A.

Analisa Harga Satuan Pekerjaan Persiapan


01. Memasang 1 M' Pagar Sementara Dari Kayu Tinggi 2 m
URAIAN
SATUAN VOLUME HARGA SATUAN
Bahan
- Dolken Kayu 8-10 / 400 cm
Btg
1.25
28,000.00
- Semen Portland
Kg
2.5
1,406.00
- Pasir beton
M3
0.005
255,400.00
- Koral Beton 2/3
M3
0.009
211,100.00
- Kayu balok terentang
M3
0.072
2,640,000.00
- Paku Biasa 2" - 5"
Kg
0.06
23,400.00
- Residu
Kg
0.4
8,100.00
Jumlah
Tenaga Kerja
- Pekerja
Oh
0.4
42,000.00
- Tukang Kayu
Oh
0.2
65,000.00
- Kepala Tukang
Oh
0.02
75,000.00
- Mandor
Oh
0.02
80,000.00
Jumlah
Total
Dibulatkan
02. Memasang 1 M' Pagar Sementara Seng Gelombang Tinggi 2 m
URAIAN
SATUAN VOLUME HARGA SATUAN
Bahan
- Dolken Kayu 8-10 / 400 cm
Btg
1.25
28,000.00
- Semen Portland
Kg
2.5
1,406.00
- Seng Gelombang BJLS-30
Lbr
1.2
62,900.00
- Pasir beton
M3
0.005
255,400.00
- Koral Beton 2/3
M3
0.009
211,100.00
- Kayu balok terentang
M3
0.072
2,640,000.00
- Paku Biasa 2" - 5"
Kg
0.06
23,400.00
- Meni Besi
Kg
0.45
30,400.00
Jumlah
Tenaga Kerja
- Pekerja
Oh
0.4
42,000.00
- Tukang Kayu
Oh
0.2
65,000.00
- Kepala Tukang
Oh
0.02
75,000.00
- Mandor
Oh
0.02
80,000.00
Jumlah
Total
Dibulatkan
03. Memasang 1 M' Pagar Sementara Kawat Duri Tinggi 1,80 m
URAIAN
SATUAN VOLUME HARGA SATUAN

Bahan
- Dolken Kayu 8-10 / 400 cm
- Semen Portland
- Kawat Duri
- Pasir beton
- Koral Beton 2/3
- Paku Biasa 2" - 5"
Jumlah
Tenaga Kerja
- Pekerja
- Tukang Kayu
- Kepala Tukang
- Mandor
Jumlah
Total
Dibulatkan

Btg
Kg
Kg
M3
M3
Kg

1
2
2.5
0.005
0.009
0.06

28,000.00
1,406.00
63,500.00
255,400.00
211,100.00
23,400.00

Oh
Oh
Oh
Oh

0.3
0.2
0.02
0.02

42,000.00
65,000.00
75,000.00
80,000.00

04. Membuat 1 M2 Pengukuran Dan Pasang Bouwplank


URAIAN
SATUAN VOLUME HARGA SATUAN
Bahan
- Kayu kaso 5/7
M3
0.012
1,870,500.00
- Paku Biasa 2" - 5"
Kg
0.02
23,400.00
- Kayu papan albasia
M3
0.007
2,071,700.00
Jumlah
Tenaga Kerja
- Pekerja
Oh
0.1
42,000.00
- Tukang Kayu
Oh
0.1
65,000.00
- Kepala Tukang
Oh
0.01
75,000.00
- Mandor
Oh
0.005
80,000.00
Jumlah
Total
Dibulatkan
05. Membuat 1 M2 Kantor Sementara dgn Lantai Diplester
URAIAN
SATUAN VOLUME HARGA SATUAN
Bahan
- Dolken Kayu 8-10 / 400 cm
Btg
1.25
28,000.00
- Kayu Balok terentang
M3
0.18
2,640,000.00
- Paku Biasa
Kg
0.85
23,400.00
- Besi Strip
Kg
1.1
26,800.00
- Semen Portland
Kg
35
1,406.00
- Pasir Pasang
M3
0.15
233,400.00
- Pasir beton
M3
0.1
255,400.00
- Koral Beton2/3
M3
0.15
211,100.00
- Bata Merah
Bh
30
775.00

Seng Plat
Kawat harmonika
Kaca Polos 3mm
Kunci Tanam
Plywood 120 x 240 x 0,4 cm
Jumlah
Tenaga Kerja
- Pekerja
- Tukang Kayu
- Tukang Batu
- Kepala Tukang
- Mandor
Jumlah
Total
Dibulatkan

m'
M2
M2
Bh
Lbr

0.25
2
0.08
0.15
0.06

15,815.00
35,900.00
87,400.00
94,500.00
140,000.00

Oh
Oh
Oh
Oh
Oh

2
2
1
0.3
0.05

42,000.00
65,000.00
65,000.00
75,000.00
80,000.00

06. Membuat 1 M2 Gudang Semen dan Alat-alat


URAIAN
SATUAN VOLUME HARGA SATUAN
Bahan
- Dolken Kayu 8-10 / 400 cm
Btg
1.7
28,000.00
- Kayu balok terentang
M3
0.21
2,640,000.00
- Paku Biasa
Kg
0.3
23,400.00
- Semen Portland
Kg
10.5
1,406.00
- Pasir Beton
M3
0.03
255,400.00
- Koral Beton 2/3
M3
0.05
211,100.00
- Seng Gelombang BJLS 30
Lbr
1.5
62,900.00
Jumlah
Tenaga Kerja
- Pekerja
Oh
1
42,000.00
- Tukang Kayu
Oh
2
65,000.00
- Kepala Tukang
Oh
0.2
75,000.00
- Mandor
Oh
0.05
80,000.00
Jumlah
Total
Dibulatkan
07. Membuat 1 M2 Bedeng Buruh
URAIAN
SATUAN
Bahan
- Dolken Kayu 8-10 / 400 cm
Btg
- Kayu balok terentang
M3
- Paku Biasa
Kg
- Semen Portland
Kg
- Pasir Beton
M3
- Koral Beton 2/3
M3

VOLUME HARGA SATUAN


1.25
0.186
0.3
18
0.03
0.05

28,000.00
2,640,000.00
23,400.00
1,406.00
255,400.00
211,100.00

- Seng Gelombang BJLS 30


Jumlah
Tenaga Kerja
- Pekerja
- Tukang Kayu
- Kepala Tukang
- Mandor
Jumlah
Total
Dibulatkan

Lbr

1.5

62,900.00

Oh
Oh
Oh
Oh

1
2
0.2
0.05

42,000.00
65,000.00
75,000.00
80,000.00

08. Membersihkan 1 M2 Lapangan dan Perataan


URAIAN
SATUAN VOLUME HARGA SATUAN
Bahan
Jumlah
Tenaga Kerja
- Pekerja
Oh
0.1
42,000.00
- Mandor
Oh
0.05
80,000.00
Jumlah
Total
Dibulatkan
09. Membuat 1 M2 Jalan Sementara
URAIAN
SATUAN
Bahan
- Batu Belah 15/20
M3
- Batu Pecah 5/7
M3
- Pasir Pasang
M3
Jumlah
Tenaga Kerja
- Pekerja
Oh
- Mandor
Oh
Jumlah
Total
Dibulatkan
10. Membongkar 1 M3 Beton Bertulang
URAIAN
SATUAN
Bahan
Jumlah
Tenaga Kerja
- Pekerja
Oh
- Mandor
Oh

VOLUME HARGA SATUAN


0.15
0.09
0.01

205,500.00
196,000.00
233,400.00

1
0.05

42,000.00
80,000.00

VOLUME HARGA SATUAN

6.667
0.333

42,000.00
80,000.00

Jumlah
Total
Dibulatkan
11. Membongkar 1 M3 Dinding Tembok Bata Merah
URAIAN
SATUAN VOLUME HARGA SATUAN
Bahan
Jumlah
Tenaga Kerja
- Pekerja
Oh
6.667
42,000.00
- Mandor
Oh
0.033
80,000.00
Jumlah
Total
Dibulatkan
12. Membuat 1 M Pagar beton Pracetak ( 5 x 50 x 213 ) cm
URAIAN
SATUAN VOLUME HARGA SATUAN
Bahan
- Panel Beton Pracetak
Lbr
0.986
199,200.00
- Kolom Beton Pracetak
Btg
0.525
264,000.00
- Pasir Beton
M3
0.074
255,400.00
- Koral 2/3
M3
0.146
211,100.00
- Semen abu - abu
Kg
45
1,406.00
Jumlah
Tenaga Kerja
- Pekerja
Oh
0.375
42,000.00
- Tukang Batu
Oh
0.125
65,000.00
- Kepala Tukang
Oh
0.012
75,000.00
- Mandor
Oh
0.019
80,000.00
Jumlah
Total
Dibulatkan
13. Membuat 1 M Pagar kawat ayam tiang besi L50.50.5, tinggi 1 m'
URAIAN
SATUAN VOLUME HARGA SATUAN
Bahan
- Kawat ram ayam
Lbr
0.434
14,900.00
- Besi siku L 50.50.5
Kg
6.786
18,300.00
- Besi pelat (1,2 x 3) mm
Kg
0.0424
18,300.00
- Baut
bh
4
600.00
- Semen Portland
Kg
2.5
1,406.00
- Pasir beton
M3
0.005
255,400.00
- Koral Beton 2/3
M3
0.009
211,100.00
Jumlah

Tenaga Kerja
- Pekerja
- Tukang Batu
- Kepala Tukang
- Mandor
Jumlah
Total
Dibulatkan

Oh
Oh
Oh
Oh

0.375
0.125
0.012
0.019

42,000.00
65,000.00
75,000.00
80,000.00

14. Membuat 1 M2 Pagar BRC lengkap dengan tiang


URAIAN
SATUAN VOLUME HARGA SATUAN
Bahan
- BRC lengkap dengan tiang
Lbr
0.434
171,300.00
- Semen Portland
Kg
2
1,406.00
- Kawat Duri
Kg
2.5
63,500.00
- Pasir beton
M3
0.005
255,400.00
- Koral Beton 2/3
M3
0.009
211,100.00
Jumlah
Tenaga Kerja
- Pekerja
Oh
0.375
42,000.00
- Tukang Batu
Oh
0.125
65,000.00
- Kepala Tukang
Oh
0.012
75,000.00
- Mandor
Oh
0.019
80,000.00
Jumlah
Total
Dibulatkan
15. Membuat 1 M2 Steiger Werk / perancah dari Bambu
URAIAN
SATUAN VOLUME HARGA SATUAN
Bahan
- Bambu 6 - 10 (600) cm
btng
1
25,000.00
- Tali ijuk
kg
0.25
23,400.00
Jumlah
Tenaga Kerja
- Pekerja
org
0.25
42,000.00
- Tukang kayu
org
0.017
65,000.00
- Kepala tukang
org
0.002
75,000.00
- Mandor
org
0.013
80,000.00
Jumlah
Total
Dibulatkan
16. Membuat 1 M' Cerucuk Bambu
URAIAN
SATUAN
Bahan

VOLUME HARGA SATUAN

- Bambu 7 -10 (400) cm


Jumlah
Tenaga Kerja
- Pekerja
- Mandor
Jumlah
Total
Dibulatkan

btng

org
org

1.25

25,000.00

0.5
0.025

42,000.00
80,000.00

HARGA
35,000.00
3,515.00
1,277.00
1,899.90
190,080.00
1,404.00
3,240.00
236,415.90
16,800.00
13,000.00
1,500.00
1,600.00
32,900.00
269,315.90
269,316.00

HARGA
35,000.00
3,515.00
75,480.00
1,277.00
1,899.90
190,080.00
1,404.00
13,680.00
322,335.90
16,800.00
13,000.00
1,500.00
1,600.00
32,900.00
355,235.90
355,236.00

HARGA

28,000.00
2,812.00
158,750.00
1,277.00
1,899.90
1,404.00
194,142.90
12,600.00
13,000.00
1,500.00
1,600.00
28,700.00
222,842.90
222,843.00

HARGA
22,446.00
468
14,501.90
37,415.90
4,200.00
6,500.00
750.00
400.00
11,850.00
49,265.90
49,266.00

HARGA
35,000.00
475,200.00
19,890.00
29,480.00
49,210.00
35,010.00
25,540.00
31,665.00
23,250.00

3,953.75
71,800.00
6,992.00
14,175.00
8,400.00
829,565.75
84,000.00
130,000.00
65,000.00
22,500.00
4,000.00
305,500.00
1,135,065.75
1,135,066.00

HARGA
47,600.00
554,400.00
7,020.00
14,763.00
7,662.00
10,555.00
94,350.00
736,350.00
42,000.00
130,000.00
15,000.00
4,000.00
191,000.00
927,350.00
927,350.00

HARGA
35,000.00
491,040.00
7,020.00
25,308.00
7,662.00
10,555.00

94,350.00
670,935.00
42,000.00
130,000.00
15,000.00
4,000.00
191,000.00
861,935.00
861,935.00

HARGA

0.00
4,200.00
4,000.00
8,200.00
8,200.00
8,200.00

HARGA
30,825.00
17,640.00
2,334.00
50,799.00
42,000.00
4,000.00
46,000.00
96,799.00
96,799.00

HARGA

0.00
280,014.00
26,640.00

306,654.00
306,654.00
306,654.00

HARGA

0.00
280,014.00
2,640.00
282,654.00
282,654.00
282,654.00

HARGA
196,411.20
138,600.00
18,899.60
30,820.60
63,270.00
448,001.40
15,750.00
8,125.00
900.00
1,520.00
26,295.00
474,296.40
474,296.00

HARGA
6,466.60
124,183.80
775.92
2,400.00
3,515.00
1,277.00
1,899.90
140,518.22

15,750.00
8,125.00
900.00
1,520.00
26,295.00
166,813.22
166,813.00

HARGA
74,344.20
2,812.00
158,750.00
1,277.00
1,899.90
239,083.10
15,750.00
8,125.00
900.00
1,520.00
26,295.00
265,378.10
265,378.00

HARGA
25,000.00
5,850.00
30,850.00
10,500.00
1,105.00
150.00
1,040.00
12,795.00
43,645.00
43,645.00

HARGA

31,250.00
31,250.00
21,000.00
2,000.00
23,000.00
54,250.00
54,250.00

B. ANALISA HARGA SATUAN PEKERJAAN TANAH


No.
B-01

B-02

B-03

B-04

B-05

URAIAN
1 M3 Galian Tanah Biasa sedalam 1 m
Dibulatkan
1 M3 Galian Tanah Biasa Sedalam 2 m
Dibulatkan
1 M3 Galian Tanah Biasa Sedalam 3 m
Dibulatkan
1 M3 Galian Tanah Keras Sedalam 1 m
Dibulatkan
1 M3 Galian Tanah Lumpur Sedalam 1 m
Dibulatkan

SATUAN

VOLUME

Pekerja
Mandor
Jumlah

Oh
Oh

0.4
0.04

Pekerja
Mandor
Jumlah

Oh
Oh

0.526
0.052

Pekerja
Mandor
Jumlah

Oh
Oh

0.735
0.073

Pekerja
Mandor
Jumlah

Oh
Oh

0.625
0.062

Pekerja
Mandor
Jumlah

Oh
Oh

0.823
0.083

HARGA SATUAN
HARGA
(Rp)
(Rp)
42,000.00 16,800.00
80,000.00 3,200.00
20,000.00
20,000.00
42,000.00 22,092.00
80,000.00 4,160.00
26,252.00
26,252.00
42,000.00 30,870.00
80,000.00 5,840.00
36,710.00
36,710.00
42,000.00 26,250.00
80,000.00 4,960.00
31,210.00
31,210.00
42,000.00 34,566.00
80,000.00 6,640.00
41,206.00
41,206.00

C. ANALISA HARGA SATUAN PEKERJAAN PONDASI


No.
C-01

C-02

C-03

C-04

URAIAN

SATUAN

VOLUME

HARGA SATUAN
HARGA
(Rp)
(Rp)

1 M3 Pasanag Pondasi batu Kali adk 1pc : 3 ps


Batu Belah
M3
1.1
Semen Port
Kg
202
Pasir Pasan
M3
0.485
Pekerja
Oh
1.5
Tukang Batu
Oh
0.6
Kepala Tuka
Oh
0.06
Mandor
Oh
0.075
Jumlah
Dibulatkan
1 M3 Pasang Pondasi Batu kali adk 1pc : 4ps
Batu Belah
M3
1.1
Semen Port
Kg
163
Pasir Pasan
M3
0.52
Pekerja
Oh
1.5
Tukang Batu
Oh
0.6
Kepala Tuka
Oh
0.06
Mandor
Oh
0.075
Jumlah
Dibulatkan
1 M3 Pasang Pondasi Batu kali adk 1pc : 5ps
Batu Belah
M3
1.1
Semen Port
Kg
136
Pasir Pasan
M3
0.544
Pekerja
Oh
1.5
Tukang Batu
Oh
0.6
Kepala Tuka
Oh
0.06
Mandor
Oh
0.075
Jumlah
Dibulatkan
1 M3 Pasang Pondasi Batu Kosong (aanstamping)
Batu Belah
M3
1.2
Pasir Urug
M3
0.3
Pekerja
Oh
0.78
Tukang Batu
Oh
0.39
Kepala Tuka
Oh
0.039
Mandor
Oh
0.039
Jumlah
Dibulatkan

205,500.00 226,050.00
1,406.00 284,012.00
233,400.00 113,199.00
42,000.00 63,000.00
65,000.00 39,000.00
75,000.00
4,500.00
80,000.00
6,000.00
735,761.00
735,761.00
205,500.00 226,050.00
1,406.00 229,178.00
233,400.00 121,368.00
42,000.00 63,000.00
65,000.00 39,000.00
75,000.00
4,500.00
80,000.00
6,000.00
689,096.00
689,096.00
205,500.00 226,050.00
1,406.00 191,216.00
233,400.00 126,969.60
42,000.00 63,000.00
65,000.00 39,000.00
75,000.00
4,500.00
80,000.00
6,000.00
656,735.60
656,736.00
205,500.00 246,600.00
175,300.00 52,590.00
42,000.00 32,760.00
65,000.00 25,350.00
75,000.00
2,925.00
80,000.00
3,120.00
363,345.00
363,345.00

D. Analisa Harga Satuan Pekerjaan Beton


NO
D-17r2

D-29

. Analisa Harga Satuan Pekerjaan Beton


URAIAN
1 M3 Sloof Beton Tulang 15/20 (180 kg besi + bekisting) 4dia. 12 ring 8-15
Kayu papan terentang
Paku Biasa 2" - 5"
Besi Beton
Kawat Beton
Semen Portland
Pasir Beton
Koral Beton 2/3
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Jumlah
Dibulatkan

1 M3 Kolom Beton Tulang 15/20 (180 kg besi + bekisting) 4dia.12 8-15


Kayu papan terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton
Kawat Beton
Semen Portland
Pasir Beton
Koral Beton 2/3
Kayu Balok Terentang
Dolken -8-10/4m
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Jumlah
Dibulatkan

1 M3 Balok Beton Tulang 15/20 sofi-sofi, ring balk + balok poratl (180 kg besi + bekisting) 4dia. 12, 8Kayu papan terentang
Paku Biasa 2" - 5"
Besi Beton

Kawat Beton
Semen Portland
Pasir Beton
Koral Beton 2/3
Kayu Balok Terentang
Dolken -8-10/4m
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Jumlah
Dibulatkan
1 M3 Tangga Beton Tulang (90 kg besi + bekisting)
Kayu papan terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton
Kawat Beton
Semen Portland
Pasir Beton
Koral Beton 2/3
Kayu Balok Terentang
Dolken -8-10/4m
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Jumlah
Dibulatkan
1 M3 Membuat Plat Lantai Tb. 10 Cm Beton Bertulang ( 90 Kg Besi + Bekisting )
Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Kayu Balok Terentang
Plywood Tebal 9 mm
Dolken kayu Galam o - 8-10/4 m
Semen Portland
Pasir Beton
Koral Beton 2/3

Pekerja
Tukang Batu
Tukang Kayu
Kepala Tukang
Mandor
Jumlah
Dibulatkan

SAT

VOLUME

HRG.SAT

JUMLAH

M3
Kg
Kg
Kg
Kg
M3
M3
Oh
Oh
Oh
Oh
Oh
Oh

0.27 2,850,000
769,500
2
23,400
46,800
180
16,500 2,970,000
3
27,700
83,100
323
1,200
387,600
0.52
225,000
117,000
0.78
200,000
156,000
4.85
55,000
266,750
0.35
70,000
24,500
1.56
70,000
109,200
1.4
70,000
98,000
0.331
80,000
26,480
0.17
85,000
14,450
5,069,380
5,069,380

M3
Kg
Ltr
Kg
Kg
Kg
M3
M3
M3
Btg
Oh
Oh
Oh
Oh
Oh
Oh

0.4 2,850,000 1,140,000


4
23,400
93,600
40,500
180
16,500 2,970,000
1.8
27,700
49,860
323
1,200
387,600
0.52
225,000
117,000
0.78
200,000
156,000
0.15 2,640,000
396,000
20
15,000
300,000
7.3
55,000
401,500
0.35
70,000
24,500
3.3
70,000
231,000
2.1
70,000
147,000
0.57
80,000
45,600
0.25
85,000
21,250
6.480.910
6.481.000

besi + bekisting) 4dia. 12, 8-15


M3
0.32 2,850,000
912,000
Kg
3.2
23,400
74,880
Kg
180
16,500 2,970,000

Kg
Kg
M3
M3
M3
Btg
Oh
Oh
Oh
Oh
Oh
Oh

2.25
27,700
323
1,200
0.52
225,000
0.78
200,000
0.14 2,640,000
16
15,000
5.96
55,000
0.35
70,000
2.8
70,000
1.4
70,000
0.455
80,000
0.208
85,000

62,325
387,600
117,000
156,000
369,600
240,000
327,800
24,500
196,000
98,000
36,400
17,680
6.412.865
6,413,000

M3
Kg
Ltr
Kg
Kg
Kg
M3
M3
M3
Btg
Oh
Oh
Oh
Oh
Oh
Oh

0.25 2,850,000
712,500
3
23,400
70,200
1.2
40,500
48,600
90
16,500 1,485,000
3
27,700
83,100
323
1,200
387,600
0.52
225,000
117,000
0.78
200,000
156,000
0.105 2,640,000
277,200
14
15,000
210,000
5.6
55,000
308,000
0.35
70,000
24,500
2.3
70,000
161,000
1.4
70,000
98,000
0.405
80,000
32,400
0.202
85,000
17,170
4,188,720
4,189,000

M3
Kg
Ltr
Kg
Kg
M3
Lbr
Btg
Kg
M3
M3

0.4 2,850,000 1,140,000


4
23,400
93,600
2
40,500
81,000
90
16,500 1,485,000
3
27,700
83,100
0.105
151,100
15,866
3.5
151,100
528,850
60
15,000
900,000
323
1,200
387,600
0.52
225,000
117,000
0.78
200,000
156,000

Oh
Oh
Oh
Oh
Oh

5.2
0.35
3.3
0.365
1.06

55,000
70,000
70,000
80,000
85,000

286,000
24,500
231,000
29,200
90,100
5,648,816
5,649,000

E. ANALISA HARGA SATUAN PEKERJAAN DINDING


No.
URAIAN

E-01

E-02

E-03

E-04

1
-

1
-

1
-

1
-

M2 Pasang Bata Merah Tebal 1 Bata, 1pc : 3ps


Bata Merah
Semen Portland
Pasir Pasang
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Jumlah
Dibulatkan
M2 Pasang Bata Merah Tebal 1 Bata, 1pc : 4ps
Bata Merah
Semen Portland
Pasir Pasang
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Jumlah
Dibulatkan
M2 Pasang Bata Merah Tebal 1 Bata, 1pc : 5ps
Bata Merah
Semen Portland
Pasir Pasang
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Jumlah
Dibulatkan
M2 Pasang Bata Merah Tebal 1/2 Bata, 1pc : 3ps
Bata Merah
Semen Portland
Pasir Pasang
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Jumlah
Dibulatkan

SATUAN

Bh
Kg
M3
Oh
Oh
Oh
Oh

Bh
Kg
M3
Oh
Oh
Oh
Oh

Bh
Kg
M3
Oh
Oh
Oh
Oh

Bh
Kg
M3
Oh
Oh
Oh
Oh

E-05

E-06

1
-

M2 Pasang Bata Merah Tebal 1/2 Bata, 1pc : 4ps


Bata Merah
Semen Portland
Pasir Pasang
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Jumlah
Dibulatkan

1
-

M2 Pasang Bata Merah Tebal 1/2 Bata, 1pc : 5ps


Bata Merah
Semen Portland
Pasir Pasang
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Jumlah
Dibulatkan

Bh
Kg
M3
Oh
Oh
Oh
Oh

Bh
Kg
M3
Oh
Oh
Oh
Oh

VOLUME

HARGA SATUAN
(Rp)

HARGA
(Rp)

140
32.95
0.091
0.65
0.2
0.02
0.03

775 108,500.00
1,406.00 46,327.70
233,400.00 21,239.40
42,000.00 27,300.00
65,000.00 13,000.00
75,000.00
1,500.00
80,000.00
2,400.00
220,267.10
220,267.00

140
26.55
0.093
0.65
0.2
0.02
0.03

775 108,500.00
1,406.00 37,329.30
233,400.00 21,706.20
42,000.00 27,300.00
65,000.00 13,000.00
75,000.00
1,500.00
80,000.00
2,400.00
211,735.50
211,736.00

140
22.2
0.102
0.65
0.2
0.02
0.03

775 108,500.00
1,406.00 31,213.20
233,400.00 23,806.80
42,000.00 27,300.00
65,000.00 13,000.00
75,000.00
1,500.00
80,000.00
2,400.00
###
###

70
14.37
0.04
0.32
0.1
0.01
0.015

775
1,406.00
233,400.00
42,000.00
65,000.00
75,000.00
80,000.00

54,250.00
20,204.22
9,336.00
13,440.00
6,500.00
750
1,200.00
###
###

70
11.5
0.043
0.32
0.1
0.01
0.015

775
1,406.00
233,400.00
42,000.00
65,000.00
75,000.00
80,000.00

54,250.00
16,169.00
10,036.20
13,440.00
6,500.00
750
1,200.00
###
###

70
9.68
0.045
0.32
0.1
0.01
0.015

775
1,406.00
233,400.00
42,000.00
65,000.00
75,000.00
80,000.00

54,250.00
13,610.08
10,503.00
13,440.00
6,500.00
750
1,200.00
###
###

F. ANALISA HARGA SATUAN PEKERJAAN PLESTERAN


No.
URAIAN
F-01

F-02

F-03

F-04

F-05

1 M2 Plesteran adk.
Semen Portland
Pasir Pasang
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Jumlah
Dibulatkan
1 M2 Plesteran adk.
Semen Portland
Pasir Pasang
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Jumlah
Dibulatkan
1 M2 Plesteran adk.
Semen Portland
Pasir Pasang
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Jumlah
Dibulatkan
1 M2 Plesteran adk.
Semen Portland
Pasir Pasang
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Jumlah
Dibulatkan
1 M2 Plesteran adk.
Semen Portland
Pasir Pasang
Pekerja
Tukang Batu
Kepala Tukang

SATUAN

VOLUME

1pc : 2ps Tebal 15 mm


Kg
M3
Oh
Oh
Oh
Oh

8.52
0.017
0.2
0.15
0.015
0.01

Kg
M3
Oh
Oh
Oh
Oh

6.48
0.019
0.2
0.15
0.015
0.01

Kg
M3
Oh
Oh
Oh
Oh

5.2
0.02
0.2
0.15
0.015
0.01

Kg
M3
Oh
Oh
Oh
Oh

10.8
0.026
0.25
0.2
0.02
0.0125

Kg
M3
Oh
Oh
Oh

8.68
0.028
0.25
0.2
0.02

1pc : 3ps Tebal 15 mm

1pc : 4ps Tebal 15 mm

1pc : 3ps Tebal 20 mm

1pc : 4ps Tebal 20 mm

F-06

F-11

Mandor
Jumlah
Dibulatkan
1 M2 Plesteran adk. 1pc:5ps tebal 20 mm
Semen Portland
Pasir Pasang
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Jumlah
Dibulatkan
1 M2 Acian Plesteran
Semen Portland
Pekerja
Tukang batu
Kepala Tukang
Mandor
Jumlah
Dibulatkan

Oh

0.0125

Kg
M3
Oh
Oh
Oh
Oh

7.29
0.026
0.25
0.2
0.02
0.0125

Kg
Oh
Oh
Oh
Oh

4
0.143
0.107
0.0105
0.0105

HARGA SATUAN
(Rp)

HARGA
(Rp)

1,406.00 11,979.12
233,400.00 3,967.80
42,000.00 8,400.00
65,000.00 9,750.00
75,000.00 1,125.00
80,000.00
800
###
###
1,406.00
233,400.00
42,000.00
65,000.00
75,000.00
80,000.00

9,110.88
4,434.60
8,400.00
9,750.00
1,125.00
800
###
###

1,406.00
233,400.00
42,000.00
65,000.00
75,000.00
80,000.00

7,311.20
4,668.00
8,400.00
9,750.00
1,125.00
800
###
###

1,406.00 15,184.80
233,400.00 6,068.40
42,000.00 10,500.00
65,000.00 13,000.00
75,000.00 1,500.00
80,000.00 1,000.00
###
###
1,406.00 12,204.08
233,400.00 6,535.20
42,000.00 10,500.00
65,000.00 13,000.00
75,000.00 1,500.00

80,000.00

1,000.00
###
###

1,406.00 10,249.74
233,400.00 6,068.40
42,000.00 10,500.00
65,000.00 13,000.00
75,000.00 1,500.00
80,000.00 1,000.00
###
###
1,406.00
42,000.00
65,000.00
75,000.00
80,000.00

5,624.00
6,006.00
6,955.00
787.5
840
###
###

G. ANALISA HARGA SATUAN PEKERJAAN PENUTUP ATAP


No.
URAIAN
G-01
-

1 M2 Pasang Atap Genteng Palentong


Genteng palentong
Pekerja
Tukang kayu
Kepala tukang
Mandor
Jumlah
Dibulatkan

G-02

1 M2 Pasang Genteng Bubung Palentong


Genteng bubung palentong
Semen Portland
Pasir pasang
Pekerja
Tukang kayu
Kepala tukang
Mandor
Jumlah
Dibulatkan

G-03

1 M2 Pasang Roof Light Fibreglass ( 180 x 90 ) cm


Roof light fibreglass
Paku biasa " - 1"
Pekerja
Tukang kayu
Kepala tukang
Mandor
Jumlah
Dibulatkan

G-04

1 M2 Pasang Atap Asbes Gelombang ( 3,00 x 1,05 m ) x 4 mm


Asbes gelombang
Paku seng
Pekerja
Tukang kayu
Kepala tukang
Mandor
Jumlah
Dibulatkan

G-05

1 M2 Pasang Atap Asbes Gelombang ( 2,70 x 1,05 m ) x 4 mm


Asbes gelombang
Paku seng
Pekerja
Tukang kayu
Kepala tukang
Mandor
Jumlah
Dibulatkan

G-06

1 M2 Pasang Atap Asbes Gelombang ( 2,40 x 1,05 m ) x 4 mm


Asbes gelombang
Paku seng
Pekerja
Tukang kayu
Kepala tukang
Mandor
Jumlah
Dibulatkan
1 M2 Pasang Atap Asbes Gelombang ( 2,10 x 1,05 m ) x 4 mm
Asbes gelombang
Paku seng
Pekerja
Tukang kayu
Kepala tukang
Mandor
Jumlah
Dibulatkan

G-07

G-08

1 M2 Pasang Atap Asbes Gelombang ( 1,50 x 1,05 m ) x 4 mm


Asbes gelombang
Paku seng
Pekerja
Tukang kayu
Kepala tukang
Mandor
Jumlah
Dibulatkan

G-09

1 M Pasang Nok Stel Gelombang 1,05 m


Nok stel gelombang
Paku sekrup 3,5"
Pekerja
Tukang kayu
Kepala tukang
Mandor
Jumlah
Dibulatkan

G-10

1 M2 Pasang Atap Genteng Beton


Genteng beton
Paku biasa 2" - 5"
Pekerja
Tukang kayu
Kepala tukang
Mandor
Jumlah
Dibulatkan

G-11

1 M2 Pasang Atap Genteng Murando Natural


Genteng murando natural
Pekerja
Tukang kayu
Kepala tukang
Mandor
Jumlah
Dibulatkan

G-12

1 M2 Pasang Atap Genteng Murando Glazur


Genteng murando glazur
Pekerja
Tukang kayu
Kepala tukang
Mandor
Jumlah
Dibulatkan

SATUAN

VOLUME

HARGA SATUAN
(Rp)

HARGA
(Rp)

Bh
Oh
Oh
Oh
Oh

25
0.15
0.075
0.008
0.008

1,900.00
42,000.00
65,000.00
75,000.00
80,000.00

47,500.00
6,300.00
4,875.00
600
640
59,915.00
59,915.00

Bh
Kg
M3
Oh
Oh
Oh
Oh

5
8
0.032
0.4
0.2
0.02
0.002

6,000.00
1,406.00
233,400.00
42,000.00
65,000.00
75,000.00
80,000.00

30,000.00
11,248.00
7,468.80
16,800.00
13,000.00
1,500.00
160
80,176.80
80,177.00

Lbr
Kg
Oh
Oh
Oh
Oh

0.6
0.05
0.14
0.067
0.007
0.007

100,000.00
23,800.00
42,000.00
65,000.00
75,000.00
80,000.00

60,000.00
1,190.00
5,880.00
4,355.00
525
560
72,510.00
72,510.00

Lbr
Kg
Oh
Oh
Oh
Oh

0.35
0.12
0.14
0.07
0.007
0.007

80,000.00
23,800.00
42,000.00
65,000.00
75,000.00
80,000.00

28,000.00
2,856.00
5,880.00
4,550.00
525
560
42,371.00
42,371.00

Lbr
Kg
Oh
Oh
Oh
Oh

0.42
0.12
0.14
0.07
0.007
0.007

73,300.00
23,800.00
42,000.00
65,000.00
75,000.00
80,000.00

30,786.00
2,856.00
5,880.00
4,550.00
525
560
45,157.00
45,157.00

Lbr
Kg
Oh
Oh
Oh
Oh

0.44
0.12
0.14
0.067
0.007
0.007

65,900.00
23,800.00
42,000.00
65,000.00
75,000.00
80,000.00

28,996.00
2,856.00
5,880.00
4,355.00
525
560
43,172.00
43,172.00

Lbr
Kg
Oh
Oh
Oh
Oh

0.51
0.12
0.14
0.067
0.007
0.007

58,500.00
23,800.00
42,000.00
65,000.00
75,000.00
80,000.00

29,835.00
2,856.00
5,880.00
4,355.00
525
560
44,011.00
44,011.00

Lbr
Kg
Oh
Oh
Oh
Oh

0.8
0.12
0.14
0.067
0.007
0.007

42,300.00
23,800.00
42,000.00
65,000.00
75,000.00
80,000.00

33,840.00
2,856.00
5,880.00
4,355.00
525
560
48,016.00
48,016.00

Lbr
Bh
Oh
Oh
Oh
Oh

2.1
6
0.084
0.125
0.013
0.004

38,100.00
800
42,000.00
65,000.00
75,000.00
80,000.00

80,010.00
4,800.00
3,528.00
8,125.00
975
320
97,758.00
97,758.00

bh
Kg
Oh
Oh
Oh
Oh

11
0.03
0.2
0.1
0.01
0.01

8,500.00
23,400.00
42,000.00
65,000.00
75,000.00
80,000.00

93,500.00
702
8,400.00
6,500.00
750
800
###
###

bh
Oh
Oh
Oh
Oh

18
0.15
0.075
0.008
0.008

2,700.00
42,000.00
65,000.00
75,000.00
80,000.00

48,600.00
6,300.00
4,875.00
600
640
61,015.00
61,015.00

bh
Oh
Oh
Oh
Oh

18
0.15
0.075
0.008
0.008

4,000.00
42,000.00
65,000.00
75,000.00
80,000.00

72,000.00
6,300.00
4,875.00
600
640
84,415.00
84,415.00

H. ANALISA HARGA SATUAN PEKERJAAN PENUTUP LANGIT-LANGIT


No.
URAIAN
SATUAN

H-01

H-02

H-03

H-04

1 M2 Langit-langit Asbes ( 1,00 x 1,00 ) m, tebal 5


Pelat asbes tebal 4 mm
Paku seng
Pekerja
Tukang kayu
Kepala tukang
Mandor
Jumlah
Dibulatkan

1 M2 Langit-langit Asbes ( 1,00 x 1,00 ) m, tebal 3,


Pelat asbes tebal 3,5 mm
Paku seng
Pekerja
Tukang kayu
Kepala tukang
Mandor
Jumlah
Dibulatkan
1 M2 Langit-langit Akustik ( 60 x 120 ) cm
Akustik 600 x 1200
Paku
Pekerja
Tukang kayu
Kepala tukang
Mandor
Jumlah
Dibulatkan

VOLUME

m2
Kg
Oh
Oh
Oh
Oh

1.1
0.01
0.03
0.07
0.007
0.0015

Lbr
Kg
Oh
Oh
Oh
Oh

1.1
0.01
0.03
0.07
0.007
0.0015

Lbr
Kg
Oh
Oh
Oh
Oh

1.5
0.05
0.06
0.1
0.01
0.003

1 M2 Langit-langit Akustik ( 60 x 120 ) cm + Rangka Alluminium


Profil Alluminium "T"
M
Kawat f 4 mm
Kg
Ramset / dina bolt
Bh
Akustik 600 x 1200
Lbr
Pekerja
Oh
Tukang kayu
Oh
Kepala tukang
Oh

3.6
0.15
1.05
1.5
0.15
0.5
0.05

Mandor
Jumlah

Oh

0.0075

Dibulatkan
H-05

1 M2 Langit-langit teakwood (60 x 120) cm, t = 4 mm + rangka kayu borneo super


Kayu Balok Borneo Super
M3
0.023
Paku biasa 2" - 5"
Kg
0.06
Teakwood 120 cm x 240 cm x 0,4 cm
Lbr
0.39
Pekerja
Oh
0.27
Tukang kayu
Oh
0.4
Kepala tukang
Oh
0.04
Mandor
Oh
0.0135
Jumlah
Dibulatkan

H-06

1 M2 Langit-langit Teakwood 3 mm + Rangka Kayu Borneo Super


Kayu Balok Borneo Super
M3
0.023
Paku biasa 2" - 5"
Kg
0.06
Teakwood (120 x 240x 0,3) cm
Lbr
0.39
Pekerja
Oh
0.27
Tukang kayu
Oh
0.4
Kepala tukang
Oh
0.04
Mandor
Oh
0.0135
Jumlah
Dibulatkan

H-07

1 M2 Langit-langit Triplek 4 mm + Rangka Kayu Borneo Super


Kayu Balok Borneo Super
M3
Paku biasa 2" - 5"
Kg
Triplek 120 cm x 240 cm x 0,4 cm
Lbr
Pekerja
Oh
Tukang kayu
Oh
Kepala tukang
Oh
Mandor
Oh
Jumlah
Dibulatkan

H-08

0.023
0.06
0.39
0.27
0.4
0.04
0.0135

1 M2 Langit-langit Gypsum Board, tebal 9 mm + rangka besi hollow


Hollow 4/4 Zincromate
Btg
0.415
Hollow 2/4 Zincromate
Btg
0.15
Gypsum board ( 120 x 240 x 9 ) mm
Lbr
0.364
Paku gypsum
kg
0.11
Ramset / dina bolt
Bh
4
Cotton plaster
Bh
0.072
Compoun
Zak
0.125

Pekerja
Tukang kayu
Kepala tukang
Mandor
Jumlah

Oh
Oh
Oh
Oh

0.1
0.05
0.005
0.005

Dibulatkan
H-09

1 M2 Langit-langit GRC t = 4 mm + rangka besi hollow


Hollow 4/4 Zincromate
Btg
Hollow 2/4 Zincromate
Btg
GRC ( 120 x 240 x 4 ) mm
Lbr
Paku GRC
kg
Ramset / dina bolt
Bh
Cotton plaster
Bh
Compoun
Zak
Pekerja
Oh
Tukang kayu
Oh
Kepala tukang
Oh
Mandor
Oh
Jumlah
Dibulatkan

0.415
0.15
0.364
0.11
4
0.072
0.125
0.1
0.05
0.005
0.005

H-10

1 M2 Langit-langit gypsum t = 9 mm + Rangka Kayu Borneo Super


Kayu Balok Borneo Super
M3
0.023
Paku biasa 2" - 5"
Kg
0.06
Gypsum board ( 120 x 240 x 9 ) mm
Lbr
0.39
Paku sekrup
kg
0.11
Pekerja
Oh
0.27
Tukang kayu
Oh
0.4
Kepala tukang
Oh
0.04
Mandor
Oh
0.0135
Jumlah
Dibulatkan

H-11

1 M2 Langit-langit GRC t = 4 mm + Rangka Kayu Borneo Super


Kayu Balok Borneo Super
M3
Paku biasa 2" - 5"
Kg
GRC ( 120 x 240 x 4 ) mm
Lbr
Paku GRC
kg
Pekerja
Oh
Tukang kayu
Oh
Kepala tukang
Oh
Mandor
Oh
Jumlah
Dibulatkan

0.023
0.06
0.39
0.11
0.27
0.4
0.04
0.0135

H-12

H-13

1 M List Langit-langit Kayu Profil 10 cm


List Kayu profil
Paku
Pekerja
Tukang kayu
Kepala tukang
Mandor
Jumlah
Dibulatkan

1 M List Langit-langit Gypsum 10 cm


List gypsum
Tepung gypsum
Pekerja
Tukang kayu
Kepala tukang
Mandor
Jumlah
Dibulatkan

M
Kg
Oh
Oh
Oh
Oh

1.05
0.01
0.05
0.05
0.005
0.003

M
Kg
Oh
Oh
Oh
Oh

1.05
0.15
0.05
0.05
0.005
0.003

HARGA SATUAN
(Rp)
(Rp)

HARGA
(Rp)
(Rp)

22,500.00
23,800.00
42,000.00
65,000.00
75,000.00
80,000.00

24,750.00
238
1,260.00
4,550.00
525
120
31,443.00
31,443.00

19,500.00
23,800.00
42,000.00
65,000.00
75,000.00
80,000.00

21,450.00
238
1,260.00
4,550.00
525
120
28,143.00
28,143.00

132,800.00 199,200.00
23,800.00
1,190.00
42,000.00
2,520.00
65,000.00
6,500.00
75,000.00
750
80,000.00
240
210,400.00
210,400.00

12,200.00 43,920.00
28,200.00
4,230.00
7,200.00
7,560.00
132,800.00 199,200.00
42,000.00
6,300.00
65,000.00 32,500.00
75,000.00
3,750.00

80,000.00

kayu borneo super


2,640,000.00
23,400.00
131,700.00
42,000.00
65,000.00
75,000.00
80,000.00

600
298,060.00
298,060.00

60,720.00
1,404.00
51,363.00
11,340.00
26,000.00
3,000.00
1,080.00
154,907.00
154,907.00

r
2,640,000.00
23,400.00
129,100.00
42,000.00
65,000.00
75,000.00
80,000.00

60,720.00
1,404.00
50,349.00
11,340.00
26,000.00
3,000.00
1,080.00
153,893.00
153,893.00

2,640,000.00
23,800.00
64,400.00
42,000.00
65,000.00
75,000.00
80,000.00

60,720.00
1,428.00
25,116.00
11,340.00
26,000.00
3,000.00
1,080.00
128,684.00
128,684.00

29,200.00
22,600.00
79,800.00
17,500.00
7,200.00
15,000.00
75,000.00

12,118.00
3,390.00
29,047.20
1,925.00
28,800.00
1,080.00
9,375.00

llow

42,000.00
65,000.00
75,000.00
80,000.00

4,200.00
3,250.00
375
400
93,960.20
93,960.00

29,200.00
22,600.00
67,500.00
35,000.00
7,200.00
15,000.00
75,000.00
42,000.00
65,000.00
75,000.00
80,000.00

12,118.00
3,390.00
24,570.00
3,850.00
28,800.00
1,080.00
9,375.00
4,200.00
3,250.00
375
400
91,408.00
91,408.00

2,640,000.00
23,800.00
79,800.00
17,500.00
42,000.00
65,000.00
75,000.00
80,000.00

60,720.00
1,428.00
31,122.00
1,925.00
11,340.00
26,000.00
3,000.00
1,080.00
136,615.00
136,615.00

2,640,000.00
23,800.00
67,500.00
35,000.00
42,000.00
65,000.00
75,000.00
80,000.00

60,720.00
1,428.00
26,325.00
3,850.00
11,340.00
26,000.00
3,000.00
1,080.00
133,743.00
133,743.00

per

29,400.00
23,800.00
42,000.00
65,000.00
75,000.00
80,000.00

30,870.00
238
2,100.00
3,250.00
375
240
37,073.00
37,073.00

8,500.00
12,500.00
42,000.00
65,000.00
75,000.00
80,000.00

8,925.00
1,875.00
2,100.00
3,250.00
375
240
16,765.00
16,765.00

Analisa Harga Satuan Pekerjaan Penutup Lantai dan Dinding (AHS SNI 2011)
No.

I-01

I-02

I-03

URAIAN

1 M2 Lantai Ubin Granito ukuran 40 x 4


Granito 40 x 40 cm
Semen portland
Pasir pasang
Semen warna
Pekerja
Tukang batu
Kepala tukang
Mandor
Jumlah
Dibulatkan

1 M2 Lantai Ubin Granito ukuran 30 x 3


Granito 30 x 30 cm
Semen portland
Pasir pasang
Semen warna
Pekerja
Tukang batu
Kepala tukang
Mandor
Jumlah
Dibulatkan

1 M Plint Ubin Granito ukuran 10 x 40


Plint granito 10 x 40 cm
Semen portland
Pasir pasang
Semen warna
Pekerja
Tukang batu
Kepala tukang
Mandor
Jumlah

SATUAN

VOLUME

HARGA SATUAN
(Rp)

m2
Kg
M3
Kg
Oh
Oh
Oh
Oh

1.05
9.8
0.0215
1.3
0.25
0.12
0.012
0.0125

345,000.00
1,406.00
233,400.00
15,700.00
42,000.00
65,000.00
75,000.00
80,000.00

m2
Kg
M3
Kg
Oh
Oh
Oh
Oh

1.05
10
0.0215
1.5
0.26
0.125
0.0125
0.013

322,800.00
1,406.00
233,400.00
15,700.00
42,000.00
65,000.00
75,000.00
80,000.00

Bh
Kg
M3
Kg
Oh
Oh
Oh
Oh

2.65
1.2
0.003
0.1
0.06
0.03
0.003
0.003

27,600.00
1,406.00
233,400.00
15,700.00
42,000.00
65,000.00
75,000.00
80,000.00

Dibulatkan

I-04

I-05

I-06

I-07

1 M Plint Ubin Granito ukuran 10 x 30


Plint granito 10 x 30 cm
Semen portland
Pasir pasang
Semen warna
Pekerja
Tukang batu
Kepala tukang
Mandor
Jumlah
Dibulatkan

Bh
Kg
M3
Kg
Oh
Oh
Oh
Oh

3.33
1.65
0.0032
0.1
0.09
0.09
0.009
0.0045

25,900.00
1,406.00
233,400.00
15,700.00
42,000.00
65,000.00
75,000.00
80,000.00

1
8
0.0215
0.013
0.25
0.12
0.012
0.0125

56,000.00
1,406.00
233,400.00
15,700.00
42,000.00
65,000.00
75,000.00
80,000.00

m2
Kg
M3
Kg
Oh
Oh
Oh
Oh

1
8
0.0215
0.013
0.25
0.12
0.012
0.0125

62,500.00
1,406.00
233,400.00
15,700.00
42,000.00
65,000.00
75,000.00
80,000.00

m2
Kg

1
8

53,000.00
1,406.00

1 M2 Lantai Keramik Corak 10 x 20 cm setara Mulia


Keramik corak 10 x 20 cm
m2
Semen portland
Kg
Pasir pasang
M3
Semen warna
Kg
Pekerja
Oh
Tukang batu
Oh
Kepala tukang
Oh
Mandor
Oh
Jumlah
Dibulatkan

1 M2 Lantai Keramik corak 20 x 20 cm se


Keramik corak 20 x 20 cm
Semen portland
Pasir pasang
Semen warna
Pekerja
Tukang batu
Kepala tukang
Mandor
Jumlah
Dibulatkan

1 M2 Lantai Keramik polos 30 x 30 cm se


Keramik polos 30 x 30 cm
Semen portland

Pasir pasang
Semen warna
Pekerja
Tukang batu
Kepala tukang
Mandor
Jumlah

M3
Kg
Oh
Oh
Oh
Oh

0.0215
0.013
0.25
0.12
0.012
0.0125

233,400.00
15,700.00
42,000.00
65,000.00
75,000.00
80,000.00

m2
Kg
M3
Kg
Oh
Oh
Oh
Oh

1
8
0.0215
0.013
0.25
0.12
0.012
0.0125

58,000.00
1,406.00
233,400.00
15,700.00
42,000.00
65,000.00
75,000.00
80,000.00

m2
Kg
M3
Kg
Oh
Oh
Oh
Oh

1
8
0.0215
0.013
0.25
0.12
0.012
0.0125

56,800.00
1,406.00
233,400.00
15,700.00
42,000.00
65,000.00
75,000.00
80,000.00

m2
Kg
M3
Kg
Oh
Oh
Oh
Oh

1
8
0.0215
0.013
0.25
0.12
0.012
0.0125

65,500.00
1,406.00
233,400.00
15,700.00
42,000.00
65,000.00
75,000.00
80,000.00

Dibulatkan

I-08

I-09

I-10

1 M2 Lantai Keramik corak 30 x 30 cm Se


Keramik corak 30 x 30 cm
Semen portland
Pasir pasang
Semen warna
Pekerja
Tukang batu
Kepala tukang
Mandor
Jumlah
Dibulatkan

1 M2 Lantai Keramik polos 40 x 40 cm Se


Keramik polos 40 x 40 cm
Semen portland
Pasir pasang
Semen warna
Pekerja
Tukang batu
Kepala tukang
Mandor
Jumlah
Dibulatkan

1 M2 Lantai Keramik corak 40 x 40 cm Se


Keramik corak 40 x 40 cm
Semen portland
Pasir pasang
Semen warna
Pekerja
Tukang batu
Kepala tukang
Mandor

Jumlah
Dibulatkan
I-11

I-12

I-13

I-14

1 M2 Lantai Keramik Corak 10 x 20 cm setara Roman


Keramik corak 10 x 20 cm
m2
1
Semen portland
Kg
8
Pasir pasang
M3
0.0215
Semen warna
Kg
0.013
Pekerja
Oh
0.25
Tukang batu
Oh
0.12
Kepala tukang
Oh
0.012
Mandor
Oh
0.0125
Jumlah
Dibulatkan

1 M2 Lantai Keramik corak 20 x 20 cm s


Keramik corak 20 x 20 cm
Semen portland
Pasir pasang
Semen warna
Pekerja
Tukang batu
Kepala tukang
Mandor
Jumlah
Dibulatkan

1 M2 Lantai Keramik polos 30 x 30 cm s


Keramik polos 30 x 30 cm
Semen portland
Pasir pasang
Semen warna
Pekerja
Tukang batu
Kepala tukang
Mandor
Jumlah
Dibulatkan

1 M2 Lantai Keramik corak 30 x 30 cm


Keramik corak 30 x 30 cm
Semen portland

72,200.00
1,406.00
233,400.00
15,700.00
42,000.00
65,000.00
75,000.00
80,000.00

m2
Kg
M3
Kg
Oh
Oh
Oh
Oh

1
8
0.0215
0.013
0.25
0.12
0.012
0.0125

75,200.00
1,406.00
233,400.00
15,700.00
42,000.00
65,000.00
75,000.00
80,000.00

m2
Kg
M3
Kg
Oh
Oh
Oh
Oh

1
8
0.0215
0.013
0.25
0.12
0.012
0.0125

68,900.00
1,406.00
233,400.00
15,700.00
42,000.00
65,000.00
75,000.00
80,000.00

M2
Kg

1
8

76,600.00
1,406.00

Pasir pasang
Semen warna
Pekerja
Tukang batu
Kepala tukang
Mandor
Jumlah

M3
Kg
Oh
Oh
Oh
Oh

0.0215
0.013
0.25
0.12
0.012
0.0125

233,400.00
15,700.00
42,000.00
65,000.00
75,000.00
80,000.00

m2
Kg
M3
Kg
Oh
Oh
Oh
Oh

1
8
0.0215
0.013
0.25
0.12
0.012
0.0125

72,500.00
1,406.00
233,400.00
15,700.00
42,000.00
65,000.00
75,000.00
80,000.00

m2
Kg
M3
Kg
Oh
Oh
Oh
Oh

1
8
0.0215
0.013
0.25
0.12
0.012
0.0125

77,000.00
1,406.00
233,400.00
15,700.00
42,000.00
65,000.00
75,000.00
80,000.00

m2
Kg
M3
Kg
Oh
Oh
Oh
Oh

1.06
8.19
0.045
0.65
0.7
0.35
0.035
0.035

550,000.00
1,406.00
233,400.00
15,700.00
42,000.00
65,000.00
75,000.00
80,000.00

Dibulatkan

I-15

I-16

I-17

1 M2 Lantai Keramik polos 40 x 40 cm s


Keramik polos 40 x 40 cm
Semen portland
Pasir pasang
Semen warna
Pekerja
Tukang batu
Kepala tukang
Mandor
Jumlah
Dibulatkan

1 M2 Lantai Keramik corak 40 x 40 cm


Keramik corak 40 x 40 cm
Semen portland
Pasir pasang
Semen warna
Pekerja
Tukang batu
Kepala tukang
Mandor
Jumlah
Dibulatkan
1 M2 Lantai Marmer
Marmer
Semen portland
Pasir pasang
Semen warna
Pekerja
Tukang batu
Kepala tukang
Mandor
Jumlah
Dibulatkan

I-18

1 M2 Lantai Parquet Jati


Parquet jati
Lem vinyl
Pekerja
Tukang
Kepala tukang
Mandor
Jumlah
Dibulatkan

M2
Kg
Oh
Oh
Oh
Oh

1.05
0.6
0.65
0.35
0.035
0.0325

375,400.00
44,000.00
42,000.00
65,000.00
75,000.00
80,000.00

HARGA
(Rp)

362,250.00
13,778.80
5,018.10
20,410.00
10,500.00
7,800.00
900
1,000.00
421,656.90
421,657.00

338,940.00
14,060.00
5,018.10
23,550.00
10,920.00
8,125.00
937.5
1,040.00
402,590.60
402,591.00

73,140.00
1,687.20
700.2
1,570.00
2,520.00
1,950.00
225
240
82,032.40

82,032.00

86,247.00
2,319.90
746.88
1,570.00
3,780.00
5,850.00
675
360
101,548.78
101,549.00

56,000.00
11,248.00
5,018.10
204.1
10,500.00
7,800.00
900
1,000.00
92,670.20
92,670.00

62,500.00
11,248.00
5,018.10
204.1
10,500.00
7,800.00
900
1,000.00
99,170.20
99,170.00

53,000.00
11,248.00

5,018.10
204.1
10,500.00
7,800.00
900
1,000.00
89,670.20
89,670.00

58,000.00
11,248.00
5,018.10
204.1
10,500.00
7,800.00
900
1,000.00
94,670.20
94,670.00

56,800.00
11,248.00
5,018.10
204.1
10,500.00
7,800.00
900
1,000.00
93,470.20
93,470.00

65,500.00
11,248.00
5,018.10
204.1
10,500.00
7,800.00
900
1,000.00

102,170.20
102,170.00

72,200.00
11,248.00
5,018.10
204.1
10,500.00
7,800.00
900
1,000.00
108,870.20
108,870.00

75,200.00
11,248.00
5,018.10
204.1
10,500.00
7,800.00
900
1,000.00
111,870.20
111,870.00

68,900.00
11,248.00
5,018.10
204.1
10,500.00
7,800.00
900
1,000.00
105,570.20
105,570.00

76,600.00
11,248.00

5,018.10
204.1
10,500.00
7,800.00
900
1,000.00
113,270.20
113,270.00

72,500.00
11,248.00
5,018.10
204.1
10,500.00
7,800.00
900
1,000.00
109,170.20
109,170.00

77,000.00
11,248.00
5,018.10
204.1
10,500.00
7,800.00
900
1,000.00
113,670.20
113,670.00
583,000.00
11,515.14
10,503.00
10,205.00
29,400.00
22,750.00
2,625.00
2,800.00
672,798.14
672,798.00

394,170.00
26,400.00
27,300.00
22,750.00
2,625.00
2,600.00
475,845.00
475,845.00

J. ANALISA HARGA SATUAN PEKERJAAN KAYU


No.

J-01

J-02

J-03

1 M3 Kusen Pintu & jendela kayu Kamper Samarinda


Dibulatkan
1
Dibulatkan
1
Dibulatkan

J-04

1 M2 Pintu Panel Kayu Kamper Samarinda


Dibulatkan

J-05

1 M2 Pintu Panel Kayu Kamper Medan/Kruing


-

Dibulatkan
J-06

J-07

J-08

J-09

1 M2 Pintu & Jendela Kaca Kayu Kamper Medan


Dibulatkan
1
Dibulatkan
1
Dibulatkan
1
Dibulatkan

J-10

1 M2 Jalusi Mati Kusen Kayu kamper Medan


-

Dibulatkan
J-11

J-12

J-13

J-14

1 M2 Pintu Triplek Rangkap, Rangka Kayu Borneo Super


Dibulatkan
1
Dibulatkan
1
Dibulatkan
1
-

Dibulatkan
J-15

J-16

J-17

J-18

1 M3 Kuda-kuda Kayu Kamper Medan


Dibulatkan
1
Dibulatkan
1
Dibulatkan
1
Dibulatkan

J-19

1
Dibulatkan

J-20

1 M' Lisplang uk (3x30)cm, Kayu Kamper Medan


Dibulatkan

J-21

1 M List Plafond + kayu Profil 10 cm


Dibulatkan

HARGA SATUAN PEKERJAAN KAYU


URAIAN

M3 Kusen Pintu & jendela kayu Kamper Samarinda


Kayu Balok Kamper Samarinda
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Jumlah
ibulatkan
M3 Kusen Pintu & jendela kayu Kamper Medan/Kruing
Kayu Balok Kamper Medan
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Jumlah
ibulatkan
M3 Kusen Pintu & jendela kayu Borneo Super
Kayu Borneo Balok Super
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Jumlah
ibulatkan

M2 Pintu Panel Kayu Kamper Samarinda


Kayu Papan Kamper Samarinda
Paku Biasa 2" - 5"
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Jumlah
ibulatkan
M2 Pintu Panel Kayu Kamper Medan/Kruing
Kayu Papan Kamper Medan
Paku Biasa 2" - 5"
Pekerja
Tukang Kayu
Kepala Tukang

Mandor
Jumlah

ibulatkan

M2 Pintu & Jendela Kaca Kayu Kamper Medan


Kayu Papan Kamper Medan
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Jumlah
ibulatkan
M2 Pintu & Jendela Kaca Kayu Borneo
Kayu Papan Borneo Super
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Jumlah
ibulatkan
M2 Pintu & Jendela Jalusi Kayu Kamper Medan
Kayu Papan Kamper Medan
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Jumlah
ibulatkan
M2 Pintu Triplek Rangkap, Rangka Tertutup Kayu Kamper Medan
Kayu Papan Kamper Medan
Paku Biasa " - 1"
Lem Kayu
Triplek 120 x 240 x 0,4 cm
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Jumlah
ibulatkan
M2 Jalusi Mati Kusen Kayu kamper Medan
Kayu Papan Kamper Medan
Paku Biasa " - 1"
Pekerja
Tukang Kayu

Kepala Tukang
Mandor
Jumlah

ibulatkan

M2 Pintu Triplek Rangkap, Rangka Kayu Borneo Super


Kayu Papan Borneo Super
Paku Biasa " - 1"
Lem Kayu
Triplek 120 x 240 x 0,4 cm
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Jumlah
ibulatkan
M2 Pintu Teakwood Rangkap, rangka Kayu Kamper Medan
Kayu Papan Kamper Medan
Paku Biasa " - 1"
Lem Kayu
Teakwood 4 mm
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Jumlah
ibulatkan
M2 Pintu Triplek & Formika, Rangka Kayu Kamper Medan
Kayu Papan Kamper Medan
Paku Biasa " - 1"
Lem Kayu
Triplek 120 x 240 x 0,4 cm
Formica 3" x 6"
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Jumlah
ibulatkan
M2 Pintu Teakwood & Formika, Rangka Kayu Kamper Medan (dipolitur)
Kayu Papan Kamper Medan
Paku Biasa " - 1"
Lem Kayu
Teakwood 120 x 240 x 0,4 cm
Formica 4" x 8"

Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Jumlah

ibulatkan

M3 Kuda-kuda Kayu Kamper Medan


Kayu Balok Kamper Medan
Besi Strip
Paku Biasa 2" - 5"
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Jumlah
ibulatkan
M3 Kuda-kuda Kayu Borneo Super
Kayu balok Borneo super
Besi Strip
Paku Biasa 2" - 5"
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Jumlah
ibulatkan
M2 Kaso + Reng Genteng Plentong Kayu Borneo Super
Kayu balok Borneo super
Paku Biasa 2" - 5"
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Jumlah
ibulatkan
M2 Kaso + Reng Genteng Beton Kayu Borneo Super
Kayu balok Borneo super
Paku Biasa 2" - 5"
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Jumlah
ibulatkan

M' Lisplang uk (3x20)cm, Kayu Kamper Medan


Kayu Papan Kamper Medan
Paku Biasa 2" - 5"
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Jumlah

ibulatkan

M' Lisplang uk (3x30)cm, Kayu Kamper Medan


Kayu Papan Kamper Medan
Paku Biasa 2" - 5"
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Jumlah
ibulatkan

M List Plafond + kayu Profil 10 cm


Kayu Profil 10 cm
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Jumlah
ibulatkan

SATUAN

VOLUME

HARGA SATUAN

HARGA

m3
Oh
Oh
Oh
Oh

1.2
6
18
2
0.3

8,633,700.00 10,360,440.00
42,000.00
252,000.00
65,000.00 1,170,000.00
75,000.00
150,000.00
80,000.00
24,000.00
11,956,440.00
11,956,440.00

M3
Oh
Oh
Oh
Oh

1.2
6
18
2
0.3

5,692,600.00
42,000.00
65,000.00
75,000.00
80,000.00

6,831,120.00
252,000.00
1,170,000.00
150,000.00
24,000.00
8,427,120.00
8,427,120.00

M3
Oh
Oh
Oh
Oh

1.2
6
18
2
0.3

5,280,000.00
42,000.00
65,000.00
75,000.00
80,000.00

6,336,000.00
252,000.00
1,170,000.00
150,000.00
24,000.00
7,932,000.00
7,932,000.00

M3
Kg
Oh
Oh
Oh
Oh

0.04
0.05
1
2.5
0.25
0.05

8,633,700.00
23,400.00
42,000.00
65,000.00
75,000.00
80,000.00

345,348.00
1,170.00
42,000.00
162,500.00
18,750.00
4,000.00
573,768.00
573,768.00

M3
Kg
Oh
Oh
Oh

0.04
0.05
1
2.5
0.25

5,692,600.00
23,400.00
42,000.00
65,000.00
75,000.00

227,704.00
1,170.00
42,000.00
162,500.00
18,750.00

Oh

0.05

80,000.00

4,000.00
456,124.00
456,124.00

M3
Oh
Oh
Oh
Oh

0.035
0.8
2
0.2
0.04

5,692,600.00
42,000.00
65,000.00
75,000.00
80,000.00

199,241.00
33,600.00
130,000.00
15,000.00
3,200.00
381,041.00
381,041.00

M3
Oh
Oh
Oh
Oh

0.035
0.8
2
0.2
0.04

5,595,800.00
42,000.00
65,000.00
75,000.00
80,000.00

195,853.00
33,600.00
130,000.00
15,000.00
3,200.00
377,653.00
377,653.00

M3
Oh
Oh
Oh
Oh

0.064
1
3
0.3
0.5

5,692,600.00
42,000.00
65,000.00
75,000.00
80,000.00

364,326.40
42,000.00
195,000.00
22,500.00
40,000.00
663,826.40
663,826.00

M3
Kg
Ltr
Lbr
Oh
Oh
Oh
Oh

0.0196
0.03
0.3
1
0.6
2
0.2
0.03

5,692,600.00
23,800.00
23,900.00
64,400.00
42,000.00
65,000.00
75,000.00
80,000.00

111,574.96
714
7,170.00
64,400.00
25,200.00
130,000.00
15,000.00
2,400.00
356,458.96
356,459.00

M3
Kg
Oh
Oh

0.06
0.15
0.5
2

5,692,600.00
23,800.00
42,000.00
65,000.00

341,556.00
3,570.00
21,000.00
130,000.00

Oh
Oh

0.2
0.025

75,000.00
80,000.00

15,000.00
2,000.00
513,126.00
513,126.00

M3
Kg
Ltr
Lbr
Oh
Oh
Oh
Oh

0.0196
0.03
0.3
1
0.6
2
0.2
0.03

5,595,800.00
23,800.00
23,900.00
64,400.00
42,000.00
65,000.00
75,000.00
80,000.00

109,677.68
714
7,170.00
64,400.00
25,200.00
130,000.00
15,000.00
2,400.00
354,561.68
354,562.00

M3
Kg
Ltr
Lbr
Oh
Oh
Oh
Oh

0.0196
0.3
0.3
1
0.6
2
0.2
0.03

5,692,600.00
23,800.00
23,900.00
131,700.00
42,000.00
65,000.00
75,000.00
80,000.00

111,574.96
7,140.00
7,170.00
131,700.00
25,200.00
130,000.00
15,000.00
2,400.00
430,184.96
430,185.00

M3
Kg
Ltr
Lbr
Lbr
Oh
Oh
Oh
Oh

0.0196
0.3
0.8
1
0.5
0.8
2.5
0.25
0.04

5,692,600.00
23,800.00
23,900.00
64,400.00
132,900.00
42,000.00
65,000.00
75,000.00
80,000.00

111,574.96
7,140.00
19,120.00
64,400.00
66,450.00
33,600.00
162,500.00
18,750.00
3,200.00
486,734.96
486,735.00

M3
Kg
Ltr
Lbr
Lbr

0.0196
0.3
0.8
1
0.5

5,692,600.00
23,800.00
23,900.00
131,700.00
238,100.00

111,574.96
7,140.00
19,120.00
131,700.00
119,050.00

Oh
Oh
Oh
Oh

0.8
2.5
0.25
0.04

42,000.00
65,000.00
75,000.00
80,000.00

33,600.00
162,500.00
18,750.00
3,200.00
606,634.96
606,635.00

M3
Kg
Kg
Oh
Oh
Oh
Oh

1.1
15
0.8
4
12
1.2
0.2

5,692,600.00
26,800.00
23,800.00
42,000.00
65,000.00
75,000.00
80,000.00

6,261,860.00
402,000.00
19,040.00
168,000.00
780,000.00
90,000.00
16,000.00
7,736,900.00
7,736,900.00

M3
Kg
Kg
Oh
Oh
Oh
Oh

1.1
15
0.8
4
12
1.2
0.2

5,280,000.00
26,800.00
23,800.00
42,000.00
65,000.00
75,000.00
80,000.00

5,808,000.00
402,000.00
19,040.00
168,000.00
780,000.00
90,000.00
16,000.00
7,283,040.00
7,283,040.00

m3
Kg
Oh
Oh
Oh
Oh

0.012
0.15
0.1
0.1
0.01
0.005

5,280,000.00
23,800.00
42,000.00
65,000.00
75,000.00
80,000.00

63,360.00
3,570.00
4,200.00
6,500.00
750
400
78,780.00
78,780.00

M3
Kg
Oh
Oh
Oh
Oh

0.014
0.15
0.1
0.1
0.01
0.005

5,280,000.00
23,800.00
42,000.00
65,000.00
75,000.00
80,000.00

73,920.00
3,570.00
4,200.00
6,500.00
750
400
89,340.00
89,340.00

M3
Kg
Oh
Oh
Oh
Oh

0.0072
0.05
0.1
0.2
0.02
0.005

5,823,400.00
23,800.00
42,000.00
65,000.00
75,000.00
80,000.00

41,928.48
1,190.00
4,200.00
13,000.00
1,500.00
400
62,218.48
62,218.00

M3
Kg
Oh
Oh
Oh
Oh

0.011
0.05
0.11
0.22
0.022
0.005

5,692,600.00
23,800.00
42,000.00
65,000.00
75,000.00
80,000.00

62,618.60
1,190.00
4,620.00
14,300.00
1,650.00
400
84,778.60
84,779.00

M'
Oh
Oh
Oh
Oh

1.05
0.021
0.021
0.002
0.001

29,400.00
42,000.00
65,000.00
75,000.00
80,000.00

30,870.00
882
1,365.00
150
80
33,347.00
33,347.00

K. Analisa Harga Satuan Pekerjaan Penutup Besi dan Aluminium


No.
URAIAN
SAT
K-01

K-02

K-03

K-04

K-05

1 Kg
-

Besi profil
Besi profil WF
Meni besi
Pekerja
Tukang besi
Kepala tukang
Mandor
Jumlah

Dibulatkan
1 Kg
Perakitan baja
Solar
Minyak pelumas
Sewa alat
Pekerja
Tukang besi
Kepala tukang
Mandor
Jumlah
Dibulatkan
1 Cm Pengelasan dengan las listrik
kawat las
Solar
Minyak pelumas
Sewa alat
Pekerja
Tukang
Kepala Tukang
Mandor
Jumlah
Dibulatkan
1 m2 Pintu Rolling Door
Rolling door
Pekerja
Tukang besi
Kepala tukang
Mandor
Jumlah
Dibulatkan
1 m2 Pintu Alluminium Natural

VOLUME

Kg
Kg
Oh
Oh
Oh
Oh

1.1
0.08
0.06
0.006
0.006
0.0003

m'
m'
jam
Oh
Oh
Oh
Oh

0.01
0.001
0.008
0.001
0.00001
0.00001
0.00005

kg
ltr
ltr
jam
org
org
org
org

0.04
0.03
0.004
0.017
0.004
0.002
0.0002
0.0002

M2
Oh
Oh
Oh
Oh

1
1.05
1.5
0.105
0.0052

K-06

K-07

K-08

K-09

Pintu alluminium natural


Pekerja
Tukang besi
Kepala tukang
Mandor
Jumlah

Dibulatkan
1 m2 Terali Besi
Besi strip 2 x 3
Pekerja
Tukang las
Kepala tukang
Mandor
Jumlah
Dibulatkan
1 m2 Kawat Harmonika 4 cm
Kawat harmonika
Paku biasa " - 1"
Papan kayu kamper
Pekerja
Tukang kayu
Kepala tukang
Mandor
Jumlah
Dibulatkan

1 m' Talang Datar, Seng BJLS 28 lebar 90 cm


Seng plat 3' x 6' BJLS 30
Paku biasa " - 1"
Kayu papan borneo super
Flincote / meni besi
Pekerja
Tukang kayu
Kepala tukang
Mandor
Jumlah
Dibulatkan

1 m' Talang Miring, Seng BJLS 28 lebar 90 cm


Seng plat 3' x 6' BJLS 30
Paku biasa " - 1"
Kayu papan borneo super

m2
Oh
Oh
Oh
Oh

1
1.05
1.05
0.105
0.0052

m'
Oh
Oh
Oh
Oh

11.5
1.2
1.2
0.012
0.0006

M2
kg
M2
Oh
Oh
Oh
Oh

1.1
0.02
0.0018
0.1
0.1
0.01
0.005

m'
Kg
M3
Kg
Oh
Oh
Oh
Oh

1.05
0.015
0.0096
0.25
0.15
0.4
0.025
0.0013

m'
Kg
M3

1.05
0.015
0.019

Flincote / meni besi


Pekerja
Tukang kayu
Kepala tukang
Mandor
Jumlah

Kg
Oh
Oh
Oh
Oh

0.3
0.2
0.4
0.025
0.0013

m'
Kg
kg
Kg
Oh
Oh
Oh
Oh

1.05
0.1
0.019
0.5
0.15
0.3
0.03
0.008

m'
bh
m'
Oh
Oh
Oh
Oh

1.1
2
1
0.043
0.043
0.0043
0.0021

m'
bh
m'
Oh
Oh
Oh
Oh

1.1
2
1
0.043
0.043
0.0043
0.0021

Dibulatkan

K-10

K-11

K-12

1 m' Talang 1/2 lingkaran D-15 cm, seng pelat BJLS


Seng plat 3' x 6' BJLS 30
Paku biasa " - 1"
Kayu papan borneo super
Besi strip
Pekerja
Tukang kayu
Kepala tukang
Mandor
Jumlah
Dibulatkan

1 m' Pasang kusen pintu/jendela alluminium natural


Alumunium profil natural 4"
Skrup fixer
Sealant
Pekerja
Tukang kayu
Kepala tukang
Mandor
Jumlah
Dibulatkan

1 m' Pasang kusen pintu/jendela alluminium warna


Alumunium profil warna 4"
Skrup fixer
Sealant
Pekerja
Tukang kayu
Kepala tukang
Mandor

Jumlah
Dibulatkan

K-13

K-14

K-15

K-16

1 m' Pasang kusen pintu/jendela alluminium natural


Alumunium profil natural 3"
Skrup fixer
Sealant
Pekerja
Tukang kayu
Kepala tukang
Mandor
Jumlah
Dibulatkan

1 m' Pasang kusen pintu/jendela alluminium warna


Alumunium profil warna 3"
Skrup fixer
Sealant
Pekerja
Tukang kayu
Kepala tukang
Mandor
Jumlah
Dibulatkan

1 m2 Pintu alluminium strip lebar 8 cm


Alumunium profil 4" natural
Alumunium strip 6mm
Pekerja
Tukang kayu
Kepala tukang
Mandor
Jumlah
Dibulatkan

1 m2 Pintu/jendela kaca rangka alluminium natural


Alumunium profil natural 4"
Profil alluminium T

m'
bh
m'
Oh
Oh
Oh
Oh

1.1
2
1
0.043
0.043
0.0043
0.0021

m'
bh
m'
Oh
Oh
Oh
Oh

1.1
2
1
0.043
0.043
0.0043
0.0021

m'
m2
Oh
Oh
Oh
Oh

4.4
1.05
0.085
0.085
0.0085
0.0042

m'
m'

4.4
4.5

Sealant
Pekerja
Tukang kayu
Kepala tukang
Mandor
Jumlah

tube
Oh
Oh
Oh
Oh

0.27
0.085
0.085
0.0085
0.005

m'
m'
tube
Oh
Oh
Oh
Oh

4.4
4.5
0.27
0.085
0.085
0.0085
0.005

m2
bh
m'
Oh
Oh
Oh
Oh

1.1
10
7
0.2
0.2
0.02
0.001

Dibulatkan

K-17

K-18

K-19

K-20

1 m2 Pintu/jendela kaca rangka alluminium warna 4


Alumunium profil warna 4"
Profil alluminium T
Sealant
Pekerja
Tukang kayu
Kepala tukang
Mandor
Jumlah
Dibulatkan
1 m2 Jendela nako & teralis (10 klips)
Jendela nako (rangka + kaca 5 mm)
Paku skrup 1cm - 2,5cm
Besi strip
Pekerja
Tukang kayu
Kepala tukang
Mandor
Jumlah
Dibulatkan

1 m2 Pintu pelat baja tebal 2mm rangkap, rangka baja siku


Besi siku L 30.30.3
Kg
Baja pelat
Kg
kawat las
Kg
Pekerja
Oh
Tukang kayu
Oh
Kepala tukang
Oh
Mandor
Oh
Jumlah
Dibulatkan

1 m2 Rangka jendela besi square tube (5 x 5) cm

15
32.8
0.05
0.2
0.2
0.02
0.001

Besi square tube


Besi lis kaca (1 x 1) cm
Pengelasan
Pekerja
Tukang kayu
Kepala tukang
Mandor
Jumlah

M
Kg
Cm
Oh
Oh
Oh
Oh

4.76
4.522
20
0.65
0.65
0.065
0.032

M2
Oh
Oh
Oh
Oh

1
1.05
1.05
0.105
0.0052

M2
Oh
Oh
Oh
Oh

1
0.35
0.35
0.035
0.0018

Dibulatkan

K-21

K-22

1 m2 Pintu lipat (folding door) bahan besi


Pintu lipat
Pekerja
Tukang kayu
Kepala tukang
Mandor
Jumlah
Dibulatkan

1 m2 Tirai (venetions blinds and vertical blinds)


Tirai
Pekerja
Tukang kayu
Kepala tukang
Mandor
Jumlah
Dibulatkan

HARGA SAT
(Rp)

HARGA
(Rp)

24,000.00
30,400.00
42,000.00
65,000.00
75,000.00
80,000.00

26,400.00
2,432.00
2,520.00
390
450
24
32,216.00
32,216.00

7,150.00
55,000.00
100,000.00
42,000.00
65,000.00
75,000.00
80,000.00

71.5
55
800
42
0.65
0.75
4
973.9
974

23,600.00
7,150.00
55,000.00
100,000.00
42,000.00
65,000.00
75,000.00
80,000.00

944
214.5
220
1,700.00
168
130
15
16
2,463.50
2,464.00

306,600.00
42,000.00
65,000.00
75,000.00
80,000.00

306,600.00
44,100.00
97,500.00
7,875.00
416
456,491.00
456,491.00

211,800.00
42,000.00
65,000.00
75,000.00
80,000.00

211,800.00
44,100.00
68,250.00
7,875.00
416
332,441.00
332,441.00

5,500.00
42,000.00
65,000.00
75,000.00
80,000.00

63,250.00
50,400.00
78,000.00
900
48
192,598.00
192,598.00

35,900.00
23,800.00
5,692,600.00
42,000.00
65,000.00
75,000.00
80,000.00

39,490.00
476
10,246.68
4,200.00
6,500.00
750
400
62,062.68
62,063.00

20,801.00
23,800.00
5,595,800.00
30,400.00
42,000.00
65,000.00
75,000.00
80,000.00

21,841.05
357
53,719.68
7,600.00
6,300.00
26,000.00
1,875.00
104
117,796.73
117,797.00

20,801.00
23,800.00
5,595,800.00

21,841.05
357
106,320.20

30,400.00
42,000.00
65,000.00
75,000.00
80,000.00

9,120.00
8,400.00
26,000.00
1,875.00
100
174,013.25
174,013.00

20,801.00
23,800.00
5,595,800.00
26,800.00
42,000.00
65,000.00
75,000.00
80,000.00

21,841.05
2,380.00
106,320.20
13,400.00
6,300.00
19,500.00
2,250.00
640
172,631.25
172,631.00

151,100.00
250
7,500.00
42,000.00
65,000.00
75,000.00
80,000.00

166,210.00
500
7,500.00
1,806.00
2,795.00
322.5
168
179,301.50
179,302.00

163,000.00
250
7,500.00
42,000.00
65,000.00
75,000.00
80,000.00

179,300.00
500
7,500.00
1,806.00
2,795.00
322.5
168

192,391.50
192,392.00

81,000.00
250
7,500.00
42,000.00
65,000.00
75,000.00
80,000.00

89,100.00
500
7,500.00
1,806.00
2,795.00
322.5
168
102,191.50
102,192.00

102,000.00
250
7,500.00
42,000.00
65,000.00
75,000.00
80,000.00

112,200.00
500
7,500.00
1,806.00
2,795.00
322.5
168
125,291.50
125,292.00

151,100.00
171,800.00
42,000.00
65,000.00
75,000.00
80,000.00

664,840.00
180,390.00
3,570.00
5,525.00
637.5
336
855,298.50
855,299.00

151,100.00
12,200.00

664,840.00
54,900.00

7,500.00
42,000.00
65,000.00
75,000.00
80,000.00

2,025.00
3,570.00
5,525.00
637.5
400
731,897.50
731,898.00

163,000.00
12,200.00
7,500.00
42,000.00
65,000.00
75,000.00
80,000.00

717,200.00
54,900.00
2,025.00
3,570.00
5,525.00
637.5
400
784,257.50
784,258.00

300,000.00
250
5,500.00
42,000.00
65,000.00
75,000.00
80,000.00

330,000.00
2,500.00
38,500.00
8,400.00
13,000.00
1,500.00
80
393,980.00
393,980.00

24,000.00
24,000.00
23,600.00
42,000.00
65,000.00
75,000.00
80,000.00

360,000.00
787,200.00
1,180.00
8,400.00
13,000.00
1,500.00
80
1,171,360.00
1,171,360.00

7,300.00
24,000.00
2,464.00
42,000.00
65,000.00
75,000.00
80,000.00

34,748.00
108,528.00
49,280.00
27,300.00
42,250.00
4,875.00
2,560.00
269,541.00
269,541.00

501,700.00
42,000.00
65,000.00
75,000.00
80,000.00

501,700.00
44,100.00
68,250.00
7,875.00
416
622,341.00
622,341.00

537,300.00
42,000.00
65,000.00
75,000.00
80,000.00

537,300.00
14,700.00
22,750.00
2,625.00
144
577,519.00
577,519.00

1. Analisa Harga Satuan Pekerjaan Persiapan


2. Analisa Pekerjaan Tanah
3. Analisa Pekerjaan Pondasi
4. Analisa Pekerjaan Beton
5. Analisa Pekerjaan Dinding
6. Analisa Pekerjaan Plesteran-Acian
7. Analisa HArga Satuan Pekerjaan Penutup Atap
8. Analisa Harga Satuan Pekerjaan Tutup Plapond
9. Analisa Harga Satuan Pekerjaan Lantai
10. Analisa Harga Satuan Pekerjaan Kayu
11. Analisa Harga Satuan Pekerjaan Penutup Besi dan Alluminium
12. Analisa Harga Satuan Pekerjaan Kusen Aluminium
13. Analisa Harga Satuan Pekerjaan Kunci dan Kaca
14. Analisa Harga Satuan Pekerjaan Sanitasi
15. Analisa Harga Satuan Pekerjaan Pengecatan
16. Analisa Harga Satuan Pekerjaan Penanaman Pohon
17. Harga Satuan Pekerjaan Konstruksi
18. Harga Satuan Upah Kerja
19. Harga Satuan Bahan Material

Anda mungkin juga menyukai