Oleh :
ii
DATA PRIBADI
Nama
NIM
: 091321066
Alamat
: andhikareza91@yahoo.com
Nomor HP
: 085723449991
SD Lulus Tahun
: 2003 di SD
Pengalaman Berorganisasi :
1. Ketua Majelis Perwakilan Himpunan Mahasiswa. Himpunan Mahasiswa
Jurusan Elektro POLBAN (2010-2011)
2. Ketua Majelis Perwakilan Himpunan Mahasiswa. Himpunan Mahasiswa
Listrik POLBAN (2010-2011)
3. Anggota. Perhimpunan Mahasiswa Tasikmalaya POLBAN. (2009-sekarang)
4. Anggota. UKM Futsal POLBAN. (2009-2010)
5. Anggota. Forum Komunikasi Himpunan Mahasiswa Elektro Se-Bandung
Raya (FKHMEB). (2009-sekarang)
6. Koordinator. Alumni SMA N 1 Karangnunggal.(2010 - now)
iii
KATA MUTIARA
Allah mengangkat orang-orang beriman di antara kamu dan juga orang-orang yang
dikaruniai ilmu pengetahuan hingga beberapa derajat.
( al-Mujadalah : 11 )
Ilmu lebih utama daripada harta. Sebab ilmu warisan para nabi adapun harta adalah
warisan Qorun, Firaun dan lainnya. Ilmu lebih utama dari harta karena ilmu itu menjaga
kamu, kalau harta kamulah yang menjaganya.
Orang berilmu lebih utama daripada orang yang selalu berpuasa, shalat dan berjihad.
Karena apabila mati orang berilmu, maka terdapatlah kekosongan dalam islam yang
tidak dapat ditutup selain oleh penggantinya yaitu orang berilmu juga. ( Umar bin
Khattab )
aku ingin jadi "yang pertama", jika tidak, jadi "satu-satunya", jika tidak, jadi "yang
terbaik", jika tidak, aku ingin diantara orang-orang yang terbaik.
(Andika Reza Leksana)
iv
ABSTRAK
ABSTRACT
vi
KATA PENGANTAR
Puji syukur penulis panjatkan kehadirat Allah SWT yang telah memberikan
rahmat dan karunia-Nya, sehingga penulis dapat menyelesaikan proyek akhir
dengan judul
Arus Lebih ABB SPAM 150 C Pada Sistem Distribusi Tenaga Listrik, yang
Insya Allah tepat pada waktunya. sholawat serta salam semoga selalu
tercurahlimpahkan kepada junjungan Nabi Besar Muhammad SAW, para sahabat,
keluarga, hingga pada kita semua selaku umatnya sampai akhir zaman. Amin.
Bimbingan dan arahan yang telah penulis dapatkan dari pembimbing serta
dorongan dan bantuan dari semua pihak sangat berarti dalam penulisan proyek
akhir ini. Untuk itu, dengan segala kerendahan hati dan permohonan maaf atas
segala kekurangan yang ada dalam masa penulisan laporan ini, penulis
mengucapkan terima kasih dan penghargaan sebesar-besarnya kepada semua
pihak yang telah berkenan membantu dalam penulisan laporan proyek akhir ini.
Adapun pihak-pihak yang telah membantu penulis dalam proses penyusunan
laporan proyek akhir adalah :
1. Ibunda, ayahanda dan adiku tercinta yang senantiasa selalu memberikan
doa dan bantuan baik moril maupun materil kepada penulis dalam
menyelesaikan proyek akhir ini.
2. Bapak Hari Purnama, ST., M.Eng. selaku Ketua Jurusan Teknik Elektro.
3. Bapak Sunarto, ST., M.Eng. selaku Ketua Program Studi Teknik Listrik
dan selaku dosen pembimbing Utama dalam proyek akhir ini.
4. Bapak Dwi Asmono, Drs.,M.Pd selaku dosen pembimbing pendamping
dalam proyek akhir ini yang telah memberikan ide, pengarahan, dan
bantuannya serta meluangkan waktu untuk membimbing penulis dari awal
pelaksanaan sampai terselesaikannya proyek akhir ini.
5. Bapak Yudi Prana Hikmat, ST.,MT. wali kelas 3C yang telah banyak
memberikan motivasi.
vii
6. Bapak
Supriyanto,
ST.,
MT.
Yang
telah
banyak
membantu
Juli 2012
Penulis
viii
DAFTAR ISI
LEMBAR PENGESAHAN...ii
DATA PRIBADI...iii
KATA MUTIARA.iv
ABSTRAK..v
ABSTRACTvi
KATA PENGANTAR..vii
DAFTAR ISI..........................................................................................................ix
DAFTAR GAMBAR ..xiii
DAFTAR TABEL...............................................................................................xvi
DAFTAR LAMPIRAN..xvii
BAB I PENDAHULUAN...1
1.1 Latar Belakang ................................................................................... 1
1.2 Tujuan ................................................................................................ 2
1.3 Perumusan Masalah ........................................................................... 2
1.4 Batasan Masalah ................................................................................ 3
1.5 Metodologi Pengerjaan Proyek Akhir ................................................ 3
1.5.1 Identifikasi Masalah ................................................................ 3
1.5.2 Studi Literatur .......................................................................... 3
1.5.3 Realisasi ................................................................................... 3
1.5.4 Penyusunan Laporan Proyek Akhir ......................................... 3
1.5.5 Perbaikan dan Penyempurnaan ................................................ 3
1.5.6 Bimbingan ............................................................................... 4
ix
2.12.1
2.12.2
Koneksi ............................................................................. 30
2.12.3
2.12.4
2.12.5
2.12.6
Display .............................................................................. 35
2.12.7
2.12.8
2.12.9
xi
xii
DAFTAR GAMBAR
Gambar 2.15 Sinyal kontrol modul relai proteksi SPAM 150 C .............................. 33
Gambar 2.16 Contoh menghitung checksum dari pemilih switchgroup SG_ .............. 38
Gambar 2.17 Dasar prinsip menu utama dan submenu dari modul relay .................... 40
Gambar 2.18 Blok diagram modul proteksi motor SPCJ 4D34 ................................. 44
xiii
xiv
DAFTAR TABEL
xv
DAFTAR LAMPIRAN
xvi
DAFTAR PUSTAKA
82
Overcurrent
and
Earth-faulth
Relay
Modules,
6) Utomo, Heri Budi. Modul Bahan Ajar Distribusi Tenaga Listrik. 2010.
Bandung.
xvii
83
BAB I
PENDAHULUAN
1.1
Latar Belakang
Perkembangan yang pesat pada sisten tenaga listrik baik dalam ukuran dan
1.2
Tujuan
Adapun tujuan dari pelaksanaan Proyek Akhir ini adalah:
1.
2.
Pengujian karakteristik Definite Time relai arus lebih (OCR) tipe SPAM
150 C.
3.
1.3
Perumusan Masalah
Proyek Akhir ini akan membahas tentang pengaruh gangguan hubung
singkat antar phasa ( hubung singkat 2 phasa dan 3 phasa ) terhadap sistem
distribusi tenaga listrik menggunakan Relai arus lebih tipe ABB SPAM 150 C.
Untuk memudahkan dalam penyelesaiannya, dilakukan perumusan masalah
sebagai berikut:
1. Bagaimana cara membuat modul praktikum proteksi arus lebih sistem
distribusi tenaga listrik menggunakan relai arus lebih (OCR) tipe SPAM
150 C?
2. Bagaimana cara pengujian karakteristik definite relai arus lebih tipe SPAM
150 C?
3. Bagaimana cara melakukan simulasi setting gangguan hubung singkat 2
phasa dan 3 phasa pada modul proteksi arus lebih sistem distribusi tenaga
listrik ?, dimana hasil pengukuran dari simulasi tersebut dapat digunakan
sebagai data untuk perhitungan.
1.4
Batasan Masalah
Mengingat luasnya ruang lingkup bahasan yang dikemukakan oleh penulis
dan agar bahasan dalam laporan lebih terfokus maka penulis hanya akan
mengangkat topik hubung singkat antar phasa (hubung singkat 2 phasa dan 3
phasa) bagaimana cara kerja modul praktikum proteksi arus lebih ABB SPAM
150 C Pada Sistem Distribusi Tenaga Listrik .
1.5
1.5.1
Identifikasi Masalah
Merupakan langkah awal dari kegiatan Proyek Akhir yang diperlukan
Studi Literatur
Tahap ini dikerjakan untuk menemukan dasar-dasar teori yang diperlukan
dalam pengerjaan Proyek Akhir dan penulisan laporan Proyek Akhir, yang
berhubungan dengan Over Current Relai (OCR).
1.5.3
Realisasi
Tahap ini dilakukan untuk melakukan percobaan rangkaian dan pembuatan
rangkaian hardware. Sehingga dapat melihat hasil analisa dari rangkaian ataupun
data teori yang di dapat. Menggunakan modul sistem distribusi tenaga listrik yang
ada di lab SDTL.
1.5.4
1.5.5
dilakukan pada akhir kegiatan proyek akhir ketika semua kegiatan Proyek Akhir
telah selesai.
1.5.6
Bimbingan
Bimbingan dilakukan penulis untuk konsultasi langsung dengan
Sistematika Penulisan
Untuk mempermudah dalam penulisan laporan proyek akhir ini, maka
PENDAHULUAN
Pada bab ini menjelaskan tentang pendahuluan yang terdiri dari Latar
PENUTUP
Bab ini berisikan kesimpulan dan yang didapat dari Proyek Akhir yang
telah dibuat serta saran yang diharapkan untuk perkembangan lebih lanjut.
BAB II
LANDASAN TEORI
2.1
2.2
distribusi ini berguna untuk menyalurkan tenaga listrik dari sumber daya listrik
besar (Bulk Power Source) sampai ke konsumen.
fungsi distribusi tenaga listrik adalah:
a. Pembagian atau penyaluran tenaga listrik ke beberapa tempat
pelanggan
b. Merupakan sub sistem tenaga listrik yang langsung berhubungan
dengan pelanggan, karena catu daya pada pusat-pusat beban
(pelanggan) dilayani langsung melalui jaringan distribusi.
Tenaga listrik yang dihasilkan oleh pembangkit listrik besar dengan
tegangan dari 11 kV sampai 24 kV dinaikan tegangannya oleh gardu induk
dengan transformator penaik tegangan menjadi 70 kV ,154kV, 220kV atau 500kV
kemudian disalurkan melalui saluran transmisi. Tujuan menaikkan tegangan ialah
untuk memperkecil kerugian daya listrik pada saluran transmisi, dimana dalam hal
ini kerugian daya adalah sebanding dengan kuadrat arus yang mengalir (I kwadrat
R). Dengan daya yang sama bila nilai tegangannya diperbesar, maka arus yang
mengalir semakin kecil sehingga kerugian daya juga akan kecil pula.
Dari saluran transmisi, tegangan diturunkan lagi menjadi 20 kV dengan
transformator penurun tegangan pada gardu induk distribusi, kemudian dengan
sistem tegangan tersebut penyaluran tenaga listrik dilakukan oleh saluran
distribusi primer. Dari saluran distribusi primer inilah gardu-gardu distribusi
mengambil tegangan untuk diturunkan tegangannya dengan trafo distribusi
menjadi sistem tegangan rendah, yaitu 220/380 Volt. Selanjutnya disalurkan oleh
saluran distribusi sekunder ke konsumen-konsumen. Dengan ini jelas bahwa
sistem distribusi merupakan bagian yang penting dalam sistem tenaga listrik
secara keseluruhan.
Pada sistem penyaluran daya jarak jauh, selalu digunakan tegangan
setinggi mungkin, dengan menggunakan trafo-trafo step-up. Nilai tegangan yang
sangat tinggi ini (HV,UHV,EHV) menimbulkan beberapa konsekuensi antara lain:
berbahaya bagi lingkungan dan mahalnya harga perlengkapan-perlengkapannya,
selain menjadi tidak cocok dengan nilai tegangan yang dibutuhkan pada sisi
beban. Maka, pada daerah-daerah pusat beban tegangan saluran yang tinggi ini
diturunkan kembali dengan menggunakan trafo-trafo step-down. Akibatnya, bila
ditinjau nilai tegangannya, maka mulai dari titik sumber hingga di titik beban,
terdapat bagian-bagian saluran yang memiliki nilai tegangan berbeda-beda.
2.3
Transformator Daya
Transformator daya adalah salah satu peralatan terpenting dalam sistem
tenaga listrik yang fungsinya adalah untuk menaikkan atau menurunkan tegangan
dari satu nilai ke nilai tertentu. Transformator daya yang banyak dipakai oleh
PT.PLN (Persero) sebagian besar memiliki perbandingan tegangan 70/20 KV
yang menurunkan tegangan tinggi 70 KV pada sisi primer ke tegangan distribusi
20 KV pada sisi sekunder, yang kemudian disalurkan melalui saluran-saluran
penyulang (feeder). Transformator daya ini merupakan transformator 3 (tiga)
phasa yang memiliki 3 terminal pada sisi primer dan 4 terminal pada sisi sekunder
dengan rating daya berkisar antara 6 MVA hingga 100 MVA. Dalam sebuah
gardu induk bisa terdapat lebih dari 1 (satu) unit transformator daya.
Kerja
transformator
yang
berdasarkan
induksi-elektromagnet,
2.4
150 kV atau 70 kV melalui trafo tenaga yang terpasang di gardu induk. Dan
besarnya kapasitas trafo bervariasi antara 5,10,20,30, sampai 60 MVA. Dan
keluaran trafo dihubungkan ke bus 20 kV pada gardu-gardu induk yang kemudian
didistribusikan ke masing-masing penyulang 20 kV ke konsumen-konsumen
dengan mnenggunakan saluran udara tegangan menengah (SUTM) atau saluran
kabel tegangan menengah (SKTM). Dan biasanya di Indonesia pemakaian saluran
udara tegangan menengah lebih dominan oleh sebab itu sering terjadi gangguan
hubung singkat baik itu gangguan antar Phasa atau gangguan Phasa dengan tanah.
Ketika terjadi gangguan, sistem proteksi dapat mencegah terjadinya kerugian yang
lebih besar, dan dapat bekerja melokalisasi gangguan tersebut.
Penyulang distribusi 20 kV PLN diamankan dari gangguan arus hubung
singkat dengan menggunakan over current relay (OCR), Sesuai dengan
pertumbuhan kelistrikan di Indonesia, maka PLN tidak saja berusaha memenuhi
permintaan daya yang meningkat, akan tetapi PLN memperbaiki TMP. Sejalan
dengan itu, perlu dikembangkan suatu cara penilaian terhadap TMP atau
diperlukan penentuan TMP.
Menurut kamus besar bahasa Indonesia, mutu adalah sekumpulan atibut
yang memberikan kepuasan pada pelanggan. Apabila ditinjau secara etimologi,
maka penentuan TMP penyulang ini harus dilihat dari sisi pelanggan sebagai
pengguna tenaga listrik. Mutu pelayanan antara lain tegantung lamanya
pemadaman dan kerapnya pemadaman yang terjadi. Untuk dapat memenuhi mutu
pelayanan tersebut, maka diperlukan data atau laporan tentang sebab-sebab
pemadaman (trip) pada penyulang.
2.5
10
2.5.1
I f 3
Dimana:
Ea
( Ampere) ......................................................... (2.1)
Z1
Ea =
VLL
(Volt ) ....................................................... (2.2)
3
IA
A
Ea
IB
a).
b).
Z1
IC
C
Gambar 2.3 Gangguan Hubung Singkat 3 Phasa (a), Rangkaian Ekivalen Gangguan Hubung
Singkat 3 Phasa (b). [1]
Ihs
11
2.5.2
yang berupa hubungan pendek antara satu Phasa dengan Phasa yang lain. Apabila
hubung singkat terjadi pada Phasa a dan b akan didapat persamaan dibawah :
I f 2
Ea
( Ampere) ......................................................(2.3)
Z1 Z 2
I f 3
2
Ea
......................................(2.4)
Z1
3 ...............................................................(2.5)
IA
A
Ea
IB
a).
b).
Ihs
Z1
IC
C
Z2
Gambar 2.4 Gangguan Hubung Singkat 2 Phasa (a), Rangkaian Ekivalen Gangguan
Hubung Singkat 2 Phasa (b). [1]
Arus hubung singkat dua Phasa lebih kecil daripada arus gangguan hubung
singkat tiga Phasa.
12
2.6
diantaranya :
a. Daun-daun atau Sampah yang Menempel Pada Isolator
Daun-daun atau sampah yang terbang terbawa angin dan kemudian
menempel pada isolator akan mengakibatkan jarak bebas berkurang
sehingga dapat menyebabkan terjadinya loncatan bunga api. Hal ini dapat
menyebabkan terjadinya gangguan antar Phasa atau gangguan dari Phasa
ke tanah.
b. Isolator yang Rusak
Isolator yang rusak akibat tersambar petir atau usia yang sudah tua dapat
menyebabkan terjadinya gangguan antar Phasa atau gangguan dari Phasa
ke tanah.
c. Kerusakan Mekanis dari Peralatan
d. Pohon-pohon yang Tidak Terawat
Ranting-ranting yang masuk ke daerah bebas saluran transmisi dan
distribusi akan mengakibatkan terjadinya gangguan ke tanah.
e. Polusi Debu
Debu-debu yang menempel pada isolator, bila udara lembab maka debu
tersebut akan menjadi konduktor yang dapat menyebabkan gangguan ke
tanah.
f. Surja Hubung
Merupakan kenaikan tegangan pada saat dilangsungkan pemutusan arus
oleh pemutus tenaga. Gangguan ini pun dapat mengakibatkan rusaknya
isolasi pada peralatan.
g. Surja Petir
Biasanya sering terjadi pada saat musim penghujan. Gangguan ini sangat
dipengaruhi oleh kondisi cuaca yang berbeda-beda di suatu tempat.
Gangguan yang disebabkan oleh petir ini sangat berbahaya karena dapat
merusak isolasi dari peralatan.
h. Turunnya Kekuatan Dielektris dari Isolasi Sistem.
13
2.7
Peralatan Proteksi
Gangguan pada jaringan distribusi tenaga listrik sebagian besar merupakan
gangguan hubung singkat, yang menimbulkan arus listrik cukup besar. Semakin
besar sistemnya, semakin besar pula arus gangguannya.
Arus gangguan yang besar bila tidak segera dihilangkan akan merusak
peralatan yang dilalui arus gangguan. Untuk melepaskan daerah yang terganggu
diperlukan alat pengaman. Di sini jelas bahwa alat pengaman bertujuan untuk
melepaskan atau membuka sistem yang terganggu sehingga arus gangguan ini
akan padam. Untuk memenuhi tujuan tersebut maka diperlukan sistem proteksi.
Yang dimaksud dengan sistem proteksi tenaga listrik adalah suatu sistem
pengaman kepada peralatan-peralatan listrik dan saluran terhadap kondisi
abnormal. Sistem proteksi diperlukan untuk menghindari ataupun untuk
mengurangi kerusakan peralatan listrik akibat gangguan. Semakin cepat reaksi
perangkat proteksi yang digunakan maka akan semakin sedikitlah pengaruh
gangguan kepada kemungkinan kerusakan alat. Disamping itu dengan bekerjanya
sistem proteksi maka daerah yang terganggu bisa dilokalisir sehingga dapat
memberikan pelayanan listrik dengan keandalan yang tinggi kepada konsumen,
dan juga untuk mengamankan manusia terhadap bahaya yang ditimbulkan oleh
listrik.
Suatu sistem proteksi terdiri dari beberapa komponen peralatan yang
membentuk satu rangkaian yang masing-masing komponen mempunyai tugas
sesuai dengan fungsinya.Komponen peralatan pada sistem pengaman adalah
sebagai berikut:
Relai
Kabel Kontrol
Baterai
14
2.8
adanya suatu gangguan atau merasakan adanya kondisi tidak normal yang
mungkin terjadi pada peralatan atau bagian sistem tenaga listrik.
Relai proteksi dapat mendeteksi adanya gangguan pada peralatan yang
diamankan dengan mengukur besaran-besaran listrik yang diterimanya dan
membandingkan antara besaran pada saat kondisi normal dengan besaran pada
saat kondisi gangguan. Besaran-besaran yang berubah harganya pada kondisi
gangguan tersebut misalnya arus, tegangan, daya, sudut Phasa, impedansi,
frekuensi, dan lain sebagainya.
Relai secara otomatis akan membuka pemutus tenaga (PMT) untuk
memisahkan peralatan atau bagian dari sistem yang terganggu dan memberikan
isyarat berupa lampu dan alarm (bel) yang menandakan pada sistem telah terjadi
gangguan.
2.8.1
2.8.2
gangguan pada bagian suatu sistem tenaga listrik yang kemudian secara otomatis
akan membuka Pemutus Tenaga.
15
menimbulkan
seharusnya
ataupun
menyulitkan analisa gangguan yang terjadi. Dalam hal ini yang harus dapat
diandalkan tidak hanya relainya sendiri tetapi mulai dari trafo arus, trafo
tegangan serta rangkaiannya, baterai serta pemutus tenaganya.
2. Selektif
Relai bertugas mengamankan peralatan atau bagian sistem dalam daerah
pengamannya. Letak PMT (Pemutus Tenaga) sedemikian rupa sehingga setiap
bagian dari sistem dapat dipisahkan. Maka tugas relai adalah mendeteksi
adanya gangguan yang terjadi pada daerah pengamanannya dan memberi
perintah untuk membuka PMT (Pemutus Tenaga) untuk memisahkan bagian
dari sistem pada daerah yang terganggu. Dengan demikian bagian sistem
lainnya yang tidak terganggu jangan sampai dilepas, dan masih beroperasi
normal sehingga tidak terjadi pemutusan pelayanan. Dengan kata lain
pengamanan dinyatakan selektif bila relai dan PMT (Pemutus Tenaga) yang
bekerja hanyalah pada daerah yang terganggu saja.
16
4. Peka
Relai pengaman harus cepat merasakan adanya arus gangguan yang melebihi
arus settingnya. Relai dikatakan peka (sensitif) apabila dapat bekerja dengan
masukan dari besaran yang dideteksi kecil. Jadi relai dapat bekerja pada awal
kejadian gangguan atau dengan kata lain gangguan dapat diatasi pada awal
kejadian. Hal ini memberi keuntungan dimana kerusakan peralatan yang
diamankan akibat gangguan menjadi kecil. Namun demikian relai harus stabil,
yang artinya relai harus dapat membedakan antara arus gangguan dan arus
beban maksimum.
2.9
arus yang melebihi suatu nilai pengamanan tertentu dan dalam jangka waktu
tertentu, sehingga relai ini dapat dipakai sebagai pola pengaman arus lebih. Relai
ini pada dasarnya mengamankan adanya arus lebih yang disebabkan oleh
gangguan hubung singkat atau beban lebih. Relai arus lebih akan bekerja bila
besarnya arus input melebihi suatu harga tertentu (arus kerja) yang dapat diatur
dan dinyatakan menurut kumparan sekunder dari trafo arus. Relai arus lebih akan
memberi isyarat kepada PMT (Pemutus Tenaga) bila terjadi gangguan hubung
singkat untuk membuka rangkaian sehingga kerusakan alat akibat gangguan dapat
dihindari.
Pengamanan dengan menggunakan relai arus lebih mempunyai beberapa
keuntungan yaitu :
a. Dapat mengamankan arus lebih yang terjadi karena hubung singkat atau
beban lebih.
17
2.9.1
sebagai:
1. Pengaman utama.
Relai pengaman sebagai pengaman utama adalah relai yang pertama kali
merespon dan bertindak jika terjadi gangguan pada sistem.
2. Pengaman cadangan
Sedangkan sebagai pengaman cadangan, relai pengaman cadangan baru akan
merespon dan bekerja jika relai pengaman utama gagal bekerja.
18
2.9.2
besaran arus gangguan akibat hubung singkat yang mengalir pada rangkaian
kumparan geraknya. Apabila besarnya arus yang dideteksi melebihi batas
settingnya, maka akan bekerja (Pick up), kemudian dalam waktu tertentu akan
memberikan perintah trip ke PMT untuk mengelimir gangguan tersebut.
Prinsip kerja relai arus lebih yang bekerja berdasarkan besaran arus lebih
akibat adanya gangguan hubung singkat dan memberikan perintah trip ke PMT
sesuai dengan karakteristik waktunya.
Pada gambar di bawah ini diberikan contoh gambar rangkaian relai arus
lebih waktu sesaat pada SUTM.
CT
Ib
PMT
CT
CT
Ir
R
Ir
Ir
trip
coil
OCR
Batere
Pada kondisi normal arus beban (Ib) mengalir pada SUTM dan oleh trafo
arus besaran arus ini ditransformasikan ke besaran sekunder (Ir). Arus Ir mengalir
pada kumparan relai, tetapi karena arus ini masih lebih kecil dari pada suatu harga
yang ditetapkan (setting), maka relai tidak bekerja.
Bila terjadi gangguan hubung singkat, arus Ib akan naik dan menyebabkan
arus Ir naik pula. Apabila arus Ir naik melebihi suatu harga yang telah ditetapkan
19
(diatas setting) maka relai akan bekerja dan memberikan perintah trip coil untuk
bekerja dan membuka PMT, sehingga SUTM yang terganggu dipisahkan dari
jaringan.
2.9.3
2.9.3.1
Relai
Arus
Lebih
Karakteristik
Waktu
Sesaat/Moment
(Instantaneous).
Adalah relai arus lebih yang tidak dilengkapi dengan elemen pengukur
waktu, sehingga apabila suatu kumparan bekerja, maka dalam waktu seketika
mengirim perintah trip ke PMT.
Gambar 2.6 Karakteristik Relai Arus Lebih Waktu Seketika (Instantaneous). [5]
20
Gambar 2.7 Karakteristik Relai Arus Lebih Waktu Tertentu (Definite Time). [5]
.
Gambar 2.8 Karakteristik Relai Arus Lebih Waktu Terbalik (Inverse Time). [5]
21
0,14
TMS
I
1
0 , 02
Very Inverse
yaitu karakteristik yang menunjukkan perbandingan antara besar
arus dengan waktu kerja relai yang lebih cepat/tinggi dari Standard
Inverse, ditulis dengan rumus:
13,5
TMS
I 1
Extremely Inverse,
yaitu karakteristik yang menunjukkan perbandingan antara besar
arus dengan waktu kerja relai yang lebih cepat/tinggi dari Standard
Inverse dan very inverse, ditulis dengan rumus:
=
80
120
22
23
Trip
Adalah suatu tanda bahwa relai bekerja dan telah memberi perintah
pada tripping coil untuk bekerja melepas kontak PMT.
2.9.4
24
3. Pada saat melakukan setting waktu relai inverse, lakukanlah pada saat arus
gangguan maksimum karena untuk arus yang lebih kecil waktu kerja relai akan
lebih besar.
ks
x In(1)
kd
k S = 1,1 1,2
k D > 80 %
(3)
(4)
Iset diambil dari nilai terkecil diantara persamaan (3) dan (4)
Di sisi hulu maka :
I setInst = 1,2 x I hs3 max diHilir .
(5)
25
2.10 Konstruksi Relai Arus Lebih (OCR) tipe ABB SPAM 150C
Gambar 2.10 Konstruksi Relai Arus Lebih tipe ABB SPAM 150C [3]
Keterangan :
1. Phasa R
2. current transformer In = 5 A
3. current transformer In = 1 A
4. Phasa S
5. current transformer In = 5 A
6. current transformer In = 1 A
7. Phasa T
8. current transformer In = 5 A
9. current transformer In = 1 A
26
63. grounding
PMT
OCR
P1
GFR
S1
OCR
CT
S2
P2
3 buah OCR
1 buah GFR
Gambar 2.11 Pengawatan Relai Arus Lebih tipe ABB SPAM 150C Pada Jaringan Tenaga Listrik
[3]
Didalam OCR ABB SPAM 150C terdapat 4 buat relai yaitu, 1 buang relai
setiap phasa nya dan 1 relai buat GFR.
2.12 Relai Arus Lebih tipe ABB SPAM 150C
Relai spam 150 c berbasis mikroprosesor adalah desain relai terpadu dengan
pengukuran multifungsi lengkap dengan pelindung motor, melingkupi cakupan
yang besar atau menengah seperti motor 2 Phasa dalam semua jenis konvensional
kontaktor atau pemutus sirkuit yang di kendalikan oleh drive. Reli proteksi motor
tersedia dalam dua versi, satu dengan membuat trip kontak dan yang lain
menggunakan breaking trip kontak. Relai ini juga dapat digunakan dalam aplikasi
arus lebih 1,2 dan 3 Phasa dan proteksi beban lebih dan earth fault protection.
Kombinasi multifungsi relai proteksi motor adalah sebuah perangkat relai
sekunder yang di hubungkan ke transformator arus dari drive motor yang
27
dilindungi. Arus tiga Phasa dan arus netral dari perangkat yang dilindungi dapat di
ukur dan atas dasar pengukuran ini, kondisi termal dari motor dihitung dan
kesalahan jaringan dapat terdeteksi. Dalam keadaan fault unit proteksi dari relai
meminta alarm atau men-tripkan CB.
Dengan signal pemrograman yang sesuai dari matriks output relai, berbagai
signal, alaram awal atau signal restart inhibit akan menerima sebagai fungsi
kontak. Kontak informasi dapat digunakan untuk memblokir, bekerja sama
dengan relai pelindung yang terletak di hulu, untuk koneksi ke unit signal.
Relai pelindung motor berisi satu logika input kontrol ekternal, yang
diaktifkan oleh signal kontrol pada level tambahan tegangan. Pengaruh input
kontrol pada relai ditentukan oleh switch pemograman. Input kontrol dapat
digunakan baik untuk memblokir satu atau lebih level proteksi, untuk
melaksanakan perintah trip, untuk menghambat upaya untuk restart atau reset relai
yang terkunci secara manual.
Gambar 2.12 Fungsi dari jenis relay Proteksi bermotor SPAM 150 C. mengacu pada ANSIpenomoran fungsi pelindung [3]
28
29
Uaux
Auxiliary tegangan
A, B, C, D, E, F
output relay
IRF
Self-supervision
SGB
TRIP
SIGNAL
PRIOR ALARM
START
Restart ENABLE
U1
U2
U3
SPA-ZC-
PORT SERIAL
STALL
RESTART INHIBITAT
30
2.12.2 Koneksi
Tiga arus Phasa yang terhubung ke terminal 1-2, 4-5 dan 7-8, ketika arus
pengenal dari sirkuit sekunder adalah In = 5 A. Bila menggunakan transformator
arus dengan arus pengenal 1 A, terminal 1-3 , 4-6 dan 7-9 yang digunakan.
Perlindungan kelebihan beban termal juga dapat digunakan dalam aplikasi fase
tunggal atau dua fase, dalam hal ini input tidak digunakan dapat dibiarkan tidak
tersambung.
Untuk mendapatkan operasi yang tepat dari perlindungan fase urutan
ketidakseimbangan dan tidak benar dalam aplikasi dua fase, dua arus Phasa harus
disimpulkan pada input tahap ketiga saat ini. Dalam satu fase aplikasi, kabel fase
arus melalui dua atau tiga input saat ini di seri sedikit dapat meningkatkan
kecepatan operasi dari relay dan menstabilkan operasi di unit termal.
31
arus
pengenal
adalah
dan
ke
terminal
25-27
ketika
32
dan C diberikan seperti konfigurasi yang alarm sebelum termal diperoleh dari
relai C dan sinyal perjalanan dari unit perlindungan terkait dengan output relay B
untuk membentuk sinyal trip tambahan. Ini juga merupakan pengaturan default
dari relay pada pengiriman dari pabrik. Sinyal-sinyal untuk diteruskan ke relay D
output dipilih dengan switch 1, 2 dan 3 perangkat lunak switchgroup SGR2 dalam
menu utama dari modul relay. Switch SGR2 / 1 rute alarm sebelum termal, beralih
SGR2 / 2 rute informasi startup untuk motor dan beralih SGR2 / 3 rute sinyal awal
tahap set arus lebih untuk output relay D.
Output relay E, terminal 74-75, adalah output relay tugas berat, mampu
mengendalikan pemutus sirkuit, sebagai relai trip utama A. E Relay digunakan
untuk mengendalikan restart motor. Jika kapasitas termal yang digunakan
melebihi set restart menghambat tingkat unit termal, jika maksimum yang
diperbolehkan kumulatif start-up jumlah terlampaui atau jika restart eksternal
menghambat sinyal aktif E output relay mencegah motor memulai kembali usaha.
Ini juga berlaku untuk suatu kondisi dimana relay pelindung dari tegangan
tambahan atau relai rusak. F output relay, terminal 70-71-72, beroperasi sebagai
relay output dari sistem self-supervisi-sion terintegrasi. Relay beroperasi pada
prinsip sirkuit tertutup, sehingga dalam kondisi layanan normal kesenjangan
kontak 70-72 ditutup. Jika suatu kesalahan terdeteksi oleh sistem self-supervisision, atau jika pasokan tambahan gagal, output relay drops off, memberikan sinyal
alarm dengan menutup kontak NO 71-72.
Relay dihubungkan ke bus data SPA dengan jenis modul bus koneksi
SPA-ZC 17 atau SPA-ZC21. Modul koneksi bus dihubungkan ke konektor tipe D
ditandai PORT SERIAL pada panel belakang relai. Kabel serat optik yang
terhubung ke konektor Tx dan Rx dari modul koneksi bus. Modus komunikasi
pemilih switch pada modul koneksi bus diatur dalam posisi "SPA".
2.12.3 Kontrol Signal
Gambar di bawah ini secara skematis menggambarkan bagaimana , start,
trip, kontrol dan pemblokiran sinyal dapat diprogram untuk mendapatkan fungsi
yang diperlukan dari relay proteksi.
33
Gambar 2.15 Sinyal kontrol modul relai proteksi SPAM 150 C [3]
Fungsi sinyal blocking dan mulai dipilih dengan switch dari switchgroups
SGF, SGB dan SGR. Checksum dari switchgroups ditemukan dalam menu
pengaturan dari modul relai pengukuran. Fungsi switch yang berbeda dijelaskan
dalam manual pengguna dari modul SPCJ 4D34.
34
c. Selain menjadi nomor kode pada penyajian data, angka merah paling kiri
di layar berfungsi sebagai indikator operasi visual. Indikator operasi
diakui oleh fakta bahwa angka merah saja diaktifkan. Biasanya hal
pertama yang muncul diindikasikan. Untuk unit termal, bagaimanapun,
alarm sebelum sinyal ini kemudian diganti dengan indikasi trip, jika
tripping dilakukan. Untuk memungkinkan pembacaan tingkat termal
sebenarnya dll, adalah mungkin untuk mengakui indikasi thermal unit saat
unit masih diaktifkan. Hal yang sama berlaku untuk sinyal gangguan ke
tanah. Dalam kasus ini, indikasi yang menyimpan dan muncul kembali
ketika layar gelap. Semua indikator operasi secara otomatis me-reset
ketika motor di-restart. Tabel berikut, bernama OPERASI IND. pada
panel depan relay, adalah kunci ke nomor operasi indikator kode yang
digunakan.
d. Indikasi TRIP bertahan ketika tahap pelindung kembali normal. Indikatorreset dengan menekan tombol RESET / STEP. Sebuah restart secara
otomatis me-reset indikasi operasi. Selanjutnya, indikator dapat mengatur
ulang melalui input kontrol eksternal 10-11 dengan menggunakan
tegangan kontrol untuk input, asalkan saklar SGB / 6 pada posisi 1.
Fungsi dasar Relay proteksi tidak tergantung pada keadaan indikator
operasi, yaitu reset atau non-reset. Relay adalah permanen operasi.
e. Dalam dua menit setelah sistem self-super-visi internal telah mendeteksi
gangguan permanen, indikator IRF merah menyala dan relay output dari
sistem pengawasan beroperasi. Selanjutnya, dalam situasi gangguan akan
di diagnostik secara otomatis dan ditampilkan di layar. Kode gangguan
terdiri dari 1 angka merah dan nomor kode hijau, yang menunjukkan
jenis gangguan. Kode gangguan tidak dapat mengatur ulang selama
gangguan terus berlanjut. Ketika kode gangguan muncul di layar, nomor
kode harus dicatat pada kertas dan diberikan kepada bengkel resmi, ketika
overhaul diperintahkan.
35
Indikasi
Keterangan
1.
2.
3.
= restart termal menjaga tingkat berlebih
waktu start up atau mencegah sinyal ekternal aktif
4.
5.
6.
7.
8.
9.
merah
menunjukkan
jumlah
digit
kode
dari
register.
36
yang berdekatan kuning pada panel depan. Ketika sebuah nilai gangguan direkam
sedang ditampilkan menunjukkan angka merah nomor sesuai mendaftar. Ketika
fungsi layar sebagai indikator operasi angka merah saja itampilkan.
Ketika tegangan auxiliary dari modul relai proteksi diaktifkan modul
awalnya menguji layar dengan melangkah melalui semua segmen layar selama
sekitar 15 detik. Pada awalnya segmen yang sesuai dari semua angka yang
menyala satu per satu searah jarum jam, termasuk titik desimal. Kemudian
segmen tengah setiap digit menyala satu per satu. Urutan lengkap dilakukan dua
kali. Ketika tes selesai layar akan gelap. Pengujian dapat terganggu dengan
menekan tombol push STEP. Fungsi perlindungan dari modul relai diberitahu
seluruh pengujian.
2.12.7 DISPLAY MAIN MENU
Setiap data yang dibutuhkan selama operasi normal dapat diakses di menu
utama yaitu nilai-nilai pengukuran ini, nilai pengaturan sekarang dan nilai
parameter yang direkam. Data yang akan ditampilkan dalam menu utama secara
berurutan dipanggil untuk ditampilkan dengan cara menekan tombol STEP.
Ketika tombol push STEP ditekan selama sekitar satu detik, layar bergerak maju
dalam urutan tampilan. Ketika push button ditekan selama sekitar 0,5 detik, layar
akan bergerak mundur dalam urutan tampilan.
Dari layar gelap hanya maju gerakan adalah mungkin. Ketika tombol push
STEP didorong terus, layar terus bergerak maju menghentikan untuk sementara
dalam posisi gelap. Kecuali layar dimatikan dengan melangkah ke titik gelap, itu
tetap menyala selama sekitar 5 menit dari saat memencet tombol STEP terakhir
ditekan. Setelah 5 menit time-out dispaly dimatikan.
2.12.8 DISPLAY SUBMENU
Nilai yang kurang penting dan nilai-nilai tidak terlalu sering yang ada akan
ditampilkan dalam submenu. Jumlah submenu bervariasi dengan jenis modul relai
berbeda. Submenu disajikan dalam deskripsi modul relai proteksi yang
bersangkutan. Submenu akan dimasukkan dari menu utama dengan menekan
tombol push PROGRAM selama sekitar satu detik. Ketika push button dilepas,
angka merah layar mulai berkedip, menunjukkan bahwa submenu telah
37
dimasukkan. Pergi dari satu submenu lain atau kembali ke menu utama mengikuti
prinsip yang sama seperti ketika bergerak dari tampilan menu utama yang lain.
layar bergerak maju ketika tombol push STEP ditekan selama satu detik dan
mundur ketika ditekan selama 0,5 detik. Menu utama telah kembali memasuki
saat layar merah akan gelap. Ketika submenu dimasukkan dari menu utama dari
sebuah nilai yang diukur atau ditetapkan ditunjukkan dengan indikator LED,
indikator tetap menyala dan jendela alamat dari layar mulai berkedip. Posisi
submenu diindikasikan oleh sejumlah alamat berkedip merah sendirian di dispaly
tanpa nilai yang ditetapkan menyalakan LED indikator pada panel depan.
38
Fungsi dari switch selektor dari modul proteksi yang berbeda relai dijelaskan
secara rinci dalam manual dari relay yang berbeda modul.
2.12.10 Settings
Sering kali dari nilai awal dan beroperasi ditetapkan melalui layar dan
push button pada panel depan dari modul relay. Pengaturan masing-masing
memiliki indikator terkait yang menyala ketika nilai pengaturan yang
bersangkutan ditampilkan pada layar.
Selain susunan utama dari nilai pengaturan modul jenis yang paling D
relai memungkinkan tumpukan kedua pengaturan. Beralih di antara pengaturan
utama dan pengaturan yang kedua dapat dilakukan dengan tiga cara berbeda:
1) Dengan perintah V150 melalui bus komunikasi serial
2) Dengan kontrol sinyal eksternal BS1, BS2 atau RRES (BS3)
3) Via push-tombol dari modul relay, melihat submenu 4 dari register A.
2.12.11 Setting mode
Secara umum, ketika sejumlah besar pengaturan adalah untuk diubah,
misalnya selama komisioning relay sistem, dianjurkan bahwa relay settings
dimasukkan dengan keyboard dari komputer pribadi disediakan dengan yang
diperlukan perangkat lunak. Bila tidak ada komputer atau perangkat lunak adalah
tersedia atau ketika hanya nilai beberapa pengaturan perlu harus diubah prosedur
yang diuraikan di bawah ini digunakan. Register dari menu utama dan submenu
39
berisi semua parameter yang dapat diatur. pengaturan yang dibuat dalam modus
pengaturan yang disebut, yang dapat diakses dari menu utama atau submenu
dengan menekan push PROGRAM tombol, sampai seluruh tampilan mulai
berkedip. Posisi ini menunjukkan nilai parameter sebelum telah diubah. Dengan
menekan PROGRAM menekan tombol pemrograman sequence bergerak maju
satu langkah. Pertama paling kanan digit mulai berkedip sementara sisa display
yang steady Angka berkedip diatur oleh cara push button STEP. Kursor berkedip
yang pindah dari digit ke digit oleh persing tombol push PROGRAM dan dalam
setiap menghentikan pengaturan dilakukan dengan STEP tersebut menekan
tombol. Setelah nilai parameter memiliki telah ditetapkan, titik desimal
diberlakukan. Pada mengakhiri posisi dengan tampilan keseluruhan berkedip
tercapai lagi dan data siap menjadi disimpan. Sebuah nilai yang ditetapkan dicatat
dalam memori dengan persing STEP tombol push dan PROGRAM secara
bersamaan. Sampai nilai baru telah mencatat kembali dari modus pengaturan akan
tidak berpengaruh pada pengaturan yang dahulu nilai masih akan berlaku.
Selanjutnya setiap upaya untuk membuat pengaturan di luar batas yang diijinkan
untuk parameter tertentu akan menyebabkan nilai baru yang akan didiskualifikasi
dan nilai sebelumnya akan main terjadi saat. Kembali dari mode pengaturan ke
menu
utama
atau
submenu
dimungkinkan
dengan
menekan
menekan tombol PROGRAM sampai hijau digit pada layar berkedip berhenti.
CATATAN! Selama setiap komunikasi manusia-mesin lokal di atas
tombol push dan tampilan pada panel depan fungsi waktu lima menit aktif. Jadi,
jika tidak ada tombol push telah ditekan selama lima menit terakhir, relay kembali
ke keadaan normal secara otomatis. Ini berarti bahwa layar akan gelap, relay
terlepas dari mode tampilan, rutinitas pemrograman atau rutin terjadi, ketika relay
ini tidak tersentuh. Ini adalah cara yang nyaman keluar dari setiap situasi ketika
pengguna tidak tahu harus berbuat apa. Sebelum modul relay dimasukkan ke
dalam hal relay, kita harus memastikan bahwa modul tersebut telah diberikan
pengaturan yang benar. Jika ada namun keraguan tentang pengaturan dari modul
yang akan dimasukkan, nilai pengaturan harus dibaca menggunakan unit relai
cadang atau dengan sirkuit trip relai terputus. Jika ini tidak dapat dilakukan relay
40
dapat sett ke dalam mode non-tripping dengan menekan tombol push PROGRAM
dan powering up modul relai secara bersamaan. Layar akan menampilkan tiga
strip "---" untuk menunjukkan modus non tripping. Komunikasi serial adalah
operasi dan semua utama dan submenues dapat diakses. Dalam mode non-tripping
trippings yang tidak perlu dihindari dan pengaturan dapat diperiksa. Modus
perlindungan normal relay dimasukkan secara otomatis setelah batas waktu lima
menit atau sepuluh detik setelah posisi layar gelap dari menu utama telah
dimasukkan.
Gambar 2.17 Dasar prinsip menu utama dan submenu dari modul relay [3]
41
No
1
Langkah-langkah
Gambar
Tekan tombol STEP berulang kali sampai RESET
STEP
ke lampu LED pada simnol I> menyala,
kemudian nilai arus start akan tertera di
display
PROGRAM
PROGRAM
PROGRAM
untuk
PROGRAM
PROGRAM
PROGRAM
PROGRAM
42
RESET/ STEP
10
Tekan
PROGRAM kembali,
mengedipkan titik maksimal.
PROGRAM
11
RESET
STEP
12
PROGRAM
13
RESET
STEP
untuk
43
14
PROGRAM
15
RESET
STEP
2.12.12 Karakteristik
Tahap set arus lebih dimulai jika arus pada satu atau beberapa Phasa
melebihi nilai pengaturan. Ketika start, mengeluarkan sinyal awal. Jika situasi
arus lebih berlangsung cukup lama melebihi set waktu beroperasi, unit trip akan
mengindikasikan untuk memutus CB. Pada saat yang sama indikator operasi
menyala dengan cahaya merah. Indikator operasi merah akan tetap menyala
selama gangguan. Indikator direset dengan tombol RESET. Rute Sinyal selalu
diarahkan ke output SS3 dan juga dapat dengan pemrograman akan diarahkan ke
output SS2. Pengaturan awal saat ini kisaran pada set arus lebih adalah 0,5 ... 20 x
In. Waktu beroperasi t >> dari set arus lebih diatur dalam kisaran operasi 0,04 ...
30 s. Unit set arus lebih dilengkapi dengan fitur latching (saklar SGB / 7 atau SGB
/ 8) , yang menjaga output triping tetap energize, meskipun gangguan yang
menyebabkan operasi telah menghilang. Relay output yang mungkin diatur ulang
dalam lima cara yang berbeda:
a) dengan menekan tombol PROGRAM,
b) dengan menekan LANGKAH PROGRAM dan push tombol simultaneously,
dengan remote control melalui bus SPA menggunakan
c) perintah V101 atau
d) perintah V102 dan e lebih lanjut) dengan remote control atas input kontrol
eksternal.
44
Ketika mengatur ulang sesuai dengan a) atau c) tidak ada data yang tersimpan
akan terhapus, tetapi ketika mengatur ulang sesuai b), d) atau e) data yang tercatat
akan terhapus. Nilai pengaturan I >> / In Dalam tahap set arus lebih dapat
diberikan fungsi penggandaan otomatis ketika objek yang dilindungi terhubung ke
jaringan, yaitu dalam situasi awal. Oleh karena itu nilai pengaturan set arus lebih
mungkin lebih rendah daripada arus aliran masuk koneksi. Fungsi penggandaan
otomatis dipilih dengan switch SGF / 2. Situasi mulai didefinisikan sebagai situasi
dimana arus Phasa bangkit dari nilai di bawah 0,12 x I ke nilai melebihi 1,5 x I
dalam waktu kurang dari 60 ms. Situasi mulai berakhir ketika arus jatuh di bawah
1,25 x I set arus lebih dapat ditetapkan operasi dengan menggunakan saklar SGF
/ 1. Ketika unit tinggi set diatur dari operasi layar menampilkan "---" pembacaan,
menunjukkan bahwa nilai operasi tidak terbatas.
2.12.13 Block Diagram
Gambar 2.18 Blok diagram modul proteksi motor SPCJ 4D34 [3]
45
arus Phasa
I0
arus Netral
BS
SGF
SGB
SGR
TS1
SS1
SS2
SS3
TS2
AR1, AR2, AR3 Mulai sinyal untuk unit autoreclose eksternal (tidak digunakan
dengan motor!)
TRIP
Note:
Semua sinyal input dan output dari modul tidak perlu kabel ke terminal dari setiap
unit estafet menggunakan modul tertentu. Sinyal-sinyal kabel ke terminal
diperlihatkan dalam diagram yang menggambarkan aliran sinyal antara modul
perlindungan dari unit relay.
46
Setting
Parameter
Setting range
2.0...120 s
20...100% (50%)
tingkat trip
1.0...10.0 x In
I>>
0.3...80 s (2 s)
47
0.5...20 x In
t>>
0.04...30 s
I0
1.0...100% In
t0
I
0.05...30 s
10...40% IL
arus Phasa
20...120 s
I<
t<
tidak sesuai
< 1s
2600 s
5...500 s
dalam detik*)
Countdown tingkat counter start dalam hitungan
detik per jam
Checksum dari pemilih switchgroups SGF,
SGB,
SGF
SGB
SGR
2...250 s/h
48
Saklar pemilih dari SGF switchgroup digunakan untuk mendefinisikan fungsifungsi tertentu dari relay dan diidentifikasi sebagai SGF / 1 sampai SGF / 8.
Tabel 2.3 Pemrograman fungsional saklar kelompok SGF
Factory
Fungsi
Switch
Default
SGF/1
User
Weight
Setting
Value
SGF/3
SGF/4
16
no inhibit
SGF/3 =1
inhibit at
four times
FLC
SGF/4 = 1
inhibit at
eight times
SGF/5
FLC
49
perlindungan
0 = tidak digunakan (pengaturan ditampilkan ---)
SGF/6
1 = operatif
32
64
128
1 = operatif
Stall perlindungan berdasarkan pengawasan
tegangan termal Is2 x ts atau fungsi arus lebih waktu
tertentu Is & ts.
0 = arus lebih waktu tertentu;
SGF/8
115
Saklar pemilih dari SGB switchgroup digunakan untuk mendefinisikan fungsifungsi tertentu dari input kontrol eksternal dari relay dan diidentifikasi sebagai
SGB / 1 sampai SGB / 8.
Tabel 2.4 Pemblokiran dan kendali input pemilih switchgroup SGB
Switch
SGB /1
Fungsi
Stall informasi untuk relay dari switch kecepatan
Factory
Checksum
setting
value
50
16
32
64
SGB/5
SGB/6
SGB/7
51
128
Saklar pemilih dari switchgroups SGR 1 dan SGR2 digunakan untuk sinyal output
rute yang diinginkan ke relay output yang sesuai. Switch diidentifikasi sebagai
SGR1 / 1 ... SGR1 / 8 dan SGR2/1...SGR2/8.
52
Switch
1
Fungsi
Ketika SGR1 / 1 = 1, alarm sebelum termal
Factory
Checksum
setting
value
16
32
64
128
129
Switch
1
Fungsi
Ketika SGR2 / 1 = 1, alarm sebelum termal
Factory
Checksum
setting
value
53
16
32
64
128
250
Perangkat lunak switchgroup SG4 berisi tiga switch pemilih di submenu keempat
register A.
Tabel 2.7 Switchgroup SG4
Switch
1
Fungsi
Switch SG4 / 1 digunakan, ketika Is2 x ts prinsip telah
Factory
Checksum
setting
value
54
Ketika checksum dihitung menurut contoh sama dengan checksum yang tertera di
layar dari modul relay, switch ditetapkan dengan benar.
Data Pengukuran
Nilai-nilai diukur ditampilkan oleh tiga digit paling kanan layar. Data saat ini
diukur ditunjukkan dengan indikator LED menyala pada panel depan.
Tabel 2.8 Data Pengukuran
Indikator
Data Pengukuran
IL1
IL2
IL3
I0
Pencatatan informasi
Setiap saat relay start atau melakukan sebuah, trip nilai arus pada saat
tripping, durasi awal bagi unit yang berbeda dan parameter lainnya disimpan
dalam tumpukan memori dua tempat. Sebuah operasi baru bergerak nilai-nilai
lama ke tempat kedua dan menambahkan nilai baru ke tempat pertama dari
55
tumpukan yang terdiri dari register 1 ... 7. Dua pasang nilai yang hafal jika start
ketiga terjadi, set lama nilai-nilai akan hilang. Sebuah master reset dari relai
menghapus semua isi dari kedua blok register Angka merah paling kiri
menampilkan alamat register dan tiga lainnya digit informasi yang dicatat. Sebuah
simbol / / dalam teks menunjukkan bahwa item berikut ini terletak di submenu.
Tabel 2.9 Pencatatan Informasi 1 s/d 8
Register /
Pencatatan informasi
Step
1
Phasa IL1 saat ini diukur sebagai kelipatan dari arus pengenal
unit arus lebih. / / Durasi start dari unit I > dalam persen dari
waktu beroperasi.
Phasa IL2 saat ini diukur sebagai kelipatan dari arus pengenal
unit arus lebih. / / Durasi start dari unit I >> persen dari waktu
beroperasi.
Phasa IL3 saat ini diukur sebagai kelipatan dari arus pengenal
unit arus lebih. / / Durasi start dari unit I < persen dari waktu
beroperasi.
56
Register /
Pencatatan informasi
Step
0
Digit paling kanan menunjukkan status dari input kontrol eksternal unit.
Status berikut mungkin ditunjukkan:
0 = tidak ada kontrol / memblokir sinyal
1 = kontrol atau memblokir sinyal BS energize
Efek dari sinyal pada unit ditentukan oleh pengaturan switchgroup SGB
Dari Register "0" dimungkinkan untuk beralih ke mode TEST, di mana
alarm dan tripping sinyal dari modul diaktifkan satu per satu dalam
urutan sebagai berikut dan ditunjukkan oleh indikasi pengaturan flashing
LED:
57
BAB III
PERANCANGAN DAN REALISASI
58
59
Power
Supply
CB
OCR
Beban
Trafo Daya
Gambar 3.1 Perancangan Fungsional Karakteristik Relai Arus Lebih (OCR) tipe ABB SPAM150C
S1
S2
S1
S2
S1
SIGNAL 1
1
2
P1
P2
69
5A
P1
P2
80
4
5
SIGNAL 2
68
3 R
7
S
8
81
RESTART
ENABLE
START
PRIOR
ALARM
CBFP
TRIP
T
P1
P2
Led OFF
FUSE
Led ON
IRF
Output
Relay
62
Uaux +
220 V
CB
61
Push ON
Push OFF
A
`
60
L1
L1
L2
L2
L3
L3
SPS
PLC
Relay
PE
PE
PE
Gambar 3.3 Perancangan rangkaian pengujian Karakteristik Relai Arus Lebih (OCR) tipe ABB
SPAM 150C.
61
CB3
CB 4
Gardu
Distribusi TR
CB7
CB8
r1
r3
r5
z1
z3
SIGNAL 1 SIGNAL 2
CB 2
Gardu Distribusi TM
c1
c2
c3
c4
c5
c6
RESTART START
ENABLE ALARM
N
CBFP
420
400
380
360
340
220
TRIP
IRF
L
KONTAKTOR
220 Vac
Simulator CB-CT
Uaux +
220 V
-
+
-
CB
CB1
R S T
PE
N
Gambar 3.4 Rangkaian Simulasi Hubung Singkat 2 Phasa pada Distribusi Tenaga Listrik
Menggunakan Relai Arus Lebih (OCR) tipe ABB SPAM 150C.
z4
z6
200 100
r6
z2
z5
127/60V
220/127V
r2
r4
62
CB3
CB 4
Gardu
Distribusi TR
CB7
CB8
r1
r3
r5
z1
z3
SIGNAL 1 SIGNAL 2
CB 2
Gardu Distribusi TM
c1
c2
c3
c4
c5
c6
RESTART START
ENABLE ALARM
N
CBFP
420
400
380
360
340
220
TRIP
IRF
L
KONTAKTOR
220 Vac
Simulator CB-CT
Uaux +
220 V
-
+
-
CB
CB1
R S T
PE
N
Gambar 3.5 Rangkaian Simulasi Hubung Singkat 3 Phasa pada Distribusi Tenaga Listrik
Menggunakan Relai Arus Lebih (OCR) tipe ABB SPAM 150C.
z4
z6
200 100
r6
z2
z5
127/60V
220/127V
r2
r4
63
64
Pengajuan
Tidak
Setuju?
Ya
Deskripsi Kerja
Perancangan Modul
Praktikum
Sesuai?
Tidak
Ya
Pengujian
Tidak
Sesuai?
Ya
Selesai
65
proteksi hubung singkat ini, yaitu menggunakan relai arus lebih. Pemilihan relai
arus lebih ini lebih di dasarkan karena pertimbangannya, yaitu dalam
pemanfaatannya relai arus lebih dapat digunakan pada proteksi penyulang
transmisi ataupun distribusi pada sistem jaringan listrik yang ada di Indonesia
yang berfungsi sebagai pengaman gangguan hubung singkat antar fasa dan
gangguan hubung singkat fasa ke tanah di jaringan.
1
2
3
80
81
68
4
5
6
69
5A
77
7
8
9
78
10
25
26
27
11
74
73
65
66
62
70
CB
71
72
61
Gambar 3.7 Proteksi arus lebih (OCR) tipe ABB SPAM 150 C [3]
Spesifikasi :
= Rasio 1 : 1
= I Time delay
I >>
= I Instantaneous
= Time
66
CB :
- Type NC
- Batas Kemampuan 3 Amp
CT :
- Merk MCO
- Primary 50 Amp
- Secondary 5 Amp
- Lilitan menggunakan NYAF ;
11 lilitan menjadi rasio 1 : 1
67
BAB IV
HASIL PENGUJIAN DAN ANALISA
Tujuan
68
69
OCR/ GFR
ABB SPAM150 C
1
2
3
81
68
4
5
6
80
69
5A
77
7
8
9
78
10
25
26
27
11
74
73
65
66
62
+
CB
-
61
L1
L1
L2
L2
L3
L3
SPS
PLC
Relay
PE
PE
PE
Gambar 4.1 Rangkaian Pengujian Karakteristik OCR ABB Tipe SPAM 150 C.
70
71
72
70
9. Atur dan setting relai OCR ABB tipe ABB SPAM 150 C dengan :
Iset = 1 A.
10. Lakukan pengujian untuk variable waktu pemutusan OCR (pada poin 7)
dimulai dengan t 1;2;3 menggunakan stopwatch.
11. Lakukan pengukuran waktu pemutusan OCR, caranya tekan tombol ON
pada simulator CB dan stopwatch secara bersamaan. Tekan lagi stopwatch
secara bersamaan ketika simulator CB berada pada posisi OFF, sehingga
akan diperoleh nilai waktu pemutusannya.
12. Catat hasil pengujian pada tabel.
13. Catat hasil perhitungan dan susun pada tabel hasil perhitungan untuk
dibandingkan nilainya. Lalu buat kurva perbandingan untuk hasil uji
pengukuran dan perhitungan.
NO
1
2
3
4
5
JENIS
KURVA
Definite
Definite
Definite
Definite
Definite
t (detik)
Iset (A)
Iuji (A)
t hitung
t ukur
1
1
1
1
1
1
1
1
1
1
1,01
1,20
1,40
1,60
1,80
1,01
1,20
1,40
1,60
1,80
1,00
1,00
1,00
1,00
1,00
1,10
1,15
1,10
1,10
1,12
NO
1
2
3
4
5
JENIS
KURVA
Definite
Definite
Definite
Definite
Definite
t (detik)
Iset (A)
Iuji (A)
t hitung
t ukur
3
3
3
3
3
1
1
1
1
1
1,01
1,20
1,40
1,60
1,80
1,01
1,20
1,40
1,60
1,80
3,00
3,00
3,00
3,00
3,00
3,24
3,19
3,19
3,10
3,09
71
t (detik)
Iset (A)
Iuji (A)
t hitung
t ukur
2
2
2
2
2
1
1
1
1
1
1,01
1,20
1,40
1,60
1,80
1,01
1,20
1,40
1,60
1,80
2,00
2,00
2,00
2,00
2,00
2,10
2,16
2,07
2,11
2,10
5,00
4,50
4,00
3,50
Waktu ( detik )
1
2
3
4
5
3,00
2,50
T ukur = 1 detik
2,00
T hitung = 1 detik
1,50
1,00
0,50
0,00
1,01
1,20
1,40
1,60
1,80
I (A)
Gambar 4.2 Kurva Karakteristik Definite OCR t = 1 detik
5,00
4,50
4,00
Waktu ( detik )
NO
JENIS
KURVA
Definite
Definite
Definite
Definite
Definite
3,50
3,00
T ukur 2 detik
2,50
T hitung 2 detik
2,00
1,50
1,00
1,01
1,20
1,40
1,60
1,80
I(A)
Gambar 4.3 Kurva Karakteristik Definite OCR t = 2 detik
72
5,00
4,50
Waktu ( detik )
4,00
3,50
3,00
T ukur 3 detik
2,50
T hitung 3 detik
2,00
1,50
1,00
1,01
1,20
1,40
1,60
1,80
I(A)
Gambar 4.4 Kurva Karakteristik Definite OCR t = 3 detik
73
NO
t (detik)
Iuji (A)
I = Iuji/Iset
t hitung
t ukur
Selisih
Error %
1
2
3
4
5
1
1
1
1
1
1,01
1,20
1,40
1,60
1,80
1,01
1,20
1,40
1,60
1,80
1,00
1,00
1,00
1,00
1,00
1,10
1,15
1,10
1,10
1,12
0,1
0,15
0,1
0,1
0,12
0,09
0,13
0,09
0,09
0,1
Dilihat pada tabel 4.4 nilai waktu pemutusan kerja relai pada pengukuran dan
perbandingan memiliki beda selisih dan % error yang mendekati, ini
menandakan keakuratan pada relai itu sendiri.
4.7.1 Tujuan
Melakukan instalasi rangkaian proteksi hubung singkat dengan
mengggunakan relai arus lebih pada jaringan distribusi tenaga listrik,
simulasi settting dan simulasi gangguan hubung singkat.
74
75
4.7.4
CB 4
Gardu
Distribusi TR
CB7
CB8
r1
r3
r5
z1
z3
SIGNAL 1 SIGNAL 2
CB 2
127/60V
220/127V
Gardu Distribusi TM
RESTART START
ENABLE ALARM
200 100
N
CBFP
420
400
380
360
340
220
TRIP
IRF
L
KONTAKTOR
220 Vac
Simulator CB-CT
Uaux +
220 V
-
+
-
CB
CB1
R S T
PE
N
r2
r4
r6
z2
z4
z5
z6
c1
c2
c3
c4
c5
c6
76
CB3
CB 4
Gardu
Distribusi TR
CB7
CB8
r1
r3
r5
z1
z3
SIGNAL 1 SIGNAL 2
CB 2
127/60V
220/127V
Gardu Distribusi TM
RESTART START
ENABLE ALARM
200 100
N
CBFP
420
400
380
360
340
220
TRIP
IRF
L
KONTAKTOR
220 Vac
Simulator CB-CT
Uaux +
220 V
-
+
-
CB
CB1
R S T
PE
N
r2
r4
r6
z2
z4
z5
z6
c1
c2
c3
c4
c5
c6
77
4.7.5
Langkah Percobaan
78
Dari hasil pengujian dengan beban 3 buah lampu pijar 100 watt pada
penyulang 1, didapatkan hasil sebagai berikut :
a)
adalah :
Phasa R = 0,24 A
Phasa S = 0,24 A
Phasa T = 0,23 A
b)
Phasa
Arus Beban
Ihs 3 phasa
Ihs 2 phasa
Nominal
(In)
R
0,24 A
4,3 A
0,24 A
4,3 A
4A
0,23 A
4,3 A
4A
79
4.7.6
kS
x In(1)
kD
k S = 1,1
k D > 80 %
1,1
x0,24 0,27
0,95
Setting t [8]
Relai ABB SPAM 150C mempunyai rating waktu (detik) dari 0,3 s/d 80
detik maka jika t diinginkan 0,4 detik bisa terpenuhi.
4.7.8
80
(1) I HS2
=4A
(2) I HS 3
= 4,3 A
Iset diambil dari nilai tengah hasil pengukuran (1) dan pengukuran (2).
Iset = 4,1 A
4,1
=
= 4,1
Seting = 4,1
4.7.9
Analisa Pengujian
Maka hasil pengujian gangguan hubung singkat yang diproteksi oleh relai
Item Uji
Ihs
I >>
2 phasa
I>
0,4
3 phasa
4,3
0,4
I >>
Untuk gangguan 2 phasa low-set bekerja dan 3 phasa high-set relai yang
akan bekerja.
BAB V
PENUTUP
5.1 Kesimpulan
Dari hasil uraian dan pengujian proyek akhir ini dapat diambil beberapa
kesimpulan, yaitu :
1. Rancang bangun modul praktikum relai OCR tipe ABB SPAM 150 C, dapat
dibuat dan di setting pada switchgroup seperti SGF, SGB dan SGR dimana
switchgroup tersebut akan menentukan output, fungsi dan blocking pada relay
ABB SPAM 150 C, setelah itu baru bisa mengatur nilai Arus dan Waktu.
2. Dalam pengujian karakteristik OCR ABB tipe ABB SPAM , terdapat
Karakteristik relai arus lebih yang mempunyai elemen pengukur waktu yang
independent, yaitu tidak tergantung kepada besarnya arus gangguan yang
dideteksi. Jadi waktu kerjanya selalu tetap (konstan), untuk setiap arus
gangguan yang berbeda. Hasil pengujian karakteristik definite pada sample t =
1 masih cukup akurat, hasil perbandingan dan pengukuran % errornya adalah
rata-rata 0,1%.
3. Terdapat 3 settingan yang harus dilakukan dalam penyetingan relai arus lebih
81
82
5.2 Saran
Berikut ini adalah saran-saran untuk pengembangan sistem lebih lanjut:
1. Jika memungkinkan hendaknya ada alat uji atau alat ukur yang akurat, yang
mampu mencatat waktu kerja relai bahkan di saat uji instant sekalipun untuk
mempermudah analisa karakteristik perubahan waktu kerja relai.
2. Memaksimalkan fungsi utama dari ABB SPAM 150C yaitu sebagai pengaman
motor.
SPAM 150 C
Motor protection relay
Users manual and Technical description
3I >>
3
(I )
I n = 1A 5A (I o )
I n = 1A 5A
f n = 50Hz
L1
L2
L3
I
I o IRF
60Hz
SPAM 150 C
80...265V
~
18...80V
NO
NC
I /I n
t 6x [ s]
p [ %]
a [ %]
i [ %]
kc
I s /I n
t s [ s]
U aux
SPCJ 4D34
REGISTERS
1
2
3
4
5
6
7
8
9
/I n
I L2 / I n
I L3 / I n
I
L1
I o [ % I n]
[ %I L ]
I t [ %I s 2 t s ]
m [ % ]
[ %]
t i [ min ]
I
OPER.IND.
I >> / I n
t >> [ s]
1
2
3
4
5
6
7
8
9
I o [%I n]
t o [ s]
> a
> t
i + t si + EINH
I [% I L ]
t [ s]
I < [% I ]
t < [ s]
I >>
t si [ s]
t s [ s/h ]
RESET
STEP
PROGRAM
SGF
Io
I<
SGB
EXT.TRIP
SGR 1
SGR 2
RS 641
Ser.No.
956
955D
TRIP
SPCJ 4D34
1MRS 750637-MUM EN
Issued 1997-03-05
Modified 2002-04-24
Version B (replaces 34 SPAM 8 EN1)
Checked MK
Approved OL
SPAM 150 C
Motor protection relay
Contents
Characteristics ................................................................................................................ 2
Area of application .......................................................................................................... 3
Short description of operation ........................................................................................ 3
Connection diagram ....................................................................................................... 4
Connections ................................................................................................................... 6
Control signals between the modules .............................................................................. 7
Abbreviations of signal names ......................................................................................... 7
Operation indicators ....................................................................................................... 8
Power supply and output relay module ........................................................................... 9
Technical data (modified 2002-04) ............................................................................... 10
Maintenance and repair ................................................................................................ 13
Spare parts .................................................................................................................... 13
Ordering numbers ........................................................................................................ 13
Dimensions and instructions for mounting .................................................................. 14
Information required with order ................................................................................... 14
The complete users manual includes the following separate manuals:
Motor protection relay, general description
General characteristics of D type relay modules
Motor protection relay module type SPCJ 4D34
Characteristics
1MRS 750637-MUM EN
1MRS 750066-MUM EN
1MRS 750476-MUM EN
Undercurrent protection with wide start current and operate time setting ranges
Start-up supervision with Is2 x ts-characteristic,
with a low-set overcurrent unit or as a start-up
time counter. The start-up supervision can also
cooperate with a speed switch on the motor
shaft of an ExE-type motor
Continuous self-supervision of hardware and
software
Current range handled meets the requirements
for ExE motor drives of Zone 1
Two versions; one with a normally open trip
contact for circuit-breaker controlled drives and
another with a normally closed trip contact for
contactor controlled drives
Fibre-optic serial communication over the SPA
bus provides access to any relay data
Powerful support software for parametrization
of the relay and for recording of measured and
recorded values, events, etc.
Area of
application
Short description
of operation
for the blocking of co-operating protective relays located upstreams, for connection to annunciator units etc.
By appropriate programming of the output relay matrix, various starting, prior alarm or restart inhibit signals are received as contact
functions. This contact information is used e.g.
The motor protection relay contains one external logic control input, which is activated by a
control signal on the auxiliary voltage level. The
influence of the control input on the relay is
determined by programming switches of the
measuring module. The control input can be
used either for blocking one or more of the
protective stages, for carrying out an external
trip order, for inhibiting a restart attempt or for
resetting a latched output relay in the manual
reset mode.
IL1
IL2
THREE-PHASE THERMAL
OVERLOAD PROTECTION
49
14
48
51
THREE-PHASE HIGH-SET
DEFINITE TIME OVERCURRENT
PROTECTION
50
TRIP
SIGNAL 1
PRIOR ALARM
OR SIGNAL 2
IL3
LOW-SET DEFINITE TIME
EARTH-FAULT PROTECTION
51N
START
46
RESTART
ENABLE
Io
DEFINITE TIME UNDERCURRENT PROTECTION
37
IRF SELF-SUPERV.
CONTROL
INPUT BS
CUMULATIVE START-UP
COUNTER AND RESTART
INHIBIT FUNCTION
SERIAL PORT
SERIAL COMMUNICATION PORT
Fig. 1. Protective functions of the motor protection relay type SPAM 150 C.
The encircled numbers refer to the ANSI-numbering of protective functions.
3
Connection
diagram
U3
63
5A
1A
5A
1A
62 61
L1
L2
L3
SIGNAL 1
PRIOR ALARM
SIGNAL 2
U aux
START
PRIOR ALARM
- (~)
+ (~)
IRF
68 69
TRIP
65 66
80 81
77 78
+
74 75
+
RESTART
ENABLE
+
SS3
70 71 72
+
TS2
SS2
SGB/7
SGB/8
LATCHING
U1
TRIP
SS1
TS1
SGR2/4
SGR2/5
SGR2/6
SGR2/7
SGR2/8
~
+ SPTU _ R2
IRF
> i
> a
> t
I s2 x t s
START
Is >
SGR1/1
SGR1/2
SGR1/3
SGR1/4
SGR1/5
SGR1/6
SGR1/7
CONTROL
INPUT
10
U2
STALL
ts >
RESTART RESTART
INHIBIT
INHIBIT
I>>
I
Io>
I<
EXTERNAL TRIP
RELAY RESET I/O
SG4/2
1 2 3 4 5 6 7 8 9 25 26 27 11
SPTE 4E3
SGB/1
SGB/2
SGB/3
SGB/4
SGB/5
SGB/6
SPA-ZC_
Rx
Tx
SERIAL
PORT
SPCJ 4D34
5A
1A
SPAM 150 C
SGR1/8
SGR2/1
SGR2/2
SGR2/3
SG4/3
5A
1A
Fig. 2. Connection diagram of the motor protection relay SPAM 150 C. The version shown is the
one with the normally open trip contact, i.e. with an auxiliary supply and output relay module type
SPTU 240R2 or SPTU 48R2.
U3
SPA-ZC
SERIAL PORT
Rx, Tx
Serial Port
STALL
RESTART INHIBIT
LATCHING
Auxiliary voltage
Output relays
Self-supervision
Switchgroup for the configuration of the blocking or control signal
Trip output relay, output 65-66
Signal on tripping
Prewarning for a beginning overload condition
Start information from the motor
Starting of motor inhibited in fault conditions
Motor protection module SPCJ 4D34
Power supply and output relay module SPTU 240 R2 or SPTU 48 R2
with a normally open trip contact, SPTU 240 R3 or SPTU 48 R3 with
a normally closed trip contact
Input module SPTE 4E3
Bus connection module
Serial communication port
Receiver bus terminal (Rx) and the transmitter bus terminal (Tx) of
the bus connection module
External stall control input
External restart inhibit control signal
Latching function of the trip relay
SPA
Uaux
A, B, C, D, E, F
IRF
SGB
TRIP
SIGNAL
PRIOR ALARM
START
RESTART ENABLE
U1
U2
61
62
69
63
77
65
66
74
75
70
71
68
78
80
Made in Finland
81
25 72
26 10
27 11
Connections
The three phase currents are connected to terminals 1-2, 4-5 and 7-8, when the rated current
of the secondary circuits is In = 5 A. When using
current transformers with a rated current of 1 A,
terminals 1-3, 4-6 and 7-9 are used. The thermal overload protection may also be used in
single-phase or two-phase applications, in this
case inputs not used may be left unconnected.
To get a proper operation of the unbalance and
incorrect phase sequence protection in a twophase application, the two phase currents should
be summed in the third phase current input. In
single-phase applications, wiring the phase current through two or three current inputs in series
may slightly increase the operating speed of the
relay and stabilize operation of the thermal unit.
The neutral current of the earth-fault protection
is connected to terminals 25-26 when the rated
current is 5 A and to terminals 25-27 when the
rated current is 1 A.
The control input 10-11 can be used in five
different ways:
- as the control input controlled by a motor
speed switch in Ex-type applications
- as the control input of an external blocking
signal for blocking the operation of the unbalance or earth-fault protection units
- as the control input for an external trip signal
- as the control input for unlatching the trip relay
- as the control input for the restart enable relay.
The designed function is selected by means of
switches 1...8 of switchgroup SGB in the main
menu of the protection relay module.
The auxiliary supply voltage of the relay is
connected to the terminals 61-62. At d.c. auxiliary supply voltage the positive lead is connected
to terminal 61. The accepted input voltage
range is determined by the type of power supply
and output relay module inserted in the relay
case. For further details see the description of the
power supply module. The accepted auxiliary
voltage range of the relay is indicated on the
front panel.
Output relay A provides the CB tripping commands when the operate time of a protective
unit has elapsed. The earth-fault unit can be
made non-tripping, i.e. only signalling, with
switch 8 of switchgroup SGR1. On delivery from
factory all protective units are selected to perform tripping. A latching function of the output
relay A can be selected by means of switches
SGB/7 and SGB/8. Switch SGB/7 gives a latching function after a short-circuit, an earth-fault
or an unbalance tripping. Switch SGB/8 pro-
vides a latching function after any trip operation. After having latched the output relay must
be manually reset or reset by remote control.
The trip alarm signals from the relay module are
obtained via output relays B and C. The signals
to be routed to these relays are selected with
switches1...7 of switchgroup SGR1 and switches
4...8 of switchgroup SGR2 of the relay module.
Normally the output relays B and C are given
such a configuration that a thermal prior alarm
is obtained over relay C and the trip signals of
the protection units are linked to output relay B
to form an auxiliary trip signal. This is also the
default setting of the relay on delivery from the
factory.
The signals to be routed to the output relay D
are selected with switches 1, 2 and 3 of software
switchgroup SGR2 in the main menu of the
relay module. Switch SGR2/1 routes the thermal prior alarm, switch SGR2/2 routes the
startup information for the motor and switch
SGR2/3 routes the start signal of the high-set
overcurrent stage to output relay D.
Output relay E, terminals 74-75, is a heavy duty
output relay capable of controlling a circuit
breaker, as the main trip relay A. Relay E is used
for controlling the restart of the motor. If the
thermal capacity used exceeds the set restart
inhibit level of the thermal unit, if the allowed
maximum cumulative start-up count is exceeded
or if the external restart inhibit signal is active
the output relay E prevents a motor restart
attempt. This also applies to a condition where
the protective relay is out of auxiliary voltage or
the relay is faulty.
Output relay F, terminals 70-71-72, operates as
the output relay of the integrated self-supervision system. The relay operates on the closedcircuit principle, thus under normal service conditions the contact gap 70-72 is closed. If a fault
is detected by the self-supervision system, or if
the auxiliary supply fails, the output relay drops
off, providing an alarm signal by closing the NO
contact 71-72.
The relay is connected to the SPA data bus by
means of bus connection module type SPA-ZC
17 or SPA-ZC21. The bus connection module
is connected to the D type connector marked
SERIAL PORT on the rear panel of the relay.
The fibre-optic cables are connected to the
connectors Tx and Rx of the bus connection
module. The communication mode selector
switches on the bus connection module are set
in position "SPA".
Control signals
between the
modules
SGR2 / 2
I ,t 6x
START
IL1
IL2
> t
> a
> i
RESTART RESTART INH.
ts
INH.
IL3
SGR1 / 2
SGR2 / 4
SGB / 1
I>, Is
t>, ts
SG4 / 2
TS1
1
SGB / 7
SG4 / 3
SGB / 2
IRF
SGR2 / 1
SGR1 / 1
SGR1 / 3
SGR2 / 5
I>>
t>>
RESTART
ENABLE
RESET+
PROGRAM
SS1
SGR2 / 3
SGR1 / 4
STALL
IRF
START /
PRIOR ALARM
(AR2)
BS
SGR1 / 5
SS2
SGR2 / 6
PRIOR ALARM /
SIGNAL 2
(AR3)
SGB / 3
t<
I<
SGR1 / 7
SGR2 / 8
SS3
Io>
to>, ko
Io
SGR1 / 6
SGR2 / 7
SGR1 / 8
TS2
SGB / 4
(AR1)
RESET+
PROGRAM
SGB / 8
SIGNAL1
TRIP
TRIP
RESET
SGB / 5
SGB / 6
EXTERNAL TRIP
RELAY RESET
SPCJ 4D34
SPTU ___R2
Fig. 4. Control signals between the modules of the motor protection relay SPAM 150 C.
The functions of the blocking and starting signals are selected with the switches of switchgroups
SGF, SGB and SGR. The checksums of the
switchgroups are found in the setting menu of
Abbreviations of
signal names
Phase currents
Neutral current
Blocking or control Signal
Start Signal 1
Start Signal 2
Start Signal 3
Trip Signal 1
Trip Signal 2
Auto-Reclose start signals (not in use in SPAM 150 C)
Internal Relay Fault signal
Switch Group for Functions
Switch Group for Blockings
Switch Groups for Relay configuration
Operation
indicators
3I >>
3
(I )
I n = 1A 5A (I o )
I n = 1A 5A
f n = 50Hz
L1
L2
L3
I
I o IRF
60Hz
SPAM 150 C
80...265V
~
18...80V
NO
NC
I /I n
t 6x [ s]
p [ %]
a [ %]
i [ %]
kc
I s /I n
t s [ s]
U aux
SPCJ 4D34
REGISTERS
1
2
3
4
5
6
7
8
9
0 0
OPER.IND.
/I n
/I n
I L3 / I n
I
L1
L2
I o [ % I n]
[ %I L ]
t [ %I s 2 t s ]
m [ % ]
[ %]
t i [ min ]
I >> / I n
t >> [ s]
1
2
3
4
5
6
7
8
9
I o [%I n]
t o [ s]
> a
> t
i + t si + EINH
I [% I L ]
t [ s]
I < [% I ]
t < [ s]
I >>
t si [ s]
t s [ s/h ]
RESET
STEP
PROGRAM
SGF
Io
I<
SGB
EXT.TRIP
SGR 1
SGR 2
Ser.No.
956
955D
TRIP
RS 641
SPCJ 4D34
Indication
Explanation
1
2
3
> a
> t
> i, tsi,
EINH
I>>
I
4
5
6
7
8
9
C) Besides being a code number at data presentation, the leftmost red digit in the display
serves as a visual operation indicator. An
operation indicator is recognized by the fact
that the red digit alone is switched on. Normally the first event to appear is indicated.
For the thermal unit, however, a prior alarm
signal is later replaced by the trip indication,
if tripping is carried out. In order to enable
reading of actual thermal levels etc., it is
possible to acknowledge the indication of
the thermal unit while the unit is still activated. The same applies to a signalling earthfault. In these cases the indications are memorized and reappear when the display is dark.
All operation indicators are automatically
reset when the motor is restarted. The following table, named OPERATION IND.
on the relay front panel, is a key to the
operation indicator code numbers used.
= The thermal level has exceeded the set prior alarm level
= The thermal unit has tripped
= The thermal restart inhibit level is exceeded, the startup time
counter is full or the external inhibit signal is active
= The high-set stage of the overcurrent unit has tripped
= The unbalance/incorrect phase sequence protection unit has
tripped
I2 x t
= The start-up stall protection unit has tripped
I0
= The earth-fault unit has tripped
I<
= The undercurrent unit has tripped
EXT.TRIP = An external tripping has been carried out
D) The TRIP indications persist when the protective stage returns to normal. The indicator is reset by pushing the RESET/STEP
push-button. A restart of the motor automatically resets the operation indications.
Further, the indicators may be reset via the
external control input 10-11 by applying a
control voltage to the input, provided that
the switch SGB/6 is in position 1.
The basic protective relay functions are not
depending on the state of the operation
indicators, i.e. reset or non-reset. The relay is
permanently operative.
B) If the display is dark when one of the protection stages I>, I>> or I0> operates, the faulty
phase or the neutral path is indicated with a
yellow LED. If, for instance, the TRIP indicator glows red, and the indicators IL1 and
IL2 at the same time are illuminated, overcurrent has occurred on phase L1 and L2.
E) In two minutes after the internal self-supervision system has detected a permanent relay
fault the red IRF indicator is lit and the
output relay of the self-supervision system
operates. Further, in most fault situations an
autodiagnostic fault code is shown in the
display. The fault code is composed of a red
figure 1 and a green code number, which
indicates the fault type. The fault code can
not be reset as long as the fault persists.
When a fault code appears on the display, the
code number should be recorded on a piece
of paper and given to the authorized repair
shop, when overhaul is ordered.
Power supply
and output relay
module
1 A slow
Uaux
80...265 V ac & dc
18...80 V dc
+8V
Unstabilized logics
voltage
+12V
-12V
+24V
Operation amplifier
voltage
Output relay coil
voltage
Technical data
(modified 2002-04)
Energizing inputs
Phase and neutral current inputs,
terminals
Rated current In
Thermal withstand capability
- continuously
- for 1 s
Dynamic current withstand, half-wave value
Input impedance
Phase current monitoring range
Neutral current monitoring range
Rated frequency fn
20 A
500 A
1250 A
< 20 m
4A
100 A
250 A
< 100 m
0...63 x In
0...210 % In
50 Hz / 60 Hz
NO (normally open)
65-66, 74-75
250 V dc/ac
5A
30 A
15 A
NC (normally closed)
65-66
250 V dc/ac
5A
10 A
8A
5A/3A/1A
5A
1 A / 0.25 A / 0.15 A
5A
Signalling contacts
Terminals
- Rated voltage
- Rated current
- Make and carry for 0.5 s
- Make and carry for 3.0 s
- Breaking capacity for dc, when the control
circuit time-constant L/R 40 ms,
at 48 / 110 / 220 V dc control circuit voltage
External control inputs
Blocking, remote reset or remote setting input
External control voltage level
Typical control current of input circuit
Power supply and output relay module
Supply and relay module, type SPTU 240R2/ - R3
Supply and relay module, type SPTU 48R2/ - R3
Power consumption under quiescent/operating
conditions
10-11
18...265 V dc or 80...265 V ac
220 mA
80...265 V dc/ac
18...80 V dc
~4 W/ ~6 W
Note!
*) The trip contact 65-66 has different contact ratings depending on whether it is a normally open
contact (SPTU 240R2 or SPTU 48R2) or a normally closed contact (SPTU 240R3 or SPTU
48R3).
10
0.5...1.50 x In
0.01 x In
2.0...120 s
0.5 s
1...64 x the heating time constant
50...100% of the thermal trip level t
20...80% of the thermal trip level t
70% of the thermal trip level t,
i.e. hot motor
1.0...10.0 x In
0.380 s
1.0...10.0 x In
0.380 s
~300 ms
1.0...100% In
0.05...30 s
-20 dB
Undercurrent unit
Start current I< in per cent of the full load
current setting
Operation inhibited below level
Operate time
5...500 s
2...250 s / h
Note!
*) If the thermal prior alarm is set below 70%, the connection of the auxiliary supply to the relay
will cause a thermal prior alarm signal.
**)The operation can be defined either as a low-set definite time overcurrent function (SGF/7 = 0)
or as a current based start-up supervision function (SGF/7=1). Both functions cannot be used
at the same time. In either case, the time-counting can be stopped by a control signal to the speed
switch input (SGB/1 =1).
11
Data transmission
Transmission mode
Data code
Selectable data transfer rates
Fibre optic bus connection module
for supply from host relay
- for plastic core cables
- for glass fibre cables
Fibre optic bus connection module for
supply from separate power source
- for plastic core cables
- for glass fibre cables
Insulation Tests *)
Dielectric test IEC 60255-5
Impulse voltage test IEC 60255-5
Insulation resistance measurement IEC 60255-5
Electromagnetic Compatibility Tests *)
High-frequency (1 MHz) burst disturbance test
IEC 60255-22-1
- common mode
- differential mode
Electrostatic discharge test IEC 60255-22-2 and
IEC 61000-4-2
- contact discharge
- air discharge
Fast transient disturbance test IEC 60255-22-4
and IEC 61000-4-4
- power supply
- I/O ports
Mechanical tests (tested with SPAJ 140 C)
Seismic tests acc. to ANSI/IEEE C37.98-1987
- operating basis earth-quake tests (OBE)
- safe shut-down earth-quake tests (SSE)
Vibration test
Shock/bump test acc. to IEC 60255-21-2
Environmental conditions
Corrosion test
Specified ambient service temperature range
Long term damp heat withstand according
to IEC 60068-2-3
Transport and storage temperature range
Protection by enclosure according to IEC 60529,
when the relay is panel mounted
Mass of the relay including flush mounting
relay case
SPA-ZC 21 BB
SPA-ZC 21 MM
SPA-ZC 17 BB
SPA-ZC 17 MM
2.5 kV
1.0 kV
6 kV
8 kV
4 kV
2 kV
0.55.25 g
0.57.5 g
213.2 Hz, 1.0 mm
13.2100 Hz, 0.7 g
20 g, 1000 bumps/direction
Battelle-test
-10...+55C
<95% at 40C for 56 d
-40...+70C
IP 54
~3.5 kg
*) The tests do not apply to the serial port, which is used exclusively for the bus connection module.
12
Maintenance
and repair
Spare parts
Ordering
numbers
Note!
Static protective relays are measuring instruments and should be handled with care and
protected against moisture and mechanical stress,
especially during transport.
SPCJ 4D34
SPTK 4E3
SPTE 4E3
SPA-ZC 17 or SPA-ZC 21
Dimensions and
instructions for
mounting
142
162
139 1
129 1
SPA-ZX 111
SPA-ZX 112
SPA-ZX 113
14
Panel cut-out
Raising frame
Information
required with
order
34
136
30
250
216
186
176
136
96
74
114
154
Example
15 pcs SPAM 150 C
RS 641 014 - AA
Normally open
fn = 50 Hz
Uaux = 110 V dc
15 pcs bus interface modules SPA-ZC21 MM
2 pcs fibre optical cables SPA-ZF MM 100
14 pcs fibre optical cables SPA-ZF MM 5
General characteristics of
D-type relay modules
Users manual and Technical description
3I >
Fastening screw
I
I
L1
L2
L3
I o IRF
Relay symbol
Self-supervision alarm indicator
(Internal Relay Fault)
Display, 1 + 3 digits
I >/I n
RESET
STEP
t > [s]
I >> / I n
t >> [s]
I o >/ I n
t o > [s]
ko
I o >> /I n
t o >>[s]
PROGRAM
SGF
Programming push-button
SGB
SGR
Fastening screw
879B
TRIP
SPCJ 4D29
Trip indicator
Module type designation
1MRS 750066-MUM EN
Issued 95-04-12
Version A (replaces 34 SPC 3 EN1)
Checked JH
Approved TK
General characteristics
of D type relay modules
Contents
Control
push-buttons
certain position in the main menu to the corresponding submenu, for entering the setting
mode of a certain parameter and together with
the STEP push button for storing the set values.
The different operations are described in the
subsequent paragraphs in this manual.
Display
Display submenus
Settings
Setting mode
Switch No
Pos.
1
2
3
4
5
6
7
8
1
0
1
1
1
0
1
0
Weigth
Value
x
x
x
x
x
x
x
x
1
2
4
8
16
32
64
128
=
=
=
=
=
=
=
=
1
0
4
8
16
0
64
0
Checksum
93
cursor is moved on from digit to digit by pressing the PROGRAM push button and in each
stop the setting is performed with the STEP
push button. After the parameter values have
been set, the decimal point is put in place. At the
end the position with the whole display flashing
is reached again and the data is ready to be
stored.
A set value is recorded in the memory by pressing the push buttons STEP and PROGRAM
simultaneously. Until the new value has been
recorded a return from the setting mode will
have no effect on the setting and the former
value will still be valid. Furthermore any attempt
to make a setting outside the permitted limits for a
particular parameter will cause the new value to be
disqualified and the former value will be maintained. Return from the setting mode to the
main menu or a submenu is possible by pressing
the PROGRAM push button until the green
digits on the display stop flashing.
NOTE! During any local man-machine communication over the push buttons and the display on the front panel a five minute time-out
function is active. Thus, if no push button has
been pressed during the last five minutes, the
relay returns to its normal state automatically.
This means that the display turns dark, the relay
escapes from a display mode, a programming
routine or any routine going on, when the relay
is left untouched. This is a convenient way out
of any situation when the user does not know
what to do.
Before a relay module is inserted into the relay
case, one must assure that the module has been
given the correct settings. If there however is
MAIN MENU
SUBMENU
SETTING MODE
STEP 0,5 s
PROGRAM 1 s
PROGRAM 5 s
PROGRAM 5 s
FWD.STEP 1 s
Main setting
value for stage 1
Second setting
value for stage 1
NOTE! IN MOST MENU CHARTS THE SUBMENUS HAVE BEEN DRAWN IN A HORIZONTAL DIRECTION IN ORDER TO GET
ALL MAIN AND SUBMENU POSITIONS SHOWN IN THE SAME CHART.
Fig.3. Basic principles of entering the main menus and submenus of a relay module.
MAIN MENU
SUBMENUS
STEP 0.5 s
PROGRAM 1 s
Current on phase L2
Current on phase L3
REV. STEP 0.5 s
Neutral current Io
Main setting
value for I>
Second setting
value for I>
Main setting
value for t> or k
Second setting
value for t> or k
Main setting
value for I>>
Second setting
value for I>>
Main setting
value for t>>
Second setting
value for t>>
Main setting
value for Io>
Second setting
value for Io>
Main setting
value for to> or ko
Second setting
value for to> or ko
M
A
I
N
Main setting
value for Io>>
Second setting
value for Io>>
Main setting
value for to>>
Second setting
value for to>>
M
E
N
U
1 Main setting of
SGF1 checksum
Main setting of
SGF2 checksum
Main setting of
SGB checksum
Second setting of
SGB checksum
Main setting of
SGR1 checksum
Main setting of
SGR2 checksum
1 Event (n-1)
value of phase L1
2 Event (n-2)
value of phase L1
1 Event (n-1)
value of phase L2
Event (n-2)
value of phase L2
1 Event (n-1)
value of phase L3
Event (n-2)
value of phase L3
1 Highest maximum
demand value found
R
E
V.
S
T
E
P
.5
s
F
W
D.
S
T
E
P
FWD. STEP 1 s
SUBMENUS
1
s
Fig. 4.Example of part of the main and submenus for the settings of the overcurrent and earth-fault
relay module SPCJ 4D29. The settings currently in use are in the main manu and they are displayed
by pressing the STEP push button. The main menu also includes the measured current values, the
registers 1...9, 0 and A. The main and second setting values are located in the submenus and are
called up on the display with the PROGRAM push button.
Example 1
d)
Press the PROGRAM push button once again
for one second to get the rightmost digit flashing.
e)
Now the flashing digit can be altered. Use the
STEP push button to set the digit to the desired
value.
f)
Press the PROGRAM push button to make the
middle one of the green digits flash.
g)
Set the middle digit with of the STEP push
button.
5x1s
0. 8 0
PROGRAM
1s
1 0. 8 0
PROGRAM
5s
1 0. 8 0
1s
1 0. 8 0
5x
1 0. 8 5
PROGRAM
RESET
STEP
PROGRAM
1s
1 0. 8 5
RESET
STEP
2x
1 0. 0 5
h)
Press the PROGRAM push button to make the
leftmost green digit flash.
PROGRAM
1s
1 0. 0 5
7
i)
Set the digit with the STEP push button.
j)
Press the PROGRAM push button to make the
decimal point flash.
k)
If needed, move the decimal point with the
STEP push button.
l)
Press the PROGRAM push button to make the
whole display flash. In this position, corresponding to position c) above, one can see the
new value before it is recorded. If the value
needs changing, use the PROGRAM push button to alter the value.
m)
When the new value has been corrected, record
it in the memory of the relay module by pressing
the PROGRAM and STEP push buttons simultaneously. At the moment the information enters the memory, the green dashes flash once in
the display, i.e. 1 - - -.
n)
Recording of the new value automatically initiates a return from the setting mode to the
normal submenu. Without recording one can
leave the setting mode any time by pressing the
PROGRAM push button for about five seconds, until the green display digits stop flashing.
o)
If the second setting is to be altered, enter
submenu position 2 of the setting I> by pressing
the STEP push button for approx. one second.
The flashing position indicator 1 will then be
replaced by a flashing number 2 which indicates
that the setting shown on the display is the
second setting for I>.
Enter the setting mode as in step c) and proceed
in the same way. After recording of the requested values return to the main menu is
obtained by pressing the STEP push button
8
RESET
STEP
0x
1 1. 0 5
PROGRAM
1s
1 1. 0 5
RESET
STEP
0x
1 1. 0 5
PROGRAM
1s
1 1. 0 5
RESET
STEP
1 - - PROGRAM
PROGRAM
5s
RESET
STEP
1s
1 1. 0 5
2 1. 0 0
Example 2
d)
Press the PROGRAM push button once again
to get the first switch position. The first digit of
the display now shows the switch number. The
position of the switch is shown by the rightmost
digit.
e)
The switch position can now be toggled between 1 and 0 by means of the STEP push
button and it is left in the requested position 1.
f)
When switch number 1 is in the requested
position, switch number 2 is called up by pressing the PROGRAM push button for one second. As in step e), the switch position can be
altered by using the STEP push button. As the
desired setting for SGF1/2 is 0 the switch is left
in the 0 position.
g)
Switch SGF1/3 is called up as in step f) by
pressing the PROGRAM push button for about
one second.
RESET
STEP
nx1s
PROGRAM
0 0 0
1s
1 0 0 0
PROGRAM
PROGRAM
5s
1 0 0 0
1x
1 1
1x
1 1
1s
1 2
1s
1 3
RESET
STEP
PROGRAM
PROGRAM
h)
The switch position is altered to the desired
position 1 by pressing the STEP push button
once.
i)
Using the same procedure the switches SGF 1/
4...8 are called up and, according to the example, left in position 0.
RESET
STEP
1x
l)
Recording the new value automatically initiates
a return from the setting mode to the normal
menu. Without recording one can leave the
setting mode any time by pressing the PROGRAM push button for about five seconds,
until the green display digits stop flashing.
m)
After recording the desired values return to the
main menu is obtained by pressing the STEP
push button until the first digit is turned off.
The LED indicator SGF still shows that one is
in the SGF position and that the display shows
the new checksum for SGF1 currently in use by
the relay module.
10
PROGRAM
5x1s
j)
In the final setting mode position, corresponding to step c), the checksum based on the set
switch positions is shown.
k)
If the correct checksum has been obtained, it is
recorded in the memory by pressing the push
buttons PROGRAM and STEP simultaneously.
At the moment the information enters the
memory, the green dashes flash in the display,
i.e.1 - - -. If the checksum is incorrect, the
setting of the separate switches is repeated using
the PROGRAM and STEP push buttons starting from step d).
1 3
1 0 0 5
RESET
STEP
1 - - PROGRAM
PROGRAM
RESET
STEP
5s
nx1s
1 0 0 5
0 0 5
Recorded
information
Submenu 2 of register A contains a bus communication monitor for the SPAbus. If the protection relay, which contains the relay module, is
linked to a system including a contol data
communicatoe, for instance SRIO 1000M and
the data communication system is operating,
the counter reading of the monitor will be zero.
Otherwise the digits 1...255 are continuously
scrolling in the monitor.
Submenu 3 contains the password required for
changing the remote settings. The address code,
the data transfer rate of the serial communication and the password can be set manually or via
the serial communication bus. For manual setting see example 1.
The default value is 001 for the address code, 9.6
kilobaud for the data transfer rate and 001 for
the password.
In order to secure the setting values, all settings
are recorded in two separate memory banks
within the non-volatile memory. Each bank is
complete with its own checksum test to verify
the condition of the memory contents. If, for
some reason, the contents of one bank is
disturbed, all settings are taken from the other
bank and the contents from here is transferred to
the faulty memory region, all while the relay is
in full operation condition. If both memory
banks are simultaneously damaged the relay will
be be set out of operation, and an alarm signal
will be given over the serial port and the IRF
output relay
11
IRF
I> TRIP
I> START
I START
I TRIP
Io> TRIP
Io> START
IoSTART
Io TRIP
REGISTER 0
PROGRAM
5s
PROGRAM
1s
I>
PROGRAM
1s
t>
PROGRAM
1s
PROGRAM
1s
PROGRAM
1s
PROGRAM
1s
PROGRAM
1s
Io>
PROGRAM
1s
to>
PROGRAM
1s
Io
to
STEP
STEP &
PROGRAM
STEP &
PROGRAM
STEP &
PROGRAM
STEP &
PROGRAM
STEP &
PROGRAM
STEP &
PROGRAM
STEP &
PROGRAM
STEP &
PROGRAM
Fig. 5.Sequence order for the selection of output signals in the Trip test mode
If, for instance, the indicator of the setting t> is
flashing, and the push buttons STEP and PROGRAM are being pressed, the trip signal from
the low-set overcurrent stage is activated. Return to the main menu is possible at any stage of
the trip test sequence scheme, by pressing the
PROGRAM push button for about five seconds.
12
Note!
The effect on the output relays then depends on
the configuration of the output relay matrix
switchgroups SGR 1...3.
nx1s
0 0 0 0
b)
Press the PROGRAM push button for about
five seconds until the three green digits to the
right.
3I >
I
I
L1
L2 I
L3
I o IRF
0 0 0 0
PROGRAM
I >/I n
5s
RESET
STEP
t > [s]
k
I >> / I n
t >> [s]
I o >/ I n
t o > [s]
ko
I o >> /I n
t o >>[s]
PROGRAM
SGF
SGB
SGR
TRIP
879B
c)
Hold down the STEP push button. After one
second the red IRF indicator is lit and the IRF
output is activated. When the step push button
is released the IRF indicator is switched off and
the IRF output resets.
d)
Press the PROGRAM push button for one
second and the indicator of the topmost setting
start flashing.
SPCJ 4D29
3I >
I
I
e)
If a start of the first stage is required, now press
the push-buttons PROGRAM and STEP simultaneously. The stage output will be activated and
the output relays will operate according to the
actual programming of the relay output
switchgroups SGR.
L1
L2
L3
I >/I n
I o IRF
RESET
STEP
0 0 0 0
t > [s]
k
I >> / I n
t >> [s]
I o >/ I n
t o > [s]
ko
I o >> /I n
t o >>[s]
PROGRAM
SGF
SGB
RESET
STEP
SGR
TRIP
879B
Example 3
SPCJ 4D29
PROGRAM
13
f)
To proceed to the next position press the PROGRAM push button for about 1 second until
the indicator of the second setting starts flashing.
PROGRAM
3I >
I
I
L1
L2 I
L3
I o IRF
0 0 0 0
I >/I n
RESET
STEP
t > [s]
1s
I >> / I n
t >> [s]
I o >/ I n
t o > [s]
ko
I o >> /I n
t o >>[s]
PROGRAM
SGF
SGB
SGR
879B
TRIP
g)
Press the push buttons PROGRAM and STEP
simultaneously to activate tripping of stage 1
(e.g. the I> stage of the overcurrent module
SPCJ 4D29). The output relays will operate
according to the actual programming of the
relay switchgroups SGR. If the main trip relay
is operated the trip indicator of the measuring
module is lit.
SPCJ 4D29
3I >
I
I
L1
L2
L3
I o IRF
0 0 0 0
I >/I n
RESET
STEP
t > [s]
k
I >> / I n
t >> [s]
I o >/ I n
RESET
STEP
t o > [s]
ko
I o >> /I n
t o >>[s]
PROGRAM
SGF
SGB
SGR
h)
The starting and tripping of the remaining
stages are activated in the same way as the first
stage above. The indicator of the corresponding
setting starts flashing to indicate that the concerned stage can be activated by pressing the
STEP and PROGRAM buttons simultaneously.
For any forced stage operation, the output
relays will respond according to the setting of
the relay output switchgroups SGR. Any time
a certain stage is selected that is not wanted to
operate, pressing the PROGRAM button once
more will pass by this position and move to the
next one without carrying out any operation of
the selected stage.
14
879B
TRIP
PROGRAM
SPCJ 4D29
Operation
indication
Fault codes
15
SPCJ 4D34
Motor protection relay module
Users manual and Technical description
3I >>
3
I
L1
L2 I
L3
I
I o IRF
I /I n
t 6x [ s]
p [ %]
a [ %]
i [ %]
kc
I s /I n
t s [ s]
RESET
STEP
I >> / I n
t >> [ s]
I o [%I n]
t o [ s]
I [% I L ]
t [ s]
I < [% I ]
t < [ s]
t si [ s]
t s [ s/h ]
PROGRAM
SGF
SGB
SGR 1
SGR 2
956
TRIP
SPCJ 4D34
1MRS 750476-MUM EN
Issued 97-03-05
Version B (replaces 34 SPCJ 10 EN1)
Checked GL
Approved JS
SPCJ 4D34
Motor protection
relay module
Contents
Characteristics ................................................................................................................ 3
Description of units ........................................................................................................ 3
Thermal overload unit ............................................................................................... 3
Time/current characteristics ....................................................................................... 5
Start-up supervision unit ........................................................................................... 7
High-set overcurrent unit .......................................................................................... 8
Earth-fault unit.......................................................................................................... 9
Phase unbalance unit ............................................................................................... 10
Incorrect phase sequence unit .................................................................................. 11
Undercurrent unit ................................................................................................... 11
Cumulative start-up time counter ............................................................................ 11
Self-supervision ....................................................................................................... 11
Block diagram ............................................................................................................... 12
Front panel ................................................................................................................... 13
Operation indicators ..................................................................................................... 14
Relay settings ................................................................................................................ 15
Programming switches .................................................................................................. 16
Example of switchgroup checksum calculation ............................................................. 19
Measured data............................................................................................................... 20
Recorded information ................................................................................................... 20
Main menus and submenus of settings and registers ..................................................... 22
Technical data ............................................................................................................... 24
Serial communication ................................................................................................... 26
Event codes .............................................................................................................. 26
Remote transfer data ................................................................................................ 28
Fault codes .................................................................................................................... 33
Characteristics
Description of
units
Thermal overload
unit
The thermal overload unit constitutes an adequate thermal protection for the motor under
varying load conditions. The heating-up of a
motor follows an exponential curve, the levelout value of which is determined by the squared
value of the load current. The operating values
of the thermal unit are defined by means of two
relay settings. The full load current (FLC) setting I defines the thermal operating level of
the unit and the time setting t6x defines the
operate time. The setting t6x is the operate time
of the thermal unit at six times FLC, starting
from a cold motor condition.
The thermal unit comprises two different thermal curves, one describing short and long time
overloads, carrying out the tripping and an other
curve keeping track of the thermal background.
A weighting factor p which determines the ratio of thermal increase of the two curves is
settable between 20% and 100%. For direct online started motors having a characteristic hotspot behaviour p is typically set at 50%. For the
protection of objects without hot-spot characteristics, e.g. cables or motors started with soft
starters, a setting p =100% is used.
Time/current
characteristics
t/s
t/s
4000
4000
3000
3000
2000
2000
1000
1000
500
500
400
400
300
300
200
200
100
100
t 6x
[s]
50
50
120
40
30
40
30
60
20
20
30
10
10
20
15
5
4
10
3
t 6x
[s]
5
4
120
60
1.05
2.5
1.05
2.5
10 I/I
10 15 20
5
4
30
10 I/I
t/s
t/s
4000
4000
3000
3000
2000
2000
1000
1000
500
500
400
400
300
300
200
200
100
100
50
50
40
40
t 6x
[s]
30
t 6x
[s]
120
30
120
20
20
60
60
10
10
30
20
30
5
15
20
15
10
10
2.5
1.05
10 I/I
1.05
2.5
10 I/I
Start-up supervision
unit
High-set overcurrent
unit
The high-set overcurrent stage starts if the current on one or several phases exceeds the setting
value. When starting, the stage issues a starting
signal. If the overcurrent situation lasts long
enough to exceed the set operate time, the unit
calls for a C.B. tripping by providing a tripping
signal. At the same time the operation indicator is lit with red light. The red operation indicator remains on although the stage resets. The
indicator is reset with the RESET push-button.
The trip signal is always routed to output SS3
and can also, by programming, be routed to
output SS2.
The start current setting range of the high-set
overcurrent stage is 0.5...20 x In. The operate
time t>> of the high-set overcurrent stage is set
within the range 0.04...30 s.
The operation of the high-set overcurrent unit
is provided with a latching feature (switch SGB/7
or SGB/8), which keeps the tripping output
energized, although the fault that caused the
operation has disappeared. The output relay may
be reset in five different ways; a) by pressing the
PROGRAM push-button, b) by pressing the
STEP and PROGRAM push-buttons simulta-
Earth-fault unit
120
100
t
s
80
60
50
40
t
s
30
120
100
20
80
60
10
40
The operation of the phase unbalance protection can be blocked by bringing a blocking
signal BS to the unit. The blocking configuration is set by means of switchgroup SGB/3.
With switch SGF/5 the unbalance unit can be
made operative or set out of function.
The setting range of the start current is 10...
40 % IL or (Indicated by "- - -"). The basic
operate time t of the unbalance unit is set
within the range 20...120 s.
6
5
20
1
10
10
20
30
40
50
60 70 80 90 100
I/ IL [%]
Fig. 5. The operate time of the unbalance protection as a function of the degree of unbalance
Incorrect phase
sequence unit
one second. The incorrect phase sequence protection can be selected or inhibited by the switch
SGF/6. After an ope-ration, the operation indicators and output relays are the same as for the
previously described unbalance unit.
Undercurrent unit
Cumulative start-up
time counter
rapidly the contents of the start-up time register should be decreased. If the motor manufacturer e.g. states that a maximum of three 60 s
starts may be made with a motor within four
hours, the setting tsi should be 3 x 60 = 180 s
and the setting ts = 180 s / 4h = 45 s/h.
Self-supervision
11
Block diagram
SGR2 / 2
I ,t 6x
SGR1 / 2
START
IL1
IL2
IRF
SGR2 / 4
> t
SGR2 / 1
> a
> i
SGR1 / 1
SG4 / 2
IL3
SG4 / 3
SGB / 2
SGB / 1
TS1
1
SGB / 7
RESET +
PROGRAM
SGR1 / 3
Is
ts
SGR2 / 5
SS1
SGR2 / 3
STALL
SGR1 / 4
I>>
t>>
(AR2)
BS
SS2
SGR1 / 5
SGR2 / 6
(AR3)
SGB / 3
t<
I<
SGR1 / 7
SS3
SGR2 / 8
SGB / 8
Io>
to>, ko
Io
(AR1)
RESET +
PROGRAM
TS2
SGR1 / 6
SGR2 / 7
SGR1 / 8
SGB / 4
TRIP
RESET
SGB / 5
SGB / 6
EXTERNAL TRIP
SPCJ 4D34
RELAY RESET
Phase currents
Neutral current
External control,blocking or resetting signal
Selector switchgroup SGF
Selector switchgroup SGB
Selector switchgroups SGR
Restart enable signal
Starting or prior alarm signal selected with switchgroup SGR2
Prior alarm or trip signal 2 selected with switchgroup SGR1
Trip signal 2 for stages selected with switchgroup SGR2
Tripping signal selected with switchgroup SGR2
Starting signals for external autoreclose unit (not used with motors!)
Red indicator for tripping
Note!
All input and output signals of the module are
not necessarily wired to the terminals of every
relay unit using a particular module. The sig-
12
nals wired to the terminals are shown in the diagram illustrating the flow of signals between the
protection modules of the relay unit.
Front panel
3I >>
3
I
I
L1
L2
L3
I o IRF
Simplified device
symbol
Self-supervision alarm
indicator
Display for set and
measured values/
starting and operation
indicator
I /I n
t 6x [ s]
p [ %]
a [ %]
i [ %]
kc
I s /I n
t s [ s]
RESET
STEP
I >> / I n
t >> [ s]
I o [%I n]
t o [ s]
I [% I L ]
t [ s]
I < [% I ]
t < [ s]
t si [ s]
t s [ s/h ]
PROGRAM
SGF
SGB
SGR 1
SGR 2
Selector push-button
956
TRIP
SPCJ 4D34
Trip indicator
Type designation
of relay module
Fig. 7. Front panel of the motor protection relay module SPCJ 4D34
13
Operation
indications
Each protective unit has its own operation indicator shown as a figure in the digital display.
Further all stages share a common operation
indicator named "TRIP", which indicates with
red light that the module has delivered a tripping signal.
The operation indication in the display persists
Indication Explanation
1
2
3
4
5
6
7
8
9
> a
> t
> i, tsi,
EINH
I>>
I
The self-supervision alarm indicator IRF indicates that the self-supervision system has detected a permanent fault. The indicator is lit
with red light about one minute after the fault
has been detected. At the same time the protection module delivers a signal to the self-supervision system output relay of the protection unit.
14
Relay settings
Parameter
Setting range
(Factory settings)
0.50...1.50 x In
t6x
2.0...120 s
20...100% (50%)
kc
Is
1.0...10.0 x In
ts
0.3...80 s (2 s)
I>>
0.5...20 x In and
t>>
0.04...30 s
I0
1.0...100% In
t0
0.05...30 s
10...40% IL and
I<
20...120 s
< 1s
t<
2600 s
tsi
5...500 s
ts
2...250 s/h
SGF
SGB
SGR
the start-up stall protection unit, time counting is stopped when the speed switch changes
its state, if the facility is in use. In this case
the setting ts should preferrably be equal to
the te time of the motor.
15
Programming
switches
Functional
programming
switchgroup SGF
Function
Factory User
Weight
default settings value
0
0
4
8
16
32
64
128
SGF/3 = 0
SGF/3 =1
SGF/4 = 0
no inhibit
SGF/4 = 1
16
115
ternal control input of the relay and are identified as SGB/1 to SGB/8.
Function
SGB/5
16
SGB/6
32
SGB/7
64
128
17
Relay output
programming
switchgroups
SGR1 and SGR2
Function
16
32
64
128
129
16
32
64
128
18
250
Switchgroup SG4
Example of
checksum
calculation
Switch
Factor
SGF/1
SGF/2
SGF/3
SGF/4
SGF/5
SGF/6
SGF/7
SGF/8
1
2
4
8
16
32
64
128
Switch position
x
x
x
x
x
x
x
x
1
0
1
0
0
0
1
0
Value
=
=
=
=
=
=
=
=
1
0
4
0
0
0
64
+0
69
19
Measured data
Recorded
information
Measured data
IL1
IL2
IL3
I0
Neutral current expressed in per cent of the relay rated current In.
20
Phase current IL1 measured as a multiple of the rated current of the overcurrent
unit. // The duration of the starting of the I> unit in per cent of the operate time.
Phase current IL2 measured as a multiple of the rated current of the overcurrent
unit. // The duration of the starting of the I>> unit in per cent of the operate time.
Phase current IL3 measured as a multiple of the rated current of the overcurrent
unit. // The duration of the starting of the I< unit in per cent of the operate time.
Neutral current Io measured as a per cent of the rated current of the earth-fault
unit. // The duration of the starting of the I0 unit in per cent of the operate time.
Start-up thermal stress product Is2 x ts. // Motor start-up count. Cleared only by a
power supply interrupt.
The thermal level I at the end of the event, given in per cent of the trip level. //
The thermal level I at the beginning of the event, given in per cent of the trip level.
The actual value of the thermal capacity used. // The actual value of the phase
unbalance.
The approximate time in minutes to a restart enabling of the motor if the motor is
stopped. // The actual value of the cumulative start-up time counter, which is continuously decreased with a rate determined by the setting t/t. // The motor
start-up time memorized during the latest start-up. // Counter for the total amount
of motor running hours expressed in hours x 100.
I / In
t [s]
Io [%In]
to [s]
I [%IL]
t [s]
I< [%I ]
t< [s]
tsi [s]
ts [s/h]
The LED positions adjacent to SGF, SGB and SGR are not tied to any test function.
For further details, see the description "General characteristics of D-type SPC relay
modules".
A
The address code of the protection relay module, required by the serial communication system. // Data transfer rate of the serial communication. // The bus traffic
monitor indicating the operation state of the serial communication system. If the
module is connected to a system including the control data communicator type
SACO 148D4 and if the communication system is operating, the counter reading
of the bus traffic monitor will be zero. Otherwise the numbers 0...255 are continuously scrolling in the counter. // The password required for the remote control of
settings. The password given in the setting mode of the next submenu step must
always be entered via the serial communication before settings can be remotely
altered. // Checksum of switchgroup SG4
Display dark. By pressing the STEP push-button the beginning of the display sequence is re-entered.
MAIN MENU
SUBMENUS
STEP 0.5 s
PROGRAM 1 s
Current on phase L1
Current on phase L2
Current on phase L3
Neutral current Io
R
E
V
S
T
E
P
Maximum safe
stall time t6x
Weighting factor
p for thermal unit
Restart inhibit
level i
Cooling reduction
at standstill k c
Motor startup
time setting t s
Operating time to
Operating time t
Setting of relay
switchgroup SGR2
.5
s
M
A
I
N
M
E
N
U
Setting of functional
switchgroup SGF
Setting of blocking
switchgroup SGB
Setting of relay
switchgroup SGR1
FWD. STEP 1 s
SUBMENUS
F
W
D
S
T
E
P
Duration of latest
activation of unit I>
1
s
Duration of latest
activation of unit I>>
Duration of previous
3 activation of unit I>>
Duration of latest
activation of unit I<
Duration of previous
3 activation of unit I<
Duration of latest
activation of unit Io
Duration of previous
3 activation of unit Io
Duration of latest
activation of unit I
Motor startup
count at event (n)
3 Motor startup
count at event (n-1)
Approximate
i time ti before
a restart attempt is enabled
000
Communication
speed [kBd]
Ists
I>>
I<
Bus
supervision
Duration of previous
activation of unit I>
Duration of previous
activation of unit I
ts
Password
Switchgroup SG4
Fig. 8. Man-machine communication menu for the motor protection relay module SPCJ 4D34
22
Push-button
Action
STEP
STEP
Keep depressed
STEP
PROGRAM
Press for 1 s
(Active on release)
PROGRAM
Press for 5 s
STEP
PROGRAM
STEP&PROGRAM
Press simultaneously
STEP&PROGRAM
PROGRAM
Press once,
display must be off
Note! All parameters which can be set in a setting mode are indicated with the symbol
23
Technical data
0.50...1.50 x In
0.01 x In
2%
2.0...120 s
0.5 s
0.5 s
2% or 0.5 s
70% x t *)
1.0...10.0 x In
0.3...80 s
50 ms
0.96
2% of set value or 25 ms
3% of set value
200 ms
10% of set value Is2 x ts
about 300 ms
0.5...20.0 x In or , infinite
50 ms
0.04...30 s
50 ms
0.96
2% of set value or 25 ms
3% of set value
*) Note!
Due to this feature, low settings of the prior
alarm level will always render a thermal prior
alarm signal when the auxiliary supply is connected.
24
**) Note!
Both protection functions cannot be selected at
the same time. The selection is carried out with
switch SGF/7. In both cases the operation of
the timing circuit can be interrupted with an
external control signal fed to the relay's control
input (SGB/1 = 1).
Earth-fault unit
Start current I0, setting range
Start time, typ.
Operate time setting range
Reset time, typ.
Drop-off / pick-up ratio, typ.
Operate time accuracy
Operation accuracy
Unbalance / phase reversal unit
Start current I, setting range
Operation time at lowest possible setting, 10 %
Reset time, typ.
Operate time accuracy
1.0...100 % In
50 ms
0.05...30 s
50 ms
0.96
2% of set value or 25 ms
3% of set value +0.0005 x In
10...40% IL or , infinite
20...120 s, inverse time
200 ms
20% of theoretical value for
U/B > 20%, see Fig. 5
1s
600 ms
Undercurrent unit
Starting value I<, setting range
Operate time t<, setting range
Reset time, typ.
Drop-off / pick-up ratio, typ.
30...80% Iq or off
2600 s
200 ms
1.1
5...500 s
2...250 s/h
25
Serial
communication
Event codes
Code
Event
E1
E2
E3 *
E4 *
E5
E6
E7
E8
E9 *
E10 *
E11
E12
E13 *
E14 *
E15
E16
26
Default settings
in the masks
1
2
4
8
16
32
64
128
0
0
0
0
1
0
1
0
80
1
2
4
8
16
32
64
128
68
0
0
1
0
0
0
1
0
Code
Event
E17 *
E18 *
E19
E20
E21 *
E22 *
E23
E24
E25 *
E26 *
E27
E28
E29
E30
E31
E32
E33
E34
E35
E36
E37
E38
E39
E40
E41
E42
E50
E51
E52
E53
E54
Default settings
in the masks
1
2
4
8
16
32
64
128
0
0
1
0
0
0
1
0
68
1
2
4
8
16
32
64
128
20
1
2
4
8
16
32
64
128
256
512
768
Restarting
Overflow of event register
Temporary interruption in data communication
No response from the module over the data
communication
The module responds again over the data
communication
0
0
1
0
1
0
0
0
0
0
0
0
0
0
0
0
1
1
- no code number
cannot be programmed
27
Value range
I1
I2
I3
I4
I5
R
R
R
R
R
0...63 x In
0...63 x In
0...63 x In
0...210 % In
0 = no blocking
1 = external blocking or control
signal active
Starting of stage I
O1
O2
Tripping of stage I
O3
O4
O5
O6
O7
O8
O9
Starting of stage I
O10
Tripping of stage I
O11
O12
O13
O14
O15
O16
O17
R, W (P)
O18
R, W (P)
O19
R, W (P)
O20
R, W (P)
INPUTS
Measured current on phase L1
Measured current on phase L2
Measured current on phase L3
Measured neutral current
Blocking or control signal
OUTPUTS
28
Data
Code
Data flow
direction
Value range
O21
R, W (P)
O22
W(P)
0 = not operated
1 = operated
0 = not affecting restart enable
1 = restart remotely inhibited
O31
O32
O33
O34
O35
O36
O37
O38
O39
O40
O41
O42
O43
O44
O45
O46
O47
O48
O49
O50
O51
29
Data
Code
S1
S2
S3
S4
S5
S6
S7
S8
S9
R, W (P)
R, W (P)
R, W (P)
R, W (P)
R, W (P)
R, W (P)
R, W (P)
R, W (P)
R, W (P)
S10
S11
S12
S13
R, W (P)
R, W (P)
R, W (P)
R, W (P)
S14
S15
R, W (P)
R, W (P)
S16
S17
S18
S19
S20
S21
S22
S23
R, W (P)
R, W (P)
R, W (P)
R, W (P)
R, W (P)
R, W (P)
R, W (P)
R, W (P)
0.5...1.50 x In
2.0...120 s
20...100 %
50...100 % of trip level
20...80 % of trip level
1...64
1.0...10.0 x In
0.3...80 s
0.5...20.0 x In
999 = not in use ()
0.04...30 s
1.0...100 % In
0.05...30 s
10...40 % IL
999 = not in use ()
20...120 s
30...80 % I
999 = not in use ()
2.0600 s
5...500 s
2...250 s/h
0...255
0...255
0...255
0...255
0...7
R
R
R
R
R
R
R
R
R
R
R
R
R
R
0...63 x In
0...63 x In
0...63 x In
0...210 % In
0...100 %
0...100 %
0...100 %
0...100 %
0...100 %
0...100 %
0...100 %
0...100 %
0...999
0...100 %
SETTING VALUES
30
Data
Value range
V1
V2
V3
R,W(P)
R
R
0...106 %
0...100 %
0...999 min
V4
V5
V6
R
R
R
Operation indicator
Motor running hour counter
V7
V8
R
R, W(P)
0...999 s
0...100 s
1 = IsL3,
2 = IsL2,
4 = IsL1,
8 = I0>,
16 = IL3>>, 32 = IL2>>,
64 = IL1>>
128 = not used
0...9
0...999 x100 h
*) Code numbers 1, 2 and 4 are not in use, when the relay calculates the Is2 x ts value only
during the start-up situation (SGF/7 = 1 and SG4/1 = 0).
CONTROL PARAMETERS
Resetting of output relays
at self-holding
Resetting of output relays
and recorded data
V101 W
V102 W
V155 R, W
V160 W
V161 W (P)
1...999
0...999
V165 W
1 = self-supervision input
is activated and IRF
LED turned on
V167 W (P)
V169 R
1...255
V200 R, W
1...254
V201 R, W
V205 R
043 _
V156 R, W
V157 R, W
V158 R, W
V159 R, W
31
Data
Code
Data flow
direction
Value range
SPCJ 4D34
0 = normal state
1 = module been subject
to automatic reset
2 = overflow of event regist.
3 = events 1 and 2 together
0 = resetting
R, W
00.000...59.999 s
32
The setting values S1...S23 are the setting values used by the protection programs. All the
settings can be read or written. A condition for
writing is that remote set password has been
opened.
When changing settings, the relay unit will
check that the variables are not given out of
range values as specified in the technical data of
the module. If an out of range value is given to
the module, either manually or by remote setting, the module will not perform the store operation, but will keep the previous setting.
Fault codes
33
1MRS 750637-MUM
Proteksi SDTL
JUDUL :
Waktu
Edisi Pertama :
Tgl Revisi :
Disusun Oleh :
Halaman :
Disahkan Oleh :
1. Tujuan Percobaan
Setelah melakukan percobaan, praktikan diharapkan dapat
2. Dasar Teori
Relai arus lebih ialah relai yang bekerja berdaasarkan adanya kenaikan arus
yang melampaui rating yang direncanakan. Batasan parameter kerja dari rating
relai ini adalah arus dan waktu.
Ada
terdapat
Proteksi SDTL
keuntungan
mendekati
inverse
yang proporsional
dari
waktu
Is (min) = ( Ks / Kd ) Imaks
Dimana : Is (min)
Ks
: faktor keamanan
Kd
I maks
2.1 Pengantar
Sistem tenaga listrik pada dasarnya harus diberi perlindungan dengan sistem
proteksi yang memadai. Sistem proteksi tersebut harus bekerja mengamankan
peralatan yang berada di dalamnya pada saat terjadinya suatu gangguan. Peralatan
proteksi merupakan peralatan yang mengidentifikasi gangguan dan memisahkan
bagian jaringan yang terganggu dari bagian lain yang tidak terganggu serta
mengamankan bagian yang tidak terganggu dari kerusakan atau kerugian yang
lebih besar.
Gangguan pada sistem tenaga listrik ada yang bersifat temporer dan ada juga
yang bersifat permanen. Gangguan temporer ditandai dengan normalnya kerja dari
PMT setelah dimasukkan kembali. Sedangkan gangguan permanen ditandai
dengan jatuhnya PMT setelah dimasukkan kembali, biasanya dilakukan hingga
tiga kali.
Proteksi SDTL
I f 3
Dimana:
Ea
( Ampere) ......................................................... (2.2)
Z1
Ea =
VLL
(Volt ) ....................................................... (2.3)
3
IA
A
Ea
IB
a).
b).
IC
Z1
Ihs
Gambar 2.1 Gangguan Hubung Singkat 3 Fasa (a), Rangkaian Ekivalen Gangguan
Hubung Singkat 3 Fasa (b).
Proteksi SDTL
I f 2
Ea
( Ampere) ......................................................(2.4)
Z1 Z 2
I f 3
2
Ea
......................................(2.5)
Z1
3 ...............................................................(2.6)
IA
A
Ea
IB
a).
b).
Ihs
Z1
IC
C
Z2
Gambar 2.2 Gangguan Hubung Singkat 2 Fasa (a), Rangkaian Ekivalen Gangguan
Hubung Singkat 2 Fasa (b).
Arus hubung singkat dua fasa lebih kecil daripada arus gangguan hubung
singkat tiga fasa.
Proteksi SDTL
4. Langkah Percobaan
1. Persiapkan alat dan bahan yang akan digunakan.
2. Rangkai peralatan sesuai dengan gambar rangkaian pengujian.
3. Pastikan peralatan dan wiring terpasang dengan benar.
4. Periksa dan uji simulator jaringan sumber 3 fasa, simulator CB, simulator
lampu, simulator beban dan relai OCR ABB Tipe SPAM 150 C.
5. Pengujian simulator peralatan harus pada kondisi ON dan pastikan lampu
indikator pada masing-masing peralatan simulator menyala.
6. Cek simulator beban, atur pada kondisi beban maksimum 100%.
7. ON-kan simulator CB dan atur simulator beban. Lakukan pengujian untuk
Iuji dari 1,0;1,2;1,4;1,6;1,8 dengan melihat indikator amperemeter pada
modul dan pada amperemeter luar modul OCR tipe ABB SPAM 150 C.
8. Setelah menetapkan nilai Iuji-nya, OFF-kan simulator CB.
9. Atur dan setting relai OCR ABB tipe ABB SPAM 150 C dengan :
Iset = 1 A.
10. Lakukan pengujian untuk variable waktu pemutusan OCR (pada poin 7)
dimulai dengan t 1;2;3 menggunakan stopwatch.
11. Lakukan pengukuran waktu pemutusan OCR, caranya tekan tombol ON
pada simulator CB dan stopwatch secara bersamaan. Tekan lagi stopwatch
secara bersamaan ketika simulator CB berada pada posisi OFF, sehingga
akan diperoleh nilai waktu pemutusannya.
Proteksi SDTL
1
2
3
81
68
4
5
6
80
69
5A
77
7
8
9
78
10
25
26
27
11
74
73
65
66
62
70
CB
71
72
61
L1
L1
L2
L2
L3
L3
SPS
PLC
Relay
PE
PE
PE
Gambar 1 Gambar Rangkaian Pengujian Karakteristik Relai arus lebih (OCR) tipe ABB SPAM
150 C.
Proteksi SDTL
SGF
1
2
1
3
1
4
1
5
1
6
0
7
0
MODE
VALUE
8
0
0 SET
SGB
1
2
1
3
0
4
0
5
1
6
0
7
0
MODE
VALUE
8
1
1 SET
SGR 1
1
2
0
3
0
4
0
5
0
6
0
7
0
MODE
VALUE
8
0
1 SET
SGR 1
1
2
1
3
0
4
1
5
1
6
0
7
0
MODE
VALUE
8
1
0 SET
Switch
Factor
Switch Position
SGF/1
SGF/2
SGF/3
SGF/4
SGF/5
16
SGF/6
32
SGF/7
64
SGF/8
128
Checksum
value
15
Proteksi SDTL
Setting Relai
Nilai pengaturan ditunjukkan oleh tiga digit paling kanan pada layar.
Indikator dekat dengan simbol nilai pengaturan yang menunjukkan kelompok
pengaturan nilai saat ini ditunjukkan pada layar.
Tabel 2 Setting Relai
Setting
Parameter
Setting range
2.0...120 s
tingkat trip
Restart mencegah tingkat untuk kondisi
kelebihan beban termal dalam persen dari
tingkat trip
faktor reduksi Pendinginan untuk motor
terhenti dibanding dengan waktu pemanasan
konstan
pengaturan Motor start sebagai kelipatan
dari relay ratting arus In
1.0...10.0 x In
0.3...80 s (2 s)
Proteksi SDTL
0.5...20 x In
t>>
0.04...30 s
I0
1.0...100% In
0.05...30 s
10...40% IL
20...120 s
I<
t<
< 1s
2600 s
5...500 s
detik
Time-based start inhibit counter pengaturan
2...250 s/h
dalam detik*)
Countdown tingkat counter start dalam
hitungan detik per jam
SGF
SGB
SGR
Proteksi SDTL
7. Pertanyaan
1. Sebutkan jenis relai arus lebih yang anda ketahui dan karakteristik
pemutusannya?
2. Sebutkan keuntungan dan kekurangan pemakaian relai arus lebih dalam
penggunaan di dalam memproteksi sistem distribusi tenaga listrik?
8. Tabel Perhitungan
Tabel 1 Tabel Karakteristik Definite OCR dengan t = 1
NO
1
2
3
4
5
JENIS
KURVA
Definite
Definite
Definite
Definite
Definite
t (detik)
Iset (A)
1
1
1
1
1
1
1
1
1
1
Iuji (A)
t hitung
t ukur
NO
1
2
3
4
5
JENIS
KURVA
Definite
Definite
Definite
Definite
Definite
t (detik)
Iset (A)
3
3
3
3
3
1
1
1
1
1
Iuji (A)
t hitung
t ukur
1,01
1,20
1,40
1,60
1,80
NO
1
2
3
4
5
JENIS
KURVA
Definite
Definite
Definite
Definite
Definite
t (detik)
Iset (A)
2
2
2
2
2
1
1
1
1
1
Iuji (A)
t hitung
t ukur
10
Proteksi SDTL
JUDUL :
Waktu
Edisi Pertama :
Tgl Revisi :
Disusun Oleh :
Halaman :
Disahkan Oleh :
1. Tujuan Percobaan
Setelah melakukan percobaan, praktikan diharapkan dapat :
Melakukan instalasi rangkaian proteksi hubung singkat dengan mengggunakan
relai arus lebih pada jaringan distribusi tenaga listrik, simulasi settting dan
simulasi gangguan hubung singkat.
2. Dasar Teori
Rele arus lebih ialah rele yang bekerja berdaasarkan adanya kenaikan arus yang
melampaui rating yang direncanakan. Batasan parameter kerja dari rating rele
ini adalah arus dan waktu.
Ada terdapat beberapa jenis rele arus lebih berdasarkan karakteristik waktu
kerja , yaitu :
1. Relai arus lebih dengan karakteristik waktu high-set. Relai ini memiliki
waktu kerja yang sangat singkat (20 ms s/d 300 s). Rele ini pada umumnya
dikombinasikan dengan rele arus lebih karakteristik waktu tertentu, atau
dengan rele karakteristik waktu kerja terbalik.
2. Relai arus lebih dengan karakteristik waktu kerja low-set. Relai ini
bekerja berdasarkan waktu tunda yang tertentu tidak tergantung besar arus
lebih yang menggerakan. Pola ini menggabungkan waktu start, peralatan
waktu tunda, relai sinyal, dan relai bantu.
Proteksi SDTL
3. Relai arus lebih dengan karakteristik waktu kerja terbalik ( Inverse time
overcurrent relay ). Rele dengan karakteristik waktu kerja terbalik ialah jika
jangka waktu rele mulai kerja sampai selesainya kerja diperpanjang, dengan
nilai berbanding terbalik dengan besarnya dengan arus yang menggerakannya,
juga
keuntungan
mendekati
inverse
yang proporsional
dari
waktu
Is (min) = ( Ks / Kd ) Imaks
Dimana : Is (min)
Ks
: faktor keamanan
Kd
I maks
2.1 Pengantar
Sistem tenaga listrik pada dasarnya harus diberi perlindungan dengan sistem
proteksi yang memadai. Sistem proteksi tersebut harus bekerja mengamankan
peralatan yang berada di dalamnya pada saat terjadinya suatu gangguan. Peralatan
proteksi merupakan peralatan yang mengidentifikasi gangguan dan memisahkan
bagian jaringan yang terganggu dari bagian lain yang tidak terganggu serta
mengamankan bagian yang tidak terganggu dari kerusakan atau kerugian yang
lebih besar.
Gangguan pada sistem tenaga listrik ada yang bersifat temporer dan ada juga
yang bersifat permanen. Gangguan temporer ditandai dengan normalnya kerja dari
PMT setelah dimasukkan kembali. Sedangkan gangguan permanen ditandai
dengan jatuhnya PMT setelah dimasukkan kembali, biasanya dilakukan hingga
tiga kali.
Pada gangguan permanen, PMT dapat bekerja normal kembali setelah
gangguan tersebut dapat diatasi. Sedangkan gangguan yang bersifat temporer,
Proteksi SDTL
penyebab gangguan akan hilang dengan sendirinya setelah PMT jatuh. Ditinjau
dari macamnya, gangguan hubung singkat dibedakan menjadi :
a. Gangguan hubung singkat tiga fasa
b. Gangguan hubung singkat dua fasa
c. Gangguan hubung singkat satu fasa ke tanah
I f 3
Dimana:
Ea
( Ampere) ......................................................... (2.2)
Z1
Ea =
VLL
(Volt ) ....................................................... (2.3)
3
IA
A
Ea
IB
a).
b).
IC
Z1
Ihs
Gambar 2.1 Gangguan Hubung Singkat 3 Fasa (a), Rangkaian Ekivalen Gangguan
Hubung Singkat 3 Fasa (b).
Proteksi SDTL
I f 2
E ab
( Ampere) ......................................................(2.4)
Z1 Z 2
I f 3
2
Ea
......................................(2.5)
Z1
3 ...............................................................(2.6)
IA
A
Ea
IB
a).
b).
Ihs
Z1
IC
C
Z2
Gambar 2.2 Gangguan Hubung Singkat 2 Fasa (a), Rangkaian Ekivalen Gangguan
Hubung Singkat 2 Fasa (b).
Arus hubung singkat dua fasa lebih kecil daripada arus gangguan hubung
singkat tiga fasa.
Proteksi SDTL
4. Langkah Percobaan
1. Persiapkan alat dan bahan yang akan digunakan.
2. On-kan power supply AC.
3. Hubungkan power supply AC ke terminal masukan sumber AC 220v
pada OCR ABB tipe SPAM 150 C.
4. Jika lampu indikator menyala relai dalam kondisi ON dan siap untuk
diuji.
5. Matikan kembali sumber AC.
6. Rangkai dan wiring komponen sesuai dengan gambar rangkaian
pengujian.
a. Sambungkan kabel dari input phasa R, S, dan T ke tap 380
(dirangkai bintang).
b. Dan untuk keluarannya, disambung YY ke tanah (dengan nilai
pentanahan 100 ohm).
c. Output dan input kabel dari CB pada simulator distribusi tenaga
listrik disambungkan ke simulator CB-CT, sesuai dengan phasanya
masing-masing (misalkan untuk phasa R ke phasa R, untuk phasa S
ke phasa S, dan untuk phasa T ke phasa T).
d. Untuk CT pada phasa R disambung ke terminal 1 dan 3, phasa S
disambung ke terminal 4 dan 6, dan phasa T disambung ke
terminal 7 dan 9 (terminal 1,3,4,6,7,9 terletak pada relai OCR ABB
SPAM 150 C).
7. Lihat indikator arus nominal pada penyulang 1 di relai OCR ABB
SPAM 150 C.
Proteksi SDTL
Proteksi SDTL
CB3
CB 4
Gardu
Distribusi TR
CB7
CB8
r1
r3
r5
z1
z3
SIGNAL 1 SIGNAL 2
CB 2
Gardu Distribusi TM
c1
c2
c3
c4
c5
c6
RESTART START
ENABLE ALARM
N
CBFP
420
400
380
360
340
220
TRIP
IRF
L
KONTAKTOR
220 Vac
Simulator CB-CT
Uaux +
220 V
-
+
-
z4
z6
200 100
r6
z2
z5
127/60V
220/127V
r2
r4
CB
CB1
R S T
PE
N
Proteksi SDTL
CB3
CB 4
Gardu
Distribusi TR
CB7
CB8
r2
r1
r3
r4
r5
z1
z3
SIGNAL 1 SIGNAL 2
CB 2
r6
z2
z4
z5
z6
c1
c2
c3
c4
c5
c6
127/60V
220/127V
Gardu Distribusi TM
RESTART START
ENABLE ALARM
200 100
N
CBFP
420
400
380
360
340
220
TRIP
IRF
L
KONTAKTOR
220 Vac
Simulator CB-CT
Uaux +
220 V
-
+
-
CB
CB1
R S T
PE
N
Proteksi SDTL
SGF
1
2
1
3
1
4
1
5
1
6
0
7
0
MODE
VALUE
8
0
0 SET
SGB
1
2
1
3
0
4
0
5
1
6
0
7
0
MODE
VALUE
8
1
1 SET
SGR 1
1
2
0
3
0
4
0
5
0
6
0
7
0
MODE
VALUE
8
0
1 SET
SGR 1
1
2
1
3
0
4
1
5
1
6
0
7
0
MODE
VALUE
8
1
0 SET
Switch
Factor
Switch Position
SGF/1
SGF/2
SGF/3
SGF/4
SGF/5
16
SGF/6
32
SGF/7
64
SGF/8
128
Checksum
value
15
Proteksi SDTL
Setting Relai
Nilai pengaturan ditunjukkan oleh tiga digit paling kanan pada layar.
Indikator dekat dengan simbol nilai pengaturan yang menunjukkan kelompok
pengaturan nilai saat ini ditunjukkan pada layar.
Tabel 2 Setting Relai
Setting
Parameter
Setting range
2.0...120 s
tingkat trip
Restart mencegah tingkat untuk kondisi
kelebihan beban termal dalam persen dari
tingkat trip
faktor reduksi Pendinginan untuk motor
terhenti dibanding dengan waktu pemanasan
konstan
pengaturan Motor start sebagai kelipatan
dari relay ratting arus In
Pengaturan start Motor, waktu dalam
hitungan detik *)
I>>
1.0...10.0 x In
0.3...80 s (2 s)
10
Proteksi SDTL
0.5...20 x In
t>>
0.04...30 s
I0
1.0...100% In
0.05...30 s
10...40% IL
20...120 s
I<
< 1s
t<
2600 s
2...250 s/h
SGB,
SGR1 dan SGR2 ditunjukkan pada layar
saat indikator berdekatan dengan simbol
switchgroup di panel depan menyala.
incluence dari posisi switch yang berbeda
pada operasi relay dijelaskan dalam paragraf
terpisah.
11
Proteksi SDTL
7. Pertanyaan
1. Apa
yang
dimaksud
dengan
hubung
singkat
dua
fasa
pada
dengan
hubung
singkat
tiga
fasa
pada
SUTM?jelaskan!
2. Apa
yang
dimaksud
SUTM?jelaskan!
3. Sebutkan Faktor-faktor yang menyebabkan terjadinya gangguan pada
sistem transmisi dan distribusi tenaga listrik?Jelaskan!
12
Proteksi DTL
beberapa
kerugian
atau
kekurangan
pengamanan
dengan
Proteksi DTL
Proteksi DTL