TABULASI JOB FAKTOR

FAKTOR
Eco EA.M Em EM
NO JENIS ALAT ( Cuaca dan ( Alat dan (Material) (Manajemen) E Total
Operator ) Medan Kerja )

1 EXCAVATOR
KONDISI : A 0.737 0.900 1.200 0.850 0.677
B 0.737 0.852 1.100 0.850 0.587
C 0.737 0.805 0.900 0.850 0.454
D 0.737 0.715 0.800 0.850 0.358

2 BULDOZER
KONDISI : A 0.783 0.850 1.100 0.850 0.622
B 0.783 0.805 0.900 0.850 0.482
C 0.783 0.760 0.700 0.850 0.354
D 0.783 0.715 0.600 0.850 0.286

3 DUMP TRUCK 0.783 0.805 1.100 0.850 0.589

4 COMPACTOR 0.783 0.852 1.000 0.850 0.567

FAKTOR GABUNGAN CUACA DAN OPERATOR (E.c.o)

KONDISI ALAT
No. CUACA
TRAMPIL BAIK CUKUP SEDANG

1 TERANG, SEGAR 0.900 0.850 0.800 0.750

2 TERANG, PANAS, BERDEBU 0.830 0.783 0.737 0.691

3 DINGIN, MENDUNG, GERIMIS 0.750 0.708 0.666 0.624

4 GELAP 0.666 0.629 0.592 0.555

FAKTOR GABUNGAN ALAT DAN MEDAN (E.A.M)

KONDISI KONDISI ALAT


No.
MEDAN PRIMA BAIK CUKUP SEDANG

1 IDEAL 0.950 0.900 0.850 0.800

2 RINGAN 0.900 0.852 0.805 0.757

3 SEDANG 0.850 0.805 0.760 0.715

4 BERAT 0.800 0.715 0.715 0.673


TABEL : FAKTOR MATERIAL (E.m)

TINGKAT FAKTOR
PENGERJAAN KESULITAN MATERIAL KONDISI DAN JENIS MATERIAL
(E m)

DOZING
Dapat digusur secara sempurna penuh blade, kadar air rendah, bukan tanah
A Mudah 1.100
pasir dipadatkan, tanah biasa, onggokan material
Tanah lepas tetapi tidak digusur sepenuh blade, tanah kerikil, pasir, batu pecah
B Sedang 0.900
KONDISI

halus
Kadar air tinggi, liat lengket, tanah liat keras kering ; pasir kerikil
C Agak Sulit 0.700
Batu hasil peledakan atau batu berukuran kasar dan lumpur
D Sulit 0.600

EXCAVATING
Kondisi alam ; tanah biasa atau batu lunak
A Mudah 1.200
Kondisi alam tanah liat, tanah liat, tanah pasir atau pasir kering
B Sedang 1.100
KONDISI

Kondisi alam tanah pasir dengan kerikil


C Agak Sulit 0.900
Onggokan batu hasil peledakan, lumpur
D Sulit 0.800

LOADING
1.000 - 1.100 Onggokan material, hasil galian, dapat munjung, pasir, tanah pasir, tanah liat
A Mudah
lembek basah (kadar air sedang)
0.850 - 0.950 Onggokan tanah material tetapi untuk mengambilnya agak diforsir, pasir kering
B Sedang
KONDISI

tanah liat, batu pecah, kerikil halus


0.800 - 0.820 Batu pecah halus, tanah liat keras, sirtu, tanah pasir, tanah liat yang semuanya
C Agak Sulit
sulit disodok dan lumpur
0.750 - 0.800 Batu pecah kasar, hasil peledakan, batu kali, sirtu, tanah pasir, tanah liat yang
D Sulit
semuanya sulit disodok dan lumpur

HAULING
Pengisian oleh 1.100 - 1.200 - Semuanya material yang diangkut adalah material lepas
Loader
- Alat hanya berfungsi pengangkutan, bukan pengisian

FAKTOR MANAGEMENT (EM)

No. KUALIFIKASI CURRICULUM VITAE NILAI FAKTOR ( % )

1 Sangat Baik Pendidikan :


a. Formal : S1 - Teknik
b. Informal :
1. Large Project Manager
2. Management Audit
3. Project Administration 0.95

2 Baik 0.90

3 Cukup 0.85

4 Sedang 0.80
ANALISA PRODUKSI ALAT
1. BULLDOZER

No. Subject Formulasi Data Hasil

1. Draw bar pull side dump (P ; kg)


(gaya dorong buang samping) P = (Bo + Bj x q Cos a) x Kt Kt = 0.60 (Tanah Gembur) P = 6,605.26 kg
Bo = 10,000 kg Pspec = 12,300.00 kg
Bj = 950 kg/m3 P < Pspec
q = 1.85 m3 belum terjadi slip
a = 55 o

cos a = cos 55
= 0.5740

2. Kecepatan dorong (V ; km/jam) N x 75 3600 N = 110 Hp V = 4.496 km/jam


V = x
P 1000 P = 6,605.26 kg Vspec = 2.7 km/jam
dengan F2

3. Produksi (Continous Loading) Cos a x V x E Sf = 0.43 Q(kond.A) = 674.39 m3 B/jam


Q =
(Q ; m3/jam) (1 + Sf) Etotal = 0.622 (Kondisi A) Q(kond.B) = 522.56 m3 B/jam
= 0.482 (Kondisi B) Q(kond.C) = 383.72 m3 B/jam
catatan : = 0.354 (Kondisi C) Q(kond.D) = 309.43 m3 B/jam
= 0.286 (Kondisi D)
Cyle time tidak diperhitungkan karena
continous loading V = 2,700 m/jam Koef Alat(kond.A) = 0.0015 B/jam
Koef Alat(kond.B) = 0.0019 B/jam
Koef Alat(kond.C) = 0.0026 B/jam
Koef Alat(kond.D) = 0.0032 B/jam

2. Excavator (Daerah Galian Saluran)

No. Subject Formulasi Data Hasil

1. Cylce time actual (Cta ; menit) Cta = Ctspec x r Ctspec = 0.4 Cta = 0.6 menit
r = 1.30

2. Produksi (Q ; m3/jam) 60 x q x E x CF Cta = 0.6 Q(kond.A) = 33.56 m3 B/jam


Q =
Cta q = 0.62 Q(kond.B) = 29.12 m3 B/jam
Etotal = 0.677 (Kondisi A) Q(kond.C) = 22.51 m3 B/jam
= 0.587 (Kondisi B) Q(kond.D) = 17.77 m3 B/jam
= 0.454 (Kondisi C)
= 0.358 (Kondisi D) Koef Alat(kond.A) = 0.0298 B/jam
CF = 0.80 Koef Alat(kond.B) = 0.0343 B/jam
Koef Alat(kond.C) = 0.0444 B/jam
Koef Alat(kond.D) = 0.0563 B/jam

3. Excavator (Perapihan Tanggul)

No. Subject Formulasi Data Hasil

1. Cylce time actual (Cta ; menit) Cta = Ctspec x r Ctspec = 0.4 Cta = 0.6 menit
r = 1.30

2. Produksi (Q ; m3/jam) 60 x q x E x CF Cta = 0.2 Q(kond.A) = 100.67 m2 B/jam


Q =
Cta q = 0.75 Q(kond.B) = 87.36 m2 B/jam
Etotal = 0.677 (Kondisi A) Q(kond.C) = 67.53 m2 B/jam
= 0.587 (Kondisi B) Q(kond.D) = 53.32 m2 B/jam
= 0.454 (Kondisi C)
= 0.358 (Kondisi D) Koef Alat(kond.A) = 0.0099 B/jam
CF = 0.80 Koef Alat(kond.B) = 0.0114 B/jam
Koef Alat(kond.C) = 0.0148 B/jam
Koef Alat(kond.D) = 0.0188 B/jam
3. Dump Truk (Jarak angkut 500 m - 1.000 m)

No. Subject Formulasi Data Hasil

1. Rimpul, membawa muatan Pa = (GVW x RR - GVW Sin a) 2/3 R = 0.6 GVW = 21.36 ton
(Pa ; kg) GVW = Bo + q.Bj Bo = 11.4 ton
q = 6 m3 Pa = 215.03 kg
Bj = 1.66 ton/m3
a = 2 o

sin a = sin 2
= 0.0348995
RR = 50 kg/ton

2. Rimpul kosong (Pk ; kg) Pk = (GVW x RR + GVW Sin a) 2/3 Pk = 645.24 kg


GVW = Bo

3. Kecepatan angkut N x 75 x 3,6 N = 125 Hp Va = 156.95 km/jam


Va =
(Va ; km/jam) Pa Pa = 215.03 kg Vspec = 12 F3
digunakan F3 dengan
Va = 30 km/jam

4. Kecepatan balik (kosong) N x 75 x 3,6 N = 125 Hp Vk = 52.31 km/jam


Vk =
(Vk : km/jam) Pk Pk = 645.24 kg Vspec = 40 (F3)

5. Cylce time (Ct ; menit) Ct = Waiting time (Wt) + Wt = 0.5 menit Lt = 2.329 menit
Loading time (Lt) + dt = 0.3 menit Cat = 2.000 menit
Carry time (Cat) + Ft = 0.2 menit Dt = 1.500 menit
Dumpling time (dt) + qdt = 5.7 m3
Return time (Ft) + qex = 0.7 m3 Ct = 6.829 menit
Fix time (F2) Ctex = 0.286 menit
D = 1 km
Lt = (qdt/qex) x Ctex Va = 30 km/jam
Cat = (D/Va) x 60 Vk = 40 km/jam
Dt = (D/Vk) x 60

6. Produksi (Q ; m3/jam) 60 x q x E x CF q = 5.7 m3 Q = 20.66 m3 B/jam


Q = Ct Etotal = 0.589 = 29.52 m3 L/jam
CF = 0.70 B (bank)
= 1.00 L (loose) Koefisien Alat = 0.0484 B/jam
Ct = 6.83 = 0.0339 L/jam

4. Vibrator Roller

No. Subject Formulasi Data Hasil

1. Produksi (Q ; m3/jam) 1000 x V x W x CF x E L = 0.75 m Q = 141.62 m3 B/jam


Q =
n V = 1.50 km/jam = 127.59 m3 C/jam
t = 0.20 m
E = 0.567 Koefisien Alat = 0.0071 B/jam
n = 1.00 (double drum) = 0.0078 C/jam
CF = 1.11 B (bank)
= 1.00 C (compact)
REKAPITULASI ANGGARAN BIAYA

Pengaman Tebing Sungai Kedai Padang, Kec. K. Utara, Desa Kedai Padang Kab. Aceh
Pekerjaan :
Selatan (OTSUS Kab/Kota)
Kegiatan : Mengendalikan Banjir Pada Daerah Tangkapan Air Dan Badan-Badan Sungai
Lokasi : Kabupaten Aceh Selatan
Tahun Anggaran : 2015

NO MATA PEMBAYARAN HARGA

I Pekerjaan Persiapan 14,207,700.00

II Pekerjaan Pokok 1,047,667,798.50

III Pekerjaan Lain-Lain #REF!

Jumlah Total (I+II+III) #REF!


PPN 10% #REF!
Total #REF!
Dibulatkan #REF!

Terbilang :
#REF!

Banda Aceh, 30 April 2015


Penawar
……………

……………..
Direktur
1 2 3 4 5 6

I Asumsi
Jam Kerja Efektif per hari Tk 7.00 Jam
TAKSIRAN PRODUKSI ALAT
GALIAN TANAH BIASA

No. URAIAN KODE KOEF. SAT. KET.

1 2 3 4 5 6

I Asumsi
Jam Kerja Efektif per hari Tk 7.00 Jam

II PEMAKAIAN BAHAN, ALAT DAN TENAGA


1 BAHAN
Tidak ada bahan yang diperlukan

2 ALAT
EXCAVATOR 140 Hp
A. Tenaga yang tersedia dlm mesin N 140 HP
B. Kapasitas Bucket q 0.8 m3
C. Perhitungan Waktu Siklus Ct
1. Penggalian (Cutting) 45 detik
2. Pengangkatan & Swing (Loaded) 10 detik
3. Pembuangan (Dumping) 10 detik
4. Swing Kembali (Unloaded) 10 detik
Jumlah 75 detik
1.250 menit

D. Job Factor (Efisiensi Kerja) E 0.602


E. Faktor Konversi Material (Asli - Lepas) CF 1.25
F. Produktifitas Alat Q
28.896 m3/jam

G. Koefisien Alat (1/Q) 0.0382 jam/m3


DAFTAR KUANTITAS DAN HARGA

SKPA : Dinas Pengairan


Nama Pekerjaan : Rehab Jaringan Irigasi D.I. Lawe Bulan Kab. Aceh Tenggara (DAK)
Kegiatan ; Rehabilitasi/Pemeliharaan Jaringan Irigasi
Lokasi : Kabupaten Aceh Tenggara
Tahun Anggaran : 2015

Harga Satuan Jumlah Harga


No. Uraian Pekerjaan Satuan Kuantitas Analisa
(Rp) (Rp)
(1) (2) (3) (4) (5) (6) (7)=((4)x(6)

I. PEKERJAAN PERSIAPAN
1. Pembersihan Lapangan M² 1,215.00 T.01 4,780.00 5,807,700.00

2. Dewatering Ls 1.00 Ls 3,000,000.00 3,000,000.00

3. Mobilisasi dan Demobilisasi Ls 1.00 Taksir 5,400,000.00 5,400,000.00

Jumlah I 14,207,700.00

II. PEKERJAAN POKOK

1 Galian Tanah Biasa (AB) M³ 585.05 AB.1 16,170.00 9,460,258.50

2 Galian Tanah Berbatu (AB) M³ 168.00 AB.2 21,260.00 3,571,680.00

3 Timbunan Tanah Hasil Galian (MP) M³ 142.15 T.14.a 27,510.00 3,910,546.50

4 Timbunan Tanah Didatangkan Dipadatkan (MP) M³ 585.85 T.14.b-1 138,860.00 81,351,131.00

5 Pasangan Batu Kali 1 Pc : 4 Ps M³ 724.00 P.01.c 735,130.00 532,234,120.00

6 Plesteran 1 Pc : 3 Ps T = 15 mm M² 2,572.15 P.04.d 58,750.00 151,113,812.50

7 Beton Cor 1 : 2 : 3 M³ 45.00 B.05.b 887,230.00 39,925,350.00

8 Pembesian Beton Kg 6,120.00 B.17 19,920.00 121,910,400.00

9 Pemasangan Bekisting M² 315.00 P.05.a 164,370.00 51,776,550.00

10 Membongkar Bekisting M² 315.00 B.36 8,330.00 2,623,950.00

11 Memasang Pipa Drain Hole PVC Dia. 1,0" Bh 500.00 P.16.b 47,580.00 23,790,000.00

12 Bongkaran Pasangan Batu M³ 40.00 P.01.f 150,000.00 6,000,000.00

13 Pintu Air Uk. B=0.80 Ht= 2.00 Unit 2.00 Ls 5,000,000.00 10,000,000.00

14 Pintu Air Uk. B=1.00 Ht= 2.50 Unit 2.00 Ls 5,000,000.00 10,000,000.00

Jumlah II 1,047,667,798.50

III JUMLAH HARGA 1,061,875,498.50


IV PAJAK PERTAMBAHAN NILAI (10% x III) 106,187,549.85
V JUMLAH HARGA TOTAL 1,168,063,048.35
VI DIBULATKAN 1,168,000,000.00

Terbilang : Satu Milyar Seratus Enam Puluh Delapan Juta Rupiah

Banda Aceh, 30 April 2015


CV. BUDI PRIMA SENTOSA

FAHMI
Direktur
ANALISA HARGA SATUAN PEKERJAAN

Jenis pekerjaan : Pembersihan Lapangan


Satuan / Unit : m2
Analisa : T.01

Kuantitas / Harga Satuan


No. Uraian Satuan Jumlah Harga (Rp)
Koefisien Dasar (Rp)
`( 1 ) `( 2 ) `(3) `( 4 ) `( 5 ) 6=(4)x(5)

A. TENAGA KERJA
1 Pekerja OH 0.0600 65,000 3,900.00
2 Mandor OH 0.0060 75,000 450.00

Sub Jumlah A 4,350.00


B. BAHAN

Sub Jumlah B -
C. PERALATAN

Sub Jumlah C -

D. Sub Jumlah (A + B + C) 4,350.00


E. Overhead + Provit 10 % X Sub Jumlah (D) 435.00
F. Jumlah Harga = (D + E) 4,785.00
Harga Satuan Pekerjaan (Dibulatkan) 4,780.00

Catatan :
`- Biaya Overhead + Keuntungan diisi maksimal sebesar 15% ( Lima Belas Persen )
ANALISA HARGA SATUAN PEKERJAAN

Jenis pekerjaan : Galian Tanah Berbatu (AB)


Satuan / Unit : M3
Analisa : AB.2

Kuantitas / Harga Satuan


No. Uraian Satuan Jumlah Harga (Rp)
Koefisien Dasar (Rp)
`( 1 ) `( 2 ) `(3) `( 4 ) `( 5 ) 6=(4)x(5)

A. TENAGA KERJA

Sub Jumlah A -
B. BAHAN

Sub Jumlah B -
C. PERALATAN
1. Excavator Jam 0.0382 506,000.00 19,329.20

Sub Jumlah C 19,329.20

D. Sub Jumlah (A + B + C) 19,329.20


E. Overhead + Provit 10 % X Sub Jumlah (D) 1,932.92
F. Jumlah Harga = (D + E) 21,262.12
Harga Satuan Pekerjaan (Dibulatkan) 21,260.00

Catatan :
`- Biaya Overhead + Keuntungan diisi maksimal sebesar 15% ( Lima Belas Persen )
ANALISA HARGA SATUAN PEKERJAAN

Jenis pekerjaan : Timbunan Tanah Didatangkan Dipadatkan (MP)


Satuan / Unit : M3
Analisa : T.14.b-1

Kuantitas / Harga Satuan


No. Uraian Satuan Jumlah Harga (Rp)
Koefisien Dasar (Rp)
`( 1 ) `( 2 ) `(3) `( 4 ) `( 5 ) 6=(4)x(5)

A. TENAGA KERJA
1. Pekerja OH 0.5000 65,000 32,500.00
2. Mandor OH 0.0500 75,000 3,750.00

Sub Jumlah A 36,250.00


B. BAHAN
1. Tanah Timbun M3 1.2000 60,000.00 72,000.00

Sub Jumlah B 72,000.00


C. PERALATAN
1. Stamper Hr-Sewa 0.0500 250,000.00 12,500.00

Sub Jumlah C 12,500.00

D. Sub Jumlah (A + B + C) 120,750.00


E. Overhead + Provit 15 % X Sub Jumlah (D) 18,112.50
F. Jumlah Harga = (D + E) 138,862.50
Harga Satuan Pekerjaan (Dibulatkan) 138,860.00

Catatan :
`- Biaya Overhead + Keuntungan diisi maksimal sebesar 15% ( Lima Belas Persen )
ANALISA HARGA SATUAN PEKERJAAN

Jenis pekerjaan : Pasangan Batu 1 : 4


Satuan / Unit : M3
Analisa : P.01.c

Kuantitas / Harga Satuan


No. Uraian Satuan Jumlah Harga (Rp)
Koefisien Dasar (Rp)
`( 1 ) `( 2 ) `(3) `( 4 ) `( 5 ) 6=(4)x(5)

A. TENAGA KERJA
1. Pekerja OH 2.7000 65,000.00 175,500.00
2. Tukang OH 0.9000 65,000.00 58,500.00
3. Kepala Tukang OH 0.0900 75,000.00 6,750.00
4. Mandor OH 0.2700 75,000.00 20,250.00
Sub Jumlah A 261,000.00
B. BAHAN
1. Batu Kali / Batu Gunung M3 1.2000 125,000.00 150,000.00
2. Pasir Pasang M3 0.5200 120,000.00 62,400.00
3. Semen PC Kg 163.0000 1,350.00 220,050.00

Sub Jumlah B 432,450.00


C. PERALATAN
1. Molen 0,35 M3 Unit/Hari 0.1670 40,000.00 6,680.00

Sub Jumlah C 6,680.00

D. Sub Jumlah (A + B + C) 700,130.00


E. Overhead + Provit 15 % X Sub Jumlah (D) 35,006.50
F. Jumlah Harga = (D + E) 735,136.50
Harga Satuan Pekerjaan (Dibulatkan) 735,130.00

Catatan :
`- Biaya Overhead + Keuntungan diisi maksimal sebesar 15% ( Lima Belas Persen )
ANALISA HARGA SATUAN PEKERJAAN

Jenis pekerjaan : Plateran 1 : 3, Tebal 15 mm


Satuan / Unit : M2
Analisa : P.04.d

Kuantitas / Harga Satuan


No. Uraian Satuan Jumlah Harga (Rp)
Koefisien Dasar (Rp)
`( 1 ) `( 2 ) `(3) `( 4 ) `( 5 ) 6=(4)x(5)

A. TENAGA KERJA
1. Pekerja OH 0.3840 65,000.00 24,960.00
2. Tukang OH 0.1900 65,000.00 12,350.00
3. Kepala Tukang OH 0.0190 75,000.00 1,425.00
4. Mandor OH 0.0190 75,000.00 1,425.00
Sub Jumlah A 40,160.00
B. BAHAN
1. Pasir Pasang M3 0.0230 120,000.00 2,760.00
2. Semen PC Kg 7.7760 1,350.00 10,497.60

Sub Jumlah B 13,257.60


C. PERALATAN
-

Sub Jumlah C -

D. Sub Jumlah (A + B + C) 53,417.60


E. Overhead + Provit 10 % X Sub Jumlah (D) 5,341.76
F. Jumlah Harga = (D + E) 58,759.36
Harga Satuan Pekerjaan (Dibulatkan) 58,750.00

Catatan :
`- Biaya Overhead + Keuntungan diisi maksimal sebesar 15% ( Lima Belas Persen )
ANALISA HARGA SATUAN PEKERJAAN

Jenis pekerjaan : Beton Cor 1 : 2 : 3


Satuan / Unit : M3
Analisa : B.05.b

Kuantitas / Harga Satuan


No. Uraian Satuan Jumlah Harga (Rp)
Koefisien Dasar (Rp)
`( 1 ) `( 2 ) `(3) `( 4 ) `( 5 ) 6=(4)x(5)

A. TENAGA KERJA
1. Pekerja OH 1.3230 65,000.00 85,995.00
2. Tukang OH 0.1890 65,000.00 12,285.00
3. Kepala Tukang OH 0.0190 75,000.00 1,425.00
4. Mandor OH 0.1320 75,000.00 9,900.00
Sub Jumlah A 109,605.00
B. BAHAN
1. Semen PC Kg 326.0000 1,350.00 440,100.00
2. Pasir Pasang M3 0.5429 120,000.00 65,148.00
3. Kerikil M3 0.7622 100,000.00 76,220.00
4. Air Ltr 215.0000 500.00 107,500.00
Sub Jumlah B 688,968.00
C. PERALATAN
1. Molen 0,35 m3 Unit/Hari 0.2000 40,000.00 8,000.00

Sub Jumlah C 8,000.00

D. Sub Jumlah (A + B + C) 806,573.00


E. Overhead + Provit 10 % X Sub Jumlah (D) 80,657.30
F. Jumlah Harga = (D + E) 887,230.30
Harga Satuan Pekerjaan (Dibulatkan) 887,230.00

Catatan :
`- Biaya Overhead + Keuntungan diisi maksimal sebesar 15% ( Lima Belas Persen )
ANALISA HARGA SATUAN PEKERJAAN

Jenis pekerjaan : Pembesian


Satuan / Unit : Kg
Analisa : B.17

Kuantitas / Harga Satuan


No. Uraian Satuan Jumlah Harga (Rp)
Koefisien Dasar (Rp)
`( 1 ) `( 2 ) `(3) `( 4 ) `( 5 ) 6=(4)x(5)

A. TENAGA KERJA
1. Pekerja OH 0.0070 65,000.00 455.00
2. Tukang OH 0.0070 65,000.00 455.00
3. Kepala Tukang OH 0.0007 75,000.00 52.50
4. Mandor OH 0.0007 75,000.00 52.50
Sub Jumlah A 1,015.00
B. BAHAN
1. Besi Beton Kg 1.0500 16,000.00 16,800.00
2. Kawat Beton Kg 0.0150 20,000.00 300.00
-
-
Sub Jumlah B 17,100.00
C. PERALATAN

Sub Jumlah C -

D. Sub Jumlah (A + B + C) 18,115.00


E. Overhead + Provit 10 % X Sub Jumlah (D) 1,811.50
F. Jumlah Harga = (D + E) 19,926.50
Harga Satuan Pekerjaan (Dibulatkan) 19,920.00

Catatan :
`- Biaya Overhead + Keuntungan diisi maksimal sebesar 15% ( Lima Belas Persen )
ANALISA HARGA SATUAN PEKERJAAN

Jenis pekerjaan : Bekisting


Satuan / Unit : M2
Analisa : B.22

Kuantitas / Harga Satuan


No. Uraian Satuan Jumlah Harga (Rp)
Koefisien Dasar (Rp)
`( 1 ) `( 2 ) `(3) `( 4 ) `( 5 ) 6=(4)x(5)

A. TENAGA KERJA
1. Pekerja OH 0.6000 65,000.00 39,000.00
2. Tukang OH 0.3000 65,000.00 19,500.00
3. Kepala Tukang OH 0.0300 75,000.00 2,250.00
4. Mandor OH 0.0600 75,000.00 4,500.00
Sub Jumlah A 65,250.00
B. BAHAN
1. Papan Kayu Kelas III M3 0.0240 3,000,000.00 72,000.00
2. Kaso 5/7 cm M3 0.0113 1,000,000.00 11,300.00
3. Paku Kayu Kg 0.4000 15,000.00 6,000.00
4. Minyak Bekisting Ltr 0.2000 10,000.00 2,000.00
Sub Jumlah B 91,300.00
C. PERALATAN
-

Sub Jumlah C -

D. Sub Jumlah (A + B + C) 156,550.00


E. Overhead + Provit 5% X Sub Jumlah (D) 7,827.50
F. Jumlah Harga = (D + E) 164,377.50
Harga Satuan Pekerjaan (Dibulatkan) 164,370.00

Catatan :
`- Biaya Overhead + Keuntungan diisi maksimal sebesar 15% ( Lima Belas Persen )
ANALISA HARGA SATUAN PEKERJAAN

Jenis pekerjaan : Membongkar Bekisting


Satuan / Unit : M2
Analisa : B.35

Kuantitas / Harga Satuan


No. Uraian Satuan Jumlah Harga (Rp)
Koefisien Dasar (Rp)
`( 1 ) `( 2 ) `(3) `( 4 ) `( 5 ) 6=(4)x(5)

A. TENAGA KERJA
1. Pekerja OH 0.1000 65,000.00 6,500.00
2. Mandor OH 0.0100 75,000.00 750.00
-
-
Sub Jumlah A 7,250.00
B. BAHAN
-
-
-
-
Sub Jumlah B -
C. PERALATAN
-

Sub Jumlah C -

D. Sub Jumlah (A + B + C) 7,250.00


E. Overhead + Provit 15 % X Sub Jumlah (D) 1,087.50
F. Jumlah Harga = (D + E) 8,337.50
Harga Satuan Pekerjaan (Dibulatkan) 8,330.00

Catatan :
`- Biaya Overhead + Keuntungan diisi maksimal sebesar 15% ( Lima Belas Persen )
ANALISA HARGA SATUAN PEKERJAAN

Jenis pekerjaan : Pemasangan Wiremesh Dia. 5 mm (Ulir)


Satuan / Unit : M2
Analisa : Dihitung

Kuantitas / Harga Satuan


No. Uraian Satuan Jumlah Harga (Rp)
Koefisien Dasar (Rp)
`( 1 ) `( 2 ) `(3) `( 4 ) `( 5 ) 6=(4)x(5)

A. TENAGA KERJA
1. Pekerja OH 0.0338 65,000.00 2,197.00
2. Tukang OH 0.0338 65,000.00 2,197.00
3. Kepala Tukang OH 0.0113 75,000.00 847.50
-
Sub Jumlah A 5,241.50
B. BAHAN
1. Wiremesh Dia. 5 mm (Ulir) M2 1.0500 65,000.00 68,250.00
-
-
-
Sub Jumlah B 68,250.00
C. PERALATAN
-

Sub Jumlah C -

D. Sub Jumlah (A + B + C) 73,491.50


E. Overhead + Provit 5% X Sub Jumlah (D) 3,674.58
F. Jumlah Harga = (D + E) 77,166.08
Harga Satuan Pekerjaan (Dibulatkan) 77,160.00

Catatan :
`- Biaya Overhead + Keuntungan diisi maksimal sebesar 15% ( Lima Belas Persen )
ANALISA HARGA SATUAN PEKERJAAN

Jenis pekerjaan : Drain Hole PVC Dia. 1,0"


Satuan / Unit : Bh
Analisa : P.16.b

Kuantitas / Harga Satuan


No. Uraian Satuan Jumlah Harga (Rp)
Koefisien Dasar (Rp)
`( 1 ) `( 2 ) `(3) `( 4 ) `( 5 ) 6=(4)x(5)

A. TENAGA KERJA
1. Pekerja OH 0.0500 65,000.00 3,250.00
2. Tukang OH 0.0050 65,000.00 325.00
-
-
Sub Jumlah A 3,575.00
B. BAHAN
1. Pipa PVC Dia. 1.0" M' 0.5000 70,000.00 35,000.00
2. Kerikil M3 0.0180 100,000.00 1,800.00
3. Ijuk Kg 0.1000 10,000.00 1,000.00
-
Sub Jumlah B 37,800.00
C. PERALATAN
-

Sub Jumlah C -

D. Sub Jumlah (A + B + C) 41,375.00


E. Overhead + Provit 15 % X Sub Jumlah (D) 6,206.25
F. Jumlah Harga = (D + E) 47,581.25
Harga Satuan Pekerjaan (Dibulatkan) 47,580.00

Catatan :
`- Biaya Overhead + Keuntungan diisi maksimal sebesar 15% ( Lima Belas Persen )
ANALISA HARGA SATUAN PEKERJAAN

Jenis pekerjaan : Bongkaran Pasangan Batu


Satuan / Unit : M3
Analisa : L.04

Kuantitas / Harga Satuan


No. Uraian Satuan Jumlah Harga (Rp)
Koefisien Dasar (Rp)
`( 1 ) `( 2 ) `(3) `( 4 ) `( 5 ) 6=(4)x(5)

A. TENAGA KERJA
1. Pekerja OH 1.8000 65,000.00 117,000.00
2. Mandor OH 0.1800 75,000.00 13,500.00
-
-
Sub Jumlah A 130,500.00
B. BAHAN
-
-
-
-
Sub Jumlah B -
C. PERALATAN
-

Sub Jumlah C -

D. Sub Jumlah (A + B + C) 130,500.00


E. Overhead + Provit 15 % X Sub Jumlah (D) 19,575.00
F. Jumlah Harga = (D + E) 150,075.00
Harga Satuan Pekerjaan (Dibulatkan) 150,000.00

Catatan :
`- Biaya Overhead + Keuntungan diisi maksimal sebesar 15% ( Lima Belas Persen )
ANALISA HARGA SATUAN PEKERJAAN

Jenis pekerjaan : Galian Tanah Biasa (AB)


Satuan / Unit : M3
Analisa : AB.1.a

Kuantitas / Harga Satuan


No. Uraian Satuan Jumlah Harga (Rp)
Koefisien Dasar (Rp)
`( 1 ) `( 2 ) `(3) `( 4 ) `( 5 ) 6=(4)x(5)

A. TENAGA KERJA

Sub Jumlah A -
B. BAHAN

Sub Jumlah B -
C. PERALATAN
1. Excavator Jam 0.0278 506,000.00 14,066.80

Sub Jumlah C 14,066.80

D. Sub Jumlah (A + B + C) 14,066.80


E. Overhead + Provit 15 % X Sub Jumlah (D) 2,110.02
F. Jumlah Harga = (D + E) 16,176.82
Harga Satuan Pekerjaan (Dibulatkan) 16,170.00

Catatan :
`- Biaya Overhead + Keuntungan diisi maksimal sebesar 15% ( Lima Belas Persen )
ANALISA HARGA SATUAN PEKERJAAN

Jenis pekerjaan : Timbunan Tanah Hasil Galian (MP)


Satuan / Unit : M3
Analisa : T.14.a

Kuantitas / Harga Satuan


No. Uraian Satuan Jumlah Harga (Rp)
Koefisien Dasar (Rp)
`( 1 ) `( 2 ) `(3) `( 4 ) `( 5 ) 6=(4)x(5)
A. TENAGA KERJA
1 Pekerja OH 0.3300 65,000 21,450.00
2 Mandor OH 0.0330 75,000 2,475.00

Sub Jumlah A 23,925.00


B. BAHAN

Sub Jumlah B -
C. PERALATAN
-

Sub Jumlah C -

D. Sub Jumlah (A + B + C) 23,925.00


E. Overhead + Provit 15 % X Sub Jumlah (D) 3,588.75
F. Jumlah Harga = (D + E) 27,513.75
Harga Satuan Pekerjaan (Dibulatkan) 27,510.00

Catatan :
`- Biaya Overhead + Keuntungan diisi maksimal sebesar 15% ( Lima Belas Persen )
URAIAN ANALISA ALAT EXCAVATOR
A. DATA PERALATAN
1. Jenis Peralatan : EXCAVATOR 0.80 m3
2. Tenaga N : 140 HP
3. Harga : Rp 800,000,000.00
4. Umur Kerja : 5.00 Tahun
5. 1 Hari Kerja : 7.00 Jam
6. Umur Ekonomis (Tahun) UE : 5.00 Tahun 10,000 jam
7. Jam Kerja per Tahun (Tahun) h : 2,000 Jam/Tahun
8. Harga Pokok HP : Rp 2,800,000.00 Per Hari Sewa
9. Harga Bahan Pokok/Track Hbb : Rp 700,000.00
10. Harga Sisa HS = 10 %(HP-Hbp) : Rp 280,000.00
11. Harga Penyusutan (HP-Hbp-HS) : Rp 1,820,000.00

B. BIAYA KEPEMILIKAN (OWNERSHIP) Rp./Jam


a. Penyusutan : D = (HP-Hbp-HS)/(UExh) = Rp 182.00 / Jam
b. Bunga Modal : (i = 15 %) BM = i ((UE+1)/(2UE)x(HP/h)) = Rp 126.00 / Jam
c. Asuransi : (P = 2 %) Ba = p ((UE+1)/(2UE)x(HP/h)) = Rp 16.80 / Jam
Harga Biaya Kepemilikan (Ownership) Rp 324.80 / Jam

C. BIAYA OPERASIONAL (OPERATIONAL COST)


1. Biaya Bahan Bakar
BBM = ((0,8 x N x S)/E) x Hbbm Rp. 305,000.00
S (Solar) = 0.150
E = 0.602
N = 140
Hbbm = (Harga BBM) Rp. 9,500.00
2. Biaya Olie Pelumas
a. Mesin
BBOm = ((C/T)+ (S/E)) x N x Hbop Rp. 6,617.77
C = 0.130 (L/HP)
T = 250 (jam)
S = 0.0005 (L/HP.jam)
E = 0.602
N = 140
Hbop = (Harga bahan olie) Rp. 35,000.00
b. Transmisi
BBOT = ((C/T)+ (S/E)) x N x Hbop Rp. 3,029.62
C = 0.223 (L/HP)
T = 1,000 (jam)
S = 0.0003 (L/HP.jam)
E = 0.602
N = 140
Hbop = (Harga bahan olie) Rp. 30,000.00

3. Biaya Bahan Hydraulik


BBOm = ((C/T)+ (S/E)) x N x Hbop Rp. 10,502.62
C (Excavator) = 2.875 (L/HP)
T = 2,000 (jam)
S (Excavator) = 0.00064 (L/HP.jam)
E = 0.602
N = 140
Hbop = (Harga bahan olie) Rp. 30,000.00
4. Biaya Gemok (Grease)
BBG = ( S/E) x N x Hbbg Rp. 1,534.88
S = 0.0006 (L/HP.jam)
E = 0.602
N = 140
Hbbg = (Harga bahan gemok) Rp. 11,000.00
5. Biaya Saringan (Filter-filter)
BFF = 0,5 (BBM+BBO+BBH+BBG) Rp. 163,342.45
6. Biaya Bahan Pokok/Ban
BBP = Hbp/T Rp. 350.00
URAIAN ANALISA ALAT EXCAVATOR
A. DATA PERALATAN
1. Jenis Peralatan : EXCAVATOR 0.80 m3
Hbp = Rp. 700,000.00
T = 2,000 (jam), kondisi medan sedang
7. Biaya Operator / Jam Rp. 15,714.29
Biaya Pemeliharaan / Perbaikan (f = 90%)
BBP = f x (HP-Hbp)/UE Rp. 189.00

Harga Biaya Operasional (Operational Cost) Rp 506,280.62 / Jam

HARGA SATUAN PEKERJAAN Rp 506,605.42 / Jam


DIBULATKAN Rp 506,000.00 / Jam
DAFTAR HARGA UPAH, BAHAN DAN PERALATAN

SKPA Dinas Pengairan


Nama Pekerjaan Rehab Jaringan Irigasi D.I. Lawe Bulan Kab. Aceh Tenggara (DAK)
Kegiatan Rehabilitasi/Pemeliharaan Jaringan Irigasi
Lokasi Kabupaten Aceh Tenggara
Tahun Anggaran 2015

Harga Satuan
No Uraian Satuan Keterangan
(Rp)

A. Upah
1 Pekerja 65,000.00 /OH
2 Mandor 75,000.00 /OH
3 Tukang 65,000.00 /OH
4 Kepala Tukan 75,000.00 /OH
5 Operator 120,000.00 /OH
6 Driver 70,000.00 /OH

B. Bahan
1 Air 500.00 Ltr
2 Batu Pecah 130,000.00 M3
3 Batu Uk. > 1.000 Kg 200,000.00 M3
4 Batu Uk. 250 - 1.000 Kg 170,000.00 M3
5 BatuUk. < 250 Kg 120,000.00 M3
6 Batu kali 125,000.00 M3
7 pasir Pasang 120,000.00 M3
8 Pasir Beton 120,000.00 M3
9 Kerikil Sungai 100,000.00 M3
10 Kerikil Beton 100,000.00 M3
11 Semen @40 Kg 54,000.00 Zak
12 Tanah Timbun 60,000.00 M3
13 Paku Kayu (biasa) 15,000.00 Kg
14 Bronjong Buatan pabrik dia. 3 mm (2 x 1 x 0.5) 280,000.00 Unit
15 Besi Beton 16,000.00 Kg
16 Kawat Beton 20,000.00 Kg
17 Papan Kayu Kelas III 3,000,000.00 M3
18 Kayu Kaso 5/7 cm 1,000,000.00 M3
19 Ijuk 10,000.00 Kg
20 Geotextile 32,000.00 M2
21 Pipa PVC ø 2 " 125,000.00 Btg
22 Pipa PVC ø 3 " 140,000.00 Btg
23 Hbbm = (Harga BBM, Solar) 9,500.00 Liter
24 Hbop = (Harga Bahan Olie Mesin) 45,000.00 Liter
25 Hbop = (Harga Bahan Olie Mesin transmisi)) 35,000.00 Liter
26 Hbbh = (Harga Bahan Hidraulic) 35,000.00 Liter
27 hbbg = (Harga Bahan Gemuk) 12,000.00 Kg
28 Minyak Bekisting 10,000.00 Ltr
29 Wiremesh Dia. 5 mm (ulir) 65,000.00 M2
30 Pipa PVC Dia. 1.0" 70,000.00 M'

C. Peralatan
1 Stamper 250,000.00 Hr-Sewa
2 Excavator 506,000.00 /Jam
3 Dump Truck #REF! /Jam
4 Pemotong Besi 20,000.00 Hari
Harga Satuan
No Uraian Satuan Keterangan
(Rp)

6 Molen Beton 40,000.00 Unit/Hari