Beton Poer 2
Panjang = 0.6 m
Lebar = 1.2 m
Tinggi = 0.4 m
Jumlah = 7 Buah
Volume = 2.01 m3
Volume bekisting = 1.08 m2
Volume Besi = 376.04 Kg
Beton Poer 3
Panjang = 0.6 m
Lebar = 0.6 m
Tinggi = 0.4 m
Jumlah = 1 Buah
Volume = 0.14 m3
Volume bekisting = 0.66 m2
Volume Besi = 31.6 Kg
9 Pekerjaan Tangga
Anak Tangga
Panjang = 1.2 m
Lebar = 0.28 m
Tinggi = 0.18 m
Jumlah = 18 Buah
Volume = 0.45 m3
Volume Bekisting Anak Tangga = 2.2464 m2
Volume Besi = 104.09292 Kg
Bordes
Panjang = 1.2 m
Lebar = 1.15 m
Tinggi = 0.18 m
Jumlah = 2 Buah
Volume = 0.49 m3
Volume Bekisting Bordes = 3.606 m2
Volume Besi = 29.964672 Kg
Plat tangga
Panjang = 4.615 m
Lebar = 1.2 m
Tinggi = 0.12 m
Jumlah = 1 Buah
Volume = 0.66 m3
Volume Bekisting Pelat Tangga = 6.6456 m2
Volume Besi = 60.813792 Kg
Volume Total Tangga = 1.6 m3
10 Pekerjaan Pelat Lantai
Tbl Panjang Lebar
Type A 0.12 4.2 3
Type B 0.12 1.825 1.2
Type C 0.12 2.5 1.725
Type D 0.12 3.5 1.725
Type E 0.12 2.1 2.4
Type F 0.12 3.6 4
Type G 0.12 2.1 5.4
Type H 0.12 3.9 1.8
Volume Pelat Total
Volume Bekisting =
Volume Besi =
V. Pekerjaan Dinding
1 Pekerjaan Dinding Dalam Bata Tebal 1/2 Bata 1 Pc ; 5 Pp
Panjang = 56.895 m
Tinggi = 3.4 m
Luas = 193.443 m2
Pekerjaan Dinding Pagar
Panjang = 29.725 m
Tinggi = 1.5 m
Luas = 44.5875 m2
Pagar 2
Panjang = 3.2 m
Tinggi = 7.3 m
Luas = 23.36 m2
Pagar 3
Panjang = 0.575 m
Tinggi = 2.3 m
Luas = 1.3225 m2
Luasan Total Bata = 262.713 m2
2 Pekerjaan Dinding Trasram
Panjang = 9.4 m
Tinggi = 1.17 m
Luas = 10.998 m2
3 Pekerjaan Plesteran 1 Pc : 3 Pp
Plesteran Dinding Dalam = 386.886 m2
Plesteran Dinding Pagar 1 = 89.175 m2
Plesteran Dinding Pagar 2 = 46.72 m2
Plesteran Dinding Pagar 3 = 2.645 m2
Total Luas Plesteran = 525.426 m2
5 Pekerjaan Acian = 525.426 m2
VI Pekerjaan Lantai
1 Pemasangan Keramik 30 x 30 cm
Panjang Lebar
R. Tidur 1 = 2.25 1.65
R. Tidur 2 = 3.075 2.775
Dapur = 2.65 2.175
2 Pemasangan Keramik 40 x 40 cm
Panjang Lebar
Teras = 1.25 0.9
R. Utama
Luasan 1 = 2.65 4.65
Luasan 2 = 1.785 4.125
Luasan 3 = 1.4 4.05
Luasan 4 = 1.1 0.67
Luasan 5 = 1.35 2.25
Luasan 6 = 0.45 2.25
Luasan 7 = 0.45 1.825
Luasan 8 = 2.875 1.2
Luasan Total R. Utama =
4 Pemasangan Keramik 20 x 20 cm
Panjang Lebar
Kamar Mandi 1 = 1.65 1.05
Kamar Mandi 2
Luasan 1 = 2.05 1
Luasan 2 = 1.05 0.675
Luasan Total Kamar Mandi 2
5 Keramik dinding Kamar Mandi 20 x 25 cm Volume Satuan
Kamar Mandi 1
Panjang = 1.65 m2
Lebar = 1.05 m2
Tinggi = 1.2 m2
Volume = 6.48 m2
Kamar Mandi 2
Luasan 1
Panjang = 2.05 m2
Lebar = 1 m2
Tinggi = 1.2 m2
Volume = 7.32 m2
Luasan 2
Panjang = 1.05 m2
Lebar = 0.675 m2
Tinggi = 1.2 m2
Volume = 4.14 m2
Luasan Total Kamar Mandi 2 = 11.46 m2
Luasan bersih Keramik dinding = 17.94 m2
VII
1 Panjang Lebar
Pintu 1 = 1.92 0.74
Pintu 2 = 0.74 0.64
Jendela 1 = 0.88 3.28
Jendela 2 = 0.48 1.38
Jendela 3 = 0.48 0.88
Jendela 4 = 0.58 0.88
Jendela 5 = 0.88 0.38
Jendela 6 = 0.54 0.24
Kusen Pintu & Jendela
Volume Satuan
1 Kusen Pintu 1
Panjang = 4.74 m
Lebar = 0.06 m
Tinggi = 0.15 m
Jumlah = 6 Buah
Volume = 0.25 m3
2 Kusen Pintu 2
Panjang = 4.64 m
Lebar = 0.06 m
Tinggi = 0.15 m
Jumlah = 2 Buah
Volume = 0.08 m3
3 Kusen Jendela 1
Panjang = 8.56 m
Lebar = 0.06 m
Tinggi = 0.15 m
Jumlah = 1 Buah
Volume = 0.07 m3
4 Kusen Jendela 2
Panjang = 11.88 m
Lebar = 0.06 m
Tinggi = 0.15 m
Jumlah = 1 Buah
Volume = 0.1 m3
5 Kusen Jendela 3
Panjang = 5.92 m
Lebar = 0.06 m
Tinggi = 0.15 m
Jumlah = 1 Buah
Volume = 0.05 m3
6 Kusen Jendela 4
Panjang = 3.16 m
Lebar = 0.06 m
Tinggi = 0.15 m
Jumlah = 1 Buah
Volume = 0.02 m3
7 Kusen Jendela 5
Panjang = 2.76 m
Lebar = 0.06 m
Tinggi = 0.15 m
Jumlah = 1 Buah
Volume = 0.02 m3
8 Kusen Jendela 6
Panjang = 1.6 m
Lebar = 0.05 m
Tinggi = 0.15 m
Jumlah = 1 Buah
Volume = 0.01 m3
Total Volume Kusen = 0.6 m3
Luas Kaca Jendela
P L Jumlah
Luas Kaca Mati Jendela 1 0.8 3.2 1
Luas Kaca Mati Jendela 2 0.38 1.28 3
Luas Kaca Mati Jendela 3 0.38 0.78 2
Luas Kaca Mati Jendela 4 0.48 0.78 1
Luas Kaca Mati Jendela 5 0.8 0.3 1
Luas Kaca Mati Jendela 6 0.48 0.18 1
Luas volume Total Daun Jendela
Luas daun Jendela 1 = 0.32 m2
Luas daun Jendela 2 = 0.53 m2
Luas daun Jendela 3 = 0.25 m2
Luas daun Jendela 4 = 0.14 m2
Luas daun Jendela 5 = 0.09 m2
Luas daun Jendela 6 = 0.04 m3
Material Pelengkap Pintu & Jendela
P1 P2
Engsel Kuningan Pintu = 3 3
Slot Grendel Panjang = 1 1
Kunci Tanam Kecil = 1 1
J1 J2 J3
Engsel Kuningan Jendela 0 6 4
Slot Grendel Kecil Jendela 0 3 2
Hak Angin Lurus 0 6 4
Kaca Mati Polos 1 3 2
Kaca Bouven 0 0 0
VIII Pekerjaan Atap & Plafond
1 Pemasangan Plafond Gypsum Volume Satuan
Ruang Tidur 1
Panjang = 2.25 m
Lebar = 1.65 m
Luas = 7.8 m2
Ruang Tidur 2
Panjang = 3.075 m
Lebar = 2.775 m
Luas = 11.7 m2
Ruang Utama = 34.39 m2
Total Luasan Plafond Gypsum = 53.89 m2
2 Pemasangan List Gypsum
Ruang Tidur 1
Panjang = 2.25 m
Lebar = 1.65 m
Keliling = 7.8 m
Ruang Tidur 2
Panjang = 3.075 m
Lebar = 2.775 m
Keliling = 11.7 m
Ruang Utama = 29.025 m
Total Keliling List Plafond Gypsum 48.525 m
3 Pemasangan Eternit
Kamar Mandi 1
Panjang = 1.65 m
Lebar = 1.05 m
Luas = 1.73 m2
Kamar Mandi 2
Luas = 2.75 m2
Total Luasan Eternit = 4.48 m2
IX Pekerjaan Pengecatan
Volume Satuan
1 Pekerjaan Dinding Dalam = 386.886 m2
2 Pekerjaan Dinding Pagar = 138.54 m2
3 Pekerjaan Kusen = 1.2 m2
X Pekerjaan Sanitasi Air
Volume Satuan
1 Pemasangan Pipa Air bersih 1/2" = 29.38 m
2 Pemasangan Pipa Air Kotor 3" = 6m
3 Pemasangan Pipa Air Limbah = 16.62 m
4 Pemasangan Closet Duduk = 1 Unit
5 Pemasangan Wastafel = 2 Unit
6 Pemasangan Kran = 6 Unit
7 Pemasangan Septic Tank & resapan = 1 Unit
8 Pemasangan Floor Drain = 2 Unit
9 Pemasangan Bathup = 1 Unit
XI Pemasangan Instalasi Listrik
Volume Satuan
1 Pemasangan Titik Stop Kontak = 6 Unit
2 Pemasangan Saklar Ganda = 1 Unit
3 Pemasangan Saklar Tunggal = 8 Unit
4 Pemasangan Titik Down Light = 12 Unit
Lampu LED 5 Watt Phillips Bulb = 5 Buah
Lampu LED 10 Watt Phillips Bulb = 7 Buah
5 Pemasangan Titik Lampu Taman = 4 Unit
6 Pemasangan MCB = 1 Unit
B Pekerjaan Lantai 2
I Pekerjaan Beton Struktur
1 Pekerjaan Kolom Type 1 (20 x 20 cm)
Panjang = 0.2 m
Lebar = 0.2 m
Tinggi = 3.8 m
Jumlah = 11 Buah
Volume = 1.67 m3
Volume Bekisting
= 16.72 m2
Volume Besi
Tul. Utama = 661.8304 Kg
Sengkang = 116.0764 Kg
Volume = 777.9068 Kg
II Pekerjaan Dinding
1 Pekerjaan Dinding Bata Merah Tebal 1/2 Bata, 1Pc:5Pp
Panjang = 59.02 m
Tinggi = 3.8 m
Luas = 224.27 m2
Luas Bersih Pas. Bata (L.Total - Kusen) = 223.69 m2
2 Pekerjaan Dinding Trasram
Panjang = 16.075 m
Tinggi = 1.5 m
Luas = 24.11 m2
Luas Bersih (L. Total Trasram - kusen) =
3 Pekerjaan Plesteran 1 Pc : 3 Pp = 448.54 m2
4 Pekerjaan Acian = 448.54 m2
III Pekerjaan Lantai
1 Pemasangan Keramik 20 x 20 cm
Kamar Mandi 1
Panjang = 1.8 m
Lebar = 2.5 m
Luas = 4.5 m2
Kamar Mandi 2
Panjang = 2.4 m
Lebar = 2.1 m
Luas = 5.04 m2
2 Pemasangan Keramik 30 x 30 cm
Ruang Tidur 1
Panjang = 3.6 m
Lebar = 4m
Luas = 14.4 m2
Ruang Tidur 2
Panjang = 3m
Lebar = 4.2 m
Luas = 12.6 m2
Ruang Baca
Luasan R. Baca 1
Panjang = 1.8 m
Lebar = 3.6 m
Luas = 6.48 m2
Luasan R. Baca 2
Panjang = 1.2 m
Lebar = 1.9 m
Luas = 2.28 m2
Total Luasan Ruang Baca = 8.76 m2
3 Pemasangan Keramik 40 x 40 cm
Ruang Keluarga
Ruang Keluarga Luasan 1
Panjang = 5.4 m
Lebar = 2.03 m
Luas = 10.96 m2
Ruang Keluarga Luasan 2
Panjang = 2.9 m
Lebar = 0.67 m
Luas = 1.94 m2
Total Luasan Ruang Keluarga = 12.9 m2
Balkon
Panjang = 1.8 m
Lebar = 4m
Luas = 7.2 m2
4 Pasangan Keramik Dinding 20 x 25 cm
Kamar Mandi 1
Panjang = 2.4 m
Lebar = 2.1 m
Tinggi = 1.5 m
Luas = 7.56 m2
Kamar Mandi 2
Panjang = 1.8 m
Lebar = 2.5 m
Tinggi = 1.5 m
Luas = 6.75 m2
Luas bersih Keramik Dinding = 12.09 m2
IV Pekerjaan Atap & Plafond
1 Pemasangan Kuda Kuda kayu Meranti
Panjang = 86.67 m
Lebar = 0.08 m
Tinggi = 0.12 m
Volume = 0.83 m3
2 Pemasangan Reng Meranti
Panjang = 263.5 m
Lebar = 0.02 m
Tinggi = 0.03 m
Volume = 0.15 m3
3 Pemasangan Usuk Kamper
Panjang = 125 m
Lebar = 0.05 m
Tinggi = 0.07 m
Volume = 0.43 m3
4 Pemasangan Gording
Panjang = 42.65 m
Lebar = 0.08 m
Tinggi = 0.12 m
Volume = 0.4 m3
5 Pemasangan Nok
Panjang = 21.725 m
Lebar = 0.08 m
Tinggi = 0.12 m
Volume = 0.2 m3
6 Pemasangan Papan Reuter
Panjang = 21.725 m
Lebar = 0.02 m
Tinggi = 0.2 m
Volume = 0.08 m3
7 Pemasangan Listplank = 66 m
8 Pemasangan Talang = 33 m
9 Pemasangan Plafond Gypsum
Ruang Tidur 1
Panjang = 3.6 m
Lebar = 4m
Luas = 14.4 m2
Ruang Tidur 2
Panjang = 3m
Lebar = 4.2 m
Luas = 12.6 m2
Ruang Baca
Ruang Baca Luasan 1
Panjang = 1.8 m
Lebar = 3.6 m
Luas = 6.48 m2
Ruang Baca Luasan 2
Panjang = 1.2 m
Lebar = 1.9 m
Luas = 2.28 m2
Total Luas Ruangan Baca = 8.76 m2
Ruang Keluarga
Ruang Keluarga Luasan 1
Panjang = 5.4 m
Lebar = 2.03 m
Luas = 10.962 m2
Ruang Keluarga Luasan 2
Panjang = 2.9 m
Lebar = 0.67 m
Luas = 1.943 m2
Total Luas Ruang Keluarga = 12.905 m2
Total Luas Plafond Gypsum = 48.665 m2
10 Pemasangan List Gypsum
Ruang Tidur 1
Panjang 3.6 m
Lebar 4m
Keliling 28.8 m
Ruang Tidur 2
Panjang 3m
Lebar 4.2 m
Keliling 25.2 m
Total Keliling Ruang Baca 12.3 m
Total keliling Ruang Keluarga 17.755 m
11 Pemasangan Eternit
Kamar Mandi 1
Panjang 1.8 m
Lebar 2.5 m
Luas 4.5 m2
Kamar Mandi 2
Panjang 2.4 m
Lebar 2.1 m
Luas 5.04 m2
Total Luas Eternit 9.54 m2
12 Pemasangan Genteng Karangpilang
Panjang 10.3 m
Lebar 6.2 m
Luas 63.86 m2
13 Pemasangan Bubungan Karangpilang
Panjang 21.725 m
V
Panjang Lebar
1 Pintu 1 = 1.92 0.74
2 Pintu 2 = 0.74 0.64
3 Jendela 7 = 1.48 0.38
4 Jendela 8 = 1.48 0.38
5 Jendela 9 = 0.38 2.08
6 Jendela 10 = 0.94 1.38
Volume Satuan
7 Kusen Pintu 1
Panjang = 4.74 m
Lebar = 0.06 m
Tinggi = 0.15 m
Jumlah = 6 Buah
Volume = 0.25 m3
8 Kusen Pintu 2
Panjang = 4.64 m
Lebar = 0.06 m
Tinggi = 0.15 m
Jumlah = 2 Buah
Volume = 0.08 m3
9 Kusen Jendela 7
Panjang = 11.88 m
Lebar = 0.06 m
Tinggi = 0.15 m
Jumlah = 1 Buah
Volume = 0.1 m3
10 Kusen Jendela 8
Panjang = 3.96 m
Lebar = 0.06 m
Tinggi = 0.15 m
Jumlah = 1 Buah
Volume = 0.03 m3
11 Kusen Jendela 9
Panjang = 5.16 m
Lebar = 0.06 m
Tinggi = 0.15 m
Jumlah = 1 Buah
Volume = 0.04 m3
12 Kusen Jendela 10
Panjang = 9.52 m
Lebar = 0.06 m
Tinggi = 0.15 m
Jumlah = 1 Buah
Volume = 0.08 m3
Total Volume Kusen = 0.58 m3
Luas Kaca Jendela
P L Jumlah
1 Luas Kaca Mati Jendela 7 1.38 0.28 3
2 Luas Kaca Mati Jendela 8 1.42 0.32 1
3 Luas Kaca Mati Jendela 9 0.32 2.02 1
4 Luas Kaca Mati Jendela 10 0.82 1.26 2
Luas Bersih Daun Jendela
Volume Satuan
1 Luas Daun Jendela 7 = 0.53 m2
2 Luas Daun Jendela 8 = 0.11 m2
3 Luas Daun Jendela 9 = 0.15 m2
4 Luas Daun Jendela 10 = 0.53 m2
Material Pelengkap Pintu
P1 P2
Engsel Kuningan Pintu = 3 3
Slot Grendel Panjang = 1 1
Kunci Tanam Kecil = 1 1
J7 J8
Engsel Kuningan Jendela = 6 2
Slot Grendel Kecil Jendela = 3 1
Hak Angin Lurus = 6 2
Kaca Mati Polos = 3 1
Kaca Bouven = 0 0
VI Pekerjaan Pengecatan
1 Pengecatan Dinding Dalam = 223.69 m2
2 Pengecatan Dinding Luar = 223.69 m2
3 Pengecatan Kusen = 1.16 m2
VII Pekerjaan Sanitasi Air
1 Pemasangan Pipa Air bersih 1/2" = 17.585 m
2 Pemasangan Pipa Air Kotor 3" = 18.88 m
3 Pemasangan Pipa Air Limbah = 20.83 m
4 Pemasangan Kloset Duduk Porcelain = 2 Unit
5 Pemasangan Kran = 4 Unit
6 Pemasangan Floor Drain = 2 Unit
7 Pemasangan Bathup = 2 Unit
VIII Pekerjaan Instalasi Listrik
1 Pemasangan Titik Areal Stop Kontak = 5 Unit
2 Pemasangan Saklar Ganda = 2 Unit
3 Pemasangan Saklar Tunggal = 4 Unit
4 Pemasangan Titik Lampu LED = 10 Unit
5 Lampu LED 5 Watt = 4 Buah
6 Lampu LED 10 Watt = 6 Buah
7 Pemasangan MCB = 1 Unit
0.745
3.05
0.82
4.615
Luas Satuan
1.51 m3
0.26 m3
0.51 m3
0.72 m3
0.6 m3
1.72 m3
1.36 m3
0.84 m3
7.52 m3
12.498 m2
937.56041 Kg
Luas Satuan
3.71 m2
8.53 m2
5.76 m2
Luas Satuan
1.12 m2
12.32 m2
7.36 m2
5.67 m2
0.73 m2
3.03 m2
1.01 m2
0.82 m2
3.45 m2
34.39 m2
Luas Satuan
1.73 m2
2.05 m2
0.7 m2
2.75 m2
Jumlah Luas
6 8.52
2 0.94
1 2.88
3 1.98
2 0.84
1 0.51
1 0.33
1 0.12
Luas Satuan
2.56 m2
1.45 m2
0.59 m2
0.37 m2
0.24 m2
0.08 m2
J4 J5
2 0
1 0
2 0
1 1
0 0
Jumlah Luas
6 8.52
2 0.94
3 1.68
1 0.56
1 0.79
2 2.59
Luas Satuan
1.15 m2
0.45 m2
0.64 m2
2.06 m2
J9 J10
0 4
0 2
0 4
1 2
0 0
4.2 Daftar Volume Pekerjaan
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
Kg
m3
m2
Kg
m3
m2
Kg
m3
m2
Kg
m3
m2
Kg
m3
m2
Kg
m3
m2
Kg
m3
m2
Kg
m3
m2
Kg
m3
m2
Kg
m3
m2
Kg
m3
m2
Kg
m3
m2
Kg
m3
m2
Kg
m2
m2
m2
m2
m2
m2
m2
m2
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
m2
m2
m2
m2
m2
m2
m
m
m
Unit
Unit
Unit
ls
Unit
Unit
Unit
Unit
Unit
Unit
Buah
Buah
Unit
Unit
m3
m2
Kg
m3
m2
Kg
m3
m2
Kg
m2
m2
m2
m2
m2
m2
m2
m2
m3
m3
m3
m3
m
m
m
m
m2
m2
m2
m2
m
Unit
Unit
Unit
Unit
Unit
Unit
m2
m2
m2
m
m
m
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Buah
Buah
Unit
5 Analisa Harga Satuan Pekerjaan
B,
C.
D.
B. Bahan / Material
Kayu Meranti (Papan 2/20)
Kayu Meranti (Usuk 4/6)
Paku Kayu 2"- 5"
C.
D.
E.
II PEKERJAAN TANAH
Analisa Harga Satuan Pekerjaan (HSPK 2019)
Jenis pekerjaan : Penggalian Tanah Untuk Konstruksi
Satuan : m3
Harga Satuan Rp 96,250.00
No. Uraian
[1] [2]
A. Upah
Mandor
Pembantu Tukang
B.
C.
D.
B. Bahan
Tasirtu / Sirtu
C. Sewa Peralatan:
Sewa Stamper
D.
E.
F.
Analisa Harga Satuan Pekerjaan (HSPK 2019)
Jenis pekerjaan : Urugan Pasir Padat
Satuan : m3
Harga Satuan Rp 223,300.00
No. Uraian
[1] [2]
A. Upah
Mandor
Pembantu Tukang
B. Bahan
Pasir urug
C.
D.
E.
B.
C.
D.
B. Sewa Peralatan
Sewa Alat Bantu Strouss Pile
C.
D.
E.
B. Bahan
Semen Portland 50 Kg
Pasir Pasang
Batu Kali Belah 15/20
C.
D.
E.
B. Bahan
Pasir Urug
Batu Kali Belah 15/20
C.
D.
E.
B. Bahan
Batu Bata
Semen Portland 40 Kg
Pasir Pasang
C.
D.
E.
B. Bahan\
Pasir Urug
C.
D.
E.
IV PEKERJAAN BETON
Analisa Harga Satuan Pekerjaan (SNI 2008)
Jenis pekerjaan : Pekerjaan Bekisting Pondasi
Satuan : m3 (2x Pakai)
Harga Satuan Rp 67,760.00
No. Uraian
[1] [2]
A. Upah
Mandor
Kepala Tukang
Tukang Kayu
Pembantu Tukang
B. Bahan
Kayu Kelas III
Paku 5 - 10 cm
Minyak Bekisting
C.
D.
E. Harga
B. Bahan
Kayu Kelas III
Paku 5 - 10 cm
Minyak Bekisting
C.
D.
E. Harga
B. Bahan
Kayu Kelas III
Paku Kayu 5cm - 12 cm
Minyak Bekisting
Balok Kayu Kelas II
Plywood 9mm
Dolken Kayu Gelam dia.8-10 cm @4m
C.
D.
E. Harga
B. Bahan
Kayu Kelas III
Paku 5 - 10 cm
Minyak Bekisting
Balok Kayu Kelas II
Plywood t=9mm
Dolken Kayu Galam D=8-10 cm, p=4m
C.
D.
E. Harga
B. Bahan
Kayu Kelas III
Paku 5 - 12 cm
Minyak Bekisting
Balok Kayu Kelas II
Plywood t=9mm
Dolken Kayu Galam D=8-10 cm, p=4m
C.
D.
E. Harga
B. Bahan
Kayu Kelas III
Paku 5 - 12 cm
Minyak Bekisting
Balok Kayu Kelas II
Plywood t=9mm
Dolken Kayu Galam D=8-10 cm, p=4m
C.
D.
E. Harga
Analisa Harga Satuan Pekerjaan (HSPK 2019)
Jenis pekerjaan : Pekerjaan Beton K-225
Satuan : m3
Harga Satuan Rp 1,190,894.00
No. Uraian
[1] [2]
A. Upah
Mandor
Kepala Tukang Batu
Tukang Batu
Pembantu Tukang
B. Bahan
Semen Gresik 40 Kg
Pasir Cor
Batu Pecah Mesin 1/2 cm
Air Kerja
C.
D.
E.
B. Bahan
Besi Beton Polos D8
Kawat Bendrat
C.
D.
E.
B. Bahan
Besi Beton Polos D10
Kawat Bendrat
C.
D.
E.
B. Bahan
Besi Beton Polos D12
Kawat Bendrat
C.
D.
E.
B. Bahan
Besi Beton Polos D16
Kawat Bendrat
C.
D.
E.
V PEKERJAAN DINDING
Analisa Harga Satuan Pekerjaan (SNI 2008)
Jenis pekerjaan : Pekerjaan Pemasangan Batu Bata 1 pc : 5 pp
Satuan : m3
Harga Satuan Rp 136,327.00
No. Uraian
[1] [2]
A. Upah
Mandor
Kepala Tukang Batu
Tukang Batu
Pembantu Tukang
B. Bahan
Batu Bata
Semen Portland 40 Kg
Pasir Pasang
C.
D.
E.
B. Bahan
Batu Bata
Semen Portland
Pasir Pasang
C.
D.
E.
B. Bahan
Semen Portland
Pasir Pasang
C.
D.
E.
B. Bahan
Semen Portland
C.
D.
E.
VI PEKERJAAN LANTAI
B. Bahan
Ubin Keramik
Semen Portland
Pasir Pasang
Semen Warna
C.
D.
E.
B. Bahan
Ubin Keramik
Semen Portland
Pasir Pasang
Semen Warna
C.
D.
E.
B. Bahan
Semen Gresik 50 Kg
Semen Berwarna Yiyitan
Pasir Pasang
Keramik Lantai Putih 40 x 40 cm
C.
D.
E.
B. Bahan
Semen Gresik 50 Kg
Semen Berwarna Yiyitan
Pasir Pasang
Keramik Lantai Putih 20 x 25 cm
C.
D.
E.
B. Bahan
Balok Kayu Kelas I
Paku 10 cm
Lem Kayu
C.
D.
E.
B. Bahan
Papan Kayu Kelas II
Lem Kayu
C.
D.
E.
B. Bahan
Papan Kayu Kelas II
Lem Kayu
C.
D.
E.
B. Bahan
Engsel Pintu Kuningan
C.
D.
E.
B. Bahan
Engsel Jendela Kuningan
C.
D.
E.
B. Bahan
Hak Angin Lurus Biasa
C.
D.
E.
B. Bahan
Grendel Panjang
C.
D.
E.
B. Bahan
Kunci Tanam
C.
D.
E.
B. Bahan
Grendel Biasa (Kecil)
C.
D.
E.
B. Bahan
Grendel Tanam
C.
D.
E.
B. Bahan
Kaca Polos 5mm
C.
D.
E.
B. Bahan
Paku Triplek / Eternit
Gypsum Board Tebal 9mm
C.
D.
E.
B. Bahan
List Profil Gypsum
Tepung Gypsum
C.
D.
E.
Analisa Harga Satuan Pekerjaan (HSPK 2019)
Jenis pekerjaan : Pemasangan Plafond eternit Rangka Kayu Meranti
Satuan : m2
Harga Satuan Rp 150,931.00
No. Uraian
[1] [2]
A. Upah
Mandor
Kepala Tukang
Tukang
Pembantu Tukang
B. Bahan
Eternit
Paku Triplek / Eternit
Kayu Meranti Usuk 4/6,5/7
C.
D.
E.
B. Bahan
Cat Tembok Dalam 2.5 Kg
Dempul Tembok
Kertas Gosok Halus
C.
D.
E.
B. Bahan
Cat Tembok Luar 2.5 Kg
Dempul Tembok
Kertas Gosok Halus
C.
D.
E.
B. Bahan
Cat Kayu
Cat Meni Kayu
Clear Gloss
Plamir Tembok 5 Kg
Kuas 4 inchi
C.
D.
E.
B. Bahan
Pipa Plastik PVC AW Uk. 1/2" pj. 4 meter
Perlengkapan Pipa Plastik PVC AW Uk. 1/2" pj. 4 meter
C.
D.
E.
B. Bahan
Pipa Plastik PVC AW Uk. 3" pj. 4 meter
Perlengkapan Pipa Plastik PVC AW Uk. 3" pj. 4 meter
C.
D.
E.
B. Bahan
Kran Air uk. 3/4
Rol TBA
C.
D.
E.
B. Bahan
Perlengkapan Harga Kloset 6%
Closet Duduk Porcelain (Komplit) Warna Putih
C.
D.
E.
B. Bahan
Semen PC 50 Kg
Pasir Pasang
Wastafel
Perlengkapan 12% harga Wastafel
C.
D.
E.
B. Bahan
Semen PC 50 Kg
Pasir Pasang
Wastafel
Perlengkapan 12% harga Wastafel
C.
D.
E.
B. Bahan
Floor Drain
C.
D.
E.
B. Bahan
Bata Merah
Semen Portland
Pasir Pasang
Pasir Beton
Kerikil
Baja Tulangan
C.
D.
E.
B. Bahan
Ijuk
C.
D.
E.
IX Pekerjaan Instalasi Listrik
B. Bahan
Kabel NYM 3 x 2.5 mm
Stop Kontak
Pipa Paralon 5/8
T doos Pvc
C.
D.
E.
B. Bahan
Kabel NYM 3 x 2.5 mm
Isolator
Fitting Plafond
Pipa Paralon 5/8
T doos Pvc
Lampu LED 5 Watt
Lampu LED 10 Watt
C.
D.
E.
B. Bahan
Saklar Tunggal
C.
D.
E.
C.
D.
E.
X Pekerjaan Atap
B. Bahan
Plat Besi / Baja
Paku Klem No.4 / Beton
Kayu Meranti Balok 6/15, 6/12, 8/12
C.
D.
E.
B. Bahan
Paku Reng
Kayu Kamper Balok 4/6, 5/7
Kayu Meranti Reng 2/3, 3/4
C.
D.
E.
B. Bahan
Plat Besi / Baja
Paku Reng
Kayu Kamper Balok 6/12, 6/15
C.
D.
E.
B. Bahan
Genteng Karangpilang / Wisma 32 x 31.4 cm
C.
D.
E.
B. Bahan
Paku Reng
Kayu Meranti Papan 2/20, 4/10
C.
D.
E.
B. Bahan
Klem PVC
Pipa Plastik PVC Uk. 3" Pj 4 m
C.
D.
E.
B. Bahan
Semen PC 50 Kg
Pasir Pasang
Genteng Wuwung Karangpilang/wisma
C.
D.
E.
Koefisien Satuan Harga Satuan (Rp) Jumlah Harga (Rp)
[3] [4] [5] [6]=[3] x [5]
O.H
0.025 O.H Rp 200,000.00 Rp 5,000.00
0.05 O.H Rp 110,000.00 Rp 5,500.00
Sub Total Upah Rp 10,500.00
Jumlah Harga Tenaga Kerja Rp 10,500.00
Overhead + Profit (10% x B) Rp 1,050.00
Harga Satuan Pekerjaan (B+C) Rp 11,550.00
Dibulatkan Rp 11,550.00
Pekerjaan Plafond
Koefisien Satuan Harga Satuan (Rp) Jumlah Harga (Rp)
[3] [4] [5] [6] = [3] x [5]
Pekerjaan Pengecatan
Sanitasi Air
1 Kg Rp 7,500.00 Rp 7,500.00
Sub Total Bahan Rp 7,500.00
Jumlah Rp 26,250.00
Overhead+Profit (10% x C) Rp 2,625.00
Harga Satuan Pekerjaan (C + D) Rp 28,875.00
Pembulatan Rp 28,875.00
Pekerjaan Instalasi Listrik
Pekerjaan Atap
B. Pekerjaan Lantai 2
I Pekerjaan Beton Struktur
II Pekerjaan Dinding
III Pekerjaan Lantai
IV Pekerjaan Atap Atau Plafond
V Pekerjaan Kusen Dan Pintu Jendela
VI Pekerjaan Pengecatan
VII Pekerjaan Sanitasi Air
VIII Pekerjaan Instalasi Listrik
TOTAL
PPN (10%)
TOTAL
PEMBULATAN
Terbilang
DELAPAN :RATUS TUJUH PULUH TUJUH JUTA TUJUH PULUH LIMA RIBU ENAM RATUS ENAM
PULUH LIMA RUPIAH
Jumlah Harga
[3]
Rp 6,869,280.00
Rp 25,543,269.40
Rp 46,639,656.62
Rp 207,585,420.17
Rp 102,889,467.88
Rp 17,574,869.68
Rp 41,419,200.00
Rp 4,762,480.56
Rp 32,664,894.90
Rp 18,337,866.00
Rp 9,608,852.00
Rp 33,746,657.19
Rp 89,471,658.11
Rp 19,195,386.27
Rp 48,762,088.96
Rp 38,723,900.00
Rp 13,942,176.10
Rp 33,281,589.55
Rp 6,322,800.00
Rp 797,341,513.38
Rp 79,734,151.34
Rp 877,075,664.72
Rp 877,075,665.00
H LIMA RIBU ENAM RATUS ENAM
7.1 Daftar Harga Satuan Bahan
Mitra 10 Wiyung
Mitra 10 Wiyung
Mitra 10 Wiyung
Mitra 10 Wiyung
m3
1 3 Pasang
1 1 Pasang
1 1 Pasang
Unit
1 2 Buah
Pasang
1 3 Pasang
Pasang
1 1 Pasang
Pasang
1 1 Pasang
Unit
m3
1.1 0.077 m3
1.25 0.0875 Kg
1 0.07 Kg
m2
0.024 0.0077 m3
0.3 0.0960 Kg
Pasang
1 0 Pasang
Pasang
1 0 Pasang
Pasang
1 0 Pasang
m 2
1.1 2.816 m2
Unit
m3
1.1 0.11 m3
1.25 0.125 Kg
1 0.1 Kg
m2
0.024 0.0127 m3
0.3 0.1590 Kg
Pasang
1 6 Pasang
Pasang
1 3 Pasang
Pasang
1 6 Pasang
m 2
1.1 1.595 m2
Unit
m3
1.1 0.055 m3
1.25 0.0625 Kg
1 0.05 Kg
m2
0.024 0.0060 m3
0.3 0.0750 Kg
Pasang
1 4 Pasang
Pasang
1 2 Pasang
Pasang
1 4 Pasang
m 2
1.1 0.649 m2
Unit
m3
1.1 0.022 m3
1.25 0.025 Kg
1 0.02 Kg
m2
0.024 0.0034 m3
0.3 0.0420 Kg
Pasang
1 2 Pasang
Pasang
1 1 Pasang
Pasang
1 2 Pasang
m2
1.1 0.407 m2
Unit
m3
1.1 0.022 m3
1.25 0.025 Kg
1 0.02 Kg
m2
0.024 0.0022 m3
0.3 0.0270 Kg
Pasang
1 0 Pasang
Pasang
1 0 Pasang
Pasang
1 0 Pasang
m2
1.1 0.264 m2
Unit
m3
1.1 0.66 m3
1.25 0.75 Kg
1 0.6 Kg
m2
0.024 0.0010 m3
0.3 0.0120 Kg
Pasang
1 0 Pasang
Pasang
1 0 Pasang
Pasang
1 0 Pasang
m 2
1.1 0.088 m2
ap dan Plafond
m2
0.11 5.9279 Kg
0.364 19.6160 Lembar
m2
1.05 50.9513 m'
0.15 7.2788 Kg
m2
1.1 4.9280 Lembar
0.06 0.2688 Kg
0.012 0.0538 m3
Pengecatan
m2
0.104 40.2361 Kaleng
0.1 38.6886 Kg
0.1 38.6886 Lembar
m2
0.104 14.4082 Kaleng
0.1 13.8540 Kg
0.1 13.8540 Lembar
m2
0.17 0.2040 Kg
0.2 0.2400 Kg
0.35 0.4200 Kg
0.15 0.1800 Kaleng
0.01 0.0120 Buah
n Sanitasi Air
m
0.3 8.814 Batang
0.105 3.0849 Batang
m
0.3 1.8 Batang
0.105 0.63 Batang
m
Unit
0.06 0.06 Buah
1 1 Buah
Unit
0.12 0.24 Zak
0.01 0.02 m3
1 2 Buah
0.12 0.24 Buah
Unit
1 6 Buah
1 6 Roll
ls
70 70 Buah
0.531 0.531 Kg
0.043 0.043 m3
Unit
1 2 Unit
Unit
1 1 Unit
1 1 Unit
Instalasi Listrik
Unit
10 60 Meter
1 6 Unit
2.5 15 Batang
1 6 Buah
Unit
1 1 Unit
Unit
1 8 Unit
Unit
24 120 Meter
4 20 Unit
1 5 Buah
3 15 Batang
3 15 Buah
1 5 Buah
Unit
24 168 Meter
4 28 Unit
1 7 Buah
3 21 Batang
3 21 Buah
1 7 Buah
Unit 4 Unit
Unit 1 Unit
ai 2
Beton Struktur
m3
0.04 0.6688 m3
0.4 6.688 Kg
0.2 3.344 Liter
0.015 0.2508 m3
0.35 5.852 Lembar
2 33.44 Batang
44 Lonjor
16 Lonjor
0.015 11.668602 Kg
m3
0.04 0.63536 m3
0.4 6.3536 Kg
0.2 3.1768 Liter
0.015 0.23826 m3
0.35 5.5594 Lembar
2 31.768 Batang
38 Lonjor
10 Lonjor
0.015 2.3720565 Kg
m3
0.04 0.778415 m3
0.4 7.78415 Kg
0.2 3.892075 Liter
0.018 0.35028675 m3
0.35 6.81113125 Lbr
2 38.92075 Batang
31 Lonjor
36 Lonjor
0.015 9.618018 Kg
an Dinding
m2
70 15658.3 Buah
9.68 2165.3192 Kg
0.045 10.0661 m3
m2
70 1687.7 Buah
0.531 12.8024 Kg
0.043 1.0367 m3
m2
7.776 3487.8470 Kg
0.023 10.3164 m3
m2
3.25 1457.755 Kg
aan Lantai
m2
26.5 253 Buah
10.4 100 Kg
0.045 1 m3
1.62 16 m2
m2
11.87 425 Buah
10 358 Kg
0.045 2 m3
1.5 54 m2
m2
0.196 4 Zak
1.3 27 Kg
0.045 1 m3
1.0608 22 m2
m2
0.186 3 Zak
1.94 24 Kg
0.018 1 m3
1.05 13 m2
ap Atau Plafond
m3
15 12.45 Kg
5.6 4.648 Doz
1.1 0.913 m3
m3
0.25 0.0375 Kg
0.014 0.0021 m3
0.0072 0.00108 m3
m3
0.25 0.1075 Kg
0.014 0.00602 m3
0.0072 0.003096 m3
m3
15 6 Lonjor
0.2 0.08 Doz
1.1 0.44 m3
m
15 3 Lonjor
0.2 0.04 Doz
1.1 0.22 m3
m
m
0.1 6.6 Kg
0.0108 0.7128 m3
m
1 33 Buah
0.3 9.9 Batang
m2
0.11 5.35315 Kg
0.364 17.71406 Lembar
m2
1.05 88.25775 m'
0.15 12.60825 Kg
m2
1.1 10.494 Lembar
0.06 0.5724 Kg
0.012 0.11448 m3
m2
25 1596.5 Buah
m
0.16 3.476 Kg
0.0323 0.7017175 m3
5 108.625 m2
n Dan Pintu Jendela
Unit
m3
1.1 0.275 m3
1.25 0.3125 Kg
1 0.25 Kg
m2
0.04 0.3408 m3
0.5 4.26 Kg
Pasang
1 3 Pasang
Pasang
1 1 Pasang
Pasang
1 1 Pasang
Unit
1 2 Buah
Pasang
1 3 Pasang
Pasang
1 1 Pasang
Pasang
1 1 Pasang
Unit
m3
1.1 0.11 m3
1.25 0.125 Kg
1 0.1 Kg
m2
0.024 0.01272 m3
0.3 0.159 Kg
Pasang
1 6 Pasang
Pasang
1 3 Pasang
Pasang
1 6 Pasang
m 2
1.1 1.265 m2
Unit
m3
1.1 0.033 m3
1.25 0.0375 Kg
1 0.03 Kg
m2
0.024 0.00264 m3
0.3 0.033 Kg
Pasang
1 2 Pasang
Pasang
1 1 Pasang
Pasang
1 2 Pasang
m2
1.1 0.495 m2
Unit
m3
1.1 0.044 m3
1.25 0.05 Kg
1 0.04 Kg
m2
0.024 0.0036 m3
0.3 0.045 Kg
Pasang
1 0 Pasang
Pasang
1 0 Pasang
Pasang
1 0 Pasang
m2
1.1 0.704 m2
Unit
m3
1.1 0.638 m3
1.25 0.725 Kg
1 0.58 Kg
m2
0.024 0.01272 m3
0.3 0.159 Kg
Pasang
1 4 Pasang
Pasang
1 2 Pasang
Pasang
1 4 Pasang
m 2
1.1 2.266 m2
Pengecatan
m2
0.104 23.2638 Kaleng
0.1 22.3690 Kg
0.1 22.3690 Lembar
m2
0.104 23.2638 Kaleng
0.1 22.3690 Kg
0.1 22.3690 Lembar
m2
0.17 0.1972 Kg
0.2 0.2320 Kg
0.35 0.4060 Kg
0.15 0.1740 Kaleng
n Sanitasi Air
m
0.3 5.2755 Batang
0.105 1.8464 Batang
m
0.3 5.664 Batang
0.105 1.9824 Batang
m
Unit
0.06 0.12 Buah
1 2.0000 Buah
Unit
1 4 Buah
1 4.0000 Roll
Unit
1 2 Unit
Unit
1 2 Buah
1 2 Roll
nstalasi Listrik
Unit
10 50 Meter
1 5 Unit
2.5 13 Batang
1 5 Buah
Unit
1 2 Unit
Unit
1 4 Unit
Unit
24 96 Meter
4 16 Unit
1 4 Buah
3 12 Batang
3 12 Buah
1 4 Buah
Unit
24 144 Meter
4 24 Unit
1 6 Buah
3 18 Batang
3 18 Buah
1 6 Buah
Unit 1 Unit
8.2 Rekapitulasi Kebutuhan Bahan
[4]
m3
m3
Doz
m3
m3
Zak
Kg
Zak
m3
Buah
Zak
Kg
Zak
m3
m3
Liter
Kg
m3
Kg
Liter
Kg
m3
Lembar
Batang
Buah
m2
Kg
m2
m2
m3
Kg
Pasang
Pasang
Pasang
Buah
m3
Pasang
Pasang
Pasang
m2
Kg
Lembar
m'
Kg
Lembar
Kaleng
Kg
Lembar
Kaleng
Kg
Kg
Kg
Kaleng
Buah
Batang
Batang
Buah
Buah
Buah
Roll
Unit
Unit
Meter
Unit
Batang
Buah
Unit
Unit
Unit
Buah
Buah
Buah
Kg
Lonjor
Buah
m3
Kg
Doz
m3
m3
m3
Buah
m2
Lonjor
Lonjor
Lonjor
Lonjor
Lonjor
Lonjor
Lonjor
Lonjor
7.1 Analisa Kebutuhan Bahan
A. Pekerjaan Lantai 1
Angka Satuan
No. Uraian Pekerjaan
1 Bekisting Poer 1
Panjang 1.2 m
Lebar 1.2 m
Tinggi 0.4 m
Luas Bekisting 3.36 m2
Asumsi pemakaian Bekisting 2 x 1.68 m2
Vol. Pekerjaan Beton Poer 1 1.72 m3
Koef. Bekisting 0.9767
B. Pekerjaan Lantai 2
Angka Satuan
No. Uraian Pekerjaan
21 Bekisting Ring Balk
Panjang 70.765 m
Lebar 0.15 m
Tinggi 0.2 m
Luas Bekisting 38.92075 m2
Asumsi pemakaian Bekisting 2 x 19.460375 m2
Vol. Pekerjaan Beton Ring Balk 2.12 m3
Koef. Bekisting 9.17942217
Dia Berat
No. SKETSA
(mm/m) (Kg/m)
[1] [2] [3] [4]
Strouss 30 - 300 D
0.04 0.008 0.395
0.12
1
3
0.04
Strouss 30 - 300 Ø
0.06 0.01 0.617
0.5
0.048
2 0.048
0.2
0.5 Total Besi Polos Ø10
0.2 Koefisien
0.048 Total Besi Ulir D8
Koefisien
Poer 1 120 x 120 x 40 (A-A & B-B)
0.016 1.58
1.16
3 0.36 0.36
0.08
0.08
1.16
3
0.56
4 0.36 0.36
0.08
0.08
0.56
Total Besi Polos Ø16
Koefisien
Poer 2 120 x 60 x 40 (B-B)
0.016 1.58
1.16
5 0.36 0.36
0.08
0.08
1.16
Total Besi Polos Ø16
Koefisien
Poer 3 60 x 60 x 40 (A-A & B-B)
0.016 1.58
0.56
6 0.36 0.36
0.08
0.08
0.56
Total Besi Polos Ø16
Koefisien
Sloof 1 (A"6-B6 ; D6-E' ; A3'-B'3') D
0.016 1.58
1.6
7
0.24 0.24
7
0.11 0.11
8
0.05
0.05 0.26
1.9
9
0.24 0.24
0.11 0.11
10
0.05
0.05 0.26
2.2
11
11
0.24 0.24
0.11 0.11
12
0.05
0.05 0.26
2.8
13
0.24 0.24
0.11 0.11
14
0.05
0.05 0.26
15
3.7
15
0.24 0.24
0.11 0.11
16
0.05
0.05 0.26
Sloof 1 (B3'-B6) D
0.016 1.58
4.3
17
0.24 0.24
Sengkang (B3'-B6) Ø
0.01 0.617
0.26
0.11 0.11
18
0.05
0.05 0.26
Sloof 1 (D2"-F2") D
0.016 1.58
4.5
19
0.24 0.24
Sengkang (D2"-F2") Ø
0.01 0.617
0.26
0.11 0.11
20
0.05
0.05 0.26
Sloof 1 (B6-D6) D
0.016 1.58
5.2
21
0.24 0.24
Sengkang (B6-D6) Ø
0.01 0.617
0.26
0.11 0.11
22
0.05
0.05 0.26
Sloof 1 (D2"-D6; F2"-F6) D
0.016 1.58
5.8
23
0.24 0.24
0.11 0.11
24
1.2
25
0.24 0.24
0.11 0.11
26
0.05
26
0.05 0.16
1.4
27
0.24 0.24
0.11 0.11
28
0.05
0.05 0.16
2.8
29
0.24 0.24
0.11 0.11
30
30
0.05
0.05 0.16
31
0.24 0.24
0.11 0.11
32
0.05
0.05 0.16
3.6
33
0.24 0.24
34
0.11 0.11
34
0.05
0.05 0.16
4.825
35
0.24 0.24
0.11 0.11
36
0.05
0.05 0.16
5.5
37
0.24 0.24
38
0.16
0.11 0.11
38
39 3.6 m
0.08 m
5D
15 D 0.24 m
Sengkang Kolom Type 1 Ø
0.01 0.62
5D 0.05 0.16
0.05
0.16
40 0.16
41 3.8 m
0.08 m
5D
15 D 0.24 m
Sengkang Kolom Type 1 Ø
0.01 0.62
5D 0.05 0.16
0.05
0.16
42 0.16
0.4
43 3.6
0.05
0.15
Sengkang Kolom Type 2 Ø
0.01 0.617
0.05 0.07
0.05
44 0.07
0.07
Total Besi Polos Ø10
0.07 Koefisien
Total Besi Ulir D10
Koefisien
Kolom Type 2 (11 x 11 ) Lantai 2 D
0.15 0.01 0.617
0.05
0.4
45 3.8
0.05
45
0.15
Sengkang Kolom Type 2 lantai 2 Ø
0.01 0.617
0.05 0.07
0.05
46 0.07
0.07
Total Besi Polos Ø10
0.07 Koefisien
Total Besi Ulir D10
Koefisien
Balok Type 1 (15 x 30 cm) Ø
0.05 0.01 0.617
0.05 0.11
47 0.26 0.26
0.11
Tul. Utama D
0.016 1.58
12
48
0.08 0.08
9
49
49
0.08 12 0.08
50 0.26 0.26
0.11
Tul. Utama D
0.016 1.58
7.195
51
0.08 0.08
5.40
52
53
53 0.26 0.26
0.11
Tul. Utama D
0.016 1.58
6.12
54
0.08 0.08
4.59
55
56 0.26 0.26
0.11
Tul. Utama D
0.016 1.58
57
4.967
57
0.08 0.08
3.72525
58
59 0.26 0.26
0.11
Tul. Utama D
0.016 1.58
3.492
60
0.08 0.08
2.619
61
62 0.26 0.26
0.11
Tul. Utama D
0.016 1.58
2.692
63
0.08 0.08
2.019
64
65 0.26 0.26
0.11
Tul. Utama D
0.016 1.58
1.942
66
0.08 0.08
1.4565
67
68 0.26 0.26
68
0.11
Tul. Utama D
0.016 1.58
1.342
69
0.08 0.08
1.0065
70
71 0.16 0.16
0.11
Tul. Utama D
0.016 1.58
2.225
72
72
0.08 0.08
1.66875
73
74 0.16 0.16
0.11
Tul. Utama D
0.016 1.58
2.25
75
0.08 0.08
76
1.6875
76
0.24
0.04
77 0.14
0.04
1.15
78
0.06 0.06
1.16
79 0.144 0.06
0.06
80
0.06
80 0.144 0.06
1.16
1.1
81
0.144 0.144
0.144 0.144
82
1.1
83
0.06 0.3
0.144
Tulangan Plat Tangga Bawah
0.012 0.888
0.06
0.745
84
0.3
0.06
0.144
Tulangan Plat Tangga Tengah
0.012 0.888
0.06
85 3.05
0.144
0.06
Tulangan Plat Tangga Tengah
0.012 0.888
0.06
86 3.05
0.144
0.06
Tulangan Plat Tangga Atas
0.012 0.888
0.06
87 0.82
0.144
87
0.06
Tulangan Plat Tangga Atas
0.012 0.888
0.06
88 0.82
0.05 0.05
89
0.84 0.84
0.06 0.06
90
Tulangan Bagi Ø
0.01 0.617
91
91
0.05 0.05
0.05 0.05
92
0.12 3 0.12
0.6 0.6
0.06 0.06
93
Tulangan Bagi Ø
0.01 0.617
0.12 3 0.12
94
0.05 0.05
95
95
0.365 0.365
0.06 0.06
96
Tulangan Bagi Ø
0.01 0.617
97
0.05 0.05
0.05 0.05
98
99
0.24 0.24
0.06 0.06
99
Tulangan Bagi Ø
0.01 0.617
100
0.05 0.05
101
0.5 0.5
0.06 0.06
102
Tulangan Bagi Ø
0.01 0.617
103
0.05 0.05
0.05 0.05
104
0.345 0.345
0.06 0.06
105
Tulangan Bagi Ø
0.01 0.617
106
0.05 0.05
107
0.7 0.7
0.06 0.06
108
Tulangan Bagi Ø
0.01 0.617
109
0.05 0.05
0.05 0.05
110
110
0.345 0.345
0.06 0.06
111
Tulangan Bagi Ø
0.01 0.617
112
0.05 0.05
113
0.48 0.48
0.06 0.06
114
114
Tulangan Bagi Ø
0.01 0.617
115
0.05 0.05
0.05 0.05
116
0.42 0.42
0.06 0.06
117
Tulangan Bagi Ø
0.01 0.617
118
118
0.05 0.05
119
0.12 4 0.12
0.8 0.8
0.06 0.06
120
Tulangan Bagi Ø
0.01 0.617
0.12 4 0.12
121
0.05 0.05
122
0.05 0.05
122
0.72 0.72
0.06 0.06
123
Tulangan Bagi Ø
0.01 0.617
124
0.05 0.05
125
1.08 1.08
0.06 0.06
126
Tulangan Bagi Ø
0.01 0.617
127
0.05 0.05
0.05 0.05
128
0.42 0.42
0.06 0.06
129
Tulangan Bagi Ø
0.01 0.617
130
0.05 0.05
131
0.78 0.78
0.06 0.06
132
Tulangan Bagi Ø
0.01 0.617
133
133
0.05 0.05
0.05 0.05
134
0.36 0.36
0.06 0.06
135
Tulangan Bagi Ø
0.01 0.617
0.16 0.16
137
137
0.11
10.22
138
0.08 0.08
RingBalk Ø
0.05 0.01 0.617
0.05 0.11
0.16 0.16
139
0.11
7.92
140
0.08 0.08
RingBalk Ø
0.05 0.01 0.617
0.05 0.11
141
0.16 0.16
141
0.11
6.12
142
0.08 0.08
RingBalk Ø
0.05 0.01 0.617
0.05 0.11
0.16 0.16
143
0.11
6.07
144
0.08 0.08
RingBalk Ø
0.05 0.01 0.617
0.05 0.11
0.16 0.16
145
0.11
4.27
146
0.08 0.08
RingBalk Ø
0.05 0.01 0.617
0.05 0.11
0.16 0.16
147
0.11
3.995
148
0.08 0.08
RingBalk Ø
0.05 0.01 0.617
0.05 0.11
0.16 0.16
149
0.11
3.695
150
0.08 0.08
RingBalk Ø
0.05 0.01 0.617
0.05 0.11
0.16 0.16
151
0.11
3.07
152
0.08 0.08
152
RingBalk Ø
0.05 0.01 0.617
0.05 0.11
0.16 0.16
153
0.11
1.895
154
0.08 0.08
RingBalk Ø
0.05 0.01 0.617
0.05 0.11
0.16 0.16
155
0.11
1.795
156
156
0.08 0.08
Besi Polos Ø10
Koefisien
Besi Ulir D16
Koefisien
Panjang Jumlah
Potongan Potongan Total Panjang Berat JUMLAH POTONG/LONJOR
0 = 26.721036 Kg
= 1.1674 Kg/m3
= 136.67 Kg
= 5.9707 Kg/m3
2 63 126 199.08 6
6 = 199.08 Kg
= 99.0448 Kg/m3
6 = 176.96 Kg
= 88.0398 Kg/m3
2 10 20 31.6 6
6 = 31.6 Kg
= 225.7143 Kg/m3
ma D16 = 632.4108 Kg
a Sloof 1 = 258.1005 Kg/m3
gkang Ø 10 = 179.32488 Kg
a Sengkang Sloof 1 = 73.1864 Kg/m3
0 = 100.936 Kg
= 59.0269 Kg/m3
= 634.0224 Kg
= 370.7733 Kg/m3
0 = 116.0764 Kg
= 69.5068 Kg/m3
= 661.8304 Kg
= 396.3056 Kg/m3
0 = 38.6859 Kg
= 75.8547 Kg/m3
= 119.4512 Kg
= 234.2180 Kg/m3
0 = 66.8211 Kg
= 76.8059 Kg/m3
= 215.7032 Kg
= 247.9347 Kg/m3
Tumpuan
0.84 61 102.48 63.23016 14.2857142857143
Lapangan
61
Total
122
Tumpuan
0.84 64 107.52 66.33984 14.2857142857143
Lapangan
64
Total
128
Tumpuan
0.84 52 87.36 53.90112 14.2857142857143
Lapangan
52
Total
104
Tumpuan
0.84 74 124.32 76.70544 14.2857142857143
Lapangan
74
Total
148
Tumpuan
0.84 44 73.92 45.60864 14.2857142857143
Lapangan
44
Total
88
Tumpuan
0.84 16 26.88 16.58496 14.2857142857143
Lapangan
16
Total
32
1.502 12 18.024 28.47792 7.98934753661784
0 = 405.29496 Kg
= 137.8554 Kg/m3
= 1070.56218 Kg
= 364.1368 Kg/m3
Tumpuan
0.64 25 32 19.744 18.75
Lapangan
25
Total
50
Tumpuan
0.64 13 16.64 10.26688 18.75
Lapangan
13
Total
26
= 22.8942 Kg
= 14.308875 Kg/m3
= 171.9772 Kg
= 107.4857 Kg/m3
0 = 122.70896 Kg
= 81.2642 Kg/m3
2 = 60.867072 Kg
= 40.3093 Kg/m3
0 = 21.13842 Kg
= 81.3016 Kg/m3
2 = 16.115424 Kg
= 61.9824 Kg/m3
0 = 37.90848 Kg
= 74.3304 Kg/m3
2 = 27.555528 Kg
= 54.0304 Kg/m3
0 = 44.07848 Kg
= 61.2201 Kg/m3
2 = 31.995528 Kg
= 44.4382 Kg/m3
0 = 132.33416 Kg
= 76.9385 Kg/m3
2 = 84.409728 Kg
= 49.0754 Kg/m3
0 = 105.28488 Kg
= 77.4154 Kg/m3
2 = 69.05088 Kg
= 50.7727 Kg/m3
= 61.78638 Kg
= 73.5552 Kg/m3
= 42.506784 Kg
= 50.6033 Kg/m3
os Ø10 = 572.99556 Kg
os Ø12 = 364.564848 Kg
3 2.4 36
7 0.772 4
3 2.4 18
6 0 11
3 2.4 12
6 0 2
5 1.6 5
14 0.24 3
5 0.1 6
14 0.24 4
4 1.28 2
14 0.24 2
3 2.16 5
14 0.24 3
2 3.64 4
14 0.24 2
2 2.44 4
14 0.24 3
2 2.04 4
14 0.24 3
2 0.64 4
14 0.24 3
1 5.72 14
14 0.24 6
7 0.24 3
18 0.48 2
6 0.72 2
18 0.48 2
3 2.16 2
18 0.48 2
3 1.56 7
18 0.48 5
2 3.84 5
18 0.48 3
2 1.39 3
18 0.48 2
2 0.04 3
18 0.48 3
2 2.88 44
16 0 14
2 2.48 44
16 0 16
2 0 22
31 0 6
2 0 38
31 0 10
14 0.24 9
1 -0.16 6
1 -9.16 2
14 0.24 6
1 4.645 6
1 -0.75125 2
14 0.24 10
1 5.72 12
1.1 0.043 4
14 0.24 8
2 1.746 3
1.3 0.492075 2
14 0.24 11
3 1.044 8
1.9 0.0851 5
14 0.24 7
4 0.592 5
2.4 0.3096 3
14 0.24 7
5 1.49 5
3.3 0.25695 3
14 0.24 3
7 1.486 2
4.7 0.21005 1
18 0.48 3
5 0.075 3
2.9 0.244125 2
18 0.48 2
4 2.36 2
2.9 0.11725 1
26 0.04 5
9 0.57 8
8 0.608 1
8 0.608 1
8 0.896 1
8 0.896 1
9 0.219 1
9 0.219 1
3 2.058 2
3 2.058 2
11 0.076 1
11 0.076 1
2 2.92 8
2 2.496 4
2 2.92 3
3 1.98 7
3 1.416 4
3 1.98 4
5 1.175 2
5 0.115 1
5 1.175 1
7 1.22 2
6 1.632 1
7 1.22 1
4 0.64 2
3 2.844 2
4 0.64 1
5 1.675 3
5 0.735 2
5 1.675 1
3 0.48 3
2 3.896 3
3 0.48 1
5 1.675 3
5 0.735 2
5 1.675 1
4 1.04 3
4 0.192 2
4 1.04 1
4 2.24 3
4 1.488 2
4 2.24 1
2 3.32 9
2 2.896 5
2 3.32 3
3 0.18 7
2 3.744 6
3 0.18 3
2 0.52 5
2 0.096 3
2 0.52 2
4 2.24 7
4 1.488 4
4 2.24 3
2 3.52 5
2 3.096 3
2 3.52 1
5 1.3 4
5 0.36 3
5 1.3 2
18 0.48 8
1 1.62 8
18 0.48 3
1 3.92 4
18 0.48 5
1 5.72 8
18 0.48 3
1 5.77 4
18 0.48 2
2 3.14 2
18 0.48 4
2 3.69 4
18 0.48 2
3 0.435 2
18 0.48 2
3 2.31 2
18 0.48 1
5 1.725 1
18 0.48 1
6 0.27 1
TABEL BESI BETON POLOS SNI 2014 TABEL BESI BETON SIRIP SNI 2014
Diameter Berat/m Diameter
Uk. Satuan A (Cm2) Kg/m Uk. Satuan
6 mm 0.2827 0.222 D6 mm
8 mm 0.5027 0.395 D8 mm
10 mm 0.7854 0.617 D10 mm
12 mm 1.131 0.888 D13 mm
14 mm 1.539 1.21 D16 mm
16 mm 2.011 1.58 D19 mm
19 mm 2.835 2.23 D22 mm
22 mm 3.801 2.98 D25 mm
25 mm 4.909 3.85 D29 mm
28 mm 6.158 4.83