3.00
20-Apr-17
..............................
Ketua TPK
P3MD 2017
A.4.1.1.2 Membuat beton mutu f3c = 9,8 Mpa (K 125), slump (12 ± 2) Cm, w/c 0,78
Volume Beton Pekerjaan Pengecoran
P 150.00 - Volume = 0.15 x 3.00 x 150 Volume Beton Konstruksi
= 67.50 m3 = 67.50 m3
K tkg = 0.028 x 68
= 1.89 Hok
Mandor = 0.083 x 68
= 5.603 Hok
3. Pekerjaan Pengecoran
Semen PCC 372.60 = 373 Zak
Pasir Pasang 39.92 = 40 M3
Kerikil 50.60 = 51 M3
Pekerja 111.38 = 84 HOK
Tukang 18.56 = 14 HOK
Kepala tukang 1.89 = 2 HOK
Mandor 5.6025 = 5 HOK
7-Apr-14
..............................
Ketua
Kabupaten ; Indragiri Hulu Jenis Prasarana ; Olah Raga
Kecamatan ; Batang Cenaku Perhitungan Volume Lokasi ;
Pekerjaan
Desa ; Pematang Manggis Volume ; 18 x 28 M
Sketsa Volume Kebutuhan
DATA LAPANGAN
1 Pemasangan Pagar
Pipa Galvanis 3" Tegak = 40 x 6 M 40 Batang
Mendatar = 92 m x 3 ( Atas, Tgh 48 Batang
Bawah ) Pembuatan Pintu + Keperluan Lain ( Gawang ) = 2 Batang
VOLUME TOTAL
NO URAIAN SATUAN KETERANGAN
Analisa Pembulatan
A BAHAN
1 Semen Zak 209.49 210
2 Koral M3 12.32 13
3 Pasir M3 15.84 16
4 Kayu Kelas III M3 1.24 0.5
5 Minyak bekisting Ltr 2.76 2
6 Paku Kg 15.64 15
7 Besi 6" Btg 37 37
8 Besi 8" Btg 387 387
9 Kawat beton Kg 18.85 14
10 Rangka pagar 3 Inc Batang 68.00 70
11 Kawat harmonika khass 5 - 7 cm M2 368 368
12 cat dasar Ltr 37.50 38
13 cat minyak Ltr 97.50 98
B ALAT
1 Mesin Las Hari 12 12
C UPAH
1 Pekerja OH 147 147
2 Tukang OH 70 70
3 Tukang Las OH 12 12
Desa
Membangun
No. RAB : 1
Sumber Dana : Dana Desa APBN TA. 2017
Bidang : Pelaksanaan Pembangunan Desa
Kegiatan : Pembuatan Lapangan Futsal
Ukuran / Dimensi : 18 x 28 M
Biaya Pelaksanaan : Rp. 244,340,436
BIDANG : Pembangunan
KEGIATAN : Pembangunan TK
UKURAN/DIMENSI : 15 x 10 x 3,5 M
PAGU ANGGARAN : 244,340,435.50
WAKTU PELAKSANAAN : 90 Hari Kalender
BIDANG : Pembangunan
KEGIATAN : Pembangunan TK
UKURAN/DIMENSI : 15 x 10 x 3,5 M
PAGU ANGGARAN : 244340436
WAKTU PELAKSANAAN : 90 Hari Kalender
URAIAN DAN PERHITUNGAN VOLUME PEKERJAAN KEBUTUHAN BAHAN, ALAT & UPAH/HOK
PEMBANGUNAN TK
0.15
135 °
0.55
0.20 0.70
1.70
LonengBeton
1.70
DindingPenahanTanah
0.20
0.60
DENAH
4.00
0.50 0.20 1.70 0.20 1.70 0.20 0.50
LonengBeton
DindingPenahanTanah
0.30
0.20
TapakDindingPenahanTanah
KayuCerocokDia4" - 8"
TAMPAK SAMPING
Data Box Culvert :
- Panjang : 6.00 Meter
- Lebar : 4.00 Meter
- Tinggi : 2.50 Meter
- Tebal dinding box : 0.20 Meter
- Panjang Sayap : 1.50 Meter
- Tebal dinding Sayap : 0.15 Meter
- Kuat Beton : Beton K 225 Catatan : Satuan dalam meter
I. PEKERJAAN PENDAHULUAN
1. Pek. Pembersihan Lokasi Kegiatan - (M2) U P A H : Pek. Pembersihan Lokasi Kegiatan - (M2)
- Luas = 8.00 x 2.00 x 2 sisi Pekerja = 0.100 x 0.64 = 0.06 HOK
= 32.0 M² Tukang = 0.050 x 0.64 = 0.03 HOK
= 1 HOK = 50.0 M²
= 32.0 : 50.0
= 0.6 M²
2. Pek. Urugan Pasir dibawah lantai (t = 3 cm) - (M3) U P A H : Pek. Urugan Pasir dibawah lantai (t = 3 cm) - (M3)
Untuk Box Culvert = 6.40 x 4.00 x 0.03 M Pekerja = 0.300 x 1.06 = 0.32 HOK
= 0.77 M³ Tukang = 0.010 x 1.06 = 0.01 HOK
Untuk Sayap = 0.4 x 6.00 x 0.03 M B A H A N : Pek. Urugan Pasir dibawah lantai (t = 3 cm) - (M3)
= 0.07 x 4.00 Sisi M³ Pasir urug = 1.200 x 1.1 = 1.27 M³
= 0.29 M³
1 Pek. Lantai Kerja Tebal 10 Cm ( K-125 ) U P A H : Pek. Lantai Kerja Tebal 10 Cm ( K-125 )
Volume = P X L X T M Pekerja = 1.650 x 2.9 = 4.83 HOK
Untuk Box Culvert = 6.40 x 4.20 x 0.1 M Tukang = 0.275 x 2.9 = 0.81 HOK
= 2.69 M³
B A H A N : Pek. Lantai Kerja Tebal 10 Cm ( K-125 )
Untuk Sayap = 0.4 x 6 x 0.1 M Semen Type. I - @ 50 Kg = 5.520 x 2.9 = 16.16 Sak
= 0.24 M³ Pasir beton = 0.591 x 2.9 = 1.73 M³
Kerikil (Maks 30 mm) = 0.750 x 2.9 = 2.19 M³
Volume Total = 2.93 M³
2.40
Besi AØ12- 20cm
4.00
d Untuk Loneng Beton
Luas begisting = 4.0 X 0.3 X 4 Sisi
= 4.80 M²
= 30 Buah
Total Panjang Besi = 4.80 X 30
= 144 M
= 192 M
2.40
DindingPenahanTanah
2.32
B A H A N : Pek. Pembesian
Kawat Beton = 0.150 x 194.2 = 29.131 Kg
Besi Dia 12 mm = 1.1 x 182.5 = 200.7 Btg
SegmenG
SegmenD SegmenD
0.30
0.20
SegmenA
SegmenC
SegmenB SegmenB
2.40 2.00
SegmenE
SegmenA
0.20
Plat Segmen C
Volume = 0.20 X 0.20 /2 X 4.00 X 8 Bh
= 0.64 M³
VOLUME BETON K - 125 = 0.60 M³
Total Volume Beton Box = 17.44 M³
U P A H : Pek. Cor Beton Beton K-125
Pekerja = 1.650 x 0.60 = 0.99 HOK
B Dinding Sayap ( Beton K-225 ) Tukang = 0.275 x 0.60 = 0.17 HOK
VOLUME TOTAL
NO U R A I A N SATUAN KETERANGAN
Analisa Pembulatan
I. B A H A N :
1 Balok Kayu Kelas II M³ 6.13 6.00
2 Paku biasa 2" - 5" Kg 43.94 44.00
3 Kayu papan M³ 0.25 0.20
4 Minyak bekisting Ltr 21.40 21.00
5 Plywod tebal 9 mm Lbr 37.45 37.00
6 Dolken kayu φ 8-10 Cm Btg 321.00 321.00
7 Kayu Cerocok Btg 256.00 256.00
8 Pasir urug M³ 1.27 1.00
9 Tanah Timbun M³ 38.50 39.00
10 Plastik Hitam M 21.58 22.00
11 Kawat Beton Kg 29.13 29.00
12 Besi Dia 12 mm Btg 200.70 201.00 Panjang 12 M
13 Semen Portland @ 50 Kg SaK 171.14 171.00
14 Pasir beton M³ 12.28 12.00
15 Kerikil (Maks 30 mm) M³ 18.50 18.00
16 Pipa PCV 1 " Btg 1.00 1.00
17 Papan Nama Kegiatan Unit 1.00 1.00
II. ALAT
1 Gerobak Sorong Unit 1.00 1.00
2 Ember Cor Buah 10.00 10.00
3 Drum Air Buah 1.00 1.00
4 Sewa Concrete Mixer Hari 3.99 4.00
III. U P A H :
1 Pekerja HOK 214.67 215.00
2 Tukang HOK 81.59 82.00
JURI HANDOKO,S.Hut
Kepala Desa PD/TA/…. Ketua
RENCANA ANGGARAN BIAYA (RAB)
DESA BUKIT LIPAI KEC. BATANG CENAKU
TAHUN ANGGARAN 2017
BIDANG : PEMBANGUNAN
KEGIATAN : PEMBANGUNAN TK
UKURAN/DIMENSI : 15 x 10 x 3,5 M,
PAGU ANGGARAN : 244,340,436
WAKTU PELAKSANAAN : 90 Hari Kalender
1 2 3 4 5
I. B A H A N :
II UPAH
SATUAN
Jarak ke Desa = KM Jarak ke Desa = KM Jarak ke Desa = KM Harga Satuan
NO U R A I AN Terpakai KETERANGAN
Biaya Biaya Biaya
Harga Toko Transport & Harga s/d ke Harga Toko Transport & Harga s/d ke Harga Toko Transport & Harga s/d ke
Bongkar- Desa Bongkar- Desa Bongkar- Desa
muat muat muat
1 2 3 4 5 6 = (4+5) 7 8 10 = (7+8) 11 12 13 = (11+12) 14 15
I. B A H A N :
II. ALAT
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
DAFTAR HASIL SURVEY HARGA PASAR SETEMPAT
Gambaran pekerjaan yang membutuhkan alat berat, termasuk perkiraan volume pekerjaan:
JURI HANDOKO,S.Hut
Kepala Desa
PEMERIKSAAN DOKUMEN PROPOSAL TEKNIS DAN RAB
1 2 3 4 5
1 Sketsa lokasi kegiatan
2 Dokumen survey teknis
3 Gambar desain (Tampak, Potongan & Detail)
4 Perhitungan volume (Pekerjaan, Bahan, Alat & HOK)
5 Survey harga bahan dan alat
6 Kesepakatan pembayaran upah kerja
7 Perhitungan RAB
8 Kajian sederhana mengenai dampak lingkungan
9 Pernyataan hibah lahan dari masyarakat
10 Pernyataan kesanggupan tidak minta ganti rugi
11 Kesanggupan swadaya dan gotong royong
12 Rencana penggunaan alat berat
13 Pernyataan kesiapan warga untuk mengerjakan
14 Data pemanfaat
15 Foto Dokumentasi Pekerjaan (0%)
- Pemeriksaan ke :
- TIM VERIFIKASI :
NO U R A I A N N A M A TANDA TANGAN
4. 4.