Anda di halaman 1dari 2

KOREKSI RSUD BENGKULU

# WAHYU
1. ruang irna diganti ac 1hp type wall mounted
2. ac ceiling diberi arah semburan
3. RUANG IRNA MEMAKAI SAKLAR HOTEL
4. LAMPU LANTAI ATAP TL 1X36
5. LAMPU RUANG MESIN LIFT
6. LAMPU RAMP DIGANTI BARRET 2
7. LAMPU SITE
8. DETAIL LAMPU
9. DETAIL PEMASANGAN AC
10. KABEL TOEVOER DAN LETAK PANEL
# NORMAN
1. STYLE TABLE EQUIPMENT SISTEM HYDRANT DIGANTI
2. KOTAK KONTAK DI LANTAI ATAP TAMBAH 2 (PIT LIFT & DUMB WAITER)
3. MATV UNTUK LANTAI 4 TIDAK MENGGUNAKAN SPLITER
4. POWER SUPLY SYSTEM MATV DIHILANGKAN
5. TABLE SPESIFIKASI BED LIFT
6. LIFT SESUAIKAN RAB
#FAJRAN
INSTALASI DATA
1. SKALA 150
2. PATCH PANEL DIGANDI SWICTH PORT
3. FO GANTI CAT 6
4. SH JADI SW
SISTEM SKEMATIK DATA
1. TAMBAH KOLOM MENYESUAIKAN JENIS SWITCH
2. KELUARAN DARI SWITCH HUB 1 KABEL
3. PEMPOSISIAN SERVER
SISTEM TELEPON
1. PABX JADI 24 EXT
2. MDF-TP 30
INSTALASI TELEPON
1. KETERANGAN KABEL TELEPON KELUARAN DARI SHAFT LT.1
2. OUTLET TELEPON LT. 1 KE MDF MELALUI TBT
3. OUTLET TELEPON LT.2.3.4 LANGSUNG KE MDF
INSTALASI PENYALUR PETIR
1. PENGHANTAR TURUN SATU TARIKAN, GROUNDING 2
2. RADIUS PROTEKSI ATAS 50m DIGANTI 120m
3. *DETAIL PEMASANGAN (DIGANTI 70mm)
4. TURUN MELALUI LIFT
5. BAK KONTROL ARDE POJOK KANAN ATAS/BAWAH
#ISTU
PL ABK
1. SHAFT LANTAI 3 DIBUAT 30CM
2. ARAH PIPA + UKURAN
3. PIPA UTAMA LT.3 DITAMBAH SLOPE 1%
4. SISTEM > KELUARAN LANGSUNG MENUJU EXISTING
DRAIN

1. RESAPAN DIGAMBAR SEMUA


2. SISTEM > BAK KONTROL DIKECILIN
TS
1. EMERGENCY DITAMBAH
2. SISTEM > FONT DISAMAKAN
3. SISTEM > PAGGING DICABANG
#AAN
FA
1. KET KABEL NYA DARI FS DAN TBFA
2. TAMBAH NOTASI ZONA
3. LT.3 TAMBAH DETEKTOR DI RUANG KOSONG
4. SIS FA > DARI MCFA KET SEMI ADRESEBLE DIGANTI CONVENSIONAL 10 ZONE
5. KELUARAN MCFA DI KASIH KET KE SOUND SISTEM
AB
1.
2.
3.
4.

TANGKI AIR PANAS KAP.500L


RISER JADI 2 OUT
PRINT GAMBAR EXISTING + PROGRESS
MENYESUAIKAN SISTEM EXISTING

#JANU
CCTV
1. PERBAIKAN MAIN CONTROL
2. HAPUS KAMERA YANG TIDAK DIGUNAKAN
3. SERTAKAN CTB(CAMERA TERMINAL BOX) + MDB (MAIN DISTRIBUTION BOX) DALAM TABEL
4. WIRING KABEL DIBEDAKAN LINETYPE NYA (DATA=DASHDOT2 ) NYA=DASHED2
5. WIRING SISTEM = WIRING LAYOUT
6. TAMBAH KAMERA OUTDOOR DI PINTU RAMP (ALL FLOOR) + RUANG TINDAKAN
7. TAMBAHKAN CTB TIAP LANTAI
8. SEBELUM DVR DIKASIH MDB
9. SKALA 1:150
TRAY
1. SKALA 1:150
2. ARUS KUAT 30 + ARUS LEMAH 20
3.
NURSECALL
1.LEGEND DISESUIKAN DGN RAB
2. TAMBAH CEILING SPEAKER AMBIL DI TS
3. NYADUR AN NUR
4. SIMBOL GANTI SEMUA