: Nama: Nama: HARGA
KABUPATEN/KO Almt : Nama Toko/Pemasok
Almt : Almt : SATUAN*)
TA Telp : Telp : Telp :

III. KEBUTUHAN K3 DAN PROKES PENCEGAHAN COVID - 19


1 Sosialisasi K3 dan Prokes (Spanduk) 75,000
2 Helm Keselamatan 100,000
3 Rompi Kerja 60,000
4 Sarung Tangan (Safety Glove) 5,000
5 Sepatu Keselamatan (Rubber Shoes) 100,000
6 Tali Pengaman 231,500
7 Kotak P3K 40,000
8 Asuransi Tenaga Kerja 912,000
9 Alat ukur suhu badan nir-sentuh (Thermoscan) 350,000
10 Vitamin C (1 Box isi 100 tablet) 25,000
11 Tempat Cuci Tangan 250,000
12 Sabun Cuci Tangan (Cair) 200ml/btl 25,000
13 Masker kain 5,000
14 Alat penyemprot desinfektan 65,000
15 Cairan Desinfektan 5L 75,000

REKOMENDASI HARGA
HARGA SATUAN HARGA SATUAN HASIL SURVEY*) TERENDAH YANG DIPILIH
SESUAI Toko/Pemasok - 1 Toko/Pemasok - 2 Toko/Pemasok - 3 UNTUK BULAN INI
No. Uraian Tenaga Kerja Satuan STANDAR Nama: Nama: Nama: HARGA
KABUPATEN/KO Almt : Nama Toko/Pemasok
Almt : Almt : SATUAN*)
TA Telp : Telp : Telp :

XIX ADMINISTRASI KEGIATAN


1 Pelaporan KSM 270,000.00
2 Photo Copy / Penggandaan 250,000.00
3 Biaya Alat Tulis Kantor (ATK) 150,000.00
4 Materai 10,000.00
5 Pengujian Lab 500,000.00
6 Papan Nama Kegiatan 250,000.00

*) Harga Satuan sampai dilokasi Kegiatan (sudah termasuk biaya Transport)


…………., Tgl. …………….20…..

Diverifikasi Oleh : Dibuat Oleh :


Askot Infrastruktur, Fasilitator Teknik, UPL

Wiwit Whindari, ST. Hengky Pradana, ST


RAB-2

BANTUAN PEMERINTAH UNTUK MASYARAKAT ( BPM ) DFAT PROGRAM KOTA TANPA KUMUH (KOTAKU)
DAFTAR KUANTITAS PEKERJAAN
PAKET : PEMBANGUNAN TPS3R

Kab./Kota : Palangka Raya Kelurahan : Kereng Bangkirai


Kecamatan : Sebangau BKM : Kereng Membangun

NO. URAIAN PEKERJAAN SATUAN VOLUME

I PEKERJAAN PERSIAPAN
1 Pembersihan Awal m2 200.00
2 Pengukuran dan Pemasangan Bowplank m 66.00

II PEKERJAAN TANAH
1 Pek urugan tanah lokasi kegiatan m3 218.55
2 Pek. Galian Tanah Pondasi m3 11.68
3 Pek. Urugan Bekas Galian m3 2.92
4 Pek. Urugan Pasir bawah lantai m3 44.84
5 Pek. Pemancangan Cerucuk Kayu Galam btg 372.00

III PEKERJAAN BETON BERTULANG


1 Pondasi Footplat P1 (80 cm x 80 cm x 20 cm)
a Pek. Pembesian Kg 316.93
b Pek. Lantai Kerja Beton K.100 t=5 cm m3 0.67
c Pek. Bekisting Pondasi m2 2.24
d Cor Beton Mutu k.200 m3 2.69
2 Pondasi Footplat P2 (60 cm x 60 cm x 20 cm)
a Pek. Pembesian Kg 217.59
b Pek. Lantai Kerja Beton K.100 t=5 cm m3 0.34
c Pek. Bekisting Pondasi m2 1.52
d Cor Beton Mutu k.200 m3 1.37
3 Pondasi Footplat P3 (60 cm x 60 cm x 20 cm)
a Pek. Pembesian Kg 39.77
b Pek. Lantai Kerja Beton K.100 t=5 cm m3 0.05
c Pek. Bekisting Pondasi m2 1.92
d Cor Beton Mutu k.200 m3 0.19
4 Pek Kolom K1
a Pek. Pembesian Kg 484.00
b Pek. Bekisting Kolom m2 40.40
c Cor Beton Mutu k.200 m3 4.23
5 Pek Kolom K2
a Pek. Pembesian Kg 147.98
b Pek. Bekisting Kolom m2 15.43
c Cor Beton Mutu k.200 m3 1.76
6 Pek Kolom K3
NO. URAIAN PEKERJAAN SATUAN VOLUME

a Pek. Pembesian Kg 66.65


b Pek. Bekisting Kolom m2 6.96
c Cor Beton Mutu k.200 m3 0.26
7 Pekerjaan Sloof 20x30
a Pek. Pembesian Kg 392.56
b Pek. Bekisting Sloof m2 11.60
c Cor Beton Mutu k.200 m3 3.48
8 Pekerjaan Sloof 15x20
a Pek. Pembesian Kg 302.62
b Pek. Bekisting Sloof m2 23.72
c Cor Beton Mutu k.200 m3 2.03
9 Pekerjaan Ring Balok 20x20
a Pek. Pembesian Kg 275.43
b Pek. Bekisting Ring Balok m2 11.60
c Cor Beton Mutu k.200 m3 2.32
10 Pekerjaan Balok 15x20
a Pek. Pembesian Kg 44.67
b Pek. Bekisting Ring Balok m2 3.36
c Cor Beton Mutu k.200 m3 0.25
11 Pekerjaan Ring Balok 15/15
a Pek. Pembesian Kg 281.95
b Pek. Bekisting Ring Balok m2 17.79
c Cor Beton Mutu k.200 m3 0.62
12 Pekerjaan lantai beton bertulang
a Pek. Pembesian Kg 1101.59
b Cor Beton Mutu k.175 m3 42.55
13 Pek. Plat /Dak Beton
a Pembesian Kg 36.50
b Pek. Bekisting m2 4.29
c Cor Beton Mutu k.200 m3 0.64

IV PEKERJAAN DINDING, PLESTERAN DAN KERAMIK


1 Pek. Pasangan dinding Bataco
a Bangunan Hanggar TPS3R m2 142.96
b Kantor m2 60.60
c WC m2 23.50
d Pagar m2 73.61
2 Pek. Plesteran Dinding
a Bangunan Hanggar TPS3R m2 205.28
b Kantor m2 89.03
c WC m2 38.21
d Pagar m2 93.01
3 Cor Beton Lantai Beton Mutu k.200 m3 5.04
4 Pek Keramik lantai Uk.40x40 m2 46.73
5 Pek Keramik lantai WC Uk.20x20 m2 3.68
NO. URAIAN PEKERJAAN SATUAN VOLUME

6 Pek Keramik dinding WC Uk.10x20 m2 8.16


7 Pek. Tawing layar m2 45.05

V PEKERJAAN ATAP, PLAFOND, LISPLANK


1 Rangka Atap Baja Ringan
a Hanggar TPS3R m2 242.24
b Kantor m2 18.63
c WC m2 9.96
2 Pek Atap Genteng Metal Zincalume
a Hanggar TPS3R m2 242.24
b Kantor m2 18.63
c WC m2 9.96
3 Pek. Lisplank Superplank Eksterior m 57.34
4 Rangka Hollow Plafond Kantor m2 9.55
5 Pek. Pas. Plafond Kalsiboard m2 9.55

VI PEKERJAAN PINTU, JENDELA, KUNCI & PENGGANTUNG


1 Pek. Kusen Pintu dan Jendela Kayu Klas II
a Hanggar TPS3R m3 0.12
b Kantor m3 0.06
c WC m3 0.02
2 Pek. Daun Pintu Panel Kayu Klas II
a Hanggar TPS3R m2 3.60
b Kantor m2 1.80
c WC m2 1.80
3 Pek. Rangka Jendela Kaca Kayu Klas II m2 2.26
4 Pek.Pemasangan Kaca Tebal 5 mm m2 7.48
5 Pek. Engsel Pintu bh 12.00
6 Pek. Engsel Jendela bh 12.00
7 Kunci Tanam bh 4.00
8 Hak angin Jendela bh 6.00
9 Gerendel Jendela bh 6.00
10 Handel Jendela bh 6.00
11 Pekerjaan Ventilasi Kerawang m2 16.20
12 Pekerjaan glasblock m2 8.92

VII PEKERJAAN PENGECATAN


1 Pengecatan dinding
a Hanggar TPS3R m2 205.28
b Kantor m2 89.03
c WC m2 38.21
d Pagar m2 93.01
2 Pengecatan Plafond Kantor m2 9.55
3 Pengecatan Kusen Pintu dan Jendela m2 10.08
4 Pengecatan Pintu Panel
NO. URAIAN PEKERJAAN SATUAN VOLUME

a Hanggar TPS3R m2 10.80


b Kantor m2 3.60
c WC m2 3.60
5 Pengecatan Rangka Jendela Kaca m2 3.20

VIII PEKERJAAN SANITASI


1 Pekerjaan Septictank 2 unit
a Galian Septictank m3 13.88
b Pek. Urugan Pasir t=5 cm m2 0.38
c Pek Cor Beton K.175 tebal 10 cm m3 0.53
d Pek. Sloof 15/15
- Pek. Pembesian Kg 56.55
- Pek. bekisting m2 4.80
- Pek cor beton K.175 m3 0.36
e Pek. Kolom 15/15
- Pek. Pembesian Kg 48.46
- Pek. bekisting m2 8.16
- Pek cor beton K.175 m3 0.31
f Pek. Pas. Batako m2 23.12
g Pek. Plesteran m2 23.12
h Pek. Ring Balk 15/15
- Pek. Pembesian Kg 56.55
- Pek. bekisting m2 4.80
- Pek cor beton K.175 m3 0.36
i Pek. Plat penutup septictank tebal 10 cm
- Pek. Pembesian Kg 9.32
- Pek. bekisting m2 2.40
- Pek cor beton K.175 m3 0.17
j Pek. Tutup mainhole
- Pek. Pembesian Kg 6.00
- Pek. bekisting m2 0.84
- Pek cor beton K.175 m3 0.10
k Bioseptictank Kapasitas 3000L Bh 2.00
l Urugan Pasir dalam septictank m3 0.34
2 Pekerjaan Pipa 4" m 3.50
3 Pekerjaan Pipa 2" m 1.93
4 Pekerjaan Pipa 3/4" (Air Bersih) m 36.66
5 Pek. Sumur Bor+pompa Bh 1.00
6 Pekerjaan kran air Bh 2.00
7 Pekerjaan stop kran Bh 1.00
8 Profil tank 1200 L Bh 1.00
9 Pek. Closed Duduk Bh 1.00
10 Pek. Wastafel+cermin Unit 1.00
11 Pek. Grill besi penutup saluran m2 3.75
NO. URAIAN PEKERJAAN SATUAN VOLUME

IX PEKERJAAN JEMBATAN
1 Pekerjaan Pondasi Batu Belah m3 14.67
2 Pekerjaan Sloof 20/30
a Pek. Pembesian kg 102.56
b Pekerjaan Bekisting Sloof m2 12.44
c Cor Beton k.200 m3 1.09
3 Pekerjaan Balok 20/30
a Pek. Pembesian kg 51.28
b Pekerjaan Bekisting Balok m2 7.28
c Cor Beton k.200 m3 0.55
4 Pekerjaan Plat beton
a Pek. Pembersian kg 250.87
b Pekerjaan Bekisting Plat m2 11.89
c Cor Beton K200 tebal 20 cm m3 4.03
5 Pekerjaan Reling jembatan
a Pembesian Kolom 15/15 Kg 22.59
b Pek. Bekisting Kolom m2 2.40
c Cor Beton k.200 m3 0.18
d Pek. Pas Batako m2 3.10
e Pek. Plesteran m2 6.60
f Pek Besi Galvanis 2" m 7.40

X PEKERJAAN LISTRIK
1 Penyambungan Daya Baru PLN Unit 1.00
2 Instalasi Titik Lampu Titik 13.00
3 Lampu SL 18 Watt Bh 13.00
4 Saklar Tunggal Bh 4.00
5 Saklar Ganda Bh 4.00
6 Pek. Pas. Panel Listrik Bh 1.00
7 Pek. Instalasi stop kontak Titik 6.00
8 Stop Kontak Bh 6.00

XI PEKERJAAN LAIN-LAIN
1 Pekerjaan Pagar Besi BRC m2 16.30
2 Pekerjaan Pintu Pagar Besi m2 9.45
3 Pekerjaan Handrail difabel stainless
a Hanggar TPS3R panjang 2 m m 13.54
b Kantor panjang 0,95 m m 4.75
c WC Panjang 0,75 m 4.29
d Biaya pengelasan (100% fisik) m 22.58
4 Pekerjaan Rolling door m2 7.27
5 Pek. Handrail WC m 1.20
6 Pekerjaan ukiran kayu m2 19.20
7 Pek. Plesteran letter timbul Paket 1.00
NO. URAIAN PEKERJAAN SATUAN VOLUME

XII PERALATAN TPS3R


1 Mesin Pencacah Plastik kap 400 Kg/hari Diesel 16 HP Unit 1.00
2 Mesin Pencacah Kompos kapasitas 500 kg/jam Diesel 8HP Unit 1.00
3 Mesin Pengayak Kapasitas 500 Kg/Jam Unit 1.00

XIII KEBUTUHAN K3 DAN PROKES PENCEGAHAN COVID - 19


A KEBUTUHAN KESEHATAN DAN KESELAMATAN KERJA
1 Sosialisasi K3 dan Prokes (Spanduk) Bh 4.00
2 Helm Keselamatan Bh 21.00
3 Rompi Kerja Bh 21.00
4 Sarung Tangan (Safety Glove) Bh 21.00
5 Sepatu Keselamatan (Rubber Shoes) Bh 21.00
6 Tali Pengaman Bh 3.00
7 Kotak P3K Bh 2.00
8 Asuransi Tenaga Kerja Paket 1.00
B KEBUTUHAN PROTOKOL KESEHATAN PENCEGAHAN COVID-19
1 Alat ukur suhu badan nir-sentuh (Thermoscan) Bh 2.00
2 Vitamin C (1 Box isi 100 tablet) Bh 20.00
3 Tempat Cuci Tangan Bh 2.00
4 Sabun Cuci Tangan (Cair) 200ml/btl Bh 4.00
5 Masker kain Bh 20.00
6 Alat penyemprot desinfektan Bh 2.00
7 Cairan Desinfektan 5L Bh 3.00

XIV ADMINISTRASI KEGIATAN


1 Pelaporan KSM Ls 1.00
2 Photo Copy / Penggandaan Ls 1.00
3 Biaya Alat Tulis Kantor (ATK) Ls 1.00
4 Materai Ls 8.00
5 Pengujian Lab Bh 1.00
6 Papan Nama Kegiatan Paket 1.00

Diverifikasi Oleh : Dibuat Oleh :


Askot Infrastruktur Fasilitator Teknik, UPL

Wiwit Whindari, ST. Hengky Pradana, ST Alfiansyah


Form - RAB 3
BANTUAN PEMERINTAH UNTUK MASYARAKAT ( BPM ) DFAT
PROGRAM KOTA TANPA KUMUH (KOTAKU)
FORMAT PEREKAMAN ANALISA HARGA SATUAN

Pekerjaan : (K3) Pembersihan 1 m2 lapangan dan perataan Kode Analisa


Satuan Pembayaran : M2 A.2.2.1.9

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.) (Rp)
A. Tenaga Kerja
Pekerja L.01 OH 0.1000 140,000.00 14,000.00
Mandor L.04 OH 0.0500 -
Jumlah Tenaga 14,000.00
B. Bahan -
Jumlah Bahan
C. Peralatan - -
Jumlah Peralatan -
D. Harga Satuan Pekerjaan (A+B+C) 14,000.00

Pekerjaan : (Pengukuran dan pemasangan 1 m’ Bouwplank Kode Analisa


Satuan Pembayaran : M2 A. 2.2.1.4.

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.) (Rp)
A. Tenaga Kerja
Pekerja L.01 OH 0.1000 140,000.00 14,000.00
Tukang Kayu L.02 OH 0.1000 150,000.00 15,000.00
Kepala tukang L.03 OH 0.0100 170,000.00 1,700.00
Mandor L.04 OH 0.0050 -
Jumlah Tenaga 30,700.00
B. Bahan
Kayu balok 5/7 Klas III m3 0.012 2,200,000.00 26,400.00
Paku 5-10 cm Kg 0.02 22,000.00 440.00
Kayu papan 2/20 Klas III m3 0.0070 2,450,000.00 17,150.00
Jumlah Bahan 43,990.00
C. Peralatan - -
Jumlah Peralatan -
D. Harga Satuan Pekerjaan (A+B+C) 74,690.00

Pekerjaan : Penggalian 1 m3 tanah biasa sedalam 1 m Kode Analisa


Satuan Pembayaran : M3 A. 2.3.1.1

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.) (Rp)
A. Tenaga Kerja
Pekerja L.01 OH 0.7500 140,000.00 105,000.00
Mandor L.04 OH 0.0250 -
Jumlah Tenaga 105,000.00
B. Bahan -
Jumlah Bahan
C. Peralatan - -
Jumlah Peralatan -
D. Harga Satuan Pekerjaan (A+B+C) 105,000.00
Pekerjaan : Pengurugan kembali 1 m3 galian tanah Kode Analisa
Satuan Pembayaran : M3 A.2.3.1.9.

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.) (Rp)
A. Tenaga Kerja
Pekerja L.01.01 OH 0.5000 140,000.00 70,000.00
Mandor L.04.01 OH 0.0500 -
Jumlah Tenaga 70,000.00
B. Bahan -

Jumlah Bahan -
C. Peralatan - -
Jumlah Peralatan -
D. Harga Satuan Pekerjaan (A+B+C) 70,000.00

Pekerjaan : Pengurugan 1 m3 dengan tanah urug Kode Analisa


Satuan Pembayaran : M3 A.2.3.1.11.a

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.) (Rp)
A. Tenaga Kerja
Pekerja L.01 OH 0.3000 140,000.00 42,000.00
Mandor L.04 OH 0.0100 -
Jumlah Tenaga 42,000.00
B. Bahan -
Tanah urug m3 1.2000 100,000 120,000.00
Jumlah Bahan 120,000.00
C. Peralatan - -
Jumlah Peralatan -
D. Harga Satuan Pekerjaan (A+B+C) 162,000.00

Pekerjaan : Pengurugan 1 m3 dengan Pasir Kode Analisa


Satuan Pembayaran : M3 A.2.3.1.11.

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.) (Rp)
A. Tenaga Kerja
Pekerja L.01 OH 0.3000 140,000.00 42,000.00
Mandor L.04 OH 0.0100 -
Jumlah Tenaga 42,000.00
B. Bahan -
Pasir Urug m3 1.2000 150,000.00 180,000.00
Jumlah Bahan 180,000.00
C. Peralatan - -
Jumlah Peralatan -
D. Harga Satuan Pekerjaan (A+B+C) 222,000.00
Pekerjaan : 1 M Pancang Cerucuk Kayu atau Dolken dia. 8 - 10 Cm Kode Analisa
Satuan Pembayaran :M P.07.a

No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


(Rp.) (Rp)
A. Tenaga Kerja
Pekerja L.01 OH 0.045 140,000 6,300.00
Tukang Kayu L.02 OH 0.012 150,000 1,800.00
Jumlah Tenaga 8,100.00
B. Bahan
Dolken Kayu Galam ø 10-12 m Btg 1.000 35,000 35,000.00
Alat Bantu 0.200 35,000 7,000.00
Jumlah Bahan 42,000.00
C. Peralatan
Jumlah Peralatan -
D. Harga Satuan Pekerjaan (A+B+C) 50,100.00

Pekerjaan : Pembesian 10 kg dengan besi polos atau besi ulir Kode Analisa
Satuan Pembayaran : Kg A.4.1.1.17

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.) (Rp)
A. Tenaga Kerja
Pekerja L.01 OH 0.0700 140,000.00 9,800.00
Tukang Besi L.02 OH 0.0700 150,000.00 10,500.00
Kepala Tukang L.03 OH 0.0070 170,000.00 1,190.00
Mandor L.04 OH 0.0040 - -
-
Jumlah Tenaga 21,490.00
B. Bahan
Besi beton Kg 10.5000 12,000.00 126,000.00
Kawat Beton Kg 0.1500 25,000.00 3,750.00
Jumlah Bahan 129,750.00
C. Peralatan
-
Jumlah Peralatan -

D. Harga Satuan Pekerjaan (A+B+C) 151,240.00

Pembesian 1 Kg Besi 15,124.00


Pekerjaan : Membuat 1 m3 beton mutu f’c = 7,4 Mpa (K.100) Kode Analisa
Satuan Pembayaran : M3 A.4.1.1.1

No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


(Rp.) (Rp)
A. Tenaga Kerja
Pekerja L.01 OH 1.6500 140,000.00 231,000.00
Tukang batu L.02 OH 0.2750 155,000.00 42,625.00
Kepala tukang L.03 OH 0.0280 170,000.00 4,760.00
Mandor L.04 OH 0.0830 - -
Jumlah Tenaga 278,385.00
B. Bahan
Semen Portland kg 247.0000 1,275.00 314,925.00
Pasir beton kg 869.0000 128.57 111,728.57
Split kg 999.0000 250.00 249,750.00
Air Liter 215.0000 -
Jumlah Bahan 676,403.57
C. Peralatan
-
Jumlah Peralatan -
D. Harga Satuan Pekerjaan (A+B+C) 954,788.57

Pekerjaan : Membuat 1 m3 beton mutu f’c = 14,5 Mpa (K.175) Kode Analisa
Satuan Pembayaran : M3 A.4.1.1.5.

No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


(Rp.) (Rp)
A. Tenaga Kerja
Pekerja L.01 OH 1.6500 140,000.00 231,000.00
Tukang batu L.02 OH 0.2750 155,000.00 42,625.00
Kepala tukang L.03 OH 0.0280 170,000.00 4,760.00
Mandor L.04 OH 0.0830 - -
Jumlah Tenaga 278,385.00
B. Bahan
Semen Portland kg 326.0000 1,275.00 415,650.00
Pasir beton kg 760.0000 128.57 97,714.29
Split kg 1,029.0000 250.00 257,250.00
Air Liter 215.0000 -
Jumlah Bahan 770,614.29
C. Peralatan
-
Jumlah Peralatan -
D. Harga Satuan Pekerjaan (A+B+C) 1,048,999.29
Pekerjaan : Membuat 1 m3 beton mutu f’c = 19,3 MPa (K 225) Kode Analisa
Satuan Pembayaran : M3 A.4.1.1.7.

No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


(Rp.) (Rp)
A. Tenaga Kerja
Pekerja L.01 OH 1.6500 140,000.00 231,000.00
Tukang batu L.02 OH 0.2750 155,000.00 42,625.00
Kepala tukang L.03 OH 0.0280 170,000.00 4,760.00
Mandor L.04 OH 0.0830 - -
Jumlah Tenaga 278,385.00
B. Bahan
Semen Portland kg 352.0000 1,275.00 448,800.00
Pasir beton kg 731.0000 128.57 93,985.71
Split kg 1,031.0000 250.00 257,750.00
Air Liter 215.0000 -
Jumlah Bahan 800,535.71
C. Peralatan
-
Jumlah Peralatan -
D. Harga Satuan Pekerjaan (A+B+C) 1,078,920.71

Pekerjaan : (K3) Pemasangan 1 m2 bekisting untuk pondasi Kode Analisa


Satuan Pembayaran : M3 A.4.1.1.20

No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


(Rp.) (Rp)
A. Tenaga Kerja
Pekerja L.01 OH 0.5200 140,000.00 72,800.00
Tukang kayu L.02 OH 0.2600 150,000.00 39,000.00
Kepala tukang L.03 OH 0.0260 170,000.00 4,420.00
Mandor L.04 OH 0.0260 - -
Jumlah Tenaga 116,220.00
B. Bahan
Papan Kayu Klas III m3 0.0400 2,450,000.00 98,000.00
Paku 5-10 cm kg 0.3000 22,000.00 6,600.00
Minyak Bekisting kg 0.1000 -
Jumlah Bahan 104,600.00
C. Peralatan
-
Jumlah Peralatan -
D. Harga Satuan Pekerjaan (A+B+C) 220,820.00
Pekerjaan : (K3) Pemasangan 1 m2 bekisting untuk sloof Kode Analisa
Satuan Pembayaran : M3 A.4.1.1.21

No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


(Rp.) (Rp)
A. Tenaga Kerja
Pekerja L.01 OH 0.5200 140,000.00 72,800.00
Tukang kayu L.02 OH 0.2600 150,000.00 39,000.00
Kepala tukang L.03 OH 0.0260 170,000.00 4,420.00
Mandor L.04 OH 0.0260 - -
Jumlah Tenaga 116,220.00
B. Bahan
Papan Kayu Klas III m3 0.0400 2,450,000.00 98,000.00
Paku 5-10 cm kg 0.4000 22,000.00 8,800.00
Minyak Bekisting kg 0.2000 - -
Jumlah Bahan 106,800.00
C. Peralatan
-
Jumlah Peralatan -
D. Harga Satuan Pekerjaan (A+B+C) 223,020.00

Pekerjaan : (K3) Pemasangan 1 m2 bekisting untuk kolom Kode Analisa


Satuan Pembayaran : M3 A.4.1.1.22

No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


(Rp.) (Rp)
A. Tenaga Kerja
Pekerja L.01 OH 0.6600 140,000.00 92,400.00
Tukang kayu L.02 OH 0.3300 150,000.00 49,500.00
Kepala tukang L.03 OH 0.0330 170,000.00 5,610.00
Mandor L.04 OH 0.0330 - -
Jumlah Tenaga 147,510.00
B. Bahan
Papan Kayu Klas III m3 0.0400 2,450,000.00 98,000.00
Paku 5-10 cm kg 0.4000 22,000.00 8,800.00
Minyak Bekisting kg 0.2000 -
Balok kayu kelas II uk.5/7 m3 0.0150 4,000,000.00 60,000.00
Plywood tebal 9 mm Lbr 0.3500 - -
Dolken kayu φ 8-10cm Batang 2.0000 30,000.00 60,000.00
Jumlah Bahan 226,800.00
C. Peralatan
-
Jumlah Peralatan -
D. Harga Satuan Pekerjaan (A+B+C) 374,310.00
Pekerjaan : (K3) Pemasangan 1 m2 bekisting untuk balok Kode Analisa
Satuan Pembayaran : M3 A.4.1.1.23

No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


(Rp.) (Rp)
A. Tenaga Kerja
Pekerja L.01 OH 0.6600 140,000.00 92,400.00
Tukang kayu L.02 OH 0.3300 150,000.00 49,500.00
Kepala tukang L.03 OH 0.0330 170,000.00 5,610.00
Mandor L.04 OH 0.0330 - -
Jumlah Tenaga 147,510.00
B. Bahan
Papan Kayu Klas III m3 0.0400 2,450,000.00 98,000.00
Paku 5-10 cm kg 0.4000 22,000.00 8,800.00
Minyak Bekisting kg 0.2000 - -
Balok kayu kelas II m3 0.0180 4,000,000.00 72,000.00
Plywood tebal 9 mm Lbr 0.3500 - -
Dolken kayu φ 8-10cm Batang 2.0000 30,000.00 60,000.00
Jumlah Bahan 238,800.00
C. Peralatan
-
Jumlah Peralatan -
D. Harga Satuan Pekerjaan (A+B+C) 386,310.00

Pekerjaan : (K3) Pemasangan 1 m2 bekisting untuk plat Kode Analisa


Satuan Pembayaran : M2 A.4.1.1.24

No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


(Rp.) (Rp)
A. Tenaga Kerja
Pekerja L.01 OH 0.6600 140,000.00 92,400.00
Tukang kayu L.02 OH 0.3300 150,000.00 49,500.00
Kepala tukang L.03 OH 0.0330 170,000.00 5,610.00
Mandor L.04 OH 0.0330 - -
Jumlah Tenaga 147,510.00
B. Bahan
Papan Kayu Klas III m3 0.0400 2,450,000.00 98,000.00
Paku 5-10 cm kg 0.4000 22,000.00 8,800.00
Minyak Bekisting kg 0.2000 -
Balok kayu kelas II m3 0.0150 4,000,000.00 60,000.00
Plywood tebal 9 mm Lbr 0.3500 130,000.00 45,500.00
Dolken kayu φ 8-10cm Batang 6.0000 30,000.00 180,000.00
Jumlah Bahan 392,300.00
C. Peralatan
-
Jumlah Peralatan -
D. Harga Satuan Pekerjaan (A+B+C) 539,810.00
Pekerjaan : 1 m2 Pengecatan bidang kayu baru Kode Analisa
Satuan Pembayaran : M2 A.4.7.1.4.

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.) (Rp)
A. Tenaga Kerja
Pekerja L.01 OH 0.0700 140,000.00 9,800.00
Tukang cat L.02 OH 0.0090 150,000.00 1,350.00
Kepala tukang L.03 OH 0.0060 170,000.00 1,020.00
Mandor L.04 OH 0.0030 - -
Jumlah Tenaga 12,170.00
B. Bahan
Cat menie Kayu Kg 0.2000 60,000.00 12,000.00
Plamuur Kg 0.1500 - -
Cat dasar Kayu Kg 0.1700 60,000.00 10,200.00
Cat penutup Kayu Kg 0.2600 60,000.00 15,600.00
Kuas Bh 0.0100 45,000.00 450.00
Pengencer Kg 0.0300 28,100.00 843.00
Ampelas Lbr 0.2000 10,000.00 2,000.00
Jumlah Bahan 41,093.00
C. Peralatan
-
Jumlah Peralatan -
D. Harga Satuan Pekerjaan (A+B+C) 53,263.00

Pekerjaan : Pengecatan 1 m2 tembok baru Kode Analisa


Satuan Pembayaran : M2 A.4.7.1.10.

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.) (Rp)
A. Tenaga Kerja
Pekerja L.01 OH 0.0200 140,000.00 2,800.00
Tukang cat L.02 OH 0.0630 150,000.00 9,450.00
Kepala tukang L.03 OH 0.0063 170,000.00 1,071.00
Mandor L.04 OH 0.0030 -
Jumlah Tenaga 13,321.00
B. Bahan
Plamuur Kg 0.1000 - -
Cat dasar Tembok Kg 0.1200 110,000.00 13,200.00
Cat Penutup Tembok Kg 0.1800 110,000.00 19,800.00
Jumlah Bahan 33,000.00
C. Peralatan - -
Jumlah Peralatan -
D. Harga Satuan Pekerjaan (A+B+C) 46,321.00
Pekerjaan : (K3) Pemasangan 1 buah closet duduk/monoblock Kode Analisa
Satuan Pembayaran : Bh A.5.1.1.1.

No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


(Rp.) (Rp)
A. Tenaga Kerja
Pekerja L.01 OH 3.300 140,000.00 462,000.00
Tukang Batu L.02 OH 1.100 155,000.00 170,500.00
Kepala Tukang L.03 OH 0.010 170,000.00 1,700.00
Mandor L.04 OH 0.160 - -
Jumlah Tenaga 634,200.00
B. Bahan
Closed duduk Unit 1.000 1,800,000.00 1,800,000.00
Perlengkapan % 6.000 1,800,000.00 108,000.00
Jumlah Bahan 1,908,000.00
C. Peralatan
-
Jumlah Peralatan -
D. Harga Satuan Pekerjaan (A+B+C) 2,542,200.00

Pekerjaan : Pemasangan 1 buah kran diameter ½” atau ¾ ” Kode Analisa


Satuan Pembayaran : Bh A.5.1.1 19.

No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


(Rp.) (Rp)
A. Tenaga Kerja
Pekerja L.01 OH 0.010 140,000.00 1,400.00
Tukang Batu L.02 OH 0.400 155,000.00 62,000.00
Kepala Tukang L.03 OH 0.040 170,000.00 6,800.00
Mandor L.04 OH 0.005 - -
Jumlah Tenaga 70,200.00
B. Bahan
Kran Air Bh 1.000 65,000.00 65,000.00
Seal Tape Bh 0.025 12,000.00 300.00
Jumlah Bahan 65,300.00
C. Peralatan
-
Jumlah Peralatan -
D. Harga Satuan Pekerjaan (A+B+C) 135,500.00
Pekerjaan : Pemasangan 1 buah Stop Kran 3/4 Kode Analisa
Satuan Pembayaran : Bh A.5.1.1 19.a

No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


(Rp.) (Rp)
A. Tenaga Kerja
Pekerja L.01 OH 0.010 140,000.00 1,400.00
Tukang Batu L.02 OH 0.400 155,000.00 62,000.00
Kepala Tukang L.03 OH 0.040 170,000.00 6,800.00
Mandor L.04 OH 0.005 - -
Jumlah Tenaga 70,200.00
B. Bahan
Stop Kran 3/4 Bh 1.000 65,000.00 65,000.00
Seal Tape Bh 0.025 12,000.00 300.00
Jumlah Bahan 65,300.00
C. Peralatan
-
Jumlah Peralatan -
D. Harga Satuan Pekerjaan (A+B+C) 135,500.00

Pekerjaan : Pemasangan 1 m’ pipa PVC tipe AW diameter 4” Kode Analisa


Satuan Pembayaran :M A.5.1.1 32.

No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


(Rp.) (Rp)
A. Tenaga Kerja
Pekerja L.01 OH 0.0810 140,000.00 11,340.00
Tukang batu L.02 OH 0.1350 155,000.00 20,925.00
Kepala tukang L.03 OH 0.0135 170,000.00 2,295.00
Mandor L.04 OH 0.0040 -
Jumlah Tenaga 34,560.00
B. Bahan
Pipa PVC 4” M 1.200 73,750 88,500.00
Perlengkapan % 35.000 73,750 25,812.50
Jumlah Bahan 114,312.50
C. Peralatan - -
Jumlah Peralatan -
D. Harga Satuan Pekerjaan (A+B+C) 148,872.50

Pekerjaan : Pemasangan 1 m’ pipa PVC tipe AW diameter ¾ ” Kode Analisa


Satuan Pembayaran :M A.5.1.1 26.

No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


(Rp.) (Rp)
A. Tenaga Kerja
Pekerja L.01 OH 0.0360 140,000.00 5,040.00
Tukang batu L.02 OH 0.0600 155,000.00 9,300.00
Kepala tukang L.03 OH 0.0060 170,000.00 1,020.00
Mandor L.04 OH 0.0020 -
Jumlah Tenaga 15,360.00
B. Bahan
Pipa PVC 3/4” M 1.200 10,500 12,600.00
Perlengkapan % 35.000 10,500 3,675.00
Jumlah Bahan 16,275.00
C. Peralatan - -
Jumlah Peralatan -
D. Harga Satuan Pekerjaan (A+B+C) 31,635.00
Pekerjaan : Pemasangan 1 m’ pipa PVC tipe AW diameter 2” Kode Analisa
Satuan Pembayaran :M A.5.1.1 29.

No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


(Rp.) (Rp)
A. Tenaga Kerja
Pekerja L.01 OH 0.0540 140,000.00 7,560.00
Tukang batu L.02 OH 0.0900 155,000.00 13,950.00
Kepala tukang L.03 OH 0.0090 170,000.00 1,530.00
Mandor L.04 OH 0.0030 -
Jumlah Tenaga 23,040.00
B. Bahan
Pipa PVC 2” M 1.200 31,875 38,250.00
Perlengkapan % 35.000 31,875 11,156.25
Jumlah Bahan 49,406.25
C. Peralatan - -
Jumlah Peralatan -
D. Harga Satuan Pekerjaan (A+B+C) 72,446.25

Pekerjaan : Pemasangan 1 cm2 dinding conblock HB10/Batako 1SP : 4PP Kode Analisa
Satuan Pembayaran : M2 A.4.4.1.21a.

No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


(Rp.) (Rp)
A. Tenaga Kerja
Pekerja L.01 OH 0.3000 140,000.00 42,000.00
Tukang batu L.02 OH 0.1000 155,000.00 15,500.00
Kepala tukang L.03 OH 0.0100 170,000.00 1,700.00
Mandor L.04 OH 0.0150 -
Jumlah Tenaga 59,200.00
B. Bahan
Batako Bh 12.500 2,800.00 35,000.00
Semen Portland Kg 12.130 1,275.00 15,465.75
Pasir pasang m3 0.388 150,000.00 58,200.00
Jumlah Bahan 108,665.75
C. Peralatan - -
Jumlah Peralatan -
D. Harga Satuan Pekerjaan (A+B+C) 167,865.75

Pekerjaan : Pemasangan 1 m2 plesteran 1SP : 4PP tebal 15 mm Kode Analisa


Satuan Pembayaran : M2 A.4.4.2.4.

No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


(Rp.) (Rp)
A. Tenaga Kerja
Pekerja L.01 OH 0.3000 140,000.00 42,000.00
Tukang batu L.02 OH 0.1500 155,000.00 23,250.00
Kepala tukang L.03 OH 0.0150 170,000.00 2,550.00
Mandor L.04 OH 0.0150 -
Jumlah Tenaga 67,800.00
B. Bahan
Semen Portland Kg 6.240 1,275.00 7,956.00
Pasir pasang m3 0.024 150,000.00 3,600.00
Jumlah Bahan 11,556.00
C. Peralatan - -
Jumlah Peralatan -
D. Harga Satuan Pekerjaan (A+B+C) 79,356.00
Pekerjaan : Pemasangan 1m2 lantai keramik ukuran 40 cm x 40 cm Kode Analisa
Satuan Pembayaran : M2 A.4.4.3.35.a

No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


(Rp.) (Rp)
A. Tenaga Kerja
Pekerja L.01 OH 0.700 140,000.00 98,000.00
Tukang batu L.02 OH 0.350 155,000.00 54,250.00
Kepala tukang L.03 OH 0.035 170,000.00 5,950.00
Mandor L.04 OH 0.035 -
Jumlah Tenaga 158,200.00
B. Bahan
Ubin keramik 40x40 Doz 1.050 75,000.00 78,750.00
Semen Portland Kg 10.000 1,275.00 12,750.00
Pasir pasang M3 0.045 150,000.00 6,750.00
Semen warna Kg 0.500 5,000.00 2,500.00
Jumlah Bahan 100,750.00
C. Peralatan - -
Jumlah Peralatan -
D. Harga Satuan Pekerjaan (A+B+C) 258,950.00

Pekerjaan : Pemasangan 1m2 lantai keramik ukuran 20 cm x 20 cm Kode Analisa


Satuan Pembayaran : M2 A.4.4.3.36.

No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


(Rp.) (Rp)
A. Tenaga Kerja
Pekerja L.01 OH 0.700 140,000.00 98,000.00
Tukang batu L.02 OH 0.350 155,000.00 54,250.00
Kepala tukang L.03 OH 0.035 170,000.00 5,950.00
Mandor L.04 OH 0.035 -
Jumlah Tenaga 158,200.00
B. Bahan
Ubin keramik 20x20 Doz 1.050 65,000.00 68,250.00
Semen Portland Kg 10.400 1,275.00 13,260.00
Pasir pasang M3 0.045 150,000.00 6,750.00
Semen warna Kg 0.500 5,000.00 2,500.00
Jumlah Bahan 90,760.00
C. Peralatan - -
Jumlah Peralatan -
D. Harga Satuan Pekerjaan (A+B+C) 248,960.00

Pekerjaan : Pemasangan 1 m2 dinding keramik 10 cm x 20 cm Kode Analisa


Satuan Pembayaran : M2 A.4.4.3.53.

No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


(Rp.) (Rp)
A. Tenaga Kerja
Pekerja L.01 OH 0.900 140,000.00 126,000.00
Tukang batu L.02 OH 0.450 155,000.00 69,750.00
Kepala tukang L.03 OH 0.045 170,000.00 7,650.00
Mandor L.04 OH 0.045 -
Jumlah Tenaga 203,400.00
B. Bahan
Ubin keramik 10x20 Doz 1.050 65,400.00 68,670.00
Semen Portland Kg 9.300 1,275.00 11,857.50
Pasir pasang M3 0.180 150,000.00 27,000.00
Semen warna Kg 2.750 5,000.00 13,750.00
Jumlah Bahan 121,277.50
C. Peralatan - -
Jumlah Peralatan -
D. Harga Satuan Pekerjaan (A+B+C) 324,677.50
Pekerjaan : Pemasangan 1 m2 Rangka Kuda-kuda Baja Ringan Kode Analisa
Satuan Pembayaran : M2 A.4.2.1.2 d

No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


(Rp.) (Rp)
A. Tenaga Kerja
Pekerja L.01 OH 0.060 140,000.00 8,400.00
Tukang besi L.02 OH 0.060 150,000.00 9,000.00
Kepala tukang L.03 OH 0.006 170,000.00 1,020.00
Mandor L.04 OH 0.003 -
Jumlah Tenaga 18,420.00
B. Bahan
baja ringan 75x35x0,75 MM M 2.000 20,833.33 41,666.67
baja ringan 30x30x0,3 MM M 1.500 8,333.33 12,500.00
Paku Skrup Bh 19.000 3,500.00 66,500.00
Jumlah Bahan 120,666.67
C. Peralatan - -
Jumlah Peralatan -
D. Harga Satuan Pekerjaan (A+B+C) 139,086.67

Pekerjaan : Pemasangan 1 m2 genteng metal ukuran 80 x 100 atap pelana Kode Analisa
Satuan Pembayaran : M2 A.4.5.2.32.

No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


(Rp.) (Rp)
A. Tenaga Kerja
Pekerja L.01 OH 0.200 140,000.00 28,000.00
Tukang besi L.02 OH 0.100 150,000.00 15,000.00
Kepala tukang L.03 OH 0.010 170,000.00 1,700.00
Mandor L.04 OH 0.001 -
Jumlah Tenaga 44,700.00
B. Bahan
Genteng Metal M2 1.020 39,308.18 40,094.34
Paku Genteng Metal Kg 0.200 35,000.00 7,000.00
Jumlah Bahan 47,094.34
C. Peralatan - -
Jumlah Peralatan -
D. Harga Satuan Pekerjaan (A+B+C) 91,794.34
Pekerjaan : Pemasangan 1 m’ Listplank Kalsiboard Exterior Kode Analisa
Satuan Pembayaran :M A.4.6.1.21.a

No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


(Rp.) (Rp)
A. Tenaga Kerja
Pekerja L.01 OH 0.100 140,000.00 14,000.00
Tukang besi L.02 OH 0.200 150,000.00 30,000.00
Kepala tukang L.03 OH 0.020 170,000.00 3,400.00
Mandor L.04 OH 0.005 -
Jumlah Tenaga 47,400.00
B. Bahan
Papan Plank Kalsiboard M' 1.10000 64,583.33 71,041.67
Paku 5-10 cm Kg 0.100 22,000.00 2,200.00
Jumlah Bahan 73,241.67
C. Peralatan - -
Jumlah Peralatan -
D. Harga Satuan Pekerjaan (A+B+C) 120,641.67

Pekerjaan : Pemasangan 1 m2 Rangka Besi Hollow Modul 60x60 cm Kode Analisa


Satuan Pembayaran : M2 A.4.2.1.21.

No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


(Rp.) (Rp)
A. Tenaga Kerja
Pekerja L.01 OH 0.350 140,000.00 49,000.00
Tukang besi L.02 OH 0.350 150,000.00 52,500.00
Kepala tukang L.03 OH 0.035 170,000.00 5,950.00
Mandor L.04 OH 0.018 -
Jumlah Tenaga 107,450.00
B. Bahan
Besi Hollow Plafond 1,3x 3,3 mm M' 4.000 2,500.00 10,000.00
Assesoris (Perkuatan, Las dll) Ls (100%xRangka) 2,500.00 Rp 10,000.00
Jumlah Bahan 20,000.00
C. Peralatan - -
Jumlah Peralatan -
D. Harga Satuan Pekerjaan (A+B+C) 127,450.00

Pekerjaan : Pemasangan 1 m2 Langit2 Kalsiboard uk 1,2x2,4 m tebal 9mm Kode Analisa


Satuan Pembayaran : M2 A.4.5.1.1a

No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


(Rp.) (Rp)
A. Tenaga Kerja
Pekerja L.01 OH 0.100 140,000.00 14,000.00
Tukang besi L.02 OH 0.100 150,000.00 15,000.00
Kepala tukang L.03 OH 0.010 170,000.00 1,700.00
Mandor L.04 OH 0.005 -
Jumlah Tenaga 30,700.00
B. Bahan
Kalsiboard 6 mm Lbr 0.375 110,000.00 41,250.00
Paku Kalsiboard Kg 0.030 25,000.00 750.00
Jumlah Bahan 42,000.00
C. Peralatan - -
Jumlah Peralatan -
D. Harga Satuan Pekerjaan (A+B+C) 72,700.00
Pekerjaan : Pembuatan dan pas 1 m3 kusen pintu dan kusen jendela Kayu Klas II Kode Analisa
Satuan Pembayaran : M3 A.4.6.1.2.

No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


(Rp.) (Rp)
A. Tenaga Kerja
Pekerja L.01 OH 6.000 140,000.00 840,000.00
Tukang besi L.02 OH 18.000 150,000.00 2,700,000.00
Kepala Tukang L.03 OH 1.800 170,000.00 306,000.00
Mandor L.04 OH 0.300 -
Jumlah Tenaga 3,846,000.00
B. Bahan
Balok kayu kelas II M3 1.200 4,000,000.00 4,800,000.00
Paku Skrup Kg 1.250 22,000.00 27,500.00
Lem Kayu Kg 1.000 33,000.00 33,000.00
Jumlah Bahan 4,860,500.00
C. Peralatan - -
Jumlah Peralatan -
D. Harga Satuan Pekerjaan (A+B+C) 8,706,500.00

Pekerjaan : Pembuatan dan pemasangan 1 m2 daun pintu panel, Kayu Klas II Kode Analisa
Satuan Pembayaran : M2 A.4.6.1.5.

No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


(Rp.) (Rp)
A. Tenaga Kerja
Pekerja L.01 OH 1.000 140,000.00 140,000.00
Tukang kayu L.02 OH 3.000 150,000.00 450,000.00
Kepala Tukang L.03 OH 0.300 170,000.00 51,000.00
Mandor L.04 OH 0.050 -
Jumlah Tenaga 641,000.00
B. Bahan
Papan Kayu Klas II M3 0.040 5,000,000.00 200,000.00
Lem Kayu Kg 0.500 33,000.00 16,500.00
Jumlah Bahan 200,000.00
C. Peralatan - -
Jumlah Peralatan -
D. Harga Satuan Pekerjaan (A+B+C) 841,000.00

Pekerjaan : Pembuatan dan pemasangan 1 m2 pintu jendela kaca, Kayu Klas II Kode Analisa
Satuan Pembayaran : M2 A.4.6.1.6.

No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


(Rp.) (Rp)
A. Tenaga Kerja
Pekerja L.01 OH 0.800 140,000.00 112,000.00
Tukang kayu L.02 OH 2.400 150,000.00 360,000.00
Kepala Tukang L.03 OH 0.240 170,000.00 40,800.00
Mandor L.04 OH 0.040 -
Jumlah Tenaga 512,800.00
B. Bahan
Papan Kayu Klas II M3 0.024 5,000,000.00 120,000.00
Lem Kayu Kg 0.300 33,000.00 9,900.00
Jumlah Bahan 120,000.00
C. Peralatan - -
Jumlah Peralatan -
D. Harga Satuan Pekerjaan (A+B+C) 632,800.00
Pekerjaan : Pemasangan 1 m2 kaca tebal 5 mm Kode Analisa
Satuan Pembayaran : M2 A.4.6.2.17

No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


(Rp.) (Rp)
A. Tenaga Kerja
Pekerja L.01 OH 0.015 140,000.00 2,100.00
Tukang kayu L.02 OH 0.150 150,000.00 22,500.00
Kepala Tukang L.03 OH 0.015 170,000.00 2,550.00
Mandor L.04 OH 0.001 -
Jumlah Tenaga 27,150.00
B. Bahan
Kaca Tebal 5 mm M2 1.100 135,000.00 148,500.00
Sealant Kg 0.050 47,500.00 2,375.00
Jumlah Bahan 148,500.00
C. Peralatan - -
Jumlah Peralatan -
D. Harga Satuan Pekerjaan (A+B+C) 175,650.00

Pekerjaan : Pemasangan 1 buah engsel pintu Kode Analisa


Satuan Pembayaran : Bh A.4.6.2.5

No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


(Rp.) (Rp)
A. Tenaga Kerja
Pekerja L.01 OH 0.015 140,000.00 2,100.00
Tukang kayu L.02b OH 0.150 150,000.00 22,500.00
Kepala Tukang L.03 OH 0.015 170,000.00 2,550.00
Mandor L.04 OH 0.0008 -
Jumlah Tenaga 27,150.00
B. Bahan
Engsel pintu Bh 1.000 35,000.00 35,000.00
Jumlah Bahan 35,000.00
C. Peralatan - -
Jumlah Peralatan -
D. Harga Satuan Pekerjaan (A+B+C) 62,150.00

Pekerjaan : Pemasangan 1 buah engsel jendela kupu-kupu Kode Analisa


Satuan Pembayaran : Bh A.4.6.2.6.

No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


(Rp.) (Rp)
A. Tenaga Kerja
Pekerja L.01 OH 0.010 140,000.00 1,400.00
Tukang kayu L.02b OH 0.100 150,000.00 15,000.00
Kepala Tukang L.03 OH 0.010 170,000.00 1,700.00
Mandor L.04 OH 0.0005 -
Jumlah Tenaga 18,100.00
B. Bahan
Engsel jendela Bh 1.000 41,000.00 41,000.00
Jumlah Bahan 41,000.00
C. Peralatan - -
Jumlah Peralatan -
D. Harga Satuan Pekerjaan (A+B+C) 59,100.00
Pekerjaan : Pemasangan 1 buah kunci tanam biasa Kode Analisa
Satuan Pembayaran : Bh A.4.6.2.2.

No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


(Rp.) (Rp)
A. Tenaga Kerja
Pekerja L.01 OH 0.010 140,000.00 1,400.00
Tukang kayu L.02 OH 0.500 150,000.00 75,000.00
Kepala Tukang L.03 OH 0.050 170,000.00 8,500.00
Mandor L.04 OH 0.0050 -
Jumlah Tenaga 84,900.00
B. Bahan
Kunci tanam biasa Bh 1.000 95,000.00 95,000.00
Jumlah Bahan 95,000.00
C. Peralatan - -
Jumlah Peralatan -
D. Harga Satuan Pekerjaan (A+B+C) 179,900.00

Pekerjaan : Pemasangan 1 buah kait angin Kode Analisa


Satuan Pembayaran : Bh A.4.6.2.9.

No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


(Rp.) (Rp)
A. Tenaga Kerja
Pekerja L.01 OH 0.015 140,000.00 2,100.00
Tukang kayu L.02 OH 0.150 150,000.00 22,500.00
Kepala Tukang L.03 OH 0.015 170,000.00 2,550.00
Mandor L.04 OH 0.0080 -
Jumlah Tenaga 27,150.00
B. Bahan
Kait angin Bh 1.000 20,800.00 20,800.00
Jumlah Bahan 20,800.00
C. Peralatan - -
Jumlah Peralatan -
D. Harga Satuan Pekerjaan (A+B+C) 47,950.00

Pekerjaan : Pemasangan 1 buah kunci slot Kode Analisa


Satuan Pembayaran : Bh A.4.6.2.11.

No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


(Rp.) (Rp)
A. Tenaga Kerja
Pekerja L.01 OH 0.015 140,000.00 2,100.00
Tukang kayu L.02 OH 0.150 150,000.00 22,500.00
Kepala Tukang L.03 OH 0.015 170,000.00 2,550.00
Mandor L.04 OH 0.0080 -
Jumlah Tenaga 27,150.00
B. Bahan
Grendel/Kunci Slot Bh 1.000 35,000.00 35,000.00
Jumlah Bahan 35,000.00
C. Peralatan - -
Jumlah Peralatan -
D. Harga Satuan Pekerjaan (A+B+C) 62,150.00
Pekerjaan : Pemasangan 1 buah Handel Jendela Kode Analisa
Satuan Pembayaran : Bh A.4.6.2.8.a

No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


(Rp.) (Rp)
A. Tenaga Kerja
Pekerja L.01 OH 0.015 140,000.00 2,100.00
Tukang kayu L.02 OH 0.150 150,000.00 22,500.00
Kepala Tukang L.03 OH 0.015 170,000.00 2,550.00
Mandor L.04 OH 0.0080 -
Jumlah Tenaga 27,150.00
B. Bahan
Handel Jendela Bh 1.000 8,000.00 8,000.00
Jumlah Bahan 8,000.00
C. Peralatan -
Jumlah Peralatan -
D. Harga Satuan Pekerjaan (A+B+C) 35,150.00

Pekerjaan : Pemasangan 1 m3 pondasi batu belah campuran 1SP : 4PP Kode Analisa
Satuan Pembayaran : m3 A.3.2.1.2.

No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


(Rp.) (Rp)
A. Tenaga Kerja
Pekerja L.01 OH 1.500 140,000.00 210,000.00
Tukang batu L.02 OH 0.750 155,000.00 116,250.00
Kepala Tukang L.03 OH 0.075 170,000.00 12,750.00
Mandor L.04 OH 0.0750 -
Jumlah Tenaga 339,000.00
B. Bahan
Batu belah m3 1.200 400,000.00 480,000.00
Semen Portland Kg 163.000 1,275.00 207,825.00
Pasir pasang m3 0.520 150,000.00 78,000.00
Jumlah Bahan 765,825.00
C. Peralatan -
Jumlah Peralatan -
D. Harga Satuan Pekerjaan (A+B+C) 1,104,825.00

Pekerjaan : Pemasangan 1 m2 dinding terawang (rooster) Kode Analisa


Satuan Pembayaran : m2 A. 4.4.1.23

No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


(Rp.) (Rp)
A. Tenaga Kerja
Pekerja L.01 OH 0.300 140,000.00 42,000.00
Tukang batu L.02 OH 0.100 155,000.00 15,500.00
Kepala Tukang L.03 OH 0.010 170,000.00 1,700.00
Mandor L.04 OH 0.0150 -
Jumlah Tenaga 59,200.00
B. Bahan
Roster/Kerawang Bh 12.000 25,000.00 300,000.00
Semen Portland Kg 11.000 1,275.00 14,025.00
Pasir pasang m3 0.035 150,000.00 5,250.00
Jumlah Bahan 319,275.00
C. Peralatan -
Jumlah Peralatan -
D. Harga Satuan Pekerjaan (A+B+C) 378,475.00
Pekerjaan : Pemasangan 1 m2 dinding pemisah GRC Board Kode Analisa
Satuan Pembayaran : m3 A.4.6.1.25.a

No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


(Rp.) (Rp)
A. Tenaga Kerja
Pekerja L.01 OH 0.2000 140,000.00 28,000.00
Tukang Kayu L.02 OH 0.6000 150,000.00 90,000.00
Kepala Tukang L.03 OH 0.0600 170,000.00 10,200.00
Mandor L.04 OH 0.0100 -
Jumlah Tenaga 128,200.00
B. Bahan
Balok Kayu Klas II m3 0.0280 -
Paku Kalsiboard Kg 0.1500 25,000.00 3,750.00
GRC Board tebal 8 m Lbr 0.4300 190,000.00 81,700.00
Lem Kayu Kg 0.5600
Jumlah Bahan 85,450.00
C. Peralatan -
Jumlah Peralatan -
D. Harga Satuan Pekerjaan (A+B+C) 213,650.00

Pekerjaan : (K3) Pemasangan 1 buah wastafel Kode Analisa


Satuan Pembayaran : m3 A.5.1.1 5.

No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


(Rp.) (Rp)
A. Tenaga Kerja
Pekerja L.01 OH 1.2000 140,000.00 168,000.00
Tukang Batu L.02 OH 1.4500 155,000.00 224,750.00
Kepala Tukang L.03 OH 0.1500 170,000.00 25,500.00
Mandor L.04 OH 0.0600 -
Jumlah Tenaga 418,250.00
B. Bahan
Wastafel+cermin Unit 1.2000 940,000.00 1,128,000.00
Semen Portland Kg 6.0000 1,275.00 7,650.00
Pasir pasang M3 0.0100 150,000.00 1,500.00
Perlengkapan % 12.0000 940,000.00 112,800.00
Jumlah Bahan 1,249,950.00
C. Peralatan - -
Jumlah Peralatan -
D. Harga Satuan Pekerjaan (A+B+C) 1,668,200.00
Pekerjaan : Pemasangan 1 m2 rolling door alluminium Kode Analisa
Satuan Pembayaran : m3 A.4.2.1.10

No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


(Rp.) (Rp)
A. Tenaga Kerja
Pekerja L.01 OH 1.0000 140,000.00 140,000.00
Tukang besi L.02 OH 1.0000 150,000.00 150,000.00
Kepala Tukang L.03 OH 0.1200 170,000.00 20,400.00
Mandor L.04 OH 0.0060 -
Jumlah Tenaga 310,400.00
B. Bahan
Rolling Door Unit 1.0000 500,000.00 500,000.00
Jumlah Bahan 500,000.00
C. Peralatan -
Jumlah Peralatan -
D. Harga Satuan Pekerjaan (A+B+C) 810,400.00

Dibuat oleh : Tim Verifikasi,


UPL Tim Faskel Tim Korkot

Alfiansyah Hengky Pradana, ST Wiwit Whindari, ST


RAB-4

PROGRAM KOTA TANPA KUMUH (KOTAKU)


DAFTAR HARGA SATUAN JADI PEKERJAAN

Kab./Kota : Palangka Raya Nama Paket Pekerjaan : Pembangunan TPS3R


Kecamatan : Sebangau
Kelurahan : Kereng Bangkirai
BKM : Kereng Membangun

HARGA
NO. JENIS PEKERJAAN SATUAN
(Rp.)

I PEKERJAAN PERSIAPAN
1. Pembersihan Awal m2 Rp 14,000.00
2. Pengukuran dan Pemasangan Bowplank m Rp 74,690.00

II PEKERJAAN TANAH
1. Pek urugan tanah lokasi kegiatan m3 Rp 162,000.00
2. Pek. Galian Tanah Pondasi m3 Rp 105,000.00
3. Pek. Urugan Bekas Galian m3 Rp 70,000.00
4. Pek. Urugan Pasir bawah lantai m3 Rp 222,000.00
5. Pek. Pemancangan Cerucuk Kayu Galam btg Rp 50,100.00

III PEKERJAAN BETON BERTULANG


1. Pondasi Footplat P1 (80 cm x 80 cm x 20 cm)
a Pek. Pembesian Kg Rp 15,124.00
b Pek. Lantai Kerja Beton K.100 t=5 cm m3 Rp 954,788.57
c Pek. Bekisting Pondasi m2 Rp 220,820.00
d Cor Beton Mutu k.200 m3 Rp 1,078,920.71
2. Pondasi Footplat P2 (60 cm x 60 cm x 20 cm)
a Pek. Pembesian Kg Rp 15,124.00
b Pek. Lantai Kerja Beton K.100 t=5 cm m3 Rp 954,788.57
c Pek. Bekisting Pondasi m2 Rp 220,820.00
d Cor Beton Mutu k.200 m3 Rp 1,078,920.71
3. Pondasi Footplat P3 (60 cm x 60 cm x 20 cm)
a Pek. Pembesian Kg Rp 15,124.00
b Pek. Lantai Kerja Beton K.100 t=5 cm m3 Rp 954,788.57
c Pek. Bekisting Pondasi m2 Rp 220,820.00
d Cor Beton Mutu k.200 m3 Rp 1,078,920.71
4. Pek Kolom K1
a Pek. Pembesian Kg Rp 15,124.00
b Pek. Bekisting Kolom m2 Rp 374,310.00
c Cor Beton Mutu k.200 m3 Rp 1,078,920.71
5. Pek Kolom K2
a Pek. Pembesian Kg Rp 15,124.00
b Pek. Bekisting Kolom m2 Rp 374,310.00
c Cor Beton Mutu k.200 m3 Rp 1,078,920.71
6. Pek Kolom K3
a Pek. Pembesian Kg Rp 15,124.00
b Pek. Bekisting Kolom m2 Rp 374,310.00
c Cor Beton Mutu k.200 m3 Rp 1,078,920.71
HARGA
NO. JENIS PEKERJAAN SATUAN
(Rp.)
7. Pekerjaan Sloof 20x30
a Pek. Pembesian Kg Rp 15,124.00
b Pek. Bekisting Sloof m2 Rp 223,020.00
c Cor Beton Mutu k.200 m3 Rp 1,078,920.71
8. Pekerjaan Sloof 15x20
a Pek. Pembesian Kg Rp 15,124.00
b Pek. Bekisting Sloof m2 Rp 223,020.00
c Cor Beton Mutu k.200 m3 Rp 1,078,920.71
9. Pekerjaan Ring Balok 20x20
a Pek. Pembesian Kg Rp 15,124.00
b Pek. Bekisting Ring Balok m2 Rp 386,310.00
c Cor Beton Mutu k.200 m3 Rp 1,078,920.71
10. Pekerjaan Balok 15x20
a Pek. Pembesian Kg Rp 15,124.00
b Pek. Bekisting Ring Balok m2 Rp 386,310.00
c Cor Beton Mutu k.200 m3 Rp 1,078,920.71
11. Pekerjaan Ring Balok 15/15
a Pek. Pembesian Kg Rp 15,124.00
b Pek. Bekisting Ring Balok m2 Rp 386,310.00
c Cor Beton Mutu k.200 m3 Rp 1,078,920.71
12. Pekerjaan lantai beton bertulang
a Pek. Pembesian Kg Rp 15,124.00
b Cor Beton Mutu k.175 m3 Rp 1,048,999.29
13. Pek. Plat /Dak Beton
a Pembesian Kg Rp 15,124.00
b Pek. Bekisting m2 Rp 539,810.00
c Cor Beton Mutu k.200 m3 Rp 1,078,920.71

IV PEKERJAAN DINDING, PLESTERAN DAN KERAMIK


1. Pek. Pasangan dinding Bataco
a Bangunan Hanggar TPS3R m2 Rp 167,865.75
b Kantor m2 Rp 167,865.75
c WC m2 Rp 167,865.75
d Pagar m2 Rp 167,865.75
2. Pek. Plesteran Dinding
a Bangunan Hanggar TPS3R m2 Rp 79,356.00
b Kantor m2 Rp 79,356.00
c WC m2 Rp 79,356.00
d Pagar m2 Rp 79,356.00
3. Cor Beton Lantai Beton Mutu k.200 m3 Rp 1,078,920.71
4. Pek Keramik lantai Uk.40x40 m2 Rp 258,950.00
5. Pek Keramik lantai WC Uk.20x20 m2 Rp 248,960.00
6. Pek Keramik dinding WC Uk.10x20 m2 Rp 324,677.50
7. Pek. Tawing layar m2 Rp 213,650.00
HARGA
NO. JENIS PEKERJAAN SATUAN
(Rp.)
V PEKERJAAN ATAP, PLAFOND, LISPLANK
1. Rangka Atap Baja Ringan
a Hanggar TPS3R m2 Rp 139,086.67
b Kantor m2 Rp 139,086.67
c WC m2 Rp 139,086.67
2. Pek Atap Genteng Metal Zincalume
a Hanggar TPS3R m2 Rp 91,794.34
b Kantor m2 Rp 91,794.34
c WC m2 Rp 91,794.34
3. Pek. Lisplank Superplank Eksterior m Rp 120,641.67
4. Rangka Hollow Plafond Kantor m2 Rp 127,450.00
5. Pek. Pas. Plafond Kalsiboard m2 Rp 72,700.00

VI PEKERJAAN PINTU, JENDELA, KUNCI & PENGGANTUNG


1. Pek. Kusen Pintu dan Jendela Kayu Klas II
a Hanggar TPS3R m3 Rp 8,706,500.00
b Kantor m3 Rp 8,706,500.00
c WC m3 Rp 8,706,500.00
2. Pek. Daun Pintu Panel Kayu Klas II
a Hanggar TPS3R m2 Rp 841,000.00
b Kantor m2 Rp 841,000.00
c WC m2 Rp 841,000.00
3. Pek. Rangka Jendela Kaca Kayu Klas II m2 Rp 632,800.00
4. Pek.Pemasangan Kaca Tebal 5 mm m2 Rp 175,650.00
5. Pek. Engsel Pintu bh Rp 62,150.00
6. Pek. Engsel Jendela bh Rp 59,100.00
7. Kunci Tanam bh Rp 179,900.00
8. Hak angin Jendela bh Rp 47,950.00
9. Gerendel Jendela bh Rp 62,150.00
10. Handel Jendela bh Rp 35,150.00
11. Pekerjaan Ventilasi Kerawang m2 Rp 378,475.00
12. Pekerjaan glasblock m2 Rp 650,000.00

VII PEKERJAAN PENGECATAN


1. Pengecatan dinding
a Hanggar TPS3R m2 Rp 46,321.00
b Kantor m2 Rp 46,321.00
c WC m2 Rp 46,321.00
d Pagar m2 Rp 46,321.00
2. Pengecatan Plafond Kantor m2 Rp 46,321.00
3. Pengecatan Kusen Pintu dan Jendela m2 Rp 53,263.00
4. Pengecatan Pintu Panel
a Hanggar TPS3R m2 Rp 53,263.00
b Kantor m2 Rp 53,263.00
c WC m2 Rp 53,263.00
5. Pengecatan Rangka Jendela Kaca m2 Rp 53,263.00
HARGA
NO. JENIS PEKERJAAN SATUAN
(Rp.)
VIII PEKERJAAN SANITASI
1. Pekerjaan Septictank 2 unit
a Galian Septictank m3 Rp 105,000.00
b Pek. Urugan Pasir t=5 cm m2 Rp 222,000.00
c Pek Cor Beton K.175 tebal 10 cm m3 Rp 1,048,999.29
d Pek. Sloof 15/15
- Pek. Pembesian Kg Rp 15,124.00
- Pek. bekisting m2 Rp 223,020.00
- Pek cor beton K.175 m3 Rp 1,048,999.29
e Pek. Kolom 15/15
- Pek. Pembesian Kg Rp 15,124.00
- Pek. bekisting m2 Rp 374,310.00
- Pek cor beton K.175 m3 Rp 1,048,999.29
f Pek. Pas. Batako m2 Rp 167,865.75
g Pek. Plesteran m2 Rp 79,356.00
h Pek. Ring Balk 15/15
- Pek. Pembesian Kg Rp 15,124.00
- Pek. bekisting m2 Rp 223,020.00
- Pek cor beton K.175 m3 Rp 1,048,999.29
i Pek. Plat penutup septictank tebal 10 cm
- Pek. Pembesian Kg Rp 15,124.00
- Pek. bekisting m2 Rp 539,810.00
- Pek cor beton K.175 m3 Rp 1,048,999.29
j Pek. Tutup mainhole
- Pek. Pembesian Kg Rp 15,124.00
- Pek. bekisting m2 Rp 539,810.00
- Pek cor beton K.175 m3 Rp 1,048,999.29
k Bioseptictank Kapasitas 3000L Bh Rp 10,643,500.00
l Urugan Pasir dalam septictank m3 Rp 222,000.00
2. Pekerjaan Pipa 4" m Rp 148,872.50
3. Pekerjaan Pipa 2" m Rp 72,446.25
4. Pekerjaan Pipa 3/4" (Air Bersih) m Rp 31,635.00
5. Pek. Sumur Bor+pompa Bh Rp 2,500,000.00
6. Pekerjaan kran air Bh Rp 135,500.00
7. Pekerjaan stop kran Bh Rp 135,500.00
8. Profil tank 1200 L Bh Rp 1,600,000.00
9. Pek. Closed Duduk Bh Rp 2,542,200.00
10. Pek. Wastafel+cermin Unit Rp 1,668,200.00
11. Pek. Grill besi penutup saluran m2 Rp 340,000.00

IX PEKERJAAN JEMBATAN
1. Pekerjaan Pondasi Batu Belah m3 Rp 1,104,825.00
2. Pekerjaan Sloof 20/30
a Pek. Pembesian kg Rp 15,124.00
b Pekerjaan Bekisting Sloof m2 Rp 223,020.00
c Cor Beton k.200 m3 Rp 1,078,920.71
3. Pekerjaan Balok 20/30
a Pek. Pembesian kg Rp 15,124.00
b Pekerjaan Bekisting Balok m2 Rp 386,310.00
c Cor Beton k.200 m3 Rp 1,078,920.71
HARGA
NO. JENIS PEKERJAAN SATUAN
(Rp.)
4. Pekerjaan Plat beton
a Pek. Pembersian kg Rp 15,124.00
b Pekerjaan Bekisting Plat m2 Rp 539,810.00
c Cor Beton K200 tebal 20 cm m3 Rp 1,078,920.71
5. Pekerjaan Reling jembatan
a Pembesian Kolom 15/15 Kg Rp 15,124.00
b Pek. Bekisting Kolom m2 Rp 374,310.00
c Cor Beton k.200 m3 Rp 1,078,920.71
d Pek. Pas Batako m2 Rp 167,865.75
e Pek. Plesteran m2 Rp 79,356.00
f Pek Besi Galvanis 2" m Rp 29,916.67

X PEKERJAAN LISTRIK
1. Penyambungan Daya Baru PLN Unit Rp 4,500,000.00
2. Instalasi Titik Lampu Titik Rp 325,000.00
3. Lampu SL 18 Watt Bh Rp 35,000.00
4. Saklar Tunggal Bh Rp 20,000.00
5. Saklar Ganda Bh Rp 20,000.00
6. Pek. Pas. Panel Listrik Bh Rp 760,000.00
7. Pek. Instalasi stop kontak Titik Rp 325,000.00
8. Stop Kontak Bh Rp 20,000.00

XI PEKERJAAN LAIN-LAIN
1. Pekerjaan Pagar Besi BRC m2 Rp 320,000.00
2. Pekerjaan Pintu Pagar Besi m2 Rp 600,000.00
3. Pekerjaan Handrail difabel stainless
a Hanggar TPS3R panjang 2 m m Rp 52,000.00
b Kantor panjang 0,95 m m Rp 52,000.00
c WC Panjang 0,75 m Rp 52,000.00
d Biaya pengelasan (100% fisik) m Rp 52,000.00
4. Pekerjaan Rolling door m2 Rp 810,400.00
5. Pek. Handrail WC m Rp 52,000.00
6. Pekerjaan ukiran kayu m2 Rp 625,000.00
7. Pek. Plesteran letter timbul Paket Rp 800,000.00

XII PERALATAN TPS3R


1. Mesin Pencacah Plastik kap 400 Kg/hari Diesel 16 HP Unit Rp 36,130,000.00
2. Mesin Pencacah Kompos kapasitas 500 kg/jam Diesel 8HP Unit Rp 22,650,000.00
3. Mesin Pengayak Kapasitas 500 Kg/Jam Unit Rp 18,150,000.00

XIII KEBUTUHAN K3 DAN PROKES PENCEGAHAN COVID - 19


A KEBUTUHAN KESEHATAN DAN KESELAMATAN KERJA
1. Sosialisasi K3 dan Prokes (Spanduk) Bh Rp 75,000.00
2. Helm Keselamatan Bh Rp 100,000.00
3. Rompi Kerja Bh Rp 60,000.00
4. Sarung Tangan (Safety Glove) Bh Rp 5,000.00
5. Sepatu Keselamatan (Rubber Shoes) Bh Rp 100,000.00
6. Tali Pengaman Bh Rp 231,500.00
7. Kotak P3K Bh Rp 40,000.00
8. Asuransi Tenaga Kerja Paket Rp 912,000.00
HARGA
NO. JENIS PEKERJAAN SATUAN
(Rp.)
B KEBUTUHAN PROTOKOL KESEHATAN PENCEGAHAN 0.00 Rp -
1. Alat ukur suhu badan nir-sentuh (Thermoscan) Bh Rp 350,000.00
2. Vitamin C (1 Box isi 100 tablet) Bh Rp 25,000.00
3. Tempat Cuci Tangan Bh Rp 250,000.00
4. Sabun Cuci Tangan (Cair) 200ml/btl Bh Rp 25,000.00
5. Masker kain Bh Rp 5,000.00
6. Alat penyemprot desinfektan Bh Rp 65,000.00
7. Cairan Desinfektan 5L Bh Rp 75,000.00

XIV ADMINISTRASI KEGIATAN


1. Pelaporan KSM Ls Rp 270,000.00
2. Photo Copy / Penggandaan Ls Rp 250,000.00
3. Biaya Alat Tulis Kantor (ATK) Ls Rp 150,000.00
4. Materai Ls Rp 10,000.00
5. Pengujian Lab Bh Rp 500,000.00
6. Papan Nama Kegiatan Paket Rp 250,000.00

Diverifikasi Oleh : Dibuat Oleh :


Askot Infrastruktur, Fasilitator Teknik, UPL

Wiwit Whindari, ST. Hengky Pradana, ST Alfiansyah


RAB-5
BANTUAN PEMERINTAH UNTUK MASYARAKAT ( BPM ) DFAT
PROGRAM KOTA TANPA KUMUH (KOTAKU)
RENCANA ANGARAN BIAYA

Kab./Kota : Palangka Raya Nama Paket Pekerjaan : Pembangunan TPS3R


Kecamatan : Sebangau
Kelurahan : Kereng Bangkirai
BKM :

HARGA SATUAN JUMLAH HARGA


NO JENIS PEKERJAAN SATUANVOLUME ANALISA
(Rp) (Rp)

I PEKERJAAN PERSIAPAN
1 Pembersihan Awal m2 200.00 A.2.2.1.9 Rp 14,000.00 Rp 2,800,000.00
2 Pengukuran dan Pemasangan Bowplank m 66.00 A. 2.2.1.4. Rp 74,690.00 Rp 4,929,540.00
Jumlah I Rp 7,729,540.00
II PEKERJAAN TANAH
1 Pek urugan tanah lokasi kegiatan m3 218.55 A.2.3.1.11.a Rp 162,000.00 Rp 35,405,100.00
2 Pek. Galian Tanah Pondasi m3 11.68 A. 2.3.1.1 Rp 105,000.00 Rp 1,226,610.00
3 Pek. Urugan Bekas Galian m3 2.92 A.2.3.1.9. Rp 70,000.00 Rp 204,435.00
4 Pek. Urugan Pasir bawah lantai m3 44.84 A.2.3.1.11. Rp 222,000.00 Rp 9,953,479.89
5 Pek. Pemancangan Cerucuk Kayu Galam btg 372.00 P.07.a Rp 50,100.00 Rp 18,637,200.00
Jumlah II Rp 65,426,824.89
III PEKERJAAN BETON BERTULANG
1 Pondasi Footplat P1 (80 cm x 80 cm x 20 cm)
a Pek. Pembesian Kg 316.93 A.4.1.1.17 Rp 15,124.00 Rp 4,793,254.16
b Pek. Lantai Kerja Beton K.100 t=5 cm m3 0.67 A.4.1.1.1 Rp 954,788.57 Rp 641,617.92
c Pek. Bekisting Pondasi m2 2.24 A.4.1.1.20 Rp 220,820.00 Rp 494,636.80
d Cor Beton Mutu k.200 m3 2.69 A.4.1.1.7. Rp 1,078,920.71 Rp 2,900,138.88
2 Pondasi Footplat P2 (60 cm x 60 cm x 20 cm)
a Pek. Pembesian Kg 217.59 A.4.1.1.17 Rp 15,124.00 Rp 3,290,830.80
b Pek. Lantai Kerja Beton K.100 t=5 cm m3 0.34 A.4.1.1.1 Rp 954,788.57 Rp 326,537.69
c Pek. Bekisting Pondasi m2 1.52 A.4.1.1.20 Rp 220,820.00 Rp 335,646.40
d Cor Beton Mutu k.200 m3 1.37 A.4.1.1.7. Rp 1,078,920.71 Rp 1,475,963.54
3 Pondasi Footplat P3 (60 cm x 60 cm x 20 cm)
a Pek. Pembesian Kg 39.77 A.4.1.1.17 Rp 15,124.00 Rp 601,506.40
b Pek. Lantai Kerja Beton K.100 t=5 cm m3 0.05 A.4.1.1.1 Rp 954,788.57 Rp 45,829.85
c Pek. Bekisting Pondasi m2 1.92 A.4.1.1.20 Rp 220,820.00 Rp 423,974.40
d Cor Beton Mutu k.200 m3 0.19 A.4.1.1.7. Rp 1,078,920.71 Rp 207,152.78
4 Pek Kolom K1
a Pek. Pembesian Kg 484.00 A.4.1.1.17 Rp 15,124.00 Rp 7,320,039.11
b Pek. Bekisting Kolom m2 40.40 A.4.1.1.22 Rp 374,310.00 Rp 15,122,124.00
c Cor Beton Mutu k.200 m3 4.23 A.4.1.1.7. Rp 1,078,920.71 Rp 4,561,676.78
5 Pek Kolom K2
a Pek. Pembesian Kg 147.98 A.4.1.1.17 Rp 15,124.00 Rp 2,237,998.10
b Pek. Bekisting Kolom m2 15.43 A.4.1.1.22 Rp 374,310.00 Rp 5,775,603.30
c Cor Beton Mutu k.200 m3 1.76 A.4.1.1.7. Rp 1,078,920.71 Rp 1,895,933.43
6 Pek Kolom K3
a Pek. Pembesian Kg 66.65 A.4.1.1.17 Rp 15,124.00 Rp 1,008,025.19
b Pek. Bekisting Kolom m2 6.96 A.4.1.1.22 Rp 374,310.00 Rp 2,605,197.60
c Cor Beton Mutu k.200 m3 0.26 A.4.1.1.7. Rp 1,078,920.71 Rp 281,598.31
7 Pekerjaan Sloof 20x30
a Pek. Pembesian Kg 392.56 A.4.1.1.17 Rp 15,124.00 Rp 5,937,107.39
b Pek. Bekisting Sloof m2 11.60 A.4.1.1.21 Rp 223,020.00 Rp 2,587,032.00
c Cor Beton Mutu k.200 m3 3.48 A.4.1.1.7. Rp 1,078,920.71 Rp 3,754,644.09
8 Pekerjaan Sloof 15x20
a Pek. Pembesian Kg 302.62 A.4.1.1.17 Rp 15,124.00 Rp 4,576,861.96
b Pek. Bekisting Sloof m2 23.72 A.4.1.1.21 Rp 223,020.00 Rp 5,290,034.40
c Cor Beton Mutu k.200 m3 2.03 A.4.1.1.7. Rp 1,078,920.71 Rp 2,186,432.83
9 Pekerjaan Ring Balok 20x20
a Pek. Pembesian Kg 275.43 A.4.1.1.17 Rp 15,124.00 Rp 4,165,565.51
b Pek. Bekisting Ring Balok m2 11.60 A.4.1.1.23 Rp 386,310.00 Rp 4,481,196.00
c Cor Beton Mutu k.200 m3 2.32 A.4.1.1.7. Rp 1,078,920.71 Rp 2,503,096.06
10 Pekerjaan Balok 15x20
a Pek. Pembesian Kg 44.67 A.4.1.1.17 Rp 15,124.00 Rp 675,542.20
b Pek. Bekisting Ring Balok m2 3.36 A.4.1.1.23 Rp 386,310.00 Rp 1,298,001.60
c Cor Beton Mutu k.200 m3 0.25 A.4.1.1.7. Rp 1,078,920.71 Rp 271,888.02
11 Pekerjaan Ring Balok 15/15
a Pek. Pembesian Kg 281.95 A.4.1.1.17 Rp 15,124.00 Rp 4,264,274.02
b Pek. Bekisting Ring Balok m2 17.79 A.4.1.1.23 Rp 386,310.00 Rp 6,872,454.90
c Cor Beton Mutu k.200 m3 0.62 A.4.1.1.7. Rp 1,078,920.71 Rp 665,154.62
12 Pekerjaan lantai beton bertulang
a Pek. Pembesian Kg 1101.59 A.4.1.1.17 Rp 15,124.00 Rp 16,660,432.64
b Cor Beton Mutu k.175 m3 42.55 A.4.1.1.7. Rp 1,048,999.29 Rp 44,636,361.98
HARGA SATUAN JUMLAH HARGA
NO JENIS PEKERJAAN SATUANVOLUME ANALISA
(Rp) (Rp)
13 Pek. Plat /Dak Beton
a Pembesian Kg 36.50 A.4.1.1.17 Rp 15,124.00 Rp 551,958.70
b Pek. Bekisting m2 4.29 A.4.1.1.24 Rp 539,810.00 Rp 2,314,435.38
c Cor Beton Mutu k.200 m3 0.64 A.4.1.1.7. Rp 1,078,920.71 Rp 693,880.88
Jumlah III Rp 170,731,640.59
IV PEKERJAAN DINDING, PLESTERAN DAN KERAMIK
1 Pek. Pasangan dinding Bataco
a Bangunan Hanggar TPS3R m2 142.96 A.4.4.1.21a. Rp 167,865.75 Rp 23,998,020.47
b Kantor m2 60.60 A.4.4.1.21a. Rp 167,865.75 Rp 10,173,168.05
c WC m2 23.50 A.4.4.1.21a. Rp 167,865.75 Rp 3,945,348.72
d Pagar m2 73.61 A.4.4.1.21a. Rp 167,865.75 Rp 12,356,346.06
2 Pek. Plesteran Dinding
a Bangunan Hanggar TPS3R m2 205.28 A.4.4.2.4. Rp 79,356.00 Rp 16,290,136.20
b Kantor m2 89.03 A.4.4.2.4. Rp 79,356.00 Rp 7,065,382.10
c WC m2 38.21 A.4.4.2.4. Rp 79,356.00 Rp 3,031,875.34
d Pagar m2 93.01 A.4.4.2.4. Rp 79,356.00 Rp 7,380,822.20
3 Cor Beton Lantai Beton Mutu k.200 m3 5.04 A.4.1.1.7. Rp 1,078,920.71 Rp 5,439,098.26
4 Pek Keramik lantai Uk.40x40 m2 46.73 A.4.4.3.35.a Rp 258,950.00 Rp 12,101,354.98
5 Pek Keramik lantai WC Uk.20x20 m2 3.68 A.4.4.3.36. Rp 248,960.00 Rp 916,172.80
6 Pek Keramik dinding WC Uk.10x20 m2 8.16 A.4.4.3.53. Rp 324,677.50 Rp 2,649,368.40
7 Pek. Tawing layar m2 45.05 A.4.6.1.25.a Rp 213,650.00 Rp 9,624,932.50
Jumlah III Rp 114,972,026.08
V PEKERJAAN ATAP, PLAFOND, LISPLANK
1 Rangka Atap Baja Ringan
a Hanggar TPS3R m2 242.24 A.4.2.1.2 d Rp 139,086.67 Rp 33,691,801.24
b Kantor m2 18.63 A.4.2.1.2 d Rp 139,086.67 Rp 2,591,677.02
c WC m2 9.96 A.4.2.1.2 d Rp 139,086.67 Rp 1,385,827.29
2 Pek Atap Genteng Metal Zincalume
a Hanggar TPS3R m2 242.24 A.4.5.2.32. Rp 91,794.34 Rp 22,235,895.93
b Kantor m2 18.63 A.4.5.2.32. Rp 91,794.34 Rp 1,710,453.53
c WC m2 9.96 A.4.5.2.32. Rp 91,794.34 Rp 914,617.51
3 Pek. Lisplank Superplank Eksterior m 57.34 A.4.6.1.21.a Rp 120,641.67 Rp 6,918,162.66
4 Rangka Hollow Plafond Kantor m2 9.55 A.4.2.1.21. Rp 127,450.00 Rp 1,216,828.88
5 Pek. Pas. Plafond Kalsiboard m2 9.55 A.4.5.1.1a Rp 72,700.00 Rp 694,103.25
Jumlah IV Rp 71,359,367.32
VI PEKERJAAN PINTU, JENDELA, KUNCI & PENGGANTUNG
1 Pek. Kusen Pintu dan Jendela Kayu Klas II
a Hanggar TPS3R m3 0.12 A.4.6.1.2. Rp 8,706,500.00 Rp 1,007,342.05
b Kantor m3 0.06 A.4.6.1.2. Rp 8,706,500.00 Rp 504,977.00
c WC m3 0.02 A.4.6.1.2. Rp 8,706,500.00 Rp 182,836.50
2 Pek. Daun Pintu Panel Kayu Klas II
a Hanggar TPS3R m2 3.60 A.4.6.1.5. Rp 841,000.00 Rp 3,027,600.00
b Kantor m2 1.80 A.4.6.1.5. Rp 841,000.00 Rp 1,513,800.00
c WC m2 1.80 A.4.6.1.5. Rp 841,000.00 Rp 1,513,800.00
3 Pek. Rangka Jendela Kaca Kayu Klas II m2 2.26 A.4.6.1.6. Rp 632,800.00 Rp 1,427,596.80
4 Pek.Pemasangan Kaca Tebal 5 mm m2 7.48 A.4.6.2.17 Rp 175,650.00 Rp 1,314,213.30
5 Pek. Engsel Pintu bh 12.00 A.4.6.2.5 Rp 62,150.00 Rp 745,800.00
6 Pek. Engsel Jendela bh 12.00 A.4.6.2.6. Rp 59,100.00 Rp 709,200.00
7 Kunci Tanam bh 4.00 A.4.6.2.2. Rp 179,900.00 Rp 719,600.00
8 Hak angin Jendela bh 6.00 A.4.6.2.9. Rp 47,950.00 Rp 287,700.00
9 Gerendel Jendela bh 6.00 A.4.6.2.11. Rp 62,150.00 Rp 372,900.00
10 Handel Jendela bh 6.00 A.4.6.2.8.a Rp 35,150.00 Rp 210,900.00
11 Pekerjaan Ventilasi Kerawang m2 16.20 A. 4.4.1.23 Rp 378,475.00 Rp 6,131,295.00
12 Pekerjaan glasblock m2 8.92 Ls Rp 650,000.00 Rp 5,798,000.00
Jumlah V Rp 25,467,560.65
VII PEKERJAAN PENGECATAN
1 Pengecatan dinding
a Hanggar TPS3R m2 205.28 A.4.7.1.10. Rp 46,321.00 Rp 9,508,737.82
b Kantor m2 89.03 A.4.7.1.10. Rp 46,321.00 Rp 4,124,143.91
c WC m2 38.21 A.4.7.1.10. Rp 46,321.00 Rp 1,769,740.13
d Pagar m2 93.01 A.4.7.1.10. Rp 46,321.00 Rp 4,308,269.89
2 Pengecatan Plafond Kantor m2 9.55 A.4.7.1.10. Rp 46,321.00 Rp 442,249.75
3 Pengecatan Kusen Pintu dan Jendela m2 10.08 A.4.7.1.4. Rp 53,263.00 Rp 536,891.04
4 Pengecatan Pintu Panel
a Hanggar TPS3R m2 10.80 A.4.7.1.4. Rp 53,263.00 Rp 575,240.40
b Kantor m2 3.60 A.4.7.1.4. Rp 53,263.00 Rp 191,746.80
c WC m2 3.60 A.4.7.1.4. Rp 53,263.00 Rp 191,746.80
5 Pengecatan Rangka Jendela Kaca m2 3.20 A.4.7.1.4. Rp 53,263.00 Rp 170,441.60
Jumlah VI Rp 21,819,208.14
HARGA SATUAN JUMLAH HARGA
NO JENIS PEKERJAAN SATUANVOLUME ANALISA
(Rp) (Rp)
VIII PEKERJAAN SANITASI
1 Pekerjaan Septictank 2 unit
a Galian Septictank m3 13.88 A. 2.3.1.1 Rp 105,000.00 Rp 1,456,875.00
b Pek. Urugan Pasir t=5 cm m2 0.38 A.2.3.1.11. Rp 222,000.00 Rp 83,250.00
c Pek Cor Beton K.175 tebal 10 cm m3 0.53 A.4.1.1.5. Rp 1,048,999.29 Rp 553,871.62
d Pek. Sloof 15/15
- Pek. Pembesian Kg 56.55 A.4.1.1.17 Rp 15,124.00 Rp 855,292.45
- Pek. bekisting m2 4.80 A.4.1.1.21 Rp 223,020.00 Rp 1,070,496.00
- Pek cor beton K.175 m3 0.36 A.4.1.1.5. Rp 1,048,999.29 Rp 377,639.74
e Pek. Kolom 15/15
- Pek. Pembesian Kg 48.46 A.4.1.1.17 Rp 15,124.00 Rp 732,972.56
- Pek. bekisting m2 8.16 A.4.1.1.22 Rp 374,310.00 Rp 3,054,369.60
- Pek cor beton K.175 m3 0.31 A.4.1.1.5. Rp 1,048,999.29 Rp 320,993.78
f Pek. Pas. Batako m2 23.12 A.4.4.1.21a. Rp 167,865.75 Rp 3,881,056.14
g Pek. Plesteran m2 23.12 A.4.4.2.4. Rp 79,356.00 Rp 1,834,710.72
h Pek. Ring Balk 15/15
- Pek. Pembesian Kg 56.55 A.4.1.1.17 Rp 15,124.00 Rp 855,292.45
- Pek. bekisting m2 4.80 A.4.1.1.21 Rp 223,020.00 Rp 1,070,496.00
- Pek cor beton K.175 m3 0.36 A.4.1.1.5. Rp 1,048,999.29 Rp 377,639.74
i Pek. Plat penutup septictank tebal 10 cm
- Pek. Pembesian Kg 9.32 A.4.1.1.17 Rp 15,124.00 Rp 140,985.93
- Pek. bekisting m2 2.40 A.4.1.1.24 Rp 539,810.00 Rp 1,295,544.00
- Pek cor beton K.175 m3 0.17 A.4.1.1.5. Rp 1,048,999.29 Rp 176,231.88
j Pek. Tutup mainhole
- Pek. Pembesian Kg 6.00 A.4.1.1.17 Rp 15,124.00 Rp 90,804.50
- Pek. bekisting m2 0.84 A.4.1.1.24 Rp 539,810.00 Rp 453,440.40
- Pek cor beton K.175 m3 0.10 A.4.1.1.5. Rp 1,048,999.29 Rp 102,801.93
k Bioseptictank Kapasitas 3000L Bh 2.00 Ls Rp 10,643,500.00 Rp 21,287,000.00
l Urugan Pasir dalam septictank m3 0.34 A.2.3.1.11. Rp 222,000.00 Rp 74,592.00
2 Pekerjaan Pipa 4" m 3.50 A.5.1.1 32. Rp 148,872.50 Rp 521,053.75
3 Pekerjaan Pipa 2" m 1.93 A.5.1.1 29. Rp 72,446.25 Rp 139,821.26
4 Pekerjaan Pipa 3/4" (Air Bersih) m 36.66 A.5.1.1 26. Rp 31,635.00 Rp 1,159,739.10
5 Pek. Sumur Bor+pompa Bh 1.00 Ls Rp 2,500,000.00 Rp 2,500,000.00
6 Pekerjaan kran air Bh 2.00 A.5.1.1 19. Rp 135,500.00 Rp 271,000.00
7 Pekerjaan stop kran Bh 1.00 A.5.1.1 19.a Rp 135,500.00 Rp 135,500.00
8 Profil tank 1200 L Bh 1.00 Ls Rp 1,600,000.00 Rp 1,600,000.00
9 Pek. Closed Duduk Bh 1.00 A.5.1.1.1. Rp 2,542,200.00 Rp 2,542,200.00
10 Pek. Wastafel+cermin Unit 1.00 A.5.1.1 5. Rp 1,668,200.00 Rp 1,668,200.00
11 Pek. Grill besi penutup saluran m2 3.75 Ls Rp 340,000.00 Rp 1,275,000.00
Jumlah VII Rp 51,958,870.55
IX PEKERJAAN JEMBATAN
1 Pekerjaan Pondasi Batu Belah m3 14.67 A.3.2.1.2. Rp 1,104,825.00 Rp 16,207,782.75
2 Pekerjaan Sloof 20/30
a Pek. Pembesian kg 102.56 A.4.1.1.17 Rp 15,124.00 Rp 1,551,043.33
b Pekerjaan Bekisting Sloof m2 12.44 A.4.1.1.21 Rp 223,020.00 Rp 2,774,368.80
c Cor Beton k.200 m3 1.09 A.4.1.1.7. Rp 1,078,920.71 Rp 1,178,181.42
3 Pekerjaan Balok 20/30
a Pek. Pembesian kg 51.28 A.4.1.1.17 Rp 15,124.00 Rp 775,521.67
b Pekerjaan Bekisting Balok m2 7.28 A.4.1.1.23 Rp 386,310.00 Rp 2,812,336.80
c Cor Beton k.200 m3 0.55 A.4.1.1.7. Rp 1,078,920.71 Rp 589,090.71
4 Pekerjaan Plat beton
a Pek. Pembersian kg 250.87 A.4.1.1.17 Rp 15,124.00 Rp 3,794,191.15
b Pekerjaan Bekisting Plat m2 11.89 A.4.1.1.24 Rp 539,810.00 Rp 6,418,340.90
c Cor Beton K200 tebal 20 cm m3 4.03 A.4.1.1.7. Rp 1,078,920.71 Rp 4,345,892.64
5 Pekerjaan Reling jembatan
a Pembesian Kolom 15/15 Kg 22.59 A.4.1.1.17 Rp 15,124.00 Rp 341,620.91
b Pek. Bekisting Kolom m2 2.40 A.4.1.1.22 Rp 374,310.00 Rp 898,344.00
c Cor Beton k.200 m3 0.18 A.4.1.1.7. Rp 1,078,920.71 Rp 194,205.73
d Pek. Pas Batako m2 3.10 A.4.4.1.21a. Rp 167,865.75 Rp 520,383.83
e Pek. Plesteran m2 6.60 A.4.4.2.4. Rp 79,356.00 Rp 523,749.60
f Pek Besi Galvanis 2" m 7.40 Ls Rp 29,916.67 Rp 221,383.33
Jumlah VIII Rp 43,146,437.57
HARGA SATUAN JUMLAH HARGA
NO JENIS PEKERJAAN SATUANVOLUME ANALISA
(Rp) (Rp)
X PEKERJAAN LISTRIK
1 Penyambungan Daya Baru PLN Unit 1.00 Ls Rp 4,500,000.00 Rp 4,500,000.00
2 Instalasi Titik Lampu Titik 13.00 Ls Rp 325,000.00 Rp 4,225,000.00
3 Lampu SL 18 Watt Bh 13.00 Ls Rp 35,000.00 Rp 455,000.00
4 Saklar Tunggal Bh 4.00 Ls Rp 20,000.00 Rp 80,000.00
5 Saklar Ganda Bh 4.00 Ls Rp 20,000.00 Rp 80,000.00
6 Pek. Pas. Panel Listrik Bh 1.00 Ls Rp 760,000.00 Rp 760,000.00
7 Pek. Instalasi stop kontak Titik 6.00 Ls Rp 325,000.00 Rp 1,950,000.00
8 Stop Kontak Bh 6.00 Ls Rp 20,000.00 Rp 120,000.00
Jumlah IX Rp 12,170,000.00
XI PEKERJAAN LAIN-LAIN
1 Pekerjaan Pagar Besi BRC m2 16.30 Ls Rp 320,000.00 Rp 5,216,000.00
2 Pekerjaan Pintu Pagar Besi m2 9.45 Ls Rp 600,000.00 Rp 5,670,000.00
3 Pekerjaan Handrail difabel stainless
a Hanggar TPS3R panjang 2 m m 13.54 Ls Rp 52,000.00 Rp 704,080.00
b Kantor panjang 0,95 m m 4.75 Ls Rp 52,000.00 Rp 247,000.00
c WC Panjang 0,75 m 4.29 Ls Rp 52,000.00 Rp 223,080.00
d Biaya pengelasan (100% fisik) m 22.58 Ls Rp 52,000.00 Rp 1,174,160.00
4 Pekerjaan Rolling door m2 7.27 A.4.2.1.10 Rp 810,400.00 Rp 5,889,582.00
5 Pek. Handrail WC m 1.20 Ls Rp 52,000.00 Rp 62,400.00
6 Pekerjaan ukiran kayu m2 19.20 Ls Rp 625,000.00 Rp 12,000,000.00
7 Pek. Plesteran letter timbul Paket 1.00 Ls Rp 800,000.00 Rp 800,000.00
Jumlah IX Rp 31,986,302.00
XII PERALATAN TPS3R
1 Mesin Pencacah Plastik kap 400 Kg/hari Diesel 16 HP Unit 1.00 Ls Rp 36,130,000.00 Rp 36,130,000.00
2 Mesin Pencacah Kompos kapasitas 500 kg/jam Diesel 8HP Unit 1.00 Ls Rp 22,650,000.00 Rp 22,650,000.00
3 Mesin Pengayak Kapasitas 500 Kg/Jam Unit 1.00 Ls Rp 18,150,000.00 Rp 18,150,000.00
Jumlah IX Rp 76,930,000.00
XIII KEBUTUHAN K3 DAN PROKES PENCEGAHAN COVID - 19
A KEBUTUHAN KESEHATAN DAN KESELAMATAN KERJA
1 Sosialisasi K3 dan Prokes (Spanduk) Bh 4.00 Ls Rp 75,000.00 Rp 300,000.00
2 Helm Keselamatan Bh 21.00 Ls Rp 100,000.00 Rp 2,100,000.00
3 Rompi Kerja Bh 21.00 Ls Rp 60,000.00 Rp 1,260,000.00
4 Sarung Tangan (Safety Glove) Bh 21.00 Ls Rp 5,000.00 Rp 105,000.00
5 Sepatu Keselamatan (Rubber Shoes) Bh 21.00 Ls Rp 100,000.00 Rp 2,100,000.00
6 Tali Pengaman Bh 3.00 Ls Rp 231,500.00 Rp 694,500.00
7 Kotak P3K Bh 2.00 Ls Rp 40,000.00 Rp 80,000.00
8 Asuransi Tenaga Kerja Paket 1.00 Ls Rp 912,000.00 Rp 912,000.00
B KEBUTUHAN PROTOKOL KESEHATAN PENCEGAHAN COVID-19
1 Alat ukur suhu badan nir-sentuh (Thermoscan) Bh 2.00 Ls Rp 350,000.00 Rp 700,000.00
2 Vitamin C (1 Box isi 100 tablet) Bh 20.00 Ls Rp 25,000.00 Rp 500,000.00
3 Tempat Cuci Tangan Bh 2.00 Ls Rp 250,000.00 Rp 500,000.00
4 Sabun Cuci Tangan (Cair) 200ml/btl Bh 4.00 Ls Rp 25,000.00 Rp 100,000.00
5 Masker kain Bh 20.00 Ls Rp 5,000.00 Rp 100,000.00
6 Alat penyemprot desinfektan Bh 2.00 Ls Rp 65,000.00 Rp 130,000.00
7 Cairan Desinfektan 5L Bh 3.00 Ls Rp 75,000.00 Rp 225,000.00
Jumlah X Rp 9,806,500.00
XIV ADMINISTRASI KEGIATAN
1 Pelaporan KSM Ls 1.00 Ls Rp 270,000.00 Rp 270,000.00
2 Photo Copy / Penggandaan Ls 1.00 Ls Rp 250,000.00 Rp 250,000.00
3 Biaya Alat Tulis Kantor (ATK) Ls 1.00 Ls Rp 150,000.00 Rp 150,000.00
4 Materai Ls 8.00 Ls Rp 10,000.00 Rp 80,000.00
5 Pengujian Lab Bh 1.00 Ls Rp 500,000.00 Rp 500,000.00
6 Papan Nama Kegiatan Paket 1.00 Ls Rp 250,000.00 Rp 250,000.00
Jumlah IX Rp 1,500,000.00

TOTAL Rp 705,004,278
DIBULATKAN Rp 705,000,000

Diverifikasi Oleh : Dibuat Oleh :


Askot Infrastruktur Fasilitator Teknik, UPL

Wiwit Whindari, ST. Hengky Pradana, ST Alfiansyah


RAB-6
BANTUAN PEMERINTAH UNTUK MASYARAKAT ( BPM ) DFAT
PROGRAM KOTA TANPA KUMUH (KOTAKU)
REKAPITULASI RENCANA ANGGARAN BIAYA
Kab./Kota : Palangka Raya
Kecamatan : Sebangau
Kelurahan : Kereng Bangkirai
BKM : Kereng Membangun

JUMLAH HARGA
NO. NAMA PAKET PEKERJAAN SATUAN VOLUME
(Rp.)

01. PEKERJAAN PERSIAPANPembersihan Awal m2 200.00 Rp 2,800,000.00


Pengukuran dan Pemasangan Bowplank m 66.00 Rp 4,929,540.00
JUMLAH 7,729,540.00
02. PEKERJAAN TANAH Pek urugan tanah lokasi kegiatan m3 218.55 Rp 35,405,100.00
Pek. Galian Tanah Pondasi m3 11.68 Rp 1,226,610.00
Pek. Urugan Bekas Galian m3 2.92 Rp 204,435.00
Pek. Urugan Pasir bawah lantai m3 44.84 Rp 9,953,479.89
Pek. Pemancangan Cerucuk Kayu Galam btg 372.00 Rp 18,637,200.00
JUMLAH 65,426,824.89
03. PEKERJAAN BETON Pondasi Footplat P1 (80 cm x 80 cm x 20 cm)
BERTULANG
a Pek. Pembesian Kg 316.93 Rp 4,793,254.16
b Pek. Lantai Kerja Beton K.100 t=5 cm m3 0.67 Rp 641,617.92
c Pek. Bekisting Pondasi m2 2.24 Rp 494,636.80
d Cor Beton Mutu k.200 m3 2.69 Rp 2,900,138.88
Pondasi Footplat P2 (60 cm x 60 cm x 20 cm)
a Pek. Pembesian Kg 217.59 Rp 3,290,830.80
b Pek. Lantai Kerja Beton K.100 t=5 cm m3 0.34 Rp 326,537.69
c Pek. Bekisting Pondasi m2 1.52 Rp 335,646.40
d Cor Beton Mutu k.200 m3 1.37 Rp 1,475,963.54
Pondasi Footplat P3 (60 cm x 60 cm x 20 cm)
a Pek. Pembesian Kg 39.77 Rp 601,506.40
b Pek. Lantai Kerja Beton K.100 t=5 cm m3 0.05 Rp 45,829.85
c Pek. Bekisting Pondasi m2 1.92 Rp 423,974.40
d Cor Beton Mutu k.200 m3 0.19 Rp 207,152.78
Pek Kolom K1
a Pek. Pembesian Kg 484.00 Rp 7,320,039.11
b Pek. Bekisting Kolom m2 40.40 Rp 15,122,124.00
c Cor Beton Mutu k.200 m3 4.23 Rp 4,561,676.78
Pek Kolom K2
a Pek. Pembesian Kg 147.98 Rp 2,237,998.10
b Pek. Bekisting Kolom m2 15.43 Rp 5,775,603.30
c Cor Beton Mutu k.200 m3 1.76 Rp 1,895,933.43
Pek Kolom K3
a Pek. Pembesian Kg 66.65 Rp 1,008,025.19
b Pek. Bekisting Kolom m2 6.96 Rp 2,605,197.60
c Cor Beton Mutu k.200 m3 0.26 Rp 281,598.31
Pekerjaan Sloof 20x30
a Pek. Pembesian Kg 392.56 Rp 5,937,107.39
b Pek. Bekisting Sloof m2 11.60 Rp 2,587,032.00
c Cor Beton Mutu k.200 m3 3.48 Rp 3,754,644.09
Pekerjaan Sloof 15x20
a Pek. Pembesian Kg 302.62 Rp 4,576,861.96
b Pek. Bekisting Sloof m2 23.72 Rp 5,290,034.40
c Cor Beton Mutu k.200 m3 2.03 Rp 2,186,432.83
Pekerjaan Ring Balok 20x20
a Pek. Pembesian Kg 275.43 Rp 4,165,565.51
b Pek. Bekisting Ring Balok m2 11.60 Rp 4,481,196.00
c Cor Beton Mutu k.200 m3 2.32 Rp 2,503,096.06
Pekerjaan Balok 15x20
a Pek. Pembesian Kg 44.67 Rp 675,542.20
b Pek. Bekisting Ring Balok m2 3.36 Rp 1,298,001.60
c Cor Beton Mutu k.200 m3 0.25 Rp 271,888.02
Pekerjaan Ring Balok 15/15
a Pek. Pembesian Kg 281.95 Rp 4,264,274.02
b Pek. Bekisting Ring Balok m2 17.79 Rp 6,872,454.90
c Cor Beton Mutu k.200 m3 0.62 Rp 665,154.62
Pekerjaan lantai beton bertulang
a Pek. Pembesian Kg 1101.59 Rp 16,660,432.64
b Cor Beton Mutu k.175 m3 42.55 Rp 44,636,361.98
Pek. Plat /Dak Beton
a Pembesian Kg 36.50 Rp 551,958.70
b Pek. Bekisting m2 4.29 Rp 2,314,435.38
c Cor Beton Mutu k.200 m3 0.64 Rp 693,880.88
JUMLAH 170,731,640.59
04. PEKERJAAN DINDING, Pek. Pasangan dinding Bataco
PLESTERAN DAN
KERAMIK a Bangunan Hanggar TPS3R m2 142.96 Rp 23,998,020
b Kantor m2 60.60 Rp 10,173,168
c WC m2 23.50 Rp 3,945,349
d Pagar m2 73.61 Rp 12,356,346
Pek. Plesteran Dinding
a Bangunan Hanggar TPS3R m2 205.28 Rp 16,290,136
b Kantor m2 89.03 Rp 7,065,382
c WC m2 38.21 Rp 3,031,875
d Pagar m2 93.01 Rp 7,380,822
Cor Beton Lantai Beton Mutu k.200 m3 5.04 Rp 5,439,098
Pek Keramik lantai Uk.40x40 m2 46.73 Rp 12,101,355
Pek Keramik lantai WC Uk.20x20 m2 3.68 Rp 916,173
Pek Keramik dinding WC Uk.10x20 m2 8.16 Rp 2,649,368
Pek. Tawing layar m2 45.05 Rp 9,624,933
JUMLAH 114,972,026.08
05. PEKERJAAN ATAP, Rangka Atap Baja Ringan
PLAFOND, LISPLANK
a Hanggar TPS3R m2 242.24 Rp 33,691,801
b Kantor m2 18.63 Rp 2,591,677
c WC m2 9.96 Rp 1,385,827
Pek Atap Genteng Metal Zincalume
a Hanggar TPS3R m2 242.24 Rp 22,235,896
b Kantor m2 18.63 Rp 1,710,454
c WC m2 9.96 Rp 914,618
Pek. Lisplank Superplank Eksterior m 57.34 Rp 6,918,163
Rangka Hollow Plafond Kantor m2 9.55 Rp 1,216,829
Pek. Pas. Plafond Kalsiboard m2 9.55 Rp 694,103
JUMLAH 71,359,367.32
06. PEKERJAAN PINTU, Pek. Kusen Pintu dan Jendela Kayu Klas II
JENDELA, KUNCI &
PENGGANTUNG a Hanggar TPS3R m3 0.12 Rp 1,007,342
b Kantor m3 0.06 Rp 504,977
c WC m3 0.02 Rp 182,837
Pek. Daun Pintu Panel Kayu Klas II
a Hanggar TPS3R m2 3.60 Rp 3,027,600
b Kantor m2 1.80 Rp 1,513,800
c WC m2 1.80 Rp 1,513,800
Pek. Rangka Jendela Kaca Kayu Klas II m2 2.26 Rp 1,427,597
Pek.Pemasangan Kaca Tebal 5 mm m2 7.48 Rp 1,314,213
Pek. Engsel Pintu bh 12.00 Rp 745,800
Pek. Engsel Jendela bh 12.00 Rp 709,200
Kunci Tanam bh 4.00 Rp 719,600
Hak angin Jendela bh 6.00 Rp 287,700
Gerendel Jendela bh 6.00 Rp 372,900
Handel Jendela bh 6.00 Rp 210,900
Pekerjaan Ventilasi Kerawang m2 16.20 Rp 6,131,295
Pekerjaan glasblock m2 8.92 Rp 5,798,000
JUMLAH 25,467,560.65
07. PEKERJAAN Pengecatan dinding
PENGECATAN
a Hanggar TPS3R m2 205.28 Rp 9,508,738
b Kantor m2 89.03 Rp 4,124,144
c WC m2 38.21 Rp 1,769,740
d Pagar m2 93.01 Rp 4,308,270
Pengecatan Plafond Kantor m2 9.55 Rp 442,250
Pengecatan Kusen Pintu dan Jendela m2 10.08 Rp 536,891
Pengecatan Pintu Panel
a Hanggar TPS3R m2 10.80 Rp 575,240
b Kantor m2 3.60 Rp 191,747
c WC m2 3.60 Rp 191,747
Pengecatan Rangka Jendela Kaca m2 3.20 Rp 170,442
JUMLAH 21,819,208.14
08. PEKERJAAN SANITASI Pekerjaan Septictank 2 unit
a Galian Septictank m3 13.88 Rp 1,456,875
b Pek. Urugan Pasir t=5 cm m2 0.38 Rp 83,250
c Pek Cor Beton K.175 tebal 10 cm m3 0.53 Rp 553,872
d Pek. Sloof 15/15
- Pek. Pembesian Kg 56.55 Rp 855,292
- Pek. bekisting m2 4.80 Rp 1,070,496
- Pek cor beton K.175 m3 0.36 Rp 377,640
e Pek. Kolom 15/15
- Pek. Pembesian Kg 48.46 Rp 732,973
- Pek. bekisting m2 8.16 Rp 3,054,370
- Pek cor beton K.175 m3 0.31 Rp 320,994
f Pek. Pas. Batako m2 23.12 Rp 3,881,056
g Pek. Plesteran m2 23.12 Rp 1,834,711
h Pek. Ring Balk 15/15
- Pek. Pembesian Kg 56.55 Rp 855,292
- Pek. bekisting m2 4.80 Rp 1,070,496
- Pek cor beton K.175 m3 0.36 Rp 377,640
i Pek. Plat penutup septictank tebal 10 cm
- Pek. Pembesian Kg 9.32 Rp 140,986
- Pek. bekisting m2 2.40 Rp 1,295,544
- Pek cor beton K.175 m3 0.17 Rp 176,232
j Pek. Tutup mainhole
- Pek. Pembesian Kg 6.00 Rp 90,804
- Pek. bekisting m2 0.84 Rp 453,440
- Pek cor beton K.175 m3 0.10 Rp 102,802
k Bioseptictank Kapasitas 3000L Bh 2.00 Rp 21,287,000
l Urugan Pasir dalam septictank m3 0.34 Rp 74,592
Pekerjaan Pipa 4" m 3.50 Rp 521,054
Pekerjaan Pipa 2" m 1.93 Rp 139,821
Pekerjaan Pipa 3/4" (Air Bersih) m 36.66 Rp 1,159,739
Pek. Sumur Bor+pompa Bh 1.00 Rp 2,500,000
Pekerjaan kran air Bh 2.00 Rp 271,000
Pekerjaan stop kran Bh 1.00 Rp 135,500
Profil tank 1200 L Bh 1.00 Rp 1,600,000
Pek. Closed Duduk Bh 1.00 Rp 2,542,200
Pek. Wastafel+cermin Unit 1.00 Rp 1,668,200
Pek. Grill besi penutup saluran m2 3.75 Rp 1,275,000
JUMLAH 51,958,870.55
09. PEKERJAAN JEMBATANPekerjaan Pondasi Batu Belah m3 14.67 Rp 16,207,783
Pekerjaan Sloof 20/30
a Pek. Pembesian kg 102.5551 Rp 1,551,043
b Pekerjaan Bekisting Sloof m2 12.44 Rp 2,774,369
c Cor Beton k.200 m3 1.092 Rp 1,178,181
Pekerjaan Balok 20/30
a Pek. Pembesian kg 51.27755 Rp 775,522
b Pekerjaan Bekisting Balok m2 7.28 Rp 2,812,337
c Cor Beton k.200 m3 0.546 Rp 589,091
Pekerjaan Plat beton
a Pek. Pembersian kg 250.8722 Rp 3,794,191
b Pekerjaan Bekisting Plat m2 11.89 Rp 6,418,341
c Cor Beton K200 tebal 20 cm m3 4.028 Rp 4,345,893
Pekerjaan Reling jembatan
a Pembesian Kolom 15/15 Kg 22.588 Rp 341,621
b Pek. Bekisting Kolom m2 2.4 Rp 898,344
c Cor Beton k.200 m3 0.18 Rp 194,206
d Pek. Pas Batako m2 3.1 Rp 520,384
e Pek. Plesteran m2 6.6 Rp 523,750
f Pek Besi Galvanis 2" m 7.4 Rp 221,383
JUMLAH 43,146,437.57
10. PEKERJAAN LISTRIK Penyambungan Daya Baru PLN Unit 1 Rp 4,500,000
Instalasi Titik Lampu Titik 13 Rp 4,225,000
Lampu SL 18 Watt Bh 13 Rp 455,000
Saklar Tunggal Bh 4 Rp 80,000
Saklar Ganda Bh 4 Rp 80,000
Pek. Pas. Panel Listrik Bh 1 Rp 760,000
Pek. Instalasi stop kontak Titik 6 Rp 1,950,000
Stop Kontak Bh 6 Rp 120,000
JUMLAH 12,170,000.00
11. PEKERJAAN LAIN-LAIN Pekerjaan Pagar Besi BRC m2 16.30 Rp 5,216,000
Pekerjaan Pintu Pagar Besi m2 9.45 Rp 5,670,000
Pekerjaan Handrail difabel stainless
a Hanggar TPS3R panjang 2 m m 13.54 Rp 704,080
b Kantor panjang 0,95 m m 4.75 Rp 247,000
c WC Panjang 0,75 m 4.29 Rp 223,080
d Biaya pengelasan (100% fisik) m 22.58 Rp 1,174,160
Pekerjaan Rolling door m2 7.27 Rp 5,889,582
Pek. Handrail WC m 1.20 Rp 62,400
Pekerjaan ukiran kayu m2 19.20 Rp 12,000,000
Pek. Plesteran letter timbul Paket 1.00 Rp 800,000
JUMLAH 31,986,302.00
12. PERALATAN TPS3R Mesin Pencacah Plastik kap 400 Kg/hari Diesel 16 HP Unit 1.00 Rp 36,130,000
Mesin Pencacah Kompos kapasitas 500 kg/jam Diesel 8HP Unit 1.00 Rp 22,650,000
Mesin Pengayak Kapasitas 500 Kg/Jam Unit 1.00 Rp 18,150,000
JUMLAH 76,930,000.00
13. KEBUTUHAN K3 DAN Sosialisasi K3 dan Prokes (Spanduk) Bh 4.00 Rp 300,000
PROKES PENCEGAHAN
COVID - 19 Helm Keselamatan Bh 21.00 Rp 2,100,000
Rompi Kerja Bh 21.00 Rp 1,260,000
Sarung Tangan (Safety Glove) Bh 21.00 Rp 105,000
Sepatu Keselamatan (Rubber Shoes) Bh 21.00 Rp 2,100,000
Tali Pengaman Bh 3.00 Rp 694,500
Kotak P3K Bh 2.00 Rp 80,000
Asuransi Tenaga Kerja Paket 1.00 Rp 912,000
Alat ukur suhu badan nir-sentuh (Thermoscan) Bh 2.00 Rp 700,000
Vitamin C (1 Box isi 100 tablet) Bh 20.00 Rp 500,000
Tempat Cuci Tangan Bh 2.00 Rp 500,000
Sabun Cuci Tangan (Cair) 200ml/btl Bh 4.00 Rp 100,000
Masker kain Bh 20.00 Rp 100,000
Alat penyemprot desinfektan Bh 2.00 Rp 130,000
Cairan Desinfektan 5L Bh 3.00 Rp 225,000
JUMLAH 9,806,500.00
14. ADMINISTRASI KEGIATPelaporan KSM Ls 1.00 270,000
Photo Copy / Penggandaan Ls 1.00 250,000
Biaya Alat Tulis Kantor (ATK) Ls 1.00 150,000
Materai Ls 8.00 80,000
Pengujian Lab Bh 1.00 500,000
Papan Nama Kegiatan Paket 1.00 250,000
JUMLAH 1,500,000.00
TOTAL 705,004,277.79
PEMBULATAN 705,000,000.00

Diverifikasi Oleh : Dibuat Oleh :


Askot Infrastruktur, Fasilitator Teknik, UPL

Wiwit Whindari, ST. Hengky Pradana, ST Alfiansyah


RAB-7
BANTUAN PEMERINTAH UNTUK MASYARAKAT ( BPM ) DFAT
PROGRAM KOTA TANPA KUMUH (KOTAKU)
RINCIAN KEBUTUHAN TENAGA KERJA/BAHAN/ALAT
KEGIATAN: TPS 3R

Kab./Kota : Palangka Raya Kelurahan : Kereng Bangkirai


Kecamatan : Sebangau BKM : Kereng Membangun

HARGA SATUAN
JUMLAH BIAYA
NO. URAIAN SATUAN VOLUME (Rp.)
(Rp.)
(1) (2) (4) (5) 6 = (4) X (5)
TENAGA KERJA
1. Kepala Tukang HOK 51.00 170,000.00 8,670,000.00
2. Tukang Batu HOK 149.00 155,000.00 23,095,000.00
1. 3. Tukang Kayu HOK 132.00 150,000.00 19,800,000.00
4. Tukang Besi HOK 135.00 150,000.00 20,250,000.00
5. Tukang Cat HOK 25.00 150,000.00 3,750,000.00
6. Pekerja HOK 900.00 140,000.00 126,000,000.00
JUMLAH 201,565,000.00
BAHAN
1. Kayu balok 5/7 Klas III Batang 57.00 31,250.00 1,781,250.00
2. Paku 5 -10 cm Kg 76.00 22,000.00 1,672,000.00
3. Kayu papan 2/20 Klas III Batang 687.00 39,700.00 27,273,900.00
4. Tanah Urug m3 281.00 100,000.00 28,100,000.00
5. Pasir Urug m3 53.00 150,000.00 7,950,000.00
6. Kayu Galam ø 10-12 m Batang 195.00 35,000.00 6,825,000.00
7. Besi Beton Kg 4,528.00 12,000.00
Besi beton polos dia. 8 Batang 445.00 45,000.00 20,025,000.00
Besi beton polos dia. 10 Batang 100.00 70,000.00 7,000,000.00
Besi beton polos dia. 12 Batang 206.00 101,000.00 20,806,000.00
8. Kawat Beton Kg 70.00 25,000.00 1,750,000.00
9. Semen Portland Zak 796.00 51,000.00 40,596,000.00
10. Pasir Beton m3 34.00 180,000.00 6,120,000.00
11. Split m3 32.00 450,000.00 14,400,000.00
13. Balok Kayu Klas II uk.5/7 Batang 143.00 56,000.00 8,008,000.00
14. Dolken Kayu ø8-10 Batang 308.00 30,000.00 9,240,000.00
15. Plywood 9 mm Lembar 8.00 130,000 1,040,000.00
16. Batako Bh 4,100.00 2,800.00 11,480,000.00
17. Pasir Pasang m3 149.00 150,000.00 22,350,000.00
18. Ubin Keramik 40x40 Doz 49.00 75,000.00 3,675,000.00
19. Semen Warna Kg 48.00 5,000.00 240,000.00
20. Ubin Keramik 20x20 Doz 4.00 65,000.00 260,000.00
21. Ubin Keramik 10x20 Doz 9.00 65,400.00 588,600.00
22. Paku GRC Kg 7.00 25,000.00 175,000.00
23. Kalsiboard Tebal 9 mm Lbr 19.00 190,000.00 3,610,000.00
24. Baja Ringan 75x35x0,75 MM Batang 193.00 125,000.00 24,125,000.00
25. Baja Ringan 30x30x0,3 MM Batang 67.00 50,000.00 3,350,000.00
26. Paku Skrup Kg 1,200.00 3,500.00 4,200,000.00
27. Genteng Metal Lembar 44.00 250,000.00 11,000,000.00
28. Paku Genteng Metal Kg 54.00 35,000.00 1,890,000.00
29. Papan Plank Kalsiboard Lembar 27.00 155,000.00 4,185,000.00
HARGA SATUAN
JUMLAH BIAYA
NO. URAIAN SATUAN VOLUME (Rp.)
(Rp.)

30. Besi Hollow Plafond 1,3x3,3 Batang 6.00 15,000.00 90,000.00


32. Kalsiboard 6 mm Lbr 6.00 110,000.00 660,000.00
33. Paku Kalsiboard Kg 3.00 25,000.00 75,000.00
34. Balok kayu kelas II 5/10 untuk kusen Batang 117.00 80,000.00 9,360,000.00
35. Lem Kayu Kg 1.00 33,000.00 33,000.00
36. Papan Kayu Klas II Benuas Keping 21.00 80,000.00 1,680,000.00
37. Kaca Tebal 5 mm m2 8.30 135,000.00 1,120,500.00
38. Sealant Kg 1.00 47,500.00 47,500.00
39. Engsel pintu Bh 12.00 35,000.00 420,000.00
40. Engsel jendela Bh 12.00 41,000.00 492,000.00
2.
41. Kunci tanam biasa Bh 4.00 95,000.00 380,000.00
42. Kait angin Bh 6.00 20,800.00 124,800.00
43. Grendel/Kunci Slot Bh 6.00 35,000.00 210,000.00
44. Handel Jendela Bh 6.00 8,000.00 48,000.00
45. Roster/Kerawang Bh 195.00 25,000.00 4,875,000.00
46. Glassblock Bh 223.00 26,000.00 5,798,000.00
47. Cat tembok Pail 44.00 275,000.00 12,100,000.00
49. Cat Menie kayu Kg 3.00 60,000.00 180,000.00
50. Cat dasar Kayu Kg 5.00 60,000.00 300,000.00
51. Cat Penutup Kayu Kg 8.00 60,000.00 480,000.00
52. Kuas Bh 1.00 45,000.00 45,000.00
53. Pengencer Kg 1.00 28,100.00 28,100.00
54. Ampelas Lbr 8.00 10,000.00 80,000.00
55. Closet Duduk Bh 1.00 1,800,000.00 1,800,000.00
57. Kran air Bh 2.00 65,000.00 130,000.00
59. Stop Kran 3/4 Bh 1.00 65,000.00 65,000.00
60. Pipa PVC 4” Batang 1.00 295,000 295,000.00
62. Pipa PVC 3/4” Batang 7.00 42,000 294,000.00
64. Pipa PVC 2” Batang 1.00 127,500 127,500.00
66. Wastafel+cermin Bh 1.00 940,000.00 940,000.00
68. Bioseptictank Kapasitas 3000L Bh 2.00 10,643,500.00 21,287,000.00
69. Profil Tank 1200 L Bh 1.00 1,600,000.00 1,600,000.00
70. Sumur bor+pompa Unit 1.00 2,500,000.00 2,500,000.00
71. Grill besi penutup saluran m2 7.45 450,000.00 3,352,500.00
72. Batu belah m3 18.00 400,000.00 7,200,000.00
74. Penyambungan Daya Baru PLN Bh 1.00 4,500,000.00 4,500,000.00
75. Instalasi Titik Lampu Bh 13.00 325,000.00 4,225,000.00
76. Lampu SL 18 Watt Bh 13.00 35,000.00 455,000.00
77. Saklar Tunggal Bh 4.00 20,000.00 80,000.00
78. Saklar Ganda Bh 4.00 20,000.00 80,000.00
79. Pek. Pas Panel Listrik Ls 1.00 760,000.00 760,000.00
80. Pek. Instalasi Stop Kontak Ls 6.00 325,000.00 1,950,000.00
81. Stop Kontak Ls 6.00 20,000.00 120,000.00
82. Pagar Besi BRC m2 16.30 321,000.00 5,232,000.00
83. Pekerjaan Pintu Pagar Besi m2 9.45 500,000.00 4,725,000.00
84. Pekerjaan Handrailing difabel stainless m 22.50 52,000.00 1,170,000.00
85. Biaya pengelasan m 22.50 52,000.00 1,170,000.00
86. Pekerjaan Rolling door m2 7.27 810,400.00 5,889,582.00
87. Pek. Handrail WC m 1.20 52,000.00 62,000.00
HARGA SATUAN
JUMLAH BIAYA
NO. URAIAN SATUAN VOLUME (Rp.)
(Rp.)

88. Pekerjaan ukiran kayu m2 19.20 625,000.00 12,000,000.00


89. Pek. Plesteran letter timbul Paket 1.00 800,000.00 800,000.00

JUMLAH 415,152,232.00
ALAT
1. Mesin Pencacah Plastik kap 400 Kg/hari Diesel 16 HP Unit 1.00 36,130,000 36,130,000.00
3. 2. Mesin Pencacah Kompos kapasitas 500 kg/jam Diesel Unit 1.00 22,650,000 22,650,000.00
3. Mesin Pengayak Kapasitas 500 Kg/Jam Unit 1.00 18,150,000 18,150,000.00

JUMLAH 76,930,000
TOTAL 693,647,232
TOTAL 693,600,000
*)Rincian Kebutauhan Tenaga Kerja/bahan/alat untuk masing-masing Kegiatan
**) Mandor tidak diperhitungkan pada dana BPM, namun dapat diakomodir pada komponen swadaya

Askot Infrastruktur, Fasilitator Teknik, UPL

Wiwit Whindari, ST. Hengky Pradana, ST Alfiansyah


RAB-8
BANTUAN PEMERINTAH UNTUK MASYARAKAT ( BPM ) DFAT
PROGRAM KOTA TANPA KUMUH (KOTAKU)
REKAPITULASI RINCIAN KEBUTUHAN TENAGA KERJA / BAHAN / ALAT
PAKET : No. 3 dari 3

Kab./Kota : Palangka Raya Kelurahan : Kereng Bangkirai


Kecamatan : Sebangau BKM : Kereng Membangun

HARGA SATUAN
JUMLAH BIAYA
NO. URAIAN SATUAN VOLUME (Rp.)
(Rp.)
(1) (2) (4) (5) 6 = (4) X (5)
TENAGA KERJA
1. Kepala Tukang HOK 51.00 170,000.00 8,670,000.00
2. Tukang Batu HOK 149.00 155,000.00 23,095,000.00
1. 3. Tukang Kayu HOK 132.00 150,000.00 19,800,000.00
4. Tukang Besi HOK 135.00 150,000.00 20,250,000.00
5. Tukang Cat HOK 25.00 150,000.00 3,750,000.00
6. Pekerja HOK 900.00 140,000.00 126,000,000.00
JUMLAH 201,565,000.00
BAHAN
1. Kayu balok 5/7 Klas III Batang 57.00 31,250.00 1,781,250.00
2. Paku 5 -10 cm Kg 76.00 22,000.00 1,672,000.00
3. Kayu papan 2/20 Klas III Batang 687.00 39,700.00 27,273,900.00
4. Tanah Urug m3 281.00 100,000.00 28,100,000.00
5. Pasir Urug m3 53.00 150,000.00 7,950,000.00
6. Kayu Galam ø 10-12 m Batang 195.00 35,000.00 6,825,000.00
7. Besi Beton Kg 4,528.00 12,000.00
Besi beton polos dia. 8 Batang 445.00 45,000.00 20,025,000.00
Besi beton polos dia. 10 Batang 100.00 70,000.00 7,000,000.00
Besi beton polos dia. 12 Batang 206.00 101,000.00 20,806,000.00
8. Kawat Beton Kg 70.00 25,000.00 1,750,000.00
9. Semen Portland Zak 796.00 51,000.00 40,596,000.00
10. Pasir Beton m3 34.00 180,000.00 6,120,000.00
11. Split m3 32.00 450,000.00 14,400,000.00
13. Balok Kayu Klas II uk.5/7 Batang 143.00 56,000.00 8,008,000.00
14. Dolken Kayu ø8-10 Batang 308.00 30,000.00 9,240,000.00
15. Plywood 9 mm Lembar 8.00 130,000 1,040,000.00
16. Batako Bh 4,100.00 2,800.00 11,480,000.00
17. Pasir Pasang m3 149.00 150,000.00 22,350,000.00
18. Ubin Keramik 40x40 Doz 49.00 75,000.00 3,675,000.00
19. Semen Warna Kg 48.00 5,000.00 240,000.00
20. Ubin Keramik 20x20 Doz 4.00 65,000.00 260,000.00
21. Ubin Keramik 10x20 Doz 9.00 65,400.00 588,600.00
22. Paku GRC Kg 7.00 25,000.00 175,000.00
23. Kalsiboard Tebal 9 mm Lbr 19.00 190,000.00 3,610,000.00
24. Baja Ringan 75x35x0,75 MM Batang 193.00 125,000.00 24,125,000.00
25. Baja Ringan 30x30x0,3 MM Batang 67.00 50,000.00 3,350,000.00
26. Paku Skrup Kg 1,200.00 3,500.00 4,200,000.00
27. Genteng Metal Lembar 44.00 250,000.00 11,000,000.00
28. Paku Genteng Metal Kg 54.00 35,000.00 1,890,000.00
29. Papan Plank Kalsiboard Lembar 27.00 155,000.00 4,185,000.00
HARGA SATUAN
JUMLAH BIAYA
NO. URAIAN SATUAN VOLUME (Rp.)
(Rp.)

30. Besi Hollow Plafond 1,3x3,3 Batang 6.00 15,000.00 90,000.00


32. Kalsiboard 6 mm Lbr 6.00 110,000.00 660,000.00
33. Paku Kalsiboard Kg 3.00 25,000.00 75,000.00
34. Balok kayu kelas II 5/10 untuk kusen Batang 117.00 80,000.00 9,360,000.00
35. Lem Kayu Kg 1.00 33,000.00 33,000.00
36. Papan Kayu Klas II Benuas Keping 21.00 80,000.00 1,680,000.00
37. Kaca Tebal 5 mm m2 8.30 135,000.00 1,120,500.00
38. Sealant Kg 1.00 47,500.00 47,500.00
39. Engsel pintu Bh 12.00 35,000.00 420,000.00
40. Engsel jendela Bh 12.00 41,000.00 492,000.00
2.
41. Kunci tanam biasa Bh 4.00 95,000.00 380,000.00
42. Kait angin Bh 6.00 20,800.00 124,800.00
43. Grendel/Kunci Slot Bh 6.00 35,000.00 210,000.00
44. Handel Jendela Bh 6.00 8,000.00 48,000.00
45. Roster/Kerawang Bh 195.00 25,000.00 4,875,000.00
46. Glassblock Bh 223.00 26,000.00 5,798,000.00
47. Cat tembok Pail 44.00 275,000.00 12,100,000.00
49. Cat Menie kayu Kg 3.00 60,000.00 180,000.00
50. Cat dasar Kayu Kg 5.00 60,000.00 300,000.00
51. Cat Penutup Kayu Kg 8.00 60,000.00 480,000.00
52. Kuas Bh 1.00 45,000.00 45,000.00
53. Pengencer Kg 1.00 28,100.00 28,100.00
54. Ampelas Lbr 8.00 10,000.00 80,000.00
55. Closet Duduk Bh 1.00 1,800,000.00 1,800,000.00
57. Kran air Bh 2.00 65,000.00 130,000.00
59. Stop Kran 3/4 Bh 1.00 65,000.00 65,000.00
60. Pipa PVC 4” Batang 1.00 295,000 295,000.00
62. Pipa PVC 3/4” Batang 7.00 42,000 294,000.00
64. Pipa PVC 2” Batang 1.00 127,500 127,500.00
66. Wastafel+cermin Bh 1.00 940,000.00 940,000.00
68. Bioseptictank Kapasitas 3000L Bh 2.00 10,643,500.00 21,287,000.00
69. Profil Tank 1200 L Bh 1.00 1,600,000.00 1,600,000.00
70. Sumur bor+pompa Unit 1.00 2,500,000.00 2,500,000.00
71. Grill besi penutup saluran m2 7.45 450,000.00 3,352,500.00
72. Batu belah m3 18.00 400,000.00 7,200,000.00
74. Penyambungan Daya Baru PLN Bh 1.00 4,500,000.00 4,500,000.00
75. Instalasi Titik Lampu Bh 13.00 325,000.00 4,225,000.00
76. Lampu SL 18 Watt Bh 13.00 35,000.00 455,000.00
77. Saklar Tunggal Bh 4.00 20,000.00 80,000.00
78. Saklar Ganda Bh 4.00 20,000.00 80,000.00
79. Pek. Pas Panel Listrik Ls 1.00 760,000.00 760,000.00
80. Pek. Instalasi Stop Kontak Ls 6.00 325,000.00 1,950,000.00
81. Stop Kontak Ls 6.00 20,000.00 120,000.00
82. Pagar Besi BRC m2 16.30 321,000.00 5,232,000.00
83. Pekerjaan Pintu Pagar Besi m2 9.45 500,000.00 4,725,000.00
84. Pekerjaan Handrailing difabel stainless m 22.50 52,000.00 1,170,000.00
85. Biaya pengelasan m 22.50 52,000.00 1,170,000.00
86. Pekerjaan Rolling door m2 7.27 810,400.00 5,889,582.00
87. Pek. Handrail WC m 1.20 52,000.00 62,000.00
HARGA SATUAN
JUMLAH BIAYA
NO. URAIAN SATUAN VOLUME (Rp.)
(Rp.)

88. Pekerjaan ukiran kayu m2 19.20 625,000.00 12,000,000.00


89. Pek. Plesteran letter timbul Paket 1.00 800,000.00 800,000.00

JUMLAH 415,152,232.00
ALAT
1. Mesin Pencacah Plastik kap 400 Kg/hari Diesel 16 HP Unit 1.00 36,130,000 36,130,000.00
3. 2. Mesin Pencacah Kompos kapasitas 500 kg/jam Diesel Unit 1.00 22,650,000 22,650,000.00
3. Mesin Pengayak Kapasitas 500 Kg/Jam Unit 1.00 18,150,000 18,150,000.00

JUMLAH 76,930,000
KEBUTUHAN KESEHATAN DAN KESELAMATAN KERJA
1. Sosialisasi K3 dan Prokes (Spanduk) Bh 4.00 75,000.00 300,000.00
2. Helm Keselamatan Bh 21.00 100,000.00 2,100,000.00
3. Rompi Kerja Bh 21.00 60,000.00 1,260,000.00
4. Sarung Tangan (Safety Glove) Bh 21.00 5,000.00 105,000.00
5. Sepatu Keselamatan (Rubber Shoes) Bh 21.00 100,000.00 2,100,000.00
6. Tali Pengaman Bh 3.00 231,500.00 694,500.00
7. Kotak P3K Bh 2.00 40,000.00 80,000.00
4.
8. Asuransi Tenaga Kerja Paket 1.00 912,000.00 912,000.00
9. Alat ukur suhu badan nir-sentuh (Thermoscan) Bh 2.00 350,000.00 700,000.00
10. Vitamin C (1 Box isi 100 tablet) Bh 25.00 25,000.00 625,000.00
11. Tempat Cuci Tangan Bh 2.00 250,000.00 500,000.00
12. Sabun Cuci Tangan (Cair) 200ml/btl Bh 4.00 25,000.00 100,000.00
13. Masker kain Bh 20.00 5,000.00 100,000.00
14. Alat penyemprot desinfektan Bh 2.00 65,000.00 130,000.00
15. Cairan Desinfektan 5L Bh 3.00 75,000.00 225,000.00
JUMLAH 9,931,500
ADMINISTRASI
1. Pelaporan KSM Ls 1.00 270,000.00 270,000.00
2. Photo Copy / Penggandaan Ls 1.00 250,000.00 250,000.00
4. 3. Biaya Alat Tulis Kantor (ATK) Ls 1.00 150,000.00 150,000.00
4. Materai Ls 8.00 10,000.00 80,000.00
5. Pengujian Lab Bh 1.00 500,000.00 500,000.00
6. Papan Nama Kegiatan Paket 1.00 250,000.00 250,000.00
JUMLAH 1,500,000

TOTAL 705,078,732
TOTAL 705,000,000
*)Rincian Kebutauhan Tenaga Kerja/bahan/alat untuk masing-masing Kegiatan
**) Mandor tidak diperhitungkan pada dana BPM, namun dapat diakomodir pada komponen swadaya

Askot Infrastruktur, Fasilitator Teknik, UPL

Wiwit Whindari, ST. Hengky Pradana, ST Alfiansyah


Pekerjaan Rencana Awal

No. Uraian Pekerjaan Volume Harga Satuan

I PEKERJAAN PERSIAPAN
1 Pembersihan Awal 200.00 m2 14,000
2 Pengukuran dan Pemasangan Bowplank 66.00 m 74,690

II PEKERJAAN TANAH
1 Pek urugan tanah lokasi kegiatan 218.55 m3 162,000
2 Pek. Galian Tanah Pondasi 11.68 m3 105,000
3 Pek. Urugan Bekas Galian 2.92 m3 70,000
4 Pek. Urugan Pasir bawah lantai 44.84 m3 222,000
5 Pek. Pemancangan Cerucuk Kayu Galam 372.00 btg 50,100

III PEKERJAAN BETON BERTULANG


1 Pondasi Footplat P1 (80 cm x 80 cm x 20 cm)
a Pek. Pembesian 316.93 Kg 15,124
b Pek. Lantai Kerja Beton K.100 t=5 cm 0.67 m3 954,789
c Pek. Bekisting Pondasi 2.24 m2 220,820
d Cor Beton Mutu k.200 2.69 m3 1,078,921
2 Pondasi Footplat P2 (60 cm x 60 cm x 20 cm)
a Pek. Pembesian 217.59 Kg 15,124
b Pek. Lantai Kerja Beton K.100 t=5 cm 0.34 m3 954,789
c Pek. Bekisting Pondasi 1.52 m2 220,820
d Cor Beton Mutu k.200 1.37 m3 1,078,921
3 Pondasi Footplat P3 (60 cm x 60 cm x 20 cm)
a Pek. Pembesian 39.77 Kg 15,124
b Pek. Lantai Kerja Beton K.100 t=5 cm 0.05 m3 954,789
c Pek. Bekisting Pondasi 1.92 m2 220,820
d Cor Beton Mutu k.200 0.19 m3 1,078,921
4 Pek Kolom K1
a Pek. Pembesian 484.00 Kg 15,124
b Pek. Bekisting Kolom 40.40 m2 374,310
c Cor Beton Mutu k.200 4.23 m3 1,078,921
5 Pek Kolom K2
a Pek. Pembesian 147.98 Kg 15,124
b Pek. Bekisting Kolom 15.43 m2 374,310
c Cor Beton Mutu k.200 1.76 m3 1,078,921
6 Pek Kolom K3
a Pek. Pembesian 66.65 Kg 15,124
b Pek. Bekisting Kolom 6.96 m2 374,310
c Cor Beton Mutu k.200 0.26 m3 1,078,921
7 Pekerjaan Sloof 20x30
a Pek. Pembesian 392.56 Kg 15,124
b Pek. Bekisting Sloof 11.60 m2 223,020
c Cor Beton Mutu k.200 3.48 m3 1,078,921
8 Pekerjaan Sloof 15x20
a Pek. Pembesian 302.62 Kg 15,124
b Pek. Bekisting Sloof 23.72 m2 223,020
c Cor Beton Mutu k.200 2.03 m3 1,078,921
9 Pekerjaan Ring Balok 20x20
a Pek. Pembesian 275.43 Kg 15,124
b Pek. Bekisting Ring Balok 11.60 m2 386,310
c Cor Beton Mutu k.200 2.32 m3 1,078,921
10 Pekerjaan Balok 15x20
a Pek. Pembesian 44.67 Kg 15,124
b Pek. Bekisting Ring Balok 3.36 m2 386,310
c Cor Beton Mutu k.200 0.25 m3 1,078,921
11 Pekerjaan Ring Balok 15/15
a Pek. Pembesian 281.95 Kg 15,124
b Pek. Bekisting Ring Balok 17.79 m2 386,310
c Cor Beton Mutu k.200 0.62 m3 1,078,921
12 Pekerjaan lantai beton bertulang
a Pek. Pembesian 1101.59 Kg 15,124
b Cor Beton Mutu k.175 42.55 m3 1,048,999
13 Pek. Plat /Dak Beton
a Pembesian 36.50 Kg 15,124
b Pek. Bekisting 4.29 m2 539,810
c Cor Beton Mutu k.200 0.64 m3 1,078,921

IV PEKERJAAN DINDING, PLESTERAN DAN KERAMIK


1 Pek. Pasangan dinding Bataco
a Bangunan Hanggar TPS3R 142.96 m2 167,866
b Kantor 60.60 m2 167,866
c WC 23.50 m2 167,866
d Pagar 73.61 m2 167,866
2 Pek. Plesteran Dinding
a Bangunan Hanggar TPS3R 205.28 m2 79,356
b Kantor 89.03 m2 79,356
c WC 38.21 m2 79,356
d Pagar 93.01 m2 79,356
3 Cor Beton Lantai Beton Mutu k.200 5.04 m3 1,078,921
4 Pek Keramik lantai Uk.40x40 46.73 m2 258,950
5 Pek Keramik lantai WC Uk.20x20 3.68 m2 248,960
6 Pek Keramik dinding WC Uk.10x20 8.16 m2 324,678
7 Pek. Tawing layar 45.05 m2 213,650
V PEKERJAAN ATAP, PLAFOND, LISPLANK
1 Rangka Atap Baja Ringan
a Hanggar TPS3R 242.24 m2 139,087
b Kantor 18.63 m2 139,087
c WC 9.96 m2 139,087
2 Pek Atap Genteng Metal Zincalume
a Hanggar TPS3R 242.24 m2 91,794
b Kantor 18.63 m2 91,794
c WC 9.96 m2 91,794
3 Pek. Lisplank Superplank Eksterior 57.34 m 120,642
4 Rangka Hollow Plafond Kantor 9.55 m2 127,450
5 Pek. Pas. Plafond Kalsiboard 9.55 m2 72,700

VI PEKERJAAN PINTU, JENDELA, KUNCI & PENGGANTUNG


1 Pek. Kusen Pintu dan Jendela Kayu Klas II
a Hanggar TPS3R 0.12 m3 8,706,500
b Kantor 0.06 m3 8,706,500
c WC 0.02 m3 8,706,500
2 Pek. Daun Pintu Panel Kayu Klas II
a Hanggar TPS3R 3.60 m2 841,000
b Kantor 1.80 m2 841,000
c WC 1.80 m2 841,000
3 Pek. Rangka Jendela Kaca Kayu Klas II 2.26 m2 632,800
4 Pek.Pemasangan Kaca Tebal 5 mm 7.48 m2 175,650
5 Pek. Engsel Pintu 12.00 bh 62,150
6 Pek. Engsel Jendela 12.00 bh 59,100
7 Kunci Tanam 4.00 bh 179,900
8 Hak angin Jendela 6.00 bh 47,950
9 Gerendel Jendela 6.00 bh 62,150
10 Handel Jendela 6.00 bh 35,150
11 Pekerjaan Ventilasi Kerawang 16.20 m2 378,475
12 Pekerjaan glasblock 8.92 m2 650,000

VII PEKERJAAN PENGECATAN


1 Pengecatan dinding
a Hanggar TPS3R 205.28 m2 46,321
b Kantor 89.03 m2 46,321
c WC 38.21 m2 46,321
d Pagar 93.01 m2 46,321
2 Pengecatan Plafond Kantor 9.55 m2 46,321
3 Pengecatan Kusen Pintu dan Jendela 10.08 m2 53,263
4 Pengecatan Pintu Panel
a Hanggar TPS3R 10.80 m2 53,263
b Kantor 3.60 m2 53,263
c WC 3.60 m2 53,263
5 Pengecatan Rangka Jendela Kaca 3.20 m2 53,263
VIII PEKERJAAN SANITASI
1 Pekerjaan Septictank 2 unit
a Galian Septictank 13.88 m3 105,000
b Pek. Urugan Pasir t=5 cm 0.38 m2 222,000
c Pek Cor Beton K.175 tebal 10 cm 0.53 m3 1,048,999
d Pek. Sloof 15/15
- Pek. Pembesian 56.55 Kg 15,124
- Pek. bekisting 4.80 m2 223,020
- Pek cor beton K.175 0.36 m3 1,048,999
e Pek. Kolom 15/15
- Pek. Pembesian 48.46 Kg 15,124
- Pek. bekisting 8.16 m2 374,310
- Pek cor beton K.175 0.31 m3 1,048,999
f Pek. Pas. Batako 23.12 m2 167,866
g Pek. Plesteran 23.12 m2 79,356
h Pek. Ring Balk 15/15
0 - Pek. Pembesian 56.55 Kg 15,124
0 - Pek. bekisting 4.80 m2 223,020
0 - Pek cor beton K.175 0.36 m3 1,048,999
i Pek. Plat penutup septictank tebal 10 cm
0 - Pek. Pembesian 9.32 Kg 15,124
0 - Pek. bekisting 2.40 m2 539,810
0 - Pek cor beton K.175 0.17 m3 1,048,999
j Pek. Tutup mainhole
0 - Pek. Pembesian 6.00 Kg 15,124
0 - Pek. bekisting 0.84 m2 539,810
0 - Pek cor beton K.175 0.10 m3 1,048,999
k Bioseptictank Kapasitas 3000L 2.00 Bh 10,643,500
l Urugan Pasir dalam septictank 0.34 m3 222,000
2 Pekerjaan Pipa 4" 3.50 m 148,873
3 Pekerjaan Pipa 2" 1.93 m 72,446
4 Pekerjaan Pipa 3/4" (Air Bersih) 36.66 m 31,635
5 Pek. Sumur Bor+pompa 1.00 Bh 2,500,000
6 Pekerjaan kran air 2.00 Bh 135,500
7 Pekerjaan stop kran 1.00 Bh 135,500
8 Profil tank 1200 L 1.00 Bh 1,600,000
9 Pek. Closed Duduk 1.00 Bh 2,542,200
10 Pek. Wastafel+cermin 1.00 Unit 1,668,200
11 Pek. Grill besi penutup saluran 3.75 m2 340,000

IX PEKERJAAN JEMBATAN
1 Pekerjaan Pondasi Batu Belah 14.67 m3 1,104,825
2 Pekerjaan Sloof 20/30
a Pek. Pembesian 102.56 kg 15,124
b Pekerjaan Bekisting Sloof 12.44 m2 223,020
c Cor Beton k.200 1.09 m3 1,078,921
3 Pekerjaan Balok 20/30
a Pek. Pembesian 51.28 kg 15,124
b Pekerjaan Bekisting Balok 7.28 m2 386,310
c Cor Beton k.200 0.55 m3 1,078,921
4 Pekerjaan Plat beton
a Pek. Pembersian 250.87 kg 15,124
b Pekerjaan Bekisting Plat 11.89 m2 539,810
c Cor Beton K200 tebal 20 cm 4.03 m3 1,078,921
5 Pekerjaan Reling jembatan
a Pembesian Kolom 15/15 22.59 Kg 15,124
b Pek. Bekisting Kolom 2.40 m2 374,310
c Cor Beton k.200 0.18 m3 1,078,921
d Pek. Pas Batako 3.10 m2 167,866
e Pek. Plesteran 6.60 m2 79,356
f Pek Besi Galvanis 2" 7.40 m 29,917

X PEKERJAAN LISTRIK
1 Penyambungan Daya Baru PLN 1.00 Unit 4,500,000
2 Instalasi Titik Lampu 13.00 Titik 325,000
3 Lampu SL 18 Watt 13.00 Bh 35,000
4 Saklar Tunggal 4.00 Bh 20,000
5 Saklar Ganda 4.00 Bh 20,000
6 Pek. Pas. Panel Listrik 1.00 Bh 760,000
7 Pek. Instalasi stop kontak 6.00 Titik 325,000
8 Stop Kontak 6.00 Bh 20,000

XI PEKERJAAN LAIN-LAIN
1 Pekerjaan Pagar Besi BRC 16.30 m2 320,000
2 Pekerjaan Pintu Pagar Besi 9.45 m2 600,000
3 Pekerjaan Handrail difabel stainless
a Hanggar TPS3R panjang 2 m 13.54 m 52,000
b Kantor panjang 0,95 m 4.75 m 52,000
c WC Panjang 0,75 4.29 m 52,000
d Biaya pengelasan (100% fisik) 22.58 m 52,000
4 Pekerjaan Rolling door 7.27 m2 810,400
5 Pek. Handrail WC 1.20 m 52,000
6 Pekerjaan ukiran kayu 19.20 m2 625,000
7 Pek. Plesteran letter timbul 1.00 Paket 800,000

XII PERALATAN TPS3R


1 Mesin Pencacah Plastik kap 400 Kg/hari Diesel 16 HP 1.00 Unit 36,130,000
2 Mesin Pencacah Kompos kapasitas 500 kg/jam Diesel 1.00 Unit 22,650,000
3 Mesin Pengayak Kapasitas 500 Kg/Jam 1.00 Unit 18,150,000

XIII KEBUTUHAN K3 DAN PROKES PENCEGAHAN COVID - 19


A KEBUTUHAN KESEHATAN DAN KESELAMATAN KERJA
1 Sosialisasi K3 dan Prokes (Spanduk) 4.00 Bh 75,000
2 Helm Keselamatan 21.00 Bh 100,000
3 Rompi Kerja 21.00 Bh 60,000
4 Sarung Tangan (Safety Glove) 21.00 Bh 5,000
5 Sepatu Keselamatan (Rubber Shoes) 21.00 Bh 100,000
6 Tali Pengaman 3.00 Bh 231,500
7 Kotak P3K 2.00 Bh 40,000
8 Asuransi Tenaga Kerja 1.00 Paket 912,000
B KEBUTUHAN PROTOKOL KESEHATAN PENCEGAHAN COVID-19
1 Alat ukur suhu badan nir-sentuh (Thermoscan) 2.00 Bh 350,000
2 Vitamin C (1 Box isi 100 tablet) 20.00 Bh 25,000
3 Tempat Cuci Tangan 2.00 Bh 250,000
4 Sabun Cuci Tangan (Cair) 200ml/btl 4.00 Bh 25,000
5 Masker kain 20.00 Bh 5,000
6 Alat penyemprot desinfektan 2.00 Bh 65,000
7 Cairan Desinfektan 5L 3.00 Bh 75,000

XIV ADMINISTRASI KEGIATAN


1 Pelaporan KSM 1.00 Ls 270,000
2 Photo Copy / Penggandaan 1.00 Ls 250,000
3 Biaya Alat Tulis Kantor (ATK) 1.00 Ls 150,000
4 Materai 8.00 Ls 10,000
5 Pengujian Lab 1.00 Bh 500,000
6 Papan Nama Kegiatan 1.00 Paket 250,000

TOTAL

DIBULATKAN
Pekerjaan Tambah Kurang

Jumlah Harga No. Uraian Pekerjaan Volume Harga Satuan

I PEKERJAAN PERSIAPAN
2,800,000 1 Pembersihan Awal 200.00 m2 14,000
4,929,540 2 Pengukuran dan Pemasangan Bowplank 66.00 m 74,690

II PEKERJAAN TANAH
35,405,100 1 Pek urugan tanah lokasi kegiatan 218.55 m3 162,000
1,226,610 2 Pek. Galian Tanah Pondasi 11.68 m3 105,000
204,435 3 Pek. Urugan Bekas Galian 2.92 m3 70,000
9,953,480 4 Pek. Urugan Pasir bawah lantai 45.49 m3 222,000
18,637,200 5 Pek. Pemancangan Cerucuk Kayu Galam (p. 2m) 372.00 Btg 50,100

III PEKERJAAN BETON BERTULANG


1 Pondasi Footplat P1 (80 cm x 80 cm x 20 cm)
4,793,254 a Pek. Pembesian 318.33 Kg 15,124
641,618 b Pek. Lantai Kerja Beton K.100 t=5 cm 0.67 m3 954,789
494,637 c Pek. Bekisting Pondasi 2.24 m2 220,820
2,900,139 d Cor Beton Mutu K.200 2.69 m3 1,078,921
2 Pondasi Footplat P2 (60 cm x 60 cm x 20 cm)
3,290,831 a Pek. Pembesian 218.55 Kg 15,124
326,538 b Pek. Lantai Kerja Beton K.100 t=5 cm 0.34 m3 954,789
335,646 c Pek. Bekisting Pondasi 1.52 m2 220,820
1,475,964 d Cor Beton Mutu K.200 1.37 m3 1,078,921
3 Pondasi Footplat P3 (120 cm x 80 cm x 20 cm)
601,506 a Pek. Pembesian 39.95 Kg 15,124
45,830 b Pek. Lantai Kerja Beton K.100 t=5 cm 0.05 m3 954,789
423,974 c Pek. Bekisting Pondasi 1.92 m2 220,820
207,153 d Cor Beton Mutu K.200 0.19 m3 1,078,921
4 Pek Kolom K1
7,320,039 a Pek. Pembesian 485.65 Kg 15,124
15,122,124 b Pek. Bekisting Kolom 40.40 m2 374,310
4,561,677 c Cor Beton Mutu K.200 4.23 m3 1,078,921
5 Pek Kolom K2
2,237,998 a Pek. Pembesian 148.41 Kg 15,124
5,775,603 b Pek. Bekisting Kolom 15.43 m2 374,310
1,895,933 c Cor Beton Mutu K.200 1.76 m3 1,078,921
6 Pek Kolom K3
1,008,025 a Pek. Pembesian 66.62 Kg 15,124
2,605,198 b Pek. Bekisting Kolom 6.96 m2 374,310
281,598 c Cor Beton Mutu K.200 0.26 m3 1,078,921
7 Pekerjaan Sloof 20x30
5,937,107 a Pek. Pembesian 393.92 Kg 15,124
2,587,032 b Pek. Bekisting Sloof 11.60 m2 223,020
3,754,644 c Cor Beton Mutu K.200 3.48 m3 1,078,921
8 Pekerjaan Sloof 15x20
4,576,862 a Pek. Pembesian 303.68 Kg 15,124
5,290,034 b Pek. Bekisting Sloof 23.72 m2 223,020
2,186,433 c Cor Beton Mutu K.200 2.03 m3 1,078,921
9 Pekerjaan Ring Balok 20x20
4,165,566 a Pek. Pembesian 275.43 Kg 15,124
4,481,196 b Pek. Bekisting Ring Balok 11.60 m2 386,310
2,503,096 c Cor Beton Mutu K.200 2.32 m3 1,078,921
10 Pekerjaan Balok 15x20
675,542 a Pek. Pembesian 44.67 Kg 15,124
1,298,002 b Pek. Bekisting Ring Balok 3.36 m2 386,310
271,888 c Cor Beton Mutu K.200 0.25 m3 1,078,921
11 Pekerjaan Ring Balok 15/15
4,264,274 a Pek. Pembesian 282.53 Kg 15,124
6,872,455 b Pek. Bekisting Ring Balok 17.79 m2 386,310
665,155 c Cor Beton Mutu K.200 0.62 m3 1,078,921
12 Pekerjaan lantai beton bertulang
16,660,433 a Pek. Pembesian 1053.65 Kg 15,124
44,636,362 b Cor Beton Mutu K.175 48.72 m3 1,048,999
13 Pek. Plat /Dak Beton
551,959 a Pembesian 36.50 Kg 15,124
2,314,435 b Pek. Bekisting 4.29 m2 539,810
693,881 c Cor Beton Mutu K.200 0.64 m3 1,078,921

IV PEKERJAAN DINDING, PLESTERAN DAN KERAMIK


1 Pek. Pasangan dinding Bataco
23,998,020 a Bangunan Hanggar TPS3R 142.96 m2 167,866
10,173,168 b Kantor 60.60 m2 167,866
3,945,349 c WC 23.50 m2 167,866
12,356,346 d Pagar 73.61 m2 167,866
2 Pek. Plesteran Dinding
16,290,136 a Bangunan Hanggar TPS3R 205.28 m2 79,356
7,065,382 b Kantor 89.03 m2 79,356
3,031,875 c WC 38.21 m2 79,356
7,380,822 d Pagar 93.01 m2 79,356
5,439,098 3 Cor Beton Lantai Beton Mutu K.200 5.04 m3 1,078,921
12,101,355 4 Pek Keramik lantai Uk.40x40 46.21 m2 258,950
916,173 5 Pek Keramik lantai WC Uk.20x20 3.68 m2 248,960
2,649,368 6 Pek Keramik dinding WC Uk.10x20 8.16 m2 324,678
9,624,933 7 Pek. Dinding Tawing layar 64.20 m2 213,650
V PEKERJAAN ATAP, PLAFOND, LISPLANK
1 Rangka Atap Baja Ringan
33,691,801 a Hanggar TPS3R 242.24 m2 139,087
2,591,677 b Kantor 18.63 m2 139,087
1,385,827 c WC 9.96 m2 139,087
2 Pek Atap Genteng Metal Zincalume
22,235,896 a Hanggar TPS3R 242.24 m2 91,794
1,710,454 b Kantor 18.63 m2 91,794
914,618 c WC 9.96 m2 91,794
6,918,163 3 Pek. Lisplank Superplank Eksterior 57.34 m 120,642
1,216,829 4 Rangka Hollow Plafond Kantor 9.55 m2 127,450
694,103 5 Pek. Pas. Plafond Kalsiboard 9.55 m2 72,700

VI PEKERJAAN PINTU, JENDELA, KUNCI & PENGGANTUNG


1 Pek. Kusen Pintu dan Jendela Kayu Klas II
1,007,342 a Hanggar TPS3R 0.12 m3 8,706,500
504,977 b Kantor 0.06 m3 8,706,500
182,837 c WC 0.02 m3 8,706,500
2 Pek. Daun Pintu Panel Kayu Klas II
3,027,600 a Hanggar TPS3R 3.60 m2 841,000
1,513,800 b Kantor 1.80 m2 841,000
1,513,800 c WC 1.80 m2 841,000
1,427,597 3 Pek. Rangka Jendela Kaca Kayu Klas II 2.26 m2 632,800
1,314,213 4 Pek.Pemasangan Kaca Tebal 5 mm 7.48 m2 175,650
745,800 5 Pek. Engsel Pintu 12.00 bh 62,150
709,200 6 Pek. Engsel Jendela 12.00 bh 59,100
719,600 7 Kunci Tanam 4.00 bh 179,900
287,700 8 Hak angin Jendela 6.00 bh 47,950
372,900 9 Gerendel Jendela 6.00 bh 62,150
210,900 10 Handel Jendela 6.00 bh 35,150
6,131,295 11 Pekerjaan Ventilasi Kerawang 16.20 m2 378,475
5,798,000 12 Pekerjaan glasblock 8.92 m2 650,000

VII PEKERJAAN PENGECATAN


1 Pengecatan dinding
9,508,738 a Hanggar TPS3R 205.28 m2 46,321
4,124,144 b Kantor 89.03 m2 46,321
1,769,740 c WC 38.21 m2 46,321
4,308,270 d Pagar 93.01 m2 46,321
442,250 2 Pengecatan Plafond Kantor 9.55 m2 46,321
536,891 3 Pengecatan Kusen Pintu dan Jendela 10.08 m2 53,263
4 Pengecatan Pintu Panel
575,240 a Hanggar TPS3R 10.80 m2 53,263
191,747 b Kantor 3.60 m2 53,263
191,747 c WC 3.60 m2 53,263
170,442 5 Pengecatan Rangka Jendela Kaca 3.20 m2 53,263
VIII PEKERJAAN SANITASI
1 Pekerjaan Septictank 1 unit
1,456,875 a Galian Septictank 6.94 m3 105,000
83,250 b Pek. Urugan Pasir t=5 cm 0.19 m2 222,000
553,872 c Pek Cor Beton K.175 tebal 10 cm 0.26 m3 1,048,999
d Pek. Sloof 15/15
855,292 - Pek. Pembesian 26.06 Kg 15,124
1,070,496 - Pek. bekisting 2.40 m2 223,020
377,640 - Pek cor beton K.175 0.18 m3 1,048,999
e Pek. Kolom 15/15
732,973 - Pek. Pembesian 24.23 Kg 15,124
3,054,370 - Pek. bekisting 4.08 m2 374,310
320,994 - Pek cor beton K.175 0.15 m3 1,048,999
3,881,056 f Pek. Pas. Batako 11.56 m2 167,866
1,834,711 g Pek. Plesteran 11.56 m2 79,356
h Pek. Ring Balk 15/15
855,292 - Pek. Pembesian 28.28 Kg 15,124
1,070,496 - Pek. bekisting 2.40 m2 223,020
377,640 - Pek cor beton K.175 0.18 m3 1,048,999
i Pek. Plat penutup septictank tebal 10 cm
140,986 - Pek. Pembesian 4.66 Kg 15,124
1,295,544 - Pek. bekisting 1.20 m2 539,810
176,232 - Pek cor beton K.175 0.17 m3 1,048,999
j Pek. Tutup mainhole
90,804 - Pek. Pembesian 3.00 Kg 15,124
453,440 - Pek. bekisting 0.42 m2 539,810
102,802 - Pek cor beton K.175 0.05 m3 1,048,999
21,287,000 k Bioseptictank Kapasitas 3000L 1.00 Bh 12,287,000
74,592 l Urugan Pasir dalam septictank 0.34 m3 222,000
521,054 2 Pekerjaan Pipa 4" 3.50 m 148,873
139,821 3 Pekerjaan Pipa 2" 1.93 m 72,446
1,159,739 4 Pekerjaan Pipa 3/4" (Air Bersih) 36.66 m 31,635
2,500,000 5 Pek. Sumur Bor+pompa 1.00 Bh 2,500,000
271,000 6 Pekerjaan kran air 2.00 Bh 135,500
135,500 7 Pekerjaan stop kran 1.00 Bh 135,500
1,600,000 8 Profil tank 1200 L 1.00 Bh 1,600,000
2,542,200 9 Pek. Closed Duduk 1.00 Bh 2,542,200
1,668,200 10 Pek. Wastafel+cermin 1.00 Unit 1,668,200
1,275,000 11 Pek. Grill besi penutup saluran 37.50 m 89,400
12 Pek. Bak air lindi & resapan 1.00 unit 1,360,000

IX PEKERJAAN JEMBATAN
16,207,783 1 Pekerjaan Pondasi Batu Belah 19.18 m3 1,104,825
2 Pekerjaan Sloof 20/30
1,551,043 a Pek. Pembesian 102.56 kg 15,124
2,774,369 b Pekerjaan Bekisting Sloof 12.44 m2 223,020
1,178,181 c Cor Beton K.200 1.09 m3 1,078,921
3 Pekerjaan Balok 20/30
775,522 a Pek. Pembesian 51.28 kg 15,124
2,812,337 b Pekerjaan Bekisting Balok 7.28 m2 386,310
589,091 c Cor Beton K.200 0.55 m3 1,078,921
4 Pekerjaan Plat beton
3,794,191 a Pek. Pembersian 250.87 kg 15,124
6,418,341 b Pekerjaan Bekisting Plat 11.89 m2 539,810
4,345,893 c Cor Beton K200 tebal 20 cm 4.03 m3 1,078,921
5 Pekerjaan Reling jembatan
341,621 a Pembesian Kolom 15/15 22.59 Kg 15,124
898,344 b Pek. Bekisting Kolom 2.40 m2 374,310
194,206 c Cor Beton K.200 0.18 m3 1,078,921
520,384 d Pek. Pas Batako 3.10 m2 167,866
523,750 e Pek. Plesteran 6.60 m2 79,356
221,383 f Pek Besi Galvanis 2" 0.00 m 29,917

X PEKERJAAN LISTRIK
4,500,000 1 Penyambungan Daya Baru PLN 1.00 Unit 4,500,000
4,225,000 2 Instalasi Titik Lampu 13.00 Titik 325,000
455,000 3 Lampu SL 18 Watt 13.00 Bh 35,000
80,000 4 Saklar Tunggal 4.00 Bh 20,000
80,000 5 Saklar Ganda 4.00 Bh 20,000
760,000 6 Pek. Pas. Panel Listrik 1.00 Bh 760,000
1,950,000 7 Pek. Instalasi stop kontak 6.00 Titik 325,000
120,000 8 Stop Kontak 6.00 Bh 20,000

XI PEKERJAAN LAIN-LAIN
5,216,000 1 Pekerjaan Pagar Besi BRC 16.30 m2 320,000
5,670,000 2 Pekerjaan Pintu Pagar Besi 9.45 m2 600,000
3 Pekerjaan Handrail difabel stainless
704,080 a Hanggar TPS3R panjang 2 m 13.54 m 52,000
247,000 b Kantor panjang 0,95 m 4.75 m 52,000
223,080 c WC Panjang 0,75 4.29 m 52,000
1,174,160 d Biaya pengelasan & pemasangan (100% fisik) 22.58 m 52,000
5,889,582 4 Pekerjaan Rolling door 7.27 m2 810,400
62,400 5 Pek. Handrail closet 1.20 m 52,000
12,000,000 6 Pekerjaan ukiran kayu 19.20 m2 625,000
800,000 7 Pek. Plesteran letter timbul 1.00 Paket 830,000

XII PERALATAN TPS3R


36,130,000 1 Mesin Pencacah Plastik kap 400 Kg/hari Diesel 16 HP 1.00 Unit 36,130,000
22,650,000 2 Mesin Pencacah Kompos kapasitas 500 kg/jam Diese 1.00 Unit 22,650,000
18,150,000 3 Mesin Pengayak Kapasitas 500 Kg/Jam 1.00 Unit 18,150,000

XIII KEBUTUHAN K3 DAN PROKES PENCEGAHAN COVID - 19


A KEBUTUHAN KESEHATAN DAN KESELAMATAN KERJA
300,000 1 Sosialisasi K3 dan Prokes (Spanduk) 4.00 Bh 75,000
2,100,000 2 Helm Keselamatan 21.00 Bh 100,000
1,260,000 3 Rompi Kerja 21.00 Bh 60,000
105,000 4 Sarung Tangan (Safety Glove) 21.00 Bh 5,000
2,100,000 5 Sepatu Keselamatan (Rubber Shoes) 21.00 Bh 100,000
694,500 6 Tali Pengaman 3.00 Bh 231,500
80,000 7 Kotak P3K 2.00 Bh 40,000
912,000 8 Asuransi Tenaga Kerja 1.00 Paket 912,000
B KEBUTUHAN PROTOKOL KESEHATAN PENCEGAHAN COVID-19
700,000 1 Alat ukur suhu badan nir-sentuh (Thermoscan) 2.00 Bh 350,000
500,000 2 Vitamin C (1 Box isi 100 tablet) 25.00 Bh 25,000
500,000 3 Tempat Cuci Tangan 2.00 Bh 250,000
100,000 4 Sabun Cuci Tangan (Cair) 200ml/btl 4.00 Bh 25,000
100,000 5 Masker kain 25.00 Bh 5,000
130,000 6 Alat penyemprot desinfektan 2.00 Bh 65,000
225,000 7 Cairan Desinfektan 5L 3.00 Bh 75,000

XIV ADMINISTRASI KEGIATAN


270,000 1 Pelaporan KSM 1.00 Ls 270,000
250,000 2 Photo Copy / Penggandaan 1.00 Ls 250,000
150,000 3 Biaya Alat Tulis Kantor (ATK) 1.00 Ls 150,000
80,000 4 Materai 8.00 Ls 10,000
500,000 5 Pengujian Lab 1.00 Bh 500,000
250,000 6 Papan Nama Kegiatan 1.00 Paket 250,000

705,004,278 TOTAL

705,000,000 DIBULATKAN
Pekerjaan tambah
Jumlah Harga kurang

2,800,000 - 1
4,929,540 - 1

35,405,100 - 1
1,226,610 - 1
204,435 - 1
10,099,672 146,193 1
18,637,200 - 1

4,814,347 21,093 1
641,618 - 1
494,637 - 1
2,900,139 - 1

3,305,312 14,482 1
326,538 - 1
335,646 - 1
1,475,964 - 1

604,153 2,647 1
45,830 - 1
423,974 - 1
207,153 - 1

7,345,020 24,981 1
15,122,124 - 1
4,561,677 - 1

2,244,497 6,499 1
5,775,603 - 1
1,895,933 - 1
1,007,557 (468) 1
2,605,198 - 1
281,598 - 1

5,957,669 20,561 1
2,587,032 - 1
3,754,644 - 1

4,592,827 15,965 1
5,290,034 - 1
2,186,433 - 1

4,165,566 - 1
4,481,196 - 1
2,503,096 - 1

675,542 - 1
1,298,002 - 1
271,888 - 1

4,272,924 8,650 1
6,872,455 - 1
665,155 - 1

15,935,374 (725,058) 1
51,102,918 6,466,556 1
1
551,959 - 1
2,314,435 - 1
693,881 - 1

23,998,020 - 1
10,173,168 - 1
3,945,349 - 1
12,356,346 - 1

16,290,136 - 1
7,065,382 - 1
3,031,875 - 1
7,380,822 - 1
5,439,098 - 1
11,964,785 (136,570) 1
916,173 - 1
2,649,368 - 1
13,716,330 4,091,398 1
33,691,801 - 1
2,591,677 - 1
1,385,827 - 1

22,235,896 - 1
1,710,454 - 1
914,618 - 1
6,918,163 - 1
1,216,829 - 1
694,103 - 1

1,007,342 - 1
504,977 - 1
182,837 - 1

3,027,600 - 1
1,513,800 - 1
1,513,800 - 1
1,427,597 - 1
1,314,213 - 1
745,800 - 1
709,200 - 1
719,600 - 1
287,700 - 1
372,900 - 1
210,900 - 1
6,131,295 - 1
5,798,000 - 1

9,508,738 - 1
4,124,144 - 1
1,769,740 - 1
4,308,270 - 1
442,250 - 1
536,891 - 1

575,240 - 1
191,747 - 1
191,747 - 1
170,442 - 1
728,438 (728,438) 1
41,625 (41,625) 1
276,936 (276,936) 1

394,192 (461,101) 1
535,248 (535,248) 1
188,820 (188,820) 1

366,486 (366,486) 1
1,527,185 (1,527,185) 1
160,497 (160,497) 1
1,940,528 (1,940,528) 1
917,355 (917,355) 1

427,646 (427,646) 1
535,248 (535,248) 1
188,820 (188,820) 1

70,493 (70,493) 1
647,772 (647,772) 1
176,232 - 1

45,402 (45,402) 1
226,720 (226,720) 1
51,401 (51,401) 1
12,287,000 (9,000,000) 0
74,592 - 1
521,054 - 1
139,821 - 1
1,159,739 - 1
2,500,000 - 1
271,000 - 1
135,500 - 1
1,600,000 - 1
2,542,200 - 1
1,668,200 - 1
3,352,500 2,077,500 0
1,360,000 1,360,000 0

21,190,544 4,982,761 1

1,551,043 - 1
2,774,369 - 1
1,178,181 - 1

775,522 - 1
2,812,337 - 1
589,091 - 1

3,794,191 - 1
6,418,341 - 1
4,345,893 - 1

341,621 - 1
898,344 - 1
194,206 - 1
520,384 - 1
523,750 - 1
- (221,383) 1

4,500,000 - 1
4,225,000 - 1
455,000 - 1
80,000 - 1
80,000 - 1
760,000 - 1
1,950,000 - 1
120,000 - 1

5,216,000 - 1
5,670,000 - 1

704,080 - 1
247,000 - 1
223,080 - 1
1,174,160 - 1
5,889,582 - 1
62,400 - 1
12,000,000 - 1
830,000 30,000 0

36,130,000 - 1
22,650,000 - 1
18,150,000 - 1
300,000 - 1
2,100,000 - 1
1,260,000 - 1
105,000 - 1
2,100,000 - 1
694,500 - 1
80,000 - 1
912,000 - 1

700,000 - 1
625,000 125,000 1
500,000 - 1
100,000 - 1
125,000 25,000 1
130,000 - 1
225,000 - 1

270,000 - 1
250,000 - 1
150,000 - 1
80,000 - 1
500,000 - 1
250,000 - 1

705,002,362 (1,915)

705,000,000 -
PERHITUNGAN VOLUME PEKERJAAN

PROGRAM : KOTA TANPA KUMUH (KOTAKU)


KEGIATAN : BPM-DFAT
LOKASI : KERENG BANGKIRAI
KEGIATAN : TPS3R
TAHUN ANGGARAN : 2021

JUMLAH
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME SATUAN

1 2 3 4 5

I PEKERJAAN PERSIAPAN
1 Pembersihan Awal Panjang Lebar 200.00 m2
= 20 m x 10.00 m 200.00 m2

2 Pengukuran dan Pemasangan Bowplank Panjang m + 1 m kiri + 1 m kanan 66.00 m


= 12.00 m + 1 m + 1 m = 14.00 m
= 12.00 m + 1 m + 1 m = 14.00 m
= 17.00 m + 1 m + 1 m = 19.00 m
= 17.00 m + 1 m + 1 m = 19.00 m

II PEKERJAAN TANAH
1 Pek urugan tanah lokasi kegiatan Panjang Lebar Tebal 218.55 m3
= 20.00 m x 20.00 m x 0.50 m = 200.00 m3
Depan jembatan = 5.50 m x 6.00 m x 0.35 m = 11.55 m3
Jalan masuk = 4.00 m x 5.00 m x 0.35 m = 7.00 m3

2 Pek. Galian Tanah Pondasi Panjang Lebar Tebal Jumlah 11.68 m3


Pondasi P1 = 0.8 m x 0.80 m x 0.55 m x 21 = 7.39 m3
Pondasi P2 = 0.60 m x 0.60 m x 0.55 m x 19 = 3.76 m3
Pondasi P3 = 1.20 m x 0.80 m x 0.55 m x 1 = 0.53 m3

3 Pek. Urugan Bekas Galian = Volume galian x 1/4 2.92 m3


= 11.68 / 4.00 = 2.92 m3

4 Pek. Urugan Pasir bawah lantai Panjang Lebar Tebal Jumlah 45.49 m3
Lantai Hanggar TPS3R = 13.42 m x 11.80 m x 0.20 m x 1 = 31.67 m3
= 3.23 m x 2.83 m x 0.20 m x 2 = 3.66 m3
= 5.83 m x 3.23 m x 0.20 m x 2 = 7.53 m3
Lantai Kantor = 3.33 m x 2.85 m x 0.20 m x 1 = 1.90 m3
Lantai WC = 2.30 m x 1.60 m x 0.20 m x 1 = 0.74 m3

5 Pek. Pemancangan Cerucuk Kayu Galam (p. 2m) Jumlah cerucuk Panjang Jumlah Pondasi 372.00 Btg
Pondasi P1 = 9 Bh x 2 m x 21 Bh / 2 = 189.00 Btg
Pondasi P2 = 9 Bh x 2 m x 19 Bh / 2 = 171.00 Btg
Pondasi P3 = 12 Bh x 2 m x 1 Bh / 2 = 12.00 Btg

III PEKERJAAN BETON BERTULANG


1 Pondasi Footplat P1 (80 cm x 80 cm x 20 cm)
a Pek. Pembesian Panjang Berat jenis Jumlah Besi Jumlah Pondasi 318.33 Kg
ø 12 = 1.70 m x 0.892 kg/m x 10.00 bh x 21 = 318.33 Kg

b Pek. Lantai Kerja Beton K.100 t=5 cm Panjang Lebar Tebal Jumlah Pondasi 0.67 m3
= 0.80 m x 0.80 m x 0.05 m x 21 = 0.67 m3

c Pek. Bekisting Pondasi Panjang Lebar Jumlah Jumlah Pondasi 2.24 m2


= 0.8 m x 0.20 m x 2.00 Bh x 21 x 1/3 = 2.24 m2

d Cor Beton Mutu K.200 Panjang Lebar Tebal Jumlah Pondasi 2.69 m3
= 0.80 m x 0.80 m x 0.20 m x 21 = 2.69 m3
JUMLAH
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME SATUAN

1 2 3 4 5
2 Pondasi Footplat P2 (60 cm x 60 cm x 20 cm)
a Pek. Pembesian Panjang Berat jenis Jumlah Besi Jumlah Pondasi 218.55 Kg
ø 12 = 1.29 m x 0.892 kg/m x 10.00 bh x 19 = 218.55 Kg

b Pek. Lantai Kerja Beton K.100 t=5 cm Panjang Lebar Tebal Jumlah Pondasi 0.34 m3
= 0.60 m x 0.60 m x 0.05 m x 19 = 0.34 m3

c Pek. Bekisting Pondasi Panjang Lebar Jumlah Jumlah Pondasi 1.52 m2


= 0.6 m x 0.20 m x 2.00 Bh x 19 x 1/3 = 1.52 m2

d Cor Beton Mutu K.200 Panjang Lebar Tebal Jumlah Pondasi 1.37 m3
= 0.60 m x 0.60 m x 0.20 m x 19 = 1.37 m3

3 Pondasi Footplat P3 (120 cm x 80 cm x 20 cm)


a Pek. Pembesian Panjang Berat jenis Jumlah Besi Jumlah Pondasi 39.95 Kg
ø 12 = 2.80 m x 0.892 kg/m x 16.00 bh x 1 = 39.95 Kg

b Pek. Lantai Kerja Beton K.100 t=5 cm Panjang Lebar Tebal Jumlah Pondasi 0.05 m3
= 1.20 m x 0.80 m x 0.05 m x 1 = 0.05 m3

c Pek. Bekisting Pondasi Panjang Lebar Jumlah Jumlah Pondasi 1.92 m2


= 1.2 m x 0.80 m x 2.00 Bh x 1 = 1.92 m2

d Cor Beton Mutu K.200 Panjang Lebar Tebal Jumlah Pondasi 0.19 m3
= 1.20 m x 0.80 m x 0.20 m x 1 = 0.19 m3

2 Pek Kolom K1
a Pek. Pembesian Panjang Berat jenis Jumlah Besi Jumlah Kolom 485.65 Kg
Hanggar TPS3R ø 12 = 4.60 m x 0.892 kg/m x 4.00 bh x 18 = 295.32 Kg
WC ø 12 = 3.85 m x 0.892 kg/m x 4.00 bh x 4 = 54.93 Kg
Pagar ø 12 = 3.40 m x 0.892 kg/m x 4.00 bh x 1 = 12.13 Kg
ø 12 = 4.10 m x 0.892 kg/m x 4.00 bh x 1 = 14.62 Kg
ø8 = 0.52 m x 0.395 kg/m x 529.00 bh = 108.66 Kg

b Pek. Bekisting Kolom Panjang Lebar Jumlah Jumlah Kolom 40.40 m2


Hanggar TPS3R = 4.60 m x 0.20 m x 4.00 Bh x 18 x 1/3 = 22.08 m2
WC = 3.85 m x 0.20 m x 4.00 Bh x 4 = 12.32 m2
Pagar = 3.40 m x 0.20 m x 4.00 Bh x 1 = 2.72 m2
= 4.10 m x 0.20 m x 4.00 Bh x 1 = 3.28 m2

c Cor Beton Mutu K.200 Panjang Lebar Tinggi Jumlah Kolom 4.23 m3
Hanggar TPS3R bawah sloof = 0.20 m x 0.20 m x 0.80 m x 18 = 0.58 m3
Atas sloof = 0.20 m x 0.20 m x 3.80 m x 18 = 2.74 m3
WC bawah sloof = 0.20 m x 0.20 m x 0.80 m x 4 = 0.13 m3
Atas sloof = 0.20 m x 0.20 m x 3.05 m x 4 = 0.49 m3
Pagar bawah sloof = 0.20 m x 0.20 m x 0.80 m x 1 = 0.03 m3
Atas sloof = 0.20 m x 0.20 m x 2.60 m x 1 = 0.10 m3
bawah sloof = 0.20 m x 0.20 m x 0.80 m x 1 = 0.03 m3
Atas sloof = 0.20 m x 0.20 m x 3.30 m x 1 = 0.13 m3

3 Pek Kolom K2
a Pek. Pembesian Panjang Berat jenis Jumlah Besi Jumlah Kolom 148.41 Kg
Kantor ø 12 = 3.85 m x 0.892 kg/m x 4.00 bh x 3 = 41.20 Kg
Pagar ø 12 = 2.50 m x 0.892 kg/m x 4.00 bh x 8 = 71.33 Kg
ø 12 = 3.40 m x 0.892 kg/m x 4.00 bh x 1 = 12.13 Kg
ø 12 = 4.10 m x 0.892 kg/m x 4.00 bh x 1 = 14.62 Kg
ø8 = 0.65 m x 0.395 kg/m x 196.00 bh = 50.32 Kg

b Pek. Bekisting Kolom Panjang Lebar Jumlah Jumlah Kolom 15.43 m2


= 3.85 m x 0.15 m x 4.00 Bh x 3 = 6.93 m2
= 2.50 m x 0.15 m x 4.00 Bh x 8 x 1/3 = 4.00 m2
= 3.40 m x 0.15 m x 4.00 Bh x 1 = 2.04 m2
= 4.10 m x 0.15 m x 4.00 Bh x 1 = 2.46 m2

c Cor Beton Mutu K.200 Panjang Lebar Tinggi Jumlah Kolom 1.76 m3
Kantor bawah sloof = 0.30 m x 0.15 m x 0.80 m x 3 = 0.11 m3
Atas sloof = 0.30 m x 0.15 m x 3.05 m x 3 = 0.41 m3
Pagar bawah sloof = 0.30 m x 0.15 m x 0.80 m x 8 = 0.29 m3
Atas sloof = 0.30 m x 0.15 m x 1.70 m x 8 = 0.61 m3
bawah sloof = 0.30 m x 0.15 m x 0.80 m x 1 = 0.04 m3
Atas sloof = 0.30 m x 0.15 m x 2.60 m x 1 = 0.12 m3
bawah sloof = 0.30 m x 0.15 m x 0.80 m x 1 = 0.04 m3
Atas sloof = 0.30 m x 0.15 m x 3.30 m x 1 = 0.15 m3

4 Pek Kolom K3
a Pek. Pembesian Panjang Berat jenis Jumlah Besi Jumlah Kolom 66.62 Kg
Pagar ø 10 = 3.40 m x 0.617 kg/m x 8.00 bh x 1 = 16.77 Kg
ø 10 = 4.10 m x 0.617 kg/m x 8.00 bh x 2 = 40.45 Kg
ø8 = 0.41 m x 0.395 kg/m x 58.00 bh = 9.39 Kg

b Pek. Bekisting Kolom Panjang Lebar Jumlah Jumlah Kolom 6.96 m2


= 3.40 m x 0.15 m x 4.00 Bh x 1 = 2.04 m2
= 4.10 m x 0.15 m x 4.00 Bh x 2 = 4.92 m2

c Cor Beton Mutu K.200 Panjang Lebar Tinggi Jumlah Kolom 0.26 m3
Pagar bawah sloof = 0.15 m x 0.15 m x 0.80 m x 1 = 0.02 m3
Atas sloof = 0.15 m x 0.15 m x 2.60 m x 1 = 0.06 m3
bawah sloof = 0.15 m x 0.15 m x 0.80 m x 2 = 0.04 m3
Atas sloof = 0.15 m x 0.15 m x 3.30 m x 2 = 0.15 m3
JUMLAH
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME SATUAN

1 2 3 4 5
3 Pekerjaan Sloof 20x30
a Pek. Pembesian Panjang Berat jenis Jumlah Besi Jumlah sisi 393.92 Kg
Hanggar TPS3R ø 12 = 17.00 m x 0.892 kg/m x 6.00 bh x 2 = 181.90 Kg
ø 12 = 12.00 m x 0.892 kg/m x 6.00 bh x 2 = 128.40 Kg
ø8 = 0.73 m x 0.395 kg/m x 290.00 bh = 83.62 Kg

b Pek. Bekisting Sloof Panjang Lebar Jumlah Jumlah sisi 11.60 m2


= 17 m x 0.20 m x 2.00 Bh x 2 x 1/2 = 6.80 m2
= 12 m x 0.20 m x 2.00 Bh x 2 x 1/2 = 4.80 m2

c Cor Beton Mutu K.200 Panjang Lebar Tinggi Jumlah sisi 3.48 m3
= 17.00 m x 0.20 m x 0.30 m x 2 = 2.04 m3
= 12.00 m x 0.20 m x 0.30 m x 2 = 1.44 m3

7 Pekerjaan Sloof 15x20


a Pek. Pembesian Panjang Berat jenis Jumlah Besi Jumlah sisi 303.68 Kg
Hanggar TPS3R ø 12 = 12.00 m x 0.892 kg/m x 4.00 bh x 1 = 42.80 Kg
Kantor ø 12 = 3.50 m x 0.892 kg/m x 4.00 bh x 2 = 24.97 Kg
ø 12 = 3.00 m x 0.892 kg/m x 4.00 bh x 2 = 21.40 Kg
WC ø 12 = 2.45 m x 0.892 kg/m x 4.00 bh x 1 = 8.74 Kg
ø 12 = 1.75 m x 0.892 kg/m x 4.00 bh x 2 = 12.48 Kg
Pagar Kiri ø 12 = 2.57 m x 0.892 kg/m x 4.00 bh x 1 = 9.17 Kg
Kanan ø 12 = 20.00 m x 0.892 kg/m x 4.00 bh x 1 = 71.33 Kg
Belakang ø 12 = 2.83 m x 0.892 kg/m x 4.00 bh x 1 = 10.09 Kg
Depan ø 12 = 11.20 m x 0.892 kg/m x 4.00 bh x 1 = 39.95 Kg
ø8 = 0.47 m x 0.395 kg/m x 338 bh = 62.75 Kg

b Pek. Bekisting Sloof Panjang Lebar Jumlah Jumlah sisi 23.72 m2


= 12.00 m x 0.20 m x 2.00 Bh x 1 = 4.80 m2
= 3.50 m x 0.20 m x 2.00 Bh x 2 x 1/2 = 1.40 m2
= 3.00 m x 0.20 m x 2.00 Bh x 2 x 1/2 = 1.20 m2
= 2.45 m x 0.20 m x 2.00 Bh x 1 = 0.98 m2
= 1.75 m x 0.20 m x 2.00 Bh x 2 x 1/2 = 0.70 m2
= 2.57 m x 0.20 m x 2.00 Bh x 1 = 1.03 m2
= 20.00 m x 0.20 m x 2.00 Bh x 1 = 8.00 m2
= 2.83 m x 0.20 m x 2.00 Bh x 1 = 1.13 m2
= 11.20 m x 0.20 m x 2.00 Bh x 1 = 4.48 m2

c Cor Beton Mutu K.200 Panjang Lebar Tinggi Jumlah sisi 2.03 m3
Hanggar TPS3R = 12.00 m x 0.15 m x 0.20 m x 1 = 0.36 m3
Kantor = 3.50 m x 0.15 m x 0.20 m x 2 = 0.21 m3
= 3.00 m x 0.15 m x 0.20 m x 2 = 0.18 m3
WC = 2.45 m x 0.15 m x 0.20 m x 1 = 0.07 m3
= 1.75 m x 0.15 m x 0.20 m x 2 = 0.11 m3
Pagar Kiri = 2.57 m x 0.15 m x 0.20 m x 1 = 0.08 m3
Kanan = 20.00 m x 0.15 m x 0.20 m x 1 = 0.60 m3
Belakang = 2.83 m x 0.15 m x 0.20 m x 1 = 0.08 m3
Depan = 11.20 m x 0.15 m x 0.20 m x 1 = 0.34 m3
JUMLAH
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME SATUAN

1 2 3 4 5
10 Pekerjaan Ring Balok 20x20
a Pek. Pembesian Panjang Berat jenis Jumlah Besi Jumlah sisi 275.43 Kg
Hanggar TPS3R ø 10 = 17.00 m x 0.617 kg/m x 6.00 bh x 2 = 125.87 Kg
TPS ø 10 = 12.00 m x 0.617 kg/m x 6.00 bh x 2 = 88.85 Kg
ø8 = 0.53 m x 0.395 kg/m x 290.00 bh = 60.71 Kg

b Pek. Bekisting Ring Balok Panjang Lebar Jumlah Jumlah sisi 11.60 m2
= 17 m x 0.20 m x 2.00 Bh x 2 x 1/2 = 6.80 m2
= 12 m x 0.20 m x 2.00 Bh x 2 x 1/2 = 4.80 m2

c Cor Beton Mutu K.200 Panjang Lebar Tinggi Jumlah sisi 2.32 m3
= 17.00 m x 0.20 m x 0.20 m x 2 = 1.36 m3
= 12.00 m x 0.20 m x 0.20 m x 2 = 0.96 m3

11 Pekerjaan Balok 15x20


a Pek. Pembesian Panjang Berat jenis Jumlah Besi Jumlah sisi 44.67 Kg
WC ø 10 = 2.45 m x 0.617 kg/m x 6.00 bh x 1 = 9.07 Kg
ø 10 = 3.00 m x 0.617 kg/m x 6.00 bh x 1 = 11.11 Kg
ø 10 = 1.75 m x 0.617 kg/m x 6.00 bh x 2 = 12.96 Kg
ø8 = 0.73 m x 0.395 kg/m x 40.00 bh = 11.53 Kg

b Pek. Bekisting Ring Balok Panjang Lebar Jumlah Jumlah sisi 3.36 m2
= 2.45 m x 0.20 m x 2.00 Bh x 2 = 1.96 m2
= 1.75 m x 0.20 m x 2.00 Bh x 2 = 1.40 m2

c Cor Beton Mutu K.200 Panjang Lebar Tinggi Jumlah sisi 0.25 m3
= 2.45 m x 0.15 m x 0.20 m x 2 = 0.15 m3
= 1.75 m x 0.15 m x 0.20 m x 2 = 0.11 m3

12 Pekerjaan Ring Balok 15/15


a Pek. Pembesian Panjang Berat jenis Jumlah Besi Jumlah sisi 282.53 Kg
Hanggar TPS3R ø 10 = 12.00 m x 0.617 kg/m x 4.00 bh x 1 = 29.62 Kg
WC ø 10 = 2.45 m x 0.617 kg/m x 6.00 bh x 2 = 18.14 Kg
ø 10 = 1.75 m x 0.617 kg/m x 6.00 bh x 2 = 12.96 Kg
Kantor ø 10 = 3.50 m x 0.617 kg/m x 6.00 bh x 2 = 25.91 Kg
ø 10 = 3.00 m x 0.617 kg/m x 6.00 bh x 1 = 11.11 Kg
Pagar Kiri ø 12 = 2.57 m x 0.892 kg/m x 4.00 bh x 1 = 9.17 Kg
Kanan ø 12 = 20.00 m x 0.892 kg/m x 4.00 bh x 1 = 71.33 Kg
Belakang ø 12 = 2.83 m x 0.892 kg/m x 4.00 bh x 1 = 10.09 Kg
Depan ø 12 = 11.20 m x 0.892 kg/m x 4.00 bh x 1 = 39.95 Kg
ø8 = 0.41 m x 0.395 kg/m x 335.00 bh = 54.25 Kg

b Pek. Bekisting Ring Balok Panjang Lebar Jumlah Jumlah sisi 17.79 m2
= 12.00 m x 0.15 m x 2.00 Bh x 1 = 3.60 m2
= 2.45 m x 0.15 m x 2.00 Bh x 2 x 1/2 = 0.74 m2
= 1.75 m x 0.15 m x 2.00 Bh x 2 x 1/2 = 0.53 m2
= 3.50 m x 0.15 m x 2.00 Bh x 2 x 1/2 = 1.05 m2
= 3.00 m x 0.15 m x 2.00 Bh x 1 = 0.90 m2
= 2.57 m x 0.15 m x 2.00 Bh x 1 = 0.77 m2
= 20.00 m x 0.15 m x 2.00 Bh x 1 = 6.00 m2
= 2.83 m x 0.15 m x 2.00 Bh x 1 = 0.85 m2
= 11.20 m x 0.15 m x 2.00 Bh x 1 = 3.36 m2

c Cor Beton Mutu K.200 Panjang Lebar Tinggi Jumlah sisi 0.62 m3
Hanggar TPS3R = 12.00 m x 0.15 m x 0.15 m x 1 = 0.27 m3
WC = 2.45 m x 0.15 m x 0.15 m x 2 = 0.11 m3
= 1.75 m x 0.15 m x 0.15 m x 2 = 0.08 m3
Kantor = 3.50 m x 0.15 m x 0.15 m x 2 = 0.16 m3
= 3.00 m x 0.15 m x 0.15 m x 1 = 0.07 m3
Pagar Kiri = 2.57 m x 0.15 m x 0.15 m x 1 = 0.06 m3
Kanan = 20.00 m x 0.15 m x 0.15 m x 1 = 0.45 m3
Belakang = 2.83 m x 0.15 m x 0.15 m x 1 = 0.06 m3
Depan = 11.20 m x 0.15 m x 0.15 m x 1 = 0.25 m3

13 Pekerjaan lantai beton bertulang


a Pek. Pembesian Panjang Berat jenis Jumlah Besi 1,053.65 Kg
Hanggar TPS3R ø 8-20 = 13.4 m x 0.395 kg/m x 59.00 bh = 312.29 Kg
ø 8-20 = 11.8 m x 0.395 kg/m x 67.00 bh = 312.29 Kg
Halaman ø 10-30 = 13.8 m x 0.617 kg/m x 25.00 bh = 212.87 Kg
ø 10-30 = 7.3 m x 0.617 kg/m x 46.00 bh = 207.19 Kg
ø 10-30 = 1.5 m x 0.617 kg/m x 2.00 bh = 1.85 Kg
ø 10-30 = 0.35 m x 0.617 kg/m x 5.00 bh = 1.08 Kg
ø 10-30 = 1.75 m x 0.617 kg/m x 3.00 bh = 3.24 Kg
ø 10-30 = 0.77 m x 0.617 kg/m x 6.00 bh = 2.85 Kg
ø 10-30 = 19.35 m x 0.617 kg/m x 2.00 bh (halaman samping) = Kg
ø 10-30 = 0.6 m x 0.617 kg/m x 65.00 bh (halaman samping) = Kg

b Cor Beton Mutu K.175 Panjang Lebar Tebal 48.72 m3


Hanggar TPS3R = 13.4 m x 11.8 m x 0.20 m = 31.62 m3
Halaman = 13.8 m x 7.3 m x 0.15 m = 15.11 m3
= 1.5 m x 0.35 m x 0.15 m = 0.08 m3
= 1.75 m x 0.77 m x 0.15 m = 0.20 m3
= 19.35 m x 0.6 m x 0.15 m (halaman samping) = m3
Area Ram = 8.5 m x 2 m x 0.20 m x 1/2 = 1.70 m3

14 Pek. Plat /Dak Beton


a Pembesian Panjang Berat jenis Jumlah Besi 36.50 m3
WC ø 10-15 = 2.45 m x 0.617 kg/m x 12.00 bh = 18.14 m3
ø 10-15 = 1.75 m x 0.617 kg/m x 17.00 bh = 18.36 m3

b Pek. Bekisting Panjang Lebar 4.29 m2


= 2.45 m x 1.75 m 4.29 m2

c Cor Beton Mutu K.200 Panjang Lebar Tebal 0.64 m3


= 2.45 m x 1.75 m x 0.15 m = 0.64 m3
JUMLAH
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME SATUAN

1 2 3 4 5
Luas
IV PEKERJAAN DINDING, LANTAI DAN PLESTERAN pintu/
Jendela/
1 Pek. Pasangan dinding Bataco kerawang/
a Bangunan Hanggar TPS3R Panjang Lebar Jumlah sisi Glasblok 142.96 m2
Samping Kanan = 3.8 m x 2.8 m x 4 - 1.87 = 40.69 m2
Depan = 3.8 m x 3.2 m x 1 - 1.69 = 10.48 m2
Area Dalam = 3.8 m x 2.8 m x 4 - 13.48 = 29.08 m2
Samping Kiri = 2.8 m x 2.0 m x 4 = 22.40 m2
Bawah Sloof Kiri = 2.8 m x 0.8 m x 4 40.32 = 8.96 m2
Kanan = 2.8 m x 0.8 m x 4 = 8.96 m2
Belakang = 2.8 m x 0.8 m x 5 = 11.20 m2
Depan = 2.8 m x 0.8 m x 5 = 11.20 m2

Luas pintu/
Jendela/
kerawang/G
b Kantor Lebar Tinggi lasblok sisi 60.60 m2
Depan = 3.35 m x 3.05 m - 3.47 = 13.69 m2
Samping Kiri = 2.28 m x 3.05 m = 6.95 m2
= 0.37 m x 3.05 m = 1.13 m2
Samping Kanan = 2.85 m x 3.05 m = 8.69 m2
= 1.35 m x 3.05 m = 4.12 m2
Belakang = 3.35 m x 4.2 m - 1.11 = 15.18 m2
Bawah Sloof Kiri = 2.28 m x 0.8 m = 1.82 m2
= 0.37 m x 0.8 m = 0.30 m2
Kanan = 2.85 m x 0.8 m = 2.28 m2
= 1.35 m x 0.8 m = 1.08 m2
Belakang = 3.35 m x 0.8 m = 2.68 m2
Depan = 3.35 m x 0.8 m = 2.68 m2

Luas pintu/
Jendela/
kerawang/G
c WC Lebar Tinggi lasblok 23.50 m2
Depan = 1.60 m x 3.05 m - 2.33 = 7.21 m2
Samping Kanan = 2.30 m x 3.05 m = 7.02 m2
Belakang = 1.60 m x 3.05 m = 4.88 m2
Bawah Sloof Kanan = 2.30 m x 0.8 m = 1.84 m2
Belakang = 1.60 m x 0.8 m = 1.28 m2
Depan = 1.60 m x 0.8 m = 1.28 m2

d Pagar Panjang Lebar Jumlah sisi 73.61 m2


Depan = 3 m x 1.35 m x 1 = 4.05 m2
Box tanaman = 2.85 m x 0.5 m x 2 = 2.85 m2
= 2.45 m x 0.5 m x 1 = 1.23 m2
= 0.5 m x 0.35 m x 5 = 0.88 m2
Samping Kiri = 2.35 m x 1.65 m x 7 = 27.14 m2
= 1.85 m x 1.65 m x 1 = 3.05 m2
Samping Kanan = 2.38 m x 1.65 m x 1 = 3.93 m2
Belakang = 2.05 m x 1.65 m x 1 = 3.38 m2
Bawah Sloof Kiri = 2.35 m x 0.8 m x 7 = 13.16 m2
= 1.85 m x 0.8 m x 1 = 1.48 m2
Kanan = 2.38 m x 0.8 m x 1 = 1.90 m2
Belakang = 2.05 m x 0.8 m x 1 = 1.64 m2
Depan = 3 m x 0.8 m x 1 = 2.40 m2
= 2.85 m x 0.8 m x 2 = 4.56 m2
= 2.45 m x 0.8 m x 1 = 1.96 m2
2 Pek. Plesteran Dinding
a Bangunan Hanggar TPS3R Luas bidang Sisi 205.28 m2
Samping Kanan = 40.69 m2 x 2 Bh luar-dalam = 81.37 m2
Samping Kiri = 22.40 m2 x 2 Bh luar-dalam = 44.80 m2
Depan = 10.48 m2 x 2 Bh luar-dalam = 20.95 m2
Area Dalam = 29.08 m2 x 2 Bh luar-dalam = 58.16 m2

89.03 m2
b Kantor Depan = 13.69 m2 x 2 Bh luar-dalam = 27.38 m2
Samping Kiri = 6.95 m2 x 2 Bh luar-dalam = 13.91 m2
Samping Kanan = 8.69 m2 x 2 Bh luar-dalam = 17.39 m2
Belakang = 15.18 m2 x 2 Bh luar-dalam = 30.36 m2

38.21 m2
c WC Depan = 7.21 m2 x 2 Bh = 14.42 m2
Samping Kanan = 7.02 m2 x 2 Bh = 14.03 m2
Belakang = 4.88 m2 x 2 Bh = 9.76 m2

93.01 m2
d Pagar Depan = 9.00 m2 x 2 Bh = 18.00 m2
Samping Kiri = 30.20 m2 x 2 Bh = 60.39 m2
Samping Kanan = 3.93 m2 x 2 Bh = 7.85 m2
Belakang = 3.38 m2 x 2 Bh = 6.77 m2

3 Cor Beton Lantai Beton Mutu K.200 Panjang Lebar Tebal 5.04 m3
Hanggar TPS3R Gudang = 5.83 m x 3.23 m x 0.10 m = 1.88 m3
Area Penyimpanan = 2.85 m x 3.23 m x 0.10 m = 0.92 m3
Tempat Barang Lapak = 2.85 m x 3.23 m x 0.10 m = 0.92 m3
KM/WC = 2.30 m x 1.60 m x 0.10 m = 0.37 m3
Kantor = 3.33 m x 2.85 m x 0.10 m = 0.95 m3
JUMLAH
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME SATUAN

1 2 3 4 5
4 Pek Keramik lantai Uk.40x40 Panjang Lebar 46.21 m2
Kantor = 3.3 m x 2.85 m = 9.41 m2
Gudang = 5.8 m x 3.2 m = 18.56 m2
Area Penyimpanan = 2.85 m x 3.2 m = 9.12 m2
Tempat Barang Lapak = 2.85 m x 3.2 m = 9.12 m2

5 Pek Keramik lantai WC Uk.20x20 Panjang Lebar 3.68 m2


= 2.30 m x 1.60 m = 3.68 m2

6 Pek Keramik dinding WC Uk.10x20 Panjang Lebar sisi 8.16 m2


= 2.3 m x 1.2 m x 2 = 5.52 m2
= 1.6 m x 1.2 m x 1 = 1.92 m2
= 0.6 m x 1.2 m x 1 = 0.72 m2

7 Pek. Dinding Tawing layar Panjang Lebar 64.20 m2


Hanggar TPS3R T.Layar kanan = 12.2 m x 2 m x 1/2 = 12.20 m2
T. Layar kiri = 12.2 m x 2 m x 1/2 = 12.20 m2
T. Layar Blkg = 17.2 m x 2 m = 34.40 m2
Kantor T. Layar kiri = 2.7 m x 1 m x 1/2 = 1.35 m2
T. Layar kanan = 2.7 m x 1 m x 1/2 = 1.35 m2
WC T. Layar kiri = 2.7 m x 1 m x 1/2 = 1.35 m2
T. Layar kanan = 2.7 m x 1 m x 1/2 = 1.35 m2

Derajat
V PEKERJAAN ATAP, PLAFOND, LISPLANK Panjang+ Lebar + Kemiringan
1 Rangka Atap Baja Ringan overstek overstek (Cos15) 242.24 m2
a Hanggar TPS3R = 18 m x 13 m / 0.966 = 242.24 m2

Derajat
Panjang+ Lebar + Kemiringan
overstek overstek (Cos15) 18.63 m2
b Kantor = 4.5 m x 4 m / 0.966 = 18.63 m2

Derajat
Panjang+ Lebar + Kemiringan
overstek overstek (Cos15) 9.96 m2
c WC = 2.75 m x 3.5 m / 0.966 = 9.96 m2

2 Pek Atap Genteng Metal Zincalume


a Hanggar TPS3R = Volume Rangka Atap = 242.24 m2
= 242.24 = 242.24 m2

b Kantor = Volume Rangka Atap = 18.63 m2


= 18.63 = 18.63 m2

d WC = Volume Rangka Atap = 9.96 m2


= 9.96 = 9.96 m2

3 Pek. Lisplank Superplank Eksterior Panjang/


cos15 Panjang sisi = 57.34 m
Hanggar TPS3R = 13.46 m + 18 = 31.46 m
Kantor = 4.14 m + 4.5 m x 2 = 13.14 m
WC = 3.62 m + 2.75 m x 2 = 12.75 m

4 Rangka Hollow Plafond Kantor Panjang Lebar 9.55 m2


= 3.35 m x 2.85 m = 9.55 m2

5 Pek. Pas. Plafond Kalsiboard Panjang Lebar 9.55 m2


= 3.35 m x 2.85 m = 9.55 m2

V PEKERJAAN PINTU, JENDELA, KUNCI & PENGGANTUNG


1 Pek. Kusen Pintu dan Jendela Kayu Klas II
a Hanggar TPS3R Panjang Lebar Panjang Kusen Jumlah Kusen Jumlah P/J 0.12 m3
P1 = 0.1 m x 0.05 m x 2.1 m x 2 x 2 = 0.04 m3
= 0.1 m x 0.05 m x 1.02 m x 1 x 2 = 0.01 m3
J1 = 0.1 m x 0.05 m x 1.45 m x 3 x 2 = 0.04 m3
= 0.1 m x 0.05 m x 1 m x 2 x 2 = 0.02 m3

b Kantor Panjang Lebar Panjang Kusen Jumlah Kusen Jumlah P/J 0.06 m3
P1 = 0.1 m x 0.05 m x 2.1 m x 2 x 1 = 0.02 m3
= 0.1 m x 0.05 m x 1.05 m x 1 x 1 = 0.01 m3
J1 = 0.1 m x 0.05 m x 1.45 m x 3 x 1 = 0.02 m3
= 0.1 m x 0.05 m x 1 m x 2 x 1 = 0.01 m3

c WC Panjang Lebar Panjang Kusen Jumlah Kusen Jumlah P/J 0.02 m3


P1 = 0.1 m x 0.05 m x 2.1 m x 2 x 1 = 0.02 m3
2 Pek. Daun Pintu Panel Kayu Klas II
a Hanggar TPS3R Panjang Lebar Jumlah 3.60 m3
P1 = 2 m x 0.9 m x 2 = 3.60 m3

b Kantor Panjang Lebar Jumlah 1.80 m3


P1 = 2 m x 0.9 m x 1 = 1.80 m3

c WC Panjang Lebar Jumlah 1.80 m3


P1 = 2 m x 0.9 m x 1 = 1.80 m3

3 Pek. Rangka Jendela Kaca Kayu Klas II Lebar Panjang Jumlah Rangka Jumlah Jendela 2.26 m2
J1 = 0.1 m x 1.45 m x 4 Bh x 3 = 1.74 m2
= 0.1 m x 0.43 m x 4 Bh x 3 = 0.52 m2
JUMLAH
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME SATUAN

1 2 3 4 5

4 Pek.Pemasangan Kaca Tebal 5 mm Panjang Lebar Jumlah Kaca Jumlah Jendela 7.48 m3
J1 = 1.45 m x 0.43 m x 4 Bh x 3 = 7.48 m3

5 Pek. Engsel Pintu Jumlah engsel banyak pintu 12.00 Bh


= 3 bh x 4 = 12.00

6 Pek. Engsel Jendela Jumlah engsel banyak jendela 12.00 Bh


= 4 bh x 3 = 12.00

7 Kunci Tanam = 4.00 = 4.00 Bh

8 Hak angin Jendela = 6.00 = 6.00 Bh

9 Gerendel Jendela = 6.00 = 6.00 Bh

10 Handel Jendela = 6.00 = 6.00 Bh

11 Pekerjaan Ventilasi Kerawang Panjang Lebar Jumlah 16.20 m2


V3 = 2.7 m x 1.5 m x 4 = 16.20 m2

12 Pekerjaan Pas. Glasblock Panjang Lebar Jumlah 8.92 m2


Hanggar 1 = 2.8 m x 0.6 m x 4 = 6.72 m2
Hanggar 2 = 3.2 m x 0.6 m x 1 = 1.92 m2
Kantor = 1.4 m x 0.2 m x 1 = 0.28 m2

VI PEKERJAAN PENGECATAN
1 Pengecatan dinding = volume pekerjaan plesteran
a Hanggar TPS3R = 205.28 = 205.28 m2
b Kantor = 89.03 = 89.03 m2
c WC = 38.21 = 38.21 m2
d Pagar = 93.01 = 93.01 m2

2 Pengecatan Plafond Kantor = 9.55 = 9.55 m2

3 Pengecatan Kusen Pintu dan Jendela Panjang Kusen Lebar Jumlah Kusen Jumlah P/J 10.08 m2
P1 = 2.05 m x 0.2 m x 2 Bh x 5 = 4.10 m2
= 0.9 m x 0.2 m x 1 Bh x 5 = 0.90 m2
J1 = 1.45 m x 0.2 m x 3 Bh x 4 = 3.48 m2
= 1 m x 0.2 m x 2 Bh x 4 = 1.60 m2

4 Pengecatan Pintu Panel


a Hanggar TPS3R Panjang Lebar Jumlah sisi Jumlah Pintu 10.80 m3
P1 = 2 m x 0.9 m x 2 Bh x 3 = 10.80 m3

b Kantor Panjang Lebar Jumlah Jumlah Pintu 3.60 m3


P1 = 2 m x 0.9 m x 2 Bh x 1 = 3.60 m3

c WC Panjang Lebar Jumlah Jumlah Pintu 3.60 m3


P1 = 2 m x 0.9 m x 2 Bh x 1 = 3.60 m3

5 Pengecatan Rangka Jendela Kaca Panjang Lebar Jumlah Rangka Jumlah Jendela 3.20 m2
J1 = 0.1 m x 1.55 m x 4 Bh x 4 = 2.48 m2
= 0.1 m x 0.45 m x 4 Bh x 4 = 0.72 m2

VII PEKERJAAN SANITASI


1 Pekerjaan Septictank 1 unit
a. Galian Septictank Panjang Lebar Tinggi Jumlah 6.94 m3
= 2.50 m x 1.5 m x 1.85 x m 1 unit = 6.94 m3

b Pek. Urugan Pasir t=5 cm Panjang Lebar Tinggi Jumlah 0.19 m3


= 2.50 m x 1.5 m x 0.05 x 1 unit = 0.19 m3

c Pek Cor Beton K.175 tebal 10 cm Panjang Lebar Tinggi Jumlah 0.26 m3
2.20 m x 1.2 m x 0.1 x 1 unit = 0.26 m3

d Pek. Sloof 15/15 Panjang Berat jenis Jumlah Besi Sisi Jumlah unit 26.06 Kg
- Pek. Pembesian ø 10 = 2.5 m x 0.617 kg/m x 4.00 bh x 2 x 1 = 12.34 Kg
ø 10 = 1.5 m x 0.617 kg/m x 4.00 bh x 2 x 1 = 7.40 Kg
ø8 = 0.40 m x 0.395 kg/m x 40.00 bh x 1 = 6.32 Kg

- Pek. bekisting Panjang Lebar Jumlah Jumlah sisi Jumlah unit 2.40 m2
= 2.5 m x 0.15 m x 2.00 Bh x 2 x 1 = 1.50 m2
= 1.5 m x 0.15 m x 2.00 Bh x 2 x 1 = 0.90 m2

- Pek cor beton K.175 Panjang Lebar Tinggi Jumlah sisi Jumlah unit 0.18 m3
= 2.5 m x 0.15 m x 0.15 m x 2 x 1 = 0.11 m3
= 1.5 m x 0.15 m x 0.15 m x 2 x 1 = 0.07 m3

e Pek. Kolom 15/15 Panjang Berat jenis Jumlah Besi Jumlah Kolom Jumlah unit 24.23 Kg
- Pek. Pembesian ø 10 = 1.70 m x 0.617 kg/m x 4.00 bh x 4 x 1 = 16.78 Kg
ø8 = 0.41 m x 0.395 kg/m x 46.00 bh x 1 = 7.45 Kg

- Pek. bekisting Panjang Lebar Jumlah Jumlah sisi Jumlah unit 4.08 m2
= 1.70 m x 0.15 m x 4.00 Bh x 4 x 1 = 4.08 m2

- Pek cor beton K.175 Panjang Lebar Tinggi Jumlah sisi Jumlah unit 0.15 m3
= 1.70 m x 0.15 m x 0.15 m x 4 x 1 = 0.15 m3
JUMLAH
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME SATUAN

1 2 3 4 5
f Pek. Pas. Batako Panjang Lebar Jumlah sisi Jumlah unit 11.56 m2
= 2.2 m x 1.7 m x 2 x 1 = 7.48 m2
= 1.2 m x 1.7 m x 2 x 1 = 4.08 m2

9 Pek. Plesteran Panjang Lebar Jumlah sisi Jumlah unit 11.56 m2


= 2.2 m x 1.7 m x 2 x 1 = 7.48 m2
= 1.2 m x 1.7 m x 2 x 1 = 4.08 m2

h Pek. Ring Balk 15/15 Panjang Berat jenis Jumlah Besi Sisi Jumlah unit 28.28 Kg
- Pek. Pembesian ø 10 = 2.5 m x 0.617 kg/m x 4.00 bh x 2 x 1 = 12.34 Kg
ø 10 = 1.5 m x 0.617 kg/m x 4.00 bh x 2 x 1 = 7.40 Kg
ø8 = 0.40 m x 0.395 kg/m x 54.00 bh x 1 = 8.53 Kg

- Pek. bekisting Panjang Lebar Jumlah Jumlah sisi Jumlah unit 2.40 m2
= 2.5 m x 0.15 m x 2.00 Bh x 2 x 1 = 1.50 m2
= 1.5 m x 0.15 m x 2.00 Bh x 2 x 1 = 0.90 m2

- Pek cor beton K.175 Panjang Lebar Tinggi Jumlah sisi Jumlah unit 0.18 m3
= 2.5 m x 0.15 m x 0.15 m x 2 x 1 = 0.11 m3
= 1.5 m x 0.15 m x 0.15 m x 2 x 1 = 0.07 m3

i Pek. Plat penutup septictank tebal 10 cm Panjang Berat jenis Jumlah Besi Jumlah unit 4.66 m3
- Pek. Pembesian ø 8-15 = 2.2 m x 0.395 kg/m x 4.00 bh x 1 = 3.48 Kg
ø 8-15 = 0.3 m x 0.395 kg/m x 8.00 bh x 1 = 0.95 Kg
ø 8-15 = 0.15 m x 0.395 kg/m x 4.00 bh x 1 = 0.24 Kg

- Pek. bekisting Panjang Lebar Jumlah Jumlah unit 1.20 m2


= 2.5 m x 0.15 m x 2.00 Bh x 1 = 0.75 m2
= 1.5 m x 0.15 m x 2.00 Bh x 1 = 0.45 m2

Volume
tutup
- Pek cor beton K.175 Panjang Lebar Tinggi mainhole Jumlah unit 0.17 m3
= 2.5 m x 1.50 m x 0.10 m - 0.098 x 1 = 0.28 m3

j Pek. Tutup mainhole Panjang Berat jenis Jumlah Besi Jumlah unit 3.00 m3
- Pek. Pembesian ø 8-15 = 0.7 m x 0.395 kg/m x 5.00 bh x 1 = 1.38 Kg
ø 8-15 = 0.7 m x 0.395 kg/m x 5.00 bh x 1 = 1.38 Kg
ø 8-15 = 0.15 m x 0.395 kg/m x 4.00 bh x 1 = 0.24 Kg

- Pek. bekisting Panjang Lebar Jumlah Jumlah unit 0.42 m2


= 0.7 m x 0.15 m x 2.00 Bh x 1 = 0.21 m2
= 0.7 m x 0.15 m x 2.00 Bh x 1 = 0.21 m2

- Pek cor beton K.175 Panjang Lebar Tinggi Jumlah unit 0.05 m3
= 0.7 m x 0.70 m x 0.10 m x 1 = 0.05 m3

k. Bioseptictank BF-08 = 1 = 1.00 Bh

Volume
l Urugan Pasir dalam septictank Panjang Lebar Tinggi Biofil Jumlah unit = 0.34 Bh
= 2.2 m x 1.2 m x 1.2 m - 3 x 2 = 0.34 m3

2 Pekerjaan Pipa 4" Panjang Pipa Air Lindi


= 1.7 m + 1.8 = 3.50 m

3 Pekerjaan Pipa 2" Panjang


= 0.5 m + 0.78 m + 0.65 = 1.93 m

4 Pekerjaan Pipa 3/4" (Air Bersih) Panjang


= 4.1 m + 13.42 m + 4.84 m + 6.6 + 7.7 = 36.66 m

5 Pek. Sumur Bor+pompa = 1.00 = 1.00 Bh

6 Pekerjaan kran air = 2.00 = 2.00 Bh

7 Pekerjaan stop kran = 1.00 = 1.00 Bh

8 Profil tank 1200 L = 1.00 = 1.00 Bh

9 Pek. Closed Duduk = 1.00 = 1.00 Bh

10 Pek. Wastafel+cermin = 1.00 = 1.00 Bh

11 Pek. Grill besi penutup saluran = ( 12.00 + 13.5 + 12 = 37.50 37.50 M

VIII PEKERJAAN JEMBATAN


(Lebar
atas+lebar
1 Pekerjaan Pondasi Batu Belah Panjang bawah)/2 Tinggi 19.18 m3
A = 5.70 m x 0.7 m x 2.3 = 9.18 m3
B = 5.30 m x 0.7 m x 2.3 = 8.53 m3
= 1.40 m x 0.75 m x 0.7 x m 2 = 1.47 m3
2 Pekerjaan Sloof 20/30
a Pek. Pembesian Panjang Berat jenis Jumlah Besi Jumlah sisi 102.56 Kg
ø 10 = 5.30 m x 0.617 kg/m x 6.00 bh x 2 = 39.24 Kg
ø 10 = 3.80 m x 0.617 kg/m x 6.00 bh x 2 = 28.14 Kg
ø8 = 0.73 m x 0.395 kg/m x 122.00 bh = 35.18 Kg

b Pekerjaan Bekisting Sloof Panjang Lebar Jumlah 12.44 m2


= 5.30 m x 0.3 m x 4 Bh = 6.36 m2
= 3.80 m x 0.3 m x 4 Bh = 4.56 m2
= 3.80 m x 0.2 m x 2 Bh = 1.52 m2

c Cor Beton K.200 Panjang Lebar Tebal Jumlah sisi 1.09 m2


= 5.30 m x 0.3 m x 0.2 m x 2 = 0.64 m2
= 3.80 m x 0.3 m x 0.2 m x 2 = 0.46 m2
JUMLAH
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME SATUAN

1 2 3 4 5

3 Pekerjaan Balok 20/30


a Pek. Pembesian Panjang Berat jenis Jumlah Besi Jumlah 51.28 Kg
ø 10 = 5.30 m x 0.617 kg/m x 6.00 bh x 1 = 19.62 Kg
ø 10 = 3.80 m x 0.617 kg/m x 6.00 bh x 1 = 14.07 Kg
ø8 = 0.73 m x 0.395 kg/m x 61.00 bh = 17.59 Kg

b Pekerjaan Bekisting Balok Panjang Lebar Jumlah 7.28 m2


= 5.30 m x 0.3 m x 2 Bh = 3.18 m2
= 5.30 m x 0.2 m x 1 Bh = 1.06 m2
= 3.80 m x 0.3 m x 2 Bh = 2.28 m2
= 3.80 m x 0.2 m x 1 Bh = 0.76 m2

c Cor Beton K.200 Panjang Lebar Tebal Jumlah 0.55 m2


= 5.30 m x 0.3 m x 0.2 m x 1 = 0.32 m2
= 3.80 m x 0.3 m x 0.2 m x 1 = 0.23 m2

4 Pekerjaan Plat beton


a Pek. Pembersian Panjang Berat jenis Jumlah Besi Banyak Besi 250.87 Kg
ø 10 = 5.3 m x 0.617 kg/m x 2.00 bh x 19.00 bh = 124.26 Kg
ø 10 = 3.8 m x 0.617 kg/m x 2.00 bh x 27.00 bh = 126.61 Kg

b Pekerjaan Bekisting Plat Panjang Lebar Jumlah 11.89 m2


= 5.30 m x 3.8 m x 1 m x 50% = 10.07 m2
= 5.30 m x 0.2 m x 2 m x 50% = 1.06 m2
= 3.80 m x 0.2 m x 2 m x 50% = 0.76 m2

c Cor Beton K200 tebal 20 cm Panjang Lebar Tebal 4.03 m2


= 5.30 m x 3.8 m x 0.2 m = 4.03 m2

5 Pekerjaan Reling jembatan


a Pembesian Kolom 15/15 Panjang Berat jenis Jumlah Besi Jumlah Kolom 22.59 Kg
ø 12 = 1.00 m x 0.617 kg/m x 4.00 bh x 8 = 19.74 Kg
ø8 = 0.36 m x 0.395 kg/m x 20.00 bh = 2.84 Kg

b Pek. Bekisting Kolom Panjang Lebar Jumlah Papan Jumlah Kolom 2.40 m2
= 1.00 m x 0.15 m x 4 m x 8x 50% = 2.40 m2

c Cor Beton K.200 Panjang Lebar Tebal Jumlah Kolom 0.18 m2


= 1.00 m x 0.15 m x 0.15 m x 8 = 0.18 m2

d Pek. Pas Batako Panjang Lebar Jumlah 3.10 m2


= 3.10 m x 0.5 m x 2 Bh = 3.10 m2

e Pek. Plesteran Panjang Lebar Jumlah Sisi Jumlah 6.60 m2


= 3.10 m x 0.5 m x 2 Bh x 2 = 6.20 m2
= 0.20 m x 0.5 m x 2 Bh x 2 = 0.40 m2

X PEKERJAAN LISTRIK
1 Penyambungan Daya Baru PLN = 1.00 1.00 Unit
2 Instalasi Titik Lampu = 13.00 13.00 Titik
3 Lampu SL 18 Watt = 13.00 13.00 Bh
4 Saklar Tunggal = 4.00 4.00 Bh
5 Saklar Ganda = 4.00 4.00 Bh
6 Pek. Pas. Panel Listrik = 1.00 1.00 Bh
7 Pek. Instalasi stop kontak = 6.00 6.00 Titik
8 Stop Kontak = 6.00 6.00 Bh

XI PEKERJAAN LAIN-LAIN
1 Pekerjaan Pagar Besi BRC Tinggi Panjang Jumlah 16.30 m2
= 2.00 m x 2.85 m x 2 .= 11.40 m2
= 2.00 m x 2.45 m x 1 .= 4.90 m2

2 Pekerjaan Pintu Pagar Besi Panjang Lebar 9.45 m2


= 5.00 m x 1.89 .= 9.45 m2

3 Pekerjaan Handrailing Pintu Masuk Panjang Jumlah


Hanggar TPS3R = 1.96 m x 2 x 2 = 7.84 Jumlah .= 13.54 M'
0.72 x 3 x 2 = 4.32
0.25 x 2 x 2 = 1.00
0.19 x 1 x 2 = 0.38

Kantor = 0.95 m x 2 x 1 = 1.90 .= 4.75 M


0.72 m x 3 x 1 = 2.16
0.25 m x 2 x 1 = 0.50
0.19 m x 1 x 1 = 0.19

WC = 0.72 m x 5 x 1 = 3.60 .= 4.29 M


0.25 m x 2 x 1 = 0.50
0.19 m x 1 x 1 = 0.19

pengelasan (100% fisik) = 13.54 + 4.75 + 4.29 22.58 M

4 Pekerjaan Rolling door Panjang Lebar 7.27 m2


= 2.85 m x 2.55 .= 7.27 m2

5 Pek. Handrail WC = 1.20 = 1.20 M

6 Pekerjaan ukiran kayu Luas ukiran jumlah 19.20 m2


Depan = 2.64 m2 x 4 10.56 m2
Samping Kiri = 2.16 m2 x 4 8.64 m2

7 Pek. Plesteran letter timbul = 1.00 = 1.00 Paket

X PERALATAN TPS3R
1 Mesin Pencacah Plastik = 1.00 1.00 Unit
2 Mesin Pencacah Kompos = 1.00 1.00 Unit
JUMLAH
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME SATUAN

1 2 3 4 5
3 Mesin Pengayak = 1.00 1.00 Unit

XI KEBUTUHAN K3 DAN PROKES PENCEGAHAN COVID - 19


A KEBUTUHAN KESEHATAN DAN KESELAMATAN KERJA
1 Sosialisasi K3 dan Prokes (Spanduk) = 4.00 4.00 Bh
2 Helm Keselamatan = 21.00 21.00 Bh
3 Rompi Kerja = 21.00 21.00 Bh
4 Sarung Tangan (Safety Glove) = 21.00 21.00 Bh
5 Sepatu Keselamatan (Rubber Shoes) = 21.00 21.00 Bh
6 Tali Pengaman = 3.00 3.00 Bh
7 Kotak P3K = 2.00 2.00 Bh
8 Asuransi Tenaga Kerja = 1.00 1.00 Paket
B KEBUTUHAN PROTOKOL KESEHATAN PENCEGAHAN COVID-19
1 Alat ukur suhu badan nir-sentuh (Thermoscan) = 2.00 2.00 Bh
2 Vitamin C (1 Box isi 100 tablet) = 25.00 25.00 Bh
3 Tempat Cuci Tangan = 2.00 2.00 Bh
4 Sabun Cuci Tangan (Cair) 200ml/btl = 4.00 4.00 Bh
5 Masker kain = 25.00 25.00 Bh
6 Alat penyemprot desinfektan = 2.00 2.00 Bh
7 Cairan Desinfektan 5L = 3.00 3.00 Bh

XII ADMINISTRASI KEGIATAN


1 Pelaporan KSM = 1.00 1.00 Ls
2 Photo Copy / Penggandaan = 1.00 1.00 Ls
3 Biaya Alat Tulis Kantor (ATK) = 1.00 1.00 Ls
4 Materai = 9.00 9.00 Bh
5 Papan Nama Kegiatan = 1.00 1.00 Paket
Form - RAB1
BANTUAN PEMERINTAH UNTUK MASYARAKAT ( BPM ) DFAT PROGRAM KOTA TANPA KUMUH (KOTAKU)
HASIL KESEPAKATAN HARGA SATUAN UPAH/BAHAN/ALAT
BULAN :
Provinsi : Kalimantan Tengah Kecamatan : Sebangau
Kota : Palangka Raya Kelurahan : Kereng Bangkirai

HARGA SATUAN
SESUAI
No. Uraian Tenaga Kerja Satuan STANDAR
KOTA/KABUPAT
EN
I. TENAGA KERJA
1 Mandor HOK 225,000
2 Kepala Tukang HOK 170,000
3 Tukang Batu HOK 155,000
4 Tukang Kayu HOK 150,000
5 Tukang Besi HOK 150,000
6 Tukang Cat HOK 150,000
7 Pekerja HOK 140,000

REKOMENDASI HARGA
HARGA SATUAN HARGA SATUAN HASIL SURVEY*) TERENDAH YANG DIPILIH
SESUAI UNTUK BULAN INI
No. Uraian Tenaga Kerja Satuan STANDAR Toko/Pemasok -1 Toko/Pemasok - 2 Toko/Pemasok - 3
KABUPATEN/KO Nama: Nama: Nama: HARGA
Nama Toko/Pemasok
TA Almt : Almt : Almt : SATUAN*)
Telp : Telp : Telp :

II. BAHAN/MATERIAL :
1 Cat Menie Kayu Platone Kg 62,400 60,000
2 Cat dasar kayu platone Kg 62,400 60,000
3 Cat penutup kayu platone Kg 62,400 60,000
4 Cat tembok Kg 120,000 110,000
5 Kwas 4" Bh 45,000 45,000
6 Paku 5 - 12 cm Kg 22,000 22,000
7 Pasir beton m3 200,000 180,000
8 Pasir Pasang m3 190,000 150,000
9 Semen Portland Kg 1,325 1,275
10 Semen Portland Gresik 40 Kg/zak 53,000 51,000
11 Minyak Cat/Thinner Cemerlang Kg 28,100 28,100
12 Ampelas Kayu Flexigo Lbr 10,000 10,000
13 Kran air stainless Duffi Bh 65,000 65,000
14 Seal Tape Onda Kg 12,000 12,000
15 Papan Informasi Kegiatan Lbr 200,000 200,000
16 Kunci Tanam Bh 195,000 195,000
17 Engsel Pintu Bh 26,000 26,000
18 Lem Kayu Kg 33,000 33,000
19 Bata Merah Bh 800 800
20 Pipa PVC 4" AW Btg 295,000 295,000
21 Pipa PVC 3/4" AW Btg 42,000 42,000
22 Pipa PVC 2" AW Btg 127,500 127,500
23 Elboh/Knee Bh 25,000 25,000
25 Stop Kran 3/4 Bh 65,000 65,000
26 TanahUrug m3 100,000 100,000
27 Besi Beton Polos Kg 12,000 12,000
Besi beton polos dia. 8 Batang 47,000 45,000
Besi beton polos dia. 10 Batang 70,500 70,000
Besi beton polos dia. 12 Batang 101,500 101,000
28 Kawat Beton/Bendrat Kg 25,000 25,000
29 Plywood 9 mm Lbr 130,000 130,000
30 Batako Bh 3,000 2,800
31 Keramik lantai uk.40x40 Doz 75,000 75,000
32 Semen Warna Kg 5,000 5,000
33 Keramik lantai uk.20x20 Doz 65,000 65,000
34 Keramik dinding uk.10x20 Doz 65,400 65,400
35 Baja ringan 75x35x0,75 MM Batang 82,000 125,000
36 Hollow 30x30x0,3 MM Batang 50,000 50,000
37 Paku Skrup Bh 3,500 3,500
38 Atap Metal Zincalume Spandek (106x600) Lbr 255,000 250,000
39 Paku Anti Karat Kg 35,000 35,000
40 Papan Plank Kalsiboard tbl.8 mm (30x240mm) Lbr 155,000 155,000
41 Besi Hollow Plafond 1,3x 3,3 mm Batang 15,000 15,000
42 Kalsiboard tebal 6 mm Lbr 110,000 110,000
43 Paku Kalsiboard Kg 25,000 25,000
44 Kaca Bening 5 mm m2 135,000 135,000
45 Sealant Kaca Kg 47,500 47,500
46 Engsel Pintu 4" Bh 35,000 35,000
47 Engsel Jendela Bh 41,000 41,000
48 Kunci pintu tanam lengkap Bh 95,000 95,000
49 Hak/Kait Angin Bh 20,800 20,800
50 Gerendel/Kunci slot Bh 35,000 35,000
51 Handel Jendela Bh 8,000 8,000
52 Bioseptictank BF-08 Bh 10,643,500 10,643,500
53 Profil tank 1200 L Bh 1,600,000 1,600,000
54 Closed duduk Unit 1,828,300 1,800,000
55 Batu Belah (Tangkiling-Dalam Kota) m3 400,000 400,000
56 Roster/Kerawang uk. 30cmx30cm Bh 25,000 25,000
57 Glasblock uk. 20x20 Bh 27,000 26,000
58 KalsiBoard tebal 8 mm (120x240) Bh 190,000 190,000
59 Wastafel lengkap+cermin putih Unit 940,000 940,000
60 Box panel 20x80x60 Bh 760,000 760,000
61 Penyambungan Daya Baru PLN Unit 4,500,000 4,500,000
62 Instalasi Titik Lampu Titik 325,000 325,000
REKOMENDASI HARGA
HARGA SATUAN HARGA SATUAN HASIL SURVEY*) TERENDAH YANG DIPILIH
SESUAI UNTUK BULAN INI
No. Uraian Tenaga Kerja Satuan STANDAR Toko/Pemasok - 1 Toko/Pemasok - 2 Toko/Pemasok - 3
KABUPATEN/KO Nama: Nama: Nama: HARGA
Nama Toko/Pemasok
TA Almt : Almt : Almt : SATUAN*)
Telp : Telp : Telp :
63 Lampu SL 18 Watt Bh 35,000 35,000
64 Saklar Tunggal Bh 20,000 20,000
65 Saklar Ganda Bh 20,000 20,000
66 Pek. Pas. Panel Listrik Bh 760,000 760,000
67 Pek. Instalasi stop kontak Titik 325,000 325,000
68 Stop Kontak Bh 20,000 20,000
69 Pipa Besi Galvanis tbl 1,2 mm P=6 m Batang 179,500 179,500
70 Rolling door manual m2 500,000 500,000
71 Pagar BRC Hot Deep Galvanized T.90-P.240 Lembar 577,500 577,500
Pagar BRC Hot Deep Galvanized M2 320,000
73 Pipa Stainless Steel 2" btg/6m 206,000 308,700
Pipa Stainless Steel 2" m 52,000
74 Glassblock Bh 26,000
75 Sumur Bor+Pompa Unit 2,500,000
REKOMENDASI HARGA
HARGA SATUAN HASIL SURVEY*) TERENDAH YANG DIPILIH
HARGA SATUAN UNTUK BULAN INI
SESUAI Toko/Pemasok -1 Toko/Pemasok - 2 Toko/Pemasok - 3
No. Uraian Tenaga Kerja Satuan STANDAR HARGA
KABUPATEN/KO Nama: Nama: Nama: Nama Toko/Pemasok
SATUAN*)
TA Almt : Almt : Almt :
Telp : Telp : Telp :
1 Balok Kayu Klas II (Lanan) m3 4,000,000.00 4,000,000.00 4,000,000.00
2 Papan Kayu Klas II (Lanan) m3 5,000,000.00 5,000,000.00 5,000,000.00
3 Papan Kayu Klas II (Benuas) m3 6,500,000.00 6,000,000.00 6,000,000.00
4 Balok Kayu Klas III m3 2,250,000.00 2,200,000.00 2,200,000.00
5 Papan Kayu Klas III m3 2,500,000.00 2,450,000.00 2,450,000.00
6 Kerikil (Maks 30mm) m3 475,000.00 450,000.00 450,000.00
7 Kayu Galam diameter 10-12 cm P=4 m Batang 35,000.00 35,000.00 35,000.00
8 Kayu Galam diameter 6-10 cm P=4 m Batang 30,000.00 30,000.00 30,000.00

REKOMENDASI HARGA
HARGA SATUAN HARGA SATUAN HASIL SURVEY*) TERENDAH YANG DIPILIH
SESUAI Toko/Pemasok - 1 Toko/Pemasok - 2 Toko/Pemasok - 3 UNTUK BULAN INI
No. Uraian Tenaga Kerja Satuan STANDAR Nama: Nama: Nama: HARGA
KABUPATEN/KO Almt : Nama Toko/Pemasok
Almt : Almt : SATUAN*)
TA Telp : Telp : Telp :

III. KEBUTUHAN K3 DAN PROKES PENCEGAHAN COVID - 19


1 Sosialisasi K3 dan Prokes (Spanduk) 75,000
2 Helm Keselamatan 100,000
3 Rompi Kerja 60,000
4 Sarung Tangan (Safety Glove) 5,000
5 Sepatu Keselamatan (Rubber Shoes) 100,000
6 Tali Pengaman 231,500
7 Kotak P3K 40,000
8 Asuransi Tenaga Kerja 912,000
9 Alat ukur suhu badan nir-sentuh (Thermoscan) 350,000
10 Vitamin C (1 Box isi 100 tablet) 25,000
11 Tempat Cuci Tangan 250,000
12 Sabun Cuci Tangan (Cair) 200ml/btl 25,000
13 Masker kain 5,000
14 Alat penyemprot desinfektan 65,000
15 Cairan Desinfektan 5L 75,000

REKOMENDASI HARGA
HARGA SATUAN HARGA SATUAN HASIL SURVEY*) TERENDAH YANG DIPILIH
SESUAI Toko/Pemasok - 1 Toko/Pemasok - 2 Toko/Pemasok - 3 UNTUK BULAN INI
No. Uraian Tenaga Kerja Satuan STANDAR Nama: Nama: Nama: HARGA
KABUPATEN/KO Almt : Nama Toko/Pemasok
Almt : Almt : SATUAN*)
TA Telp : Telp : Telp :

XIX ADMINISTRASI KEGIATAN


1 Pelaporan KSM 270,000.00
2 Photo Copy / Penggandaan 250,000.00
3 Biaya Alat Tulis Kantor (ATK) 150,000.00
4 Materai 10,000.00
5 Pengujian Lab 500,000.00
6 Papan Nama Kegiatan 250,000.00

*) Harga Satuan sampai dilokasi Kegiatan (sudah termasuk biaya Transport)


…………., Tgl. …………….20…..

Diverifikasi Oleh : Dibuat Oleh :


Askot Infrastruktur, Fasilitator Teknik, UPL

Wiwit Whindari, ST. Hengky Pradana, ST


RAB-2

BANTUAN PEMERINTAH UNTUK MASYARAKAT ( BPM ) DFAT PROGRAM KOTA TANPA KUMUH (KOTAKU)
DAFTAR KUANTITAS PEKERJAAN
PAKET : PEMBANGUNAN TPS3R

Kab./Kota : Palangka Raya Kelurahan : Kereng Bangkirai


Kecamatan : Sebangau BKM : Kereng Membangun

NO. URAIAN PEKERJAAN SATUAN VOLUME

I PEKERJAAN PERSIAPAN
1 Pembersihan Awal m2 200.00
2 Pengukuran dan Pemasangan Bowplank m 66.00

II PEKERJAAN TANAH
1 Pek urugan tanah lokasi kegiatan m3 218.55
2 Pek. Galian Tanah Pondasi m3 11.68
3 Pek. Urugan Bekas Galian m3 2.92
4 Pek. Urugan Pasir bawah lantai m3 45.49
5 Pek. Pemancangan Cerucuk Kayu Galam (p. 2m) Btg 372.00

III PEKERJAAN BETON BERTULANG


1 Pondasi Footplat P1 (80 cm x 80 cm x 20 cm)
a Pek. Pembesian Kg 318.33
b Pek. Lantai Kerja Beton K.100 t=5 cm m3 0.67
c Pek. Bekisting Pondasi m2 2.24
d Cor Beton Mutu K.200 m3 2.69
2 Pondasi Footplat P2 (60 cm x 60 cm x 20 cm)
a Pek. Pembesian Kg 218.55
b Pek. Lantai Kerja Beton K.100 t=5 cm m3 0.34
c Pek. Bekisting Pondasi m2 1.52
d Cor Beton Mutu K.200 m3 1.37
3 Pondasi Footplat P3 (120 cm x 80 cm x 20 cm)
a Pek. Pembesian Kg 39.95
b Pek. Lantai Kerja Beton K.100 t=5 cm m3 0.05
c Pek. Bekisting Pondasi m2 1.92
d Cor Beton Mutu K.200 m3 0.19
4 Pek Kolom K1
a Pek. Pembesian Kg 485.65
b Pek. Bekisting Kolom m2 40.40
c Cor Beton Mutu K.200 m3 4.23
5 Pek Kolom K2
a Pek. Pembesian Kg 148.41
b Pek. Bekisting Kolom m2 15.43
c Cor Beton Mutu K.200 m3 1.76
6 Pek Kolom K3
a Pek. Pembesian Kg 66.62
b Pek. Bekisting Kolom m2 6.96
c Cor Beton Mutu K.200 m3 0.26
7 Pekerjaan Sloof 20x30
a Pek. Pembesian Kg 393.92
b Pek. Bekisting Sloof m2 11.60
c Cor Beton Mutu K.200 m3 3.48
NO. URAIAN PEKERJAAN SATUAN VOLUME

8 Pekerjaan Sloof 15x20


a Pek. Pembesian Kg 303.68
b Pek. Bekisting Sloof m2 23.72
c Cor Beton Mutu K.200 m3 2.03
9 Pekerjaan Ring Balok 20x20
a Pek. Pembesian Kg 275.43
b Pek. Bekisting Ring Balok m2 11.60
c Cor Beton Mutu K.200 m3 2.32
10 Pekerjaan Balok 15x20
a Pek. Pembesian Kg 44.67
b Pek. Bekisting Ring Balok m2 3.36
c Cor Beton Mutu K.200 m3 0.25
11 Pekerjaan Ring Balok 15/15
a Pek. Pembesian Kg 282.53
b Pek. Bekisting Ring Balok m2 17.79
c Cor Beton Mutu K.200 m3 0.62
12 Pekerjaan lantai beton bertulang 0.00 0.00
a Pek. Pembesian Kg 1053.65
b Cor Beton Mutu K.175 m3 48.72
13 Pek. Plat /Dak Beton
a Pembesian Kg 36.50
b Pek. Bekisting m2 4.29
c Cor Beton Mutu K.200 m3 0.64

IV PEKERJAAN DINDING, PLESTERAN DAN KERAMIK


1 Pek. Pasangan dinding Bataco
a Bangunan Hanggar TPS3R m2 142.96
b Kantor m2 60.60
c WC m2 23.50
d Pagar m2 73.61
2 Pek. Plesteran Dinding 0.00 0.00
a Bangunan Hanggar TPS3R m2 205.28
b Kantor m2 89.03
c WC m2 38.21
d Pagar m2 93.01
3 Cor Beton Lantai Beton Mutu K.200 m3 5.04
4 Pek Keramik lantai Uk.40x40 m2 46.21
5 Pek Keramik lantai WC Uk.20x20 m2 3.68
6 Pek Keramik dinding WC Uk.10x20 m2 8.16
7 Pek. Dinding Tawing layar m2 64.20

V PEKERJAAN ATAP, PLAFOND, LISPLANK


1 Rangka Atap Baja Ringan
a Hanggar TPS3R m2 242.24
b Kantor m2 18.63
c WC m2 9.96
2 Pek Atap Genteng Metal Zincalume 0.00 0.00
a Hanggar TPS3R m2 242.24
b Kantor m2 18.63
c WC m2 9.96
3 Pek. Lisplank Superplank Eksterior m 57.34
4 Rangka Hollow Plafond Kantor m2 9.55
5 Pek. Pas. Plafond Kalsiboard m2 9.55
NO. URAIAN PEKERJAAN SATUAN VOLUME

VI PEKERJAAN PINTU, JENDELA, KUNCI & PENGGANTUNG


1 Pek. Kusen Pintu dan Jendela Kayu Klas II 0.00 0.00
a Hanggar TPS3R m3 0.12
b Kantor m3 0.06
c WC m3 0.02
2 Pek. Daun Pintu Panel Kayu Klas II
a Hanggar TPS3R m2 3.60
b Kantor m2 1.80
c WC m2 1.80
3 Pek. Rangka Jendela Kaca Kayu Klas II m2 2.26
4 Pek.Pemasangan Kaca Tebal 5 mm m2 7.48
5 Pek. Engsel Pintu bh 12.00
6 Pek. Engsel Jendela bh 12.00
7 Kunci Tanam bh 4.00
8 Hak angin Jendela bh 6.00
9 Gerendel Jendela bh 6.00
10 Handel Jendela bh 6.00
11 Pekerjaan Ventilasi Kerawang m2 16.20
12 Pekerjaan glasblock m2 8.92

VII PEKERJAAN PENGECATAN


1 Pengecatan dinding
a Hanggar TPS3R m2 205.28
b Kantor m2 89.03
c WC m2 38.21
d Pagar m2 93.01
2 Pengecatan Plafond Kantor m2 9.55
3 Pengecatan Kusen Pintu dan Jendela m2 10.08
4 Pengecatan Pintu Panel
a Hanggar TPS3R m2 10.80
b Kantor m2 3.60
c WC m2 3.60
5 Pengecatan Rangka Jendela Kaca m2 3.20

VIII PEKERJAAN SANITASI


1 Pekerjaan Septictank 1 unit
a Galian Septictank m3 6.94
b Pek. Urugan Pasir t=5 cm m2 0.19
c Pek Cor Beton K.175 tebal 10 cm m3 0.26
d Pek. Sloof 15/15
- Pek. Pembesian Kg 26.06
- Pek. bekisting m2 2.40
- Pek cor beton K.175 m3 0.18
e Pek. Kolom 15/15
- Pek. Pembesian Kg 24.23
- Pek. bekisting m2 4.08
- Pek cor beton K.175 m3 0.15
f Pek. Pas. Batako m2 11.56
g Pek. Plesteran m2 11.56
h Pek. Ring Balk 15/15
- Pek. Pembesian Kg 28.28
- Pek. bekisting m2 2.40
- Pek cor beton K.175 m3 0.18
NO. URAIAN PEKERJAAN SATUAN VOLUME

i Pek. Plat penutup septictank tebal 10 cm


- Pek. Pembesian Kg 4.66
- Pek. bekisting m2 1.20
- Pek cor beton K.175 m3 0.17
j Pek. Tutup mainhole
- Pek. Pembesian Kg 3.00
- Pek. bekisting m2 0.42
- Pek cor beton K.175 m3 0.05
k Bioseptictank Kapasitas 3000L Bh 1.00
l Urugan Pasir dalam septictank m3 0.34
2 Pekerjaan Pipa 4" m 3.50
3 Pekerjaan Pipa 2" m 1.93
4 Pekerjaan Pipa 3/4" (Air Bersih) m 36.66
5 Pek. Sumur Bor+pompa Bh 1.00
6 Pekerjaan kran air Bh 2.00
7 Pekerjaan stop kran Bh 1.00
8 Profil tank 1200 L Bh 1.00
9 Pek. Closed Duduk Bh 1.00
10 Pek. Wastafel+cermin Unit 1.00

IX PEKERJAAN JEMBATAN
1 Pekerjaan Pondasi Batu Belah m3 19.18
2 Pekerjaan Sloof 20/30
a Pek. Pembesian kg 102.56
b Pekerjaan Bekisting Sloof m2 12.44
c Cor Beton K.200 m3 1.09
3 Pekerjaan Balok 20/30
a Pek. Pembesian kg 51.28
b Pekerjaan Bekisting Balok m2 7.28
c Cor Beton K.200 m3 0.55
4 Pekerjaan Plat beton
a Pek. Pembersian kg 250.87
b Pekerjaan Bekisting Plat m2 11.89
c Cor Beton K200 tebal 20 cm m3 4.03
5 Pekerjaan Reling jembatan
a Pembesian Kolom 15/15 Kg 22.59
b Pek. Bekisting Kolom m2 2.40
c Cor Beton K.200 m3 0.18
d Pek. Pas Batako m2 3.10
e Pek. Plesteran m2 6.60
### ### Err:509 Err:509

X PEKERJAAN LISTRIK
1 Penyambungan Daya Baru PLN Unit 1.00
2 Instalasi Titik Lampu Titik 13.00
3 Lampu SL 18 Watt Bh 13.00
4 Saklar Tunggal Bh 4.00
5 Saklar Ganda Bh 4.00
6 Pek. Pas. Panel Listrik Bh 1.00
7 Pek. Instalasi stop kontak Titik 6.00
8 Stop Kontak Bh 6.00
NO. URAIAN PEKERJAAN SATUAN VOLUME

XI PEKERJAAN LAIN-LAIN
1 Pekerjaan Pagar Besi BRC m2 16.30
3 Pekerjaan Handrail difabel stainless 0.00 0.00
4 Pekerjaan Rolling door m2 7.27
5 Pek. Handrail closet m 1.20
6 Pekerjaan ukiran kayu m2 19.20

XII PERALATAN TPS3R


1 Mesin Pencacah Plastik kap 400 Kg/hari Diesel 16 HP Unit 1.00
2 Mesin Pencacah Kompos kapasitas 500 kg/jam Diesel 8HP Unit 1.00
3 Mesin Pengayak Kapasitas 500 Kg/Jam Unit 1.00

XIII KEBUTUHAN K3 DAN PROKES PENCEGAHAN COVID - 19


A KEBUTUHAN KESEHATAN DAN KESELAMATAN KERJA
1 Sosialisasi K3 dan Prokes (Spanduk) Bh 4.00
2 Helm Keselamatan Bh 21.00
3 Rompi Kerja Bh 21.00
4 Sarung Tangan (Safety Glove) Bh 21.00
5 Sepatu Keselamatan (Rubber Shoes) Bh 21.00
6 Tali Pengaman Bh 3.00
7 Kotak P3K Bh 2.00
8 Asuransi Tenaga Kerja Paket 1.00
B KEBUTUHAN PROTOKOL KESEHATAN PENCEGAHAN COVID-19
1 Alat ukur suhu badan nir-sentuh (Thermoscan) Bh 2.00
2 Vitamin C (1 Box isi 100 tablet) Bh 25.00
3 Tempat Cuci Tangan Bh 2.00
4 Sabun Cuci Tangan (Cair) 200ml/btl Bh 4.00
5 Masker kain Bh 25.00
6 Alat penyemprot desinfektan Bh 2.00
7 Cairan Desinfektan 5L Bh 3.00

XIV ADMINISTRASI KEGIATAN


1 Pelaporan KSM Ls 1.00
2 Photo Copy / Penggandaan Ls 1.00
3 Biaya Alat Tulis Kantor (ATK) Ls 1.00
4 Pengujian Lab Bh 1.00
5 Papan Nama Kegiatan Paket 1.00

Diverifikasi Oleh : Dibuat Oleh :


Askot Infrastruktur Fasilitator Teknik, UPL

Wiwit Whindari, ST. Hengky Pradana, ST


Form - RAB 3
BANTUAN PiMiRINTAH UNTUK MASYARAKAT ( BPM ) DFAT
PROGRAM KOTA TANPA KUMUH (KOTAKU)
FORMAT PiRiKAMAN ANALISA HARGA SATUAN

Pikirjaan : (K3) Pimbirsihan 1 m2 lapangan dan pirataan Kodi Analisa


Satuan Pimbayaran : M2 A.2.2.1.9

Harga Satuan Jumlah Harga


No. Uraian Kodi Satuan Koifisiin
(Rp.) (Rp)
A. Tinaga Kirja
Pikirja L.01 OH 0.1000 140,000.00 14,000.00
Mandor L.04 OH 0.0500 -
Jumlah Tinaga 14,000.00
B. Bahan
Jumlah Bahan
C. Peralatan -
Jumlah Peralatan -
D. Harga Satuan Pekerjaan (A+B+C) 14,000.00

Pekerjaan : (Pengukuran dan pemasangan 1 m’ Bouwplank Kode Analisa


Satuan Pembayaran : M2 A. 2.2.1.4.

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.) (Rp)
A. Tenaga Kerja
Pekerja L.01 OH 0.1000 140,000.00 14,000.00
Tukang Kayu L.02 OH 0.1000 150,000.00 15,000.00
Kepala tukang L.03 OH 0.0100 170,000.00 1,700.00
Mandor L.04 OH 0.0050 -
Jumlah Tenaga 30,700.00
B. Bahan
Kayu balok 5/7 Klas III m3 0.012 2,200,000.00 26,400.00
Paku 5-10 cm Kg 0.02 22,000.00 440.00
Kayu papan 2/20 Klas III m3 0.0070 2,450,000.00 17,150.00
Jumlah Bahan 43,990.00
C. Peralatan
Jumlah Peralatan -
D. Harga Satuan Pekerjaan (A+B+C) 74,690.00

Pekerjaan : Penggalian 1 m3 tanah biasa sedalam 1 m Kode Analisa


Satuan Pembayaran : M3 A. 2.3.1.1

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.) (Rp)
A. Tenaga Kerja
Pekerja L.01 OH 0.7500 140,000.00 105,000.00
Mandor L.04 OH 0.0250 -
Jumlah Tenaga 105,000.00
B. Bahan
Jumlah Bahan
C. Peralatan -
Jumlah Peralatan -
D. Harga Satuan Pekerjaan (A+B+C) 105,000.00
Pekerjaan : Pengurugan kembali 1 m3 galian tanah Kode Analisa
Satuan Pembayaran : M3 A.2.3.1.9.

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.) (Rp)
A. Tenaga Kerja
Pekerja L.01.01 OH 0.5000 140,000.00 70,000.00
Mandor L.04.01 OH 0.0500 -
Jumlah Tenaga 70,000.00
B. Bahan -

Jumlah Bahan -
C. Peralatan - -
Jumlah Peralatan -
D. Harga Satuan Pekerjaan (A+B+C) 70,000.00

Pekerjaan : Pengurugan 1 m3 dengan tanah urug Kode Analisa


Satuan Pembayaran : M3 A.2.3.1.11.a

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.) (Rp)
A. Tenaga Kerja
Pekerja L.01 OH 0.3000 140,000.00 42,000.00
Mandor L.04 OH 0.0100 -
Jumlah Tenaga 42,000.00
B. Bahan -
Tanah urug m3 1.2000 100,000 120,000.00
Jumlah Bahan 120,000.00
C. Peralatan - -
Jumlah Peralatan -
D. Harga Satuan Pekerjaan (A+B+C) 162,000.00

Pekerjaan : Pengurugan 1 m3 dengan Pasir Kode Analisa


Satuan Pembayaran : M3 A.2.3.1.11.

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.) (Rp)
A. Tenaga Kerja
Pekerja L.01 OH 0.3000 140,000.00 42,000.00
Mandor L.04 OH 0.0100 -
Jumlah Tenaga 42,000.00
B. Bahan -
Pasir Urug m3 1.2000 150,000.00 180,000.00
Jumlah Bahan 180,000.00
C. Peralatan - -
Jumlah Peralatan -
D. Harga Satuan Pekerjaan (A+B+C) 222,000.00

Pekerjaan : 1 Btg Pancang Cerucuk Kayu atau Dolken dia. 8 - 10 Cm (panjang Kode Analisa
Satuan Pembayaran :M P.07.a

No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


(Rp.) (Rp)
A. Tenaga Kerja
Pekerja L.01 OH 0.045 140,000 6,300.00
Tukang Kayu L.02 OH 0.012 150,000 1,800.00
Jumlah Tenaga 8,100.00
B. Bahan
Dolken Kayu Galam ø 10-12 m Btg 1.000 35,000 35,000.00
Alat Bantu 0.200 35,000 7,000.00
Jumlah Bahan 42,000.00
C. Peralatan -
Jumlah Peralatan -
D. Harga Satuan Pekerjaan (A+B+C) 50,100.00
Pekerjaan : Pembesian 10 kg dengan besi polos atau besi ulir Kode Analisa
Satuan Pembayaran : Kg A.4.1.1.17

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.) (Rp)
A. Tenaga Kerja
Pekerja L.01 OH 0.0700 140,000.00 9,800.00
Tukang Besi L.02 OH 0.0700 150,000.00 10,500.00
Kepala Tukang L.03 OH 0.0070 170,000.00 1,190.00
Mandor L.04 OH 0.0040 - -
-
Jumlah Tenaga 21,490.00
B. Bahan
Besi beton Kg 10.5000 12,000.00 126,000.00
Kawat Beton Kg 0.1500 25,000.00 3,750.00
Jumlah Bahan 129,750.00
C. Peralatan
-
Jumlah Peralatan -

D. Harga Satuan Pekerjaan (A+B+C) 151,240.00

Pembesian 1 Kg Besi 15,124.00

Pekerjaan : Membuat 1 m3 beton mutu f’c = 7,4 Mpa (K.100) Kode Analisa
Satuan Pembayaran : M3 A.4.1.1.1

No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


(Rp.) (Rp)
A. Tenaga Kerja
Pekerja L.01 OH 1.6500 140,000.00 231,000.00
Tukang batu L.02 OH 0.2750 155,000.00 42,625.00
Kepala tukang L.03 OH 0.0280 170,000.00 4,760.00
Mandor L.04 OH 0.0830 - -
Jumlah Tenaga 278,385.00
B. Bahan
Semen Portland kg 247.0000 1,275.00 314,925.00
Pasir beton kg 869.0000 128.57 111,728.57
Split kg 999.0000 250.00 249,750.00
Air Liter 215.0000 -
Jumlah Bahan 676,403.57
C. Peralatan
-
Jumlah Peralatan -
D. Harga Satuan Pekerjaan (A+B+C) 954,788.57

Pekerjaan : Membuat 1 m3 beton mutu f’c = 14,5 Mpa (K.175) Kode Analisa
Satuan Pembayaran : M3 A.4.1.1.5.

No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


(Rp.) (Rp)
A. Tenaga Kerja
Pekerja L.01 OH 1.6500 140,000.00 231,000.00
Tukang batu L.02 OH 0.2750 155,000.00 42,625.00
Kepala tukang L.03 OH 0.0280 170,000.00 4,760.00
Mandor L.04 OH 0.0830 - -
Jumlah Tenaga 278,385.00
B. Bahan
Semen Portland kg 326.0000 1,275.00 415,650.00
Pasir beton kg 760.0000 128.57 97,714.29
Split kg 1,029.0000 250.00 257,250.00
Air Liter 215.0000 -
Jumlah Bahan 770,614.29
C. Peralatan
-
Jumlah Peralatan -
D. Harga Satuan Pekerjaan (A+B+C) 1,048,999.29
Pekerjaan : Membuat 1 m3 beton mutu f’c = 19,3 MPa (K 200) Kode Analisa
Satuan Pembayaran : M3 A.4.1.1.6.

No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


(Rp.) (Rp)
A. Tenaga Kerja
Pekerja L.01 OH 1.6500 140,000.00 231,000.00
Tukang batu L.02 OH 0.2750 155,000.00 42,625.00
Kepala tukang L.03 OH 0.0280 170,000.00 4,760.00
Mandor L.04 OH 0.0830 - -
Jumlah Tenaga 278,385.00
B. Bahan
Semen Portland kg 352.0000 1,275.00 448,800.00
Pasir beton kg 731.0000 128.57 93,985.71
Split kg 1,031.0000 250.00 257,750.00
Air Liter 215.0000 -
Jumlah Bahan 800,535.71
C. Peralatan
-
Jumlah Peralatan -
D. Harga Satuan Pekerjaan (A+B+C) 1,078,920.71

Pekerjaan : (K3) Pemasangan 1 m2 bekisting untuk pondasi Kode Analisa


Satuan Pembayaran : M3 A.4.1.1.20

No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


(Rp.) (Rp)
A. Tenaga Kerja
Pekerja L.01 OH 0.5200 140,000.00 72,800.00
Tukang kayu L.02 OH 0.2600 150,000.00 39,000.00
Kepala tukang L.03 OH 0.0260 170,000.00 4,420.00
Mandor L.04 OH 0.0260 - -
Jumlah Tenaga 116,220.00
B. Bahan
Papan Kayu Klas III m3 0.0400 2,450,000.00 98,000.00
Paku 5-10 cm kg 0.3000 22,000.00 6,600.00
Minyak Bekisting kg 0.1000 - -
Jumlah Bahan 104,600.00
C. Peralatan
-
Jumlah Peralatan -
D. Harga Satuan Pekerjaan (A+B+C) 220,820.00

Pekerjaan : (K3) Pemasangan 1 m2 bekisting untuk sloof Kode Analisa


Satuan Pembayaran : M3 A.4.1.1.21

No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


(Rp.) (Rp)
A. Tenaga Kerja
Pekerja L.01 OH 0.5200 140,000.00 72,800.00
Tukang kayu L.02 OH 0.2600 150,000.00 39,000.00
Kepala tukang L.03 OH 0.0260 170,000.00 4,420.00
Mandor L.04 OH 0.0260 - -
Jumlah Tenaga 116,220.00
B. Bahan
Papan Kayu Klas III m3 0.0400 2,450,000.00 98,000.00
Paku 5-10 cm kg 0.4000 22,000.00 8,800.00
Minyak Bekisting kg 0.2000 -
Jumlah Bahan 106,800.00
C. Peralatan
-
Jumlah Peralatan -
D. Harga Satuan Pekerjaan (A+B+C) 223,020.00
Pekerjaan : (K3) Pemasangan 1 m2 bekisting untuk kolom Kode Analisa
Satuan Pembayaran : M3 A.4.1.1.22

No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


(Rp.) (Rp)
A. Tenaga Kerja
Pekerja L.01 OH 0.6600 140,000.00 92,400.00
Tukang kayu L.02 OH 0.3300 150,000.00 49,500.00
Kepala tukang L.03 OH 0.0330 170,000.00 5,610.00
Mandor L.04 OH 0.0330 - -
Jumlah Tenaga 147,510.00
B. Bahan
Papan Kayu Klas III m3 0.0400 2,450,000.00 98,000.00
Paku 5-10 cm kg 0.4000 22,000.00 8,800.00
Minyak Bekisting kg 0.2000 -
Balok kayu kelas II uk.5/7 m3 0.0150 4,000,000.00 60,000.00
Plywood tebal 9 mm Lbr 0.3500 - -
Dolken kayu φ 8-10cm Batang 2.0000 30,000.00 60,000.00
Jumlah Bahan 226,800.00
C. Peralatan
-
Jumlah Peralatan -
D. Harga Satuan Pekerjaan (A+B+C) 374,310.00

Pekerjaan : (K3) Pemasangan 1 m2 bekisting untuk balok Kode Analisa


Satuan Pembayaran : M3 A.4.1.1.23

No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


(Rp.) (Rp)
A. Tenaga Kerja
Pekerja L.01 OH 0.6600 140,000.00 92,400.00
Tukang kayu L.02 OH 0.3300 150,000.00 49,500.00
Kepala tukang L.03 OH 0.0330 170,000.00 5,610.00
Mandor L.04 OH 0.0330 - -
Jumlah Tenaga 147,510.00
B. Bahan
Papan Kayu Klas III m3 0.0400 2,450,000.00 98,000.00
Paku 5-10 cm kg 0.4000 22,000.00 8,800.00
Minyak Bekisting kg 0.2000 -
Balok kayu kelas II m3 0.0180 4,000,000.00 72,000.00
Plywood tebal 9 mm Lbr 0.3500 - -
Dolken kayu φ 8-10cm Batang 2.0000 30,000.00 60,000.00
Jumlah Bahan 238,800.00
C. Peralatan
-
Jumlah Peralatan -
D. Harga Satuan Pekerjaan (A+B+C) 386,310.00
Pekerjaan : (K3) Pemasangan 1 m2 bekisting untuk plat Kode Analisa
Satuan Pembayaran : M2 A.4.1.1.24

No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


(Rp.) (Rp)
A. Tenaga Kerja
Pekerja L.01 OH 0.6600 140,000.00 92,400.00
Tukang kayu L.02 OH 0.3300 150,000.00 49,500.00
Kepala tukang L.03 OH 0.0330 170,000.00 5,610.00
Mandor L.04 OH 0.0330 - -
Jumlah Tenaga 147,510.00
B. Bahan
Papan Kayu Klas III m3 0.0400 2,450,000.00 98,000.00
Paku 5-10 cm kg 0.4000 22,000.00 8,800.00
Minyak Bekisting kg 0.2000 -
Balok kayu kelas II m3 0.0150 4,000,000.00 60,000.00
Plywood tebal 9 mm Lbr 0.3500 130,000.00 45,500.00
Dolken kayu φ 8-10cm Batang 6.0000 30,000.00 180,000.00
Jumlah Bahan 392,300.00
C. Peralatan
-
Jumlah Peralatan -
D. Harga Satuan Pekerjaan (A+B+C) 539,810.00

Pekerjaan : 1 m2 Pengecatan bidang kayu baru Kode Analisa


Satuan Pembayaran : M2 A.4.7.1.4.

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.) (Rp)
A. Tenaga Kerja
Pekerja L.01 OH 0.0700 140,000.00 9,800.00
Tukang cat L.02 OH 0.0090 150,000.00 1,350.00
Kepala tukang L.03 OH 0.0060 170,000.00 1,020.00
Mandor L.04 OH 0.0030 - -
Jumlah Tenaga 12,170.00
B. Bahan
Cat menie Kayu Kg 0.2000 60,000.00 12,000.00
Plamuur Kg 0.1500 - -
Cat dasar Kayu Kg 0.1700 60,000.00 10,200.00
Cat penutup Kayu Kg 0.2600 60,000.00 15,600.00
Kuas Bh 0.0100 45,000.00 450.00
Pengencer Kg 0.0300 28,100.00 843.00
Ampelas Lbr 0.2000 10,000.00 2,000.00
Jumlah Bahan 41,093.00
C. Peralatan
-
Jumlah Peralatan -
D. Harga Satuan Pekerjaan (A+B+C) 53,263.00

Pekerjaan : Pengecatan 1 m2 tembok baru Kode Analisa


Satuan Pembayaran : M2 A.4.7.1.10.

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp.) (Rp)
A. Tenaga Kerja
Pekerja L.01 OH 0.0200 140,000.00 2,800.00
Tukang cat L.02 OH 0.0630 150,000.00 9,450.00
Kepala tukang L.03 OH 0.0063 170,000.00 1,071.00
Mandor L.04 OH 0.0030 -
Jumlah Tenaga 13,321.00
B. Bahan
Plamuur Kg 0.1000 - -
Cat dasar Tembok Kg 0.1200 110,000.00 13,200.00
Cat Penutup Tembok Kg 0.1800 110,000.00 19,800.00
Jumlah Bahan 33,000.00
C. Peralatan -
Jumlah Peralatan -
D. Harga Satuan Pekerjaan (A+B+C) 46,321.00
Pekerjaan : (K3) Pemasangan 1 buah closet duduk/monoblock Kode Analisa
Satuan Pembayaran : Bh A.5.1.1.1.

No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


(Rp.) (Rp)
A. Tenaga Kerja
Pekerja L.01 OH 3.300 140,000.00 462,000.00
Tukang Batu L.02 OH 1.100 155,000.00 170,500.00
Kepala Tukang L.03 OH 0.010 170,000.00 1,700.00
Mandor L.04 OH 0.160 - -
Jumlah Tenaga 634,200.00
B. Bahan
Closed duduk Unit 1.000 1,800,000.00 1,800,000.00
Perlengkapan % 6.000 1,800,000.00 108,000.00
Jumlah Bahan 1,908,000.00
C. Peralatan
-
Jumlah Peralatan -
D. Harga Satuan Pekerjaan (A+B+C) 2,542,200.00

Pekerjaan : Pemasangan 1 buah kran diameter ½” atau ¾ ” Kode Analisa


Satuan Pembayaran : Bh A.5.1.1 19.

No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


(Rp.) (Rp)
A. Tenaga Kerja
Pekerja L.01 OH 0.010 140,000.00 1,400.00
Tukang Batu L.02 OH 0.400 155,000.00 62,000.00
Kepala Tukang L.03 OH 0.040 170,000.00 6,800.00
Mandor L.04 OH 0.005 - -
Jumlah Tenaga 70,200.00
B. Bahan
Kran Air Bh 1.000 65,000.00 65,000.00
Seal Tape Bh 0.025 12,000.00 300.00
Jumlah Bahan 65,300.00
C. Peralatan
-
Jumlah Peralatan -
D. Harga Satuan Pekerjaan (A+B+C) 135,500.00

Pekerjaan : Pemasangan 1 buah Stop Kran 3/4 Kode Analisa


Satuan Pembayaran : Bh A.5.1.1 19.a

No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


(Rp.) (Rp)
A. Tenaga Kerja
Pekerja L.01 OH 0.010 140,000.00 1,400.00
Tukang Batu L.02 OH 0.400 155,000.00 62,000.00
Kepala Tukang L.03 OH 0.040 170,000.00 6,800.00
Mandor L.04 OH 0.005 - -
Jumlah Tenaga 70,200.00
B. Bahan
Stop Kran 3/4 Bh 1.000 65,000.00 65,000.00
Seal Tape Bh 0.025 12,000.00 300.00
Jumlah Bahan 65,300.00
C. Peralatan
-
Jumlah Peralatan -
D. Harga Satuan Pekerjaan (A+B+C) 135,500.00
Pekerjaan : Pemasangan 1 m’ pipa PVC tipe AW diameter 4” Kode Analisa
Satuan Pembayaran :M A.5.1.1 32.

No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


(Rp.) (Rp)
A. Tenaga Kerja
Pekerja L.01 OH 0.0810 140,000.00 11,340.00
Tukang batu L.02 OH 0.1350 155,000.00 20,925.00
Kepala tukang L.03 OH 0.0135 170,000.00 2,295.00
Mandor L.04 OH 0.0040 -
Jumlah Tenaga 34,560.00
B. Bahan
Pipa PVC 4” M 1.200 73,750 88,500.00
Perlengkapan % 35.000 73,750 25,812.50
Jumlah Bahan 114,312.50
C. Peralatan - -
Jumlah Peralatan -
D. Harga Satuan Pekerjaan (A+B+C) 148,872.50

Pekerjaan : Pemasangan 1 m’ pipa PVC tipe AW diameter ¾ ” Kode Analisa


Satuan Pembayaran :M A.5.1.1 26.

No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


(Rp.) (Rp)
A. Tenaga Kerja
Pekerja L.01 OH 0.0360 140,000.00 5,040.00
Tukang batu L.02 OH 0.0600 155,000.00 9,300.00
Kepala tukang L.03 OH 0.0060 170,000.00 1,020.00
Mandor L.04 OH 0.0020 -
Jumlah Tenaga 15,360.00
B. Bahan
Pipa PVC 3/4” M 1.200 10,500 12,600.00
Perlengkapan % 35.000 10,500 3,675.00
Jumlah Bahan 16,275.00
C. Peralatan - -
Jumlah Peralatan -
D. Harga Satuan Pekerjaan (A+B+C) 31,635.00

Pekerjaan : Pemasangan 1 m’ pipa PVC tipe AW diameter 2” Kode Analisa


Satuan Pembayaran :M A.5.1.1 29.

No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


(Rp.) (Rp)
A. Tenaga Kerja
Pekerja L.01 OH 0.0540 140,000.00 7,560.00
Tukang batu L.02 OH 0.0900 155,000.00 13,950.00
Kepala tukang L.03 OH 0.0090 170,000.00 1,530.00
Mandor L.04 OH 0.0030 -
Jumlah Tenaga 23,040.00
B. Bahan
Pipa PVC 2” M 1.200 31,875 38,250.00
Perlengkapan % 35.000 31,875 11,156.25
Jumlah Bahan 49,406.25
C. Peralatan - -
Jumlah Peralatan -
D. Harga Satuan Pekerjaan (A+B+C) 72,446.25
Pekerjaan : Pemasangan 1 cm2 dinding conblock HB10/Batako 1SP : 4PP Kode Analisa
Satuan Pembayaran : M2 A.4.4.1.21a.

No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


(Rp.) (Rp)
A. Tenaga Kerja
Pekerja L.01 OH 0.3000 140,000.00 42,000.00
Tukang batu L.02 OH 0.1000 155,000.00 15,500.00
Kepala tukang L.03 OH 0.0100 170,000.00 1,700.00
Mandor L.04 OH 0.0150 -
Jumlah Tenaga 59,200.00
B. Bahan
Batako Bh 12.500 2,800 35,000.00
Semen Portland Kg 12.130 1,275.00 15,465.75
Pasir pasang m3 0.388 150,000.00 58,200.00
Jumlah Bahan 108,665.75
C. Peralatan - -
Jumlah Peralatan -
D. Harga Satuan Pekerjaan (A+B+C) 167,865.75

Pekerjaan : Pemasangan 1 m2 plesteran 1SP : 4PP tebal 15 mm Kode Analisa


Satuan Pembayaran : M2 A.4.4.2.4.

No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


(Rp.) (Rp)
A. Tenaga Kerja
Pekerja L.01 OH 0.3000 140,000.00 42,000.00
Tukang batu L.02 OH 0.1500 155,000.00 23,250.00
Kepala tukang L.03 OH 0.0150 170,000.00 2,550.00
Mandor L.04 OH 0.0150 -
Jumlah Tenaga 67,800.00
B. Bahan
Semen Portland Kg 6.240 1,275.00 7,956.00
Pasir pasang m3 0.024 150,000.00 3,600.00
Jumlah Bahan 11,556.00
C. Peralatan - -
Jumlah Peralatan -
D. Harga Satuan Pekerjaan (A+B+C) 79,356.00

Pekerjaan : Pemasangan 1m2 lantai keramik ukuran 40 cm x 40 cm Kode Analisa


Satuan Pembayaran : M2 A.4.4.3.35.a

No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


(Rp.) (Rp)
A. Tenaga Kerja
Pekerja L.01 OH 0.700 140,000.00 98,000.00
Tukang batu L.02 OH 0.350 155,000.00 54,250.00
Kepala tukang L.03 OH 0.035 170,000.00 5,950.00
Mandor L.04 OH 0.035 -
Jumlah Tenaga 158,200.00
B. Bahan
Ubin keramik 40x40 Doz 1.050 75,000.00 78,750.00
Semen Portland Kg 10.000 1,275.00 12,750.00
Pasir pasang M3 0.045 150,000.00 6,750.00
Semen warna Kg 0.500 5,000.00 2,500.00
Jumlah Bahan 100,750.00
C. Peralatan - -
Jumlah Peralatan -
D. Harga Satuan Pekerjaan (A+B+C) 258,950.00
Pekerjaan : Pemasangan 1m2 lantai keramik ukuran 20 cm x 20 cm Kode Analisa
Satuan Pembayaran : M2 A.4.4.3.36.

No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


(Rp.) (Rp)
A. Tenaga Kerja
Pekerja L.01 OH 0.700 140,000.00 98,000.00
Tukang batu L.02 OH 0.350 155,000.00 54,250.00
Kepala tukang L.03 OH 0.035 170,000.00 5,950.00
Mandor L.04 OH 0.035 -
Jumlah Tenaga 158,200.00
B. Bahan
Ubin keramik 20x20 Doz 1.050 65,000.00 68,250.00
Semen Portland Kg 10.400 1,275.00 13,260.00
Pasir pasang M3 0.045 150,000.00 6,750.00
Semen warna Kg 0.500 5,000.00 2,500.00
Jumlah Bahan 90,760.00
C. Peralatan - -
Jumlah Peralatan -
D. Harga Satuan Pekerjaan (A+B+C) 248,960.00

Pekerjaan : Pemasangan 1 m2 dinding keramik 10 cm x 20 cm Kode Analisa


Satuan Pembayaran : M2 A.4.4.3.53.

No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


(Rp.) (Rp)
A. Tenaga Kerja
Pekerja L.01 OH 0.900 140,000.00 126,000.00
Tukang batu L.02 OH 0.450 155,000.00 69,750.00
Kepala tukang L.03 OH 0.045 170,000.00 7,650.00
Mandor L.04 OH 0.045 -
Jumlah Tenaga 203,400.00
B. Bahan
Ubin keramik 10x20 Doz 1.050 65,400.00 68,670.00
Semen Portland Kg 9.300 1,275.00 11,857.50
Pasir pasang M3 0.180 150,000.00 27,000.00
Semen warna Kg 2.750 5,000.00 13,750.00
Jumlah Bahan 121,277.50
C. Peralatan - -
Jumlah Peralatan -
D. Harga Satuan Pekerjaan (A+B+C) 324,677.50

Pekerjaan : Pemasangan 1 m2 Rangka Kuda-kuda Baja Ringan Kode Analisa


Satuan Pembayaran : M2 A.4.2.1.2 d

No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


(Rp.) (Rp)
A. Tenaga Kerja
Pekerja L.01 OH 0.060 140,000.00 8,400.00
Tukang besi L.02 OH 0.060 150,000.00 9,000.00
Kepala tukang L.03 OH 0.006 170,000.00 1,020.00
Mandor L.04 OH 0.003 -
Jumlah Tenaga 18,420.00
B. Bahan
baja ringan 75x35x0,75 MM M 2.000 20,833.33 41,666.67
baja ringan 30x30x0,3 MM M 1.500 8,333.33 12,500.00
Paku Skrup Bh 19.000 3,500.00 66,500.00
Jumlah Bahan 120,666.67
C. Peralatan
Jumlah Peralatan -
D. Harga Satuan Pekerjaan (A+B+C) 139,086.67
Pekerjaan : Pemasangan 1 m2 genteng metal ukuran 80 x 100 atap pelana Kode Analisa
Satuan Pembayaran : M2 A.4.5.2.32.

No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


(Rp.) (Rp)
A. Tenaga Kerja
Pekerja L.01 OH 0.200 140,000.00 28,000.00
Tukang besi L.02 OH 0.100 150,000.00 15,000.00
Kepala tukang L.03 OH 0.010 170,000.00 1,700.00
Mandor L.04 OH 0.001 -
Jumlah Tenaga 44,700.00
B. Bahan
Genteng Metal M2 1.020 39,308.18 40,094.34
Paku Genteng Metal Kg 0.200 35,000.00 7,000.00
Jumlah Bahan 47,094.34
C. Peralatan - -
Jumlah Peralatan -
D. Harga Satuan Pekerjaan (A+B+C) 91,794.34

Pekerjaan : Pemasangan 1 m’ nok genteng metal Kode Analisa


Satuan Pembayaran :M A.4.5.2.37

No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


(Rp.) (Rp)
A. Tenaga Kerja
Pekerja L.01 OH 0.250 140,000.00 35,000.00
Tukang besi L.02 OH 0.150 150,000.00 22,500.00
Kepala tukang L.03 OH 0.015 170,000.00 2,550.00
Mandor L.04 OH 0.013 -
Jumlah Tenaga 60,050.00
B. Bahan
Nok Genteng Metal M2 1.100 -
Paku Genteng Metal Kg 0.200 35,000.00 7,000.00
Jumlah Bahan 7,000.00
C. Peralatan - -
Jumlah Peralatan -
D. Harga Satuan Pekerjaan (A+B+C) 67,050.00

Pekerjaan : Pemasangan 1 m’ Listplank Kalsiboard Exterior Kode Analisa


Satuan Pembayaran :M A.4.6.1.21.a

No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


(Rp.) (Rp)
A. Tenaga Kerja
Pekerja L.01 OH 0.100 140,000.00 14,000.00
Tukang besi L.02 OH 0.200 150,000.00 30,000.00
Kepala tukang L.03 OH 0.020 170,000.00 3,400.00
Mandor L.04 OH 0.005 -
Jumlah Tenaga 47,400.00
B. Bahan
Papan Plank Kalsiboard M' 1.10000 64,583.33 71,041.67
Paku 5-10 cm Kg 0.100 22,000.00 2,200.00
Jumlah Bahan 73,241.67
C. Peralatan - -
Jumlah Peralatan -
D. Harga Satuan Pekerjaan (A+B+C) 120,641.67
Pekerjaan : Pemasangan 1 m2 Rangka Besi Hollow Modul 60x60 cm Kode Analisa
Satuan Pembayaran : M2 A.4.2.1.21.

No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


(Rp.) (Rp)
A. Tenaga Kerja
Pekerja L.01 OH 0.350 140,000.00 49,000.00
Tukang besi L.02 OH 0.350 150,000.00 52,500.00
Kepala tukang L.03 OH 0.035 170,000.00 5,950.00
Mandor L.04 OH 0.018 -
Jumlah Tenaga 107,450.00
B. Bahan
Besi Hollow Plafond 1,3x 3,3 mm M' 4.000 2,500.00 10,000.00
Assesoris (Perkuatan, Las dll) Ls (100%xRangka) 2,500.00 Rp 10,000.00
Jumlah Bahan 20,000.00
C. Peralatan - -
Jumlah Peralatan -
D. Harga Satuan Pekerjaan (A+B+C) 127,450.00

Pekerjaan : Pemasangan 1 m2 Langit2 Kalsiboard uk 1,2x2,4 m tebal 9mm Kode Analisa


Satuan Pembayaran : M2 A.4.5.1.1a

No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


(Rp.) (Rp)
A. Tenaga Kerja
Pekerja L.01 OH 0.100 140,000.00 14,000.00
Tukang besi L.02 OH 0.100 150,000.00 15,000.00
Kepala tukang L.03 OH 0.010 170,000.00 1,700.00
Mandor L.04 OH 0.005 -
Jumlah Tenaga 30,700.00
B. Bahan
Kalsiboard 6 mm Lbr 0.375 110,000.00 41,250.00
Paku Kalsiboard Kg 0.030 25,000.00 750.00
Jumlah Bahan 42,000.00
C. Peralatan - -
Jumlah Peralatan -
D. Harga Satuan Pekerjaan (A+B+C) 72,700.00

Pekerjaan : Pembuatan dan pas 1 m3 kusen pintu dan kusen jendela Kayu Klas Kode Analisa
Satuan Pembayaran : M3 A.4.6.1.2.

No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


(Rp.) (Rp)
A. Tenaga Kerja
Pekerja L.01 OH 6.000 140,000.00 840,000.00
Tukang besi L.02 OH 18.000 150,000.00 2,700,000.00
Kepala Tukang L.03 OH 1.800 170,000.00 306,000.00
Mandor L.04 OH 0.300 -
Jumlah Tenaga 3,846,000.00
B. Bahan
Balok kayu kelas II M3 1.200 4,000,000.00 4,800,000.00
Paku Skrup Kg 1.250 22,000.00 27,500.00
Lem Kayu Kg 1.000 33,000.00 33,000.00
Jumlah Bahan 4,860,500.00
C. Peralatan -
Jumlah Peralatan -
D. Harga Satuan Pekerjaan (A+B+C) 8,706,500.00
Pekerjaan : Pembuatan dan pemasangan 1 m2 daun pintu panel, Kayu Klas II Kode Analisa
Satuan Pembayaran : M2 A.4.6.1.5.

No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


(Rp.) (Rp)
A. Tenaga Kerja
Pekerja L.01 OH 1.000 140,000.00 140,000.00
Tukang kayu L.02 OH 3.000 150,000.00 450,000.00
Kepala Tukang L.03 OH 0.300 170,000.00 51,000.00
Mandor L.04 OH 0.050 -
Jumlah Tenaga 641,000.00
B. Bahan
Papan Kayu Klas II M3 0.040 5,000,000.00 200,000.00
Lem Kayu Kg 0.500 33,000.00 16,500.00
Jumlah Bahan 200,000.00
C. Peralatan -
Jumlah Peralatan -
D. Harga Satuan Pekerjaan (A+B+C) 841,000.00

Pekerjaan : Pembuatan dan pemasangan 1 m2 pintu jendela kaca, Kayu Klas I Kode Analisa
Satuan Pembayaran : M2 A.4.6.1.6.

No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


(Rp.) (Rp)
A. Tenaga Kerja
Pekerja L.01 OH 0.800 140,000.00 112,000.00
Tukang kayu L.02 OH 2.400 150,000.00 360,000.00
Kepala Tukang L.03 OH 0.240 170,000.00 40,800.00
Mandor L.04 OH 0.040 -
Jumlah Tenaga 512,800.00
B. Bahan
Papan Kayu Klas II M3 0.024 5,000,000.00 120,000.00
Lem Kayu Kg 0.300 33,000.00 9,900.00
Jumlah Bahan 120,000.00
C. Peralatan -
Jumlah Peralatan -
D. Harga Satuan Pekerjaan (A+B+C) 632,800.00

Pekerjaan : Pemasangan 1 m2 kaca tebal 5 mm Kode Analisa


Satuan Pembayaran : M2 A.4.6.2.17

No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


(Rp.) (Rp)
A. Tenaga Kerja
Pekerja L.01 OH 0.015 140,000.00 2,100.00
Tukang kayu L.02 OH 0.150 150,000.00 22,500.00
Kepala Tukang L.03 OH 0.015 170,000.00 2,550.00
Mandor L.04 OH 0.001 -
Jumlah Tenaga 27,150.00
B. Bahan
Kaca Tebal 5 mm M2 1.100 135,000.00 148,500.00
Sealant Kg 0.050 47,500.00 2,375.00
Jumlah Bahan 148,500.00
C. Peralatan - -
Jumlah Peralatan -
D. Harga Satuan Pekerjaan (A+B+C) 175,650.00
Pekerjaan : Pemasangan 1 buah engsel pintu Kode Analisa
Satuan Pembayaran : Bh A.4.6.2.5

No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


(Rp.) (Rp)
A. Tenaga Kerja
Pekerja L.01 OH 0.015 140,000.00 2,100.00
Tukang kayu L.02b OH 0.150 150,000.00 22,500.00
Kepala Tukang L.03 OH 0.015 170,000.00 2,550.00
Mandor L.04 OH 0.0008 -
Jumlah Tenaga 27,150.00
B. Bahan
Engsel pintu Bh 1.000 35,000.00 35,000.00
Jumlah Bahan 35,000.00
C. Peralatan - -
Jumlah Peralatan -
D. Harga Satuan Pekerjaan (A+B+C) 62,150.00

Pekerjaan : Pemasangan 1 buah engsel jendela kupu-kupu Kode Analisa


Satuan Pembayaran : Bh A.4.6.2.6.

No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


(Rp.) (Rp)
A. Tenaga Kerja
Pekerja L.01 OH 0.010 140,000.00 1,400.00
Tukang kayu L.02b OH 0.100 150,000.00 15,000.00
Kepala Tukang L.03 OH 0.010 170,000.00 1,700.00
Mandor L.04 OH 0.0005 -
Jumlah Tenaga 18,100.00
B. Bahan
Engsel jendela Bh 1.000 41,000.00 41,000.00
Jumlah Bahan 41,000.00
C. Peralatan - -
Jumlah Peralatan -
D. Harga Satuan Pekerjaan (A+B+C) 59,100.00

Pekerjaan : Pemasangan 1 buah kunci tanam biasa Kode Analisa


Satuan Pembayaran : Bh A.4.6.2.2.

No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


(Rp.) (Rp)
A. Tenaga Kerja
Pekerja L.01 OH 0.010 140,000.00 1,400.00
Tukang kayu L.02 OH 0.500 150,000.00 75,000.00
Kepala Tukang L.03 OH 0.050 170,000.00 8,500.00
Mandor L.04 OH 0.0050 -
Jumlah Tenaga 84,900.00
B. Bahan
Kunci tanam biasa Bh 1.000 95,000.00 95,000.00
Jumlah Bahan 95,000.00
C. Peralatan - -
Jumlah Peralatan -
D. Harga Satuan Pekerjaan (A+B+C) 179,900.00
Pekerjaan : Pemasangan 1 buah kait angin Kode Analisa
Satuan Pembayaran : Bh A.4.6.2.9.

No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


(Rp.) (Rp)
A. Tenaga Kerja
Pekerja L.01 OH 0.015 140,000.00 2,100.00
Tukang kayu L.02 OH 0.150 150,000.00 22,500.00
Kepala Tukang L.03 OH 0.015 170,000.00 2,550.00
Mandor L.04 OH 0.0080 -
Jumlah Tenaga 27,150.00
B. Bahan
Kait angin Bh 1.000 20,800.00 20,800.00
Jumlah Bahan 20,800.00
C. Peralatan - -
Jumlah Peralatan -
D. Harga Satuan Pekerjaan (A+B+C) 47,950.00

Pekerjaan : Pemasangan 1 buah kunci slot Kode Analisa


Satuan Pembayaran : Bh A.4.6.2.11.

No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


(Rp.) (Rp)
A. Tenaga Kerja
Pekerja L.01 OH 0.015 140,000.00 2,100.00
Tukang kayu L.02 OH 0.150 150,000.00 22,500.00
Kepala Tukang L.03 OH 0.015 170,000.00 2,550.00
Mandor L.04 OH 0.0080 -
Jumlah Tenaga 27,150.00
B. Bahan
Grendel/Kunci Slot Bh 1.000 35,000.00 35,000.00
Jumlah Bahan 35,000.00
C. Peralatan - -
Jumlah Peralatan -
D. Harga Satuan Pekerjaan (A+B+C) 62,150.00

Pekerjaan : Pemasangan 1 buah Handel Jendela Kode Analisa


Satuan Pembayaran : Bh A.4.6.2.8.a

No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


(Rp.) (Rp)
A. Tenaga Kerja
Pekerja L.01 OH 0.015 140,000.00 2,100.00
Tukang kayu L.02 OH 0.150 150,000.00 22,500.00
Kepala Tukang L.03 OH 0.015 170,000.00 2,550.00
Mandor L.04 OH 0.0080 -
Jumlah Tenaga 27,150.00
B. Bahan
Handel Jendela Bh 1.000 8,000.00 8,000.00
Jumlah Bahan 8,000.00
C. Peralatan - -
Jumlah Peralatan -
D. Harga Satuan Pekerjaan (A+B+C) 35,150.00
Pekerjaan : Pemasangan 1 m3 pondasi batu belah campuran 1SP : 4PP Kode Analisa
Satuan Pembayaran : m3 A.3.2.1.2.

No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


(Rp.) (Rp)
A. Tenaga Kerja
Pekerja L.01 OH 1.500 140,000.00 210,000.00
Tukang batu L.02 OH 0.750 155,000.00 116,250.00
Kepala Tukang L.03 OH 0.075 170,000.00 12,750.00
Mandor L.04 OH 0.0750 -
Jumlah Tenaga 339,000.00
B. Bahan
Batu belah m3 1.200 400,000.00 480,000.00
Semen Portland Kg 163.000 1,275.00 207,825.00
Pasir pasang m3 0.520 150,000.00 78,000.00
Jumlah Bahan 765,825.00
C. Peralatan - -
Jumlah Peralatan -
D. Harga Satuan Pekerjaan (A+B+C) 1,104,825.00

Pekerjaan : Pemasangan 1 m2 dinding terawang (rooster) Kode Analisa


Satuan Pembayaran : m2 A. 4.4.1.23

No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


(Rp.) (Rp)
A. Tenaga Kerja
Pekerja L.01 OH 0.300 140,000.00 42,000.00
Tukang batu L.02 OH 0.100 155,000.00 15,500.00
Kepala Tukang L.03 OH 0.010 170,000.00 1,700.00
Mandor L.04 OH 0.0150 -
Jumlah Tenaga 59,200.00
B. Bahan
Roster/Kerawang Bh 12.000 25,000.00 300,000.00
Semen Portland Kg 11.000 1,275.00 14,025.00
Pasir pasang m3 0.035 150,000.00 5,250.00
Jumlah Bahan 319,275.00
C. Peralatan - -
Jumlah Peralatan -
D. Harga Satuan Pekerjaan (A+B+C) 378,475.00

Pekerjaan : Pemasangan 1 m2 dinding pemisah GRC Board Kode Analisa


Satuan Pembayaran : m3 A.4.6.1.25.a

No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


(Rp.) (Rp)
A. Tenaga Kerja
Pekerja L.01 OH 0.2000 140,000.00 28,000.00
Tukang Kayu L.02 OH 0.6000 150,000.00 90,000.00
Kepala Tukang L.03 OH 0.0600 170,000.00 10,200.00
Mandor L.04 OH 0.0100 -
Jumlah Tenaga 128,200.00
B. Bahan
Balok Kayu Klas II m3 0.0280 -
Paku Kalsiboard Kg 0.1500 25,000.00 3,750.00
GRC Board tebal 8 m Lbr 0.4300 190,000.00 81,700.00
Lem Kayu Kg 0.5600
Jumlah Bahan 85,450.00
C. Peralatan - -
Jumlah Peralatan -
D. Harga Satuan Pekerjaan (A+B+C) 213,650.00
Pekerjaan : (K3) Pemasangan 1 buah wastafel Kode Analisa
Satuan Pembayaran : m3 A.5.1.1 5.

No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


(Rp.) (Rp)
A. Tenaga Kerja
Pekerja L.01 OH 1.2000 140,000.00 168,000.00
Tukang Batu L.02 OH 1.4500 155,000.00 224,750.00
Kepala Tukang L.03 OH 0.1500 170,000.00 25,500.00
Mandor L.04 OH 0.0600 -
Jumlah Tenaga 418,250.00
B. Bahan
Wastafel+cermin Unit 1.2000 940,000.00 1,128,000.00
Semen Portland Kg 6.0000 1,275.00 7,650.00
Pasir pasang M3 0.0100 150,000.00 1,500.00
Perlengkapan % 12.0000 940,000.00 112,800.00
Jumlah Bahan 1,249,950.00
C. Peralatan - -
Jumlah Peralatan -
D. Harga Satuan Pekerjaan (A+B+C) 1,668,200.00

Pekerjaan : Pemasangan 1 m2 rolling door alluminium Kode Analisa


Satuan Pembayaran : m3 A.4.2.1.10

No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


(Rp.) (Rp)
A. Tenaga Kerja
Pekerja L.01 OH 1.0000 140,000.00 140,000.00
Tukang besi L.02 OH 1.0000 150,000.00 150,000.00
Kepala Tukang L.03 OH 0.1200 170,000.00 20,400.00
Mandor L.04 OH 0.0060 -
Jumlah Tenaga 310,400.00
B. Bahan
Rolling Door Unit 1.0000 500,000.00 500,000.00
Jumlah Bahan 500,000.00
C. Peralatan - -
Jumlah Peralatan -
D. Harga Satuan Pekerjaan (A+B+C) 810,400.00

Dibuat oleh : Tim Verifikasi,


Ketua KSM Tim Faskel Tim Korkot
RAB-4

PROGRAM KOTA TANPA KUMUH (KOTAKU)


DAFTAR HARGA SATUAN JADI PEKERJAAN

Kab./Kota : Palangka Raya Nama Paket Pekerjaan : Pembangunan TPS3R


Kecamatan : Sebangau
Kelurahan : Kereng Bangkirai
BKM : Kereng Membangun

HARGA
NO. JENIS PEKERJAAN SATUAN
(Rp.)

I PEKERJAAN PERSIAPAN
1. Pembersihan Awal m2 Rp 14,000.00
2. Pengukuran dan Pemasangan Bowplank m Rp 74,690.00

II PEKERJAAN TANAH
1. Pek urugan tanah lokasi kegiatan m3 Rp 162,000.00
2. Pek. Galian Tanah Pondasi m3 Rp 105,000.00
3. Pek. Urugan Bekas Galian m3 Rp 70,000.00
4. Pek. Urugan Pasir bawah lantai m3 Rp 222,000.00
5. Pek. Pemancangan Cerucuk Kayu Galam (p. 2m) Btg Rp 50,100.00

III PEKERJAAN BETON BERTULANG


1. Pondasi Footplat P1 (80 cm x 80 cm x 20 cm)
a Pek. Pembesian Kg Rp 15,124.00
b Pek. Lantai Kerja Beton K.100 t=5 cm m3 Rp 954,788.57
c Pek. Bekisting Pondasi m2 Rp 220,820.00
d Cor Beton Mutu K.200 m3 Rp 1,078,920.71
2. Pondasi Footplat P2 (60 cm x 60 cm x 20 cm)
a Pek. Pembesian Kg Rp 15,124.00
b Pek. Lantai Kerja Beton K.100 t=5 cm m3 Rp 954,788.57
c Pek. Bekisting Pondasi m2 Rp 220,820.00
d Cor Beton Mutu K.200 m3 Rp 1,078,920.71
3. Pondasi Footplat P3 (120 cm x 80 cm x 20 cm)
a Pek. Pembesian Kg Rp 15,124.00
b Pek. Lantai Kerja Beton K.100 t=5 cm m3 Rp 954,788.57
c Pek. Bekisting Pondasi m2 Rp 220,820.00
d Cor Beton Mutu K.200 m3 Rp 1,078,920.71
4. Pek Kolom K1
a Pek. Pembesian Kg Rp 15,124.00
b Pek. Bekisting Kolom m2 Rp 374,310.00
c Cor Beton Mutu K.200 m3 Rp 1,078,920.71
HARGA
NO. JENIS PEKERJAAN SATUAN
(Rp.)
5. Pek Kolom K2
a Pek. Pembesian Kg Rp 15,124.00
b Pek. Bekisting Kolom m2 Rp 374,310.00
c Cor Beton Mutu K.200 m3 Rp 1,078,920.71
6. Pek Kolom K3
a Pek. Pembesian Kg Rp 15,124.00
b Pek. Bekisting Kolom m2 Rp 374,310.00
c Cor Beton Mutu K.200 m3 Rp 1,078,920.71
7. Pekerjaan Sloof 20x30
a Pek. Pembesian Kg Rp 15,124.00
b Pek. Bekisting Sloof m2 Rp 223,020.00
c Cor Beton Mutu K.200 m3 Rp 1,078,920.71
8. Pekerjaan Sloof 15x20
a Pek. Pembesian Kg Rp 15,124.00
b Pek. Bekisting Sloof m2 Rp 223,020.00
c Cor Beton Mutu K.200 m3 Rp 1,078,920.71
9. Pekerjaan Ring Balok 20x20
a Pek. Pembesian Kg Rp 15,124.00
b Pek. Bekisting Ring Balok m2 Rp 386,310.00
c Cor Beton Mutu K.200 m3 Rp 1,078,920.71
10. Pekerjaan Balok 15x20
a Pek. Pembesian Kg Rp 15,124.00
b Pek. Bekisting Ring Balok m2 Rp 386,310.00
c Cor Beton Mutu K.200 m3 Rp 1,078,920.71
11. Pekerjaan Ring Balok 15/15
a Pek. Pembesian Kg Rp 15,124.00
b Pek. Bekisting Ring Balok m2 Rp 386,310.00
c Cor Beton Mutu K.200 m3 Rp 1,078,920.71
12. Pekerjaan lantai beton bertulang
a Pek. Pembesian Kg Rp 15,124.00
b Cor Beton Mutu K.175 m3 Rp 1,048,999.29
13. Pek. Plat /Dak Beton
a Pembesian Kg Rp 15,124.00
b Pek. Bekisting m2 Rp 539,810.00
c Cor Beton Mutu K.200 m3 Rp 1,078,920.71

IV PEKERJAAN DINDING, PLESTERAN DAN KERAMIK


1. Pek. Pasangan dinding Bataco
a Bangunan Hanggar TPS3R m2 Rp 167,865.75
b Kantor m2 Rp 167,865.75
c WC m2 Rp 167,865.75
d Pagar m2 Rp 167,865.75
HARGA
NO. JENIS PEKERJAAN SATUAN
(Rp.)
2. Pek. Plesteran Dinding
a Bangunan Hanggar TPS3R m2 Rp 79,356.00
b Kantor m2 Rp 79,356.00
c WC m2 Rp 79,356.00
d Pagar m2 Rp 79,356.00
3. Cor Beton Lantai Beton Mutu K.200 m3 Rp 1,078,920.71
4. Pek Keramik lantai Uk.40x40 m2 Rp 258,950.00
5. Pek Keramik lantai WC Uk.20x20 m2 Rp 248,960.00
6. Pek Keramik dinding WC Uk.10x20 m2 Rp 324,677.50
7. Pek. Dinding Tawing layar m2 Rp 213,650.00

V PEKERJAAN ATAP, PLAFOND, LISPLANK


1. Rangka Atap Baja Ringan
a Hanggar TPS3R m2 Rp 139,086.67
b Kantor m2 Rp 139,086.67
c WC m2 Rp 139,086.67
2. Pek Atap Genteng Metal Zincalume
a Hanggar TPS3R m2 Rp 91,794.34
b Kantor m2 Rp 91,794.34
c WC m2 Rp 91,794.34
3. Pek. Lisplank Superplank Eksterior m Rp 120,641.67
4. Rangka Hollow Plafond Kantor m2 Rp 127,450.00
5. Pek. Pas. Plafond Kalsiboard m2 Rp 72,700.00

VI PEKERJAAN PINTU, JENDELA, KUNCI & PENGGANTUNG


1. Pek. Kusen Pintu dan Jendela Kayu Klas II
a Hanggar TPS3m3 m3 Rp 8,706,500.00
b Kantor m3 m3 Rp 8,706,500.00
c WC m3 m3 Rp 8,706,500.00
2. Pek. Daun Pintu Panel Kayu Klas II
a Hanggar TPS3R m2 Rp 841,000.00
b Kantor m2 Rp 841,000.00
c WC m2 Rp 841,000.00
3. Pek. Rangka Jendela Kaca Kayu Klas II m2 Rp 632,800.00
4. Pek.Pemasangan Kaca Tebal 5 mm m2 Rp 175,650.00
5. Pek. Engsel Pintu bh Rp 62,150.00
6. Pek. Engsel Jendela bh Rp 59,100.00
7. Kunci Tanam bh Rp 179,900.00
8. Hak angin Jendela bh Rp 47,950.00
9. Gerendel Jendela bh Rp 62,150.00
10. Handel Jendela bh Rp 35,150.00
11. Pekerjaan Ventilasi Kerawang m2 Rp 378,475.00
12. Pekerjaan glasblock m2 Rp 650,000.00
HARGA
NO. JENIS PEKERJAAN SATUAN
(Rp.)
VII PEKERJAAN PENGECATAN
1. Pengecatan dinding
a Hanggar TPS3R m2 Rp 46,321.00
b Kantor m2 Rp 46,321.00
c WC m2 Rp 46,321.00
d Pagar m2 Rp 46,321.00
2. Pengecatan Plafond Kantor m2 Rp 46,321.00
3. Pengecatan Kusen Pintu dan Jendela m2 Rp 53,263.00
4. Pengecatan Pintu Panel
a Hanggar TPS3R m2 Rp 53,263.00
b Kantor m2 Rp 53,263.00
c WC m2 Rp 53,263.00
5. Pengecatan Rangka Jendela Kaca m2 Rp 53,263.00

VIII PEKERJAAN SANITASI


1. Pekerjaan Septictank 1 unit
a Galian Septictank m3 Rp 105,000.00
b Pek. Urugan Pasir t=5 cm m2 Rp 222,000.00
c Pek Cor Beton K.175 tebal 10 cm m3 Rp 1,048,999.29
d Pek. Sloof 15/15
- Pek. Pembesian Kg Rp 15,124.00
- Pek. bekisting m2 Rp 223,020.00
- Pek cor beton K.175 m3 Rp 1,048,999.29
e Pek. Kolom 15###
- Pek. PembesiKg Kg Rp 15,124.00
- Pek. bekistin m2 m2 Rp 374,310.00
- Pek cor beto m3 m3 Rp 1,048,999.29
f Pek. Pas. Bata m2 m2 Rp 167,865.75
g Pek. Plesteran m2 m2 Rp 79,356.00
h Pek. Ring Balk###
- Pek. PembesiKg Kg Rp 15,124.00
- Pek. bekistin m2 m2 Rp 223,020.00
- Pek cor beto m3 m3 Rp 1,048,999.29
i Pek. Plat penu ###
- Pek. PembesiKg Kg Rp 15,124.00
- Pek. bekistin m2 m2 Rp 539,810.00
- Pek cor beto m3 m3 Rp 1,048,999.29
j Pek. Tutup ma###
- Pek. PembesiKg Kg Rp 15,124.00
- Pek. bekistin m2 m2 Rp 539,810.00
- Pek cor beto m3 m3 Rp 1,048,999.29
k Bioseptictank Bh Bh Rp 12,287,000.00
l Urugan Pasir dm3 m3 Rp 222,000.00
HARGA
NO. JENIS PEKERJAAN SATUAN
(Rp.)
2. Pekerjaan Pipa 4" m Rp 148,872.50
3. Pekerjaan Pipa 2" m Rp 72,446.25
4. Pekerjaan Pipa 3/4" (Air Bersih) m Rp 31,635.00
5. Pek. Sumur Bor+pompa Bh Rp 2,500,000.00
6. Pekerjaan kran air Bh Rp 135,500.00
7. Pekerjaan stop kran Bh Rp 135,500.00
8. Profil tank 1200 L Bh Rp 1,600,000.00
9. Pek. Closed Duduk Bh Rp 2,542,200.00
10. Pek. Wastafel+cermin Unit Rp 1,668,200.00

IX PEKERJAAN JEMBATAN
1. Pekerjaan Pondasi Batu Belah m3 Rp 1,104,825.00
2. Pekerjaan Sloof 20/30
a Pek. Pembesian kg Rp 15,124.00
b Pekerjaan Bekisting Sloof m2 Rp 223,020.00
c Cor Beton K.200 m3 Rp 1,078,920.71
3. Pekerjaan Balok 20/30
a Pek. Pembesian kg Rp 15,124.00
b Pekerjaan Bekisting Balok m2 Rp 386,310.00
c Cor Beton K.200 m3 Rp 1,078,920.71
4. Pekerjaan Plat beton
a Pek. Pembersian kg Rp 15,124.00
b Pekerjaan Bekisting Plat m2 Rp 539,810.00
c Cor Beton K200 tebal 20 cm m3 Rp 1,078,920.71
5. Pekerjaan Reling jembatan
a Pembesian Kolom 15/15 Kg Rp 15,124.00
b Pek. Bekisting Kolom m2 Rp 374,310.00
c Cor Beton K.200 m3 Rp 1,078,920.71
d Pek. Pas Batako m2 Rp 167,865.75
e Pek. Plesteran m2 Rp 79,356.00
### Err:509 Err:509 Rp Err:509

X PEKERJAAN LISTRIK
1. Penyambungan Daya Baru PLN Unit Rp 4,500,000.00
2. Instalasi Titik Lampu Titik Rp 325,000.00
3. Lampu SL 18 Watt Bh Rp 35,000.00
4. Saklar Tunggal Bh Rp 20,000.00
5. Saklar Ganda Bh Rp 20,000.00
6. Pek. Pas. Panel Listrik Bh Rp 760,000.00
7. Pek. Instalasi stop kontak Titik Rp 325,000.00
8. Stop Kontak Bh Rp 20,000.00
HARGA
NO. JENIS PEKERJAAN SATUAN
(Rp.)
XI PEKERJAAN LAIN-LAIN
1. Pekerjaan Pagar Besi BRC m2 Rp 320,000.00
3. Pekerjaan Handrail difabel stainless 0.00 Rp -
4. Pekerjaan Rolling door m2 Rp 810,400.00
5. Pek. Handrail closet m Rp 52,000.00
6. Pekerjaan ukiran kayu m2 Rp 625,000.00

XII PERALATAN TPS3R


1. Mesin Pencacah Plastik kap 400 Kg/hari Diesel 16 HP Unit Rp 36,130,000.00
2. Mesin Pencacah Kompos kapasitas 500 kg/jam Diesel 8HP Unit Rp 22,650,000.00
3. Mesin Pengayak Kapasitas 500 Kg/Jam Unit Rp 18,150,000.00

XIII KEBUTUHAN K3 DAN PROKES PENCEGAHAN COVID - 19


A KEBUTUHAN KESEHATAN DAN KESELAMATAN KERJA
1. Sosialisasi K3 dan Prokes (Spanduk) Bh Rp 75,000.00
2. Helm Keselamatan Bh Rp 100,000.00
3. Rompi Kerja Bh Rp 60,000.00
4. Sarung Tangan (Safety Glove) Bh Rp 5,000.00
5. Sepatu Keselamatan (Rubber Shoes) Bh Rp 100,000.00
6. Tali Pengaman Bh Rp 231,500.00
7. Kotak P3K Bh Rp 40,000.00
8. Asuransi Tenaga Kerja Paket Rp 912,000.00
B KEBUTUHAN PROTOKOL KESEHATAN PENCEGAHAN COVID-19
1. Alat ukur suhu badan nir-sentuh (Thermoscan) Bh Rp 350,000.00
2. Vitamin C (1 Box isi 100 tablet) Bh Rp 25,000.00
3. Tempat Cuci Tangan Bh Rp 250,000.00
4. Sabun Cuci Tangan (Cair) 200ml/btl Bh Rp 25,000.00
5. Masker kain Bh Rp 5,000.00
6. Alat penyemprot desinfektan Bh Rp 65,000.00
7. Cairan Desinfektan 5L Bh Rp 75,000.00

XIV ADMINISTRASI KEGIATAN


1. Pelaporan KSM Ls Rp 270,000.00
2. Photo Copy / Penggandaan Ls Rp 250,000.00
3. Biaya Alat Tulis Kantor (ATK) Ls Rp 150,000.00
4. Pengujian Lab Bh Rp 10,000.00
5. Papan Nama Kegiatan Paket Rp 500,000.00

Diverifikasi Oleh : Dibuat Oleh :


Askot Infrastruktur, Fasilitator Teknik, UPL

Wiwit Whindari, ST. Hengky Pradana, ST


RAB-5
BANTUAN PEMERINTAH UNTUK MASYARAKAT ( BPM ) DFAT
PROGRAM KOTA TANPA KUMUH (KOTAKU)
RENCANA ANGARAN BIAYA

Kab./Kota : Palangka Raya Nama Paket Pekerjaan : Pembangunan TPS3R


Kecamatan : Sebangau
Kelurahan : Kereng Bangkirai
BKM : Kereng Membangun

HARGA SATUAN JUMLAH HARGA


NO JENIS PEKERJAAN SATUANVOLUME ANALISA
(Rp) (Rp)

I PEKERJAAN PERSIAPAN
1 Pembersihan Awal m2 200.00 A.2.2.1.9 Rp 14,000.00 Rp 2,800,000.00
2 Pengukuran dan Pemasangan Bowplank m 66.00 A. 2.2.1.4. Rp 74,690.00 Rp 4,929,540.00
Jumlah I Rp 7,729,540.00
II PEKERJAAN TANAH
1 Pek urugan tanah lokasi kegiatan m3 218.55 A.2.3.1.11.a Rp 162,000.00 Rp 35,405,100.00
2 Pek. Galian Tanah Pondasi m3 11.68 A. 2.3.1.1 Rp 105,000.00 Rp 1,226,610.00
3 Pek. Urugan Bekas Galian m3 2.92 A.2.3.1.9. Rp 70,000.00 Rp 204,435.00
4 Pek. Urugan Pasir bawah lantai m3 45.49 A.2.3.1.11. Rp 222,000.00 Rp 10,099,672.44
5 Pek. Pemancangan Cerucuk Kayu Galam (p. 2m) Btg 372.00 P.07.a Rp 50,100.00 Rp 18,637,200.00
Jumlah II Rp 65,573,017.44
III PEKERJAAN BETON BERTULANG
1 Pondasi Footplat P1 (80 cm x 80 cm x 20 cm)
a Pek. Pembesian Kg 318.33 A.4.1.1.17 Rp 15,124.00 Rp 4,814,347.30
b Pek. Lantai Kerja Beton K.100 t=5 cm m3 0.67 A.4.1.1.1 Rp 954,788.57 Rp 641,617.92
c Pek. Bekisting Pondasi m2 2.24 A.4.1.1.20 Rp 220,820.00 Rp 494,636.80
d Cor Beton Mutu K.200 m3 2.69 A.4.1.1.6. Rp 1,078,920.71 Rp 2,900,138.88
2 Pondasi Footplat P2 (60 cm x 60 cm x 20 cm)
a Pek. Pembesian Kg 218.55 A.4.1.1.17 Rp 15,124.00 Rp 3,305,312.39
b Pek. Lantai Kerja Beton K.100 t=5 cm m3 0.34 A.4.1.1.1 Rp 954,788.57 Rp 326,537.69
c Pek. Bekisting Pondasi m2 1.52 A.4.1.1.20 Rp 220,820.00 Rp 335,646.40
d Cor Beton Mutu K.200 m3 1.37 A.4.1.1.6. Rp 1,078,920.71 Rp 1,475,963.54
3 Pondasi Footplat P3 (120 cm x 80 cm x 20 cm)
a Pek. Pembesian Kg 39.95 A.4.1.1.17 Rp 15,124.00 Rp 604,153.39
b Pek. Lantai Kerja Beton K.100 t=5 cm m3 0.05 A.4.1.1.1 Rp 954,788.57 Rp 45,829.85
c Pek. Bekisting Pondasi m2 1.92 A.4.1.1.20 Rp 220,820.00 Rp 423,974.40
d Cor Beton Mutu K.200 m3 0.19 A.4.1.1.6. Rp 1,078,920.71 Rp 207,152.78
4 Pek Kolom K1
a Pek. Pembesian Kg 485.65 A.4.1.1.17 Rp 15,124.00 Rp 7,345,020.01
b Pek. Bekisting Kolom m2 40.40 A.4.1.1.22 Rp 374,310.00 Rp 15,122,124.00
c Cor Beton Mutu K.200 m3 4.23 A.4.1.1.6. Rp 1,078,920.71 Rp 4,561,676.78
5 Pek Kolom K2
a Pek. Pembesian Kg 148.41 A.4.1.1.17 Rp 15,124.00 Rp 2,244,497.39
b Pek. Bekisting Kolom m2 15.43 A.4.1.1.22 Rp 374,310.00 Rp 5,775,603.30
c Cor Beton Mutu K.200 m3 1.76 A.4.1.1.6. Rp 1,078,920.71 Rp 1,895,933.43
6 Pek Kolom K3
a Pek. Pembesian Kg 66.62 A.4.1.1.17 Rp 15,124.00 Rp 1,007,557.35
b Pek. Bekisting Kolom m2 6.96 A.4.1.1.22 Rp 374,310.00 Rp 2,605,197.60
c Cor Beton Mutu K.200 m3 0.26 A.4.1.1.6. Rp 1,078,920.71 Rp 281,598.31
7 Pekerjaan Sloof 20x30
a Pek. Pembesian Kg 393.92 A.4.1.1.17 Rp 15,124.00 Rp 5,957,668.77
b Pek. Bekisting Sloof m2 11.60 A.4.1.1.21 Rp 223,020.00 Rp 2,587,032.00
c Cor Beton Mutu K.200 m3 3.48 A.4.1.1.6. Rp 1,078,920.71 Rp 3,754,644.09
8 Pekerjaan Sloof 15x20
a Pek. Pembesian Kg 303.68 A.4.1.1.17 Rp 15,124.00 Rp 4,592,826.58
b Pek. Bekisting Sloof m2 23.72 A.4.1.1.21 Rp 223,020.00 Rp 5,290,034.40
c Cor Beton Mutu K.200 m3 2.03 A.4.1.1.6. Rp 1,078,920.71 Rp 2,186,432.83
9 Pekerjaan Ring Balok 20x20
a Pek. Pembesian Kg 275.43 A.4.1.1.17 Rp 15,124.00 Rp 4,165,565.51
b Pek. Bekisting Ring Balok m2 11.60 A.4.1.1.23 Rp 386,310.00 Rp 4,481,196.00
c Cor Beton Mutu K.200 m3 2.32 A.4.1.1.6. Rp 1,078,920.71 Rp 2,503,096.06
10 Pekerjaan Balok 15x20
a Pek. Pembesian Kg 44.67 A.4.1.1.17 Rp 15,124.00 Rp 675,542.20
b Pek. Bekisting Ring Balok m2 3.36 A.4.1.1.23 Rp 386,310.00 Rp 1,298,001.60
c Cor Beton Mutu K.200 m3 0.25 A.4.1.1.6. Rp 1,078,920.71 Rp 271,888.02
11 Pekerjaan Ring Balok 15/15
a Pek. Pembesian Kg 282.53 A.4.1.1.17 Rp 15,124.00 Rp 4,272,923.98
b Pek. Bekisting Ring Balok m2 17.79 A.4.1.1.23 Rp 386,310.00 Rp 6,872,454.90
c Cor Beton Mutu K.200 m3 0.62 A.4.1.1.6. Rp 1,078,920.71 Rp 665,154.62
12 Pekerjaan lantai beton bertulang
a Pek. Pembesian Kg 1053.65 A.4.1.1.17 Rp 15,124.00 Rp 15,935,374.47
b Cor Beton Mutu K.175 m3 48.72 A.4.1.1.6. Rp 1,048,999.29 Rp 51,102,918.08
HARGA SATUAN JUMLAH HARGA
NO JENIS PEKERJAAN SATUANVOLUME ANALISA
(Rp) (Rp)
13 Pek. Plat /Dak Beton
a Pembesian Kg 36.50 A.4.1.1.17 Rp 15,124.00 Rp 551,958.70
b Pek. Bekisting m2 4.29 A.4.1.1.24 Rp 539,810.00 Rp 2,314,435.38
c Cor Beton Mutu K.200 m3 0.64 A.4.1.1.6. Rp 1,078,920.71 Rp 693,880.88
Jumlah III Rp 176,587,548.53
IV PEKERJAAN DINDING, PLESTERAN DAN KERAMIK
1 Pek. Pasangan dinding Bataco
a Bangunan Hanggar TPS3R m2 142.96 A.4.4.1.21a. Rp 167,865.75 Rp 23,998,020.47
b Kantor m2 60.60 A.4.4.1.21a. Rp 167,865.75 Rp 10,173,168.05
c WC m2 23.50 A.4.4.1.21a. Rp 167,865.75 Rp 3,945,348.72
d Pagar m2 73.61 A.4.4.1.21a. Rp 167,865.75 Rp 12,356,346.06
2 Pek. Plesteran Dinding
a Bangunan Hanggar TPS3R m2 205.28 A.4.4.2.4. Rp 79,356.00 Rp 16,290,136.20
b Kantor m2 89.03 A.4.4.2.4. Rp 79,356.00 Rp 7,065,382.10
c WC m2 38.21 A.4.4.2.4. Rp 79,356.00 Rp 3,031,875.34
d Pagar m2 93.01 A.4.4.2.4. Rp 79,356.00 Rp 7,380,822.20
3 Cor Beton Lantai Beton Mutu K.200 m3 5.04 A.4.1.1.6. Rp 1,078,920.71 Rp 5,439,098.26
4 Pek Keramik lantai Uk.40x40 m2 46.21 A.4.4.3.35.a Rp 258,950.00 Rp 11,964,784.75
5 Pek Keramik lantai WC Uk.20x20 m2 3.68 A.4.4.3.36. Rp 248,960.00 Rp 916,172.80
6 Pek Keramik dinding WC Uk.10x20 m2 8.16 A.4.4.3.53. Rp 324,677.50 Rp 2,649,368.40
7 Pek. Dinding Tawing layar m2 64.20 A.4.6.1.25.a Rp 213,650.00 Rp 13,716,330.00
Jumlah III Rp 118,926,853.35
V PEKERJAAN ATAP, PLAFOND, LISPLANK
1 Rangka Atap Baja Ringan
a Hanggar TPS3R m2 242.24 A.4.2.1.2 d Rp 139,086.67 Rp 33,691,801.24
b Kantor m2 18.63 A.4.2.1.2 d Rp 139,086.67 Rp 2,591,677.02
c WC m2 9.96 A.4.2.1.2 d Rp 139,086.67 Rp 1,385,827.29
2 Pek Atap Genteng Metal Zincalume
a Hanggar TPS3R m2 242.24 A.4.5.2.32. Rp 91,794.34 Rp 22,235,895.93
b Kantor m2 18.63 A.4.5.2.32. Rp 91,794.34 Rp 1,710,453.53
c WC m2 9.96 A.4.5.2.32. Rp 91,794.34 Rp 914,617.51
3 Pek. Lisplank Superplank Eksterior m 57.34 A.4.6.1.21.a Rp 120,641.67 Rp 6,918,162.66
4 Rangka Hollow Plafond Kantor m2 9.55 A.4.2.1.21. Rp 127,450.00 Rp 1,216,828.88
5 Pek. Pas. Plafond Kalsiboard m2 9.55 A.4.5.1.1a Rp 72,700.00 Rp 694,103.25
Jumlah IV Rp 71,359,367.32
VI PEKERJAAN PINTU, JENDELA, KUNCI & PENGGANTUNG
1 Pek. Kusen Pintu dan Jendela Kayu Klas II
a Hanggar TPS3R m3 0.12 A.4.6.1.2. Rp 8,706,500.00 Rp 1,007,342.05
b Kantor m3 0.06 A.4.6.1.2. Rp 8,706,500.00 Rp 504,977.00
c WC m3 0.02 A.4.6.1.2. Rp 8,706,500.00 Rp 182,836.50
2 Pek. Daun Pintu Panel Kayu Klas II
a Hanggar TPS3R m2 3.60 A.4.6.1.5. Rp 841,000.00 Rp 3,027,600.00
b Kantor m2 1.80 A.4.6.1.5. Rp 841,000.00 Rp 1,513,800.00
c WC m2 1.80 A.4.6.1.5. Rp 841,000.00 Rp 1,513,800.00
3 Pek. Rangka Jendela Kaca Kayu Klas II m2 2.26 A.4.6.1.6. Rp 632,800.00 Rp 1,427,596.80
4 Pek.Pemasangan Kaca Tebal 5 mm m2 7.48 A.4.6.2.17 Rp 175,650.00 Rp 1,314,213.30
5 Pek. Engsel Pintu bh 12.00 A.4.6.2.5 Rp 62,150.00 Rp 745,800.00
6 Pek. Engsel Jendela bh 12.00 A.4.6.2.6. Rp 59,100.00 Rp 709,200.00
7 Kunci Tanam bh 4.00 A.4.6.2.2. Rp 179,900.00 Rp 719,600.00
8 Hak angin Jendela bh 6.00 A.4.6.2.9. Rp 47,950.00 Rp 287,700.00
9 Gerendel Jendela bh 6.00 A.4.6.2.11. Rp 62,150.00 Rp 372,900.00
10 Handel Jendela bh 6.00 A.4.6.2.8.a Rp 35,150.00 Rp 210,900.00
11 Pekerjaan Ventilasi Kerawang m2 16.20 A. 4.4.1.23 Rp 378,475.00 Rp 6,131,295.00
12 Pekerjaan glasblock m2 8.92 Ls Rp 650,000.00 Rp 5,798,000.00
Jumlah V Rp 25,467,560.65
VII PEKERJAAN PENGECATAN
1 Pengecatan dinding
a Hanggar TPS3R m2 205.28 A.4.7.1.10. Rp 46,321.00 Rp 9,508,737.82
b Kantor m2 89.03 A.4.7.1.10. Rp 46,321.00 Rp 4,124,143.91
c WC m2 38.21 A.4.7.1.10. Rp 46,321.00 Rp 1,769,740.13
d Pagar m2 93.01 A.4.7.1.10. Rp 46,321.00 Rp 4,308,269.89
2 Pengecatan Plafond Kantor m2 9.55 A.4.7.1.10. Rp 46,321.00 Rp 442,249.75
3 Pengecatan Kusen Pintu dan Jendela m2 10.08 A.4.7.1.4. Rp 53,263.00 Rp 536,891.04
4 Pengecatan Pintu Panel
a Hanggar TPS3R m2 10.80 A.4.7.1.4. Rp 53,263.00 Rp 575,240.40
b Kantor m2 3.60 A.4.7.1.4. Rp 53,263.00 Rp 191,746.80
c WC m2 3.60 A.4.7.1.4. Rp 53,263.00 Rp 191,746.80
5 Pengecatan Rangka Jendela Kaca m2 3.20 A.4.7.1.4. Rp 53,263.00 Rp 170,441.60
Jumlah VI Rp 21,819,208.14
HARGA SATUAN JUMLAH HARGA
NO JENIS PEKERJAAN SATUANVOLUME ANALISA
(Rp) (Rp)
VIII PEKERJAAN SANITASI
1 Pekerjaan Septictank 1 unit
a Galian Septictank m3 6.94 A. 2.3.1.1 Rp 105,000.00 Rp 728,437.50
b Pek. Urugan Pasir t=5 cm m2 0.19 A.2.3.1.11. Rp 222,000.00 Rp 41,625.00
c Pek Cor Beton K.175 tebal 10 cm m3 0.26 A.4.1.1.5. Rp 1,048,999.29 Rp 276,935.81
d Pek. Sloof 15/15
- Pek. Pembesian Kg 26.06 A.4.1.1.17 Rp 15,124.00 Rp 394,191.94
- Pek. bekisting m2 2.40 A.4.1.1.21 Rp 223,020.00 Rp 535,248.00
- Pek cor beton K.175 m3 0.18 A.4.1.1.5. Rp 1,048,999.29 Rp 188,819.87
e Pek. Kolom 15/15
- Pek. Pembesian Kg 24.23 A.4.1.1.17 Rp 15,124.00 Rp 366,486.28
- Pek. bekisting m2 4.08 A.4.1.1.22 Rp 374,310.00 Rp 1,527,184.80
- Pek cor beton K.175 m3 0.15 A.4.1.1.5. Rp 1,048,999.29 Rp 160,496.89
f Pek. Pas. Batako m2 11.56 A.4.4.1.21a. Rp 167,865.75 Rp 1,940,528.07
g Pek. Plesteran m2 11.56 A.4.4.2.4. Rp 79,356.00 Rp 917,355.36
h Pek. Ring Balk 15/15
- Pek. Pembesian Kg 28.28 A.4.1.1.17 Rp 15,124.00 Rp 427,646.22
- Pek. bekisting m2 2.40 A.4.1.1.21 Rp 223,020.00 Rp 535,248.00
- Pek cor beton K.175 m3 0.18 A.4.1.1.5. Rp 1,048,999.29 Rp 188,819.87
i Pek. Plat penutup septictank tebal 10 cm
- Pek. Pembesian Kg 4.66 A.4.1.1.17 Rp 15,124.00 Rp 70,492.96
- Pek. bekisting m2 1.20 A.4.1.1.24 Rp 539,810.00 Rp 647,772.00
- Pek cor beton K.175 m3 0.17 A.4.1.1.5. Rp 1,048,999.29 Rp 176,231.88
j Pek. Tutup mainhole
- Pek. Pembesian Kg 3.00 A.4.1.1.17 Rp 15,124.00 Rp 45,402.25
- Pek. bekisting m2 0.42 A.4.1.1.24 Rp 539,810.00 Rp 226,720.20
- Pek cor beton K.175 m3 0.05 A.4.1.1.5. Rp 1,048,999.29 Rp 51,400.97
k Bioseptictank Kapasitas 3000L Bh 1.00 Ls Rp 12,287,000.00 Rp 12,287,000.00
l Urugan Pasir dalam septictank m3 0.34 A.2.3.1.11. Rp 222,000.00 Rp 74,592.00
2 Pekerjaan Pipa 4" m 3.50 A.5.1.1 32. Rp 148,872.50 Rp 521,053.75
3 Pekerjaan Pipa 2" m 1.93 A.5.1.1 29. Rp 72,446.25 Rp 139,821.26
4 Pekerjaan Pipa 3/4" (Air Bersih) m 36.66 A.5.1.1 26. Rp 31,635.00 Rp 1,159,739.10
5 Pek. Sumur Bor+pompa Bh 1.00 Ls Rp 2,500,000.00 Rp 2,500,000.00
6 Pekerjaan kran air Bh 2.00 A.5.1.1 19. Rp 135,500.00 Rp 271,000.00
7 Pekerjaan stop kran Bh 1.00 A.5.1.1 19.a Rp 135,500.00 Rp 135,500.00
8 Profil tank 1200 L Bh 1.00 Ls Rp 1,600,000.00 Rp 1,600,000.00
9 Pek. Closed Duduk Bh 1.00 A.5.1.1.1. Rp 2,542,200.00 Rp 2,542,200.00
10 Pek. Wastafel+cermin Unit 1.00 A.5.1.1 5. Rp 1,668,200.00 Rp 1,668,200.00
11 Pek. Grill besi penutup saluran m 37.50 Ls Rp 89,400.00 Rp 3,352,500.00
12 Pek. Bak air lindi & resapan unit 1.00 Ls Rp 1,360,000.00 Rp 1,360,000.00
Jumlah VII Rp 37,058,649.98
IX PEKERJAAN JEMBATAN
1 Pekerjaan Pondasi Batu Belah m3 19.18 A.3.2.1.2. Rp 1,104,825.00 Rp 21,190,543.50
2 Pekerjaan Sloof 20/30
a Pek. Pembesian kg 102.56 A.4.1.1.17 Rp 15,124.00 Rp 1,551,043.33
b Pekerjaan Bekisting Sloof m2 12.44 A.4.1.1.21 Rp 223,020.00 Rp 2,774,368.80
c Cor Beton K.200 m3 1.09 A.4.1.1.6. Rp 1,078,920.71 Rp 1,178,181.42
3 Pekerjaan Balok 20/30
a Pek. Pembesian kg 51.28 A.4.1.1.17 Rp 15,124.00 Rp 775,521.67
b Pekerjaan Bekisting Balok m2 7.28 A.4.1.1.23 Rp 386,310.00 Rp 2,812,336.80
c Cor Beton K.200 m3 0.55 A.4.1.1.6. Rp 1,078,920.71 Rp 589,090.71
4 Pekerjaan Plat beton
a Pek. Pembersian kg 250.87 A.4.1.1.17 Rp 15,124.00 Rp 3,794,191.15
b Pekerjaan Bekisting Plat m2 11.89 A.4.1.1.24 Rp 539,810.00 Rp 6,418,340.90
c Cor Beton K200 tebal 20 cm m3 4.03 A.4.1.1.6. Rp 1,078,920.71 Rp 4,345,892.64
5 Pekerjaan Reling jembatan
a Pembesian Kolom 15/15 Kg 22.59 A.4.1.1.17 Rp 15,124.00 Rp 341,620.91
b Pek. Bekisting Kolom m2 2.40 A.4.1.1.22 Rp 374,310.00 Rp 898,344.00
c Cor Beton K.200 m3 0.18 A.4.1.1.6. Rp 1,078,920.71 Rp 194,205.73
d Pek. Pas Batako m2 3.10 A.4.4.1.21a. Rp 167,865.75 Rp 520,383.83
e Pek. Plesteran m2 6.60 A.4.4.2.4. Rp 79,356.00 Rp 523,749.60

Jumlah VIII Rp 47,907,814.98


HARGA SATUAN JUMLAH HARGA
NO JENIS PEKERJAAN SATUANVOLUME ANALISA
(Rp) (Rp)
X PEKERJAAN LISTRIK
1 Penyambungan Daya Baru PLN Unit 1.00 Ls Rp 4,500,000.00 Rp 4,500,000.00
2 Instalasi Titik Lampu Titik 13.00 Ls Rp 325,000.00 Rp 4,225,000.00
3 Lampu SL 18 Watt Bh 13.00 Ls Rp 35,000.00 Rp 455,000.00
4 Saklar Tunggal Bh 4.00 Ls Rp 20,000.00 Rp 80,000.00
5 Saklar Ganda Bh 4.00 Ls Rp 20,000.00 Rp 80,000.00
6 Pek. Pas. Panel Listrik Bh 1.00 Ls Rp 760,000.00 Rp 760,000.00
7 Pek. Instalasi stop kontak Titik 6.00 Ls Rp 325,000.00 Rp 1,950,000.00
8 Stop Kontak Bh 6.00 Ls Rp 20,000.00 Rp 120,000.00
Jumlah IX Rp 12,170,000.00
XI PEKERJAAN LAIN-LAIN
1 Pekerjaan Pagar Besi BRC m2 16.30 Ls Rp 320,000.00 Rp 5,216,000.00
2 Pekerjaan Pintu Pagar Besi m2 9.45 Ls Rp 600,000.00 Rp 5,670,000.00
3 Pekerjaan Handrail difabel stainless
a Hanggar TPS3R panjang 2 m m 13.54 Ls Rp 52,000.00 Rp 704,080.00
b Kantor panjang 0,95 m m 4.75 Ls Rp 52,000.00 Rp 247,000.00
c WC Panjang 0,75 m 4.29 Ls Rp 52,000.00 Rp 223,080.00
d Biaya pengelasan & pemasangan (100% fisik) m 22.58 Ls Rp 52,000.00 Rp 1,174,160.00
4 Pekerjaan Rolling door m2 7.27 A.4.2.1.10 Rp 810,400.00 Rp 5,889,582.00
5 Pek. Handrail closet m 1.20 Ls Rp 52,000.00 Rp 62,400.00
6 Pekerjaan ukiran kayu m2 19.20 Ls Rp 625,000.00 Rp 12,000,000.00
7 Pek. Plesteran letter timbul Paket 1.00 Ls Rp 830,000.00 Rp 830,000.00
Jumlah IX Rp 32,016,302.00
XII PERALATAN TPS3R
1 Mesin Pencacah Plastik kap 400 Kg/hari Diesel 16 HP Unit 1.00 Ls Rp 36,130,000.00 Rp 36,130,000.00
2 Mesin Pencacah Kompos kapasitas 500 kg/jam Diesel 8H Unit 1.00 Ls Rp 22,650,000.00 Rp 22,650,000.00
3 Mesin Pengayak Kapasitas 500 Kg/Jam Unit 1.00 Ls Rp 18,150,000.00 Rp 18,150,000.00
Jumlah IX Rp 76,930,000.00
XIII KEBUTUHAN K3 DAN PROKES PENCEGAHAN COVID - 19
A KEBUTUHAN KESEHATAN DAN KESELAMATAN KERJA
1 Sosialisasi K3 dan Prokes (Spanduk) Bh 4.00 Ls Rp 75,000.00 Rp 300,000.00
2 Helm Keselamatan Bh 21.00 Ls Rp 100,000.00 Rp 2,100,000.00
3 Rompi Kerja Bh 21.00 Ls Rp 60,000.00 Rp 1,260,000.00
4 Sarung Tangan (Safety Glove) Bh 21.00 Ls Rp 5,000.00 Rp 105,000.00
5 Sepatu Keselamatan (Rubber Shoes) Bh 21.00 Ls Rp 100,000.00 Rp 2,100,000.00
6 Tali Pengaman Bh 3.00 Ls Rp 231,500.00 Rp 694,500.00
7 Kotak P3K Bh 2.00 Ls Rp 40,000.00 Rp 80,000.00
8 Asuransi Tenaga Kerja Paket 1.00 Ls Rp 912,000.00 Rp 912,000.00
B KEBUTUHAN PROTOKOL KESEHATAN PENCEGAHAN COVID-19
1 Alat ukur suhu badan nir-sentuh (Thermoscan) Bh 2.00 Ls Rp 350,000.00 Rp 700,000.00
2 Vitamin C (1 Box isi 100 tablet) Bh 25.00 Ls Rp 25,000.00 Rp 625,000.00
3 Tempat Cuci Tangan Bh 2.00 Ls Rp 250,000.00 Rp 500,000.00
4 Sabun Cuci Tangan (Cair) 200ml/btl Bh 4.00 Ls Rp 25,000.00 Rp 100,000.00
5 Masker kain Bh 25.00 Ls Rp 5,000.00 Rp 125,000.00
6 Alat penyemprot desinfektan Bh 2.00 Ls Rp 65,000.00 Rp 130,000.00
7 Cairan Desinfektan 5L Bh 3.00 Ls Rp 75,000.00 Rp 225,000.00
Jumlah X Rp 9,956,500.00
XIV ADMINISTRASI KEGIATAN
1 Pelaporan KSM Ls 1.00 Ls Rp 270,000.00 Rp 270,000.00
2 Photo Copy / Penggandaan Ls 1.00 Ls Rp 250,000.00 Rp 250,000.00
3 Biaya Alat Tulis Kantor (ATK) Ls 1.00 Ls Rp 150,000.00 Rp 150,000.00
4 Materai Ls 8.00 Ls Rp 10,000.00 Rp 80,000.00
5 Pengujian Lab Bh 1.00 Ls Rp 500,000.00 Rp 500,000.00
6 Papan Nama Kegiatan Paket 1.00 Ls Rp 250,000.00 Rp 250,000.00
Jumlah IX Rp 1,500,000.00

TOTAL Rp 705,002,362
DIBULATKAN Rp 705,000,000
JADWAL PELAKSANAAN PEKERJAAN
PAKET : PEMBANGUNAN TPS3R

KAB/KOTA : PALANGKA RAYA KELURAHAN : KERENG BANGKIRAI


KECAMATAN : SABANGAU BKM : KERENG MEMBANGUN

JML.BIAYA BOBOT DURASI JADWAL PELAKSANAAN (Minggu Ke)


No. URAIAN PEKERJAAN SATUAN VOLUME KETERANGAN
(Rp.) (%) (Minggu) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
I PEKERJAAN PERSIAPAN
1 Pembersihan Awal m2 200.00 2,800,000.00 0.40 2
2 Pengukuran dan Pemasangan Bowplank m 66.00 4,929,540.00 0.70 1

II PEKERJAAN TANAH
1 Pek urugan tanah lokasi kegiatan m3 218.55 35,405,100.00 5.02 2
2 Pek. Galian Tanah Pondasi m3 11.68 1,226,610.00 0.17 0
3 Pek. Urugan Bekas Galian m3 2.92 204,435.00 0.03 0
4 Pek. Urugan Pasir bawah lantai m3 45.49 10,099,672.44 1.43 0
5 Pek. Pemancangan Cerucuk Kayu Galam (p. 2m) Btg 372.00 18,637,200.00 2.64 0

III PEKERJAAN BETON BERTULANG


1 Pondasi Footplat P1 (80 cm x 80 cm x 20 cm)
a Pek. Pembesian Kg 318.33 4,814,347.30 0.68 0
b Pek. Lantai Kerja Beton K.100 t=5 cm m3 0.67 641,617.92 0.09 0
c Pek. Bekisting Pondasi m2 2.24 494,636.80 0.07 0
d Cor Beton Mutu K.200 m3 2.69 2,900,138.88 0.41 0
2 Pondasi Footplat P2 (60 cm x 60 cm x 20 cm)
a Pek. Pembesian Kg 218.55 3,305,312.39 0.47 0
b Pek. Lantai Kerja Beton K.100 t=5 cm m3 0.34 326,537.69 0.05 0
c Pek. Bekisting Pondasi m2 1.52 335,646.40 0.05 0
d Cor Beton Mutu K.200 m3 1.37 1,475,963.54 0.21 0
3 Pondasi Footplat P3 (120 cm x 80 cm x 20 cm)
a Pek. Pembesian Kg 39.95 604,153.39 0.09 0
b Pek. Lantai Kerja Beton K.100 t=5 cm m3 0.05 45,829.85 0.01 0
c Pek. Bekisting Pondasi m2 1.92 423,974.40 0.06 0
d Cor Beton Mutu K.200 m3 0.19 207,152.78 0.03 0
4 Pek Kolom K1
a Pek. Pembesian Kg 485.65 7,345,020.01 1.04 0
b Pek. Bekisting Kolom m2 40.40 15,122,124.00 2.14 0
c Cor Beton Mutu K.200 m3 4.23 4,561,676.78 0.65 0
5 Pek Kolom K2
a Pek. Pembesian Kg 148.41 2,244,497.39 0.32 0
b Pek. Bekisting Kolom m2 15.43 5,775,603.30 0.82 0
c Cor Beton Mutu K.200 m3 1.76 1,895,933.43 0.27 0
6 Pek Kolom K3
a Pek. Pembesian Kg 66.62 1,007,557.35 0.14 0
b Pek. Bekisting Kolom m2 6.96 2,605,197.60 0.37 0
c Cor Beton Mutu K.200 m3 0.26 281,598.31 0.04 0
7 Pekerjaan Sloof 20x30
a Pek. Pembesian Kg 393.92 5,957,668.77 0.85 0
b Pek. Bekisting Sloof m2 11.60 2,587,032.00 0.37 0
c Cor Beton Mutu K.200 m3 3.48 3,754,644.09 0.53 0
8 Pekerjaan Sloof 15x20
a Pek. Pembesian Kg 303.68 4,592,826.58 0.65 0
b Pek. Bekisting Sloof m2 23.72 5,290,034.40 0.75 0
c Cor Beton Mutu K.200 m3 2.03 2,186,432.83 0.31 0
9 Pekerjaan Ring Balok 20x20
a Pek. Pembesian Kg 275.43 4,165,565.51 0.59 0
b Pek. Bekisting Ring Balok m2 11.60 4,481,196.00 0.64 0
c Cor Beton Mutu K.200 m3 2.32 2,503,096.06 0.36 0
JML.BIAYA BOBOT DURASI JADWAL PELAKSANAAN (Minggu Ke)
No. URAIAN PEKERJAAN SATUAN VOLUME KETERANGAN
(Rp.) (%) (Minggu) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
10 Pekerjaan Balok 15x20
a Pek. Pembesian Kg 44.67 675,542.20 0.10 0
b Pek. Bekisting Ring Balok m2 3.36 1,298,001.60 0.18 0
c Cor Beton Mutu K.200 m3 0.25 271,888.02 0.04 0
11 Pekerjaan Ring Balok 15/15
a Pek. Pembesian Kg 282.53 4,272,923.98 0.61 0
b Pek. Bekisting Ring Balok m2 17.79 6,872,454.90 0.97 0
c Cor Beton Mutu K.200 m3 0.62 665,154.62 0.09 0
12 Pekerjaan lantai beton bertulang
a Pek. Pembesian Kg 1,053.65 15,935,374.47 2.26 0
b Cor Beton Mutu K.175 m3 48.72 51,102,918.08 7.25 0
13 Pek. Plat /Dak Beton
a Pembesian Kg 36.50 551,958.70 0.08 0
b Pek. Bekisting m2 4.29 2,314,435.38 0.33 0
c Cor Beton Mutu K.200 m3 0.64 693,880.88 0.10 0

IV PEKERJAAN DINDING, PLESTERAN DAN KERAMIK


1 Pek. Pasangan dinding Bataco
a Bangunan Hanggar TPS3R m2 142.96 23,998,020.47 3.40 0
b Kantor m2 60.60 10,173,168.05 1.44 0
c WC m2 23.50 3,945,348.72 0.56 0
d Pagar m2 73.61 12,356,346.06 1.75 0
2 Pek. Plesteran Dinding
a Bangunan Hanggar TPS3R m2 205.28 16,290,136.20 2.31 0
b Kantor m2 89.03 7,065,382.10 1.00 0
c WC m2 38.21 3,031,875.34 0.43 0
d Pagar m2 93.01 7,380,822.20 1.05 0
3 Cor Beton Lantai Beton Mutu K.200 m3 5.04 5,439,098.26 0.77 0
4 Pek Keramik lantai Uk.40x40 m2 46.21 11,964,784.75 1.70 0
5 Pek Keramik lantai WC Uk.20x20 m2 3.68 916,172.80 0.13 0
6 Pek Keramik dinding WC Uk.10x20 m2 8.16 2,649,368.40 0.38 0
7 Pek. Dinding Tawing layar m2 64.20 13,716,330.00 1.95 0

V PEKERJAAN ATAP, PLAFOND, LISPLANK


1 Rangka Atap Baja Ringan
a Hanggar TPS3R m2 242.24 33,691,801.24 4.78 0
b Kantor m2 18.63 2,591,677.02 0.37 0
c WC m2 9.96 1,385,827.29 0.20 0
2 Pek Atap Genteng Metal Zincalume
a Hanggar TPS3R m2 242.24 22,235,895.93 3.15 0
b Kantor m2 18.63 1,710,453.53 0.24 0
c WC m2 9.96 914,617.51 0.13 0
3 Pek. Lisplank Superplank Eksterior m 57.34 6,918,162.66 0.98 0
4 Rangka Hollow Plafond Kantor m2 9.55 1,216,828.88 0.17 0
5 Pek. Pas. Plafond Kalsiboard m2 9.55 694,103.25 0.10 0

VI PEKERJAAN PINTU, JENDELA, KUNCI & PENGGANTUNG


1 Pek. Kusen Pintu dan Jendela Kayu Klas II
a Hanggar TPS3R m3 0.12 1,007,342.05 0.14 0
b Kantor m3 0.06 504,977.00 0.07 0
c WC m3 0.02 182,836.50 0.03 0
2 Pek. Daun Pintu Panel Kayu Klas II
a Hanggar TPS3R m2 3.60 3,027,600.00 0.43 0
b Kantor m2 1.80 1,513,800.00 0.21 0
c WC m2 1.80 1,513,800.00 0.21 0
3 Pek. Rangka Jendela Kaca Kayu Klas II m2 2.26 1,427,596.80 0.20 0
4 Pek.Pemasangan Kaca Tebal 5 mm m2 7.48 1,314,213.30 0.19 0
5 Pek. Engsel Pintu bh 12.00 745,800.00 0.11 0
JML.BIAYA BOBOT DURASI JADWAL PELAKSANAAN (Minggu Ke)
No. URAIAN PEKERJAAN SATUAN VOLUME KETERANGAN
(Rp.) (%) (Minggu) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
6 Pek. Engsel Jendela bh 12.00 709,200.00 0.10 0
7 Kunci Tanam bh 4.00 719,600.00 0.10 0
8 Hak angin Jendela bh 6.00 287,700.00 0.04 0
9 Gerendel Jendela bh 6.00 372,900.00 0.05 0
10 Handel Jendela bh 6.00 210,900.00 0.03 0
11 Pekerjaan Ventilasi Kerawang m2 16.20 6,131,295.00 0.87 0
12 Pekerjaan glasblock m2 8.92 5,798,000.00 0.82 0

VII PEKERJAAN PENGECATAN


1 Pengecatan dinding
a Hanggar TPS3R m2 205.28 9,508,737.82 1.35 0
b Kantor m2 89.03 4,124,143.91 0.58 0
c WC m2 38.21 1,769,740.13 0.25 0
d Pagar m2 93.01 4,308,269.89 0.61 0
2 Pengecatan Plafond Kantor m2 9.55 442,249.75 0.06 0
3 Pengecatan Kusen Pintu dan Jendela m2 10.08 536,891.04 0.08 0
4 Pengecatan Pintu Panel
a Hanggar TPS3R m2 10.80 575,240.40 0.08 0
b Kantor m2 3.60 191,746.80 0.03 0
c WC m2 3.60 191,746.80 0.03 0
5 Pengecatan Rangka Jendela Kaca m2 3.20 170,441.60 0.02 0

VIII PEKERJAAN SANITASI


1 Pekerjaan Septictank 1 unit
a Galian Septictank m3 6.94 728,437.50 0.10 0
b Pek. Urugan Pasir t=5 cm m2 0.19 41,625.00 0.01 0
c Pek Cor Beton K.175 tebal 10 cm m3 0.26 276,935.81 0.04 0
d Pek. Sloof 15/15
- Pek. Pembesian Kg 26.06 394,191.94 0.06 0
- Pek. bekisting m2 2.40 535,248.00 0.08 0
- Pek cor beton K.175 m3 0.18 188,819.87 0.03 0
e Pek. Kolom 15/15
- Pek. Pembesian Kg 24.23 366,486.28 0.05 0
- Pek. bekisting m2 4.08 1,527,184.80 0.22 0
- Pek cor beton K.175 m3 0.15 160,496.89 0.02 0
f Pek. Pas. Batako m2 11.56 1,940,528.07 0.28 0
g Pek. Plesteran m2 11.56 917,355.36 0.13 0
h Pek. Ring Balk 15/15
- Pek. Pembesian Kg 28.28 427,646.22 0.06 0
- Pek. bekisting m2 2.40 535,248.00 0.08 0
- Pek cor beton K.175 m3 0.18 188,819.87 0.03 0
i Pek. Plat penutup septictank tebal 10 cm
- Pek. Pembesian Kg 4.66 70,492.96 0.01 0
- Pek. bekisting m2 1.20 647,772.00 0.09 0
- Pek cor beton K.175 m3 0.17 176,231.88 0.02 0
j Pek. Tutup mainhole
- Pek. Pembesian Kg 3.00 45,402.25 0.01 0
- Pek. bekisting m2 0.42 226,720.20 0.03 0
- Pek cor beton K.175 m3 0.05 51,400.97 0.01 0
k Bioseptictank Kapasitas 3000L Bh 1.00 12,287,000.00 1.74 0
l Urugan Pasir dalam septictank m3 0.34 74,592.00 0.01 0
2 Pekerjaan Pipa 4" m 3.50 521,053.75 0.07 0
3 Pekerjaan Pipa 2" m 1.93 139,821.26 0.02 0
4 Pekerjaan Pipa 3/4" (Air Bersih) m 36.66 1,159,739.10 0.16 0
5 Pek. Sumur Bor+pompa Bh 1.00 2,500,000.00 0.35 0
6 Pekerjaan kran air Bh 2.00 271,000.00 0.04 0
7 Pekerjaan stop kran Bh 1.00 135,500.00 0.02 0
8 Profil tank 1200 L Bh 1.00 1,600,000.00 0.23 0
JML.BIAYA BOBOT DURASI JADWAL PELAKSANAAN (Minggu Ke)
No. URAIAN PEKERJAAN SATUAN VOLUME KETERANGAN
(Rp.) (%) (Minggu) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
9 Pek. Closed Duduk Bh 1.00 2,542,200.00 0.36 0
10 Pek. Wastafel+cermin Unit 1.00 1,668,200.00 0.24 0
11 Pek. Grill besi penutup saluran m 37.50 3,352,500.00 0.48 0

IX PEKERJAAN JEMBATAN
1 Pekerjaan Pondasi Batu Belah m3 19.18 21,190,543.50 3.01 0
2 Pekerjaan Sloof 20/30
a Pek. Pembesian kg 102.56 1,551,043.33 0.22 0
b Pekerjaan Bekisting Sloof m2 12.44 2,774,368.80 0.39 0
c Cor Beton K.200 m3 1.09 1,178,181.42 0.17 0
3 Pekerjaan Balok 20/30
a Pek. Pembesian kg 51.28 775,521.67 0.11 0
b Pekerjaan Bekisting Balok m2 7.28 2,812,336.80 0.40 0
c Cor Beton K.200 m3 0.55 589,090.71 0.08 0
4 Pekerjaan Plat beton
a Pek. Pembersian kg 250.87 3,794,191.15 0.54 0
b Pekerjaan Bekisting Plat m2 11.89 6,418,340.90 0.91 0
c Cor Beton K200 tebal 20 cm m3 4.03 4,345,892.64 0.62 0
5 Pekerjaan Reling jembatan
a Pembesian Kolom 15/15 Kg 22.59 341,620.91 0.05 0
b Pek. Bekisting Kolom m2 2.40 898,344.00 0.13 0
c Cor Beton K.200 m3 0.18 194,205.73 0.03 0
d Pek. Pas Batako m2 3.10 520,383.83 0.07 0
e Pek. Plesteran m2 6.60 523,749.60 0.07 0
### Err:509 Err:509 Err:509 Err:509 Err:509 0

X PEKERJAAN LISTRIK
1 Penyambungan Daya Baru PLN Unit 1.00 4,500,000.00 0.64 0
2 Instalasi Titik Lampu Titik 13.00 4,225,000.00 0.60 0
3 Lampu SL 18 Watt Bh 13.00 455,000.00 0.06 0
4 Saklar Tunggal Bh 4.00 80,000.00 0.01 0
5 Saklar Ganda Bh 4.00 80,000.00 0.01 0
6 Pek. Pas. Panel Listrik Bh 1.00 760,000.00 0.11 0
7 Pek. Instalasi stop kontak Titik 6.00 1,950,000.00 0.28 0
8 Stop Kontak Bh 6.00 120,000.00 0.02 0

XI PEKERJAAN LAIN-LAIN
1 Pekerjaan Pagar Besi BRC m2 16.30 5,216,000.00 0.74 0
2 Pekerjaan Pintu Pagar Besi m2 9.45 5,670,000.00 0.80 0
3 Pekerjaan Handrail difabel stainless
a Hanggar TPS3R panjang 2 m m 13.54 704,080.00 0.10 0
b Kantor panjang 0,95 m m 4.75 247,000.00 0.04 0
c WC Panjang 0,75 m 4.29 223,080.00 0.03 0
d Biaya pengelasan & pemasangan (100% fisik) m 22.58 1,174,160.00 0.17 0
4 Pekerjaan Rolling door m2 7.27 5,889,582.00 0.84 0
5 Pek. Handrail closet m 1.20 62,400.00 0.01 0
6 Pekerjaan ukiran kayu m2 19.20 12,000,000.00 1.70 0
7 Pek. Plesteran letter timbul Paket 1.00 830,000.00 0.12 0

XII PERALATAN TPS3R


1 Mesin Pencacah Plastik kap 400 Kg/hari Diesel 16 HP Unit 1.00 36,130,000.00 5.12 0
2 Mesin Pencacah Kompos kapasitas 500 kg/jam Diesel 8HP Unit 1.00 22,650,000.00 3.21 0
3 Mesin Pengayak Kapasitas 500 Kg/Jam Unit 1.00 18,150,000.00 2.57 0

XIII KEBUTUHAN K3 DAN PROKES PENCEGAHAN COVID - 19


A KEBUTUHAN KESEHATAN DAN KESELAMATAN KERJA
1 Sosialisasi K3 dan Prokes (Spanduk) Bh 4.00 300,000.00 0.04
2 Helm Keselamatan Bh 21.00 2,100,000.00 0.30
JML.BIAYA BOBOT DURASI JADWAL PELAKSANAAN (Minggu Ke)
No. URAIAN PEKERJAAN SATUAN VOLUME KETERANGAN
(Rp.) (%) (Minggu) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
3 Rompi Kerja Bh 21.00 1,260,000.00 0.18
4 Sarung Tangan (Safety Glove) Bh 21.00 105,000.00 0.01
5 Sepatu Keselamatan (Rubber Shoes) Bh 21.00 2,100,000.00 0.30
6 Tali Pengaman Bh 3.00 694,500.00 0.10
7 Kotak P3K Bh 2.00 80,000.00 0.01
8 Asuransi Tenaga Kerja Paket 1.00 912,000.00 0.13
B KEBUTUHAN PROTOKOL KESEHATAN PENCEGAHAN COVID-19
1 Alat ukur suhu badan nir-sentuh (Thermoscan) Bh 2.00 700,000.00 0.10
2 Vitamin C (1 Box isi 100 tablet) Bh 25.00 625,000.00 0.09
3 Tempat Cuci Tangan Bh 2.00 500,000.00 0.07
4 Sabun Cuci Tangan (Cair) 200ml/btl Bh 4.00 100,000.00 0.01
5 Masker kain Bh 25.00 125,000.00 0.02
6 Alat penyemprot desinfektan Bh 2.00 130,000.00 0.02
7 Cairan Desinfektan 5L Bh 3.00 225,000.00 0.03

XIV ADMINISTRASI KEGIATAN


1 Pelaporan KSM Ls 1.00 270,000.00 0.04
2 Photo Copy / Penggandaan Ls 1.00 250,000.00 0.04
3 Biaya Alat Tulis Kantor (ATK) Ls 1.00 150,000.00 0.02
4 Materai Ls 8.00 80,000.00 0.01
5 Pengujian Lab Bh 1.00 500,000.00 0.07
6 Papan Nama Kegiatan Paket 1.00 250,000.00 0.04

JUMLAH Err:509 Err:509


RAB-6
BANTUAN PEMERINTAH UNTUK MASYARAKAT ( BPM ) DFAT
PROGRAM KOTA TANPA KUMUH (KOTAKU)
REKAPITULASI RENCANA ANGGARAN BIAYA
Kab./Kota : Palangka Raya
Kecamatan : Sebangau
Kelurahan : Kereng Bangkirai
BKM : Kereng Membangun

JUMLAH HARGA
NO. NAMA PAKET PEKERJAAN SATUAN VOLUME
(Rp.)

01. PEKERJAAN PERSIAPANPembersihan Awal m2 200.00 Rp 2,800,000.00


Pengukuran dan Pemasangan Bowplank m 66.00 Rp 4,929,540.00
JUMLAH 7,729,540.00
02. PEKERJAAN TANAH Pek urugan tanah lokasi kegiatan m3 218.55 Rp 35,405,100.00
Pek. Galian Tanah Pondasi m3 11.68 Rp 1,226,610.00
Pek. Urugan Bekas Galian m3 2.92 Rp 204,435.00
Pek. Urugan Pasir bawah lantai m3 45.49 Rp 10,099,672.44
Pek. Pemancangan Cerucuk Kayu Galam (p. 2m) Btg 372.00 Rp 18,637,200.00
JUMLAH 65,573,017.44
03. PEKERJAAN BETON Pondasi Footplat P1 (80 cm x 80 cm x 20 cm)
BERTULANG a Pek. Pembesian Kg 318.33 Rp 4,814,347.30
b Pek. Lantai Kerja Beton K.100 t=5 cm m3 0.67 Rp 641,617.92
c Pek. Bekisting Pondasi m2 2.24 Rp 494,636.80
d Cor Beton Mutu K.200 m3 2.69 Rp 2,900,138.88
Pondasi Footplat P2 (60 cm x 60 cm x 20 cm)
a Pek. Pembesian Kg 218.55 Rp 3,305,312.39
b Pek. Lantai Kerja Beton K.100 t=5 cm m3 0.34 Rp 326,537.69
c Pek. Bekisting Pondasi m2 1.52 Rp 335,646.40
d Cor Beton Mutu K.200 m3 1.37 Rp 1,475,963.54
Pondasi Footplat P3 (120 cm x 80 cm x 20 cm)
a Pek. Pembesian Kg 39.95 Rp 604,153.39
b Pek. Lantai Kerja Beton K.100 t=5 cm m3 0.05 Rp 45,829.85
c Pek. Bekisting Pondasi m2 1.92 Rp 423,974.40
d Cor Beton Mutu K.200 m3 0.19 Rp 207,152.78
Pek Kolom K1
a Pek. Pembesian Kg 485.65 Rp 7,345,020.01
b Pek. Bekisting Kolom m2 40.40 Rp 15,122,124.00
c Cor Beton Mutu K.200 m3 4.23 Rp 4,561,676.78
Pek Kolom K2
a Pek. Pembesian Kg 148.41 Rp 2,244,497.39
b Pek. Bekisting Kolom m2 15.43 Rp 5,775,603.30
c Cor Beton Mutu K.200 m3 1.76 Rp 1,895,933.43
Pek Kolom K3
a Pek. Pembesian Kg 66.62 Rp 1,007,557.35
b Pek. Bekisting Kolom m2 6.96 Rp 2,605,197.60
c Cor Beton Mutu K.200 m3 0.26 Rp 281,598.31
Pekerjaan Sloof 20x30
a Pek. Pembesian Kg 393.92 Rp 5,957,668.77
b Pek. Bekisting Sloof m2 11.60 Rp 2,587,032.00
c Cor Beton Mutu K.200 m3 3.48 Rp 3,754,644.09
Pekerjaan Sloof 15x20
a Pek. Pembesian Kg 303.68 Rp 4,592,826.58
b Pek. Bekisting Sloof m2 23.72 Rp 5,290,034.40
c Cor Beton Mutu K.200 m3 2.03 Rp 2,186,432.83
Pekerjaan Ring Balok 20x20
a Pek. Pembesian Kg 275.43 Rp 4,165,565.51
b Pek. Bekisting Ring Balok m2 11.60 Rp 4,481,196.00
c Cor Beton Mutu K.200 m3 2.32 Rp 2,503,096.06
Pekerjaan Balok 15x20
a Pek. Pembesian Kg 44.67 Rp 675,542.20
b Pek. Bekisting Ring Balok m2 3.36 Rp 1,298,001.60
c Cor Beton Mutu K.200 m3 0.25 Rp 271,888.02
JUMLAH HARGA
NO. NAMA PAKET PEKERJAAN SATUAN VOLUME
(Rp.)

Pekerjaan Ring Balok 15/15


a Pek. Pembesian Kg 282.53 Rp 4,272,923.98
b Pek. Bekisting Ring Balok m2 17.79 Rp 6,872,454.90
c Cor Beton Mutu K.200 m3 0.62 Rp 665,154.62
Pekerjaan lantai beton bertulang
a Pek. Pembesian Kg 1053.65 Rp 15,935,374.47
b Cor Beton Mutu K.175 m3 48.72 Rp 51,102,918.08
Pek. Plat /Dak Beton
a Pembesian Kg 36.50 Rp 551,958.70
b Pek. Bekisting m2 4.29 Rp 2,314,435.38
c Cor Beton Mutu K.200 m3 0.64 Rp 693,880.88
JUMLAH 176,587,548.53
04. PEKERJAAN DINDING, Pek. Pasangan dinding Bataco
PLESTERAN DAN a Bangunan Hanggar TPS3R m2 142.96 Rp 23,998,020
KERAMIK b Kantor m2 60.60 Rp 10,173,168
c WC m2 23.50 Rp 3,945,349
d Pagar m2 73.61 Rp 12,356,346
Pek. Plesteran Dinding
a Bangunan Hanggar TPS3R m2 205.28 Rp 16,290,136
b Kantor m2 89.03 Rp 7,065,382
c WC m2 38.21 Rp 3,031,875
d Pagar m2 93.01 Rp 7,380,822
Cor Beton Lantai Beton Mutu K.200 m3 5.04 Rp 5,439,098
Pek Keramik lantai Uk.40x40 m2 46.21 Rp 11,964,785
Pek Keramik lantai WC Uk.20x20 m2 3.68 Rp 916,173
Pek Keramik dinding WC Uk.10x20 m2 8.16 Rp 2,649,368
Pek. Dinding Tawing layar m2 64.20 Rp 13,716,330
JUMLAH 118,926,853.35
05. PEKERJAAN ATAP, Rangka Atap Baja Ringan
PLAFOND, LISPLANK a Hanggar TPS3R m2 242.24 Rp 33,691,801
b Kantor m2 18.63 Rp 2,591,677
c WC m2 9.96 Rp 1,385,827
Pek Atap Genteng Metal Zincalume
a Hanggar TPS3R m2 242.24 Rp 22,235,896
b Kantor m2 18.63 Rp 1,710,454
c WC m2 9.96 Rp 914,618
Pek. Lisplank Superplank Eksterior m 57.34 Rp 6,918,163
Rangka Hollow Plafond Kantor m2 9.55 Rp 1,216,829
Pek. Pas. Plafond Kalsiboard m2 9.55 Rp 694,103
JUMLAH 71,359,367.32
06. PEKERJAAN PINTU, Pek. Kusen Pintu dan Jendela Kayu Klas II
JENDELA, KUNCI & a Hanggar TPS3R m3 0.12 Rp 1,007,342
PENGGANTUNG b Kantor m3 0.06 Rp 504,977
c WC m3 0.02 Rp 182,837
Pek. Daun Pintu Panel Kayu Klas II
a Hanggar TPS3R m2 3.60 Rp 3,027,600
b Kantor m2 1.80 Rp 1,513,800
c WC m2 1.80 Rp 1,513,800
Pek. Rangka Jendela Kaca Kayu Klas II m2 2.26 Rp 1,427,597
Pek.Pemasangan Kaca Tebal 5 mm m2 7.48 Rp 1,314,213
Pek. Engsel Pintu bh 12.00 Rp 745,800
Pek. Engsel Jendela bh 12.00 Rp 709,200
Kunci Tanam bh 4.00 Rp 719,600
Hak angin Jendela bh 6.00 Rp 287,700
Gerendel Jendela bh 6.00 Rp 372,900
Handel Jendela bh 6.00 Rp 210,900
Pekerjaan Ventilasi Kerawang m2 16.20 Rp 6,131,295
Pekerjaan glasblock m2 8.92 Rp 5,798,000
JUMLAH 25,467,560.65
JUMLAH HARGA
NO. NAMA PAKET PEKERJAAN SATUAN VOLUME
(Rp.)

07. PEKERJAAN Pengecatan dinding


PENGECATAN a Hanggar TPS3R m2 205.28 Rp 9,508,738
b Kantor m2 89.03 Rp 4,124,144
c WC m2 38.21 Rp 1,769,740
d Pagar m2 93.01 Rp 4,308,270
Pengecatan Plafond Kantor m2 9.55 Rp 442,250
Pengecatan Kusen Pintu dan Jendela m2 10.08 Rp 536,891
Pengecatan Pintu Panel
a Hanggar TPS3R m2 10.80 Rp 575,240
b Kantor m2 3.60 Rp 191,747
c WC m2 3.60 Rp 191,747
Pengecatan Rangka Jendela Kaca m2 3.20 Rp 170,442
JUMLAH 21,819,208.14
08. PEKERJAAN SANITASI Pekerjaan Septictank 1 unit
a Galian Septictank m3 6.94 Rp 728,438
b Pek. Urugan Pasir t=5 cm m2 0.19 Rp 41,625
c Pek Cor Beton K.175 tebal 10 cm m3 0.26 Rp 276,936
d Pek. Sloof 15/15
- Pek. Pembesian Kg 26.06 Rp 394,192
- Pek. bekisting m2 2.40 Rp 535,248
- Pek cor beton K.175 m3 0.18 Rp 188,820
e Pek. Kolom 15/15
- Pek. Pembesian Kg 24.23 Rp 366,486
- Pek. bekisting m2 4.08 Rp 1,527,185
- Pek cor beton K.175 m3 0.15 Rp 160,497
f Pek. Pas. Batako m2 11.56 Rp 1,940,528
g Pek. Plesteran m2 11.56 Rp 917,355
h Pek. Ring Balk 15/15
- Pek. Pembesian Kg 28.28 Rp 427,646
- Pek. bekisting m2 2.40 Rp 535,248
- Pek cor beton K.175 m3 0.18 Rp 188,820
i Pek. Plat penutup septictank tebal 10 cm
- Pek. Pembesian Kg 4.66 Rp 70,493
- Pek. bekisting m2 1.20 Rp 647,772
- Pek cor beton K.175 m3 0.17 Rp 176,232
j Pek. Tutup mainhole
- Pek. Pembesian Kg 3.00 Rp 45,402
- Pek. bekisting m2 0.42 Rp 226,720
- Pek cor beton K.175 m3 0.05 Rp 51,401
k Bioseptictank Kapasitas 3000L Bh 1.00 Rp 12,287,000
l Urugan Pasir dalam septictank m3 0.34 Rp 74,592
Pekerjaan Pipa 4" m 3.50 Rp 521,054
Pekerjaan Pipa 2" m 1.93 Rp 139,821
Pekerjaan Pipa 3/4" (Air Bersih) m 36.66 Rp 1,159,739
Pek. Sumur Bor+pompa Bh 1.00 Rp 2,500,000
Pekerjaan kran air Bh 2.00 Rp 271,000
Pekerjaan stop kran Bh 1.00 Rp 135,500
Profil tank 1200 L Bh 1.00 Rp 1,600,000
Pek. Closed Duduk Bh 1.00 Rp 2,542,200
Pek. Wastafel+cermin Unit 1.00 Rp 1,668,200
Pek. Grill besi penutup saluran m 37.50 Rp 3,352,500
Pek. Bak air lindi & resapan unit 1.00 Rp 1,360,000
JUMLAH 37,058,649.98
JUMLAH HARGA
NO. NAMA PAKET PEKERJAAN SATUAN VOLUME
(Rp.)

09. PEKERJAAN JEMBATAN Pekerjaan Pondasi Batu Belah m3 19.18 Rp 21,190,544


Pekerjaan Sloof 20/30
a Pek. Pembesian kg 102.5551 Rp 1,551,043
b Pekerjaan Bekisting Sloof m2 12.44 Rp 2,774,369
c Cor Beton K.200 m3 1.092 Rp 1,178,181
Pekerjaan Balok 20/30
a Pek. Pembesian kg 51.27755 Rp 775,522
b Pekerjaan Bekisting Balok m2 7.28 Rp 2,812,337
c Cor Beton K.200 m3 0.546 Rp 589,091
Pekerjaan Plat beton
a Pek. Pembersian kg 250.8722 Rp 3,794,191
b Pekerjaan Bekisting Plat m2 11.89 Rp 6,418,341
c Cor Beton K200 tebal 20 cm m3 4.028 Rp 4,345,893
Pekerjaan Reling jembatan
a Pembesian Kolom 15/15 Kg 22.588 Rp 341,621
b Pek. Bekisting Kolom m2 2.4 Rp 898,344
c Cor Beton K.200 m3 0.18 Rp 194,206
d Pek. Pas Batako m2 3.1 Rp 520,384
e Pek. Plesteran m2 6.6 Rp 523,750
JUMLAH 47,907,814.98
10. PEKERJAAN LISTRIK Penyambungan Daya Baru PLN Unit 1 Rp 4,500,000
Instalasi Titik Lampu Titik 13 Rp 4,225,000
Lampu SL 18 Watt Bh 13 Rp 455,000
Saklar Tunggal Bh 4 Rp 80,000
Saklar Ganda Bh 4 Rp 80,000
Pek. Pas. Panel Listrik Bh 1 Rp 760,000
Pek. Instalasi stop kontak Titik 6 Rp 1,950,000
Stop Kontak Bh 6 Rp 120,000
JUMLAH 12,170,000.00
11. PEKERJAAN LAIN-LAIN Pekerjaan Pagar Besi BRC m2 16.30 Rp 5,216,000
Pekerjaan Pintu Pagar Besi m2 9.45 Rp 5,670,000
Pekerjaan Handrail difabel stainless
a Hanggar TPS3R panjang 2 m m 13.54 Rp 704,080
b Kantor panjang 0,95 m m 4.75 Rp 247,000
c WC Panjang 0,75 m 4.29 Rp 223,080
d Biaya pengelasan & pemasangan (100% fisik) m 22.58 Rp 1,174,160
Pekerjaan Rolling door m2 7.27 Rp 5,889,582
Pek. Handrail closet m 1.20 Rp 62,400
Pekerjaan ukiran kayu m2 19.20 Rp 12,000,000
Pek. Plesteran letter timbul Paket 1.00 Rp 830,000
JUMLAH 32,016,302.00
12. PERALATAN TPS3R Mesin Pencacah Plastik kap 400 Kg/hari Diesel 16 HP Unit 1.00 Rp 36,130,000
Mesin Pencacah Kompos kapasitas 500 kg/jam Diesel 8HP Unit 1.00 Rp 22,650,000
Mesin Pengayak Kapasitas 500 Kg/Jam Unit 1.00 Rp 18,150,000
JUMLAH 76,930,000.00
13. KEBUTUHAN K3 DAN Sosialisasi K3 dan Prokes (Spanduk) Bh 4.00 Rp 300,000
PROKES PENCEGAHAN Helm Keselamatan Bh 21.00 Rp 2,100,000
COVID - 19 Rompi Kerja Bh 21.00 Rp 1,260,000
Sarung Tangan (Safety Glove) Bh 21.00 Rp 105,000
Sepatu Keselamatan (Rubber Shoes) Bh 21.00 Rp 2,100,000
Tali Pengaman Bh 3.00 Rp 694,500
Kotak P3K Bh 2.00 Rp 80,000
Asuransi Tenaga Kerja Paket 1.00 Rp 912,000
Alat ukur suhu badan nir-sentuh (Thermoscan) Bh 2.00 Rp 700,000
Vitamin C (1 Box isi 100 tablet) Bh 25.00 Rp 625,000
Tempat Cuci Tangan Bh 2.00 Rp 500,000
Sabun Cuci Tangan (Cair) 200ml/btl Bh 4.00 Rp 100,000
Masker kain Bh 25.00 Rp 125,000
Alat penyemprot desinfektan Bh 2.00 Rp 130,000
Cairan Desinfektan 5L Bh 3.00 Rp 225,000
JUMLAH 9,956,500.00
JUMLAH HARGA
NO. NAMA PAKET PEKERJAAN SATUAN VOLUME
(Rp.)

14. ADMINISTRASI KEGIAT Pelaporan KSM Ls 1.00 270,000


Photo Copy / Penggandaan Ls 1.00 250,000
Biaya Alat Tulis Kantor (ATK) Ls 1.00 150,000
Materai Ls 8.00 80,000
Pengujian Lab Bh 1.00 500,000
Papan Nama Kegiatan Paket 1.00 250,000
JUMLAH 1,500,000.00
TOTAL 705,002,362.40
PEMBULATAN 705,000,000.00

Diverifikasi Oleh : Dibuat Oleh :


Askot Infrastruktur, Fasilitator Teknik, UPL

Wiwit Whindari, ST. Hengky Pradana, ST


FORM - RPD
RENCANA PENGGUNAAN DANA (RPD)
KSM/PANITIA

Kab./Kota : Palangka Raya


Kecamatan : Sebangau Nama Paket : TPS 3R
Kel/Desa : Kereng Bangkirai
KSM/Panit : Kereng Membangun 3

JUMLAH HARGA
RPD TAHAP-I RPD TAHAP-II
NO. URAIAN SESUAI SPPD-L
(70%) (30%)
(Rp.)
(1) (2) (4) (5)
TENAGA KERJA
1. Kepala Tukang 8,670,000 6,069,000 2,601,000
2. Tukang Batu 23,095,000 16,166,500 6,928,500
1. 3. Tukang Kayu 19,800,000 13,860,000 5,940,000
4. Tukang Besi 20,250,000 14,175,000 6,075,000
5. Tukang Cat 3,750,000 2,625,000 1,125,000
6. Pekerja 126,000,000 88,200,000 37,800,000
JUMLAH 201,565,000 141,095,500 60,469,500
BAHAN
1. Kayu balok 5/7 Klas III 1,781,250 1,246,875 534,375
2. Paku 5 -10 cm 1,672,000 1,170,400 501,600
3. Kayu papan 2/20 Klas III 27,273,900 19,091,730 8,182,170
4. Tanah Urug 28,100,000 19,670,000 8,430,000
5. Pasir Urug 7,950,000 5,565,000 2,385,000
6. Kayu Galam ø 10-12 m 6,825,000 4,777,500 2,047,500
7. Besi Beton - - -
Besi beton polos dia. 8 20,025,000 14,017,500 6,007,500
Besi beton polos dia. 10 7,000,000 4,900,000 2,100,000
Besi beton polos dia. 12 20,806,000 14,564,200 6,241,800
8. Kawat Beton 1,750,000 1,225,000 525,000
9. Semen Portland 40,596,000 28,417,200 12,178,800
10. Pasir Beton 6,120,000 4,284,000 1,836,000
11. Split 14,400,000 10,080,000 4,320,000
13. Balok Kayu Klas II uk.5/7 8,008,000 5,605,600 2,402,400
14. Dolken Kayu ø8-10 9,240,000 6,468,000 2,772,000
15. Plywood 9 mm 1,040,000 728,000 312,000
16. Batako 11,480,000 8,036,000 3,444,000
17. Pasir Pasang 22,350,000 15,645,000 6,705,000
18. Ubin Keramik 40x40 3,675,000 2,572,500 1,102,500
19. Semen Warna 240,000 168,000 72,000
20. Ubin Keramik 20x20 260,000 182,000 78,000
21. Ubin Keramik 10x20 588,600 412,020 176,580
22. Paku GRC 175,000 122,500 52,500
23. Kalsiboard Tebal 9 mm 3,610,000 2,527,000 1,083,000
24. Baja Ringan 75x35x0,75 MM 24,125,000 16,887,500 7,237,500
25. Baja Ringan 30x30x0,3 MM 3,350,000 2,345,000 1,005,000
26. Paku Skrup 4,200,000 2,940,000 1,260,000
27. Genteng Metal 11,000,000 7,700,000 3,300,000
28. Paku Genteng Metal 1,890,000 1,323,000 567,000
JUMLAH HARGA
RPD TAHAP-I RPD TAHAP-II
NO. URAIAN SESUAI SPPD-L (30%)
(70%)
(Rp.)

29. Papan Plank Kalsiboard 4,185,000 2,929,500 1,255,500


30. Besi Hollow Plafond 1,3x3,3 90,000 63,000 27,000
32. Kalsiboard 6 mm 660,000 462,000 198,000
33. Paku Kalsiboard 75,000 52,500 22,500
34. Balok kayu kelas II 5/10 untuk kusen 9,360,000 6,552,000 2,808,000
35. Lem Kayu 33,000 23,100 9,900
36. Papan Kayu Klas II Benuas 1,680,000 1,176,000 504,000
37. Kaca Tebal 5 mm 1,120,500 784,350 336,150
38. Sealant 47,500 33,250 14,250
39. Engsel pintu 420,000 294,000 126,000
40. Engsel jendela 492,000 344,400 147,600
2.
41. Kunci tanam biasa 380,000 266,000 114,000
42. Kait angin 124,800 87,360 37,440
43. Grendel/Kunci Slot 210,000 147,000 63,000
44. Handel Jendela 48,000 33,600 14,400
45. Roster/Kerawang 4,875,000 3,412,500 1,462,500
46. Glassblock 5,798,000 4,058,600 1,739,400
47. Cat tembok 12,100,000 8,470,000 3,630,000
49. Cat Menie kayu 180,000 126,000 54,000
50. Cat dasar Kayu 300,000 210,000 90,000
51. Cat Penutup Kayu 480,000 336,000 144,000
52. Kuas 45,000 31,500 13,500
53. Pengencer 28,100 19,670 8,430
54. Ampelas 80,000 56,000 24,000
55. Closet Duduk 1,800,000 1,260,000 540,000
57. Kran air 130,000 91,000 39,000
59. Stop Kran 3/4 65,000 45,500 19,500
60. Pipa PVC 4” 295,000 206,500 88,500
62. Pipa PVC 3/4” 294,000 205,800 88,200
64. Pipa PVC 2” 127,500 89,250 38,250
66. Wastafel+cermin 940,000 658,000 282,000
68. Bioseptictank Kapasitas 3000L 21,287,000 14,900,900 6,386,100
69. Profil Tank 1200 L 1,600,000 1,120,000 480,000
70. Sumur bor+pompa 2,500,000 1,750,000 750,000
71. Grill besi penutup saluran 3,352,500 2,346,750 1,005,750
72. Batu belah 7,200,000 5,040,000 2,160,000
74. Penyambungan Daya Baru PLN 4,500,000 3,150,000 1,350,000
75. Instalasi Titik Lampu 4,225,000 2,957,500 1,267,500
76. Lampu SL 18 Watt 455,000 318,500 136,500
77. Saklar Tunggal 80,000 56,000 24,000
78. Saklar Ganda 80,000 56,000 24,000
79. Pek. Pas Panel Listrik 760,000 532,000 228,000
80. Pek. Instalasi Stop Kontak 1,950,000 1,365,000 585,000
81. Stop Kontak 120,000 84,000 36,000
82. Pagar Besi BRC 5,232,000 3,662,400 1,569,600
83. Pekerjaan Pintu Pagar Besi 4,725,000 3,307,500 1,417,500
84. Pekerjaan Handrailing difabel stainless 1,170,000 819,000 351,000
85. Biaya pengelasan 1,170,000 819,000 351,000
JUMLAH HARGA
RPD TAHAP-I RPD TAHAP-II
NO. URAIAN SESUAI SPPD-L (30%)
(70%)
(Rp.)

86. Pekerjaan Rolling door 5,889,582 4,122,707 1,766,875


87. Pek. Handrail WC 62,000 43,400 18,600
88. Pekerjaan ukiran kayu 12,000,000 8,400,000 3,600,000
89. Pek. Plesteran letter timbul 800,000 560,000 240,000

JUMLAH 415,152,232 290,606,562 124,545,670


ALAT
1. Mesin Pencacah Plastik kap 400 Kg/hari Diesel 16 HP 36,130,000 25,291,000 10,839,000
3. 2. Mesin Pencacah Kompos kapasitas 500 kg/jam Diesel 22,650,000 15,855,000 6,795,000
3. Mesin Pengayak Kapasitas 500 Kg/Jam 18,150,000 12,705,000 5,445,000

JUMLAH 76,930,000 53,851,000 23,079,000


KEBUTUHAN KESEHATAN DAN KESELAMATAN KERJA
1. Sosialisasi K3 dan Prokes (Spanduk) 300,000 210,000 90,000
2. Helm Keselamatan 2,100,000 1,470,000 630,000
3. Rompi Kerja 1,260,000 882,000 378,000
4. Sarung Tangan (Safety Glove) 105,000 73,500 31,500
5. Sepatu Keselamatan (Rubber Shoes) 2,100,000 1,470,000 630,000
6. Tali Pengaman 694,500 486,150 208,350
7. Kotak P3K 80,000 56,000 24,000
4.
8. Asuransi Tenaga Kerja 912,000 638,400 273,600
9. Alat ukur suhu badan nir-sentuh (Thermoscan) 700,000 490,000 210,000
10. Vitamin C (1 Box isi 100 tablet) 625,000 437,500 187,500
11. Tempat Cuci Tangan 500,000 350,000 150,000
12. Sabun Cuci Tangan (Cair) 200ml/btl 100,000 70,000 30,000
13. Masker kain 100,000 70,000 30,000
14. Alat penyemprot desinfektan 130,000 91,000 39,000
15. Cairan Desinfektan 5L 225,000 157,500 67,500
JUMLAH 9,931,500 6,952,050 2,979,450
ADMINISTRASI
1. Pelaporan KSM 270,000 189,000 81,000
2. Photo Copy / Penggandaan 250,000 175,000 75,000
4. 3. Biaya Alat Tulis Kantor (ATK) 150,000 105,000 45,000
4. Materai 80,000 56,000 24,000
5. Pengujian Lab 500,000 350,000 150,000
6. Papan Nama Kegiatan 250,000 175,000 75,000
JUMLAH 1,500,000 1,050,000 450,000

TOTAL 705,078,732 493,555,112 211,523,620


Dibulatkan 705,000,000 493,500,000 211,500,000

Diverifikasi Oleh : Dibuat Oleh


Fasilitator Teknik, KSM Kereng Membangun 3

Hengky Pradana, ST Aldius


FORM - RPD
RENCANA PENGGUNAAN DANA (RPD)
KSM/PANITIA

Kab./Kota : Palangka Raya


Kecamatan : Sebangau Nama Paket : TPS 3R
Kel/Desa : Kereng Bangkirai
KSM/Panit : Kereng Membangun 3

JUMLAH HARGA
REALISASI s/d SISA s/d SAAT INI
NO. URAIAN SESUAI SPPD-L
SAAT INI (Rp.) (Rp.)
(Rp.)
(1) (2) (4) (5)
TENAGA KERJA
1. Kepala Tukang 8,670,000 4,420,000 4,250,000
2. Tukang Batu 23,095,000 13,640,000 9,455,000
1. 3. Tukang Kayu 19,800,000 12,600,000 7,200,000
4. Tukang Besi 20,250,000 13,500,000 6,750,000
5. Tukang Cat 3,750,000 - 3,750,000
6. Pekerja 126,000,000 71,400,000 54,600,000

JUMLAH 201,565,000 115,560,000 86,005,000

BAHAN
1. Kayu balok 5/7 Klas III 1,781,250 1,781,250 -
2. Paku 5 -10 cm 1,672,000 1,320,000 352,000
3. Kayu papan 2/20 Klas III 27,273,900 26,003,500 1,270,400
4. Tanah Urug 28,100,000 26,200,000 1,900,000
5. Pasir Urug 7,950,000 7,950,000 -
6. Kayu Galam ø 10-12 m 6,825,000 6,825,000 -
7. Besi Beton - - -
Besi beton polos dia. 8 20,025,000 6,660,000 13,365,000
Besi beton polos dia. 10 7,000,000 7,000,000 -
Besi beton polos dia. 12 20,806,000 20,806,000 -
8. Kawat Beton 1,750,000 1,250,000 500,000
9. Semen Portland 40,596,000 20,196,000 20,400,000
10. Pasir Beton 6,120,000 2,880,000 3,240,000
11. Split 14,400,000 5,850,000 8,550,000
13. Balok Kayu Klas II uk.5/7 8,008,000 6,440,000 1,568,000
14. Dolken Kayu ø8-10 9,240,000 6,600,000 2,640,000
15. Plywood 9 mm 1,040,000 520,000 520,000
16. Batako 11,480,000 11,480,000 -
17. Pasir Pasang 22,350,000 19,200,000 3,150,000
18. Ubin Keramik 40x40 3,675,000 - 3,675,000
19. Semen Warna 240,000 - 240,000
20. Ubin Keramik 20x20 260,000 - 260,000
JUMLAH HARGA
REALISASI s/d SISA s/d SAAT INI
NO. URAIAN SESUAI SPPD-L
SAAT INI (Rp.) (Rp.)
(Rp.)
21. Ubin Keramik 10x20 588,600 - 588,600
22. Paku GRC 175,000 - 175,000
23. Kalsiboard Tebal 9 mm 3,610,000 3,610,000 -
24. Baja Ringan 75x35x0,75 MM 24,125,000 24,375,000 - 250,000
25. Baja Ringan 30x30x0,3 MM 3,350,000 3,350,000 -
26. Paku Skrup 4,200,000 1,750,000 2,450,000
27. Genteng Metal 11,000,000 11,000,000 -
28. Paku Genteng Metal 1,890,000 1,890,000 -
29. Papan Plank Kalsiboard 4,185,000 - 4,185,000
30. Besi Hollow Plafond 1,3x3,3 90,000 - 90,000
32. Kalsiboard 6 mm 660,000 - 660,000
33. Paku Kalsiboard 75,000 - 75,000
34. Balok kayu kelas II 5/10 untuk kusen 9,360,000 9,360,000 -
35. Lem Kayu 33,000 - 33,000
36. Papan Kayu Klas II Benuas 1,680,000 - 1,680,000
37. Kaca Tebal 5 mm 1,120,500 - 1,120,500
38. Sealant 47,500 - 47,500
39. Engsel pintu 420,000 - 420,000
40. Engsel jendela 492,000 - 492,000
2.
41. Kunci tanam biasa 380,000 - 380,000
42. Kait angin 124,800 - 124,800
43. Grendel/Kunci Slot 210,000 - 210,000
44. Handel Jendela 48,000 - 48,000
45. Roster/Kerawang 4,875,000 4,875,000 -
46. Glassblock 5,798,000 5,798,000 -
47. Cat tembok 12,100,000 - 12,100,000
49. Cat Menie kayu 180,000 - 180,000
50. Cat dasar Kayu 300,000 - 300,000
51. Cat Penutup Kayu 480,000 - 480,000
52. Kuas 45,000 - 45,000
53. Pengencer 28,100 - 28,100
54. Ampelas 80,000 - 80,000
55. Closet Duduk 1,800,000 - 1,800,000
57. Kran air 130,000 - 130,000
59. Stop Kran 3/4 65,000 - 65,000
60. Pipa PVC 4” 295,000 - 295,000
62. Pipa PVC 3/4” 294,000 - 294,000
64. Pipa PVC 2” 127,500 - 127,500
66. Wastafel+cermin 940,000 - 940,000
68. Bioseptictank Kapasitas 3000L 21,287,000 21,287,000 -
69. Profil Tank 1200 L 1,600,000 - 1,600,000
70. Sumur bor+pompa 2,500,000 2,500,000 -
71. Grill besi penutup saluran 3,352,500 - 3,352,500
72. Batu belah 7,200,000 9,200,000 - 2,000,000
74. Penyambungan Daya Baru PLN 4,500,000 - 4,500,000
JUMLAH HARGA
REALISASI s/d SISA s/d SAAT INI
NO. URAIAN SESUAI SPPD-L
SAAT INI (Rp.) (Rp.)
(Rp.)
75. Instalasi Titik Lampu 4,225,000 - 4,225,000
76. Lampu SL 18 Watt 455,000 - 455,000
77. Saklar Tunggal 80,000 - 80,000
78. Saklar Ganda 80,000 - 80,000
79. Pek. Pas Panel Listrik 760,000 - 760,000
80. Pek. Instalasi Stop Kontak 1,950,000 - 1,950,000
81. Stop Kontak 120,000 - 120,000
82. Pagar Besi BRC 5,232,000 - 5,232,000
83. Pekerjaan Pintu Pagar Besi 4,725,000 - 4,725,000
84. Pekerjaan Handrailing difabel stainless 1,170,000 - 1,170,000
85. Biaya pengelasan 1,170,000 - 1,170,000
86. Pekerjaan Rolling door 5,889,582 - 5,889,582
87. Pek. Handrail WC 62,000 - 62,000
88. Pekerjaan ukiran kayu 12,000,000 12,000,000 -
89. Pek. Plesteran letter timbul 800,000 - 800,000

JUMLAH 415,152,232 289,956,750 125,195,482

ALAT
1. Mesin Pencacah Plastik kap 400 Kg/hari Diesel 16 HP 36,130,000 36,130,000 -
3. 2. Mesin Pencacah Kompos kapasitas 500 kg/jam Diesel 8 22,650,000 22,650,000 -
3. Mesin Pengayak Kapasitas 500 Kg/Jam 18,150,000 18,150,000 -

JUMLAH 76,930,000 76,930,000 -

KEBUTUHAN KESEHATAN DAN KESELAMATAN KERJA


1. Sosialisasi K3 dan Prokes (Spanduk) 300,000 300,000 -
2. Helm Keselamatan 2,100,000 2,100,000 -
3. Rompi Kerja 1,260,000 1,260,000 -
4. Sarung Tangan (Safety Glove) 105,000 105,000 -
5. Sepatu Keselamatan (Rubber Shoes) 2,100,000 2,100,000 -
6. Tali Pengaman 694,500 694,500 -
7. Kotak P3K 80,000 80,000 -
4.
8. Asuransi Tenaga Kerja 912,000 912,000 -
9. Alat ukur suhu badan nir-sentuh (Thermoscan) 700,000 700,000 -
10. Vitamin C (1 Box isi 100 tablet) 625,000 500,000 125,000
11. Tempat Cuci Tangan 500,000 500,000 -
12. Sabun Cuci Tangan (Cair) 200ml/btl 100,000 100,000 -
13. Masker kain 100,000 100,000 -
14. Alat penyemprot desinfektan 130,000 130,000 -
15. Cairan Desinfektan 5L 225,000 225,000 -
16. Tisu - 72,000

JUMLAH 9,931,500 9,878,500 125,000


JUMLAH HARGA
REALISASI s/d SISA s/d SAAT INI
NO. URAIAN SESUAI SPPD-L
SAAT INI (Rp.) (Rp.)
(Rp.)
ADMINISTRASI
1. Pelaporan KSM 270,000 - 270,000
2. Photo Copy / Penggandaan 250,000 - 250,000
4. 3. Biaya Alat Tulis Kantor (ATK) 150,000 150,000 -
4. Materai 80,000 80,000 -
5. Pengujian Lab 500,000 - 500,000
6. Papan Nama Kegiatan 250,000 250,000 -
7. Biaya transfer - 43,500 -

JUMLAH 1,500,000 523,500 1,020,000

TOTAL 705,078,732 492,848,750 212,345,482

Diverifikasi Oleh : Dibuat Oleh


Fasilitator Teknik, KSM Kereng Membangun 3

Hengky Pradana, ST Aldius


FORM - RPD
RENCANA PENGGUNAAN DANA (RPD)
KSM/PANITIA

Kab./Kota : Palangka Raya


Kecamatan : Sebangau Nama Paket : TPS 3R
Kel/Desa : Kereng Bangkirai
KSM/Panit : Kereng Membangun 3

JUMLAH HARGA
REALISASI s/d SISA s/d SAAT INI
NO. URAIAN SESUAI SPPD-L
SAAT INI (Rp.) (Rp.)
(Rp.)
(1) (2) (4) (5)
TENAGA KERJA
1. Kepala Tukang 8,670,000 8,500,000 170,000
2. Tukang Batu 23,095,000 23,095,000 -
1. 3. Tukang Kayu 19,800,000 19,800,000 -
4. Tukang Besi 20,250,000 21,750,000 - 1,500,000
5. Tukang Cat 3,750,000 3,750,000 -
6. Pekerja 126,000,000 128,100,000 - 2,100,000

JUMLAH 201,565,000 204,995,000 (3,430,000)

BAHAN
1. Kayu balok 5/7 Klas III 1,781,250 1,781,250 -
2. Paku 5 -10 cm 1,672,000 1,672,000 -
3. Kayu papan 2/20 Klas III 27,273,900 27,273,900 -
4. Tanah Urug 28,100,000 28,200,000 - 100,000
5. Pasir Urug 7,950,000 7,950,000 -
6. Kayu Galam ø 10-12 m 6,825,000 6,825,000 -
7. Besi Beton - - -
Besi beton polos dia. 8 20,025,000 20,025,000 -
Besi beton polos dia. 10 7,000,000 7,000,000 -
Besi beton polos dia. 12 20,806,000 20,806,000 -
8. Kawat Beton 1,750,000 1,750,000 -
9. Semen Portland 40,596,000 40,596,000 -
10. Pasir Beton 6,120,000 6,120,000 -
11. Split 14,400,000 14,850,000 - 450,000
13. Balok Kayu Klas II uk.5/7 8,008,000 8,008,000 -
14. Dolken Kayu ø8-10 9,240,000 9,240,000 -
15. Plywood 9 mm 1,040,000 1,040,000 -
16. Batako 11,480,000 11,480,000 -
17. Pasir Pasang 22,350,000 22,350,000 -
18. Ubin Keramik 40x40 3,675,000 3,675,000 -
19. Semen Warna 240,000 240,000 -
20. Ubin Keramik 20x20 260,000 260,000 -
JUMLAH HARGA
REALISASI s/d SISA s/d SAAT INI
NO. URAIAN SESUAI SPPD-L
SAAT INI (Rp.) (Rp.)
(Rp.)
21. Ubin Keramik 10x20 588,600 588,600 -
22. Paku GRC 175,000 175,000 -
23. Kalsiboard Tebal 9 mm 3,610,000 5,320,000 - 1,710,000
24. Baja Ringan 75x35x0,75 MM 24,125,000 24,375,000 - 250,000
25. Baja Ringan 30x30x0,3 MM 3,350,000 3,350,000 -
26. Paku Skrup 4,200,000 3,500,000 700,000
27. Genteng Metal 11,000,000 11,000,000 -
28. Paku Genteng Metal 1,890,000 1,890,000 -
29. Papan Plank Kalsiboard 4,185,000 4,185,000 -
30. Besi Hollow Plafond 1,3x3,3 90,000 90,000 -
32. Kalsiboard 6 mm 660,000 660,000 -
33. Paku Kalsiboard 75,000 75,000 -
34. Balok kayu kelas II 5/10 untuk kusen 9,360,000 9,360,000 -
35. Lem Kayu 33,000 33,000 -
36. Papan Kayu Klas II Benuas 1,680,000 1,680,000 -
37. Kaca Tebal 5 mm 1,120,500 1,120,500 -
38. Sealant 47,500 47,500 -
39. Engsel pintu 420,000 420,000 -
40. Engsel jendela 492,000 492,000 -
2.
41. Kunci tanam biasa 380,000 380,000 -
42. Kait angin 124,800 124,800 -
43. Grendel/Kunci Slot 210,000 210,000 -
44. Handel Jendela 48,000 48,000 -
45. Roster/Kerawang 4,875,000 4,875,000 -
46. Glassblock 5,798,000 5,798,000 -
47. Cat tembok 12,100,000 13,200,000 - 1,100,000
49. Cat Menie kayu 180,000 180,000 -
50. Cat dasar Kayu 300,000 300,000 -
51. Cat Penutup Kayu 480,000 480,000 -
52. Kuas 45,000 45,000 -
53. Pengencer 28,100 28,100 -
54. Ampelas 80,000 80,000 -
55. Closet Duduk 1,800,000 1,800,000 -
57. Kran air 130,000 130,000 -
59. Stop Kran 3/4 65,000 65,000 -
60. Pipa PVC 4” 295,000 590,000 - 295,000
62. Pipa PVC 3/4” 294,000 294,000 -
64. Pipa PVC 2” 127,500 255,000 - 127,500
66. Wastafel+cermin 940,000 1,668,200 - 728,200
68. Bioseptictank Kapasitas 3000L 21,287,000 12,287,000 9,000,000
69. Profil Tank 1200 L 1,600,000 1,600,000 -
70. Sumur bor+pompa 2,500,000 2,500,000 -
71. Grill besi penutup saluran 3,352,500 3,352,500 -
72. Batu belah 7,200,000 9,200,000 - 2,000,000
74. Penyambungan Daya Baru PLN 4,500,000 4,500,000 -
JUMLAH HARGA
REALISASI s/d SISA s/d SAAT INI
NO. URAIAN SESUAI SPPD-L
SAAT INI (Rp.) (Rp.)
(Rp.)
75. Instalasi Titik Lampu 4,225,000 4,225,000 -
76. Lampu SL 18 Watt 455,000 455,000 -
77. Saklar Tunggal 80,000 80,000 -
78. Saklar Ganda 80,000 80,000 -
79. Pek. Pas Panel Listrik 760,000 760,000 -
80. Pek. Instalasi Stop Kontak 1,950,000 1,950,000 -
81. Stop Kontak 120,000 120,000 -
82. Pagar Besi BRC 5,232,000 5,232,300 - 300
83. Pekerjaan Pintu Pagar Besi 4,725,000 6,032,500 - 1,307,500
84. Pekerjaan Handrailing difabel stainless 1,170,000 1,175,200 - 5,200
85. Biaya pengelasan 1,170,000 1,175,200 - 5,200
86. Pekerjaan Rolling door 5,889,582 3,632,500 2,257,082
87. Pek. Handrail WC 62,000 - 62,000
88. Pekerjaan ukiran kayu 12,000,000 12,000,000 -
89. Pek. Plesteran letter timbul 800,000 700,000 100,000

JUMLAH 415,152,232 411,377,050 3,775,182

ALAT
1. Mesin Pencacah Plastik kap 400 Kg/hari Diesel 16 HP 36,130,000 36,130,000 -
3. 2. Mesin Pencacah Kompos kapasitas 500 kg/jam Diesel 8 22,650,000 22,650,000 -
3. Mesin Pengayak Kapasitas 500 Kg/Jam 18,150,000 18,150,000 -

JUMLAH 76,930,000 76,930,000 -

KEBUTUHAN KESEHATAN DAN KESELAMATAN KERJA


1. Sosialisasi K3 dan Prokes (Spanduk) 300,000 300,000 -
2. Helm Keselamatan 2,100,000 2,100,000 -
3. Rompi Kerja 1,260,000 1,260,000 -
4. Sarung Tangan (Safety Glove) 105,000 105,000 -
5. Sepatu Keselamatan (Rubber Shoes) 2,100,000 2,100,000 -
6. Tali Pengaman 694,500 694,500 -
7. Kotak P3K 80,000 80,000 -
4.
8. Asuransi Tenaga Kerja 912,000 912,000 -
9. Alat ukur suhu badan nir-sentuh (Thermoscan) 700,000 700,000 -
4. JUMLAH HARGA
REALISASI s/d SISA s/d SAAT INI
NO. URAIAN SESUAI SPPD-L
SAAT INI (Rp.) (Rp.)
(Rp.)
10. Vitamin C (1 Box isi 100 tablet) 625,000 625,000 -
11. Tempat Cuci Tangan 500,000 500,000 -
12. Sabun Cuci Tangan (Cair) 200ml/btl 100,000 100,000 -
13. Masker kain 100,000 125,000 - 25,000
14. Alat penyemprot desinfektan 130,000 130,000 -
15. Cairan Desinfektan 5L 225,000 225,000 -
16. Tisu - 72,000 - 72,000

JUMLAH 9,931,500 10,028,500 (25,000)

ADMINISTRASI
1. Pelaporan KSM 270,000 270,000 -
2. Photo Copy / Penggandaan 250,000 250,000 -
4. 3. Biaya Alat Tulis Kantor (ATK) 150,000 150,000 -
4. Materai 80,000 80,000 -
5. Pengujian Lab 500,000 500,000 -
6. Papan Nama Kegiatan 250,000 250,000 -
7. Biaya transfer - 58,000 - 58,000

JUMLAH 1,500,000 1,558,000 (58,000)

TOTAL 705,078,732 704,888,550 262,182

Diverifikasi Oleh : Dibuat Oleh


Fasilitator Teknik, KSM Kereng Membangun 3

Hengky Pradana, ST Aldius