RUMUS DAN CONTOH PERHITUNGAN TALUD SEDERHANA

RUMUS MISAL a= 30 cm
No. H h b
= H 1 0.50 0.40 0.38
h + a
H 5 2 0.60 0.42 0.40
3 0.70 0.44 0.42
4 0.80 0.46 0.43
= H 5 0.90 0.48 0.45
b + a
6 6 1.00 0.50 0.47
h 7 1.10 0.52 0.48
8 1.20 0.54 0.50
b 9 1.30 0.56 0.52
10 1.40 0.58 0.53
11 1.50 0.60 0.55
12 1.60 0.62 0.57
13 1.70 0.64 0.58
14 1.80 0.66 0.60
15 1.90 0.68 0.62
b 16 2.00 0.70 0.63
17 2.10 0.72 0.65
18 2.20 0.74 0.67
a
19 2.30 0.76 0.68
20 2.40 0.78 0.70
POSISI TALUD 21 2.50 0.80 0.72
AGAK MIRING 2.60 0.82 0.73
2.70 0.84 0.75
2.80 0.86 0.77
2.90 0.88 0.78
3.00 0.90 0.80
3.10 0.92 0.82
3.20 0.94 0.83
3.30 0.96 0.85
3.40 0.98 0.87
3.50 1.00 0.88
3.60 1.02 0.90
3.70 1.04 0.92
3.80 1.06 0.93
3.90 1.08 0.95
4.00 1.10 0.97
PERHITUNGAN TALUD

0.30 TALUD P= 45.00 M T= 4.00 M

1. Galian tanah
Plester 1.00 x 1.10 x 45.00 = 49.50 M3
2. Pasangan batu talud
4.00 Volume 1 : 0.5 x ( 0.63 + 0.30 x 2.00 x 45.00 = 41.85 M3
Volume 2 : 0.50 x ( 1.00 + 0.73 ) x 2.00 x 45.00 = 77.85 M3
Urugan Tanah Volume 3 : 0.50 x 0.30 x 4.00 x 5.00 = 3.00 M3
Volume 4 : 1.00 x 1.10 x 45.00 = 49.50 M3
172.20 m3
1.10 Pasangan Batu
3. Plesteran 0.70 x 45.00 + 6.00 = 37.50 M2
1.00
4. Urugan tanah kembali 4.00 x 45.00 = 25.00 M3
RENCANA ANGGARAN BIAYA
DESA A KECAMATAN B KABUPATEN C
TAHUN ANGGARAN 2017

BIDANG : PEMBANGUNAN
PEKERJAAN : PEMBANGUNAN TALUD JALAN
LOKASI : DUSUN TIRTO DESA KWARAKAN
SUMBER DANA : DANA DESA 2017

URAIAN VOLUME SATUAN HARGA SATUAN JUMLAH BIAYA


1 2 3 4 5 (2x4)
I BAHAN
1 Semen 475.66 Zak 62,000.00 29,490,858.00
2 Pasir Pasang 93.74 M3 320,000.00 29,996,160.00
3 Batu 15/20 206.64 M3 275,000.00 56,826,000.00
4 Besi 60.00 btg 77,000.00 4,620,000.00
SUB TOTAL I 120,933,018.00
II ALAT
1 Cangkul 4 bh 75,000.00 300,000.00
2 Cetok 4 bh 25,000.00 100,000.00
3 bak 4 m' 25,000.00 100,000.00
4 Palu Kecil 4 bh 30,000.00 120,000.00
5 Ember 10 bh 10,000.00 100,000.00
6 Benang 1 rol 12,500.00 12,500.00
7 Pipa Drainase dia. 1 in 5 bh 36,000.00 180,000.00
8 Papan Proyek 1 bh 250,000.00 250,000.00
9 Prasasti 1 bh 250,000.00 250,000.00
10 palu besar 3 bh 60,000.00 180,000.00
11 Gerobak Angkong 2 bh 64,500.00 129,000.00

SUB TOTAL II 1,721,500.00


III UPAH
1 Pekerja 283.30 HOK 50,000.00 14,165,000.00
2 Tukang 140.40 HOK 60,000.00 8,424,000.00
SUB TOTAL III 22,589,000.00
JUMLAH : (I+II+III) 145,243,518.00
Biaya Operasional Kegiatan 4,357,305.54
TOTAL BIAYA 149,600,823.54

Desa Kwarakan, 2017

Menyetujui, Dibuat Oleh:


Kepala Desa Kwarakan TPK Desa Kwarakan

SRI SURAYA SUNGKONO


CONTOH PERHITUNGAN DUIKER PLAT 1.00 x 1.50 x 7.00

0,3 0,3

1.40
0.20 1. Galian tanah
2.60 x 1.70 x 7.00 = 24.36
0.80 x 0.70 x 7.00 x 2 = 7.84
1.50
32.20

2. Pasangan batu
0.20
0.50 x ( 0.80 + ### ) x 1.50 x 7.00 x 2 = ###
0.70 0.20 x 1.00 x 7.00 = 1.40
0.80 x 0.70 x 7.00 x 2 = 7.84
0.80 1.00 0.80 15.89

2. Pekerjaan plesteran
4.00 x 7.00 = 24.55
3. beton
0.20 x 1.40 x 7.00 = 1.96
4. Acuan
1.00 x 7.00 = 7.05
5. Pembesian

CARA PERHITUNGAN UPAH TENAGA DAN BAHAN SAMA DENGAN TALUD


M3
M3
M3

M3
M3
M3
m3

M3

M3

M2
Kg

N TALUD
PERHITUNGAN VOLUME B
Sta. 300
P =
L =
A A T =

I. PERHITUNGAN VOLUME
1 . BETON 1 : 2 : 3
Talud 1 P=……… T=……..Pasir Urug / Sirtu 5 CM
Sta. 200
Cor Beton 1:2:3
Cor Beton 1:2:3

II. PERHITUNGAN KEBUTUHA

NO
Duiker Plat/Gorong goron
Sta. 100 1

Sta 0

3.00

III. PERHTUNGAN BIAYA

NO
POT A-A
1
CONTOH GAMBAR JALAN DAB ASESORIS JALAN 2
3
4
5
6
PERHITUNGAN VOLUME BETON 1 : 2 : 3

300.00 M
3.00 M
0.15 M

I. PERHITUNGAN VOLUME
1 . BETON 1 : 2 : 3
Pasir Urug / Sirtu 5 CM 0.05 x 3.00 x 300.00 = 45.00

Cor Beton 1:2:3 0.15 x 3.00 x 300.00 = 135.00

II. PERHITUNGAN KEBUTUHAN BAHAN


TUKANG PEKERJA SEMEN
NAMA N\BAHAN VOLUME SAT
KOEF OH KOEF OH KOEF
Pasir urug 45.00 M3 0.3 13.5

Pek Beton 1 2 3 135.00 M3 0.35 47.25 2.00 270.00 6.72

47.25 283.50

III. PERHTUNGAN BIAYA


HARGA SATUAN JUMLAH HARGA JUMLAH TOTAL
URAIAN VOLUME SAT
Rp. Rp. Rp.
Tukang 47.25 OH 70,000.00 3,307,500.00
Pekerja 283.50 OH 55,000.00 ### 18,900,000.00
Semen 907.20 ZAK 61,000.00 ###
Pasir Beton 72.90 M3 240,000.00 ###
Split 2/3 109.35 M3 230,000.00 ###
Pasir Urug 54.00 M3 190,000.00 ### 108,245,700.00
127,145,700.00
m3

m3

SEMEN PASIR COR SPLIT PASIR URUG MANDOR


ZAK KOEF M3 KOEF M3 KOEF M3 KOEF M3
1.2 54.00 0.03 1.35

907.20 0.54 72.90 0.81 109.35 0.08 `


-
907.20 72.90 109.35 54.00 1.35

JUMLAH TOTAL
Rp. `

18,900,000.00

108,245,700.00
127,145,700.00
PERHITUNGAN VOLUME B
Sta. 300
P =
L =
A A T =

I. PERHITUNGAN VOLUME
1 . BETON 1 : 2 : 3
Talud 1 P=……… T=……..Pasir Urug / Sirtu 5 CM
Sta. 200
Cor Beton 1:2:3
Cor Beton 1:2:3

II. PERHITUNGAN KEBUTUHA

NO
Duiker Plat/Gorong goron
Sta. 100 1

Saluran 2

Sta 0

3.00

III. PERHTUNGAN BIAYA

NO
POT A-A
1
CONTOH GAMBAR JALAN DAB ASESORIS JALAN 2
3
4
5
6
PERHITUNGAN VOLUME BETON 1 : 3 : 5

300.00 M
3.00 M
0.15 M

I. PERHITUNGAN VOLUME
1 . BETON 1 : 2 : 3
Pasir Urug / Sirtu 5 CM 0.05 x 3.00 x 300.00 = 45.00

Cor Beton 1:2:3 0.15 x 3.00 x 300.00 = 135.00

II. PERHITUNGAN KEBUTUHAN BAHAN


TUKANG PEKERJA SEMEN
NAMA N\BAHAN VOLUME SAT
KOEF OH KOEF OH KOEF
Pasir urug 45.00 M3 0.3 13.5

Pek Beton 1: 3:5 135.00 M3 0.25 33.75 1.65 222.75 4.24

33.75 236.25

III. PERHTUNGAN BIAYA


HARGA SATUAN JUMLAH HARGA JUMLAH TOTAL
URAIAN VOLUME SAT
Rp. Rp. Rp.
Tukang 33.75 OH 70,000.00 2,362,500.00
Pekerja 236.25 OH 55,000.00 ### 15,356,250.00
Semen 572.40 ZAK 61,000.00 ###
Pasir Beton 70.20 M3 240,000.00 ###
Split 2/3 110.70 M3 230,000.00 ###
Pasir Urug 54.00 M3 190,000.00 ### 87,485,400.00
102,841,650.00
m3

m3

SEMEN PASIR COR SPLIT PASIR URUG PASIR URUG


ZAK KOEF M3 KOEF M3 KOEF M3 KOEF M3
1.20 54.00 0.03 1.13

572.40 0.52 70.20 0.82 110.70 0.08 10.80

572.40 70.20 110.70 54.00 11.93

JUMLAH TOTAL
Rp. `

15,356,250.00

87,485,400.00
102,841,650.00
Pasir KOEF split 2/3

1.95 0.82 3.075

1.95 3.075
SALURAN PASANGAN BATU PAKAI BUIS BETON U 30

0.30 0.30 0.30


PANJANG SALURAN

1. Galian Tanah
0.90 x 0.50
0.50
1. Pasangan Batu 1: 5
0.30 x 0.50 x
Pasangan batu 1:5
Buis Beton U30 2. Pasangan Buis Beton U30
Plesteran
3. Pekerjaan Plester
( 0.10 + 0.30 +

KEBUTUHAN UPAH TENAGA DAN BAHAN

VOLUME SAT PEKERJA TUKANG


No.
KOEF OH KOEF

1 Galian Tanah 13.50 M3 0.75 10.13


2 Pasangan batu 1:5 9.00 M3 1.50 13.50 0.75 13.50
3 Pasangan Buis Beton U30 30.00 M' 0.15 4.50
4 Pekerjaan Plester 54.00 M2 0.30 16.20 0.15 13.50

JUMLAH 44.33 31.725

KEBUTUHAN BIAYA

HARGA SAT JML HARGA


NO URAIAN VOLUME SAT
Rp. Rp.
1 Pekerja 44.33 OH 55,000.00 2,437,875.00
2 Tukang 31.73 OH 65,000.00 2,062,125.00
3 Pasir 31.73 OH 200,000.00 6,345,000.00
4 Semen 29.90 OH 60,000.00 1,793,923.20
5 Buis U30 30.00 OH 45,000.00 1,350,000.00
JUMLAH
Panjang = 30.00 M

30.00 = 13.50 M3

30.00 x 2 = 9.00 M3

= 30.00 M

0.50 ) x 30.00 x 2 = 54.00 M2

PASIR BATU BELAH SEMEN BUIS U 30


OH KOEF M3 KOEF M3 KOEF ZAK KOEF BH

13.50 0.54 13.50 1.20 10.80 2.70 24.30 -


1.00 30.00
13.50 0.03 13.50 0.10 5.60 -

31.725 31.725 10.80 29.90 30.00

JML HARGA JUMLAH


Rp. Rp.
2,437,875.00
2,062,125.00 4,500,000.00
6,345,000.00
1,793,923.20
1,350,000.00 9,488,923.20
13,988,923.20
MANDOR
KOEF BH

0.025 0.34
0.075 0.68
- -
0.015 0.81

1.82
A
PERHITUNGAN VOLUME PAS. BATU 1:4

A = 0.30 M
H
B = 0.60 M
C= 0.20 M
D D= 0.90 M
C 1 . TALUDA 1 : 4
h a. Galian Tanah h
0.70
H
B 1.00

b. Pas. Batu 1 : 4
h
0.70

0.30

C
0.20

VARIASI SALURAN PASANGAN BATU c. Plesteran 1 : 4


2.90

d. Acian 2.90

PERHITUNGAN BAHAN
TUKANG PEKERJA
NO NAMA BAHAN VOLUME SAT
KOEF OH KOEF OH
a Galian Tanah 44.10 M3 0.75 33.075
b Pas. Batu 1 :4 28.80 M3 0.75 21.60 1.50 43.20
c Plesteran 1 :4 43.50 M2 0.15 6.53 0.30 13.05
d Acian 43.50 M2 0.10 4.35 0.20 8.70
32.48 98.03

PERHITUNGAN BIAYA
HARGA SAT JML HARGA
NO URAIAN VOLUME SAT
Rp. Rp.
1 Pekerja 98.03 OH 55,000.00 5,391,375.00
2 Tukang 32.48 OH 65,000.00 2,110,875.00
3 Pasir 16.02 OH 200,000.00 3,204,000.00
4 Semen 102.36 OH 60,000.00 6,141,708.00
5 Batu Pecah 34.56 OH 45,000.00 1,555,200.00
JUMLAH
N VOLUME PAS. BATU 1:4

H= 1.00 M
h= 0.70 M
P= 15.00 M
C= 0.20 M

x B x P
x 0.60 x 15.00 x 2.00 = 12.60
x (B+D+B) x P
x 2.10 x 15.00 = 31.50
44.10

x B x P
x 0.60 x 15.00 x 2.00 = 12.60

+ B x H x P
2.00

+ 0.60 x 1.00 x 15.00 x 2.00 = 13.50


2.00

x D x P =
x 0.90 x 15.00 = 2.70
28.80

x 15.00 = 43.50

x 15.00 = 43.50

SEMEN PASIR BATU PECAH MANDOR


KOEF ZAK KOEF M3 KOEF M3 KOEF M3
0.025 1.10
3.26 93.89 0.52 14.98 1.20 34.56 0.075 2.16
0.125 5.43 0.02 1.04 0.015 0.65
0.07 3.05 0.010 0.44
102.36 16.02 34.56 4.35

JUMLAH
Rp.

7,502,250.00

10,900,908.00
18,403,158.00
m3

m3
`

m3

m3

m2

m2

Anda mungkin juga menyukai