I PEKERJAAN PEMBONGKARAN
1 Pembongkaran Lantai Keramik
2 Pembongkaran dinding pas. Bata
3 Pembongkaran Plafon
4 Pembongkaran Rangka Atap
5 Pembongkaran Penutup Atap
6 Pembuangan Sisa Bongkaran
VI PEKERJAAN ATAP
1 Pasang/Rehab Gording Baja C.150.50.20.3,2
2 Pasang Penutup Atap Spandeck Warna
3 Pasang Bubungan Atap
4 Pasang Patahan Atap
5 Pasang Lisplank Super Plank
6 Pasang Manumata Kisi-kisi Aluminium
IX PEKERJAAN SANITAIR
1 Pasang Pipa PVC 4
2 Pasang Pipa PVC 3
3 Pasang Pipa PVC 1
4 Pasang Pipa PVC 1/2
5 Pasang Kloset Duduk
6 Pasang Washtafel
7 Pasang Kran Washer
8 Pasang Kran air
9 Pasang Floor Drain
10 Pasang Kaca Cermin
11 Pasang Bio Septic PVC Kapasitas 2m3
12 Pasang Bak Cuci Stainless 1 Lubang
VI PEKERJAAN LANGIT-LANGIT
1 Pasang Rangka dan Gantungan Besi Hollow/Galvalum
2 Pasang Plafond Gypsumboard 9 mm
3 Pasang Lisplafond gypsum
X PEKERJAAN SANITAIR
1 Pasang Pipa PVC 4
2 Pasang Pipa PVC 3
3 Pasang Pipa PVC 1
4 Pasang Pipa PVC 1/2
5 Pasang Kloset Duduk
6 Pasang Kran Washer
7 Pasang Kran air
8 Pasang Floor Drain
9 Pasang Bio Septic PVC Kapasitas 2m3
E PEKERJAAN DERMAGA
I PEKERJAAN TANAH & PASIR
1 Pengadaan tiang pancang beton bulat dia 400mm p=6m (K300FC=26,4 Mpa)
2 Mobilisasi tiang pancang
3 Pengangkatan dan penyetelan tiang dari tempat penyimpanan ke lokasi
4 Pemancangan tiang
5 Pemotongan tiang
6 Pasir Pengisi Tiang Pancang
II PEKERJAAN BETON
1 Beton Abutment (Mutu fc = 21,7 MPa (K 250))
2 Pembesian
3 Bekisting
4 Beton Poer 80x80x80 cm (Mutu fc = 21,7 MPa (K 250))
5 Pembesian
6 Bekisting
7 Beton Balok Memanjang 40/70 (Mutu fc = 21,7 MPa (K 250))
8 Pembesian
9 Bekisting balok
10 Beton Balok Melintang 40/40 (Mutu fc = 21,7 MPa (K 250))
11 Pembesian
12 Bekisting balok
13 Beton Plat Lantai t=25cm (Mutu fc = 21,7 MPa (K 250))
14 Pembesian
15 Bekisting Lantai
16 Kanstin beton 12/15 (Mutu fc = 21.5 MPa (K 175))
17 Pembesian
18 Bekisting
E PEKERJAAN LANDSCAPE
I PEKERJAAN TANAH
1 Timbunan Tanah Biasa (dengan peralatan)
II PEKERJAAN PERKERASAN
1 Pasang Paving Blok
2 Beton Kanstin ( MUTU fc = 21,7 MPa (K 250)
3 Pembesian
4 Bekisting
5 Penyiapan Badan Jalan
6 Lapis Pondasi Agregat Kelas A
7 Lapis Resap Pengikat - Aspal Cair
8 Lataston Lapis Pondasi (HRS-Base) (gradasi senjang/semi senjang)
IV PEKERJAAN GAPURA
1 Galian Tanah Pondasi
2 Timbunan Tanah Pondasi Kembali
3 Pasir Pasang Bawah Pondasi
4 Beton Rabat Lantai Kerja (Mutu fc = 7,4 MPa (K 100)) t=7cm
5 Beton Pondasi Footplate (Mutu fc = 14,5 MPa (K 175))
6 Pembesian
7 Bekisting Kolom
8 Beton Kolom (Mutu fc = 14,5 MPa (K 175))
9 Pembesian
10 Bekisting Kolom
11 Beton Sloof 20/30 (Mutu fc = 14,5 MPa (K 175))
12 Pembesian
13 Bekisting Sloof
14 Beton Balok (Mutu fc = 14,5 MPa (K 175))
15 Pembesian
16 Bekisting balok
17 Acian Dinding 1 2
18 Pekerjaan Pengecatan
19 Pasang Rangka Besi Holo
20 Pekerjaan Pengecatan Besi
21 Tulisan/Ornamen/Hiasan
22 PEKERJAAN PENGHIJAUAN
23 Penanaman Rumput Gajah Mini
24 Penanaman Pohon
F PEKERJAAN REHABILITASI SLIPWAY
I PEKERJAAN TANAH
1 Galian Pondasi
2 Urugan Tanah Kembali
3 Timbunan Tanah Bawah Lantai
4 Urugan Pasir Bawah Pondasi
5 Urugan Pasir Bawah Lantai
IX PENCEGAHAN COVID 19
1 Hand Sanitizer
2 Disinfektan
3 Tempat Cuci Tangan
4 Aicare Thermometer Infrared
KIRAAN SENDIRI (HPS)
37,627,657,258.04