Analisa Aspal
Analisa Aspal
Analisa Aspal
Jenis Pekerjaan
: Lapisan ATB
Satuan Pembayaran : Ton
No.
URAIAN KEGIATAN
1
1
2
3
4
5
6
7
8
9
10
11
12
13
2
Mandor
Pekerja
Agregat Kasar
Agregat Halus
Filter
Aspal Curah
Sewa Asphatt Mixing Plant
Sewa Wheel Leader 10-15 HP
Sewa Dump Truck 8-10 m3
Sewa Asphatt Finisher
Sewa Todem Roller
Sewa Tire Roller
Sewa Alat Bantu
0.0613
0.4293
0.7028
0.5341
139.2000
157.0000
0.0613
0.0421
0.5429
0.0767
0.0476
0.0356
1.0000
8,571.43
4,571.43
175,200.00
173,880.00
1,350.00
7,300.00
3,800,000.00
482,502.02
65,000.00
856,725.00
223,436.00
226,360.00
1,000.00
2
Mandor
Pekerja
Agregat Kasar
Agregat Halus
Filter
Aspal Curah
Sewa Asphatt Mixing Plant
Sewa Wheel Leader 10-15 HP
Sewa Dump Truck 8-10 m3
Sewa Asphatt Finisher
Sewa Todem Roller
Sewa Tire Roller
Sewa Alat Bantu
0.0024
0.0241
0.0336
0.0149
4.8015
6.6150
0.0024
0.0016
0.0385
0.0030
0.0018
0.0025
1.0000
8,571.43
4,571.43
175,200.00
173,880.00
1,350.00
7,300.00
3,800,000.00
482,502.02
65,000.00
856,725.00
223,436.00
226,360.00
1,000.00
Jenis Pekerjaan
: Pengecatan Marka Jalan dengan Thermoplastic ( teb. 2mm)
Satuan Pembayaran : M2
No.
URAIAN KEGIATAN
SAT. KOEFFISIEN HARGA SATUAN
( Rp. )
1
2
3
4
5
1
2
3
4
5
6
7
8
Mandor
Operator
Pengemudi / sopir
Pekerja / buruh tak terampil
Thermoplastic
Glass beed
Cargo truck 5,0 ton
Road marking machine
Jam
Jam
Jam
Jam
kg
kg
jam
jam
0.0140
0.0140
0.0140
0.0275
2.8000
0.5000
0.0500
0.0500
8,571.43
5,000.00
5,000.00
4,571.43
27,000.00
40,000.00
109,814.52
41,600.00
Mandor
Pekerja Terampil
Aspal Curah
Minyak Tanah
Sewa Aspal Spatyer
Sewa Compresor
Sewa Dump Truck 8-10 m3
Jam
Jam
Kg
Ltr
Jam
Jam
Jam
0.0030
0.0201
0.8894
0.2530
0.0030
0.0063
0.0030
8,571.43
4,571.43
7,300.00
7,000.00
23,000.00
75,000.00
65,000.00
JUMLAH
( Rp. )
6=45
525.43
1,962.51
123,130.56
92,869.31
187,920.00
1,146,100.00
232,940.00
20,313.34
35,288.50
65,710.81
10,635.55
8,058.42
1,000.00
1,926,454.42
844,936.15
844,930.00
JUMLAH
( Rp. )
6=45
20.66
110.17
5,886.72
2,590.81
6,482.03
48,289.50
9,158.00
772.00
2,502.50
2,570.18
402.18
565.90
1,000.00
80,350.65
80,350.00
JUMLAH
( Rp. )
6=45
25.71
91.89
6,492.62
1,771.00
69.00
472.50
195.00
9,117.72
9,115.00
:
:
:
NO.
#REF!
#REF!
#REF!
URAIAN
3
4
5
6
7
SATUAN
HARGA SATUAN
m3
Rp
173,880.00
Rp
175,200.00
Rp
171,240.00
m3
Rp
164,400.00
Rp
131,894.00
Rp
171,240.00
kg
Rp
2,832.00
Aspal Curah
kg
Rp
7,300.00
Agregat Kasar
Rp
175,200.00
10
Agregat Halus
Rp
173,880.00
11
Filler
kg
Rp
1,350.00
12
kg
Rp
15,350.00
13
kg
Rp
12,500.00
14
m3
Rp
1,636,000.00
15
Paku
kg
Rp
11,040.00
16
Rp
114,000.00
17
Pasir Pasang
Rp
110,000.00
18
Minyak Tanah
lt
Rp
7,000.00
19
Set
Rp
1,000.00
20
jam
Rp
856,725.00
21
jam
Rp
23,000.00
22
jam
Rp
226,360.00
23
jam
Rp
223,436.00
24
jam
Rp
75,000.00
25
jam
Rp
65,000.00
26
jam
Rp
65,000.00
27
jam
Rp
270,000.00
28
jam
Rp
70,000.00
29
jam
Rp
80,000.00
30
jam
Rp
3,800,000.00
31
jam
Rp
135,000.00
32
jam
Rp
235,950.00
33
jam
Rp
482,502.02
34
jam
Rp
50,000.00
35
Rp
9,200.00
36
Thermoplastic
Kg
Rp
27,000.00
37
Glass beed
Kg
Rp
40,000.00
38
Jam
Rp
41,600.00
39
Gedeg Guling
Rp
29,500.00
40
Jam
Rp
109,814.52
41
Bh
Rp
19,250.00
42
Bh
Rp
24,050.00
43
Bh
Rp
950.00
44
Bh
Rp
1,200.00
45
Bh
Rp
4,000.00
46
Bh
Rp
5,000.00
47
Batu Bata
Bh
Rp
300.00
48
Btg
Rp
15,500.00
:
:
:
NO.
#REF!
#REF!
#REF!
URAIAN
49
50
51
SATUAN
HARGA SATUAN
Btg
Rp
21,600.00
Rp
40,600.00
Pasir Cor
Rp
115,000.00
52
Zak
Rp
56,000.00
53
Pasir Urug
m3
Rp
94,400.00
54
Tasirtu
Rp
87,850.00
55
Jam
Rp
150,000.00
:
:
:
NO.
#REF!
#REF!
#REF!
URAIAN
SATUAN
HARGA SATUAN
Mandor
Orang Hari
Rp
60,000.00
Pekerja Terampil
Orang Hari
Rp
35,000.00
Orang Hari
Rp
32,000.00
Operator
Orang Hari
Rp
35,000.00
Pembantu Operator
Orang Hari
Rp
32,000.00
Orang Hari
Rp
35,000.00
Sopir
Orang Hari
Rp
35,000.00
Pembantu Sopir
Orang Hari
Rp
32,000.00
Orang Hari
Rp
50,000.00
10
Tukang batu
Orang Hari
Rp
40,000.00
11
Orang Hari
Rp
50,000.00
12
Tukang Besi
Orang Hari
Rp
35,000.00
13
Orang Hari
Rp
50,000.00
14
Tukang kayu
Orang Hari
Rp
40,000.00
15
Masinis
Orang Hari
Rp
40,000.00
16
Pembantu masinis
Orang Hari
Rp
30,000.00