La = 0.4 m
Plesteran
Tebal 2 cm
0.10 m
Ta = 2.50 m
Pas. Batu
Camp 1PC : 5PP
Tb = 0.50 m
Lb = 0.6 m P= 3m
TPT
T = 0.50 m Volume = T x L x P
0.50 m L = 0.60 m = 0.50 x 0.60 x 3
P = 3 m = 0.90 m3
0.60 m
0.40 TPT
Ta = 3.60 m Vol I = 0.40 + 0.60
3.60 3.0
La = 0.40 m 2
2.50 Lb 1 = 0.60 m = 5 m3
Lb = 0.60 m
P = 3 m
0.60
Ta = 3.30 m Vol II = 0.30 + 0.60
3.30 5.0
0.50 La = 0.30 m 2
Lb 1 = 0.60 m = 7 m3
0.60 Lb = 0.60 m
P = 5 m Volume I+II 13.9 m3
0.30
0.9 Lb 1
Ta = 0.90 Vol I = 0.30 + 0.30
0.90 1.0
La = 0.30 2
Lb = 0.30 = 1.08 m3
P = 1
0.30
Bahan Material Koef Volume Jumlah Sat
Batu Belah 1.200 14 17 m3 17
Semen PC @50 kg 2.720 14 38 sak 38
Pasir Pasang 0.544 14 8 m3 8
Ø 10 2
Tenaga Kerja Koef Volume Jumlah Sat
Ø 10 4 Pekerja 1.250 16 2 HOK
Ø 10 4 Tukang 0.077 16 1 HOK
25
Tul Pokok 8 Ø10
Begel Ø 10
Rekapitulasi:
1 Batu Belah = 17 ~ 17 m3
2 Semen = 44 ~ 44 Zak
3 Pasir Pasang = 8 ~ 8 m3
4 Besi Beton = 16 ~ 16 Btg
5 Kawat Besi = 4 ~ 4 Kg
6 Papan = 0.2 ~ - m3
7 Paku = 0.1 ~ 0.1 Kg
8 Kayu Balok Albasia = 0.1 ~ 0.1 m3
9 Besi WF = 1.1 ~ 1 Btg
10 Pipa Besi dia. 6.0 6 Btg
11 Pasir Beton = 0.549 ~ 1 m3
12 Split = 0.772 ~ 1 m3
13 Pekerja = 26.58 ~ 27 HOK
14 Tukang = 12.44 ~ 12 HOK
Pekerja Angkut Bahan
#REF! = 17 ~ 17
#REF! = 44 ~ 44
#REF! = 8 ~ 8
69 34.50 35
RENCANA ANGGARAN BIAYA F
o
KEGIATAN DANA DESA TA 2024 r
m
.
DESA : KARYALAKSANA Bidang : Pembangunan Desa 7
KECAMATAN : IBUN Kegiatan : Pembangunan Jembatan e
KABUPATEN : BANDUNG Lokasi : RW 02-08
PROVINSI : JAWA BARAT Volume : TPT = 3 m'
: Jembatan = 6,5 x 1,5 m
HARGA
URAIAN VOLUME SATUAN JUMLAH
SATUAN
a b c d e=bxd
1. BAHAN
1 Batu Belah 17 m3 240,000 4,080,000
2 Semen 44 Zak 75,000 3,300,000
3 Pasir Pasang 8 m3 250,000 2,000,000
4 Besi Beton 16 Btg 130,000 2,080,000
5 Kawat Besi 4 Kg 20,000 80,000
6 Papan 1 m3 1,500,000 1,500,000
7 Paku 1.0 Kg 25,000 25,000
8 Kayu Balok Albasia 1.0 m3 1,500,000 1,500,000
9 Besi WF 2 Btg 1,500,000 3,000,000
10 Pipa Besi dia. 12 Btg 450,000 5,400,000
11 Pasir Beton 1 m3 300,000 300,000
12 Split 1 m3 300,000 300,000
13 Bondek 4 Buah 820,000 3,280,000
Sub Total 1) Rp 26,845,000
2. ALAT
3 Papan Proyek 1 Buah 160,000 160,000
4 Prasasti 1 Buah 300,000 300,000
Sub Total 2) Rp 460,000
3. UPAH
1 Pekerja 27 HOK 112,000 3,024,000
2 Tukang 12 HOK 120,000 1,440,000
3 Upah Angkut Bahan 35 HOK 112,000 3,920,000
Sub Total 3) Rp 8,384,000
4. BIAYA UMUM
1 Survey Perencanaan 1 Ls 450,000 450,000
2 ATK Dokumen 1 Ls 250,000 250,000
3 Survey Pelaksanaan 1 Ls 450,000 450,000
4 ATK Pelaporan 1 Ls 250,000 250,000
Sub Total 4) Rp 1,400,000
Total Biaya Rp 37,089,000
...................................... ......................................
Mengetahui : Mengetahui :
Tim Pendamping Desa Tim Teknis/Pendamping Kecamatan
III 0,50
M
0,1 M
0,6 M
,1 M
...................................
KEPALA DESA KARYALAKSANA
….............................................
NIP. …...........................................
TIM TEKNIS KABUPATEN
...............................................................
NIP.
Catatan : Gambar dibuat secara manual