PEKERJAAN
KAB/KOTA
: ACEH TAMIANG
LOKASI
No
Uraian Pekerjaan
PEKERJAAN PERSIAPAN
II
Pengukuran Lapangan
Pek.Peninggian Kolom 30 x 30 Cm
a.
Beton K200
b.
c.
2
a.
b.
c.
3
a.
b.
c.
4
a.
b.
c.
5
a.
b.
c.
PEMERINTAH ACEH
DINAS CIPTA KARYA
Pembesian
Bekisting
Beton K200
Pembesian
Bekisting
Pek.Balok Beton 20 x 30 Cm
Beton K175
Pembesian
Bekisting
Pek.Balok Beton 40 x 60 Cm
Beton K200
Pembesian
Bekisting
Beton K200
Pembesian
Bekisting
Analisa
Taksir
Taksir
A. 4.1.1.6
A. 4.1.1.17
A. 4.1.1.22
A. 4.1.1.6
A. 4.1.1.17
A. 4.1.1.22
A. 4.1.1.5
A. 4.1.1.17
A. 4.1.1.23
A. 4.1.1.6
A. 4.1.1.17
A. 4.1.1.23
A. 4.1.1.6
A. 4.1.1.17
A. 4.1.1.24
Volume
1,000
Ls
6,804
M3
22,657
M2
1,000
Ls
300.000,00
1.300.000,00
6,804
1.165,253
5,429
5,429
228,893
6,786
7,008
7,008
1.554,585
M3
Kg
M3
M3
Kg
M2
M3
M3
300.000,00
1.300.000,00
1.600.000,00
6.990.243,79
15.269,59
17.792.936,17
1.027.372,69
5.577.770,72
296.181,75
15.269,59
296.181,75
990.946,14
6.710.684,69
3.495.108,15
2.010.022,64
6.944.550,57
15.269,59
23.737.870,07
1.027.372,69
17.851.627,87
1.027.372,69
29.692.247,10
339.796.880,14
21,024
17,376
17,376
2.610,049
52,128
28,901
28,901
4.551,930
202,308
Kg
1.027.372,69
M2
M3
M3
Kg
M2
M3
M3
Kg
M2
305.406,75
15.269,59
305.406,75
15.269,59
431.481,75
6.420.871,51
39.854.377,50
15.920.243,06
69.506.109,96
87.292.216,35
A. 4.4.1.9
A. 4.4.2.4
Taksir
64,440
208,880
21,843
M2
M2
M2
99.747,99
56.303,02
248.185,58
6.427.760,28
11.760.573,98
5.421.067,93
23.609.402,19