HARGA SAT

No URAIAN PEKERJAAN KUANTITAS SAT


Rp

A PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi m2
2 Pembuatan Direksi Keet m2
3 Pengukuran dan Pemasangan Bowplank m1

B PEKERJAAN TANAH
1 Galian Tanah sedalam 1 m m3
2 Galian Tanah sedalam 2 m m3
3 Urugan Tanah Kembali m3
4 Urugan Tanah m3
5 Urugan Pasir m3

C PEKERJAAN PONDASI
1 Pasangan Batu Kosong m3
2 Pasangan Batu Kali 1 PC : 5 PS m3

D PEKERJAAN DINDING
1 Pasangan Dinding 1 PC : 3 PS m2
2 Pasangan Tasram 1 PC : 6 PS m2

E PEKERJAAN PLESTERAN
1 Plesteran Dinding 1 PC : 3 PS
2 Plesteran Tasram 1 PC : 6 PS
3 Benangan Sudut

F PEKERJAAN KAYU
1 Kusen Pintu & Jendela Kayu Jati
2 Pintu & Jendela Kaca Kayu Jati
3 Kuda2 Kayu Jati
4 Usuk dan Reng
5 Listplank 2/30
6 Rangka Hollow

G PEKERJAAN BETON
1 Beton Lantai Kerja
2 Beton 1 PC : 2 PS : 3 KR
3 Pembesian polos
4 Begesting Pondasi
5 Begesting Sloof
6 Begesting kolom
7 Begesting Balok
8 Begesting Dinding
9 Begesting lantai
10 Begesting Tangga

H PEKERJAAN ATAP
1 Pasang Atap Genteng Kodok
2 Pasang Bubung Kodok

I PEKERJAAN LANGIT2
1 Pas. Langit Gypsumboard
2 List Langit2

J PEKERJAAN KERAMIK
1 Lantai Keramik 30x30
2 Lantai Keramik 20x20
3 Dinding Keramik 20x25

K PEKERJAAN KUNCI & KACA


1 Kunci Tanam Biasa
2 Kunci Kamar Mandi
3 Engsel Pintu
4 Engsel Jendela
5 Grendel pintu
6 Grendel Jendela
7 Rel Pintu dorong
8 Kaca Rayben

L PEKERJAAN BESI & ALUMINIUM


1 Rolling Door

M PEKERJAAN SANITASI
1 Kloset Jongkok
2 Wastafel
3 Tempat Sabun
4 Bak Mandi Batu Bata
5 Pipa Galvanish f1/2"
6 Pipa PVC f2"
7 Pipa PVC f4"
8 Kran Air f1/2"
9 Kaca Wastafel

N PEKERJAAN PENGECATAN
1 Cat Dinding Dalam
2 Cat Dinding Luar
3 Cat Kusen
4 Cat Pintu & Jendela
5 Cat Genteng Dulux
O PEKERJAAN INSTALASI LISTRIK
1 Stop Kontak
2 Lampu Pijar + Saklar
3 Sekring
JUMLAH TOTAL
Rp Rp
BILL OF QUANTITY

No Jenis Pekerjaan Analisa P


I PEKERJAAN PERSIAPAN

1 Pembersihan lokasi

m 12

m 17

2 Pembuatan Direksi Keet

4m

5m

3 Pemasangan Bowplank

No Jenis Pekerjaan Analisa P


II PEKERJAAN TANAH
1 Galian Tanah Pondasi Batu Kali

1m

1m

2 Galian Tanah Pondasi Menerus Pagar

1m

1m

3 Galian Tanah Pondasi Telapak

0.8 m

1,55 m
4 Urugan Tanah Kembali Pondasi Batu Kali

5 Urugan Tanah Kembali Pondasi Telapak

6 Urugan Tanah Kembali Pondasi Menerus Pagar

7 Urugan Peninggi Pail Lantai


8 Urugan Pasir Bawah Pondasi Batu Kali

9 Urugan Pasir Bawah Pondasi Telapak

10 Urugan Pasir Bawah Pondasi Menerus Pagar

11 Urugan Pasir Bawah Lantai


No Jenis Pekerjaan Analisa P
III PEKERJAAN PASANGAN & PLESTERAN

1 Pasangan Batu Kosong (Anstamping)

2 Pasangan Pondasi Batu kali

3 Pasangan Dinding Trasram


4 Pasangan Dinding Biasa

Lantai 1

Lantai 2

3,5 m

4m

5 Plesteran Trasram

6 Plesteran Dinding Biasa

7 Benangan Tali Air

lantai 1

lantai 2
No Jenis Pekerjaan Uraian pe

IV PEKERJAAN BETON

1 Beton Lantai Kerja

2 Beton Pondasi Telapak

3 Beton Sloof 20/30

4 Beton Kolom Struktur 20/40


5 Beton Kolom Praktis 15/15

15 cm

15

5 Beton Kolom Praktis 20/20

6 Beton Balok Struktur 20/20

7 Beton Balok Struktur 15/20


6 Beton Balok Struktur 20/40

7 Beton Pelat Lantai

0,12 m

8 Beton Pelat Tangga


No Jenis Pekerjaan Uraian pe

V PEMBESIAN
1 Pondasi Telapak

2 Kolom Struktur
8 f 16

f 8 -150

3 Kolom Praktis

4f12

f6-200

4 Balok Struktur
5 Pelat Lantai 2

6 Pelat Tangga
No Jenis Pekerjaan Uraian perhitungan
VI PEKERJAAN ATAP
1 Rangka Atap

Panjang kuda-kuda = 10 m
Panjang total = 2,5 * 10 m
= 25 m

2 Gording 8/12
4 Usuk dan Reng

No Jenis Pekerjaan Uraian perhitungan


VII PEKERJAAN KUSEN
1 Kusen Pintu 6/15
type P2

type P1
type PVC

type J1

type J2

type J3
No Jenis Pekerjaan Uraian pe
VIII PEKERJAAN DAUN
1 Daun Pintu

2 Daun Jendela

No Jenis Pekerjaan Uraian pe


XI PEKERJAAN PLAFOND
1 Rangka Plafond Hollow 4/4
Lantai 1

Lantai 2
2 Penutup Plafond

3 List Tepi Plafond

No Jenis Pekerjaan Uraian pe


X PEKERJAAN GANTUNGAN

1 Pemasangan Engsel Pintu

2 Pemasangan Kunci Pintu

3 Pemasangan Grendel Pintu

4 Pemasangan Engsel Jendela

5 Pemasangan Grendel Jendela

No Jenis Pekerjaan Uraian pe


XI PEKERJAAN SANITASI DAN DRAINASE
1 Pembuatan Septictank

2 Pembuatan Sumur Resapan

3 Pemasangan Kloset

4 Pemasangan Kran

5 Pemasangan Wastafel

6 Shower

7 Pipa air bersih galvanis Ø 1/2"

8 Pipa air kotor Ø 4"

9 Pipa tinja Ø 6"

10 Tandon Air

No Jenis Pekerjaan Uraian pe


XII PEKERJAAN KERAMIK

1 Lantai Granit 60x60

Lantai 1

Lanatai 2
2 Lantai Kamar Mandi 40x40

4 Dinding Dapur 20x25

5 Wastafel

No Jenis Pekerjaan Uraian pe

XIII PEKERJAAN INSTALASI LISTRIK


1 Lampu Gantung

2 Stop Kontak
3 Lampu Plafond

4 Lampu Taman

5 Saklar ganda

No Jenis Pekerjaan Uraian pe


XIV PEKERJAAN PENGECATAN

1 Cat Dinding Dalam

2 Cat Dinding luar

3 Cat Kusen

4 Cat Pintu

5 Cat Jendela
BILL OF QUANTITY

Analisa Perhitungan

L = 17 x 12
= 204 m2

L=4m×5m
= 20 m2

Panjang = 13,75 m
Lebar = 11 m

K = 11(11) + 5(13,75)
= 189,75 m

Analisa Perhitungan
Panjang galian = 92,5 m
Tinggi galian = 1 m
Lebar galian = 1 m

L = 1 m × 1 m = 1 m2

V = 92,5 m × 1 m × 1 m
= 92,5 m3

Panjang pondasi = 47,5 m

L=1m×1m
= 1 m2

V = 47,5 m × 1 m2
= 47,5 m3

Jumlah pondasi telapak = 20 buah

V1 = 0,8 × 0,8 × 1,55 = 0,992 m3


V2 = 1 x 0,8 x 1,55 = 1,24 m3
V3 = 1 x 0,5 x 1,55 = 0,755 m3

Vtot = (12 x 0,992) + (4 x 1,24) + (4 x 0,755)


= 19,884 m3
Panjang galian = 92,5 m'

Luas penampang pondasi batu kali


`= (0,2 m x 1 m) + (0,4 m x 0,35 m x 2) + (0,3 m x 0,8 m)
`= 0,72 m²

Volume urugan tanah kembali


`= 92,5 m3 - (0,72 m2 x 92,5 m)
`= 25,9 mᶟ

Volume Pondasi Telapak


V1 = (0,35 x 0,8 x 0,8) + (0,2 x 0,2 x 1,2) = 0,272 m3
V2 = (0,35 x 1 x 0,8) + (0,2 x 0,4 x 1,2) = 0,376 m3
V3 = (0,35 x 1 x 0,5) + (0,2 x 0,2 x 1,2) = 0,223 m3

Volume urugan kembali pondasi telapak


= 19,884 - ((12 x 0,272) + (4 x 0,376) + (4 x 0,223))
= 14,224 m3

Panjang pondasi = 47,5 m

Luas penampang pondasi batu kali samping


`= (0,2 m x 1 m) + (0,4 m x 0,7 m) + (0,3 m x 0,8 m)
`= 0,72 m²

Volume urugan tanah kembali


`= 47,5 m3 - (0,72 m2 x 47,5 m)
`= 13,3 mᶟ

Luas lantai = 107,25 m2

Volume urugan peninggi lantai


= 107,25 x 0,1
= 10,725 m3
panjang pondasi = 92,5 m

V = tinggi × lebar × Σ panjang


` = 0,05 m × 1 m × 92,5 m
` = 4,625 mᶟ

Jumlah pondasi telapak = 20 buah

V1 = 0,8 × 0,8 × 0,05 = 0,032 m3


V2 = 1 x 0,8 x 0,05 = 0,04 m3
V3 = 1 x 0,5 x 0,05 = 0,025 m3

Vtot = (12 x 0,032) + (4 x 0,04) + (4 x 0,025)


= 0,644 m3

panjang pondasi = 47,5 m

A = 1 m × 0,05 m
= 0,05 m2

V = 47,5 m × 0,05 m2
= 2.375 m3

luas lantai 1 = 107,25 m2


luas lantai 2 = 90,25 m2

V = (107,25 m2 + 90,25 m2) × 0,1 m


= 19,75 m3
Analisa Perhitungan

Panjang pondasi = 140 m

A = 1 m × 0,15 m
= 0,15 m2

V = 140 m × 0,15 m2
= 21 m3

Panjang pondasi = 145 m

A = (0,2 m x 1 m) + (0,4 m x 0,7 m) + (0,3 m x 0,8 m)


= 0,72 m2

V = 140 m × 0,72 m2
= 100,8 m3

Panjang lantai 1 = 105 m


Luas tasram = 0,2 m × 105 m
= 21 m2
Luas pintu = 2(1,12 x 0,2) + 1(0,92 x 0,2) + 1(1,12 x 0,2)
= 0,856 m2
Luas bersih tasram = 21 m2 - 0,856 m2
= 20,144 m2

Panjang Lantai 2 = 67,5 m


Luas Tasram = 0,2 m x 67,5 m
= 13,5 m2
Luas Pintu = (2(1,12) + 1(0,92) + 2(1,12)) x 0,2
= 1,08 m2
Luas bersih tasram = 13,5 m2 - 1,08 m2
= 12,42 m2
Lantai 1
Panjang Lantai 1 = 105 m
Luas Dinding = 3,5 m x 105 m
= 367,5 m2
Luas Pintu = 10,576 m2
Luas Tasram = 20,144 m2
Luas Jendela = 17,812 m2
Luas dinding lantai 1 = 367,5 m2 - 48,532 m2
= 318,968 m2
Lantai 2
Panjang Lantai 2 = 67,5 m
Luas Dinding = 4 m * 67,5 m
= 270 m2
Luas Pintu = 13,04 m2
Luas Tasram = 12,42 m2
Luas Jendela = 21,9 m2
Luas dinding lantai 2 = 270 m2 - 47,36 m2
= 222,64 m2

L = 2 x luas tasram
= 2 x 32,56 m2
= 65,12 m2

L = 2 * luas pasangan dinding


= 2 x 541,60 m2
= 1083,2 m2

P1 = 4(2 × 0,92 + 2 × 2,8) = 12,96 m


P2 = 3(2 × 0,92 + 2 × 2,2) = 9,92 m
PVC = 2(2 × 0,92 + 2 × 2) = 7,68 m
J1 = 9(2 × 2,6 + 2 × 1,4) = 49,6 m
J2 = 3(2 × 4,5 + 2 × 1,45) = 29,9 m
J3 = 1(2 × 0,82 + 2 × 1,46) = 4,56 m

Keliling total = 114,62 m


V = 114,62 m × 2 = 229,24 m'
Uraian perhitungan

didapat jumlah pondasi telapak = 20 buah

V1 = 0,8 × 0,8 × 0,05 = 0,032 m3


V2 = 1 x 0,8 x 0,05 = 0,04 m3
V3 = 1 x 0,5 x 0,05 = 0,025 m3

Vtot = (12 x 0,032) + (4 x 0,04) + (4 x 0,025)


= 0,644 m3

Volume Pondasi Telapak


V1 = (0,35 x 0,8 x 0,8) + (0,2 x 0,2 x 1,2) = 0,272 m3
V2 = (0,35 x 1 x 0,8) + (0,2 x 0,4 x 1,2) = 0,376 m3
V3 = (0,35 x 1 x 0,5) + (0,2 x 0,2 x 1,2) = 0,223 m3

Volume total pondasi telapak


= (12 x 0,272) + (4 x 0,376) + (4 x 0,223)
= 5,66 m3

panjang = 92,5 m
A = 0,2 m × 0,3 m
= 0,06 m2
V = 92,5 m x 0,06 m2
= 5,55 m3

jumlah kolom = 4 buah


tinggi kolom = lantai 1 + lantai 2
= 7,4 m
A = 0,20 m x 0,40 m = 0,08 m2
V = 0,08 m x 7,4 m2
= 0,592 m3
V total = 4 x 0,592 m3
= 2,368 m3

jumlah kolom = (lt.1 11 bh) (lt.2 9 bh)


tinggi kolom = (lt.1 3,6m) (lt.2 3,8m)
= 7,4 m
A = 0,15 m * 0,15 m = 0,0225 m2
V1 = 3,6 m 0,0225 m2 = 0,081 m3
V2 = 3,8 m 0,0225 m2 = 0,0855 m3

V total = (11 x 0,081) + (9 x 0,0855)


= 1,6605 m3

jumlah kolom = 16 buah


tinggi kolom = lantai 1 + lantai 2
= 7,4 m
A = 0,20 m x 0,20 m = 0,04 m2
V = 7,4 m x 0,04 m2
= 0,296 m3
V total = 16 x 0,296 m3
= 4,736 m3

panjang balok Lantai 1 = 29 m


A = 0,20 m x 0,20 m = 0,04 m2
V = 29 m x 0,04 m2
= 1,16 m3
panajng balok Lantai 2 = 0 m

V total = 1,16 m3 + 0 m3
= 1,16 m3

panjang balok Lantai 1 = 0 m


panajng balok Lantai 2 = 67,5 m
A = 0,15 m x 0,20 m = 0,03 m2
V = 67,5 m x 0,03 m2
= 2,025 m3

panjang balok Lantai 2 = 81,75 m


A = 0,20 m x 0,40 m = 0,08 m2
V = 81,75 m x 0,08 m2
= 6,54 m3
panajng balok Lantai 1 = 0 m

V total = 6,54 m3 + 0 m3
= 6,54 m3

Luas Lantai 2 = 98,25 m2


tinggi pelat = 0,12 m

V = 0,12 m x 98,25 m2
= 11,79 m3

panjang tangga = 8 m

A1 = 1,75 m * 2 m = 3,5 m2
A2 = 2,7 m x 0,9 m = 2,43 m2
A3 = 3 m x 0,9 m = 2,7 m2

A total = 3,5 + 2,43 + 2,7


= 8,63 m2

didapat tebal pelat tangga = 0,12 m


V = 8,63 m2 x 0,12 m
= 1,0356 m3
Uraian perhitungan

N x = 100 cm / 10 cm = 10 buah
N y = 80 cm / 10 cm = 8 buah
Panjang bukaan = 260 cm = 2,6 m
P total = 18 buah * 2,6 m = 46.8 m
konversi = 61,65*0,162*46.8 m = 73.86 kg
Untuk pondasi 20 buah = 20*73.86 kg
= 1477.2 kg
Kolom Pendek Pondasi Telapak
Tul. Pokok 4f12
konversi = 61,65*0,122*1,2 m * 4 = 4.26 kg
V = 20 buah * 4.26 kg = 85.2 kg
Tul. Sengkang f8-150
panjang = 1,2 m * 20 buah = 24 m
jumlah sengkang = 24 m / 0,15 m = 160 bh
panjang bukaan begel = 0,82 m
panjang total = 0,82 m * 160 bh = 131.2 m
konversi = 61,65*0,082*131.2 = 51.76 kg

Lantai 1
jumlah kolom = 20 buah
tinggi kolom = 3,6 m
Tul. Pokok 8f12
konversi = 61,65*0,122*3,6*8 = 25,6kg
V 20 kolom = 20 * 45,5 kg = 511 kg
Tul. Sengkang f8-150
panjang = 3,6 m * 20 = 72 m
jumlah sengkang = 72 m / 0,15 m = 480 bh
panjang bukaan begel = 1,2 m
panjang total = 480 * 1,2 m = 576 m
konversi = 61,65*0,082*576 = 227,26 kg

Lantai 2
jumlah kolom = 20 buah
tinggi kolom = 4 m
Tul. Pokok 8f12
konversi = 61,65*0,122*4*8 = 28,41 kg
V 20 kolom = 20 * 28,41 kg = 568,17 kg
Tul. Sengkang f8-150
panjang = 4 m * 20 = 80 m
jumlah sengkang = 80 m / 0,15 m = 533,33 bh
panjang bukaan begel = 1,2 m
panjang total = 533,33 * 1,2 m = 640 m
konversi = 61,65*0,082*640 = 252,52 kg

jumlah kolom = 7 buah


tinggi kolom = lantai 1 + lantai 2
= 3,6 m + 4 m
= 7.6 m
Tul. Pokok 4f12
konversi = 61,65*0,122*7,6*4 = 26.99 kg
V total = 7 bh * 26.99 kg =188.93 kg
Tul. Sengkang f6-200
panjang = 7,6 m *7 = 53,9 m
jumlah sengkang = 53,9 m / 0,20 m = 270 bh
panjang bukaan begel = 0,3 m
panjang total = 270 * 0,3 m = 81 m
konversi = 61,65*0,062*81 = 17,98 kg

Balok 1
panjang balok = 83 m
Tul. Pokok 7f12
konversi = 61,65*0,122*7 = 6.21 kg
V total = 83 m * 6.21 kg =515,43 kg
Tul. Sengkang f8-100
panjang = 83 m
jumlah sengkang = 83 m / 0,10 m = 830 bh
panjang bukaan begel = 1 m
panjang total = 830* 1 m = 830 m
konversi = 61,65*0,082*830 = 327.48 kg
Balok 2
panjang balok = 15,7 m
Tul. Pokok 7f12
konversi = 61,65*0,122*7 = 6.21 kg
V total = 15,7 m * 6.21 kg = 97,50 kg
Tul. Sengkang f8-150
panjang = 15,7 m
jumlah sengkang = 15,7 m / 0,15 m = 105 bh
panjang bukaan begel = 2,42 m
panjang total = 105* 2,42 m = 254,1 m
konversi = 61,65*0,082*254,1 = 100,26 kg

n = 10 m / 0,2 m = 50 bh
panjang = 3,5 m * 50 bh = 175 m
n = 3,5 m / 0,2 m = 18 bh
panjang = 10 m * 18 bh = 180 m
konversi = 61,65*0,12*355 m = 218,86 kg

n = 6,5 m / 0,2 m = 33 bh
panjang = 2,5 m * 33 bh = 82,5 m
n = 2,5 m / 0,2 m = 13 bh
panjang = 6,5 m * 13 bh = 84,5 m
konversi = 61,65*0,12*167 m = 102,96 kg

n = 10 m / 0,2 m = 50 bh
panjang = 3 m * 50 bh = 150 m
n = 3 m / 0,2 m = 15 bh
panjang = 10 m * 15 bh = 150 m
konversi = 61,65*0,12*300 m = 184,95 kg

n = 3 m / 0,2 m = 15 bh
panjang = 2,5 m * 15 bh = 37,5 m
n = 2,5 m / 0,2 m = 13 bh
panjang = 3 m * 13 bh = 39 m
konversi = 61,65*0,12* 76,5 m = 47,16 kg

jumlah anak tangga = 18 buah


Tulangan f8-200
panjang = 0,3 m * 5 bh * 18 bh = 27 m
konversi = 61,65*0,082*27 m = 10,65 kg

Tulangan f8-150
panjang = 1 m * 2 bh * 18 bh = 36 m
konversi = 61,65*0,082*36 m = 14,20 kg

Tulangan f12-200
panjang = 3,3 m
n = 1m / 0,2 m = 5 bh
konversi = 61,65*0,122*3,3 m = 2,93 kg
V total = 2 * 5 bh * 2,93 kg = 29,4 kg

Tulangan f8-150
n = 3,3 m / 0,15 m = 22 bh
panjang = 1 m * 22 bh = 22 m
konversi = 61,65*0,082*22 m = 8,68 kg
V total = 2 * 8,68 kg = 17,36 kg

an perhitungan

Panjang kuda-kuda = 10 m
Panjang total = 2,5 * 10 m
= 25 m

V = 0,08m*0,12m*25 m
= 0,24 m3

panjang = 55 m
V = 55 m * 0,08 m * 0,12 m
= 0,528 m3
Luas = 159,25 m2

untuk sudut < 45 koefisien 1,3


konversi = 1,3 * 159,25 m2
= 207 m2

an perhitungan

Panjang Kusen
` = 0,8 + (2,2 × 2) = 5,2 m'
Volume kusen pintu
` = 3 × (5,2 x 0,06 x 0,15) = 0,1404 m3

Panjang Kusen
` = 0,8 + (2,8 × 2) = 6,4 m'
Volume kusen pintu
` = 4 × (6,4 x 0,06 x 0,15) = 0,2304 m3
Panjang Kusen
` = 0,92 + (2 × 2) = 4,92 m3
Volume kusen pintu
` = 2 × (4,92 x 0,06 x 0,15) = 0,08856 m3

Panjang Kusen
` = (2× 1,52 ) + (1,46 × 2) = 5,96 m3
Volume kusen pintu
` = 9 × (5,96 x 0,06 x 0,15)= 0,48276 m3

Panjang Kusen
` = (2× 2,34 ) + (1,46 × 2) = 7,6 m3
Volume kusen pintu
` = 3 × (7,6 x 0,06 x 0,15) = 0,2052 m3
Panjang Kusen
` = (2× 0,82 ) + (1,46 × 2) = 4,56 m3
Volume kusen pintu
` = 1 × (4,56 x 0,06 x 0,15) = 0,04104 m3

Uraian perhitungan

Uraian perhitungan

didapat luas rangka plafond lantai 1


L1 = 3 x 10 = 30 m2
L2 = 4 x 10,5 = 42 m2
L3 = 3 x 11,75 = 35,25 m2
Lvoid = 3 x 3 = 9 m2
Ltotal = 30 + 42 + 35,25 - 9 = 98,25 m2

didapat luas rangka plafond lantai 2


L1 = 3 x 10 = 30 m2
L2 = 4 x 10,5 = 42 m2
L3 = 3 x 11,75 = 35,25 m2
Ltotal = 30 + 42 + 35,25 = 107,25 m2

Luas = Luas rangka plafond


= 205,5 m2

didapat keliling list plafond


K = 2(10m) +2(11m) + 2(2m) + 3m
= 49 m

Uraian perhitungan

Type P1 4 bh
Type P2 3 bh
Type PVC 2 bh

Tiap pintu 1 kunci

Type P1 4 bh
Type P2 3 bh
Type PVC 2 bh

Tiap daun jendela 2 engsel

Tiap jendela 1 grendel

Uraian perhitungan
Jumlah 1 buah

Jumlah 1 buah

1 buah tiap km/wc

2 buah tiap km/wc


1 buah di dapur
2 buah di taman dan teras

Jumlah 2 buah

Jumlah 2 buah

Uraian perhitungan

L = 8,25 + 27 + 42 + 12 + 2 + 12
= 103.25 m2

L = 8,25 + 27 + 42 + 12 + 2 + 12 - 9
= 94,25 m2
L=2m×2m
= 4 m2

V = 2 KM * 4 m2
= 8 m2

Luas dinding = 3,5 x 8,3


= 29 m2

Uraian perhitungan

6 titik

12 titik
20 titik

8 titik

8 titik

Uraian perhitungan

V = L plesteran - L ples. Luar


= 1239,06 - 619,53
= 619,53 m2

V = Luas Plesteran
= 1239,06 m2

panjang = 67,2 + 48,68 m + 30,8


= 146,68 m

2 type PJ1
3 type P1 dan 2 type P2

3 type J1
4 type J2
3 type J3
2 type J4
Quantity Satuan

204 m2

20 m2

189.75 m1

Quantity Satuan
92.5 m3

47.5 m3

19.884 m3
25.9 m3

14.224 m3

13.3 m3

10.725 m3
4.625 m3

0.644 m3

2.375 m3

19.75 m3
Quantity Satuan

21 m3

100.8 m3

32,56 m2
541,60 m2

65,12 m2

1083,2 m2

229,24 m
Total Satuan

0.644 m3

V1 =( (0,25*0,25)+(1*1)x 0,2 ) / 2
= 0,106 m3
V2 = 1m * 1m * 0,25 m = 0,25 m3
5.66 m3
V telapak = 0,106 m3 + 0,25 m3 = 0,356 m3
V kolom pondasi = 0,25 m*0,25 m*1,95 m
= 0,122 m3
V total = 18 * (0,356 + 0,122) = 8,6 m3

1 32
2 29,15
61,15
5.55 m3
2.368 m3

jumlah kolom = 21 buah


tinggi kolom = lantai 1 + lantai 2
= 8,85 m
A = 0,12 m * 0,12 m = 0,014 m2
V = 8,85 m * 0,014 m2
1.6605 m3
= 0,124 m3
V total = 5 * 0,124 m3
= 0,62 m3

4.736 m3

1.16 m3
2.025 m3

6.54 m3

11.79 m3

1,04 m3
Total Satuan

1614.17 kg

1558,95 kg
206,91 kg
1040,67 kg

553.93 kg
71.51 kg

Total Satuan

0,24 m3

0,53 m3
3

207 m2

Total Satuan

0.1404 m3

0.2304 m3
0.08856 m3

0.48276 m3

0.2052 m3
0.04104 m3

Total Satuan

9 bh

28 bh

Total Satuan

205.5 m2
205.5 m2

49 m1

Total Satuan

18 bh

9 bh

9 bh

24 bh

13 bh

Total Satuan
1 bh

1 bh

2 bh

5 titik

2 bh

2 bh

25.35 m

34.55 m

27 m

1 unit

Total Satuan

197,5 m2
8 m2

29 m2

2 unit

Total Satuan

6 titik

12 titik
20 titik

8 titik

8 titik

Total Satuan

619.53 m2

1239.06 m2

146.68 m

9 bh

12 bh
LAMPIRAN II KEPUTUSAN BUPATI MALANG
NOMOR : 108/524/KEP/421.013/2011
TANGGAL : 23 AGUSTUS 2011

BAHAN BANGUNAN
PERKIRAAN HARGA
TERTINGI
No JENIS BAHAN SATUAN
TAHUN 2012
(Rp.)
1 2 3 4
I BAHAN PENUTUP ATAP DAN PLAFON
1 Asbes datar tebal 4 mm (60x180) lbr 52.700,00
2 Asbes datar tebal 4 mm (120x240) lbr 61.000,00
3 Asbes datar tebal 5 mm (60x180) lbr 49.500,00
4 Asbes datar tebal 6 mm (40x180) lbr 46.300,00
5 Asbes gelombang besar tebal 5 mm (2.50x0.92m) lbr 90.200,00
6 Asbes gelombang besar tebal 5 mm (3.05x1.05m) lbr 91.350,00
7 Asbes gelombang kecil tebal 5 mm (2.25x0.92m) lbr 72.100,00
8 Asbes gelombang kecil tebal 5 mm (2.00x0.92m) lbr 65.650,00
9 Asbes gelombang kecil tebal 5 mm (1.80x0.92m) lbr 65.650,00
10 Asbes gelombang kecil 4 mm (3.05x1.05m) lbr 83.300,00
11 Asbes gelombang kecil 4 mm (2.70x1.05m) lbr 17.800,00
12 Asbes gelombang kecil 4 mm (2.40x1.05) lbr 62.450,00
13 Asbes gelombang kecil 4 mm (2.10x1.05m) lbr 62.450,00
14 Asbes gelombang kecil 4 mm 1.50x1.05m) lbr 39.750,00
15 Asbes wuwung gelombang besar tb. 5mm lbr 56.175,00
16 Asbes wuwung gelombang kecil tb. 4mm lbr 41.200,00
17 Plat asbes tebal 3.5 mm lbr 52.650,00
18 Plat asbes tebal 4 mm lbr 59.150,00
19 Plat asbes tebal 5 mm lbr 55.850,00
20 Plat asbes tebal 6 mm lbr 78.550,00
21 Genteng karang pilang/ wisma bj 6.900,00
22 Genteng wuwung karang pilang/ wisma bj 6.900,00
23 Genteng wuwung galvalum bj 5.500,00
24 Genteng model karang pilang nglayur bj 1.785,00
25 Genteng kodok ex. Bambe bj 5.200,00
26 Genteng kodok ex. Wisma bj 5.200,00
27 Genteng Palentong bj 4.100,00
28 Genteng Palentong Super bh 8.775,00
29 Genteng Nok Palentong bj 7.100,00
30 Genteng Nok Kodok Glazzur bh 10.185,00
31 Genteng bubung kodok bj 5.200,00
32 Genteng beton bj 2.900,00
33 Genteng sirap lbr 121.200,00
34 Nok genteng pinggir bj 4.000,00
35 Nok stel gelombang bj 31.500,00
36 Genteng kodok bj 525.000,00
37 Seng gelombang BKLS 30 ukuran 1.8x0.9 lbr 81.200,00
38 Seng gelombang BJLS 30 ( 0.8x3.00) lbr 130.000,00
39 Seng gelombang BJLS 30 ( 0.8x1.50) lbr 79.600,00
40 Seng plat dasar BJLS 30 (0.45x1.00) lbr 24.400,00
41 Seng plat dasar BJLS 30 (0.60x1.00) lbr 32.445,00
42 Seng plat dasar BJLS 30 (0.90x1.00) lbr 48.750,00
43 Seng plat 3'x6' Bjls 28 lbr 44.950,00
44 Gypsum Board 120x24x9mm lbr 232.900,00
45 Kalsi Board 120x240x4mm lbr 52.550,00
46 Teakwood tebal 4 mm(1.22x2.44) lbr 102.700,00
47 Teakwood tebal 4 mm(1.10x2.10) lbr 67.650,00
48 Plywood tebal 4 mm(1.22x2.44) lbr 85.000,00
49 Plywood tebal 9 mm(1.22x2.44) lbr 152.900,00
50 Plywood tebal 6 mm(0.40x0.80) lbr 89.250,00
51 Triplek tebal 4 mm (1.20x2.40) lbr 69.650,00
52 Triplek tebal 4 mm (0.90x2.00) lbr 49.665,00
53 Triplek tebal 4 mm (1.22x2.44)) lbr 65.600,00
54 Triplek tebal 4 mm (1.10x2.10) lbr 38.500,00
55 Multipleks 12 mm lbr 199.700,00
56 Sirab asbes 4 mm m² 31.500,00
57 Sirab asbes 5 mm m² 34.350,00
58 Tepung gypsum kg 45.900,00
59 Geotextil m² 30.300,00

II BAHAN MENGGUNAKAN KAYU


60 Dolken kayu Ф 8- 10/400 cm btg 53.650,00
61 Kayu jati m³ 28.990.500,00
62 Kayu jati balok 8/12, 6/12 m³ 28.990.500,00
63 Kayu jati usuk 5/7, 4/6, 3/5 m³ 28.990.500,00
64 Kayu jati papan 2/20 x 2 m m³ 32.212.500,00
65 Kayu jati reng 2/3, 3/5 m³ 8.589.900,00
66 Kayu kamper m³ 8.232.400,00
67 Kayu kamper (balok) m³ 7.620.600,00
68 Kayu kamper (papan) m³ 8.852.700,00
69 Kayu kamper (usuk) m³ 7.620.600,00
70 Kayu kamper (reng) m³ 7.666.700,00
71 Kayu meranti m³ 6.939.400,00
72 Kayu meranti ( balok) m³ 4.745.000,00
73 Kayu meranti (papan) m³ 4.874.700,00
74 Kayu meranti (usuk) m³ 4.259.800,00
75 Kayu meranti (bagasting) m³ 3.307.500,00
76 Kayu kruing (balok) m³ 6.100.300,00
77 Kayu kruing (papan) m³ 6.767.500,00
78 Kayu kruing (usuk) m³ 5.367.600,00
79 Kayu bengkirai balok m³ 6.219.000,00
80 Kayu bengkirai Papan m³ 6.889.800,00
81 Kayu bengkirai usuk m³ 6.609.800,00
82 Kayu 5/7 m³ 5.428.500,00
83 Kayu acuan m³ 193.600,00
84 Kayu dolken 8/10 cm 400cm btg 67.200,00
85 Kayu Balau m³ 7.500.000,00
86 List Gypsum m 10,350.00
86 List kayu 2/4 m³ 7.150,00
87 List kayu profil m³ 27.000,00
88 Perancah kayu m³ 3.135.000,00
89 Kayu terentang m³ 3.570.000,00
90 Ijuk kg 10.000,00
91 Bambu Ф 6-10/600 cm btg 31.300,00
92 Bambu bongkotan 10-12 cm pj. 3,00 mt btg 31.300,00
93 Bambu ori 10-12 cm pj. 3.00 mt btg 40.350,00
94 Gedek guling m² 31.300,00
95 Dinding/gedek halus lbr 129.000,00
96 Dinding/gedek kasar lbr 96.800,00
97 Bambu wulung btg 16.400,00
98 Bambu petung btg 45.200,00
99 Bambu tali / apus btg 19.300,00
100 Minyak begesting ltr 2500.00
100 Tusuk bambu bh 24.100,00
101 Kayu / papan bagasting m³ 2.557.500,00

III BAHAN MENGGUNAKAN BATU/PASIR DAN SEMEN


102 Bataco tebal 10 cm bh 3.650,00
103 Batu bata merah bh 500,00
104 Batu bata merah kelas I bh 525,00
105 Batu bata merah kelas II bh 450,00
106 Batu kali pecah 15/20 m³ 167.800,00
107 Batui kali pecah (pecah mesin) 5/7 m³ 201.600,00
108 Batu pecah 5/7 m³ 199.800,00
109 Batu pecah 2/3 m³ 218.500,00
110 Batu pecah 1/2 m³ 222.400,00
111 Batu kali pecah 3/5 m³ 207.400,00
112 Batu kali m³ 159.800,00
113 Batu gunung pecah 15/20 m³ 175.350,00
114 Batu ampyang kg 10.500,00
115 Batu belah 15/20 cm Gunung m³ 159.500,00
116 Batu belah / Kerakal m³ 159.800,00
117 Batu belah kecil m³ 217.400,00
118 Batu bobos uk. 10x20x1.5 cm bj 7.100,00
119 Batu gilang (kasar acak) m² 43.800,00
120 Batu gilang (kasar bermodul) m² 61.425,00
121 Batu gilang jember (halus) m² 87.675,00
122 Batu /cor koral pecah (Pecah Mesin) 2/3 m³ 262.400,00
123 Batu /cor koral pecah (Pecah Mesin) 1/1 m³ 251.200,00
124 Batu /cor koral pecah (Pecah Mesin) 1/2 m³ 251.200,00
125 Batu /cor koral pecah (Pecah Mesin) 5/7 m³ 182.700,00
126 Batu /cor koral pecah (Pecah Mesin) 0,5/1 m³ 235.200,00
127 Batu /cor koral pecah (Pecah Mesin) 3/5-4/6 m³ 191.700,00
128 Agregat Pecah Mesin 0-5mm m³ 184.700,00
129 Agregat Pecah Mesin 5-10 & 10-20 mm m³ 184.700,00
130 Agregat Pecah Mesin 20-30 mm m³ 184.700,00
131 Bahan Agr.Base Kelas A m³ 208.500,00
132 Bahan Agr.Base Kelas B m³ 188.400,00
133 Bahan Agr.Base Kelas C m³ 171.600,00
134 Batu krikil beton m³ 117.950,00
135 Kreikil m³ 140.700,00
136 Agregat Kasar m³ 184.700,00
137 Agregat Halus m³ 184.700,00
138 F i l l e r m³ 1.200,00
139 G r a v e l m³ 113.300,00
140 Pasir cor/beton m³ 137.350,00
141 Pasir pasang m³ 134.800,00
142 Pasir urug m³ 104.800,00
143 S I r t u m³ 113.300,00
144 Pasir silika kg 1.800,00
145 Pasir pasang (Sedang) m³ 153.400,00
146 Pasir beton (kasar) m³ 159.800,00
147 Pasir halus (untuk HRS) m³ 126.500,00
148 Pasir Urug (ada unsur lempung) m³ 127.800,00
149 Klingker bj 42.000,00
150 Glass bead bj 57.900,00
151 Glass block bj 33.200,00
152 Semen berwarna yiyitan kg 20.250,00
153 Semen PC (Portland Cement) / Semen Gresik 50 kg kg 15.150,00
154 Semen / PC (40 kg) zak 63.200,00
155 Semen PC / 50 kg zak 68.700,00
156 Semen / PC (kg) kg 1.200,00
157 Semen Tiga Roda ( 50 kg ) kg 61.800,00
158 Semen Putih kg 1.750,00
159 Semen merah m³ 98.700,00
160 Kapur pasang (10 kg) zak 8.350,00
161 Kapur gamping ton 930.510,00
162 Kapur m³ 1.100.000,00
163 Chipping m³ 184.700,00
164 Chipping (kg) kg 100,00
165 Tanah Urug m³ 83.700,00
166 Tanah sirtu m³ 129.600,00
167 Tanah katel m³ 84.100,00
168 Bahan tanah timbunan m³ 13.800,00
169 Bahan pilihan m³ 31.400,00
170 Semen nat kg 12.150,00

IV BAHAN MENGGUNAKAN BESI / LOGAM


171 Besi begel/ baut kg 24.500,00
172 Besi polos kg 9.900,00
173 Beton K-125 m³ 666.200,00
174 Beton K-175 m³ 685.400,00
175 Beton K-250 m³ 1.023.000,00
176 Beton K-300 m³ 986.100,00
177 Beton K- 350 m³ 998.600,00
178 Beton K-400 m³ 1.014.000,00
179 Beton K-500 m³ 1.132.400,00
180 Besi Beton (polos/ ulir) kg 20.400,00
181 Besi Beton diameter 16 mm, 12 mm ljr 249.400,00
182 Besi Beton diameter 14 mm, 12 mm ljr 154.700,00
183 Besi Beton diameter 12 mm, 12 mm ljr 126.950,00
184 Besi Beton diameter 10 mm, 12 mm ljr 83.600,00
185 Besi Beton diameter 8 mm, 12 mm ljr 62.300,00
186 Besi Beton diameter 6 mm, 12 mm ljr 38.650,00
187 Besi Beton diameter 5 mm, 12 mm ljr 20.800,00
188 Keni bh 3.600,00
189 Besi pipa galvanis medium 1 1/2, 6 m ljr 327.600,00
190 Besi pipa galvanis medium 1 1/4, 6 m ljr 271.350,00
191 Besi pipa galvanis medium 1, 6 m ljr 192.800,00
192 Besi pipa galvanis medium 1/2, 6 m ljr 230.300,00
193 Besi pipa galvanis medium 3/4, 6 m ljr 233.950,00
194 Besi pipa galvanis medium 2 1/2, 6 m ljr 674.000,00
195 Besi pipa galvanis medium 2, 6 m ljr 674.000,00
196 Besi pipa galvanis medium 3, 6 m ljr 1.085.800,00
197 Besi pipa galvanis medium 4, 6 m ljr 1.452.150,00
198 Besi pipa galvanis medium 5, 6 m ljr 1.699.950,00
199 Besi pipa galvanis medium 6, 6 m ljr 2.246.000,00
200 Besi pipa galvanis medium 3/4, 6 m ljr 205.900,00
201 Pipa Galvanis Dia 3" m 121.000,00
202 Pipa Galvanis Dia 1,5" m 60.500,00
203 Besi angkur kg 20.200,00
204 Besi Kanal kg 29.400,00
205 Besi Balok kg 36.800,00
206 Besi Bulat st 42 kg 14.500,00
207 Besi Bulat st 60 kg 14.500,00
208 Besi Trekstang 10 mm ljr 100.500,00
209 Plat Plendes 10 mm m² 1.497.800,00
210 Plat Rambu (Eng. Grade) BH 193.600,00
211 Plat Rambu (High I. Grade) BH 238.200,00
212 Rel Pengaman M' 453.800,00
213 Jarum Kerasn 14 mm bj 23.650,00
214 Besi plat 4 x 8 tebal 2 mm lbr 866.500,00
215 Besi plat alumunium tb.2 mm m² 44.950,00
216 Besi plat bordes 4" x 8" tebal 3mm kg 15.900,00
217 Besi Strip kg 14.700,00
218 Besi plat bordes 4" x 8" tebal 3mm kg 15.000,00
219 Besi profil WF<=200 mm (256 kg/ljr) ljr 5.171.300,00
220 Besi Siku kg 17.600,00
221 Besi Siku L. 70. 70. 7 ljr 710.150,00
222 Besi Siku L. 40. 40. 4 ljr 167.300,00
223 Canal C (150. 5) kg 43.400,00
224 Besi profil WF<=200 mm s/d 400 mm kg 11.900,00
225 Besi profil WF<=200 mm s/d 500 mm kg 13.200,00
226 Besi siku L 60.60.6 kg 10.800,00
227 Besi siku L 30.30.3 kg 11.100,00
228 Besi cor kg 12.500,00
229 Baja cor kg 18.000,00
230 Besi INP kg 35.000,00
231 Kawat ikat beton kg 23.650,00
232 Kawat Bronjong kg 14.900,00
233 Kawat Bronjong d 4 mm kg 16.500,00
234 Kawat Bronjong d 3 mm kg 16.500,00
235 Bronjong Kawat pabrikasi d 3 mm bh 275.000,00
236 Kawat bendrat kg 21.810,00
237 Kawat biasa galvanis kg
238 Kawat nyamuk kasa alumunium m² 32.800,00
239 Kawat duri pagar m' 5.900,00
240 Kawatnyamu kasa plastik m² 14.600,00
241 elektroda stainless kg 122.600,00
242 elektroda baja kg 29.610,00
243 Tiang pagar BRC/PMG 2" tinggi 1.50 mt bt 173.600,00
244 Pintu dorong BRC/PMG uk. 1.2 x 3.00 m² unit 2.066.400,00
245 Pintu Swing ganda BRC/PMG uk. 1.2 x 3.00 m² unit 1.798.000,00
246 Pagar BRC/PMG A ( uk. 1.2 x 2.4 mt) unit 517.860,00
247 Baja Tulangan (Polos) U24 kg 11.600,00
248 Baja Tulangan (Ulir) D32 kg 12.700,00
249 Baja Tulangan (Polos) U32 kg 12.100,00
250 Baja Tulangan (Uir) D39 kg 12.700,00
251 Baja Tulangan (Ulir) D48 kg 13.200,00
252 Cerucuk m 16.500,00
253 Joint Sealent kg 37.500,00
254 Arbocell kg 35.200,00
255 Baja Bergelombang kg 13.800,00
256 Baja Struktur kg 12.700,00
257 Tiang Pancang Baja M' 27.800,00
258 Kawat Las Dos 17.600,00
259 Pipa Baja kg 16.500,00
260 Baja Prategang kg 11.000,00
261 Pipa Baja (SCH) 1" medium ljr 206.000,00
262 Pipa Baja (SCH) 2" medium ljr 473.650,00
263 Pipa Baja (SCH) 3" medium ljr 1.029.650,00
264 Pipa Baja (SCH) 4" medium ljr 2.011.500,00
265 Pipa Baja (SCH) 5" medium ljr 2.583.700,00
266 Pipa Baja (SCH) 6" medium ljr 3.276.500,00
267 Pipa Besi putih 1.2" medium ljr 121.700,00
268 Pipa stainlesteel ljr 382.950,00
269 Pipa Besi hollow 2.5 m ljr 161.700,00
270 Besi galvalum ljr 238.150,00
271 Kawat Seng Polos kg 26.250,00
272 Kawat Loket m² 20.800,00
273 Kawat Burung m² 15.100,00
274 Pagar besi komplit dengan mainan m² 748.800,00
275 Pintu pagar besi komplit dengan mainan m² 805.035,00
276 Kawat harmonika m 46.725,00
277 Kawat las listrik kg 29.800,00
278 Kawat Ф 4 mm kg 20.100,00
279 Jendela nako (termasuk kaca dan besi) bh 35.600,00
280 Kusen almunium tebal 4 mm m' 120.700,00
281 Kusen dan pintu PVC unit 487.300,00
282 Mata kucing bh 82.500,00
283 Anchorage bh 660.000,00
284 Bahan modifikasi kg 1.100,00
285 Mur baut 1/2", 5/8", 7/8" kg 36.800,00
286 Rolling door alluminium m² 1.123.300,00
287 Kawat duri m' 5.900,00
288 Kunci lemari bh 10.400,00

V BAHAN MENGGUNAKAN LANTAI


289 Paving stone persegi abu-abu tebal 6 cm halus bh 1.700,00
290 Paving stone persegi abu-abu tebal 6 cm kasar bh 1.700,00
291 Paving stone 3 berlian abu-abu tb. 6 cm bh 1.450,00
292 Paving stone segi 6 abu-abu tb. 6 cm bh 1.575,00
293 Paving stone persegi merah abu-abu tb. 6 cm bh 1.800,00
294 Paving stone 3 berlian merah abu-abu tb. 6 cm bh 1.600,00
295 Paving stone segi 6 merah abu-abu tb. 6 cm bh 1.750,00
296 Paving stone persegi abu-abu tebal 8 cm halus bh 1.850,00
297 Paving stone persegi abu-abu tebal 8 cm kasar bh 1.800,00
298 Paving stone 3 berlian abu-abu tb. 8 cm bh 1.800,00
299 Paving stone segi 6 abu-abu tb. 8 cm bh 1.850,00
300 Paving stone persegi merah tb. 8cm bh 2.050,00
301 Paving stone 3 berlian merah tb. 8 cm bh 1.800,00
302 Paving stone segi 6 merah tb. 8 cm bh 1.850,00
303 Paving stone persegi abu abu tebal 10 cm halus bh 1.950,00
304 Paving stone persegi abu abu tebal 10 cm kasar bh 1.850,00
305 Paving stone 3 berlian abu-abu tb. 10 cm bh 1.600,00
306 Paving block bh 44.000,00
307 Tegel PC abu-abu 20 x 20 cm bh 1.300,00
308 Tegel PC abu-abu 20 x 30 cm bh 2.200,00
309 Tegel PC abu-abu 30 x 30 cm bh 3.000,00
310 Tegel PC abu-abu 40 x 40 cm bh 4.050,00
311 Ubin warna 20 x 20 cm bh 3.950,00
312 Ubin warna 30 x 30 cm bh 4.300,00
313 Ubin warna 40 x 40 cm bh 4.450,00
314 Tegel keramik 10 x 20 cm bh 1.150,00
315 Tegel keramik 15 x 15 cm bh 1.400,00
316 Tegel keramik 15 x 20 cm bh 1.550,00
317 Tegel keramik 20 x 20 cm bh 2.100,00
318 Tegel keramik 25 x 25 cm bh 6.050,00
319 Tegel keramik 30 x 30 cm bh 4.550,00
320 Tegel keramik 30 x 30 cm (mozaik) bh 6.950,00
321 Tegel keramik 40 x 40 cm bh 16.700,00
322 Tegel trotoar bh 1.800,00
323 Tegel list dinding bh 21.950,00
324 Tegel keramik 20 x 25 (dinding) bh 4.050,00
325 Tegel wafel 20 x 20 bh 1.600,00
326 Keramik Artistik (5x20) cm bh 17.115,00
327 Plint ubin PC warna (10x30) cm bh 1.750,00
328 Plint ubin PC warna (10x40) cm bh 1.950,00
329 Tegel keramik dinding (20x25) cm bh 4.050,00
330 Hollowblock (HB.20) bh 7.250,00
331 Hollowblock (HB.15) bh 5.750,00
332 Hollowblock (HB.10) bh 4.200,00
333 Batu lempeng jember acak m² 72.050,00
334 Batu palimanan tebal 2 cm m² 132.550,00
335 Batu sisir m² 195.300,00
336 Mini Timber Pile bh 29.700,00
337 Mosaik (30x30) cm bh 6.900,00
338 Batu paras m² 102.200,00
339 Gebalan Rumput m² 16.500,00
340 Kerb Type A bh 49.500,00

VI BAHAN UNTUK PENGECATAN


341 Cat dasar kg 30.000,00
342 Cat besi kg 71.500,00
343 Cat besi Emco kg 53.200,00
344 Cat kayu kg 56.500,00
345 Cat kayu Emco kg 53.200,00
346 Cat meni kg 23.400,00
347 Cat meni (besi/kayu) cap Pedang kg 23.300,00
348 Meni A kg 19.400,00
349 Meni B kg 10.350,00
350 Cat tembok kg 38.400,00
351 Cat tembok Vinilek, Aviapaint (sejenis) kg 34.250,00
352 Cat tembok (mowilex) kg 74.150,00
353 Cat Marka (Non Thermoplas) kg 24.800,00
354 Cat Marka (Thermoplastic) kg 30.300,00
355 Additive liter 42.400,00
356 Cerlak kg 109.300,00
357 Politur liter 59.250,00
358 Vernis liter 31.200,00
359 Dempul kg 18.700,00
360 Minyak cat/ afduner liter 4.750,00
361 Teer kg 7.850,00
362 Plamir kg 6.680,00
363 Bronze kg 75.000,00
364 Bahan pengawet kreosot liter 5.500,00
365 Anti stripping agent liter 26.400,00
366 Kertas gosok/ Ampelas lbr 3.875,00
367 Plamur tembok kg 35.100,00
368 Plamur kayu kg 20.300,00
369 Plamur besi kg 35.500,00
370 Spiritus ltr 11.700,00
371 Lem kayu kg 12.500,00
372 Cat anti karat kg 39.300,00
373 Expansion Cap m² 6.700,00
374 Polytene 125 mikron m² 21.200,00
375 Curing Compound kg 42.400,00
376 Thinner A / minyak cat liter 8.700,00
377 Thinner B / minyak cat liter 7.500,00
378 Thinner liter 13.200,00
379 Casing liter 9.900,00
380 Glass Bead m² 31.500,00
381 Soda api kg 21.950,00
382 Sabun kg 11,000.00
383 Kuas 2-4' bh 14.175,00
384 Karung Plastik bh 3.000,00
385 Pillow Block bh 17.500,00
386 Spei bh 17.500,00

VII BAHAN PENGGANTUNG DAN PENGUNCI


387 Engsel H stl 22.700,00
388 Engsel Kuningan arch asli stl 76.125,00
389 Engsel jendela bh 11.800,00
390 Engsel jendela arch bh 16.600,00
391 Engsel pintu bh 15.450,00
392 Espanyolet stl 15.700,00
393 Grendel bj 14.500,00
394 Grendel biasa (besar) bh 6.350,00
395 Grendel biasa (kecil) bh 4.500,00
396 Grendel kuningan/crom (kecil) bh 4.500,00
397 Grendel tanam bh 54.400,00
398 Nipple bh 14.700,00
399 Splite pen bh 47.500,00
400 Gembok besar bh 106.400,00
401 Rantai kg 18.000,00
402 Drucklager besar bh 320.000,00
403 Drucklager kecil bh 245.000,00
404 Seal bh 44.200,00
405 Naf + ring besar bh 550.000,00
406 Naf + ring kecil bh 450.000,00
407 Roda Gigi M 10 bh 2.500.000,00
408 Besi Roda Gigi Pawi kg 7.500,00
409 Angker Bolt bh 45.000,00
410 Fleud kg 7.500,00
411 Pengait bh 50.000,00
412 Kunci Gembok besar bh 49.900,00
413 Kunci Gembok sedang bh 30.900,00
414 Kunci tanam antik bh 263.150,00
415 Kunci tanam (808) bj 10.850,00
416 Kunci tanam besar kuda terbang 2 x putar bj 92.500,00
417 Kunci tanam kamar mandi bh 67.100,00
418 Kunci silinder bh 67.100,00
419 Spring knip bh 38.000,00
420 Kunci selot bh 124.950,00
421 Kunci lemari bh 27.200,00
422 Hak angin bj 28.600,00
423 Hak Angin (sikutan) stl 14.500,00
424 Hak angin lurus (bisa distel maju/mundur) stl 95.250,00
425 Kait angin bh 22.700,00
426 Dor closer bh 337.400,00
427 Dor stop bh 27.200,00
428 Rel pintu dorong bh 346.500,00

VIII BAHAN UNTUK KM / WC / URINOIR


429 Pipa / slang spiral saluran kran set 45.400,00
430 Closet duduk putih porselin komplit bh 1.237.800,00
431 Closet jongkok porselin warna putih bh 136.100,00
432 Closet jongkok teraso bh 63.500,00
433 Bak cuci stainless steel bh 784.100,00
434 Wastafel bh 508.100,00
435 Kran air bh 63.500,00
436 Watermur bh 22.700,00
437 Rol TBA rol 4.150,00
438 Sifon Wasser set 109.300,00
439 Water drain + Assesories set 22.700,00
440 Urinoir bh 1.650.000,00
441 Floor drain bh 22.500,00
Tempat Sabun bh 27,500.00
442 Bak fibreglass bh 598.950,00

IX BAHAN JENIS KACA


443 Kaca polos tb. 3 mm m² 58.800,00
444 Kaca polos tb. 5 mm m² 111.100,00
445 Kaca polos tb. 8 mm m² 147.100,00
446 Kaca rayban tb. 5 mm m² 138.950,00
447 Krepyak kaca nako + kerangka lbr 30.975,00
448 Pemantul cahaya (reflector) bh 13.900,00
449 Kaca buram m² 117.000,00
450 Kaca cermin 5 mm m² 135.800,00

X BAHAN BETON CETAKAN


451 Bahan roster klingker warna merah bh 7.875,00
452 Buis beton diameter 15 cm bh 26.050,00
453 Buis beton diameter 20 cm bh 29.700,00
454 Buis beton diameter 30 cm bh 41.800,00
455 Buis beton diameter 40 cm bh 53.900,00
456 Buis beton diameter 50 cm bh 69.100,00
457 Buis beton U 20 cm bh 28.900,00
458 Buis beton U 30 cm bh 39.800,00
459 Buis beton U 40 cm bh 51.975,00
460 Buis beton U 50 cm bh 65.800,00
461 Buis beton U 60 cm bh 103.100,00
462 Buis beton U 80 cm bh 132.600,00
463 Tandon air feber Glas kapasitas 100L bh 599.700,00
464 Tandon air feber Glas kapasitas 200L bh 780.900,00
465 Roster/krawang 12 x 11 x 24 cm bh 5.900,00

XI BAHAN PLASTIK PIPA PVC


467 Keni PVC 1/2" bh 3.990,00
469 Keni PVC 3/4" bh 4.725,00
471 Keni PVC 2" bh 15.450,00
473 Keni PVC 3" bh 16.170,00
475 Keni PVC 4" bh 16.400,00
477 Keni PVC 5" bh 30.450,00
479 Klem PVC bh 4.700,00
481 Pipa air / 1/2" ljr 43.000,00
483 Pipa air / 3/4" ljr 55.300,00
485 Pipa air / 1" ljr 67.600,00
487 Pipa air / 2" ljr 67.600,00
489 Pipa paralon 5/8" panjang 4.00 mt (Maspion) ljr 7.140,00
491 Pipa PVC 1/2" panjang 4.00 mt (Maspion) ljr 27.650,00
493 Pipa PVC 2" panjang 4.00 mt (Maspion) ljr 115.850,00
495 Pipa PVC 3" panjang 4.00 mt (Maspion) ljr 161.300,00
497 Pipa PVC 3/4" panjang 4.00 mt (Maspion) ljr 63.350,00
499 Pipa PVC 4" panjang 4.00 mt (Maspion) ljr 308.900,00
501 Pipa PVC 5" panjang 4.00 mt (Maspion) ljr 486.400,00
503 Pipa PVC 6" panjang 4.00 mt (Maspion) M' 258.200,00
505 Pipa PVC 3/4" type AW panjang 6.00 mt ljr 42.300,00
507 Pipa PVC 1/2" type AW panjang 6.00 mt ljr 32.550,00
509 Pipa PVC 1" type AW panjang 6.00 mt ljr 52.000,00
511 Pipa PVC 1½" type AW panjang 6.00 mt ljr 93.950,00
513 Pipa PVC 2" type AW panjang 6.00 mt ljr 136.000,00
515 Pipa PVC 2½" type AW panjang 6.00 mt ljr 327.600,00
517 Pipa PVC 3" type AW panjang 6.00 mt ljr 225.500,00
519 Pipa PVC 4" type AW panjang 6.00 mt ljr 317.900,00
521 Pipa PVC 5" type AW panjang 6.00 mt ljr 508.450,00
523 Plastik Filter m² 16.500,00
525 Pipa Galvanis Dia. 1.6" batang 176.000,00
526 Pipa Porus M' 44.000,00
Perlengkapan unit 28900.00

XII BAHAN JENIS PAKU


527 Paku kg 13.200,00
528 Paku asbes kg 27.950,00
529 Paku reng kg 28.800,00
530 Paku triplek kg 29.950,00
531 Paku usuk kg 28.800,00
532 Paku pancing kg 900,00
533 Paku baja kg 51.500,00
534 Paku keling 3/4", 5/8", 7/8" kg 23.000,00
535 Paku sekrup 3,5" kg 26.985,00
536 Paku sekrup 2" kg 28.875,00
537 Paku seng payung kg 26.400,00
538 Paku sumbat bj 580,00
539 Sekerup bj 450,00

XIII BAHAN PERALATAN LISTRIK


540 Capasito Sx 135 W 20 MF/250 V bh 100.700,00
541 Capasito Sx 90 W 10 MF/250 V bh 48.100,00
542 Fiting Flapon bh 22.300,00
543 T Doos PVC bh 4.700,00
544 Isolator bj 1.150,00
545 Stop kontak (Broco) bh 40.950,00
546 Skakelar (Broco) bh 51.700,00
547 Skakelar / hendel bh 36.650,00
548 Zekering lengkap bh 57.450,00
549 Zekering SPA 60 Amp. bh 118.020,00
550 Las Doof bj 450,00
551 Panel box bh 258.950,00
552 Main Swith bj 204.350,00
553 Sekering MCB thermix 10-16 Amp. bj 21.525,00
554 Sekering MCB thermix 10 Amp. bj 21.525,00
555 Stater lampu TL bj 6.500,00
556 Lampu pijar 25,40,75 / 220 V bh 6.500,00
557 Lampu TL 20 W / 220 V komplit balas, kaca (Philips) bh 71.850,00
558 Lampu TL 40 W / 220 V komplit balas, kaca (philips) bh 86.350,00
559 Kabel NYA 500 V 1 x 2.5 mm2 m' 3.600,00
560 Kabel NYA 1000 V 1 x 1.5 mm2 m' 2.200,00
561 Kabel NYA 1000 V 1 x 2.5 mm3 m' 4.850,00
562 Kabel NYA 1000 V 1 x 21.5 mm4 m' 5.400,00
563 Kabel NYFGBY 4 x 25 mm m' 194.400,00
564 Kabel NYFGBY 4 x 35 mm m' 245.500,00
565 Kabel NYFGBY 4 x 50 mm m' 308.500,00
566 Kabel NYFGBY 4 x 70 mm m' 401.000,00
567 Kabel NYM 500 V 2 x 1.5 mm m' 15.750,00
568 Kabel NYM 500 V 2 x 2.5 mm m' 16.400,00
569 Kabel NYM 500 V 2 x 4 mm m' 19.550,00
570 Kabel NYY 2 x 2.5 mm m' 26.800,00
571 Kabel NYY 3 x 2.5 mm m' 29.300,00
572 Kabel NYY 4 x 10 mm m' 65.950,00
573 Kabel NYY 4 x 16 mm m' 143.450,00
574 Kabel NYY 4 x 4 mm m' 41.895,00
XIV BAHAN BBM
575 Bensin liter 7.500,00
576 B e n s I n (Industri) liter 9.200,00
577 B e n s I n (Non Industri) liter 5.000,00
578 Solar liter 8.200,00
579 S o l a r (Industri) liter 10.100,00
580 S o l a r (Non Industri) liter 5.000,00
581 Minyak Tanah liter 10.100,00
582 Minyak Pelumas / Olie liter 33.000,00
583 Minyak Fluks liter 6.900,00
584 Aspal liter 8.700,00
585 Aspal AC (AC 60-70) curah kg 11.250,00
586 Aspal Emulsi kg 14.000,00
587 Asbuton Halus ton 357.500,00
588 Butonic Aspal (Apal beton) ton 5.345.050,00
PATI MALANG
P/421.013/2011
3 AGUSTUS 2011

0.1
RESIKO DAN 0.004
Laba 10 % (Rp) OVERHEAD 0,4% TOTAL (Rp) Pembulatan (Rp)
(Rp)

#VALUE! #VALUE! #VALUE!


#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! 5700.00
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! 5700.00
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! 87900.00
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! 257100.00
#VALUE! #VALUE! #VALUE! 58000.00
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! 168800.00
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! 42500.00
#VALUE! #VALUE! #VALUE! 220500.00
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!

#VALUE! #VALUE! #VALUE! 59200.00


#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! 32005500.00
#VALUE! #VALUE! #VALUE! 32005500.00
#VALUE! #VALUE! #VALUE! 35562600.00
#VALUE! #VALUE! #VALUE! 9483200.00
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! 9773400.00
#VALUE! #VALUE! #VALUE! 8413100.00
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! 7661100.00
#VALUE! #VALUE! #VALUE! 5238500.00
#VALUE! #VALUE! #VALUE! 5381700.00
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! 3651500.00
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
1035.00 41.40 11426.40 11400.00
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! 29800.00
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
250.00 10.00 2760.00 2800.00
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! 2823500.00

#VALUE! #VALUE! #VALUE!


#VALUE! #VALUE! #VALUE! 600.00
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! 185200.00
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! 176400.00
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! 289700.00
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! 201700.00
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! 151600.00
#VALUE! #VALUE! #VALUE! 148800.00
#VALUE! #VALUE! #VALUE! 115700.00
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! 141100.00
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! 22300.00
#VALUE! #VALUE! #VALUE! 16700.00
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! 1300.00
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! 92400.00
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!

#VALUE! #VALUE! #VALUE!


#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! 22500.00
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! 16200.00
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! 26100.00
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
0.00 0.00 0.00
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! 1240100.00
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!

#VALUE! #VALUE! #VALUE!


#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! 1300.00
#VALUE! #VALUE! #VALUE! 1500.00
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! 2300.00
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! 5000.00
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! 4500.00
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! 8000.00
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!

#VALUE! #VALUE! #VALUE! 33100.00


#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! 25800.00
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! 42400.00
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! 65400.00
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! 7400.00
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! 4300.00
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! 13800.00
#VALUE! #VALUE! #VALUE! 43400.00
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
1100.00 44.00 12144.00
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!

#VALUE! #VALUE! #VALUE!


#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! 13000.00
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! 17000.00
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! 7000.00
#VALUE! #VALUE! #VALUE! 5000.00
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! 12000.00
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! 74100.00
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! 382500.00

#VALUE! #VALUE! #VALUE!


#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! 150200.00
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! 561000.00
#VALUE! #VALUE! #VALUE! 70100.00
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
2750.00 110.00 30360.00 30400.00
#VALUE! #VALUE! #VALUE!

#VALUE! #VALUE! #VALUE!


#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! 153400.00
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! 150000.00

#VALUE! #VALUE! #VALUE!


#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!

#VALUE! #VALUE! #VALUE!


#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! 47500.00
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! 7900.00
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! 150100.00
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! 351000.00
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
2890.00 115.60 31905.60 32000.00

#VALUE! #VALUE! #VALUE! 14600.00


#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! 31800.00
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! 31900.00
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!

#VALUE! #VALUE! #VALUE!


#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! 24600.00
#VALUE! #VALUE! #VALUE! 5200.00
#VALUE! #VALUE! #VALUE! 1300.00
#VALUE! #VALUE! #VALUE! 45200.00
#VALUE! #VALUE! #VALUE! 57100.00
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! 63400.00
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! 500.00
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! 7200.00
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! 4000.00
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! 46200.00
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
SEWA ALAT

PERKIRAAN HARGA
No JENIS BAHAN SATUAN TERTINGGI TAHUN 2012
(Rp.)
1 2 3 4
SEWA ALAT
1 Pesawat ukur (Sewa per hari) Bh
2 Meteran (50m) Bh
3 Palu / Bodem Bh
4 Ganco Bh
5 Keranjang Bh
6 Alat pelancip / Pisau besar Bh
7 Kereta dorong Unit
8 Jack Hammer Bh
9 Timbris Unit
10 Ember Bh
11 Cetok Bh
12 Kuas Bh
13 Kasut kayu Bh
14 Kotak adukan Bh
15 Tang pemotong kawat Bh
16 Molen (sewa per hari) Unit
17 Vibrator (sewa per hari) Unit
18 Gergaji Bh
19 Gunting pemotong baja Bh
20 Kunci pembengkok tulangan Bh
21 Tusuk bambu Bh
22 Gerobak Bh
23 Pompa air Unit/hari
24 Vibro roller/stamper Unit/hari
25 Sabit Bh
26 Tampar pemikul kayu Bh
27 Kompresor, blasting, selang dan Nozzle Unit/hari
28 Asphalt Mixing Plant Unit/hari
29 Asphalt Finisher Unit/hari
30 Asphalt Sprayer Unit/hari
31 Buldozer 100-150 HP Unit/hari
32 Compressor 4000-6500 L/M Unit/hari
33 Concrete Mixer 0.3-0.6 M3 Unit/hari
34 Crane 10-15 TON Unit/hari
35 Dump Truck 3.5 TON Unit/hari
36 Dump Truck 10 TON Unit/hari
37 Excavator 80-140 HP Unit/hari
38 Flat Bed Truck 3-4 M3 Unit/hari
39 Generator set Unit/hari
40 Motor Grader >100 HP Unit/hari
41 Track Loader 75-100 HP Unit/hari
42 Wheel Loader 1.0-1.6 M3 Unit/hari
43 Three Whell Roller 6-8 T. Unit/hari
44 Tandem Roller 6-8 T. Unit/hari
45 Tire Roller 8-10 T. Unit/hari
46 Vibratory Roller 5-8 T. Unit/hari
47 Concrete Vibrator Unit/hari
48 Stone Crusher Unit/hari
49 Water Pump 70-100 mm Unit/hari
50 Water Tanker 3000-4500 L. Unit/hari
51 Pedestrian Roller Unit/hari
52 Tamper Unit/hari
53 Jack Hammer Unit/hari
54 Fulvi Mixer Unit/hari
55 Concrete Pump Unit/hari
56 Trailer 20 TON Unit/hari
57 Pile Driver + Hammer Unit/hari
58 Crane On Track 35 TON Unit/hari
59 Welding Set Unit/hari
60 Bore Pile Mechine Unit/hari
61 Asphalt Liquid Mixer Unit/hari
62 Tronton Unit/hari
63 Cold Milling Unit/hari
64 Rock Drill Breaker Unit/hari
65 Cold Recyler Unit/hari
66 Hot Recyler Unit/hari
67 Agregat ( CHIP ) Spreader Unit/hari
68 Asphalt Distributor Unit/hari
69 Slip Form Paver Unit/hari
70 Concrete Pan Mixer Unit/hari
71 Concrete Breaker Unit/hari
72 Asphalt Tanker Unit/hari
73 Cement Tanker Unit/hari
74 Concrete Mixer (350) Unit/hari
75 Vibrating Rammer Unit/hari
76 Truck Mixer (AGITATOR) Unit/hari
77 Bore Pile Mechine Unit/hari
78 Crane On Track 75-100 TON Unit/hari
79 Blending Equipment Unit/hari
80 ASPHALT LIQUID MIXER Unit/hari
UPAH TENAGA KERJA

PERKIRAAN HARGA
No JENIS PEKERJAAN SATUAN TERTINGGI TAHUN 2012
(Rp.)
1 2 3 4
UPAH TENAGA KERJA (HARI)
1 Mandor Orang / hari
2 Kepala Tukang Orang / hari
3 Kepala Tukang Batu Orang / hari
4 Kepala Tukang Besi Orang / hari
5 Kepala Tukang Cat Orang / hari
6 Kepala Tukang Pipa Orang / hari
7 Kepala Tukang Kayu Orang / hari
8 Kepala Tukang Listrik Orang / hari
9 Tukang Batu Orang / hari
10 Tukang Besi Orang / hari
11 Tukang Cat Orang / hari
12 Tukang Kayu Orang / hari
13 Tukang Plitur Orang / hari
14 Tukang Pipa Orang / hari
15 Tukang Listrik Orang / hari
16 Tukang Gali Tanah Orang / hari
17 Pembantu Tukang Batu / Pekerja Orang / hari
18 Pembantu Tukang Kayu / Pekerja Orang / hari
19 Pembantu Tukang Besi / Pekerja Orang / hari
20 Pembantu Tukang Cat / Pekerja Orang / hari
21 Penjaga Orang / hari
22 Sopir Orang / hari
23 Mekanik Terampil Orang / hari
24 Mekanik Semi Terampil Orang / hari
25 Operator terampil Orang / hari
26 Operator semi terampil Orang / hari
27 Pembantu operator Orang / hari
28 Pembantu sopir Orang / hari
29 Pekerja semi terampil Orang / hari
30 Pekerja terampil Orang / hari
31 Pekerja Orang / hari
32 Juru Ukur Orang / hari
33 Ongkos kerja Kontruksi Pintu Air Kg
34 Ongkos Kerja Mesin Kg
35 Ongkos Kerja Kayu Kg
36 Sandblasting dan Cat M2
37 Pengecatan tanpa Sandblasting M2
38 Ongkos Angkut pintu air M2
39 Ongkos Batu Candi M3 Bh
40 Ongkos Angkut beton Precast M2
RESIKO DAN
Laba 10 % TOTAL (Rp) Pembulatan (Rp) 0.1
OVERHEAD 0,4%
0.004
5 6 7 8
Harga Satuan
KODE URAIAN
(Rp)
A PEKERJAAN PERSIAPAN

1. 1m2 PEMBERSIHAN LOKASI


Upah
0.050 Oh Mandor
0.100 Oh Pekerja
Sub Jumlah

2. 1 m1 PENGUKURAN dan PEMASANGAN BOUWPLANK


Bahan
0.008 m³ Kayu kasau meranti
0.005 m³ Papan meranti
0.020 kg Paku
Upah
0.005 Oh Mandor
0.010 Oh Kepala tukang kayu
0.100 Oh Tukang kayu
0.100 Oh Pekerja
Sub Jumlah

3. 1m2 PEMASANGAN DIREKSI KEET


Bahan
0.010 m³ Kayu Meranti
0.850 m2 Triplek
0.750 lbr Seng
0.200 kg Paku
Upah
0.250 Oh Mandor
0.014 Oh Pekerja
Sub Jumlah

KODE URAIAN

B PEKERJAAN TANAH

1. 1m3 GALIAN TANAH BIASA SEDALAM 1 M


Upah
0.040 Oh Mandor
0.400 Oh Pekerja
Sub Jumlah

2. 1m3 GALIAN TANAH BIASA SEDALAM 2 M


Upah
0.052 Oh Mandor
0.526 Oh Pekerja
Sub Jumlah

3. 1m3 URUGAN TANAH KEMBALI


Upah
0.019 Oh Mandor
0.192 Oh Pekerja
Sub Jumlah

4. 1m3 URUGAN TANAH


Bahan
1.200 m³ Tanah urug
Upah
0.010 Oh Mandor
0.300 Oh Pekerja
Sub Jumlah

5. 1m3 URUGAN PASIR


Bahan
1.200 m³ Pasir urug
Upah
0.010 Oh Mandor
0.300 Oh Pekerja
Sub Jumlah

KODE URAIAN

C PEKERJAAN PONDASI

1. 1m3 PASANGAN BATU KOSONG (ANSTAMPING)


Bahan
1.200 m³ Batu kali
0.300 m³ Pasir urug
Upah
0.039 Oh Mandor
0.039 Oh Kepala tukang batu
0.390 Oh Tukang batu
0.780 Oh Pekerja
Sub Jumlah

2. 1m3 PASANGAN BATU KALI 1PC : 5 PS


Bahan
1.100 m³ Batu kali pecah 15/20
136.000 kg Semen / PC (kg)
0.544 m³ Pasir pasang
Upah
0.075 Oh Mandor
0.060 Oh Kepala tukang batu
0.600 Oh Tukang batu
1.500 Oh Pekerja
Sub Jumlah

KODE URAIAN

D PEKERJAAN DINDING
1. 1m2 PASANGAN BATU MERAH 1/2 BATA 1 PC : 3 PS
Bahan
70.000 bh Batu merah 5 x 11 x 22 cm
14.370 kg Semen / PC (kg)
0.040 m³ Pasir pasang
Upah
0.015 Oh Mandor
0.010 Oh Kepala tukang batu
0.100 Oh Tukang batu
0.320 Oh Pekerja
Sub Jumlah

2. 1m2 PASANGAN BATU MERAH 1/2 BATA 1 PC : 6 PS


Bahan
70.000 bh Batu merah 5 x 11 x 22 cm
8.320 kg Semen / PC (kg)
0.049 m³ Pasir pasang
Upah
0.015 Oh Mandor
0.010 Oh Kepala tukang batu
0.100 Oh Tukang batu
0.320 Oh Pekerja
Sub Jumlah

KODE URAIAN

E PEKERJAAN PLESTERAN

1. 1m2 PLESTERAN 1 PC : 3 PS , t = 15 mm
Bahan
6.480 kg Semen / PC (kg)
0.019 m³ Pasir pasang
Upah
0.010 Oh Mandor
0.015 Oh Kepala tukang batu
0.150 Oh Tukang batu
0.200 Oh Pekerja
Sub Jumlah
2. 1m 2
PLESTERAN 1 PC : 6 PS, t = 15 mm
Bahan
3.680 kg Semen / PC (kg)
0.023 m³ Pasir pasang
Upah
0.010 Oh Mandor
0.015 Oh Kepala tukang batu
0.150 Oh Tukang batu
0.200 Oh Pekerja
Sub Jumlah

3. 1m1 BENANGAN SUDUT


Bahan
6.500 kg Semen / PC (kg)
0.021 m³ Pasir pasang
Upah
0.000 Oh Mandor
0.000 Oh Kepala tukang batu
0.120 Oh Tukang batu
0.000 Oh Pekerja
Sub Jumlah

KODE URAIAN

F PEKERJAAN KAYU

1. 1m3 PASANG KUSEN PINTU & JENDELA KAYU JATI


Bahan
1.100 m³ Kayu Jati balok
Upah
0.300 Oh Mandor
2.000 Oh Kepala tukang kayu
20.000 Oh Tukang kayu
6.000 Oh Pekerja
Sub Jumlah

2. 1m2 PASANG PINTU PANEL KAYU JATI


Bahan
0.040 m³ Kayu Jati papan
Upah
0.050 Oh Mandor
0.250 Oh Kepala tukang kayu
2.500 Oh Tukang kayu
1.000 Oh Pekerja
Sub Jumlah

3. 1m2 PASANG PINTU & JENDELA KACA KAYU JATI


Bahan
0.035 m³ Kayu Jati papan
Upah
0.800 Oh Mandor
2.000 Oh Kepala tukang kayu
0.200 Oh Tukang kayu
0.040 Oh Pekerja
Sub Jumlah

4. 1m3 PASANG KONSTRUKSI KUDA KUDA KAYU JATI


Bahan
1.100 m³ Kayu Jati balok
15.000 kg Besi strip
0.800 kg Paku kayu segala ukuran
Upah
0.200 Oh Mandor
1.200 Oh Kepala tukang kayu
12.000 Oh Tukang kayu
4.000 Oh Pekerja biasa
Sub Jumlah

5. 1m2 PASANG KASO + RENG GENTENG KODOK KAYU JATI


Bahan
0.012 m³ Kayu Jati usuk / reng
0.150 kg Paku kayu segala ukuran
Upah
0.005 Oh Mandor
0.010 Oh Kepala tukang kayu
0.100 Oh Tukang kayu
0.100 Oh Pekerja biasa
Sub Jumlah

6. 1m2 PASANG RANGKA LANGIT - LANGIT HOLLOW


Bahan
0.023 bh Kayu Jati usuk
0.150 kg Paku kayu segala ukuran
Upah
0.010 Oh Mandor
0.030 Oh Kepala tukang kayu
0.300 Oh Tukang kayu
0.200 Oh Pekerja biasa
Sub Jumlah

7. 1m1 PASANG LISPLANG ( 2 x 30 ) cm, KAYU MERANTI


Bahan
0.011 m³ Kayu meranti (papan)
0.050 kg Paku kayu segala ukuran
Upah
0.005 Oh Mandor
0.022 Oh Kepala tukang kayu
0.220 Oh Tukang kayu
0.110 Oh Pekerja biasa
Sub Jumlah

8. 1m1 PASANG LIST PLAFON KAYU PROFIL


Bahan
1.000 m' Kayu profil
Upah
0.001 Oh Mandor
0.002 Oh Kepala tukang kayu
0.021 Oh Tukang kayu
0.021 Oh Pekerja
Sub Jumlah

KODE URAIAN

G PEKERJAAN BETON

1. 1m3 LANTAI KERJA BETON 1 PC : 3 PS : 5 KR


Bahan
10.000 kg Semen / PC (kg)
0.026 m³ Pasir beton
0.044 m³ Batu pecah/koral (mesin)
Upah
0.006 Oh Mandor
0.002 Oh Kepala tukang batu
0.020 Oh Tukang batu
1.150 Oh Pekerja
Sub Jumlah

2. 1m3 BETON BERTULANG 1 PC : 2 PS : 4 KR


Bahan
280.000 kg Semen / PC (kg)
0.450 m³ Pasir beton
0.900 m³ Batu pecah/koral (mesin)
Upah
0.080 Oh Mandor
0.025 Oh Kepala tukang batu
0.250 Oh Tukang batu
1.650 Oh Pekerja
Sub Jumlah

3. kg PEMBESIAN ( POLOS )
Bahan
1.050 kg Besi beton
0.015 kg Kawat beton
Upah
0.000 Oh Mandor
0.001 Oh Kepala tukang besi
0.007 Oh Tukang besi
0.007 Oh Pekerja
Sub Jumlah

4. 1m2 PASANG BEKISTING PONDASI


Bahan
0.040 m³ Kayu papan bekesting
0.300 kg Paku biasa 2" - 5"
0.100 ltr Minyak bekisting
Upah
0.005 Oh Mandor
0.026 Oh Kepala tukang kayu
0.260 Oh Tukang kayu
0.300 Oh Pekerja
Sub Jumlah

5. 1m2 PASANG BEKISTING SLOOF


Bahan
0.045 m³ Kayu papan bekesting
0.300 kg Paku biasa 2" - 5"
0.100 ltr Minyak bekisting
Upah
0.005 Oh Mandor
0.026 Oh Kepala tukang kayu
0.260 Oh Tukang kayu
0.300 Oh Pekerja
Sub Jumlah

6. 1m2 PASANG BEKISTING KOLOM


Bahan
0.040 m³ Kayu papan bekesting
0.400 kg Paku biasa 2" - 5"
0.200 ltr Minyak bekisting
0.015 m³ Kayu meranti ( balok)
0.350 lbr Plywood , t = 9mm
2.000 btg Dolken Ø 8 - 10 / 4m
Upah
0.006 Oh Mandor
0.033 Oh Kepala tukang kayu
0.330 Oh Tukang kayu
0.300 Oh Pekerja
Sub Jumlah

7. 1m2 PASANG BEKISTING BALOK


Bahan
0.040 m³ Kayu papan bekesting
0.400 kg Paku biasa 2" - 5"
0.200 ltr Minyak bekisting
0.018 m³ Kayu meranti ( balok)
0.350 lbr Plywood , t = 9mm
2.000 btg Dolken Ø 8 - 10 / 4m
Upah
0.006 Oh Mandor
0.033 Oh Kepala tukang kayu
0.330 Oh Tukang kayu
0.320 Oh Pekerja
Sub Jumlah

8. 1m2 PASANG BEKISTING LANTAI


Bahan
0.040 m³ Kayu papan bekesting
0.400 kg Paku biasa 2" - 5"
0.200 ltr Minyak bekisting
0.015 m³ Kayu meranti ( balok)
0.350 lbr Plywood , t = 9mm
6.000 btg Dolken Ø 8 - 10 / 4m
Upah
0.006 Oh Mandor
0.033 Oh Kepala tukang kayu
0.330 Oh Tukang kayu
0.320 Oh Pekerja
Sub Jumlah

9. 1m2 PASANG BEKISTING DINDING


Bahan
0.030 m³ Kayu papan bekesting
0.400 kg Paku biasa 2" - 5"
0.200 ltr Minyak bekisting
0.020 m³ Kayu meranti ( balok)
0.350 lbr Plywood , t = 9mm
3.000 btg Dolken Ø 8 - 10 / 4m
4.000 bh Formtie / spacer
Upah
0.006 Oh Mandor
0.033 Oh Kepala tukang kayu
0.330 Oh Tukang kayu
0.320 Oh Pekerja
Sub Jumlah

10. 1m2 PASANG BEKISTING TANGGA


Bahan
0.030 m³ Kayu papan bekesting
0.400 kg Paku biasa 2" - 5"
0.150 ltr Minyak bekisting
0.015 m³ Kayu meranti ( balok)
0.350 lbr Plywood , t = 9mm
2.000 btg Dolken Ø 8 - 10 / 4m
Upah
0.006 Oh Mandor
0.033 Oh Kepala tukang kayu
0.330 Oh Tukang kayu
0.320 Oh Pekerja
Sub Jumlah

11. 1m3 BUAT BETON MUTU K 225


Bahan
388.000 kg Semen / PC (kg)
0.650 m³ Pasir beton
0.650 m³ Batu pecah/koral ( tangan )
Upah
0.300 Oh Mandor
0.100 Oh Kepala tukang batu
1.000 Oh Tukang batu
6.000 Oh Pekerja
Sub Jumlah

KODE URAIAN

H PEKERJAAN ATAP

1. 1m2 PAS. ATAP GENTENG KODOK


Bahan
25.000 bh Genteng kodok glazuur
Upah
0.008 Oh Mandor
0.008 Oh Kepala tukang kayu
0.075 Oh Tukang kayu
0.150 Oh Pekerja
Sub Jumlah

2. 1m1 PAS. BUBUNG KODOK


Bahan
5.000 bh Bubung genteng kdk glazuur
8.000 kg Semen / PC (kg)
0.032 m³ Pasir pasang
Upah
0.002 Oh Mandor
0.020 Oh Kepala tukang kayu
0.200 Oh Tukang kayu
0.400 Oh Pekerja
Sub Jumlah

KODE URAIAN
KODE URAIAN

I PEKERJAAN LANGIT-LANGIT

1. 1m2 PAS. LANGIT LANGIT GYPSUM BOARD


Bahan
0.350 lbr Gypsumboard
0.030 kg Paku segala ukuran
0.390 bh Paku skrup
Upah
0.004 Oh Mandor
0.010 Oh Kepala tukang kayu
0.100 Oh Tukang kayu
0.070 Oh Pekerja
Sub Jumlah

2. 1m1 PAS. LIST LANGIT - LANGIT GYPSUM


Bahan
1.100 m' List gypsum
0.050 kg Lem kayu
Upah
0.003 Oh Mandor
0.005 Oh Kepala tukang kayu
0.050 Oh Tukang kayu
0.050 Oh Pekerja
Sub Jumlah

KODE URAIAN

J PEKERJAAN KERAMIK

1. 1m2 PASANG LANTAI KERAMIK 30 x 30 cm WARNA / MOTIF


Bahan
11.870 bh Ubin keramik 30 x 30 cm
11.380 kg Semen / PC (kg)
0.042 m³ Pasir pasang
1.500 kg Semen warna
Upah
0.030 Oh Mandor
0.035 Oh Kepala tukang batu
0.350 Oh Tukang batu
0.620 Oh Pekerja
Sub Jumlah

2. 1m2 PASANG LANTAI KM / WC KERAMIK 20 x 20 cm


Bahan
25.000 bh tegel keramik 20 x 20 cm
11.380 kg Semen / PC (kg)
0.042 m³ Pasir pasang
1.500 kg Semen warna
Upah
0.030 Oh Mandor
0.035 Oh Kepala tukang batu
0.350 Oh Tukang batu
0.620 Oh Pekerja
Sub Jumlah

3. ` PASANG DINDING PORSELIN 20 x 25 cm WARNA / MOTIF


Bahan
45.000 bh Tegel keramik 20 x 25 (dinding)
9.300 kg Semen / PC (kg)
0.018 m³ Pasir pasang
1.500 kg Semen warna
Upah
0.030 Oh Mandor
0.045 Oh Kepala tukang batu
0.450 Oh Tukang batu
0.600 Oh Pekerja
Sub Jumlah

KODE URAIAN

K PEKERJAAN KUNCI & KACA

1. 1 bh PASANG KUNCI TANAM BIASA


Bahan
1.000 bh Kunci tanam biasa
Upah
0.005 Oh Mandor
0.010 Oh Kepala tukang kayu
0.500 Oh Tukang kayu
0.010 Oh Pekerja
Sub Jumlah

2. 1 bh PASANG KUNCI TANAM KAMAR MANDI


Bahan
1.000 bh Kunci tanam kamar mandi
Upah
0.003 Oh Mandor
0.005 Oh Kepala tukang kayu
0.500 Oh Tukang kayu
0.005 Oh Pekerja
Sub Jumlah

3. 1 bh PASANG ENGSEL PINTU


Bahan
1.000 bh Engsel pintu
Upah
0.001 Oh Mandor
0.015 Oh Kepala tukang kayu
0.150 Oh Tukang kayu
0.015 Oh Pekerja
Sub Jumlah

4. 1 bh PASANG ENGSEL JENDELA


Bahan
1.000 bh Engsel jendela
Upah
0.001 Oh Mandor
0.010 Oh Kepala tukang kayu
0.100 Oh Tukang kayu
0.010 Oh Pekerja
Sub Jumlah

5. 1 bh PASANG GRENDEL PINTU


Bahan
1.000 bh Grendel Pintu
Upah
0.001 Oh Mandor
0.015 Oh Kepala tukang kayu
0.150 Oh Tukang kayu
0.015 Oh Pekerja
Sub Jumlah

6. 1 bh PASANG GRENDEL JENDELA


Bahan
1.000 bh Grendel Jendela
Upah
0.001 Oh Mandor
0.010 Oh Kepala tukang kayu
0.100 Oh Tukang kayu
0.010 Oh Pekerja
Sub Jumlah

7. 1 bh PASANG REL PINTU DORONG


Bahan
1.000 bh Rel pintu dorong
Upah
0.003 Oh Mandor
0.060 Oh Kepala tukang kayu
0.600 Oh Tukang kayu
0.060 Oh Pekerja
Sub Jumlah

8. 1 bh PASANG KACA RAYBEN t = 5 mm


Bahan
1.100 m2 Kaca rayban tb. 5 mm
Upah
0.001 Oh Mandor
0.015 Oh Kepala tukang kayu
0.150 Oh Tukang kayu
0.015 Oh Pekerja
Sub Jumlah

KODE URAIAN

L PEKERJAAN BESI & ALUMINIUM

1. 1m2 PASANG ROLLING DOOR


Bahan
1.000 m² Rolling door
Upah
0.005 Oh Mandor
0.105 Oh Kepala tukang besi
1.050 Oh Tukang besi
1.500 Oh Pekerja
Sub Jumlah

KODE URAIAN

M PEKERJAAN SANITASI

1. 1 bh PASANG KLOSET JONGKOK PORSELIN Kw A


Bahan
1.000 bh Kloset jongkok porselin Kw A
6.000 kg Semen / PC (kg)
0.010 m³ Pasir pasang
Upah
0.160 Oh Mandor
1.500 Oh Kepala tukang batu
1.500 Oh Tukang batu
1.000 Oh Pekerja
Sub Jumlah

2. 1 bh PASANG WASTAFEL Kw A
Bahan
1.000 bh Wastafel Kw A
6.000 kg Semen / PC (kg)
0.010 m³ Pasir pasang
Upah
0.100 Oh Mandor
0.150 Oh Kepala tukang batu
1.450 Oh Tukang batu
1.200 Oh Pekerja
Sub Jumlah

3. 1 bh PASANG TEMPAT SABUN KERAMIK


Bahan
1.000 bh Tempat sabun
Upah
0.005 Oh Mandor
0.010 Oh Kepala tukang batu
0.100 Oh Tukang batu
0.010 Oh Pekerja
Sub Jumlah

4. 1 bh PASANG BAK MANDI BATU BATA, vol 0.30 m³


Bahan
400.000 bh Batu merah 5 x 11 x 22 cm
120.000 kg Semen / PC (kg)
0.300 m³ Pasir pasang
220.000 bh Porselin 10 x 20 cm
6.000 kg Semen warna
Upah
0.300 Oh Mandor
0.300 Oh Kepala tukang batu
3.000 Oh Tukang batu
6.000 Oh Pekerja
Sub Jumlah

5. 1 m1 PASANG PIPA GALVANIS Ø 1/2"


Bahan
0.300 ljr Pipa galvanis Ø 1/2"
0.350 unit Perlengkapan
Upah
0.027 Oh Mandor
0.009 Oh Kepala Tukang Pipa
0.090 Oh Tukang Pipa
0.054 Oh Pekerja
Sub Jumlah
6. 1 m1 PASANG PIPA PVC AW Ø 2"
Bahan
0.300 m' Pipa PVC AW Ø 2"
0.350 unit Perlengkapan
Upah
0.003 Oh Mandor
0.009 Oh Kepala Tukang Pipa
0.090 Oh Tukang Pipa
0.054 Oh Pekerja
Sub Jumlah

7. 1 m1 PASANG PIPA PVC AW Ø 4"


Bahan
0.300 m' Pipa PVC AW Ø 4"
0.350 unit Perlengkapan
Upah
0.004 Oh Mandor
0.014 Oh Kepala Tukang Pipa
0.135 Oh Tukang Pipa
0.081 Oh Pekerja
Sub Jumlah

8. 1 m1 PASANG KRAN AIR Ø 1/2"


Bahan
1.000 bh Kran air Ø 1/2"
0.025 bh Seal tape
Upah
0.005 Oh Mandor
0.010 Oh Kepala Tukang Pipa
0.100 Oh Tukang Pipa
0.010 Oh Pekerja
Sub Jumlah

9. 1 bh PASANG KACA WASTAFEL


Bahan
1.000 bh Kaca cermin t = 5 mm
0.100 Perlengkapan
Upah
0.001 Oh Mandor
0.015 Oh Kepala tukang batu
0.150 Oh Tukang batu
0.015 Oh Pekerja
Sub Jumlah

KODE URAIAN

N PEKERJAAN PENGECATAN
1. 1 m2 MENGECAT BIDANG KAYU BARU : 1 lps PLAMIR, 1 lps CAT DASAR, 2 lps CAT PENUTUP
Bahan
0.200 kg Plamir
0.150 kg Cat meni
0.170 kg Cat dasar
0.260 kg Cat penutup 2 kali
Upah
0.003 Oh Mandor
0.006 Oh Kepala tukang cat
0.009 Oh Tukang cat
0.070 Oh Pekerja
Sub Jumlah

2. 1 m2 MELABUR BIDANG KAYU DENGAN POLITUR


Bahan
0.880 ltr Politur jadi
3.000 lbr Kertas gosok
Upah
0.003 Oh Mandor
0.016 Oh Kepala tukang cat
0.060 Oh Tukang cat
0.000 Oh Pekerja
Sub Jumlah

3. 1 m2 MENGECAT TEMBOK BARU : 1 lps PLAMIR,1 lps CAT DASAR, 2 lps CAT PENUTUP
Bahan
0.200 kg Plamir
0.230 kg Cat dasar
0.480 kg Cat penutup 2 kali
Upah
0.003 Oh Mandor
0.006 Oh Kepala tukang cat
0.063 Oh Tukang cat
0.020 Oh Pekerja
Sub Jumlah

4. 1 m2 PEKERJAAN WATER PROOFING


Bahan
0.360 kg Water Proofing
Upah
0.003 Oh Mandor
0.006 Oh Kepala tukang cat
0.063 Oh Tukang cat
0.020 Oh Pekerja
Sub Jumlah
5. 1 m2 MENGECAT GENTENG CAT DULUX
Bahan
0.600 kg Cat penutup 2 kali
Upah
0.004 Oh Mandor
0.005 Oh Kepala tukang cat
0.049 Oh Tukang cat
0.048 Oh Pekerja
Sub Jumlah

KODE URAIAN

O PEKERJAAN INSTALASI LISTRIK

1. 1 ttk PASANG STOP KONTAK


Bahan
1.000 bh Stop kontak
15.000 m' Kabel NYA 2.5 mm
1.000 bh T dos PVC
0.650 ljr Pipa PVC Ø 5/8"
Upah
0.050 Oh Mandor
0.050 Oh Kepala tukang listrik
0.500 Oh Tukang listrik
0.500 Oh Pekerja
Sub Jumlah

2. 1 ttk PASANG LAMPU PIJAR 5 - 40 Watt + SAKLAR


Bahan
1.000 bh Lampu pijar 5 - 40 Watt
20.000 m' Kabel NYA 2.5 mm
1.000 bh Saklar
15.000 m' Isolator
2.000 bh T dos PVC
1.000 ljr Pipa PVC Ø 5/8"
1.000 bh Fitting plafon
6.000 bh Las dof
Upah
0.050 Oh Mandor
0.050 Oh Kepala tukang listrik
0.500 Oh Tukang listrik
0.500 Oh Pekerja
Sub Jumlah

3. 1 ttk PASANG SIKRING 1 GROUP


Bahan
1.000 bh Sikring 1 group
4.000 m' Kabel NYA 4.0 mm
1.000 ljr Pipa PVC Ø 5/8"
Upah
0.006 Oh Mandor
0.006 Oh Kepala tukang listrik
0.062 Oh Tukang listrik
0.620 Oh Pekerja
Sub Jumlah
Upah (Rp) Bahan (Rp) Jumlah Harga (Rp)
DASAR, 2 lps CAT PENUTUP

2 lps CAT PENUTUP


HARGA SAT
No URAIAN PEKERJAAN KUANTITAS SAT
Rp

A PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi 204.000 m2 0.00
2 Pembuatan Direksi Keet 20.000 m2 0.00
3 Pengukuran dan Pemasangan Bowplank 189.750 m 1
0.00

B PEKERJAAN TANAH
1 Galian Tanah sedalam 1 m 140.000 m3 0.00
2 Galian Tanah sedalam 2 m 19.884 m3 0.00
3 Urugan Tanah Kembali 53.424 m 3
0.00
4 Urugan Tanah 10.725 m3 0.00
5 Urugan Pasir 7.644 m 3
0.00

C PEKERJAAN PONDASI
1 Pasangan Batu Kosong 21.000 m3 0.00
2 Pasangan Batu Kali 1 PC : 5 PS 100.800 m3 0.00

D PEKERJAAN DINDING
1 Pasangan Dinding 1 PC : 3 PS 541,60 m2 0.00
2 Pasangan Tasram 1 PC : 6 PS 32,56 m 2
0.00

E PEKERJAAN PLESTERAN
1 Plesteran Dinding 1 PC : 3 PS 1083,2 m2 0.00
2 Plesteran Tasram 1 PC : 6 PS 65,12 m2 0.00
3 Benangan Sudut 229,24 m 1
0.00

F PEKERJAAN KAYU
1 Kusen Pintu & Jendela Kayu Jati m3
2 Pintu & Jendela Kaca Kayu Jati m2
3 Kuda2 Kayu Jati 0,24 m3 0.00
4 Usuk dan Reng 207.000 m2 0.00
5 Listplank 2/30 Err:509 m 1
0.00
6 Rangka Hollow 205.500 m2 0.00

G PEKERJAAN BETON
1 Beton Lantai Kerja 0.644 m3 0.00
2 Beton 1 PC : 2 PS : 3 KR Err:509 m 3
0.00
3 Pembesian polos #VALUE! kg 0.00
4 Begesting Pondasi m2
5 Begesting Sloof m2
6 Begesting kolom m2
7 Begesting Balok m2
8 Begesting Dinding m2
9 Begesting lantai m2
10 Begesting Tangga m2

H PEKERJAAN ATAP
1 Pasang Atap Genteng Kodok
2 Pasang Bubung Kodok

I PEKERJAAN LANGIT2
1 Pas. Langit Gypsumboard 205.500 m2 0.00
2 List Langit2 49.000 m1 0.00

J PEKERJAAN KERAMIK
1 Lantai Keramik 30x30 197,5 m2 0.00
2 Lantai Keramik 20x20 8.000 m2 0.00
3 Dinding Keramik 20x25 Err:509 m2 0.00

K PEKERJAAN KUNCI & KACA


1 Kunci Tanam Biasa 9.000 bh 0.00
2 Kunci Kamar Mandi 2.000 bh 0.00
3 Engsel Pintu 18.000 bh 0.00
4 Engsel Jendela 24.000 bh 0.00
5 Grendel pintu 9.000 bh 0.00
6 Grendel Jendela 13.000 bh 0.00
7 Rel Pintu dorong 1.000 bh 0.00
8 Kaca Rayben 12.000 bh 0.00

L PEKERJAAN BESI & ALUMINIUM


1 Rolling Door

M PEKERJAAN SANITASI
1 Kloset Jongkok 2.000 bh 0.00
2 Wastafel 1.000 bh 0.00
3 Tempat Sabun 2.000 bh 0.00
4 Bak Mandi Batu Bata 2.000 bh 0.00
5 Pipa Galvanish f1/2" 25.350 m1 0.00
6 Pipa PVC f2" 34.550 m1 0.00
7 Pipa PVC f4" 27.000 m1
0.00
8 Kran Air f1/2" 5.000 bh 0.00
9 Kaca Wastafel 1.000 bh 0.00

N PEKERJAAN PENGECATAN
1 Cat Dinding Dalam 619.530 m2 0.00
2 Cat Dinding Luar 1239.060 m 2
0.00
3 Cat Kusen
4 Cat Pintu & Jendela
5 Cat Genteng Dulux

O PEKERJAAN INSTALASI LISTRIK


1 Stop Kontak 12.000 ttk 0.00
2 Lampu Pijar + Saklar Err:509 ttk 0.00
3 Sekring 1.000 unit 0.00

TOTAL KESELURUHAN
PEKERJAAN
JUMLAH TOTAL
Rp Rp

0.00
0.00 0.00
0.00

0.00
0.00
0.00 0.00
0.00
0.00

0.00
0.00
0.00

#VALUE!
#VALUE!
#VALUE!

#VALUE!
#VALUE! #VALUE!
#VALUE!

#VALUE!
#VALUE!
0.00
Err:509
0.00

0.00
Err:509
#VALUE!

Err:509
Err:509

0.00

0.00
0.00
0.00

#VALUE!
0.00 #VALUE!
Err:509

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00
0.00
0.00 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
Err:509 Err:509
0.00

L KESELURUHAN
EKERJAAN Err:509
PROSENTASE
NO ITEM PEKERJAAN BIAYA (Rp)
(%)
A PEKERJAAN PERSIAPAN
B PEKERJAAN TANAH
C PEKERJAAN PONDASI
D PEKERJAAN DINDING
E PEKERJAAN PLESTERAN
F PEKERJAAN KAYU
G PEKERJAAN BETON
H PEKERJAAN ATAP
I PEKERJAAN LANGIT-LANGIT
J PEKERJAAN KERAMIK
K PEKERJAAN KUNCI & KACA
L PEKERJAAN BESI & ALUMINIUM
M PEKERJAAN SANITASI
N PEKERJAAN PENGECATAN
O PEKERJAAN INSTANSI LISTRIK
TOTAL BIAYA
LUAS TANAH (M2)
BIAYA PER M2

Anda mungkin juga menyukai