Anda di halaman 1dari 23

DESAIN DAN RENCANA ANGGARAN BIAY

KEGIATAN : PASANGAN BATU KA


VOLUME : ( 500 X 0,6 X 0,25 ) M
TAHUN ANGGARAN 2016

DUSUN : SUKOREJO
DESA : KEDUNGJERUK
KECAMATAN : MOJOGEDANG

KABUPATEN KARANGANYAR
JAWA TENGAH
N RENCANA ANGGARAN BIAYA
: PASANGAN BATU KALI
ME : ( 500 X 0,6 X 0,25 ) M
HUN ANGGARAN 2016

BUPATEN KARANGANYAR
JAWA TENGAH
Kabupate : Karanganyar Jenis Prasarana

No. Kecamata: Mojogedang Take Of Sheet Lokasi

Desa : Kedungjeruk Volume

Beton K125
I
Urug Dastu
1
Beton K125
2
Talud 1 : 5
II
Galian Tanah =500 x0,25 x 0,25 31.25
1
2 Timbunan Tanah =500 x0,25 x 0,26 31.25

3 Pas batu 1 : 5 = 500 x 0,6 x 0,25 75.00

4 Plesteran =500 x 0,40 175.00

III Gorong - gorong Plat

I. Bahan :

1 Cement

2 Pasir

3 Batu

4 Koral 2/3

5 Besi D 10 mm

II Upah :

1 Pekerja

2 Tukang
: Pas Batu Kali

: Dsn Sukorejo

:500 X 0,6X 0,25 M

m3

m3

m3

m3

m3

m2

Zak

M3

M3

M3

Btg

HOK

HOK
PERHITUNGAN BAHAN, UPAH DENGAN ACUAN SNI
DUSUN : SUKOREJO DESA : KEDUNGJERUK KECAMATAN : MOJOGEDANG
Kebutuhan Bahan
No Jenis Pekerjaan Vol Sat
Koef Sirtu Koef Tanah Koef Sirtu Koef Batu (Bt) Koef PC(zak) Koef Pasir(m3) Koef Split Koef Besi Kg Koef Bendrat Koef

1 Galian Tanah 31 m3

2 Timbunan Tanah 31 m2 1.20 37.50

3 Pas. Batu 75 m3 1.10 82.50 3.40 255.00 0.52 39.00

4 Plesteran 1:4 175 m2 0.13 22.75 0.02 3.50

1 Urugan Sirtu - m3 1.20 -

2 Beton K125 - m3 6.90 - 0.59 - 0.75 -

1 Pembersihan - m2

2 Galian Tanah - m3

3 Timbunan Tanah - m2 1.20 -

4 Timbunan Sirtu - m2 1.20 -

5 Pas. Batu - m3 1.10 - 3.40 - 0.52 -

6 Rabat Beton K100 - m3 5.68 - 0.54 - 0.91 -

7 Beton Bertulang - m3 8.08 - 0.52 - 0.78 - 150.00 - 2.25 - 0.32

8 Plesteran 1:4 di Jembt - m3 0.13 - 0.02 -

9 Plat landasan - m2

10 Pipa dia 2 " - m2

11 Cat Tembok - m2

12 Cat Kayu/besi - m2
Jumlah - 38 - 83 278 43 - - -
Kebutuhan Bahan
Bkstg

-
-
Kebutuhan Tenaga HOK
Koef Kayu Blk Koef Minyak Ltr Koef Play wood Koef Dolken m Koef Paku(Kg) Koef Bs plat Koef Pipa m Koef Cat Kayu Koef Pekerja Koef Mandor Koef Tukang Koef Katuk

0.40 12.50 0.04 1.25

0.19 6.00 0.02 0.60

1.50 112.50 0.08 5.63 0.60 45.00 0.06 4.50

0.20 35.00 0.01 1.75 0.15 26.25 0.02 2.63

0.30 - 0.01 -

1.65 - 0.08 - 0.28 - 0.03 -

0.10 - 0.01 -

0.40 - 0.04 -

0.30 - 0.01 -

0.30 - 0.01 -

1.50 - 0.08 - 0.60 - 0.06 -

1.65 - 0.08 - 0.28 - 0.03 -

0.14 - 1.60 - 2.80 - 32.00 - 3.20 - 5.80 - 0.19 - 4.55 - 0.46 -

0.20 - 0.01 - 0.15 - 0.02 -

1.00 - 0.50 - 0.03 - 0.25 - 0.03 -

1.00 - 0.10 - 0.01 - 0.15 - 0.02 -

1.00 - 0.02 - 0.01 - 0.03 - 0.00 -

1.00 - 0.10 - 0.01 - 0.15 - 0.02 -


- - - - - - - - 166 9 71 7
- 23 -

XXII. FORMAT GAMBAR RENCANA PRASARANA


GAMBAR RENCANA PRASARANA

PLESTERAN 1 : 4 SULING2 PLESTERAN 1 : 4


MATA BATU
A 0.3
SULING2

0,8
PASANGAN 1:5

0,8

V
V

0.3

A 0.5
TAMPAK MUKA TEMBOK PENAHAN TANAH POTONGAN A - A
- 23 -

TYPE I

Catatan : Gambar dibuat secara manual


- 23 -

CANA PRASARANA

GAMBAR RENCANA

KABUPATEN
KARANGANYAR
KECAMATAN
MOJOGEDANG
PASANGAN 1:5 DESA
KEDUNGJERUK
JENIS PRASARANA
JALAN BETON
LOKASI
DUSUN SUKOREJO
JUDUL GAMBAR
TAMPAK MELINTANG, DAN
MEMANJANG
Digambar Oleh

SUWARNO
Pelaksana Kegiatan
(Kader Teknik)

Diperiksa dan Disetujui oleh :


- 23 -

Dinas/Instansi terkait dan/atau


Tenaga Profesional
(jika tersedia)

Lembar..Dari..Lembar
- 24 -

XXIII. FORMAT RENCANA ANGGARAN DAN BIAYA (RAB)

RENCANA ANGGARAN BIAYA (RAB)


DESA :
KECAMATAN : Mojogedang No.RAB
KABUPATEN : Karanganyar Bidang
PROVINSI : Jawa Tengah Kegiatan

Volume Harga
Volume Volume
URAIAN Dana Satuan Satuan Jumlah Total Rp
Total Swadaya
Desa Rp
a b c d e f g=bxf
1. BAHAN
1.1 Semen ,40an 277.75 0 277.75 sak 57,500 15,970,000
1.2 Pasir 42.50 0 42.5 m3 245,000 10,412,000
1.3 Koral 2/3 - 0 0 m3 250,000 -
1.4 Batu belah 82.50 0 82.5 m3 245,000 20,212,000
1.5 Besi D 10 mm - 0 0 M3 65,000 -
1.6 Reng 20.00 20 0 Btg 30,000 600,000
1.7 Paku 2.00 2 0 Kg 15,000 30,000
1.8 Timbunan Tanah 37.50 30 7.5 M3 45,000 1,687,000
Sub Total 1) 48,911,000
2. ALAT
2.1 Molen - 0 0 hari 150,000 -
2.2 Sekop 2 2 0 biji 25,000 50,000
2.3 Ember 6 6 0 biji 6,000 36,000
2.4 Cangkul 5 5 0 biji 25,000 125,000
2.5 Ember gede - 0 0 biji 25,000 -
2.6 Benang 1 1 0 rol 30,000 30,000
2.7 Drum 2 2 0 bh 75,000 150,000
2.8 Gerobak 15 15 0 hari 10,000 150,000
2.9 Linggis 1 1 0 bh 50,000 50,000
2.10 Cetok 2 2 0 bh 20,000 40,000
2.11 Papan Proyek Dll 1 0 1 Ls 250,000 250,000
Sub Total 2) 670,000
3. UPAH
3.1 Mandor 9.23 - 9.23 OH 75,000 691,000
3.2 Tukang 71.25 49.99 21.26 OH 75,000 5,343,000
3.3 Pekerja 166.00 166.00 - OH 60,000 9,960,000
3.4 Kepala Tukang 7.13 - 7.13 OH 75,000 534,000
215.9867 37.61333 Sub Total 3 ) 16,528,000
Total Biaya 66,109,000
Keterangan :

Kategori Biaya
I-a Pembelian bahan hasil tenaga manusia
I-b Pembelian bahan hasil industri
II-a Pembelian alat tangan
II-b Pembelian / penyewaan alat mesin
- 24 -

III-a Pembayaran tenaga kerja untuk konstruksi


III-b Pembayaran tenaga untuk pengumpulan bahan

Kedungjeruk, Tanggal
Mengetahui :
Kepala Desa Tim Penyusun R

(H.SALEH.) (SUWARN
- 24 -

ANGGARAN BIAYA (RAB)

: 001/III/kdjrk/2016
: Sarana prasarana
: Jalan Beton

Jumlah Dana
Jumlah Swadaya
Desa
Rp
Rp
h=cxf i= d x f

- 15,970,000
- 10,412,000
- -
- 20,212,000
- -
600,000 -
30,000 -
1,350,000 337,000
1,980,000 46,931,000

- -
50,000 -
36,000 -
125,000 -
- -
30,000 -
150,000 -
150,000 -
50,000 -
40,000 -
- 250,000
420,000 250,000

- 691,000
3,749,000 1,594,000
9,960,000 -
- 534,000
13,709,000 2,819,000
16,109,000 50,000,000
- 24 -

Kedungjeruk, Tanggal 03 Maret 2016

Tim Penyusun RKP Desa

(SUWARNO)
REKAPITULASI ANGGARAN BIAYA PRASARANA
Jenis Prasarana : Pasangan Batu Kali
Propinsi : Jawa Tengah Kecamatan : Mojogedang
Kabupaten : Karanganyar Desa : Kedungjeruk
Kegiatan Pas Batu Kegiatan Kegiatan
No. Uraian Ukuran 100x1x0,40 Bobot Ukuran Bobot Ukuran Bobot Bobot
Jumlah Total
Jumlah 1 Unit (%) Jumlah (%) Jumlah (%) (%)
No. RAB 001 No. RAB No. RAB
Dana Desa Swadaya Dana Desa Swadaya Dana Desa Swadaya Dana Desa Swadaya
(Rp.) (Rp.) (Rp.) (Rp.) (Rp.) (Rp.) (Rp.) (Rp.)

I Bahan I.a 46,931,000 1,980,000 93.86 - - #REF! 46,931,000 1,980,000 93.86

Ib

II Alat II.a 250,000 420,000 0.50 - - #REF! 250,000 420,000 0.50

Iib

III Upah III.a 2,819,000 ### 5.64 - - #REF! 2,819,000 13,709,000 5.64

IIIb

Jumlah 50,000,000 ### 100.00 - - #REF! 50,000,000 16,109,000 100.00

Jumlah Biaya Upah 2,819,000 ### - 2,819,000 13,709,000

Jumlah HOK Konstruksi 216 38 HOK - HOK HOK 216 38 HOK

Mengetahui Dibuat Oleh :


Kepala Desa Kedungjeruk Ketua TPK

(H.SALEH.) (SUWARNO)
- 25 -

XXIV. FORMAT PEMERIKSAAN DOKUMEN PROPOSAL TEKNIS DAN RAB

PEMERIKSAAN DOKUMEN PROPOSAL TEKNIS DAN RAB

Desa : ... Lokasi :


Kecamatan : Mojogedang Bidang :
Kabupaten : Karanganyar Kegiatan :
Provinsi : Jawa Tengah Volume :

Ada & Tidak


Ada Memenuhi
Jenis Dokumen yang Diperiksa Memenuhi
Syarat
Syarat

1 Sketsa lokasi kegiatan

2 Dokumen survey teknis

3 Gambar desain

4 Perhitungan volume

5 Survey harga bahan dan alat

6 Kesepakatan pembayaran upah kerja

7 Perhitungan RAB

8 Kajian sederhana mengenai dampak lingkungan

9 Pernyataan hibah lahan dari masyarakat

10 Pernyataan kesanggupan tidak minta ganti rugi

11 Kesanggupan swadaya dan gotong royong

12 Rencana penggunaan alat berat

13 Pernyataan kesiapan warga untuk mengerjakan

14 Data pemanfaat

Diperiksa Tanggal :
Hasil Pemeriksaan dinyatakan : Layak / Tidak Layak

Tim Verifikasi
- 25 -

1 Wakil Masyarakat : 1..


2 Pendamping Profesional : 2.
3 Dinas Instansi Terkait : 3
4 . : 4.
- 25 -

UMEN PROPOSAL TEKNIS DAN RAB

:
:
:
:

Tidak Ada
- 25 -

2. ..

4. .