A. DAFTAR UPAH
1 Pekerja 81,816.89 oh
2 Tukang 94,089.42 oh
3 Kepala tukang 98,180.27 oh
4 Mandor 102,271.11 oh
1DAFTAR HARGA SATUAN BAHAN DAN UPAH PEKERJAAN PEMBANGUNAN GEDUNG OLAH RAGA RSUD WALED KABUPATEN CIREBON
NO URAIAN HARGA SATUAN
C. BAHAN KAYU
1 Dolken kayu dia. 8-10/400 cm 29,400.00 btg
2 Kayu papan begisting kelas IV 5,147,000.00 m³
3 Kayu 5/7 kelas IV 5,147,000.00 m³
4 Plywood 4 mm 85,000.00 lbr
5 Kayu Kelas III m³
6 Kayu Kelas IV m³
7 Balok Kayu Kelas II. m³
8 Plywood 9 mm m³
9 Billboard UK. 80 X 120 CM unit
F. PEKERJAAN ATAP
1 Pekerjaan Atap Ex. Union Metal Tebal 0.5 mm Klip - Lok m²
2 Atap Sky light Fibre Glass tebal 1,2 mm m²
3 Alumunium foil Primary Smart Form 6,5 mm m²
4 Talang air zincalum m
5 Lisplank GRC m
6 Talang air m
G. SANITAIR
1 Closed Duduk ex Toto type CW 420/S 516 ESS lengkap aksesories bh
2 Urinoir lengkap dengan aksesoris setara type U 57 M bh
3 Wastafel gantung lengkap dengan aksesoris setara type LW 240 CJW bh
4 Jet washer setara type TX 403 SV3 bh
5 Kran dinding bh
6 Partisi Urinoir setara type A 50 bh
7 Kaca cermin m2
8 Tisue holder bh
9 Hand Dryer bh
10 Soap desh bh
11 Cove ligth wastafel bh
12 Zink satu lubang + accessories bh
13 Floor drain setara type TX 1 B bh
H. BAHAN FINISHING
1 Plamur (1 pail = @ 20 kg) kg
2 Cat emultion paint (1 pail = @ 25 kg) kg
3 Cat weathershield (1 pail = @ 25 kg) kg
2DAFTAR HARGA SATUAN BAHAN DAN UPAH PEKERJAAN PEMBANGUNAN GEDUNG OLAH RAGA RSUD WALED KABUPATEN CIREBON
NO URAIAN HARGA SATUAN
4 Dempul kg
5 Meni Duco kg
6 Cat Duco kg
7 Thinner ltr
8 Cat marka thermoplastic kg
9 Minyak Cat Nippon Paint - Thinner Melamic ( 1 ltr ) liter
10 Glass Bit kg
11 Allumunium Composite Panel m²
b. Hardware:
1 Kunci Swing set
2 Lever Handle set
3 Mortise Lock set
4 Cylinder set
5 Door closer set
6 Engsel pintu bh
7 Friction Stay Jendela bh
8 Friction Stay Bouvenlight bh
9 Kunci tanam Flush Bolt FB 040 S/S 8 + 18 SSS set
10 Door stoper bh
11 Window Handle bh
c. Material
1 Alumunium Kusen Pintu Powder Coating m
2 Alumunium Kusen Jendela Powder Coating m
3 Alumunium Frame Jendela Powder Coating m
4 Rangka hollow alumunium 38x38 t:1mm ex. Alexindo atau setara m
5 Louvre Grill Alumunium m2
6 Curtain Wall kaca green stopsol 8 mm ex. Asaimas (terpasang) m2
7 Besi UNP C / Channel 150 x 50 x 20 x 3,2 m
8 Kaca tempered 10 mm Clear/ Polos+kaca film m2
9 Kaca Stopsol 12 mm Silver Green ex. Asahimas + Perkuatan m2
10 Kaca Stopsol 8 mm Silver Green ex. Asahimas m2
11 Kaca Stopsol 6 mm Silver Green ex. Asahimas m2
12 Kaca Es t = 5 mm m2
13 Kaca Polos 8 mm ex Asaimas m2
14 Kaca Polos 6 mm ex Asaimas m2
15 Skrup fixer bh
16 Sealent tube
17 Sealent dengan lakban ex. GE/ Wacker non stain atau setara m2
18 Profil kaca m
19 Hand Railling tangga m
- Pipa besi stainless steel Ø2"
3DAFTAR HARGA SATUAN BAHAN DAN UPAH PEKERJAAN PEMBANGUNAN GEDUNG OLAH RAGA RSUD WALED KABUPATEN CIREBON
NO URAIAN HARGA SATUAN
BAHAN ELEKTRIKAL
1 Pasang listrik /Wiring 135,000.00 Ttk
2 Lampu RM 2 X 16 Watt LED 255,000.00 Bh
3 Lampu Downlight LED (16W) 68,000.00 Bh
4 Lampu Downlight LED (16W) OUTBOW 110,000.00 Bh
5 Lampu Sorot LED 50 watt 70,000.00 Bh
6 Exhaust Fan 100 W 512,000.00 Bh
7 Isolator 50,000.00 Bh
8 Las Doof 500.00 Bh
9 Fiting Plafond 10,000.00 Bh
10 T dos PVC 10,000.00 Bh
11 Stop Kontak Wall Type 12,000.00 Bh
12 Saklar tunggal 15,000.00 Bh
13 Saklar ganda 17,500.00 Bh
14 Kabel NYM 300/750 Volt 3x2,5 mm2 11,400.00 M1
15 Kabel NYM 300/750 Volt 3x4 mm2 19,500.00 M2
16 Kabel NYY 0,6/1 Kv 4x4 mm2 14,000.00 M1
17 Kabel NYY 0,6/1 Kv 4x6 mm2 14,000.00 M1
18 Kabel NYY 0,6/1 Kv 4x10 mm2 14,000.00 M1
19 Kabel NYY 0,6/1 Kv 4x16 mm2 14,000.00 M1
20 Pipa Konduit HI dia.20 mm 10,000.00 M1
21 Splitzen T=1 meter, pipa galvanized c/w : peralatan bantu 250,000.00
22 Bak kontrol 40x40x30 cm 250,000.00
23 Down Conduktor BC 50mm + accessories 250,000.00
KOMPONEN PANEL
4DAFTAR HARGA SATUAN BAHAN DAN UPAH PEKERJAAN PEMBANGUNAN GEDUNG OLAH RAGA RSUD WALED KABUPATEN CIREBON
NO URAIAN HARGA SATUAN
BAHAN VALVE
1 Gate valve 10K 3/4" (20 mm) bh
2 Gate valve 10K 1" (25 mm) bh
3 Gate valve 10K 1,25" (32 mm) bh
4 Gate valve 10K 1,5" (40 mm) bh
5 Gate valve 10K 2" (50 mm) bh
6 Gate valve 10K 2,5" (65 mm) bh
7 Gate valve 10K 3" (80 mm) bh
8 Roof drain 2" (50 mm) bh
9 Roof drain 3" (80 mm) bh
10 Floor drain 2" (50 mm) bh
5DAFTAR HARGA SATUAN BAHAN DAN UPAH PEKERJAAN PEMBANGUNAN GEDUNG OLAH RAGA RSUD WALED KABUPATEN CIREBON
NO URAIAN HARGA SATUAN
PERALATAN HYDRANT
1 Fire Extinguisher Type CO2 Class B,C Kap. 6 kg bh
2 Fire Extinguisher Type Class A,B,C Kap. 3,5 kg bh
D. LAIN - LAIN
1 Air ltr
2 Paku kg
3 Paku roofing 7 cm m2
4 Paku Pancing 6 x 2 , 3 cm kg
5 Minyak bekisiting ltr
6 Paku biasa kg
7 Baut 3/4" pcs
8 Baut 5/8" pcs
9 Baut 1/2" pcs
10 Besi strip kg
11 Seng Gelombang lbr
12 Seng plat m²
13 Signate plat tebal 0,6 mm cm
14 Signate LOGO plat tebal 0,6 mm cm
15 Besi Hollow 40 x 40 m
16 Jendela nako bh
17 Kaca polos m²
18 Kunci tanam bh
19 Roll Cat bh
20 Amplas lbr
21 Kape bh
22 Kawat beton kg
23 Skrup bh
24 Paku ramset+misiu bh
25 Gantungan bh
26 Jointing Coumpond kg
27 Joint Tape @ 75 m roll
28 Siku metal furing L.2.5 cm m
29 Canal C metal furing C.2 x 3 x 2 cm m
30 Lem/adhesive ltr
31 Signage room bh
32 Signage toilet bh
33 Urugan tanah humus m3
34 Penanaman rumput gajah mini dan teh-tehan m²
35 Penanaman pohon bougenvile m²
36 Penanaman pohon angsana m²
37 Wheel Loader jam
38 Motor Grader jam
39 Vibrator Roller jam
40 Water Tanker jam
41 Pneumatic Tire Roller jam
42 Dump truck 3-4 ton jam
43 Asphalt Spray jam
44 Compressor jam
45 Asphalt Mixing Plant jam
46 Asphalt finisher jam
6DAFTAR HARGA SATUAN BAHAN DAN UPAH PEKERJAAN PEMBANGUNAN GEDUNG OLAH RAGA RSUD WALED KABUPATEN CIREBON
NO URAIAN HARGA SATUAN
7DAFTAR HARGA SATUAN BAHAN DAN UPAH PEKERJAAN PEMBANGUNAN GEDUNG OLAH RAGA RSUD WALED KABUPATEN CIREBON