Anda di halaman 1dari 1

LAPORAN HARIAN SINGKAT PEMBORAN EKSPLORASI MIGAS

SENIN, 22 Desember 2008

SUMUR GALIAN(GAL)-02
DAERAH DESA TANJUNG MEKAR, KECAMATAN PAKIS JAYA, KABUPATEN KARAWANG, JAWA BARAT
OPERATOR / RIG / GL / KB PERTAMINA EP/ BKY-01 1500 HP / 1.7 m SS / 7.76 m
SURF : UTM : X = 733,179.6 E & Y = 9,335, 706.3 N / GEOGRAFIS : Long : 107 deg 06’23.57” E & Lat :006 deg 00’20.86” S, SUB SURF : UTM : X = 733,179.6 E & Y = 9,335, 706.3 N
Koordinat Surface / Sub surface
/ GEOGRAFIS : Long : 107 deg 06’23.57” E & Lat :006 deg 00’20.86”
Tanggal Tajak Sabtu, 22 November 2008 Pkl 00.00 bbwi
HARI KE / PROGRAM (Hari) 31 / 34 ( DRY HOLE BASE)
KEDALAMAN / KEMAJUAN / PROGRAM TD /Type 1747.8 m / - m / 2202 mbpl, Vertical Well
O B Y E K T IF CBL, BRF, TAF

STATUS Sedang Sirkulasi Kondisikan Lumpur.


CISUBUH @surface/surface, PARIGI @ 706.8 m/ 708 m, MMC @ 1036 m/ 1037 m, BATURAJA @ 1456 m/ 1474 m, TALANGAKAR @ 1772 m/ 1740 m, BASEMENT @ 2002 m/ - m
F O R M A S I ( program / realisasil)

LITHOLOGI -
FLUIDA PEMBORAN/KOMPLESI (SG/PV/YP/pH/Cl-) KCl Polymer PHPA (1.06/12/16/42/20000)
SELUBUNG (program / realisasi ) 30" @ 40 m / 45.7 m ; 20" @ 350 m / 352 m ; 13-3/8" @ 940m / 932 m ; 9-5/8" @ 1772 m / - m ; 7" @ 1712-2002 m / - m
INDIKASI HIDROKARBON -

A N G G A R A N (RUPIAH / US $ / Eq US $ ) Rp. US $ 8,065,674.00 US $ 8,065,674.00 1 US$ = Rp 9200

BIAYA HARIAN ( Rupiah / US $ / Eq US $ ) Rp. US $ 163,970.84 US $ 163,970.84 (2.03 %)


BIAYA KUMULATIF (Rupiah / US$ / Eqv.US $) Rp. US $ 3,363,726.14 US $ 3,363,726.14 (41.70 %) Dry Hole Basis

- Lanjut EWL Job, Run I: PEX-HALS; Run II: CBL-VDL-GR; Run III: FMI-DSI-GR; Run IV: CST-GR.
- Persiapan dan masuk rangkaian pahat 12-1/4" sampai 1350 m.
- Sirkulasi kondisikan lumpur.

RENCANA: Trip, Masuk Casing 9-5/8", Cementing Job.

Anda mungkin juga menyukai