P L T jml V Luas

Sloof S1 34.5 0.15 0.25 1.29375 5.175


Sloof S2 81.4 0.2 0.35 5.698 16.28
PC 2 0.8 0.8 0.3 13 2.496 0.64
PC 3 0 0 0 0 0 0
PC 1 0.6 0.6 0.3 5 0.54 0.36
Rollag 14.5 0.2 0.6 1.74 8.7
LC 0.05 1.593625 31.8725
Urugan tanah kmbl 5.026
Urugan Sirtu Rumah 0.5 28.90625 57.8125
Trasram 115.9 0.11 0.5 6.3745
Dinding 362.2988
Dinding Sopi 29.9668
Penebalan dinding 0.1 2.52708 25.2708
PJ1 1.545 2.74 1 4.2333
PJ2 1.795 2.74 1 4.9183
PJ3 3.275 2.74 1 8.9735
PJ3 2.32 2.74 1 6.3568
PJ3 4.775 2.74 1 13.0835
P1 0.92 2.74 4 10.0832
P2 0.82 2.14 3 5.2644
P2A 0
J1 0.68 2.74 1 1.8632
J2 0.85 2.74 1 2.329
J3 1 0.48 1 0.48
J4 0 0 0
BV1 0.3 1.9 1 0.57
BV2 0 0 0 0
BV K1 1.35 2.74 1 3.699
BV K2 0.3 2.74 1 0.822
Strous 3 31 4.5669643 0.0491071
K1 0.15 0.1 88.3 1.3245
K2 0.15 0.3 107.9 4.8555
K3 0 0 0 0 0
B1 72.33 0.15 0.1 1.08495
B2 40.05 0.1 0.2 0.801
B3 86 0.15 0.35 4.515
B4 0 0.0725 0
B5 0 0.1 0.48 0
BB 0 0.1 0.52 0
Dak Lantai 0.12 11.7291 97.7425
Dak Atap 0.12 0.3798 3.165
Plesteran dinding 754.5644
Woodplank 11.7469
WPC 0
Pekerjaan Benangan 18.58 31.92
Cat Teksture 70.56
Railing Tangga 10.059761
Dinding dlam 583.9354
Dinding Luar 170.629
Aqua Proof 239.657
Tiang Pancang 6 0 0
12.48
0
3.6

2.545 7.025
2.795 7.275
4.275 8.755
3.32 7.8
5.775 10.255
7.68 25.6
5.46 15.3
0 0
1.68 6.16
1.85 6.33
2 1.96
0 0
1.3 4.1
0 0
2.35 6.83
1.3 5.78

0.1253644

2.9187092 28.7194 10.059761 M2 railing


RENCANA ANGGARAN BIAYA
RAB B3/04 TIPE 180-140 EDELWEISS SAFIRA GARDEN

VOLUME PEKERJA HARGA


NO. URAIAN PEKERJAAN SAT PEKERJA
TUNGGAL RP RP

I. PEKERJAAN PERSIAPAN :
1 Pembersihan Lapangan M2 94.79 20,500 1,943,168
20,500 1,943,168
II. PEKERJAAN PONDASI :
1 Pasangan Bouplank M' 55.60 27,850 1,548,460
2 Galian Tanah Biasa M3 10.03 94,250 945,115
3 Galian Tanah Biasa 2m (Kolam) M3 25.71 96,750 2,487,053
4 Galian Pondasi Rolaag Teras M3 1.74 94,250 163,995
5 Pekerjaan Lantai kerja Pondasi M3 1.59 187,600 298,964
6 Pasangan Batu Kali 1 : 4 M3 - -
7 Pasangan Bata Merah Pondasi Rollag M3 1.74 55,250 96,135
8 Urugan Tanah Kembali M3 5.03 12,604 63,348
9 Urugan Sirtu M3 23.88 34,250 817,899
602,804 6,420,969
III. PEKERJAAN BETON
A. PONDASI
1 Pemancangan Tiang Pancang Mini Pile 20x20cm M' - - -
2 Bekisting Pilecap M2 16.08 30,820 495,586
3 Pasangan Beton Bertulang 1 : 3 : 5
- Strous M3 4.57 689,727 3,149,959
- Strous (Kolam) M3 1.18 689,727 812,893
- Pilecap Ø10 M3 3.04 319,257 969,264
- Sloof 15/25 + Bekisting M3 1.29 881,384 1,140,290
- Sloof 20/35 + Bekisting M3 3.64 746,842 2,718,506
- Sloof 20/35 + Bekisting (Kolam) M3 2.06 746,842 1,537,002
4,104,599 10,823,499
B. KOLOM
- Kolom 10/15 + Bekisting M3 1.32 1,107,668 1,467,106
- Kolom 15/30 + Bekisting M3 4.86 857,152 4,161,901
1,964,820 5,629,007
C. BALOK
- Balok B1 10/15 + Bekisting M3 1.08 1,123,198 1,218,614
- Balok B2 10/20 + Bekisting M3 0.80 1,123,198 899,682
- Balok B3 15/35 + Bekisting M3 4.52 788,485 3,560,009
- Balok B4 10/55 + Bekisting M3 - 1,092,991 -
- Balok B5 10/48 + Bekisting M3 - 997,697 -
- Balok BB 10/52 + Bekisting M3 - 1,086,139 -
6,211,708 5,678,305
D. LANTAI
- Plat Lantai K-250 t=12cm + Bekisting M3 11.73 1,424,573 16,708,962
- Plat Lantai K-250 t=10cm + Bekisting (Kolam) M3 4.50 1,424,573 6,417,617
- Plat Dak 1:2:3 t=10cm + Bekisting M3 0.38 735,076 279,182
- Plat Dak 1:2:3 t=10cm + Bekisting (Pompa) M3 1.09 735,076 798,293
- Rabat Lantai M3 5.78 214,765 1,241,612
- Rabat Lantai Pooldeck M3 1.16 214,765 248,108
4,748,830 25,693,774
IV. PEKERJAAN DINDING
A. PASANGAN DINDING
1 Pasangan Dinding Bata Merah M3 8.90 55,250 491,812
2 Pasangan Dinding Bata Ringan GE M2 362.30 55,250 20,017,009
3 Pasangan Dinding Bata Ringan GE Dinding Sopi M2 29.97 55,250 1,655,666
165,750 22,164,487
B. PENUTUP DINDING
1 Plesteran Dinding 20mm 1 : 5 M2 754.56 30,340 22,893,484
2 Plesteran Dinding 20mm 1 : 5 (Kolam) M2 48.81 30,340 1,480,877
3 Acian Dinding M2 754.56 10,275 7,753,149
4 Acian Dinding (Kolam) M2 48.81 10,275 501,517
5 Benangan M' 295.01 16,280 4,802,787
6 Ban-banan 10x5cm M' 25.65 54,500 1,397,925
152,010 38,829,739
V. PEKERJAAN ATAP :
1 Penutup Atap Genteng Beton M2 77.55 30,610 2,373,806
2 Wuwung Genteng Beton M' 33.25 78,340 2,604,805
3 Pas. Lisplang Gypsum M' 39.20 - -
4 Pekerjaan rangka atap baja ringan M2 39.50 - -
4,978,611
VI. PEKERJAAN PLAFOND :
1 Pas Rangka Plafond Plus Gypsum M2 103.02 - -
2 List Plafond Gypsum 5CM M' 153.63 - -
- -
VII. PEKERJAAN LANTAI :
1 Pas. Granit 80/80 M2 91.17 79,467 7,245,032
2 Pas. Keramik Mozaik Kolam M2 48.81 31,045 1,515,288
3 Pas. Duma Pooldeck M2 11.55 60,204 695,507
4 Pas. Keramik 30/30 lantai teras M2 9.63 29,800 287,072
5 Pas. Keramik 40/40 lantai km/wc M2 7.15 29,800 213,106
6 Pas. Keramik 40/40 dinding km/wc M2 42.63 31,045 1,323,448
7 Plint Lantai M' 132.63 12,092 1,603,702
261,361 12,883,154
VIII. PEKERJAAN INSTALASI LISTRIK
1 Titik Lampu Ttk 17.00 - -
2 Titik Stop Kontak Ttk 16.00 - -
3 Titik Stop Kontak AC Ttk 5.00 - -
4 Titik MCB Ttk 6.00 - -
5 Down Light Out BOO Ttk - - -
6 Down Light In BOO Ttk 17.00 - -
7 Ground/Arde Ttk 1.00 - -
8 Power/Pudeng M' 39.59 - -
9 Fuse/Box Pcs 2.00 - -
10 Stop Kontak Pompa Ttk 2.00 - -
- -
IX. PEKERJAAN INSTALASI AIR :
1 Saluran Air Bersih Westpex Ø 20mm M' 53.55 13,696 733,421
2 Saluran Pipa Air Panas M' 5.70 13,662 77,873
3 Pipa Hawa PVC Ø 1 1/4" M' 5.95 11,100 66,045
4 Pipa air kotor wastavel dan zink PVC Ø 1,5" M' 5.70 13,662 77,873
5 Pipa Pembuangan Air Kotor PVC Ø 2" M' 53.40 20,622 1,101,236
6 Saluran Air Limbah PVC Ø 3" M' 30.50 30,931 943,396
7 Saluran Air Tinja PVC Ø 4" M' 26.90 30,931 832,044
134,604 3,831,888
X. PEKERJAAN SANITAIR :
1 Closet Monoblok Toto CW 633JW/F Bh 3.00 402,424 1,207,272
2 Kitchen Sink Royal SB 35 Bh 1.00 13,500 13,500
3 Kran Dinding AER TR 5J F Bh 2.00 27,829 55,658
4 Kran Wastafel AER AOV 1A Bh 1.00 27,829 27,829
5 Mixer Shower AER SAS BX1 Bh 3.00 27,829 83,487
6 Hand Shower AER YSH 5C Bh 3.00 27,829 83,487
7 Kran Closet AER TF 03C Bh 3.00 27,829 83,487
8 Jet Shower AER SC 07C Bh 3.00 27,829 83,487
9 Floor Strainer AER FS 04 SS (Avur) Bh 3.00 27,829 83,487
10 Pemasangan Fitting Saluran Air Panas Bh 6.00 22,686 136,116
11 Pekerjaan Septictank Bh 1.00 831,500 831,500
12 Pekerjaan Sumur Resapan Bh 1.00 342,471 342,471
13 Pemasangan Tandon Air 1m3 Bh 1.00 - -
14 Pemasangan Tandon Balancing Kolam 2m3 Bh 1.00 - -
15 Pas. Bak Kontrol 40x40 Bh 4.00 39,463 157,851
1,846,847 3,189,632
XI. PEKERJAAN PENGECATAN :
1 Pengecatan Dinding dalam M2 583.94 10,614 6,197,598
2 Pengecatan Dinding luar M2 170.63 10,614 1,810,971
3 Pengecatan Tekstur M2 70.56 19,215 1,355,810
4 Pengecatan Plafond M2 103.02 10,614 1,093,401
5 Pengecatan Lisplang M2 11.76 10,614 124,815
6 Pelapisan Aquaproof Kolam (5x) M2 48.81 63,179 3,083,705
7 Pelapisan Aquaproof M2 239.66 12,636 3,028,234
137,483 16,694,534
XII. PEKERJAAN PINTU & JENDELA :
1 - Pintu Tipe PJ1 Bh 1.00 178,500 178,500
- Pintu Tipe PJ2 Bh 1.00 178,500 178,500
- Pintu Tipe PJ3 Bh 1.00 - -
- Pintu Tipe PJ4 Bh 1.00 - -
- Pintu Tipe PJ5 Bh 2.00 - -
- Pintu Tipe P1 Bh 3.00 178,500 535,500
- Pintu Tipe P2 Bh 3.00 - -
- Jendela Tipe PJ1 M2 1.88 - -
- Jendela Tipe PJ3 M2 3.73 - -
- Jendela Tipe PJ4 M2 1.86 - -
- Jendela Tipe J1 M2 1.86 - -
- Jendela Tipe J3 M2 0.48 - -
- Jendela Tipe J4 M2 - - -
2 Kusen Alumunium 4"
- Pintu Tipe PJ1 M' 10.49 - -
- Pintu Tipe PJ2 M' 10.99 - -
- Pintu Tipe PJ3 M' 19.45 - -
- Pintu Tipe PJ4 M' 14.78 - -
- Pintu Tipe PJ5 M' 24.39 - -
- Pintu Tipe P1 M' 25.60 - -
- Pintu Tipe P2 M' 15.30 - -
- Jendela Tipe J1 M' 6.84 - -
- Jendela Tipe J2 M' 7.18 - -
- Jendela Tipe J3 M' 2.96 - -
- Jendela Tipe J4 M' - - -
3 Kaca Tebal 5mm
- Jendela Tipe PJ2 M2 2.56 - -
- Jendela Tipe PJ3 M2 2.96 - -
- Jendela Tipe PJ4 M2 2.03 - -
- Jendela Tipe PJ5 M2 8.70 - -
- Jendela Tipe J2 M2 2.33 - -
- Jendela Tipe BV1 *Kaca Es M2 0.57 - -
- Jendela Tipe K1 *8mm M2 3.70 - -
- Jendela Tipe K2 M2 0.82 - -
- Kaca Kombinasi Railing untuk Fasad M2 7.13 - -
4 Handle + Body Dekkson Stainless SST 02-0022 SS Bh 6.00 - -
535,500 892,500
XIII. FINISHING :
1 Laser Cutting LS 1.00 - -
2 Railing Tangga M2 12.28 - -
3 Pas. Marmer Dark Emperador Spain M2 30.44 - -
- -
XIV. PEKERJAAN LAIN - LAIN :
1 Rabat untuk Carport + Inrit M3 1.72 735,076 1,266,169
2 Ampyangan(Include list dan batu andesit) + Inrit M2 34.45 46,398 1,598,418
3 Palungan Ls 1.00 - -
4 Meja Dapur Bh 1.00 291,788 291,788
5 Pas. List Pembatas Kavling M' 27.60 5,802 160,144
6 Aksesoris Kolam
- Pompa Emaux SPH 1,5 Hp Bh 1.00 - -
- Sand filter emaux v 650 Bh 1.00 - -
- Maindrain Square 30 x 30 Bh 1.00 - -
- Walt Inlet Bh 2.00 - -
- Vacuum Fitting Bh 4.00 - -
- Telescopic handle 2.4 - 4.8 m Hayward Bh 1.00 - -
- Lampu Emaux LED Bh 2.00 - -
- Vacuum house 9 m Hayward Bh 1.00 - -
- Vacuum Head 8 roda Hayward Bh 1.00 - -
- Leaf Rake Hayward Bh 1.00 - -
- Pool Brom / Wall Bruss Hayward Bh 1.00 - -
- Test Kit Hayward Bh 1.00 - -
- Piping, Electrical, Material & Instalation Ls 1.00 - -
- Power Panel Control Timer Ls 1.00 - -
1,079,065 3,316,519
REKAPITULASI RENCANA ANGGARAN BIAYA
RAB B3/04 TIPE 180-140 EDELWEISS SAFIRA GARDEN

PEKERJA
NO. URAIAN PEKERJAAN

RP
I. Pekerjaan Persiapan …………………………………………………………………………… 1,943,168

II. Pekerjaan Pondasi ……………………………………………………………………………… 6,420,969

III. Pekerjaan Beton


A. Pondasi ……………………………………………………………………………………………………… 10,823,499

B. Kolom ………………………………………………………………………………………………………… 5,629,007

C. Balok …………………………………………………………………………………………………………… 5,678,305

D. Lantai ………………………………………………………………………………………………………… 25,693,774

IV. Pekerjaan Dinding


A. Pasangan Dinding …………………………………………………………………………………… 22,164,487

B. Penutup Dinding ……………………………………………………………………………………… 38,829,739

V. Pekerjaan Atap ……………………………………………………………………………………… 4,978,611

VI. Pekerjaan Plafond ………………………………………………………………………………… -

VII. Pekerkjaan Lantai …………………………………………………………………………… 12,883,154

VIII. Pekerjaan Instalasi Listrik ……………………………………………………………… -

IX. Pekerjaan Instalasi Air …………………………………………………………………… 3,831,888

X. Pekerjaan Sanitair ……………………………………………………………………………… 3,189,632

XI. Pekerjaan Pengecatan ………………………………………………………………………… 16,694,534

XII. Pekerjaan Pintu & Jendela ………………………………………………………………… 892,500

XIII. Pekerjaan Finishing …………………………………………………………………………… -

XIV. Pekerjaan Lain - Lain ………………………………………………………………………… 3,316,519


Jumlah ……………………………………………………………………… 162,969,784
Harga / M2 (Tanpa PPN) …………………………………… 1,038,024
PPN 10 % ……………………………………………………….......... 16,296,978
Jumlah + PPN 10 % ………………............................... 179,266,763
Harga / M2 ……………………………………………………………. 1,141,827