DAFTAR HARGA MATERIAL DAN UPAH

PADA AKHIR 2014

HARGA SATUAN (Rp)


NO. URAIAN BAHAN SATUAN
Samarinda
A. DAFTAR HARGA MATERIAL
1 Ampelas ( kertas pasir ) Lbr 3,500.00
11 Bata Merah Bh 700.00
13 Batu Belah M3 350,000.00
15 Batu Koral M3 350,000.00
16 Bendrat / Kawat Beton Kg 18,000.00
19 Besi Beton U-24 Kg 10,000.00
23 Cat meni kualitas bagus Kg 15,000.00
24 Cat dasar ( material primer, zinc cromat, dll) Kg 25,000.00
25 Cat Besi kg 35,000.00
26 Cat tembok untuk interior kualitas baik Kg 25,000.00
27 Cat tembok Weathersield/exterior kualitas baik Kg 80,000.00
28 Cat tembok kualitas sedang Kg 15,000.00
29 Cat Kayu kualitas sedang Kg 28,250.00
30 Cat Kayu kualitas baik Kg 45,000.00
31 Compoun Kg 32,000.00
34 Dempul halus Kg 24,500.00
38 Engsel pintu Bh 35,000.00
39 Engsel jendela Bh 25,000.00
46 Genteng metal Lbr 42,500.00
47 Gypsum board 120 x 240 tebal 9 mm Lbr 65,000.00
48 GRC tebal 4 mm Lbr 47,500.00
50 Hollow 4/4 Zincromate Btg 25,000.00
51 Hollow 2/4 Zincromate Btg 35,000.00
54 Kaca bening (polos) tebal 5 mm M2 130,000.00
55 Kait angin untuk daun jendela Bh 20,000.00
59 Balok dolken / Stoot dia 8 s/d 10 cm Btg 8,000.00
60 Balok kayu Borneo Super / Meranti M3 2,500,000.00
61 Papan kayu Borneo Super / Meranti M3 2,500,000.00
62 Balok kayu Kamper Samarinda/Damar M3 4,000,000.00
63 Papan kayu Kamper Samarinda/Damar M3 4,200,000.00
64 Balok kayu Kamper Medan M3 3,300,000.00
65 Papan kayu Kamper Medan M3 3,500,000.00
68 Papan kayu terentang M3 1,800,000.00
71 Keramik lantai 20 x 20 cm M2 60,000.00
73 Keramik ukuran 40 x 40 cm polished M2 55,000.00
74 Keramik ukuran 40 x 40 cm granito unpolished M2 60,000.00
80 Keramik dinding polos 20 x 25 cm M2 65,000.00
86 Kuas 2 " cat Bh 15,000.00
87 Kuas 3 " cat Bh 18,000.00
88 Kunci Pintu 2 slaag besar kualitas baik Bh 250,000.00
89 Kunci Pintu 2 slaag kualitas standar Bh 150,000.00
90 Kunci Pintu KM/WC putar bulat ( Alpha ) Bh 150,000.00
93 Lem Vinyl kg 35,000.00
94 Lem Kayu Ltr 28,000.00
95 List Kayu 1/4 M1 1,925.00
96 List profil Gypsum M1 8,200.00
97 List Profil kayu 5 x 5 cm M¹ 15,000.00
HARGA SATUAN (Rp)
NO. URAIAN BAHAN SATUAN
Samarinda
100 Meni kayu Kg 20,000.00
HARGA SATUAN (Rp)
NO. URAIAN BAHAN SATUAN
Samarinda
101 Minyak cat ( Tinner ) Ltr 20,000.00
108 Nok genteng Metal M1 40,000.00
109 Paku Kg 18,000.00
110 Paku sekrup 3,5" bh 1,000.00
112 Pasir Pasang M3 165,000.00
113 Pasir Beton M3 250,000.00
114 Pasir Urug M3 100,000.00
115 Panel Listrik standar untuk rumah unit 100,000.00
122 Pipa PVC AW Ø 1/2' setara Maspion M1 7,500.00
123 Pipa PVC AW Ø 3/4' M1 12,000.00
124 Pipa PVC AW Ø 1" M1 13,000.00
125 Pipa PVC AW Ø 2" M1 23,000.00
126 Pipa PVC AW Ø 4" M1 40,000.00
131 Plamir tembok Kg 20,000.00
132 Plamir/dempul plitur (impra) Kg 20,000.00
133 Plamir kayu Kg 20,000.00
135 Triplek Tebal 4 mm ukr 120 x 240 cm Lbr 75,000.00
145 Rol cat Bh 27,400.00
147 Semen PC (abu-abu) 50 kg zak 55,000.00
148 Semen instant kg 2,450.00
149 Semen warna/putih kg 2,500.00
151 Spandeck Lbr 53,800.00
155 Slot / Grendel pintu 4 " Bh 32,500.00
156 Slot / Grendel jendela 3 " Bh 19,500.00
157 Saklar / Stop Kontak listrik standart Bh 25,000.00
172 Bak cuci stainless steel Bh 450,000.00
173 Floor drain stailes steel Bh 63,000.00
174 Kitchen Zink stailessteel standar 1 lubang Bh 198,000.00
176 Kloset jongkok porselen warna standart Bh 250,000.00
177 Kran Air 1/2" kualitas sedang Bh 56,000.00
178 Kran Air angsa 1/2" kualitas sedang Bh 155,500.00
179 Soap Holder ( Tempat Sabun) Bh 150,000.00
189 Kabel NYM 3 x 2,5 mm ( 50 m ) Roll 445,000.00
190 Lampu XL 14 watt Bh 58,000.00
191 Lampu Downlight + lampu 18 watt Bh 90,000.00
199 Tanah Urug M3 70,000.00
201 Tarikan Jendela Bh 25,000.00
202 Septictank Jadi 1,5 m3 Bh 3,750,000.00
203 Baja ringan untuk rangka atap ( Pabrikan) M2 130,000.00

B. DAFTAR HARGA UPAH TUKANG DAN PEKERJA


1 Pembantu tukang setengah terampil hari
1 Pembantu tukang Terampil hari 80,000.00
2 Tukang Gali hari 80,000.00
3 Tukang kayu Terampil hari 125,000.00
4 Tukang batu Terampil hari 125,000.00
5 Tukang besi Beton Terampil hari 125,000.00
6 Tukang Cat/Pelitur Terampil hari 125,000.00
7 Tukang Besi Profil Terampil hari 125,000.00
8 Tukang Ledeng/Pipa hari 125,000.00
9 Tukang Listrik hari 125,000.00
ANALISA HARGA SATUAN PEKERJAAN
Kota : Samarinda
No. URAIAN KOEFISIEN SAT HARGA SATUAN JUMLAH (RP)
1 1 M1 PENGUKURAN & PEMASANGAN BOWPLANK
a Kayu kaso 5/7 borneo 0.01 m3 2,500,000.00 25,000.00
b Paku 5 - 10 cm 0.02 kg 18,000.00 360.00
c Papan Papan kayu terentang 2/20 0.00 m3 1,800,000.00 7,200.00
d Tukang Kayu 0.10 org 125,000.00 12,500.00
e Pembantu Tukang 0.10 org 80,000.00 8,000.00
Jumlah 53,060.00
Dibulatkan 53,060.00
2 1 m2 MEMBERSIHKAN LOKASI ROYEK
a Pembantu Tukang 0.10 org 80,000.00 8,000.00
Jumlah 8,000.00
Dibulatkan 8,000.00
3 1 m3 GALIAN TANAH SEDALAM 1 M
a Pembantu Tukang 0.40 org 80,000.00 32,000.00
b Tukang Gali 0.02 org 80,000.00 1,600.00
Jumlah 33,600.00
Dibulatkan 33,600.00
4 1 m3 URUGAN TANAH KEMBALI
a Pembantu Tukang 0.19 org 80,000.00 15,200.00
b Tukang Gali 0.02 org 80,000.00 1,600.00
Jumlah 16,800.00
Dibulatkan 16,800.00
5 1 m3 PEMADATAN TANAH
a Pembantu Tukang 0.50 org 80,000.00 40,000.00
b Tukang Gali 0.02 org 80,000.00 1,600.00
Jumlah 41,600.00
Dibulatkan 41,600.00
6 1 m3 URUGAN PASIR
a Pasir Urug 1.20 m3 100,000.00 120,000.00
b Pembantu Tukang 0.30 org 80,000.00 24,000.00
c Tukang Gali 0.02 org 80,000.00 1,600.00
Jumlah 145,600.00
Dibulatkan 145,600.00
7 1 m3 URUGAN TANAH
a Tanah Urug 1.20 m3 70,000.00 84,000.00
b Pembantu Tukang 0.30 org 80,000.00 24,000.00
c Tukang Gali 0.02 org 80,000.00 1,600.00
Jumlah 109,600.00
Dibulatkan 109,600.00
8 1 m3 PASANG PONDASI BT KALI , 1 Pc : 5 Ps
a Batu Belah 1.10 m3 350,000.00 385,000.00
b Semen PC (abu-abu) 2.72 sak 55,000.00 149,600.00
c Pasir Pasang 0.54 m3 165,000.00 89,760.00
d Pembantu Tukang 1.50 org 80,000.00 120,000.00
e Tukang Batu 0.60 org 125,000.00 75,000.00
Jumlah 819,360.00
Dibulatkan 819,360.00
9 1 m3 MEMBUAT BETON BERTULANG UNTUK PONDASI 1 Pc : 2 Ps : 3 Kr
a Semen PC (abu-abu) 6.72 sak 55,000.00 369,600.00
b Pasir Beton 0.54 m3 250,000.00 135,000.00
c Splitz (batu pecah) 0.81 m3 132,000.00 106,920.00
d Pembantu Tukang 2.00 org 80,000.00 160,000.00
e Tukang Batu 0.35 org 125,000.00 43,750.00
Jumlah 815,270.00
Dibulatkan 815,200.00
No. URAIAN KOEFISIEN SAT HARGA SATUAN JUMLAH (RP)
10 1 m3 MEMBUAT BETON NON STRUKTUR, 1 Pc : 3 Ps : 5 Splt
a Semen PC (abu-abu) 4.36 sak 55,000.00 239,800.00
b Pasir Beton 0.52 m3 250,000.00 130,000.00
c Splitz (batu pecah) 0.87 m3 132,000.00 114,840.00
d Pembantu Tukang 2.00 org 80,000.00 160,000.00
e Tukang Batu 0.35 org 125,000.00 43,750.00
Jumlah 688,390.00
Dibulatkan 688,300.00
11 1 m3 MEMBUAT BETON STRUKTUR 1 Pc : 2 Ps : 3 Splt
a Semen PC (abu-abu) 6.72 sak 55,000.00 369,600.00
b Pasir Beton 0.54 m3 250,000.00 135,000.00
c Splitz (batu pecah) 0.81 m3 132,000.00 106,920.00
d Pembantu Tukang 2.00 org 80,000.00 160,000.00
e Tukang Batu 0.35 org 125,000.00 43,750.00
Jumlah 815,270.00
Dibulatkan 815,200.00
12 1 kg PENULANGAN BETON/BESI BETON POLOS
a Besi Beton Polos 1.05 kg 10,000.00 10,500.00
b Kawat Beton 0.02 kg 18,000.00 360.00
c Pembantu Tukang 0.01 org 80,000.00 800.00
d Tukang Besi 0.01 org 125,000.00 1,250.00
Jumlah 12,910.00
Dibulatkan 12,900.00
13 1 m3 MEMBUAT SLOOF BETON BERTULANG ( 150 kg BESI + BEKISTING ) K225
a Papan kayu terentang 0.27 m3 1,800,000.00 486,000.00
b Paku 5 - 12 cm 2.00 kg 18,000.00 36,000.00
c Pelumas begisting (oli/minyak) 0.60 Ltr 10,000.00 6,000.00
d Besi Beton Polos 150.00 kg 10,000.00 1,500,000.00
e Kawat Beton 3.00 kg 18,000.00 54,000.00
f Semen PC (abu-abu) 8.00 sak 55,000.00 440,000.00
g Pasir Beton 0.52 m3 250,000.00 130,000.00
h Splitz (batu pecah) 0.78 m3 132,000.00 102,960.00
i Pembantu Tukang 4.50 org 80,000.00 360,000.00
j Tukang Batu 0.35 org 125,000.00 43,750.00
k Tukang Kayu 1.56 org 125,000.00 195,000.00
l Tukang Besi 1.40 org 125,000.00 175,000.00
Jumlah 3,528,710.00
Dibulatkan 3,528,700.00
14 1 m3 MEMBUAT RING BALK BETON BERTULANG ( 175 kg BESI + BEKISTING ) K225
a Papan kayu terentang 0.27 m3 1,800,000.00 486,000.00
b Paku 5 - 12 cm 2.00 kg 18,000.00 36,000.00
c Pelumas begisting (oli/minyak) 0.60 Ltr 10,000.00 6,000.00
d Besi Beton Polos 175.00 kg 10,000.00 1,750,000.00
e Kawat Beton 3.00 kg 18,000.00 54,000.00
f Semen PC (abu-abu) 8.00 sak 55,000.00 440,000.00
g Pasir Beton 0.52 m3 250,000.00 130,000.00
h Splitz (batu pecah) 0.78 m3 132,000.00 102,960.00
i Pembantu Tukang 4.85 org 80,000.00 388,000.00
j Tukang Batu 0.40 org 125,000.00 50,000.00
k Tukang Kayu 1.75 org 125,000.00 218,750.00
l Tukang Besi 1.45 org 125,000.00 181,250.00
Jumlah 3,842,960.00
Dibulatkan 3,842,900.00
No. URAIAN KOEFISIEN SAT HARGA SATUAN JUMLAH (RP)
15 1 m2 PASANGAN BATA MERAH TEBAL ½ BATA, CAMPURAN 1 Pc : 5 Ps
a Bata Merah 60.00 bh 700.00 42,000.00
b Semen PC (abu-abu) 0.22 sak 55,000.00 12,100.00
c Pasir Pasang 0.05 m3 165,000.00 8,250.00
d Pembantu Tukang 0.32 org 80,000.00 25,600.00
e Tukang Batu 0.10 org 125,000.00 12,500.00
Jumlah 100,450.00
Dibulatkan 100,400.00
16 1 m2 PLESTERAN CAMPURAN 1 Pc : 5 Ps TEBAL 1,5 cm
a Semen PC (abu-abu) 0.09 sak 55,000.00 4,950.00
b Pasir Pasang 0.02 m3 165,000.00 3,300.00
c Pembantu Tukang 0.20 org 80,000.00 16,000.00
d Tukang Batu 0.15 org 125,000.00 18,750.00
Jumlah 43,000.00
Dibulatkan 43,000.00
17 1 m2 PASANG LANTAI KERAMIK UKURAN 40 x 40 cm POLISHED
a Keramik ukuran 40 x 40 cm 1.00 m2 55,000.00 55,000.00
b Semen PC (abu-abu) 0.16 sak 55,000.00 8,800.00
c Pasir pasang 0.02 m3 165,000.00 3,547.50
d Semen warna 0.02 kg 2,500.00 50.00
e Pembantu Tukang 0.25 org 80,000.00 20,000.00
f Tukang batu 0.12 org 125,000.00 15,000.00
Jumlah 102,397.50
Dibulatkan 102,390.00
18 1 m2 PASANG LANTAI KERAMIK MOTIF 20 x 20 cm
a Keramik motif 20 x 20 cm 1.00 m2 38,000.00 38,000.00
b Semen PC (abu-abu) 0.17 sak 55,000.00 9,350.00
c Pasir pasang 0.02 m3 165,000.00 3,547.50
d Semen warna 0.02 kg 2,500.00 50.00
e Pembantu Tukang 0.30 org 80,000.00 24,000.00
f Tukang batu 0.15 org 125,000.00 18,750.00
Jumlah 93,697.50
Dibulatkan 93,690.00
19 1 m2 PASANG DINDING KERAMIK POLOS 20 x 25 cm
a Keramik polos 20 x 25 cm 1.00 m2 65,000.00 65,000.00
b Semen PC ( abu-abu ) 0.16 sak 55,000.00 8,800.00
c Pasir pasang 0.02 m3 165,000.00 2,970.00
d Semen warna 0.01 kg 2,500.00 32.50
e Pembantu Tukang 0.19 org 80,000.00 15,000.00
f Tukang batu 0.38 org 125,000.00 46,875.00
Jumlah 138,677.50
Dibulatkan 138,670.00
20 1 m3 PEKERJAAN NOK/GORDING/JURAY KAYU BORNEO SUPER
a Balok kayu Borneo super 1.05 m3 2,500,000.00 2,625,000.00
b Paku 10 - 15 cm 0.20 kg 18,000.00 3,600.00
c Pembantu Tukang 2.00 org 80,000.00 160,000.00
d Tukang Kayu 2.00 org 125,000.00 250,000.00
Jumlah 3,038,600.00
Dibulatkan 3,038,600.00
21 1 m¹ PASANG NOK SPANDECK
a Nok metal 1.10 bh 40,000.00 44,000.00
b Paku Payung 0.05 kg 18,000.00 900.00
c Pembantu Tukang 0.25 org 80,000.00 20,000.00
d Tukang kayu 0.15 org 125,000.00 18,750.00
Jumlah 83,650.00
Dibulatkan 83,650.00
No. URAIAN KOEFISIEN SAT HARGA SATUAN JUMLAH (RP)
22 1 m2 PASANG ATAP SPANDECK
a Spandeck 0.70 lbr 53,800.00 37,660.00
b Paku Payung 0.02 kg 18,000.00 360.00
c Pembantu Tukang 0.12 org 80,000.00 9,600.00
d Tukang kayu 0.06 org 125,000.00 7,500.00
Jumlah 55,120.00
Dibulatkan 55,120.00
23 1 M¹ List Plafond kayu 1/4
a List kayu 1/4 1.10 M¹ 1,925.00 2,117.50
b Paku 2 cm 0.01 kg 18,000.00 180.00
c Pembantu Tukang 0.05 org 80,000.00 4,000.00
d Tukang kayu 0.05 org 125,000.00 6,250.00
Jumlah 12,547.50
Dibulatkan 12,540.00
24 1 m2 plafond Gypsum Board, tebal 9 mm + rangka besi hollow
a Hollow 4/4 Zincromate 0.42 btg 25,000.00 10,375.00
b Hollow 2/4 Zincromate 0.15 btg 35,000.00 5,250.00
c Gypsum board ( 120 x 240 x 9 ) mm 0.36 lbr 65,000.00 23,660.00
d Paku sekrup 25.00 bh 1,000.00 25,000.00
e Ramset / dina bolt 4.00 bh 2,200.00 8,800.00
f Cotton plaster 0.07 bh 58,000.00 4,176.00
g Compoun 0.13 kg 32,000.00 4,000.00
h Pembantu Tukang 0.10 org 80,000.00 8,000.00
i Tukang kayu 0.05 org 125,000.00 6,250.00
Jumlah 95,511.00
Dibulatkan 95,510.00
25 1 m2 plafond GRC, tebal 4 mm + rangka besi hollow
a Hollow 4/4 Zincromate 0.42 btg 25,000.00 10,375.00
b Hollow 2/4 Zincromate 0.15 btg 35,000.00 5,250.00
c GRC board ( 120 x 240 x 4 ) mm 0.36 lbr 47,500.00 17,290.00
d Paku sekrup 25.00 bh 1,000.00 25,000.00
e Ramset / dina bolt 4.00 bh 2,200.00 8,800.00
f Cotton plaster 0.07 bh 58,000.00 4,176.00
g Compoun 0.13 kg 32,000.00 4,000.00
h Pembantu Tukang 0.10 org 80,000.00 8,000.00
i Tukang kayu 0.05 org 125,000.00 6,250.00
Jumlah 89,141.00
Dibulatkan 89,140.00
26 Memasang 1 buah kloset jongkok porselen
a Kloset jongkok porselen 1.00 bh 250,000.00 250,000.00
b Semen PC (abu-abu) 0.12 sak 55,000.00 6,600.00
c Pasir pasang 0.01 m3 165,000.00 1,650.00
d Pembantu Tukang 1.00 org 80,000.00 80,000.00
e Tukang batu 1.50 org 125,000.00 187,500.00
Jumlah 525,750.00
Dibulatkan 525,750.00
27 Memasang Kichen Zink/bak cuci piring stainless steel
a Bak cuci stainless steel 1.00 bh 450,000.00 450,000.00
b Water Drain + Asesories 1.00 Set 85,000.00 85,000.00
c Pembantu Tukang 0.03 org 80,000.00 2,400.00
d Tukang batu 0.30 org 125,000.00 37,500.00
Jumlah 574,900.00
Dibulatkan 574,900.00
No. URAIAN KOEFISIEN SAT HARGA SATUAN JUMLAH (RP)
28 Memasang 1 bh kran diameter 3/4 " atau 1/2 "
a Kran air 1.00 bh 56,000.00 56,000.00
b Perlengkapan ( 2% hrg kran ) 1.00 ls 1,120.00 1,120.00
c Pembantu Tukang 0.01 org 80,000.00 800.00
d Tukang batu 0.10 org 125,000.00 12,500.00
Jumlah 70,420.00
Dibulatkan 70,420.00
29 Memasang 1 bh kran air angsa
a Kran air angsa 1.00 bh 155,500.00 155,500.00
b Perlengkapan ( 2% hrg kran ) 1.00 ls 3,110.00 3,110.00
c Pembantu Tukang 0.01 org 80,000.00 800.00
d Tukang batu 0.10 org 125,000.00 12,500.00
Jumlah 171,910.00
Dibulatkan 171,910.00
30 Memasang 1 bh Floor drain
a Floor drain 1.00 bh 63,000.00 63,000.00
b Pembantu Tukang 0.01 org 80,000.00 800.00
c Tukang batu 0.10 org 125,000.00 12,500.00
Jumlah 76,300.00
Dibulatkan 76,300.00
31 Memasang 1 M¹ PVC tipe AW diameter ½"
a Pipa PVC 1.10 M¹ 7,500.00 8,250.00
b Perlengkapan ( 30% harga pipa ) 2,250.00 2,250.00
c Pembantu Tukang 0.04 org 80,000.00 2,880.00
d Tukang pipa 0.06 org 125,000.00 7,500.00
Jumlah 20,880.00
Dibulatkan 20,880.00
32 Memasang 1 M¹ PVC tipe AW diameter ¾"
a Pipa PVC 1.10 M¹ 12,000.00 13,200.00
b Perlengkapan ( 30% harga pipa ) 3,600.00 3,600.00
c Pembantu Tukang 0.03 org 80,000.00 2,400.00
d Tukang pipa 0.06 org 125,000.00 7,500.00
Jumlah 26,700.00
Dibulatkan 26,700.00
33 Memasang 1 M¹ PVC tipe AW diameter 1"
a Pipa PVC 1.10 M¹ 13,000.00 14,300.00
b Perlengkapan ( 30% harga pipa ) 3,900.00 3,900.00
c Pembantu Tukang 0.04 org 80,000.00 2,880.00
d Tukang pipa 0.06 org 125,000.00 7,500.00
Jumlah 28,580.00
Dibulatkan 28,580.00
34 Memasang 1 M¹ PVC tipe AW diameter 2"
a Pipa PVC 1.10 M¹ 23,000.00 25,300.00
b Perlengkapan ( 30% harga pipa ) 6,900.00 6,900.00
c Pembantu Tukang 0.05 org 80,000.00 4,320.00
d Tukang pipa 0.09 org 125,000.00 11,250.00
Jumlah 47,770.00
Dibulatkan 47,770.00
35 Memasang 1 M¹ PVC tipe AW diameter 4"
a Pipa PVC 1.10 M¹ 40,000.00 44,000.00
b Perlengkapan ( 30% harga pipa ) 12,000.00 12,000.00
c Pembantu Tukang 0.08 org 80,000.00 6,480.00
d Tukang pipa 0.14 org 125,000.00 16,875.00
Jumlah 79,355.00
Dibulatkan 79,350.00
No. URAIAN KOEFISIEN SAT HARGA SATUAN JUMLAH (RP)
36 1 Buah Pasang Kunci Tanam besar
a Kunci tanam besar 1.00 bh 250,000.00 250,000.00
b Pembantu Tukang 0.06 org 80,000.00 4,800.00
c Tukang kayu 0.60 org 125,000.00 75,000.00
Jumlah 329,800.00
Dibulatkan 329,800.00
37 1 Buah Pasang Kunci bulat putar Kamar Mandi
a Kunci bulat putar kamar mandi 1.00 bh 150,000.00 150,000.00
b Pembantu Tukang 0.01 org 80,000.00 400.00
c Tukang kayu 0.50 org 125,000.00 62,500.00
Jumlah 212,900.00
Dibulatkan 212,900.00
38 1 Buah Pasang Engsel Pintu
a Engsel pintu 1.00 bh 35,000.00 35,000.00
b Pembantu Tukang 0.02 org 80,000.00 1,200.00
c Tukang kayu 0.15 org 125,000.00 18,750.00
Jumlah 54,950.00
Dibulatkan 54,950.00
39 1 Buah Pasang Engsel Jendela Kupu-kupu
a Engsel jendela 1.00 bh 25,000.00 25,000.00
b Pembantu Tukang 0.01 org 80,000.00 800.00
c Tukang kayu 0.10 org 125,000.00 12,500.00
Jumlah 38,300.00
Dibulatkan 38,300.00
40 1 Buah Pasang Kait Angin
a Kait angin 1.00 bh 20,000.00 20,000.00
b Pembantu Tukang 0.02 org 80,000.00 1,200.00
c Tukang kayu 0.15 org 125,000.00 18,750.00
Jumlah 39,950.00
Dibulatkan 39,950.00
41 1 Buah Pasang Door Closer
a Door closer 1.00 bh 412,000.00 412,000.00
b Pembantu Tukang 0.05 org 80,000.00 4,000.00
c Tukang kayu 0.50 org 125,000.00 62,500.00
Jumlah 478,500.00
Dibulatkan 478,500.00
42 1 Buah Pasang Grendel / Sloot pintu
a Grendel / sloot pintu 1.00 bh 32,500.00 32,500.00
b Pembantu Tukang 0.05 org 80,000.00 4,000.00
c Tukang kayu 0.50 org 125,000.00 62,500.00
Jumlah 99,000.00
Dibulatkan 99,000.00
43 1 Buah Pasang Grendel / Sloot jendela
a Grendel / sloot jendela 1.00 bh 19,500.00 19,500.00
b Pembantu Tukang 0.05 org 80,000.00 4,000.00
c Tukang kayu 0.50 org 125,000.00 62,500.00
Jumlah 86,000.00
Dibulatkan 86,000.00
44 1 Buah Pasang tarikan jendela
a Tarikan jendela 1.00 bh 25,000.00 25,000.00
b Pembantu Tukang 0.05 org 80,000.00 4,000.00
c Tukang kayu 0.50 org 125,000.00 62,500.00
Jumlah 91,500.00
Dibulatkan 91,500.00
No. URAIAN KOEFISIEN SAT HARGA SATUAN JUMLAH (RP)
45 1 m2 Pasang Kaca polos, tebal 5 mm
a Kaca polos 1.10 m2 130,000.00 143,000.00
b Pembantu Tukang 0.02 org 80,000.00 1,200.00
c Tukang kayu 0.15 org 125,000.00 18,750.00
Jumlah 162,950.00
Dibulatkan 162,950.00
46 1 m2 Pengecatan Kayu Baru
a Cat meni 0.50 kg 15,000.00 7,500.00
b Plamir 0.15 kg 20,000.00 3,000.00
c Ampelas 1.00 lbr 3,500.00 3,500.00
d Cat dasar 0.15 kg 25,000.00 3,750.00
e Cat penutup kwalitas baik 0.35 kg 45,000.00 15,750.00
f Pembantu Tukang 0.05 org 80,000.00 4,000.00
g Tukang cat 0.15 org 125,000.00 18,750.00
Jumlah 56,250.00
Dibulatkan 56,250.00
47 1 m2 Pengecatan Tembok/plafond Baru kwalitas sedang
a Plamir 0.10 kg 20,000.00 2,000.00
b Rol cat 0.01 bh 27,400.00 274.00
c Cat penutup kwalitas sedang 0.30 kg 15,000.00 4,500.00
d Steger ( perancah kerja ) 0.01 Ls 70,000.00 700.00
e Ampelas 0.50 lbr 3,500.00 1,750.00
f Pembantu Tukang 0.06 org 80,000.00 4,800.00
g Tukang cat 0.10 org 125,000.00 12,500.00
Jumlah 26,524.00
Dibulatkan 26,520.00
48 1 m2 Pengecatan Tembok/plafond Baru kwalitas baik
a Plamir 0.10 kg 20,000.00 2,000.00
b Rol cat 0.01 bh 27,400.00 274.00
c Cat penutup kwalitas baik 0.30 kg 25,000.00 7,500.00
d Steger ( perancah kerja ) 0.01 Ls 70,000.00 700.00
e Ampelas 0.50 lbr 3,500.00 1,750.00
f Pembantu Tukang 0.06 org 80,000.00 4,800.00
g Tukang cat 0.10 org 125,000.00 12,500.00
Jumlah 29,524.00
Dibulatkan 29,520.00
49 Pasang 1 Titik Stop Kontak
a Stop Kontak 1.00 bh 25,000.00 25,000.00
b Kabel Listrik NYM 3 x 2,5 mm 0.20 rol 445,000.00 89,000.00
c Accecories ( 20 % material ) 1.00 ls 17,800.00 17,800.00
d Pembantu Tukang 0.20 org 80,000.00 16,000.00
e Tukang listrik 0.60 org 125,000.00 75,000.00
Jumlah 222,800.00
Dibulatkan 222,800.00
50 Pasang 1 Titik lampu
a Saklar 1.00 bh 25,000.00 25,000.00
b Kabel Listrik NYM 2 x 2,5 mm 0.20 rol 425,000.00 85,000.00
c Accecories ( 20 % material ) 1.00 ls 17,000.00 17,000.00
d Pembantu Tukang 0.20 org 80,000.00 16,000.00
e Tukang listrik 0.60 org 125,000.00 75,000.00
Jumlah 218,000.00
Dibulatkan 218,000.00
51 Pasang 1 Buah Lampu XL
a Lampu XL 1.00 bh 58,000.00 58,000.00
b Accecories ( 1 % alat ) 1.00 ls 580.00 580.00
c Tukang listrik 0.10 org 125,000.00 12,500.00
No. URAIAN KOEFISIEN SAT HARGA SATUAN JUMLAH (RP)
Jumlah 71,080.00
Dibulatkan 71,080.00
52 Pasang 1 Buah Lampu Downlight
a Lampu Downlight 1.00 bh 90,000.00 90,000.00
b Accecories ( 1 % alat ) 1.00 ls 900.00 900.00
c Tukang listrik 0.15 org 125,000.00 18,750.00
Jumlah 109,650.00
Dibulatkan 109,650.00
53 Pasang 1 Buah Panel
a Panel Listrik standart untuk Rumah 1.00 bh 100,000.00 100,000.00
b Accecories ( 10 % alat ) 1.00 ls 10,000.00 10,000.00
c Tukang listrik 1.00 org 125,000.00 125,000.00
Jumlah 235,000.00
Dibulatkan 235,000.00
DAFTAR HARGA SATUAN PEKERJAAN

I. PEKERJAAN PERSIAPAN
NO URAIAN SATUAN BIAYA (Rp.) KETERANGAN
1 Pagar sementara seng gelombang 2 m 1 M1 362,820.00
2 Pagar kawat Berduri T = 1,8 m 1 M1 594,710.00
3 Pengukuran & Pemasangan Bowplank 1 M2 53,060.00
4 Pembuatan kantor Direksi 1 M2 3,133,510.00
5 Pembuatan Gudang Proyek 1 M2 538,770.00
6 Membersihkan lokasi Proyek 1 M2 8,000.00
7 Membersihkan Puing-puing 1 M2 16,000.00
8 Membersihkan Tunggul Tanaman 1 M2 160,000.00
9 Pembuatan jalan sementara 1 M2 121,100.00
10 Pembongkaran Beton Bertulang 1 M3 496,000.00
11 Pembongkaran Dinding Tembok Bata Merah 1 M3 368,000.00
12 Pekerjaan Pagar papan rangka Balok 1 M2 213,900.00

II. PEKERJAAN TANAH


NO URAIAN SATUAN BIAYA (Rp.) KETERANGAN
1 Galian tanah sedalam 1 m 1 M3 33,600.00
2 Galian tanah sedalam 2 m 1 M3 44,000.00
3 Galian tanah sedalam 3 m 1 M3 60,800.00
4 Galian tanah keras sedalam 1 m 1 M3 37,600.00
5 Pekerjaan pengupasan tanah setebal 10 cm 1 M2 3,200.00
6 Pembuangan tanah sejauh 150 m 1 M3 35,200.00
7 Urugan tanah kembali 1 M3 16,800.00
8 Pemadatan Tanah 1 M3 41,600.00
9 Urugan pasir 1 M3 145,600.00
10 Urugan tanah 1 M3 109,600.00
11 Urugan sirtu 1 M3 144,000.00

III. PEKERJAAN PONDASI


NO URAIAN SATUAN BIAYA (Rp.) KETERANGAN
1 Pasang pondasi batu kali 1 Pc : 3 Psr 1 M3 882,220.00
2 Pasang pondasi batu kali 1 Pc : 4 Psr 1 M3 845,100.00
3 Pasang pondasi batu kali 1 Pc : 5 Psr 1 M3 819,360.00
4 Pasang pondasi batu kosong 1 M3 561,100.00
5 Membuat Beton Bertulang untuk Pondasi 1 Pc : 2 Psr : 3 Splt 1 M3 815,200.00
6 Penulangan beton Pondasi 1 Kg 12,200.00
7 Pekerjaan Bekisting untuk Pondasi 1 M2 130,000.00
8 Pasang pondasi cycloop, 50 % beton : 40 % batu kali 1 M3 1,287,500.00
9 Pasang pondasi sumuran Dia. 100 cm 1 M3 894,300.00
10 Pembuatan pondasi tiang beton bertulang 40 x 40 cm 1 M1 854,100.00
11 Pembuatan pondasi tiang beton bertulang 35 x 35 cm 1 M1 682,200.00
12 Pembuatan pondasi tiang beton bertulang 25 x 25 cm 1 M1 663,700.00
13 Pembuatan Pondasi Plat Beton ( penulangan 125 kg/m3 & bekisting ) 1 M3 2,886,700.00
14 Pembuatan Pondasi Plat Beton ( penulangan 150 kg/m3 & bekisting ) 1 M3 3,139,700.00
15 Pembuatan Pondasi Beton Borepile ( penulangan 125 kg/m3 & bekisting ) 1 M3 2,879,000.00
16 Pembuatan Pondasi Beton Borepile ( penulangan 150 kg/m3 & bekisting ) 1 M3 3,139,700.00

IV. PEKERJAAN BETON NON STRUKUR DAN BETON STRUKTUR


NO URAIAN SATUAN BIAYA (Rp.) KETERANGAN
A PEKERJAAN BETON
1 Membuat Beton Non Struktur, 1 Pc : 3 Psr : 5 Splt 1 M3 688,300.00
2 Membuat Beton Struktur, 1 Pc : 2 Psr : 4 Splt 1 M3 691,900.00
3 Membuat Beton Struktur 1 Pc : 2 Psr : 3 Splt 1 M3 815,200.00
4 Membuat Beton Struktur dengan mutu K 225 1 M3 878,800.00
5 Membuat Beton Struktur dengan mutu K 275 1 M3 881,500.00

B PEKERJAAN PEMBESIAN
1 Penulangan Beton/Besi Beton Polos 1 KG 12,900.00
2 Penulangan Beton/Besi Beton Ulir 1 KG 14,500.00

C PEKERJAAN BEKISTING
1 Pasang Bekisting Untuk Sloof 1 M2 143,900.00
2 Pasang Bekisting Untuk Kolom 1 M2 290,200.00
3 Pasang Bekisting Untuk Balok 1 M2 291,800.00
4 Pasang Bekisting Untuk Lantai 1 M2 273,800.00
5 Pasang Bekisting Untuk Tangga 1 M2 223,300.00

D PEKERJAAN BETON BERTULANG


1 Membuat Sloof Beton Bertulang ( 150 Kg Besi + Bekisting ) 1 M3 3,528,700.00
2 Membuat Kolom Beton Bertulang ( 125 Kg Besi + Bekisting ) 1 M3 5,220,900.00
3 Membuat Kolom Beton Bertulang ( 150 Kg Besi + Bekisting ) 1 M3 5,470,900.00
4 Membuat Kolom Beton Bertulang ( 160 Kg Besi + Bekisting ) 1 M3 5,570,900.00
5 Membuat Kolom Beton Bertulang ( 175 Kg Besi + Bekisting ) 1 M3 5,720,900.00
6 Membuat Kolom Beton Bertulang ( 200 Kg Besi + Bekisting ) 1 M3 5,970,900.00
7 Membuat Kolom Beton Bertulang ( 250 Kg Besi + Bekisting ) 1 M3 6,470,900.00
8 Membuat Kolom Beton Bertulang ( 300 Kg Besi + Bekisting ) 1 M3 6,970,900.00
9 Membuat Balok Beton Bertulang ( 125 Kg Besi + Bekisting ) 1 M3 4,422,800.00
10 Membuat Balok Beton Bertulang ( 150 Kg Besi + Bekisting ) 1 M3 4,672,800.00
11 Membuat Balok Beton Bertulang ( 200 Kg Besi + Bekisting ) 1 M3 4,646,200.00
12 Membuat Balok Beton Bertulang ( 225 Kg Besi + Bekisting ) 1 M3
13 Membuat Balok Beton Bertulang ( 250 Kg Besi + Bekisting ) 1 M3 5,718,800.00
14 Membuat Tangga Beton Bertulang ( 200 Kg Besi + Bekisting ) 1 M3 5,174,400.00
15 Membuat Plat Lantai tebal 10 Cm Beton Bertulang ( 100 Kg Besi + Bekisting ) 1 M3 4,553,200.00
16 Membuat Plat Lantai tebal 12 Cm Beton Bertulang ( 115 Kg Besi + Bekisting ) 1 M3 4,579,400.00
17 Membuat Plat Lantai tebal 12 Cm Beton Bertulang ( 125 Kg Besi + Bekisting ) 1 M3 4,708,400.00
18 Membuat Plat Lantai tebal 15 Cm Beton Bertulang ( 100 Kg Besi + Bekisting ) 1 M3 3,931,400.00
19 Membuat Plat Lantai tebal 20 Cm Beton Bertulang ( 115 Kg Besi + Bekisting ) 1 M3 4,352,200.00
20 Membuat Ring Balk Beton Bertulang ( 175 Kg Besi + Bekisting ) 1 M3 3,842,900.00
V. PEKERJAAN DINDING
NO URAIAN SATUAN BIAYA (Rp.) KETERANGAN
1 Pasangan Bata Merah Tebal 1 Bata, Campuran 1 Pc : 3 Psr 1 M2 211,600.00
2 Pasangan Bata Merah Tebal 1 Bata, Campuran 1 Pc : 4 Psr 1 M2 206,100.00
3 Pasangan Bata Merah Tebal 1 Bata, Campuran 1 Pc : 5 Psr 1 M2 202,200.00
4 Pasangan Bata Merah Tebal ½ Bata, Campuran 1 Pc : 3 Psr 1 M2 102,650.00
5 Pasangan Bata Merah Tebal ½ Bata, Campuran 1 Pc : 4 Psr 1 M2 102,100.00
6 Pasangan Bata Merah Tebal ½ Bata, Campuran 1 Pc : 5 Psr 1 M2 100,400.00
7 Pasang Dinding Rooster / Terawang ( 12x11x24 ) 1 M2 209,600.00
8 Pasang Dinding Glassblock 1 M2 637,100.00
9 Pasangan Bataco Putih, Campuran 1 Pc : 5 Psr 1 M2 124,400.00
10 Pasangan Bataco Press Semen, Campuran 1 Pc : 5 Psr 1 M2 121,500.00
11 Pasangan Bata Ringan (Hebel/Celcon) 1 M2 107,400.00

VI. PEKERJAAN PLESTERAN/ACCI


NO URAIAN SATUAN BIAYA (Rp.) KETERANGAN
1 Plesteran Campuran 1 Pc : 2 Psr Tebal 1,5 Cm 1 M2 45,700.00
2 Plesteran Campuran 1 Pc : 3 Psr Tebal 1,5 Cm 1 M2 45,200.00
3 Plesteran Campuran 1 Pc : 4 Psr Tebal 1,5 Cm 1 M2 43,500.00
4 Plesteran Campuran 1 Pc : 5 Psr Tebal 1,5 Cm 1 M2 43,000.00
5 Plesteran Campuran 1 Pc : 4 Psr Tebal 2 Cm 1 M2 51,900.00
6 Plesteran Campuran 1 Pc : 5 Psr Tebal 2 Cm 1 M2 58,200.00
7 Berapen Campuran 1 Pc : 5 Psr Tebal 1,5 Cm 1 M2 30,900.00
8 Plesteran Beton Campuran 1 Pc : 2 Psr Tebal 1,5 Cm 1 M2 59,500.00
9 Plesteran Beton Campuran 1 Pc : 3 Psr Tebal 1,5 Cm 1 M2 57,300.00
10 Plesteran Ban/Skoneng Campuran 1 Pc : 2 Psr 1 M1 57,900.00
11 Accian Plesteran 1 M2 29,300.00
12 Plesteran Siar Camuran 1 Pc : 2 Psr 1 M2 29,000.00

VII. PEKERJAAN PELAPIS LANTAI


NO URAIAN SATUAN BIAYA (Rp.) KETERANGAN
1 Pasang Lantai keramik ukuran 40 x 40 cm Polish 1 M2 102,390.00
2 Pasang Lantai keramik ukuran 40 x 40 cm Unpolish 1 M2 108,570.00
3 Pasang Lantai keramik ukuran 60 x 60 cm 1 M2 338,480.00
4 Pasang Lantai keramik ukuran 60 x 90 cm 1 M2 387,240.00
5 Pasang Lantai Keramik 10 x 20 cm 1 M2 112,850.00
6 Pasang Lantai Keramik polos 20 x 20 cm 1 M2 93,690.00
7 Pasang Lantai Keramik motif 20 x 20 cm 1 M2 93,690.00
8 Pasang Lantai Keramik polos 30 x 30 cm 1 M2 167,150.00
9 Pasang Lantai Keramik motif 30 x 30 cm 1 M2 88,150.00
10 Pasang Lantai Marmer 1 M2 336,750.00
11 Pasang Lantai Parquet Jati 1 M2 408,650.00
12 Pasang Lantai Granit 1 M2 897,850.00

VIII. PEKERJAAN PELAPIS DINDING


NO URAIAN SATUAN BIAYA (Rp.) KETERANGAN
1 Pasang Dinding Keramik Motif 10 x 20 cm 1 M2 118,850.00
2 Pasang Dinding Keramik polos 10 x 20 cm 1 M2 114,850.00
3 Pasang Dinding Keramik Motif 20 x 20 cm 1 M2 115,450.00
4 Pasang Dinding Keramik polos 20 x 20 cm 1 M2 115,450.00
5 Pasang Dinding Keramik polos 20 x 25 cm 1 M2 138,670.00
6 Pasang Dinding Keramik Motif 20 x 25 cm 1 M2 112,670.00
7 Pasang Dinding Marmer 1 M2 365,370.00
8 Pasang Dinding Granit standart 1 M2 913,370.00
9 Pasang Dinding Batu Tempel Hitam 1 M2 225,820.00
10 Pasang Dinding Batu Alam 1 M2 226,370.00
11 Pasang Plint Keramik Ukuran 10 x 40 Cm 1 M1 35,400.00
12 Pasang Plint Keramik Ukuran 10 x 30 Cm 1 M1 36,350.00

IX. PEKERJAAN KUSEN, PINTU, JENDELA, PARTISI


NO URAIAN SATUAN BIAYA (Rp.) KETERANGAN
1 Pasang Kusen Pintu & Jendela Kayu Kamper Samarinda 1 M3 7,155,000.00
2 Pasang Kusen Pintu & Jendela Kayu Kamper Medan / Kruing 1 M3 6,315,000.00
3 Pasang Kusen Pintu & Jendela Kayu Borneo Super 1 M3 5,355,000.00
4 Pasang Pintu Panel Kayu Kamper Samarinda 1 M2 560,500.00
5 Pasang Pintu Panel Kayu Kamper Medan / Kruing 1 M2 532,500.00
6 Pasang Pintu dan Jendela Kaca Kayu Kamper Medan 1 M2 831,200.00
7 Pasang Pintu dan Jendela Kaca Kayu Borneo 1 M2 323,600.00
8 Pasang Pintu dan Jendela Jalusi Kayu Kamper Medan 1 M2 679,000.00
9 Pasang Pintu Triplek Rangkap , Rangka Kayu Kamper Medan 1 M2 438,500.00
10 Pasang Jalusi Mati Kusen Kayu Kamper Medan 1 M2 502,700.00
11 Pasang Pintu Triplek Rangkap , Rangka Kayu Borneo Super 1 M2 418,900.00
12 Pasang Pintu Teakwood Rangkap , Rangka Kayu Kamper Medan 1 M2 460,400.00
13 Pasang Pintu Triplek & Formika Rangka Kayu Kamper Medan 1 M2 610,900.00
14 Pasang Pintu Teakwood & Formika Rangka Kayu Kamper Medan 1 M2 627,900.00
15 Pasang Dinding Pemisah Double Teakwood, Rangka Kayu Kamper Medan 1 M2 254,500.00
16 Pasang Dinding Pemisah Double GRC, Rangka Kayu Kamper Medan 1 M2 260,300.00
17 Pasang Pintu Aluminium / pintu PVC 1 bh 442,600.00
18 Pasang Kusen Partisi Double Triplek 1 M2 129,530.00
19 Pasang Kusen Partisi Double GyPsrum + Rangka Kayu 1 M2 129,530.00
20 Pasang Dinding Partisi Gysum Board + Rangka Besi Hollow 1 M2 120,560.00
X. PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP
NO URAIAN SATUAN BIAYA (Rp.) KETERANGAN
A PEKERJAAN RANGKA ATAP
1 Pekerjaan Konstruksi Kuda-kuda Kayu Kamper Medan 1 M3 5,637,400.00
2 Pekerjaan Konstruksi Kuda-kuda Kayu Borneo Super 1 M3 4,757,400.00
3 Pasang Kaso + Reng Genteng Plentong Kayu Borneo Super 1 M2 85,700.00
4 Pasang Kaso + Reng Genteng Beton Kayu Borneo Super 1 M2 58,200.00
5 Pasang Lisplang Kayu Kamper Medan Ukuran 3 x 20 Cm 1 M2 59,100.00
6 Pasang Lisplang Kayu Kamper Medan Ukuran 3 x 30 Cm 1 M2 75,700.00
7 Pekerjaan Nok/gording/juray kayu Borneo super 1 M3 3,038,600.00

B PEKERJAAN PENUTUP ATAP


1 Pasang Atap Genteng Plentong 1 M2 41,370.00
2 Pasang Nok/Bubungan Genteng keramik glazur 1 M1 195,580.00
3 Pasang Atap Fibreglass Ukuran 180 x 90 cm 1 M2 61,270.00
4 Pasang Atap Asbes Gelombang Ukuran 2,70 x 1,05 m Tebal 4 mm 1 M2 47,310.00
5 Pasang Atap Asbes Gelombang Ukuran 2,40 x 1,05 m Tebal 4 mm 1 M2 49,410.00
6 Pasang Atap Asbes Gelombang Ukuran 2,70 x 1,02 m Tebal 4 mm 1 M2 61,330.00
7 Pasang Atap Asbes Gelombang Ukuran 2,40 x 1,02 m Tebal 4 mm 1 M2 63,040.00
8 Pasang Atap Asbes Gelombang Ukuran 1,50 x 1,02 m Tebal 4 mm 1 M2 60,510.00
9 Pasang Atap Genteng Sirap 1 M2 84,600.00
10 Pasang Atap Genteng Beton 1 M2 100,540.00
11 Pasang Atap Genteng Metal 1 M2 100,950.00
12 Pasang Nok Genteng Beton 1 M1 133,560.00
13 Pasang Nok Genteng Metal 1 M1 83,650.00
14 Pasang Atap Spandeck 1 M2 55,120.00
15 Pasang Nok Seng untuk Atap Seng Gelombang 1 M1 56,120.00
16 Pasang Atap Polycarbonate + rangka 1 M2 335,470.00
17 Pasang Alluminium Foil / Sisalation 1 M2 25,300.00
18 Pasang Rangka atap Baja ringan ( pabrikan ) 1 M2 130,000.00

XI. PEKERJAAN PENUTUP PLAFOND


NO URAIAN SATUAN BIAYA (Rp.) KETERANGAN
1 Pasang rangka Plafond ( 0,50 x 1,00 ) m, Kayu Borneo Super 1 M2 75,000.00
2 Plafond GRC ( 6,00 x 1,20 ) m, tebal 4 mm 1 M2 63,580.00
3 Plafond Asbes ( 1,00 x 1,00 ) m, tebal 5 mm 1 M2 26,180.00
4 Plafond Akustik ( 60 x 120 ) cm 1 M2 135,200.00
5 Plafond Akustik ( 60 x 120 ) cm + Rangka Alluminium 1 M2 277,700.00
6 List Plafond Profil Kayu 1 M1 26,930.00
7 Plafond Triplek 4 mm + Rangka Kayu Borneo Super 1 M2 154,750.00
8 Plafond Teakwood 4 mm + Rangka Kayu Borneo Super 1 M2 161,380.00
9 Plafond Papan 10 cm, tebal 1 cm + Rangka Kayu Borneo Super 1 M2 235,600.00
10 Plafond GyPsrum Board, tebal 9 mm + rangka besi hollow 1 M2 95,510.00
1 m2 plafond GRC, tebal 4 mm + rangka besi hollow 89,140.00
11 List Plafond Kayu 1/4 1 M1 12,540.00

VIII. PEKERJAAN SANITAIR


NO URAIAN SATUAN BIAYA (Rp.) KETERANGAN
1 Memasang Kloset Duduk / Monoblok 1 BH 2,986,500.00
2 Memasang Kloset Jongkok porselen 1 BH 525,750.00
3 Memasang Urinoir 1 BH 733,250.00
4 Memasang Wastafel Dinding 1 BH 526,300.00
5 Memasang Wastafel kaki 1 BH 576,700.00
6 Memasang Shower dinding 1 BH 158,300.00
7 Memasang Bak mandi Fibreglass ukuran sedang 1 BH 894,500.00
8 Memasang Bak kontrol pasangan batu bata ukuran ( 30 x 30 ) cm, tinggi 35 cm 1 BH 485,050.00
9 Memasang Kitchen Zink / bak cuci piring stailess steel 1 BH 574,900.00
10 Memasang Kran diameter 3/4 " atau 1/2 " 1 BH 70,420.00
11 Memasang Kran angsa 1 BH 171,910.00
12 Memasang Floor drain 1 BH 76,300.00
13 Memasang Tempat Sabun 1 BH 163,300.00
14 Septictank Jadi 1,5 m3 ( ulin ) 1 BH 3,750,000.00
15 Membuat Septictank pasangan bata dan rembesan 1UNIT 7,766,420.00

IX. PEKERJAAN PERPIPAAN DAN POMPA


NO URAIAN SATUAN BIAYA (Rp.) KETERANGAN
1 Memasang pipa galvanis diameter 1/2" ( GIP ) 1 M1 30,970.00
2 Memasang pipa galvanis diameter 3/4" (GIP ) 1 M1 41,470.00
3 Memasang pipa galvanis diameter 1" ( GIP ) 1 M1 57,920.00
4 Memasang pipa galvanis diameter 1,5" (GIP ) 1 M1 77,340.00
5 Memasang pipa PVC type D diameter 3" 1 M1 39,880.00
6 Memasang pipa PVC type D diameter 4" 1 M1 50,500.00
7 Memasang pipa PVC type AW diameter 1/2" 1 M1 20,880.00
8 Memasang pipa PVC type AW diameter 3/4" 1 M1 26,700.00
9 Memasang pipa PVC type AW diameter 1" 1 M1 28,580.00
10 Memasang pipa PVC type AW diameter 2" 1 M1 47,770.00
11 Memasang pipa PVC type AW diameter 4" 1 M1 79,350.00
12 Memasang Pompa Air 1 BH 1,179,600.00
13 Penyambungan pipa PAM 1LS 750,000.00

XII. PEKERJAAN PENUTUP BESI DAN BAJA


NO URAIAN SATUAN BIAYA (Rp.) KETERANGAN
1 Pasang Rangka Atap Baja 1 KG 28,460.00
2 Pasang Rangka Atap Besi Siku 1 KG 29,860.00
3 Pasang Gording Besi C 1 KG 28,700.00
4 Pasang Pintu Rolling Door Besi 1 M2 451,500.00
5 Pasang Pintu Besi ukuran 0,8 x 2 m 1 M2 615,250.00
6 Pasang Teralis Besi 1 M2 372,500.00
7 Pasang Kawat Harmonika 1 M2 46,960.00
8 Pasang Talang Datar, Seng BJLS 1 M1 124,270.00
9 Pasang Talang Miring, Seng plat BJLS 1 M1 123,470.00

XIII. PEKERJAAN ALUMINIUM


NO URAIAN SATUAN BIAYA (Rp.) KETERANGAN
1 Pasang Pintu Roling door Aluminium 1 M2 451,500.00
2 Pasang Pintu Aluminium Pabrikan ( pintu jadi ) 1 M2 531,250.00
3 Kusen jendela Aluminium 2 lubang dgn 2 daun jendela 1 UNIT 2,447,240.00
4 Kusen jendela Aluminium 3 lubang dgn 2 daun jendela dan 1 kaca mati 1 UNIT 2,401,820.00
5 Kusen gendong dgn jendela Aluminium 2 lubang dan 1 pintu teakwood 1 UNIT 4,273,620.00
6 Kusen Pintu Aluminium ukr 0.9 x 2,7 m 1 UNIT 1,779,070.00
7 Bovenlight Aluminium 0,5 x 1 m dengan kisi-kisi aluminium plat 1 BH 347,250.00
8 Bovenlight Aluminium 0,5 x 1 m dengan bagian dalam kaca 1 BH 363,670.00
XIV. PEKERJAAN KACA DAN PENGGANTUNG
NO URAIAN SATUAN BIAYA (Rp.) KETERANGAN
1 Pasang Kunci Tanam Besar 1 BH 329,800.00
2 Pasang Kunci Tanam Sedang 1 BH 213,300.00
3 Pasang Kunci bulat putar Kamar Mandi 1 BH 212,900.00
4 Pasang Engsel Pintu 1 BH 54,950.00
5 Pasang Engsel Jendela 1 BH 38,300.00
6 Pasang Kait Angin 1 BH 39,950.00
7 Pasang Door Closer 1 BH 478,500.00
8 Pasang Pegangan Pintu / Door Holder 1 BH 116,500.00
9 Pasang Penahan Pintu / Door Stoper 1 BH 131,500.00
10 Pasang Grendel / sloot pintu 1 BH 99,000.00
11 Pasang Grendel / sloot jendela 1 BH 86,000.00
12 Pasang Tarikan jendela 1 BH 91,500.00
13 Pasang Kaca polos, tebal 3 mm 1 M2 86,610.00
14 Pasang Kaca polos, tebal 5 mm 1 M2 162,950.00
15 Pasang Kaca Ray band, tebal 5 mm 1 M2 190,450.00

XV. PEKERJAAN PENGECATAN


NO URAIAN SATUAN BIAYA (Rp.) KETERANGAN
1 Mengikis / Mengerok / mengelupas Permukaan Cat Tembok Lama 1 M2 8,750.00
2 Mendempul Dan Menggosok Kayu 1 M2 13,550.00
3 Pengecatan Kayu Lama 1 M2 63,750.00
4 Pengecatan Kayu Baru 1 M2 56,250.00
5 Pengecatan Kayu dengan Politur 1 M2 42,620.00
6 Pengecatan Kayu dengan Melamik 1 M2 40,700.00
7 Pengecatan Kayu dengan Cat Residu/Ter 1 M2 15,690.00
8 Pengecatan Tembok/Plafond Baru Kwalitas Sedang 1 M2 26,520.00
9 Pengecatan Tembok/Plafond Baru Kwalitas Baik 1 M2 29,520.00
10 Pengecatan Tembok Lama 1 M2 1,750.00
11 Pengecatan exterior 1 M2 88,220.00
12 Memasang Wallpaper 1 M2 48,470.00
13 Pengecatan Permukaan Baja dengan Meni Besi 1 M2 28,280.00
14 Pengecatan Permukaan Baja dengan Meni Besi dan cat 1 M2 49,680.00

XVI. PEKERJAAN LISTRIK


NO URAIAN SATUAN BIAYA (Rp.) KETERANGAN
1 Pasang titik Stop kontak 1 TTK 222,800.00
2 Pasang titik Lampu 1 TTK 218,000.00
3 Pasang Lampu XL 1 M2 71,080.00
4 Pasang Lampu TL 1 M2 73,580.00
5 Pasang Lampu downlight 1 M2 109,650.00
6 Pasang Lampu Pijar 1 M2 18,560.00
7 Pasang Taman 1 M2 231,610.00
8 Pasang Panel Listrik 1 M2 235,000.00
9 Penyambungan daya Listrik 1LS 2,000,000.00
PROGRES KEMAJUAN PEKERJAAN PEMBANGUNAN RUMAH TEMPAT TINGGAL

PROGRES PEKERJAAN BOBOT


BOBOT TERHADAP
NO. URAIAN PEKERJAAN VOLUME SATUAN MINGGU LALU 2 MINGGU INI S/D MINGGU INI
ITEM
(%) VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT PEKERJAAN
I. PEKERJAAN PERSIAPAN, GALIAN DAN URUGAN
1 Pekerjaan persiapan lahan (pembersihan lokasi pekerjaan) 150.00 m² 0.63 #REF! #REF! - #REF! #REF! #REF!
2 Pekerjaan pengukuran dan pasangan bouw plank 45.00 m1 1.26 #REF! #REF! - #REF! #REF! #REF!
3 Pekerjaan galian tanah untuk pondasi 81.50 m³ 1.45 #REF! #REF! - #REF! #REF! #REF!
4 Urugan tanah kembali sisi pondasi 24.45 m³ 0.22 #REF! #REF! 24.45 0.22 #REF! #REF! #REF!
5 Urugan tanah untuk peninggian lantai 78.75 m³ 4.56 #REF! #REF! 78.75 4.56 #REF! #REF! #REF!
6 Pekerjaan urugan pasir di bawah pondasi 3.10 m³ 0.24 #REF! #REF! - #REF! #REF! #REF!
7 Pekerjaan urugan pasir di bawah lantai 5.63 m³ 0.43 #REF! #REF! 5.63 0.43 #REF! #REF! #REF!

II PEKERJAAN STRUKTUR PONDASI DAN BETON


1 Membuat Poerplat Beton Bertulang 100/100/25cm ( 115 KG Besi + Bekisting ) 5.00 m³ 12.10 #REF! #REF! - #REF! #REF! #REF!
2 Pancang Ulin 10/10-800cm 100.00 Ttk 15.85 #REF! #REF! - #REF! #REF! #REF!
3 Membuat Pondasi Batu belah 1 Pc : 5 Psr 14.60 m³ 6.32 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
5 Membuat Sloof Beton Bertulang 20/40cm ( 200 KG Besi + Bekisting ) 7.20 m³ 13.42 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
6 Membuat Kolom Beton Bertulang 13/40cm ( lantai 1 ) 5.20 m³ 14.34 #REF! #REF! 5.20 14.34 #REF! #REF! #REF!
6 Membuat Kolom Beton Bertulang 13/20cm ( lantai 2 ) 3.30 m³ 8.10 #REF! #REF! - #REF! #REF! #REF!
7 Membuat Kolom praktis Beton Bertulang 10/10cm ( lantai 1 ) 0.50 m³ 1.38 #REF! #REF! - #REF! #REF! #REF!
7 Membuat Kolom praktis Beton Bertulang 10/10cm ( lantai 2 ) 0.30 m³ 0.83 #REF! #REF! - #REF! #REF! #REF!
8 Membuat Balok Beton Bertulang 20/30cm ( lantai 1 ) 5.80 m³ 14.24 #REF! #REF! 5.80 14.24 #REF! #REF! #REF!
8 Membuat Balok Beton Bertulang 15/20cm ( lantai 1 ) 1.20 m³ 2.95 #REF! #REF! 1.20 2.95 #REF! #REF! #REF!
9 Membuat Ring Balok Beton Bertulang 13/20cm ( lantai 2 ) 2.70 m³ 6.31 #REF! #REF! - #REF! #REF! #REF!
10 Membuat Plat Atap Beton Bertulang tbl 10cm 2.60 m³ 6.29 #REF! #REF! - #REF! #REF! #REF!
11 Membuat Plat Lantai Beton Bertulang tbl 12cm ( lantai 2 ) 14.20 m³ 35.32 #REF! #REF! 14.20 35.32 #REF! #REF! #REF!
12 Membuat Meja dapur plat Beton Bertulang 0.40 m³ 0.99 #REF! #REF! - #REF! #REF! #REF!
13 Membuat Beton lantai kerja dibawah lantai 1 PC : 3 Splt: 5 Psr 6.00 m³ 2.18 #REF! #REF! 6.00 2.18 #REF! #REF! #REF!
14 Membuat Tangga Beton Bertulang 1.60 m³ 3.68 #REF! #REF! - #REF! #REF! #REF!

III PEKERJAAN PASANGAN DAN PLESTERAN


2 Pasangan dinding bata merah 1 : 5 ( lantai 1 ) 288.00 m² 15.28 #REF! #REF! 122.50 6.50 #REF! #REF! #REF!
2 Pasangan dinding bata merah 1 : 5 ( lantai 2 ) 332.50 m² 17.64 #REF! #REF! - #REF! #REF! #REF!
4 Plesteran 1 : 5 (lantai 1) 576.00 m² 13.08 #REF! #REF! - #REF! #REF! #REF!
5 Plesteran 1 : 5 (lantai 2) 665.00 m² 15.11 #REF! #REF! - #REF! #REF! #REF!
7 Accian 1,241.00 m² 19.21 #REF! #REF! - #REF! #REF! #REF!
6 Ban plesteran diaci 157.50 m1 4.82 #REF! #REF! - #REF! #REF! #REF!

IV PEKERJAAN LANTAI DAN DINDING


1 Pasangan lantai keramik motif 40 cm x 40 cm 203.00 m² 10.98 #REF! #REF! - #REF! #REF! #REF!
2 Pasangan lantai keramik polos 20 cm x 20 cm u/ (KM/WC) 12.00 m² 0.59 #REF! #REF! - #REF! #REF! #REF!
3 Pasangan lantai keramik polos 30 cm x 30 cm untuk teras 31.00 m² 2.74 #REF! #REF! - #REF! #REF! #REF!
4 Pasangan lantai keramik polos 30 cm x 30 cm untuk tangga 15.00 m² 1.32 #REF! #REF! - #REF! #REF! #REF!
5 Pasangan dinding keramik 20 cm x 25 cm u/ KM (WC) 17.10 m² 1.25 #REF! #REF! - #REF! #REF! #REF!
6 Pasangan dinding keramik 20 cm x 20 cm u/ meja dapur 10.20 m² 0.62 #REF! #REF! - #REF! #REF! #REF!
6 Pasangan dinding bata tempel 18.50 m² 2.21 #REF! #REF! - #REF! #REF! #REF!
8 Pasangan plint keramik 10 cm x 30 cm 314.00 m1 6.03 #REF! #REF! - #REF! #REF! #REF!
PROGRES PEKERJAAN BOBOT
BOBOT TERHADAP
NO. URAIAN PEKERJAAN VOLUME SATUAN MINGGU LALU 2 MINGGU INI S/D MINGGU INI
ITEM
(%) VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT PEKERJAAN
V PEKERJAAN ATAP
1 Pasang rangka atap baja ringan 110.00 m² 7.55 #REF! #REF! - #REF! #REF! #REF!
3 Pasang Atap Genteng Metal 110.00 m² 5.87 #REF! #REF! - #REF! #REF! #REF!
4 Pasang Nok Genteng Metal 33.50 m1 1.48 #REF! #REF! - #REF! #REF! #REF!
5 Pasangan lisplank kayu 3/30 43.00 m1 1.72 #REF! #REF! - #REF! #REF! #REF!

VI PEKERJAAN PLAFON
1 Pasangan plafon Gypsum + rangka plafon hollow 237.80 m² 19.44 #REF! #REF! - #REF! #REF! #REF!
2 Pasangan lis plafon gypsum 314.00 m1 4.47 #REF! #REF! - #REF! #REF! #REF!

VII PEKERJAAN KUSEN, PINTU DAN JENDELA


1 Pasangan kusen kayu Bengkirai 102.30 m1 4.32 #REF! #REF! - #REF! #REF! #REF!
2 Pasangan daun pintu Kaca rangka kayu kamper 4.00 Bh 1.37 #REF! #REF! - #REF! #REF! #REF!
3 Pasangan daun pintu panel double teakwood rangka kayu kamper 7.00 Bh 2.40 #REF! #REF! - #REF! #REF! #REF!
5 Pasangan daun pintu ulin u/ km/wc 3.00 Bh 1.03 #REF! #REF! - #REF! #REF! #REF!
6 Pasangan daun jendela kaca (50x120) 2.00 Bh 0.42 #REF! #REF! - #REF! #REF! #REF!
7 Pasangan daun jendela kaca (50x170) 9.00 Bh 2.38 #REF! #REF! - #REF! #REF! #REF!
Pasangan boven light u/ km/wc (50 cm x 60 cm) 1.00 Bh 0.18 #REF! #REF! - #REF! #REF! #REF!
8 Pasangan boven light di atas kusen pintu dan jendela (20 cm x 20 cm) 29.00 Bh 0.38 #REF! #REF! - #REF! #REF! #REF!

VIII PEKERJAAN PERLENGKAPAN PINTU DAN JENDELA


1 Pasangan kunci pintu 2 slaag (putaran) 7.00 Bh 1.22 #REF! #REF! - #REF! #REF! #REF!
2 Pasangan kunci pintu KM (WC) tipe alpha bulat 3.00 Bh 0.34 #REF! #REF! - #REF! #REF! #REF!
3 Pasangan engsel pintu standard 4 inci 42.00 Bh 1.22 #REF! #REF! - #REF! #REF! #REF!
4 Pasangan engsel jendela standard 3 inci 22.00 Bh 0.45 #REF! #REF! - #REF! #REF! #REF!
5 Pasangan grendel pintu 2.00 Bh 0.10 #REF! #REF! - #REF! #REF! #REF!
6 Pasangan grendel jendela 22.00 Bh 1.00 #REF! #REF! - #REF! #REF! #REF!
7 Pasangan kait angin jendela 22.00 Bh 0.46 #REF! #REF! - #REF! #REF! #REF!
8 Pasangan tarikan jendela 9.00 Bh 0.44 #REF! #REF! - #REF! #REF! #REF!

IX PEKERJAAN SANITAIR
1 Pasangan bak mandi fiber glass 2.00 Bh 0.95 #REF! #REF! - #REF! #REF! #REF!
2 Pasangan kloset jongkok 1.00 Bh 0.28 #REF! #REF! - #REF! #REF! #REF!
Pasangan Kloset duduk 2.00 Bh 3.16 #REF! #REF! - #REF! #REF! #REF!
Pasang Bathtube + asesoris 1.00 Bh 3.96 #REF! #REF! - #REF! #REF! #REF!
Pasangan Shower + asesoris 2.00 Bh 0.79 #REF! #REF! - #REF! #REF! #REF!
3 Pasangan kran air KM / WC 3.00 Bh 0.11 #REF! #REF! - #REF! #REF! #REF!
Pasangan tempat sabun 3.00 Bh 0.26 #REF! #REF! - #REF! #REF! #REF!
4 Pasangan kran air taman + wudlu 3.00 Bh 0.11 #REF! #REF! - #REF! #REF! #REF!
5 Pasangan kran air meja dapur tipe angsa 1.00 Bh 0.09 #REF! #REF! - #REF! #REF! #REF!
6 Pasangan floor drain 4.00 Bh 0.16 #REF! #REF! - #REF! #REF! #REF!
7 Pasangan kitchen zink meja dapur 1.00 Bh 0.30 #REF! #REF! - #REF! #REF! #REF!
5 Pekerjaan septic tank dan rembesan 1.00 Unit 4.10 #REF! #REF! - #REF! #REF! #REF!
PROGRES PEKERJAAN BOBOT
BOBOT TERHADAP
NO. URAIAN PEKERJAAN VOLUME SATUAN MINGGU LALU 2 MINGGU INI S/D MINGGU INI
ITEM
(%) VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT PEKERJAAN
X PASANGAN INSTALASI AIR
1 Pasangan pipa PVC diameter 1/2 inci 64.50 m1 0.71 #REF! #REF! - #REF! #REF! #REF!
2 Pasangan pipa PVC diameter 3 inci 20.00 m1 0.50 #REF! #REF! - #REF! #REF! #REF!
3 Pasangan pipa PVC diameter 4 inci 60.00 m1 2.52 #REF! #REF! - #REF! #REF! #REF!
4 Accesoris lain (lem pipa, ampelas, sambungan, dll 10 % pipa) 1.00 Ls 1.12 #REF! #REF! - #REF! #REF! #REF!
5 Pekerjaan septic tank dan rembesan 1.00 Unit 4.10 #REF! #REF! - #REF! #REF! #REF!

XI PEKERJAAN INSTALSI LISTRIK


1 Pasangan instalasi titik nyala lampu kabel NYM 3 x 2,5 mm 44.00 Ttk 5.18 #REF! #REF! - #REF! #REF! #REF!
2 Pasangan instalasi daya stop kontak kabel NYM 3x2,5 mm 19.00 Ttk 2.19 #REF! #REF! - #REF! #REF! #REF!
3 Pasangan lampu downlight 5 watt 16.00 Bh 0.93 #REF! #REF! - #REF! #REF! #REF!
3 Pasangan lampu SL 18 watt 7.00 Bh 0.26 #REF! #REF! - #REF! #REF! #REF!
4 Pasangan lampu TL 1 x 18 watt 18.00 Bh 0.70 #REF! #REF! - #REF! #REF! #REF!
4 Pasangan lampu LED Sembunyi 3.00 Set 0.79 #REF! #REF! - #REF! #REF! #REF!
5 Pasangan panel listrik/ MCB 1.00 Bh 0.12 #REF! #REF! - #REF! #REF! #REF!

XII PEKERJAAN PENGECATAN


1 Pengecatan dinding dengan cat tembok kwalitas baik 1,241.00 m² 19.35 #REF! #REF! - #REF! #REF! #REF!
2 Pengecatan plafon dengan cat tembok kwalitas sedang 237.80 m² 3.33 #REF! #REF! - #REF! #REF! #REF!
3 Water proofing dak atap dan km/wc lt 02 52.00 m² 3.98 #REF! #REF! - #REF! #REF! #REF!
3 Pengecatan lis plank dengan cat minyak 15.48 m² 0.46 #REF! #REF! - #REF! #REF! #REF!
5 Pengecatan kusen dengan cat minyak 36.83 m² 1.09 #REF! #REF! - #REF! #REF! #REF!
6 Pengecatan bovenlight dengan cat minyak 2.32 m² 0.07 #REF! #REF! - #REF! #REF! #REF!
7 Pengecatan daun pintu dengan cat minyak 52.90 m² 1.57 #REF! #REF! - #REF! #REF! #REF!
8 Pengecatan daun jendela dengan cat minyak 11.00 m² 0.33 #REF! #REF! - #REF! #REF! #REF!

XIII PEKERJAAN LAIN-LAIN


1 Pembersihan lahan setelah selesai pekerjaan 150.00 m² 0.40 #REF! #REF! - #REF! #REF! #REF!
2 Pasang Railing Besi Hollow u/ Tangga dan Balkon 17.50 m1 2.54 #REF! #REF! - #REF! #REF! #REF!

JUMLAH 388.73 #REF! #REF! #REF!

Samarinda, 25 Februari 2016


Daftar Rencana Anggaran Biaya

PEKERJAAN PARIT
HARGA SATUAN
NO. URAIAN PEKERJAAN VOLUME JUMLAH HARGA (Rp)
SATUAN Rp

I PEKERJAAN PERSIAPAN
1 Pekerjaan persiapan lahan (pembersihan lokasi pekerjaan) 84.50 m² 8,000.00 676,000.00
2 Pekerjaan pengukuran dan pasangan bouw plank 34.00 m1 53,060.00 1,804,040.00
Jumlah 2,480,040.00

II PEKERJAAN TANAH DAN PONDASI


1 Pekerjaan galian tanah untuk pondasi 32.30 m³ 33,600.00 1,085,280.00
2 Urugan tanah kembali sisi pondasi 10.77 m³ 16,800.00 180,880.00
3 Pekerjaan urugan pasir di bawah pondasi 2.60 m³ 145,600.00 378,560.00
4 Membuat Pondasi Batu belah 1 Pc : 5 Psr 20.80 m³ 819,360.00 17,042,688.00
5 Pancang Ulin 8/8-200cm 45.00 Ttk 175,000.00 7,875,000.00
Jumlah 26,562,408.00

III PEKERJAAN PASANGAN DAN PLESTERAN


1 Membuat Beton Rabat lantai 1 PC : 3 Kr : 5 Psr 1.00 m³ 688,300.00 688,300.00
2 Plesteran 1 : 5 132.00 m² 43,000.00 5,676,000.00
Jumlah 6,364,300.00
REKAPITULASI BIAYA
PEKERJAAN PARIT

NO. URAIAN PEKERJAAN JUMLAH HARGA (Rp)

I PEKERJAAN PERSIAPAN 2,480,040.00


II PEKERJAAN TANAH DAN PONDASI 26,562,408.00
III PEKERJAAN PASANGAN DAN PLESTERAN 6,364,300.00
JUMLAH 35,406,748.00

Samarinda, Agustus 2020

................................
Daftar Rencana Anggaran Biaya

PEKERJAAN BANGUNAN GUDANG


HARGA SATUAN
NO. URAIAN PEKERJAAN VOLUME JUMLAH HARGA (Rp)
SATUAN Rp

I PEKERJAAN PERSIAPAN
1 Pekerjaan persiapan lahan (pembersihan lokasi pekerjaan) 84.50 m² 8,000.00 676,000.00
2 Pekerjaan pengukuran dan pasangan bouw plank 34.00 m1 53,060.00 1,804,040.00
Jumlah 2,480,040.00

II PEKERJAAN TANAH DAN PONDASI


1 Pekerjaan galian tanah untuk pondasi 5.50 m³ 33,600.00 184,800.00
2 Urugan tanah kembali sisi pondasi 1.83 m³ 16,800.00 30,800.00
3 Urugan tanah untuk peninggian lantai 27.50 m³ 109,600.00 3,014,000.00
4 Pekerjaan urugan pasir di bawah pondasi 0.80 m³ 145,600.00 116,480.00
5 Pekerjaan urugan pasir di bawah lantai 2.10 m³ 145,600.00 305,760.00
6 Membuat Pondasi Batu belah 1 Pc : 5 Psr 7.30 m³ 819,360.00 5,981,328.00
7 Pancang Ulin 8/8-200cm + kalang sunduk 18.00 Ttk 175,000.00 3,150,000.00
Jumlah 12,783,168.00

III PEKERJAAN STRUKTUR BETON


1 Membuat Sloof Beton Bertulang 15/20cm 0.80 m³ 3,528,700.00 2,822,960.00
7 Membuat Kolom praktis Beton Bertulang 10/10cm 0.40 m³ 3,842,900.00 1,537,160.00
10 Membuat Plat Atap Beton Bertulang tbl 10cm 0.50 m³ 3,842,900.00 1,921,450.00
13 Membuat Beton lantai kerja dibawah lantai 1 PC : 3 Splt: 5 Psr 2.10 m³ 688,300.00 1,445,430.00
Jumlah 7,727,000.00

IV PEKERJAAN PASANGAN DAN PLESTERAN


1 Pasangan dinding bata merah 1 : 5 ( lantai 1 ) 85.20 m² 100,400.00 8,554,080.00
2 Plesteran 1 : 5 (lantai 1) 170.40 m² 43,000.00 7,327,200.00
Jumlah 15,881,280.00

V PEKERJAAN LANTAI DAN DINDING


1 Pasangan lantai keramik motif 40 cm x 40 cm 42.25 m² 102,390.00 4,325,977.50
Jumlah 4,325,977.50

VI PEKERJAAN ATAP
1 Pasang rangka atap baja ringan 86.70 m² 130,000.00 11,271,000.00
2 Pasang Atap Spandeck Berpasir 86.70 m² 55,120.00 4,778,904.00
3 Pasang Nok Spandeck 26.40 m1 83,650.00 2,208,360.00
4 Pasangan lisplank GRC 8/200 56.40 m1
59,100.00 3,333,240.00
Jumlah 21,591,504.00

VII PEKERJAAN PLAFON


1 Pasangan plafon Gypsum + rangka plafon hollow 42.25 m² 95,510.00 4,035,297.50
2 Pasangan plafon GRC + rangka plafon hollow 30.00 m² 89,140.00 2,674,200.00
3 Pasangan lis plafon gypsum 52.00 m1 26,930.00 1,400,360.00
4 Pasangan lis plafon kayu 1 cm x 4 cm ( yg menempel pada list 34.00 m1 12,540.00 426,360.00
Jumlah 8,536,217.50
HARGA SATUAN
NO. URAIAN PEKERJAAN VOLUME JUMLAH HARGA (Rp)
SATUAN Rp

VIII PEKERJAAN KUSEN, PINTU DAN JENDELA


1 Pasangan kusen kayu Bengkirai 18.70 m1 80,000.00 1,496,000.00
2 Pasangan daun pintu panel double teakwood rangka kayu kam 3.00 Bh 650,000.00 1,950,000.00
4 Pasangan daun jendela kaca (50x120) 1.00 Bh 400,000.00 400,000.00
Jumlah 3,846,000.00

IX PEKERJAAN PERLENGKAPAN PINTU DAN JENDELA


1 Pasangan kunci pintu 2 slaag (putaran) 2.00 Bh 329,800.00 659,600.00
3 Pasangan engsel pintu standard 4 inci 9.00 Bh 54,950.00 494,550.00
4 Pasangan engsel jendela standard 3 inci 2.00 Bh 38,300.00 76,600.00
5 Pasangan grendel pintu 2.00 Bh 99,000.00 198,000.00
6 Pasangan grendel jendela 2.00 Bh 86,000.00 172,000.00
7 Pasangan kait angin jendela 2.00 Bh 39,950.00 79,900.00
8 Pasangan tarikan jendela 1.00 Bh 91,500.00 91,500.00
9 Pasangan kaca polos 5 mm 1.00 m² 162,950.00 162,950.00
Jumlah 1,935,100.00

XII PEKERJAAN INSTALSI LISTRIK


1 Pasangan instalasi titik nyala lampu kabel NYM 3 x 2,5 mm 4.00 Ttk 218,000.00 872,000.00
2 Pasangan instalasi daya stop kontak kabel NYM 3x2,5 mm 2.00 Ttk 222,800.00 445,600.00
3 Pasangan lampu downlight 5 watt 4.00 Bh 109,650.00 438,600.00
5 Pasangan panel listrik/ MCB 1.00 Bh 235,000.00 235,000.00
Jumlah 1,991,200.00

XIII PEKERJAAN PENGECATAN


1 Pengecatan dinding dengan cat tembok kwalitas baik 144.40 m² 29,520.00 4,262,688.00
2 Pengecatan plafon dengan cat tembok kwalitas sedang 72.25 m² 26,520.00 1,916,070.00
3 Pengecatan lis plank dengan cat minyak 11.28 m² 56,250.00 634,500.00
5 Pengecatan kusen dengan cat minyak 6.73 m² 56,250.00 378,675.00
7 Pengecatan daun pintu dengan cat minyak 9.60 m² 56,250.00 540,000.00
8 Pengecatan daun jendela dengan cat minyak 0.60 m² 56,250.00 33,750.00
Jumlah 7,765,683.00
REKAPITULASI BIAYA
PEKERJAAN BANGUNAN GUDANG

NO. URAIAN PEKERJAAN JUMLAH HARGA (Rp)

I PEKERJAAN PERSIAPAN 2,480,040.00


II PEKERJAAN TANAH DAN PONDASI 12,783,168.00
III PEKERJAAN STRUKTUR BETON 7,727,000.00
IV PEKERJAAN PASANGAN DAN PLESTERAN 15,881,280.00
V PEKERJAAN LANTAI DAN DINDING 4,325,977.50
VI PEKERJAAN ATAP 21,591,504.00
VII PEKERJAAN PLAFON 8,536,217.50
VIII PEKERJAAN KUSEN, PINTU DAN JENDELA 3,846,000.00
IX PEKERJAAN PERLENGKAPAN PINTU DAN JENDELA 1,935,100.00
X PEKERJAAN INSTALSI LISTRIK 1,991,200.00
XI PEKERJAAN PENGECATAN 7,765,683.00
JUMLAH 88,863,170.00

Samarinda, Agustus 2020

................................
Daftar Rencana Anggaran Biaya

PEKERJAAN RUMAH COUPLE


HARGA SATUAN
NO. URAIAN PEKERJAAN VOLUME JUMLAH HARGA (Rp)
SATUAN Rp

I PEKERJAAN PERSIAPAN
1 Pekerjaan persiapan lahan (pembersihan lokasi pekerjaan) 71.50 m² 8,000.00 572,000.00
2 Pekerjaan pengukuran dan pasangan bouw plank 43.00 m1 53,060.00 2,281,580.00
Jumlah 2,853,580.00

II PEKERJAAN TANAH DAN PONDASI


1 Pekerjaan galian tanah untuk pondasi 15.30 m³ 33,600.00 514,080.00
2 Urugan tanah kembali sisi pondasi 5.10 m³ 16,800.00 85,680.00
3 Urugan tanah untuk peninggian lantai 46.50 m³ 109,600.00 5,096,400.00
4 Pekerjaan urugan pasir di bawah pondasi 2.20 m³ 145,600.00 320,320.00
5 Pekerjaan urugan pasir di bawah lantai 3.60 m³ 145,600.00 524,160.00
6 Membuat Pondasi Batu belah 1 Pc : 5 Psr 20.44 m³ 819,360.00 16,747,718.40
7 Pancang Ulin 8/8-200cm + kalang sunduk 32.00 Ttk 175,000.00 5,600,000.00
Jumlah 28,888,358.40

III PEKERJAAN STRUKTUR BETON


1 Membuat Sloof Beton Bertulang 15/20cm 2.20 m³ 3,528,700.00 7,763,140.00
2 Membuat Kolom praktis Beton Bertulang 10/10cm 1.10 m³ 3,842,900.00 4,227,190.00
3 Membuat Balok Beton Bertulang 10/20cm 0.10 m³ 3,842,900.00 384,290.00
4 Membuat Ring Balok Beton Bertulang 10/20cm ( lantai 2 ) 1.90 m³ 3,842,900.00 7,301,510.00
5 Membuat Plat Atap Beton Bertulang tbl 10cm 0.50 m³ 3,842,900.00 1,921,450.00
6 Membuat Beton lantai kerja dibawah lantai 1 PC : 3 Splt: 5 Psr 3.60 m³ 688,300.00 2,477,880.00
Jumlah 24,075,460.00

IV PEKERJAAN PASANGAN DAN PLESTERAN


1 Pasangan dinding bata merah 1 : 5 ( lantai 1 ) 243.80 m² 100,400.00 24,477,520.00
2 Plesteran 1 : 5 (lantai 1) 446.40 m² 43,000.00 19,195,200.00
Jumlah 43,672,720.00

V PEKERJAAN LANTAI DAN DINDING


1 Pasangan lantai keramik motif 40 cm x 40 cm 66.50 m² 102,390.00 6,808,935.00
2 Pasangan lantai keramik polos 20 cm x 20 cm u/ (KM/WC) 5.00 m² 93,690.00 468,450.00
3 Pasangan dinding keramik 20 cm x 25 cm u/ KM (WC) 17.10 m² 138,670.00 2,371,257.00
Jumlah 9,648,642.00

VI PEKERJAAN ATAP
1 Pasang Gording Kayu 5/10cm 0.60 m³ 3,038,600.00 1,823,160.00
2 Pasang Atap Spandeck Berpasir 116.10 m² 55,120.00 6,399,432.00
3 Pasang Nok Spandeck 12.00 m1 83,650.00 1,003,800.00
4 Pasangan lisplank GRC 8/200 56.40 m1 59,100.00 3,333,240.00
Jumlah 12,559,632.00

VII PEKERJAAN PLAFON


1 Pasangan plafon Gypsum + rangka plafon hollow 67.50 m² 95,510.00 6,446,925.00
2 Pasangan plafon GRC + rangka plafon hollow 34.20 m² 89,140.00 3,048,588.00
3 Pasangan lis plafon gypsum 143.00 m1 26,930.00 3,850,990.00
4 Pasangan lis plafon kayu 1 cm x 4 cm ( yg menempel pada list 56.40 m1 12,540.00 707,256.00
Jumlah 14,053,759.00

VIII PEKERJAAN KUSEN, PINTU DAN JENDELA


1 Pasangan kusen kayu Bengkirai 66.60 m1 80,000.00 5,328,000.00
2 Pasangan daun pintu panel double teakwood rangka kayu kam 4.00 Bh 650,000.00 2,600,000.00
3 Pasangan daun pintu ulin u/ km/wc 2.00 Bh 650,000.00 1,300,000.00
4 Pasangan daun jendela kaca (50x120) 4.00 Bh 400,000.00 1,600,000.00
5 Pasangan daun jendela kaca (50x170) 2.00 Bh 500,000.00 1,000,000.00
Pasangan boven light u/ km/wc (50 cm x 60 cm) 2.00 Bh 350,000.00 700,000.00
HARGA SATUAN
NO. URAIAN PEKERJAAN VOLUME JUMLAH HARGA (Rp)
SATUAN Rp

Jumlah 12,528,000.00
HARGA SATUAN
NO. URAIAN PEKERJAAN VOLUME JUMLAH HARGA (Rp)
SATUAN Rp

IX PEKERJAAN PERLENGKAPAN PINTU DAN JENDELA


1 Pasangan kunci pintu 2 slaag (putaran) 4.00 Bh 329,800.00 1,319,200.00
2 Pasangan kunci pintu KM (WC) tipe alpha bulat 2.00 Bh 212,900.00 425,800.00
3 Pasangan engsel pintu standard 4 inci 18.00 Bh 54,950.00 989,100.00
4 Pasangan engsel jendela standard 3 inci 12.00 Bh 38,300.00 459,600.00
5 Pasangan grendel pintu 4.00 Bh 99,000.00 396,000.00
6 Pasangan grendel jendela 12.00 Bh 86,000.00 1,032,000.00
7 Pasangan kait angin jendela 12.00 Bh 39,950.00 479,400.00
8 Pasangan tarikan jendela 6.00 Bh 91,500.00 549,000.00
9 Pasangan kaca polos 5 mm 3.30 m² 162,950.00 537,735.00
Jumlah 6,187,835.00

X PEKERJAAN SANITAIR
1 Pasangan kloset jongkok 2.00 Bh 525,750.00 1,051,500.00
2 Pasangan kran air KM / WC 2.00 Bh 70,420.00 140,840.00
3 Pasangan tempat sabun 2.00 Bh 163,300.00 326,600.00
4 Pasangan kran air taman + wudlu 2.00 Bh 70,420.00 140,840.00
5 Pasangan kran air meja dapur tipe angsa 1.00 Bh 171,910.00 171,910.00
6 Pasangan floor drain 4.00 Bh 76,300.00 305,200.00
7 Pasangan kitchen zink meja dapur 2.00 Bh 574,900.00 1,149,800.00
5 Pekerjaan septic tank dan rembesan 2.00 Unit 3,750,000.00 7,500,000.00
Jumlah 10,786,690.00

XI PASANGAN INSTALASI AIR


1 Pasangan pipa PVC diameter 1/2 inci 17.00 m1 20,880.00 354,960.00
2 Pasangan pipa PVC diameter 3 inci 4.00 m1 47,770.00 191,080.00
3 Pasangan pipa PVC diameter 4 inci 8.00 m1 79,350.00 634,800.00
4 Accesoris lain (lem pipa, ampelas, sambungan, dll 10 % pipa) 1.00 Ls 354,252.00 354,252.00
Jumlah 1,535,092.00

XII PEKERJAAN INSTALSI LISTRIK


1 Pasangan instalasi titik nyala lampu kabel NYM 3 x 2,5 mm 12.00 Ttk 218,000.00 2,616,000.00
2 Pasangan instalasi daya stop kontak kabel NYM 3x2,5 mm 6.00 Ttk 222,800.00 1,336,800.00
3 Pasangan lampu downlight 5 watt 8.00 Bh 109,650.00 877,200.00
4 Pasangan lampu XL 14 watt 4.00 Bh 71,080.00 284,320.00
5 Pasangan panel listrik/ MCB 2.00 Bh 235,000.00 470,000.00
Jumlah 5,584,320.00

XIII PEKERJAAN PENGECATAN


1 Pengecatan dinding dengan cat tembok kwalitas baik 381.30 m² 29,520.00 11,255,976.00
2 Pengecatan plafon dengan cat tembok kwalitas sedang 101.70 m² 26,520.00 2,697,084.00
3 Pengecatan lis plank dengan cat minyak 11.28 m² 56,250.00 634,500.00
5 Pengecatan kusen dengan cat minyak 23.98 m² 56,250.00 1,348,650.00
6 Pengecatan bovenlight dengan cat minyak 0.60 m² 56,250.00 33,750.00
7 Pengecatan daun pintu dengan cat minyak 12.80 m² 56,250.00 720,000.00
8 Pengecatan daun jendela dengan cat minyak 4.10 m² 56,250.00 230,625.00
Jumlah 16,920,585.00
REKAPITULASI BIAYA

PEKERJAAN RUMAH COUPLE

NO. URAIAN PEKERJAAN JUMLAH HARGA (Rp)

I PEKERJAAN PERSIAPAN 2,853,580.00


II PEKERJAAN TANAH DAN PONDASI 28,888,358.40
III PEKERJAAN STRUKTUR BETON 24,075,460.00
IV PEKERJAAN PASANGAN DAN PLESTERAN 43,672,720.00
V PEKERJAAN LANTAI DAN DINDING 9,648,642.00
VI PEKERJAAN ATAP 12,559,632.00
VII PEKERJAAN PLAFON 14,053,759.00
VIII PEKERJAAN KUSEN, PINTU DAN JENDELA 12,528,000.00
IX PEKERJAAN PERLENGKAPAN PINTU DAN JENDELA 6,187,835.00
X PEKERJAAN SANITAIR 10,786,690.00
XI PASANGAN INSTALASI AIR 1,535,092.00
XII PEKERJAAN INSTALSI LISTRIK 5,584,320.00
XIII PEKERJAAN PENGECATAN 16,920,585.00
A HARGA RUMAH COUPLE (2 UNIT) 189,294,673.40
B HARGA RUMAH 4,5 TYPE COUPLE (9 UNIT) 851,826,030.30

Samarinda, Agustus 2020

................................
REKAPITULASI BIAYA KESELURUHAN

NO. URAIAN PEKERJAAN JUMLAH HARGA (Rp)

I PEKERJAAN RUMAH COUPLE Rp 851,826,030

II PEKERJAAN BANGUNAN GUDANG Rp 88,863,170

III PEKERJAAN PARIT Rp 35,406,748

JUMLAH Rp 976,095,948
DIBULATKAN Rp 976,095,000

Samarinda, Agustus 2020

................................
REKAPITULASI BIAYA UNTUK PEKERJAAN BAGIAN BAWAH

JUMLAH HARGA TOTAL JUMLAH


NILAI BIAYA JUMLAH
NO. URAIAN PEKERJAAN (Rp)
(Rp) (Rp) UNIT/TYPE (Rp)

A PEKERJAAN RUMAH COUPLE


I PEKERJAAN PERSIAPAN
1 Pekerjaan persiapan lahan (pembersihan lokasi pekerjaan) 572,000
2 Pekerjaan pengukuran dan pasangan bouw plank 2,281,580
2,853,580
II PEKERJAAN TANAH DAN PONDASI
1 Pekerjaan galian tanah untuk pondasi 514,080
2 Urugan tanah kembali sisi pondasi 85,680
3 Urugan tanah untuk peninggian lantai 5,096,400
4 Pekerjaan urugan pasir di bawah pondasi 320,320
5 Pekerjaan urugan pasir di bawah lantai 524,160
6 Membuat Pondasi Batu belah 1 Pc : 5 Psr 16,747,718
7 Pancang Ulin 8/8-200cm + kalang sunduk 5,600,000
28,888,358
III PEKERJAAN STRUKTUR BETON
1 Membuat Sloof Beton Bertulang 15/20cm 7,763,140
7,763,140
X PEKERJAAN SANITAIR
5 Pekerjaan septic tank dan rembesan 7,500,000
7,500,000
XI PASANGAN INSTALASI AIR
2 Pasangan pipa PVC diameter 3 inci 191,080
3 Pasangan pipa PVC diameter 4 inci 634,800
825,880 47,830,958.40 4.5 215,239,312.80

B PEKERJAAN BANGUNAN GUDANG


I PEKERJAAN PERSIAPAN
1 Pekerjaan persiapan lahan (pembersihan lokasi pekerjaan) 676,000
2 Pekerjaan pengukuran dan pasangan bouw plank 1,804,040
2,480,040
II PEKERJAAN TANAH DAN PONDASI
1 Pekerjaan galian tanah untuk pondasi 184,800
2 Urugan tanah kembali sisi pondasi 30,800
3 Urugan tanah untuk peninggian lantai 3,014,000
4 Pekerjaan urugan pasir di bawah pondasi 116,480
5 Pekerjaan urugan pasir di bawah lantai 305,760
6 Membuat Pondasi Batu belah 1 Pc : 5 Psr 5,981,328
7 Pancang Ulin 8/8-200cm + kalang sunduk 3,150,000
12,783,168
III PEKERJAAN STRUKTUR BETON
1 Membuat Sloof Beton Bertulang 15/20cm 2,822,960
2,822,960 18,086,168.00 1 18,086,168.00

C PEKERJAAN PARIT
I PEKERJAAN PERSIAPAN
1 Pekerjaan persiapan lahan (pembersihan lokasi pekerjaan) 676,000
2 Pekerjaan pengukuran dan pasangan bouw plank 1,804,040
2,480,040
II PEKERJAAN TANAH DAN PONDASI
1 Pekerjaan galian tanah untuk pondasi 1,085,280
2 Urugan tanah kembali sisi pondasi 180,880
3 Pekerjaan urugan pasir di bawah pondasi 378,560
4 Membuat Pondasi Batu belah 1 Pc : 5 Psr 17,042,688
5 Pancang Ulin 8/8-200cm 7,875,000
26,562,408
III PEKERJAAN PASANGAN DAN PLESTERAN
1 Membuat Beton Rabat lantai 1 PC : 3 Kr : 5 Psr 688,300
2 Plesteran 1 : 5 5,676,000
6,364,300 35,406,748.00 1 35,406,748.00

JUMLAH TOTAL 268,732,228.80


DIBULATKAN 268,732,000.00