LEMBAR PENGESAHAN

Kajian Teknis Pengolahan Feldspar di PT. La


Tahzan Quarry, Kabupaten Sanggau, Kalimantan
Barat
1. Judul Makalah
:

2. Pemakalah
a. Nama Lengkap
b. NIM
c. Jurusan
d. Universitas

: Hasbi Trihatmanto
: 1309055043
: S1 Teknik Pertambangan
: Universitas Mulawarman
e. Alamat Rumah dan No. HP : Jl. Pramuka 6 Komp.
P&K Blok D
No. 09 Samarinda, 085299405083
: hasbitrihat@gmail.com

f. Alamat Email

3. Dosen Pembimbing
a. Nama Lengkap dan Gelar : Windhu Nugroho, S.T., M.T.
b. NIP
: 19721111 200012 1 001
c. Alamat Rumah dan No. HP : Perum Borneo Mukti 1, Blok K, RT. 64, No.
09, Kec. Sungai Pinang, Samarinda,
0811217178

Samarinda, 24 Juni 2016


Menyetujui,
Dosen Pembimbing

Pemakalah

(Windhu Nugroho, S.T., M.T.)


NIP. 19721111 200012 1 001

(Hasbi Trihatmanto)
NIM. 1309055043

Mengetahui,
Ketua Program Studi S1 Teknik Pertambangan
Fakultas Teknik Universitas Mulawarman

(Dr. Shalaho Dina Devy, S.T., M.Eng.)


NIP. 19751217 200501 1 005

LEMBAR PERNYATAAN
Yang bertanda tangan di bawah ini;
Nama Pemakalah

: Hasbi Trihatmanto

Tempat, Tanggal Lahir

: Lupia, 08 Mei 1995

Jurusan/Fakultas

: S1 Teknik Pertambangan/Fakultas Teknik

Universitas

: Universitas Mulawarman

Dengan ini menyatakan bahwa makalah dengan judul,


KAJIAN TEKNIS PENGOLAHAN FELDSPAR DI PT. LA TAHZAN QUARRY,
KABUPATEN SANGGAU, KALIMANTAN BARAT
Adalah benar-benar hasil karya sendiri dan bukan merupakan plagiat atau saduran dari karya
tulis orang lain. Apabila dikemudian hari pernyataan ini tidak benar maka saya bersedia
menerima sanksi yang ditetapkan oleh panitia SPC TPT XXV PERHAPI berupa diskualifikasi
dari kompetisi. Demikian surat ini dibuat dengan sebeanr-benarnya, untuk dapat dipergunakan
sebagaimana mestinya.
Samarinda, 24 Juni 2016
Pemakalah

(Hasbi Trihatmanto)
NIM.1309055043

KATA PENGANTAR
Puji syukur kepada Allah SWT. Tuhan Yang Maha Esa, Tuhan Yang Maha Pengasih yang
tidak pernah pilih terhadap hamba-Nya. Sehingga, penulis dapat menyelesaikan makalah
dengan judul Kajian Teknis Pengolahan Feldspar di PT. La Tahzan Quarry, Kabupaten
Sanggau, Kalimantan Barat.
Dalam menyelesaikan makalah ini banyak pihak yang telah memberikan bantuan,
bimbingan, motivasi dan arahan serta nasihat kepada penulis. Oleh karena itu penulis
mengucapkan terima kasih kepada:
1. Bapak Windhu Nugroho, S.T., M.T.. Selaku dosen pembimbing yang telah berkenan
memberikan petunjuk, bimbingan, dorongan dan nasihat dengan penuh keikhlasan
dan kesabaran dalam penulisan makalah ini.
2. Bapak dan Ibu dosen Fakultas Teknik yang telah memberikan arahan dan motivasi
dalam penulisan makalah ini.
3. Orang tua penulis yang dengan untaian doa yang tidak pernah terputus hingga dalam
penulisan makalah ini berjalan dengan baik.
4. Rekan-rekan mahasiswa Fakultas Teknik yang telah memberikan bantuan, arahan, dan
semangat dalam penulisan makalah ini.
Sebesar

apapun

kemampuan

yang

penulis curahkan

tidak

akan

bisa menutupi

kekurangan dan keterbatasan dari makalah ini. Oleh karena itu, segala kritik

yang

membangun dan saran yang bermanfaat selalu penulis harapkan dengan senang hati
agar makalah ini lebih bermanfaat bagi pembaca umumnya dan bagi penulis khususnya.
Samarinda, 24 Juni 2016
Penulis

DAFTAR ISI

halaman

LEMBAR PENGESAHAN ................................................................................................... i


LEMBAR PERNYATAAN.................................................................................................... ii
KATA PENGANTAR ............................................................................................................ iii
DAFTAR ISI .......................................................................................................................... iv
DAFTAR GAMBAR ............................................................................................................. vi
DAFTAR TABEL...................................................................................................................vii
ABSTRAK ............................................................................................................................viii
DAFTAR PUSTAKA ............................................................................................................. ix
LAMPIRAN............................................................................................................................ x
RIWAYAT HIDUP................................................................................................................ xiv
BAB I
1.1
1.2
1.3
1.4
1.5
1.5.1
1.5.2
1.6

PENDAHULUAN ................................................................................................. 1
Latar Belakang ........................................................................................................
Tujuan .....................................................................................................................
Batasan Masalah......................................................................................................
Lokasi Penambangan ..............................................................................................
Pelaksanaan Studi ...................................................................................................
Pemrakarsa ..............................................................................................................
Penyusun .................................................................................................................
Jadwal Studi ............................................................................................................

1
1
1
2
2
2
2
2

BAB II

DIAGRAM ALIR DAN MATERIAL BALANCE ............................................... 4

2.1

Stockpile................................................................................................................... 4

2.2

Hopper .................................................................................................................... 5

2.3

Vibrating Feeder...................................................................................................... 6

2.4

Jaw Crusher ............................................................................................................ 6

2.5

Impact Crusher ....................................................................................................... 7

2.6

Vibrating Screen ...................................................................................................... 7

2.7

Dimensi Sump ......................................................................................................... 8

BAB III DASAR PEMILIHAN ALAT ............................................................................... 9


BAB IV PENUTUP ............................................................................................................ 10
4.1 Kesimpulan ........................................................................................................... 10

4.2

Saran ................................................................................................................. 10

DAFTAR GAMBAR
halaman

Gambar 2.1 Diagram Alir Pengolahan Feldspar ..................................................................... 4


Gambar 2.2 Material Balance Pengolahan Feldspar ............................................................... 4

Gambar 2.3 Desain Stockpile .................................................................................................. 5


Gambar 2.4 Hopper.................................................................................................................. 5
Gambar 2.5 Vibrating Feeder .................................................................................................. 6
Gambar 2.6 Jaw Crusher ......................................................................................................... 6
Gambar 2.7 Impact Crusher .................................................................................................... 7
Gambar 2.8 Vibrating Screen .................................................................................................. 8
Gambar 2.9 Dimensi Sump ...................................................................................................... 8

DAFTAR TABEL
halaman

Tabel 2.1 Conical Stockpile Volumes ....................................................................................... 5

KAJIAN TEKNIS
PENGOLAHAN FELDSPAR DI PT. LA TAHZAN QUARRY
KABUPATEN SANGGAU, KALIMANTAN BARAT
Hasbi Trihatmanto
Universitas Mulawarman
Kampus Gunung Kelua, Jalan Sambaliung Nomor 9 Samarinda, kode pos : 75119

ABSTRAK
Indonesia adalah negara yang kaya akan sumber daya alam, salah satunya kaya akan feldspar.
Di Indonesia, potensi endapan feldspar tersebar hampir di seluruh daerah dengan bentuk
endapan berbeda dari satu daerah dengan daerah yang lain tergantung jenis endapan, primer
atau sekunder. Dari data Direktorat Inventarisasi Sumberdaya Mineral pada tahun 2015
menunjukkan cadangan nasional Indonesia bahan galian feldspar memiliki cadangan terukur
(proved), tereka (probable) dan terindikasi (possible) masing-masing sebesar 271.693 ribu
ton, 11.728 ribu ton dan 56.561 ribu ton. Salah satu daerah yang memiliki potensi kandungan
feldspar adalah kabupaten Sanggau, Kalimantan Barat.
Kegiatan eksplorasi feldspar meliputi studi kelayakan, pelaksanaannya dimulai pada bulan
Agustus 2015, melakukan penyesuaian data hasil studi kelayakan direncanakan dengan
penyusunan dibuat selama 5 (lima) bulan kalender (20 minggu kerja). Studi kelayakan dapat
dihasilkan sumberdaya dan cadangan berharga feldspar, dari data pemboran penyebaran
feldspar lebih terperinci sehingga dapat dievaluasi lebih detail, pemilihan metode-metode
penambangan, evaluasi umur tambang, evaluasi perhitungan stripping ratio, evaluasi
pemakaian alat berat, penentuan lokasi sarana dan prasarana pelabuhan, pemantauan harga
feldspar, pemantauan permintaan konsumen, studi investasi, analisa kelayakan penambangan,
pembuatan cash flow hingga pembuatan laporan dan paparan.
Pengolahan feldspar di PT. La Tahzan Quarry dilakukan dengan menggunakan dua jenis
crusher, yaitu jaw crusher sebagai primary crusher dan impact crusher sebagai secondary
crusher. Dilakukan dua kali penggerusan untuk memperoleh ukuran produk yang sesuai
dengan kebutuhan industri kaca, yaitu -12 mm. Dalam dasar pemilihan alat dari data-data
yang didapat, kemudian diolah sehingga dapat dibuat material balancenya dan pemilihan
spesifikasi alatnya yang sesuai, sehingga nantinya dapat tercapai target produksi yang
diinginkan.
Dari proses kajian teknis pengolahan feldspar yang dilakukan, maka diperoleh jumlah jam
kerja per hari adalah 20 jam/hari (6.848 jam/tahun, 570 jam/bulan) dengan 2 shift kerja per
hari, jumlah produksi sebesar 2.780 ton/hari (1.000.000 ton/tahun, 83.334 ton/bulan) dengan
target produksi 139 ton/jam dan cadangan mineral feldspar yang dimiliki sebanyak 1.000.000
BCM.
Kata Kunci : Kajian Teknis, Material Balance, Pengolahan Feldspar, Target Produksi

DAFTAR PUSTAKA
1. Mithondo, Aston. 2004. Product Knowledge Komatsu Basic Kompetency I PT. United
Tractors Tbk.. Training Centre Department: Jakarta.

2. Mithondo, Aston. 2004. Product Knowledge Komatsu Basic Kompetency II PT. United
Tractors Tbk.. Training Centre Department: Jakarta.
3. Nordberg. 1976. Conveyor Units. Australian Trucks : Australia.
4. Projosumarto, Partanto. 1998. Pengolahan Bahan Galian dan Metalurgi. ITB Press :
Bandung.

5. Sunandar. 2015. Penyebaran Bahan Galian Industri di Indonesia. Direktorat Inventarisasi


Sumberdaya Mineral Kementrian Energi dan Sumber Daya Mineral : Jakarta.
6. Susimah, Bonita Intan. 2010. Bahan Galian Industri. Universitas Trisakti Press : Jakarta.