RENCANA ANGGARAN BIAYA (RAB)

PEKERJAAN

: PEMB.SARANA DAN PRASARANA MESJID BABUL TAQWA DESA SIMPANG III


KEC.MANYAK PAYED KAB.ACEH TAMIANG (OA)

KAB/KOTA

: ACEH TAMIANG

LOKASI

No

Uraian Pekerjaan

PEKERJAAN PERSIAPAN

Pek. Papan Nama Kegiatan

II

PEKERJAAN BETON BERTULANG

Pengukuran Lapangan

Pek.Peninggian Kolom 30 x 30 Cm

a.

Beton K200

b.
c.
2

a.

b.
c.
3

a.

b.
c.
4

a.

b.
c.
5

a.

b.
c.

PEMERINTAH ACEH
DINAS CIPTA KARYA

: DESA SIMPANG III KEC.MANYAK PAYED

Pembesian
Bekisting

Pek.Peninggian Kolom Dia.80 Cm

Beton K200
Pembesian
Bekisting

Pek.Balok Beton 20 x 30 Cm

Beton K175
Pembesian
Bekisting

Pek.Balok Beton 40 x 60 Cm

Beton K200
Pembesian
Bekisting

Pek.Plat Dinding Beton

Beton K200
Pembesian
Bekisting

Jalan Pemancar No.5 Simpang Tiga


Telp.(0641) Fax.(0651) 42882,Banda Aceh 23239

Analisa

Taksir
Taksir

A. 4.1.1.6

A. 4.1.1.17
A. 4.1.1.22
A. 4.1.1.6

A. 4.1.1.17
A. 4.1.1.22
A. 4.1.1.5

A. 4.1.1.17
A. 4.1.1.23
A. 4.1.1.6

A. 4.1.1.17
A. 4.1.1.23
A. 4.1.1.6

A. 4.1.1.17
A. 4.1.1.24

Volume

Satuan Harga Satuan (Rp)

1,000

Ls

6,804

M3

22,657

M2

1,000

Ls

300.000,00

1.300.000,00

SUB JUMLAH PEKERJAAN PERSIAPAN

6,804

1.165,253

5,429
5,429

228,893

6,786
7,008
7,008

1.554,585

M3
Kg

M3
M3
Kg

M2
M3
M3

300.000,00

1.300.000,00

1.600.000,00

6.990.243,79

15.269,59

17.792.936,17

1.027.372,69

5.577.770,72

296.181,75

15.269,59

296.181,75
990.946,14

6.710.684,69

3.495.108,15
2.010.022,64
6.944.550,57

15.269,59

23.737.870,07

1.027.372,69

17.851.627,87

1.027.372,69

29.692.247,10

SUB JUMLAH PEKERJAAN BETON BERTULANG

339.796.880,14

21,024
17,376
17,376

2.610,049

52,128
28,901
28,901

4.551,930

202,308

Kg

1.027.372,69

Jumlah Harga (Rp)

M2
M3
M3
Kg

M2
M3
M3
Kg

M2

305.406,75

15.269,59

305.406,75

15.269,59

431.481,75

6.420.871,51

39.854.377,50
15.920.243,06

69.506.109,96
87.292.216,35

III PEKERJAAN PASANGAN DAN PLESTERAN


1
2
3

Pek. Pasangan Batu Bata 1 : 4


Pek. Plesteran Batu Bata 1 : 4

Pek. Pemasangan Kaca Motif 5 mm

A. 4.4.1.9
A. 4.4.2.4
Taksir

64,440

208,880

21,843

M2
M2
M2

99.747,99
56.303,02

248.185,58

SUB JUMLAH PEKERJAAN PASANGAN DAN PLESTERAN

6.427.760,28

11.760.573,98

5.421.067,93

23.609.402,19