Anda di halaman 1dari 11

DAFTAR HARGA BAHAN DAN UPAH KERJA

NO

URAIAN

HARGA SATUAN (Rp)

A. HARGA BAHAN
1 . Kerikil (lokal)

662,400.00

m3

2 . Pasir beton (lokal)

616,400.00

m3

3 . Pasir pasangan

616,400.00

m3

4 . Pasir urugan

558,900.00

m3

5 . Tanah timbunan

280,025.00

m3

2,006.75

bh

135,330.36

zak

Kayu kelas I

4,081,781.25

m3

9 . Kayu kelas II

2,883,625.00

m3

10 . Papan Bowplank

2,174,937.50

m3

11 . Papan Bekesting

2,174,937.50

m3

12 . Kayu skor (steger)

2,883,625.00

m3

265,039.06

m2

14 . Tripleks 4 mm

97,750.00

btg

15 . Lat kayu

13,271.00

m'

16 . Besi beton

17,455.01

kg

17 . Kawat pengikat

29,037.50

kg

18 . Paku campuran

28,807.50

kg

19 . Paku Tripleks

28,807.50

kg

20 . Paku seng

28,807.50

kg

21 . Cat dasar / meni

29,037.50

kg

22 . Cat kilap kayu

63,537.50

kg

23 . Minyak cat

40,537.50

ltr

24 . Cat Tembok

14,892.50

kg

25 . Dempul

36,512.50

kg

26 . Plamur

13,167.50

kg

27 . Ter / residu

31,912.50

ltr

5,821.88

lbr

103,571.88

bh

30 . Engsel pintu kuningan

31,696.88

bh

31 . Engsel jendela kuningan

17,321.88

bh

32 . Hak angin

28,821.88

bh

33 . Grendel

31,696.88

bh

34 . Lampu XL 20 watt

51,893.75

set

35 . Kabel/pipa union

32,431.06

m'

36 . Stop kontak

28,246.88

bh

37 . Saklar tunggal

34,571.88

bh

38 . Saklar ganda

51,821.88

bh

39 . Stand inbow

25,000.00

bh

40 . Stand lampu XL

15,000.00

bh

41 . Sekering limit

45,496.88

bh

42 . Zinc Allume Colour

105,000.00

lbr

43 . Kloset jongkok

207,000.00

bh

6 . Batu merah
7 . Semen
8

13 . Kaca polos 5 mm

28 . Kertas amplas
29 . Kunci tanam cap kuda terbang

NO

URAIAN

HARGA SATUAN (Rp)

44 . Stop kran

30,546.88

bh

45 . Tegel keramik 40/40 cm

19,182.92

bh

46 . Tegel keramik 20/20 cm

3,911.73

bh

47 . Tegel keramik 20/25 cm

5,177.16

bh

44,270.00

lbr

48 . Nok Zinc Allume Colur


49 . Bak Air / Fiberglass 1/4 m3

305,037.50

bh

50 . Zeng plat Bjls 20

23,021.99

lbr

51 . Floor Drain Besi

31,620.00

bh

B. UPAH KERJA
1

Mandor

150,000.00

o/h

Kepala tukang

120,000.00

o/h

Tukang

100,000.00

o/h

Pekerja

80,000.00

o/h

Pekerja Bongkar/siram

80,000.00

o/h

DAFTAR ANALISA DAN UPAH KERJA


1.

2.

3.

4.

5.

1.0000 m'

Papan Bowplank

a.Rp

2,174,937.50 Rp.

10,874.69

0.0050 m

Kayu skor (steger)

a.Rp

2,883,625.00 Rp.

14,418.13

0.2000 kg

Paku campuran

a.Rp

28,807.50 Rp.

5,761.50

0.1000 o/h

Pekerja

a.Rp

80,000.00 Rp.

8,000.00

0.1000 o/h

Tukang

a.Rp

100,000.00 Rp.

10,000.00

0.0100 o/h

Kepala tukang

a.Rp

120,000.00 Rp.

1,200.00

0.0050 o/h

Mandor

a.Rp

150,000.00 Rp.

750.00

Rp.

51,004.31

1.0000 m3

7.

GALIAN TANAH BIASA

0.4000 o/h

Pekerja

a.Rp

80,000.00 Rp.

32,000.00

0.0400 o/h

Mandor

a.Rp

150,000.00 Rp.

6,000.00

Rp.

38,000.00

280,025.00 Rp.

336,030.00

1.0000 m

URUGAN TANAH

1.2000 m3

Tanah timbunan

a.Rp

0.3000 o/h

Pekerja

a.Rp

80,000.00 Rp.

24,000.00

0.0100 o/h

Mandor

a.Rp

150,000.00 Rp.

1,500.00

Rp.

361,530.00

1.0000 m3

URUGAN PASIR

1.2000 m3

Pasir urugan

a.Rp

558,900.00 Rp.

670,680.00

0.3000 o/h

Pekerja

a.Rp

80,000.00 Rp.

24,000.00

0.0100 o/h

Mandor

a.Rp

150,000.00 Rp.

1,500.00

Rp.

696,180.00

1.0000 m3
750.0000 bh

6.

PENGUKURAN/PEMASANGAN BOWPLANK

0.0050 m3

PASANGAN BATU MERAH 1pc : 4psr


Batu merah

a.Rp

2,006.75 Rp.

1,505,062.50

2.5400 zak

Semen

a.Rp

135,330.36 Rp.

343,739.11

0.3800 m3

Pasir pasangan

a.Rp

616,400.00 Rp.

234,232.00

1.5000 o/h

Tukang

a.Rp

100,000.00 Rp.

150,000.00

0.1500 o/h

Kepala tukang

a.Rp

120,000.00 Rp.

18,000.00

3.0000 o/h

Pekerja

a.Rp

80,000.00 Rp.

240,000.00

0.1500 o/h

Mandor

a.Rp

150,000.00 Rp.

22,500.00

Rp.

2,513,533.61

1.0000 m2

PLESTERAN 1pc : 4psr (T=1 cm)

0.0868 zak

Semen

a.Rp

135,330.36 Rp.

11,746.68

0.0139 m3

Pasir pasangan

a.Rp

616,400.00 Rp.

8,567.96

0.1500 o/h

Tukang

a.Rp

100,000.00 Rp.

15,000.00

0.0150 o/h

Kepala tukang

a.Rp

120,000.00 Rp.

1,800.00

0.4000 o/h

Pekerja

a.Rp

80,000.00 Rp.

32,000.00

0.0200 o/h

Mandor

a.Rp

150,000.00 Rp.

3,000.00

Rp.

72,114.64
14,209.69

10.0000 m2

PEKERJAAN ACIAN

0.1050 zak

Semen

a.Rp

135,330.36 Rp.

0.0085 m

Pasir pasangan

a.Rp

616,400.00 Rp.

5,239.40

0.1200 o/h

Tukang

a.Rp

100,000.00 Rp.

12,000.00

0.0120 o/h

Kepala tukang

a.Rp

120,000.00 Rp.

1,440.00

0.3600 o/h

Pekerja

a.Rp

80,000.00 Rp.

28,800.00

0.0180 o/h

Mandor

a.Rp

150,000.00 Rp.

(a)
Untuk 1 m 2 = 1/10 x ( a )
8.

1.0000 m2

2,700.00

Rp.

64,389.09

Rp.

6,438.91

PEKERJAAN JALUSI, TOP GEVEL DAN LEISPLANK

1.8000 o/h

Tukang

a.Rp

100,000.00 Rp.

180,000.00

0.6000 o/h

Kepala tukang

a.Rp

120,000.00 Rp.

72,000.00

0.1800 o/h

Pekerja

a.Rp

80,000.00 Rp.

14,400.00

0.0300 o/h

Mandor

a.Rp

150,000.00 Rp.

4,500.00

0.1000 kg

Paku campuran

a.Rp

28,807.50 Rp.

2,880.75

0.0200 m

Kayu kelas I

a.Rp

4,081,781.25 Rp.

81,635.63

Rp.

355,416.38

9.

10.

11.

12.

13.

14.

15.

1.0000 m3

PEKERJAAN KUDA-KUDA KAYU KLAS II

12.0000 o/h

Tukang

a.Rp

100,000.00 Rp.

1,200,000.00

1.2000 o/h

Kepala tukang

a.Rp

120,000.00 Rp.

144,000.00

4.0000 o/h

Pekerja

a.Rp

80,000.00 Rp.

320,000.00

0.2000 o/h

Mandor

a.Rp

150,000.00 Rp.

30,000.00

5.6000 kg

Paku campuran

a.Rp

28,807.50 Rp.

161,322.00

1.1000 m3

Kayu kelas II

a.Rp

2,883,625.00 Rp.

3,171,987.50

Rp.

5,027,309.50

1.0000 m3

PEKERJAAN GORDING KAYU KLAS II

7.2000 o/h

Tukang

a.Rp

100,000.00 Rp.

720,000.00

0.7200 o/h

Kepala tukang

a.Rp

120,000.00 Rp.

86,400.00

2.4000 o/h

Pekerja

a.Rp

80,000.00 Rp.

192,000.00

0.1200 o/h

Mandor

a.Rp

150,000.00 Rp.

18,000.00

3.0000 kg

Paku campuran

a.Rp

28,807.50 Rp.

86,422.50

1.1000 m

Kayu kelas II

a.Rp

2,883,625.00 Rp.

3,171,987.50

Rp.

4,274,810.00

1.0000 m

PEKERJAAN RANGKA DINDING, KUSEN PINTU / JENDELA

25.2000 o/h

Tukang

a.Rp

7.2000 o/h

Pekerja

1.5600 o/h

Mandor

3.0000 kg

Paku campuran

a.Rp

28,807.50 Rp.

86,422.50

1.1000 m3

Kayu kelas I

a.Rp

4,081,781.25 Rp.

4,489,959.38

Rp.

7,906,381.88

1.0000 m2

100,000.00 Rp.

2,520,000.00

a.Rp

80,000.00 Rp.

576,000.00

a.Rp

150,000.00 Rp.

234,000.00

MENGERJAKAN DAUN PINTU PANIL

8.0000 o/h

Tukang

a.Rp

100,000.00 Rp.

800,000.00

0.8000 o/h

Kepala tukang

a.Rp

120,000.00 Rp.

96,000.00

3.5000 o/h

Pekerja

a.Rp

80,000.00 Rp.

280,000.00

0.1500 o/h

Mandor

a.Rp

150,000.00 Rp.

22,500.00

0.2000 kg

Paku campuran

a.Rp

28,807.50 Rp.

5,761.50

0.0400 m3

Kayu kelas I

a.Rp

4,081,781.25 Rp.

163,271.25

Rp.

1,367,532.75

1.0000 m2

PEKERJAAN PINTU DAN JENDELA PANIL KACA

6.0000 o/h

Tukang

a.Rp

100,000.00 Rp.

600,000.00

0.6000 o/h

Kepala tukang

a.Rp

120,000.00 Rp.

72,000.00

2.0000 o/h

Pekerja

a.Rp

80,000.00 Rp.

160,000.00

0.1000 o/h

Mandor

a.Rp

150,000.00 Rp.

15,000.00

1.2000 m

Kaca Polos 5 mm

a.Rp

265,039.06 Rp.

318,046.87

0.0200 kg

Paku campuran

a.Rp

28,807.50 Rp.

576.15

0.0100 m3

Kayu kelas I

a.Rp

4,081,781.25 Rp.

40,817.81

Rp.

1,206,440.83

1.0000 m2

PINTU LAPIS ZENG PLAT

1.0000 lbr

Tripleks 4 mm

a.Rp

97,750.00 Rp.

97,750.00

2.0000 lbr

Zeng plat Bjls 20

a.Rp

23,021.99 Rp.

46,043.98

0.2500 kg

Paku campuran

a.Rp

28,807.50 Rp.

7,201.88

0.0135 m3

Kayu kelas I

a.Rp

4,081,781.25 Rp.

55,104.05

1.5000 o/h

Tukang

a.Rp

100,000.00 Rp.

150,000.00

0.1500 o/h

Kepala tukang

a.Rp

120,000.00 Rp.

18,000.00

2.5000 o/h

Pekerja

a.Rp

80,000.00 Rp.

200,000.00

0.1250 o/h

Mandor

a.Rp

150,000.00 Rp.

18,750.00

Rp.

592,849.90

1.0000 m2

COR LANTAI BETON TUMBUK 1pc : 3psr : 5krl (Tebal 7 cm)

0.0700 m3

Kerikil (lokal)

a.Rp

662,400.00 Rp.

46,368.00

0.3600 zak

Semen

a.Rp

135,330.36 Rp.

48,718.93

0.0440 m

Pasir beton (lokal)

a.Rp

616,400.00 Rp.

27,121.60

0.1350 o/h

Tukang

a.Rp

100,000.00 Rp.

13,500.00

0.0135 o/h

Kepala tukang

a.Rp

120,000.00 Rp.

1,620.00

0.7200 o/h

Pekerja

a.Rp

80,000.00 Rp.

57,600.00

0.0360 o/h

Mandor

a.Rp

150,000.00 Rp.

5,400.00

Rp.

200,328.53

16.

1.0000 m2
0.0700 m

17.

COR BETON RABBAT 1pc : 3psr : 5krg (Tebal 5 cm)


Kerikil (lokal)

a.Rp

662,400.00 Rp.

46,368.00

0.2500 zak

Semen

a.Rp

135,330.36 Rp.

33,832.59

0.0300 m

Pasir beton (lokal)

a.Rp

616,400.00 Rp.

18,492.00

0.1350 o/h

Tukang

a.Rp

100,000.00 Rp.

13,500.00

0.0135 o/h

Kepala tukang

a.Rp

120,000.00 Rp.

1,620.00

0.7200 o/h

Pekerja

a.Rp

80,000.00 Rp.

57,600.00

0.0360 o/h

Mandor

a.Rp

150,000.00 Rp.

5,400.00

Rp.

176,812.59

1.0000 m3

BETON BERTULANG 1pc : 2psr : 3krl

1.0000 m3

Campuran Beton 1pc : 2psr : 3krl

0.8300 m

Kerikil (lokal)

a.Rp

662,400.00 Rp.

549,792.00

0.5400 m3

Pasir beton (lokal)

a.Rp

616,400.00 Rp.

332,856.00

6.8000 zak

Semen

a.Rp

135,330.36 Rp.

920,246.43

6.0000 o/h

Pekerja

a.Rp

80,000.00 Rp.

480,000.00

0.3000 o/h

Mandor

a.Rp

150,000.00 Rp.

45,000.00

1.0000 o/h

Tukang

a.Rp

100,000.00 Rp.

100,000.00

0.1000 o/h

Kepala tukang

a.Rp

120,000.00 Rp.

12,000.00

Rp.

2,439,894.43

1.0000 m3
110.0000 kg

Besi Beton
Besi beton

a.Rp

17,455.01 Rp.

1,920,051.13

Kawat pengikat

a.Rp

29,037.50 Rp.

58,075.00

6.0000 O/H

Pekerja

a.Rp

80,000.00 Rp.

480,000.00

2.2500 O/H

Tukang

a.Rp

100,000.00 Rp.

225,000.00

0.2250 O/H

Kepala tukang

a.Rp

120,000.00 Rp.

27,000.00

Rp.

2,710,126.13

2.0000 kg

1.0000 m3

Bekisting / Cetakan

0.4000 m3

Papan bekesting

a.Rp

2,174,937.50 Rp.

869,975.00

4.0000 kg

Paku Campuran

a.Rp

28,807.50 Rp.

115,230.00

6.0000 O/H

Pekerja

a.Rp

80,000.00 Rp.

480,000.00

1.0000 O/H

Tukang

a.Rp

100,000.00 Rp.

100,000.00

0.1000 O/H

Kepala tukang

a.Rp

120,000.00 Rp.

12,000.00

0.3000 O/H

Mandor

a.Rp

150,000.00 Rp.

45,000.00

Pekerja Bongkar/siram

a.Rp

80,000.00 Rp.

80,000.00

Rp.

1,702,205.00

Rp.

6,852,225.55

1.0000 O/H

1 m3 Pekerjaan Beton Bertulang1pc : 2psr : 3krl = (A) + (B) + (C)


18.

1.0000 m2

PASANGAN TEGEL KERAMIK 20/20 UNTUK LANTAI K.M.

25.0000 bh

Tegel keramik 20/20 cm

a.Rp

3,911.73 Rp.

97,793.13

0.0230 m

19.

Pasir pasangan

a.Rp

616,400.00 Rp.

14,177.20

0.1932 zak

Semen

a.Rp

135,330.36 Rp.

26,145.83

0.1300 o/h

Tukang

a.Rp

100,000.00 Rp.

13,000.00

0.0130 o/h

Kepala tukang

a.Rp

120,000.00 Rp.

1,560.00

0.2700 o/h

Pekerja

a.Rp

80,000.00 Rp.

21,600.00

0.0135 o/h

Mandor

a.Rp

150,000.00 Rp.

2,025.00

Rp.

176,301.15

1.0000 m2

PASANGAN TEGEL KERAMIK DINDING 20 X 25 cm

20.0000 bh

Tegel keramik 20/25 cm

a.Rp

5,177.16 Rp.

103,543.13

0.1932 zak

Semen

a.Rp

135,330.36 Rp.

26,145.83

0.0230 m

Pasir pasangan

a.Rp

616,400.00 Rp.

14,177.20

0.1500 o/h

Tukang

a.Rp

100,000.00 Rp.

15,000.00

0.0150 o/h

Kepala tukang

a.Rp

120,000.00 Rp.

1,800.00

0.2900 o/h

Pekerja

a.Rp

80,000.00 Rp.

23,200.00

0.0145 o/h

Mandor

a.Rp

150,000.00 Rp.

2,175.00

Rp.

186,041.15

20.

21.

22.

23.

1.0000 m2

PASANGAN ATAP ZINC ALLUME COLOUR

1.0500 lbr

Zinc Allume Colour

a.Rp

105,000.00 Rp.

110,250.00

0.0200 kg

Paku Seng

a.Rp

28,807.50 Rp.

576.15

0.1500 o/h

Pekerja

a.Rp

80,000.00 Rp.

12,000.00

0.7500 o/h

Tukang

a.Rp

100,000.00 Rp.

75,000.00

0.0080 o/h

Kepala Tukang

a.Rp

120,000.00 Rp.

960.00

0.0060 o/h

Mandor

a.Rp

150,000.00 Rp.

900.00

Rp.

199,686.15

1.0000 m'

PASANGAN NOK / JURAI

1.2000 lbr

Zeng plat Bjls 20

a.Rp

23,021.99 Rp.

27,626.39

0.0250 kg

Paku Seng

a.Rp

28,807.50 Rp.

720.19

0.0200 o/h

Tukang

a.Rp

100,000.00 Rp.

2,000.00

0.0020 o/h

Kepala tukang

a.Rp

120,000.00 Rp.

240.00

0.0100 o/h

Pekerja

a.Rp

80,000.00 Rp.

800.00

0.0050 o/h

Mandor

a.Rp

150,000.00 Rp.

750.00

Rp.

32,136.57

1.0000 m2

PEKERJAAN PLAFOND TRIPLEKS DENGAN PENGGANTUNG

0.3500 lbr

Tripleks 4 mm

a.Rp

97,750.00 Rp.

34,212.50

0.0250 m

Kayu kelas II

a.Rp

2,883,625.00 Rp.

72,090.63

0.0200 kg

Paku Tripleks

a.Rp

28,807.50 Rp.

576.15

0.8000 o/h

Tukang

a.Rp

100,000.00 Rp.

80,000.00

0.0800 o/h

Kepala tukang

a.Rp

120,000.00 Rp.

9,600.00

0.2800 o/h

Pekerja

a.Rp

80,000.00 Rp.

22,400.00

0.0014 o/h

Mandor

a.Rp

150,000.00 Rp.

210.00

1.0000 m'

Lat Kayu

a.Rp

13,271.00 Rp.

13,271.00

Rp.

232,360.28

10.0000 m2

PEKERJAAN CAT DASAR

1.2000 kg

Cat dasar / meni

a.Rp

29,037.50 Rp.

34,845.00

0.7500 o/h

Tukang

a.Rp

100,000.00 Rp.

75,000.00

0.0750 o/h

Kepala tukang

a.Rp

120,000.00 Rp.

9,000.00

0.5000 o/h

Pekerja

a.Rp

80,000.00 Rp.

40,000.00

0.0250 o/h

Mandor

a.Rp

150,000.00 Rp.

3,750.00

( a ) Rp.

162,595.00

Rp.

16,259.50

Untuk 1 m2 = 1/10 x ( a )
24.

10.0000 m2

MENGECAT TEMBOK DINDING (2 kali)

3.6667 kg

Cat tembok

a.Rp

14,892.50 Rp.

54,605.83

3.6667 kg

Plamur

a.Rp

13,167.50 Rp.

48,280.83

1.0000 lbr

Kertas amplas

a.Rp

5,821.88 Rp.

5,821.88

1.0000 o/h

Tukang

a.Rp

100,000.00 Rp.

100,000.00

0.1100 o/h

Kepala tukang

a.Rp

120,000.00 Rp.

13,200.00

0.7000 o/h

Pekerja

a.Rp

80,000.00 Rp.

56,000.00

0.0250 o/h

Mandor

a.Rp

150,000.00 Rp.

3,750.00

( a ) Rp.

281,658.54

Rp.

28,165.85

Untuk 1 m2 = 1/10 x ( a )
25.

10.0000 m2

MENGECAT PLAFOND BARU (2 kali)

3.6667 kg

Cat tembok

a.Rp

14,892.50 Rp.

54,606.33

1.1000 o/h

Tukang

a.Rp

100,000.00 Rp.

110,000.00

0.1100 o/h

Kepala tukang

a.Rp

120,000.00 Rp.

13,200.00

0.8000 o/h

Pekerja

a.Rp

80,000.00 Rp.

64,000.00

0.0250 o/h

Mandor

a.Rp

150,000.00 Rp.

3,750.00

( a ) Rp.

245,556.33

Rp.

24,555.63

Untuk 1 m2 = 1/10 x ( a )

26.

10.0000 m2

MENGECAT KILAP KAYU MENGGOSOK DAN DEMPUL (2 kali)

1.5000 kg

Cat kilap kayu

a.Rp

63,537.50 Rp.

95,306.25

0.6667 ltr

Minyak cat

a.Rp

40,537.50 Rp.

27,025.00

0.5333 kg

Dempul

a.Rp

36,512.50 Rp.

19,473.33

2.5000 lbr

Kertas amplas

a.Rp

5,821.88 Rp.

14,554.69

2.4000 o/h

Tukang

a.Rp

100,000.00 Rp.

240,000.00

0.2400 o/h

Kepala tukang

a.Rp

120,000.00 Rp.

28,800.00

2.0000 o/h

Pekerja

a.Rp

80,000.00 Rp.

160,000.00

0.1000 o/h

Mandor

a.Rp

150,000.00 Rp.

15,000.00

( a ) Rp.

600,159.27

Rp.

60,015.93

31,912.50 Rp.

111,693.75

Untuk 1 m2 = 1/10 x ( a )
27.

10.0000 m2

MENGECAT DENGAN TER / RESIDU

3.5000 ltr

Ter / residu

a.Rp

1.0000 o/h

Pekerja

a.Rp

80,000.00 Rp.

80,000.00

0.0500 o/h

Mandor

a.Rp

150,000.00 Rp.

7,500.00

( a ) Rp.

199,193.75

Rp.

19,919.38

Untuk 1 m2 = 1/10 x ( a )
28.

29.

30.

31.

32.

33.

34.

1.0000 bh

PASANGAN KUNCI TANAM YALE

1.0000 set

Kunci tanam cap kuda terbang

a.Rp

103,571.88 Rp.

103,571.88

1.0000 o/h

Tukang

a.Rp

100,000.00 Rp.

100,000.00

Rp.

203,571.88

1.0000 bh

PASANGAN ENGSEL PINTU

1.0000 bh

Engsel pintu kuningan

a.Rp

31,696.88 Rp.

31,696.88

0.1000 o/h

Tukang

a.Rp

100,000.00 Rp.

10,000.00

Rp.

41,696.88

1.0000 bh

PASANGAN ENGSEL JENDELA

1.0000 bh

Engsel jendela kuningan

a.Rp

17,321.88 Rp.

17,321.88

0.1000 o/h

Tukang

a.Rp

100,000.00 Rp.

10,000.00

Rp.

27,321.88

1.0000 bh

PASANGAN HAK ANGIN

1.0000 bh

Hak angin

a.Rp

28,821.88 Rp.

28,821.88

0.0500 o/h

Tukang

a.Rp

100,000.00 Rp.

5,000.00

Rp.

33,821.88

1.0000 bh

PASANGAN GRENDEL

1.0000 bh

Grendel

a.Rp

31,696.88 Rp.

31,696.88

0.1000 o/h

Tukang

a.Rp

100,000.00 Rp.

10,000.00

Rp.

41,696.88

1.0000 ttk

PEMASANGAN LAMPU XL TANAM

1.0000 bh

Lampu XL 14 watt

a.Rp.

#N/A Rp.

1.0000 bh

Stand inbow

a.Rp.

25,000.00 Rp.

25,000.00

1.0000 set

Stand lampu XL

a.Rp.

15,000.00 Rp.

15,000.00

3.0000 m'

Kabel/pipa union

a.Rp.

32,431.06 Rp.

97,293.17

1.0000 o/h

Tukang

a.Rp.

100,000.00 Rp.

100,000.00

0.1000 o/h

Kepala tukang

a.Rp.

120,000.00 Rp.

12,000.00

1.0000 o/h

Pekerja

a.Rp.

80,000.00 Rp.

80,000.00

0.1500 o/h

Mandor

a.Rp.

150,000.00 Rp.

22,500.00

1.0000 ttk
1.0000 set

XL 14 Watt Tanam

Rp.

XL 14 Watt Biasa

Rp.

#N/A

#N/A
351,793.17

PEMASANGAN SEKERING
Sekering limit

a.Rp.

45,496.88 Rp.

45,496.88

Kabel/pipa union

a.Rp.

32,431.06 Rp.

324,310.58

1.5000 o/h

Tukang

a.Rp.

100,000.00 Rp.

150,000.00

0.1500 o/h

Kepala tukang

a.Rp.

120,000.00 Rp.

18,000.00

1.0000 o/h

Pekerja

a.Rp.

80,000.00 Rp.

80,000.00

0.1500 o/h

Mandor

a.Rp.

150,000.00 Rp.

22,500.00

10.0000 m'

640,307.45

35.

1.0000 ttk

PEMASANGAN STOP KONTAK

1.0000 bh

Stop kontak

a.Rp.

28,246.88 Rp.

28,246.88

3.0000 m'

Kabel/pipa union

a.Rp.

32,431.06 Rp.

97,293.17

0.2500 o/h

Pekerja

a.Rp.

80,000.00 Rp.

20,000.00
145,540.05

36.

1.0000 ttk

PEMASANGAN SAKLAR TUNGGAL

1.0000 bh

Saklar tunggal

a.Rp.

34,571.88 Rp.

34,571.88

0.2500 o/h

Pekerja

a.Rp.

80,000.00 Rp.

20,000.00
54,571.88

37.

1.0000 ttk

PEMASANGAN SAKLAR GANDA

1.0000 bh

Saklar ganda

a.Rp.

51,821.88 Rp.

51,821.88

0.2500 o/h

Pekerja

a.Rp.

80,000.00 Rp.

20,000.00
71,821.88

38.

39.

40.

41.

1.0000 bh

PEMASANGAN STOP KRAN

1.0000 bh

Stop kran

a.Rp

30,546.88 Rp.

30,546.88

0.1000 o/h

Tukang

a.Rp

100,000.00 Rp.

10,000.00

0.0100 o/h

Kepala Tukang

a.Rp

120,000.00 Rp.

1,200.00

Rp.

41,746.88
207,000.00

1.0000 bh

PEMASANGAN KLOSET JONGKOK

1.0000 bh

Kloset jongkok

a.Rp

207,000.00 Rp.

0.0500 zak

Semen

a.Rp

135,330.36 Rp.

6,766.52

0.0300 m3

Pasir pasangan

a.Rp

616,400.00 Rp.

18,492.00

1.0000 o/h

Tukang

a.Rp

100,000.00 Rp.

100,000.00

0.1000 o/h

Kepala tukang

a.Rp

120,000.00 Rp.

12,000.00

0.5000 o/h

Pekerja

a.Rp

80,000.00 Rp.

40,000.00

0.0400 o/h

Mandor

a.Rp

150,000.00 Rp.

6,000.00

Rp.

390,258.52

1.0000 bh

PEMASANGAN FLOOR DRAIN

1.0000 bh

Floor Drain Besi

a.Rp

31,620.00 Rp.

31,620.00

0.1000 o/h

Tukang

a.Rp

100,000.00 Rp.

10,000.00

0.0100 o/h

Kepala Tukang

a.Rp

120,000.00 Rp.

1,200.00

Rp.

42,820.00

1.0000 m2

PASANGAN TEGEL KERAMIK 40/40 UNTUK LANTAI K.M.

6.0000 bh

Tegel keramik 40/40 cm

a.Rp

19,182.92 Rp.

115,097.53

0.0230 m

Pasir pasangan

a.Rp

616,400.00 Rp.

14,177.20

0.1932 zak

Semen

a.Rp

135,330.36 Rp.

26,145.83

0.1300 o/h

Tukang

a.Rp

100,000.00 Rp.

13,000.00

0.0130 o/h

Kepala tukang

a.Rp

120,000.00 Rp.

1,560.00

0.2700 o/h

Pekerja

a.Rp

80,000.00 Rp.

21,600.00

0.0135 o/h

Mandor

a.Rp

150,000.00 Rp.

2,025.00

Rp.

193,605.56

0
0
0
0

0
0

ENGINEERING ESTIMETE (EE)

NO

URAIAN PEKERJAAN

I. PEKERJAAN PERSIAPAN
1 . Pekerjaan Penyiapan Lokasi
2 . Pengukuran / Pemasangan Bowplank
3 . Pelaporan dan Dokumentasi

VOLUME

JUMLAH
HARGA
(Rp.)

500,000.00
51,004.31
1,750,000.00

500,000.00
2,346,198.38
1,750,000.00
4,596,198.38

m3
m3
m3
m3

38,000.00
11,400.00
361,530.00
696,180.00

869,250.00
86,925.00
7,094,057.35
6,613,166.98
14,663,399.33

III. PEKERJAAN BATU/BETON


1 . Cor Pondasi 30/60/60 Beton 1pc : 2 psr : 3kr
2 . Sloof 15/20 Beton Bertulang 1pc : 2psr : 3kr
3 . Pek. Pondasi Rolag batu bata

16.47 m3
1.83 m3
2.04 m3

2,439,894.43
6,852,225.55
2,513,533.61

40,185,061.24
12,539,572.77
5,135,953.49
57,860,587.49

IV. PEKERJAAN DINDING DAN PLESTERAN


1 . Pas. Batu Merah 1pc : 4psr
2 . Pek. Plesteran 1pc : 4psr
3 . Pek. Acian Tembok

2.06 m3
72.12 m2
72.12 m2

2,513,533.61
72,114.64
6,438.91

5,180,392.76
5,200,907.48
464,374.10

II.
1
2
3
4

.
.
.
.

PEKERJAAN GALIAN DAN URUGAN


Pek. Galian Biasa
Pek. Urugan Kembali Galian Pondasi
Pek. Urugan Peninggian Lantai Dengan Tan
Pek. Urugan Pasir 5 cm

1.00 pkt
46.00 m'
1.00 ls

HARGA
SATUAN
(Rp.)

22.88
7.63
19.62
9.50

10,845,674.34
V.
PEKERJAAN LANTAI
1 . Pek. Cor Lantai 1pc : 3psr : 5krl tebal 7 cm
VI.
1
2
3
4
5
VII.
1
2
3
4
5
6

92.43 m2

200,328.53

.
.
.
.
.

PEKERJAAN RANGKA DINDING, KUSEN, PINTU DAN JENDELA


7,906,381.88
Pekerjaan rangka dinding dan ring balok
1.45 m3
Pek. Jalusi Pintu dan Jendela Kayu Klas I
355,416.38
21.00 m2
2
Pek. Jendela panel Kaca Ungkit
1,206,440.83
14.00 m
Pek. Pintu Panil Kayu Klas I
1,367,532.75
6.00 bh
1.00 m2
592,849.90
Pintu Panil Papan Lapis Formika (KM/WC)

.
.
.
.
.
.

PEKERJAAN ATAP
Pek. Kuda-kuda Kayu Klas II
Pek. Gording Kayu Klas II
Pek. Lisplank Papan Kayu Klas I
Pek. Zinc Allume Colour
Pek. Nok, Jurai dan talang
Pek. Plafond Tripleks dan Rangka
List Plafond 1.5/4 cm

1.31
1.08
88.00
158.61
6.00
120.44
151.34

m3
m3
m2
m2
m'
m2
m'

5,027,309.50
4,274,810.00
355,416.38
199,686.15
32,136.57
232,360.28

18,517,167.21
18,517,167.21
11,469,693.31
7,463,743.88
16,890,171.68
8,205,196.50
592,849.90
44,621,655.27
6,600,334.53
4,630,474.19
31,276,641.00
31,672,939.12
192,819.44
27,986,180.22
102,359,388.51

NO

URAIAN PEKERJAAN

VIII .
1 .
2 .
3 .
4 .
5 .

PEKERJAAN PENGGANTUNG DAN PENGUNCI


Pas. Kunci Tanam Yale 2x Putar
Pas. Engsel Jendela
Pas. Grendel
Pas. Hak Angin
Pas. Engsel Pintu

IX.
PEKERJAAN PENGECATAN
1 . Pek. Cat Dinding
2
3
4
5

X
1
2
3
4
5
6

VOLUME

.
.
.
.

Residu Rangka Plafond


Pek. Cat Plafond
Pek. Cat Dasar
Pek. Cat Kilap Kayu
Pek. Cat Ter/Residu

.
.
.
.
.

PEKERJAAN SANITAIR DAN AKHIR


Pas. Kloset Jongkok
Pas. Stop Kran
Bak Air / Fiberglass 1/4 m3
Floor Drain
Pembersihan Akhir
Septicktank Beton Dan Peresapan

HARGA
SATUAN
(Rp.)

JUMLAH
HARGA
(Rp.)

5.00
28.00
20.00
14.00
14.00

bh
bh
bh
bh
bh

203,571.88
27,321.88
41,696.88
33,821.88
41,696.88

1,017,859.38
765,012.50
833,937.60
473,506.25
583,756.25
3,674,071.98

72.12
86.48
119.36
86.60
100.83
179.71

m2

28,165.85

2,031,321.40

m2
m2
m2
m2

24,555.63
16,259.50
60,015.93
19,919.38

2,931,009.46
1,408,098.72
6,051,621.99
3,579,655.11
16,001,706.67

390,258.52
41,746.88
305,037.50
42,820.00
500,000.00

390,258.52
41,746.88
305,037.50
42,820.00
500,000.00

1.00
1.00
1.00
1.00
1.00
1.00

bh
bh
unit
bh
ls
unit

1,279,862.89

REKAPITULASI
I
II
III
IV
V
VI

.
.
.
.
.
.

VII
VIII
IX
X

.
.
.
.

PEKERJAAN PERSIAPAN
PEKERJAAN GALIAN DAN URUGAN
PEKERJAAN BATU/BETON
PEKERJAAN DINDING DAN PLESTERAN
PEKERJAAN LANTAI
PEKERJAAN KUSEN, DINDING PARTISI, PINTU
DAN JENDELA
PEKERJAAN ATAP
PEKERJAAN PENGGANTUNG DAN PENGUNCI
PEKERJAAN PENGECATAN
PEKERJAAN SANITAIR DAN AKHIR
JUMLAH
PPN 10%
TOTAL COST
DIBULATKAN

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

4,596,198.38
14,663,399.33
57,860,587.49
10,845,674.34
18,517,167.21
44,621,655.27

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

102,359,388.51
3,674,071.98
16,001,706.67
1,279,862.89
274,419,712.06
27,441,971.21
301,861,683.27
301,860,000.00