I. PERSIAPAN
1.1 Pembersihan
1.2 Pengukuran dan pemasangan booplank
1.3 Penyediaan air kerja
X. PEKERJAAN SANITAIR
10.1 Kloset jongkok
10.2 Kran air km/wc
10.3 Kran air meja dapur
10.4 Floor drain km/wc
10.5 Kitchen zink meja dapur
NO URAIAN PEKERJAAN
I PEKERJAAN PERSIAPAN
1.1 PEMBERSIHAN
II PEKERJAAN TANAH
200
250
x
IV PEKERJAAN BETON
1500
4.8 Beton meja dapur
VI PEKERJAAN ATAP
6.2 Gording
PEKERJAAN PERLENGKAPAN
IX
PINTU DAN JENDELA
X PEKERJAAN SANITAIR
13.6 Sakelar
PEKERJAAN AKHIR
XV
( FINISHING )
1 135 m2
900
VOLUME = P x L
9 M' x 15 M' = 135 M2
1500
1 1 LS
100 1 33.66 M3
90
70
100 1 39.78 M3
90
70
1 2.25 M3
200
250
Volume = Vol. Galian - ( Vol. Pondasi + Vol. Pasir bawah pondasi) 1 42.875 M3
Volume = 71,4 - ( 21,525 + 7) = 42, 875 m3
Volume = Vol. Galian - ( Vol. Pondasi + Vol. Pasir bawah pondasi) 1 34.45 m3
Volume = 66,3 - ( 25,35 + 6,5 ) = 34,45 m3
1 13.5 m3
15
70
1 5.77 m3
15
74
30 1 16.38 m3
70
60
1 12.29 m3
30
70
60
15 1 1.56 m3
20
15
Panjang yang akan di pasang 39 m'
Volume = 0,15 x 0,15 x 39 m = 0,8775 m3
1500 1 0.09 m3
1500
1500 0.248 m3
1500
1500 24 2.16 m3
1500
1500 1 1.17 m3
1500
1500
1500
Panjang ring balok yang akan di buat 52 m
Volume = 0,15 x 0,15 x 52 m = 1,17 m3
1500 1 1.51 m3
a. Kaso 1 0.54 m3
ukuran kaso yang di pakai 5/7
panjang kaso yang di pakai 153,135 m
volume = 0,05 x 0,07 x 153,135 m = 0,536 m3
b. Reng 1 0.48 m3
ukuran reng yang di pakai 3/4
panjang reng yang di pakai 396 m
volume = 0,03 x 0,04 x 396 m = 0,4752 m3
c. Nok 1 0.11 m3
Ukuran nok yang di pakai 8/12
Panjang nok yang di pakai 11 m
volume = 0,08 x 0,12 x 11m = 0,11 m3
Volume plafond sama dengan luasan ruangan yang akan di beri plafond 1 87 m2
Volume list plafond = panjang seluruh yang akan di pasangi list 1 100.85 m
lantai 1 = 100,85 m
Tipe 1 1 2.386 m2
Untuk lebar jendela di tambah 1 cm kekiri dan kekanan
volume = l x h x ϵ dj = 0,42 m x 1,42 m x 4 bh = 2,3856 m2
Tipe 2 1 1.279 m2
volume = l x h x ϵ dj = 0,52 m x 0,82 x 3 bh = 1,2792 m2
Tipe 3 1 3.956 m2
Volume = l x h x Edj = 0,42m x 1,57m x 6 bh = 3,9564 m2
volume = 2 bh / set 1 2 bh
a. Pintu 1 27 bh
Grendel pintu akan di pasang 2 bh setiap pintunya
volume = jumlah pintu x 2 grendel = 9 pintu x 2 grendel = 18 bh
b. Jendela
Grendel jendela di pasang 1 bh setiap jendela
volume = jumlah jendela x 1 grendel = 11 jendela x 1 grendel = 11 bh
Dinding KM/WC yang akan di pasangi keramik tinggi 1,5 m 480 19.2 m2
Volume = P X T = 12.8 m x 1.5 m = 19.2 m2
Volume = Luasan meja dapur yang akan di pasang keramik 71.25 2.85 m2
volume = 4,75m x 0,6 m = 2,85 m2
a. Lampu pijar 1 10 bh
Volume = jumlah lampu yang akan di pasang
volume = 10 bh
b. Lampu taman 1 1 bh
Volume = jumlah lampu yang akan di pasang
volume = 1 bh
c. Lampu hias 1 1 bh
Volume = jumlah lampu yang akan di pasang
volume = 1 bh
Sakelar Tunggal = 8 Bh 1 8 bh
Sakelar Ganda = 2 Bh 1 2 bh
Pagar samping dan belakang [t = (2, 2.9, 3.4, 3.7) m] 1 32.69 m2
Panjang pagar (berurutan) = (14.5, 0.4, 0.2, 0.5) m
Luas (t=2) = 14,5 m x 2 m = 29 m2
Luas (t=2,9) = 0,4 m x 2,9 m = 1,16 m2
Luas (t=3,4) = 0,2 m x 3,4 m = 0.68 m2
Luas (t=3,7) = 0,5 m x 3,7 m = 1,85 m2
1 1 LS
1 1 LS
Daftar Harga Satuan Upah, Bahan Bangunan dan Peralatan Tahun 2010 Semester I
A UPAH
1 Kepala Tukang Oh 137,500.00 125,000.00 125,000.00
2 Tukang Oh 110,000.00 100,000.00 100,000.00
3 Mandor Oh 165,000.00 150,000.00 150,000.00
4 Pekerja Tidak Terlatih Oh 71,500.00 65,000.00 65,000.00
5 Pekerja Terlatih Oh 82,500.00 75,000.00 75,000.00
6 Masinis Oh 93,500.00 85,000.00 85,000.00
7 Operator Oh 93,500.00 85,000.00 85,000.00
8 Sopir Oh 93,500.00 85,000.00 85,000.00
9 Pembantu Masinis/Operator Oh 88,000.00 80,000.00 80,000.00
10 Supervisor Oh 137,500.00 125,000.00 125,000.00
11 Pemasak Aspal Oh 71,500.00 65,000.00 65,000.00
12 Penjaga Oh 110,000.00 100,000.00 100,000.00
13 Pembantu Sopir Oh 88,000.00 80,000.00 80,000.00
14 Mekanik Oh 93,500.00 85,000.00 85,000.00
15 Surveyor Oh 165,000.00 150,000.00 150,000.00
B BAHAN/MATERIAL
1 Agregat Halus m3 298,100.00 303,520.00 271,000.00
2 Agregat Kasar m3 291,500.00 296,800.00 265,000.00
3 Agregat Kelas A m3 280,500.00 285,600.00 255,000.00
4 Agregat Kelas B m3 247,500.00 252,000.00 225,000.00
5 Agregat Kelas C m3 236,500.00 240,800.00 215,000.00
6 Aluminium Foil m2 16,500.00 16,800.00 15,000.00
7 Alcubond m2 1,375,000.00 1,400,000.00 1,250,000.00
8 Amplas Biasa Lbr 13,200.00 13,440.00 12,000.00
9 Amplas Niken Lbr 13,200.00 13,440.00 12,000.00
10 Atap Aluminium Zink Coated (seng) tebal 0,25 mm Lbr 42,900.00 43,680.00 39,000.00
11 Atap Aluminium Zink Coated (seng) tebal 0,3 mm Lbr 55,000.00 56,000.00 50,000.00
12 Atap Aluminium Zink Coated (seng) tebal 0,4 mm Lbr 83,600.00 85,120.00 76,000.00
13 Atap Aluminium Zincalume, tebal 0,25 mm Lbr 61,600.00 62,720.00 56,000.00
14 Atap Aluminium Zincalume, tebal 0,3 mm Lbr 85,800.00 87,360.00 78,000.00
15 Atap Aluminium Zincalume, tebal 0,4 mm Lbr 96,800.00 98,560.00 88,000.00
16 Atap Aluminium Gelombang tebal 0,5 mm Lbr 115,500.00 117,600.00 105,000.00
17 Atap Fiber warna"Polycarbonat" tbl. 4-5 mm m2 40,740.74 41,481.48 37,037.04
18 Atap Genteng Beton Lokal buah 36,850.00 37,520.00 33,500.00
19 Atap Genteng Beton buah 36,850.00 37,520.00 33,500.00
20 Atap Genteng Beton Cisangkan buah 6,600.00 6,720.00 6,000.00
21 Atap Genteng Buleleng buah 1,210.00 1,232.00 1,100.00
22 Atap Genteng Keramik biasa berglazur buah 17,600.00 17,920.00 16,000.00
23 Atap Genteng Keramik Berglazur Natural buah 8,250.00 8,400.00 7,500.00
24 Atap Genteng Keramik sejenis Berglazur warna buah 14,850.00 15,120.00 13,500.00
25 Atap Genteng Metal Biasa (88 cm X 77 cm) m2 58,928.57 60,000.00 53,571.43
26 Atap Genteng Metal Warna (120 cm X 76 cm) m2 78,157.89 79,578.95 71,052.63
27 Atap Genteng Metal Zincalume 2x4 (38,5 cm X 80cm) m2 151,785.71 154,545.45 137,987.01
28 Atap Genteng Metal Zincalume berpasir (77cmX100cm) m2 175,714.29 178,909.09 159,740.26
29 Atap Genteng Metal Zincalume berpasir biasa m2 95,700.00 97,440.00 87,000.00
30 Atap Genteng Kodok buah 2,750.00 2,800.00 2,500.00
31 Atap Genteng Palentong buah 1,100.00 1,120.00 1,000.00
31 Atap Genteng Palentong Super buah 1,347.50 1,372.00 1,225.00
32 Atap Onduline m2 86,900.00 88,480.00 79,000.00
32 Asbes polos 100 x 100 tbl = 4 mm Lbr 20,350.00 20,720.00 18,500.00
33 Asbes Gelombang Kecil, lebar 80 cm m2 32,083.33 32,666.67 29,166.67
34 Asbes Gelombang Kecil, lebar 105 cm m2 33,255.75 33,860.40 30,232.50
35 Asbes Gelombang Besar, lebar 105 cm m2 66,000.00 67,200.00 60,000.00
36 Asbes Gelombang motif genteng m2 26,400.00 26,880.00 24,000.00
37 Aquaproof kg 48,400.00 49,280.00 44,000.00
38 Bak Cuci Stainless Steel buah 198,000.00 201,600.00 180,000.00
- 25 -
Daftar Harga Satuan Upah, Bahan Bangunan dan Peralatan Tahun 2010 Semester I
HRG SATUAN HARGA HARGA
NO URAIAN SATUAN
(RUPIAH) Swakelola (Rp) DASAR (Rp)
39 Bak Cuci Teraso buah 110,000.00 112,000.00 100,000.00
40 Bak Fibreglass buah 203,500.00 207,200.00 185,000.00
41 Bak Teraso buah 82,500.00 84,000.00 75,000.00
42 Bambu dia. 6-8 cm/6m Btg 44,000.00 44,800.00 40,000.00
43 Batako buah 2,750.00 2,800.00 2,500.00
44 Batu Andesit Susun Sirih m2 313,500.00 319,200.00 285,000.00
45 Batu alam kecoklatan (Sangarong) m2 195,250.00 198,800.00 177,500.00
46 Batu Bata lobang m3 471,900.00 480,480.00 429,000.00
47 Batu Bata Kecil buah 517.00 526.40 470.00
48 Batu Bata Lobang buah 605.00 616.00 550.00
49 Batu Candi hitam m2 231,000.00 235,200.00 210,000.00
50 Batu Kali m3 308,000.00 313,600.00 280,000.00
51 Batu Kali tempel m2 68,750.00 70,000.00 62,500.00
52 Batu Karang Pilang m2 302,500.00 308,000.00 275,000.00
53 Batu Kerikil m3 247,500.00 252,000.00 225,000.00
54 Batu Koral beton m3 220,000.00 224,000.00 200,000.00
55 Batu Koral Jagung m3 297,000.00 302,400.00 270,000.00
56 Batu Krokos m3 236,500.00 240,800.00 215,000.00
57 Batu Palimanan kuning/hijau m2 198,000.00 201,600.00 180,000.00
58 Batu Palimanan kuning/hijau + bevel m2 220,000.00 224,000.00 200,000.00
59 Batu Pecah 0.5 - 1 (screen) m3 348,700.00 355,040.00 317,000.00
60 Batu Abu 0.00 - 0.5 (filler) m3 302,500.00 308,000.00 275,000.00
61 Batu Pecah 1.3 - 1.9 (spilt) m3 299,200.00 304,640.00 272,000.00
62 Batu Pecah 2/3 m3 293,700.00 299,040.00 267,000.00
63 Batu Pecah 3/5 m3 288,200.00 293,440.00 262,000.00
64 Batu Pecah 5/7 m3 281,600.00 286,720.00 256,000.00
65 Batu Marmer m2 283,200.00 288,400.00 257,500.00
66 Batu Roster / Terawang keramik buah 44,000.00 44,800.00 40,000.00
67 Besi dia. 5 mm Batang 13,200.00 13,440.00 12,000.00
68 Besi dia. 6 mm KS Batang 18,150.00 18,480.00 16,500.00
69 Besi dia. 8 mm KS TI Batang 44,000.00 44,800.00 40,000.00
70 Besi dia. 10 mm KS TI Batang 67,100.00 68,320.00 61,000.00
71 Besi dia. 12 mm KS TI Batang 94,600.00 96,320.00 86,000.00
72 Besi dia. 14 mm KS TI Batang 159,500.00 162,400.00 145,000.00
73 Besi dia. 16 mm KS TI Batang 167,750.00 170,800.00 152,500.00
74 Besi dia. 19 mm KS TI Batang 343,750.00 350,000.00 312,500.00
75 Besi Beton Polos kg 11,550.00 11,760.00 10,500.00
76 Besi Baja Profil WF, I dan H kg 15,950.00 16,240.00 14,500.00
77 Besi Baja Konstruksi ( CNP, INP,dan besi L) kg 13,750.00 14,000.00 12,500.00
78 Besi Beam Clamp dan Plat Siku m2 24,750.00 25,200.00 22,500.00
79 Besi Hollow baja 20 X 40, tb. 2mm Batang 178,750.00 182,000.00 162,500.00
80 Besi Hollow baja 40 X 40, tb. 2mm Batang 200,750.00 204,400.00 182,500.00
81 Besi Hollow baja 30 X 60, tb. 2mm Batang 214,500.00 218,400.00 195,000.00
82 Besi Hollow Plafond 2 X 4 Batang 23,650.00 24,080.00 21,500.00
83 Besi Strip kg 8,250.00 8,400.00 7,500.00
84 Besi Strip 2 X 3 M' 3,300.00 3,360.00 3,000.00
85 Beton Ready Mix K - 125 m3 665,500.00 677,600.00 605,000.00
86 Beton Ready Mix K - 175 m3 689,333.33 701,866.67 626,666.67
87 Beton Ready Mix K - 225 m3 723,250.00 736,400.00 657,500.00
88 Beton Ready Mix K - 250 m3 745,250.00 758,800.00 677,500.00
89 Beton Ready Mix K - 275 m3 779,166.67 793,333.33 708,333.33
90 Beton Ready Mix K - 300 m3 800,250.00 814,800.00 727,500.00
91 Beton Ready Mix K - 350 m3 833,250.00 848,400.00 757,500.00
92 Beton Ready Mix K - 400 m4 836,000.00 851,200.00 760,000.00
93 Bubungan Asbes Gelombang Besar m' 16,500.00 16,800.00 15,000.00
94 Bubungan Asbes Gelombang Kecil m' 14,025.00 14,280.00 12,750.00
95 Bubungan/Nok Genteng Beton Buah 5,500.00 5,600.00 5,000.00
96 Bubungan Genteng Buleleng Buah 2,750.00 2,800.00 2,500.00
97 Bubungan/ Nok genteng Keramik biasa berglazur Buah 7,150.00 7,280.00 6,500.00
98 Bubungan/Nok genteng Keramik sejenis berglazur Buah 13,750.00 14,000.00 12,500.00
99 Bubungan gtg Keramik sejenis warna berglazur Buah 19,250.00 19,600.00 17,500.00
100 Bubungan/Nok Genteng Metal/aluminium M' 25,850.00 26,320.00 23,500.00
101 Bubungan Genteng Kodok Buah 2,062.50 2,100.00 1,875.00
- 26 -
Daftar Harga Satuan Upah, Bahan Bangunan dan Peralatan Tahun 2010 Semester I
HRG SATUAN HARGA HARGA
NO URAIAN SATUAN
(RUPIAH) Swakelola (Rp) DASAR (Rp)
102 Bubungan Genteng Palentong kecil Buah 2,090.00 2,128.00 1,900.00
103 Bubungan Genteng Palentong besar Buah 2,750.00 2,800.00 2,500.00
104 Cat Dasar kg 21,450.00 21,840.00 19,500.00
105 Cat Antara kg 20,900.00 21,280.00 19,000.00
106 Cat Kayu dan Besi Anti Rayap kg 22,550.00 22,960.00 20,500.00
107 Cat Khusus Glossy dan Quick Drying kg 22,550.00 22,960.00 20,500.00
108 Cat Minyak warna (biasa) mutu C kg 28,600.00 29,120.00 26,000.00
109 Cat Minyak mutu B kg 40,700.00 41,440.00 37,000.00
110 Cat Minyak Semprot kg 55,000.00 56,000.00 50,000.00
111 Cat Meni Besi kg 30,800.00 31,360.00 28,000.00
112 Cat Meni Besi /kayu/ Flincote kg 35,200.00 35,840.00 32,000.00
113 Cat Penutup kg 79,750.00 81,200.00 72,500.00
114 Cat Tembok mutu C (Vinotex,Q-Luc, dan sejenis) kg 10,450.00 10,640.00 9,500.00
115 Cat Tembok mutu B (Catylax,vinilex, dan sejenis) kg 15,400.00 15,680.00 14,000.00
116 Cat Tembok mutu B, Anti Lumut dan Jamur kg 19,250.00 19,600.00 17,500.00
117 Cat Tembok mutu A (Mowilex,Kemtone,Dulux,dll) kg 65,340.00 66,528.00 59,400.00
118 Closed Duduk Setara (sejenis standar KIA) unit 1,375,000.00 1,400,000.00 1,250,000.00
119 Closed Duduk Standar (sejenis Ex.TOTOC721FV1) unit 2,303,400.00 2,345,280.00 2,094,000.00
120 Closed Duduk Halmar unit 3,368,200.00 3,429,440.00 3,062,000.00
121 Closed Duduk mutu C unit 1,886,500.00 1,920,800.00 1,715,000.00
122 Closed Duduk mutu A unit 4,697,000.00 4,782,400.00 4,270,000.00
123 Closed Duduk mutu B unit 2,852,300.00 2,904,160.00 2,593,000.00
124 Closed Duduk standar unit 2,366,100.00 2,409,120.00 2,151,000.00
125 Closet Duduk / Monoblok bh 434,500.00 442,400.00 395,000.00
126 Closet Jongkok Porselen / biasa buah 88,000.00 89,600.00 80,000.00
127 Closet Jongkok Teraso buah 27,500.00 28,000.00 25,000.00
128 Closed Jongkok Standart / sejenis (mutu B) unit 165,000.00 168,000.00 150,000.00
129 Closed Jongkok sejenis ( mutu A) Unit 192,500.00 196,000.00 175,000.00
130 Shower Spray TX 403 SV 3 buah 357,500.00 364,000.00 325,000.00
131 Coneblock biasa tebal 6 cm buah 990.00 1,008.00 900.00
132 Coneblock warna tebal 6 cm buah 1,430.00 1,456.00 1,300.00
133 Coneblock biasa tebal 8 cm buah 1,320.00 1,344.00 1,200.00
134 Coneblock warna tebal 8 cm buah 1,980.00 2,016.00 1,800.00
135 Cornice (bubuk Semen putih utk gypsum) kg 6,600.00 6,720.00 6,000.00
136 Dempul Jadi kg 13,200.00 13,440.00 12,000.00
137 Dempul Ross Polac kg 14,300.00 14,560.00 13,000.00
138 Dempul Isamu kg 41,800.00 42,560.00 38,000.00
139 Dolken Kayu dia. 8 - 10/400 cm m3 247,500.00 252,000.00 225,000.00
140 Door Closer buah 418,000.00 425,600.00 380,000.00
141 Door Holder buah 33,000.00 33,600.00 30,000.00
142 Door Stoper buah 330,000.00 336,000.00 300,000.00
143 Door Stop buah 24,200.00 24,640.00 22,000.00
144 Ember hitam buah 5,500.00 5,600.00 5,000.00
145 Engsel Biasa buah 3,850.00 3,920.00 3,500.00
146 Engsel Kuningan 4" buah 6,050.00 6,160.00 5,500.00
147 Engsel Pintu buah 4,950.00 5,040.00 4,500.00
148 Epoxi kg 46,750.00 47,600.00 42,500.00
149 Eternit 100 x 100 tebal 2,7 mm Lbr 12,100.00 12,320.00 11,000.00
150 Eternit 100 x 100 tebal 3,5 mm Lbr 14,850.00 15,120.00 13,500.00
151 Filler m3 189,750.00 193,200.00 172,500.00
152 Fitting plafond listrik buah 5,500.00 5,600.00 5,000.00
153 Glass Block buah 24,750.00 25,200.00 22,500.00
154 Grendel/Slot Tanam 4" buah 79,750.00 81,200.00 72,500.00
155 Grendel biasa buah 14,850.00 15,120.00 13,500.00
156 Gypsum Board ( 120 x 240 x 9 ) mm lbr 159,500.00 162,400.00 145,000.00
157 Hordeng Horizontal Blind (aluminium) m2 96,250.00 98,000.00 87,500.00
158 Hordeng Vertikal Blind m3 99,000.00 100,800.00 90,000.00
159 Ijuk Kg 7,700.00 7,840.00 7,000.00
160 Jendela Aluminium + Kaca Reyband 5 mm m2 3,052,500.00 3,108,000.00 2,775,000.00
161 Jendela Besi m2 275,000.00 280,000.00 250,000.00
162 Jendela Bingkai Nako 100 cm X 70 cm Unit 66,000.00 67,200.00 60,000.00
163 Jendela Bingkai Nako m2 104,500.00 106,400.00 95,000.00
164 Kabel NYA 1,5 mm m' 2,200.00 2,240.00 2,000.00
- 27 -
Daftar Harga Satuan Upah, Bahan Bangunan dan Peralatan Tahun 2010 Semester I
HRG SATUAN HARGA HARGA
NO URAIAN SATUAN
(RUPIAH) Swakelola (Rp) DASAR (Rp)
165 Kabel NYA 2,5 mm m' 3,300.00 3,360.00 3,000.00
166 Kabel NYA 4.0 mm m' 4,400.00 4,480.00 4,000.00
167 Kabel NYM 2 X 1,5 mm m' 4,950.00 5,040.00 4,500.00
168 Kabel NYM 2 X 2,5 mm m' 7,700.00 7,840.00 7,000.00
169 Kabel NYM 2 X 4,0 mm m' 15,950.00 16,240.00 14,500.00
170 Kaca Cermin 3 mm m2 132,000.00 134,400.00 120,000.00
171 Kaca Cermin 5 mm m2 371,250.00 378,000.00 337,500.00
172 Kaca Patri m2 1,320,000.00 1,344,000.00 1,200,000.00
173 Kaca Bening 3 mm m2 79,750.00 81,200.00 72,500.00
174 Kaca Bening 4 mm m2 104,500.00 106,400.00 95,000.00
175 Kaca Bening 5 mm m2 134,750.00 137,200.00 122,500.00
176 Kaca Bening 8 mm m2 156,750.00 159,600.00 142,500.00
177 Kaca Bening 10 mm m2 385,000.00 392,000.00 350,000.00
178 Kaca Buram 12 mm m2 220,000.00 224,000.00 200,000.00
179 Kaca Rayband 5 mm m2 156,750.00 159,600.00 142,500.00
180 Kaca Buram/Es 5 mm m2 82,500.00 84,000.00 75,000.00
181 Bingkai Kaca Nako Set 27,500.00 28,000.00 25,000.00
182 Kaca Naco 6 daun Set 140,250.00 142,800.00 127,500.00
183 Kaca Naco 8 daun Set 156,750.00 159,600.00 142,500.00
184 Kaca Naco Rayben 5 mm, 6 daun Set 184,250.00 187,600.00 167,500.00
185 Kaca Naco Rayben 5 mm, 8 daun Set 195,250.00 198,800.00 177,500.00
186 Kait angin Jendela Buah 5,500.00 5,600.00 5,000.00
187 Kalsiboard 3,5 mm (120 cm X 240 cm) Kpg 58,300.00 59,360.00 53,000.00
188 Kalsiboard 4,5 mm (120 cm X 240 cm) Kpg 68,750.00 70,000.00 62,500.00
189 Kapur kg 3,300.00 3,360.00 3,000.00
190 Karpet tebal 6 mm m2 75,625.00 77,000.00 68,750.00
191 Kawat Beton kg 18,700.00 19,040.00 17,000.00
192 Kawat Burung m2 11,000.00 11,200.00 10,000.00
193 Kawat Duri m' 2,640.00 2,688.00 2,400.00
194 Kawat Harmonika m2 38,500.00 39,200.00 35,000.00
195 Kawat Jaring pagar lbr 27,500.00 28,000.00 25,000.00
196 Kawat Kassa m2 11,000.00 11,200.00 10,000.00
197 Kawat Las Dos 57,750.00 58,800.00 52,500.00
198 Kawat Nyamuk m2 18,700.00 19,040.00 17,000.00
199 Kawat Seng Polos kg 17,050.00 17,360.00 15,500.00
200 Kayu Gelam dia. 6-8 btg 5,500.00 5,600.00 5,000.00
201 Kayu Gelam dia. 10-12 btg 7,150.00 7,280.00 6,500.00
202 Kayu Hek btg 9,350.00 9,520.00 8,500.00
203 Kayu Lis 1/3 m' 1,237.50 1,260.00 1,125.00
204 Kayu Lis 1/4 m' 1,512.50 1,540.00 1,375.00
205 Kayu Lis Profil kecil m' 1,650.00 1,680.00 1,500.00
206 Kayu Lis Profil sedang m' 3,300.00 3,360.00 3,000.00
207 Kayu Lis Profil besar m' 7,150.00 7,280.00 6,500.00
208 Kayu Mosaik 30 x 30 cm Buah 6,050.00 6,160.00 5,500.00
209 Kayu Kaso 5/7 kelas III (Meranti dan sejenis) Btg 53,900.00 54,880.00 49,000.00
210 Kayu Kelas I (Unglen, Jati) m3 6,050,000.00 6,160,000.00 5,500,000.00
211 Kayu Kelas II (Petanang dan sejenis) m3 4,290,000.00 4,368,000.00 3,900,000.00
212 Kayu Kelas III (Meranti dan sejenis) m3 3,245,000.00 3,304,000.00 2,950,000.00
213 Kayu Papan 3/20 Kls. III m3 2,062,500.00 2,100,000.00 1,875,000.00
214 Kayu Kelas IV (Racuk dan sejenis) m3 1,210,000.00 1,232,000.00 1,100,000.00
215 Kayu Papan kelas IV keping 16,500.00 16,800.00 15,000.00
216 Kayu Racuk m3 935,000.00 952,000.00 850,000.00
217 Kayu Reng btg 13,200.00 13,440.00 12,000.00
218 Keramik lantai/dinding 20 x 20/25 cm putih polos Kotak 50,600.00 51,520.00 46,000.00
Keramik lantai/dinding 20 x 20/25 cm putih polos buah 2,024.00 2,060.80 1,840.00
219 Keramik lantai 20 x 20 cm warna, mutu C Kotak 46,750.00 47,600.00 42,500.00
Keramik lantai 20 x 20 cm warna, mutu C buah 1,870.00 1,904.00 1,700.00
220 Keramik lantai 20 x 20 cm warna, mutu B Kotak 68,200.00 69,440.00 62,000.00
Keramik lantai 20 x 20 cm warna, mutu B buah 2,728.00 2,777.60 2,480.00
221 Keramik dinding 20 x 25 cm warna Kotak 53,350.00 54,320.00 48,500.00
Keramik dinding 20 x 25 cm warna buah 2,667.50 2,716.00 2,425.00
222 Keramik lantai 20 x 25 cm warna, mutu B Kotak 74,800.00 76,160.00 68,000.00
Keramik lantai 20 x 25 cm warna, mutu B buah 2,992.00 3,046.40 2,720.00
- 28 -
Daftar Harga Satuan Upah, Bahan Bangunan dan Peralatan Tahun 2010 Semester I
HRG SATUAN HARGA HARGA
NO URAIAN SATUAN
(RUPIAH) Swakelola (Rp) DASAR (Rp)
223 Keramik lantai 30 x 30 cm warna Kotak 53,350.00 54,320.00 48,500.00
Keramik lantai 30 x 30 cm warna buah 4,801.50 4,888.80 4,365.00
224 Keramik lantai 30 x 30 cm putih polos Kotak 37,400.00 38,080.00 34,000.00
Keramik lantai 30 x 30 cm putih polos buah 3,366.00 3,427.20 3,060.00
225 Keramik lantai 40 x 40 cm warna mutu C Kotak 56,100.00 57,120.00 51,000.00
Keramik lantai 40 x 40 cm warna mutu C buah 8,976.00 9,139.20 8,160.00
226 Keramik lantai 40 x 40 cm warna mutu B Kotak 102,300.00 104,160.00 93,000.00
Keramik lantai 40 x 40 cm warna mutu B buah 16,368.00 16,665.60 14,880.00
227 Keramik lantai motif kayu (kasar) mutu A Kotak 127,600.00 129,920.00 116,000.00
228 Klem Talang Paralon Buah 2,475.00 2,520.00 2,250.00
229 Klem kabel listrik biasa Buah 82.50 84.00 75.00
230 Klem kabel listrik Buah 3,025.00 3,080.00 2,750.00
231 Korosin Ltr 2,200.00 2,240.00 2,000.00
232 Kran Air buah 9,350.00 9,520.00 8,500.00
233 Kuas 3"-4" buah 6,600.00 6,720.00 6,000.00
234 Kunci Gembok buah 9,900.00 10,080.00 9,000.00
235 Kunci Lemari buah 13,200.00 13,440.00 12,000.00
236 Kunci Pintu Kamar Tidur (Hotel) buah 495,000.00 504,000.00 450,000.00
237 Kunci Pintu KM/WC (lux) buah 396,000.00 403,200.00 360,000.00
238 Kunci Selot buah 3,850.00 3,920.00 3,500.00
239 Kunci Tanam biasa mutu C buah 24,750.00 25,200.00 22,500.00
240 Kunci Tanam 2 slaag biasa buah 79,750.00 81,200.00 72,500.00
241 Kunci Tanam 2 slaag mutu B buah 134,750.00 137,200.00 122,500.00
242 Kunci Tanam Kamar Mandi buah 24,750.00 25,200.00 22,500.00
243 L.bow listrik buah 550.00 560.00 500.00
244 Lampu Down Light buah 41,250.00 42,000.00 37,500.00
245 Lampu Hologen 50 watt buah 9,900.00 10,080.00 9,000.00
246 Lampu Hologen 150 watt buah 41,250.00 42,000.00 37,500.00
247 Lampu Hologen Box buah 33,000.00 33,600.00 30,000.00
248 Lampu TL 10 Watt buah 49,500.00 50,400.00 45,000.00
249 Lampu TL 20 Watt buah 71,500.00 72,800.00 65,000.00
250 Lampu TL 40 Watt (bambu) buah 82,500.00 84,000.00 75,000.00
251 Lampu Pijar 25 Watt Putih buah 12,100.00 12,320.00 11,000.00
252 Lampu Pijar 40 Watt Putih buah 13,200.00 13,440.00 12,000.00
253 Lantai Granit 30/30 Buah 18,810.00 19,152.00 17,100.00
254 Lantai Granit 40/40 Buah 40,480.00 41,216.00 36,800.00
255 Lantai Granit 60/60 Buah 114,840.00 116,928.00 104,400.00
256 Lantai Kayu Panil Gracewood m2 387,750.00 394,800.00 352,500.00
257 Las dop listrik Buah 1,100.00 1,120.00 1,000.00
258 Lem Kayu ltr 34,100.00 34,720.00 31,000.00
259 Lem Vinyl Kg 4,950.00 5,040.00 4,500.00
260 List Gypsum Besar m' 20,900.00 21,280.00 19,000.00
261 List Gypsum Kecil m' 15,400.00 15,680.00 14,000.00
262 Mangkok Saklar listrik Buah 990.00 1,008.00 900.00
263 MCB Buah 16,500.00 16,800.00 15,000.00
264 MCB Box isi 4 grup Buah 19,250.00 19,600.00 17,500.00
265 MCB Box isi 8 grup Buah 35,750.00 36,400.00 32,500.00
266 Melamic Clear kg 34,100.00 34,720.00 31,000.00
267 Melamic Gloss/dop (Finishing) kg 55,000.00 56,000.00 50,000.00
268 Mill kg 32,450.00 33,040.00 29,500.00
269 Minyak Bekisting liter 11,000.00 11,200.00 10,000.00
270 Minyak Cat liter 4,400.00 4,480.00 4,000.00
271 Minyak solar untuk industri / Minyak aspal liter 4,620.00 4,704.00 4,200.00
272 Minyak Gardan liter 17,050.00 17,360.00 15,500.00
273 Minyak Hidrolik liter 25,850.00 26,320.00 23,500.00
274 Minyak Selinder liter 17,050.00 17,360.00 15,500.00
275 Mozaik kayu lantai Uk. 30 x 30 cm buah 8,250.00 8,400.00 7,500.00
276 Pagar BRC, uk. 240 cm X 120 cm, dia. 5,5 mm Unit 341,000.00 347,200.00 310,000.00
277 Pagar BRC, uk. 240 cm X 90 cm, dia. 6 mm Unit 374,000.00 380,800.00 340,000.00
278 Paku Biasa bermacam ukuran 2" - 5" kg 18,150.00 18,480.00 16,500.00
279 Paku Biasa /2" - 1"
1
kg 18,150.00 18,480.00 16,500.00
280 Paku Sumbat buah 522.50 532.00 475.00
- 29 -
Daftar Harga Satuan Upah, Bahan Bangunan dan Peralatan Tahun 2010 Semester I
HRG SATUAN HARGA HARGA
NO URAIAN SATUAN
(RUPIAH) Swakelola (Rp) DASAR (Rp)
281 Paku Beton buah 605.00 616.00 550.00
282 Paku Gypsum kg 68,750.00 70,000.00 62,500.00
283 Paku Seng,Asbes kg 19,800.00 20,160.00 18,000.00
284 Paku Asbes buah 522.50 532.00 475.00
285 Paku Sekrup 3,5" Kg 41,250.00 42,000.00 37,500.00
286 Paku Sekrup 3,5" buah 412.50 420.00 375.00
287 Parquet Jati m2 423,500.00 431,200.00 385,000.00
288 Pasir Beton / Pasang m3 82,500.00 84,000.00 75,000.00
289 Pasir Urug m3 71,500.00 72,800.00 65,000.00
290 Pewarna nat Bks 1,650.00 1,680.00 1,500.00
291 Pintu Alluminium m2 495,000.00 504,000.00 450,000.00
292 Pintu Besi Baja m2 1,925,000.00 1,960,000.00 1,750,000.00
293 Pintu Lipat m2 371,250.00 378,000.00 337,500.00
294 Pintu PVC lengkap + pemasangan Unit 495,000.00 504,000.00 450,000.00
295 Pipa besi medium 2 mm & 1/2", pjg 6 m M' 9,166.67 9,333.33 8,333.33
296 Pipa besi medium 2 mm & 3/4", pjg 6 m M' 11,000.00 11,200.00 10,000.00
297 Pipa besi medium 2 mm & 1", pjg 6 m M' 13,750.00 14,000.00 12,500.00
298 Pipa besi medium 2 mm & 1,5", pjg 6 m M' 21,083.33 21,466.67 19,166.67
299 Pipa besi medium 2 mm & 2", pjg 6 m M' 30,250.00 30,800.00 27,500.00
300 Pipa besi medium 2 mm & 2,5", pjg 6 m M' 49,958.33 50,866.67 45,416.67
301 Pipa besi medium 2 mm & 3", pjg 6 m M' 57,291.67 58,333.33 52,083.33
302 Pipa besi medium 2 mm & 4", pjg 6 m M' 85,250.00 86,800.00 77,500.00
303 Pipa paralon listrik 5/8" Btg 4,950.00 5,040.00 4,500.00
304 Pipa PVC & 1/2" mutu A (Wavin dan sejenis) M' 2,750.00 2,800.00 2,500.00
305 Pipa PVC biasa & 1/2" mutu B M' 1,375.00 1,400.00 1,250.00
306 Pipa PVC & 3/4" mutu A (Wavin dan sejenis) M' 3,666.67 3,733.33 3,333.33
307 Pipa PVC & 3/4" mutu B M' 1,833.33 1,866.67 1,666.67
308 Pipa PVC & 1" mutu A (Wavin dan sejenis) M' 4,400.00 4,480.00 4,000.00
309 Pipa PVC & 1" mutu B M' 2,750.00 2,800.00 2,500.00
310 Pipa PVC & 1.5" mutu A (Wavin dan sejenis) M' 7,791.67 7,933.33 7,083.33
311 Pipa PVC & 1.5" mutu B M' 3,116.67 3,173.33 2,833.33
312 Pipa PVC & 2" mutu A ( Wavin dan sejenis) M' 10,541.67 10,733.33 9,583.33
313 Pipa PVC & 2" mutu B M' 4,950.00 5,040.00 4,500.00
314 Pipa PVC & 3" mutu A (Wavin dan sejenis) M' 20,350.00 20,720.00 18,500.00
315 Pipa PVC & 3" mutu B M' 7,333.33 7,466.67 6,666.67
316 Pipa PVC & 4" mutu A ( Wavin dan sejenis) M' 36,300.00 36,960.00 33,000.00
317 Pipa PVC & 4" mutu B M' 11,458.33 11,666.67 10,416.67
318 Pipa PVC & 6" (15 cm) mutu A (Wavin dan sejenis) M' 96,250.00 98,000.00 87,500.00
319 Pipa Stainless 2", tebal 1 mm M' 54,083.33 55,066.67 49,166.67
320 Pipa Stainless 2", tebal 0.8 mm M' 44,916.67 45,733.33 40,833.33
321 Pipa Stainless 2,5", tebal 1 mm M' 66,458.33 67,666.67 60,416.67
322 Pipa Stainless 2,5", tebal 1.2 mm M' 78,833.33 80,266.67 71,666.67
323 Plamir Tembok kg 24,750.00 25,200.00 22,500.00
324 Plamir Kayu kg 26,400.00 26,880.00 24,000.00
325 Plat stainless, tebal 1 mm, uk. 244 cm X 122 cm Lbr 1,705,000.00 1,736,000.00 1,550,000.00
326 Plint keramik 10 x 30 cm warna buah 3,300.00 3,360.00 3,000.00
327 Plint keramik 10 x 40 cm warna buah 3,850.00 3,920.00 3,500.00
328 Plint Ubin PC Abu-abu 15 x 20 cm buah 797.50 812.00 725.00
329 Plint Ubin PC Abu-abu 10 x 30 cm buah 852.50 868.00 775.00
330 Plint Ubin PC Abu-abu 10 x 40 cm buah 907.50 924.00 825.00
331 Plywood warna/Jabarwood Lbr 68,750.00 70,000.00 62,500.00
332 Plywood Jati 3 mm Lbr 121,000.00 123,200.00 110,000.00
333 Plywood Sungkay 3 mm/ megatick Lbr 121,000.00 123,200.00 110,000.00
334 Plywood 3 mm Lbr 45,100.00 45,920.00 41,000.00
335 Plywood 4 mm Lbr 61,600.00 62,720.00 56,000.00
336 Plywood 6 mm Lbr 82,500.00 84,000.00 75,000.00
337 Plywood 9 mm Lbr 126,500.00 128,800.00 115,000.00
338 Plywood 12 mm Lbr 162,250.00 165,200.00 147,500.00
339 Plywood 20 mm Lbr 195,250.00 198,800.00 177,500.00
340 Politur dasar ltr 29,700.00 30,240.00 27,000.00
341 Politur Jadi ltr 42,900.00 43,680.00 39,000.00
342 Porselin Putih Uk. 10 x 10 cm buah 440.00 448.00 400.00
- 30 -
Daftar Harga Satuan Upah, Bahan Bangunan dan Peralatan Tahun 2010 Semester I
HRG SATUAN HARGA HARGA
NO URAIAN SATUAN
(RUPIAH) Swakelola (Rp) DASAR (Rp)
343 Porselin Warna Uk. 10 x 10 cm buah 852.50 868.00 775.00
344 Rangka Atap baja ringan untuk atap genteng, genteng m2 200,750.00 204,400.00 182,500.00
keramik, beton, dll + pemasangan
345 Rangka Atap baja ringan untuk atap seng metal, atap m2 192,500.00 196,000.00 175,000.00
asbes, aluminium, sirap, dll + pemasangan
346 Rangka Atap baja ringan bentuk joglo/bertumpuk/ m2 236,500.00 240,800.00 215,000.00
khusus + pemasangan
347 Rangka Atap baja ringan "Pryda" untuk atap Pelana, m2 267,300.00 272,160.00 243,000.00
Metal dan keramik + pemasangan
348 Rangka Atap baja ringan "Pryda" untuk atap Perisai, m2 287,650.00 292,880.00 261,500.00
Metal dan keramik + pemasangan
349 Rangka Atap baja ringan "Pryda" untuk atap Joglo, m2 303,600.00 309,120.00 276,000.00
Metal dan keramik + pemasangan
350 Rel Pintu Dorong Unit 214,500.00 218,400.00 195,000.00
351 Rolling Door Standar, t=4 mm, (minimal pas. 7 M2) m2 269,500.00 274,400.00 245,000.00
352 Rolling Door Standar, t=5 mm, (minimal pas. 7 M2) m2 297,000.00 302,400.00 270,000.00
353 Sanding Sealer Impra (Cat dasar) Kg 38,500.00 39,200.00 35,000.00
354 Seal Tape buah 2,200.00 2,240.00 2,000.00
355 Semen ( 50 kg ) Zak 57,200.00 58,240.00 52,000.00
356 Semen Portland ( PC ) kg 2,200.00 2,240.00 2,000.00
357 Semen Putih (40 kg) Zak 99,000.00 100,800.00 90,000.00
358 Semen Putih Kg 4,400.00 4,480.00 4,000.00
359 Semen Merah m3 38,500.00 39,200.00 35,000.00
360 Semen Nat kg 9,900.00 10,080.00 9,000.00
361 Seng Gelombang, lebar 70 cm m2 34,800.34 35,433.07 6,750.00
362 Seng Plat 120 cm X 240 cm lbr 96,250.00 98,000.00 87,500.00
363 Seng Plat 33 cm M' 10,450.00 10,640.00 9,500.00
364 Seng Plat 38 cm M' 13,750.00 14,000.00 12,500.00
365 Seng Plat 45 cm M' 16,500.00 16,800.00 15,000.00
366 Seng Plat 55 cm M' 20,075.00 20,440.00 18,250.00
367 Seng Plat 88 cm M' 30,800.00 31,360.00 28,000.00
368 Seng Plat 92 cm M' 30,250.00 30,800.00 27,500.00
369 Sabun Kg 11,000.00 11,200.00 10,000.00
370 shower Unit 112,000.00 111,000.00 100,000.00
371 Soda Api Kg 30,800.00 31,360.00 28,000.00
372 Soft Board ( 120 x 240 ) mm lbr 60,500.00 61,600.00 55,000.00
373 Saklar Tunggal biasa Buah 6,050.00 6,160.00 5,500.00
374 Saklar Ganda biasa Buah 8,800.00 8,960.00 8,000.00
375 Saklar Tunggal National Buah 18,700.00 19,040.00 17,000.00
376 Saklar Ganda National Buah 37,400.00 38,080.00 34,000.00
377 Scafolding tg 1,77 m X 1,77 m Unit 715,000.00 728,000.00 650,000.00
378 Roda Scafolding 4 buah Unit 385,000.00 392,000.00 350,000.00
379 Smartruss Aluminium Magnesium
- Lysaght Smartruss C 75.100 M' 24,200.00 24,640.00 22,000.00
- Lysaght Smartruss C 75.75 M' 19,250.00 19,600.00 17,500.00
- Reng U T S 40 M' 14,300.00 14,560.00 13,000.00
- Screw / Dynabolt Buah 1,320.00 1,344.00 1,200.00
- Valery Gutter Talang Jurai M' 110,000.00 112,000.00 100,000.00
- Strap Bracing M' 6,600.00 6,720.00 6,000.00
380 Stop Kontak biasa Buah 6,600.00 6,720.00 6,000.00
381 Stop kontak AC Buah 52,250.00 53,200.00 47,500.00
382 Sunscreen Aluminium M2 357,500.00 364,000.00 325,000.00
383 T.Duss listrik Buah 825.00 840.00 750.00
384 Talang Paralon, pjg 4 m btg 45,650.00 46,480.00 41,500.00
385 Tali Ijuk Kg 9,900.00 10,080.00 9,000.00
386 Ijuk m3 6,600.00 6,720.00 6,000.00
387 Tanah Liat/Urug m3 37,400.00 38,080.00 34,000.00
388 Tanah Puru m3 55,000.00 56,000.00 50,000.00
389 Tanah Sirtu m3 71,500.00 72,800.00 65,000.00
390 Taekwood 3 mm m2 29,150.00 29,680.00 26,500.00
391 Taekwood 4 mm biasa m2 34,650.00 35,280.00 31,500.00
392 Ter / Residu liter 2,475.00 2,520.00 2,250.00
- 31 -
Daftar Harga Satuan Upah, Bahan Bangunan dan Peralatan Tahun 2010 Semester I
HRG SATUAN HARGA HARGA
NO URAIAN SATUAN
(RUPIAH) Swakelola (Rp) DASAR (Rp)
393 Textil Tape roll 6,600.00 6,720.00 6,000.00
394 Thinner biasa Liter 12,100.00 12,320.00 11,000.00
395 Thinner Cat Glossy (Cobra dan sejenis) Liter 25,300.00 25,760.00 23,000.00
396 Urinoir buah 1,338,700.00 1,363,040.00 1,217,000.00
397 Urinoir mutu A unit 1,540,000.00 1,568,000.00 1,400,000.00
398 Vernis ltr 44,000.00 44,800.00 40,000.00
399 Vernis Batu Kg 64,900.00 66,080.00 59,000.00
400 Wallpaper m2 49,500.00 50,400.00 45,000.00
401 Wastafel biasa buah 165,000.00 168,000.00 150,000.00
402 Wastafel Halmar unit 247,500.00 252,000.00 225,000.00
403 Wastafel mutu A unit 1,870,000.00 1,904,000.00 1,700,000.00
404 Wood Filler Impra (dempul) Klg 27,500.00 28,000.00 25,000.00
405 Wood Stain Impra (cat pewarna) Klg 55,000.00 56,000.00 50,000.00
C PERALATAN
1 Asphalt Finisher jam 236,500.00 240,800.00 215,000.00
2 Asphalt Mixing Plan jam 1,760,000.00 1,792,000.00 1,600,000.00
3 Asphalt Sprayer jam 71,500.00 72,800.00 65,000.00
4 Compresor jam 143,000.00 145,600.00 130,000.00
5 Concrete Mixer jam 16,500.00 16,800.00 15,000.00
6 Concrete Pump jam 206,250.00 210,000.00 187,500.00
7 Concrete Vibrator jam 24,200.00 24,640.00 22,000.00
8 Dump Truck jam 319,000.00 324,800.00 290,000.00
9 Excavator jam 654,500.00 666,400.00 595,000.00
10 Filter jam 44,000.00 44,800.00 40,000.00
11 Genset jam 11,000.00 11,200.00 10,000.00
12 Grader jam 517,000.00 526,400.00 470,000.00
13 Loader jam 412,500.00 420,000.00 375,000.00
14 Pneumatic Tired Roller jam 401,500.00 408,800.00 365,000.00
15 Tandem Roller jam 264,000.00 268,800.00 240,000.00
16 Flatbed Truck 3,5 ton jam 247,500.00 252,000.00 225,000.00
17 Water Tank Truck jam 330,000.00 336,000.00 300,000.00
18 Generator jam 38,500.00 39,200.00 35,000.00
19 Alat Bantu jam 82,500.00 84,000.00 75,000.00
20 Roller 3 roda jam 181,500.00 184,800.00 165,000.00
21 Sprayer, Selfprof jam 154,000.00 156,800.00 140,000.00
22 Buldozer jam 709,500.00 722,400.00 645,000.00
23 Scaffolding 177cm X 177 cm, Tg. 177 cm Set/Bulan 52,250.00 53,200.00 47,500.00
24 Stone Crusher (Pemecah batu) jam 858,000.00 873,600.00 780,000.00
25 Pengaduk beton jam 110,000.00 112,000.00 100,000.00
26 Stemper jam 26,400.00 26,880.00 24,000.00
27 Roller, Vibrator Pneu jam 99,000.00 100,800.00 90,000.00
28 Water Pump jam 23,650.00 24,080.00 21,500.00
D SERVICE
1 AC Window/Split/Multi Ls 55,000.00 50,000.00 50,000.00
2 Dispenser Ls 38,500.00 35,000.00 35,000.00
3 Kulkas/Freezer Ls 38,500.00 35,000.00 35,000.00
4 Kompor Gas 2T Ls 38,500.00 35,000.00 35,000.00
5 Kompor Gas 4T Ls 60,500.00 55,000.00 55,000.00
6 Mesin Cuci Ls 38,500.00 35,000.00 35,000.00
7 Pompa Air Ls 38,500.00 35,000.00 35,000.00
8 Instalasi listrik Ls 49,500.00 45,000.00 45,000.00
- 32 -
STANDAR HARGA SATUAN BAHAN BANGUNAN DAN UPAH KERJA
PEMERINTAH PROVINSI SULAWESI SELATAN
MAKASSAR, GOWA, TAKALAR DAN JENEPONTO
TAHUN 2015
Dalam Rupiah (Rp)
NO JENIS BAHAN SATUAN MAKASSAR GOWA TAKALAR
BAHAN DASAR
1 Batu Kali
Utuh M³ 184,000 142,000 147,000
Batu pecah 7 - 10 cm M³ 237,000 232,000 268,800
Batu pecah 5 - 7 cm M³ 256,000 247,000 268,800
Batu pecah 3 - 5 cm M³ 262,000 252,000 273,600
Batu pecah 2 - 3 cm M³ 267,000 257,000 262,000
Batu pecah 1 - 2 cm M³ 272,000 262,000 288,000
Batu pecah 0.51 - 1 cm M³ 317,000 267,000 297,600
2 Batu Merah Buah 550 500 575
3 Batu Gunung M³ 167,000 155,000 150,000
4 Batu Alam
Andesit Biasa M² 186,000 186,500 187,000
Andesit Susun Sirih M² 285,000 285,500 286,000
Andesit Halus M² 185,000 185,500 186,000
Andesit Gelombang M² 196,000 196,500 197,000
Batu Candi Permukaan Rata M² 175,000 175,500 176,000
Batu Palimanan Kuning M² 180,000 180,500 181,000
Batu Hijau Sukabumi M² 170,000 170,500 171,000
Batu Bali Green M² 166,000 166,500 167,000
Batu Bali Napoli M² 185,000 185,500 186,000
Paras Jokja Besar M² 180,000 180,500 181,000
Batu Cirebon Beraturan M² 170,000 170,500 171,000
Batu Cirebon Tidak Beraturan M² 125,000 125,500 126,000
5 Tanah Timbunan M³ 110,000 100,000 105,000
6 Pasir
Timbunan / Urug M³ 100,000 83,000 88,000
Pasangan M³ 135,000 100,000 110,000
Beton M³ 148,000 130,000 134,000
7 Kerikil M³ 277,000 272,000 282,000
8 Sirtu M³ 177,000 158,000 162,000
9 Kapur Pasangan Zak 60,000 63,000 64,000
10 Semen PC (40 kg) Zak 51,000 49,000 49,500
11 Semen Putih (50 Kg) Zak 53,000 53,500 54,000
12 Bata Ringan/Hebel(60x20x7,5 s/d 20) M³ 1,200,000 1,205,000 1,210,000
13 Semen Prime Mortar
PM 110 (40 Kg) Perekat Zak 75,000 75,500 76,000
PM 210 (50 Kg) Plesteran Zak 65,000 65,500 66,000
PM 310 (40 Kg) Acian Zak 65,000 65,500 66,000
14 Paving Blok Mutu (K 175)
Tebal 6 Cm M² 55,000 56,000 57,000
Tebal 8 Cm M² 60,000 61,000 62,000
Berlian M² 51,000 52,000 53,000
15 Paving Blok Mutu (K 225)
Tebal 6 Cm M² 59,000 60,000 61,000
Tabal 8 Cm M² 62,000 63,000 64,000
16 Paving Blok Mutu ( K 300)
Tebal 6 Cm M² 60,000 61,000 62,000
Tebal 8 cm M² 65,000 66,000 67,000
17 Paving Blok Mutu (K 400) M² 75,000 76,000 77,000
18 Topiuskup (K 225) biji 4,200 4,700 5,200
19 Kanstin 20x25x50 biji 37,000 38,000 39,000
20 Buis Beton
d=20 cm Biji 215,000 225,000 235,000
d=30 cm Biji 256,000 266,000 276,000
d=40 cm Biji 326,500 336,500 346,500
d=50 cm Biji 386,000 396,000 406,000
d=60 cm Biji 442,000 452,000 462,000
BAHAN KAYU
1 Kayu Kelas I
Balok Gergaji Sawmil M³ 9,550,000 10,050,000 10,300,000
Papan Gergaji Sawmil M³ 10,050,000 10,550,000 10,550,000
Balok Gergaji Sansaw M³ 8,550,000 8,650,000 8,750,000
Papan Gergaji Sansaw M³ 8,650,000 8,850,000 8,800,000
2 Kayu Kelas II
Balok M³ 4,550,000 4,800,000 4,850,000
Papan M³ 4,850,000 4,650,000 4,700,000
3 Kayu Kelas III
Balok M³ 2,800,000 2,850,000 2,900,000
Papan M³ 3,275,000 3,425,000 3,475,000
BAHAN LANTAI
Tegel Keramik
Putih 10 X 20 cm Dos 45,000 45,500 46,000
Warna 10 X 20 cm Dos 47,000 47,500 48,000
Putih 20 X 20 cm Dos 60,000 60,500 61,000
Warna 20 X 20 cm Dos 65,000 65,500 66,000
Putih 20 X 25 cm Dos 60,000 60,500 61,000
Warna 20 X 25 cm Dos 65,000 65,500 66,000
Putih 30 X 30 cm Dos 50,000 50,500 51,000
Warna 30 X 30 cm Dos 60,000 60,500 61,000
Putih 40 X 40 cm Dos 55,000 55,500 56,000
Warna 40 X 40 cm Dos 65,000 65,500 66,000
Warna 50 x 50 cm Dos 135,000 135,500 136,000
Warna 60 x 60 cm Dos 175,000 175,500 176,000
BAHAN KACA
Kaca Bening 3 mm Mtr 100,000 100,500 105,000
Kaca Bening 5 mm Mtr 125,000 125,500 157,500
Kaca Buram 3 mm Mtr 100,000 100,500 157,500
Kaca Buram 5 mm Mtr 110,000 110,500 168,000
Kaca Ryben 3 mm Mtr 150,000 150,500 157,500
Kaca Ryben 5 mm Mtr 175,000 175,500 176,000
Rangka Nako Lengkap Terali 7 mata Set/daun 350,000 350,500 351,000
BAHAN BESI
1 Besi Beton
Ø 4 mm Btg 24,000 24,500 25,000
Ø 6 mm Btg 35,000 35,500 36,000
Ø 8 mm Btg 50,000 50,500 51,000
Ø 10 mm Btg 75,000 75,500 76,000
Ø 12 mm Btg 106,000 106,500 107,000
Ø 14 mm Btg 131,000 131,500 132,000
Ø 16 mm Btg 165,000 165,500 166,000
Ø 19 mm Btg 210,000 222,500 235,000
Ø 22 mm Btg 325,000 325,500 326,000
2 Besi Ulir
d = 13 mm Btg 110,000 110,500 111,000
d = 16 mm Btg 165,000 165,500 166,000
d = 19 mm Btg 227,000 227,500 228,000
3 Paku
Paku Biasa Kg 17,500 18,000 19,500
Paku Asbes Kg 45,000 45,500 46,000
Paku Seng (payung) RRT Dos 21,000 23,500 26,000
Paku skrup 3 ½ inci Dos 15,000 15,100 15,200
Paku Skrup 4 Inci Dos 15,000 15,100 15,600
Paku Payung Berulir 75 mm Kg 35,500 36,000 36,500
Paku Sirap Kg 20,000 20,500 21,000
Paku Beton Hitam Dos 43,500 44,000 44,500
Paku Beton Putih Dos 27,500 28,000 28,500
4 Kawat
Beton Kg 21,000 21,500 22,000
Nyamuk Mtr 30,000 30,500 31,000
Ayakan Kecil mtr 26,000 26,500 27,000
Duri roll 153,000 154,000 155,000
5 Besi Plat
2mm=120x240 mm Lbr 410,000 420,000 430,000
3 mm = 120 X 240 mm Lbr 520,000 530,000 540,000
Besi H 15 cm Panjang 12 m Btg 4,750,000 4,775,000 4,805,000
6 Besi Strep
30.3 mm Btg 34,000 34,500 35,000
35.4 mm Btg 55,000 55,500 56,000
46.4 mm Btg 105,000 105,500 106,000
40.6 mm Btg 75,000 75,500 76,000
50.6 mm Btg 130,000 130,500 131,000
7 Besi Siku
30.30.3 Btg 76,400 76,900 77,400
40.40.4 Btg 146,000 146,500 147,000
40.40.3 Btg 65,500 66,000 66,500
50.50.4 Btg 101,000 101,500 102,000
50.50.5 Btg 230,000 230,500 231,000
60.60.6 Btg 301,000 311,000 321,000
70.70.7 Btg 351,000 356,000 361,000
8 Besi 6 mm Mtr 20,000 20,500 21,000
9 Besi Tipe C (Rangka Baja Ringan) 6 m
Lebar 10, tebal, 1,8 -2,00 mm Btg 138,000 139,000 140,000
Lebar 12,5, tebal 1,8 -2,00 mm Btg 165,000 166,000 167,000
Lebar 15,Tebal 1,8 – 2,00 mm Btg 220,000 221,000 222,000
BAHAN PIPA
1 Pipa Besi GIP
ؽ Inci – 6 m Btg 128,500 129,500 130,500
Ø ¾ Inci – 6 m Btg 120,000 121,000 122,000
Ø 1Inci – 6 m Btg 252,500 253,500 254,500
Ø 2 Inci – 6 m Btg 550,000 555,000 565,000
Ø 2 ½ Inci – 6 m Btg 900,000 905,000 910,000
Ø 3 Inci – 6 m Btg 1,150,000 1,175,000 1,200,000
2 Pipa PVC Air Bersih
Ø ½ Inci – 6 m Btg 22,500 23,000 23,500
Ø ¾ Inci – 6 m Btg 32,000 32,500 33,000
Ø 1 Inci – 6 m Btg 44,000 44,500 45,000
Ø 1½ Inci – 6 m Btg 102,690 103,190 103,690
Ø 2 Inci – 6 m Btg 130,500 131,500 132,500
Ø 2 ½ Inci – 6 m Btg 186,800 187,800 188,800
Ø 3 Inci – 6 m Btg 135,400 136,400 137,400
Ø 4 Inci – 6 m Btg 400,000 405,000 410,000
Ø 6 Inci – 6 m Btg 855,700 864,700 884,700
Ø 8 Inci – 6 m Btg 1,405,000 1,445,000 1,495,000
Ø 10 Inci – 6 m Btg 2,232,250 2,248,250 2,298,250
3 Pipa untuk Saluran Pembuangan Air
Ø ½ Inci – 4 m Btg 22,500 23,000 23,500
Ø ¾ Inci – 4 m Btg 27,500 28,000 28,500
Ø 1 Inci – 4 m Btg 33,500 34,000 34,500
Ø 1 ½ Inci – 4 m Btg 96,500 97,000 97,500
Ø 2 Inci – 4 m Btg 152,500 153,000 153,500
Ø 2 ½ Inci – 4 m Btg 220,000 220,500 221,000
Ø 3 Inci – 4 m Btg 315,000 316,000 317,000
Ø 4 Inci – 4 m Btg 473,000 476,000 481,000
Ø 5 Inci – 4 m Btg 764,500 767,500 777,500
Ø 6 Inci – 4 m Btg 1,011,000 1,105,000 1,205,000
Ø 10 Inci – 4 m Btg 2,461,000 2,505,000 2,555,000
4 Pipa Untuk Instalasi Listrik
Ø 5/8 Inci – 4 m Btg 15,500 16,000 16,500
Ø ¾ Inci – 4 m Btg 25,500 26,000 26,500
Ø 1 Inci – 4 m Btg 32,500 33,000 33,500
Ø 1 ½ Inci – 4 m Btg 96,500 97,000 97,500
BAHAN LANGIT-LANGIT
1 Eternit 100 X 100 Set 18,500 19,000 19,500
2 Tripleks
122 X 244 x 0.2 cm Lbr 52,500 53,000 53,500
122 X 244 x 0.3 cm Lbr 70,000 70,500 71,000
122 X 244 x 0.6 cm Lbr 98,000 100,000 100,500
122 X 244 x 0.9 cm Lbr 130,000 130,500 131,000
3 Tripleks Melamin
122 X 244 x 0.3 cm Lbr 85,500 86,000 86,500
4 Accoustic 40 X 60 Lbr 55,500 56,000 56,500
5 Teakwood
80 X 244 x 0.3 cm Lbr 92,000 92,500 93,000
122 X 244 x 0.3 cm Lbr 96,500 97,000 97,500
Karsiboard Lbr 70,000 70,500 71,000
Gypsum Lbr 63,500 64,000 64,500
Les gipsum Lbr 29,500 30,000 30,500
6 Hard Board 122 X 244 cm Lbr 77,000 77,500 78,000
7 Asbes Plat Harfeks
200 X 100 X 0.3 cm Lbr 48,500 49,000 49,500
8 List Profil
2 x 3 cm / 4 m Btg 11,500 12,000 12,500
3 x 3 cm / 4 m Btg 15,500 16,000 16,500
4 x 4 cm / 4 m Btg 19,500 20,000 20,500
4 x 5 cm / 4 m Btg 25,500 26,000 26,500
BAHAN ATAP
1 Genteng
Beton Biji 33,500 34,000 34,500
Keramik Bh 16,000 16,500 17,000
Asbes gelombang 7 kaki Lbr 60,000 60,500 61,000
Harfles (115X85x0.5 cm) Lbr 63,000 63,500 64,000
2 Atap Metal lbr 87,000 87,500 88,000
3 Asbes Genteng Lbr 72,500 73,000 73,500
4 Sirap Ikat 305,000 310,000 315,000
5 Seng gelombang kecil
BJLS 0.20 mm Kaki 7,000 7,500 8,000
BJLS 0.22 mm Kaki 7,500 8,000 8,500
BJLS 0.30 mm Lbr 54,000 54,500 55,000
BJLS 0.35 mm Lbr 70,500 71,000 71,500
6 Atap Bitumen
Bitumen Gel.Acrylic Base(200x95x0,23 cm) Lbr 173,800 174,300 174,800
Lisplank Acrylic Bace (104x34x023cm) Lbr 101,200 101,700 102,200
Nok Acrylic Base (50x104x0.23 Cm) Lbr 101,200 101,700 102,200
Sekrup Atap 6,5 cm Bh 1,200 1,200 1,300
Sekrup Nok 6,5 cm Bh 1,200 1,200 1,300
Talang Air Acrylic Bace (104x50x0.23cm) Lbr 101,200 101,700 102,200
Sekrup Durafit (Ø 0.355cm - 6,5 cm) Bh 1,350 1,450 1,550
Bitumen Genteng (106x40x0,3 Cm) Lbr 70,000 70,500 71,000
Fiber Glass Gel. (transparan) 200x95x0.23cm Lbr 343,000 343,500 344,000
7 Seng Plat
BJLS 0.30 mm 40x180 Lbr 65,000 65,500 66,000
BJLS 0.35 mm Lbr 75,000 75,500 76,000
8 Seng Super Deck
180 X 70 cm – 10 kaki Kaki 13,000 13,500 14,000
9 Seng Aluminium Gelombang
SWG 32” 0.27 mm Kaki 9,500 10,000 10,500
SWG 30” 0.31 mm Kaki 12,000 12,500 13,000
SWG 28” 0.38 mm Kaki 13,000 13,500 14,000
10 Seng Plastik (Fiber) Kaki 13,500 14,000 14,500
11 Fiber Semen (Harflex)
Super 240 X 108 X 0.6 cm Lbr 79,000 79,500 80,000
Super 180 X 108 X 0.6 cm Lbr 65,000 65,500 66,000
Ekonomi 240 X 92 X 0.5 cm Lbr 69,500 70,000 70,500
Ekonomi 180 X 92 X 0.4 cm Lbr 63,000 63,500 64,000
Mini 240 X 105 X 0.4 cm Lbr 62,500 63,000 63,500
Mini 180 X 92 X 0.5 cm Lbr 71,000 71,500 72,000
Super 240 X 105 X 0.4 cm Lbr 66,500 67,000 67,500
Super 180 X 105 X 0.4 cm Lbr 69,000 69,500 70,000
12 Nok/Bubungan
Genteng Beton Bh 35,500 36,000 36,500
Genteng Asbes Bh 55,500 56,000 56,500
Genteng Keramik Bh 20,500 21,000 21,500
Alm. SWG 28” -180 cm Lbr 45,000 45,500 46,000
Alm. SWG 28” –105 cm Lbr 40,000 40,500 41,000
13 Nok Steel Gelombang
Super – 180 cm Bh 52,500 53,000 53,500
Mini – 105 cm Bh 41,500 42,000 42,500
Ekonomi – 95 cm Bh 19,000 19,500 20,000
14 Nok Steel Rata
Super – 108 cm Bh 30,000 30,500 31,000
Mini – 105 cm Bh 25,500 26,000 26,500
Ekonomi – 95 cm Bh 21,000 21,500 22,000
15 Nok ½ Lingkaran Bh 40,500 41,000 41,500
16 Karet Pelapis Genteng
Ukuran 55 mtr 9,500 10,000 10,500
Ukuran 90 Mtr 19,000 19,500 20,000
BAHAN PENGGANTUNG
1 Kunci Tanam
1 Slag Bh 173,000 173,500 174,000
Double Slag Bh 307,000 311,000 316,000
2 Penggantung
Hak Angin Kecil Bh 10,500 11,000 11,500
Hak Angin Besar Bh 15,500 16,000 16,500
Grendel Kecil Bh 13,500 14,000 14,500
Grendel Besar Bh 17,500 18,000 18,500
Engsel Pintu Bh 35,500 36,000 36,500
Engsel Jendela Bh 26,000 26,500 27,000
Expanyolet Bh 125,000 125,500 126,000
BAHAN SANITER
Kloset Jongkok Bh 230,000 235,000 240,000
Kloset Duduk Bh 2,000,000 2,005,000 2,010,000
Wasthafel warna Bh 475,000 480,000 485,000
Wasthafel cuci piring logam Bh 451,000 456,000 461,000
Pompa Mesin Bh 1,800,000 1,825,000 1,850,000
Urinoir lengkap Bh 1,500,000 1,525,000 1,550,000
Bak Mandi fiber Bh 755,000 760,000 765,000
Reservoir fiber = 1 m3 Bh 1,255,000 1,265,000 1,270,000
Reservoir Stainless stell = 1 m3 Bh 3,400,000 3,450,000 3,500,000
Stop Kran Bh 25,000 26,000 27,000
Kran Air Bh 20,000 20,500 21,000
BAHAN FINISHING/CAT
1 Cat Tembok
Cat Dasar 5 Kg 60,000 61,000 62,000
Cat Kilap 5 Kg 90,000 91,000 92,000
2 Cat Kayu
Cat Dasar Kg 20,000 20,500 21,000
Cat Kilap Ltr 61,000 61,500 62,000
Palatone Ltr 50,500 51,000 51,500
ICI Kg 75,500 76,000 76,500
Politur Kg 51,000 51,500 52,000
Meni 4 Kg 65,500 66,000 66,500
Minyak Cat Ltr 10,000 10,500 11,000
3 Cat Atap
Cat Dasar Kg 30,000 30,500 31,000
Cat Kilap Ltr 90,000 90,500 91,000
Lem Seng Ltr 13,000 13,500 14,000
Amplas/Kertas Gosok M 12,000 12,500 13,000
Dempul Kg 31,000 31,500 32,000
Residu 10 ltr 64,000 64,500 65,000
BAHAN JALAN
Aspal Kg 15,000 15,500 16,000
Minyak Tanah Ltr 10,000 10,500 11,000
Minyak Solar Ltr 4,500 5,000 5,500
Minyak Pelumas Ltr 28,000 28,500 29,000
UPAH KERJA
Pekerja Tidak Terampil Org/hr 65,000 65,000 65,000
Pekerja Terampil Org/hr 75,000 75,000 75,000
Pembantu Masinis Org/hr 80,000 80,000 80,000
Penjaga Gudang Org/hr 100,000 100,000 100,000
Penjaga Malam Org/hr 100,000 100,000 100,000
Tukang :
Tukang Kayu Org/hr 100,000 100,000 100,000
Tukang Batu Org/hr 100,000 100,000 100,000
Tukang Cat Org/hr 100,000 100,000 100,000
Tukang Listrik Org/hr 100,000 100,000 100,000
Tukang Pipa Org/hr 100,000 100,000 100,000
Tukang Besi Org/hr 100,000 100,000 100,000
Kepala Tukang
Kepala Tukang Kayu Org/hr 125,000 125,000 125,000
Kepala Tukang Batu Org/hr 125,000 125,000 125,000
Kepala Tukang Listrik Org/hr 125,000 125,000 125,000
Kepala Tukang Cat Org/hr 125,000 125,000 125,000
Kepala Tukang Pipa Org/hr 125,000 125,000 125,000
Kepala Tukang Besi Org/hr 125,000 125,000 125,000
Mandor Org/hr 150,000 150,000 150,000
JA Standar
175,300 191180
102,700 111320
102,700 111320
1,400 1320
1,400 1320
102,700 111320
1,650 1485
71,500 77000
344,500 377300
66,500 71500
76,500 82500
14,500 14300
11,000 10450
13,500 13200
14,500 14300
15,000 14850
80,500 86900
66,500 71500
71,000 76450
64,500 69300
64,000 68750
72,500 78100
68,000 73150
70,500 75900
37,000 39050
57,000 61050
22,000 22550
46,500 49500
41,500 44000
54,000 57750
43,000 45650
20,500 20900
31,500 33000
27,000 28050
22,500 23100
42,000 44550
11,000 10450
20,500 20900
174,500 190300
321,000 337700
12,000 11550
17,000 17050
15,000 14850
19,000 19250
37,000 39050
27,500 28600
126,500 137500
245,000 253000
2,015,000 2200000
490,000 522500
466,000 496100
1,875,000 1980000
1,555,000 1650000
770,000 830500
1,275,000 1380500
3,550,000 3740000
28,000 27500
21,500 22000
63,000 66000
158,000 99000
21,500 22000
62,500 67100
52,000 55550
77,000 83050
52,500 56100
67,000 72050
11,500 11000
31,500 33000
91,500 99000
14,500 14300
13,500 13200
32,500 34100
65,500 70400
302,500 331100
401,000 424600
637,000 673200
782,000 838200
667,000 717200
95,500 103400
124,500 135300
118,500 128700
151,500 165000
33,500 35200
57,500 61600
107,500 116600
189,500 206800
369,000 389400
24,500 25300
19,500 19800
27,500 28600
22,500 23100
27,500 28600
29,500 30800
84,500 91300
97,000 105050
17,000 17050
16,500 16500
11,500 11000
6,000 4950
29,500 30800
65,000 71500
75,000 82500
80,000 88000
100,000 110000
100,000 110000
100,000 110000
100,000 110000
100,000 110000
100,000 110000
100,000 110000
100,000 110000
125,000 137500
125,000 137500
125,000 137500
125,000 137500
125,000 137500
125,000 137500
150,000 165000
Daftar Analisa Pekerjaan Kota Palembang TA. 2010 Semester I
SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN Satuan Bahan Tenaga Bahan+Tenaga
Analisa
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
4.6 1 M2 Pasang Bekisting Untuk plat dag dan Topi-topi teras
a. Bahan
0.040 M3 Kayu Kls III 3,602,500.00 144,100.00 144,100.00
0.400 Kg Paku Biasa 2"- 5" 18,150.00 7,260.00 7,260.00
0.015 M3 Kayu Balok Kls III 3,080,000.00 46,200.00 46,200.00
0.350 Lbr Plywood 4 mm 61,600.00 21,560.00 21,560.00
6.000 Btg Kayu Gelam dia. 6-8 cm 5,500.00 33,000.00 33,000.00
252,120.00 252,120.00
b. Tenaga
0.320 Oh Pekerja 82,500.00 26,400.00 26,400.00
0.330 Oh Tukang Batu 110,000.00 36,300.00 36,300.00
0.033 Oh Kepala Tukang 137,500.00 4,537.50 4,537.50
0.006 Oh Mandor 165,000.00 990.00 990.00
68,227.50 68,227.50
4.7 1 M3 Beton Ready Mix K-225 untuk Plat atap dag, topi-topi dengan Concrete Pump
a. Bahan
1.020 M3 Beton Ready Mix K-225 723,250.00 737,715.00 737,715.00
737,715.00 737,715.00
b. Tenaga
2 Oh Pekerja 82,500.00 165,000.00 165,000.00
0.1667 Oh Tukang batu 110,000.00 18,337.00 18,337.00
0.00167 Oh Kepala Tukang 137,500.00 229.21 229.21
0.050 Oh Mandor 165,000.00 8,250.00 8,250.00
0.16667 M3 Concrete Pump 206,250.00 34,375.69 34,375.69
226,191.90 226,191.90
a. Bahan ###
0.250 M3 Kayu Kls. IV 1,210,000.00 302,500.00 302,500.00
3.000 Kg Paku Biasa 2"- 5" 18,150.00 54,450.00 54,450.00
200.000 Kg Besi Beton Polos 11,550.00 2,310,000.00 2,310,000.00
3.000 Kg Kawat Beton 396,000.00 1,188,000.00 1,188,000.00
232.000 Kg Semen Portland 2,200.00 510,400.00 510,400.00
0.520 M3 Pasir Beton 82,500.00 42,900.00 42,900.00
0.780 M3 Koral Beton 220,000.00 171,600.00 171,600.00
4,579,850.00 4,579,850.00
b. Tenaga ###
5.600 Oh Pekerja 82,500.00 462,000.00 462,000.00
0.405 Oh Kepala Tukang 137,500.00 55,687.50 55,687.50
0.202 Oh Mandor 165,000.00 33,330.00 33,330.00
551,017.50 551,017.50
b. Tenaga
0.650 Oh Pekerja 82,500.00 53,625.00 53,625.00
0.200 Oh Tukang Batu 110,000.00 22,000.00 22,000.00
0.020 Oh Kepala Tukang 137,500.00 2,750.00 2,750.00
0.030 Oh Mandor 165,000.00 4,950.00 4,950.00
83,325.00 83,325.00
- 55 -
Daftar Analisa Pekerjaan Kota Palembang TA. 2010 Semester I
SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN Satuan Bahan Tenaga Bahan+Tenaga
Analisa
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
0.0430 M3 Pasir Pasang 148,500.00 6,385.50 6,385.50
67,078.00 67,078.00
b. Tenaga
0.320 Oh Pekerja 82,500.00 26,400.00 26,400.00
0.100 Oh Tukang Batu 110,000.00 11,000.00 11,000.00
0.010 Oh Kepala Tukang 137,500.00 1,375.00 1,375.00
0.015 Oh Mandor 165,000.00 2,475.00 2,475.00
41,250.00 41,250.00
a. Bahan
5.200 Kg Semen Portland 2,200.00 11,440.00 11,440.00
0.020 M3 Pasir Pasang 82,500.00 1,650.00 1,650.00
13,090.00 13,090.00
b. Tenaga
0.200 Oh Pekerja 82,500.00 16,500.00 16,500.00
0.150 Oh Tukang Batu 110,000.00 16,500.00 16,500.00
0.015 Oh Kepala Tukang 137,500.00 2,062.50 2,062.50
0.010 Oh Mandor 165,000.00 1,650.00 1,650.00
36,712.50 36,712.50
###
Jumlah 13,090.00 36,712.50 49,802.50
VI PEKERJAAN ATAP
###
6.1 1 M3 Kuda-Kuda dan Gording Kayu kelas II ###
a. Bahan ###
1.100 M3 Kayu Kelas II 5,005,000.00 5,505,500.00 5,505,500.00
15.000 Kg Besi Strip 60,500.00 907,500.00 907,500.00
0.250 Kg Paku Biasa 19,250.00 4,812.50 4,812.50
6,417,812.50 6,417,812.50
b. Tenaga
15.000 Oh Tukang 110,000.00 1,650,000.00 1,650,000.00
1.500 Oh Kepala Tukang 137,500.00 206,250.00 206,250.00
0.100 Oh Pekerja 82,500.00 8,250.00 8,250.00
0.250 Oh Mandor 165,000.00 41,250.00 41,250.00
1,905,750.00 1,905,750.00
###
Jumlah 6,417,812.50 1,905,750.00 8,323,562.50
###
6.2 1 M2 Pasang Kaso, Reng dan Nok Kayu kelas III ###
a. Bahan ###
0.012 M3 Kayu Kls. III 3,080,000.00 36,960.00 36,960.00
0.200 Kg Paku Biasa 2" - 5" 18,150.00 3,630.00 3,630.00
40,590.00 40,590.00
b. Tenaga
0.120 Oh Pekerja 82,500.00 9,900.00 9,900.00
0.120 Oh Tukang Kayu 110,000.00 13,200.00 13,200.00
0.012 Oh Kepala Tukang 137,500.00 1,650.00 1,650.00
0.006 Oh Mandor 165,000.00 990.00 990.00
25,740.00 25,740.00
40,590.00 25,740.00 66,330.00
b. Tenaga
0.100 Oh Pekerja 82,500.00 8,250.00 8,250.00
0.200 Oh Tukang Kayu 110,000.00 22,000.00 22,000.00
0.025 Oh Kepala Tukang 137,500.00 3,437.50 3,437.50
0.0050 Oh Mandor 165,000.00 825.00 825.00
34,512.50 34,512.50
###
Jumlah 36,943.50 34,512.50 71,456.00
- 56 -
Daftar Analisa Pekerjaan Kota Palembang TA. 2010 Semester I
SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN Satuan Bahan Tenaga Bahan+Tenaga
Analisa
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
a. Bahan ###
25.000 Bh Genteng Keramik 22,550.00 563,750.00 563,750.00
563,750.00 563,750.00
###
b. Tenaga ###
0.150 Oh Pekerja 82,500.00 12,375.00 12,375.00
0.075 Oh Tukang Kayu 110,000.00 8,250.00 8,250.00
0.008 Oh Kepala Tukang 137,500.00 1,100.00 1,100.00
0.008 Oh Mandor 165,000.00 1,320.00 1,320.00
23,045.00 23,045.00
###
Jumlah 563,750.00 23,045.00 586,795.00
- 57 -
RENCANA ANGGARAN BIAYA
I PEKERJAAN PERSIAPAN
1 Pembersihan Rp 16,500.00 135.000 M'
2 Pengukuran dan pemasangan Bouwplank Rp 84,012.50 50.000 M2
3 Penyediaan Air Kerja Rp 100,000.00 1.000 LS
Jumlah
II PEKERJAAN TANAH
1 Galian tanah Rp 93,225.00 75.690 M3
2 Urugan Tanah Kembali Rp 18,975.00 78.925 M3
3 Urugan pasir bawah Pondasi Rp 158,400.00 13.500 M3
4 Urugan Pasir bawah lantai Rp 158,400.00 19.600 M3
Jumlah
IV PEKERJAAN BETON
1 Sloof Beton bertulang Rp 6,034,269.85 2.438 M3
2 Kolom beton bertulang Rp 9,218,008.03 0.338 M3
3 Kolom praktis Rp 87,698.57 2.160 M3
4 Balok beton bertulang Rp 107,035.02 1.170 M3
5 Atap Dag dan Topi-topi teras Rp 1,284,254.40 1.535 M3
6 Beton meja dapur Rp 5,130,867.50 0.228 M3
7 Rabat Beton Rp 1,275,917.50 1.600 M3
Jumlah
VI PEKERJAAN ATAP
1 Pekerjaan rangka atap
Kuda-kuda Rp 8,323,562.50 0.794 M3
Gording Rp 8,323,562.50 0.880 M3
Kaso, Reng dan Nok Rp 66,330.00 1.121 M3
2 Pek. Genteng dan bubungan Rp 410,712.50 92.800 M2
3 Pek. List plank Rp 339,295.00 0.102 M'
Jumlah
BIAYA
6
Rp 2,227,500.00
Rp 4,200,625.00
Rp 100,000.00
Rp 6,528,125.00
Rp 7,056,200.25
Rp 1,497,601.88
Rp 2,138,400.00
Rp 3,104,640.00
Rp 13,796,842.13
Rp 38,069,071.76
Rp 3,070.74
Rp 38,072,142.49
Rp 14,708,532.76
Rp 3,115,686.71
Rp 189,428.91
125230.978459459
Rp 1,971,330.50
Rp 1,169,837.79
Rp 2,041,468.00
Rp 23,321,515.66
Rp 7,099,987.79
Rp 531,457.17
Rp 943,290.81
Rp 143,182.19
Rp 8,717,917.95
Rp 6,608,908.63
Rp 7,327,398.54
Rp 74,369.20
Rp 38,114,120.00
Rp 34,608.09
Rp 52,159,404.45
Rp 13,292,730.00
Rp 2,954,737.50
Rp 3,513,866.13
Rp 19,761,333.63
Rp 5,138,009.25
Rp 8,644,680.00
Rp 990,000.00
Rp 4,597,972.84
Rp 404,547.00
Rp 19,775,209.09
Rp 2,500,000.00
Rp 1,375,935.00
Rp 108,240.00
Rp 78,160.00
Rp 475,695.00
Rp 2,038,030.00
Rp 1,460,250.00
Rp 173,011.67
Rp 275,237.50
Rp 4,469,580.50
Rp 9,456,081.25
Rp 6,670,092.69
Rp 102,547.50
Rp 84,047.50
Rp 303,142.50
Rp 2,500,000.00
Rp 25,493,991.10
Rp 244,464.01
Rp 6,084,787.50
Rp 780,712.50
Rp 3,252,656.14
Rp 571,462.57
Rp 10,934,082.72
Rp 2,280,245.00
Rp 1,632,015.00
Rp 1,956,350.00
Rp 389,510.00
Rp 3,000,000.00
Rp 9,258,120.00
Rp 14,054,019.18
Rp 116,218.08
Rp 730,551.97
Rp 14,900,789.22
Rp 2,500,000.00
Rp 1,700,000.00
Rp 2,000,000.00
Rp 6,200,000.00
II PEKERJAAN TANAH
1 Galian tanah 76
2 Urugan Tanah Kembali 79
3 Urugan pasir bawah Pondasi 14
4 Urugan Pasir bawah lantai 20
IV PEKERJAAN BETON
1 Sloof Beton bertulang 2 1
2 Kolom beton bertulang 0 0 7
3 Kolom praktis 2 0
4 Balok beton bertulang 1 0
5 Atap Dag dan Topi-topi teras 2 0 9
6 Beton meja dapur 0 0
7 Rabat Beton 2
VI PEKERJAAN ATAP
1 Pekerjaan rangka atap
2 Kuda-kuda 1 1
3 Gording 1 1
4 Kaso, Reng dan Nok 1 0
5 Pek. Genteng dan bubungan 93
6 Pek. List plank 0 0
X PEKERJAAN SANITAIR
1 Memasang Kloset Duduk 2
2 Memasang Kran 1/2'' dan 3/4'' 3
3 Memasang Floor drain 2
4 Memasang Bak cuci piring stanless steel 2
BAHAN
Batu CAT Asesoris Kabel Beton Kloset
Keramik Genteng Kaca Plywood
Bata Kali Tembok Minyak Plamir Listrik NYA Readymix duduk
M3 M3 Kg Kg Kg Bh M' Bh Bh M2 Lbr M3 Bh
43
0
1 2
3670
287
2784
0
0
21
284
57
196
19
11 264
9 135
10 150
2 6
70 62
1 1
5 4
TENAGA
Floor Pipa Tukang
Fitting Kran Shower Asbes Semen Pasir Koral Besi Paku Kawat Pekerja
Drain PVC Kayu Batu
Bh Bh Bh M' Bh Lbr Kg M3 M3 Kg Kg Kg Org Org Org
7
1 5 5
6
5
318 4
24 3
2025 34 7 8
0 0 0 0
787 1 2 488 5 7 6 4 1
109 0 0 101 1 2 2 1 0
9 0 0 6 0 1 0 0 0
6 0 0 4 0 0 0 0 0
1 0 1
53 0 0 46 1 1 1
371 1 1 4
832.87 3 5 5
56 0 2 2
141 0 2 2
15 0 1 1
0 2 2
0 2 2
0 2 2
742 3 6 6
0 2 2
17 5 5
96 1 3 3
5 2 2
4 4
4 4
1 1
2 2
1 1
4 4
3 2 2
2 1 1
1 1
30 1 2
2 0 0
5 0 0
29 1 2
21 1 2
0 0
1 0 0
1 0 0
3 0 0
0 0
29.4 0 1 0
563 3 17 8
60 0 4 5
221 0 15 7
9 0 6 0
1
1
29
0
2
1
1
1
TENAGA
Tukang
Kepala Tukang Mandor
Cat Besi
Org Org Org Org
1
1 1
1
1
1
1
2 1
0 1
3 1 0
1 0 0
0 0 0
0 0 0
0 0
0 0
1 0
1 1
0 0
0 0
0 0
1 0
1 0
0 0
1 1
0 0
3 1
1 0
0 0
1 0
4 1
2 0
0 0
0 0
0 0
0 0
0 0
0 1
0 0
0 0
0 1
0 0
0 0
0 0
0 0
0 0
0 0
0 0
1 1
0 0
1 1
0 0
31 3 1
0.3 0 0
2 0 0
PERHITUNGAN WAKTU DURASI PEKERJAAN
I PEKERJAAN PERSIAPAN
1 Pembersihan Lapangan 1 0.1
2 Pemasangan Bowplang 1 0.1
3 Biaya air kerja
II PEKERJAAN TANAH
1 Galian tanah 1 0.526
2 Urugan Tanah Kembali 1 0.192
3 Urugan pasir bawah Pondasi 1 0.3
4 Urugan Pasir bawah lantai 1 0.3
IV PEKERJAAN BETON
1 Sloof Beton bertulang 1 4.85
2 Kolom beton bertulang 1 7.3
3 Kolom praktis 1 0.06
4 Balok beton bertulang 1 0.1
5 Atap Dag dan Topi-topi teras 1 2
6 Beton meja dapur 1 5.6
7 Rabat Beton 1 5.6
VI PEKERJAAN ATAP
1 Pekerjaan rangka atap
Kuda-kuda 1 0.1
Gording 1 0.1
Kaso, Reng dan Nok 1 0.12
2 Pek. Genteng dan bubungan 1 0.55
3 Pek. List plank 1 0.1
X PEKERJAAN SANITAIR
1 Memasang Kloset Jongkok 1 3.3
2 Memasang Kran 1/2'' dan 3/4'' 1 0.01
3 Memasang Floor drain 1 0.01
4 Memasang Bak cuci piring stanless steel 1 0.03
Hari
Orang Yang di butuhkan Volume Pekerjaan
Asli Pembulatan
7 135 2.0 2
5 50 1.0 1
1 1
6 75.69 6.6 7
5 78.925 3.0 3
4 13.5 1.0 1
3 19.6 2.0 2
7 34.44 7.13 8
1 0.01 0.01 1
6 2.44 2.00 2
2 0.34 1.00 1
1 2.16 0.13 1
1 1.17 0.12 1
2 1.535 1.78 2
1 0.228 1.00 1
4 1.6 2.00 2
5 31.37 4.00 4
2 4.906 1.00 1
2 16.59 2.00 2
1 2.875 1.00 1
2 0.794 0.05 1
2 0.88032 0.04 1
2 1.1212 0.06 1
6 92.8 7.86 8
2 0.102 0.01 1
5 87 4.00 4
3 87 1.00 1
2 100.85 1.00 2
4 0.5835 1.00 1
4 14.4 3.33 4
1 2 2.00 2
2 7.6206 5.00 5
1 0.984 1.00 1
1.00 1
4 2 1.65 2
1 3 0.03 1
1 2 0.02 1
1 2 0.06 1
2 25 0.68 1
1 2 0.11 1
1 5 0.27 1
2 23.8 0.64 1
2 17.5 0.47 2
2 1 0.03 1
1 1 0.05 1
1 1 0.05 1
1 3 0.16 1
1.00 1
3 3 0.26 1
3 68.75 5.73 6
2 6 2.02 3
5 22.05 3.09 4
3 7.185 1.92 2
3 11 3.67 4
3 9 3.00 3
3 10 3.33 4
2 2 1.00 1
1.00 1
10 411.14 2.88 3
4 4.35 0.08 1
3 24.0412 0.56 1
2 2
1 1
1 1
* 1 minggu dihitung 6 hari kerja
I PEKERJAAN PERSIAPAN
1 Pembersihan 2
2 Pengukuran dan pemasangan Bouwplank 1
3 Penyediaan Air Kerja 1
II PEKERJAAN TANAH
1 Galian tanah 7
2 Urugan Tanah Kembali 3
3 Urugan pasir bawah Pondasi 1
4 Urugan Pasir bawah lantai 2
III PEKERJAAN PONDASI
1 Pondasi batu kali ad. 1:4 8
2 Pondasi batu bata ad 1:4 1
IV PEKERJAAN BETON
1 Sloof Beton bertulang 2
2 Kolom beton bertulang 1
3 Kolom praktis 1
4 Balok beton bertulang 1
7 Atap Dag dan Topi-topi teras 2
8 Beton meja dapur 1
9 Rabat Beton 2
V PEKERJAAN DINDING DAN PLESTERAN
1 Dinding batu bata lobang Bangunan 4
2 Dinding batu bata lobang pagar 1
3 Trasram 1 Pc : 2 Ps 2
3 Plesteran 1 Pc : 4 Ps 1
VI PEKERJAAN ATAP
1 Pekerjaan rangka atap
Kuda-kuda 1
Gording 1
Kaso, Reng dan Nok 1
2 Pek. Genteng dan bubungan 8
3 Pek. List plank 1
VII PEKERJAAN PLAFOND
1 Pas. Rangka Plafond 4
2 Pas. Plafond 1
3 Pek. List Plafond 2
VIII PEKERJAAN KUSEN, PINTU DAN JENDELA
1 Kusen Pintu dan jendela 1
2 Pasang pintu panel 4
3 Kusen dan daun pintu PVC 2
4 Pasang Daun jendela 5
5 Pasang Kaca Mati 5 mm 1
IX PEKERJAAN PERLENGKAPAN PINTU & JENDELA 1
X PEKERJAAN SANITAIR
1 Memasang Kloset Duduk 2
3 Memasang Kran 1/2'' dan 3/4'' 1
4 Memasang Floor drain 1
5 Memasang Bak cuci piring stanless steel 1
XI PEKERJAAN INSTALASI AIR
1 Pipa PVC 1/2'' 1
3 Tee stuck 1/2'' 1
5 Keni 1/2'' 1
7 Pipa PVC 2'' 1
8 Pipa PVC 4'' 2
9 Septictank dan resapan 1
10 Tee stuck 4'' 1
11 Keni 2'' 1
12 Keni 4'' 1
13 Penyambung air ke PDAM 1
XII PEKERJAAN KERAMIK
2 Pasang Lantai Keramik Ukuran 30 x 30 cm texture 1
3 Pasang Lantai keramik 60 x 60 cm Warna 6
4 Pasang lantai keramik 20 x 20 cm 3
5 Pasang dinding keramik 20 x 20 4
6 Pasang Plin keramik 10 x 60 2
XIII PEKERJAAN INSTALASI LISTRIK
1 Pemasangan titik nyala lampu 3
2 Pasangan stop kontak 3
3 Pasangan Saklar 4
4 Pemasangan MCB 1
5 Penyambung daya ke PLN 1
XIV PEKERJAAN PENGECATAN
1 Pengecatan dinding 3
2 Pengecatan plafond dan list plafond 1
3 Pengecatan bidang kayu 1
XV PEKERJAAN AKHIR (FINISHING)
1 As Built Drawing 2
2 Dokumentasi dan Pelaporan 1
3 Pembersihan akhir 1
TOTAL 130
PERSENTASE PROGES RENCANA
KOMULATIF PERSENTASE PROGES RENCANA
BARCHAT ( KURVA
Rp 7,099,987.79 2.801
Rp 531,457.17 0.210
Rp 943,290.81 0.372
Rp 143,182.19 0.056 0.06
Rp 6,608,908.63 2.608
Rp 7,327,398.54 2.891
Rp 74,369.20 0.029
Rp 38,114,120.00 15.038
Rp 34,608.09 0.014
Rp 13,292,730.00 5.245
Rp 2,954,737.50 1.166
Rp 3,513,866.13 1.386
Rp 5,138,009.25 2.027
Rp 8,644,680.00 3.411
Rp 990,000.00 0.391
Rp 4,597,972.84 1.814
Rp 404,547.00 0.160
Rp 2,500,000.00 0.986
Rp 1,375,935.00 0.543
Rp 108,240.00 0.043
Rp 78,160.00 0.031
Rp 475,695.00 0.188
Rp 1,460,250.00 0.576
Rp 173,011.67 0.068
Rp 275,237.50 0.109
Rp 4,469,580.50 1.763 1.76
Rp 9,456,081.25 3.731 3.73
Rp 6,670,092.69 2.632 2.63
Rp 102,547.50 0.040 0.04
Rp 84,047.50 0.033 0.03
Rp 303,142.50 0.120
Rp 2,500,000.00 0.986
Rp 244,464.01 0.096
Rp 6,084,787.50 2.401
Rp 780,712.50 0.308
Rp 3,252,656.14 1.283
Rp 571,462.57 0.225
Rp 2,280,245.00 0.900
Rp 1,632,015.00 0.644
Rp 1,956,350.00 0.772
Rp 389,510.00 0.154
Rp 3,000,000.00 1.184
Rp 2,500,000.00 0.986
Rp 1,700,000.00 0.671
Rp 2,000,000.00 0.789
Rp 253,457,503.44
100.00
2.58 1.59 7.73 7.40 16.04 7.65
2.58 4.17 11.89 19.29 35.33 42.98
T ( KURVA S )
WAKTU
Bulan ke - 2 Bulan ke - 3 Bulan ke - 4
3 4 1 2 3 4 1 2 3 4
1.23
0.07
0.05
0.39 0.39
0.46
0.81
1.40 1.40
0.21
0.19 0.19
2.61
2.89
0.03
15.04
0.01
2.62 2.62
1.17
1.39
2.03
3.41
0.39
1.81
0.16
0.03
0.19
0.58
0.07
0.11
0.12
0.99
0.10
2.40
0.31
1.28
0.23
0.99
2.60 0.67 1.38 4.43 0.69 2.58 2.21 24.37 9.45 1.97
45.57 46.25 47.62 52.05 52.74 55.32 57.53 81.90 91.34 93.32
Bulan ke - 5 Bulan ke - 6
1 2 3 4 1 2 3 4
100%
75%
0.99
50%
0.54
0.04
25%
0.60 0.30
0.64
0.77
0.15
1.18
0.67
0.79
0%
2.13 0.99 0.93 1.18 0.00 1.46 0.00 0.00
95.44 96.43 97.36 98.54 98.54 100.00 100.00 100.00
Compatibility Report for Tugas Estimasi Bagus Setiawan.xls
Run on 5/27/2016 11:35
The following features in this workbook are not supported by earlier versions of
Excel. These features may be lost or degraded when opening this workbook in
an earlier version of Excel or if you save this workbook in an earlier file format.
Any effects on this object will be removed. Any text that overflows the 34
boundaries of this graphic will appear clipped.
VOLUME PEKERJAAN'!A2:F550
Some formulas in this workbook are linked to other workbooks that are 506
closed. When these formulas are recalculated in earlier versions of Excel
without opening the linked workbooks, characters beyond the 255-character
limit cannot be returned.
ANALISA HARGA SATUAN'!G21:G23
RAB'!D17
RAB'!C51:D52
RAB'!D86
Some formulas in this workbook are linked to other workbooks that are 21
closed. When these formulas are recalculated in earlier versions of Excel Defined Names
without opening the linked workbooks, characters beyond the 255-character
limit cannot be returned.
Some cells or styles in this workbook contain formatting that is not supported 8
by the selected file format. These formats will be converted to the closest
format available.
Version
Excel 97-2003
Excel 97-2003
Excel 97-2003
Excel 97-2003
Excel 97-2003