GAMBAR
REKAPITULASI
URAIAN PEKERJAAN
NO
(RP.)
I
II
8,690,777.81
#REF!
III
#REF!
#REF!
IV
#REF!
#REF!
#REF!
#REF!
VI
JUMLAH
#REF!
JUMLAH TOTAL
#REF!
DIBULATKAN
#REF!
Terbilang :
Seratus tujuh puluh lima juta dua ratus tujuh puluh tujuh ribu rupiah
NO
URAIAN PEKERJAAN
VOL
SAT
HARGA
SATUAN
(RP.)
(RP.)
6=5X3
I.
Pek. galian
4.61
m3
46,310.00
213,442.79
1.00
m2
58,490.00
58,490.00
5.76
128,133.50
738,048.96
0.50
m3
3,759,862.92
1,879,931.46
5.00
m2
236,729.24
1,183,646.20
5.00
203,443.68
1,017,218.40
1.00
ls
500,000.00
500,000.00
1.00
ls
1,250,000.00
1,250,000.00
Mesin pendorong
1.00
ls
1,600,000.00
1,600,000.00
10
1.00
ls
250,000.00
TOTAL
II.
250,000.00
8,690,777.81
13.4
m2
91,509.58
1,223,116.99
4.0
m3
2,892,202.25
11,568,808.98
24.1
m2
128,133.50
3,091,348.82
24.1
m2
77,877.50
1,878,872.57
13.4
118,364.62
1,582,061.51
14.2
305,165.52
TOTAL
III.
1
2
3
4
5
30.1
60.3
30.1
0.3
60.3
m2
m2
m2
m3
m2
128,133.50
61,670.40
37,002.24
3,312,450.83
27,850.90
SUB TOTAL B
IV.
1
2
3
2.3 m2
1.0 unit
1.0 ls
V.
1
2
3
25,000.00
250,000.00
550,000.00
58,500.00
250,000.00
550,000.00
858,500.00
6.0
6.0
4.0
ttk
ttk
ttk
200,000.00
200,000.00
250,000.00
SUB TOTAL D
1
3,862,456.22
3,717,985.08
1,115,395.52
934,111.13
1,679,075.06
11,309,023.02
SUB TOTAL C
VI.
4,334,571.05
23,678,779.92
1,200,000.00
1,200,000.00
1,000,000.00
3,400,000.00
PEKERJAAN PLUMBING
Pek. Clean Out
12.0
m'
55,000.00
SUB TOTAL D
660,000.00
660,000.00
Pek. AC
Pek. Exhaust
3.0
3.0
ttk
ttk
250,000.00
220,000.00
750,000.00
660,000.00
NO
URAIAN PEKERJAAN
VOL
SAT
HARGA
SATUAN
(RP.)
(RP.)
SUB TOTAL D
6=5X3
1,410,000.00
8.0
m2
8.0
SUB TOTAL D
289,220.22
1,350,000.00
2,313,761.80
10,800,000.00
13,113,761.80
JUMLAH
63,120,842.54
JASA 10 %
JUMLAH TOTAL
6,312,084.25
73,188,677.56
PERHITUNGAN VOLUME
LEBAR
16
2
128
128 M2
2
2
194.4
82
276.4 M'
UNIT
97.2
41
PANJANG
1.25
Pondasi Tangga
LEBAR
1.25
0.7
UNIT
28
DALAM
1
0.6
=
43.75
0.42
44.17 M3
LEBAR
1
DALAM
1
TEBAL
0.1
35.6
M3
PLAT SETEMPAT
Pondasi Tangga
LEBAR
1
0.7
0.6
UNIT
28
2.80
0.04
0.1
2.84 M3
LEBAR
0.8
TEBAL
0.1
TEBAL
0.15
2.848
M3
4.272
M3
TINGGI
0.7
UNIT
LEBAR
0.8
PENAMPANG PONDASI
0.3 +
0.8
13.706
M3
2
3
Pek. Lantai Kerja dibawah Pond.plat, Pond. Tangga & Sloof t=5 cm
PANJANG
1
PLAT SETEMPAT
Pondasi Tangga
0.7
LEBAR
1
0.6
TEBAL
0.05
28
1.40
0.02
0.05
1.42 M3
PLAT SETEMPAT
PANJANG
0.7
Pondasi Tangga
PANJANG
9
LEBAR
1
LEBAR
0.6
TEBAL
0.15
TEBAL
0.15
UNIT
28
4.20 M3
4.20 M3
Pondasi Tangga
UNIT
0.06 M3
0.06 M3
Sloof
SL 1
UNIT
PANJANG
9
9 M'
LEBAR
0.2
TINGGI
0.2
VOLUME
0.36
0.36 M3
C. PEKERJAAN BETON
Lantai 1
1
PANJANG X
0.3
LEBAR X
0.12
UNIT
=
24.00
3.46 M3
PANJANG X
0.25
LEBAR X
0.25
UNIT
=
4.00
1.00 M3
TINGGI
UNIT
DINDING BATA
X
3
=
28 =
0.84 M3
0.84 M3
UNIT
PENAMPANG BALOK
X PANJANG X
0.15 X
0.3
8
0.1 X
0.3
8
UNIT
=
1
5.15 M3
- M3
5.15 M3
0.36 M3
0.24 M3
0.60 M3
LEBAR
UNIT
8
1
0.15
=
1
1
1
LUAS
X
128
4.5
17.175
149.68 M2
TEBAL
=
0.12
0.12
0.12
JUMLAH
15.36
0.54
2.06
12.76
M3
M3
M3
M3
Lantai 2
2
DINDING BATA
TINGGI
X
3
UNIT
=
4 =
0.15 M3
0.15 M3
E. PEKERJAAN ATAP
1
LEBAR
2.5
JUMLAH
10
UNIT
1
10.00 M2
Lisplang
PANJANG
UNIT
2.50
4.00
1
1
2.50
4.00
6.50 M'
UNIT
1
4
5
4
RD
PJ1
P1
PVC
B PEKERJAAN KERAMIK
1
LEBAR
1.10
JUMLAH
4
LUAS
5.94
5.94 M2
PANJANG
1.35
LEBAR
1.10
JUMLAH
4
LUAS
5.94
5.94 M2
LEBAR
0.85
1.35
1.35
UNIT
4
4
4
LUAS
11.90
8.64
15.39
35.93 M2
LEBAR
0.60
UNIT
21
LUAS
12.60
12.60 M2
LEBAR
1.00
UNIT
1
LUAS
44.50
44.50 M2
LEBAR
1.00
UNIT
1
LUAS
44.50
44.50 M2
C. PEKERJAAN PASANGAN
1
PASANGAN BATA
PANJANG
44.50
TINGGI
3.50
UNIT
1
TEBAL
1
LUAS
155.75
155.75 M2
20.70 M2
135.05 M2
PLESTER
311.50 M3
C. PEKERJAAN PLAFON
1
PASANGAN PLAFON
PANJANG
16.00
LEBAR
8.00
UNIT
1
TEBAL
0
LUAS
128.00
LEBAR
8.00
UNIT
1
TEBAL
0
LUAS
128.00
LEBAR
8.00
1.00
1.00
1.00
1.00
1.00
UNIT
1
1
1
2
4
4
TINGGI
3
3
3
3
3
2
LUAS
384.00
4.50
7.50
39.00
144.00
44.00
D PEKERJAAN CAT
1
CAT PLAFON
PANJANG
16.00
CAT DINDING
PANJANG
16.00
1.50
2.50
6.50
12.00
5.50
623.00 M2
PENGURANGAN KUSEN
PJ1
P1
PVC
19.8
16
5.6
581.60 M2
CAT KUSEN
PJ1
P1
PANJANG
7.45
4.80
LEBAR
0.35
0.35
UNIT
4
5
TINGGI
1
1
LUAS
10.43
8.40
18.83 M2
KODE
ANALISA
1
A.
A.1
A.2
A.3
A.4
A.5
A.6
A.7
A.8
A.9
A.10
A.11
A.12
A.13
A.14
A.15
A.16
A.17
A.18
A.19
A.20
B.
URAIAN PEKERJAAN
2
ANALISA BIAYA KONSTRUKSI PEKERJAAN PERSIAPAN
1 m' Pagar sementara dari kayu tinggi 2 m
1 m' Pagar sementara dari seng gelombang tinggi 2 m
1 m' Pagar sementara dari kawat berduri tinggi 1,8 m
1 m' Pengukuran dan pemasangan bouwplank, papan 2/20
1 m Pembuatan kantor sementara dengan lantai plesteran
1 m Pembuatan gudang semen dan alat - alat
1 m Membersihkan lapangan dan peralatan
1 m Pembuatan bak adukan ukuran 40 cm x 50 cm x 20 cm
1 m Pembuatan bedeng buruh
1 m Pembuatan stegger
1 m Pembuatan jalan sementara (dengan tenaga)
1 m Pembuatan jalan sementara, tebal 25 cm (dengan tenaga)
1 m Bongkaran beton bertulang
1 m Bongkaran dinding tembok bata merah
1 m Bongkaran lantai
1 m Menurunkan atap genteng/sirap
1 m Menurunkan atap seng
1 m Membongkar rangka atap
1 m Membongkar rangka kuda-kuda kayu
1 m Membongkar langit-langit + rangka
C.
D.
D.1
D.2
D.3
D.4
D.5
D.6
D.7
D.8
D.9
D.10
D.11
D.12
D.13
D.14
D.15
D.16
D.17
D.18
KETERANGAN
B.1
B.2
B.3
B.4
B.5
B.6
B.7
B.8
B.9
B.10
B.11
B.12
B.13
C.1
C.2
C.3
C.4
C.5
C.6
C.7
C.8
C.9
C.10
JUMLAH (Rp.)
42,100.00
22,570.00
31,565.00
26,835.00
53,750.00
35,445.00
2,150.00
22,060.00
15,520.00
25,000.00
205,300.00
95,470.00
148,940.00
1,074,888.30
817,872.00
902,853.60
877,904.90
565,920.00
2,214,183.80
1,195,683.60
1,225,293.05
955,480.19
701,985.44
46,097.00
359,055.00
336,592.60
331,365.40
116,485.00
165,307.70
97,034.00
161,431.46
1,022,992.40
860,794.50
788,026.50
958,034.15
779,344.18
284,933.80
125,340.00
406,865.90
317,680.70
68,227.69
KODE
ANALISA
1
E.
E.1
E.2
E.3
E.4
E.5
E.6
E.7
E.8
E.9
E.10
E.11
E.12
E.13
E.14
E.15
E.16
E.17
F.
F.1
F.2
F.3
F.4
F.5
F.5a
F.6
F.7
F.8
F.9
F.10
F.11
F.12
F.13
F.14
F.15
F.16
F.17
F.18
F.19
F.20
F.21
F.22
F.23
F.24
F.25
F.26
F.27
F.28
F.29
F.30
F.31
F.32
F.33
F.34
F.35
G.
G.1
G.2
G.3
G.4
G.5
G.6
G.7
G.8
G.9
G.10
G.11
G.12
G.13
G.14
G.15
G.16
G.17
G.18
G.19
URAIAN PEKERJAAN
2
ANALISA BIAYA KONSTRUKSI PEKERJAAN PLESTERAN
1 m Plesteran 1 PC : 2 Ps, tebal 15 mm
1 m Plesteran 1 PC : 4 Ps, tebal 15 mm
1 m Plesteran 1 PC : 5 Ps, tebal 15 mm
1 m Plesteran 1 PC : 2 Ps, tebal 20 mm
1 m Plesteran 1 PC : 4 Ps, tebal 20 mm
1 m Plesteran 1 PC : 5 Ps, tebal 20 mm
1 m Plesteran 1 PC : 2 Ps, tebal 25 mm
1 m Plesteran 1 PC : 4 Ps, tebal 25 mm
1 m Plesteran 1 PC : 5 Ps, tebal 25 mm
1 m Plesteran 1 PC : 2 Ps, tebal 30 mm
1 m Plesteran 1 PC : 4 Ps, tebal 30 mm
1 m Plesteran 1 PC : 5 Ps, tebal 30 mm
1 m Plesteran beton 1 PC : 2 Ps, tebal 15 mm
1 m Plesteran beton 1 PC : 3 Ps, tebal 15 mm
1 m Plesteran ciprat 1Pc : 2 Ps
1 m Plesteran siar, 1 PC : 2 Ps
1 m Plesteran waterproof batacote, 3 lapis
JUMLAH (Rp.)
KETERANGAN
31,449.26
27,092.60
26,052.16
45,396.14
38,041.84 Harga satuan
36,098.62 tidak termasuk PPN
47,942.70
41,899.24
39,841.22
58,669.20
49,170.04
44,995.12
38,349.60
35,516.76
24,257.76
18,172.76
205,688.40
5,167,595.17
2,968,179.47
375,714.00
414,433.86
444,439.50
317,939.50
520,242.40
379,798.36
478,598.36
480,548.36
469,048.36
547,398.36
393,176.00
5,299,645.17
3,953,395.17
71,433.93
70,886.95
106,822.90
126,626.88
46,808.52
62,290.10
84,459.45
47,997.26
134,475.61
233,690.61
371,315.61
280,690.61
56,921.50
14,715.00
302,904.27
3,389,420.17
3,405,315.17
311,113.50
349,806.75
203,890.50
673,783.75
79,545.28
829,514.60
850,939.40
846,847.80
881,699.80
1,639,544.00
1,136,739.80
942,013.00
1,145,804.60
1,083,820.20
1,135,125.00
1,167,153.00
21,816.05
24,877.00
40,595.75
70,000.00
6,031,318.21
92,762.00
101,146.00
KODE
ANALISA
1
G.20
G.21
G.22
G.23
G.24
G.25
G.26
G.27
G.28
G.29
G.30
G.31
G.32
G.33
G.34
G.35
G.36
G.37
G.38
G.39
G.40
H.
H.1
H.2
H.3
H.4
H.5
H.6
H.7
H.8
H.9
H.10
H.11
H.12
H.13
H.14
H.15
H.16
H.17
H.18
H.19
H.20
H.21
H.22
H.23
H.24
H.25
H.26
H.27
H.28
I.
I.1
I.2
I.3
I.4
I.5
I.6
I.7
I.8
I.9
I.10
I.11
I.12
I.13
I.14
I.15
I.16
I.17
I.18
I.19
URAIAN PEKERJAAN
2
1 m Pasang bekisting untuk kolom
1 m Pasang bekisting untuk balok
1 m Pasang bekisting untuk lantai
1 m Membuat beton mutu K. 225
1 m Membuat beton mutu K. 275
1 m Pasang bekisting untuk jembatan cor
1 m Membuat pondasi beton bertulang (150 kg besi + bekisting)
1 m Membuat sloof beton bertulang (200 kg besi + bekisting)
1 m Membuat kolom beton bertulang (150 kg besi + bekisting)
1 m Membuat kolom beton bertulang (300 kg besi + bekisting)
1 m Membuat dinding beton bertulang (150 kg besi + bekisting)
1 m Membuat dinding beton bertulang (200 kg besi + bekisting)/(non SNI)
1 m' Membuat kolom penguat beton bertulang uk. 11 cm x 11 cm
1 m' Membuat ringbalk beton bertulang uk. 10 cm x 15 cm
1 m Membuat beton bertulang 1 : 2 : 3 untuk sloof, dengan pembesian 100 kg
1 m Membuat beton bertulang 1 : 2 : 3 untuk kolom, dengan pembesian 100 kg
1 m Membuat beton bertulang 1 : 2 : 3 untuk balok, dengan pembesian 100 kg
1 m Membuat beton bertulang 1 : 2 : 3 untuk lantai, dengan pembesian 100 kg
1 m Membuat beton bertulang 1 : 2 : 3 untuk lantai, dengan pembesian 75 kg
1 m Membuat beton bertulang 1 : 2 : 3 untuk lantai, dengan Pembesian 200 kg
1 m Membuat beton bertulang 1 : 2 : 3 untuk sloof, dengan pembesian 75 kg
JUMLAH (Rp.)
3
4
231,660.54
238,118.50
308,748.06
1,156,172.00
1,287,186.40
83,100.96
4,603,835.10
5,841,988.60
6,684,710.51
9,550,538.01 Harga satuan
6,055,958.21 tidak termasuk PPN
6,729,317.38
89,955.18
104,692.90
3,919,037.62
6,008,787.84
5,395,150.20
5,907,296.55
5,361,895.30
10,275,198.60
3,373,636.37
90,490.00
86,245.00
86,598.00
92,318.00
83,738.00
45,343.00
58,973.00
63,607.00
56,799.00
61,099.00
71,583.00
84,572.00
80,883.00
80,899.00
81,562.00
46,018.00
71,128.75
113,196.00
337,954.00
62,246.92
29,293.84
79,880.80
86,128.33
110,105.00
177,838.00
62,600.80
105,790.00
122,172.00
J.
J.1
J.2
J.3
KETERANGAN
42,847.00
44,717.00
47,687.00
928,459.50
95,436.00
344,835.00
37,678.00
39,910.00
40,463.50
40,463.50
52,150.00
13,099.00
28,497.14
913,335.74
513,631.74
152,043.74
26,952.80
11,997.40
17,310.00
2,364,619.00
459,937.00
275,050.00
KODE
ANALISA
1
J.4
J.5
J.6
J.7
J.8
J.9
J.10
J.11
J.12
J.13
J.14
J.15
J.16
J.17
J.18
J.19
J.20
J.21
J.22
J.23
J.24
J.25
J.26
J.27
J.28
J.29
J.30
J.31
J.32
J.33
J.34
J.35
J.36
K.
K.1
K.2
K.3
K.4
K.5
K.6
K.7
K.8
K.9
K.10
K.11
K.12
K.13
K.14
K.15
K.16
K.17
K.18
L.
L.1
L.2
L.3
L.4
L.5
L.6
L.7
L.8
L.9
L.10
L.11
L.12
L.13
L.14
L.15
L.16
L.17
L.18
L.19
L.20
L.21
L.22
URAIAN PEKERJAAN
2
Memasang 1 buah urinoir
Memasang 1 buah wastafel
Memasang 1 buah bak mandi fibreglass vol. 0,3 m
Memasang 1 buah bak mandi fibreglass vol. 1 m
Memasang 1 buah bak mandi batu bata vol. 0,3 m + porselin 11 cm x 11 cm
Memasang 1 buah bak mandi batu bata vol. 0,3 m + keramik 20 cm x 20 cm
Memasang 1 buah bak beton vol. 1 m air dengan keramik 10 cm x 20 cm
Memasang 1 buah bak beton vol. 1 m air dengan porselin 11 cm x 11 cm
Memasang 1 buah bathtub (non SNI)
Memasang 1 m' pipa beton 15 cm - 20 cm
Memasang 1 m' pipa beton 30 cm - 100 cm
Memasang 1 bh bak kontrol pas. batu bata uk. 30 cm x 30 cm, tinggi 35 cm
Memasang 1 bh bak kontrol pas. batu bata uk. 45 cm x 45 cm, tinggi 50 cm
Memasang 1 bh bak kontrol pas. batu bata uk. 30 cm x 30 cm, tinggi 30 cm
Memasang 1 m' pipa galvanis 1/2"
Memasang 1 m' pipa galvanis 3/4"
Memasang 1 m' pipa galvanis 1"
Memasang 1 m' pipa galvanis 1,5"
Memasang 1 m' pipa galvanis 2"
Memasang 1 m' pipa galvanis 4"
Memasang 1 m' pipa PVC tipe AW 1/2"
Memasang 1 m' pipa PVC tipe AW 3/4"
Memasang 1 m' pipa PVC tipe AW 1"
Memasang 1 m' pipa PVC tipe AW 1,5"
Memasang 1 m' pipa PVC type AW 3"
Memasang 1 m' pipa PVC type AW 4"
Memasang 1 bh kran air 3/4" atau 1/2"
Memasang 1 bh floor drain
Memasang 1 bh tempat sabun keramik (non SNI)
Memasang 1 bh septic tank, volume air 1 m (non SNI)
Memasang 1 bh septic tank, volume air 1,5 m (non SNI)
Memasang 1 bh septic tank, volume air 2 m (non SNI)
Memasang 1 bh Peresapan, dalam 2 m'
JUMLAH (Rp.)
3
4
1,192,727.00
681,411.00
690,840.00
1,068,004.00
1,544,482.38
701,500.00
7,671,160.40
8,987,244.40
2,130,125.00
201,889.56
354,439.55 Harga satuan
420,559.10 tidak termasuk PPN
477,837.60
179,350.00
63,099.00
78,813.00
116,559.00
175,122.00
234,414.00
690,974.50
12,015.00
14,056.20
26,028.00
23,679.00
40,209.00
88,663.00
47,209.93
55,900.00
71,153.92
3,620,559.53
2,224,213.73
7,136,045.85
459,183.11
15,324.30
31,146.25
23,233.08
6,882.13
7,122.13
12,493.00
16,972.50
105,719.49
83,339.79
75,930.00
26,222.13
12,381.40
7,390.00
4,904.00
5,915.00
5,915.00
73,722.60
22,525.88
KETERANGAN
166,020.04
91,920.04
169,620.04
173,120.04
167,820.04
176,620.04
187,220.04
54,650.75
58,897.85
36,037.30
71,469.38
26,815.38
25,821.38
26,815.38
22,565.38
166,884.60
182,109.60
149,484.60
530,838.00
509,757.00
22,647.84
34,116.00
KODE
ANALISA
1
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
N.
URAIAN PEKERJAAN
JUMLAH (Rp.)
KETERANGAN
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
N.1
N.2
N.3
N.4
N.5
N.6
N.7
N.8
N.9
N.10
N.11
N.12
N.13
N.14
N.15
O.
O.1
O.2
O.3
O.4
O.5
O.6
O.7
O.8
O.9
O.10
O.11
O.12
O.13
O.14
O.15
O.16
O.17
O.18
O.19
O.20
O.21
O.22
O.23
O.24
O.25
O.26
O.27
O.28
O.29
198,840.00
168,900.00
99,250.00
219,970.00
27,210.00
32,510.00
40,410.00
23,109.00
29,010.00
2,397,000.00
32,180.00
129,000.00
96,440.00
269,440.00
60,950.00
14,545,200.00
4,089,700.00
3,941,700.00
3,645,300.00
#REF!
#REF!
463,200.00
2,871,600.00
2,837,100.00
496,400.00
#REF!
4,811,600.00
#REF!
2,611,800.00
7,132,000.00
1,123,600.00
1,724,500.00
1,175,300.00
#REF!
#REF!
#REF!
#REF!
#REF!
2,899,400.00
4,068,800.00
3,052,500.00
1,542,100.00
295,700.00
731,700.00
DAFTAR
DAFTAR HARGA SATUAN UMUM UPAH, BAHAN DAN PERALATAN
No.
SATUAN
USULAN
HARGA SATUAN
(Rp)
2009
HARGA SATUAN
(Rp)
2009
KET.
A. UPAH
1 Mandor
oh
Rp
80,000.00
Rp
80,000.00
2 Mekanik
oh
Rp
60,000.00
Rp
60,000.00
3 Mekanik pembantu
oh
Rp
40,000.00
Rp
40,000.00
4 Kepala tukang
oh
Rp
75,000.00
Rp
75,000.00
5 Tukang batu
oh
Rp
60,000.00
Rp
60,000.00
6 Tukang kayu
oh
Rp
70,000.00
Rp
70,000.00
oh
Rp
75,000.00
Rp
75,000.00
8 Tukang cat
oh
Rp
60,000.00
Rp
60,000.00
9 Tukang listrik
oh
Rp
60,000.00
Rp
60,000.00
oh
Rp
60,000.00
Rp
60,000.00
oh
Rp
50,000.00
Rp
50,000.00
12 Operator terlatih
oh
Rp
82,241.25
Rp
82,241.25
oh
Rp
68,986.26
Rp
68,986.26
14 Pembantu operator
oh
Rp
51,815.02
Rp
51,815.02
oh
Rp
76,216.26
Rp
76,216.26
oh
Rp
68,750.00
Rp
68,750.00
oh
Rp
51,815.02
Rp
51,815.02
18 Pekerja terlatih
oh
Rp
45,000.00
Rp
45,000.00
oh
Rp
40,000.00
Rp
40,000.00
oh
Rp
35,000.00
Rp
35,000.00
21 Penjaga
oh
Rp
60,250.00
Rp
60,250.00
22 Pemasak aspal
oh
Rp
48,802.53
Rp
48,802.53
23 Pengangkut air
oh
Rp
48,802.53
Rp
48,802.53
ikat
Rp
1,500.00
2 Alat-alat bantu**
set
Rp
134,900.00
Rp
134,900.00
unit
Rp
75,000.00
Rp
75,000.00
unit
Rp
50,000.00
Rp
50,000.00
5 Aluminium foil
Rp
92,000.00
Rp
92,000.00
lembar
Rp
11,600.00
Rp
11,600.00
kg
Rp
12,330.36
Rp
12,330.36
B. MATERIAL/BAHAN
1 Alang-alang
6 Amplas
7 Aspal bitumen
8 Atap alumunium super sheet uk. 1,8 x 6 (m), t = 0,2 mm (berwarna)
Rp
265,800.00
Rp
265,800.00
lembar
Rp
36,814.70
Rp
36,814.70
lembar
Rp
71,500.00
Rp
71,500.00
lembar
Rp
107,200.00
Rp
107,200.00
lembar
Rp
41,000.00
Rp
41,000.00
lembar
Rp
78,500.00
Rp
78,500.00
lembar
Rp
55,500.00
Rp
55,500.00
lembar
Rp
114,400.00
Rp
114,400.00
lembar
Rp
91,600.00
Rp
91,600.00
lembar
Rp
137,100.00
Rp
137,100.00
lembar
Rp
128,700.00
Rp
128,700.00
lembar
Rp
96,400.00
Rp
96,400.00
lembar
Rp
144,600.00
Rp
144,600.00
lembar
Rp
143,000.00
Rp
143,000.00
lembar
Rp
116,700.00
Rp
116,700.00
No.
SATUAN
USULAN
HARGA SATUAN
(Rp)
2009
HARGA SATUAN
(Rp)
2009
KET.
lembar
Rp
175,000.00
Rp
175,000.00
lembar
Rp
126,800.00
Rp
126,800.00
lembar
Rp
189,700.00
Rp
189,700.00
m2
Rp
733,471.20
Rp
733,471.20
m2
Rp
900,169.20
Rp
900,169.20
lembar
Rp
14,300.00
Rp
14,300.00
buah
Rp
4,961.25
Rp
4,961.25
buah
Rp
3,150.00
Rp
3,150.00
buah
Rp
2,646.00
Rp
2,646.00
lembar
Rp
88,300.00
Rp
88,300.00
lembar
Rp
97,100.00
Rp
97,100.00
lembar
Rp
158,000.00
Rp
158,000.00
lembar
Rp
74,800.00
Rp
74,800.00
Unit
Rp
2,193,411.78
Rp
2,193,411.78
Unit
Rp
2,741,848.20
Rp
2,741,848.20
m'
Rp
1,134,000.00
Rp
1,134,000.00
m'
Rp
913,500.00
Rp
913,500.00
m'
Rp
693,000.00
Rp
693,000.00
buah
Rp
321,200.00
Rp
321,200.00
buah
Rp
644,200.00
Rp
644,200.00
buah
Rp
317,700.00
Rp
317,700.00
buah
Rp
353,000.00
Rp
353,000.00
buah
Rp
494,200.00
Rp
494,200.00
buah
Rp
1,750,000.00
Rp
1,750,000.00
47 Bataco
buah
Rp
2,115.00
Rp
2,115.00
48 Batacote
Rp
61,800.00
Rp
61,800.00
Rp
441,300.00
Rp
441,300.00
50 Batu apung
kg
Rp
2,600.00
Rp
2,600.00
buah
Rp
2,600.00
Rp
2,600.00
bh
Rp
1,800.00
Rp
1,800.00
bh
Rp
1,764.00
Rp
1,764.00
bh
Rp
1,512.00
Rp
1,512.00
Rp
511,000.00
Rp
511,000.00
Rp
401,500.00
Rp
401,500.00
Rp
401,500.00
Rp
401,500.00
Rp
100,600.00
Rp
100,600.00
59 Batu kapur
Rp
97,100.00
Rp
97,100.00
Rp
207,400.00
Rp
207,400.00
Rp
176,500.00
Rp
176,500.00
Rp
203,000.00
Rp
203,000.00
63 Batu paras
Rp
441,300.00
Rp
441,300.00
64 Batu kacang
m3
Rp
416,745.00
Rp
416,745.00
Rp
374,125.00
Rp
374,125.00
Rp
446,516.67
Rp
446,516.67
Rp
455,520.00
Rp
455,520.00
Rp
455,520.00
Rp
455,520.00
Rp
601,397.36
Rp
601,397.36
Rp
291,200.00
Rp
291,200.00
71 Batu teraso
Rp
185,300.00
Rp
185,300.00
buah
Rp
10,600.00
Rp
10,600.00
73 Baut klem
buah
Rp
7,900.00
Rp
7,900.00
74 Bensin premium
liter
Rp
5,670.00
Rp
5,670.00
kg
Rp
44,100.00
Rp
44,100.00
No.
SATUAN
USULAN
HARGA SATUAN
(Rp)
2009
HARGA SATUAN
(Rp)
2009
KET.
kg
Rp
19,800.00
Rp
19,800.00
77 Besi beton
kg
Rp
19,656.00
Rp
19,656.00
kg
Rp
19,400.00
Rp
19,400.00
kg
Rp
22,900.00
Rp
22,900.00
80 Besi siku
6 m'
Rp
315,945.00
Rp
315,945.00
81 Besi strip
kg
Rp
53,550.00
Rp
53,550.00
82 Kawat
kg
Rp
23,730.00
Rp
23,730.00
83 Plat kembang 3 mm
m2
Rp
200,037.60
Rp
200,037.60
84 Besi strip 2 x 3
m'
Rp
29,100.00
Rp
29,100.00
m'
Rp
651,622.86
Rp
651,622.86
m'
Rp
1,645,142.94
Rp
1,645,142.94
Unit
Rp
626,618.16
Rp
626,618.16
Unit
Rp
822,487.68
Rp
822,487.68
89 Bend PVC 50 x 90
Unit
Rp
182,701.26
Rp
182,701.26
90 Bend PVC 80 x 90
Unit
Rp
274,051.26
Rp
274,051.26
m'
Rp
29,100.00
Rp
29,100.00
buah
Rp
61,800.00
Rp
61,800.00
buah
Rp
101,500.00
Rp
101,500.00
buah
Rp
64,400.00
Rp
64,400.00
buah
Rp
59,800.00
Rp
59,800.00
buah
Rp
72,300.00
Rp
72,300.00
buah
Rp
82,300.00
Rp
82,300.00
98 Box sekering
set
Rp
56,700.00
Rp
56,700.00
44,100.00
91 Besi teralis 6 mm - 10 mm
bh
Rp
44,100.00
Rp
bh
Rp
6,300.00
Rp
6,300.00
bh
Rp
28,350.00
Rp
28,350.00
Rp
85,600.00
Rp
85,600.00
lembar
Rp
61,800.00
Rp
61,800.00
buah
Rp
43,200.00
Rp
43,200.00
buah
Rp
5,433.75
Rp
5,433.75
buah
Rp
7,200.00
Rp
7,200.00
buah
Rp
4,680.00
Rp
4,680.00
buah
Rp
37,100.00
Rp
37,100.00
m'
Rp
69,700.00
Rp
69,700.00
buah
Rp
494,200.00
Rp
494,200.00
buah
Rp
1,147,300.00
Rp
1,147,300.00
buah
Rp
460,700.00
Rp
460,700.00
buah
Rp
105,000.00
Rp
105,000.00
buah
Rp
460,700.00
Rp
460,700.00
kg
Rp
22,176.00
Rp
22,176.00
kg
Rp
50,793.75
Rp
50,793.75
kg
Rp
32,700.00
Rp
32,700.00
kg
Rp
30,693.60
Rp
30,693.60
kg
Rp
63,800.00
Rp
63,800.00
kg
Rp
64,400.00
Rp
64,400.00
kg
Rp
18,405.00
Rp
18,405.00
kg
Rp
42,840.00
Rp
42,840.00
kg
Rp
59,062.50
Rp
59,062.50
kg
Rp
24,680.00
Rp
24,680.00
kg
Rp
9,648.95
Rp
9,648.95
kg
Rp
16,443.00
Rp
16,443.00
kg
Rp
15,172.50
Rp
15,172.50
kg
Rp
12,810.00
Rp
12,810.00
No.
SATUAN
USULAN
HARGA SATUAN
(Rp)
2009
HARGA SATUAN
(Rp)
2009
KET.
kg
Rp
19,500.00
Rp
19,500.00
buah
Rp
2,047,400.00
Rp
2,047,400.00
buah
Rp
181,400.00
Rp
181,400.00
buah
Rp
200,300.00
Rp
200,300.00
buah
Rp
238,300.00
Rp
238,300.00
bh
Rp
441,000.00
Rp
441,000.00
bh
Rp
143,850.00
Rp
143,850.00
bh
Rp
1,554,000.00
Rp
1,554,000.00
bh
Rp
383,250.00
Rp
383,250.00
unit
Rp
91,183.68
Rp
91,183.68
unit
Rp
104,519.52
Rp
104,519.52
unit
Rp
173,365.92
Rp
173,365.92
unit
Rp
207,539.64
Rp
207,539.64
buah
Rp
69,700.00
Rp
69,700.00
buah
Rp
57,400.00
Rp
57,400.00
Rp
2,016.00
Rp
2,016.00
Rp
2,268.00
Rp
2,268.00
146 Dempul
kg
Rp
34,177.50
Rp
34,177.50
kg
Rp
6,510.00
Rp
6,510.00
Ltr
Rp
6,414.55
Rp
6,414.55
kg
Rp
11,263.00
Rp
11,263.00
kg
Rp
5,040.00
Rp
5,040.00
kg
Rp
146,500.00
Rp
146,500.00
buah
Rp
2,200.00
Rp
2,200.00
buah
Rp
88,300.00
Rp
88,300.00
unit
Rp
41,674.50
Rp
41,674.50
unit
Rp
5,000.94
Rp
5,000.94
unit
Rp
127,857.24
Rp
127,857.24
unit
Rp
74,347.56
Rp
74,347.56
bh
Rp
25,200.00
Rp
25,200.00
bh
Rp
441,000.00
Rp
441,000.00
bh
Rp
630,000.00
Rp
630,000.00
Rp
1,420,800.00
Rp
1,420,800.00
buah
Rp
325,500.00
Rp
325,500.00
buah
Rp
15,000.00
Rp
15,000.00
buah
Rp
20,300.00
Rp
20,300.00
buah
Rp
28,200.00
Rp
28,200.00
set
Rp
10,600.00
Rp
10,600.00
buah
Rp
90,000.00
Rp
90,000.00
2 bh
Rp
20,370.00
Rp
20,370.00
2 bh
Rp
14,553.00
Rp
14,553.00
Rp
32,700.00
Rp
32,700.00
Rp
34,400.00
Rp
34,400.00
Rp
37,100.00
Rp
37,100.00
m2
Rp
22,680.00
Rp
22,680.00
lembar
Rp
75,000.00
Rp
75,000.00
Rp
84,500.00
Rp
84,500.00
Rp
152,100.00
Rp
152,100.00
174 Exspanoglet
Rp
200,900.00
Rp
200,900.00
buah
Rp
48,400.00
Rp
48,400.00
lbr
Rp
79,400.00
Rp
79,400.00
bh
Rp
136,025.82
Rp
136,025.82
unit
Rp
548,436.42
Rp
548,436.42
No.
SATUAN
USULAN
HARGA SATUAN
(Rp)
2009
HARGA SATUAN
(Rp)
2009
KET.
182 Filler
kg
Rp
1,512.00
Rp
1,512.00
buah
Rp
11,500.00
Rp
11,500.00
buah
Rp
7,900.00
Rp
7,900.00
buah
Rp
4,203,957.24
Rp
4,203,957.24
buah
Rp
16,800.00
Rp
16,800.00
unit
Rp
5,940,616.36
Rp
5,940,616.36
m'
Rp
3,693,861.36
Rp
3,693,861.36
unit
Rp
68,922.00
Rp
68,922.00
unit
Rp
1,761,606.00
Rp
1,761,606.00
unit
Rp
3,324,958.56
Rp
3,324,958.56
buah
Rp
25,600.00
Rp
25,600.00
43,200.00
kg
Rp
43,200.00
Rp
buah
Rp
20,300.00
Rp
20,300.00
buah
Rp
158,000.00
Rp
158,000.00
lembar
Rp
116,500.00
Rp
116,500.00
lembar
Rp
56,385.00
Rp
56,385.00
bh
Rp
8,190.00
Rp
8,190.00
buah
Rp
37,900.00
Rp
37,900.00
buah
Rp
37,900.00
Rp
37,900.00
buah
Rp
64,400.00
Rp
64,400.00
buah
Rp
2,206,300.00
Rp
2,206,300.00
buah
Rp
57,400.00
Rp
57,400.00
buah
Rp
62,700.00
Rp
62,700.00
buah
Rp
75,000.00
Rp
75,000.00
206 Hook
buah
Rp
20,300.00
Rp
20,300.00
Rp
402,400.00
Rp
402,400.00
Rp
402,400.00
Rp
402,400.00
Rp
238,300.00
Rp
238,300.00
bh
Rp
503,566.88
Rp
503,566.88
bh
Rp
700,000.00
Rp
700,000.00
bh
Rp
882,000.00
Rp
882,000.00
m'
Rp
3,400.00
Rp
3,400.00
m'
Rp
4,800.00
Rp
4,800.00
m'
Rp
5,800.00
Rp
5,800.00
m'
Rp
12,200.00
Rp
12,200.00
m'
Rp
30,800.00
Rp
30,800.00
Rp
359,400.00
Rp
359,400.00
Rp
102,294.36
Rp
102,294.36
Rp
132,300.00
Rp
132,300.00
Rp
253,100.00
Rp
253,100.00
Rp
432,400.00
Rp
432,400.00
Rp
165,000.00
Rp
165,000.00
Rp
197,700.00
Rp
197,700.00
Rp
263,900.00
Rp
263,900.00
Rp
441,300.00
Rp
441,300.00
Rp
529,500.00
Rp
529,500.00
220,600.00
Rp
220,600.00
Rp
Daun
Rp
34,776.00
Rp
34,776.00
m2
Rp
135,025.38
Rp
135,025.38
m2
Rp
151,200.00
Rp
151,200.00
Rp
2,137,800.00
Rp
2,137,800.00
Rp
874,600.00
Rp
874,600.00
kg
Rp
16,500.00
Rp
16,500.00
No.
SATUAN
USULAN
HARGA SATUAN
(Rp)
2009
HARGA SATUAN
(Rp)
2009
KET.
buah
Rp
10,899.00
Rp
buah
Rp
16,800.00
Rp
16,800.00
Rp
105,900.00
Rp
105,900.00
kg
Rp
37,100.00
Rp
37,100.00
m'
Rp
13,671.00
Rp
13,671.00
Rp
26,500.00
Rp
26,500.00
Rp
24,700.00
Rp
24,700.00
kg
Rp
18,900.00
Rp
18,900.00
kg
Rp
22,050.00
Rp
22,050.00
kg
Rp
126,200.00
Rp
126,200.00
Rp
22,900.00
Rp
22,900.00
Rp
109,400.00
Rp
109,400.00
Rp
19,400.00
Rp
19,400.00
kg
Rp
20,300.00
Rp
20,300.00
Rp
315,000.00
Rp
315,000.00
m3
Rp
1,066,867.20
Rp
1,066,867.20
m3
Rp
636,498.84
Rp
636,498.84
10,899.00
batang
Rp
19,096.88
Rp
19,096.88
Rp
3,075,995.61
Rp
3,075,995.61
Rp
3,574,100.00
Rp
3,574,100.00
m'
Rp
19,400.00
Rp
19,400.00
Rp
2,652,249.52
Rp
2,652,249.52
Rp
2,462,200.00
Rp
2,462,200.00
m'
Rp
10,100.00
Rp
10,100.00
Rp
1,919,318.71
Rp
1,919,318.71
Rp
1,676,800.00
Rp
1,676,800.00
Rp
4,236,000.00
Rp
4,236,000.00
Rp
1,209,000.00
Rp
1,209,000.00
Rp
74,100.00
Rp
74,100.00
Rp
79,400.00
Rp
79,400.00
Rp
74,100.00
Rp
74,100.00
266 Keramik 15 x 15 cm
Rp
267 Keramik 15 x 20 cm
Rp
75,900.00
Rp
75,900.00
Rp
77,700.00
Rp
77,700.00
Rp
92,700.00
Rp
92,700.00
270 Keramik 25 x 25 cm
Rp
81,200.00
Rp
81,200.00
Rp
93,500.00
Rp
93,500.00
Rp
84,700.00
Rp
84,700.00
Rp
79,400.00
Rp
79,400.00
Rp
84,700.00
Rp
84,700.00
Rp
95,300.00
Rp
95,300.00
Rp
77,700.00
Rp
77,700.00
m2
Rp
60,725.70
Rp
60,725.70
m2
Rp
67,155.48
Rp
67,155.48
m2
Rp
72,514.26
Rp
72,514.26
m2
Rp
60,102.00
Rp
60,102.00
m2
Rp
55,010.34
Rp
55,010.34
m2
Rp
68,040.00
Rp
68,040.00
buah
Rp
6,200.00
Rp
6,200.00
buah
Rp
3,100.00
Rp
3,100.00
buah
Rp
3,700.00
Rp
3,700.00
bh
Rp
3,830.40
Rp
3,830.40
bh
Rp
9,169.02
Rp
9,169.02
No.
SATUAN
USULAN
HARGA SATUAN
(Rp)
2009
HARGA SATUAN
(Rp)
2009
KET.
lembar
Rp
47,700.00
Rp
47,700.00
m3
Rp
453,600.00
Rp
453,600.00
bh
Rp
7,560.00
Rp
7,560.00
bh
Rp
50,400.00
Rp
50,400.00
buah
Rp
39,700.00
Rp
39,700.00
buah
Rp
48,500.00
Rp
48,500.00
buah
Rp
29,100.00
Rp
29,100.00
buah
Rp
6,200.00
Rp
6,200.00
buah
Rp
7,900.00
Rp
7,900.00
buah
Rp
13,200.00
Rp
13,200.00
set
Rp
26,500.00
Rp
26,500.00
buah
Rp
40,600.00
Rp
40,600.00
set
Rp
150,000.00
Rp
150,000.00
set
Rp
238,300.00
Rp
238,300.00
set
Rp
40,600.00
Rp
40,600.00
buah
Rp
184,400.00
Rp
184,400.00
buah
Rp
132,400.00
Rp
132,400.00
No.
SATUAN
USULAN
HARGA SATUAN
(Rp)
2009
HARGA SATUAN
(Rp)
2009
KET.
buah
Rp
150,000.00
Rp
150,000.00
buah
Rp
63,500.00
Rp
63,500.00
bh
Rp
18,427.50
Rp
18,427.50
set
Rp
69,195.00
Rp
69,195.00
set
Rp
53,550.00
Rp
53,550.00
set
Rp
105,210.00
Rp
105,210.00
set
Rp
75,600.00
Rp
75,600.00
m'
Rp
133,358.40
Rp
133,358.40
313
Rp
Rp
612,100.00
Rp
612,100.00
Rp
759,700.00
Rp
759,700.00
buah
Rp
234,800.00
Rp
234,800.00
buah
Rp
234,800.00
Rp
234,800.00
set
Rp
264,500.00
Rp
264,500.00
titik
Rp
79,394.92
Rp
79,394.92
titik
Rp
113,300.00
Rp
113,300.00
titik
Rp
87,800.00
Rp
87,800.00
titik
Rp
118,600.00
Rp
118,600.00
Rp
68,800.00
Rp
68,800.00
Rp
70,600.00
Rp
70,600.00
325 Langit-langit Accoustic board / tile uk. 0,60 x 1,20 x 0,14 (m)
Rp
86,500.00
Rp
86,500.00
326 Langit-langit Accoustic board / tile uk. 0,60 x 1,20 x 0,15 (m)
Rp
98,800.00
Rp
98,800.00
m'
Rp
23,310.00
Rp
23,310.00
m'
Rp
11,340.00
Rp
11,340.00
kg
Rp
29,000.00
Rp
29,000.00
kg
Rp
31,500.00
Rp
31,500.00
klg
Rp
6,300.00
Rp
6,300.00
titik
Rp
52,300.00
Rp
52,300.00
titik
Rp
389,400.00
Rp
389,400.00
liter
Rp
9,700.00
Rp
9,700.00
liter
Rp
28,900.00
Rp
28,900.00
liter
Rp
22,050.00
Rp
22,050.00
liter
Rp
6,655.32
Rp
6,655.32
liter
Rp
11,500.00
Rp
11,500.00
lembar
Rp
292,100.00
Rp
292,100.00
lembar
Rp
361,100.00
Rp
361,100.00
lembar
Rp
407,200.00
Rp
407,200.00
lembar
Rp
142,100.00
Rp
142,100.00
lembar
Rp
213,200.00
Rp
213,200.00
m2
Rp
996,320.00
Rp
996,320.00
345 Paku
kg
Rp
19,358.18
Rp
19,358.18
kg
Rp
37,900.00
Rp
37,900.00
kg
Rp
30,900.00
Rp
30,900.00
kg
Rp
31,270.91
Rp
31,270.91
kg
Rp
28,200.00
Rp
28,200.00
kg
Rp
33,500.00
Rp
33,500.00
kg
Rp
61,800.00
Rp
61,800.00
bh
Rp
1,700.00
Rp
1,700.00
bh
Rp
1,800.00
Rp
1,800.00
kg
Rp
27,846.00
Rp
27,846.00
kg
Rp
26,500.00
Rp
26,500.00
kg
Rp
39,585.00
Rp
39,585.00
buah
Rp
101,700.00
Rp
101,700.00
No.
SATUAN
USULAN
HARGA SATUAN
(Rp)
2009
HARGA SATUAN
(Rp)
2009
KET.
buah
Rp
130,200.00
Rp
130,200.00
buah
Rp
133,700.00
Rp
133,700.00
buah
Rp
180,200.00
Rp
180,200.00
Rp
150,000.00
Rp
150,000.00
Rp
132,400.00
Rp
132,400.00
Rp
94,900.00
Rp
94,900.00
Rp
91,250.00
Rp
91,250.00
m3
Rp
79,380.00
Rp
79,380.00
buah
Rp
88,300.00
Rp
88,300.00
kg
Rp
900.00
Rp
900.00
unit
Rp
2,356,300.00
Rp
2,356,300.00
unit
Rp
3,549,400.00
Rp
3,549,400.00
Rp
529,500.00
Rp
529,500.00
Rp
882,500.00
Rp
882,500.00
m'
Rp
23,059.89
Rp
23,059.89
m'
Rp
28,005.18
Rp
28,005.18
m'
Rp
69,235.32
Rp
69,235.32
m'
Rp
69,235.32
Rp
69,235.32
m'
Rp
43,995.00
Rp
43,995.00
m'
Rp
54,138.00
Rp
54,138.00
m'
Rp
77,742.00
Rp
77,742.00
m'
Rp
6,779.01
Rp
6,779.01
m'
Rp
32,700.00
Rp
32,700.00
m'
Rp
42,400.00
Rp
42,400.00
m'
Rp
65,700.00
Rp
65,700.00
m'
Rp
84,700.00
Rp
84,700.00
m'
Rp
98,000.00
Rp
98,000.00
m'
Rp
134,600.00
Rp
134,600.00
m'
Rp
413,900.00
Rp
413,900.00
buah
Rp
141,200.00
Rp
141,200.00
buah
Rp
232,100.00
Rp
232,100.00
m'
Rp
38,507.18
Rp
38,507.18
m'
Rp
62,178.48
Rp
62,178.48
m'
Rp
181,450.71
Rp
181,450.71
m'
Rp
10,168.52
Rp
10,168.52
m'
Rp
24,462.90
Rp
24,462.90
m'
Rp
7,969.50
Rp
7,969.50
m'
Rp
16,537.50
Rp
16,537.50
m'
Rp
30,712.50
Rp
30,712.50
m'
Rp
46,068.75
Rp
46,068.75
m'
Rp
12,700.00
Rp
12,700.00
m'
Rp
22,100.00
Rp
22,100.00
m'
Rp
7,200.00
Rp
7,200.00
m'
Rp
56,500.00
Rp
56,500.00
m'
Rp
9,500.00
Rp
9,500.00
m'
Rp
92,700.00
Rp
92,700.00
m'
Rp
2,833.87
Rp
2,833.87
m;
Rp
40,229.78
Rp
40,229.78
406 Plamuer
kg
Rp
19,400.00
Rp
19,400.00
buah
Rp
1,800.00
Rp
1,800.00
buah
Rp
2,600.00
Rp
2,600.00
buah
Rp
3,500.00
Rp
3,500.00
buah
Rp
8,300.00
Rp
8,300.00
No.
SATUAN
USULAN
HARGA SATUAN
(Rp)
2009
HARGA SATUAN
(Rp)
2009
KET.
buah
Rp
8,800.00
Rp
8,800.00
buah
Rp
10,600.00
Rp
10,600.00
lembar
Rp
73,200.00
Rp
73,200.00
lembar
Rp
79,400.00
Rp
79,400.00
lembar
Rp
77,700.00
Rp
77,700.00
lembar
Rp
114,700.00
Rp
114,700.00
lembar
Rp
121,800.00
Rp
121,800.00
lembar
Rp
130,600.00
Rp
130,600.00
419 Politur
liter
Rp
59,700.00
Rp
59,700.00
liter
Rp
98,300.00
Rp
98,300.00
buah
Rp
1,600.00
Rp
1,600.00
m'
Rp
45,900.00
Rp
45,900.00
unit
Rp
441,000.00
Rp
441,000.00
424 Railing tangga stainless steel pipa dia. 2" dan 1"
m'
Rp
1,152,500.00
Rp
1,152,500.00
m'
Rp
45,900.00
Rp
45,900.00
m'
Rp
55,600.00
Rp
55,600.00
m'
Rp
26,500.00
Rp
26,500.00
m'
Rp
61,800.00
Rp
61,800.00
Rp
349,500.00
Rp
349,500.00
Rp
325,600.00
Rp
325,600.00
431 Rapidrant
kg
Rp
3,400.00
Rp
3,400.00
buah
Rp
10,100.00
Rp
10,100.00
buah
Rp
14,000.00
Rp
14,000.00
buah
Rp
12,100.00
Rp
12,100.00
unit
Rp
821,737.79
Rp
821,737.79
unit
Rp
1,330,085.01
Rp
1,330,085.01
unit
Rp
1,450,942.73
Rp
1,450,942.73
buah
Rp
220,600.00
Rp
220,600.00
439 Residu
liter
Rp
18,500.00
Rp
18,500.00
m2
Rp
463,137.05
Rp
463,137.05
Rp
503,000.00
Rp
503,000.00
Rp
414,800.00
Rp
414,800.00
lembar
Rp
123,600.00
Rp
123,600.00
buah
Rp
10,200.00
Rp
10,200.00
buah
Rp
5,775.00
Rp
5,775.00
446 Sabun
kg
Rp
9,300.00
Rp
9,300.00
447 Saklar
buah
Rp
18,900.00
Rp
18,900.00
buah
Rp
31,400.00
Rp
31,400.00
449 Sealent
kg
Rp
61,800.00
Rp
61,800.00
450 Semen PC @ 50 kg
kg
Rp
1,398.00
Rp
1,398.00
kg
Rp
1,432.80
Rp
1,432.80
kg
Rp
1,432.80
Rp
1,432.80
kg
Rp
1,432.80
Rp
1,432.80
kg
Rp
1,432.80
Rp
1,432.80
kg
Rp
1,958.73
Rp
1,958.73
m3
Rp
77,380.00
Rp
77,380.00
m3
Rp
68,620.00
Rp
68,620.00
kg
Rp
16,200.00
Rp
16,200.00
lembar
Rp
56,500.00
Rp
56,500.00
lembar
Rp
70,600.00
Rp
70,600.00
m2
Rp
59,503.50
Rp
59,503.50
Kp
Rp
73,347.12
Rp
73,347.12
buah
Rp
2,600.00
Rp
2,600.00
No.
SATUAN
USULAN
HARGA SATUAN
(Rp)
2009
HARGA SATUAN
(Rp)
2009
KET.
464 Sirtu
Rp
70,600.00
Rp
70,600.00
buah
Rp
14,100.00
Rp
14,100.00
buah
Rp
15,900.00
Rp
15,900.00
buah
Rp
15,000.00
Rp
15,000.00
buah
Rp
10,600.00
Rp
10,600.00
buah
Rp
12,100.00
Rp
12,100.00
buah
Rp
8,800.00
Rp
8,800.00
kg
Rp
38,800.00
Rp
38,800.00
lembar
Rp
61,800.00
Rp
61,800.00
kg
Rp
41,300.00
Rp
41,300.00
titik
Rp
46,620.00
Rp
46,620.00
bh
Rp
25,803.18
Rp
25,803.18
kg
Rp
5,300.00
Rp
5,300.00
Rp
79,400.00
Rp
79,400.00
buah
Rp
3,208,800.00
Rp
3,208,800.00
buah
Rp
2,643,630.24
Rp
2,643,630.24
buah
Rp
9,712,800.00
Rp
9,712,800.00
buah
Rp
29,564,600.00
Rp
29,564,600.00
buah
Rp
2,797,500.00
Rp
2,797,500.00
buah
Rp
6,354,000.00
Rp
6,354,000.00
buah
Rp
8,454,400.00
Rp
8,454,400.00
buah
Rp
10,801,800.00
Rp
10,801,800.00
buah
Rp
12,628,600.00
Rp
12,628,600.00
buah
Rp
1,200,200.00
Rp
1,200,200.00
buah
Rp
2,647,500.00
Rp
2,647,500.00
buah
Rp
5,295,000.00
Rp
5,295,000.00
buah
Rp
9,712,800.00
Rp
9,712,800.00
buah
Rp
970,800.00
Rp
970,800.00
lembar
Rp
113,400.00
Rp
113,400.00
lembar
Rp
144,700.00
Rp
144,700.00
lembar
Rp
220,600.00
Rp
220,600.00
m2
Rp
67,500.00
Rp
67,500.00
unit
Rp
2,626,206.97
Rp
2,626,206.97
bh
Rp
3,780.00
Rp
3,780.00
unit
Rp
829,015.83
Rp
829,015.83
unit
Rp
1,330,085.01
Rp
1,330,085.01
unit
Rp
1,450,060.89
Rp
1,450,060.89
unit
Rp
1,209,008.92
Rp
1,209,008.92
unit
Rp
1,934,590.30
Rp
1,934,590.30
unit
Rp
626,600.00
Rp
626,600.00
unit
Rp
317,700.00
Rp
317,700.00
unit
Rp
604,503.63
Rp
604,503.63
unit
Rp
829,015.83
Rp
829,015.83
unit
Rp
365,568.84
Rp
365,568.84
buah
Rp
64,400.00
Rp
64,400.00
509 Ter
kg
Rp
8,977.50
Rp
8,977.50
Rp
70,600.00
Rp
70,600.00
Rp
114,700.00
Rp
114,700.00
lembar
Rp
74,800.00
Rp
74,800.00
lembar
Rp
79,380.00
Rp
79,380.00
m2
Rp
49,350.00
Rp
49,350.00
m2
Rp
58,716.00
Rp
58,716.00
m2
Rp
79,380.00
Rp
79,380.00
No.
SATUAN
USULAN
HARGA SATUAN
(Rp)
2009
HARGA SATUAN
(Rp)
2009
KET.
m2
Rp
102,375.00
Rp
102,375.00
buah
Rp
5,300.00
Rp
5,300.00
buah
Rp
6,200.00
Rp
6,200.00
Rp
Rp
185,300.00
Rp
185,300.00
Rp
buah
Rp
5,100.00
Rp
5,100.00
Unit
Rp
825,300.00
Rp
825,300.00
unit
Rp
365,568.84
Rp
365,568.84
Rp
67,500.00
Rp
67,500.00
Rp
5,250.00
Rp
5,250.00
Rp
240,900.00
Rp
240,900.00
Rp
96,000.00
Rp
96,000.00
unit
Rp
1,279,073.88
Rp
1,279,073.88
bh
Rp
661,500.00
Rp
661,500.00
bh
Rp
437,850.00
Rp
437,850.00
buah
Rp
467,700.00
Rp
467,700.00
unit
Rp
856,000.00
Rp
856,000.00
m'
Rp
107,100.00
Rp
107,100.00
m2
Rp
69,300.00
Rp
69,300.00
533 Wastafel
Rp
Rp
Rp
1 Bulldozer
jam
Rp
420,000.00
Rp
420,000.00
2 Stone Crusher
jam
Rp
400,000.00
Rp
400,000.00
3 Motor grader
jam
Rp
334,000.00
Rp
334,000.00
4 Pemecah batu
jam
Rp
702,000.00
Rp
702,000.00
5 Mesin penyaring
jam
Rp
278,300.00
Rp
278,300.00
6 Wheel loader
jam
Rp
318,600.00
Rp
318,600.00
7 Wheel tractor
jam
Rp
124,200.00
Rp
124,200.00
8 Track Loader
jam
Rp
300,000.00
Rp
300,000.00
jam
Rp
135,600.00
Rp
135,600.00
jam
Rp
210,900.00
Rp
210,900.00
jam
Rp
254,900.00
Rp
254,900.00
jam
Rp
277,200.00
Rp
277,200.00
jam
Rp
61,000.00
Rp
61,000.00
jam
Rp
10,600.00
Rp
10,600.00
jam
Rp
8,100.00
Rp
8,100.00
jam
Rp
98,900.00
Rp
98,900.00
jam
Rp
28,500.00
Rp
28,500.00
jam
Rp
1,139,300.00
Rp
1,139,300.00
jam
Rp
165,100.00
Rp
165,100.00
jam
Rp
122,800.00
Rp
122,800.00
21 Trailer 1 Ton
jam
Rp
13,200.00
Rp
13,200.00
22 Concrete Vibratur
jam
Rp
101,000.00
Rp
101,000.00
23 Concrete Mixer
jam
Rp
101,400.00
Rp
101,400.00
24 Vibrator Roller
jam
Rp
139,200.00
Rp
139,200.00
jam
Rp
113,200.00
Rp
113,200.00
26 Drump Truck
jam
Rp
181,400.00
Rp
181,400.00
27 Excavator
jam
Rp
313,000.00
Rp
313,000.00
28 Pulvi Mixer
jam
Rp
262,750.00
Rp
262,750.00
29 Generator set
jam
Rp
155,600.00
Rp
155,600.00
jam
Rp
38,800.00
Rp
38,800.00
No.
SATUAN
USULAN
HARGA SATUAN
(Rp)
2009
HARGA SATUAN
(Rp)
2009
KET.
31 Tamper
jam
Rp
41,250.00
Rp
41,250.00
32 Jack Hammer
jam
Rp
100,000.00
Rp
100,000.00
33 Pedestrian Roller
jam
Rp
230,000.00
Rp
230,000.00
jam
Rp
1,125,000.00
Rp
1,125,000.00
jam
Rp
173,200.00
Rp
173,200.00
jam
Rp
217,300.00
Rp
217,300.00
jam
Rp
156,700.00
Rp
156,700.00
jam
Rp
124,800.00
Rp
124,800.00
jam
Rp
249,000.00
Rp
249,000.00
jam
Rp
11,900.00
Rp
11,900.00
jam
Rp
39,500.00
Rp
39,500.00
jam
Rp
79,100.00
Rp
79,100.00
jam
Rp
73,000.00
Rp
73,000.00
jam
Rp
9,800.00
Rp
9,800.00
45 Peralatan traktor
jam
Rp
57,000.00
Rp
57,000.00
46 Asphalt Finisher
jam
Rp
340,600.00
Rp
340,600.00
jam
Rp
2,142,800.00
Rp
2,142,800.00
48 Tandem Roller
jam
Rp
191,800.00
Rp
191,800.00
jam
Rp
200,000.00
Rp
200,000.00
- 900 Watt
Ls
Rp
3,402,402.86
Rp
3,402,402.86
- 1300 Watt
Ls
Rp
39,925,924.60
Rp
39,925,924.60
- 2200 Watt
Ls
Rp
6,543,046.53
Rp
6,543,046.53
- 220000 Watt
Ls
Rp
65,430,465.30
Rp
65,430,465.30
Titik
Rp
196,260.22
Rp
196,260.22
Ls
Rp
1,701,079.74
Rp
1,701,079.74
Unit
Rp
1,570,321.83
Rp
1,570,321.83
C. LAIN-LAIN
1 a.Biaya Penyambungan Daya Listrik PLN
KODE
ANALISA
URAIAN PEKERJAAN
A.
A.4
0.0120 m
0.0200 kg
kasau 5/7
BAHAN
UPAH
JUMLAH (Rp.)
5
1,676,800.00
11,737.60
1,919,318.71
23,031.82
33,500.00
670.00
35,000.00
3,500.00
70,000.00
7,000.00
75,000.00
750.00
0.0050 Oh Mandor
80,000.00
400.00
47,089.42
A.7
35,000.00
0.0050 Oh Mandor
80,000.00
3,500.00
400.00
3,900.00
A.8
1,676,800.00
0.0800 kg
33,500.00
2,680.00
0.0140 m
1,919,318.71
26,870.46
kasau 5/7
60,364.80
70,000.00
0.0015 Oh Mandor
80,000.00
21,000.00
120.00
111,035.26
A.10
1 m Pembuatan stegger
1.2500 btg Kayu dolken 8 - 10 (cm) panjang 4 m / kiau
19,096.88
0.3000 kg
33,500.00
23,871.10
10,050.00
35,000.00
8,750.00
70,000.00
1,190.00
75,000.00
150.00
0.0130 Oh Mandor
80,000.00
1,040.00
45,051.10
KODE
HARGA SATUAN (Rp.)
ANALIS
URAIAN PEKERJAAN
BAHAN
UPAH
A
1
2
3
4
B.
ANALISA BIAYA KONSTRUKSI PEKERJAAN PENUTUP TANAH
B.1
55,000.00
90,000.00
4,210.00
B.9
B.10
B.11
38,500.00
3,600.00
42,100.00
46,310.00
35,000.00
80,000.00
14,000.00
1,520.00
15,520.00
35,000.00
80,000.00
21,000.00
4,000.00
25,000.00
C.3
150,000.00
35,000.00
80,000.00
175,000.00
1,300.00
150,000.00
35,000.00
60,000.00
75,000.00
80,000.00
175,000.00
150,000.00
35,000.00
60,000.00
75,000.00
80,000.00
G.
G.1
G.2
C.
C.5
JUMLAH
(Rp.)
55,000.00
75,000.00
80,000.00
90,000.00
1,300.00
180,000.00
200,000.00
55,000.00
75,000.00
80,000.00
90,000.00
180,000.00
24,500.00
800.00
205,300.00
192,500.00
136,500.00
81,600.00
45,500.00
30,000.00
4,500.00
6,000.00
496,600.00
210,000.00
45,000.00
27,300.00
23,400.00
2,925.00
3,120.00
311,745.00
13,000.00
4,500.00
8,800.00
27,500.00
3,750.00
400.00
540.00
58,490.00
364,000.00
108,000.00
156,000.00
220,000.00
75,000.00
16,000.00
18,000.00
957,000.00
KODE
HARGA SATUAN (Rp.)
ANALIS
URAIAN PEKERJAAN
BAHAN
UPAH
A
1
2
3
4
B.
ANALISA BIAYA KONSTRUKSI PEKERJAAN PENUTUP TANAH
G.16
G.18
G.19
55,000.00
1,676,800.00
13,000.00
6,000.00
35,000.00
70,000.00
75,000.00
80,000.00
1,676,800.00
13,000.00
6,000.00
35,000.00
70,000.00
75,000.00
80,000.00
Pemakaian 3 kali
G.20
1,676,800.00
13,000.00
6,000.00
1,919,318.71
115,000.00
20,000.00
35,000.00
70,000.00
75,000.00
80,000.00
Pemakaian 3 kali
G.21
1,676,800.00
33,500.00
9,700.00
1,919,318.71
115,000.00
19,096.88
55,000.00
75,000.00
80,000.00
90,000.00
Pemakaian 1 kali
G.22
13,119.90
1,676,800.00
33,500.00
9,700.00
1,919,318.71
115,000.00
19,096.88
55,000.00
75,000.00
80,000.00
90,000.00
8,319.05
JUMLAH
(Rp.)
5
110,000.00
110,000.00
67,072.00
3,900.00
600.00
21,000.00
14,000.00
1,950.00
2,080.00
110,602.00
75,456.00
3,900.00
600.00
21,000.00
14,000.00
1,950.00
2,080.00
118,986.00
39,662.00
67,072.00
5,200.00
1,200.00
28,789.78
21,000.00
14,000.00
1,950.00
2,080.00
141,291.78
47,097.26
16,768.00
6,700.00
1,940.00
7,677.27
38,193.76
33,000.00
22,500.00
2,080.00
2,340.00
131,199.03
144,318.94
117.38
938.00
271.60
21.50
9,705.34
53,471.26
13,860.00
4,725.00
37.86
42.59
83,190.52
91,509.58
KODE
HARGA SATUAN (Rp.)
ANALIS
URAIAN PEKERJAAN
BAHAN
UPAH
A
1
2
3
4
B.
ANALISA BIAYA KONSTRUKSI PEKERJAAN PENUTUP TANAH
G.34
G.34
G.35
G.36
G.37
JUMLAH
(Rp.)
5
79,324.00
957,000.00
1,000,000.00
110,000.00
2,146,324.00
39,662.00
957,000.00
10,000.00
110,000.00
991,550.00
957,000.00
1,800,000.00
110,000.00
3,858,550.00
47,097.26
957,000.00
10,000.00
110,000.00
47,097.26
957,000.00
2,000,000.00
110,000.00
3,114,097.26
144,318.94
957,000.00
10,000.00
110,000.00
144,318.94
957,000.00
1,800,000.00
110,000.00
3,011,318.94
91,509.58
957,000.00
10,000.00
110,000.00
762,274.77
957,000.00
800,000.00
110,000.00
2,629,274.77
2,892,202.25
262,927.48
KODE
ANALISA
URAIAN PEKERJAAN
C.
C.1
UPAH
JUMLAH (Rp.)
5
511,000.00
562,100.00
1,398.00
373,266.00
94,900.00
40,522.30
35,000.00
52,500.00
60,000.00
36,000.00
75,000.00
4,500.00
0.0750 Oh Mandor
80,000.00
6,000.00
1,074,888.30
C.2
401,500.00
441,650.00
1,398.00
227,874.00
94,900.00
49,348.00
35,000.00
52,500.00
60,000.00
36,000.00
75,000.00
4,500.00
0.0750 Oh Mandor
80,000.00
6,000.00
817,872.00
C.3
511,000.00
562,100.00
1,398.00
190,128.00
94,900.00
51,625.60
35,000.00
52,500.00
60,000.00
36,000.00
75,000.00
4,500.00
0.0750 Oh Mandor
80,000.00
6,000.00
902,853.60
C.4
511,000.00
562,100.00
1,398.00
163,566.00
94,900.00
53,238.90
35,000.00
52,500.00
60,000.00
36,000.00
75,000.00
4,500.00
0.0750 Oh Mandor
80,000.00
6,000.00
877,904.90
C.5
0.3000 m
401,500.00
481,800.00
91,250.00
27,375.00
35,000.00
27,300.00
60,000.00
23,400.00
75,000.00
2,925.00
0.0390 Oh Mandor
80,000.00
3,120.00
565,920.00
C.6
Besi beton
Semen PC @ 50 kg
19,656.00
1,474,200.00
1,398.00
282,396.00
0.3200 m
132,400.00
42,368.00
0.4900 m
455,520.00
223,204.80
0.8000 kg
Kawat beton
22,050.00
17,640.00
35,000.00
105,000.00
60,000.00
51,000.00
75,000.00
6,375.00
0.1500 Oh Mandor
80,000.00
12,000.00
2,214,183.80
C.7
Semen PC @ 50 kg
1,398.00
391,440.00
0.4500 m
132,400.00
59,580.00
0.6700 m
455,520.00
305,198.40
44,100.00
329,515.20
35,000.00
83,300.00
60,000.00
18,000.00
75,000.00
2,250.00
0.0800 Oh Mandor
80,000.00
6,400.00
1,195,683.60
KODE
ANALISA
URAIAN PEKERJAAN
C.
C.8
BAHAN
UPAH
JUMLAH (Rp.)
5
0.0190 m
91,250.00
1,733.75
0.0940 m
132,400.00
12,445.60
0.1500 m
446,516.67
66,977.50
60.5000 kg
Semen PC @ 50 kg
45.0000 kg
Besi beton
0.9000 kg
Kawat beton
0.0320 m
0.1200 kg
0.0900 ltr
Minyak bekisting
0.2400 kg
Plamuer
kasau 5/7
1,398.00
84,579.00
19,656.00
884,520.00
22,050.00
19,845.00
1,919,318.71
61,418.20
33,500.00
4,020.00
9,700.00
873.00
19,400.00
4,656.00
35,000.00
35,000.00
60,000.00
40,200.00
75,000.00
5,025.00
0.0500 Oh Mandor
80,000.00
4,000.00
1,225,293.05
C.9
91,250.00
1,460.00
0.0800 m
132,400.00
10,592.00
0.1250 m
446,516.67
55,814.58
49.0000 kg
Semen PC @ 50 kg
34.5000 kg
Besi beton
0.7000 kg
Kawat beton
0.0270 m
0.1200 kg
0.0900 ltr
Minyak bekisting
0.2000 kg
Plamuer
kasau 5/7
1,398.00
68,502.00
19,656.00
678,132.00
22,050.00
15,435.00
1,919,318.71
51,821.61
33,500.00
4,020.00
9,700.00
873.00
19,400.00
3,880.00
35,000.00
28,000.00
60,000.00
30,000.00
75,000.00
3,750.00
0.0400 Oh Mandor
80,000.00
3,200.00
955,480.19
C.10
0.0588 m
132,400.00
7,781.88
0.0918 m
446,516.67
41,006.63
36.0000 kg
Semen PC @ 50 kg
25.3469 kg
Besi beton
0.5143 kg
Kawat beton
0.0198 m
0.0882 kg
0.0661 ltr
Minyak bekisting
0.1469 kg
Plamuer
91,250.00
kasau 5/7
1,072.65
1,398.00
50,328.00
19,656.00
498,219.43
22,050.00
11,340.00
1,919,318.71
38,073.02
33,500.00
2,953.47
9,700.00
641.39
19,400.00
2,850.61
35,000.00
20,571.43
60,000.00
22,040.82
75,000.00
2,755.10
0.0294 Oh Mandor
80,000.00
2,351.02
701,985.44
KODE
ANALISA
URAIAN PEKERJAAN
D.
D.5
18.9500 kg
Semen PC @ 50 kg
0.0380 m
Pasir pasang
UPAH
JUMLAH (Rp.)
5
750.00
56,250.00
1,300.00
24,635.00
150,000.00
5,700.00
55,000.00
16,500.00
75,000.00
11,250.00
80,000.00
800.00
0.0150 Oh Mandor
90,000.00
1,350.00
11,648.50
128,133.50
116,485.00
D.7
9.6800 kg
Semen PC @ 50 kg
0.0450 m
Pasir pasang
750.00
56,250.00
1,300.00
12,584.00
150,000.00
6,750.00
35,000.00
10,500.00
60,000.00
9,000.00
75,000.00
750.00
0.0150 Oh Mandor
80,000.00
1,200.00
97,034.00
KODE
ANALISA
URAIAN PEKERJAAN
D.
D.15
UPAH
JUMLAH (Rp.)
5
3,000.00
75,000.00
12.8000 kg
Semen PC @ 50 kg
1,300.00
16,640.00
0.0350 m
Pasir pasang
150,000.00
5,250.00
35,000.00
17,500.00
60,000.00
9,000.00
75,000.00
750.00
0.0150 Oh Mandor
80,000.00
1,200.00
125,340.00
KODE
ANALISA
URAIAN PEKERJAAN
E.
E.1
Semen PC @ 50 kg
0.0170 m
Pasir pasang
UPAH
1,398.00
JUMLAH (Rp.)
5
11,910.96
94,900.00
1,613.30
35,000.00
7,000.00
60,000.00
9,000.00
75,000.00
1,125.00
0.0100 Oh Mandor
80,000.00
800.00
31,449.26
E.2
Semen PC @ 50 kg
0.0200 m
Pasir pasang
0.2000 Oh
1,398.00
7,269.60
94,900.00
1,898.00
35,000.00
7,000.00
60,000.00
9,000.00
75,000.00
1,125.00
0.0100 Oh Mandor
80,000.00
800.00
27,092.60
E.3
Semen PC @ 50 kg
0.0220 m
Pasir pasang
1,398.00
6,039.36
94,900.00
2,087.80
35,000.00
7,000.00
60,000.00
9,000.00
75,000.00
1,125.00
0.0100 Oh Mandor
80,000.00
800.00
26,052.16
E.4
Semen PC @ 50 kg
Pasir pasang
1,398.00
19,963.44
94,900.00
2,182.70
35,000.00
8,750.00
60,000.00
12,000.00
75,000.00
1,500.00
0.0125 Oh Mandor
80,000.00
1,000.00
45,396.14
E.5
Semen PC @ 50 kg
0.0280 m
Pasir pasang
1,398.00
12,134.64
94,900.00
2,657.20
35,000.00
8,750.00
60,000.00
12,000.00
75,000.00
1,500.00
0.0125 Oh Mandor
80,000.00
1,000.00
38,041.84
E.6
Semen PC @ 50 kg
0.0280 m
Pasir pasang
1,398.00
10,191.42
94,900.00
2,657.20
35,000.00
8,750.00
60,000.00
12,000.00
75,000.00
1,500.00
0.0125 Oh Mandor
80,000.00
1,000.00
36,098.62
E.7
Semen PC @ 50 kg
Pasir pasang
1,398.00
21,669.00
94,900.00
1,233.70
35,000.00
10,500.00
60,000.00
12,000.00
75,000.00
1,500.00
0.0130 Oh Mandor
80,000.00
1,040.00
47,942.70
E.8
Semen PC @ 50 kg
0.0380 m
Pasir pasang
1,398.00
13,253.04
94,900.00
3,606.20
KODE
ANALISA
URAIAN PEKERJAAN
E.
UPAH
JUMLAH (Rp.)
5
35,000.00
10,500.00
60,000.00
12,000.00
75,000.00
1,500.00
0.0130 Oh Mandor
80,000.00
1,040.00
41,899.24
E.9
Semen PC @ 50 kg
0.0390 m
Pasir pasang
1,398.00
11,100.12
94,900.00
3,701.10
35,000.00
10,500.00
60,000.00
12,000.00
75,000.00
1,500.00
0.0130 Oh Mandor
80,000.00
1,040.00
39,841.22
KODE
ANALISA
URAIAN PEKERJAAN
E.
E.10
UPAH
JUMLAH (Rp.)
5
Semen PC @ 50 kg
Pasir pasang
1,398.00
26,072.70
94,900.00
3,321.50
35,000.00
11,200.00
60,000.00
15,000.00
75,000.00
1,875.00
0.0150 Oh Mandor
80,000.00
1,200.00
58,669.20
E.11
Semen PC @ 50 kg
Pasir pasang
1,398.00
15,909.24
94,900.00
3,985.80
35,000.00
11,200.00
60,000.00
15,000.00
75,000.00
1,875.00
0.0150 Oh Mandor
80,000.00
1,200.00
49,170.04
E.12
Semen PC @ 50 kg
0.0450 m
Pasir pasang
1,398.00
11,449.62
94,900.00
4,270.50
35,000.00
11,200.00
60,000.00
15,000.00
75,000.00
1,875.00
0.0150 Oh Mandor
80,000.00
1,200.00
44,995.12
E.13
Semen PC @ 50 kg
0.0180 m
Pasir pasang
1,398.00
13,001.40
94,900.00
1,708.20
35,000.00
9,100.00
60,000.00
12,000.00
75,000.00
1,500.00
0.0130 Oh Mandor
80,000.00
1,040.00
38,349.60
E.14
Semen PC @ 50 kg
0.0210 m
Pasir pasang
1,398.00
9,883.86
94,900.00
1,992.90
35,000.00
9,100.00
60,000.00
12,000.00
75,000.00
1,500.00
0.0130 Oh Mandor
80,000.00
1,040.00
35,516.76
E.15
Semen PC @ 50 kg
0.0160 m
Pasir pasang
1,398.00
6,039.36
94,900.00
1,518.40
35,000.00
8,750.00
60,000.00
6,000.00
75,000.00
750.00
0.0150 Oh Mandor
80,000.00
1,200.00
24,257.76
E.16
1 m Plesteran siar, 1 PC : 2 Ps
4.3200 kg
Semen PC @ 50 kg
0.0160 m
Pasir pasang
1,398.00
6,039.36
94,900.00
1,518.40
35,000.00
5,250.00
60,000.00
4,200.00
75,000.00
525.00
0.0080 Oh Mandor
80,000.00
640.00
18,172.76
E.17
Semen PC @ 50 kg
2.9000 m
Batacote
1,398.00
699.00
61,800.00
179,220.00
KODE
ANALISA
URAIAN PEKERJAAN
E.
UPAH
JUMLAH (Rp.)
5
Pasir pasang
94,900.00
569.40
35,000.00
10,500.00
60,000.00
12,000.00
75,000.00
1,500.00
0.0150 Oh Mandor
80,000.00
1,200.00
205,688.40
KODE
ANALISA
URAIAN PEKERJAAN
F.
F.1
UPAH
3,075,995.61
JUMLAH (Rp.)
5
3,383,595.17
35,000.00
210,000.00
70,000.00
1,400,000.00
75,000.00
150,000.00
0.3000 Oh Mandor
80,000.00
24,000.00
5,167,595.17
F.2
2,652,249.52
0.0300 kg
33,500.00
2,917,474.47
1,005.00
35,000.00
875.00
70,000.00
43,750.00
75,000.00
1,875.00
0.0400 Oh Mandor
80,000.00
3,200.00
2,968,179.47
F.3
3,574,100.00
142,964.00
35,000.00
35,000.00
70,000.00
175,000.00
75,000.00
18,750.00
0.0500 Oh Mandor
80,000.00
4,000.00
375,714.00
F.4
1 m Pasang daun pintu / jendela kaca bening tebal 3 mm, kayu kelas II
0.0350 m
1.0000 m
0.0300 kg
3,574,100.00
125,093.50
102,294.36
102,294.36
28,200.00
846.00
35,000.00
28,000.00
70,000.00
140,000.00
75,000.00
15,000.00
0.0400 Oh Mandor
80,000.00
3,200.00
414,433.86
F.5
1 m Pasang daun pintu / jendela kaca bening tebal 5 mm, kayu kelas II
0.0350 m
1.0000 m
0.0300 kg
3,574,100.00
125,093.50
132,300.00
132,300.00
28,200.00
846.00
35,000.00
28,000.00
70,000.00
140,000.00
75,000.00
15,000.00
0.0400 Oh Mandor
80,000.00
3,200.00
444,439.50
F.5a
1 m Pasang daun pintu / jendela kaca ryben tebal 5 mm, kayu kelas II
0.0350 m
1.0000 m
0.0300 kg
3,574,100.00
125,093.50
5,800.00
5,800.00
28,200.00
846.00
35,000.00
28,000.00
70,000.00
140,000.00
75,000.00
15,000.00
0.0400 Oh Mandor
80,000.00
3,200.00
317,939.50
F.6
3,574,100.00
228,742.40
35,000.00
35,000.00
70,000.00
210,000.00
75,000.00
22,500.00
0.3000 Oh Mandor
80,000.00
24,000.00
520,242.40
F.7
3,574,100.00
70,052.36
KODE
ANALISA
URAIAN PEKERJAAN
F.
UPAH
JUMLAH (Rp.)
5
28,200.00
846.00
0.3000 Lt
29,000.00
8,700.00
1.0000 lbr
121,800.00
121,800.00
35,000.00
21,000.00
70,000.00
140,000.00
75,000.00
15,000.00
0.0300 Oh Mandor
80,000.00
2,400.00
379,798.36
F.8
0.0300 kg
3,574,100.00
28,200.00
70,052.36
846.00
0.3000 Lt
29,000.00
8,700.00
1.0000 lbr
220,600.00
220,600.00
35,000.00
21,000.00
70,000.00
140,000.00
75,000.00
15,000.00
0.0300 Oh Mandor
80,000.00
2,400.00
478,598.36
F.9
0.0300 kg
3,574,100.00
28,200.00
70,052.36
846.00
0.8000 Lt
29,000.00
23,200.00
1.0000 lbr
121,800.00
121,800.00
0.5000 lbr
79,400.00
39,700.00
35,000.00
28,000.00
70,000.00
175,000.00
75,000.00
18,750.00
0.0400 Oh Mandor
80,000.00
3,200.00
480,548.36
KODE
ANALISA
URAIAN PEKERJAAN
F.
F.10
UPAH
JUMLAH (Rp.)
5
0.0300 kg
3,574,100.00
28,200.00
70,052.36
846.00
0.8000 Lt
29,000.00
23,200.00
0.5000 lbr
220,600.00
110,300.00
0.5000 lbr
79,400.00
39,700.00
35,000.00
28,000.00
70,000.00
175,000.00
75,000.00
18,750.00
0.0400 Oh Mandor
80,000.00
3,200.00
469,048.36
F.11
0.0300 kg
3,574,100.00
28,200.00
70,052.36
846.00
1.2000 Lt
29,000.00
34,800.00
1.0000 lbr
121,800.00
121,800.00
1.0000 lbr
79,400.00
79,400.00
35,000.00
35,000.00
70,000.00
182,000.00
75,000.00
19,500.00
0.0500 Oh Mandor
80,000.00
4,000.00
547,398.36
F.12
0.1500 kg
3,574,100.00
214,446.00
28,200.00
4,230.00
35,000.00
17,500.00
70,000.00
140,000.00
75,000.00
15,000.00
0.0250 Oh Mandor
80,000.00
2,000.00
393,176.00
F.13
3,075,995.61
3,383,595.17
Besi strip
53,550.00
803,250.00
33,500.00
26,800.00
35,000.00
140,000.00
70,000.00
840,000.00
75,000.00
90,000.00
0.2000 Oh Mandor
80,000.00
16,000.00
5,299,645.17
F.14
0.8000 kg
3,075,995.61
3,383,595.17
33,500.00
26,800.00
35,000.00
70,000.00
70,000.00
420,000.00
75,000.00
45,000.00
0.1000 Oh Mandor
80,000.00
8,000.00
3,953,395.17
F.15
0.2000 kg
3,075,995.61
50,753.93
33,500.00
6,700.00
35,000.00
4,200.00
70,000.00
8,400.00
75,000.00
900.00
0.0060 Oh Mandor
80,000.00
480.00
71,433.93
F.16
0.1000 kg
3,075,995.61
36,911.95
33,500.00
3,350.00
35,000.00
5,250.00
KODE
ANALISA
URAIAN PEKERJAAN
F.
UPAH
JUMLAH (Rp.)
5
70,000.00
17,500.00
75,000.00
1,875.00
0.0750 Oh Mandor
80,000.00
6,000.00
70,886.95
F.17
0.1500 kg
3,075,995.61
70,747.90
33,500.00
5,025.00
35,000.00
7,000.00
70,000.00
21,000.00
75,000.00
2,250.00
0.0100 Oh Mandor
80,000.00
800.00
106,822.90
F.18
0.2000 kg
3,075,995.61
83,051.88
33,500.00
6,700.00
35,000.00
8,750.00
70,000.00
24,500.00
75,000.00
2,625.00
0.0125 Oh Mandor
80,000.00
1,000.00
126,626.88
F.19
3,574,100.00
0.0500 kg
33,500.00
25,733.52
1,675.00
35,000.00
3,500.00
70,000.00
14,000.00
75,000.00
1,500.00
0.0050 Oh Mandor
80,000.00
400.00
46,808.52
KODE
ANALISA
URAIAN PEKERJAAN
F.
F.20
UPAH
JUMLAH (Rp.)
5
3,574,100.00
0.0500 kg
33,500.00
39,315.10
1,675.00
35,000.00
3,850.00
70,000.00
15,400.00
75,000.00
1,650.00
0.0050 Oh Mandor
80,000.00
400.00
62,290.10
F.21
3,574,100.00
0.0600 kg
33,500.00
51,824.45
2,010.00
35,000.00
5,250.00
70,000.00
17,500.00
75,000.00
1,875.00
0.0750 Oh Mandor
80,000.00
6,000.00
84,459.45
F.22
3,574,100.00
0.0600 kg
33,500.00
30,737.26
2,010.00
35,000.00
3,500.00
70,000.00
7,000.00
75,000.00
750.00
0.0500 Oh Mandor
80,000.00
4,000.00
47,997.26
F.23
3,075,995.61
59,981.91
0.0070 m
3,574,100.00
25,018.70
0.1000 kg
33,500.00
3,350.00
35,000.00
5,250.00
70,000.00
31,500.00
75,000.00
3,375.00
0.0750 Oh Mandor
80,000.00
6,000.00
134,475.61
F.24
1 m Pasang rangka dinding pemisah triplek rangkap rangka kayu kelas III
0.0195 m
3,075,995.61
59,981.91
0.0070 m
3,574,100.00
25,018.70
0.1000 kg
33,500.00
3,350.00
0.5600 ltr
29,000.00
16,240.00
1.0000 lbr
74,800.00
74,800.00
35,000.00
7,000.00
70,000.00
42,000.00
75,000.00
4,500.00
0.0100 Oh Mandor
80,000.00
800.00
233,690.61
F.25
3,075,995.61
59,981.91
0.0070 m
3,574,100.00
25,018.70
0.1000 kg
33,500.00
3,350.00
0.5600 ltr
29,000.00
16,240.00
1.0000 lbr
220,600.00
220,600.00
35,000.00
5,250.00
70,000.00
31,500.00
75,000.00
3,375.00
0.0750 Oh Mandor
80,000.00
6,000.00
371,315.61
F.26
3,075,995.61
59,981.91
0.0070 m
3,574,100.00
25,018.70
0.1000 kg
33,500.00
3,350.00
KODE
ANALISA
URAIAN PEKERJAAN
F.
UPAH
JUMLAH (Rp.)
5
1.0000 lbr
29,000.00
16,240.00
121,800.00
121,800.00
35,000.00
7,000.00
70,000.00
42,000.00
75,000.00
4,500.00
0.0100 Oh Mandor
80,000.00
800.00
280,690.61
F.27
0.0500 kg
121,800.00
48,720.00
28,200.00
1,410.00
35,000.00
875.00
70,000.00
5,250.00
75,000.00
562.50
0.0013 Oh Mandor
80,000.00
104.00
56,921.50
KODE
ANALISA
URAIAN PEKERJAAN
F.
F.28
UPAH
JUMLAH (Rp.)
5
10,100.00
0.0500 kg
33,500.00
10,605.00
1,675.00
35,000.00
735.00
70,000.00
1,470.00
75,000.00
150.00
0.0010 Oh Mandor
80,000.00
80.00
14,715.00
F.29
2,652,249.52
51,718.87
0.0070 m
2,462,200.00
17,235.40
0.1000 kg
33,500.00
3,350.00
2.0000 kg
Cat minyak
59,062.50
118,125.00
35,000.00
8,750.00
70,000.00
52,500.00
60,000.00
45,000.00
75,000.00
5,625.00
0.0075 Oh Mandor
80,000.00
600.00
302,904.27
F.30
3,075,995.61
3,383,595.17
35,000.00
1,750.00
70,000.00
3,500.00
75,000.00
375.00
0.0025 Oh Mandor
80,000.00
200.00
3,389,420.17
F.31
3,075,995.61
3,383,595.17
35,000.00
2,800.00
70,000.00
16,800.00
75,000.00
1,800.00
0.0040 Oh Mandor
80,000.00
320.00
3,405,315.17
F.32
0.4000 kg
Paku jembatan
3,574,100.00
285,928.00
61,800.00
24,720.00
35,000.00
70.00
70,000.00
350.00
75,000.00
37.50
0.0001 Oh Mandor
80,000.00
8.00
311,113.50
F.33
1 m Pasang lantai jembatan dengan papan t = 8 cm di atas gelegar besi, kayu kelas II
0.0800 m
8.0000 bh
Baut klem
3,574,100.00
285,928.00
7,900.00
63,200.00
35,000.00
87.50
70,000.00
525.00
75,000.00
56.25
0.0001 Oh Mandor
80,000.00
10.00
349,806.75
F.34
0.4000 kg
Paku jembatan
3,574,100.00
178,705.00
61,800.00
24,720.00
35,000.00
70.00
70,000.00
350.00
75,000.00
37.50
0.0001 Oh Mandor
80,000.00
8.00
203,890.50
F.35
1 m Pasang lantai jembatan dengan papan t = 5 cm di atas gelegar besi, kayu kelas II
KODE
ANALISA
URAIAN PEKERJAAN
F.
UPAH
JUMLAH (Rp.)
5
8.0000 bh
3,574,100.00
178,705.00
61,800.00
494,400.00
35,000.00
87.50
70,000.00
525.00
75,000.00
56.25
0.0001 Oh Mandor
80,000.00
10.00
673,783.75
KODE
ANALISA
URAIAN PEKERJAAN
H.
H.1
UPAH
3,150.00
JUMLAH (Rp.)
5
78,750.00
35,000.00
5,250.00
70,000.00
5,250.00
75,000.00
600.00
0.0080 Oh Mandor
80,000.00
640.00
90,490.00
H.2
0.0500 kg
123,600.00
74,160.00
28,200.00
1,410.00
35,000.00
4,900.00
70,000.00
4,690.00
75,000.00
525.00
0.0070 Oh Mandor
80,000.00
560.00
86,245.00
H.3
0.1200 kg
Paku asbes
143,000.00
71,500.00
30,900.00
3,708.00
35,000.00
4,900.00
70,000.00
5,250.00
75,000.00
600.00
0.0080 Oh Mandor
80,000.00
640.00
86,598.00
H.4
0.1200 kg
Paku asbes
128,700.00
77,220.00
30,900.00
3,708.00
35,000.00
4,900.00
70,000.00
5,250.00
75,000.00
600.00
0.0080 Oh Mandor
80,000.00
640.00
92,318.00
H.5
0.1200 kg
Paku asbes
114,400.00
68,640.00
30,900.00
3,708.00
35,000.00
4,900.00
70,000.00
5,250.00
75,000.00
600.00
0.0080 Oh Mandor
80,000.00
640.00
83,738.00
H.6
41,000.00
0.1200 kg
Paku asbes
30,900.00
30,750.00
3,708.00
35,000.00
4,900.00
70,000.00
4,900.00
75,000.00
525.00
0.0070 Oh Mandor
80,000.00
560.00
45,343.00
H.7
0.1200 kg
Paku asbes
126,800.00
44,380.00
30,900.00
3,708.00
35,000.00
4,900.00
70,000.00
4,900.00
75,000.00
525.00
0.0070 Oh Mandor
80,000.00
560.00
58,973.00
H.8
0.1200 kg
Paku asbes
116,700.00
49,014.00
30,900.00
3,708.00
35,000.00
4,900.00
70,000.00
4,900.00
75,000.00
525.00
0.0070 Oh Mandor
80,000.00
560.00
KODE
ANALISA
URAIAN PEKERJAAN
H.
H.9
UPAH
JUMLAH (Rp.)
5
63,607.00
0.4400 lbr
96,400.00
0.1200 kg
Paku asbes
30,900.00
42,416.00
3,708.00
35,000.00
4,900.00
70,000.00
4,690.00
75,000.00
525.00
0.0070 Oh Mandor
80,000.00
560.00
56,799.00
H.10
91,600.00
0.1200 kg
Paku asbes
30,900.00
46,716.00
3,708.00
35,000.00
4,900.00
70,000.00
4,690.00
75,000.00
525.00
0.0070 Oh Mandor
80,000.00
560.00
61,099.00
KODE
ANALISA
URAIAN PEKERJAAN
H.
H.11
UPAH
JUMLAH (Rp.)
5
71,500.00
0.1200 kg
Paku asbes
30,900.00
57,200.00
3,708.00
35,000.00
4,900.00
70,000.00
4,690.00
75,000.00
525.00
0.0070 Oh Mandor
80,000.00
560.00
71,583.00
H.12
0.1200 kg
Paku asbes
189,700.00
70,189.00
30,900.00
3,708.00
35,000.00
4,900.00
70,000.00
4,690.00
75,000.00
525.00
0.0070 Oh Mandor
80,000.00
560.00
84,572.00
H.13
0.1200 kg
Paku asbes
175,000.00
66,500.00
30,900.00
3,708.00
35,000.00
4,900.00
70,000.00
4,690.00
75,000.00
525.00
0.0070 Oh Mandor
80,000.00
560.00
80,883.00
H.14
0.1200 kg
Paku asbes
144,600.00
66,516.00
30,900.00
3,708.00
35,000.00
4,900.00
70,000.00
4,690.00
75,000.00
525.00
0.0070 Oh Mandor
80,000.00
560.00
80,899.00
H.15
0.1200 kg
Paku asbes
137,100.00
67,179.00
30,900.00
3,708.00
35,000.00
4,900.00
70,000.00
4,690.00
75,000.00
525.00
0.0070 Oh Mandor
80,000.00
560.00
81,562.00
H.16
55,500.00
0.1200 kg
Paku asbes
30,900.00
31,635.00
3,708.00
35,000.00
4,900.00
70,000.00
4,690.00
75,000.00
525.00
0.0070 Oh Mandor
80,000.00
560.00
46,018.00
H.17
4,961.25
54,573.75
33,500.00
1,005.00
35,000.00
7,000.00
70,000.00
7,000.00
75,000.00
750.00
0.0100 Oh Mandor
80,000.00
800.00
71,128.75
H.18
88,300.00
0.2000 kg
37,900.00
90,066.00
7,580.00
35,000.00
7,000.00
70,000.00
7,000.00
75,000.00
750.00
0.0100 Oh Mandor
80,000.00
800.00
KODE
ANALISA
URAIAN PEKERJAAN
H.
UPAH
JUMLAH (Rp.)
5
H.19
0.0200 kg
Paku kait
265,800.00
279,090.00
1,700.00
34.00
35,000.00
5,250.00
70,000.00
52,500.00
75,000.00
600.00
0.0060 Oh Mandor
80,000.00
480.00
337,954.00
KODE
ANALISA
URAIAN PEKERJAAN
H.
H.20
UPAH
JUMLAH (Rp.)
5
74,800.00
0.0200 kg
Paku seng
27,846.00
52,360.00
556.92
35,000.00
4,200.00
70,000.00
4,200.00
75,000.00
450.00
0.0060 Oh Mandor
80,000.00
480.00
62,246.92
H.21
56,500.00
0.0400 kg
Paku seng
27,846.00
16,950.00
1,113.84
35,000.00
5,250.00
70,000.00
4,900.00
75,000.00
600.00
0.0060 Oh Mandor
80,000.00
480.00
29,293.84
H.22
7,200.00
36,000.00
8.0000 kg
Semen PC @ 50 kg
1,398.00
11,184.00
0.0320 m
Pasir pasang
94,900.00
3,036.80
35,000.00
14,000.00
70,000.00
14,000.00
75,000.00
1,500.00
0.0020 Oh Mandor
80,000.00
160.00
79,880.80
H.23
0.0500 kg
10.8000 kg
Semen PC @ 50 kg
5,433.75
19,018.13
33,500.00
1,675.00
1,398.00
15,098.40
0.0320 m
Pasir pasang
94,900.00
3,036.80
1.0000 kg
Semen Warna
16,200.00
16,200.00
35,000.00
14,000.00
70,000.00
14,000.00
75,000.00
1,500.00
0.0200 Oh Mandor
80,000.00
1,600.00
86,128.33
H.24
69,700.00
0.0500 kg
37,900.00
76,670.00
1,895.00
35,000.00
8,750.00
70,000.00
10,500.00
75,000.00
11,250.00
0.0130 Oh Mandor
80,000.00
1,040.00
110,105.00
H.25
0.0400 kg
Paku kait
85,600.00
102,720.00
1,700.00
68.00
35,000.00
3,500.00
70,000.00
70,000.00
75,000.00
750.00
0.0100 Oh Mandor
80,000.00
800.00
177,838.00
H.26
4,680.00
18,720.00
8.0000 kg
Semen PC @ 50 kg
1,398.00
11,184.00
0.0320 m
Pasir pasang
94,900.00
3,036.80
35,000.00
14,000.00
70,000.00
14,000.00
75,000.00
1,500.00
0.0020 Oh Mandor
80,000.00
160.00
62,600.80
H.27
Aluminium foil
92,000.00
96,600.00
KODE
ANALISA
URAIAN PEKERJAAN
H.
UPAH
JUMLAH (Rp.)
5
35,000.00
7,000.00
70,000.00
1,400.00
75,000.00
150.00
0.0080 oh
80,000.00
Mandor
640.00
105,790.00
H.28
97,100.00
0.2000 kg
37,900.00
99,042.00
7,580.00
35,000.00
7,000.00
70,000.00
7,000.00
75,000.00
750.00
0.0100 Oh Mandor
80,000.00
800.00
122,172.00
KODE
ANALISA
URAIAN PEKERJAAN
I.
I.1
UPAH
1.1000 lbr
32,700.00
0.0100 kg
28,200.00
JUMLAH (Rp.)
5
35,970.00
282.00
35,000.00
1,050.00
70,000.00
4,900.00
75,000.00
525.00
0.0015 Oh Mandor
80,000.00
120.00
42,847.00
I.2
34,400.00
0.0100 kg
28,200.00
37,840.00
282.00
35,000.00
1,050.00
70,000.00
4,900.00
75,000.00
525.00
0.0015 Oh Mandor
80,000.00
120.00
44,717.00
I.3
37,100.00
0.0100 kg
28,200.00
40,810.00
282.00
35,000.00
1,050.00
70,000.00
4,900.00
75,000.00
525.00
0.0015 Oh Mandor
80,000.00
120.00
47,687.00
I.4
68,800.00
770,560.00
0.8500 m'
55,600.00
47,260.00
1.6750 m'
45,900.00
76,882.50
0.0650 m'
61,800.00
4,017.00
0.6000 m'
26,500.00
15,900.00
1.0000 bh
2,200.00
2,200.00
35,000.00
2,100.00
70,000.00
8,400.00
75,000.00
900.00
0.0030 Oh Mandor
80,000.00
240.00
928,459.50
I.5
70,600.00
39,536.00
0.8500 m'
Profil aluminium T
45,900.00
39,015.00
0.1500 kg
20,300.00
3,045.00
1.0000 bh
2,200.00
2,200.00
35,000.00
2,100.00
70,000.00
8,400.00
75,000.00
900.00
0.0030 Oh Mandor
80,000.00
240.00
95,436.00
I.6
86,500.00
129,750.00
3.6000 m'
Profil Aluminium T
45,900.00
165,240.00
0.1500 kg
20,300.00
3,045.00
1.0000 bh
2,200.00
2,200.00
35,000.00
5,250.00
70,000.00
35,000.00
75,000.00
3,750.00
0.0075 Oh Mandor
80,000.00
600.00
344,835.00
I.7
73,200.00
0.0300 kg
28,200.00
26,352.00
846.00
35,000.00
2,450.00
70,000.00
7,000.00
75,000.00
750.00
KODE
ANALISA
URAIAN PEKERJAAN
I.
UPAH
JUMLAH (Rp.)
5
80,000.00
280.00
37,678.00
I.8
79,400.00
0.0300 kg
28,200.00
28,584.00
846.00
35,000.00
2,450.00
70,000.00
7,000.00
75,000.00
750.00
0.0035 Oh Mandor
80,000.00
280.00
39,910.00
I.9
77,700.00
0.0300 kg
28,200.00
29,137.50
846.00
35,000.00
2,450.00
70,000.00
7,000.00
75,000.00
750.00
0.0035 Oh Mandor
80,000.00
280.00
40,463.50
I.10
77,700.00
0.0300 kg
28,200.00
29,137.50
846.00
35,000.00
2,450.00
70,000.00
7,000.00
75,000.00
750.00
0.0035 Oh Mandor
80,000.00
280.00
40,463.50
I.11
0.0300 kg
113,400.00
40,824.00
28,200.00
846.00
35,000.00
2,450.00
70,000.00
7,000.00
75,000.00
750.00
0.0035 Oh Mandor
80,000.00
280.00
52,150.00
I.12
61,800.00
0.0300 kg
28,200.00
2,163.00
846.00
35,000.00
2,100.00
70,000.00
7,000.00
75,000.00
750.00
0.0030 Oh Mandor
80,000.00
240.00
13,099.00
I.13
0.1100 kg
Paku sekrup
56,385.00
20,524.14
1,800.00
198.00
35,000.00
3,500.00
70,000.00
3,500.00
75,000.00
375.00
0.0050 Oh Mandor
80,000.00
400.00
28,497.14
I.14
2,652,249.52
0.0600 kg
33,500.00
2,010.00
68,800.00
791,200.00
11.5000 lbr
71,610.74
35,000.00
10,850.00
70,000.00
32,900.00
75,000.00
3,525.00
0.0155 Oh Mandor
80,000.00
1,240.00
913,335.74
I.15
2,652,249.52
61,001.74
0.0600 kg
33,500.00
2,010.00
KODE
ANALISA
URAIAN PEKERJAAN
I.
UPAH
JUMLAH (Rp.)
5
70,600.00
409,480.00
35,000.00
9,100.00
70,000.00
28,000.00
75,000.00
3,000.00
0.0130 Oh Mandor
80,000.00
1,040.00
513,631.74
I.16
0.0600 kg
121,800.00
33,500.00
47,502.00
2,010.00
0.0230 m
2,652,249.52
61,001.74
35,000.00
9,450.00
70,000.00
28,000.00
75,000.00
3,000.00
0.0135 Oh Mandor
80,000.00
1,080.00
152,043.74
I.17
Kompon gypsum
47,700.00
0.1100 kg
Kain kassa
16,500.00
17,362.80
1,815.00
35,000.00
3,500.00
70,000.00
3,500.00
75,000.00
375.00
0.0050 Oh Mandor
80,000.00
400.00
26,952.80
I.18
Amplas
11,600.00
4,222.40
35,000.00
3,500.00
70,000.00
3,500.00
75,000.00
375.00
0.0050 Oh Mandor
80,000.00
400.00
11,997.40
I.19
10,100.00
0.0100 kg
33,500.00
11,110.00
335.00
35,000.00
1,750.00
70,000.00
3,500.00
75,000.00
375.00
0.0030 Oh Mandor
80,000.00
240.00
17,310.00
URAIAN PEKERJAAN
UPAH
J.
J.3
20.0000 bh
20.0000 kg
Semen PC @ 50 kg
0.0800 m
Pasir pasang
JUMLAH (Rp.)
5
145,000.00
145,000.00
750.00
15,000.00
1,300.00
26,000.00
150,000.00
12,000.00
35,000.00
21,000.00
60,000.00
36,000.00
75,000.00
11,250.00
0.1100 Oh Mandor
80,000.00
8,800.00
275,050.00
J.9
0.3000 m
Pasir pasang
2.5000 m
6.0000 kg
Semen putih
750.00
135,000.00
1,300.00
78,000.00
150,000.00
45,000.00
40,000.00
100,000.00
2,000.00
12,000.00
35,000.00
105,000.00
60,000.00
180,000.00
75,000.00
22,500.00
0.3000 Oh Mandor
80,000.00
24,000.00
701,500.00
J.17
20.0000 kg
Semen PC @ 50 kg
750.00
30,000.00
1,300.00
26,000.00
27,600.00
0.1840 m
Pasir pasang
150,000.00
0.0330 m
200,000.00
6,600.00
2.0000 kg
Besi beton
9,500.00
19,000.00
0.1200 m
150,000.00
18,000.00
35,000.00
17,500.00
60,000.00
30,000.00
75,000.00
2,250.00
0.0300 Oh Mandor
80,000.00
2,400.00
179,350.00
J.24
4,050.00
4,860.00
1,701.00
35,000.00
1,260.00
60,000.00
3,600.00
75,000.00
450.00
0.0018 Oh Mandor
80,000.00
144.00
12,015.00
J.25
5,310.00
6,372.00
2,230.20
35,000.00
1,260.00
60,000.00
3,600.00
75,000.00
450.00
0.0018 Oh Mandor
80,000.00
144.00
14,056.20
KODE
ANALISA
URAIAN PEKERJAAN
J.
J.27
UPAH
JUMLAH (Rp.)
5
11,250.00
13,500.00
4,725.00
35,000.00
1,260.00
60,000.00
3,600.00
75,000.00
450.00
0.0018 Oh Mandor
80,000.00
144.00
23,679.00
J.28
15,000.00
18,000.00
6,300.00
55,000.00
4,455.00
75,000.00
10,125.00
80,000.00
960.00
0.0041 Oh Mandor
90,000.00
369.00
40,209.00
J.30
45,000.00
54,000.00
18,900.00
35,000.00
2,835.00
60,000.00
8,100.00
75,000.00
4,500.00
0.0041 Oh Mandor
80,000.00
328.00
88,663.00
J.34
Galian tanah
42,100.00
234,918.00
3.0500 m
Urugan kembali
15,520.00
47,336.00
0.5400 m
97,034.00
52,398.36
5.3508 m
31,449.26
168,278.70
0.0840 m
3,114,097.26
261,584.17
0.2000 m
3,858,550.00
771,710.00
0.0300 m
3,858,550.00
115,756.50
0.4000 m
957,000.00
382,800.00
8.0000 m'
23,679.00
189,432.00
2,224,213.73
J.36
Galian Tanah
42,100.00
1.2000 m
Urugan Kembali
15,520.00
84,200.00
18,624.00
4.0000 m
79,700.00
318,800.00
0.3840 m
39,216.42
15,059.11
2.0000 m'
11,250.00
22,500.00
459,183.11
No.
SATUAN
A. UPAH
1 Mandor
oh
Rp
90,000.00
4 Kepala tukang
oh
Rp
80,000.00
5 Tukang batu
oh
Rp
75,000.00
6 Tukang kayu
oh
Rp
75,000.00
oh
Rp
80,000.00
8 Tukang cat
oh
Rp
75,000.00
9 Tukang listrik
oh
Rp
75,000.00
oh
Rp
75,000.00
oh
Rp
70,000.00
18 Pekerja terlatih
oh
Rp
65,000.00
oh
Rp
60,000.00
oh
Rp
55,000.00
B. MATERIAL/BAHAN
lembar
Rp
6,600.00
5 Amplas
buah
Rp
3,500.00
buah
Rp
2,300.00
buah
Rp
1,750,000.00
39 Bataco
2,500.00
buah
Rp
bh
Rp
750.00
Rp
175,000.00
Rp
175,000.00
Rp
200,000.00
Rp
200,000.00
63 Besi beton
kg
Rp
9,500.00
buah
Rp
60,000.00
87 Cat dasar
kg
Rp
15,456.00
88 Cat genteng
kg
Rp
27,840.00
91 Cat menie
kg
Rp
20,000.00
92 Cat minyak
kg
Rp
40,000.00
93 Cat tembok
kg
Rp
34,000.00
94 Cat vernis
kg
Rp
19,500.00
buah
Rp
145,000.00
buah
Rp
8,500.00
buah
Rp
5,310.00
buah
Rp
8,968.00
buah
Rp
15,000.00
lbr
Rp
80,000.00
buah
Rp
15,000.00
lembar
Rp
54,000.00
buah
Rp
21,500.00
buah
Rp
21,500.00
Rp
135,000.00
m'
Rp
2,950.00
KODE
ANALISA
URAIAN PEKERJAAN
N.
N.1
UPAH
JUMLAH (Rp.)
5
150,000.00
150,000.00
35,000.00
2,100.00
70,000.00
42,000.00
75,000.00
4,500.00
0.0030 Oh Mandor
80,000.00
240.00
198,840.00
N.2
Kunci tanam
132,400.00
132,400.00
35,000.00
350.00
70,000.00
35,000.00
75,000.00
750.00
0.0050 Oh Mandor
80,000.00
400.00
168,900.00
N.3
63,500.00
63,500.00
35,000.00
175.00
70,000.00
35,000.00
75,000.00
375.00
0.0025 Oh Mandor
80,000.00
200.00
99,250.00
N.4
Kunci silinder
184,400.00
184,400.00
35,000.00
175.00
70,000.00
35,000.00
75,000.00
375.00
0.0003 Oh Mandor
80,000.00
20.00
219,970.00
N.5
15,000.00
15,000.00
35,000.00
525.00
70,000.00
10,500.00
75,000.00
1,125.00
0.0008 Oh Mandor
80,000.00
60.00
27,210.00
N.6
20,300.00
20,300.00
35,000.00
525.00
70,000.00
10,500.00
75,000.00
1,125.00
0.0008 Oh Mandor
80,000.00
60.00
32,510.00
N.7
28,200.00
28,200.00
35,000.00
525.00
70,000.00
10,500.00
75,000.00
1,125.00
0.0008 Oh Mandor
80,000.00
60.00
40,410.00
N.8
10,899.00
10,899.00
35,000.00
525.00
70,000.00
10,500.00
75,000.00
1,125.00
0.0008 Oh Mandor
80,000.00
60.00
23,109.00
KODE
ANALISA
URAIAN PEKERJAAN
1
N.9
UPAH
JUMLAH (Rp.)
5
16,800.00
16,800.00
35,000.00
525.00
70,000.00
10,500.00
75,000.00
1,125.00
0.0008 Oh Mandor
80,000.00
60.00
29,010.00
N.10
2,356,300.00
2,356,300.00
35,000.00
1,750.00
70,000.00
35,000.00
75,000.00
3,750.00
0.0025 Oh Mandor
80,000.00
200.00
2,397,000.00
N.11
Slot pintu
15,900.00
15,900.00
35,000.00
700.00
70,000.00
14,000.00
75,000.00
1,500.00
0.0010 Oh Mandor
80,000.00
80.00
32,180.00
N.12
88,300.00
88,300.00
35,000.00
1,750.00
70,000.00
35,000.00
75,000.00
3,750.00
0.0025 Oh Mandor
80,000.00
200.00
129,000.00
N.13
Door stop
88,300.00
88,300.00
35,000.00
350.00
70,000.00
7,000.00
75,000.00
750.00
0.0005 Oh Mandor
80,000.00
40.00
96,440.00
N.14
220,600.00
220,600.00
35,000.00
2,100.00
70,000.00
42,000.00
75,000.00
4,500.00
0.0030 Oh Mandor
80,000.00
240.00
269,440.00
N.15
Kunci lemari
40,600.00
40,600.00
35,000.00
875.00
70,000.00
17,500.00
75,000.00
1,875.00
0.0013 Oh Mandor
80,000.00
100.00
60,950.00
O.
O. 1
O. 2
O. 3
O. 4
O. 5
O. 6
O. 7
O. 8
5,395,150.20
350,000.00
3,549,400.00
1,500.00
3,000.00
1,069,545.00
356,515.00
125,000.00
478,598.36
3,000.00
2,500.00
28,200.00
184,400.00
220,600.00
1,500.00
3,000.00
457,442.21
152,480.74
66,700.00
125,000.00
2,356,300.00
2,500.00
1,500.00
3,000.00
492,720.00
164,240.00
125,000.00
2,356,300.00
2,500.00
1,500.00
3,000.00
455,670.00
151,890.00
#REF!
#REF!
#REF!
#REF!
125,000.00
#REF!
2,500.00
100,000.00
1,500.00
3,000.00
#REF!
#REF!
125,000.00
#REF!
2,500.00
100,000.00
1,500.00
3,000.00
#REF!
#REF!
350,000.00
1,500.00
2,292,938.83
3,696,000.00
7,098,800.00
10,500.00
21,000.00
1,069,545.00
356,515.00
13,475,753.83
13,475,700.00
1,069,545.00
1,069,500.00
###
356,515.00
14,545,298.83
14,545,200.00
1,037,500.00
1,543,479.71
12,000.00
34,000.00
42,300.00
184,400.00
159,935.00
12,000.00
24,000.00
457,442.21
152,480.74
430,215.00
3,632,310.45
3,632,300.00
457,442.21
457,400.00
###
###
###
4,089,752.65
4,089,700.00
862,500.00
2,356,300.00
34,500.00
10,500.00
21,000.00
492,720.00
164,240.00
3,449,040.00
3,449,000.00
492,720.00
492,700.00
###
###
3,941,760.00
3,941,700.00
625,000.00
2,356,300.00
25,000.00
10,500.00
21,000.00
455,670.00
151,890.00
3,189,690.00
3,189,600.00
455,670.00
455,600.00
###
###
3,645,360.00
3,645,300.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
###
###
#REF!
#REF!
925,000.00
#REF!
32,500.00
100,000.00
12,000.00
24,000.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
###
###
#REF!
#REF!
1,912,500.00
#REF!
32,500.00
100,000.00
18,000.00
36,000.00
#REF!
#REF!
#REF!
#REF!
350,000.00
12,000.00
#REF!
#REF!
###
###
#REF!
#REF!
8.0000
1.0000
1.0000
O. 9
O. 10
O. 11
O. 12
O. 13
O. 14
O. 15
bh
Ls
Ls
Pisher
Upah Pasang
Alat Bantu
Jumlah
Dibulatkan
Memasang 1 Unit Pintu type J1
12.2500
M'
Kusen Aluminium Warna 4"
9.5000
M'
Sealan Karet Kusen
5.7750
M2
Kaca Polos 6 mm
15.2000
M'
List Karet
8.0000
bh
Paku Skrup
8.0000
bh
Pisher
1.0000
Ls
Upah Pasang
1.0000
Ls
Alat Bantu
Jumlah
Dibulatkan
Memasang 1 Unit Pintu type J6
12.5500
M'
Kusen Aluminium Warna 4"
9.7000
M'
Sealan Karet Kusen
5.2725
M2
Kaca Polos 5 mm
15.1000
M'
List Karet
8.0000
bh
Paku Skrup
8.0000
bh
Pisher
1.0000
Ls
Upah Pasang
1.0000
Ls
Alat Bantu
Jumlah
Dibulatkan
Memasang 1 Unit Pintu type BV
2.6000
M'
Kusen Aluminium Warna 4"
5.2000
M'
Sealan Karet Kusen
0.3250
M2
Kaca Polos 5 mm
2.3000
M'
List Karet
6.0000
bh
Paku Skrup
6.0000
bh
Pisher
1.0000
Ls
Upah Pasang
1.0000
Ls
Alat Bantu
Jumlah
Dibulatkan
Memasang 1 Unit Jendela type J7
8.9000
M'
Kusen Aluminium Warna 4"
12.9000
M1
Bingkai Daun Pintu Aluminium Warna
13.8000
M'
Sealan Karet Kusen
3.3000
M2
Kaca Polos 5 mm
14.8000
M'
List Karet
2.0000
Psg Engsel Pintu
1.0000
Psg Kunci Pintu
1.0000
Psg Slot Pintu Tanam
10.0000
bh
Paku Skrup
10.0000
bh
Pisher
1.0000
Ls
Upah Pasang
1.0000
Ls
Alat Bantu
Jumlah
Dibulatkan
Memasang 1 Unit Pintu type P2
10.3000
M'
Kusen Aluminium Warna 4"
4.0000
M2
Daun Pintu Double Teakwood
15.2000
M'
Sealan Karet Kusen
1.5000
M2
Kaca Polos 5 mm
7.0000
M'
List Karet
2.0000
Psg Engsel Pintu
1.0000
Psg Kunci Pintu
1.0000
Psg Slot Pintu Tanam
10.0000
bh
Paku Skrup
10.0000
bh
Pisher
1.0000
Ls
Upah Pasang
1.0000
Ls
Alat Bantu
3.4000
M2
Pengecatan Politur Melamik Daun Pintu
Jumlah
Dibulatkan
Memasang 1 Unit Pintu type P3 ( MUSHOLA)
51.4900
Kg
Kusen Baja C 125.50
2.7750
m2
Daun Pintu baja
1.0000
Ls
Upah Pasang
1.0000
Ls
Alat Bantu
5.5500
M2
Pengecatan Daun Pintu Besi
Jumlah
Dibulatkan
Memasang 1 Unit Pintu type P4
7.4000
M'
Kusen Aluminium Warna 4"
3,000.00
57,900.00
19,300.00
125,000.00
2,500.00
132,300.00
2,500.00
1,500.00
3,000.00
358,954.88
119,651.63
125,000.00
2,500.00
132,300.00
2,500.00
1,500.00
3,000.00
354,645.26
118,215.09
125,000.00
2,500.00
132,300.00
2,500.00
1,500.00
3,000.00
62,062.13
20,687.38
125,000.00
#REF!
2,500.00
132,300.00
2,500.00
90,000.00
100,000.00
75,000.00
1,500.00
3,000.00
#REF!
#REF!
125,000.00
478,598.36
2,500.00
132,300.00
2,500.00
20,300.00
184,400.00
75,000.00
1,500.00
3,000.00
570,126.52
190,042.17
73,722.60
#REF!
#REF!
#REF!
#REF!
16,972.50
125,000.00
24,000.00
57,900.00
19,300.00
405,300.00
405,300.00
57,900.00
57,900.00
###
###
463,200.00
463,200.00
1,531,250.00
23,750.00
764,032.50
38,000.00
12,000.00
24,000.00
358,954.88
119,651.63
2,512,684.13
2,512,600.00
358,954.88
358,900.00
###
###
2,871,639.00
2,871,600.00
1,568,750.00
24,250.00
697,551.75
37,750.00
12,000.00
24,000.00
354,645.26
118,215.09
2,482,516.84
2,482,500.00
354,645.26
354,600.00
###
###
2,837,162.10
2,837,100.00
325,000.00
13,000.00
42,997.50
5,750.00
9,000.00
18,000.00
62,062.13
20,687.38
434,434.88
434,400.00
62,062.13
62,000.00
###
###
496,497.00
496,400.00
1,112,500.00
#REF!
34,500.00
436,590.00
37,000.00
180,000.00
100,000.00
75,000.00
15,000.00
30,000.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
###
###
#REF!
#REF!
1,287,500.00
1,914,393.44
38,000.00
198,450.00
17,500.00
40,600.00
184,400.00
75,000.00
15,000.00
30,000.00
570,126.52
190,042.17
250,656.84
4,241,542.45
4,241,500.00
570,126.52
570,100.00
###
###
4,811,668.97
4,811,600.00
#REF!
#REF!
#REF!
94,197.38
#REF!
#REF!
925,000.00
#REF!
###
###
#REF!
#REF!
#REF!
#REF!
1.5000
13.0000
0.6375
3.2000
1.0000
1.0000
6.0000
6.0000
1.0000
1.0000
1.7000
O. 16
O. 17
O. 18
O. 19
O. 20
M2
M'
M2
M'
Psg
Psg
bh
bh
Ls
Ls
M2
533,700.00
2,500.00
132,300.00
2,500.00
20,300.00
184,400.00
1,500.00
3,000.00
312,313.69
104,104.56
66,700.00
125,000.00
478,598.36
317,939.50
2,500.00
132,300.00
28,200.00
15,000.00
100,000.00
14,100.00
45,000.00
1,500.00
3,000.00
794,455.07
264,818.36
66,700.00
125,000.00
317,939.50
2,500.00
132,300.00
15,000.00
14,100.00
45,000.00
1,500.00
3,000.00
447,302.80
149,100.93
66,700.00
125,000.00
317,939.50
2,500.00
132,300.00
2,500.00
15,000.00
14,100.00
45,000.00
1,500.00
3,000.00
140,458.59
46,819.53
125,000.00
317,939.50
2,500.00
132,300.00
2,500.00
15,000.00
14,100.00
45,000.00
1,500.00
3,000.00
215,572.98
71,857.66
125,000.00
2,500.00
800,550.00
32,500.00
84,341.25
8,000.00
20,300.00
184,400.00
9,000.00
18,000.00
312,313.69
104,104.56
113,390.00
2,299,585.81
2,299,500.00
312,313.69
312,300.00
###
###
2,611,899.50
2,611,800.00
2,037,500.00
1,914,393.44
578,649.89
24,500.00
410,923.80
28,200.00
30,000.00
100,000.00
28,200.00
90,000.00
18,000.00
36,000.00
794,455.07
264,818.36
776,388.00
6,337,573.49
6,337,500.00
794,455.07
794,400.00
###
###
7,132,028.56
7,132,000.00
1,668,750.00
578,649.89
44,500.00
496,918.80
30,000.00
28,200.00
90,000.00
15,000.00
30,000.00
447,302.80
149,100.93
242,788.00
3,373,907.62
3,373,900.00
###
###
447,302.80
447,300.00
3,821,210.43
3,821,200.00
140,458.59
###
###
1,123,668.71
1,123,600.00
575,000.00
133,534.59
19,500.00
95,256.00
12,000.00
15,000.00
14,100.00
45,000.00
9,000.00
18,000.00
46,819.53
983,210.12
983,200.00
140,458.59
140,400.00
800,000.00
267,069.18
25,000.00
142,884.00
18,000.00
30,000.00
28,200.00
90,000.00
12,000.00
24,000.00
215,572.98
71,857.66
1,509,010.84
1,509,000.00
912,500.00
30,500.00
215,572.98
215,500.00
###
###
1,724,583.82
1,724,500.00
1.5600
8.7000
8.0000
8.0000
1.0000
1.0000
O. 21
O. 22
O. 23
O. 24
O. 25
O. 26
M2
M'
bh
bh
Ls
Ls
Kaca Polos 5 mm
List Karet
Paku Skrup
Pisher
Upah Pasang
Alat Bantu
Jumlah
Dibulatkan
Memasang 1 Unit Jendela type BV-4( MUSHOLA)
5.9000
M'
Kusen Aluminium Warna 4"
10.6000
M'
Sealan Karet Kusen
1.3000
M2
Kaca Polos 5 mm
6.6000
M'
List Karet
6.0000
bh
Paku Skrup
6.0000
bh
Pisher
1.0000
Ls
Upah Pasang
1.0000
Ls
Alat Bantu
Jumlah
Dibulatkan
Memasang 1 Unit Pintu type PJ1 ( ATM)
14.0500
M'
Kusen Aluminium Warna 4"
6.7500
M1
Bingkai Daun Pintu Aluminium Warna
13.0000
M'
Sealan Karet Kusen
5.8275
M2
Kaca Polos 5 mm
21.1000
M'
List Karet
5.8275
M2
Stiker Etsa Kaca
1.0000
Psg Engsel Pintu
1.0000
Psg Kunci Pintu
12.0000
bh
Paku Skrup
12.0000
bh
Pisher
1.0000
Ls
Upah Pasang
1.0000
Ls
Alat Bantu
Jumlah
Dibulatkan
Memasang 1 Unit Pintu type PJ2 ( ATM)
15.8000
M'
Kusen Aluminium Warna 4"
6.7500
M1
Bingkai Daun Pintu Aluminium Warna
13.0000
M'
Sealan Karet Kusen
7.8150
M2
Kaca Polos 5 mm
24.1000
M'
List Karet
7.8150
M2
Stiker Etsa Kaca
1.0000
Psg Engsel Tanam (Floor Hinges) ex Dorma
1.0000
Psg Kunci Pintu Tanam
8.0000
bh
Paku Skrup
8.0000
bh
Pisher
1.0000
Ls
Upah Pasang
1.0000
Ls
Alat Bantu
Jumlah
Dibulatkan
Memasang 1 Unit Jendela type J-1( ATM)
12.3500
M'
Kusen Aluminium Warna 4"
19.6000
M'
Sealan Karet Kusen
5.9625
M2
Kaca Polos 5 mm
14.3000
M'
List Karet
5.9625
M2
Stiker Etsa Kaca
8.0000
bh
Paku Skrup
8.0000
bh
Pisher
1.0000
Ls
Upah Pasang
1.0000
Ls
Alat Bantu
Jumlah
Dibulatkan
Memasang 1 Unit Jendela type J-2( ATM)
8.7000
M'
Kusen Aluminium Warna 4"
13.1000
M'
Sealan Karet Kusen
2.1525
M2
Kaca Polos 5 mm
6.2500
M'
List Karet
2.1525
M2
Stiker Etsa Kaca
6.0000
bh
Paku Skrup
6.0000
bh
Pisher
1.0000
Ls
Upah Pasang
1.0000
Ls
Alat Bantu
Jumlah
Dibulatkan
Memasang 1 Unit Pintu type PJ3 ( ATM)
13.1130
M'
Kusen Aluminium Warna 4"
11.4000
M1
Bingkai Daun Pintu Aluminium Warna
8.7540
M'
Sealan Karet Kusen
5.5554
M2
Kaca Polos 5 mm
25.1480
M'
List Karet
132,300.00
2,500.00
1,500.00
3,000.00
181,070.70
60,356.90
125,000.00
2,500.00
132,300.00
2,500.00
1,500.00
3,000.00
146,923.50
48,974.50
125,000.00
#REF!
2,500.00
132,300.00
2,500.00
15,000.00
90,000.00
100,000.00
1,500.00
3,000.00
#REF!
#REF!
125,000.00
#REF!
2,500.00
132,300.00
2,500.00
15,000.00
1,000,000.00
450,000.00
1,500.00
3,000.00
#REF!
#REF!
125,000.00
#REF!
132,300.00
2,500.00
15,000.00
1,500.00
3,000.00
#REF!
#REF!
125,000.00
#REF!
132,300.00
2,500.00
15,000.00
1,500.00
3,000.00
#REF!
#REF!
125,000.00
#REF!
2,500.00
132,300.00
2,500.00
206,388.00
21,750.00
12,000.00
24,000.00
181,070.70
60,356.90
1,267,494.90
1,267,400.00
181,070.70
181,000.00
###
###
1,448,565.60
1,448,500.00
737,500.00
26,500.00
171,990.00
16,500.00
9,000.00
18,000.00
146,923.50
48,974.50
1,028,464.50
1,028,400.00
146,923.50
146,900.00
###
###
1,175,388.00
1,175,300.00
1,756,250.00
#REF!
32,500.00
770,978.25
52,750.00
87,412.50
90,000.00
100,000.00
18,000.00
36,000.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
###
###
#REF!
#REF!
1,975,000.00
#REF!
32,500.00
1,033,924.50
60,250.00
117,225.00
1,000,000.00
450,000.00
12,000.00
24,000.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
###
###
#REF!
#REF!
1,543,750.00
#REF!
788,838.75
35,750.00
89,437.50
12,000.00
24,000.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
###
###
#REF!
#REF!
1,087,500.00
#REF!
284,775.75
15,625.00
32,287.50
9,000.00
18,000.00
#REF!
#REF!
#REF!
#REF!
1,639,125.00
#REF!
21,885.00
734,979.42
62,870.00
#REF!
#REF!
###
###
#REF!
#REF!
###
5.5554
2.0000
2.0000
2.0000
8.0000
8.0000
1.0000
1.0000
O. 27
O. 28
O. 29
O. 30
O. 31
M2
Psg
Psg
Psg
bh
bh
Ls
Ls
15,000.00
90,000.00
100,000.00
350,000.00
1,500.00
3,000.00
#REF!
#REF!
125,000.00
2,500.00
132,300.00
2,500.00
1,500.00
3,000.00
362,436.00
120,812.00
125,000.00
533,700.00
2,500.00
132,300.00
2,500.00
20,300.00
184,400.00
1,500.00
3,000.00
321,856.95
107,285.65
66,700.00
125,000.00
478,598.36
317,939.50
2,500.00
132,300.00
2,500.00
28,200.00
15,000.00
100,000.00
14,100.00
45,000.00
1,500.00
467,747.60
155,915.87
66,700.00
125,000.00
317,939.50
2,500.00
132,300.00
15,000.00
14,100.00
45,000.00
1,500.00
3,000.00
356,550.49
118,850.16
66,700.00
125,000.00
2,500.00
132,300.00
2,500.00
1,500.00
3,000.00
192,764.40
64,254.80
83,331.00
180,000.00
200,000.00
700,000.00
12,000.00
24,000.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
###
###
#REF!
#REF!
1,462,500.00
58,500.00
833,490.00
25,750.00
12,000.00
24,000.00
362,436.00
120,812.00
2,537,052.00
2,537,000.00
362,436.00
362,400.00
###
###
2,899,488.00
2,899,400.00
900,000.00
907,290.00
32,000.00
67,473.00
7,250.00
20,300.00
184,400.00
9,000.00
18,000.00
321,856.95
107,285.65
113,390.00
2,366,388.65
2,366,300.00
321,856.95
321,800.00
###
###
2,688,245.60
2,688,200.00
1,581,250.00
813,617.21
238,454.63
36,000.00
209,695.50
22,000.00
28,200.00
15,000.00
100,000.00
14,100.00
45,000.00
15,000.00
467,747.60
155,915.87
326,830.00
3,601,063.20
3,601,000.00
467,747.60
467,700.00
###
###
4,068,810.80
4,068,800.00
1,368,750.00
476,909.25
36,500.00
301,644.00
30,000.00
28,200.00
90,000.00
15,000.00
30,000.00
356,550.49
118,850.16
200,100.00
2,695,953.41
2,695,900.00
356,550.49
356,500.00
###
###
3,052,503.90
3,052,500.00
1,012,500.00
27,000.00
201,096.00
17,500.00
9,000.00
18,000.00
192,764.40
64,254.80
###
###
O. 32
Jumlah
Dibulatkan
Memasang 1 M2 Pasang Partisi Toilet lapis Melamik
1.3333
Btg
Rangka Hollow 40x40 mm
0.6719
6.0000
25.0000
25.0000
1.0000
1.0000
O. 33
Lbr
bh
bh
bh
Ls
Ls
Melamito 4 mm
Paku Repet
Paku Skrup
Pisher
Upah Pasang
Alat Bantu
Jumlah
Keuntungan Max
Jumlah Total
Dibulatkan
Memasang 1 M1 Railling Tangga lengkap
0.50
kg
Plat Dudukan Tiang Railling
2.00
bh
DinaBolt dia.12 mm
0.25
btg
Pipa Tiang Stainlesstell dia. 1,5"
0.15
btg
Railling Pipa Bawah Stainlesstell dia. 1"
0.15
btg
Railling Pipa Tengah Stainlesstell dia. 3/4"
0.15
btg
Railling Pipa Atas Stainlesstell dia. 1"
1.20
btg
Railling Pipa Vertikal Stainlesstell dia. 3/4"
1.0000
Ls
Upah Pasang Pabrikasi Teralis besi
1.0000
Ls
Upah Pasang +Pabikasi Railling
1.00
Ls
Poles Stainlesstel
Jumlah
Keuntungan Max
Jumlah Total
Dibulatkan
1,349,350.80
1,349,300.00
192,764.40
192,700.00
1,542,115.20
1,542,100.00
150,000.00
200,000.00
###
112,000.00
500.00
1,500.00
3,000.00
58,612.29
19,537.43
75,248.59
3,000.00
37,500.00
75,000.00
###
17,300.00
13,100.00
470,550.00
264,960.00
230,400.00
264,960.00
230,400.00
81,452.33
27,150.78
13,575.39
58,612.29
19,537.43
210,286.02
21,028.60
231,314.62
231,300.00
58,612.29
5,861.23
64,473.52
64,400.00
###
###
268,898.31
26,889.83
295,788.14
295,700.00
81,452.33
27,150.78
###
###
8,650.00
26,200.00
117,637.50
39,744.00
34,560.00
39,744.00
276,480.00
13,575.39
556,590.89
55,659.09
612,249.98
612,200.00
108,603.10
10,860.31
119,463.41
119,400.00
665,193.99
66,519.40
731,713.39
731,700.00
BAHAN DASAR
PEMBANGUNAN RUMAH TINGGAL
BLIMBING - MALANG
TAHUN 2013
BAHAN STRUKTUR
NO
URAIAN PEKERJAAN
VOL
SAT
PASIR
SEMEN
A.
2.8
m3
2.8
2.8
m3
2.8
B.
PEKERJAAN PONDASI
1
2
4.3
13.7
63
m3
m3
1.7
5.5
3
4
1.4
4.2
m2
m3
0.9
2.5
5
6
0.2
0.4
m3
m3
0.1
0.2
C.
1
2
3.5
1.0
2.1
0.6
3
4
0.8
5.2
m3
m3
m3
5
6
0.6
0.3
12.8
m3
7.7
967.7
280.0
235.2
1,442.7
168.0
70.6
3,572.5
2.4
0.7
0.6
3.6
0.4
0.2
8.9
31.0
9,439.8
21.1
21.6
m3
BATA
BESI
BENDRAT
TRIPLEK
KAYU
STEGER
PAKU
5.1
1.0
2.9
0.1
0.3
0.4
0.2
m3
B. KALI
1,096.5
284.2
1,176.0
45.6
100.8
0.5
3.1
m3
m3
SPLIT
kg
16.4
1.0
1.0
0.0
biji
336.0
8.4
12.6
13.0
59.5
0.3
0.7
0.5
1.1
497.0
86.8
6.9
2.0
10.4
3.0
151.2
741.0
1.7
10.3
86.3
50.4
1.2
0.5
0.20
1,143.2
25.5
40.6
3,164.5
57.6
40.6
kg
kg
2.5
15.5
1.73
lembar
1.9
m3
0.335371179
1.8
0.8
406.1
38.3
406.1
88.3
m3
m3
HARGA MATERIAL
125,000
1,300
200,000
175,000
450.0
9,000.0
16,000.0
110,000
3,645,833.3
batang
15,000.0
JUMLAH HARGA
3,875,413
12,271,714
4,228,490
3,775,380
28,480,550
921,040
4,467,127
7,031,719
6,091,536
kg
13,500.0
1,192,691 72,335,660
BAHAN ARSITEKTUR
NO
URAIAN PEKERJAAN
VOL
SAT
PASIR
SEMEN
BATA
A.
A1.
1
LANTAI BAWAH
Pasangan dinding 1/2 bata 1 : 5
135.1
m2
6.1
1,080.4
2
3
270.1
270.1
m2
m1
5.9
0.0
1,890.7
270.1
4
5
70.0
4.0
m1
m2
3.2
0.2
70.0
32.0
4.2
2.7
m2
0.1
21.9
2.9
A2.
LEM
MENI
THINNER
PLITUR
ALAT
9,723.6
1.4
LANTAI ATAS
1
2
13.5
43.5
m2
m2
0.6
1.0
108.0
304.5
87.0
m1
3.9
87.0
4.5
m3
4.5
D.
PEKERJAAN LANTAI
D1.
1
LANTAI BAWAH
Urugan pasir bawah lantai t=10 cm ( bekas galian )
972.0
2
3
44.5
5.9
m2
m2
1.3
0.3
445.0
47.5
6.2
3.0
35.9
m2
1.6
287.4
37.7
18.0
12.6
m2
0.6
100.8
13.2
6.3
E.
E1.
LANTAI BAWAH
1.6
4.1
21
m2
582
m2
174.5
123
m2
36.9
28.8
m2
3
4
E2.
CAT KAYU
3.1
174.5
36.9
3.6
58.2
12.3
7.2
14.4
LANTAI ATAS
0.2
0.98
m2
27.00
m2
8.1
4.50
m2
1.4
3.20
m2
0.90
m2
8.1
1.4
0.2
29.2
4,745.4
kg
10,697.2
biji
64.3
m2
249.4
kg
220.8
kg
0.1
0.2
0.8
0.1
0.2
2.7
0.5
4.5
kg
73.6
kg
1.6
11.4
4.0
16.0
kg
liter
kg
13,500.0
HARGA MATERIAL
125,000
1,300
450
35,000
2,000.0
16,000.0
35,000.0
12,000
12,000.0
15,000.0
JUMLAH HARGA
3,648,550
6,168,994
4,813,721
2,249,468
498,870
3,533,280
158,060
883,320
136,644
59,273
216,000 22,366,179
m1
daun
daun
set
buah
daun
38.6
10
4
10
10
32
70,000
350,000
350,000
12,500
70,000
30,000
2,702,000
3,500,000
1,400,000
125,000
700,000
960,000
Kaca 3mm
m2
m2
3.6
80,000
286,720
250,000
Railing tangga
Pagar besi depan
m1
m1
750,000
5
7
250,000
250,000
1,250,000
1,750,000
13,423,720
13,423,720
35,789,899