Anda di halaman 1dari 29

DAFTAR HARGA BAHAN BANGUNAN

DAN UPAH KERJA DI WILAYAH KAB. SIDOARJO


DAFTAR HARGA BAHAN BANGUNAN TERTINGGI PERIODE SEMESTER I TAHUN 2018
SEBELUM PPN

NO, NAMA/JENIS BAHAN SATUAN HARGA BAHAN 2018 URAIAN CATATAN


I BATA, BATU DAN PASIR
Bata Merah Buah 750.00
Bata merah press Kelas I Buah 1,050.00
Bata ringan tebal 10 cm Buah 8,083.00
Bata ringan tebal 7.5 Buah 7,650.00
Bata berongga Buah 3,800.00
Bata Rosster Buah 11,750.00
Batu Kali m3 283,333.00
Batu Split Pecah Mesin 1/2 m3 217,500.00
Batu Split Pecah Mesin 3/5 m3 221,000.00
Batu Split per Kg Kg 163.70
Agregat Klas A m3 185,000.00
Agregat Klas B m3 175,000.00
Pasir Beton m3 313,333.00
Pasir Beton (Bj 1400 ) Kg 223.81
Pasir Pasang (sedang) m3 271,600.00
Pasir Pasang (sedang) (Kg) Kg 194.00
Pasir Urug m3 144,000.00
Tanah Urug m3 124,000.00
Tanah Liat m3 210,000.00
Air Liter 6.50

II BAHAN PEREKAT
Semen (50Kg) Zak 64,000.00
Semen (40Kg) Zak 45,000.00
Semen PC Kg 1,280.00
Semen Warna Kg 7,750.00
MSP Zak 152,500.00
MSP Kg 6,100.00
semen grouting Kg 65,000.00
Additive Ltr 64,500.00
Kapur Padam m3 270,000.00
Kapur Sirih Kg 2,500.00

III BAHAN BESI / BAJA :


Besi U-24 (Polos) Kg 10,650.00
Besi U-39 (Ulir ) Kg 11,650.00
Besi Plat Rata - Rata Kg 13,500.00
Besi Tempa m2 225,000.00
Besi strip tebal 5 mm Kg 11,200.00
Baja Struktur Kg 11,500.00
Baja Struktur titik leleh 3500kg/cm2 Kg 11,500.00
Kawat beton Kg 17,900
Kawat Bronjong Kg 17,600
Kawat Las Kg 29,000
Wiremesh Kg 10,138
Kawat Jaring m 22,600
Kawat Jaring Panjang 240 cm Lembar 54,240
Kawat tali kg 22,000
Kawat nyamuk m2 19,500
Kawat duri Barbwire Galvanize m' 2,900.00
Kawat duri Razorwire 450 Strech 8 -9 m Roll 370,000.00
Kawat duri Razorwire 500 Strech 9 -10 m Roll 395,000.00
Besi Angkur Ø 8 mm Kg 15,500.00
Baut Angkur Kg 35,000.00
Mur + Baut bh 6,540.00
Besi siku L30.30.3 Kg 7,100.00
Besi siku L30.30.3 Lonjor 30,000.00
Besi Hollow (10x10x0,6)mm Lonjor 28,500.00
Besi Hollow (10x10x0,6)mm m' 4,750.00
Besi Hollow (20x20x1,60)mm - 6 m Lonjor 51,400.00
Besi Hollow (20x20x1,60)mm - 6 m m' 8,566.67
Besi Hollow (40x40 x3)mm - 6 m Lonjor 183,000.00
Besi Hollow (40x40 x3)mm - 6 m m' 30,500.00
Besi Hollow ( 50x50x3) mm Lonjor 230,000.00
Besi Hollow ( 50x50x3) mm Kg 38,333.33
Top Cross Rail - Heavy Dutty 0,70 mm (metal furing) m' 17,013.89
Furring Channel -Fire Rated 0,50mm (metal furing) m' 15,833.33
Connector Furing (metal furing) Buah 1,800.00
Tutup Besi Tempa 60 x 60 cm Buah 1,760,000.00
Tutup Besi Tempa 80 x 80 cm Buah 2,475,000.00

Page 1
Baja Ringan Profil C 75.0,75 Batang 81,000
Baja Ringan Profil C 75.0,75 Kg 18,828
Baja Ringan Profil C 75.0,80 Batang 95,000
Baja Ringan Profil C 75.0,80 Kg 16,009
Baja Ringan Profil C 75.1,00 Batang 128,000
Baja Ringan Profil C 75.1,00 Kg 16,474
Baja Ringan Reng 28.45 Batang 28,000
Baja Ringan Reng 30.40 Batang 29,000
Baja Ringan Reng 30.45 Batang 33,000
Baja Ringan Reng 31.45 Batang 34,000
Baja Ringan Reng 32.45 Batang 35,000

IV BAHAN KAYU
Kayu Klas I (Jati ) m3 15,750,000
Kayu Klas II (Kamper ) m3 5,890,000
Kayu Klas III (Marenti, Keruing , Merbau ) m3 4,978,000
Kayu Klas IV (Sengon Laut, Sono ) m3 3,564,000
Dolken dia 8 s/d 10 cm m3 27,000
Papan kayu kamper m3 8,625,000.00
Kaso-kaso (5 × 7) cm kayu kamper m3 5,175,000.00
Reng (2 × 3) cm kayu kamper m3 6,708,333.33
Kaso-kaso (5 × 7) cm kayu meranti m3 3,500,000.00
Kaso-kaso (5 × 7) cm kayu meranti Btg 75,000.00
Usuk (4x6) cm Kayu meranti m3 3,387,500.00
Kayu meranti (balok) m3 4,861,111.11
Balok kayu kamper m3 5,789,930.56
Bambu (P.600 cm) Btg 35,000.00
Ijuk Kg 5,500
Ijuk M3 1,429,000

V BAHAN ALMUNIUM , KUSEN , PINTU dan PENGGANTUNG


Kusen Alumunium Profil 3" Putih m' 85,000.00
Kusen Alumunium Profil 3" Brown/Black m' 90,000.00
Kusen Alumunium Profil 4" Putih m' 100,000.00
Kusen Alumunium Profil 4" Brown/Black m' 110,000.00
Slimar Alumunium Profil 3/8" m' 110,000.00
Panel Sunscreen Aluminium m2 112,000.00
Aluminium Composit Panel m2
Aluminium Foil Singgle m2
Aluminium Foil Double m2
Aluminium Foil Buble Laminated m2
Aluminium Foil Foam m2
Rolling Door Allumunium m2 550,000
Alluminium Profil "T" m' 12,000
Kawat Nyamuk Alumunium m2 28,000
Kunci Tanam kecil Buah 76,500
Kunci Tanam Besar 2x Putar Kuningan Buah 139,500
Kunci Tanam Besar 2x Putar Kuningan SOLID Buah 189,800
Kunci Tanam Biasa Buah 69,000
Kunci Tanam Antik Buah 175,600
Kunci tanam KM/WC Buah 55,000
Kuncilemari ex 88 Buah 19,800
Kunci lemari ex Huben Buah 12,500
Engsel Jendela (Kuningan) Set 45,100
Engsel Pintu (Kuningan) Set 56,350
Engsel Jendela (Biasa) Set 3,000
Engsel Pintu (Biasa) Set 53,333
Grendel Biasa (Kecil) Buah 12,500
Grendel Biasa (Besar) Buah
Grendel Tanam Buah
Grendel Kuningan (Kecil) Buah
Grendel Espanyolet Buah
Hak angin sikutan biasa Set 10,000
Hak angin sikutan kuningan Set 12,000
Spring Knip Set 25,000
Door Closed Set 340,000
Door Holder Set 254,000
Door Stop Set 35,500
Engsel angin Set
Engsel kupu - kupu Set
Engsel Pintu 5" Set
Rel Pintu Sorong Set 438,000

Pintu WPC Buah 1,110,000


Pintu Kayu Kamper 80-90/220 Buah
Pintu Kayu Jati 80-90/220 Buah
Pintu gulung besi/ rolling door besi m2 810,000
Pintu Harmonika Ex. m2 1,350,000

Page 2
Folding Door PVC m2 550,000.00
Jendela Nako ( Rangka + Kaca 5 mm) m2
Sealent Tube 36,000

VI BAHAN PELAPIS :
Tripleks 3 mm (120x240)mm Lbr 55,000
Tripleks 4 mm (120x240)mm Lbr 103,000
Tripleks 6 mm (120x240)mm Lbr 113,000
Tripleks 9 mm (120x240)mm Lbr 175,000
Tripleks 12 mm Phenolic Film Lbr 199,000
Formica Lbr 45,000
Plastik Aerator Lbr 12,000

VII BAHAN PERKERASAN , LANTAI & DINDING KERAMIK


Kanstin BDCM 40 cm Buah 17,250.00
Stopper Uskup tebal 6 cm Buah 5,750.00
Kanstin K-300 m1 25,625.00
Paving Block 6 cm natural m2 55,000.00
Paving Block 6 cm warna m2 65,000.00
Paving Block 8 cm natural m2 75,000.00
Paving Block 8 cm warna m2 85,000.00
Ubin granit tile (60x60) cm Bh 134,191.20
Homogeneous Tile 60x60 ex Niro /Estilo: Elda, Carla m2 175,000.00
Keramik Lantai (11x11) cm (polos) buah 568.00
Keramik Lantai (20x20) cm (polos) m2 40,000.00
Keramik Lantai (20x20) cm (Kasar) m2 48,250.00
Keramik Lantai (30x30) cm (polos) m2 55,250.00
Keramik Lantai (30x30) cm (warna) m2 61,750.00
Keramik Lantai (33x33) cm m2 97,000.00
Keramik Lantai (40x40) cm (Polos) m2 78,200.00
Keramik Lantai (40x40) cm (warna) m2 80,500.00
Keramik Lantai (50x50) cm (Polos) m2 78,890.00
Keramik Lantai (50x50) cm (warna) m2 81,877.70
Keramik Mozaik (30x30) cm m2 999,000.00
Plint Keramik (10x40) cm Buah 17,000.00
Plint Keramik (10x20) cm Buah 11,000.00
Plint Keramik (10x10)cm Buah 9,000.00
Plint Keramik (5x20)cm Buah 8,000.00
Step Nosing (10x20)cm Buah 16,666.67
Step Nosing (10x30)cm Buah 17,012.12
Step Nosing (10x40)cm Buah 27,787.88
Plint Internal cove buah 2,200.00
Keramik Rock Tile m2 47,500.00
Granite Rock Tile m2 230,000.00
Marmer (100x100) cm m2 535,900.00
Batu alam m2 120,000.00
Granit Lokal / Andesit m2 180,000.00
Tegel alur jalur tuna netra m2 128,000.00
Keramik Artistik m2 82,000.00
Teraso Polos Warna STD (30x30)cm m2 75,350.00
Teraso Polos Warna STD (30x30)cm Buah 6,782.00
Teraso Polos Abu abu STD (30x30)cm m2 46,600.00
Teraso Polos Abu abu STD (30x30)cm Buah 4,236.00
Teraso Polos Abu abu STD (20x20)cm m2 43,500.00
Teraso Polos Abu abu STD (20x20)cm Buah 1,740.00
Teraso Motif (30x30)cm m2 81,000.00
Teraso Motif (30x30)cm Buah 7,363.64
Granit (30x30)cm m2 136,000.00
Granit (30x30)cm Buah 12,240.00
Granit (40x40)cm m2 197,000.00
Granit (40x40)cm Buah 31,520.00
Granit (60x60)cm m2 420,500.00
Granit (60x60)cm Buah 584,027.78
Marmer (60x120)cm m2 285,000.00
Marmer (60x120)cm Buah 205,200.00
Marmer (60x60)cm m2 240,000.00
Marmer (60x60)cm Buah 86,400.00
Marmer (40x40)cm m2 190,000.00
Marmer (40x40)cm Buah 30,400.00
Marmer (30x30)cm m2 185,000.00
Marmer (30x30)cm Buah 16,650.00
Plint Ubin (10x20)cm bh 1,620.00
Plint Ubin (10x30)cm bh 3,427.00
Plint Ubin (10x40)cm bh 4,640.00
Plint Ubin Warna (10x20)cm bh 2,100.00

Page 3
Plint Ubin Warna (10x30)cm bh 3,727.00
Plint Ubin Warna (10x40)cm bh 4,940.00
Plint Gnanit (10x30)cm bh 45,333.33
Plint Gnanit (10x40)cm bh 49,250.00
Plint Teralux Kerang (10x30)cm bh 5,550.00
Plint Teralux Kerang (10x40)cm bh 7,600.00
Plint Teralux Marmer (10x30)cm bh 5,550.00
Plint Teralux Marmer (10x40)cm bh 7,600.00
Plint Teralux Marmer (10x60)cm bh 14,400.00
Lantai Vinyl Box 700,000.00
Lantai Vinyl Buah 21,000.00
Plint Vinyl 15x30 cm Buah 18,750.00
Plint Vinyl profil 10 cm x 240 cm Batang 110,000.00
Karpet Lantai m2 160,000.00
Underlayer m2 7,250.00
Parquet m2 196,000.00
Floor Hardener Kg 17,600.00
Bata Keramik / Klinker m2 243,569.00

VIII BAHAN PENUTUP ATAP


Genteng Plentong Kecil 25pcs/m2 Buah 1,750
Genteng Pelentong Besar (Murando) 18pcs/m2 Buah 3,500
Genteng Kodok Bambe 20pcs/m2 Buah 4,700
Genteng Kodok Glazur 20pcs/m2 Buah 6,500
Genteng Kodok Goodyear 20pcs/m2 Buah 7,700
Genteng Glazur Ex. KIA Buah 10,500
Genteng Metal Ex.SAKURA Lembar 45,000
Genteng kaca 12 mm Buah 98,700
Genteng Beton Buah 8,850
Genteng Aspal/Sirap Ex CTI m2 120,000
Genteng Aspal/Sirap Ex CTI Buah 4,000
Bubungan Glazur Ex.KIA Buah 20,000
Bubungan Genteng Plentong Buah 8,500
Bubungan Genteng Kodok Buah 9,700
Bubungan Genteng Aspal Buah 65,200.00
Bubungan Genteng Beton Buah 15,000.00
Seng plat 0,3 x 90 m' 46,000
Seng Gelombang BJLS 0,25 x 80 m'
Seng Gelombang BJLS 0,3 x 80 m'
Seng Gelombang BJLS 0,3 x 80 x 210 lembar 85,000
Plat Galvalum BJLS 0,4 x 120 m'
Plat Galvalum BJLS 0,4 x 120 x 240 cm Lembar
Bubung Stel Gelombang 0,92 m lembar
Bubung Stel Gelombang 1,05 m lembar
Bubung Stel Gelombang 1,08 m lembar
Bubung Paten 0,92 m lembar
Bubung Paten 1,05 m lembar
Bubung Paten 1,08 m lembar
Asbes gelombang kecil 105 x 240 Lembar 76,000.00
Asbes gelombang kecil 105 x 300 Lembar 94,000.00
Asbes gelombang besar 105 x 250 Lembar 97,000.00
Asbes gelombang besar 105 x 300 Lembar 118,000.00
Asbes Semen Gel. Kecil m2 29,166.00
Asbes Semen Gel Besar m2 41,500.00

IX BAHAN KACA
Krepyak Nako Buah 16,000
Kaca Polos 3 mm m2 81,000
Kaca Polos 5 mm m2 88,000
Kaca Polos 8 mm m2 190,000
Kaca Polos 10 mm m2 210,000
Kaca Rayban Tebal 5 mm m2 125,000
Kaca Wireglassed 5 mm m2 99,000
Kaca Tempered 12 mm m2 450,000

X BAHAN PAKU DAN MUR BAUT :


Paku 1 s/d 3 cm Kg 19,500
Paku 5 s/d 10 cm Kg 19,660
Paku 8 s/d 12 cm Kg 22,000
Paku Skrup Bh 1,100
Paku Payung /Seng 7 cm Kg 28,500.00

Page 4
Paku Payung /Seng 10 cm Kg 35,000.00
Skrup Gypsum 3 " Bh 300.00
Paku Asbes Sekrup 4 inchi Bh 900.00
Skrup Fixer 4' Bh 950.00
Ramset /Dynabolt Bh 1,800.00
Angkur Bh

XI BAHAN FINISHING :
Cat Dasar Tembok Kg 20,000
Cat tembok (Interior) Kg 22,000
Cat tembok (Exterior) Kg 31,600
Cat tembok (Exterior) weathershield Kg 62,000
Cat Meni Kayu/besi Kg 41,500
Cat Besi/Kayu Kg 56,350
Dempul Besi Kg 50,000
Cat Anti Karat Kg 32,800
Menie A kg 31,500.00
Menie B kg 24,500.00
Politur Liter 71,000.00
Wood Filler Kg 50,000
Vernis Liter 35,800
Wood Stain Liter 70,000
Sanding Sealer Liter 65,000
Melamic Liter 74,600
Teak Oil Liter 80,000
Thinerr Liter 24,500
Plamir Tembok Kg 15,000
Minyak Begisting Liter 12,000
Seal Tape Bh 7,000
Amplas Lbr 6,850.00
Kuwas / roll Bh 25,000.00
Residu/Olie Bekas Liter 2,900.00
Bensin Liter 7,350.00
Solar Liter 12,700.00
Minyak pelumas Liter 45,000.00
Lem Kayu ex. Rajawali kg 12,500.00
Lem Kayu ex. Fox kg 45,000.00
Lem pipa PVC gel Tube 9,000.00
Lem pipa PVC cair Kaleng 46,000.00
Vertical Blind Standart m2 225,000.00
Vertical Blind Backout Deluxe m2 380,000.00
Vertical Blind Solar Screen m2 525,000.00
Wallpaper m 89,000.00

XII BAHAN SANITARI


Wastafel 408,333.00
Closet jongkok Unit/Buah 205,000.00
Closet duduk Tanpa Tabung Ex INA Unit/Buah 473,000.00
Closet duduk Tabung Ex INA Unit/Buah 1,680,000.00
Urinoir Unit/Buah 1,217,000.00
Bak air fiberglas Unit/Buah 325,000.00
Bak air fiberglas 1 m3 Unit/Buah 1,125,000.00
Bak air Teraso Unit/Buah 675,000.00
Shower Spray Unit/Buah 107,500.00
Shower Set Unit/Buah 125,000.00
Floor drain PVC Buah 60,000.00
Floor drain crome Buah 75,000.00
Tempat Sabun Buah 85,000.00
Bak Cuci Piring Teraso Buah 643,500.00
Kitchenzink Unit/Buah 556,000.00
Water Drain + Basket Buah 38,500.00
Kran Air 1/2 " Crome Buah 47,000.00
Kran Air 1/2 (besi) Buah 42,125.00
Kran Air 1/2 (Plastik) Buah 14,950.00
Kran Air 3/4 " Plastik Buah 16,000.00
Kran Air 3/4 (besi) Buah 33,350.00
Kran Angsa 1/2 " (Plastik) Buah 35,500.00
Kran Angsa 1/2 " (Chrome) Buah 342,000.00
Kran Air Panas/Dingin 1/2 " (Chrome) Buah 562,000.00

XIII BAHAN PARTISI DINDING /PLAFOND


Gypsumboard t.9 mm 62,500.00
List Profil 10 cm Gypsum 14,000.00
Rangka plafond Metal furing m2 135,000.00
Kalsiboard 1200x2400x35mm Lembar 67,900.00
Kalsiboard 1200x2400x35mm m2 23,579.00

Page 5
Akustik (30x30) cm 9 mm lembar 17,000.00
Akustik (30x60) cm 9 mm lembar 19,500.00
Akustik (60x120) cm 9 mm Lembar 34,500.00
Asbes Semen 100x100 t.4 Lembar
Asbes Semen100 x 100 t.5 Lembar
Asbes Semen 120 x 240 t.6 Lembar

XIV BAHAN SALURAN AIR /HIDRANT


Pipa PP Air Panas 1/2 " Ljr 103,200.00
Pipa PP Air Dingin 1/2 " Ljr 92,400.00
Pipa PVC 1/2" Type AW Panjang 4 m Ljr 22,700.00
Pipa PVC 3/4" Type AW Panjang 4 m Ljr 28,933.00
Pipa PVC 1" Type AW Panjang 4 m Ljr 38,933.00
Pipa PVC 1 1/2" Type AW Panjang 4 m Ljr 75,900.00
Pipa PVC 2" Type AW Panjang 4 m Ljr 103,530.00
Pipa PVC 2,5" Type AW Panjang 4 m Ljr 132,510.00
Pipa PVC 3" Type AW Panjang 4 m Ljr 186,690.00
Pipa PVC 4" Type AW Panjang 4 m Ljr 223,800.00
Pipa PVC 5" Type AW Panjang 4 m Ljr 469,000.00
Pipa PVC 1 1/2" Type C Panjang 4 m Ljr 39,847.50
Pipa PVC 2" Type C Panjang 4 m Ljr 51,318.75
Pipa PVC 3" Type C Panjang 4 m Ljr 90,562.50
Pipa PVC 4" Type C Panjang 4 m Ljr 144,900.00
Pipa PVC 5" Type C Panjang 4 m Ljr 205,275.00
Pipa PVC 6" Type C Panjang 4 m Ljr 283,762.50
Pipa PVC D dia 30 cm m1 298,221.00
Pipa GalvanisDia 1/2 " 48,760.00
Pipa GalvanisDia 3/4 " 53,550.00
Pipa GalvanisDia 1 " m1 67,540.00
Pipa GalvanisDia 1,5" Ljr 555,000.00
Pipa GalvanisDia 1,5" m1 92,500.00
Pipa GalvanisDia 2,5" m1 133,866.00
Pipa Hidrant Schedule 40 1/2 " Panjang 6 meter Ljr 83,619.00
Pipa Hidrant Schedule 40 3/4 " Panjang 6 meter Ljr 110,923.00
Pipa Hidrant Schedule 40 1 " Panjang 6 meter Ljr 164,394.00
Pipa Hidrant Schedule 40 1 1/4 " Panjang 6 meter Ljr 224,891.00
Pipa Hidrant Schedule 40 1 1/2 " Panjang 6 meter Ljr 266,735.00
Pipa Hidrant Schedule 40 2 " Panjang 6 meter Ljr 356,881.00
Pipa Hidrant Schedule 40 2 1/2 " Panjang 6 meter Ljr 567,700.00
Pipa Hidrant Schedule 40 3 " Panjang 6 meter Ljr 740,525.00
Pipa Hidrant Schedule 40 4 " Panjang 6 meter Ljr 1,053,487.00
Pipa Hidrant Schedule 40 5 " Panjang 6 meter Ljr 1,425,507.00
Pipa Hidrant Schedule 40 6 " Panjang 6 meter Ljr 1,842,465.00
Pipa Hidrant Schedule 40 8 " Panjang 6 meter Ljr 2,818,590.00
Pipa Hidrant SCH 40 (Galvanis) 1/2 " Panjang 6 meter Ljr 113,768.00
Pipa Hidrant SCH 40 (Galvanis) 3/4 " Panjang 6 meter Ljr 151,311.00
Pipa Hidrant SCH 40 (Galvanis) 1 " Panjang 6 meter Ljr 224,122.00
Pipa Hidrant SCH 40 (Galvanis) 1 1/4 " Panjang 6 meter Ljr 306,035.00
Pipa Hidrant SCH 40 (Galvanis) 1 1/2 " Panjang 6 meter Ljr 363,487.00
Pipa Hidrant SCH 40 (Galvanis) 2 " Panjang 6 meter Ljr 485,787.00
Pipa Hidrant SCH 40 (Galvanis) 2 1/2 " Panjang 6 meter Ljr 773,619.00
Pipa Hidrant SCH 40 (Galvanis) 3 " Panjang 6 meter Ljr 1,009,118.00
Pipa Hidrant SCH 40 (Galvanis) 4 " Panjang 6 meter Ljr 1,436,177.00
Pipa Hidrant SCH 40 (Galvanis) 5 " Panjang 6 meter Ljr 1,942,011.00
Pipa Hidrant SCH 40 (Galvanis) 6 " Panjang 6 meter Ljr 2,510,849.00
Pipa Hidrant SCH 40 (Galvanis) 8 " Panjang 6 meter Ljr 3,862,976.00
Stop kran dia 1" bh 46,000.00
Klep diameter 3/4" bh 38,000.00
Tangki air 1000 liter bh 1,864,000.00
Tangki air 500 liter bh 1,175,000.00
Pelampung otomatis bh 26,700.00
Roof Drain Metal Bh 35,750.00
Mesin Jet Pump kap.250 watt unt 950,000.00
Mesin Pompa tekan kap. 150 watt unt 550,000.00
U Ditch 40.50-120 cm+Cover (G.20 Ton ) Buah 1,253,560
U Ditch 40.50-120 cm+Cover (G.10 Ton ) Buah 844,580
U Ditch 60.60-120 cm+Cover (G.20 Ton ) Buah 1,996,500
U Ditch 60.60-120 cm+Cover (G.10 Ton ) Buah 1,148,290
U Ditch 60.80-120 cm+Cover (G.20 Ton ) Buah 2,291,740
U Ditch 60.80-120 cm+Cover (G.10 Ton ) Buah 1,497,980
U Ditch 100.100-120 cm+Cover (G.20 Ton ) Buah 4,503,620
U Ditch 150.100-120 cm+Cover (G.20 Ton ) Buah 6,158,900
U Ditch 150.150-120 cm+Cover (G.20 Ton ) Buah 7,358,010
U Ditch 200.100-120 cm+Cover (G.20 Ton ) Buah 7,533,460
U Ditch 200.150-120 cm+Cover (G.20 Ton ) Buah 8,941,900

Page 6
U Ditch 300.100-120 cm+Cover (G.20 Ton ) Buah 13,610,080
U Ditch 300.150-120 cm+Cover (G.20 Ton ) Buah 14,880,580
U Ditch 60.60-120 cm (G.10 Ton ) tanpa cover Buah 655,600
U Ditch 60.80-120 cm (G.10 Ton ) tanpa cover Buah 941,600
DUB 400.300-120 cm (G.20 Ton ) (Top+Bottom) Buah 27,571,060
U Ditch 40.50-120 cm (G.10 Ton ) tanpa cover Buah 484,000
Sheet Pile (FPC 320.500) (Mcr min 13,00 ton.m) m1 758,670
U-ditch 100.100 - 120 cm + cover (G. 10 TON) Buah 2,701,710
DUB 500.200 - 200 cm (G. 20 TON) (TOP + Bottom) Buah 42,075,330
U-ditch 500.150 - 120 cm + Cover (G. 20 TON) Buah 28,666,110
U-ditch 600.150 - 120 cm + Cover (G. 20 TON) Buah 37,667,300.00
U-ditch 50.70 - 120 cm + Cover (G.20 TON) Buah 1,965,040.00
DUB 200.200 - 120 cm (G. 20 TON) ( TOP+Bottom) Buah 10,219,660.00
DUB 300.200 - 120 cm (G. 20 TON) ( TOP+Bottom) Buah 17,399,800.00
Buis beton dia 20 cm m1 77,000.00
Buis beton dia 30 cm m1 104,500.00
Buis beton dia 50 cm m1 126,500.00
Buis beton dia 60 cm m1 181,500.00
Buis beton dia 90 cm m1 231,000.00
Buis beton U dia 20 cm m1 55,000.00
Buis beton U dia 30 cm m1 71,500.00
Tandon Cor 1 m3 Buah 2,695,000.00
Tandon Cor 2 m3 Buah 4,070,000.00
Tandon Cor 3 m3 Buah 4,620,000.00
Tandon Cor 4 m3 Buah 7,260,000.00
Tandon Cor 5 m3 Buah 9,570,000.00
Water Stop PVC 150 m' 55,000.00
Water Stop PVC 200 m' 72,000.00
Water Stop PVC 250 m' 90,000.00
Penjaga jarak bekisting/spacer Buah 1,300.00

XV PERALATAN ELEKTRIKAL
Box panel PVC isi 4 MCB Buah 150,000
MCB 10 Ampere Buah 80,000
MCB 6 Ampere Buah 50,000
MCB 4 A Buah 45,000
MCB 2 Ampere Buah 29,000
Kabel NYM 2 x 2,5 mm2 Buah 14,025
Kabel NYM 3 x 2,5 mm2 Buah 18,900
Kabel Telepon m1 15,000
Kabel UTP Cat 5 e m1 9,754.00
Kabel UTP Cat 6 e m1 11,978.00
Konektor RJ 45 Set 3,125.00
Isolator Buah 7,000
Saklar Tunggal Buah 14,700
Saklar Ganda Buah 14,700
Stop Kontak Buah 24,500
Outlet TV Buah 43,575
Outlet Telephone Buah 43,575
Down light / PLC 13 W Buah 173,460
Fitting Plafon Buah 20,000
Fiting Gantung EX Broco Buah 12,000.00
Lampu TL 2 x 18 watt grille Buah 80,850
Lampu TL 2 x 36 watt grille Buah 110,513
Kabel NYA 1.5 mm m1 3,500.00
Kabel NYA 1.5 mm (50m) m1 97,500.00
Kabel NYA 1.5 mm (100m) rool 300,000.00
Kabel NYA 2 x 1.5 mm m1 6,000.00
Klem Kabel pack 13,000.00
Kabel NYA 500 Volt 2 x 2,5 mm2 m' 9,000.00
Pipa Pralon 5/8 Lonjor 11,500.00
L Bow 5/8 Buah 1,000.00
T Doos Pvc Buah 3,450.00

XVI BAHAN LAIN - LAIN


Sabun Colek Kg 12,000.00

B SEWA PERALATAN

Page 7
1 ASPHALT MIXING PLANT E01 5,300,000.00
2 ASPHALT FINISHER E02 300,000.00
3 ASPHALT SPRAYER E03 150,000.00
4 BULLDOZER 100-150 HP E04 362,895.00
5 COMPRESSOR 4000-6500 L/M E05 150,000.00
6 CONCRETE MIXER 0.3-0.6 M3 E06 60,000.00
7 CRANE 10-15 TON E07 814,165.00
8 DUMP TRUCK 3.5 TON E08 210,000.00
9 DUMP TRUCK 10 TON E09 210,000.00
10 EXCAVATOR 80-140 HP E10 442,915.00
11 FLAT BED TRUCK 3-4M3 E11 90,000.00
12 GENERATOR SET E12 63,000.00
13 MOTOR GRADER >100 HP E13 477,080.00
14 WHEEL LOADER 1.0-1.6 M3 E15 150,000.00
15 THREE WHEEL ROLLER 6-8 T E16 170,000.00
16 TANDEM ROLLER 6-8 T E17 150,000.00
17 TIRE ROLLER 6-8T E18 150,000.00
18 VIBRATORY ROLLER 5-8T E19 362,895.00
19 CONCRETE VIBRATOR E20 35,000.00
20 WATER TANKER 3000-4500 L. E23 103,000.00
21 PEDESTRIAN ROLLER E24 75,000.00
22 STAMPER E25 30,000.00
23 JACK HAMMER E26 196,000.00
24 CONCRETE PUMP E28 125,000.00
25 TRAILER 20 TON E29 200,000.00
26 PILE DRIVER + HAMMER E30 75,000.00
27 CRANE ON TRACK 35 TON E31 175,000.00
28 WELDING SET E32 150,000.00
29 BORE PILE MACHINE E33 20,000.00
30 TRONTON E35 200,000.00
31 COLD MILLING E36 2,000,000.00
32 AGGREGAT (CHIP) SPREADER E40 584,000.00
33 ASPHALT DISTRIBUTOR E41 150,000.00
34 TRUCK MIXER (AGITATOR) E49 210,000.00
35 BORE PILE MACHINE E50 110,000.00
36 CRANE ON TRACK 75-100 TON E51 175,000.00
37 ASPHALT LIQUID MIXER E34a 150,000.00
38 MESIN LAS E58 150,000.00
39 PILE DRIVER LEADER, 75 kw E59 95,000.00
40 WELDING MACHINE, 300 A E63 150,000.00
41 CHAIN SAW 65,000.00
42 BATCHING PLANT 2,020,000.00
43 PALU/GODAM (BAJA KERAS) 79,000.00
44 PAHAT/BETON (BAJA KERAS) 61,667.00
45 LINGGIS (BAJA KERAS) 73,000.00
46 ALAT UKUR 122,667.00
47 POMPA AIR 201,667.00
48 PONTON 1,750,000.00
49 TRIPOT & TRIMBIS 593,333.00
50 THEODOLITE / WATERPASS 57,500.00
51 Scafolding Set/Hari 27,000

C UPAH

Page 8
1 Pekerja Oh 122,992.00
2 Tukang Batu Oh 136,992.00
3 Tukang Las konstruksi Oh 138,992.00
4 Tukang Cat Oh 138,992.00
5 Tukang Las biasa Oh 136,992.00
6 Tukang alumunium Oh 136,992.00
7 Tukang Kayu Oh 136,992.00
8 Tukang besi Oh 136,992.00
9 Kepala Tukang Oh 147,992.00
10 Mandor Oh 157,992.00
11 Operator jam 20,874.00 166,992.00
12 Pembantu Operator jam 17,874.00 142,992.00
13 Sopir/Driver jam 17,875.00 143,000.00
14 Pembantu Sopir/Driver jam 14,125.00 113,000.00
15 Mekanik jam 19,437.00 155,496.00
16 Pembantu Mekanik jam 17,874.00 142,992.00
17 Juru Ukur jam 19,333.00 154,664.00

Menyetujui : Dibuat :
KABID TATA BANGUNAN DINAS KASI PERENCANAAN TEKNIS BIDANG TATA
PEKERJAANMenyetujui
UMUM DAN : PENATAAN BANGUNAN DINASDibuat
PEKERJAAN
: UMUM DAN
RUANG KABUPATEN
KABID TATA BANGUNAN SIDOARJO
DINAS PENATAAN RUANG KABUPATEN
KASI PERENCANAAN SIDOARJO
TEKNIS BIDANG TATA
PEKERJAAN UMUM DAN PENATAAN BANGUNAN DINAS PEKERJAAN UMUM DAN
RUANG KABUPATEN SIDOARJO PENATAAN RUANG KABUPATEN SIDOARJO

IKA SARI DEWI, ST.


Ir. YUDHI KARTIKAWAN, MT Penata
Pembina NIP. IKA
19780216 200501ST.
SARI DEWI, 2 011
NIP.
Ir. 19680417
YUDHI 199803 1 008
KARTIKAWAN, MT Penata
Pembina NIP. 19780216 200501 2 011
NIP. 19680417 199803 1 008

Mengetahui :
KEPALA DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
KABUPATEN SIDOARJO
Mengetahui :
KEPALA DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
KABUPATEN SIDOARJO

Ir. SIGIT SETYAWAN, MT.


Pembina Utama Muda
NIP. 19611121
Ir. SIGIT 198903 1MT.
SETYAWAN, 008
Pembina Utama Muda
NIP. 19611121 198903 1 008

Page 9
DAFTAR STANDAR HARGA SATUAN DASAR UPAH
TAHUN ANGGARAN 2018
Nama Proyek :
Nama Pekerjaan :
Lokasi : Kab. Sidoarjo
Tahun Anggaran : 2018

HARGA SATUAN
NO. URAIAN TENAGA KERJA SATUAN KETERANGAN
(Rp.)
1 2 3 4 5

1 Pekerja O.H 122,992.00


2 Tukang Batu O.H 136,992.00
3 Tukang Las konstruksi O.H 138,992.00
4 Tukang Cat O.H 138,992.00
5 Tukang Las biasa O.H 136,992.00
6 Tukang alumunium O.H 136,992.00
7 Tukang Kayu O.H 136,992.00
8 Tukang besi O.H 136,992.00
9 Kepala Tukang O.H 147,992.00
10 Mandor O.H 157,992.00
11 Operator O.H 20,874.00
12 Pembantu Operator O.H 17,874.00
13 Sopir/Driver O.H 17,875.00
14 Pembantu Sopir/Driver O.H 14,125.00
15 Mekanik O.H 19,437.00
16 Pembantu Mekanik O.H 17,874.00
` 17 Juru Ukur O.H 19,333.00
DAFTAR STANDAR HARGA SATUAN DASAR BAHAN
TAHUN ANGGARAN 2018
Nama Proyek :
Nama Pekerjaan :
Lokasi : Kab. Sidoarjo
Tahun Anggaran : 2018

HARGA SATUAN
NO. JENIS / NAMA BAHAN SATUAN KETERANGAN
(Rp.)
1 2 3 4 5

I BAHAN TANAH / PASIR


1 Pasir Urug m3 144,000.00
2 Pasir Cor / Beton m3 313,333.00
3 Tasirtu / Sirtu m3 124,000.00
4 Pasir Pasang m3 271,600.00

II BAHAN BATU
1 Batu kali belah 15/20 cm m3 283,333.00 Ex. UD. Hartono
2 Batu Pecah mesin 1/2 m3 217,500.00 Ex. UD. Hartono
3 Batu kerikil m3 185,000.00 Ex. UD. Hartono
4 Batu Bata Merah bj 750.00 MRH

III BAHAN SEMEN / PC


1 Semen Portland 50 kg zak 64,000.00 Gresik/Holcim
2 Semen Portland 40 kg zak 45,000.00 Gresik/Holcim
3 Semen Warna kg 7,750.00 MU

IV BAHAN BESI & ALUMINIUM


1 Besi Beton Polos / Ulir kg 9,000.00 Setia Agung Jaya
2 Baja Profil WF kg 10,500.00 Abadi Metal Utama
3 Baja Profil Canal kg 10,500.00 Abadi Metal Utama
4 Baja Profil L kg 10,500.00 Abadi Metal Utama
5 Besi Plat baja kg 11,500.00 Abadi Metal Utama
6 Baut HTB dia. 12 mm panjang 3" kg 11,500.00 Abadi Metal Utama
7 Angkur dia. 16 mm kg 11,500.00 Abadi Metal Utama
8 Elektroda baja kg 30,000.00 Badak Steel
9 Jarum keras bh 75,000.00 Hi Steel
10 Kawat Beton / Bendrat kg 14,000.00 Hi Steel
11 Sun scren alumunium (louvre blade 60,10,2 & hollo 4/4) m2 400,000.00
12 Sun scren besi hollow galvanis finishing cat (hollo 4/8 & hollo 2/4) m2 380,000.00
13 Realling tangga besi Vikran finishing cat m2 450,000.00
14 Galvalume Profil C 75 tebal 0,75 mm (panjang 6 m) btg 75,000.00 Hi Steel
15 Galvalume Reng Profil U 65 tebal 0,45 mm (panjang 6 m) btg 40,000.00 Hi Steel
16 Besi hollow 40/40 m' 21,000.00 Hi Steel
17 Besi hollow 20/20 m' 14,300.00 Hi Steel
18 Tiang Pancang/mini pile 25/25 cm m' 189,200.00 Metro Pile
18 Aluminium coklat Uk. 4 x 10, Profil 4" m1 85,000.00 YKK
19 Slimar Alumunium 3/8 untuk jendela m1 62,375.00 YKK
20 Daun Pintu WPC uk. 72 x 2100 mm Tebal WPC 5 mm (motif kayu) Unit 900,000.00 Solid Mulia
21 Daun Pintu WPC uk. 82 x 2100 mm Tebal WPC 5 mm (motif kayu) Unit 1,100,000.00 Solid Mulia
22 Daun Pintu WPC uk. 92 x 2100 mm Tebal WPC 5 mm (motif kayu) Unit 1,250,000.00 Solid Mulia
23 Seng Talang BJLS 40 lebar 60 cm m1 22,500.00

V BAHAN KAYU & KUSEN


1 Kayu Kamper balok 6/15, 8/12 m3 8,576,388.89
2 Kayu Kamper Papan 2/20 m3 4,631,250.00
3 Kayu Kamper Papan 3/30 m3 7,780,763.89
4 Kayu kamper slimar m 4,892,500.00
5 Kayu Kamper Usuk 4/6, 5/7 m3 3,135,000.00
6 Kayu Kamper Reng 2/3, 3/5 m3 4,575,833.34
7 Kayu Meranti balok 8/12 m3 5,066,666.66
8 Kayu Meranti papan 2/20 m3 4,750,000.00
9 Kayu Meranti papan 3/30 m3 7,780,763.89
10 Kayu Meranti usuk 4/6, 5/7 m3 3,500,000.00
11 Kayu Meranti bekisting m3 3,000,000.00
12 Dolken kayu gelam 8-10/400 cm bt 5,000.00

VI BAHAN KERAMIK KW. 1


1 Keramik 40x40 cm (motif / warna) m2 75,000.00 Platinum / Roman
2 Keramik 30x30 cm (motif / warna) m2 66,500.00 Asia / Roman
3 Keramik 20x20 cm (motif / warna) m2 43,000.00 Asia / Roman
HARGA SATUAN
NO. JENIS / NAMA BAHAN SATUAN KETERANGAN
(Rp.)
1 2 3 4 5

4 Keramik 20 x 33 cm (motif / warna) m2 85,000.00 Platinum / Roman


5 Keramik plint / list bawah dinding 7,5 x 20 cm bh 7,200.00 Platinum / Roman
6 Plint Keramik anti selep / step nosing 8 x 30 cm (warna/motif) bh 11,000.00 Platinum / Roman

VII BAHAN GENTENG


1 Genteng karang pilang/wisma bj 4,000.00 Karang Pilang
2 Genteng wuwung karang pilang bh 12,000.00 Karang Pilang
3 Zincalume t = 0,3 mm lebar 0,75 m m2 44,000.00 Solarlite
4 Polycarbonat tebal 5 mm (uk. 2,1 m x 11,8 m) lbr 1,900,000.00 Abadi / Zincalume

VIII BAHAN KACA


1 Kaca Polos 5 mm m2 75,500.00 Assahimass
2 Kaca Rayban 12 mm m2 365,750.00 Assahimass
3 Kaca Rayban 5 mm m3 92,150.00 Assahimass

IX BAHAN TRIPLEK
1 Teakwood uk. 122 x 244 x 3 mm lbr 62,035.00 Parindo
2 Triplek uk. 110 x 244 t = 12 mm film satu muka lbr 199,500.00 Parindo
3 Plywood tebal 9 mm lbr 78,470.00 Parindo
4 #REF! lbr 68,875.00 Jayaboard
5 Kalsiboard EG Uk. 240 x 120 x 4 mm lbr 69,245.50 Kalsiboard
6 List gypsum m' 8,835.00 Jayaboard
7 GRC tebal 0.9 mm m2 51,300.00 GRC

X BAHAN ALAT PENGGANTUNG & PENGUNCI


1 Kunci Tanam 2 X putar unit 92,150.00 Solid
2 Kunci Tanam Pintu Swing/kaca Rangka Alumunium unit 85,500.00 Solid
3 Handle Pintu Alumunium unit 71,250.00 Solid
4 Engsel Kuningan ARCH u Pintu stell 24,700.00 Solid
5 Engsel Kuningan ARCH u Jendela stell 12,825.00 Solid
6 Grendel tanam bh 96,900.00 Solid
7 Grendel besar bh 16,150.00 Solid
8 Grendel kecil bh 11,875.00 Solid
9 Grendel Ekspanyolet bh 65,835.00 Solid
10 Hak Angin lurus stel 25,840.00 Solid
11 Hak Angin Sikutan stel 9,025.00 Solid

XI BAHAN PAKU
1 Paku biasa 2" - 5 " (reng) kg 12,750.00
### Hi Steel
2 Paku Usuk kg 13,850.00
### Hi Steel
3 Paku klem (No.4) Doz 20,000.00 Hi Steel
4 Paku Skrup bh 150.00### Hi Steel

XII BAHAN SANITAIR


1 Closet Jongkok Porselen Warna Putih bh 285,000.00 Toto CE6
2 Closet Duduk Porselen Warna Putih bh 1,900,000.00 Toto CW66
3 Wastafel Besar Warna bh 310,650.00 Toto L38V1
4 Kitchen Zink bh 2,137,500.00 Toto
5 Urinoir bh 21,565.00 Toto U57
6 Kran air Ex Import bh 223,250.00 Onda
7 Jet Shower bh 235,000.00 Toto Thx 20 Mcrb
8 Avour bh 17,575.00 axel
9 Tempat sabun bh 24,130.00 Krisbow
10 Pipa PVC 3/4'' type AW Panjang 4 m lonjot 28,975.00 Wavin
11 Pipa PVC 1 1/2'' type C Panjang 4 m lonjot 31,825.00 Maspion
12 Pipa PVC 2'' type C Panjang 4 m lonjot 46,835.00 Maspion
13 Pipa PVC 3'' type C Panjang 4 m lonjot 60,277.50 Maspion
14 Pipa PVC 4'' type C Panjang 4 m lonjot 2,850.00 Maspion
15 Roll TBA roll 1,828.75 Fukuda
16 Klem PVC bh 2,850,000.00 Maspion
17 Water Tank (Stanless) kapasitas 1100 lt Unit 3,325,000.00
18 Ground Water Tank Kap. 3 m3 Unit 1,200,000.00
19 Pompa air Unit 1,250,000.00 Panasonik
20 Cermin 1,00 x 0,50 m (frame = 3 cm) bh 300,000.00

XIII BAHAN LISTRIK


1 Stop Kontak bh 17,575.00 Broco
2 Sakelar tunggal bh 8,075.00 Broco
3 Saklar Ganda bh 16,720.00 Broco
4 T Doss Pvc bh 2,132.00 Maspion
HARGA SATUAN
NO. JENIS / NAMA BAHAN SATUAN KETERANGAN
(Rp.)
1 2 3 4 5

5 Kabel NYA 500 Volt 2 x 2,5 mm2 m' 5,650.00 Eterna


6 Pipa paralon 5/8 lonjor 8,360.00 Clipsal
7 Isolator bh 5,500.00 Vickers
8 Lass Doof bh 712.50 Shukaku
### 9 Fiting Plafon LED bh 115,000.00 Broco
### 10 Lampu LED 8 Watt bh 100,000.00 Philips
11 MCB Unit 38,237.50 Schneider
12 Runcingan penangkal petir/ spliter 1" bh 500,000.00 kurn 150
13 Kabel BC dia 50 mm2 m' 31,825.00 Cupper
14 Klem Kabel BC dia 50 mm2 bh 6,175.00 Arrow/Delta
15 Pentanahan grounding kabel BC 50 mm2 Unit 200,000.00
16 Bak kontrol penangkal petir Unit 190,000.00
17 Box test line Set 237,500.00
18 Kabel schoon Set 10,925.00 Schoen 120 M10
19 Connector Set 14,250.00 Cellpack
20 Pasang Panel + Instalasi Unit 850,000.00
21 Testing dan commissioning termasuk izin - izin Penangkal petir Ls 450,000.00

XIV BAHAN CAT


1 Cat Kayu / Besi kg 40,850.00 Emco
2 Cat Tembok Inerior kg 40,000.00 Jotun, dulux
3 Cat Tembok Exterior (Weather shield) kg 65,925.00 Jotun, dulux
4 Cat Alkali Resisting Primer kg 29,212.50 Jotun, dulux
5 Cat penutup (cat kayu) kg 19,902.50 Emco
6 Cat Batu Alam ltr 76,000.00 Propan
7 Seakent Tube 25,460.00 Shirikon
8 Waterprofing kg 36,812.50 No Drop
9 Wood Filler Kg 26,125.00 Emco
10 Kertas Gosok no 150 Lembar 8,312.50 Taiyo
11 Kertas Gosok no 280 Lembar 9,737.50 Taiyo
12 Shanding Kg 47,975.00 Peacock
13 Clear Doof Kg 43,700.00 Suzuka
14 Thinner A Liter 22,800.00 Thinner
15 Coumpond Kaleng 18,050.00 Blinken
16 Serat fiber m2 4,275.00 Serat mat
17 Dempul tembok (cat dasar) kg 14,250.00 Gm2
18 Meni Kayu kg 43,700.00 Emco
19 Meni besi kg 30,400.00 Emco
20 Plamur tembok kg 14,250.00 Big lion
21 Plamur kayu kg 21,850.00 Emco
22 Kuas bh 8,075.00 Eterna
23 Minyak bekisting ltr 8,075.00 Robinair
24 Lem kayu kg 7,410.00 Rajawali
25 Ijuk kg 9,737.50 UD lestari
26 Air Tawar ltr 30.00
DAFTAR STANDAR HARGA SATUAN DASAR PERALATAN
TAHUN ANGGARAN 2018

Nama Proyek :
Nama Pekerjaan :
Lokasi : Kab. Sidoarjo
Tahun Anggaran : 2018

HARGA SATUAN
NO. URAIAN / NAMA ALAT SATUAN KETERANGAN
(Rp.)
1 2 3 4 5

1 Sewa alat bantu (1 set @ 3 alat) Jam 950.00


2 Sewa kompresor Jam 32,250.00
3 Sewa alat bantu bor pile Jam 9,500.00
4 Sewa Stampper Jam 145,000.00
5 Sewa welding set Hari 28,500.00
6 Sewa Crane 30 ton - min. 8 jam Jam 35,000.00
(termasuk mob/demob, operator, BBM)
7 Sewa Hidrolis Hammer tiang pancang - min. 8 jam Jam 40,000.00
(termasuk mob/demob, operator, BBM)
OWNER ESTIMATE (OE) REHAB, SMPN 1 JABON - JABON

OWNER ESTIMATE (OE)


Nama Kegiatan : Pembangunan dan Rehabilitasi Gedung Kantor Lintas SKPD
Pekerjaan : Perenc. Rehab SMPN 1 JABON - JABON
Lokasi : Jl. Dukuh Sari No.01 Kel. DukuhSari, Kec.Jabon - Sidoarjo
Tahun Anggaran : 2019

Harga Sat. Jumlah


NO Jenis Pekerjaan Volume Sat.
(Rp.) (Rp.)

A PASANG KERAMIK Ruang Perpustakaan (C)


1 Pek. Bongkar Keramik 1.720 m3 144,056.00 247,776.32
2 Pemasangan Keramik 40x40 17.200 m2 240,889.00 4,143,290.80
SUB TOTAL B 4,391,067.12
B PASANG KERAMIK KELAS VIII C (I)
1 Pemasangan Keramik 40x40 64.000 m2 240,889.00 15,416,896.00
2 Perbaikan Daun Pintu 1.000 Ls 350,000.00 350,000.00
SUB TOTAL C 15,766,896.00
C PASANG KERAMIK KELAS H
1 Pemasangan Keramik Dinding Tinggi = 1,2 m (DALAM KELAS) 65.560 m2 278,971.04 18,289,341.64
2 Pemasangan Keramik Dinding Tinggi = 1,2 m (TERAS) 24.920 m2 278,971.04 6,951,958.42
SUB TOTAL C 25,241,300.06
D PEKERJAAN PLAFOND KELAS H

1 Pek. Pasang Plafond Gypsumboard Tb. 9mm + Rangka Hollow m2


40x40 & 20x40 mm Modul 60x60 cm 64.800 160,235.80 10,383,279.72

2 Pek. Pasang Plafond Kalsiboard Tb. 3,5mm + Rangka Hollow m2


40x40 & 20x40 mm Modul 60x60 cm 100.100 #NAME? #NAME?
3 m1
Pek. Lis Plafond Gypsum Lebar 10 cm 268.600 37,283.40 10,014,321.24
SUB TOTAL D. #NAME?
E PEKERJAAN PENGECATAN KELAS H
1 Pengecatan dinding 693.220 m2 26,162.62 18,136,451.44
2 Pengecatan plafond 164.900 m2 23,726.12 3,912,437.19
SUB TOTAL E. 22,048,888.62
F PEK.ELEKTRIKAL KELAS H
1 Penyambungan kabel dari meter lama 1.000 ls 20,678.72 20,678.72
2 Pasang titik Instalasi Listrik 48.000 titik 260,925.00 12,524,400.00
3 Pasang titik stop kontak 12.000 titik 162,151.82 1,945,821.79
4 Pasang saklar tunggal 1.000 titik 54,648.33 54,648.33
5 Pasang saklar ganda 5.000 titik 54,648.33 273,241.65
6 Pasang lampu SL 24 Watt (Model Tornado) 24.000 bh 53,643.73 1,287,449.58
7 Pasang lampu SL 15 Watt 12.000 bh 48,143.73 577,724.79
SUB TOTAL F. 16,663,286.13

TOTAL #NAME?
Nama Kegiatan : PEMBANGUNAN DAN REHABILITASI GEDUNG KANTOR LINTAS SKPD
Pekerjaan : Rehab SMPN 1 Jabon Lanjutan
Lokasi : Jl. Dukuh Sari No.01 Kel. DukuhSari, Kec.Jabon - Sidoarjo
Tahun Anggaran : 2019

Jumlah Harga
No. Jenis Pekerjaan
(Rp.)
1 2 3

A PASANG KERAMIK KELAS VIII C (I) 15,661,896.00


B PASANG KERAMIK KELAS H 97,857,389.67
C PEKERJAAN PLAFOND KELAS H 21,252,303.89
D PEKERJAAN PENGECATAN KELAS H 29,135,557.66
E PEK.ELEKTRIKAL KELAS H 15,427,011.20
TOTAL 179,334,158.42
PPN 10% 17,933,415.84
JUMLAH 197,267,574.26
DIBULATKAN 197,267,000.00

Terbilang : Seratus Sembilan Puluh Tujuh Juta Empat Ratus Tiga Puluh Tiga Ribu Rupiah

Sidoarjo, 21 November 2019

CV. TATA GRAHA UTAMA

MARYONO SUSANTO, SE
Direktur
BILL OF QUANTITY
Nama Kegiatan : Pembangunan dan Rehabilitasi Gedung Kantor Lintas SKPD
Pekerjaan : Rehab SMPN 1 Jabon Lanjutan
Lokasi : Jl. Dukuh Sari No.01 Kel. DukuhSari, Kec.Jabon - Sidoarjo
Tahun Anggaran : 2019

Harga Sat. Jumlah


NO Jenis Pekerjaan Volume Sat.
(Rp.) (Rp.)

A PASANG KERAMIK KELAS VIII C (I)


1 Pemasangan Keramik 40x40 64.000 m2 240,889.00 15,416,896.00
2 Perbaikan Daun Pintu 7.000 Ls 35,000.00 245,000.00
SUB TOTAL A 15,661,896.00
B PASANG KERAMIK KELAS H
1 Pemasangan Keramik Lantai 40x40 (DALAM KELAS) 239.050 m2 240,889.00 57,584,515.45
2 Pemasangan Keramik Lantai 40x40 (TERAS) 89.500 m2 240,889.00 21,559,565.50
3 Pemasangan Keramik Dinding Tinggi = 1 m (DALAM KELAS) 65.560 m2 285,437.90 18,713,308.72
(Kelas 25 & 26)
SUB TOTAL B 97,857,389.67
C PEKERJAAN PLAFOND KELAS H

1 Pek. Pasang Plafond Gypsumboard Tb. 9mm + Rangka Hollow m2


40x40 & 20x40 mm Modul 60x60 cm (1 Kelas) 64.800 160,235.80 10,383,279.72

2 Pek. Pasang Plafond Kalsiboard Tb. 3,5mm + Rangka Hollow m2


40x40 & 20x40 mm Modul 60x60 cm 100.100 108,581.66 10,869,024.17
SUB TOTAL C 21,252,303.89
D PEKERJAAN PENGECATAN KELAS H
1 Pengecatan dinding 718.140 m2 26,162.62 18,788,423.93
2 Pengecatan plafond 351.812 m2 23,726.12 8,347,133.73
3 Pengecatan Pintu dan Jendela 1.000 Ls 2,000,000.00 2,000,000.00
SUB TOTAL D 29,135,557.66
E PEK.ELEKTRIKAL KELAS H
1 Pasang titik Instalasi Listrik 44.000 titik 260,925.00 11,480,700.00
2 Pasang titik stop kontak 12.000 titik 162,151.82 1,945,821.79
3 Pasang saklar tunggal 1.000 titik 54,648.33 54,648.33
4 Pasang saklar ganda 5.000 titik 54,648.33 273,241.65
5 Pasang lampu SL 24 Watt (Model Tornado) 24.000 bh 53,643.73 1,287,449.58
6 Pasang lampu SL 15 Watt 8.000 bh 48,143.73 385,149.86
SUB TOTAL F. 15,427,011.20

TOTAL 179,334,158.42
ANALISA HARGA SATUAN PEKERJAAN
SEMESTER I TAHUN ANGGARAN 2019

HARGA SATUAN PEKERJAAN KERAMIK


Pemasangan lantai keramik ukuran 40 cm x 40 cm

No Uraian Satuan Koefisien Harga satuan Jumlah Harga(RP)


(RP)
A TENAGA
Pekerja OH 0.700 126,000.00 88,200.00
Tukang OH 0.350 134,000.00 46,900.00
Kepala tukang OH 0.035 144,000.00 5,040.00
Mandor OH 0.035 155,000.00 5,425.00
JUMLAH TENAGA KERJA 145,565.00
B BAHAN
keramik Lantai 40x40 Doos 1.050 40,000.00 42,000.00
Semen Portland kg 10.000 1,287.50 12,875.00
Pasir pasang M3 0.045 240,000.00 10,800.00
Semen warna kg 0.500 15,500.00 7,750.00
JUMLAH HARGA BAHAN 73,425.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 218,990.00
E Overhead & Profit (Contoh 10 %) 10% x D (maksimum) 21,899.00
F Harga Satuan Pekerjaan (D+E) 240,889.00

Pemasangan Dinding keramik

No Uraian Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)

A TENAGA
Pekerja OH 0.700 126,000.00 88,200.00
Tukang OH 0.350 134,000.00 46,900.00
Kepala tukang OH 0.035 144,000.00 5,040.00
Mandor OH 0.035 155,000.00 5,425.00
JUMLAH TENAGA KERJA 145,565.00
B BAHAN
keramik Dinding m2 1.050 65,000.00 68,250.00
Semen Portland 50kg zak 0.186 64,000.00 11,904.00
Pasir pasang M3 0.018 240,000.00 4,320.00
Semen warna kg 1.900 15,500.00 29,450.00
JUMLAH HARGA BAHAN 113,924.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 259,489.00
E Overhead & Profit (Contoh 10 %) 10% x D (maksimum) 25,948.90
F 285,437.90
Harga Satuan Pekerjaan (D+E)

PEKERJAAN PLAFOND
1 M2 Pekerjaan Pasang gypsum board 9 mm rangka hollow galvalume
No Uraian Satuan Koefisien Harga satuan Jumlah Harga(RP)
(RP)
A TENAGA
Pekerja OH 0.151 126,000.00 19,069.13
Tukang OH 0.252 134,000.00 33,799.78

Page 18
Kepala tukang OH 0.025 144,000.00 3,600.00
Mandor OH 0.075 155,000.00 11,625.00
JUMLAH TENAGA KERJA 68,093.91
B BAHAN
Gypsum board tbl. 9 mm lbr 0.390 62,500.00 24,375.00
Hollow galvalume 40 x 40 m1 4.600 7,500.00 34,500.00
Paku asbes / skrup bh 8.000 900.00 7,200.00
Kawat penggantung m1 2.000 4,500.00 9,000.00
Compound m2 0.250 10,000.00 2,500.00
JUMLAH HARGA BAHAN 77,575.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 145,668.91
E Overhead & Profit 10 %) 10% x D (maksimum) 14,566.89
F Harga Satuan Pekerjaan (D+E) 160,235.80

A.4.5.1.8 Pemasangan 1 m2 langit-langit kalsiboard ukuran (120x240x3,50) mm, tebal 3,50 mm


No Uraian Satuan Koefisien Harga Satuan Jumlah Harga (Rp.)
(Rp.)
A TENAGA
Pekerja OH 0.100 126,000.00 12,600.00
Tukang kayu OH 0.050 134,000.00 6,700.00
Kepala tukang OH 0.005 144,000.00 720.00
Mandor OH 0.005 155,000.00 775.00

JUMLAH TENAGA KERJA 20,795.00


B BAHAN
Kalsiboard (1200x2400x35) mm Lembar 0.364 67,900.00 24,715.60
Hollow galvalume 40 x 40 m1 4.600 7,500.00 34,500.00
Paku asbes / skrup bh 8.000 900.00 7,200.00
Kawat penggantung m1 2.000 4,500.00 9,000.00
Compound m2 0.250 10,000.00 2,500.00

JUMLAH HARGA BAHAN 77,915.60


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 98,710.60
E Overhead & Profit (10 %) 10% x D (maksimum) 9,871.06
F Harga Satuan Pekerjaan (D+E) 108,581.66

A.4.5.1.9 Pemasangan 1 m1 list plafond gypsum profil lebar 10 cm


No Uraian Satuan Koefisien Harga Satuan Jumlah Harga (Rp.)
(Rp.)
A TENAGA
Pekerja OH 0.060 126,000.00 7,560.00
Tukang kayu OH 0.060 134,000.00 8,040.00
Kepala tukang OH 0.006 144,000.00 864.00
Mandor OH 0.006 155,000.00 930.00

JUMLAH TENAGA KERJA 17,394.00


B BAHAN
List Profil 10 cm Gypsum m1 1.050 14,000.00 14,700.00
Paku skrup bh 2.000 900.00 1,800.00

JUMLAH HARGA BAHAN 16,500.00


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 33,894.00
E Overhead & Profit (10 %) 10% x D (maksimum) 3,389.40
F Harga Satuan Pekerjaan (D+E) 37,283.40

Page 19
PEKERJAAN PENGECATAN
Pengecatan 1 m2 tembok baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) (Interior)
Harga satuan
No Uraian Satuan Koefisien (RP) Jumlah Harga(RP)
A TENAGA
Pekerja OH 0.020 126,000.00 2,520.00
Tukang cat OH 0.063 134,000.00 8,442.00
Kepala tukang OH 0.006 144,000.00 907.20
Mandor OH 0.003 155,000.00 465.00
JUMLAH TENAGA KERJA 12,334.20
B BAHAN
Plamir Kg 0.100 45,000.00 4,500.00
Cat dasar Kg 0.100 17,500.00 1,750.00
Cat penutup Kg 0.260 20,000.00 5,200.00
JUMLAH HARGA BAHAN 11,450.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 23,784.20
E Overhead & Profit (10 %) 10% x D (maksimum) 2,378.42
F Harga Satuan Pekerjaan (D+E) 26,162.62

Pengecatan 1 m2 Pengecatan bidang kayu Lama(1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
Harga satuan
No Uraian Satuan Koefisien Jumlah Harga(RP)
(RP)
A TENAGA
Pekerja OH 0.070 126,000.00 8,820.00
Tukang cat OH 0.009 134,000.00 1,206.00
Kepala tukang OH 0.006 144,000.00 864.00
Mandor OH 0.003 155,000.00 465.00
JUMLAH TENAGA KERJA 11,355.00
B BAHAN
Plamir Kg 0.150 15,000.00 2,250.00
Cat penutup Kg 0.260 56,350.00 14,651.00
Kuas buah 0.010 25,000.00 250.00
Pengencer Kg 0.030 24,500.00 735.00
Ampelas Lbr 0.200 6,850.00 1,370.00
JUMLAH HARGA BAHAN 19,256.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 30,611.00
E Overhead & Profit (10 %) 10% x D (maksimum) 3,061.10
F Harga Satuan Pekerjaan (D+E) 33,672.10

Pengecatan plafond
Harga satuan
No Uraian Satuan Koefisien (RP) Jumlah Harga(RP)
A TENAGA
Pekerja OH 0.020 126,000.00 2,520.00
Tukang cat OH 0.063 134,000.00 8,442.00
Kepala tukang OH 0.006 144,000.00 907.20
Mandor OH 0.003 155,000.00 465.00
JUMLAH TENAGA KERJA 11,869.20
B BAHAN
Cat penutup Kg 0.260 20,000.00 5,200.00
Plamir kg 0.100 45,000.00 4,500.00
JUMLAH HARGA BAHAN 9,700.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 21,569.20
E Overhead & Profit (Contoh 15 %) 10% x D (maksimum) 2,156.92

Page 20
F Harga Satuan Pekerjaan (D+E) 23,726.12

PEKERJAAN BATA DAN PLESTERAN


A. 4.4.1.10 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batucampuran 1SP :5PP

No Uraian Satuan Koefisien Harga satuan Jumlah Harga(RP)


(RP)
A TENAGA
Pekerja OH 0.300 126,000.00 2,520.00
Tukang Batu OH 0.100 136,992.00 13,699.20
Kepala tukang OH 0.010 147,992.00 1,479.92
Mandor OH 0.015 157,992.00 2,369.88
JUMLAH TENAGA KERJA 20,069.00
B BAHAN
Bata merah Buah 70.000 750.00 52,500.00
Semen Portland Kg 9.680 1,280.00 12,390.40
Pasir pasang m3 0.045 271,600.00 12,222.00
JUMLAH HARGA BAHAN 77,112.40
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 97,181.40
10% x D 9,718.14
E Overhead & Profit (10 %) (maksimum)
F Harga Satuan Pekerjaan (D+E) 106,899.54

Pemasangan 1 m2 plesteran dan Acian Tb=15mm


Harga satuan
No Uraian Satuan Koefisien (RP) Jumlah Harga(RP)
A TENAGA
Pekerja OH 0.200 126,000.00 25,200.00
Tukang Batu OH 0.150 134,000.00 20,100.00
Kepala tukang OH 0.015 144,000.00 2,160.00
Mandor OH 0.010 155,000.00 1,550.00
JUMLAH TENAGA KERJA 49,010.00
B BAHAN
Semen Portland 50 Kg Kg 4.184 1,287.50 5,386.90
Pasir pasang m3 0.026 240,000.00 6,240.00
JUMLAH HARGA BAHAN 11,626.90
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 60,636.90
E Overhead & Profit (10%) 10% x D (maksimum) 6,063.69
F Harga Satuan Pekerjaan (D+E) 66,700.59

PEKERJAAN MEKANIKAL & ELEKTRIKAL

Pasangan Sakelar Tunggal titik


Harga satuan
No Uraian Satuan Koefisien (RP) Jumlah Harga(RP)
A TENAGA
Pekerja OH 0.001 126,000.00 127.21
Tukang OH 0.202 134,000.00 27,039.82
Mandor OH 0.050 155,000.00 7,813.27
JUMLAH TENAGA KERJA 34,980.30
B BAHAN
Sakelar Tunggal unit 1.000 14,700.00 14,700.00
JUMLAH HARGA BAHAN 14,700.00
C PERALATAN

Page 21
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 49,680.30
E Overhead & Profit (Contoh 15 %) 10% x D (maksimum) 4,968.03
F Harga Satuan Pekerjaan (D+E) 54,648.33

Pasangan Sakelar Ganda titik


No Uraian Satuan Koefisien Harga satuan Jumlah Harga(RP)
(RP)
A TENAGA
Pekerja OH 0.001 126,000.00 127.21
Tukang OH 0.202 134,000.00 27,039.82
Mandor OH 0.050 155,000.00 7,813.27
JUMLAH TENAGA KERJA 34,980.30
B BAHAN
Sakelar Ganda Simply Switch unit 1.000 14,700.00 14,700.00
JUMLAH HARGA BAHAN 14,700.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 49,680.30
E Overhead & Profit (Contoh 15 %) 10% x D (maksimum) 4,968.03
F Harga Satuan Pekerjaan (D+E) 54,648.33

Pasangan Titik Lampu Gedung titik


Harga satuan
No Uraian Satuan Koefisien (RP) Jumlah Harga(RP)
A TENAGA
Pekerja OH 0.300 126,000.00 37,800.00
Tukang OH 0.500 134,000.00 67,000.00
Mandor OH 0.050 155,000.00 7,750.00
JUMLAH TENAGA KERJA 112,550.00
B BAHAN
Kabel NYA 500 Volt 2 x 2,5 mm2 m 10.000 8,000.00 80,000.00
Isolator unit 3.000 7,000.00 21,000.00
Fiting Plafon bh 1.000 20,000.00 20,000.00
Pipa Paralon 5/8 batang 1.000 11,500.00 11,500.00
T Doos pvc bh 1.000 3,450.00 3,450.00
JUMLAH HARGA BAHAN 135,950.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 248,500.00
E Overhead & Profit (Contoh 15 %) 5% x D (maksimum) 12,425.00
F Harga Satuan Pekerjaan (D+E) 260,925.00

Pasangan Titik Stop Kontak titik


Harga satuan
No Uraian Satuan Koefisien Jumlah Harga(RP)
(RP)
A TENAGA
Pekerja OH 0.001 126,000.00 127.21
Tukang OH 0.202 134,000.00 27,039.82
Mandor OH 0.050 155,000.00 7,813.27
JUMLAH TENAGA KERJA 34,980.30
B BAHAN
Kabel NYA 500 Volt 2 x 2,5 mm2 m 10.000 8,000.00 80,000.00
Sop kontak unit 1.000 24,500.00 24,500.00
Pipa Paralon 5/8 batang 1.000 11,500.00 11,500.00
T Doos pvc bh 1.000 3,450.00 3,450.00
JUMLAH HARGA BAHAN 119,450.00

C PERALATAN
JUMLAH HARGA ALAT

Page 22
D Jumlah (A+B+C) 154,430.30
E Overhead & Profit (Contoh 15 %) 5% x D (maksimum) 7,721.52
F Harga Satuan Pekerjaan (D+E) 162,151.82

Page 23
Pasangan Lampu SL 24 WATT TORNADO titik
No Uraian Satuan Koefisien Harga satuan Jumlah Harga(RP)
(RP)
A TENAGA
Pekerja OH 0.001 126,000.00 127.21
Tukang OH 0.102 134,000.00 13,639.82
JUMLAH TENAGA KERJA 13,767.03
B BAHAN
Lampu SL 24Watt tornado Ex. Philips bh 1.000 35,000.00 35,000.00
JUMLAH HARGA BAHAN 35,000.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 48,767.03
E Overhead & Profit (Contoh 15 %) 10% x D (maksimum) 4,876.70
F Harga Satuan Pekerjaan (D+E) 53,643.73

Pasangan Lampu SL 15Watt titik


Harga satuan
No Uraian Satuan Koefisien (RP) Jumlah Harga(RP)
A TENAGA
Pekerja OH 0.001 126,000.00 127.21
Tukang OH 0.102 134,000.00 13,639.82
JUMLAH TENAGA KERJA 13,767.03
B BAHAN
Lampu SL 15 Watt bh 1.000 30,000.00 30,000.00
JUMLAH HARGA BAHAN 30,000.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 43,767.03
E Overhead & Profit (Contoh 15 %) 10% x D (maksimum) 4,376.70
F Harga Satuan Pekerjaan (D+E) 48,143.73

Page 24
SPESIFIKASI BAHAN BANGUNAN KONSTRUKSI

No. Jenis Material Klasifikasi Merk / Pembuat

A PASANG KERAMIK KELAS VIII C (I)

1 Keramik Lantai Kelas Putih Polos Ukuran 40x40 cm Asia Tile

B PASANG KERAMIK KELAS H

1 Pemasangan Keramik Lantai (DALAM KELAS) Ukuran 40x40 cm Asia Tile

2 Pemasangan Keramik Lantai (TERAS) Ukuran 40x40 cm Asia Tile

3 Pemasangan Keramik Dinding Tinggi = 1 m (DALAM K Ukuran 20x25 cm Asia Tile (Metro Basic 17)

C PEKERJAAN PLAFOND KELAS H

1 Plafond Gypsumboard ukuran 122x244x9mm, paku dan sekrup Jayaboard


Hollow Galvalum 40.40.3 mm – 6
2 Rangka Plafond Modul 60x60Cm Lokal
m, Penggantung Hollow Galvalum 40.40.3 mm – 6 m,
3 Lis Plafond Lis Gypsum Lokal

D PEKERJAAN PENGECATAN KELAS H

1 Cat Dinding WeaterShild : Warna ditentukan kemudian Pengecatan 3 x Catylac

2 Cat Waterproofing Elastex Nippon Paint

E PEK.ELEKTRIKAL KELAS H

1 Kabel Instalasi Pasang titik lampu NYM 2 x 2.5 mm2, Pasang titik stop kontak NYM 3 x 2.5 mm2 Eterna

2 Penerangan Lampu SL Tornado 24 watt (Dalam), Lampu SL Tornado 15 watt (Teras) Philips

3 Saklar Dinding Broco

4 Stop Kontak Broco

5 Pipa Instalasi Pelindung kabel Ukuran 3/4"


DAFTAR HARGA BAHAN BANGUNAN DAN UPAH PEKERJA
KABUPATEN SIDOARJO
Tahun 2019

NO, NAMA/JENIS BAHAN SATUAN HARGA BAHAN 2019


I BATA, BATU DAN PASIR
Pasir Beton m3 370,000.00
Pasir Pasang (sedang) m3 240,000.00
Pasir Urug m3 135,000.00
Air Liter 5.00
Paving Tebal 6 cm m2 60,000.00
II BAHAN PEREKAT
Semen (50Kg) Zak 64,000.00
Semen (40Kg) Zak 51,500.00
Semen PC Kg 1,287.50
Semen Warna Kg 15,500.00

III BAHAN BESI / BAJA :


Besi U-24 (Polos) Kg 12,600.00
Baja Struktur Kg 11,500.00
Kawat beton Kg 30,000.00
Kawat Las Kg 29,000.00
Baut Angkur Kg 35,000.00
Jarum keras bh 75,000.00
Baja ringan C75.75 mm Batang 81,000.00
Baja ringan C75.75 mm m' 13,500.00
Baja Ringan Reng 30.45 Batang 28,000.00
Baja Ringan Reng 30.45 m' 5,500.00
Plat Penahan Gording 6mm kg 13,500.00
Kalsiplank M' 26,000.00
Besi Siku 60.60.6 Kg 11,500.00

IV BAHAN KAYU
Papan kayu Meranti m3 5,000,000.00
Kayu Meranti Balok 4/6, 5/7 m3 5,000,000.00
Kayu Meranti Bekisting m3 5,000,000.00
Plywood Uk. 122x244x9 mm Lembar 105,000.00

V BAHAN KERAMIK
Keramik Lantai 40x40 m2 40,000.00
Keramik Lantai ROCK TILE m2 40,000.00
Keramik Dinding m2 65,000.00
V BAHAN PENUTUP ATAP
Genteng Kodok Bambe 20pcs/m2 Buah 4,700.00
Bubungan Genteng Kodok Buah 9,700.00

VI BAHAN KACA
Kaca Polos 5 mm m2 97,000.00
VII BAHAN PAKU DAN MUR BAUT :
Paku 1 s/d 3 cm Kg 24,750.00
Paku 8 s/d 12 cm Kg 18,500.00
Paku Asbes Sekrup 4 inchi Bh 900.00
Kawat Beton Kg 30,000.00
Screw 12-14 x 20 bh 2,000.00
Screw 12-14 x 16 bh 1,500.00

XI BAHAN FINISHING :
Cat Dasar Tembok Kg 17,500.00
Cat tembok (Interior) Kg 20,000.00
Cat tembok (Exterior) Kg 21,000.00
Kertas Gosok Lembar 20,467.00
Plamir Tembok Kg 45,000.00
Minyak Bekisting Liter 30,000.00
Solar Liter 12,700.00
kuas 4" buah 25,000.00
Sealent tube 60,300.00

X BAHAN PARTISI DINDING /PLAFOND


GypsumBoard tebal 9mm Lembar 62,500.00
Kalsiboard (1200x2400x35) mm Lembar 67,900.00
Kalsiboard (1200x2400x35) mm M2 23,579.00
List Profil 10 cm Gypsum m' 14,000.00
Hollow galvalume 40 x 40 m' 7,500.00
Kawat Penggantung m' 4,500.00

XI PERALATAN ELEKTRIKAL
Box panel PVC isi 4 MCB Buah 150,000.00
Kabel NYA 500 Volt 2 x 2,5 mm2 Buah 8,000.00
Isolator Buah 7,000.00
Saklar Tunggal Buah 14,700.00
Saklar Ganda Buah 14,700.00
Stop Kontak Buah 24,500.00
Fitting Plafon Buah 20,000.00
Lampu SL 24 WATT Tornado Buah 35,000.00
Lampu SL 15 WATT Buah 30,000.00
Pipa Pralon 5/8 Lonjor 11,500.00
T Doos Pvc Buah 3,450.00
Kabel jaringan listrik kawat x25m m 390,000.00

NO, Tenaga Kerja SATUAN Upah Kerja 2019


1 Pekerja Oh 126,000.00
2 Tukang Batu Oh 134,000.00
3 Tukang Listrik Oh 134,000.00
4 Tukang Cat Oh 134,000.00
5 Tukang Las biasa Oh 134,000.00
6 Tukang alumunium Oh 134,000.00
7 Tukang Kayu Oh 134,000.00
8 Tukang besi Oh 134,000.00
9 Kepala Tukang Oh 144,000.00
10 Mandor Oh 155,000.00
TIME SCHEDULE
Nama Kegiatan : Pembangunan dan Rehabilitasi Gedung Kantor Lintas SKPD
Pekerjaan : Rehab SMPN 1 Jabon Lanjutan
Lokasi : Kec. Jabon - Sidoarjo
Tahun Anggaran : 2019

Waktu Pelaksanaan 30 (Tiga Puluh) hari


Persentase
No Jenis Barang/Jasa Harga (Rp) BOBOT Bulan I
Mgg 1 Mgg 2 Mgg 3 Mgg 4 %
A PASANG KERAMIK KELAS VIII C (I)
1 Pemasangan Keramik 40x40 Rp 15,416,896.00 8.5967 8.5967 100%
2 Perbaikan Daun Pintu Rp 245,000.00 0.1366 0.1366
B PASANG KERAMIK KELAS H
1 Pemasangan Keramik Lantai 40x40 (DALAM KELAS) Rp 57,584,515.45 32.1102 10.7034 10.7034 10.7034
2 Pemasangan Keramik Lantai 40x40 (TERAS) Rp 21,559,565.50 12.0220 4.0073 4.0073 4.0073
3 Pemasangan Keramik Dinding Tinggi = 1 m (DALAM KELAS) Rp 18,713,308.72 10.4349 5.2174 5.2174
(Kelas 25 & 26)
C PEKERJAAN PLAFOND KELAS H
Pek. Pasang Plafond Gypsumboard Tb. 9mm + Rangka Hollow 40x40 & 20x40 mm
1 Modul 60x60 cm (1 Kelas) Rp 10,383,279.72 5.7899 2.8950 2.8950
Pek. Pasang Plafond Kalsiboard Tb. 3,5mm + Rangka Hollow 40x40 & 20x40 mm
2 Modul 60x60 cm Rp 10,869,024.17 6.0608 3.0304 3.0304
D PEKERJAAN PENGECATAN KELAS H
1 Pengecatan dinding Rp 18,788,423.93 10.4768 5.2384 5.2384
2 Pengecatan plafond Rp 8,347,133.73 4.6545 2.3273 2.3273
3 Pengecatan Pintu dan Jendela Rp 2,000,000.00 1.1152 0.5576 0.5576
E PEK.ELEKTRIKAL KELAS H
1 Pasang titik Instalasi Listrik Rp 11,480,700.00 6.4018 3.2009 3.2009
2 Pasang titik stop kontak Rp 1,945,821.79 1.0850 0.5425 0.5425
3 Pasang saklar tunggal Rp 54,648.33 0.0305 0.0152 0.0152
4 Pasang saklar ganda Rp 273,241.65 0.1524 0.0762 0.0762
5 Pasang lampu SL 24 Watt (Model Tornado) Rp 1,287,449.58 0.7179 0.3590 0.3590
6 Pasang lampu SL 15 Watt Rp 385,149.86 0.2148 0.1074 0.1074 0%

Jumlah Rp 179,334,158.42 100.000


Prestasi Fisik Mingguan 23.444 19.928 38.278 18.350 100.000
Prestasi Fisik Mingguan Kolektif 23.444 43.372 81.650 100.000

Sidoarjo, 21 November 2019


CV. TATA GRAHA UTAMA

MARYONO SUSANTO, SE
Direktur

Anda mungkin juga menyukai