BY CORINA PERMATA SARI MEDAN ± 22 APRIL 2006 FAK ± TEKNIK ± USU - MEDAN
TUJUAN
MENGERTI APA YANG DIMAKSUD DENGAN BISNIS
KONSTRUKSI MENGERTI RUANG LINGKUP BISNIS KONSTRUKSI MEMPERKENALKAN PERUSAHAAN ± PERUSAHAAN YANG TERLIBAT DALAM BISNIS KONSTRUKSI DI INDONESIA MEMBUKA WAWASAN SEJAUH MANA KESEMPATAN KERJA YANG ADA DI DUNIA KONSTRUKSI DITINJAU DARI DISIPLIN ILMU TEKNIK INDUSTRI DISIPLIN ILMU TERKAIT TEKNIK INDUSTRI DENGAN BISNIS JASA KONSTRUKSI JENJANG KARIR DI DUNIA KONSTRUKSI TIPS MENCARI KERJA DI BISNIS KONSTRUKSI
DEFENISI ± 1 (PELAKSANA)
PROJECT OWNER : PEMILIK PROYEK INVESTOR : PEMILIK SAHAM MAIN CONTRACTOR : KONTRAKTOR
UTAMA (MULTI DISIPLINE) CONTRACTOR : KONTRAKTOR PER BIDANG ATAU SUB BIDANG SUB CONTRACTOR : SUB KONTRAKTOR DARI KONTRAKTOR CONSULTANT : KONSULTAN (DESIGN, PELAKSANA)
AND CONSTRUCTION EPCC : ENGINEERING, PROCUREMENT, CONSTRUCTION, COMMISSIONING C : CONSTRUCTION ONLY M : MAINTENANCE
DASAR DETAIL ENGINEERING : RANCANG BANGUN DETIL PROCUREMENT : PENGADAAN MATERIAL DAN JASA CONSTRUCTION : PEMBANGUNAN TESTING/ COMMISSIONING : UJI KELAYAKAN/ UJI COBA
MERUPAKAN BISNIS JASA PEMBANGUNAN SUATU OBJECT DAN SELURUH INFRASTRUKTUR PENDUKUNG, DIMULAI DARI FEASIBILITY STUDY, BASIC ENGINEERING, DETAIL ENGINEERING, PENGADAAN SELURUH MATERIAL DAN JASA, KONSTRUKSI FISIK SAMPAI DENGAN TESTING DAN COMMISSIONING DAN HAND OVER KE PEMILIK PROYEK
DAN GAS BISNIS YANG TERKAIT DENGAN PEMBANGKIT TENAGA LISTRIK BISNIS YANG TERKAIT DENGAN TELEKOMUNIKASI BISNIS YANG TERKAIT DENGAN PERTAMBANGAN (EMAS, BATU BARA, MINERAL DLL) BISNIS YANG TERKAIT DENGAN PENGADAAN AIR BERSIH BISNIS YANG TERKAIT DENGAN PEMBANGUNGAN PABRIK PETROKIMIA BISNIS YANG TERKAIT DENGAN PEMBANGUNAN BANGUNAN ± BANGUNAN BERTINGKAT (HIGH RISE), PERUMAHAN (COLONY), DAN BANGUNAN LAINNYA BISNIS INFRASTRUKTUR (JALAN, PELABUHAN UDARA/ AIR, PENGADAAN AIR BERSIH DLL)
EXPLORE OLEH PERTAMINA DAN KONTRAKTOR PRODUCTION SHARING (KPS) SEPERTI DI CEPU (PERTAMINA ± EXXON MOBILE) GAS : JUTAAN CUBIC FEET GAS YANG MASIH HARUS DIEXPLORE DI BERBAGAI SUMUR (TANGGUH, BADAK LNG), TERMASUK LPG, LNG, CBM (COAL BED METAL). POWER PLANT : S/D 2010 MEMBUTUHKAN 10.000 MW LISTRIK DENGAN INVESTASI TOTAL USD 700.000 PER MW. TELECOMMUNICATION : S/D 2010 TARGET SEKITAR 50% INVESTASI UNTUK MENCAPAI 70% PENGGUNAAN TELEPON SELLULER DI SELURUH INDONESIA. UNTUK SETIAP 1 % MEMBUTUHKAN USD 1 JUTA INVESTASI. MINING : S/D 2010 MASIH SEKITAR 3.000.000 CUBIC BATU BARA YANG HARUS DI TAMBANG, SEPERTI TANJUNG ENIM, KALTIM PRIMA COAL DSB
JENJANG KARIR
SCHEDULER PROJECT CONTROL ENGINEER PROJECT CONTROL MANAGER CONTRACT ADMINISTRATION CORPORATE LAWYER (TECHNICAL ASPECT) SITE MANAGER/ PROJECT MANAGER CORPORATE CONTROL VISE PRESIDENT OPERATION OPERATIONAL DIRECTOR
MAIN CONTRACTOR/ CONTRACTOR/ SUB CONTRACTOR IDENTIFIKASI PENDANAAN PROYEK : INVESTASI ASING/ DALAM NEGRI/ LOAN WORLD BANK OR ASIAN DEVELOPMENT BANK/ ANGGARAN PEMERINTAH/ SWASTA MURNI IDENTIFIKASI JENIS KONTRAK KERJANYA : WAKTU TERTENTU ATAU TIDAK TERTENTU CARI INFORMASI RATES UPAH DI PERUSAHAAN KONSTRUKSI: ENGINEER FRESH GRADUATE, EXPERIENCE DAN NON ENGINEER APABILA UNTUK DITEMPATKAN DI PROYEK DITANYAKAN FASILITAS AKOMODASI, TRANSPORTASI, CUTI, TUNJANGAN DLL. HARUS BERSEDIA BEKERJA BERPINDAH ± PINDAH (DARI KANTOR PUSAT KE PROYEK DAN DARI SATU DAERAH KE DAERAH LAINNYA)