Proposal Pembangunan
Pabrik Peleburan Tembaga
PT. INDOGARUDA COPPER
Ahmad Fahmi Syam
Luqman Izzuddin El Hanif
Ravii
Albayruni Mostavan
DAFTAR ISI
DAFTAR ISI................................................................................................................................................ i
BAB I PENDAHULUAN ............................................................................................................................. 1
I.1.
Latar Belakang......................................................................................................................... 1
I.2.
Sumber .................................................................................................................................... 3
I.3.
I.4.
I.4.1
I.4.2
Fasilitas pengangkutan........................................................................................................ 9
I.4.3
II.2
PS Converter ......................................................................................................................... 11
II.3
II.4
Equipment Pendukung.......................................................................................................... 13
III.1.1
III.1.2
Converting ..................................................................................................................... 15
III.1.3
Firerefining .................................................................................................................... 15
III.2
III.2.1
III.2.2
III.3
III.4
Penanganan Limbah.............................................................................................................. 18
III.4.1
III.4.2
V.2
V.3
REVENUE ............................................................................................................................... 25
V.4
Organisasi .............................................................................................................................. 27
VI.2
ii
BAB I
PENDAHULUAN
I.1. Latar Belakang
Tembaga merupakan sumber penting bagi orang-orang Roma dan Yunani. Tembaga banyak
ditambang dari Cyprus. Dari dua kata itulah maka menjadi kata cuprum. Dalam sejarahnya,
penggunaan tembaga oleh manusia tercatat dari kurang lebih 10.000 tahun lalu lamanya.
Peleburan tembaga telah berkembang secara baik di beberapa belahan dunia. Di samping
berkembang di Anatolia pada 5000 SM, tembaga juga dikembangkan di China sebelum 2800 SM,
Amerika Tengah sekitar 600 TM, dan Afrika Barat sekitar 900 TM. Cu (Tembaga) merupakan
salah satu unsur logam transisi yang berwarna cokelat kemerahan dan merupakan konduktor
panas dan listrik yang sangat baik. Di alam, tembaga terdapat dalam bentuk bebas maupun dalam
bentuk berikatan dengan Cu,Ag,Au, dan terdapat dalam bentuk bijih tembaga seperti kalkopirit
(CuFeS2), cuprite (Cu2O), chalcosite (Cu2S), dan malasite (Cu2(OH)2CO3).
Tembaga dengan nama kimia Cupprum dilambangkan dengan Cu, unsur logam ini berbentuk
kristal dengan warna kemerahan. Dalam tabel periodik unsur-unsur kimia tembaga menempati
posisi dengan nomor atom (NA) 29 dan mempunyai bobot atom (BA) 63,546. Di alam dapat
ditemukan dalam bentuk senyawa padat dalam bentuk mineral. Dalam perairan laut, tembaga
dapat ditemukan dalam bentuk persenyawaan ion seperti CuCO3, CuOH, dan sebagainya (Fribeg,
1977). Tembaga (Cu) mempunyai sistem kristal kubik, secara fisik berwarna kuning dan apabila
dilihat dengan menggunakan mikroskop bijih akan berwarna pink kecoklatan sampai keabuan.
Proposal Pembangunan Peleburan Tembaga
PT. Indogaruda Copper
Unsur tembaga terdapat pada hampir 250 mineral, tetapi hanya sedikit saja yang komersial. Pada
endapan sulfida primer, kalkopirit (CuFeS2) adalah sumber yang terbesar, diikuti oleh kalkosit
(Cu2S), bornit (Cu5FeS4), kovelit (CuS), dan enargit (Cu3AsS4). Mineral tembaga utama dalam
bentuk deposit oksida adalah krisokola (CuSiO3.2HO), malasit (Cu2(OH)2CO3), dan azurit
(Cu3(OH)2(CO3)2).
I.2. Sumber
Menurut data tahun 2011, Chili merupakan penghasil tembaga terbesar di dunia, disusul oleh
China dan Peru. Chile menghasilkan 1/3 produksi tambang tembaga dunia dan pada 2011
menghasilkan sekitar 5,3 juta ton tembaga. Pada 2011 produksi smelter tembaga dunia mencapai
15,8 juta ton. Tembaga dapat ditambang dengan metode tambang terbuka dan tambang bawah
tanah. Kandungan tembaga dinyatakan dalam % (persen). Selain sebagai penghasil no.1, tambang
tembaga terbesar juga dipunyai Chili. Tambang itu terdapat di Chuquicamata, terletak sekitar
1.240 km sebelah utara ibukota Santiago. Sedang tambang tembaga terbesar di Indonesia adalah
yang dikelola oleh PT Freeport Indonesia di area Grasberg, Papua. Freeport juga mengoperasikan
beberapa tambang bawah tanah besar, meski dengan kemampuan produksi yang masih berada di
bawah Grasberg.
Table 1.1 Produsen tembaga dunia tahun 2011
Tembaga di alam tidak begitu melimpah dan ditemukan dalam bentuk bebas maupun dalam
bentuk senyawaan. Bijih tembaga yang terpenting yaitu chalcopyrite (CuFeS2), copper glance atau
chalcolite (Cu2S), cuprite (Cu2O), malaconite (CuO) dan malachite (Cu2(OH)2CO3) sedangkan
dalam unsur bebas ditemukan di Northern Michigan Amerika Serikat. Tembaga kadang-kadang
ditemukan secara alami, seperti yang ditemukan dalam mineral-mineral seperti cuprite, malachite,
azurite, chalcopyrite, dan bornite. Deposit bijih tembaga yang banyak ditemukan di AS, Chile,
Zambia, Zaire, Peru, dan Kanada.
Kemampuan untuk mengolah bahan baku dengan kualitas yang berbeda dengan tingkat
pengumpanan yang bervariasi
Dalam industri, penggunaan tembaga selain untuk kabel banyak juga digunakan untuk industri
cat, industri fungisida serta dapat digunakan sebagai katalis, baterai elektroda, sebagai pencegah
pertumbuhan lumut, turunan senyawa-senyawa karbonat banyak digunakan sebagai pigmen dan
pewarna kuningan.
Lokasi Pabrik
sulfat. Asam sulfat yang dihasilkan akan dijual ke pabrik petrokimia gresik yang sangat
membutuhkan asam sulfat sebagai bahan bakunya dan hanya berjarak 22 km.
I.4.1
I.4.2
Fasilitas pengangkutan
Distribusi bahan mentah menggunakan kapal laut karena itu lokasi pabrik yang dibangun
dekat dengan fasilitas pelabuhan. Pelabuhan yang tersedia adalah berjarak 18 km cukup
dekat dengan lokasi pabrik.
I.4.3
BAB II
BASIS DESAIN
Teknologi yang digunakan
: 300.000 ton/tahun (60% tahun ke- 1, 70% tahun ke-2, 80% tahun ke3, 90% tahun ke-4 dan full capacity tahun ke-5 hingga tahun ke-30)
Umur proyek
: 30 tahun
: 20 tahun
: 3 tahun
Operating factor
: 90%
Loading factor (average main reactor) : 90% Konsentrat dibeli putus (buying scheme) dari
perusahaan tambang di Papua berdasarkan payable metals dalam konsentrat dikurangi TC/RC
II.1
Dimensi:
Panjang
: 18 m
Lebar
:6m
Tinggi
:2m
: 4,5 m
:6m
Diameter uptake
:5m
Tinggi uptake
: 8 m Bagian dalam tanur terbuat dari magnesiachrome bricks yang diselimuti water-cooled copper
cooling jacket
10
II.2
PS Converter
Jumlah PS-Converter
: 2 buah
Dimensi PS-Converter
Diameter
: 4,5 m
Panjang
: 12 m
: 5 cm
Refraktory
: magnesia-chrome
: 50 cm#
Kapasitas
: 450 ton
Tuyere
Jumlah tuyere
: 50 buah
Diameter tuyere
: 5 cm
Tekanan udara
: 1,2 atm
: 600 Nm /menit
11
: 65%
: 99%
II.3
Anode Furnace
Tuyere
: 2 unit
Kapasitas 1 furnace
: 400 ton
: 2 buah
Jumlah burner
: 1 buah
: 250 Nm /jam/tuyere
: 1700 Nm /jam/tuyere
Minyak diesel
: 400-500 Nm /jam/tuyere
Steam
: 500 kg/jam
Waktu proses:
: 1 jam
Oksidasi
: 2 jam
: 1 jam
Kadar Tembaga:
Proposal Pembangunan Peleburan Tembaga
PT. Indogaruda Copper
12
: 99%
: 99,5%
Panjang
: 15,4 meter
Diameter
: 5,2 meter
II.4
Equipment Pendukung
Bag filter
Oxygen plant
Laddle
Laddle Crane
ESP
Pressure Filter
Cooling System
Cooling Elements
Feeding System
Air Slide
13
BAB III
DESKRIPSI PROSES DAN PERALATAN
III.1 Deskripsi Proses
Tahap pertama dalam ekstraksi tembaga adalah proses benefisiasi dari bijih dengan kandungan 1 %
menjadi hingga konsentrat 30% Cu.
Tahapannya secara umum adalah;
1. Proses konsentrasi dengan flotasi konsentrat
2. Proses smelting konsentrat menjadi lelehan matte tembaga
3. Proses converting lelehan matte menjadi tembaga leleh (impure)
4. Fire dan elektrorefining untuk pemurnian selanjutnya
III.1.1 Matte smelting
Pada proses ini konsentrat hasil proses flotasi dilelelehkan dan juga terjadi peleburan oksidasi
matte dalam tanur dengan temperature 1250 C.
Tujuan dari proses ini adalah untuk mengoksidasi S dan Fe dari konsentrat Cu-Fe-S untuk
menghasilkan fasa lelehan sulfide yang kaya akan tembaga yang disebut matte dengan
oksidator adalah udara yang diperkaya oksigen.
Lelehan matte dikonversi/dioksidasi untuk membentuk lelehan tembaga impure. Slag dapat di
treatment lagi untuk recovery tembaganya.
SO2 dihasilkan sebagai by produk proses ini (10-60%) untuk memproduksi asam sulfat.
Reaksinya eksotermik
Di bawah kondisi oksidasi, konsentrat Cu cenderung membentuk Cu2O dan akan masuk ke
slag.
Jika kandungan besi di konsentrat tinggi maka jumlah slag akan makin banyak dan
kehilangan Cu masuk ke slag makin meningkat.
Slag : FeO, Fe2O3, silica (SiO2), alumina (Al2O3), calcia ( CaO) dan magnesia (MgO).
14
III.1.2 Converting
Pada proses ini terjadi converting tembaga dari matte leleh hasil smelting dengan
menghembuskan udara yang diperkaya oksigen sehingga terjadi penghilangan Fe dan S
menghasilkan tembaga dengan kandungan (99 % Cu).
Matte leleh hasil peleburan pada temperature 1200 C dipindahkan dengan ladle dari peleburan
ke PS Converter
Proses oksidasi terjadi dengan hembusan udara yang diperkaya oleh oksigen melalui tuyere.
III.1.3 Firerefining
Lelehan blister copper dari hasil coverting mengandung 0,01% S dan 0,5%O.
15
Sumber:http://www.outotec.com/en/About-us/Our-technologies/Smelting/Direct-blister-flashsmelting
16
17
Absorption Tower
Gas SO3 yang keluar dari bed katalis yang ketiga diabsorbsi sehingga menjadi asam sulfat di
dalam intermediate absorption tower (IAT). Sedangkan gas SO3 yang keluar dari bed katalis
yang terakhir diabsorbsi menjadi asam sulfat di dalam final absorption tower (FAT).
18
19
BAB IV
PERHITUNGAN PROSES
unsur
Cu
Fe
S
O
Si
H
C
Ar
63.54
55.847
32.064
16
28.085
1
12
Recovery= 97%
Cu in CuFeS2
Cu in Cu2S
Cu in Cu2O
346.2387271
335.8515653
10.38716181
Reaksi:
No
1
2
3
4
5
6
input
CuFeS2
O2
SiO2
TOTAL
Output
Cu2S
FeS
FeO
SiO2
Cu2O
SO2
Massa
(Kg)
Kmol
T (K)
Entalphy (MJ/Kg)
Entalphy (MJ)
1000 5.449146
298
-1.04
-1040
287.27897 8.977468
298
122.77947 2.04343
298
-15.16
-1861.336812
1410.0584 16.47004
Massa(Kg)
420.5914503
119.7599651
293.6285862
122.7794731
11.69495682
441.6040106
1410.058442
-2901.336812
Kmol
T (K)
Entalphy (MJ/Kg) Entalphy (MJ)
2.642835735 1500
0.25
105.1478626
1.362286462 1500
0.11
13.17359616
4.086859385 1500
-2.49 -731.1351797
2.043429692 1500
-13.7 -1682.078781
0.081737188 1500
-0.07 -0.818646977
6.893169496 1500
-3.66 -1616.270679
17.11031796
-3911.981828
20
Pierce Smith
converter
reaksi:
No
1
2
3
4
input
FeS
Cu2S
O2
SiO2
TOTAL
Output
FeO
SiO2
SO2
Cu
Massa
(Kg)
119.75997
420.59145
149.96049
40.926491
731.2384
Massa(Kg)
97.87619541
40.92649102
256.5841484
335.8515653
731.2384001
Kmol
T (K)
Entalphy (MJ/Kg)
Entalphy (MJ)
1.362286
1473
0.11
13.17359616
2.642836
1473
0.25
105.1478626
4.686265
1473
1.04
155.9589134
0.681143
1473
-13.7
-560.692927
9.372531
-286.4125548
Kmol
T (K)
Entalphy (MJ/Kg) Entalphy (MJ)
1.362286462 1473
-2.49
-243.7117266
0.681143231 1473
-13.7
-560.692927
4.005122197 1473
-3.66
-939.0979833
5.285671471 1473
0.75
251.888674
11.33422336
-1491.613963
Anode Furnace
reaksi:
S + O2 = SO2
O2 = 2[O]
C + [O] = CO
CO + [O] = CO2
S + C +2O2 = SO2 + CO2
Asumsi Komponen
S awal
massa (Kg)
0.067848801
S akhir
0.011813874
S yang bereaksi dengan O2
0.056034927
Komponen
persentase
O di blister copper sebelum injeksi oksigen
0.40%
O di blister copper setelah injeksi oksigen
0.80%
O yang diperoleh dari injeksi oksigen
0.40%
O di copper anode
0.10%
O yang dihilangkan oleh carbon
0.70%
C untuk removal O
massa (Kg)
1.356976021
2.713952043
1.356976021
0.337539262
2.376412781
0.445577396
21
Blister copper:
Komponen kandungan massa (Kg)
Cu
99%
335.8515653
O
0.40%
1.356976021
S
0.02%
0.067848801
lain-lain
0.58%
1.967615231
blister copper
339.2440053
Copper anode:
Komponen kandungan massa (Kg)
Cu
99.50%
335.8515653
O
0.10%
0.337539262
S
0.0035%
0.011813874
lain-lain
0.39650%
1.338343172
Copper anode
337.5392616
Kebutuhan oksigen
Flash furnace
PS-converter
Anode furnace
TOTAL
Kmol
Kg
8.977468
4.686265
0.056035
13.71977
%Cu di perhitungan
%Cu dari basis desain
287.278969
149.9604937
1.793117661
439.0325804
Kmol
6.893169496
4.005122197
0.000875546
10.89916724
Kg
441.1628477
256.3278206
0.056034927
697.5467033
34.62%
26%
300000
1183584.457
619969.3926
911735
33323
650000
tpy
tpy
tpy
tpy
tpy
tpy
22
BAB V
ASPEK EKONOMI PEMBANGUNAN PABRIK
V.1
No
1
No
1
Biaya Infrastruktur
Unit
Harga
m2
$100.00
Total
$3,720,000.00
Total
$1,240,000.00
Subtotal
$1,500,000.00
$2,000,000.00
$1,200,000.00
$1,000,000.00
$200,000.00
$2,080,000.00
$600,000.00
$4,000,000.00
$400,000.00
$1,000,000.00
$10,000,000.00
$499,999.00
$900,000.00
$500,000.00
$200,000.00
$200,000.00
$120,000.00
$300,000.00
$300,000.00
$160,000.00
$320,000.00
$160,000.00
$500,000.00
$3,000,000.00
$200,000.00
$72,000.00
TOTAL
$31,411,999.00
23
$3,720,000.00
Biaya Infrastruktur
$1,240,000.00
V.2
$31,411,999.00
SUBTOTAL
$36,371,999.00
$3,637,199.90
TOTAL CAPEX
$40,009,198.90
Biaya Utilitas
Jumlah
Harga Satuan
Subtotal
310000000
$0.12
$36,166,666.67
1800000
$0.75
$1,350,000.00
115200
$1.00
$115,200.00
TOTAL
$37,631,866.67
Biaya Material Habis
Jenis
Jumlah (ton)
Harga Satuan
Subtotal
CaCO3
19374
$500.00
$9,686,920.00
V2O5
112908
$1,000.00
$112,908,225.00
TOTAL
$122,595,145.00
Biaya Kebutuhan Perkantoran
Jenis
Jumlah
Harga
Subtotal
Kertas dan Alat Tulis
$5,050.00
$5,050.00
Listrik & Air
$1,100.00
$1,100.00
TOTAL
$6,150.00
Biaya Gaji Karyawan
Jabatan
Jumlah
Gaji (bulan)
Subtotal (tahun)
Direktur
1
$3,535.00
$42,420.00
Manager SDM
1
$2,000.00
$24,000.00
Manager Produksi
1
$2,000.00
$24,000.00
Manager K3LH
1
$2,000.00
$24,000.00
Manager Pemasaran
1
$2,000.00
$24,000.00
Manager Administrasi dan Keuangan
1
$2,000.00
$24,000.00
Staf Administrasi & Keuangan
5
$900.00
$54,000.00
Kepala Gudang
1
$900.00
$10,800.00
Kepala Mekanik
1
$900.00
$10,800.00
Kepala Listrik
1
$900.00
$10,800.00
Kepala Peleburan
1
$900.00
$10,800.00
Kepala Laboratorium
1
$900.00
$10,800.00
Kepala Satpam
1
$900.00
$10,800.00
Insinyur
10
$700.00
$84,000.00
Staf Laboratorium
8
$440.00
$42,240.00
Operator Pabrik
60
$330.00
$237,600.00
Operator Ahli Alat Berat
6
$330.00
$23,760.00
Pengemudi Truck
15
$330.00
$59,400.00
Pengemudi
11
$330.00
$43,560.00
Satpam
10
$330.00
$39,600.00
Jenis
Listrik (kWh)
Gas Alam (Nm3)
Solar (Liter)
24
Pembantu Umum
$275.00
$16,500.00
$827,880.00
TOTAL
Total Biaya Operasional
Biaya Utilitas
Biaya Material Habis
Biaya Kebutuhan Perkantoran
Biaya Gaji Karyawan
Subtotal
Biaya Tak Terduga (10%)
TOTAL
V.3
$37,631,866.67
$122,595,145.00
$6,150.00
$827,880.00
$161,061,041.67
$16,106,104.17
$177,167,145.83
REVENUE
Kapasitas produksi
Berat kering konsentrat
1 ppm
1 oz
1 lb
300000
1183585
1 gr/ton
31.1 gram
0.454 kg
Pendapatan TCRC
Konsentrat Satuan Harga Satuan
TOTAL
1183585
tpy
$66.00
Ton
$78,116,579.38
Feed
Element
cu
Au
Ag
Pt
Pd
Se
Pb
Composition
26
20
63
33
0.05
0.9
0.1
%
gr/ton
gr/ton
gr/ton
gr/ton
gr/ton
%
Recovery
Weight
307731.98
23.67
74.57
39.06
0.06
1.07
1183.58
Market
tpy
tpy
tpy
tpy
tpy
tpy
tpy
96.0%
97.5%
82.5%
95.0%
95.0%
95.0%
95.0%
Technical
97.0%
98.5%
95.0%
98.0%
98.0%
98.5%
98.0%
25
Price
$237.37
$1,738.95
$33.83
$1,605.00
$663.80
$3,243.04
$900.00
USD/oz
$7.38
USD/oz $55,908.50
USD/oz
$1,087.66
USD/oz $51,601.91
USD/oz $21,341.65
USD/ton
$100.87
USD/ton
$0.90
Revenue
selisih recovery
anode
USD/kg
$227,198.52
USD/kg
$132,344.87
USD/kg
$101,377.73
USD/kg
$604,644.70
USD/kg
$378.89
USD/kg
$37.61
USD/kg
$319.57
Unit
H2SO4
gipsum
slag
Subtotal
$74,339,520.00
$833,075.00
$29,250,000.00
$104,422,595.00
Total Pendapatan
Pendapatan TCRC
Pendapatan Selisih Recovery
Pendapatan Produk Samping
TOTAL
V.4
$78,116,579.38
$839,103.38
$104,422,595.00
$183,378,277.76
Digunakan 2 parameter kelayakan finansial dalam analisis rencana pembangunan pabrik indogaruda
copper yaitu IRR dan PBP. Setelah dianalisis (lampiran C) didapatlah nilai IRR sebesar 13%
sementara suku bunga bank Indonesia sebesar 8,7% dan PBP dicapai ketika tahun ke-14. Dari data
tersebut dapat disimpulkan rencana pembangunan pabrik indogaruda copper layak untuk dilanjutkan
26
BAB VI
ORGANISASI DAN SUMBER DAYA MANUSIA
VI.1 Organisasi
Struktur organisasi pada perusahaan ini adalah sebagai berikut yaitu terdiri dari seorang manajer
umum yang membawahi 5 manajer antara lain :
1. Manajer administrasi dan keuangan
2. Manajer Pemasaran
3. Manajer produksi
4. Manajer K3LH
5. Manajer SDM
Direktur
Manajer Pemasaran
Manajer Produksi
Manajer K3LH
Manajer SDM
27
Perekrutan Karyawan.
Tujuan penyelenggaraan perekrutan adalah untuk mendapatkan sejumlah pelamar yang sesuai
dengan lowongan pekerjaan yang ditawarkan. Jumlah pelamar yang tepat harus sesuai dengan
lowongan pekerjaan atau jabatan yang belum terisi.
Tata cara perekrutan karyawan yaitu :
Perekrutan Eksternal
Perekrutan eksternal adalah upaya untuk menarik pelamar pekerjaan dari luar perusahaan.
Sarana untuk perekrutan eksternal yang dapat digunakan antara lain iklan surat kabar,
pengumuman di kampus perguruan tinggi dan lembaga penyalur tenaga kerja.
Perekrutan Internal
Perekrutan internal dilakukan dengan mempertimbangkan karyawan yang ada untuk mengisi
lowongan atau jabatan yang tersedia.
Seleksi Karyawan
Proses seleksi dilakukan untuk memilih pelamar yang memiliki kualifikasi sesuai dengan
lowongan pekerjaan yang ditawarkan.
Orientasi Karyawan
28
4. Pengecekan Referensi
Perusahaan sebagai pihak yang akan menerima pelamar sebagai karyawan berusaha
mengecek untuk mengetahui latar belakang dan referensi pelamar. Sekurang-kurangnya pihak
perusahaan ingin mengetahuii pekerjaan dan gaji terakhir pelamar. Hal ini berlaku bagi
pelamar yang pernah bekerja di suatu perusahaan atau lembaga lain. Dengan cara ini
perusahaan dapat mengetahui reputasi, karakter dan gaya hidup pelamar. Untuk lulusan dari
suatu lembaga pendidikan, pengecekan referensi dilakukan melalui nilai yang tertera pada
transkrip.
b. Pengembangan Karyawan
Pengembangan karyawan ditempuh dengan 4 jalur pendekatan yaitu pendidikan formal,
penilaian, pengalaman kerja dan hubungan antarpribadi. Beberapa perusahaan
memasukan pendekatan pengembangan tersebut.
6. Evaluasi Prestasi
Evaluasi prestasi ialah suatu system formal evaluasi dan peninjauan formal tentang prestasi
kerja individu atau tim. Melakuakn evaluasi prestasi bukanlah pekerjaan yang mudah bagi
manajemen SDM. Meskipun demikian penilaian prestasi merupakan suatu evaluasi yang
harus dilakukan. Hasil evaluasi prestasi dijadikan dasar keputusan pengembangan, promosi,
pengembangan, kenaikan gaji, pemberhentian dan rotasi.
7. Kompensasi Karyawan
Kompensasi atau imbalan kerja, yang meliputi gaji dan tunjangan, berhubungan erat dengan
evaluasi prestasi. Karyawan yang melaksanakan pekerjaan dengan lebih baik cenderung
memperoleh kenaikan kompensasi yang lebih besar. Pembayaran kompensasi dipengaruhi
oleh beberapa factor, baik internal maupun eksternal.
29
30
DAFTAR PUSTAKA
www.outotec.com
http://www.fkm.utm.my/~koh/smk2332/smk2332-studio_notes.pdf
http://www.dsir.gov.in/reports/techreps/tsr133.pdf
http://www.vtt.fi/liitetiedostot/cluster5_metsa_kemia_ymparisto/CS_FlashSmelting.pdf
www.alibaba.com
www.ptsmelting.com
www.ima-api.com
www.business-standard.com
www.lme.com
www.reuters.com
slide kuliah pirometalurgi-copper
31
LAMPIRAN A
GENERAL ARRANGEMENT DRAWING
FLASH FURNACE
PIERCE-SMITH CONVERTER
ANODE FURNACE
LAMPIRAN B
CASH FLOW
revitalisasi peralatan pabrik
waktu depresiasi
interest rate
40%
20
8.70%
tahun
2013
komponen
2014
2015
2016
revenue
(+) TCRC
(+) recovery
$ 46,869,947.63
$
503,462.03
$
$
54,681,605.57
587,372.36
$ 62,493,263.51
$
671,282.70
$ 62,653,557.00
$ 110,026,966.65
$ 73,095,816.50
$ 128,364,794.43
$ 83,538,076.00
$ 146,702,622.21
$ 11,517,732.97
11,517,732.97
$ 11,517,732.97
11,517,732.97
$ 106,300,287.50
$ 124,017,002.08
$ 141,733,716.67
$
136,400.00
$ 3,141,199.90
$ 106,300,287.50
$
449,079.25
$
112,269.81
$
336,809.44
$
136,400.00
$
3,141,199.90
$ 124,017,002.08
$
1,070,192.45
$
267,548.11
$
802,644.34
$
136,400.00
$ 3,141,199.90
$ 141,733,716.67
$ 1,691,305.64
$
422,826.41
$ 1,268,479.23
$ (7,903,323.63)
0.92
(7,437,488.73)
0.85
4,546,079.13
0.78
$ (7,270,766.91)
(6,294,586.89)
3,539,552.50
$ (24,244,499.87)
$ (30,539,086.76)
total revenue
investasi
$
4,092,000.00
$
11,517,732.97
$
1,364,000.00
$
16,973,732.97
$
$
$
$
(16,973,732.97)
1.00
$
(16,973,732.97)
$
(16,973,732.97)
$ (26,999,534.26)
2017
4
2018
5
2019
6
2020
7
2021
8
2022
9
$ 93,980,335.50
$ 104,422,595.00
$ 104,422,595.00
$ 104,422,595.00
$ 104,422,595.00
$ 165,040,449.98
$ 183,378,277.76
$ 183,378,277.76
$ 183,378,277.76
$ 183,378,277.76
$
78,116,579.38
$
839,103.38
$
104,422,595.00
$
183,378,277.76
$ 159,450,431.25
$ 177,167,145.83
$ 177,167,145.83
$ 177,167,145.83
$ 177,167,145.83
$
177,167,145.83
136,400.00
136,400.00
136,400.00
136,400.00
136,400.00
3,141,199.90
3,141,199.90
3,141,199.90
3,141,199.90
3,141,199.90
$ 70,304,921.44
$ 78,116,579.38
$ 78,116,579.38
$ 78,116,579.38
$ 78,116,579.38
755,193.04
839,103.38
839,103.38
839,103.38
839,103.38
$ 159,450,431.25
$ 177,167,145.83
$ 177,167,145.83
$ 177,167,145.83
$ 177,167,145.83
2,312,418.83
2,933,532.02
2,933,532.02
2,933,532.02
2,933,532.02
578,104.71
733,383.01
733,383.01
733,383.01
733,383.01
1,734,314.12
2,200,149.02
2,200,149.02
2,200,149.02
2,200,149.02
5,011,914.02
0.72
5,477,748.92
0.66
5,477,748.92
0.61
5,477,748.92
0.56
5,477,748.92
0.51
3,589,925.50
3,609,561.13
3,320,663.41
3,054,888.14
2,810,384.68
$ (23,409,608.76)
$ (19,800,047.62)
$ (16,479,384.21)
$ (13,424,496.07)
$ (10,614,111.39)
$
136,400.00
$
3,141,199.90
$
177,167,145.83
$
2,933,532.02
$
733,383.01
$
2,200,149.02
$
5,477,748.92
0.47
$
2,585,450.49
$
(8,028,660.90)
2023
10
2024
11
2025
12
2026
13
2027
14
2028
15
$
78,116,579.38
$
839,103.38
$
104,422,595.00
$
183,378,277.76
$
78,116,579.38
$
839,103.38
$
104,422,595.00
$
183,378,277.76
$
78,116,579.38
$
839,103.38
$
104,422,595.00
$
183,378,277.76
$
78,116,579.38
$
839,103.38
$
104,422,595.00
$
183,378,277.76
$
78,116,579.38
$
839,103.38
$
104,422,595.00
$
183,378,277.76
$
78,116,579.38
$
839,103.38
$
104,422,595.00
$
183,378,277.76
$
177,167,145.83
$
1,306,079.96
$
177,167,145.83
$
1,306,079.96
$
177,167,145.83
$
1,306,079.96
$
177,167,145.83
$
1,306,079.96
$
177,167,145.83
$
1,306,079.96
$
177,167,145.83
$
4,905,051.96
$
1,226,262.99
$
3,678,788.97
$
4,984,868.93
0.40
$
1,991,263.62
$
(3,658,877.98)
$
177,167,145.83
$
4,905,051.96
$
1,226,262.99
$
3,678,788.97
$
4,984,868.93
0.37
$
1,831,889.25
$
(1,826,988.73)
$
177,167,145.83
$
4,905,051.96
$
1,226,262.99
$
3,678,788.97
$
4,984,868.93
0.34
$
1,685,270.70
$
(141,718.02)
$
177,167,145.83
$
4,905,051.96
$
1,226,262.99
$
3,678,788.97
$
4,984,868.93
0.31
$
1,550,387.03
$
1,408,669.01
$
177,167,145.83
$
4,905,051.96
$
1,226,262.99
$
3,678,788.97
$
4,984,868.93
0.29
$
1,426,299.02
$
2,834,968.02
$
13,060,799.60
$
177,167,145.83
$
136,400.00
$
3,141,199.90
$
177,167,145.83
$
2,933,532.02
$
733,383.01
$
2,200,149.02
$
5,477,748.92
0.43
$
2,378,519.31
$
(5,650,141.60)
2029
16
2030
17
2031
18
2032
19
2033
20
2034
21
$
78,116,579.38
$
839,103.38
$
104,422,595.00
$
183,378,277.76
$
78,116,579.38
$
839,103.38
$
104,422,595.00
$
183,378,277.76
$
78,116,579.38
$
839,103.38
$
104,422,595.00
$
183,378,277.76
$
78,116,579.38
$
839,103.38
$
104,422,595.00
$
183,378,277.76
$
78,116,579.38
$
839,103.38
$
104,422,595.00
$
183,378,277.76
$
78,116,579.38
$
839,103.38
$
104,422,595.00
$
183,378,277.76
$
13,060,799.60
$
177,167,145.83
$
1,306,079.96
$
177,167,145.83
$
1,306,079.96
$
177,167,145.83
$
1,306,079.96
$
177,167,145.83
$
1,306,079.96
$
177,167,145.83
$
1,306,079.96
$
177,167,145.83
$
1,306,079.96
$
177,167,145.83
$
4,905,051.96
$
1,226,262.99
$
3,678,788.97
$
4,984,868.93
0.26
$
1,312,142.61
$
4,147,110.63
$
177,167,145.83
$
4,905,051.96
$
1,226,262.99
$
3,678,788.97
$
4,984,868.93
0.24
$
1,207,122.92
$
5,354,233.55
$
177,167,145.83
$
4,905,051.96
$
1,226,262.99
$
3,678,788.97
$
4,984,868.93
0.22
$
1,110,508.66
$
6,464,742.21
$
177,167,145.83
$
4,905,051.96
$
1,226,262.99
$
3,678,788.97
$
4,984,868.93
0.20
$
1,021,627.10
$
7,486,369.31
$
177,167,145.83
$
4,905,051.96
$
1,226,262.99
$
3,678,788.97
$
4,984,868.93
0.19
$
939,859.34
$
8,426,228.65
$
177,167,145.83
$
4,905,051.96
$
1,226,262.99
$
3,678,788.97
$
4,984,868.93
0.17
$
864,636.01
$
9,290,864.66
2035
22
2036
23
2037
24
2038
25
2039
26
2040
27
$
78,116,579.38
$
839,103.38
$
104,422,595.00
$
183,378,277.76
$
78,116,579.38
$
839,103.38
$
104,422,595.00
$
183,378,277.76
$
78,116,579.38
$
839,103.38
$
104,422,595.00
$
183,378,277.76
$
78,116,579.38
$
839,103.38
$
104,422,595.00
$
183,378,277.76
$
78,116,579.38
$
839,103.38
$
104,422,595.00
$
183,378,277.76
$
78,116,579.38
$
839,103.38
$
104,422,595.00
$
183,378,277.76
$
177,167,145.83
$
1,306,079.96
$
177,167,145.83
$
1,306,079.96
$
177,167,145.83
$
1,306,079.96
$
177,167,145.83
$
1,306,079.96
$
177,167,145.83
$
1,306,079.96
$
177,167,145.83
$
1,306,079.96
$
177,167,145.83
$
4,905,051.96
$
1,226,262.99
$
3,678,788.97
$
4,984,868.93
0.16
$
795,433.31
$
10,086,297.97
$
177,167,145.83
$
4,905,051.96
$
1,226,262.99
$
3,678,788.97
$
4,984,868.93
0.15
$
731,769.37
$
10,818,067.35
$
177,167,145.83
$
4,905,051.96
$
1,226,262.99
$
3,678,788.97
$
4,984,868.93
0.14
$
673,200.90
$
11,491,268.25
$
177,167,145.83
$
4,905,051.96
$
1,226,262.99
$
3,678,788.97
$
4,984,868.93
0.12
$
619,320.05
$
12,110,588.30
$
177,167,145.83
$
4,905,051.96
$
1,226,262.99
$
3,678,788.97
$
4,984,868.93
0.11
$
569,751.66
$
12,680,339.96
$
177,167,145.83
$
4,905,051.96
$
1,226,262.99
$
3,678,788.97
$
4,984,868.93
0.11
$
524,150.56
$
13,204,490.51
2041
28
2042
29
2043
30
$
78,116,579.38
$
839,103.38
$
104,422,595.00
$
183,378,277.76
$
78,116,579.38
$
839,103.38
$
104,422,595.00
$
183,378,277.76
$
78,116,579.38
$
839,103.38
$
104,422,595.00
$
183,378,277.76
$
177,167,145.83
$
1,306,079.96
$
177,167,145.83
$
1,306,079.96
$
177,167,145.83
$
1,306,079.96
$
177,167,145.83
$
4,905,051.96
$
1,226,262.99
$
3,678,788.97
$
4,984,868.93
0.10
$
482,199.23
$
13,686,689.74
$
177,167,145.83
$
4,905,051.96
$
1,226,262.99
$
3,678,788.97
$
4,984,868.93
0.09
$
443,605.54
$
14,130,295.29
$
177,167,145.83
$
4,905,051.96
$
1,226,262.99
$
3,678,788.97
$
4,984,868.93
0.08
$
408,100.78
$
14,538,396.06
IRR
PBP
13%
13.08