RINCIAN KEBUTUHAN MATERIAL

Pekerjaan : Pembangunan Tempat Wudhu Dan MDA Mesjid Nurul Huda Bukik Lurah Nagari Gadut Kec. Tilatang Kamang Kab Agakm

Lokasi : Mesjid Nurul Huda Bukit Lurah

HARGA JUMLAH
NO URAIAN SATUAN VOLUME KETERANGAN
SATUAN
1 Besi Ulir 13 mm Btg 285.61 130,000.00 37,129,083.33
2 Besi 10 Polos Btg 651.65 80,000.00 52,131,893.33
3 Besi 8 mm Btg 407.39 50,000.00 20,369,283.33
4 Kawat Beton Kg 125.00 20,000.00 2,500,000.00
5 Kayu 4/6 Btg 982.72 24,000.00 23,585,212.80
6 Plywood tebal 9mm Lbr 187.44 120,000.00 22,492,278.00
7 Paku Kg 209.97 20,000.00 4,199,408.00
8 Kayu Bulat / Bambu Btg 1,713.52 8,000.00 13,708,144.00
9 Karekel M3 95.57 160,000.00 15,290,722.37
10 Pasir Beton M3 157.66 120,000.00 18,919,535.52
11 Semen Zak 1,291.73 63,000.00 81,378,875.37
12 Cat Dulux Pail 12.69 2,000,000.00 25,388,147.20
13 Alkali Pail 4.95 1,000,000.00 4,947,000.00
14 Granit 60 x 60 Kesat Ktk 666.57 220,000.00 146,646,133.33 Granito
15 Semen Warna Bks 85.00 2,000.00 170,000.00
16 Pasir Timbunan M3 113.79 50,000.00 5,689,600.00
17 Batu Kali M3 61.11 180,000.00 11,000,361.60
18 Batu Bata Bh 44,501.38 1,200.00 53,401,656.00 Belum dikurangi kusen
pintu / jendela
19 Pipa 4" Btg 20.00 160,000.00 3,200,000.00
20 Pipa 3" Btg 25.00 125,000.00 3,125,000.00
21 Pipa 3/4 Btg 40.00 50,000.00 2,000,000.00
22 Kran Air Bh 50.00 35,000.00 1,750,000.00
23 Kloset Bh 10.00 650,000.00 6,500,000.00
24 Watafel Bh 10.00 850,000.00 8,500,000.00
25 Gypsum Board Lbr 58.68 110,000.00 6,454,448.00
26 Rangka Atap M2 187.20 125,000.00 23,400,000.00
27 Atap Bjls Lbr 179.16 1,250,000.00 223,949,579.83
28 Lisplank M1 72.00 65,000.00 4,680,000.00
29 Perabung M1 15.29 35,000.00 535,294.12
30 Paku Atap Ktk 20.00 25,000.00 500,000.00
31 Tedmon Bh 5.00 1,650,000.00 8,250,000.00 Pinguin
Dan lain-lain

JUMLAH 831,791,656.14
RINCIAN PENGGUNAAN UANG MUKA
Kegiatan : Peningkatan / Rehabilitasi Jalan Lingkung Perumahan
Pekerjaan : Peningkatan Jalan Lingkung Kelurahan Pakan Kurai
Lokasi : Kota Bukittinggi

NO URAIAN VOLUME SATUAN HARGA SATUAN JUMLAH

1 Beli Redymik K175 54.00 M3 1,050,000.00 56,700,000.00


2 Bayar Upah Tukang Ls 5,303,502.00 5,303,502.00

Jumlah 62,003,502.00
PPN 10 % 6,200,350.20
Jumlah 68,203,852.20
Dibulatkan 68,203,800.00

Bukittinggi 27 Agustus 2018


CV. SARI GRAHA NUSANTARA

SANTI MARTA TILOVA


Direktris
RINCIAN PENGGUNAAN UANG MUKA
Kegiatan Pengadaan, Peningkatan Dan Perbaikan Sarana Dan Prasarana Puskesmas Dan Jaringanya
Th. 2018

Pekerjaan Pembangunan Pustu Lambeh Tulang Gajah


Lokasi Palembayan - Kab. Agam

NO URAIAN VOLUME SATUAN HARGA SATUAN JUMLAH

1 Beli Batu Kali 60.00 M3 180,000.00 10,800,000.00


2 Beli Pasir Pasang 30.00 M3 130,000.00 3,900,000.00
3 Beli Pasir Urug 11.05 M3 90,000.00 994,514.40
4 Beli Kerikil Beton 6.00 M3 150,000.00 900,000.00
5 Beli Semen 240.00 Zak 65,000.00 15,600,000.00
6 Beli Besi Beton 800.00 Kg 11,000.00 8,800,000.00
7 Beli Kawat Beton 10.00 Kg 17,000.00 170,000.00
8 Beli Kusen 0.89 M3 6,652,525.00 5,920,747.25
9 Beli Batu Bata 12,000.00 Bh 1,250.00 15,000,000.00
10 Bayar Lansir Material 65.50 M3 110,000.00 7,205,000.00
11 Beli Kayu 0.75 M3 2,000,000.00 1,500,000.00
12 Bayar Upah Tukang Ls 35,000,000.00 35,000,000.00

Jumlah 105,790,261.65
PPN 10 % 10,579,026.17
Jumlah 116,369,287.50

Bukittinggi Mei 2018


CV. SARI GRAHA NUSANTARA

YONEVIS
Wakil Direktur
RINCIAN PENGGUNAAN UANG MUKA
Kegiatan Pembangunan Saluran Drainase / Gorong-gorong
Pekerjaan Pembangunan Saluran Drainase Jl. Adinegoro
Lokasi : Kota Bukittinggi
Tahun : 2019

NO URAIAN VOLUME SATUAN HARGA SATUAN JUMLAH


1 Beli Besi Beton 850.00 Kg 11,600.00 9,860,000.00
2 Beli Semen 100.00 Zak 62,000.00 6,200,000.00
3 Beli Kawat Beton 15.00 Kg 20,000.00 300,000.00
4 Beli Pasir Beton 10.00 M3 150,000.00 1,500,000.00
5 Beli Plywood 9 mm 5.00 Lbr 120,000.00 600,000.00
6 Beli Kayu Balok 1.00 M3 2,500,000.00 2,500,000.00
7 Beli Split 12.00 M3 350,000.00 4,200,000.00
8 Bayar Upah Tukang Ls 10,222,545.45 10,222,545.45

Jumlah 35,382,545.45
PPN 10% 3,538,254.55
Jumlah Total 38,920,800.00
Dibulatkan 38,920,800.00

Bukittinggi Agustus 2019


CV. EKA JAYA ABADI

SISKA
Direktris
RINCIAN PENGGUNAAN UANG MUKA
Kegiatan : Pembangunan Gedung Kantor
Pekerjaan : Belanja Modal Gedung Dan Bangunan- Pengadaan Bangunan Gedung Kantor
Lokasi : Kota Bukitinggi

NO URAIAN VOLUME SATUAN HARGA SATUAN JUMLAH


1 Beli Batu Kali 35.00 M3 150,000.00 5,250,000.00
2 Beli Pasir Beton 70.00 M3 100,000.00 7,000,000.00
3 Beli Semen 400.00 Zak 62,000.00 24,800,000.00
4 Beli Besi Beton 15,000.00 Kg 10,500.00 157,500,000.00
5 Beli Triplek 9 mm 30.00 Lbr 117,500.00 3,525,000.00
6 Beli Kayu Balok Klas II 3.00 M3 2,000,000.00 6,000,000.00
7 Beli Split 1-2 cm 45.00 M3 310,000.00 13,950,000.00
8 Beli Kawat Beton 30.00 Kg 18,000.00 540,000.00
Beli Beton ReadyMix 50.00 M3 1,200,000.00 60,000,000.00
9 Bayar Upah Tukang Ls 57,094,683.10 57,094,683.10

Jumlah 335,659,683.10
PPN 10% 33,565,968.31
Jumlah Total 369,225,651.41

Bukittinggi 07 Juli 2020


CV. SARI GRAHA NUSANTARA
12,590,000.00
27,500,000.00
40,090,000.00

SANTI MARTA TILOVA


Direktur