HARGA SATUAN
NO. JENIS BAHAN BANGUNAN SAT. ( Rp. )
1 2 3 4
16 Keramik dinding motif batu alam / batu sisir uk. 20 x 40 cm /25 x 40 cm/ 40 x40 m2 100,000.00
cm Ex. Roman / Centro
17 Mamer prasasti uk. 10 x 25 cm dengan tulisan " Ruang Kelas ini direhabilitasi oleh Bh 150,000.00
DAK 2021 "
18 Batu templek acak purwakarta m2 77,000.00
19 Grafel U 20 cm m1 22,200.00
20 Air ltr 25.00
21 Ijuk m3 15,000.00
22 Glass blok uk. 20 x 20 cm bh 32,500.00
23 Kaca bening T. 5 mm ( asahi ) m2 105,000.00
24 Sealent kg 25,000.00
25 Semen PC / 50 Kg ( SCG, Merah putih, Rajawali / Standar SNI ) Kg 1,200.00
26 Semen putih kg 9,000.00
27 Semen warna kg 9,500.00
28 Plamir tembok kg 18,000.00
29 Plamir kayu kg 26,000.00
30 Cat tembok Sanlex kg 30,000.00
31 Cat dasar ( sealer ) kg 30,000.00
32 Cat tembok Lenkote Supersil kg 85,000.00
33 Menie kayu kg 40,000.00
34 Cat kayu F -Thalie kg 65,000.00
35 Cat besi SEIV kg 65,000.00
36 Melamine Sending Sealer MSS 123( 2 x) ltr 68,000.00
37 Melamic top coat ML 131 kg 65,000.00
38 Wood stain WS162B colour ltr 45,000.00
39 Dempul kayu infra ( Wood filler ) kg 28,500.00
40 Terpentin ltr 30,000.00
41 Thiner ltr 42,000.00
42 Rol cat tembok + bak cat bh 28,500.00
43 Kape tembok bh 14,000.00
44 Kape kayu bh 13,000.00
45 Kwas 3'' bh 18,000.00
46 Ampelas lbr 4,000.00
47 Lem kuning ( Aibond ) kg 37,000.00
48 Lem kayu putih fox kg 28,500.00
49 Kayu Terentang / Albasia m3 1,850,000.00
50 Kayu Papan klas II lokal / kampung m3 3,200,000.00
51 Kayu Balok klas II lokal /kampung m3 3,000,000.00
52 Kayu Klas III lokal m3 2,250,000.00
53 Kayu Mahoni m3 3,000,000.00
54 List profil kayu kls II 1 cm m1 4,500.00
55 List profil kayu kls II 3 cm m1 5,000.00
56 List kayu kls II 1 x 2 cm m1 4,500.00
57 List kayu kls II 1 x 4 cm m1 5,500.00
58 Multiplek 18 mm uk. 122 x 244 cm lbr 240,000.00
59 Multiplek 15 mm uk. 122 x 244 cm lbr 195,000.00
NO. JENIS BAHAN BANGUNAN SAT. HARGA SATUAN
( Rp. )
1 2 3 4
66 Kusen alumunium standar SNI 4 "warna silver lengkap gasket dan sealen terpasang m1 120,000.00
Kusen alumunium standar SNI 4 "warna hitam / coklat lengkap gasket dan sealen
67 terpasang m1 110,000.00
68 Daun jendela alumunium standar SNI casment warna silver+ kaca bening 5 mm m2 775,000.00
lengkap axcesories
Daun jendela alumunium standar SNI casment warna hitam / coklat + kaca bening
69 5 mm lengkap axcesories m2 875,000.00
70 Jalusi datar alumunium standar SNI bahan hollow alumunium 2/4 warna hitam / m2 700,000.00
coklat
71 Karet C kusen / Pintu alumunium type 078 penjepit kaca m1 2,500.00
72 Besi beton U - 24 Rata - rata kg 13,750.00
73 Kawat beton kg 20,000.00
74 Paku 1 cm s/d 3 cm kg 20,000.00
75 Paku 4 cm s/d 7 cm kg 18,500.00
76 Paku 8 cm s/d 12 cm kg 18,000.00
77 Paku / sekrup GRC kg 45,000.00
78 Paku beton 2 cm s/d 5 cm bh 2,500.00
79 Sekerup baja ringan ( Srew driver ) bh 180.00
80 Dynabol Ø 12 x 120 mm bh 2,500.00
81 Rangka Atap baja ringan zincalum terpasang untuk genteng metal pasir m2 144,000.00
82 Reng canai dingin 0,45 SNI m1 5,835.00
83 Talang jurai canal dingin Zincakum m1 65,000.00
84 Genteng metal pasir uk 2 x 4 , tebal minimal 0,25 mm m2 30,000.00
85 Genteng metal polos uk 2 x 4 , tebal minimal 0,25 mm m2 28,500.00
86 Nok atas U metal pasir, tebal min. 0,25 mm M1 45,000.00
87 Nok atas C metal pasir, tebal min. 0,25 mm M1 25,000.00
88 Nok atas V metal pasir, tebal min. 0,25 mm M1 30,000.00
89 Nok sisi / pinggir metal pasir, tebal min. 0,25 mm M1 55,000.00
90 Nok atas U metal polos, tebal min. 0,25 mm M1 40,000.00
91 Nok atas C metal polos, tebal min. 0,25 mm M1 20,000.00
92 Nok atas V metal polos, tebal min. 0,25 mm M1 25,000.00
93 Nok sisi / pinggir metal polos, tebal min. 0,25 mm M1 50,000.00
94 Genteng Plentong glazuur Ex Jatiwangi bh 3,200.00
95 Genteng sisi glazuur ( genteng list plank ) kanan kiri bh 35,000.00
96 Nok / Bubung genteng plentong glazuur type bulat bh 15,500.00
97 Genteng Plentong Ex Jatiwangi natural bh 2,300.00
98 Genteng sisi ( genteng list plank ) kanan kiri natural bh 30,000.00
99 Nok / Bubung genteng plentong type bulat natural bh 13,000.00
100 Genteng kaca plentong bh 27,500.00
101 Lisplank GRC T. 9 mm, L. 30 cm ,P. 2,40 m lbr 70,000.00
102 Lisplank GRC T. 9 mm, L. 20 cm ,P. 2,40 m lbr 60,000.00
103 Lisplank GRC T. 9 mm, T. 10 cm ,P. 2,40 m lbr 45,000.00
104 Jabesmen / GRC uk. 100 x 100 cm T. 4 mm lbr 19,500.00
105 GRC board uk. 122 x 244, T. 4 mm Merek GRC lbr 68,500.00
106 Lampu Down light Led DN 020 B CW 18 watt Ex. Phillips bh 131,000.00
107 Lampu Down light Led DN 020 B CW 10,5 watt Ex. Phillips bh 92,500.00
108 Lampu SL. 18 watt Phillips bh 65,000.00
109 Fitting plafond brocco / panasonic bh 12,000.00
110 NYM Standar SNI.04-02698 SPLN42.2 3 X 2.5 mm2 standar PLN m1 13,640.00
111 NYM Standar SNI.04-02698 SPLN42.2 3 X 1.5 mm2 standar PLN m1 10,450.00
112 NYM Standar SNI.04-02698 SPLN42.2 2 X 2.5 mm2 standar PLN m1 10,670.00
113 NYM Standar SNI.04-02698 SPLN42.2 2 X 1.5 mm2 standar PLN m1 6,700.00
114 Paku Klem Utk Kabel Legrand 4 mm (@50 pcs) dus 15,000.00
115 Pipa Conduit Clipsal 20mm per m' putih m1 4,500.00
116 Kom listik kotak persegi panasonic bh 1,800.00
117 T - dus cabang bh 3,000.00
118 Saklar Brocco / Panasonic Integra (tunggal) bh 19,000.00
NO. JENIS BAHAN BANGUNAN SAT. HARGA SATUAN
( Rp. )
1 2 3 4
HARGA UPAH
NO JENIS PEKERJA BANGUNAN SATUAN WAKTU
Rp.
1 2 3 4 5 6=(3x5)
1 1 M1 PEKERJAAN PASANGAN BOUWPLANK
Kayu 5/7 kayu Terentang 0.0360 m3 2,250,000.00 81,000.00
Papan 3/20 kayu terentang 0.0210 m3 1,850,000.00 38,850.00
Paku 5 - 7 0.0600 kg 18,500.00 1,110.00
Pekerja 0.3000 oh 90,000.00 27,000.00
Tk. Kayu 0.3000 oh 110,000.00 33,000.00
Kep. Tukang 0.0300 oh 120,000.00 3,600.00
Mandor 0.0150 oh 130,000.00 1,950.00
Jumlah 0 186,510.00
Keuntungan Max. 0.3000 186,510.00 55,953.00
PPN 10% - 24,246.30
Jumlah Total 0 266,709.30
2 1 M3 PEKERJAAN GALIAN TANAH BIASA MAX. KEDALAMAN 1 M1 0
Pekerja 2.2500 oh 90,000.00 202,500.00
Mandor 0.0750 oh 130,000.00 9,750.00
Jumlah 0 212,250.00
Keuntungan Max 0.3000 212,250.00 63,675.00
PPN 10% - 27,592.50
Jumlah Total 0 303,517.50
3 1 M3 PEKERJAAN URUGAN TANAH KEMBALI 0
Pekerja 1.5000 oh 90,000.00 135,000.00
Mandor 0.1500 oh 130,000.00 19,500.00
Jumlah 0 154,500.00
Keuntungan Max 0.3000 154,500.00 46,350.00
PPN 10% - 20,085.00
Jumlah Total 0 220,935.00
4 1 M3 PEKERJAAN URUGAN PASIR URUG 0.0000
Pasir urug 3.6000 m3 100,000.00 360,000.00
Pekerja 0.9000 oh 90,000.00 81,000.00
Mandor 0.0300 oh 130,000.00 3,900.00
Jumlah 0.0000 444,900.00
Keuntungan Max 0.3000 444,900.00 133,470.00
PPN 10% - 57,837.00
Jumlah Total 0 636,207.00
5 1 M3 PEKERJAAN LANTAI KERJA 1 PC : 3 PS : 5 KRL 0.0000
PC ( 50 kg ) 593.4000 kg 1,200.00 712,080.00
Pasir beton 1.6500 m3 235,000.00 387,750.00
Split pecah mesin 2/3 2.7900 m3 245,000.00 683,550.00
Air 645.0000 Ltr 25.00 16,125.00
Pekerja 1.5000 oh 90,000.00 135,000.00
Tukang batu 1.1250 oh 110,000.00 123,750.00
Kepala tukang 0.1125 oh 120,000.00 13,500.00
Mandor 0.0225 oh 130,000.00 2,925.00
Jumlah 0.0000 2,074,680.00
Keuntungan Max 0.3000 2,074,680.00 622,404.00
PPN 10% - 269,708.40
Jumlah Total 0 2,966,792.40
6 1 M3 PEKERJAAN COR BETON SITE MIX K. 175 0.0000
Semen PC ( 50 kg ) 960.0000 kg 1,200.00 1,152,000.00
Pasir Beton ( 760 kg ) 1.8168 m3 235,000.00 426,948.00
Split Pecah Mesin 2/3 ( 1029 kg ) 2.5725 m3 245,000.00 630,262.50
Air 645.0000 Ltr 25.00 16,125.00
Pekerja 4.9500 oh 90,000.00 445,500.00
Tukang batu 0.8250 oh 110,000.00 90,750.00
Kepala tukang 0.0840 oh 120,000.00 10,080.00
Mandor 0.2490 oh 130,000.00 32,370.00
Jumlah 0.0000 2,804,035.50
Keuntungan Max 0.3000 2,804,035.50 841,210.65
No. URAIAN KOEF SAT. HARGA SAT JUMLAH
1 2 3 4 5 6=(3x5)
PPN 10% - 364,524.62
Jumlah Total 0 4,009,770.77
No. URAIAN KOEF SAT. HARGA SAT JUMLAH
1 2 3 4 5 6=(3x5)
7 10 KG PEKERJAAN BESI BETON TERPASANG POLOS / ULIR 0.0000
Besi beton rata-rata 31.5000 kg 13,750.00 433,125.00
Kawat beton 0.4500 kg 20,000.00 9,000.00
Pekerja 0.2100 oh 90,000.00 18,900.00
Tukang besi beton 0.2100 oh 110,000.00 23,100.00
Kepala tukang 0.0210 oh 120,000.00 2,520.00
Mandor 0.0120 oh 130,000.00 1,560.00
Jumlah 0.0000 488,205.00
Keuntungan Max 0.3000 488,205.00 146,461.50
PPN 10% - 63,466.65
Jumlah Total 0 698,133.15
1 Kg besi beton polos / besi ulir 0.3000 698,133.15 209,439.95
8 1 M2 PEKERJAAN BEKISTING DENGAN PAPAN 0.0000
Kaso 5/7 kayu terentang ( 2 x pakai ) 50% 0.0510 m3 925,000.00 47,175.00
Papan terentang ( 2 x pakai ) 75 % 0.0720 m3 1,387,500.00 99,900.00
Paku 5 - 7 cm 0.6000 kg 18,500.00 11,100.00
Pekerja 0.3600 oh 90,000.00 32,400.00
Tukang kayu 0.4500 oh 110,000.00 49,500.00
Kepala tukang 0.4500 oh 120,000.00 54,000.00
Mandor 0.1500 oh 130,000.00 19,500.00
Pekerja ( bongkar cetakan ) 0.3600 oh 90,000.00 32,400.00
Jumlah 0.0000 345,975.00
Keuntungan Max 0.3000 345,975.00 103,792.50
PPN 10% - 44,976.75
Jumlah Total 0 494,744.25
9 1 M3 PEKERJAAN PASANG AANSTAMPING BATU BELAH 0.0000
Batu Belah 3.6000 m3 200,000.00 720,000.00
Pasir urug 1.2960 m3 100,000.00 129,600.00
Pekerja 1.1700 oh 90,000.00 105,300.00
Tukang batu 0.1170 oh 110,000.00 12,870.00
Kepala tukang 0.1170 oh 120,000.00 14,040.00
Mandor 0.0510 oh 130,000.00 6,630.00
Jumlah 0.0000 988,440.00
Keuntungan Max 0.3000 988,440.00 296,532.00
PPN 10% - 128,497.20
Jumlah Total 0 1,413,469.20
10 1 M3 PEKERJAAN PASANG PONDASI BATU BELAH 1 : 5 0.0000
Batu belah 3.6000 m3 200,000.00 720,000.00
PC ( 50 kg ) 408.0000 kg 1,200.00 489,600.00
Pasir pasang 1.6320 m3 200,000.00 326,400.00
Pekerja 4.5000 oh 90,000.00 405,000.00
Tukang batu 2.2500 oh 110,000.00 247,500.00
Kepala tukang 0.2250 oh 120,000.00 27,000.00
Mandor 0.2250 oh 130,000.00 29,250.00
Jumlah 0.0000 2,244,750.00
Keuntungan Max 0.3000 2,244,750.00 673,425.00
PPN 10% - 291,817.50
Jumlah Total 0 3,209,992.50
11 1 M2 PAS. BATA MERAH JUMBO DIPASANG BERDIRI 1 : 5 0.0000
Bata Merah Jumbo dipasang berdiri 123.0000 bh 1,000.00 123,000.00
PC ( 50 kg ) 22.9500 kg 1,200.00 27,540.00
Pasir pasang 0.0930 m3 200,000.00 18,600.00
Pekerja 0.5040 org 90,000.00 45,360.00
Tukang batu 0.2277 org 110,000.00 25,047.00
Kepala Tukang 0.0202 org 120,000.00 2,419.20
Mandor 0.0020 org 130,000.00 257.40
Jumlah 0.0000 242,223.60
Keuntungan Max 0.3000 242,223.60 72,667.08
PPN 10% - 31,489.07
Jumlah Total 0 346,379.75
No. URAIAN KOEF SAT. HARGA SAT JUMLAH
1 2 3 4 5 6=(3x5)
12 1 M2 PEKERJAAN PASANG BATA MERAH AD. 1 : 5 ( 1/2 BATA ) 0.0000
Bata Merah 210.0000 bh 900.00 189,000.00
PC ( 50 kg ) 29.0400 kg 1,200.00 34,848.00
Pasir pasang 0.1350 m3 200,000.00 27,000.00
Pekerja 0.9000 oh 90,000.00 81,000.00
Tukang batu 0.3000 oh 110,000.00 33,000.00
Kepala tukang 0.0300 oh 120,000.00 3,600.00
Mandor 0.0450 oh 130,000.00 5,850.00
Jumlah 0.0000 374,298.00
Keuntungan Max 0.3000 374,298.00 112,289.40
PPN 10% - 48,658.74
Jumlah Total 0 535,246.14
13 1 M2 PEKERJAAN PASANG BATA MERAH AD. 1 : 5 ( 1 BATA ) 0.0000
Bata Merah 420.0000 bh 850.00 357,000.00
PC ( 50 kg ) 66.6000 kg 1,200.00 79,920.00
Pasir pasang 0.3060 m3 185,000.00 56,610.00
Pekerja 1.8000 oh 80,000.00 144,000.00
Tukang batu 0.6000 oh 100,000.00 60,000.00
Kepala tukang 0.0600 oh 110,000.00 6,600.00
Mandor 0.0900 oh 125,000.00 11,250.00
Jumlah 0.0000 715,380.00
Keuntungan Max 0.3000 715,380.00 214,614.00
PPN 10% - 92,999.40
Jumlah Total 0 1,022,993.40
14 1 M2 PEKERJAAN PLESTERAN DINDING AD. 1 : 5 TEBAL 15 MM 0.0000
PC ( 50 kg ) 12.5520 kg 1,200.00 15,062.40
Pasir pasang 0.0780 m3 200,000.00 15,600.00
Pekerja 0.9000 oh 90,000.00 81,000.00
Tukang batu 0.4500 oh 110,000.00 49,500.00
Kepala tukang 0.0450 oh 120,000.00 5,400.00
Mandor 0.0450 oh 130,000.00 5,850.00
Jumlah 0.0000 172,412.40
Keuntungan Max 0.3000 172,412.40 51,723.72
PPN 10% - 22,413.61
Jumlah Total 0 246,549.73
15 1 M2 PEKERJAAN ACIAN DINDING 0.0000
PC ( 50 kg ) 9.7500 Kg 1,200.00 11,700.00
Pekerja 0.6000 OH 90,000.00 54,000.00
Tukang Batu 0.3000 OH 110,000.00 33,000.00
Kepala Tukang 0.0300 OH 120,000.00 3,600.00
Mandor 0.0300 OH 130,000.00 3,900.00
Jumlah 0.0000 106,200.00
Keuntungan Max 0.3000 106,200.00 31,860.00
PPN 10% - 13,806.00
Jumlah Total 0 151,866.00
16 1 M2 PEKERJAAN PASANG ROOSTER BETON BIASA UK. 20 x 20 CM 0.0000
Rooster beton 75.0000 bh 15,000.00 1,125,000.00
Pekerja 0.8400 oh 90,000.00 75,600.00
Tukang batu 1.9500 oh 110,000.00 214,500.00
Kepala tukang 0.0795 oh 120,000.00 9,540.00
Mandor 0.0240 oh 130,000.00 3,120.00
Jumlah 0.0000 1,427,760.00
Keuntungan Max 0.3000 1,427,760.00 428,328.00
PPN 10% - 185,608.80
Jumlah Total 0 2,041,696.80
No. URAIAN KOEF SAT. HARGA SAT JUMLAH
1 2 3 4 5 6=(3x5)
17 1 M2 PEKERJAAN PASANG ROOSTER BETON MINIMALIS UK. 20 x 20 CM 0.0000
Rooster beton 75.0000 bh 17,000.00 1,275,000.00
Pekerja 0.8400 oh 90,000.00 75,600.00
Tukang batu 1.9500 oh 110,000.00 214,500.00
Kepala tukang 0.0795 oh 120,000.00 9,540.00
Mandor 0.0240 oh 130,000.00 3,120.00
Jumlah 0.0000 1,577,760.00
Keuntungan Max 0.3000 1,577,760.00 473,328.00
PPN 10% - 205,108.80
Jumlah Total 0 2,256,196.80
18 1 M2 PEKERJAAN PASANG ROOSTER BETON LOBANG 9 UK. 30 x 30 CM 0.0000
Rooster beton 33.0000 bh 30,000.00 990,000.00
Pekerja 0.8400 oh 90,000.00 75,600.00
Tukang batu 1.9500 oh 110,000.00 214,500.00
Kepala tukang 0.0795 oh 120,000.00 9,540.00
Mandor 0.0240 oh 130,000.00 3,120.00
Jumlah 0.0000 1,292,760.00
Keuntungan Max 0.3000 1,292,760.00 387,828.00
PPN 10% - 168,058.80
Jumlah Total 0 1,848,646.80
19 1 M2 PEKERJAAN PASANG GLASS BLOCK UK. 20 X 20 CM -
Glass block uk. 20 x 20 cm 75.000 Bh 32,500.00 2,437,500.00
Pekerja 0.840 OH 90,000.00 75,600.00
Tukang Batu 1.950 OH 110,000.00 214,500.00
Kepala Tukang 0.080 OH 120,000.00 9,540.00
Mandor 0.024 OH 130,000.00 3,120.00
Jumlah 0.0000 2,740,260.00
Keuntungan Max 0.3000 2,740,260.00 822,078.00
PPN 10% - 356,233.80
Jumlah Total 0 3,918,571.80
20 PEKERJAAN CRUCUK BAMBU BAWAH PONDASI FOOT PLAT 5 TITIK CRUCUK / FOOT PL -
Bambu uk. Ø8 cm 3.000 Bh 11,000.00 33,000.00
Pekerja 0.840 OH 90,000.00 75,600.00
Tukang Batu 1.950 OH 110,000.00 214,500.00
Kepala Tukang 0.080 OH 120,000.00 9,540.00
Mandor 0.024 OH 130,000.00 3,120.00
Jumlah 0.0000 335,760.00
Keuntungan Max 0.3000 335,760.00 100,728.00
PPN 10% - 43,648.80
Jumlah Total 0 480,136.80
21 1 M1 PEKERJAAN PENGADAAN DAN PASANG KUSEN ALUMUNIUM 3" SNI WAR 0.0000
Kusen Alumunium 3" SNI warna silver terpasang lengkap gasket dan sealent 3.0000 m1 100,000.00 300,000.00
Kusen Alumunium 3" SNI warna hitam / coklat terpasang lengkap gasket dan sealent 3.0000 m1 110,000.00 330,000.00
Daun Jendela Alumunium casment warna Silver SNI + kaca bening 5 mm, lengkap
3.0000 M2 775,000.00 2,325,000.00
gasket, sealent , dan slot jendela alumunium terpasang
1 2 3 4 5 6=(3x5)
PPN 10% - 302,250.00
Jumlah Total 0 3,324,750.00
Daun Jendela Alumunium casment warna hitam / coklat SNI + kaca bening 5 mm,
3.0000 M2 875,000.00 2,625,000.00
lengkap gasket, sealent , dan slot jendela alumunium terpasang
Jalusi datar Alumunium bahan hollow alumunium 2/4 warna hitam / coklat SNI
3.0000 M2 700,000.00 2,100,000.00
terpasang
Jumlah 0.0000 2,100,000.00
Keuntungan Max 0.3000 2,100,000.00 630,000.00
PPN 10% - 273,000.00
Jumlah Total 0 3,003,000.00
No. URAIAN KOEF SAT. HARGA SAT JUMLAH
1 2 3 4 5 6=(3x5)
26 1 M3 PEKERJAAN PASANG KUSEN KAYU KLAS II 5/14 0.0000
Kayu 6/15 klas II 3.6000 m3 3,000,000.00 10,800,000.00
Paku 8 -12 3.7500 kg 18,000.00 67,500.00
Lem putih ( FOX ) 3.0000 kg 28,500.00 85,500.00
Pekerja 18.0000 oh 90,000.00 1,620,000.00
Tukang kayu 54.0000 oh 110,000.00 5,940,000.00
Kepala tukang 5.4000 oh 120,000.00 648,000.00
Mandor 0.9000 oh 130,000.00 117,000.00
Jumlah 0.0000 19,278,000.00
Keuntungan Max 0.3000 19,278,000.00 5,783,400.00
PPN 10% - 2,506,140.00
Jumlah Total 0 27,567,540.00
27 1 M2 PEKERJAAN PASANG DAUN PINTU PANIL KAYU KLAS II 0.0000
Rangka kayu papan klas II 0.1200 m3 3,200,000.00 384,000.00
Lem putih ( Fox ) 1.5000 kg 28,500.00 42,750.00
Pekerja 3.0000 oh 90,000.00 270,000.00
Tukang kayu 9.0000 oh 110,000.00 990,000.00
Kepala tukang 0.9000 oh 120,000.00 108,000.00
Mandor 0.1500 oh 130,000.00 19,500.00
Jumlah 0.0000 1,814,250.00
Keuntungan Max 0.3000 1,814,250.00 544,275.00
PPN 10% - 235,852.50
Jumlah Total 0 2,594,377.50
28 1 M2 PEKERJAAN PASANG DAUN JENDELA KACA ( TANPA KACA ) 0.0000
Papan kayu klas II 0.0720 m3 3,200,000.00 230,400.00
Lem putih ( Fox ) 0.9000 kg 28,500.00 25,650.00
List kayu 1 cm 12.0000 m' 4,500.00 54,000.00
Pekerja 2.4000 oh 90,000.00 216,000.00
Tukang kayu 7.2000 oh 110,000.00 792,000.00
Kepala tukang 0.7200 oh 120,000.00 86,400.00
Mandor 0.1200 oh 130,000.00 15,600.00
Jumlah 0.0000 1,420,050.00
Keuntungan Max 0.3000 1,420,050.00 426,015.00
PPN 10% - 184,606.50
Jumlah Total 0 2,030,671.50
29 1 M2 PASANG KUDA-KUDA BAJA RINGAN ZINCALUM + RENG UNTUK ATAP GE 0.0000
Rangka atap baja ringan zincalum terpasang 3.0000 M2 144,000.00 432,000.00
Jumlah 0.0000 432,000.00
Keuntungan Max 0.3000 432,000.00 129,600.00
PPN 10% - 56,160.00
Jumlah Total 0 617,760.00
30 1 M2 PEKERJAAN PASANG PENUTUP ATAP GENTENG METAL PASIR UK. 2 x 4 0.0000
Genteng metal pasir uk 2 x 4 , tebal minimal 0,25 mm 4.8600 m2 30,000.00 145,800.00
Paku biasa 1 - 3 0.150 kg 20,000.00 3,000.00
Pekerja 0.6000 oh 90,000.00 54,000.00
Tukang kayu 0.3000 oh 110,000.00 33,000.00
Kepala tukang 0.0300 oh 120,000.00 3,600.00
Mandor 0.0030 oh 130,000.00 390.00
Jumlah 0.0000 239,790.00
Keuntungan Max 0.3000 239,790.00 71,937.00
PPN 10% - 31,172.70
Jumlah Total 0 342,899.70
No. URAIAN KOEF SAT. HARGA SAT JUMLAH
1 2 3 4 5 6=(3x5)
31 1 M2 PEKERJAAN PASANG PENUTUP ATAP GENTENG METAL POLOS UK. 2 x 4 0.0000
Genteng metal polos uk 2 x 4 , tebal minimal 0,25 mm 4.8600 m2 28,500.00 138,510.00
Paku biasa 1 - 3 0.150 kg 20,000.00 3,000.00
Pekerja 0.6000 oh 90,000.00 54,000.00
Tukang kayu 0.3000 oh 110,000.00 33,000.00
Kepala tukang 0.0300 oh 120,000.00 3,600.00
Mandor 0.0030 oh 130,000.00 390.00
Jumlah 0.0000 232,500.00
Keuntungan Max 0.3000 232,500.00 69,750.00
PPN 10% - 30,225.00
Jumlah Total 0 332,475.00
32 1 M1 PEKERJAAN PASANG NOK ATAS TYPE U METAL PASIR 0.0000
Nok metal pasir type U, tebal min. 0,25 mm 3.3000 m1 45,000.00 148,500.00
Paku biasa 1 - 3 0.150 kg 20,000.00 3,000.00
Pekerja 0.3000 oh 90,000.00 27,000.00
Tukang kayu 0.3000 oh 110,000.00 33,000.00
Kepala tukang 0.0300 oh 120,000.00 3,600.00
Mandor 0.0030 oh 130,000.00 390.00
Jumlah 0.0000 215,490.00
Keuntungan Max 0.3000 215,490.00 64,647.00
PPN 10% - 28,013.70
Jumlah Total 0 308,150.70
33 1 M1 PEKERJAAN PASANG NOK ATAS TYPE U METAL POLOS 0.0000
Nok metal polos type U, tebal min. 0,25 mm 3.3000 m1 40,000.00 132,000.00
Paku biasa 1 - 3 0.150 kg 20,000.00 3,000.00
Pekerja 0.3000 oh 90,000.00 27,000.00
Tukang kayu 0.3000 oh 110,000.00 33,000.00
Kepala tukang 0.0300 oh 120,000.00 3,600.00
Mandor 0.0030 oh 130,000.00 390.00
Jumlah 0.0000 198,990.00
Keuntungan Max 0.3000 198,990.00 59,697.00
PPN 10% - 25,868.70
Jumlah Total 0 284,555.70
34 1 M1 PEKERJAAN PASANG NOK SISI / PINGGIR METAL PASIR 0.0000
Nok sisi / pinggir metal pasir,tebal min. 0,25 mm 3.3000 m1 55,000.00 181,500.00
Paku biasa 1 - 3 0.150 kg 20,000.00 3,000.00
Pekerja 0.3000 oh 90,000.00 27,000.00
Tukang kayu 0.3000 oh 110,000.00 33,000.00
Kepala tukang 0.0300 oh 120,000.00 3,600.00
Mandor 0.0030 oh 130,000.00 390.00
Jumlah 0.0000 248,490.00
Keuntungan Max 0.3000 248,490.00 74,547.00
PPN 10% - 32,303.70
Jumlah Total 0 355,340.70
35 1 M1 PEKERJAAN PASANG NOK SISI / PINGGIR METAL POLOS 0.0000
Nok sisi / pinggir metal polos,tebal min. 0,25 mm 3.3000 m1 50,000.00 165,000.00
Paku biasa 1 - 3 0.150 kg 20,000.00 3,000.00
Pekerja 0.3000 oh 90,000.00 27,000.00
Tukang kayu 0.3000 oh 110,000.00 33,000.00
Kepala tukang 0.0300 oh 120,000.00 3,600.00
Mandor 0.0030 oh 130,000.00 390.00
Jumlah 0.0000 231,990.00
Keuntungan Max 0.3000 231,990.00 69,597.00
PPN 10% - 30,158.70
Jumlah Total 0 331,745.70
No. URAIAN KOEF SAT. HARGA SAT JUMLAH
1 2 3 4 5 6=(3x5)
36 1 M2 PEKERJAAN PASANG PENUTUP ATAP GENTENG PLENTONG GLAZUUR 0.0000
Genteng plentong glazuur 75.0000 bh 3,200.00 240,000.00
Pekerja 0.4500 oh 90,000.00 40,500.00
Tukang kayu 0.2250 oh 110,000.00 24,750.00
Kepala tukang 0.0225 oh 120,000.00 2,700.00
Mandor 0.0240 oh 130,000.00 3,120.00
Jumlah 0.0000 311,070.00
Keuntungan Max 0.3000 311,070.00 93,321.00
PPN 10% - 40,439.10
Jumlah Total 0 444,830.10
37 1 M1 PEKERJAAN PASANG BUBUNGAN GENTENG PLENTONG GLAZUUR 0.0000
Bubungan genteng plentong glazuur 15.0000 bh 15,500.00 232,500.00
Semen portland 24.0000 kg 1,200.00 28,800.00
Pasir pasang 0.0960 m3 200,000.00 19,200.00
Pekerja 1.2000 oh 90,000.00 108,000.00
Tukang kayu 0.6000 oh 110,000.00 66,000.00
Kepala tukang 0.0600 oh 120,000.00 7,200.00
Mandor 0.0060 oh 130,000.00 780.00
Jumlah 0.0000 462,480.00
Keuntungan Max 0.3000 462,480.00 138,744.00
PPN 10% - 60,122.40
Jumlah Total 0 661,346.40
38 1 M1 PEKERJAAN PASANG GENTENG SISI ( GENTENG LIS PLANG ) KIRI - KA 0.0000
Genteng sisi kiri - kanan glazuur 15.0000 bh 35,000.00 525,000.00
Paku 2-3 cm 0.1500 Kg 20,000.00 3,000.00
Pekerja 0.3000 oh 90,000.00 27,000.00
Tukang kayu 0.3000 oh 110,000.00 33,000.00
Kepala tukang 0.0300 oh 120,000.00 3,600.00
Mandor 0.0030 oh 130,000.00 390.00
Jumlah 0.0000 591,990.00
Keuntungan Max 0.3000 591,990.00 177,597.00
PPN 10% - 76,958.70
Jumlah Total 0 846,545.70
39 1 M' PEKERJAAN PASANG LIST PLANK GRC L. 20 CM , T. 0,9 CM 0
List plank GRC. L. 20 cm, T. 0,9 cm, P. 240 cm 1.2624 btg 60,000.00 75,744.00
Paku 2-3 cm 0.0300 kg 20,000.00 600.00
Pekerja 0.1050 oh 90,000.00 9,450.00
Tukang kayu 0.3000 oh 110,000.00 33,000.00
Kepala tukang 0.0300 oh 120,000.00 3,600.00
Mandor 0.0060 oh 130,000.00 780.00
Jumlah 0.0000 123,174.00
Keuntungan Max 0.3000 123,174.00 36,952.20
PPN 10% - 16,012.62
Jumlah Total 0 176,138.82
40 1 M' PEKERJAAN PASANG LIST PLANK TUMPANG SARI GRC L. 20 CM + L.10 C 0.0000
List plank GRC. L. 20 cm, T. 0,9 cm, P. 240 cm 1.2624 btg 60,000.00 75,744.00
List plank GRC. L. 10 cm, T. 0,9 cm, P. 240 cm 1.2624 btg 45,000.00 56,808.00
Paku 1 - 3 cm 0.3000 kg 20,000.00 6,000.00
Pekerja 0.1200 oh 90,000.00 10,800.00
Tukang kayu 0.4500 oh 110,000.00 49,500.00
Kepala tukang 0.0450 oh 120,000.00 5,400.00
Mandor 0.0090 oh 130,000.00 1,170.00
Jumlah 0.0000 205,422.00
Keuntungan Max 0.3000 205,422.00 61,626.60
PPN 10% - 26,704.86
Jumlah Total 0 293,753.46
No. URAIAN KOEF SAT. HARGA SAT JUMLAH
1 2 3 4 5 6=(3x5)
41 1 M2 PEKERJAAN PASANG PENUTUP PLAFOND JABESMEN / GRC UK. 100 x 100 0
Kaso - kaso 5/7 Klas III 0.0360 m3 2,250,000.00 81,000.00
Paku segala ukuran 0.1800 kg 18,500.00 3,330.00
Jabesmen /GRC uk. 100 x 100 cm,T. 4 mm 3.3000 lbr 19,500.00 64,350.00
Pekerja 0.5400 oh 90,000.00 48,600.00
Tukang kayu 0.9600 oh 110,000.00 105,600.00
Kepala tukang 0.0960 oh 120,000.00 11,520.00
Mandor 0.0270 oh 130,000.00 3,510.00
Jumlah 0.0000 317,910.00
Keuntungan Max 0.3000 317,910.00 95,373.00
PPN 10% - 41,328.30
Jumlah Total 0 454,611.30
1 2 3 4 5 6=(3x5)
Jumlah Total 0 461,067.75
46 1 M2 PEKERJAAN PASANG LANTAI KERAMIK 40/40 KW 1 DN PUTIH / POLOS 0.0000
Keramik 40/40 kw. 1 DN putih/ polos 3.1500 m2 55,000.00 173,250.00
PC ( 50 kg ) 30.0000 kg 1,200.00 36,000.00
Pasir pasang 0.1350 m3 200,000.00 27,000.00
Semen warna 0.4500 kg 9,500.00 4,275.00
Pekerja 0.7200 oh 90,000.00 64,800.00
Tukang batu 0.3600 oh 110,000.00 39,600.00
Kepala tukang 0.0360 oh 120,000.00 4,320.00
Mandor 0.0360 oh 130,000.00 4,680.00
Jumlah 0.0000 353,925.00
Keuntungan Max 0.3000 353,925.00 106,177.50
PPN 10% - 46,010.25
Jumlah Total 0 506,112.75
No. URAIAN KOEF SAT. HARGA SAT JUMLAH
1 2 3 4 5 6=(3x5)
47 1 M2 PEKERJAAN PASANG DINDING KERAMIK MOTIF BATU ALAM UK. 20 x 40 CM/ 0
Keramik motif batu alam uk. 20x40 cm/ 25x40cm/40x40cm ex Roman / Centro 3.1500 m2 100,000.00 315,000.00
1 2 3 4 5 6=(3x5)
Pekerja 0.2100 oh 90,000.00 18,900.00
Tukang cat 0.0270 oh 110,000.00 2,970.00
Kepala tukang 0.0180 oh 120,000.00 2,160.00
Mandor 0.0090 oh 130,000.00 1,170.00
Jumlah 0.0000 134,628.00
Keuntungan Max 0.3000 134,628.00 40,388.40
PPN 10% - 17,501.64
Jumlah Total 0 192,518.04
No. URAIAN KOEF SAT. HARGA SAT JUMLAH
1 2 3 4 5 6=(3x5)
52 1 M2 PEKERJAAN PENGECATAN MELAMIK 0.0000
Dempul kayu Infra (Wood filer SH 113 ) 0.4500 kg 28,500.00 12,825.00
Wood stain WS162B colour 0.7500 ltr 45,000.00 33,750.00
Melamine Sending Sealer MSS 123( 2 x) 1.0500 ltr 68,000.00 71,400.00
Melamic top coat ML 131 0.7500 ltr 65,000.00 48,750.00
Ampelas kayu 1.5000 lbr 4,000.00 6,000.00
Thiner 1.5000 ltr 42,000.00 63,000.00
Alat bantu ( alat semprot , dll ) 1.5000 ls 235,725.00 353,587.50
Pekerja 0.4200 oh 90,000.00 37,800.00
Tukang cat 0.4200 oh 110,000.00 46,200.00
Kepala tukang 0.0420 oh 120,000.00 5,040.00
Mandor 0.0042 oh 130,000.00 546.00
Jumlah 0.0000 678,898.50
Pengecatan mebel 1.5000 678,898.50 1,018,347.75
Keuntungan Max 0.3000 1,018,347.75 305,504.33
PPN 10% - 132,385.21
Jumlah Total 0 1,456,237.28
53 1 M2 PEKERJAAN PASANG KACA BENING, TEBAL 5 MM 0
Kaca bening T. 5 mm 3.3000 m2 105,000.00 346,500.00
Sealent 0.1500 kg 25,000.00 3,750.00
Pekerja 0.0450 oh 90,000.00 4,050.00
Tukang Kayu 0.4500 oh 110,000.00 49,500.00
Kepala Tukang 0.0450 oh 120,000.00 5,400.00
Mandor 0.0024 oh 130,000.00 312.00
Jumlah 0.0000 409,512.00
Keuntungan Max 0.3000 409,512.00 122,853.60
PPN 10% - 53,236.56
Jumlah Total 0 585,602.16
54 1 BUAH PEKERJAAN PASANG KUNCI PINTU TANAM 2 SLAAG 0
Kunci pintu besar Quatro MINA NP lengkap handle/ Quattro KANA NP lengkap
3.0000 Set 200,000.00 600,000.00
handle Ex. Belucci
Pekerja 0.0300 oh 90,000.00 2,700.00
Tukang kayu 1.5000 oh 110,000.00 165,000.00
Kepala tukang 0.0150 oh 120,000.00 1,800.00
Mandor 0.0015 oh 130,000.00 195.00
Jumlah 0.0000 769,695.00
Keuntungan Max 0.3000 769,695.00 230,908.50
PPN 10% - 100,060.35
Jumlah Total 0 1,100,663.85
55 1 BUAH PEKERJAAN PASANG ENGSEL PINTU KUPU - KUPU 0
Engsel pintu kupu - kupu logam uk 5"x 4" 3.0000 Ps 90,000.00 270,000.00
Pekerja 0.0450 oh 90,000.00 4,050.00
Tukang kayu 0.4500 oh 110,000.00 49,500.00
Kepala tukang 0.0450 oh 120,000.00 5,400.00
Mandor 0.0024 oh 130,000.00 312.00
Jumlah 0.0000 329,262.00
Keuntungan Max 0.3000 329,262.00 98,778.60
PPN 10% - 42,804.06
Jumlah Total 0 470,844.66
56 1 BUAH PEKERJAAN PASANG KAIT ANGIN 0
Hak angin kait logam 3.0000 Bh 28,000.00 84,000.00
Pekerja 0.0300 oh 90,000.00 2,700.00
Tukang kayu 0.3000 oh 110,000.00 33,000.00
Kepala tukang 0.0300 oh 120,000.00 3,600.00
Mandor 0.0015 oh 130,000.00 195.00
Jumlah 0.0000 123,495.00
Keuntungan Max 0.3000 123,495.00 37,048.50
PPN 10% - 16,054.35
Jumlah Total 0 176,597.85
No. URAIAN KOEF SAT. HARGA SAT JUMLAH
1 2 3 4 5 6=(3x5)
57 1 BUAH PEKERJAAN PASANG SELOT JENDELA 0
Slot Jendela 5 cm logam 3.0000 Bh 12,000.00 36,000.00
Pekerja 0.0300 oh 90,000.00 2,700.00
Tukang kayu 0.3000 oh 110,000.00 33,000.00
Kepala tukang 0.0300 oh 120,000.00 3,600.00
Mandor 0.0015 oh 130,000.00 195.00
Jumlah 0.0000 75,495.00
Keuntungan Max 0.3000 75,495.00 22,648.50
PPN 10% - 9,814.35
Jumlah Total 0 107,957.85
58 1 BUAH PEKERJAAN PASANG ENGSEL JENDELA KUPU - KUPU 0
Engsel jendela kupu - kupu logam uk 4"x 3" 3.0000 Ps 75,000.00 225,000.00
Pekerja 0.0450 oh 90,000.00 4,050.00
Tukang kayu 0.4500 oh 110,000.00 49,500.00
Kepala tukang 0.0450 oh 120,000.00 5,400.00
Mandor 0.0024 oh 130,000.00 312.00
Jumlah 0.0000 284,262.00
Keuntungan Max 0.3000 284,262.00 85,278.60
PPN 10% - 36,954.06
Jumlah Total 0 406,494.66
59 1 BUAH PEKERJAAN PASANG ESPANOLETE 0
Espanoleet uk. Sedang Ex. Bellucci 3.0000 Set 110,000.00 330,000.00
Pekerja 0.0600 oh 90,000.00 5,400.00
Tukang kayu 0.6000 oh 110,000.00 66,000.00
Kepala tukang 0.0600 oh 120,000.00 7,200.00
Mandor 0.0030 oh 130,000.00 390.00
Jumlah 0.0000 408,990.00
Keuntungan Max 0.3000 408,990.00 122,697.00
PPN 10% - 53,168.70
Jumlah Total 0 584,855.70
60 1 BUAH PEKERJAAN PASANG TARIKAN JENDELA LOGAM 0
Tarikan jendela logam 3.0000 Bh 15,000.00 45,000.00
Pekerja 0.0300 oh 90,000.00 2,700.00
Tukang kayu 0.3000 oh 110,000.00 33,000.00
Kepala tukang 0.0300 oh 120,000.00 3,600.00
Mandor 0.0015 oh 130,000.00 195.00
Jumlah 0.0000 84,495.00
Keuntungan Max 0.3000 84,495.00 25,348.50
PPN 10% - 10,984.35
Jumlah Total 0 120,827.85
61 1M1 PEKERJAAN PASANG PIPA PVC TIPE AW DIAMETER 0,5" 0
Pipa PVC 0,5" klas AW standar SNI 3.6000 M' 7,625.00 27,450.00
Perlengkapan ( 35% harga pipa) 1.0500 Hrg pipa 7,625.00 8,006.25
Pekerja 0.1080 OH 90,000.00 9,720.00
Tukang Batu 0.1800 OH 110,000.00 19,800.00
Kepala Tukang 0.0180 OH 120,000.00 2,160.00
Mandor 0.0060 OH 130,000.00 780.00
Jumlah 0.0000 67,916.25
Keuntungan Max 0.3000 67,916.25 20,374.88
PPN 10% - 8,829.11
Jumlah Total 0 97,120.24
62 1M1 PEKERJAAN PASANG PIPA PVC TIPE AW DIAMETER 0,75" 0
Pipa PVC 0,75" klas AW standar SNI 3.6000 M' 9,175.00 33,030.00
Perlengkapan ( 35% harga pipa) 1.0500 Hrg pipa 9,175.00 9,633.75
Pekerja 0.1080 OH 90,000.00 9,720.00
Tukang Batu 0.1800 OH 110,000.00 19,800.00
Kepala Tukang 0.0180 OH 120,000.00 2,160.00
Mandor 0.0060 OH 130,000.00 780.00
Jumlah 0.0000 75,123.75
Keuntungan Max 0.3000 75,123.75 22,537.13
No. URAIAN KOEF SAT. HARGA SAT JUMLAH
1 2 3 4 5 6=(3x5)
PPN 10% - 9,766.09
Jumlah Total 0 107,426.96
No. URAIAN KOEF SAT. HARGA SAT JUMLAH
1 2 3 4 5 6=(3x5)
63 1M1 PEKERJAAN PASANG PIPA PVC TIPE AW DIAMETER 2" ( 50 MM ) 0
Pipa PVC O 2" ( 50 mm ) klas AW standar SNI 3.6000 M' 28,625.00 103,050.00
Perlengkapan ( 35% harga pipa) 1.0500 Hrg pipa 28,625.00 30,056.25
Pekerja 0.1620 OH 90,000.00 14,580.00
Tukang Batu 0.2700 OH 110,000.00 29,700.00
Kepala Tukang 0.0270 OH 120,000.00 3,240.00
Mandor 0.0090 OH 130,000.00 1,170.00
Jumlah 0.0000 181,796.25
Keuntungan Max 0.3000 181,796.25 54,538.88
PPN 10% - 23,633.51
Jumlah Total 0 259,968.64
64 1M1 PEKERJAAN PASANG PIPA PVC TIPE AW DIAMETER 2 1/2" 0
Pipa PVC O 2 1/2" klas AW standar SNI 3.6000 M' 33,625.00 121,050.00
Perlengkapan ( 35% harga pipa) 1.0500 Hrg pipa 33,625.00 35,306.25
Pekerja 0.1620 OH 90,000.00 14,580.00
Tukang Batu 0.2700 OH 110,000.00 29,700.00
Kepala Tukang 0.0270 OH 120,000.00 3,240.00
Mandor 0.0090 OH 130,000.00 1,170.00
Jumlah 0.0000 205,046.25
Keuntungan Max 0.3000 205,046.25 61,513.88
PPN 10% - 26,656.01
Jumlah Total 0 293,216.14
65 1M1 PEKERJAAN PASANG PIPA PVC TIPE AW DIAMETER 3" ( 80 MM ) 0
Pipa PVC O 3" ( 75 mm ) klas AW standar SNI 3.6000 M' 51,000.00 183,600.00
Perlengkapan ( 35% harga pipa) 1.0500 Hrg pipa 51,000.00 53,550.00
Pekerja 0.2430 OH 90,000.00 21,870.00
Tukang Batu 0.4050 OH 110,000.00 44,550.00
Kepala Tukang 0.0405 OH 120,000.00 4,860.00
Mandor 0.0123 OH 130,000.00 1,599.00
Jumlah 0.0000 310,029.00
Keuntungan Max 0.3000 310,029.00 93,008.70
PPN 10% - 40,303.77
Jumlah Total 0 443,341.47
66 1M1 PEKERJAAN PASANG PIPA PVC TIPE AW DIAMETER 4" ( 100 MM ) 0
Pipa PVC O 4" ( 100 mm ) klas AW standar SNI 3.6000 M' 85,000.00 306,000.00
Perlengkapan ( 35% harga pipa) 1.0500 Hrg pipa 85,000.00 89,250.00
Pekerja 0.2430 OH 90,000.00 21,870.00
Tukang Batu 0.4050 OH 110,000.00 44,550.00
Kepala Tukang 0.0405 OH 120,000.00 4,860.00
Mandor 0.0120 OH 130,000.00 1,560.00
Jumlah 0.0000 468,090.00
Keuntungan Max 0.3000 468,090.00 140,427.00
PPN 10% - 60,851.70
Jumlah Total 0 669,368.70
67 1 BUAH PEKERJAAN PASANG KLOSET JONGKOK PORSELEN 0
Kloset Jongkok porselen INA 3.0000 Unit 250,000.00 750,000.00
Semen Portland 18.0000 Kg 24.00 432.00
Pasir Pasang 0.0300 M3 200,000.00 6,000.00
Pekerja 3.0000 OH 90,000.00 270,000.00
Tukang Batu 4.5000 OH 110,000.00 495,000.00
Kepala Tukang 0.4500 OH 120,000.00 54,000.00
Mandor 0.4800 OH 130,000.00 62,400.00
Jumlah 0.0000 1,637,832.00
Keuntungan Max 0.3000 1,637,832.00 491,349.60
PPN 10% - 212,918.16
Jumlah Total 0 2,342,099.76
No. URAIAN KOEF SAT. HARGA SAT JUMLAH
1 2 3 4 5 6=(3x5)
68 1 BUAH PEKERJAAN PASANG KRAN TEMBOK Ø 0,75' ATAU 0,5" 0
Kran tembok ( kran air ) Ø 1/2" Kit 3.0000 Bh 29,500.00 88,500.00
Seal tape 0.0750 Bh 7,500.00 562.50
Pekerja 0.0300 OH 90,000.00 2,700.00
Tukang Batu 1.2000 OH 110,000.00 132,000.00
Kepala Tukang 0.1200 OH 120,000.00 14,400.00
Mandor 0.0150 OH 130,000.00 1,950.00
Jumlah 0.0000 240,112.50
Keuntungan Max 0.3000 240,112.50 72,033.75
PPN 10% - 31,214.63
Jumlah Total 0 343,360.88
69 1 BUAH PEKERJAAN PASANG FLOOR DRAIN Ø 3" 0
Floor drain Ø 3" plastik 3.0000 Bh 12,500.00 37,500.00
Pekerja 0.0300 OH 90,000.00 2,700.00
Tukang Batu 0.3000 OH 110,000.00 33,000.00
Kepala Tukang 0.0300 OH 120,000.00 3,600.00
Mandor 0.0150 OH 130,000.00 1,950.00
Jumlah 0.0000 78,750.00
Keuntungan Max 0.3000 78,750.00 23,625.00
PPN 10% - 10,237.50
Jumlah Total 0 112,612.50
70 1 BUAH PEKERJAAN PASANG ROOF DRAIN Ø 2" 0
Roof drain Ø 2" stainless 3.0000 Bh 85,000.00 255,000.00
Pekerja 0.0300 OH 90,000.00 2,700.00
Tukang Batu 0.3000 OH 110,000.00 33,000.00
Kepala Tukang 0.0030 OH 120,000.00 360.00
Mandor 0.0015 OH 130,000.00 195.00
Jumlah 0.0000 291,255.00
Keuntungan Max 0.3000 291,255.00 87,376.50
PPN 10% - 37,863.15
Jumlah Total 0 416,494.65
71 1 BUAH PEKERJAAN PASANG CLEAN OUT ( CO ) Ø 4 " 0
Clean Out Ø 4" Stianless 3.0000 Bh 110,000.00 330,000.00
Pekerja 0.0300 OH 90,000.00 2,700.00
Tukang Batu 0.3000 OH 110,000.00 33,000.00
Kepala Tukang 0.0030 OH 120,000.00 360.00
Mandor 0.0015 OH 130,000.00 195.00
Jumlah 0.0000 366,255.00
Keuntungan Max 0.3000 366,255.00 109,876.50
PPN 10% - 47,613.15
Jumlah Total 0 523,744.65
72 1 BUAH PEKERJAAN PASANG KICHENT ZINK 1 LOBANG 0
Kichent Zink 1 lobang ukuran kecil stainless 3.0000 Bh 680,000.00 2,040,000.00
Waterdrain 3.0000 Bh 45,000.00 135,000.00
Pekerja 0.0300 OH 90,000.00 2,700.00
Tukang Batu 1.5000 OH 110,000.00 165,000.00
Kepala Tukang 0.0030 OH 120,000.00 360.00
Mandor 0.0015 OH 130,000.00 195.00
Jumlah 0.0000 2,343,255.00
Keuntungan Max 0.3000 2,343,255.00 702,976.50
PPN 10% - 304,623.15
Jumlah Total 0 3,350,854.65
No. URAIAN KOEF SAT. HARGA SAT JUMLAH
1 2 3 4 5 6=(3x5)
1 2 3 4 5 6=(3x5)
Tukang Listrik 0.0600 OH 110,000.00 6,600.00
Kepala Tukang 0.0300 OH 120,000.00 3,600.00
Mandor 0.0030 OH 130,000.00 390.00
Jumlah 0.0000 338,010.00
Keuntungan Max 0.3000 338,010.00 101,403.00
PPN 10% - 43,941.30
Jumlah Total 0 483,354.30
No. URAIAN KOEF SAT. HARGA SAT JUMLAH
1 2 3 4 5 6=(3x5)
78 1 TTIK PEKERJAAN PASANG INSTALASI SAKELAR KABEL NYM 2 X 1,5 MM 0
, NYM Standar SNI.04-02698 SPLN42.2 2 X 1.5 mm2 12.0000 M1 6,700.00 80,400.00
Pipa Conduit Clipsal 20mm per m' 9.0000 M1 4,500.00 40,500.00
Kom listik kotak persegi panasonic 3.0000 Bh 1,800.00 5,400.00
Pekerja 0.1500 OH 90,000.00 13,500.00
Tukang Listrik 0.0600 OH 110,000.00 6,600.00
Kepala Tukang 0.0300 OH 120,000.00 3,600.00
Mandor 0.0030 OH 130,000.00 390.00
Jumlah 0.0000 150,390.00
Keuntungan Max 0.3000 150,390.00 45,117.00
PPN 10% - 19,550.70
Jumlah Total 0 215,057.70
79 1 BUAH PEKERJAAN PASANG SAKELAR TUNGGAL 0
Saklar Brocco / Panasonic Integra (tunggal) 3.0000 Bh 19,000.00 57,000.00
Pekerja 0.0750 OH 90,000.00 6,750.00
Tukang Listrik 0.1500 OH 110,000.00 16,500.00
Kepala Tukang 0.0150 OH 120,000.00 1,800.00
Mandor 0.0150 OH 130,000.00 1,950.00
Jumlah 0.0000 84,000.00
Keuntungan Max 0.3000 84,000.00 25,200.00
PPN 10% - 10,920.00
Jumlah Total 0 120,120.00
80 1 BUAH PEKERJAAN PASANG SAKELAR SERI 0
Saklar Brocco / Panasonic Plano (seri) 3.0000 Bh 22,500.00 67,500.00
Alat bantu dan kelengkapan 0.3000 lot 67,500.00 20,250.00
Pekerja 0.0750 OH 90,000.00 6,750.00
Tukang Listrik 0.1500 OH 110,000.00 16,500.00
Kepala Tukang 0.0150 OH 120,000.00 1,800.00
Mandor 0.0150 OH 130,000.00 1,950.00
Jumlah 0.0000 114,750.00
Keuntungan Max 0.3000 114,750.00 34,425.00
PPN 10% - 14,917.50
Jumlah Total 0 164,092.50
81 1 BUAH PEKERJAAN PASANG SAKELAR TRIPPLE 0
Saklar Brocco / Panasonic Tripple 3.0000 Bh 36,000.00 108,000.00
Alat bantu dan kelengkapan 0.3000 lot 108,000.00 32,400.00
Pekerja 0.0750 OH 90,000.00 6,750.00
Tukang Listrik 0.1500 OH 110,000.00 16,500.00
Kepala Tukang 0.0150 OH 120,000.00 1,800.00
Mandor 0.0150 OH 130,000.00 1,950.00
Jumlah 0.0000 167,400.00
Keuntungan Max 0.3000 167,400.00 50,220.00
PPN 10% - 21,762.00
Jumlah Total 0 239,382.00
82 1 BUAH PEKERJAAN PASANG SAKELAR HOTEL 0
Saklar Hotel Brocco / Panasonic 3.0000 Bh 45,000.00 135,000.00
Alat bantu dan kelengkapan 0.3000 lot 135,000.00 40,500.00
Pekerja 0.5571 OH 90,000.00 6,750.00
Tukang Listrik 0.1599 OH 110,000.00 16,500.00
Kepala Tukang 0.3459 OH 120,000.00 1,800.00
Mandor 0.0159 OH 130,000.00 1,950.00
Jumlah 0.0000 202,500.00
Keuntungan Max 0.3000 202,500.00 60,750.00
PPN 10% - 26,325.00
Jumlah Total 0 289,575.00
No. URAIAN KOEF SAT. HARGA SAT JUMLAH
1 2 3 4 5 6=(3x5)
83 1 BUAH PEKERJAAN PASANG STOP KONTAK 0
Stop Kontak Brocco / Panasonic-Plano 3.0000 Bh 14,500.00 43,500.00
Alat bantu dan kelengkapan 0.3000 lot 43,500.00 13,050.00
Pekerja 0.5571 OH 90,000.00 6,750.00
Tukang Listrik 0.1599 OH 110,000.00 16,500.00
Kepala Tukang 0.3459 OH 120,000.00 1,800.00
Mandor 0.0159 OH 130,000.00 1,950.00
Jumlah 0.0000 83,550.00
Keuntungan Max 0.3000 83,550.00 25,065.00
PPN 10% - 10,861.50
Jumlah Total 0 119,476.50
84 1 BUAH PEKERJAAN PASANG STOP KONTAK LANTAI 0
Stop Kontak lantai Panasonic 3.0000 Bh 375,000.00 1,125,000.00
Alat bantu dan kelengkapan 0.3000 lot 1,125,000.00 337,500.00
Pekerja 0.5571 OH 90,000.00 50,139.00
Tukang Listrik 0.1599 OH 110,000.00 17,589.00
Kepala Tukang 0.3459 OH 120,000.00 41,508.00
Mandor 0.0159 OH 130,000.00 2,067.00
Jumlah 0.0000 1,573,803.00
Keuntungan Max 0.3000 1,573,803.00 472,140.90
PPN 10% - 204,594.39
Jumlah Total 0 2,250,538.29
85 1 BUAH PEKERJAAN PASANG STOP KONTAK AC 0
Stop Kontak AC Brocco / Panasonic 3.0000 Bh 65,000.00 195,000.00
Alat bantu dan kelengkapan 0.3000 lot 195,000.00 58,500.00
Pekerja 0.5571 OH 90,000.00 50,139.00
Tukang Listrik 0.1599 OH 110,000.00 17,589.00
Kepala Tukang 0.3459 OH 120,000.00 41,508.00
Mandor 0.0159 OH 130,000.00 2,067.00
Jumlah 0.0000 364,803.00
Keuntungan Max 0.3000 364,803.00 109,440.90
PPN 10% - 47,424.39
Jumlah Total 0 521,668.29
86 1 BUAH PEKERJAAN PASANG LAMPU DOWN LIGHT LED DN 020 B CW 18 WATT 0
Lampu Dowb light LED DN 020 B CW 18 watt Ex. Phillips 3.0000 Bh 131,000.00 393,000.00
( 5% harga lampu ) 0.1500 lot 393,000.00 58,950.00
Pekerja 0.1050 OH 90,000.00 9,450.00
Tukang Listrik 0.2100 OH 110,000.00 23,100.00
Kepala Tukang 0.0210 OH 120,000.00 2,520.00
Mandor 0.0210 OH 130,000.00 2,730.00
Jumlah 0.0000 489,750.00
Keuntungan Max 0.3000 489,750.00 146,925.00
PPN 10% - 63,667.50
Jumlah Total 0 700,342.50
87 1 BUAH PEKERJAAN PASANG LAMPU DOWN LIGHT LED DN 020 B CW 10,5 WAT 0
Lampu Dowb light LED DN 020 B CW 10,5 watt Ex. Phillips 3.0000 Bh 92,500.00 277,500.00
( 5% harga lampu ) 0.1500 lot 277,500.00 41,625.00
Pekerja 0.1050 OH 90,000.00 9,450.00
Tukang Listrik 0.2100 OH 110,000.00 23,100.00
Kepala Tukang 0.0210 OH 120,000.00 2,520.00
Mandor 0.0210 OH 130,000.00 2,730.00
Jumlah 0.0000 356,925.00
Keuntungan Max 0.3000 356,925.00 107,077.50
PPN 10% - 46,400.25
Jumlah Total 0 510,402.75
HARGA SATUAN PEKERJAAN
HARGA SATUAN
No. URAIAN SAT.
( Rp )
1 2 3 4
1 PEKERJAAN PASANGAN BOUWPLANK M1 266,709.30
2 PEKERJAAN GALIAN TANAH BIASA MAX. KEDALAMAN 1 M1 M3 303,517.50
3 PEKERJAAN URUGAN TANAH KEMBALI M3 220,935.00
4 PEKERJAAN URUGAN PASIR URUG M3 636,207.00
5 PEKERJAAN LANTAI KERJA 1 PC : 3 PS : 5 KRL M3 2,966,792.40
6 PEKERJAAN COR BETON SITE MIX K. 175 M3 4,009,770.77
7 PEKERJAAN BESI BETON POLOS / ULIR TERPASANG Kg 209,439.95
8 PEKERJAAN BEKISTING DENGAN PAPAN M2 494,744.25
9 PEKERJAAN PASANG AANSTAMPING BATU BELAH M3 1,413,469.20
10 PEKERJAAN PASANG PONDASI BATU BELAH 1 : 5 M3 3,209,992.50
PEKERJAAN PASANG SALURAN AIR HUJAN DARI GREVEL U-20 CM + PAS. PONDASI BATU BELAH
11 DIPLESTER + ACIAN SEPERTI GBR. M1 839,190.92
12 PEKERJAAN PASANG SALURAN AIR HUJAN DARI PASANGAN BATA DIPLESTER + ACIAN SEPERTI GBR. M1 731,082.92
13 PEKERJAAN PASANG SALURAN AIR HUJAN DARI KERIKIL BULAT + PAS. PONDASI BATU BELAH M1 406,072.52
DIPLESTER + ACIAN SEPERTI GBR.
14 PEKERJAAN PASANG BATA MERAH JUMBO DIPASANG BERDIRI AD. 1 : 5 M2 346,379.75
15 PEKERJAAN PASANG BATA MERAH AD. 1 : 5 ( 1/2 BATA ) M2 535,246.14
16 PEKERJAAN PASANG BATA MERAH AD. 1 : 5 ( 1 BATA ) M2 1,022,993.40
17 PEKERJAAN PLESTERAN DINDING AD. 1 : 5 TEBAL 15 MM M2 246,549.73
18 PEKERJAAN ACIAN DINDING M2 151,866.00
19 PEKERJAAN PASANG ROOSTER BETON BIASA UK. 20 x 20 CM M2 2,041,696.80
20 PEKERJAAN PASANG ROOSTER BETON MINIMALIS UK. 20 x 20 CM M2 2,256,196.80
21 PEKERJAAN PASANG ROOSTER BETON LOBANG 9 UK. 30 x 30 CM M2 1,848,646.80
22 PEKERJAAN PASANG GLASS BLOCK UK. 20 X 20 CM M2 3,918,571.80
23 PEK. CRUCUK BAMBU BAWAH PONDASI POOT PLAT, 1 POOT PLAT 5 CRUCUK BAMBU DALAM 120 CM TTK 480,136.80
26 PEKERJAAN PENGADAAN DAN PASANG KUSEN ALUMUNIUM 3" SNI WARNA HITAM / COKLAT M1 471,900.00
PEKERJAAN PENGADAAN DAN PASANG DAUN JENDELA CASMENT ALUMUNIUM SNI WARNA SILVER
27 LENGKAP KACA BENING 5 MM M2 3,324,750.00
PEKERJAAN PENGADAAN DAN PASANG DAUN JENDELA CASMENT ALUMUNIUM SNI WARNA HITAM /
28 COKLAT LENGKAP KACA BENING 5 MM M2 3,753,750.00
PEKERJAAN PENGADAAN DAN PASANG JALUSI DATAR ALUMUNIUM BAHAN HOLLOW ALUMUNIUM 2/4
29 SNI WARNA HITAM / COKLAT M2 3,003,000.00
45 PEKERJAAN PASANG PENUTUP PLAFOND JABESMEN / GRC UK. 100 x 100 CM, T. 4 MM RANGKA KAYU
KLAS III M2 454,611.30
PEKERJAAN PASANG PENUTUP PLAFOND JABESMEN / GRC UK. 100 x 100 CM, T. 4 MM RANGKA KAYU
46 LAMA YANG MASIH BAGUS M2 338,781.30
PEKERJAAN PASANG PENUTUP PLAFOND JABESMEN / GRC UK. 122 x 244 CM, T. 4 MM RANGKA KAYU
47 KLAS III M2 469,557.66
48 PEKERJAAN PASANG PENUTUP PLAFOND JABESMEN / GRC UK. 122 x 244 CM, T. 4 MM RANGKA KAYU
LAMA YANG MASIH BAGUS M2 353,727.66
49 PEKERJAAN PASANG LANTAI KERAMIK UK. 30/30 KW 1 DN PUTIH/ POLOS EX.MULYA M2 461,067.75
50 PEKERJAAN PASANG LANTAI KERAMIK UK. 40/40 KW 1 DN PUTIH/ POLOS EX.MULYA M2 506,112.75
PEKERJAAN PASANG DINDING KERAMIK MOTIF BATU ALAM / BATU SISIR UK.30 x 30 CM / 40x 40 CM EX
51 M2 823,937.40
MULYA
52 PEKERJAAN PENGECATAN DINDING DENGAN CAT SANLEX SAMPAI RATA M2 62,754.12
53 PEKERJAAN PENGECATAN DINDING DENGAN CAT LENKOTE SUPERSIL M2 93,427.62
54 PEKERJAAN PENGECATAN PLAFOND DENGAN CAT DINDING SANLEX M2 88,700.04
55 PEKERJAAN PENGECATAN KAYU DENGAN CAT KAYU F - THALITE BERIKUT MENI M2 192,518.04
56 PEKERJAAN PENGECATAN MELAMIK KAYU M2 1,456,237.28
57 PEKERJAAN PASANG KUNCI PINTU TANAM 2 SLAAG UKURAN SEDANG YALE Bh 1,100,663.85
58 PEKERJAAN PASANG ENGSEL PINTU KUPU - KUPU Bh 470,844.66
59 PEKERJAAN PASANG KAIT ANGIN Bh 176,597.85
88 PEKERJAAN PASANG LAMPU PHILLIPS SL - 18 WATT LENGKAP FITTING PLAFOND BROCO / PANASONIC Bh 96,250.00
HARGA SATUAN
No. URAIAN SAT.
( Rp )
1 2 3 4
RINCIAN
ENGINEER ESTIMATE (EE)
KEGIATAN : PEMBANGUNAN SARANA, PRASARANA DAN UTILITAS SEKOLAH
PEKERJAAN : PEMBANGUNAN 1 ( SATU ) RUANG KELAS BARU SDN BOJONG
LOKASI : KECAMATAN CISOLOK, KABUPATEN SUKABUMI
SUMBER DANA : DANA ALOKASI UMUM (DAU) APBD KABUPATEN SUKABUMI
TAHUN ANGGARAN : 2021
I PEKERJAAN PERSIAPAN
1 Papan bouwplank kayu terentang 22.00 M1 266,709.30 5,867,604.60
2 Papan nama proyek 1.00 Ls 300,000.00 300,000.00
3 Pembersihan halaman bekas pekerjaan 1.00 Ls 750,000.00 750,000.00
4 Mobilisasi dan demobilisasi bahan 1.00 Ls 2,500,000.00 2,500,000.00
5 Dokumentasi, dan administrasi 1.00 Ls 1,260,000.00 1,260,000.00
JUMLAH I 10,677,604.60
II BIAYA K3 KESELAMATAN DAN KESEHATAN KERJA
1 BPJS ( Bagi Pekerja Jasa Konstruksi) / Asuransi 1.00 Ls 265,909.00 265,909.00
2 Sosialisasi dan Promosi K3 1.00 Ls 100,000.00 100,000.00
3 Biaya K3 : Alat Pelindung Kerja dan Alat Pelindung Diri ( APD ) 1.00 Ls 1,690,000.00 1,690,000.00
seperti helem proyek, rompi, sepatu boot , P3K.
4 Personil K3 1.00 Ls 1,500,000.00 1,500,000.00
4 Pekerjaan rabat beton baru bagian depan belakang dan samping T. 5 cm ad. 12.65 M2 148,339.62 1,876,496.19
1Pc : 3Ps :5 Krl dengan finishing acian roll cat
JUMLAH VIII 43,973,180.35
IX PEKERJAAN ATAP
1 Pekerjaan rangka atap baja ringan zincalume 101.68 M2 617,760.00 62,813,836.80
Pekerjaan pasang penutup atap genteng metal pasir uk .2 x 4, tebal min. 0,25
2 mm 103.32 M2 342,899.70 35,428,397.00
3 Pasang nok atas type U metal pasir, tebal min. 0,25 mm 8.20 M2 308,150.70 2,526,835.74
4 Pasang list plank GRC L. 20 cm, T, 9 mm 20.40 M1 176,138.82 3,593,231.93
JUMLAH IX 104,362,301.47
X PEKERJAAN PLAFOND
1 Pas. Penutup plafond GRC uk. 122 x 244 cm T. 4 mm diberi nat 3 mm + rangka 102.86 M2 454,611.30 46,761,318.32
modul 61 x 122 cm kayu klas II baru + list pinggir plafond kayu 1 x4 cm
JUMLAH X 46,761,318.32
XI PEKERJAAN KUNCI DAN ALAT PENGGANTUNG
Pasang Kunci pintu besar Quatro MINA NP lengkap handle/ Quattro KANA NP
1 lengkap handle Ex. Belucci 2.00 Bh 1,100,663.85 2,201,327.70
2 Pasang engsel pintu kupu - kupu uk. 5" x 4 " logam 6.00 Ps 470,844.66 2,825,067.96
JUMLAH XI 5,026,395.66
VOLUME
HARGA SATUAN JJUMLAH HARGA
NO URAIAN PEKERJAN SAT
Rp Rp
XII PEKKERJAAN INSTALASI LISTRIK
1 Pekerjaan instalasi penerangan kabel NYM 3 x 1,5 mm 8.00 Ttk 457,871.70 3,662,973.60
2 Pekerjaan instalasi stop kontak kabel NYM 3 x 2,5 mm 2.00 Ttk 483,354.30 966,708.60
3 Pekerjaan instalasi sakelar kabel NYM 2 x 1,5 mm 3.00 Ttk 215,057.70 645,173.10
4 Pasang saklar tunggal brocco / Panasonic 2.00 Bh 120,120.00 240,240.00
5 Pasang saklar serie ( double ) brocco / Panasonic 1.00 Bh 164,092.50 164,092.50
6 Pasang stop kontak brocco / Panasonic 2.00 Bh 119,476.50 238,953.00
7 Pasang lampu Philips SL 18 watt lengkap fitting plafond 8.00 Bh 96,250.00 770,000.00
JUMLAH XII 6,688,140.80
XIII PERKERJAAN TEMPAT DUDUK DARI PAS. BATA
1 Pekerjaan bata merah ( ½ bata ) ad.1Pc : 5Ps (untuk tempat duduk) 3.70 M2 535,246.14 1,980,410.72
2 Pekerjaan plesteran dinding tempat duduk bagian luar ad. 1 : 5 tebal 15 mm 2.96 M2 246,549.73 729,787.21
3 Pasang keramik 40/40 DN putih mulya untuk top atas tempat duduk 2.80 M2 506,112.75 1,417,115.70
JUMLAH XIII 4,127,313.62
XIV PEKERJAAN PENGECATAN
1 Pengecatan dinding dengan cat dinding Sanlex 158.13 M2 62,754.12 9,923,371.75
2 Pengecatan plafond dengan cat dinding Sanlex 102.86 M2 88,700.04 9,123,686.11
3 Pengecatan kayu dengan cat kayu F - Thalite 11.90 M2 192,518.04 2,290,964.68
4 Pengecatan plint dinding T. 10 cm dengan cat kolam 28.10 M1 19,251.80 540,975.69
JUMLAH XIV 21,878,998.23
JUMLAH TOTAL ( I - XIV ) 617,608,188.13
REKAPITULASI
ENGINEER ESTIMATE (EE)
KEGIATAN : PEMBANGUNAN SARANA, PRASARANA DAN UTILITAS SEKOLAH
PEKERJAAN : PEMBANGUNAN 1 ( SATU ) RUANG KELAS BARU SDN BOJONG
LOKASI : KECAMATAN CISOLOK, KABUPATEN SUKABUMI
SUMBER DANA : DANA ALOKASI UMUM (DAU) APBD KABUPATEN SUKABUMI
TAHUN ANGGARAN : 2021
JUMLAH HARGA
NO
URAIAN PEKERJAN
Rp
#NAME?
DASAR PERHITUNGAN :
100/110 X 125,000,000.00 = 113,636,363.64
KEL 2.00
RINCIAN PERHITUNGAN :
JKK JKM JKK JKM
0.21% 0.03% X 100,000,000.00 = 210,000.00 30,000.00
0.17% 0.02% X 13,636,363.64 = 23,181.82 2,727.27
0.13% 0.02% X - = - -
0.11% 0.01% X - = - -
0.09% 0.01% X - = - -
TOTAL = 233,181.82 32,727.27
PEMBULATAN = 233,000.00 32,000.00
TOTAL
240,000.00
25,909.09
-
-
-
265,909.09
265,000.00
ANALISA HARGA SATUAN RK3K
Jumlah
Jumlah
Jumlah
4 Personil K3
a Petugas K3 ob 3.00 500,000.00
Jumlah
Jumlah
Jumlah Total
Total Harga Keterangan
233,181.82
32,727.27
265,909.09
100,000.00
100,000.00
300,000.00
100,000.00
60,000.00
930,000.00
300,000.00
1,690,000.00
1,500,000.00
1,500,000.00
35,000.00
20,000.00
150,000.00
186,000.00
391,000.00
3,946,909.09
RENCANA PEMBANGUNA
SD NEGERI GOBANG
TAHUN ANGGARAN 2022
NO RINCIAN
1 Rehabilitasi Ruang Kelas dengan Tingkat kerusakan Minimal Sedang beserta Perabotnya
2 Rehabilitasi Toilet (Jamban) dengan tingkat kerusakan minimal sedang beserta sanitasinya
3 Rehabilitasi Ruang Guru dengan tingkat kerusakan Minimal Sedang beserta Perabotnya
4 Pembangunan Ruang Kelas Baru (RKB) Beserta Perabotnya
5 Pembangunan Toilet (Jamban) beserta Sanitasinya
6 Pembangunan Ruang UKS Beserta Perabotnya
7 Pembangunan Ruang Laboratorium Komputer beserta Perabotnya
JUMLAH
PEMBANGUNAN
ERI GOBANG
NGGARAN 2022
16 Rp 1,030,584,000 Rp 2,634,041,000
Alternatif Membangun
Rp 410,640,000
Rp 283,548,000
Rp 130,880,000
Rp 132,242,000
Rp 228,133,000
Rp 1,185,443,000