Anda di halaman 1dari 44

DAFTAR HARGA SATUAN UPAH

DINAS PEKERJAAN UMUM KABUPATEN REMBANG


TAHUN 2010
EDISI SEPTEMBER 2009
NO.

JENIS PEKERJAAN

SATUAN

HARGA SATUAN
(Rp)

Pekerja

Hr

30,000.00

Mandor

Hr

40,000.00

Tukang Kayu

Hr

42,500.00

Tukang Batu

Hr

42,500.00

Tukang Besi

Hr

42,500.00

Tukang Cat

Hr

42,500.00

Tukang Leideng

Hr

42,500.00

Tukang Gali

Hr

40,000.00

Tukang Plitur

Hr

40,000.00

10

Tukang Kepala

Hr

43,000.00

11

Kep. Tukang Kayu

Hr

45,000.00

12

Kep. Tukang Batu

Hr

45,000.00

13

Kep. Tukang Cat

Hr

45,000.00

14

Kep.Tukang Plitur

Hr

45,000.00

15

Kep.Tukang Gali

Hr

45,000.00

16

Mekanik

Hr

37,500.00

17

Pemb.Mekanik

Hr

37,500.00

18

Operator alat berat

Hr

43,000.00

19

P e m b . Operator

Hr

35,000.00

20

Sopir

Hr

40,500.00

21

P e m b . Sopir

Hr

30,000.00

Rembang,

KETERANGAN

Juli 2009

KEPALA DINAS PEKERJAAN UMUM


KABUPATEN REMBANG

Ir. MUJOKO, MT.


NIP. 010 234 645 / 19620715 199011 1 002

\\vboxsrv\conversion_tmp\scratch_6\144824707.xls.ms_office

DAFTAR HARGA SATUAN BAHAN


DINAS PEKERJAAN UMUM KABUPATEN REMBANG
TAHUN 2010
NO.

J E N I S

1
I
1

BAHAN DASAR
BATU KALI

KERIKIL

BATU BATA

PASIR

TANAH

KAPUR

PORTLAND CEMENT

II

BETON

BAHAN

Bulat Utuh
Bulat Belah
Pecah
Pecah
Tempel
Batu apung
Sawur / Koral
Beton 0,5 / 1
Beton 1 / 1
Beton 1 / 2
Beton 2 / 3
Biasa
Ex lokal I

m3
m3
m3
m3
m2
kg
m3
m3
m4
m3
m3
m3
bh

91,900
93,750
135,850
208,550
68,750
6,050
27,500
261,250
238,400
248,950
246,850
28,450
425

Urug
Pasang
Beton (Muntilan)
Beton (Cepu)
Sirtu (pasir batu)
Sirtu royalty
Grosok
Abu batu
Abu batu (Tayu)
Batu alam
Padas
Liat
Biasa
Pilihan

m3
m3
m3
m3
m3
m3
m3
m3
m3
m2
m3
m3
m3
m3

61,950
125,000
309,430
171,950
106,600
27,300
103,200
116,950
211,200
90,100
33,650
55,000
49,950
68,750

Pasang (padam)
Labor

m3
Kg

196,000
2,750

PC 50 kg
PC 40 kg
PC 50 kg Sm. Warna
Semen warna

zak
zak
zak
kg

65,625
51,250
89,450
11,250

m3
m3
m3

897,850
952,875
994,250

pak

258,950

Genteng Beton Warna standard


Kerpus Beton Warna Standard

bh
bh

2,750
9,075

Mantili
Nok kerpus Mantili
Plentong Mantili besar
Genteng biasa
Genteng pres
Genteng Beton
Genteng keramik
Sirap
Genteng kerpus jatiwangi
Genteng kerpus lokal
Genteng kerpus Beton
Genteng kerpus keramik
Genteng Jatiwangi

bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh

1,000
2,900
1,200
650
1,000
4,400
11,100
6,300
10,550
3,200
9,075
19,350
3,850

Asbes gelombang ( 80 x 210 ) cm


Asbes gel. Kecil 5 mm (90 x 180)
Asbes gel. Kecil 5 mm (120 x 240)
Asbes gel. Besar 5 mm (90 x 180)
Asbes gel. Besar 5 mm (120 x 240)
Asbes gel. Kecil 0,8 x 1,80 m
Asbes gel. Kecil 0,8 x 2,40 m

bh
lbr
lbr
lbr
lbr
lbr
lbr

45,850
53,850
80,850
68,750
105,950
47,750
61,950

5/7
3/5

Adukan beton K 175 ready mix


Adukan beton K 225 ready mix
Adukan beton K 300 ready mix
PENUTUP ATAP

SIRAP

GENTENG BETON

GENTENG TANAH LIAT

SATUAN

B A H A N

EDISI SEPTEMBER 2009


HARGA
KET.
(Rp)

(100 lbr)

ASBES GELOMBANG

144824707.xls.ms_office

HARGA
NO.

J E N I S

1
6

B A H A N
2

SATUAN
3

(Rp)
4

ASBES PLAT
- 100cm X 100 cm X 5 mm
- 100cm X 200 cm X 5 mm
- 100cm X 240 cm X 5 mm
Sekrup asbes

bh
bh
bh
bh

19,050
52,800
67,750
1,450

BJLS 0,30 panjang 180 cm


BJLS 0,30 panjang 240 cm
BWG 28 x 80
BWG 28 x 90

m'
m'
m'
m'

54,850
71,225
42,075
47,200

Seng gel. Kecil 0,70 x 1,80 m


Seng gel. Kecil 0,70 x 2,10 m
BJLS 0,28
BJLS 0,28 panjang 180 cm
BJLS 0,28 panjang 240 cm

lbr
lbr
m'
lbr
lbr

54,700
63,150
81,200
48,200
64,700

Seng talang BJLS 26 lebar 0,60


Seng talang BJLS 26 lebar 0,90
Seng talang BJLS 26 lebar 1,20

m'
m'
m'

23,450
33,450
50,850

Papan
Balok/pesagen

m3
m3

16,156,250
16,156,250

SENG PLAT

SENG GELOMBANG

9 SENG TALANG

III . B A H A N K A Y U
1 JATI

KAMPER

Papan
Balok/pesagen

m3
m3

8,937,500
8,937,500

KRUING

Papan
Balok/pesagen

m3
m3

6,531,250
6,531,250

MERANTI

Papan
Balok/pesagen

m3
m3

3,437,500
3,437,500

LANAN

Papan
Balok/pesagen

m3
m3

3,437,500
3,437,500

BENGKIRAI

Papan
Balok/pesagen

m3
m3

8,937,500
9,625,000

DOLKEN

Kayu dolken sengon 8-10 cm,4m.


Kayu perancah

bt
m3

35,700
2,062,500

LAIN-LAIN
Kayu randu (papan)
Bambu
Bambu Apus
Kayu hutan lokal sekwalitas Kruing (A)
Kayu hutan lokal sekwalitas Kruing (B)
Glugu
Kayu lis 2/3

m3
bt
bt
m3
m3
m'
m'

631,300
17,050
4,200
4,855,125
2,589,400
206,250
6,500

m2
m2
m2

31,050
23,900
28,750

m2
m2
m2
m2
m2
m2
m2
m2

48,750
44,450
39,850
36,100
55,650
48,200
52,900
43,700

m2
m2
m2

607,450
1,019,425
1,381,100

IV . BAHAN PENUTUP DINDING / LANTAI


1 UBIN (TEGEL BIASA)
PC polos
30 X 30 cm
20 X 20 cm
20 X 20 cm
KERAMIK
Keramik warna (KW-1)
Keramik warna (KW-2)
Keramik putih (KW-1)
Keramik putih (KW-2)
Keramik 10 x 20 cm
Keramik 20 x 20 cm
Keramik 20 x 25 cm
Keramik 10 x 20 cm
3 MARMER
Marmer Tulung Agung
Marmer Kalimantan
Marmer Itali

Warna

144824707.xls.ms_office

30 X 30 cm
30 X 30 cm
30 X 30 cm
30 X 30 cm

KET.
5

HARGA
NO.

J E N I S

B A H A N

1
2
4 GRANITO
Granito 40 x 40 polished (lokal)
Granito 40 x 40 polished (import)
Granito 60 x 60 polished (lokal)
Granito 60 x 60 polished (import)

SATUAN
3

(Rp)
4

m2
m2
m2
m2

462,825
505,000
461,000
481,250

m2
m2
m2

131,300
241,800
67,375

bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh

39,050
55,000
58,550
68,750
86,600
108,050
128,600
195,250
321,450
54,000
42,450
52,250

kg
kg
kg

11,100
18,550
15,200

2 BESI PLAT
Besi Strip

kg

16,200

3 BAJA
Baja profil " L" dan "C"
Baja profil "IWF"

kg
kg

18,500
19,400

4 KAWAT
Kawat Ikat beton/bendrat
Kawat bronjong
Kawat las listrik

kg
kg
kg

17,850
18,550
33,000

m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'

4,500
6,600
11,275
14,300
22,250
33,550
48,125
68,900
102,900
169,800
220,450
348,300
549,450
875,700
1,476,250

m'
m'
m'

119,300
162,050
303,700

lbr

98,550

lbr
lbr
lbr

55,800
72,300
91,950

lbr
lbr

135,200
202,850

5 GRANIT
Granit lokal
Granit import
Batu Tempel
V.BAHAN CETAK
1 BUIS BETON O dan U
15 cm - 100 cm
20 cm - 100 cm
25 cm - 100 cm
30 cm - 100 cm
40 cm - 100 cm
50 cm - 100 cm
60 cm - 100 cm
80 cm - 100 cm
100 cm - 100 cm
U 15 cm - 100 cm
U 20 cm - 100 cm
U 30 cm - 100 cm
VI . B A H A N B E S I
1 BESI BETON
Besi beton polos
Besi beton prestress
Besi beton ulir

VII . B A H A N P I P A
1 Pipa PVC SII SCJ , S - 12,5 (10 bar)
Pipa PVC. S. 12,5 1/2"
Pipa PVC. S. 12,5 3/4"
Pipa PVC. S. 12,5 1"
Pipa PVC. S. 12,5 1-1/4"
Pipa PVC. S. 12,5 1-1/2"
Pipa PVC. S. 12,5 2"
Pipa PVC. S. 12,5 2-1/2"
Pipa PVC. S. 12,5 3"
Pipa PVC. S. 12,5 4"
Pipa PVC. S. 12,5 5"
Pipa PVC. S. 12,5 6"
Pipa PVC. S. 12,5 8"
Pipa PVC. S. 12,5 10"
Pipa PVC. S. 12,5 12"
Pipa PVC. S. 12,5 16"
2 Pipa Medium B Galvanis - SII
Pipa Galvanis ( 1" )
Pipa Galvanis ( 1 1/2" )
Pipa Galvanis ( 2" )
VIII . B A H A N L A N G I T - L A N G I T
PLY WOOD
- Teak wood
120 X 240
X 4 mm
- Tripleks
120 X 240
X 3 mm
120 X 240
X 4 mm
120 X 240
X 6 mm
- Multipleks
. 120 X 240
X 9 mm
. 120 X 240
X 12 mm

144824707.xls.ms_office

KET.
5

HARGA
NO.

J E N I S

B A H A N
2

Harplek 60 x 200
Harplek 50 x 200
Harplek 40 x 200
Harplek 30 x 200
Harplek 5 mm (90 x 180)
Harplek 5 mm (120 x 240)
Gypsum 6 mm
Gypsum 9 mm
Gypsum 12 mm
Gypsum 20 mm
Eternit 4 mm ( 100 x 100)
List Kayu Profil
Formika ukuran pintu
IX . B A H A N F I N I S H I N G
1 KAYU
Menie
Plamur kayu
Ambril/amplas
Batu Apung
Cat kayu (cukup)
Cat kayu (baik)
Siralax
Spiritus
Dempul
Plinkut
Wood filer (INFRA)
Oker putih
Oker warna
Melamin
Kuwas 3"
Thinner Super daimaru
Thinner A
Foxi Cat
2 TEMBOK
Kapur sirih
Plamur
Cat Tembok (cukup)
Cat Tembok (baik)
Roll cat
3

BESI
Menie
Cat besi (baik)
Cat besi (cukup)
Minyak cat
Lem Aica Aibon
Amplas Besi
Ampelas norton no.3
Ampelas Dico no.280
Ampelas Dico no.120

X.BAHAN KACA
Bening
Rayband

5 mm
5 mm

XI . BAHAN INSTALASI LISTRIK


Stop Kontak
XII . ALAT - ALAT PENGUNCI & PENGGANTUNG
1 KUNCI TANAM
Besar
Kecil
2 ENGSEL DAN GERENDEL
Engsel H
Engsel Nylon
Grendel
Hak Angin

SATUAN

(Rp)

3
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
m2
m'
lbr

4
18,200
15,750
9,200
11,700
29,975
110,000
68,100
82,500
55,825
59,675
25,200
7,600
252,500

kg
kg
lbr
kg
kg
kg
kg
ltr
kg
kg
kg
kg
kg
kg
bh
liter
liter
Kg

22,450
21,150
3,550
6,050
43,700
56,100
52,050
11,900
20,350
20,700
34,450
23,000
25,200
76,350
7,600
27,050
21,150
36,550

kg
kg
kg
kg
bh

900
19,250
15,850
18,800
17,500

kg
kg
kg
ltr
kg
lbr
buah
buah
buah

16,100
51,400
50,300
16,050
22,800
6,150
6,700
3,750
3,750

m2
m2

96,250
106,600

bh

7,900

bh
bh

154,800
65,350

bh
bh
bh
bh

5,950
7,150
10,450
19,500

bh
bh
bh
bh

584,450
123,750
501,950
261,250

XIII . BAHAN SANITAIR


1
2
3
4

Kloset duduk
Kloset jongkok
Westafel
Bak Cuci Stainlist

144824707.xls.ms_office

Porselen
Counter top

KET.
5

HARGA
NO.

J E N I S

1
XIV . ALAT PENGIKAT KAYU
1 Paku - ukuran 1" s/d 4"
2 Paku - payung
3 Paku - sekrup
4 Mur Baut 3/8 "
5 Lem kayu (fox)
6 Tali Ijuk
7 Lem kuning (aica aibon)

B A H A N
2

XV . POMPA AIR DAN TANGKI AIR


1 POMPA AIR LISTRIK
Mesin pompa 1 lt / dt
Mesin pompa 1-1/2 lt / dt
Tangki air fiber glass 3.000 lt 5mm
X VI . PAVING BLOCK
1 Paving Blok Holland t: 6 cm (ALDAS)
2 Paving Blok Holland t: 6 cm (lokal)
3 Paving Blok Holland t: 8 cm (ALDAS)
4 Paving Blok Holland t: 8 cm (lokal)
5 Paving blok warna 6 cm (lokal)
6 Paving blok warna 8 cm (lokal)
7 Kanstin 10/12,5 x 30 x 50 (ALDAS)
8 Paving Blok Hexagonal Kecil t: 6 cm, (ALDAS)
9 Paving Blok Hexagonal Kecil t: 8 cm, (ALDAS)
10 Kanstin 10 x 20 x 50 (ALDAS)
11 Kanstin 10/12,5 x 25 x 50 (ALDAS)

SATUAN
3

(Rp)
4

kg
kg
kg
buah
bh
kg
kg

16,750
25,000
22,800
4,950
18,300
13,700
50,200

buah
buah
buah

2,651,350
4,639,150
6,797,175

m2
m2
m2
m2
m2
m2
bh
m2
m2
bh
bh

59,500
36,750
102,100
18,200
51,800
55,000
22,250
76,700
103,300
11,100
18,150

Kg
Ton
Ton
Kg
Kg
Kg
Kg

5,450
302,500
907,500
2,450
3,025
3,025
3,025

50 mL

12,100

Batang
Batang
Buah
Rumpun
Buah
Batang
Batang
Buah
Buah
Batang
Batang
Batang
Buah
Batang
Batang
Batang
Batang
Batang
Rumpun
Batang
Batang
Batang
Batang
Buah
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
M2
Batang
Batang
Buah
Batang
Rumpun

72,600
12,100
3,025
29,050
19,950
26,650
39,950
10,650
7,250
60,500
29,300
79,850
12,100
79,850
226,300
7,250
53,250
36,300
3,025
3,025
19,950
11,200
6,650
12,100
382,050
189,750
25,300
30,800
126,500
31,350
4,400
4,400
37,950
5,050
55,650
632,500
3,850
75,900
15,400

XVII. RTH (JALUR HIJAU DAN TAMAN)


1

PUPUK
KCL, KS, ZK
Pupuk Kandang
Pupuk Kompos
Pupuk Organik/Bokhasi
Pupuk Phonska
SP 36
Urea
OBAT - OBATAN
Fastac 25 EC
TANAMAN HIAS
Agape
Angsana
Apinika
Bambu Hias
Bambu Jepang
Bougenville Biasa
Bougenville Parigata
Cemara Bola
Cemara Buaya
Cemara Gimbal
Cemara Kipas
Cemara Non Flok/Ventris
Daun Walisongo
Glodogan
Glodogan Pecut
Jaranan
Kamboja Jepang
Ketapang
Krokot Putih
Lamtana Rebah
Lamtana Tegak
Mahoni 1 Meter
Mimbo
Mirten
Palem Botol
Palem Ekor Tupai
Palem Kuning
Palem Merah
Palem Raja/Putri
Palem Wergu
Pangkas Kuning
Pangkas Merah
Pinisium
Rumput Jepang
Sawo Kecik
Sikas
Tanaman Taiwan
Tanjung
Teh - tehan

144824707.xls.ms_office

KET.
5

HARGA
NO.

J E N I S

1
4

B A H A N
2

ALAT - ALAT PERTAMANAN


Ajir Tanaman
Ajir Tanaman Mangrove
Batu Asahan
Bambu Usuk
Busi Mesin Potong Rumput
Cetok
Chain Saw 038 STIHL
Chain Saw 070 STIHL
Gunting Dahan
Membran Karburator Chain Saw
Membran Oli Chain Saw
Mesin Potong Rumput Dorong
Mesin Potong Rumput Gendong
Mesin Pompa Air G x 160 + 2"
Patok Batas
Pisau M. Ptng Rmput Dorong/Gendong
Piston Set Chain Saw
Piston Set M. Ptng Rmpt Drong/Gndong
Pot Tanaman Hias
Pot Tanaman Palem
Rantai Chain Saw 038 STIHL
Rantai Chain Saw 070 STIHL
Seal Ker As Mesin M. Ptng Rmput
Srumbung Bambu
Srumbung Kayu
Selang Biasa 2"
Selang Lipat 2"
Selang Spiral
Tali Starter Chain Saw
Trucuk Bambu

SATUAN
3

Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Meter
Meter
Meter
Buah
Batang

(Rp)
4

550
800
13,200
6,600
12,100
23,000
12,100,000
15,125,000
137,950
181,500
60,500
7,260,000
8,470,000
3,932,500
6,050
605,000
726,000
726,000
302,500
151,250
302,500
308,000
66,550
38,500
24,200
15,400
6,600
42,900
18,700
7,700

BAHAN KEND. TDK. BERMOTOR


As Belakang
Buah
As Tengah
Buah
Ban Dalam
Buah
Ban Luar
Buah
Bos Samping
Buah
Laker
Buah
Pedal
Buah
Pelek
Buah
Per
Buah
Rantai
Buah
Ruji
Buah
Sadel
Buah

Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah

12,100
20,900
16,500
55,000
16,500
7,700
13,200
61,600
38,500
13,200
550
19,800

PERALATAN KEBERSIHAN DAN BHN. PEMBERSIH


Angkus
Buah
Bendo
Buah
Cangkul
Buah
Ekrak
Buah
Ganco
Buah
Gunting Pangkas
Buah
Linggis
Buah
Sabit
Buah
Sapu Lidi
Buah
Skrap
Buah

Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah

18,700
24,200
33,900
9,700
36,300
115,500
15,125
21,175
7,250
6,050

Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Meter
Meter
Meter

1,100
66,000
328,900
42,350
6,875
465,850
385,000
27,500
3,650
35,750
19,250
137,950
93,200
25,300
880,000
1,694,000
57,200
11,000
71,500
8,250
8,800

XVIII. LAMPU PENERANGAN JALAN UMUM (LPJU)


1 Baut 3/8
2 Besi L
3 Box KWH Meter 1 Phasa
4 Box Trafo
5 Conector
6 Contactor SN 35
7 Cor Ornamen Tiang Listrik
8 Cup Piring
9 Cupit Urang
10 Fitting E 40
11 Fitting WD 27
12 Fotto cell 10 A
13 Fotto cell 6 A
14 Groundhing/ardhe
15 Housing Lamp 125 W
16 Housing Lamp 250 W
17 Ignisitor
18 Isolasi
19 Kabel LVTC 2 x 10 mm
20 Kabel LVTC 2 x 16 mm
21 Kabel NYM 2 x 2,5 mm

144824707.xls.ms_office

KET.
5

HARGA
NO.

J E N I S

1
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64

Kabel NYM 2 x 4 mm
Kabel NYY 2 x 4 mm
Kabel NYY 2 x 6 mm
Kapasitor
Konsul Besi 1,25" MG
Konsul Besi 2" MG
Kotak APP/Double cover
KWH Meter 20/60 A
KWH Meter 50/20 A
L Booh 1"
Lampu HPIT 250 W
Lampu Mercury 250 W
Lampu Mercury 125 W
Lampu Mercury 80 W
Lampu Selang
Lampu Son T 150 W
Lampu Son T 250 W
M C B 25 A
M C B 63 A
OK KWH Meter
Pal Besi 2" dan 1" MG
Pal Besi 4 & 3 MG
Pemasangan LPJU
Pole Band 8,5
SJ. 5
Soket Lampu Selang
T Does/Boxlit
Terminal Box Meter
Trafo Mercury 125 W
Trafo Mercury 250 W
Trafo BSN 150 W
Trafo BSN 250 W
Lampu Hias Christmas
Lampu Hias Windmill
Lampu Hias Cotton Rose
Lampu Hias Number One
Lampu Hias Dragon Phoenix
Lampu Hias Hepla
Tangga Besar 12 m
Tangga Kecil 6 m
Crystalite
Lampu XL 18 Watt
Sabuk Pengaman

B A H A N
2

SATUAN
3
Meter
Meter
Meter
Buah
Batang
Batang
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Meter
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Unit
Buah
Buah
Meter
Buah
Buah
Buah
Buah
Buah
Buah
Unit
Unit
Unit
Unit
Unit
Unit
Buah
Buah
Buah
Buah
Buah

(Rp)
4
22,000
17,600
20,020
53,625
203,500
247,500
825,000
522,500
437,250
2,200
264,550
96,250
46,750
44,000
33,000
107,800
127,300
34,100
190,850
30,800
548,900
1,705,000
99,000
28,600
46,650
14,850
21,450
28,600
125,950
207,350
216,700
258,500
29,493,750
23,100,000
22,756,250
22,343,750
21,587,500
21,587,500
9,418,750
4,812,500
123,750
41,250
3,052,500

KET.
5

XIX. ALAT PEMADAM KEBEKARAN


1

Selang Pemadam Kebakaran fire house Appron/Murata/ Yamato with Machino Working Pressure 10 Kg/cm2
- 1,5 x 30 m, W/Coupling
roll
1,807,700
- 1,5 x 20 m, W/Coupling
roll
1,478,125
- 2 x 30 m, W/Coupling
roll
1,753,125
- 2 x 20 m, W/Coupling
roll
1,519,375
- 2,5 x 40 m
roll
2,915,550
- 2,5 x 30 m, W/Coupling
roll
2,681,250
- 2,5 x 20 m, W/Coupling
roll
2,179,375

Without Coupling
- 1,5 x 20 m
- 1,5 x 30 m
- 2 x 20 m
- 2 x 30 m
- 2,5 x 20 m
- 2,5 x 30 m
- 2,5 x 40 m

Tertera
Tertera
Tertera
Tertera
Tertera
Tertera
Tertera

368,300
553,100
553,100
842,150
673,200
1,024,350
1,363,550

Hydrant Box Kosong


- A1 (66 x 52 x 15 cm)
- A1 (100 x 80 x 18 cm)
- A1 (125 x 75 x 18 cm)
- A1 (95 x 66 x 20 cm)
- A1KACA + Kunci, Tempered 5 mm
- A2KACA + Kunci, Tempered 5 mm
- B KACA + Kunci, Tempered 5 mm
- C KACA + Kunci, Tempered 5 mm

Appron
Appron
Appron
Appron
Appron
Appron
Appron
Appron

858,000
2,334,450
2,797,750
2,334,450
1,586,000
2,726,500
3,189,800
2,726,500

Fire Fighting Equipment Machino Coupling material Brass


- 1,5
- 2
- 2,5
- 3

Tertera
Tertera
Tertera
Tertera

118,250
144,375
211,750
335,500

Straight Nozzle (Machino Coupling) With Nozzle tip, Material Brass/ Branch pipa with straight Nozzle

144824707.xls.ms_office

HARGA
NO.
1

10

11

12

13

14
15
16
17
18

J E N I S

B A H A N

SATUAN

(Rp)

2
- 1,5 Seamless
- 2 Seamless
- 2,5 Seamless, Short, W/O Grip
- 2,5 Seamless, Long, W/O Grip
- 2,5 Seamless, Long, W/ Grip
- 1,5
- 2
- 2,5

3
Tertera
Tertera
Tertera
Tertera
Tertera
Appron
Appron
Appron

4
462,000
585,750
640,750
797,500
820,875
46,475
652,450
1,063,550

Hydrant Valve (Machino Coupling) 90


Material Brass. 10 K
- 1,5
- 2
- 2,5

Tertera
Tertera
Tertera

228,350
319,000
520,100

Hydrant Valve (Machino Coupling) 90


Material Brass. 20 K
- 1,5
- 2
- 2,5

Tertera
Tertera
Tertera

472,550
732,875
988,625

Hose Rack
- 1,5, 1,24 COMB
- 2,5, 1,24 COMB

Unit
Unit

589,875
643,500

Spray Nozzle Head


- 1,5
- 2

Tertera
Tertera

284,625
429,000

Hose Reel
- 1 Hose Reel, Swing Type Complete
With box Siamese Conention
4 x 2,5 x 2,5 Machino Coupling

Tertera

2,046,000

Hydrant Pillar
- H14 AP 4 x 2,5 x 2,5
- H13 AP 3 x 2,5

Tertera
Tertera

6,345,250
3,392,650

buah
buah

2,252,950
6,413,550

Tertera
Tertera

2,376,000
3,300,000

buah
buah
kg
kg
unit

12,490,450
4,900,500
121,450
79,200
35,750,000

lot
kg
ltr
ltr
liter
ltr
liter
Kg
m2
m2
m3
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
kg
daun

13,750
9,500
2,200
4,500
4,500
3,600
34,450
20,050
13,700
72,600
97,100
41,250,000
34,375,000
17,187,500
9,625,000
7,562,500
6,875,000
6,187,500
4,812,500
4,468,750
4,125,000
543,950
135,850
543,950
339,900
58,300
54,450

On Trollen
- Type AC 15 kapasitas 6 kg
- Type AC 50 kapasitas 23 kg
Pemancar Pemadam Kebakaran
- 1,5 (Variable)
- 2,5 (Variable)
Noksel Foam
Foise Cabang 2 (dua)
Liquite
Pengisian Tabung Pemadam Kebakaran
Selang Isap 2,3 4 M

XX . L A I N - L A I N
1 Alat bantu (harga rata-rata)
2 Aspal
3 Minyak aspal
4 Bensin
5 Solar
6 Minyak tanah
7 Olie (minyak pelumas)
8 Stempet
9 Gebalan rumput
10 Wiremesh MS
11 Kayu bakar
12 Pintu Ronsel Doble 200 x 200 x 300
13 Pintu Ronsel Doble 150 x 150 x 300
14 Pintu Ronsel Engkel 100 x 100 x 300
15 Pintu Intake 100 x 100 x 300
16 Pintu Intake 90 x 100 x 300
17 Pintu Intake 80 x 80 x 300
18 Pintu Intake 60 x 60 x 300
19 Pintu Intake 50 x 50 x 300
20 Pintu Intake 40 x 40 x 300
21 Pintu Intake 30 x 40 x 300
22 Nomenklatur Marmer ( 30 x 40 )
23 Nomenklatur Marmer ( 15 x 20 )
24 Pile Scale ( 20 x 100 )
25 Pile Scale ( 12 x 100 )
26 Lapisan kedap air
27 Nako lengkap

144824707.xls.ms_office

KET.
5

HARGA
NO.
1
28

29
30
31

J E N I S

B A H A N

2
Pagar BRC 90 A1
Pagar BRC 120 A1
Pagar BRC 150 A1
Pagar BRC 90 A2
Pagar BRC 120 A2
Pagar BRC 150 A2
Pipa Tiang BRC 90 - 2"
Pipa Tiang BRC 120 - 2"
Pipa Tiang BRC 150 - 2"
Minyak Beton & bekisting
Allumunium sheet 0,3 mm (90 x 180)
Shear Connector
PAGAR BRC.

SATUAN

KET.

(Rp)

3
/lb
/lb
/lb
/lb
/lb
/lb
unit
unit
unit
ltr
lbr
kg

4
485,650
566,500
890,450
404,250
485,650
809,050
202,400
234,850
251,350
22,000
130,680
11,000
Rembang,

Juli 2009

KEPALA DINAS PEKERJAAN UMUM


KABUPATEN REMBANG

Ir. MUJOKO, MT.


NIP. 010 234 645 / 19620715 199011 1 002

144824707.xls.ms_office

DAFTAR HARGA SATUAN PEKERJAAN


DINAS PEKERJAAN UMUM KABUPATEN REMBANG
TAHUN 2010
EDISI SEPTEMBER 2009

NO.

KODE

II

URAIAN PEKERJAAN
3

HARGA SATUAN
4

PEKERJAAN PERSIAPAN

A.1

1M' Pagar Sementara dari Seng Gelombang Tinggi 2,00 m

A.2

1M' Pengukuran dan Pemasangan Bouwplank

A.3

1M2 Pembuatan Kantor Sementara dg Lantai Plesteran

1,175,370.50

A.4

1M2 Pembuatan Gudang Semen dan Alat-alat

1,027,867.25

A.5

1M2 Membersihkan Lapangan dan Perataan

A.6

1M2 Pembuatan Steger dari Bambu Uk. 40 x 50 x 20 cm

A.7

1M3 Bongkaran Beton Bertulang

213,330.00

A.8

1M3 Bongkaran Dinding Tembok Bata Merah

201,330.00

A.9

1 M3 MEMBONGKAR DINDING BATA / BATU (Batu / bata dipakai lagi)

93,600.00

A.10

1 M3 MEMBONGKAR DINDING BATA / BATU (bongkaran tidak dipakai lagi)

68,000.00

A.11

1M2 MEMBONGKAR PLESTERAN DINDING

A.12

1M2 MEMBONGKAR GENTENG / SIRAP (bongkaran tidak dipakai lagi)

A.13

1M2 MEMBONGKAR GENTENG / SIRAP (bongkaran dipakai lagi)

A.14

1M2 MEMBONGKAR RANGKA ATAP/RENG KASO (bongkaran tidak dipakai lagi)

A.15

1M2 MEMBONGKAR RANGKA ATAP / RENG KASO (bongkaran dipakai lagi)

A.16

1M3 MEMBONGKAR KUDA-KUDA GORDING/BALOK (bongkaran dipakai lagi)

418,000.00

A.17

1M3 MEMBONGKAR KUDA-KUDA GORDING/BALOK (bongkaran tidak dipakai lagi)

263,500.00

A.18

1M2 MEMBONGKAR PLAFOND (bongkaran dipakai lagi)

A.19

1M2 MEMBONGKAR PLAFOND (bongkaran tidak dipakai lagi)

394,652.50
100,482.38

5,000.00
35,342.00

4,250.00
3,400.00
17,000.00
8,625.00
11,500.00

17,500.00
5,100.00

PEKERJAAN TANAH

B.1

1M3 Galian Tanah Biasa Sedalam 1 m

13,600.00

B.2

1M3 Galian Tanah Keras Sedalam 1 m

31,280.00

B.3

1M3 Galian Tanah Cadas Sedalam 1 m

47,400.00

B.4

1M3 Galian Tanah Lumpur Sedalam 1 m

37,800.00

B.5

1M2 Pekerjaan Striping Setinggi 1 m

1,700.00

B.6

1M3 Membuang Tanah Sejauh 30 m'

10,300.00

B.7

1M3 Urugan Kembali (dihitung 1/3 kali indeks pekerjaan galian)

B.8

1M3 Pemadatan Tanah

17,000.00

B.9

1M3 Urugan Pasir

B.10

1M3 Lapisan Pudel Cmp. 1Kp : 3Ps : 7TL

83,740.00

B.11

1M2 Pemasangan Lapisan Ijuk tebal 10 cm

87,300.00

B.12

1M3 Urugan Sirtu

41,500.00

B.13

1 M3 Galian Tanah Biasa Sedalam 2 meter

17,860.00

B.14

1 M3 PEK. GALIAN TANAH BIASA MAX KEDALAMAN 3 M' TENAGA MANUSIA

25,657.50

B.15

1 M3 PEK. GALIAN TANAH BIASA MAX KEDALAMAN 4 M' TENAGA MANUSIA

32,767.50

B.16

1 M3 PEK. GALIAN TANAH BIASA MAX KEDALAMAN 5 M' TENAGA MANUSIA

39,877.50

B.17

1 M3 PEK. GALIAN TANAH BANYAK TERDAPAT BATU-BATU BUNDAR

50,437.50

149,380.00

MAX KEDALAMAN 1 M' TENAGA MANUSIA


B.18

1 M3 PEK. GALIAN TANAH BERBATU MAX KEDALAMAN 1 M' TNG MANUSIA

27,187.50

B.19

1 M3 PEK. GALIAN TANAH MAX KEDALAMAN 2 M' DENGAN ALAT EXAVATOR 0,7 M3

6,763.16

B.20

1 M3 PEK. GALIAN TANAH MAX KEDALAMAN 5 M' DENGAN ALAT EXAVATOR 0,7 M3

8,784.33

B.21

MENGANGKUT HASIL GALIAN DENGAN DUMP TRUCK . M3/KM.

4,904.36

B.22

1 M3. MENGANGKUT HASIL GALIAN EXAVATOR 0,7 M3 DENGAN DUMP TRUCK

6,688.05

KURANG DARI 1,5 KM.


B.23

1 M3. MENGANGKUT HASIL GALIAN EXAVATOR 0,7 M3 DENGAN DUMP TRUCK

11,146.74

JARAK ANTARA 1,5 S/D 3 KM.


B.24

1 M3. MENGANGKUT HASIL GALIAN EXAVATOR 0,7 M3 DENGAN DUMP TRUCK

15,605.44

JARAK ANTARA 3 S/D 5 KM.


B.25

1 M3 MERATAKAN TANAH

B.26

1 M3 PEK. URUGAN TANAH PILIHAN

B.27

1 M3 PEK. LAPISAN PUDEL 1 KP : 3 TL

148,100.00

B.28

1 M3 PEK. LAPISAN PUDEL 1 KP : 5 PS

218,100.00

B.29

1 M3 MERATAKAN TANAH DAN DITIMBRIS

9,618.75

B.30

1 M2 MENGAMBIL DAN PASANGAN GEBALAN

5,271.88

B.31

1 M' MENGANGKUT GEBALAN RUMPUT

B.32

1 M2 PEKERJAAN GEBALAN RUMPUT SAMPAI TUMBUH

23,211.88

B.33

1 M2 URUGAN PAKAI ALAT BESAR TANAH DARI LUAR DIPADATKAN (U/5000 M3)

92,912.50

\\vboxsrv\conversion_tmp\scratch_6\144824707.xls.ms_office

9,618.75
93,275.00

1,871.88

11

NO.

KODE

III

URAIAN PEKERJAAN
3

HARGA SATUAN
4

PEKERJAAN PONDASI

C.1

1M3 Pasang Pondasi Batu Kali 1Pc : 3 Ps

514,450.00

C.1a

1 M3 PASANGAN BATU BELAH 1 : 4

458,262.50

C.2

1M3 Pasang Pondasi Batu Kali 1Pc : 5 Ps

435,200.00

C.3

1M3 Pasang Pondasi Batu Kali, 1 Pc : 3 Kp : 10 Ps

359,074.50

C.4

1M3 Pasang Pondasi Batu Kosong

C.5

1M3 Pasang Pondasi Siklop 60% Beton Camp. 1PC : 2PS : 3KR &

180,152.40
2,036,818.40

40% Batu Belah

IV

VI

C.6

1M3 Pasang Pondasi Sumuran diameter 100 cm

546,777.50

C.7

1M' Pembuatan Tiang Pancang (40x40) cm, Beton Bertulang

725,148.40

C.8

SEBUAH TIANG PANCANG DICINCIN DAN DILANCIPKAN (KAYU HUTAN)

10,912.50

C.9

1 M' TIANG DIPANCANGKAN DIDALAM TANAH LUNAK

57,737.50

C.10

1 M' TIANG DIPANCANGKAN DIDALAM TANAH BIASA

72,171.88

C.11

1 M' TIANG DIPANCANGKAN DIDALAM TANAH KERAS

86,606.25

C.12

1 M' TIANG DIPANCANGKAN DIDALAM TANAH PASIR

115,475.00

C.13

1 M3 PASANGAN BATU BRONJONG UNTUK KAWAT 3 MM

356,263.33

C.14

1 M3 PASANGAN BATU BRONJONG UNTUK KAWAT 4 MM

484,763.33

C.15

1 M3 PASANGAN BATU BRONJONG UNTUK KAWAT 5 MM

645,596.67

PEKERJAAN

DINDING

D.1

1M2 Pasang Batu Merah Tebal 1/2 bata, 1 Pc : 2 Ps

73,671.88

D.2

1M2 Pasang Batu Merah Tebal 1/2 bata, 1 Pc : 3 Ps

67,910.63

D.3

1M2 Pasang Batu Merah Tebal 1/2 bata, 1 Pc : 3 Kp : 10 Ps

59,146.25

D.4

1 M2 PASANGAN 1/2 BATA MERAH 1 : 4

65,118.75

D.5

1 M2 PASANGAN 1/2 BATA MERAH 1 : 5

D.6

1 M2 PASANGAN BATU TEMPEL + SIARAN

133,301.25

D.7

1 M3 PASANGAN BATA MERAH 1 PC : 2 PS

738,842.50

D.8

1 M3 PASANGAN BATA MERAH 1 PC : 4 PS

643,965.00

D.9

1 M3 PASANGAN BATA MERAH 1 PC : 3 KP : 10 PS

556,142.50

PEKERJAAN

62,980.00

PLESTERAN

E.1

1M2 Plesteran 1 Pc : 3 Ps Tebal 15 mm

25,902.50

E.2

1M2 Plesteran 1 Pc : 2 Kp : 8 Ps Tebal 15 mm

20,097.50

E.3

1M2 Plesteran 1 Pc : 3 Kp : 10 Ps Tebal 15 mm

18,183.50

E.4

1M2 Plesteran 1 Pc : 3 Ps Tebal 20 mm

35,183.00

E.5

1M2 Berapen 1 Pc : 5 Ps Tebal 15 mm

18,164.00

E.6

1M' Plesteran Skoning 1 Pc : 2 Ps lebar 10 mm

E.7

1M2 Plesteran Ciprat 1 Pc : 2 Ps

19,140.00

E.8

1M2 Finishing Siar Pas. Batu Kali Adukan 1 Pc : 2 Ps

26,001.25

E.9

1M2 Acian

13,785.63

5,155.00

PEKERJAAN KAYU

F.1

1M3 Membuat Kosen Pintu & Jendela Kayu klas I

18,943,112.50

F.2

1M3 Membuat Kosen Pintu & Jendela Kayu Bengkirai

11,002,487.50

F.3

1M2 Membuat Pintu Klamp Standard Kayu Bengkirai

418,907.50

F.4

1M2 Membuat Daun Pintu Panel Kayu Bengkirai

507,915.00

F.5

1M2 Membuat Pintu & Jendela Kaca Kayu Bengkirai

F.6

1M2 Membuat Pintu & Jendela Jalusi Kayu Kelas I (Jati)

F.7

1M2 Membuat Pintu Plywood Rangkap rangka Kayu Bengkirai lbr s/d 90cm

F.8

1M2 Membuat Pintu Plywood rangkap, rangka expose kayu Bengkirai

F.9

1M2 Membuat Jalusi mati Kosen Kayu Kelas I (Jati)

F.10

1M2 Membuat Jalusi mati Kosen Kayu Bengkirai

648,762.50

F.11

1M2 Membuat Pintu Teakwood Rangkap Rangka Kayu Kelas I (jati)

628,048.75

F.12

1M2 Membuat Pintu Teakwood Rangkap Lapis Formika Rangka ekspose

593,304.00

437,902.50
1,226,150.00
445,240.00
456,602.50
1,081,887.50

Kayu Bengkirai
F.13

1 M2 DAUN PINTU TRIPLEK DOUBLE UKURAN PINTU LAPIS ALUMINIUM ( KM/WC )

F.14

1 M2 DAUN PINTU TRIPLEK DOUBLE UKURAN PINTU LAPIS FORMIKA ( KM/WC )

F.15

1M3 Memasang Konstruksi Kuda-kuda Konvensional Kayu Bengkirai


Bentang 6 M

\\vboxsrv\conversion_tmp\scratch_6\144824707.xls.ms_office

12

456,611.00
442,085.00
11,607,900.00

NO.
1

VII

KODE

URAIAN PEKERJAAN

HARGA SATUAN
4

F.16

1M3 Memasang Konstruksi Kuda-kuda Ekspose Kayu Jati

19,240,675.00

F.17

1M3 Memasang Konstruksi Gording Kayu Bengkirai

10,539,700.00

F.18

1M2 Pasang Pintu Plywood & Formika Rangka Kayu Bengkirai

626,042.50

F.19

1M2 Pasang Pintu Formika Double, Rangka Kayu Jati

844,375.00

F.20

1M2 Memasang Rangka Atap Genteng Keramik, Kayu Bengkirai

129,512.50

F.21

1M2 Memasang Rangka Atap Genteng Beton, Kayu Bengkirai

F.22

1M2 Pasang Rangka Atap Sirap Kayu Bengkirai

F.23

1M' Pasang Listplank Uk. (3x20)cm Kayu Bengkirai

78,850.00

F.24

1M' Pasang Listplank Uk. (3x30)cm Kayu Bengkirai

111,750.00

F.25

1M' Pasang Listplank Uk. 2x(3x20)cm Kayu Bengkirai

148,656.25

F.26

1M2 Pasang Rangka Dinding Pemisah Kayu Bengkirai

281,612.50

F.27

1M2 Pas. Dinding Pemisah Teakwood Rangkap Rangka Kayu Bengkirai

373,733.50

F.28

1M2 Pasang Dinding Lambriziring dari Papan jati

221,988.75

F.29

1M2 Pasang Plywood tebal 4mm unt Dinding

52,122.00

F.30

1M2 Pasang Dinding Bilik, Rangka Kayu Klas III / IV

80,107.00

136,442.50
1,600,955.00

PEKERJAAN BETON

G.1

1M3 Membuat Beton mutu f'c=7,4 Mpa (K100), slum (122)cm, w/c = 0,87

679,355.82

G.2

1M3 Membuat Beton mutu f'c=9,8 Mpa (K125), slum (122)cm, w/c = 0,78

735,932.22

G.3

1M3 Membuat Beton mutu f'c=12,2 Mpa (K150), slum (122)cm, w/c = 0,72

742,299.65

G.4

1M3 Membuat Lantai Kerja Beton mutu f'c=7,4 MPa (K100), slum (3-6)cm, w/c = 0,87

644,983.39

G.5

1M3 Membuat Beton mutu f'c=14,5 MPa (K175), slum (122)cm, w/c = 0,66

773,823.84

G.6

1M3 Membuat Beton mutu f'c=16,9 MPa (K200), slum (122)cm,w/c = 0,61

804,752.72

G.7

1M3 Membuat Beton mutu f'c=19,3 MPa (K225), slum (122)cm, w/c = 0,58

828,562.75

G.8

1M3 Membuat Beton mutu f'c=21,7 MPa (K250), slum (122)cm,w/c = 0,56

911,379.90

G.9

1M3 Membuat Lantai Kerja Beton mutu f'c=24,0 MPa (K275), slum (122)cm, w/c = 0,53

936,109.66

G.10

1M3 Membuat Beton mutu f'c=26,4 MPa (K300), slum (122)cm,w/c = 0,52

943,719.83

G.11

1M3 Membuat Beton mutu f'c=28,8 MPa (K325), slum (122)cm,w/c = 0,49

991,870.82

G.12

1M3 Membuat Beton mutu f'c=31,2 MPa (K350), slum (122)cm, w/c = 0,48

1,001,923.14

G.13

1KG Pembesian dg Besi Polos

G.13a

110 KG Besi Beton Terpasang (polos)

1,372,552.50

G.13b

125 KG Besi Beton Terpasang (polos)

1,559,718.75

G.14

1KG Kabel Presstresed Polos/strand

20,053.00

G.15

1M2 Pasang Bekisting untuk Pondasi

118,585.00

G.16

1M2 Pasang Bekisting untuk Sloof

190,772.50

G.17

1M2 Pasang Bekisting untuk Kolom

346,918.75

G.18

1M2 Pasang Bekisting untuk Balok

310,825.00

G.19

1M2 Pasang Bekisting untuk Lantai

443,312.50

G.20

1M2 Pasang Bekisting untuk Dinding

352,775.00

G.21

1M2 Pasang Bekisting untuk Tangga

278,787.50

G.22

1 M2 Pasang Bekisting Jembatan Cor

89,520.00

G.23

1 M2 BEKESTING DENGAN PAPAN

138,762.50

G.24

1 M2 BEKESTING DENGAN MULTIPLEX 9 MM

G.25

1 M3 Membuat Pondasi Beton Bertulang (150 kg Besi + Bekisting)

3,273,255.50

G.26

1 M3 Membuat Sloof Beton Bertulang (200 kg Besi + Bekisting)

4,066,433.00

G.27

1 M3 Membuat Kolom Beton Bertulang (300 kg Besi + Bekisting)

7,375,933.00

G.28

1 M3 Membuat Balok Beton Bertulang (200 kg Besi + Bekisting)

5,740,743.00

G.29

1 M3 Membuat Balok Beton Bertulang (150 kg Besi + Bekisting)

5,509,225.50

G.30

1 M3 Membuat Dinding Beton Bertulang (150 kg Besi + Bekisting)

5,195,990.50

G.31

1 M3 Membuat Tangga Beton Bertulang (200 kg Besi + Bekisting)

5,253,870.50

G.32

1 M' Membuat Kolom Penguat Beton Bertulang (11 x 11) cm

G.33

1 M' Membuat Ring Balok Beton Bertulang (10 x 15) cm

G.34

1 M3 PAS. BETON K-175 READY MIX 6 M3 BERIKUT SLANG

988,993.75

G.35

1 M3 PAS. BETON K-225 READY MIX 6 M3 BERIKUT SLANG

1,044,018.75

G.36

1 M3 PAS. BETON K-300 READY MIX 6 M3 BERIKUT SLANG

1,085,393.75

G.37

1 KG PEK. ERECTION KONST. KUDA-KUDA BESI

G.38

1 KG PEKERJAAN BAJA IWF

44,140.00

G.39

1 KG PEKERJAAN KONSTUKSI BESI SIKU / PROFIL

43,150.00

G.40

1 CM PEK. PENGELASAN DENGAN LAS LISTRIK TEBAL KAWAT 4 MM

39,930.30

G.41

1 TITIK MELUBANG KONSTRUKSI BESI DENGAN BOR

40,025.00

G.42

1 M2 PEKERJAAN WIREMESH M8

83,213.50

\\vboxsrv\conversion_tmp\scratch_6\144824707.xls.ms_office

12,477.75

130,776.90

13

62,837.95
73,827.55

906.30

NO.

KODE

VIII

IX

URAIAN PEKERJAAN
3

HARGA SATUAN
4

PEKERJAAN PENUTUP ATAP

H.1

1 M2 Pasang Atap Genteng Mantili Kecil

33,367.50

H.2

1 M2 Pasang Atap Genteng Mantili Besar

31,640.00

H.3

1 M' Pasang Genteng Bubung Mantili

50,480.00

H.4

1 M2 Pasang Atap Asbes Gelombang (80 x 210 cm) x 5 mm

38,577.50

H.5

1 M2 Pasang Atap Genteng Beton

H.6

1 M2 Pasang Atap Sirap

H.7

1 M' Pasang Nok Genteng Beton

72,975.00

H.8

1 M' Pasang Nok Sirap

58,457.93

H.9

1 M2 Pasang Atap Seng Gelombang

63,835.00

H.10

1 M' Pasang Atap Nok Seng

33,105.00

41,852.50
175,770.00

PEKERJAAN LANGIT - LANGIT

I.1

1 M2 Langit-langit Asbes (1,00x1,00) m, tebal 4 mm, 5 mm & 6 mm

25,392.50

I.2

1 M2 Memasang Langit-langit Tripleks Uk (120x240) cm,

34,575.00

Tebal 3 mm, 4 mm & 6 mm

I.3

1 M2 Memasang Langit-langit Lambriziring Kayu Jati, tebal 6 mm

I.4

1 M2 Langit-langit Gypsum Board, tebal 9 mm

I.5

1 M' List Langit-Langit Kayu Profil

I.6

1M2 Pasang Rangka Langit-langit (1,00x1,00) m, kayu Bengkirai

170,825.00

I.7

1M2 Pasang Rangka Langit-langit (60x60) cm, kayu Bengkirai

181,575.00

38,088.00
12,117.50

PEKERJAAN SANITASI, JALAN DAN SALURAN

J.1

1 UNIT Memasang Closet Duduk Porselin

736,645.00

J.2

1 UNIT Memasang Closet Jongkok

300,525.00

J.3

1 UNIT Memasang Wastafel

714,572.50

J.4

1 M' Memasang Pipa Beton, 15 cm - 20 cm

77,660.78

J.5

1 M' Memasang Pipa Beton, 30 cm - 100 cm

122,367.05

J.6

1 M' Memasang Pipa PVC type AW "

10,092.00

J.7

1 M' MEMASANG PIPA PVC type AW 3/4"

13,346.00

J.8

1 M' MEMASANG PIPA type AW PVC 1"

20,102.00

J.9

1 M' MEMASANG PIPA PVC type AW 11/4"

24,610.00

J.10

1 M' MEMASANG PIPA PVC type AW 11/2"

35,820.00

J.11

1 M' Memasang Pipa PVC type AW 2"

51,586.00

J.12

1 M' MEMASANG PIPA PVC type AW 21/2"

J.13

1 M' Memasang Pipa PVC type AW 3"

J.14

1 M2 PASANG PAVING BLOK 6 CM K : 300

J.15

1 M2 PASANG PAVING BLOK 6 CM K : 175

71,405.00

J.16

1 M2 PASANG PAVING BLOK 8 CM K ; 300

137,408.50

J.17

1 M2 PASANG PAVING BLOK 8 CM K: 175

52,669.50

J.18

1 M2 PASANGAN PAVING BLOK WARNA 6 CM K: 175

86,605.50

J.19

1 M2 PASANGAN PAVING BLOK WARNA 8 CM K: 175

89,837.50

J.20

XI

299,311.25

72,900.75
102,643.00
94,382.50

1 M2 LAPISAN PENGISI / PENUTUP DENGAN ASPAL PANAS TEBAL 3 CM

44,630.05

J.21

MENGGILAS JALAN 1 HARI DIPERLUKAN

514,687.50

J.21a

MENGGILAS 1 M2 LAPIS KULIT PENAHAN

3,431.25

J.21b

MENGGILAS 1 M2 LAPIS KULIT PERTEGARAN

1,715.63

J.21c

MENGGILAS LAPIS AUS ( PENETRASI )

1,029.38

J.21d

MENGGILAS RINGAN 1 M2 OPERPENTING

1,286.72

J.22

100 M2 PENGASPALAN SHEET (LATASIR) TEBAL 1 CM JERENG

1,752,590.00

J.23

1M2 ASPAL SAND SHEET TEBAL 2 CM JERENG ( 1 CM PADAT )

41,206.18

J.24

1M2 ASPAL SAND SHEET TEBAL 3 CM JERENG ( 2 CM PADAT )

58,732.08

PEKERJAAN BESI & ALLUMUNIUM

K.1

1 Kg Memasang Besi Profil

K.2

1 Kg Memasang Rangka Kuda-kuda Baja IWF

26,981.00

K.3

1 M' Memasang Talang Datar/Jurai , Seng BJLS 28 Lebar 90 cm

K.4

1 M' Memasang Talang 1/2 Lingkaran 15 cm, Seng Plaat BJLS 30

27,050.00

Lebar 45 cm

\\vboxsrv\conversion_tmp\scratch_6\144824707.xls.ms_office

14

244,148.75
84,740.00

NO.

KODE

XII

XIII

XIV

URAIAN PEKERJAAN

HARGA SATUAN

PEKERJAAN KUNCI dan KACA

L.1

1 BUAH Pasang Kunci Tanam Biasa

87,550.00

L.2

1 BUAH Pasang Kunci Tanam Kamar Mandi

87,075.00

L.3

1 BUAH Pasang Engsel Pintu

14,680.00

L.4

1 BUAH Pasang Engsel Jendela Kupu-kupu

12,350.00

L.5

1 BUAH Pasang Engsel Angin

16,350.00

L.6

1 BUAH Pasang Kait Angin

27,030.00

L.7

1 BUAH Pasang Kunci Selot

20,490.00

L.8

1 BUAH Pasang Kunci Lemari

23,000.00

L.9

1 M2 Pasang Kaca tebal 5 mm

113,405.00

PEKERJAAN PENUTUP LANTAI & DINDING

M.1

1 M2 Pasang lantai Ubin PC Abu-abu Uk. 20 x 20 cm

M.2

1 M2 Pasang lantai Ubin Granito Uk. 40 x 40 cm

581,335.38

M.3

1 M2 Pasang Lantai Keramik 30 x 30 cm

129,741.25

M.4

1 M2 Pasang Lantai Keramik 20 x 20 cm

121,950.00

M.5

1M2 Memasang Lantai Marmer ukuran 1.00x1.00 m

697,684.23

M.6

1 M2 Pasang Dinding Keramik 10x20 cm,

132,065.75

M.7

1 M2 Pasang Dinding Keramik 20x20 cm,

130,193.75

M.8

1M2 Memasang Dinding Marmer ukuran 1.00x1.00 m

727,264.35

M.9

1 M2 Pasang Dinding Batu Paros / Batu Tempel Hitam

131,671.88

M.10

1 M2 DINDING GRANIT IMPORT

498,012.50

M.11

1 M2 LANTAI GRANIT IMPORT

405,602.50

M.12

1 M2 LANTAI GRANITO UKURAN 60 X 60 POLISHED

562,117.50

M.13

1 M2 DINDING GRANITO UKURAN 60 X 60 POLISHED

M.14

1 M2 LANTAI MARMER ITALY

1,544,902.50

M.15

1 M2 DINDING MARMER ITALY

1,634,312.50

55,441.50

566,587.50

PEKERJAAN PENGECATAN

N.1

1 M2 Mendempul dan Menggosok Kayu

N.2

1 M2 Pengecatan Bidang Lama

14,788.00

5,548.00

N.3

1 M2 Pengecatan Bidang Kayu Baru (1 lap.Plamir)

32,530.00

1 lap.Cat Dasar & 2 lap.Cat Penutup


N.4

1 M2 Pengecatan Bidang Kayu Baru (1 lap.Plamir)

41,569.00

1 lap.Cat Dasar & 3 lap.Cat Penutup


N.5

1 M2 Pengecat Tembok Baru (1lap.Plamir, 1lap Cat Dasar

11,292.00

2 lap. Cat Penutup)


N.6

1 M2 Pengecat Tembok Lama (1lap.Plamir, 2lap Cat Penutup)

N.7

1 M2 Pengecatan Permukaan Baja dg Meni Besi

11,428.00

7,352.00

N.8

1 M2 Pengecatan Permukaan Baja dg Meni Besi & Perancah

24,338.00

N.9

1 M2 Pengecatan Permukaan Baja lapis Seng (Galvanis) secara

88,696.00

manual sistem 3 lapis Cat Konvensional dg tebal 200 um


N.10

1 M2 PLITURAN BANGUNAN ( BIASA )

35,650.50

N.11

1 M2 PLITURAN MEUBELAIR

70,973.50

Rembang,

Juli 2009

KEPALA DINAS PEKERJAAN UMUM


KABUPATEN REMBANG

Ir. MUJOKO, MT.


NIP. 010 234 645 / 19620715 199011 1 002

\\vboxsrv\conversion_tmp\scratch_6\144824707.xls.ms_office

15

DAFTAR ANALISA SATUAN PEKERJAAN


DINAS PEKERJAAN UMUM KABUPATEN REMBANG
TAHUN 2010
EDISI SEPTEMBER 2009
No. KODE
1

KOEF

SAT.

URAIAN PAKERJAAN

HARGA SAT.
Rp
7

JUMLAH
Rp
8=(4X7)

PEKERJAAN PERSIAPAN

A.1
1.2500
2.5000
1.2000
0.0050
0.0090
0.0720
0.0600
0.4500

Btg
Kg
Lbr
m3
m3
m3
Kg
Kg

1M' Pagar Sementara dari Seng Gelombang Tinggi 2,00 m


Kayu Dolken diameter 8 - 10 / 400 cm
Portalnd Semen
Seng Gelombang 3" - 5"
Pasir Pasang
Koral Beton
Kayu 5/7X4m Kayu Meranti
Paku Biasa 2" - 5"
Meni Besi

35,700.00
1,312.50
54,850.00
125,000.00
261,250.00
3,437,500.00
16,750.00
16,100.00

394,652.50
44,625.00
3,281.25
65,820.00
625.00
2,351.25
247,500.00
1,005.00
7,245.00

0.2000
0.4000
0.0200
0.0200

OH
OH
OH
OH

Tukang Kayu
Pekerja
Kepala Tukang
Mandor

42,500.00
30,000.00
45,000.00
40,000.00

8,500.00
12,000.00
900.00
800.00

0.0120
0.0200
0.0070

m3
Kg
m3

1M' Pengukuran dan Pemasangan Bouwplank


Kayu 5/7x 4m Kayu Kruing
Paku Biasa 2" - 5"
Kayu Papan 3/20 Kayu Kruing

4,855,125.00
16,750.00
4,855,125.00

100,482.38
58,261.50
335.00
33,985.88

0.1000
0.1000
0.0100
0.0050

OH
OH
OH
OH

Tukang Kayu
Pekerja
Kepala Tukang
Mandor

42,500.00
30,000.00
45,000.00
40,000.00

4,250.00
3,000.00
450.00
200.00

1.2500
0.1800
0.8500
1.1000
35.0000
0.2500
0.1500
30.0000
0.2500
2.0000
0.0800
0.1500
0.3000
0.0600

Btg
m3
Kg
Kg
Kg
m3
m3
buah
Lbr
daun
m2
buah
buah
Lbr

35,700.00
3,437,500.00
16,750.00
16,200.00
1,312.50
125,000.00
261,250.00
425.00
54,850.00
54,450.00
96,250.00
65,350.00
5,950.00
98,550.00

1,175,370.50
44,625.00
618,750.00
14,237.50
17,820.00
45,937.50
31,250.00
39,187.50
12,750.00
13,712.50
108,900.00
7,700.00
9,802.50
1,785.00
5,913.00

2.0000
1.0000
2.0000
0.3000
0.0500

OH
OH
OH
OH
OH

Tukang Kayu
Tukang Batu
Pekerja
Kepala Tukang
Mandor

42,500.00
42,500.00
30,000.00
45,000.00
40,000.00

85,000.00
42,500.00
60,000.00
13,500.00
2,000.00

1.7000
0.2100
0.3000
10.5000
0.0300
0.0500
1.5000

Btg
m3
Kg
Kg
m3
m3
Lbr

1M2 Pembuatan Gudang Semen dan Alat-alat


Kayu Dolken diameter 8 - 10 / 400 cm
Kayu
Paku Biasa 2" - 5"
Portland Semen
Pasir Beton (Cepu)
Koral Beton
Seng Gelombang BJLS 32

35,700.00
3,437,500.00
16,750.00
1,312.50
171,950.00
261,250.00
54,850.00

1,027,867.25
60,690.00
721,875.00
5,025.00
13,781.25
5,158.50
13,062.50
82,275.00

2.0000
1.0000
0.2000
0.0500

OH
OH
OH
OH

Tukang Kayu
Pekerja
Kepala Tukang
Mandor

42,500.00
30,000.00
45,000.00
40,000.00

85,000.00
30,000.00
9,000.00
2,000.00

0.1000
0.0500

OH
OH

1M2 Membersihkan Lapangan dan Perataan


Pekerja
Mandor

30,000.00
40,000.00

5,000.00
3,000.00
2,000.00

1.0000
0.2500

Btg
Kg

1M2 Pembuatan Steger dari Bambu Uk. 40 x 50 x 20 cm


Bambu diameter 6 - 8 / 600 cm
Tali Ijuk

17,050.00
13,700.00

35,342.00
17,050.00
3,425.00

0.1700
0.2500
0.0020
0.0013

OH
OH
OH
OH

Tukang Kayu
Pekerja
Kepala Tukang
Mandor

42,500.00
30,000.00
45,000.00
40,000.00

7,225.00
7,500.00
90.00
52.00

A.2

A.3

A.4

A.5

A.6

1M2 Pembuatan Kantor Sementara dg Lantai Plesteran


Kayu Dolken 8 - 10 / 4 m
Kayu
Paku Biasa 2" - 5"
Besi Strip
Portland Sement
Pasir pasang
Koral Beton
Batu bata Merah
Seng Plat
Jendela Naco
Kaca Polos
Kunci Tanam
Engsel
Plywood 4 mm

\\vboxsrv\conversion_tmp\scratch_6\144824707.xls.ms_office

16

A.7
6.6670
0.3330

OH
OH

1M3 Bongkaran Beton Bertulang


Pekerja
Mandor

30,000.00
40,000.00

213,330.00
200,010.00
13,320.00

6.6670
0.0330

OH
OH

1M3 Bongkaran Dinding Tembok Bata Merah


Pekerja
Mandor

30,000.00
40,000.00

201,330.00
200,010.00
1,320.00

3.0000 Org
0.0900 Org

1 M3 MEMBONGKAR DINDING BATA / BATU (Batu / bata dipakai lagi)


Pekerja
Mandor

30,000.00
40,000.00

93,600.00
90,000.00
3,600.00

2.0000 Org
0.2000 Org

1 M3 MEMBONGKAR DINDING BATA / BATU (bongkaran tidak dipakai lagi)


Pekerja
30,000.00
Mandor
40,000.00

68,000.00
60,000.00
8,000.00

0.1250 Org
0.0125 Org

1M2 MEMBONGKAR PLESTERAN DINDING


pekerja
Mandor

30,000.00
40,000.00

4,250.00
3,750.00
500.00

0.1000 Org
0.0100 Org

1M2 MEMBONGKAR GENTENG / SIRAP (bongkaran tidak dipakai lagi)


pekerja
Mandor

30,000.00
40,000.00

3,400.00
3,000.00
400.00

0.5000 Org
0.0500 Org

1M2 MEMBONGKAR GENTENG / SIRAP (bongkaran dipakai lagi)


pekerja
Mandor

30,000.00
40,000.00

17,000.00
15,000.00
2,000.00

0.1500
0.0750
0.0075
0.0150

Org
Org
Org
Org

1M2 MEMBONGKAR RANGKA ATAP/RENG KASO (bongkaran tidak dipakai lagi)


Pekerja
30,000.00
Tukang Kayu
42,500.00
Kepala tukang kayu
45,000.00
Mandor
40,000.00

8,625.00
4,500.00
3,187.50
337.50
600.00

0.2000
0.1000
0.0100
0.0200

Org
Org
Org
Org

1M2 MEMBONGKAR RANGKA ATAP / RENG KASO (bongkaran dipakai lagi)


Pekerja
30,000.00
Tukang Kayu
42,500.00
Kepala tukang kayu
45,000.00
Mandor
40,000.00

11,500.00
6,000.00
4,250.00
450.00
800.00

4.0000
6.0000
0.6000
0.4000

Org
Org
Org
Org

1M3 MEMBONGKAR KUDA-KUDA GORDING/BALOK (bongkaran dipakai lagi)


Pekerja
30,000.00
Tukang Kayu
42,500.00
Kepala tukang kayu
45,000.00
Mandor
40,000.00

418,000.00
120,000.00
255,000.00
27,000.00
16,000.00

4.0000 Org
3.0000 Org
0.4000 Org

1M3 MEMBONGKAR KUDA-KUDA GORDING/BALOK (bongkaran tidak dipakai lagi)


Pekerja
30,000.00
Tukang Kayu
42,500.00
Mandor
40,000.00

263,500.00
120,000.00
127,500.00
16,000.00

0.1000
0.3000
0.0300
0.0100

1M2 MEMBONGKAR PLAFOND (bongkaran dipakai lagi)


Pekerja
Tukang Kayu
Kepala tukang kayu
Mandor

30,000.00
42,500.00
45,000.00
40,000.00

1M2 MEMBONGKAR PLAFOND (bongkaran tidak dipakai lagi)


Pekerja
Mandor

30,000.00
40,000.00

A.8

A.9

A.10

A.11

A.12

A.13

A.14

A.15

A.16

A.17

A.18
Org
Org
Org
Org

A.19
0.1500 Org
0.0150 Org
A.20

A.21

II

Biaya setiap jarak pengangkutan/langsiran 1 m3 Material

= K : (

a
( L + 75 ))
275.0000

Biaya setiap jarak pengangkutan / langsiran 1 zak semen

= K : (

a
( L + 75 ))/25
275.0000

17,500.00
3,000.00
12,750.00
1,350.00
400.00
5,100.00
4,500.00
600.00
Keterangan :
K = Biaya
a = Upah Pekerja
L = Jarak angkut
Keterangan :
K = Biaya
a = Upah Pekerja
L = Jarak angkut

PEKERJAAN TANAH

B.1
0.400
0.040

OH
OH

1M3 Galian Tanah Biasa Sedalam 1 m


Pekerja
Mandor

\\vboxsrv\conversion_tmp\scratch_6\144824707.xls.ms_office

17

30,000.00
40,000.00

13,600.00
12,000.00
1,600.00

B.2
1.000
0.032

OH
OH

1M3 Galian Tanah Keras Sedalam 1 m


Pekerja
Mandor

30,000.00
40,000.00

31,280.00
30,000.00
1,280.00

1.500
0.060

OH
OH

1M3 Galian Tanah Cadas Sedalam 1 m


Pekerja
Mandor

30,000.00
40,000.00

47,400.00
45,000.00
2,400.00

1.200
0.045

OH
OH

1M3 Galian Tanah Lumpur Sedalam 1 m


Pekerja
Mandor

30,000.00
40,000.00

37,800.00
36,000.00
1,800.00

0.050
0.005

OH
OH

1M2 Pekerjaan Striping Setinggi 1 m


Pekerja
Mandor

30,000.00
40,000.00

1,700.00
1,500.00
200.00

0.330
0.010

OH
OH

1M3 Membuang Tanah Sejauh 30 m'


Pekerja
Mandor

30,000.00
40,000.00

10,300.00
9,900.00
400.00

B.3

B.4

B.5

B.6

Suppl. B 6

1 M3 PEK. PEMBUANGAN LEBIH DARI RADIUS 30 M


Keterangan :
MENGGUNAKAN RUMUS = K :

a
275

B.7
B.8

( L + 75 )

K = Biaya
a = Upah Pekerja
L = Jarak pembuangan

0.500
0.050

OH
OH

1M3 Urugan Kembali (dihitung 1/3 kali indeks pekerjaan galian)


1M3 Pemadatan Tanah
Pekerja
Mandor

1.200

m3

1M3 Urugan Pasir


Pasir Urug

61,950.00

83,740.00
74,340.00

0.300
0.010

OH
OH

Pekerja
Mandor

30,000.00
40,000.00

9,000.00
400.00

0.400
0.135
0.948

m3
m3
m3

1M3 Lapisan Pudel Cmp. 1Kp : 3Ps : 7TL


Pasir Urug
Kapur Padam
Tanah Liat

61,950.00
196,000.00
55,000.00

149,380.00
24,780.00
26,460.00
52,140.00

0.800
0.400
0.040
0.080

OH
OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang
Mandor

30,000.00
42,500.00
45,000.00
40,000.00

24,000.00
17,000.00
1,800.00
3,200.00

6.000

kg

1M2 Pemasangan Lapisan Ijuk tebal 10 cm


Ijuk

13,700.00

87,300.00
82,200.00

0.150
0.015

OH
OH

Pekerja
Mandor

30,000.00
40,000.00

4,500.00
600.00

1.200

m3

1M3 Urugan Sirtu


Sirtu

27,500.00

41,500.00
33,000.00

0.250
0.025

OH
OH

Pekerja
Mandor

30,000.00
40,000.00

7,500.00
1,000.00

0.526
0.052

OH
OH

1 M3 Galian Tanah Biasa Sedalam 2 meter


Pekerja
Mandor

B.9

B.10

B.11

B.12

B.13

30,000.00
40,000.00

17,000.00
15,000.00
2,000.00

30,000.00
40,000.00

17,860.00
15,780.00
2,080.00

0.735 org
0.073 org
0.050 lot

1 M3 PEK. GALIAN TANAH BIASA MAX KEDALAMAN 3 M' TENAGA MANUSIA


Pekerja
30,000.00
Mandor
40,000.00
Alat bantu
13,750.00

25,657.50
22,050.00
2,920.00
687.50

0.944 org
0.094 org
0.050 lot

1 M3 PEK. GALIAN TANAH BIASA MAX KEDALAMAN 4 M' TENAGA MANUSIA


Pekerja
30,000.00
Mandor
40,000.00
Alat bantu
13,750.00

32,767.50
28,320.00
3,760.00
687.50

1.153 org
0.115 org
0.050 lot

1 M3 PEK. GALIAN TANAH BIASA MAX KEDALAMAN 5 M' TENAGA MANUSIA


Pekerja
30,000.00
Mandor
40,000.00
Alat bantu
13,750.00

39,877.50
34,590.00
4,600.00
687.50

1.500 org
0.050 org
0.250 lot

1 M3 PEK. GALIAN TANAH BANYAK TERDAPAT BATU-BATU BUNDAR


MAX KEDALAMAN 1 M' TENAGA MANUSIA
Pekerja
Mandor
Alat bantu

50,437.50
45,000.00
2,000.00
3,437.50

B.14

B.15

B.16

B.17

\\vboxsrv\conversion_tmp\scratch_6\144824707.xls.ms_office

18

30,000.00
40,000.00
13,750.00

B.18
0.625 org
0.125 org
0.250 lot

1 M3 PEK. GALIAN TANAH BERBATU MAX KEDALAMAN 1 M' TNG MANUSIA


Pekerja
30,000.00
Mandor
40,000.00
Alat bantu
13,750.00

0.005
0.704
0.018
0.005
0.005
0.005
0.005
0.002

unit
liter
liter
Kg
org
org
org
org

1 M3 PEK. GALIAN TANAH MAX KEDALAMAN 2 M' DENGAN ALAT EXAVATOR 0,7 M3
Excavator 0,7 m3
500,000.00
Solar
4,500.00
Olie (minyak pelumas)
34,450.00
Stempet
20,050.00
Operator Alat Berat
43,000.00
Pemb. Operator Alat Berat
35,000.00
Pekerja
30,000.00
Mandor
40,000.00

6,763.16
2,286.63
3,169.27
630.19
91.69
196.65
160.06
137.20
91.47

0.006
0.921
0.024
0.006
0.006
0.006
0.006
0.001

unit
liter
liter
Kg
org
org
org
org

1 M3 PEK. GALIAN TANAH MAX KEDALAMAN 5 M' DENGAN ALAT EXAVATOR 0,7 M3
Excavator 0,7 m3
500,000.00
Solar
4,500.00
Olie (minyak pelumas)
34,450.00
Stempet
20,050.00
Operator Alat Berat
43,000.00
Pemb. Operator Alat Berat
35,000.00
Pekerja
30,000.00
Mandor
40,000.00

8,784.33
2,990.21
4,144.43
824.10
119.91
257.16
209.31
179.41
59.80

0.0101
0.2515
0.0101
0.0050
0.0101
0.0101
0.0025

buah
liter
liter
Kg
org
org
org

MENGANGKUT HASIL GALIAN DENGAN DUMP TRUCK . M3/KM.


Dump Truck
Solar
Olie (minyak pelumas)
Stempet
Sopir
Pekerja
Mandor

250,000.00
4,500.00
34,450.00
20,050.00
40,500.00
30,000.00
40,000.00

4,904.36
2,515.18
1,131.83
346.59
100.86
407.46
301.82
100.61

buah
liter
liter
Kg
org
org
org

1 M3. MENGANGKUT HASIL GALIAN EXAVATOR 0,7 M3 DENGAN DUMP TRUCK


KURANG DARI 1,5 KM.
Dump Truck
250,000.00
Solar
4,500.00
Olie
34,450.00
Stempet
20,050.00
Sopir
40,500.00
Pekerja
30,000.00
Mandor
40,000.00

6,688.05
3,429.94
1,543.47
472.65
137.54
555.65
411.59
137.20

buah
liter
liter
Kg
org
org
org

1 M3. MENGANGKUT HASIL GALIAN EXAVATOR 0,7 M3 DENGAN DUMP TRUCK


JARAK ANTARA 1,5 S/D 3 KM.
Dump Truck
250,000.00
Solar
4,500.00
Olie
34,450.00
Stempet
20,050.00
Sopir
40,500.00
Pekerja
30,000.00
Mandor
40,000.00

11,146.74
5,716.57
2,572.46
787.74
229.23
926.08
685.99
228.66

buah
liter
liter
Kg
org
org
org

1 M3. MENGANGKUT HASIL GALIAN EXAVATOR 0,7 M3 DENGAN DUMP TRUCK


JARAK ANTARA 3 S/D 5 KM.
Dump Truck
250,000.00
Solar
4,500.00
Olie
34,450.00
Stempet
20,050.00
Sopir
40,500.00
Pekerja
30,000.00
Mandor
40,000.00

15,605.44
8,003.20
3,601.44
1,102.84
320.93
1,296.52
960.38
320.13

B.19

B.20

B.21

B.22
0.0137
0.3430
0.0137
0.0069
0.0137
0.0137
0.0034
B.23
0.0229
0.5717
0.0229
0.0114
0.0229
0.0229
0.0057
B.24
0.0320
0.8003
0.0320
0.0160
0.0320
0.0320
0.0080
B.25

27,187.50
18,750.00
5,000.00
3,437.50

0.2500 org
0.0100 org
0.1250 lot

1 M3 MERATAKAN TANAH
Pekerja
Mandor
Alat bantu

30,000.00
40,000.00
13,750.00

9,618.75
7,500.00
400.00
1,718.75

1.2000
0.3000
0.0100
0.1000

m3
org
org
lot

1 M3 PEK. URUGAN TANAH PILIHAN


Tanah pilihan
Pekerja
Mandor
Alat bantu

68,750.00
30,000.00
40,000.00
13,750.00

93,275.00
82,500.00
9,000.00
400.00
1,375.00

0.2000
1.0000
1.0000
0.5000
0.0500
0.0100

m3
m3
org
org
org
org

1 M3 PEK. LAPISAN PUDEL 1 KP : 3 TL


Kapur padam
Tanah liat
Pekerja
Tukang batu
Kepala tukang batu
Mandor

196,000.00
55,000.00
30,000.00
42,500.00
45,000.00
40,000.00

148,100.00
39,200.00
55,000.00
30,000.00
21,250.00
2,250.00
400.00

B.26

B.27

\\vboxsrv\conversion_tmp\scratch_6\144824707.xls.ms_office

19

B.28
1.0000
0.2000
1.0000
0.5000
0.0500
0.0100

1 M3 PEK. LAPISAN PUDEL 1 KP : 5 PS


Pasir pasang
Kapur padam
Pekerja
Tukang batu
Kepala tukang batu
Mandor

m3
m3
org
org
org
org

B.29

1 M3 MERATAKAN TANAH DAN DITIMBRIS


Pekerja
Mandor
Alat bantu

30,000.00
40,000.00
13,750.00

9,618.75
7,500.00
400.00
1,718.75

0.1500 org
0.0150 org
0.0125 lot

1 M2 MENGAMBIL DAN PASANGAN GEBALAN


Pekerja
Mandor
Alat bantu

30,000.00
40,000.00
13,750.00

5,271.88
4,500.00
600.00
171.88

0.0500 org
0.0050 org
0.0125 lot

1 M' MENGANGKUT GEBALAN RUMPUT


Pekerja
Mandor
Alat bantu

30,000.00
40,000.00
13,750.00

1,871.88
1,500.00
200.00
171.88

1.2000
0.2000
0.0150
0.0125

m2
org
org
lot

1 M2 PEKERJAAN GEBALAN RUMPUT SAMPAI TUMBUH


Gembalan rumput biasa
Pekerja
Mandor
Alat bantu

13,700.00
30,000.00
40,000.00
13,750.00

23,211.88
16,440.00
6,000.00
600.00
171.88

0.6000
0.6000
5.0000
1.2000

m3
m3
m3
m3

1 M2 URUGAN PAKAI ALAT BESAR TANAH DARI LUAR DIPADATKAN (U/5000 M3)
Pekerjaan galian (10 org) 50 % (Analis B1)
13,600.00
Pek. Galian tanah berbatu (10 org) 50 % (Analis B17)
27,187.50
Pek. Grading plant (10) 50 % (5 x Analis B5)
1,700.00
Beli tanah biasa + angkut max 10 km
49,950.00

92,912.50
8,160.00
16,312.50
8,500.00
59,940.00

B.31

B.32

B.33

PEKERJAAN PONDASI

C.1
1.200
202.000
0.485

m3
Kg
m3

1M3 Pasang Pondasi Batu Kali 1Pc : 3 Ps


Batu Belah 15/20
Portland Sement
Pasir Pasang

1.500
0.600
0.060
0.075

OH
OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang
Mandor

C.1a
1.1000
163.0000
0.5200
1.5000
0.6000
0.0600
0.0750

m3
zak
m3
org
org
org
org

C.2

1 M3 PASANGAN BATU BELAH 1 : 4


Batu Belah 15/20
PC (50 kg)
Pasir pasang
Pekerja
Tukang batu
Kepala tukang batu
Mandor

1.200
136.000
0.544

m3
Kg
m3

1M3 Pasang Pondasi Batu Kali 1Pc : 5 Ps


Batu Belah 15/20
Portland Sement
Pasir Pasang

1.500
0.600
0.060
0.075

OH
OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang
Mandor

1.200
61.000
0.147
0.492

m3
kg
m3
m3

1M3 Pasang Pondasi Batu Kali, 1 Pc : 3 Kp : 10 Ps


Batu Belah 15/20
Portland Sement
Kapur Pasang
Pasir Pasang

1.500
0.600
0.060
0.075

OH
OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang
Mandor

C.3

218,100.00
125,000.00
39,200.00
30,000.00
21,250.00
2,250.00
400.00

0.2500 org
0.0100 org
0.1250 lot
B.30

III

125,000.00
196,000.00
30,000.00
42,500.00
45,000.00
40,000.00

\\vboxsrv\conversion_tmp\scratch_6\144824707.xls.ms_office

20

93,750.00
1,312.50
125,000.00

514,450.00
112,500.00
265,125.00
60,625.00

30,000.00
42,500.00
45,000.00
40,000.00

45,000.00
25,500.00
2,700.00
3,000.00

93,750.00
1,312.50
125,000.00
30,000.00
42,500.00
45,000.00
40,000.00

458,262.50
103,125.00
213,937.50
65,000.00
45,000.00
25,500.00
2,700.00
3,000.00

93,750.00
1,312.50
125,000.00

435,200.00
112,500.00
178,500.00
68,000.00

30,000.00
42,500.00
45,000.00
40,000.00

45,000.00
25,500.00
2,700.00
3,000.00

93,750.00
1,312.50
196,000.00
125,000.00

359,074.50
112,500.00
80,062.50
28,812.00
61,500.00

30,000.00
42,500.00
45,000.00
40,000.00

45,000.00
25,500.00
2,700.00
3,000.00

C.4

1.200
0.432

m3
m3

1M3 Pasang Pondasi Batu Kosong


Batu Belah 15/20
Pasir Urug

93,750.00
61,950.00

180,152.40
112,500.00
26,762.40

0.700
0.390
0.039
0.039

OH
OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang
Mandor

30,000.00
42,500.00
45,000.00
40,000.00

21,000.00
16,575.00
1,755.00
1,560.00

0.480
126.000
194.000
0.312
0.468
1.800

m3
Kg
Kg
m3
m3
Kg

1M3 Pasang Pondasi Siklop 60% Beton Camp. 1PC : 2PS : 3KR &
40% Batu Belah
Batu Belah 15/20
Besi Beton
Portland Semen
Pasir Beton (Cepu)
Koral Beton
Kawat Beton

3.000
0.850
0.085
0.015

OH
OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang
Mandor

0.450
194.000
0.312
0.468

m3
Kg
m3
m3

1M3 Pasang Pondasi Sumuran diameter 100 cm


Batu Belah 15/20 cm
Portland Semen
Pasir Pasang
Koral Beton

2.380
0.300
0.030
0.080

OH
OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang
Mandor

0.019
0.094
0.150
60.500
45.000
0.900
0.032
0.120
0.090
0.240

m3
m3
m3
Kg
Kg
Kg
m3
Kg
Lt
Kg

1M' Pembuatan Tiang Pancang (40x40) cm, Beton Bertulang


Pasir Urug Darat
Pasir Beton (Cepu)
Koral Beton
Portland Semen
Besi Beton
Kawat beton
Kayu Kaso 5/7
Paku
Minyak Bekisting
Plamuur Tembok

1.000
0.670
0.067
0.050

OH
OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang
Mandor

C.5

C.6

C.7

C.8

2,036,818.40
93,750.00
11,100.00
1,312.50
171,950.00
261,250.00
17,850.00

45,000.00
1,398,600.00
254,625.00
53,648.40
122,265.00
32,130.00

30,000.00
42,500.00
45,000.00
40,000.00

90,000.00
36,125.00
3,825.00
600.00

93,750.00
1,312.50
125,000.00
261,250.00

546,777.50
42,187.50
254,625.00
39,000.00
122,265.00

30,000.00
42,500.00
45,000.00
40,000.00

71,400.00
12,750.00
1,350.00
3,200.00

61,950.00
171,950.00
261,250.00
1,312.50
11,100.00
17,850.00
48,415.49
16,750.00
22,000.00
19,250.00

725,148.40
1,177.05
16,163.30
39,187.50
79,406.25
499,500.00
16,065.00
1,549.30
2,010.00
1,980.00
4,620.00

30,000.00
42,500.00
45,000.00
40,000.00

30,000.00
28,475.00
3,015.00
2,000.00

0.1250
0.0125
0.1500
0.0100
0.0100

org
org
org
org
lot

SEBUAH TIANG PANCANG DICINCIN DAN DILANCIPKAN (KAYU HUTAN)


Tukang Kayu
Kepala Tukang
Pekerja
Mandor
alat bantu

42,500.00
45,000.00
30,000.00
40,000.00
13,750.00

10,912.50
5,312.50
562.50
4,500.00
400.00
137.50

0.0400
0.0040
1.8000
0.0430
0.0100

org
org
org
org
lot

1 M' TIANG DIPANCANGKAN DIDALAM TANAH LUNAK


Tukang Kayu
Kepala Tukang
Pekerja
Mandor
alat bantu

42,500.00
45,000.00
30,000.00
40,000.00
13,750.00

57,737.50
1,700.00
180.00
54,000.00
1,720.00
137.50

0.0500
0.0050
2.2500
0.0538
0.0125

org
org
org
org
lot

1 M' TIANG DIPANCANGKAN DIDALAM TANAH BIASA


Tukang Kayu
Kepala Tukang
Pekerja
Mandor
alat bantu

42,500.00
45,000.00
30,000.00
40,000.00
13,750.00

72,171.88
2,125.00
225.00
67,500.00
2,150.00
171.88

C.9

C.10

C.11

1 M' TIANG DIPANCANGKAN DIDALAM TANAH KERAS

86,606.25

0.0600 org

Tukang Kayu

42,500.00

0.0060 org

Kepala Tukang

45,000.00

270.00

2.7000 org

Pekerja

30,000.00

81,000.00

0.0645 org

Mandor

40,000.00

2,580.00

0.0150 lot

alat bantu

13,750.00

206.25

\\vboxsrv\conversion_tmp\scratch_6\144824707.xls.ms_office

21

2,550.00

C.12

1 M' TIANG DIPANCANGKAN DIDALAM TANAH PASIR


Tukang Kayu

42,500.00

0.0080 org

Kepala Tukang

45,000.00

360.00

3.6000 org

Pekerja

30,000.00

108,000.00

0.0860 org

Mandor

40,000.00

3,440.00

0.0200 lot

alat bantu

13,750.00

275.00

C.13

1 M3 PASANGAN BATU BRONJONG UNTUK KAWAT 3 MM

3,400.00

356,263.33

1.2000 m3

Batu kali

91,900.00

110,280.00

8.3333 kg

Kawat bronjong

18,550.00

154,583.33

0.6667 org

penganyam

42,500.00

28,333.33

2.0333 org

Pekerja

30,000.00

61,000.00

0.0517 org

Mandor

40,000.00

2,066.67

C.14

1 M3 PASANGAN BATU BRONJONG UNTUK KAWAT 4 MM


1.2000 m3

484,763.33

Batu kali

91,900.00

110,280.00

Kawat bronjong

18,550.00

278,250.00

0.7333 org

penganyam

42,500.00

31,166.67

2.1000 org

Pekerja

30,000.00

63,000.00

0.0517 org

Mandor

40,000.00

2,066.67

15.0000 kg

C.15

1 M3 PASANGAN BATU BRONJONG UNTUK KAWAT 5 MM


1.2000 m3

645,596.67

Batu kali

91,900.00

110,280.00

Kawat bronjong

18,550.00

432,833.33

0.8333 org

penganyam

42,500.00

35,416.67

2.1667 org

Pekerja

30,000.00

65,000.00

0.0517 org

Mandor

40,000.00

2,066.67

23.3333 kg

IV

115,475.00

0.0800 org

PEKERJAAN

D.1

DINDING

1M2 Pasang Batu Merah Tebal 1/2 bata, 1 Pc : 2 Ps


70.0000

Buah

18.9500

Kg

Portland Semen

0.0380

m3

Pasir Pasang

0.3000

OH

0.1000

OH

0.0100
0.0150

73,671.88
425.00

29,750.00

1,312.50

24,871.88

125,000.00

4,750.00

Pekerja

30,000.00

9,000.00

Tukang Batu

42,500.00

4,250.00

OH

Kepala Tukang

45,000.00

450.00

OH

Mandor

40,000.00

600.00

D.2

Bata Merah 5 x 11 x 22

1M2 Pasang Batu Merah Tebal 1/2 bata, 1 Pc : 3 Ps


70.0000

Buah

14.3700

Kg

Portland Semen

425.00

29,750.00

1,312.50

0.0400

m3

Pasir Pasang

18,860.63

125,000.00

5,000.00

0.3000

OH

0.1000

OH

Pekerja

30,000.00

9,000.00

Tukang Batu

42,500.00

0.0100

4,250.00

OH

Kepala Tukang

45,000.00

450.00

0.0150

OH

Mandor

40,000.00

600.00

70.0000

Buah

4.5000

Kg

Portland Semen

0.0500

m3

0.0150

D.3

Bata Merah 5 x 11 x 22

67,910.63

1M2 Pasang Batu Merah Tebal 1/2 bata, 1 Pc : 3 Kp : 10 Ps

59,146.25
425.00

29,750.00

1,312.50

5,906.25

Pasir Pasang

125,000.00

6,250.00

m3

Kapur Padam

196,000.00

2,940.00

0.3000

OH

Pekerja

30,000.00

9,000.00

0.1000

OH

Tukang Batu

42,500.00

4,250.00

0.0100

OH

Kepala Tukang

45,000.00

450.00

0.0150

OH

Mandor

40,000.00

600.00

D.4

Bata Merah 5 x 11 x 22

1 M2 PASANGAN 1/2 BATA MERAH 1 : 4

65,118.75

70.0000 bh

Bata merah

425.00

29,750.00

11.5000 kg

P C (50 kg)

1,312.50

15,093.75

125,000.00

5,375.00

0.0430 m3

Pasir pasang

0.3200 org

Pekerja

30,000.00

9,600.00

0.1000 org

Tukang batu

42,500.00

4,250.00

0.0100 org

Kepala tukang batu

45,000.00

450.00

0.0150 org

Mandor

40,000.00

600.00

\\vboxsrv\conversion_tmp\scratch_6\144824707.xls.ms_office

22

D.5
70.0000
9.6800
0.0450
0.3200
0.1000
0.0100
0.0150

bh
kg
m3
org
org
org
org

1 M2 PASANGAN 1/2 BATA MERAH 1 : 5


Bata merah
P C (50 kg)
Pasir pasang
Pekerja
Tukang batu
Kepala tukang batu
Mandor

425.00
1,312.50
125,000.00
30,000.00
42,500.00
45,000.00
40,000.00

62,980.00
29,750.00
12,705.00
5,625.00
9,600.00
4,250.00
450.00
600.00

1.1000
0.1200
0.0310
0.1875
0.2250
0.3750
0.3380
0.0250

m2
zak
m3
org
org
org
org
lot

1 M2 PASANGAN BATU TEMPEL + SIARAN


Batu tempel
PC (50 kg)
Pasir pasang
Pekerja
Tukang batu
Kepala tukang batu
Mandor
Peralatan

68,750.00
65,625.00
125,000.00
30,000.00
42,500.00
45,000.00
40,000.00
13,750.00

133,301.25
75,625.00
7,875.00
3,875.00
5,625.00
9,562.50
16,875.00
13,520.00
343.75

500.0000
4.1176
0.3330
4.5000
1.5000
0.1500
0.2250

bh
zak
m3
org
org
org
org

1 M3 PASANGAN BATA MERAH 1 PC : 2 PS


Bata merah
P C (50 kg)
Pasir pasang
Pekerja
Tukang batu
Kepala tukang batu
Mandor

425.00
65,625.00
125,000.00
30,000.00
42,500.00
45,000.00
40,000.00

738,842.50
212,500.00
270,217.50
41,625.00
135,000.00
63,750.00
6,750.00
9,000.00

500.0000
2.5328
0.4060
4.5000
1.5000
0.1500
0.2250

bh
zak
m3
org
org
org
org

1 M3 PASANGAN BATA MERAH 1 PC : 4 PS


Bata merah
P C (50 kg)
Pasir pasang
Pekerja
Tukang batu
Kepala tukang batu
Mandor

425.00
65,625.00
125,000.00
30,000.00
42,500.00
45,000.00
40,000.00

643,965.00
212,500.00
166,215.00
50,750.00
135,000.00
63,750.00
6,750.00
9,000.00

500.0000
0.9384
0.1100
0.3680
4.5000
1.5000
0.1500
0.2250

bh
zak
m3
m3
org
org
org
org

1 M3 PASANGAN BATA MERAH 1 PC : 3 KP : 10 PS


Bata merah
P C (50 kg)
Kapur pasang
Pasir pasang
Pekerja
Tukang batu
Kepala tukang batu
Mandor

425.00
65,625.00
196,000.00
125,000.00
30,000.00
42,500.00
45,000.00
40,000.00

556,142.50
212,500.00
61,582.50
21,560.00
46,000.00
135,000.00
63,750.00
6,750.00
9,000.00

D.6

D.7

D.8

D.9

PEKERJAAN

E.1

PLESTERAN

7.7600
0.0230

Kg
m3

1M2 Plesteran 1 Pc : 3 Ps Tebal 15 mm


Portland Semen
Pasir Pasang

0.2000
0.1500
0.0015
0.0100

OH
OH
OH
OH

Pekerja
Tukang batu
Kepala Tukang
Mandor

3.0000
0.0050
0.0200

Kg
m3
m3

1M2 Plesteran 1 Pc : 2 Kp : 8 Ps Tebal 15 mm


Portland Semen
Kapur Padam
Pasir Pasang

0.2200
0.1200
0.0120
0.0110

OH
OH
OH
OH

Pekerja
Tukang batu
Kepala Tukang
Mandor

1.8400
0.0060
0.0140

Kg
m3
m3

1M2 Plesteran 1 Pc : 3 Kp : 10 Ps Tebal 15 mm


Portland Semen
Kapur Padam
Pasir Pasang

0.2000
0.1500
0.0015
0.0100

OH
OH
OH
OH

Pekerja
Tukang batu
Kepala Tukang
Mandor

E.2

E.3

\\vboxsrv\conversion_tmp\scratch_6\144824707.xls.ms_office

23

1,312.50
125,000.00

25,902.50
10,185.00
2,875.00

30,000.00
42,500.00
45,000.00
40,000.00

6,000.00
6,375.00
67.50
400.00

1,312.50
196,000.00
125,000.00

20,097.50
3,937.50
980.00
2,500.00

30,000.00
42,500.00
45,000.00
40,000.00

6,600.00
5,100.00
540.00
440.00

1,312.50
196,000.00
125,000.00

18,183.50
2,415.00
1,176.00
1,750.00

30,000.00
42,500.00
45,000.00
40,000.00

6,000.00
6,375.00
67.50
400.00

E.4
10.3680
0.0310

Kg
m3

1M2 Plesteran 1 Pc : 3 Ps Tebal 20 mm


Portland Semen
Pasir Pasang

1,312.50
125,000.00

35,183.00
13,608.00
3,875.00

0.2600
0.2000
0.0200
0.0125

OH
OH
OH
OH

Pekerja
Tukang batu
Kepala Tukang
Mandor

30,000.00
42,500.00
45,000.00
40,000.00

7,800.00
8,500.00
900.00
500.00

5.1840
0.0260

Kg
m3

1M2 Berapen 1 Pc : 5 Ps Tebal 15 mm


Portland Semen
Pasir Pasang

1,312.50
125,000.00

18,164.00
6,804.00
3,250.00

0.1500
0.0700
0.0070
0.0080

OH
OH
OH
OH

Pekerja
Tukang batu
Kepala Tukang
Mandor

30,000.00
42,500.00
45,000.00
40,000.00

4,500.00
2,975.00
315.00
320.00

0.0570
0.0380
0.0380
0.0030

OH
OH
OH
OH

1M' Plesteran Skoning 1 Pc : 2 Ps lebar 10 mm


Pekerja
Tukang batu
Kepala Tukang
Mandor

30,000.00
42,500.00
45,000.00
40,000.00

5,155.00
1,710.00
1,615.00
1,710.00
120.00

4.3200
0.0060

Kg
m3

1M2 Plesteran Ciprat 1 Pc : 2 Ps


Portland Semen
Pasir Pasang

1,312.50
125,000.00

19,140.00
5,670.00
750.00

0.2500
0.1000
0.0100
0.0130

OH
OH
OH
OH

Pekerja
Tukang batu
Kepala Tukang
Mandor

30,000.00
42,500.00
45,000.00
40,000.00

7,500.00
4,250.00
450.00
520.00

6.3400
0.0120

Kg
m3

1M2 Finishing Siar Pas. Batu Kali Adukan 1 Pc : 2 Ps


Portland Semen
Pasir Pasang

1,312.50
125,000.00

26,001.25
8,321.25
1,500.00

0.3000
0.1400
0.0140
0.0150

OH
OH
OH
OH

Pekerja
Tukang batu
Kepala Tukang
Mandor

30,000.00
42,500.00
45,000.00
40,000.00

9,000.00
5,950.00
630.00
600.00

3.2500

Kg

1M2 Acian
Portland Semen

1,312.50

13,785.63
4,265.63

0.1500
0.1000
0.0100
0.0080

OH
OH
OH
OH

Pekerja
Tukang batu
Kepala Tukang
Mandor

30,000.00
42,500.00
45,000.00
40,000.00

4,500.00
4,250.00
450.00
320.00

1.1000
1.2500
1.0000

m3
Kg
Kg

PEKERJAAN K A Y U
1M3 Membuat Kosen Pintu & Jendela Kayu klas I
Kayu Klas I (Jati) , Balok
Paku Biasa 2" - 5 "
Lem Kayu

6.0000
20.0000
2.0000
0.3000

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1.1000
1.2500
1.0000

m3
Kg
Kg

1M3 Membuat Kosen Pintu & Jendela Kayu Bengkirai


Kayu Bengkirai, Balok
Paku Biasa 2" - 5 "
Lem Kayu

6.0000
20.0000
2.0000
0.3000

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.0400
0.0500

m3
Kg

1M2 Membuat Pintu Klamp Standard Kayu Bengkirai


Kayu Bengkirai, papan
Paku Biasa 2" - 5 "

0.3500
1.0500
0.1050
0.0180

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

E.5

E.6

E.7

E.8

E.9

VI

F
F.1

F.2

F.3

\\vboxsrv\conversion_tmp\scratch_6\144824707.xls.ms_office

24

16,156,250.00
16,750.00
18,300.00

18,943,112.50
17,771,875.00
20,937.50
18,300.00

30,000.00
42,500.00
45,000.00
40,000.00

180,000.00
850,000.00
90,000.00
12,000.00

8,937,500.00
16,750.00
18,300.00

11,002,487.50
9,831,250.00
20,937.50
18,300.00

30,000.00
42,500.00
45,000.00
40,000.00

180,000.00
850,000.00
90,000.00
12,000.00

8,937,500.00
16,750.00

418,907.50
357,500.00
837.50

30,000.00
42,500.00
45,000.00
40,000.00

10,500.00
44,625.00
4,725.00
720.00

F.4
0.0400
0.0500

m3
kg

1M2 Membuat Daun Pintu Panel Kayu Bengkirai


Kayu Bengkirai, papan
Lem Kayu

8,937,500.00
18,300.00

507,915.00
357,500.00
915.00

1.0000
2.5000
0.2500
0.0500

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

30,000.00
42,500.00
45,000.00
40,000.00

30,000.00
106,250.00
11,250.00
2,000.00

0.0350
0.3000

m3
kg

1M2 Membuat Pintu & Jendela Kaca Kayu Bengkirai


Kayu Bengkirai, papan
Lem Kayu

8,937,500.00
18,300.00

437,902.50
312,812.50
5,490.00

0.8000
2.0000
0.2000
0.0400

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

30,000.00
42,500.00
45,000.00
40,000.00

24,000.00
85,000.00
9,000.00
1,600.00

0.0640
0.5000

m3
kg

1M2 Membuat Pintu & Jendela Jalusi Kayu Kelas I (Jati)


Kayu Kelas I (Jati), papan
Lem Kayu

16,156,250.00
18,300.00

1,226,150.00
1,034,000.00
9,150.00

1.0000
3.0000
0.3000
0.3000

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

30,000.00
42,500.00
45,000.00
40,000.00

30,000.00
127,500.00
13,500.00
12,000.00

0.0250
0.0300
0.5000
1.0000

m3
Kg
Kg
Lbr

1M2 Membuat Pintu Plywood Rangkap rangka Kayu Bengkirai lbr s/d 90cm
Kayu Bengkirai, papan
8,937,500.00
Paku Biasa 1/2" - 1"
16,750.00
Lem Kayu
18,300.00
Plywood tebal 4 mm
98,550.00

445,240.00
223,437.50
502.50
9,150.00
98,550.00

0.6000
2.0000
0.2000
0.0400

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.0256
0.0300
0.5000
1.0000

m3
Kg

F.5

F.6

F.7

30,000.00
42,500.00
45,000.00
40,000.00

18,000.00
85,000.00
9,000.00
1,600.00

Lbr

1M2 Membuat Pintu Plywood rangkap, rangka expose kayu Bengkirai


Kayu Bengkirai, papan
8,937,500.00
Paku Biasa 1/2" - 1"
16,750.00
Lem Kayu
18,300.00
Plywood tebal 4 mm uk.90x220cm
98,550.00

456,602.50
228,800.00
502.50
9,150.00
98,550.00

0.8000
2.0000
0.2000
0.0400

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.0600
0.1500

m3
Kg

1M2 Membuat Jalusi mati Kosen Kayu Kelas I (Jati)


Kayu Kelas I (Jati), papan
Paku Biasa 1/2" - 1"

0.5000
2.0000
0.2000
0.0250

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.0600
0.1500

m3
Kg

1M2 Membuat Jalusi mati Kosen Kayu Bengkirai


Kayu Bengkirai, papan
Paku Biasa 1/2" - 1"

0.5000
2.0000
0.2000
0.0250

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.0250
0.0300
0.3000
1.0000

m3
Kg
Kg
Lbr

1M2 Membuat Pintu Teakwood Rangkap Rangka Kayu Kelas I (jati)


Kayu Kelas I (Jati), papan
Paku Biasa 1/2" - 1"
Lem Kayu
Teakwood tebal 4 mm

0.8000
2.0000
0.2000
0.0400

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

F.8

Kg

F.9

F.10

F.11

\\vboxsrv\conversion_tmp\scratch_6\144824707.xls.ms_office

25

30,000.00
42,500.00
45,000.00
40,000.00

24,000.00
85,000.00
9,000.00
1,600.00

16,156,250.00
16,750.00

1,081,887.50
969,375.00
2,512.50

30,000.00
42,500.00
45,000.00
40,000.00

15,000.00
85,000.00
9,000.00
1,000.00

8,937,500.00
16,750.00

648,762.50
536,250.00
2,512.50

30,000.00
42,500.00
45,000.00
40,000.00

15,000.00
85,000.00
9,000.00
1,000.00

16,156,250.00
16,750.00
18,300.00
98,550.00

628,048.75
403,906.25
502.50
5,490.00
98,550.00

30,000.00
42,500.00
45,000.00
40,000.00

24,000.00
85,000.00
9,000.00
1,600.00

F.12
0.0250
0.0300
0.0800
1.0000
0.5000

m3
Kg
Kg
Lbr
Lbr

1M2 Membuat Pintu Teakwood Rangkap Lapis Formika Rangka ekspose


Kayu Bengkirai
Kayu Bengkirai, papan
8,937,500.00
Paku Biasa 1/2" - 1"
16,750.00
Lem Kayu
18,300.00
Teakwood tebal 4 mm
98,550.00
Formika
252,500.00

0.8000
2.5000
0.2500
0.0400

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.0150
1.0000
1.2000
0.2000
0.5000

m3
lbr
m2
kg
kg

1 M2 DAUN PINTU TRIPLEK DOUBLE UKURAN PINTU LAPIS ALUMINIUM ( KM/WC )


Rangka kayu bengkirai (ram pintu)
9,625,000.00
Triplek 4 mm
72,300.00
Aluminium sheet 0,3 mm
130,680.00
Paku triplek
16,750.00
Lem putih ( FOX )
18,300.00

0.3000
1.3000
0.1300
0.0130

org
org
org
org

Pekerja
Tukang kayu
Kepala tukang kayu
Mandor

30,000.00
42,500.00
45,000.00
40,000.00

9,000.00
55,250.00
5,850.00
520.00

0.0150
1.0000
0.5000
0.2000
0.5000
0.2000

m3
lbr
lbr
kg
kg
kg

1 M2 DAUN PINTU TRIPLEK DOUBLE UKURAN PINTU LAPIS FORMIKA ( KM/WC )


Rangka kayu bengkirai (ram pintu)
9,625,000.00
Triplek 4 mm ukuran pintu
72,300.00
Formika
252,500.00
Paku triplek
16,750.00
Lem putih ( FOX )
18,300.00
Lem kuning ( aica aibon )
50,200.00

442,085.00
144,375.00
72,300.00
126,250.00
3,350.00
9,150.00
10,040.00

0.5000
1.3000
0.1300
0.0130

org
org
org
org

Pekerja
Tukang kayu
Kepala tukang kayu
Mandor

1.1000
15.0000
0.8000

m3
Kg
Kg

1M3 Memasang Konstruksi Kuda-kuda Konvensional Kayu Bengkirai


Bentang 6 M
Kayu Bengkirai, balok
9,625,000.00
Besi Strip
16,200.00
Paku Biasa 2" - 5"
16,750.00

4.0000
12.0000
1.2000
2.0000

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1.1000
15.0000
5.6000

m3
Kg
Kg

1M3 Memasang Konstruksi Kuda-kuda Ekspose Kayu Jati


Kayu Jati, balok
Besi Strip
Paku Biasa 2" - 5"

6.0000
20.0000
2.0000
0.3000

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1.1000
15.0000
3.0000

m3
Kg
Kg

1M3 Memasang Konstruksi Gording Kayu Bengkirai


Kayu Bengkirai, balok
Besi Strip
Paku Biasa 2" - 5"

2.4000
7.2000
0.7200
0.1200

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

F.13

F.14

F.15

F.16

F.17

\\vboxsrv\conversion_tmp\scratch_6\144824707.xls.ms_office

30,000.00
42,500.00
45,000.00
40,000.00

30,000.00
42,500.00
45,000.00
40,000.00

26

593,304.00

24,000.00
106,250.00
11,250.00
1,600.00

223,437.50
502.50
1,464.00
98,550.00
126,250.00

456,611.00
144,375.00
72,300.00
156,816.00
3,350.00
9,150.00

15,000.00
55,250.00
5,850.00
520.00
11,607,900.00
10,587,500.00
243,000.00
13,400.00

30,000.00
42,500.00
45,000.00
40,000.00

120,000.00
510,000.00
54,000.00
80,000.00

16,156,250.00
16,200.00
16,750.00

19,240,675.00
17,771,875.00
243,000.00
93,800.00

30,000.00
42,500.00
45,000.00
40,000.00

180,000.00
850,000.00
90,000.00
12,000.00

8,937,500.00
16,200.00
16,750.00

10,539,700.00
9,831,250.00
243,000.00
50,250.00

30,000.00
42,500.00
45,000.00
40,000.00

72,000.00
306,000.00
32,400.00
4,800.00

F.18
0.0196
0.0300
0.3000
0.5000
1.0000

m3
Kg
Kg
Lbr
Lbr

1M2 Pasang Pintu Plywood & Formika Rangka Kayu Bengkirai


Kayu Bengkirai, papan
Paku Biasa 1/2" - 1"
Lem Kayu
Plywood tebal 4 mm
Formika

0.8000
2.5000
0.2500
0.0400

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.0196
0.0300
1.2000
1.0000
1.0000

m3
Kg
Kg
Lbr
Lbr

1M2 Pasang Pintu Formika Double, Rangka Kayu Jati


Kayu Jati, papan
Paku Biasa 1/2" - 1"
Lem Kayu
Plywood tebal 4 mm
Formika

1.0000
2.6000
0.2600
0.0500

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.0086
0.0036
0.2500

m3
m3
Kg

1M2 Memasang Rangka Atap Genteng Keramik, Kayu Bengkirai


Kayu Klas II (Bengkirai), Kaso-kaso (5x7) cm
Reng (2x3) cm
Paku Biasa 2" - 5"

0.1000
0.1000
0.0100
0.0050

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.0086
0.0043
0.2500

m3
m3
Kg

1M2 Memasang Rangka Atap Genteng Beton, Kayu Bengkirai


Kayu Bengkirai Kaso-kaso (5x7) cm
Reng (2x3) cm
Paku Biasa 2" - 5"

0.1000
0.1000
0.0100
0.0050

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.1650
0.2000

m3
Kg

1M2 Pasang Rangka Atap Sirap Kayu Bengkirai


Kayu Bengkirai, balok
Paku Biasa 2" - 5"

0.1200
0.1200
0.0120
0.0060

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.0072
0.1000

m3
Kg

1M' Pasang Listplank Uk. (3x20)cm Kayu Bengkirai


Kayu Bengkirai, papan
Paku Biasa 2" - 5"

0.1000
0.2000
0.0250
0.0050

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.0110
0.0500

m3
Kg

1M' Pasang Listplank Uk. (3x30)cm Kayu Bengkirai


Kayu Bengkirai, papan
Paku Biasa 2" - 5"

0.1000
0.2000
0.0200
0.0050

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.0145
0.1500

m3
Kg

1M' Pasang Listplank Uk. 2x(3x20)cm Kayu Bengkirai


Kayu Bengkirai, papan
Paku Biasa 2" - 5"

0.1500
0.2500
0.0250
0.0075

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

F.19

F.20

F.21

F.22

F.23

F.24

F.25

\\vboxsrv\conversion_tmp\scratch_6\144824707.xls.ms_office

27

8,937,500.00
16,750.00
18,300.00
98,550.00
252,500.00

626,042.50
175,175.00
502.50
5,490.00
49,275.00
252,500.00

30,000.00
42,500.00
45,000.00
40,000.00

24,000.00
106,250.00
11,250.00
1,600.00

16,156,250.00
16,750.00
18,300.00
98,550.00
252,500.00

844,375.00
316,662.50
502.50
21,960.00
98,550.00
252,500.00

30,000.00
42,500.00
45,000.00
40,000.00

30,000.00
110,500.00
11,700.00
2,000.00

9,625,000.00
9,625,000.00
16,750.00

129,512.50
82,775.00
34,650.00
4,187.50

30,000.00
42,500.00
45,000.00
40,000.00

3,000.00
4,250.00
450.00
200.00

9,625,000.00
9,625,000.00
16,750.00

136,442.50
82,775.00
41,580.00
4,187.50

30,000.00
42,500.00
45,000.00
40,000.00

3,000.00
4,250.00
450.00
200.00

9,625,000.00
16,750.00

1,600,955.00
1,588,125.00
3,350.00

30,000.00
42,500.00
45,000.00
40,000.00

3,600.00
5,100.00
540.00
240.00

8,937,500.00
16,750.00

78,850.00
64,350.00
1,675.00

30,000.00
42,500.00
45,000.00
40,000.00

3,000.00
8,500.00
1,125.00
200.00

8,937,500.00
16,750.00

111,750.00
98,312.50
837.50

30,000.00
42,500.00
45,000.00
40,000.00

3,000.00
8,500.00
900.00
200.00

8,937,500.00
16,750.00

148,656.25
129,593.75
2,512.50

30,000.00
42,500.00
45,000.00
40,000.00

4,500.00
10,625.00
1,125.00
300.00

F.26
0.0280
0.1500

m3
Kg

1M2 Pasang Rangka Dinding Pemisah Kayu Bengkirai


Kayu Bengkirai, balok
Paku Biasa 2" - 5"

8,937,500.00
16,750.00

281,612.50
250,250.00
2,512.50

0.1500
0.4500
0.0450
0.0800

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

30,000.00
42,500.00
45,000.00
40,000.00

4,500.00
19,125.00
2,025.00
3,200.00

0.0280
0.1500
0.8600
0.5600

m3
Kg
Lbr
Kg

1M2 Pas. Dinding Pemisah Teakwood Rangkap Rangka Kayu Bengkirai


Kayu Bengkirai, balok
8,937,500.00
Paku Biasa 2" - 5"
16,750.00
Teakwood tebal 4mm
98,550.00
Lem kayu
18,300.00

373,733.50
250,250.00
2,512.50
84,753.00
10,248.00

0.1500
0.4500
0.0450
0.0080

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.0070
0.1000
0.1500

m3
Kg
Kg

1M2 Pasang Dinding Lambriziring dari Papan jati


Kayu Jati, balok
Paku Biasa 2" - 5"
Paku Sekrup 3,5"

0.6000
1.8000
0.1800
0.0300

OH
OH
OH
OH

0.4000
0.5000

F.27

30,000.00
42,500.00
45,000.00
40,000.00

4,500.00
19,125.00
2,025.00
320.00

16,156,250.00
16,750.00
22,800.00

221,988.75
113,093.75
1,675.00
3,420.00

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

30,000.00
42,500.00
45,000.00
40,000.00

18,000.00
76,500.00
8,100.00
1,200.00

Lbr
Kg

1M2 Pasang Plywood tebal 4mm unt Dinding


Plywood tebal 4mm
Paku Biasa 1/2" - 1"

98,550.00
16,750.00

52,122.00
39,420.00
8,375.00

0.0250
0.0750
0.0075
0.0013

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

30,000.00
42,500.00
45,000.00
40,000.00

750.00
3,187.50
337.50
52.00

1.5000
0.0140
0.0500
0.0030

m2
m3
Kg
m'

1M2 Pasang Dinding Bilik, Rangka Kayu Klas III / IV


Bilik Bambu
Kayu Klas III (Meranti)
Paku Biasa 1/2" - 1"
List Kayu 2/4

17,050.00
3,437,500.00
16,750.00
6,500.00

80,107.00
25,575.00
48,125.00
837.50
19.50

0.1000
0.0500
0.0050
0.0050

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

30,000.00
42,500.00
45,000.00
40,000.00

3,000.00
2,125.00
225.00
200.00

679,355.82
324,187.50
106,731.82
182,669.00

F.28

F.29

F.30

VII

PEKERJAAN PERKERASAN DAN BETON

G.1
247.0000
0.6207
0.7400

Kg
m3
m3

1M3 Membuat Beton mutu f'c=7,4 Mpa (K100), slum (122)cm, w/c = 0,87
Portland Semen
1,312.50
Pasir Beton (Cepu)
171,950.00
Kerikil (maksimum 30 mm)
246,850.00

1.6500
0.2750
0.0280
0.0830

OH
OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang
Mandor

30,000.00
42,500.00
45,000.00
40,000.00

49,500.00
11,687.50
1,260.00
3,320.00

276.0000
0.5914
0.7496

Kg
m3
m3

1M3 Membuat Beton mutu f'c=9,8 Mpa (K125), slum (122)cm, w/c = 0,78
Portland Semen
1,312.50
Pasir Beton (Cepu)
171,950.00
Kerikil (maksimum 30 mm)
246,850.00

735,932.22
362,250.00
101,696.14
185,046.07

1.6500
0.2750
0.0280
0.0830

OH
OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang
Mandor

30,000.00
42,500.00
45,000.00
40,000.00

70,125.00
12,375.00
1,120.00
3,320.00

299.0000
0.5707
0.7533

Kg
m3
m3

1M3 Membuat Beton mutu f'c=12,2 Mpa (K150), slum (122)cm, w/c = 0,72
Portland Semen
1,312.50
Pasir Beton (Cepu)
171,950.00
Kerikil (maksimum 30 mm)
246,850.00

742,299.65
392,437.50
98,134.32
185,960.33

1.6500
0.2750
0.0280
0.0830

OH
OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang
Mandor

G.2

G.3

\\vboxsrv\conversion_tmp\scratch_6\144824707.xls.ms_office

30,000.00
42,500.00
45,000.00
40,000.00

28

49,500.00
11,687.50
1,260.00
3,320.00

G.4
230.0000
0.6379
0.7607

Kg
m3
m3

1M3 Membuat Lantai Kerja Beton mutu f'c=7,4 MPa (K100), slum (3-6)cm, w/c = 0,87
Portland Semen
1,312.50
Pasir Beton (Cepu)
171,950.00
Kerikil (maksimum 30 mm)
246,850.00

1.2000
0.2000
0.0200
0.0060

OH
OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang
Mandor

30,000.00
42,500.00
45,000.00
40,000.00

36,000.00
8,500.00
900.00
240.00

326.0000
0.5429
0.7622

Kg
m3
m3

1M3 Membuat Beton mutu f'c=14,5 MPa (K175), slum (122)cm, w/c = 0,66
Portland Semen
1,312.50
Pasir Beton (Cepu)
171,950.00
Kerikil (maksimum 30 mm)
246,850.00

773,823.84
427,875.00
93,344.29
188,154.56

1.6500
0.2500
0.0250
0.0800

OH
OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang
Mandor

30,000.00
42,500.00
45,000.00
40,000.00

49,500.00
10,625.00
1,125.00
3,200.00

352.0000
0.5221
0.7637

Kg
m3
m3

1M3 Membuat Beton mutu f'c=16,9 MPa (K200), slum (122)cm,w/c = 0,61
Portland Semen
1,312.50
Pasir Beton (Cepu)
171,950.00
Kerikil (maksimum 30 mm)
246,850.00

804,752.72
462,000.00
89,782.46
188,520.26

1.6500
0.2500
0.0250
0.0800

OH
OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang
Mandor

30,000.00
42,500.00
45,000.00
40,000.00

49,500.00
10,625.00
1,125.00
3,200.00

371.0000
0.4986
0.7756

Kg
m3
m3

1M3 Membuat Beton mutu f'c=19,3 MPa (K225), slum (122)cm, w/c = 0,58
Portland Semen
1,312.50
Pasir Beton (Cepu)
171,950.00
Kerikil (maksimum 30 mm)
246,850.00

828,562.75
486,937.50
85,729.36
191,445.89

1.6500
0.2500
0.0250
0.0800

OH
OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang
Mandor

30,000.00
42,500.00
45,000.00
40,000.00

49,500.00
10,625.00
1,125.00
3,200.00

384.0000
0.4943
0.7696

Kg
m3
m3

1M3 Membuat Beton mutu f'c=21,7 MPa (K250), slum (122)cm,w/c = 0,56
Portland Semen
1,312.50
Beton (Muntilan)
309,430.00
Kerikil (maksimum 30 mm)
246,850.00

911,379.90
504,000.00
152,946.83
189,983.07

1.6500
0.2500
0.0250
0.0800

OH
OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang
Mandor

406.0000
0.4886
0.7600

Kg
m3
m3

1M3 Membuat Lantai Kerja Beton mutu f'c=24,0 MPa (K275), slum (122)cm, w/c = 0,53
Portland Semen
1,312.50
Beton (Muntilan)
309,430.00
Kerikil (maksimum 30 mm)
246,850.00

1.6500
0.2500
0.0250
0.0800

OH
OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang
Mandor

30,000.00
42,500.00
45,000.00
40,000.00

49,500.00
10,625.00
1,125.00
3,200.00

413.0000
0.4864
0.7563

Kg
m3
m3

1M3 Membuat Beton mutu f'c=26,4 MPa (K300), slum (122)cm,w/c = 0,52
Portland Semen
1,312.50
Beton (Muntilan)
309,430.00
Kerikil (maksimum 30 mm)
246,850.00

943,719.83
542,062.50
150,515.59
186,691.74

1.6500
0.2500
0.0250
0.0800

OH
OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang
Mandor

30,000.00
42,500.00
45,000.00
40,000.00

49,500.00
10,625.00
1,125.00
3,200.00

439.0000
0.4786
0.7452

Kg
m3
m3

1M3 Membuat Beton mutu f'c=28,8 MPa (K325), slum (122)cm,w/c = 0,49
Portland Semen
1,312.50
Beton (Muntilan)
309,430.00
Kerikil (maksimum 30 mm)
246,850.00

991,870.82
576,187.50
148,084.36
183,948.96

2.1000
0.3500
0.0350
0.1050

OH
OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang
Mandor

G.5

G.6

G.7

G.8

G.9

G.10

G.11

\\vboxsrv\conversion_tmp\scratch_6\144824707.xls.ms_office

30,000.00
42,500.00
45,000.00
40,000.00

30,000.00
42,500.00
45,000.00
40,000.00

29

644,983.39
301,875.00
109,679.54
187,788.85

49,500.00
10,625.00
1,125.00
3,200.00
936,109.66
532,875.00
151,178.66
187,606.00

63,000.00
14,875.00
1,575.00
4,200.00

G.12
448.0000
0.4764
0.7407

Kg
m3
m3

1M3 Membuat Beton mutu f'c=31,2 MPa (K350), slum (122)cm, w/c = 0,48
Portland Semen
1,312.50
Beton (Muntilan)
309,430.00
Kerikil (maksimum 30 mm)
246,850.00

2.1000
0.3500
0.0350
0.1050

OH
OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang
Mandor

30,000.00
42,500.00
45,000.00
40,000.00

63,000.00
14,875.00
1,575.00
4,200.00

1.0500
0.0150

Kg
Kg

1KG Pembesian dg Besi Polos


Besi Beton (polos)
Kawat Beton

a=
11,100.00
17,850.00

12,477.75
11,655.00
267.75

0.0070
0.0070
0.0007
0.0004

OH
OH
OH
OH

Pekerja
Tukang Besi
Kepala Tukang
Mandor

30,000.00
42,500.00
45,000.00
40,000.00

210.00
297.50
31.50
16.00

G.13

G.13a 110 KG Besi Beton Terpasang (polos)


G.13b 125 KG Besi Beton Terpasang (polos)
G.14

a x 110
a x 125

1,001,923.14
588,000.00
147,421.29
182,851.85

1,372,552.50
1,559,718.75

1.0500
0.0100

Kg
Kg

1KG Kabel Presstresed Polos/strand


Besi presstred polos
Kawat Beton

18,550.00
17,850.00

20,053.00
19,477.50
178.50

0.0050
0.0050
0.0005
0.0003

OH
OH
OH
OH

Pekerja
Tukang Besi
Kepala Tukang
Mandor

30,000.00
42,500.00
45,000.00
40,000.00

150.00
212.50
22.50
12.00

0.0400
0.3000
0.1000

m3
Kg
Ltr

1M2 Pasang Bekisting untuk Pondasi


Kayu Terentang (perancah)
Paku Biasa 2" - 5"
Minyak Bekisting

2,062,500.00
16,750.00
22,000.00

118,585.00
82,500.00
5,025.00
2,200.00

0.5200
0.2600
0.0260
0.0260

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

30,000.00
42,500.00
45,000.00
40,000.00

15,600.00
11,050.00
1,170.00
1,040.00

0.0450
0.3000
0.1000

m3
Kg
Ltr

1M2 Pasang Bekisting untuk Sloof


Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting

3,437,500.00
16,750.00
22,000.00

190,772.50
154,687.50
5,025.00
2,200.00

0.5200
0.2600
0.0260
0.0260

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

30,000.00
42,500.00
45,000.00
40,000.00

15,600.00
11,050.00
1,170.00
1,040.00

0.0400
0.4000
0.2000
0.0150
0.3500
2.0000

m3
Kg
Ltr
m3
Lbr
Btg

1M2 Pasang Bekisting untuk Kolom


Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Balok Kayu
Plywood tebal 9mm
Dolken diameter 8 - 10 cm / 4 m

2,062,500.00
16,750.00
22,000.00
6,531,250.00
135,200.00
35,700.00

346,918.75
82,500.00
6,700.00
4,400.00
97,968.75
47,320.00
71,400.00

0.6600
0.3300
0.0330
0.0330

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

30,000.00
42,500.00
45,000.00
40,000.00

19,800.00
14,025.00
1,485.00
1,320.00

0.0400
0.4000
0.2000
0.0180
0.3500
2.0000

m3
Kg
Ltr
m3
Lbr
Btg

1M2 Pasang Bekisting untuk Balok


Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Balok Kayu
Plywood tebal 9mm
Dolken diameter 8 - 10 cm / 4 m

2,062,500.00
16,750.00
22,000.00
3,437,500.00
135,200.00
35,700.00

310,825.00
82,500.00
6,700.00
4,400.00
61,875.00
47,320.00
71,400.00

0.6600
0.3300
0.0330
0.0330

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

30,000.00
42,500.00
45,000.00
40,000.00

19,800.00
14,025.00
1,485.00
1,320.00

G.15

G.16

G.17

G.18

\\vboxsrv\conversion_tmp\scratch_6\144824707.xls.ms_office

30

G.19
0.0400
0.4000
0.2000
0.0150
0.3500
6.0000

m3
Kg
Ltr
m3
Lbr
Btg

1M2 Pasang Bekisting untuk Lantai


Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Balok Kayu Borneo
Plywood tebal 9mm
Dolken diameter 8 - 10 cm / 4 m

2,062,500.00
16,750.00
22,000.00
3,437,500.00
135,200.00
35,700.00

443,312.50
82,500.00
6,700.00
4,400.00
51,562.50
47,320.00
214,200.00

0.6600
0.3300
0.0330
0.0330

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

30,000.00
42,500.00
45,000.00
40,000.00

19,800.00
14,025.00
1,485.00
1,320.00

0.0300
0.4000
0.2000
0.0200
0.3500
3.0000
4.0000

m3
Kg
Ltr
m3
Lbr
Btg
Buah

2,062,500.00
16,750.00
22,000.00
3,437,500.00
135,200.00
35,700.00
5,000.00

352,775.00
61,875.00
6,700.00
4,400.00
68,750.00
47,320.00
107,100.00
20,000.00

0.6600
0.3300
0.0330
0.0330

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

30,000.00
42,500.00
45,000.00
40,000.00

19,800.00
14,025.00
1,485.00
1,320.00

0.0300
0.4000
0.1500
0.0150
0.3500
2.0000

m3
Kg
Ltr
m3
Lbr
Btg

1M2 Pasang Bekisting untuk Tangga


Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Balok Kayu
Plywood tebal 9mm
Dolken diameter 8 - 10 cm / 4 m

2,062,500.00
16,750.00
22,000.00
3,437,500.00
135,200.00
35,700.00

278,787.50
61,875.00
6,700.00
3,300.00
51,562.50
47,320.00
71,400.00

0.6600
0.3300
0.0330
0.0330

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

30,000.00
42,500.00
45,000.00
40,000.00

19,800.00
14,025.00
1,485.00
1,320.00

0.0264
0.6000
0.5000

m3
Kg
Btg

1 M2 Pasang Bekisting Jembatan Cor


Kayu Terentang
Paku Biasa 2" - 5"
Dolken Kayu Galam diameter 8 - 10 / 4 m

2,062,500.00
16,750.00
35,700.00

89,520.00
54,450.00
10,050.00
17,850.00

0.1500
0.0500
0.0050
0.0080

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

30,000.00
42,500.00
45,000.00
40,000.00

4,500.00
2,125.00
225.00
320.00

0.0170
0.0240
0.4000

m3
m3
kg

1 M2 BEKESTING DENGAN PAPAN


Kaso lanan 5/7 (2x pakai) 50 %
Papan terentang (2x pakai) 75 %
Paku

3,437,500.00
2,062,500.00
16,750.00

138,762.50
58,437.50
49,500.00
6,700.00

0.3000
0.1500
0.1500
0.0500

org
org
org
org

Pekerja
Tukang kayu
Kepala tukang kayu
Mandor

30,000.00
42,500.00
45,000.00
40,000.00

9,000.00
6,375.00
6,750.00
2,000.00

0.0170
0.3470
0.4000
0.1200
0.1500
0.1500
0.0500

m3
lbr
kg
org
org
org
org

1 M2 BEKESTING DENGAN MULTIPLEX 9 MM


Kaso lanan 5/7 (2x pakai) 50 %
Multiplex 9 mm (2x pakai) 75 %
Paku
Pekerja
Tukang kayu
Kepala tukang kayu
Mandor

3,437,500.00
135,200.00
16,750.00
30,000.00
42,500.00
45,000.00
40,000.00

130,776.90
58,437.50
46,914.40
6,700.00
3,600.00
6,375.00
6,750.00
2,000.00

0.2000
1.5000
0.4000
157.5000
2.2500
336.0000
0.5400
0.8100

m3
Kg
Ltr
Kg
Kg
Kg
m3
m3

1 M3 Membuat Pondasi Beton Bertulang (150 kg Besi + Bekisting)


Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton (Cepu)
Koral Beton

2,062,500.00
16,750.00
22,000.00
11,100.00
17,850.00
1,312.50
171,950.00
261,250.00

3,273,255.50
412,500.00
25,125.00
8,800.00
1,748,250.00
40,162.50
441,000.00
92,853.00
211,612.50

5.3000
0.2750
1.3000
1.0500
0.2620
0.2650

OH
OH
OH
OH
OH
OH

Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

30,000.00
42,500.00
42,500.00
42,500.00
45,000.00
40,000.00

159,000.00
11,687.50
55,250.00
44,625.00
11,790.00
10,600.00

G.20

G.21

G.22

G.23

G.24

G.25

1M2 Pasang Bekisting untuk Dinding


Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Balok Kayu
Plywood tebal 9mm
Dolken diameter 8 - 10 cm / 4 m
Formite/Penjaga jarak / Spacer (alat bantu)

\\vboxsrv\conversion_tmp\scratch_6\144824707.xls.ms_office

31

G.26
0.2700
2.0000
0.6000
210.0000
3.0000
336.0000
0.5400
0.8100

m3
Kg
Ltr
Kg
Kg
Kg
m3
m3

1 M3 Membuat Sloof Beton Bertulang (200 kg Besi + Bekisting)


Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton (Cepu)
Koral Beton

5.6500
0.2750
1.5600
1.4000
0.3230
0.2830

OH
OH
OH
OH
OH
OH

Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

0.4000
4.0000
2.0000
315.0000
4.5000
336.0000
0.5400
0.8100
0.1500
3.5000
20.0000

m3
Kg
Ltr
Kg
Kg
Kg
m3
m3
m3
Lbr
Btg

1 M3 Membuat Kolom Beton Bertulang (300 kg Besi + Bekisting)


Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton (Cepu)
Koral Beton
Kayu Balok
Plywood 9 mm
Dolken diameter 8 / 4mm

7.0500
0.2750
1.6500
2.1000
0.4030
0.3530

OH
OH
OH
OH
OH
OH

Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

0.3200
3.2000
1.6000
210.0000
3.0000
336.0000
0.5400
0.8100
0.1400
2.8000
18.0000

m3
Kg
Ltr
Kg
Kg
Kg
m3
m3
m3
Lbr
Btg

1 M3 Membuat Balok Beton Bertulang (200 kg Besi + Bekisting)


Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton (Cepu)
Koral Beton
Kayu Balok
Plywood 9 mm
Dolken diameter 8 / 4mm

6.3500
0.2750
1.6500
1.4000
0.3330
0.3180

OH
OH
OH
OH
OH
OH

Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

0.3200
3.2000
1.6000
157.5000
2.2500
336.0000
0.5400
0.8100
0.1200
2.8000
32.0000

m3
Kg
Ltr
Kg
Kg
Kg
m3
m3
m3
Lbr
Btg

1 M3 Membuat Balok Beton Bertulang (150 kg Besi + Bekisting)


Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton (Cepu)
Koral Beton
Kayu Balok
Plywood 9 mm
Dolken diameter 8 / 4mm

5.3000
0.2750
1.3000
1.0500
0.2650
0.2650

OH
OH
OH
OH
OH
OH

Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

G.27

G.28

G.29

\\vboxsrv\conversion_tmp\scratch_6\144824707.xls.ms_office

32

2,062,500.00
16,750.00
22,000.00
11,100.00
17,850.00
1,312.50
171,950.00
261,250.00

4,066,433.00
556,875.00
33,500.00
13,200.00
2,331,000.00
53,550.00
441,000.00
92,853.00
211,612.50

30,000.00
42,500.00
42,500.00
42,500.00
45,000.00
40,000.00

169,500.00
11,687.50
66,300.00
59,500.00
14,535.00
11,320.00

2,062,500.00
16,750.00
22,000.00
11,100.00
17,850.00
1,312.50
171,950.00
261,250.00
3,437,500.00
135,200.00
35,700.00

7,375,933.00
825,000.00
67,000.00
44,000.00
3,496,500.00
80,325.00
441,000.00
92,853.00
211,612.50
515,625.00
473,200.00
714,000.00

30,000.00
42,500.00
42,500.00
42,500.00
45,000.00
40,000.00

211,500.00
11,687.50
70,125.00
89,250.00
18,135.00
14,120.00

2,062,500.00
16,750.00
22,000.00
11,100.00
17,850.00
1,312.50
171,950.00
261,250.00
3,437,500.00
135,200.00
35,700.00

5,740,743.00
660,000.00
53,600.00
35,200.00
2,331,000.00
53,550.00
441,000.00
92,853.00
211,612.50
481,250.00
378,560.00
642,600.00

30,000.00
42,500.00
42,500.00
42,500.00
45,000.00
40,000.00

190,500.00
11,687.50
70,125.00
59,500.00
14,985.00
12,720.00

2,062,500.00
16,750.00
22,000.00
11,100.00
17,850.00
1,312.50
171,950.00
261,250.00
3,437,500.00
135,200.00
35,700.00

5,509,225.50
660,000.00
53,600.00
35,200.00
1,748,250.00
40,162.50
441,000.00
92,853.00
211,612.50
412,500.00
378,560.00
1,142,400.00

30,000.00
42,500.00
42,500.00
42,500.00
45,000.00
40,000.00

159,000.00
11,687.50
55,250.00
44,625.00
11,925.00
10,600.00

G.30
0.2400
3.2000
1.6000
157.5000
2.2500
336.0000
0.5400
0.8100
0.1600
2.8000
24.0000

m3
Kg
Ltr
Kg
Kg
Kg
m3
m3
m3
Lbr
Btg

1 M3 Membuat Dinding Beton Bertulang (150 kg Besi + Bekisting)


Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton (Cepu)
Koral Beton
Kayu Balok
Plywood 9 mm
Dolken diameter 8 / 4mm

5.3000
0.2750
1.3000
1.0500
0.2620
0.2650

OH
OH
OH
OH
OH
OH

Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

0.2500
3.0000
1.2000
210.0000
3.0000
336.0000
0.5400
0.8100
0.1050
2.5000
14.0000

m3
Kg
Ltr
Kg
Kg
Kg
m3
m3
m3
Lbr
Btg

1 M3 Membuat Tangga Beton Bertulang (200 kg Besi + Bekisting)


Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton (Cepu)
Koral Beton
Kayu Balok
Plywood 9 mm
Dolken diameter 8 / 4mm

5.6500
0.2750
1.5600
1.4000
0.3230
0.2830

OH
OH
OH
OH
OH
OH

Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

0.0020
0.0100
3.0000
0.4500
4.0000
0.0060
0.0090

m3
Kg
Kg
Kg
Kg
Kg
m3

1 M' Membuat Kolom Penguat Beton Bertulang (11 x 11) cm


Kayu Terentang
Paku Biasa 2" - 5"
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton (Cepu)
Koral Beton

0.1800
0.0200
0.0200
0.0200
0.0060
0.0090

OH
OH
OH
OH
OH
OH

Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

0.0030
0.0200
3.6000
0.0500
5.5000
0.0090
0.0150

m3
Kg
Kg
Kg
Kg
Kg
m3

1 M' Membuat Ring Balok Beton Bertulang (10 x 15) cm


Kayu albasia
Paku Biasa 2" - 5"
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton (Cepu)
Koral Beton

0.2970
0.0330
0.0330
0.0330
0.0100
0.0050

OH
OH
OH
OH
OH
OH

Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

G.31

G.32

G.33

G.34
1.0000
2.5000
0.2500
0.1000
0.0100
0.0450

m3
org
org
org
org
lot

1 M3 PAS. BETON K-175 READY MIX 6 M3 BERIKUT SLANG


Adukan K-175 Ready Mix
Pekerja
Tukang batu
Kepala tukang batu
Mandor
Alat bantu (Slang + Tes Lab.)

\\vboxsrv\conversion_tmp\scratch_6\144824707.xls.ms_office

33

2,062,500.00
16,750.00
22,000.00
11,100.00
17,850.00
1,312.50
171,950.00
261,250.00
3,437,500.00
135,200.00
35,700.00

5,195,990.50
495,000.00
53,600.00
35,200.00
1,748,250.00
40,162.50
441,000.00
92,853.00
211,612.50
550,000.00
378,560.00
856,800.00

30,000.00
42,500.00
42,500.00
42,500.00
45,000.00
40,000.00

159,000.00
11,687.50
55,250.00
44,625.00
11,790.00
10,600.00

2,062,500.00
16,750.00
22,000.00
11,100.00
17,850.00
1,312.50
171,950.00
261,250.00
3,437,500.00
135,200.00
35,700.00

5,253,870.50
515,625.00
50,250.00
26,400.00
2,331,000.00
53,550.00
441,000.00
92,853.00
211,612.50
360,937.50
338,000.00
499,800.00

30,000.00
42,500.00
42,500.00
42,500.00
45,000.00
40,000.00

169,500.00
11,687.50
66,300.00
59,500.00
14,535.00
11,320.00

2,062,500.00
16,750.00
11,100.00
17,850.00
1,312.50
171,950.00
261,250.00

62,837.95
4,125.00
167.50
33,300.00
8,032.50
5,250.00
1,031.70
2,351.25

30,000.00
42,500.00
42,500.00
42,500.00
45,000.00
40,000.00

5,400.00
850.00
850.00
850.00
270.00
360.00

2,062,500.00
16,750.00
11,100.00
17,850.00
1,312.50
171,950.00
261,250.00

73,827.55
6,187.50
335.00
39,960.00
892.50
7,218.75
1,547.55
3,918.75

30,000.00
42,500.00
42,500.00
42,500.00
45,000.00
40,000.00

8,910.00
1,402.50
1,402.50
1,402.50
450.00
200.00

897,850.00
30,000.00
42,500.00
45,000.00
40,000.00
13,750.00

988,993.75
897,850.00
75,000.00
10,625.00
4,500.00
400.00
618.75

G.35
1.0000
2.5000
0.2500
0.1000
0.0100
0.0450

m3
org
org
org
org
lot

1 M3 PAS. BETON K-225 READY MIX 6 M3 BERIKUT SLANG


Adukan K-225 Ready Mix
Pekerja
Tukang batu
Kepala tukang batu
Mandor
Alat bantu (Slang + Tes Lab.)

952,875.00
30,000.00
42,500.00
45,000.00
40,000.00
13,750.00

1,044,018.75
952,875.00
75,000.00
10,625.00
4,500.00
400.00
618.75

1.0000
2.5000
0.2500
0.1000
0.0100
0.0450

m3
org
org
org
org
lot

1 M3 PAS. BETON K-300 READY MIX 6 M3 BERIKUT SLANG


Adukan K-300 Ready Mix
Pekerja
Tukang batu
Kepala tukang batu
Mandor
Alat bantu (Slang + Tes Lab.)

994,250.00
30,000.00
42,500.00
45,000.00
40,000.00
13,750.00

1,085,393.75
994,250.00
75,000.00
10,625.00
4,500.00
400.00
618.75

0.0010
0.0010
0.0002
0.0001
0.0002
0.0200
0.0002
0.0100
0.0010
0.0002

org
org
org
org
org
org
ls
lt
lt
lot

1 KG PEK. ERECTION KONST. KUDA-KUDA BESI


Pekerja
Tukang besi profil
Kepala tukang besi profil
Mandor
Operator alat berat
Pembantu operator
Sewa alat
Bahan Bakar solar
Pelumas
Alat bantu

30,000.00
42,500.00
45,000.00
40,000.00
43,000.00
35,000.00
150,000.00
4,500.00
34,450.00
13,750.00

906.30
30.00
42.50
9.00
4.00
8.60
700.00
30.00
45.00
34.45
2.75

1.1000
0.0600
0.0300
0.0150
0.0075
0.1250

kg
org
org
org
org
lot

1 KG PEKERJAAN BAJA IWF


Besi IWF
Pekerja
Tukang besi profil
Kepala tukang besi profil
Mandor
Peralatan (oksigen,solar,elpiji,kawat las)

19,400.00
30,000.00
42,500.00
45,000.00
40,000.00
150,000.00

44,140.00
21,340.00
1,800.00
1,275.00
675.00
300.00
18,750.00

1.1000
0.0600
0.0300
0.0150
0.0075
0.1250

kg
org
org
org
org
lot

1 KG PEKERJAAN KONSTUKSI BESI SIKU / PROFIL


Besi profil/besi siku
Pekerja
Tukang besi profil
Kepala tukang besi profil
Mandor
Peralatan (oksigen,solar,elpiji,kawat las)

18,500.00
30,000.00
42,500.00
45,000.00
40,000.00
150,000.00

43,150.00
20,350.00
1,800.00
1,275.00
675.00
300.00
18,750.00

0.0400
0.0300
0.0040
0.0100
0.0050
0.0050
0.0025
0.2500

kg
lt
lt
org
org
org
org
lot

1 CM PEK. PENGELASAN DENGAN LAS LISTRIK TEBAL KAWAT 4 MM


Kawat las listrik
33,000.00
Bahan bakar solar
4,500.00
Pelumas
34,450.00
Pekerja
30,000.00
Tukang besi profil
42,500.00
Kepala tukang besi profil
45,000.00
Mandor
40,000.00
Alat bantu (mesin las listrik)
150,000.00

39,930.30
1,320.00
135.00
137.80
300.00
212.50
225.00
100.00
37,500.00

0.0500
0.0200
0.0030
0.0010
0.2500

org
org
org
org
lot

1 TITIK MELUBANG KONSTRUKSI BESI DENGAN BOR


Pekerja
Tukang besi profil
Kepala tukang besi profil
Mandor
Alat bantu (mesin bor listrik)

30,000.00
42,500.00
45,000.00
40,000.00
150,000.00

40,025.00
1,500.00
850.00
135.00
40.00
37,500.00

1.0100
0.1000
0.1000
0.0750
0.0100

m2
kg
org
org
org

1 M2 PEKERJAAN WIREMESH M8
Wiremesh M8
Kawat las listrik
Pekerja
Tukang besi profil
Mandor

72,600.00
33,000.00
30,000.00
42,500.00
40,000.00

83,213.50
73,326.00
3,300.00
3,000.00
3,187.50
400.00

G.36

G.37

G.38

G.39

G.40

G.41

G.42

VIII

PEKERJAAN PENUTUP ATAP

H.1
25.0000

Buah

0.1500
0.0750
0.0080
0.0080

OH
OH
OH
OH

1 M2 Pasang Atap Genteng Mantili Kecil


Genteng mantili
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

\\vboxsrv\conversion_tmp\scratch_6\144824707.xls.ms_office

34

1,000.00

33,367.50
25,000.00

30,000.00
42,500.00
45,000.00
40,000.00

4,500.00
3,187.50
360.00
320.00

H.2

1,200.00

31,640.00
24,000.00

30,000.00
42,500.00
45,000.00
40,000.00

4,500.00
2,550.00
270.00
320.00

2,900.00
1,312.50
125,000.00

50,480.00
14,500.00
10,500.00
4,000.00

Pekerja
Tukang Batu
Kepala Tukang
Mandor

30,000.00
42,500.00
45,000.00
40,000.00

12,000.00
8,500.00
900.00
80.00

Lbr
Kg

1 M2 Pasang Atap Asbes Gelombang (80 x 210 cm) x 5 mm


Asbes Gelombang
Paku Pancing 60 x 230

45,850.00
25,000.00

38,577.50
27,510.00
3,000.00

0.1400
0.0750
0.0080
0.0080

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

30,000.00
42,500.00
45,000.00
40,000.00

4,200.00
3,187.50
360.00
320.00

11.0000
0.0300

bh
Kg

1 M2 Pasang Atap Genteng Beton


Genteng Beton Standrad
Paku Biasa 2" - 5"

2,750.00
16,750.00

41,852.50
30,250.00
502.50

0.2000
0.1000
0.0100
0.0100

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

30,000.00
42,500.00
45,000.00
40,000.00

6,000.00
4,250.00
450.00
400.00

60.0000
0.2000

Lbr
Kg

1 M2 Pasang Atap Sirap


Genteng Sirap
Paku Biasa 1/2" - 1"

2,589.50
16,750.00

175,770.00
155,370.00
3,350.00

0.1660
0.2500
0.0250
0.0080

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

30,000.00
42,500.00
45,000.00
40,000.00

4,980.00
10,625.00
1,125.00
320.00

3.5000
0.0500
10.8000
0.0320

Buah
Kg
Kg
m3

9,075.00
16,750.00
1,312.50
125,000.00

72,975.00
31,762.50
837.50
14,175.00
4,000.00

0.4000
0.2000
0.0200
0.0200

OH
OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang
Mandor

30,000.00
42,500.00
45,000.00
40,000.00

12,000.00
8,500.00
900.00
800.00

0.4000
0.0600
0.5000
0.0040

Lbr
Kg
Kg
m3

1 M' Pasang Nok Sirap


Seng Plaat 3" x 6" BJLS 28
Paku Biasa 1/2" - 1"
Paku Biasa 2" - 5"
Kayu Bengkirai Papan Tebal 3 cm

81,200.00
16,750.00
16,750.00
214,482.84

58,457.93
32,480.00
1,005.00
8,375.00
857.93

0.1250
0.2500
0.0250
0.0060

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

30,000.00
42,500.00
45,000.00
40,000.00

3,750.00
10,625.00
1,125.00
240.00

0.7000
0.0200

Lbr
Kg

1 M2 Pasang Atap Seng Gelombang


Seng Gelombang 3" x 6" BJLS 28
Paku Biasa 1/2" - 1"

81,200.00
16,750.00

63,835.00
56,840.00
335.00

0.1200
0.0600
0.0060
0.0060

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

30,000.00
42,500.00
45,000.00
40,000.00

3,600.00
2,550.00
270.00
240.00

20.0000

Buah

0.1500
0.0600
0.0060
0.0080

OH
OH
OH
OH

5.0000
8.0000
0.0320

Buah
Kg
m3

0.4000
0.2000
0.0200
0.0020

OH
OH
OH
OH

0.6000
0.1200

H.3

H.4

H.5

H.6

H.7

H.8

H.9

1 M2 Pasang Atap Genteng Mantili Besar


Genteng Mantili Besar
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
1 M' Pasang Genteng Bubung Mantili
Genteng Bubung Mantili
Portland Semen
Pasir Pasang

1 M' Pasang Nok Genteng Beton


Nok Genteng Beton
Paku Biasa 2" - 5"
Portland Semen
Pasir Pasang

\\vboxsrv\conversion_tmp\scratch_6\144824707.xls.ms_office

35

H.10

IX

0.3000
0.0400

Lbr
Kg

1 M' Pasang Atap Nok Seng


Seng Plaat 3" x 6" BJLS 28
Paku Biasa 1/2" - 1"

81,200.00
16,750.00

33,105.00
24,360.00
670.00

0.1500
0.0700
0.0080
0.0060

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

30,000.00
42,500.00
45,000.00
40,000.00

4,500.00
2,975.00
360.00
240.00

PEKERJAAN LANGIT - LANGIT

I.1
1.1000
0.0100

Lbr
Kg

1 M2 Langit-langit Asbes (1,00x1,00) m, tebal 4 mm, 5 mm & 6 mm


Plat Asbes tebal 5 mm
Paku

19,050.00
16,750.00

25,392.50
20,955.00
167.50

0.0300
0.0700
0.0070
0.0020

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

30,000.00
42,500.00
45,000.00
40,000.00

900.00
2,975.00
315.00
80.00

0.3750
0.0300

Lbr
Kg

1 M2 Memasang Langit-langit Tripleks Uk (120x240) cm,


Tebal 3 mm, 4 mm & 6 mm
Tripleks (4 mm)
Paku Tripleks

72,300.00
16,750.00

27,112.50
502.50

0.0700
0.1000
0.0100
0.0040

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

30,000.00
42,500.00
45,000.00
40,000.00

2,100.00
4,250.00
450.00
160.00

0.0150
0.0100

m3
Kg

1 M2 Memasang Langit-langit Lambriziring Kayu Jati, tebal 6 mm


Kayu Jati,Papan
Paku

16,156,250.00
16,750.00

299,311.25
242,343.75
167.50

0.6000
0.8000
0.0800
0.0300

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

30,000.00
42,500.00
45,000.00
40,000.00

18,000.00
34,000.00
3,600.00
1,200.00

0.3640
0.1100

Lbr
Kg

1 M2 Langit-langit Gypsum Board, tebal 9 mm


Gypsum Board
Paku Sekrup

82,500.00
22,800.00

38,088.00
30,030.00
2,508.00

0.1000
0.0500
0.0050
0.0050

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

30,000.00
42,500.00
45,000.00
40,000.00

3,000.00
2,125.00
225.00
200.00

1.0500
0.0100

m1
Kg

1 M' List Langit-Langit Kayu Profil


List Kayu Profil
Paku

7,600.00
16,750.00

12,117.50
7,980.00
167.50

0.0500
0.0500
0.0050
0.0030

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

30,000.00
42,500.00
45,000.00
40,000.00

1,500.00
2,125.00
225.00
120.00

0.0154
0.2000

m3
Kg

1M2 Pasang Rangka Langit-langit (1,00x1,00) m, kayu Bengkirai


Kayu Bengkirai, balok
Paku Biasa 2" - 5"

9,625,000.00
16,750.00

170,825.00
148,225.00
3,350.00

0.1500
0.2500
0.0250
0.0750

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

30,000.00
42,500.00
45,000.00
40,000.00

4,500.00
10,625.00
1,125.00
3,000.00

0.0163
0.2500

m3
Kg

1M2 Pasang Rangka Langit-langit (60x60) cm, kayu Bengkirai


Kayu Bengkirai, balok
Paku Biasa 2" - 5"

9,625,000.00
16,750.00

181,575.00
156,887.50
4,187.50

0.2000
0.3000
0.0300
0.0100

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

30,000.00
42,500.00
45,000.00
40,000.00

6,000.00
12,750.00
1,350.00
400.00

584,450.00

736,645.00
584,450.00

30,000.00
42,500.00
45,000.00
40,000.00

99,000.00
46,750.00
45.00
6,400.00

I.2

I.3

I.4

I.5

I.6

I.7

J
J.1
1.0000 Buah

PEKERJAAN SANITASI, JALAN DAN SALURAN


1 UNIT Memasang Closet Duduk Porselin
Kloset Duduk

3.3000
1.1000
0.0010
0.1600

Pekerja
Tukang Batu
Kepala Tukang
Mandor

OH
OH
OH
OH

\\vboxsrv\conversion_tmp\scratch_6\144824707.xls.ms_office

36

34,575.00

J.2

1 UNIT Memasang Closet Jongkok


Kloset Jongkok
Portland Semen
Pasir Pasang

123,750.00
1,312.50
125,000.00

300,525.00
123,750.00
7,875.00
1,250.00

30,000.00
42,500.00
45,000.00
40,000.00

30,000.00
63,750.00
67,500.00
6,400.00

501,950.00
501,950.00
1,312.50
125,000.00

714,572.50
501,950.00
150,585.00
7,875.00
1,250.00

30,000.00
42,500.00
45,000.00
40,000.00

36,000.00
6,162.50
6,750.00
4,000.00

55,000.00
425.00
1,312.50
125,000.00
61,950.00

77,660.78
60,500.00
11.48
892.50
7,000.00
1,486.80

30,000.00
42,500.00
45,000.00
40,000.00

4,200.00
2,975.00
315.00
280.00

68,750.00
425.00
1,312.50
125,000.00
61,950.00

122,367.05
75,625.00
233.75
13,518.75
7,625.00
4,274.55

30,000.00
42,500.00
45,000.00
40,000.00

11,400.00
8,075.00
855.00
760.00

4,500.00
4,500.00

10,092.00
4,545.00
1,575.00

30,000.00
42,500.00
45,000.00
40,000.00

1,080.00
2,550.00
270.00
72.00

6,600.00
6,600.00

13,346.00
6,666.00
2,310.00

Pekerja
Tukang Ledeng
Kepala Tukang
Mandor

30,000.00
42,500.00
45,000.00
40,000.00

1,188.00
2,805.00
297.00
80.00

m'

1 M' MEMASANG PIPA type AW PVC 1"


Pipa PVC
Perlengkapan 35% Harga Pipa

11,275.00
11,275.00

20,102.00
11,387.75
3,946.25

0.0432
0.0720
0.0072
0.0022

OH
OH
OH
OH

Pekerja
Tukang Ledeng
Kepala Tukang
Mandor

30,000.00
42,500.00
45,000.00
40,000.00

1,296.00
3,060.00
324.00
88.00

1.0100
0.3500

m'

1 M' MEMASANG PIPA PVC type AW 11/4"


Pipa PVC
Perlengkapan 35% Harga Pipa

14,300.00
14,300.00

24,610.00
14,443.00
5,005.00

0.0468
0.0780
0.0078
0.0023

OH
OH
OH
OH

Pekerja
Tukang Ledeng
Kepala Tukang
Mandor

30,000.00
42,500.00
45,000.00
40,000.00

1,404.00
3,315.00
351.00
92.00

1.0000
6.0000
0.0100

Buah
Kg
m3

1.0000
1.5000
1.5000
0.1600

OH
OH
OH
OH

1.0000
0.3000
6.0000
0.0100

Buah
Kg
m3

1.2000
0.1450
0.1500
0.1000

OH
OH
OH
OH

1.1000
0.0270
0.6800
0.0560
0.0240

Buah
m3
Kg
m3
m3

0.1400
0.0700
0.0070
0.0070

OH
OH
OH
OH

1.1000
0.5500
10.3000
0.0610
0.0690

Buah
m3
Kg
m3
m3

0.3800
0.1900
0.0190
0.0190

OH
OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang
Mandor

1.0100
0.3500

m'

1 M' Memasang Pipa PVC type AW "


Pipa PVC
Perlengkapan 35% Harga Pipa

0.0360
0.0600
0.0060
0.0018

OH
OH
OH
OH

Pekerja
Tukang Ledeng
Kepala Tukang
Mandor

1.0100
0.3500

m'

1 M' MEMASANG PIPA PVC type AW 3/4"


Pipa PVC
Perlengkapan 35% Harga Pipa

0.0396
0.0660
0.0066
0.0020

OH
OH
OH
OH

1.0100
0.3500

J.3

J.4

J.5

J.6

J.7

J.8

J.9

Pekerja
Tukang Batu
Kepala Tukang
Mandor
1 UNIT Memasang Wastafel
Wastafel
Perlengkapan 30% Harga Wastafel
Portland Semen
Pasir Pasang
Pekerja
Tukang Batu
Kepala Tukang
Mandor
1 M' Memasang Pipa Beton, 15 cm - 20 cm
Pipa Beton
Batu Bata
Portland Semen
Pasir Pasang
Pasir Urug
Pekerja
Tukang Batu
Kepala Tukang
Mandor
1 M' Memasang Pipa Beton, 30 cm - 100 cm
Pipa Beton
Batu Bata
Portland Semen
Pasir Pasang
Pasir Urug

\\vboxsrv\conversion_tmp\scratch_6\144824707.xls.ms_office

37

J.10
1.0100
0.3500

m'

1 M' MEMASANG PIPA PVC type AW 11/2"


Pipa PVC
Perlengkapan 35% Harga Pipa

22,250.00
22,250.00

35,820.00
22,472.50
7,787.50

0.0504
0.0840
0.0084
0.0025

OH
OH
OH
OH

Pekerja
Tukang Ledeng
Kepala Tukang
Mandor

30,000.00
42,500.00
45,000.00
40,000.00

1,512.00
3,570.00
378.00
100.00

1.0100
0.3500

m'

1 M' Memasang Pipa PVC type AW 2"


Pipa PVC
Perlengkapan 35% Harga Pipa

33,550.00
33,550.00

51,586.00
33,885.50
11,742.50

0.0540
0.0900
0.0090
0.0027

OH
OH
OH
OH

Pekerja
Tukang Ledeng
Kepala Tukang
Mandor

30,000.00
42,500.00
45,000.00
40,000.00

1,620.00
3,825.00
405.00
108.00

1.0100
0.3500

m'

1 M' MEMASANG PIPA PVC type AW 21/2"


Pipa PVC
Perlengkapan 35% Harga Pipa

48,125.00
48,125.00

72,900.75
48,606.25
16,843.75

0.0675
0.1125
0.0113
0.0034

OH
OH
OH
OH

Pekerja
Tukang Ledeng
Kepala Tukang
Mandor

30,000.00
42,500.00
45,000.00
40,000.00

2,025.00
4,781.25
508.50
136.00

1.0100
0.3500

m'

1 M' Memasang Pipa PVC type AW 3"


Pipa PVC
Perlengkapan 35% Harga Pipa

68,900.00
68,900.00

102,643.00
69,589.00
24,115.00

0.0810
0.1350
0.0135
0.0041

OH
OH
OH
OH

Pekerja
Tukang Ledeng
Kepala Tukang
Mandor

30,000.00
42,500.00
45,000.00
40,000.00

2,430.00
5,737.50
607.50
164.00

J.11

J.12

J.13

J.14
1.0100
0.1000
0.2000
0.3000
0.0300
0.0250
0.0500

m2
m3
Org
Org
Org
Org
lot

1 M2 PASANG PAVING BLOK 6 CM K : 300


Paving blok 6 Holand cm K : 300 (ALDAS)
Pasir pasang
Pekerja
Tukang batu
Kepala tukang batu
Mandor
Peralatan

59,500.00
125,000.00
30,000.00
42,500.00
45,000.00
40,000.00
13,750.00

94,382.50
60,095.00
12,500.00
6,000.00
12,750.00
1,350.00
1,000.00
687.50

1.0100
0.1000
0.2000
0.3000
0.0300
0.0250
0.0500

m2
m3
Org
Org
Org
Org
lot

1 M2 PASANG PAVING BLOK 6 CM K : 175


Paving blok Holand 6 cm K : 175
Pasir pasang
Pekerja
Tukang batu
Kepala tukang batu
Mandor
Peralatan

36,750.00
125,000.00
30,000.00
42,500.00
45,000.00
40,000.00
13,750.00

71,405.00
37,117.50
12,500.00
6,000.00
12,750.00
1,350.00
1,000.00
687.50

1.0100
0.1000
0.2000
0.3000
0.0300
0.0250
0.0500

m2
m3
Org
Org
Org
Org
lot

1 M2 PASANG PAVING BLOK 8 CM K ; 300


Paving blok Holand 8 cm K : 300 (ALDAS)
Pasir pasang
Pekerja
Tukang batu
Kepala tukang batu
Mandor
Peralatan

102,100.00
125,000.00
30,000.00
42,500.00
45,000.00
40,000.00
13,750.00

137,408.50
103,121.00
12,500.00
6,000.00
12,750.00
1,350.00
1,000.00
687.50

1.0100
0.1000
0.2000
0.3000
0.0300
0.0250
0.0500

m2
m3
Org
Org
Org
Org
lot

1 M2 PASANG PAVING BLOK 8 CM K: 175


Paving blok Holand 8 cm K : 175
Pasir pasang
Pekerja
Tukang batu
Kepala tukang batu
Mandor
Peralatan

18,200.00
125,000.00
30,000.00
42,500.00
45,000.00
40,000.00
13,750.00

52,669.50
18,382.00
12,500.00
6,000.00
12,750.00
1,350.00
1,000.00
687.50

1.0100
0.1000
0.2000
0.3000
0.0300
0.0250
0.0500

m2
m3
Org
Org
Org
Org
lot

1 M2 PASANGAN PAVING BLOK WARNA 6 CM K: 175


Paving blok warna 6 cm K : 175
Pasir pasang
Pekerja
Tukang batu
Kepala tukang batu
Mandor
Peralatan

51,800.00
125,000.00
30,000.00
42,500.00
45,000.00
40,000.00
13,750.00

86,605.50
52,318.00
12,500.00
6,000.00
12,750.00
1,350.00
1,000.00
687.50

J.15

J.16

J.17

J.18

\\vboxsrv\conversion_tmp\scratch_6\144824707.xls.ms_office

38

J.19
1.0100
0.1000
0.2000
0.3000
0.0300
0.0250
0.0500

m2
m3
Org
Org
Org
Org
lot

1 M2 PASANGAN PAVING BLOK WARNA 8 CM K: 175


Paving blok warna 8 cm K : 175
Pasir pasang
Pekerja
Tukang batu
Kepala tukang batu
Mandor
Peralatan

0.0300
0.0140
0.0050
0.0050
0.1000
0.0050
3.0000
0.0180

m3
m3
m3
m3
org
org
kg
lot

1 M2 LAPISAN PENGISI / PENUTUP DENGAN ASPAL PANAS TEBAL 3 CM


Batu pecah mesin 2/3
246,850.00
Batu pecah mesin 1/2
248,950.00
Batu pecah mesin 0.5/1
261,250.00
Kayu bakar
97,100.00
Pekerja
30,000.00
Mandor
40,000.00
Aspal
9,500.00
Peralatan
13,750.00

1.0000
1.0000
1.0000
6.0000
20.0000
0.5000
0.5000
0.5000
0.2500

org
org
org
org
ltr
ltr
ltr
ltr
ltr
hari

MENGGILAS JALAN 1 HARI DIPERLUKAN


Operator
Pembantu Operator
Penjaga
Pekerja
Solar
Oli Sae 40
Oli Sae 50
Oli Sae 140
Stenveet
Pemeliharaan Alat

J.20

J.21

55,000.00
125,000.00
30,000.00
42,500.00
45,000.00
40,000.00
13,750.00

43,000.00
35,000.00
10,000.00
30,000.00
4,500.00
34,450.00
34,450.00
34,450.00
20,050.00

89,837.50
55,550.00
12,500.00
6,000.00
12,750.00
1,350.00
1,000.00
687.50
44,630.05
7,405.50
3,485.30
1,306.25
485.50
3,000.00
200.00
28,500.00
247.50

43,000.00
35,000.00
10,000.00
180,000.00
90,000.00
17,225.00
17,225.00
17,225.00
5,012.50
100,000.00
514,687.50

1 Bulan dihitung 25 hari menggilas


a=
J.21a
J.21b
J.21c
J.21d

MENGGILAS 1 M2 LAPIS KULIT PENAHAN


MENGGILAS 1 M2 LAPIS KULIT PERTEGARAN
MENGGILAS LAPIS AUS ( PENETRASI )
MENGGILAS RINGAN 1 M2 OPERPENTING

J.22
125.0000
1.0000
0.9000
0.4000
8.3500

ax
ax
ax
ax

12,867,187.50

2 / 7.500
1 / 7.500
2/25000
0,25/2500

100 M2 PENGASPALAN SHEET (LATASIR) TEBAL 1 CM JERENG


Aspal
Abu batu
Kayu bakar
Mandor
Pekerja

kg
m3
m3
org
org

J.23

3,431.25
1,715.63
1,029.38
1,286.72

9,500.00
211,200.00
97,100.00
40,000.00
30,000.00

1M2 ASPAL SAND SHEET TEBAL 2 CM JERENG ( 1 CM PADAT )


2/100
1/500
1/200
1/2

x
x
x
x

J.24

Biaya menggilas
Sewa motor walls
Aspal untuk lem 0,5 kg

x
x
x
x

K
K.1

Biaya menggilas
Sewa motor walls
Aspal untuk lem 0,5 kg

1,752,590.00
1,187,500.00
211,200.00
87,390.00
16,000.00
250,500.00

1,752,590.00
514,687.50
75,000.00
9,500.00

41,206.18
35,051.80
1,029.38
375.00
4,750.00

1,752,590.00
514,687.50
75,000.00
9,500.00

58,732.08
52,577.70
1,029.38
375.00
4,750.00

1M2 ASPAL SAND SHEET TEBAL 3 CM JERENG ( 2 CM PADAT )


3/100
1/500
1/200
1/2

XI

25.0000 hari

1.1500
0.0600

Kg
Kg

PEKERJAAN BESI & ALLUMUNIUM


1 Kg Memasang Besi Profil
Besi Profil
Meni Besi

0.0600
0.0600
0.0060
0.0030

OH
OH
OH
OH

Pekerja
Tukang Besi
Kepala Tukang
Mandor

30,000.00
42,500.00
45,000.00
40,000.00

1,800.00
2,550.00
270.00
120.00

1.1500

kg

1 Kg Memasang Rangka Kuda-kuda Baja IWF


Besi Baja IWF

19,400.00

27,050.00
22,310.00

0.0600
0.0600
0.0060
0.0030

OH
OH
OH
OH

Pekerja
Tukang Besi
Kepala Tukang
Mandor

30,000.00
42,500.00
45,000.00
40,000.00

1,800.00
2,550.00
270.00
120.00

1.0500
0.0150
0.0190

Lbr
Kg
m3

1 M' Memasang Talang Datar/Jurai , Seng BJLS 28 Lebar 90 cm


Seng Plaat
Paku Biasa 1 - 2,5 cm
Kayu Papan Klas II atau III

0.2000
0.4000
0.0250
0.0100

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

K.2

K.3

\\vboxsrv\conversion_tmp\scratch_6\144824707.xls.ms_office

39

18,500.00
16,100.00

26,981.00
21,275.00
966.00

244,148.75
47,200.00
16,750.00
8,937,500.00

49,560.00
251.25
169,812.50

30,000.00
42,500.00
45,000.00
40,000.00

6,000.00
17,000.00
1,125.00
400.00

K.4

XII

1.0500
0.0100
0.5000

Lbr
Kg
Kg

1 M' Memasang Talang 1/2 Lingkaran 15 cm, Seng Plaat BJLS 30


Lebar 45 cm
Seng Plaat
Paku Biasa 1 - 2,5 cm
Besi strip

0.1500
0.3000
0.0300
0.0070

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

30,000.00
42,500.00
45,000.00
40,000.00

4,500.00
12,750.00
1,350.00
280.00

PEKERJAAN KUNCI dan KACA


1 BUAH Pasang Kunci Tanam Biasa
Kunci Tanam Biasa

65,350.00

87,550.00
65,350.00

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

30,000.00
42,500.00
45,000.00
40,000.00

300.00
21,250.00
450.00
200.00

1 BUAH Pasang Kunci Tanam Kamar Mandi


Kunci Tanam Kamar Mandi

65,350.00

87,075.00
65,350.00

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

30,000.00
42,500.00
45,000.00
40,000.00

150.00
21,250.00
225.00
100.00

7,150.00

14,680.00
7,150.00

30,000.00
42,500.00
45,000.00
40,000.00

450.00
6,375.00
675.00
30.00

7,150.00

12,350.00
7,150.00

30,000.00
42,500.00
45,000.00
40,000.00

300.00
4,250.00
450.00
200.00

5,950.00

16,350.00
5,950.00

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

30,000.00
42,500.00
45,000.00
40,000.00

600.00
8,500.00
900.00
400.00

1 BUAH Pasang Kait Angin


Kait Angin

19,500.00

27,030.00
19,500.00

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

30,000.00
42,500.00
45,000.00
40,000.00

450.00
6,375.00
675.00
30.00

1 BUAH Pasang Kunci Selot


Kunci Selot

10,450.00

20,490.00
10,450.00

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

30,000.00
42,500.00
45,000.00
40,000.00

600.00
8,500.00
900.00
40.00

1 BUAH Pasang Kunci Lemari


Kunci Lemari

10,450.00

23,000.00
10,450.00

L
L.1

84,740.00
54,850.00
16,750.00
16,200.00

57,592.50
167.50
8,100.00

1.0000

Buah

0.0100
0.5000
0.0100
0.0050

OH
OH
OH
OH

1.0000

Buah

0.0050
0.5000
0.0050
0.0025

OH
OH
OH
OH

1.0000

Buah

0.0150
0.1500
0.0150
0.0008

OH
OH
OH
OH

1.0000

Buah

0.0100
0.1000
0.0100
0.0050

OH
OH
OH
OH

1.0000

Buah

0.0200
0.2000
0.0200
0.0100

OH
OH
OH
OH

1.0000

Buah

0.0150
0.1500
0.0150
0.0008

OH
OH
OH
OH

1.0000

Buah

0.0200
0.2000
0.0200
0.0010

OH
OH
OH
OH

1.0000

Buah

0.0250
0.2500
0.0250
0.0013

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

30,000.00
42,500.00
45,000.00
40,000.00

750.00
10,625.00
1,125.00
50.00

1.1000

m2

1 M2 Pasang Kaca tebal 5 mm


Kaca tebal 5mm

96,250.00

113,405.00
105,875.00

0.0150
0.1500
0.0150
0.0008

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

30,000.00
42,500.00
45,000.00
40,000.00

450.00
6,375.00
675.00
30.00

L.2

L.3

L.4

L.5

L.6

L.7

L.8

L.9

1 BUAH Pasang Engsel Pintu


Engsel Pintu
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
1 BUAH Pasang Engsel Jendela Kupu-kupu
Engsel Jendela
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
1 BUAH Pasang Engsel Angin
Engsel Angin

\\vboxsrv\conversion_tmp\scratch_6\144824707.xls.ms_office

40

XIII

M
M.1

PEKERJAAN PENUTUP LANTAI dan DINDING


1 M2 Pasang lantai Ubin PC Abu-abu Uk. 20 x 20 cm
Ubin Abu-abu 20x20 cm
Portland Semen
Pasir Pasang

26.5000
10.4000
0.0135

Buah
Kg
m3

0.2700
0.1300
0.0130
0.0140

OH
OH
OH
OH

6.9300
9.8000
0.0450
1.3000

Buah
Kg
m3
Kg

0.2500
0.1200
0.0120
0.0130

OH
OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang
Mandor

1.1870
10.0000
0.0450
1.5000

m2
Kg
m3
Kg

1 M2 Pasang Lantai Keramik 30 x 30 cm


Ubin Keramik 30 x 30 cm
Portland Semen
Pasir Pasang
Semen Warna

0.6200
0.3500
0.0350
0.0300

OH
OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang
Mandor

26.5000
10.4000
0.0450
1.6200

Buah
Kg
m3
Kg

0.6200
0.3500
0.0350
0.0300

OH
OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang
Mandor

1.0600
8.1900
0.0450
0.6500

m2
Kg
m3
Kg

1M2 Memasang Lantai Marmer ukuran 1.00x1.00 m


Marmer
Portland Semen
Pasir Pasang
Semen Warna

0.6200
0.3500
0.0350
0.0300

OH
OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang
Mandor

53.0000
9.3000
0.0180
2.7500

Buah
Kg
m3
Kg

0.6000
0.4500
0.0450
0.0300

OH
OH
OH
OH

26.5000
9.3000
0.0180
2.7500

Buah
Kg
m3
Kg

0.6000
0.4500
0.0450
0.0300

OH
OH
OH
OH

M.2

M.3

M.4

M.5

M.6

M.7

Pekerja
Tukang Batu
Kepala Tukang
Mandor
1 M2 Pasang lantai Ubin Granito Uk. 40 x 40 cm
Ubin Granito 40x40 cm
Portland Semen
Pasir Pasang
Semen Warna

1 M2 Pasang Lantai Keramik 20 x 20 cm


Ubin Keramik 20 x 20 cm
Portland Semen
Pasir Pasang
Semen Warna

1 M2 Pasang Dinding Keramik 10x20 cm,


Keramik 10x20 cm
Portland Semen
Pasir Pasang
Semen Warna
Pekerja
Tukang Batu
Kepala Tukang
Mandor
1 M2 Pasang Dinding Keramik 20x20 cm,
Keramik 20x20 cm
Portland Semen
Pasir Pasang
Semen Warna
Pekerja
Tukang Batu
Kepala Tukang
Mandor

\\vboxsrv\conversion_tmp\scratch_6\144824707.xls.ms_office

41

956.00
1,312.50
125,000.00

55,441.50
25,334.00
13,650.00
1,687.50

30,000.00
42,500.00
45,000.00
40,000.00

8,100.00
5,525.00
585.00
560.00

77,137.50
1,312.50
125,000.00
11,250.00

581,335.38
534,562.88
12,862.50
5,625.00
14,625.00

30,000.00
42,500.00
45,000.00
40,000.00

7,500.00
5,100.00
540.00
520.00

48,750.00
1,312.50
125,000.00
11,250.00

129,741.25
57,866.25
13,125.00
5,625.00
16,875.00

30,000.00
42,500.00
45,000.00
40,000.00

18,600.00
14,875.00
1,575.00
1,200.00

1,818.87
1,312.50
125,000.00
11,250.00

121,950.00
48,200.00
13,650.00
5,625.00
18,225.00

30,000.00
42,500.00
45,000.00
40,000.00

18,600.00
14,875.00
1,575.00
1,200.00

607,450.00
1,312.50
125,000.00
1,789.00

697,684.23
643,897.00
10,749.38
5,625.00
1,162.85

30,000.00
42,500.00
45,000.00
40,000.00

18,600.00
14,875.00
1,575.00
1,200.00

874.00
1,312.50
125,000.00
11,250.00

132,065.75
46,322.00
12,206.25
2,250.00
30,937.50

30,000.00
42,500.00
45,000.00
40,000.00

18,000.00
19,125.00
2,025.00
1,200.00

1,677.36
1,312.50
125,000.00
11,250.00

130,193.75
44,450.00
12,206.25
2,250.00
30,937.50

30,000.00
42,500.00
45,000.00
40,000.00

18,000.00
19,125.00
2,025.00
1,200.00

M.8

1M2 Memasang Dinding Marmer ukuran 1.00x1.00 m


Marmer
Paku 12 cm
Portland Semen
Pasir Pasang
Semen Warna

1.0200
2.0000
12.4400
0.0250
0.6500

Buah
Kg
Kg
m3
Kg

0.7200
0.6500
0.0650
0.0350

OH
OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang
Mandor

1.1000
11.7500
0.0350

m2
Kg
m3

1 M2 Pasang Dinding Batu Paros / Batu Tempel Hitam


Batu Paros
Portland Semen
Pasir Pasang

0.6200
0.3500
0.0350
0.0300

OH
OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang
Mandor

M.9

M.10

607,450.00
16,750.00
1,312.50
125,000.00
1,789.00

727,264.35
619,599.00
33,500.00
16,327.50
3,125.00
1,162.85

30,000.00
42,500.00
45,000.00
40,000.00

21,600.00
27,625.00
2,925.00
1,400.00

68,750.00
1,312.50
125,000.00

131,671.88
75,625.00
15,421.88
4,375.00

30,000.00
42,500.00
45,000.00
40,000.00

18,600.00
14,875.00
1,575.00
1,200.00

1.0000
0.2600
0.0300
1.0000
1.0000
3.0000
0.2000
0.1000
0.4800

m2
zak
m3
lot
org
org
org
org
lot

1 M2 DINDING GRANIT IMPORT


Granit import
P C (50 kg)
Pasir pasang
Campuran kedap air
Pekerja
Tukang batu
Kepala tukang batu
Mandor
Alat bantu

241,800.00
65,625.00
125,000.00
58,300.00
30,000.00
42,500.00
45,000.00
40,000.00
13,750.00

498,012.50
241,800.00
17,062.50
3,750.00
58,300.00
30,000.00
127,500.00
9,000.00
4,000.00
6,600.00

1.0000
0.2600
0.0300
1.0000
0.5000
1.5000
0.1000
0.0250
0.0320

m2
zak
m3
lot
org
org
org
org
lot

1 M2 LANTAI GRANIT IMPORT


Granit import
P C (50 kg)
Pasir pasang
Campuran kedap air
Pekerja
Tukang batu
Kepala tukang batu
Mandor
Alat bantu

241,800.00
65,625.00
125,000.00
58,300.00
30,000.00
42,500.00
45,000.00
40,000.00
13,750.00

405,602.50
241,800.00
17,062.50
3,750.00
58,300.00
15,000.00
63,750.00
4,500.00
1,000.00
440.00

1.0000
0.2600
0.0300
0.7500
0.2500
0.6000
0.0500
0.0250
0.0240

m2
zak
m3
lot
org
org
org
org
lot

1 M2 LANTAI GRANITO UKURAN 60 X 60 POLISHED


Granito 60 x 60 polished lokal
P C (50 kg)
Pasir pasang
Campuran kedap air
Pekerja
Tukang batu
Kepala tukang batu
Mandor
Alat bantu

461,000.00
65,625.00
125,000.00
58,300.00
30,000.00
42,500.00
45,000.00
40,000.00
13,750.00

562,117.50
461,000.00
17,062.50
3,750.00
43,725.00
7,500.00
25,500.00
2,250.00
1,000.00
330.00

1.0000
0.2600
0.0300
0.7500
0.2500
0.7000
0.0500
0.0250
0.0400

m2
zak
m3
lot
org
org
org
org
lot

1 M2 DINDING GRANITO UKURAN 60 X 60 POLISHED


Granito 60 x 60 polished lokal
P C (50 kg)
Pasir pasang
Campuran kedap air
Pekerja
Tukang batu
Kepala tukang batu
Mandor
Alat bantu

461,000.00
65,625.00
125,000.00
58,300.00
30,000.00
42,500.00
45,000.00
40,000.00
13,750.00

566,587.50
461,000.00
17,062.50
3,750.00
43,725.00
7,500.00
29,750.00
2,250.00
1,000.00
550.00

1.0000
0.2600
0.0300
1.0000
0.5000
1.5000
0.1000
0.0250
0.0320

m2
zak
m3
lot
org
org
org
org
lot

1 M2 LANTAI MARMER ITALY


marmer italy
P C (50 kg)
Pasir pasang
Campuran kedap air
Pekerja
Tukang batu
Kepala tukang batu
Mandor
Alat bantu

1,381,100.00
65,625.00
125,000.00
58,300.00
30,000.00
42,500.00
45,000.00
40,000.00
13,750.00

1,544,902.50
1,381,100.00
17,062.50
3,750.00
58,300.00
15,000.00
63,750.00
4,500.00
1,000.00
440.00

M.11

M.12

M.13

M.14

\\vboxsrv\conversion_tmp\scratch_6\144824707.xls.ms_office

42

M.15
1.0000
0.2600
0.0300
1.0000
1.0000
3.0000
0.2000
0.0250
0.4800
XIV

1 M2 DINDING MARMER ITALY


marmer italy
P C (50 kg)
Pasir pasang
Campuran kedap air
Pekerja
Tukang batu
Kepala tukang batu
Mandor
Alat bantu

m2
zak
m3
lot
org
org
org
org
lot

1,381,100.00
65,625.00
125,000.00
58,300.00
30,000.00
42,500.00
45,000.00
40,000.00
13,750.00

1,634,312.50
1,381,100.00
17,062.50
3,750.00
58,300.00
30,000.00
127,500.00
9,000.00
1,000.00
6,600.00

PEKERJAAN PENGECATAN

N.1
0.0800
0.0200
0.1000

Kg
Kg
lbr

1 M2 Mendempul dan Menggosok Kayu


Dempul Jadi
Minyak Cat
Amplas

21,150.00
16,050.00
3,550.00

5,548.00
1,692.00
321.00
355.00

0.0400
0.0400
0.0040
0.0025

OH
OH
OH
OH

Pekerja
Tukang Cat
Kepala Tukang
Mandor

30,000.00
42,500.00
45,000.00
40,000.00

1,200.00
1,700.00
180.00
100.00

0.1500
0.1700
0.1700

Kg
Kg
Kg

1 M2 Pengecatan Bidang Lama


Plamir
Cat Dasar
Cat Penutup

21,150.00
15,850.00
18,800.00

14,788.00
3,172.50
2,694.50
3,196.00

0.0700
0.0750
0.0075
0.0025

OH
OH
OH
OH

Pekerja
Tukang Cat
Kepala Tukang
Mandor

30,000.00
42,500.00
45,000.00
40,000.00

2,100.00
3,187.50
337.50
100.00

0.2000
0.1500
0.1700
0.2600

Kg
Kg
Kg
Kg

1 M2 Pengecatan Bidang Kayu Baru (1 lap.Plamir)


1 lap.Cat Dasar & 2 lap.Cat Penutup
Cat Meni
Plamir
Cat Dasar
Cat Penutup 2 kali

22,450.00
21,150.00
43,700.00
56,100.00

4,490.00
3,172.50
7,429.00
14,586.00

0.0700
0.0090
0.0060
0.0025

OH
OH
OH
OH

Pekerja
Tukang Cat
Kepala Tukang
Mandor

30,000.00
42,500.00
45,000.00
40,000.00

2,100.00
382.50
270.00
100.00

0.2000
0.1500
0.1700
0.3500

Kg
Kg
Kg
Kg

1 M2 Pengecatan Bidang Kayu Baru (1 lap.Plamir)


1 lap.Cat Dasar & 3 lap.Cat Penutup
Cat Meni
Plamir
Cat Dasar
Cat Penutup 2 kali

22,450.00
21,150.00
43,700.00
56,100.00

4,490.00
3,172.50
7,429.00
19,635.00

0.0700
0.1050
0.0040
0.0025

OH
OH
OH
OH

Pekerja
Tukang Cat
Kepala Tukang
Mandor

30,000.00
42,500.00
45,000.00
40,000.00

2,100.00
4,462.50
180.00
100.00

N.2

N.3

N.4

N.5

32,530.00

41,569.00

1 M2 Pengecat Tembok Baru (1lap.Plamir, 1lap Cat Dasar

11,292.00

2 lap. Cat Penutup)


0.1000

Kg

Plamir

19,250.00

1,925.00

0.1000

Kg

Cat Dasar

15,850.00

1,585.00

0.2600

Kg

Cat Penutup 2 kali

15,850.00

4,121.00

0.0200

OH

Pekerja

30,000.00

600.00

0.0630

OH

Tukang Cat

42,500.00

2,677.50

0.0063

OH

Kepala Tukang

45,000.00

283.50

0.0025

OH

Mandor

40,000.00

100.00

0.1000

Kg

Cat Dasar

15,850.00

1,585.00

0.1800

Kg

Cat Penutup 2 kali

15,850.00

2,853.00

0.0280

OH

Pekerja

30,000.00

840.00

0.0420

OH

Tukang Cat

42,500.00

1,785.00

0.0042

OH

Kepala Tukang

45,000.00

189.00

0.0025

OH

Mandor

40,000.00

100.00

N.6

1 M2 Pengecat Tembok Lama (1lap.Plamir, 2lap Cat Penutup)

\\vboxsrv\conversion_tmp\scratch_6\144824707.xls.ms_office

43

7,352.00

N.7

1 M2 Pengecatan Permukaan Baja dg Meni Besi

11,428.00

0.1000

Kg

Meni Besi

16,100.00

1,610.00

0.0100

Kg

Perekat / Lem

22,800.00

228.00

0.0200

OH

Pekerja

30,000.00

600.00

0.2000

OH

Tukang Cat

42,500.00

8,500.00

0.0020

OH

Kepala Tukang

45,000.00

90.00

0.0100

OH

Mandor

40,000.00

400.00

N.8

1 M2 Pengecatan Permukaan Baja dg Meni Besi & Perancah

24,338.00

0.1000

Kg

Meni Besi

16,100.00

0.0100

Kg

Perekat / Lem

22,800.00

228.00

0.0020

m3

Perancah Kayu

2,062,500.00

4,125.00

0.2500

OH

Pekerja

30,000.00

7,500.00

0.2250

OH

Tukang Cat

42,500.00

9,562.50

0.0225

OH

Kepala Tukang

45,000.00

1,012.50

0.0075

OH

Mandor

40,000.00

300.00

N.9

1 M2 Pengecatan Permukaan Baja lapis Seng (Galvanis) secara

1,610.00

88,696.00

Manual sistem 3 lap. Cat Konvensional dg Tebal 200 m


0.1100

Kg

Cat dasar

50,300.00

5,533.00

0.1700

Kg

Cat Antara

50,300.00

8,551.00

0.0800

Kg

Cat Penutup

51,400.00

4,112.00

0.5000

OH

Pekerja

30,000.00

15,000.00

0.8000

OH

Tukang Cat

42,500.00

34,000.00

0.3000

OH

Kepala Tukang

45,000.00

13,500.00

0.2000

OH

Mandor

40,000.00

8,000.00

0.0300

kg

Dempul plitur (dempul kasar)

20,350.00

610.50

0.2000

kg

Wood Filler (INFRA)

34,450.00

6,890.00

0.0200

kg

Oker putih

23,000.00

460.00

0.0100

kg

Oker warna

25,200.00

252.00

0.2000

kg

Batu apung (gosok)

6,050.00

1,210.00

0.0100

kg

Sirlak

52,050.00

520.50

0.1000

bh

kwas 3"

7,600.00

760.00

0.2000

ltr

Spritus

11,900.00

2,380.00

0.1000

lbr

Ampelas kayu

3,550.00

355.00

0.2500

org

Pekerja

30,000.00

7,500.00

0.2850

org

Tukang cat

42,500.00

12,112.50

0.0400

org

Kepala tukang cat

45,000.00

1,800.00

0.0200

org

Mandor

40,000.00

800.00

0.0300

kg

Dempul plitur (dempul kasar)

20,350.00

610.50

0.2000

kg

Wood Filler (INFRA)

34,450.00

6,890.00

0.3500

kg

Melamik

76,350.00

26,722.50

0.0200

kg

Oker putih

23,000.00

460.00

0.0100

kg

Oker warna

25,200.00

252.00

0.1000

kg

Batu apung (gosok)

0.2000

kg

Sirlak

0.0100

bh

kwas 3"

7,600.00

76.00

0.2000

ltr

Spritus

11,900.00

2,380.00

0.1000

lbr

Ampelas kayu

3,550.00

355.00

0.2500

org

Pekerja

30,000.00

7,500.00

0.2850

org

Tukang cat

42,500.00

12,112.50

0.0400

org

Kepala tukang cat

45,000.00

1,800.00

0.0200

org

Mandor

40,000.00

800.00

N.10

1 M2 PLITURAN BANGUNAN ( BIASA )

N.11

35,650.50

1 M2 PLITURAN MEUBELAIR

70,973.50

Rembang,

6,050.00

605.00

52,050.00

10,410.00

Juli 2009

KEPALA DINAS PEKERJAAN UMUM


KABUPATEN REMBANG

Ir. MUJOKO, MT.


NIP. 010 234 645 / 19620715 199011 1 002

\\vboxsrv\conversion_tmp\scratch_6\144824707.xls.ms_office

44

Anda mungkin juga menyukai

  • Logic Thinker
    Logic Thinker
    Dokumen2 halaman
    Logic Thinker
    Keysha Aprilia
    Belum ada peringkat
  • LUCU
    LUCU
    Dokumen2 halaman
    LUCU
    Keysha Aprilia
    100% (1)
  • Mengerti Wanita Itu Susah
    Mengerti Wanita Itu Susah
    Dokumen1 halaman
    Mengerti Wanita Itu Susah
    Keysha Aprilia
    Belum ada peringkat
  • Menjadi Seorang Shabbat
    Menjadi Seorang Shabbat
    Dokumen1 halaman
    Menjadi Seorang Shabbat
    Keysha Aprilia
    Belum ada peringkat
  • Lucudeh
    Lucudeh
    Dokumen20 halaman
    Lucudeh
    Keysha Aprilia
    Belum ada peringkat
  • Meroko Dan Dirokok
    Meroko Dan Dirokok
    Dokumen2 halaman
    Meroko Dan Dirokok
    Keysha Aprilia
    Belum ada peringkat
  • Masalah Indonesia
    Masalah Indonesia
    Dokumen2 halaman
    Masalah Indonesia
    Keysha Aprilia
    Belum ada peringkat
  • LUCU1
    LUCU1
    Dokumen1 halaman
    LUCU1
    Keysha Aprilia
    Belum ada peringkat
  • LUCU12
    LUCU12
    Dokumen2 halaman
    LUCU12
    Keysha Aprilia
    Belum ada peringkat
  • Memindahkan Rasa Sakit
    Memindahkan Rasa Sakit
    Dokumen1 halaman
    Memindahkan Rasa Sakit
    Keysha Aprilia
    Belum ada peringkat
  • Menikamti Kebosanan
    Menikamti Kebosanan
    Dokumen2 halaman
    Menikamti Kebosanan
    Keysha Aprilia
    Belum ada peringkat
  • Mengharukan Sekali
    Mengharukan Sekali
    Dokumen1 halaman
    Mengharukan Sekali
    Keysha Aprilia
    Belum ada peringkat
  • Minki
    Minki
    Dokumen1 halaman
    Minki
    Keysha Aprilia
    Belum ada peringkat
  • Merajam Samapi Mati
    Merajam Samapi Mati
    Dokumen4 halaman
    Merajam Samapi Mati
    Keysha Aprilia
    Belum ada peringkat
  • Monyet Terjebak
    Monyet Terjebak
    Dokumen2 halaman
    Monyet Terjebak
    Keysha Aprilia
    Belum ada peringkat
  • Mom
    Mom
    Dokumen3 halaman
    Mom
    Keysha Aprilia
    Belum ada peringkat
  • Moral of Story
    Moral of Story
    Dokumen2 halaman
    Moral of Story
    Keysha Aprilia
    Belum ada peringkat
  • Minyak
    Minyak
    Dokumen1 halaman
    Minyak
    Keysha Aprilia
    Belum ada peringkat
  • Nasi Goreng Cadel
    Nasi Goreng Cadel
    Dokumen2 halaman
    Nasi Goreng Cadel
    Keysha Aprilia
    Belum ada peringkat
  • Nasib Raja Minyak
    Nasib Raja Minyak
    Dokumen2 halaman
    Nasib Raja Minyak
    Keysha Aprilia
    Belum ada peringkat
  • OBAT
    OBAT
    Dokumen3 halaman
    OBAT
    Keysha Aprilia
    Belum ada peringkat
  • Neternak Kantek
    Neternak Kantek
    Dokumen1 halaman
    Neternak Kantek
    Keysha Aprilia
    Belum ada peringkat
  • Orang Kay Adan Arsitek
    Orang Kay Adan Arsitek
    Dokumen1 halaman
    Orang Kay Adan Arsitek
    Keysha Aprilia
    Belum ada peringkat
  • NG Ebete
    NG Ebete
    Dokumen1 halaman
    NG Ebete
    Keysha Aprilia
    Belum ada peringkat
  • Operasi Katarak
    Operasi Katarak
    Dokumen2 halaman
    Operasi Katarak
    Keysha Aprilia
    Belum ada peringkat
  • Pendeta Gugup (
    Pendeta Gugup (
    Dokumen1 halaman
    Pendeta Gugup (
    Keysha Aprilia
    Belum ada peringkat
  • Nostalgia
    Nostalgia
    Dokumen1 halaman
    Nostalgia
    Keysha Aprilia
    Belum ada peringkat
  • Optimis Cowok
    Optimis Cowok
    Dokumen2 halaman
    Optimis Cowok
    Keysha Aprilia
    Belum ada peringkat
  • Pantat Inul
    Pantat Inul
    Dokumen5 halaman
    Pantat Inul
    Keysha Aprilia
    Belum ada peringkat
  • Pencuri Pulsa
    Pencuri Pulsa
    Dokumen1 halaman
    Pencuri Pulsa
    Keysha Aprilia
    Belum ada peringkat