DAFTAR HARGA MATERIAL

NO

JENIS BAHAN

SATUAN

HARGA (Rp.)

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17

Kayu Albasia (Balok/Rucuk)


Kayu Albasia Papan
Triplek 4 mm, 120 x 240 cm
Paku 4 - 7 cm
Semen PC 50 Kg
Semen PC
Karosene/Minyak Tanah
Hotmix AC-WC
Agregat Klas A
Agregat Klas B
Aspal Panas (Ex Cilacap ) Curah
Batu Belah/Batu Kali
Pasir Pasang
Pasir Urug
Asbes Gelombang Kecil (180 cm x 105 cm x 4 mm)
Pipa PVC 1"
Pipa PVC 1"

m3
m3
lbr
kg
Zak
kg
Ltr
Ton
m3
m3
Kg
m3
m3
m3
lbr
btg
m

DAFTAR HARGA UPAH


NO

JENIS PEKERJA

SATUAN

HARGA (Rp.)

1
2
3
4
5
6
7

Pekerja
Pekerja
Tukang Tebas
Tukang Tebas
Tukang Kayu
Tukang Kayu
Tukang Batu
Tukang Batu
Tukang Besi
Tukang Besi
Kepala Tukang
Kepala Tukang
Mandor
Mandor

Org/Hari
Jam
Org/Hari
Jam
Org/Hari
Jam
Org/Hari
Jam
Org/Hari
Jam
Org/Hari
Jam
Org/Hari
Jam

DAFTAR HARGA SEWA ALAT


NO

JENIS ALAT

SATUAN

HARGA (Rp.)

1
2
3
4
5
6
7
8

Alat Bantu
Water Tanker
Tandem Roller
P.Tyre Roller Combinasi 6-8 Ton
Asphalt Sprayer 800 Lt
Compressor 4.000 - 6.500 L/M Kap. 5.000 L
Dump Truck 125 HP, Kap. 10 Ton
Pengaduk Beton (Molen)

Ls
Jam
Jam
Jam
Jam
Jam
Jam
Sewa/Hari

DAFTAR ANALISA HARGA SATUAN


A.

1 M2 LOS KERJA/GUDANG

No.
1

KOMPONEN
BAHAN
Pasir Pasang
Semen 50 Kg
Kayu Albasia (Balok/Rucuk)
Paku 4 - 7 cm
Asbes Gelombang Kecil (180 cm x 105 cm x 4 mm)
Triplex uk.120 x 240 cm, 4 mm
TENAGA KERJA
Pekerja
Tukang Batu
Kepala Tukang
Mandor

B.

1 M2 PEK. PEMBERSIHAN LOKASI DAN PERATAAN

No.

KOMPONEN

C.
No.
1
2

TENAGA KERJA
Pekerja
Tukang Tebas
Mandor
PERALATAN
Alat Bantu

KOEFISIEN SATUAN
0,1000
0,5200
0,0500
0,2500
0,3000
0,6000

HARGA
SATUAN (Rp.)

M3
zak
M3
Kg
Lbr
Lbr

1,2000 Org/Hr
0,4000 Org/Hr
0,0400 Org/Hr
0,0500 Org/Hr
JUMLAH
KEUNTUNGAN MAX. 10%
TOTAL
DIBULATKAN

KOEFISIEN SATUAN
0,0090
0,0030
0,0010

JUMLAH
HARGA (Rp.)

HARGA
SATUAN (Rp.)

Org/Hr
Org/Hr
Org/Hr

1,0000
Ls
JUMLAH
KEUNTUNGAN MAX. 10 %
TOTAL
DIBULATKAN

JUMLAH
HARGA (Rp.)

1 M' PEK. PENGUKURAN DAN PEMATOKAN


KOMPONEN
BAHAN
Kayu Albasia (Balok/Rucuk)
TENAGA KERJA
Pekerja
Tukang Kayu
Mandor

KOEFISIEN SATUAN
0,0120

HARGA
SATUAN (Rp.)

M3

0,1000
Org/Hr
0,1000
Org/Hr
0,0050
Org/Hr
JUMLAH
KEUNTUNGAN MAX. 10 %
TOTAL
DIBULATKAN

JUMLAH
HARGA (Rp.)

D.
No.
1
2

E.
No.
1
2

F.
No.
1

1 M3 LEVELING AGREGAT KLAS A


KOMPONEN
BAHAN
Agregat Klas A
TENAGA KERJA
Pekerja
Mandor
PERALATAN
Dump Truck 125 HP, Kap. 10 Ton
Water Tanker
Tandem Roller

KOEFISIEN SATUAN

HARGA
SATUAN (Rp.)

JUMLAH
HARGA (Rp.)

1,2586

m3

0,0496
0,0071

Jam
Jam

0,5022
Jam
0,0141
Jam
0,0134
Jam
JUMLAH
KEUNTUNGAN MAX. 10%
TOTAL
DIBULATKAN

1 M3 LEVELING AGREGAT KLAS B


KOMPONEN
BAHAN
Agregat Klas B
TENAGA KERJA
Pekerja
Mandor
PERALATAN
Dump Truck 125 HP, Kap. 10 Ton
Water Tanker
Tandem Roller

KOEFISIEN SATUAN

HARGA
SATUAN (Rp.)

JUMLAH
HARGA (Rp.)

1,2586

m3

0,0496
0,0071

Jam
Jam

0,5022
Jam
0,0141
Jam
0,0134
Jam
JUMLAH
KEUNTUNGAN MAX. 10%
TOTAL
DIBULATKAN

1 L LAPIS RESAP PENGIKAT (PRIME COAT)


KOMPONEN
BAHAN
Karosene/Minyak Tanah
Aspal Panas (Ex Cilacap ) Curah
TENAGA KERJA
Pekerja
Mandor
PERALATAN
Compressor 4.000 - 6.500 L/M Kap. 5.000 L
Asphalt Sprayer 800 Lt

KOEFISIEN SATUAN

HARGA
SATUAN (Rp.)

JUMLAH
HARGA (Rp.)

0,4889
0,6294

Ltr
Kg

0,03010
0,00600

Jam
Jam

0,00310
Jam
0,00300
Jam
JUMLAH
KEUNTUNGAN MAX. 10%
TOTAL
DIBULATKAN

G.
No.
1
2

1 M2 LAPIS HOTMIX AC-WC T= 4 cm PADAT RATA-RATA (PABRIKASI)


KOMPONEN
BAHAN
Hotmix AC-WC
TENAGA KERJA
Pekerja
Mandor
PERALATAN
P.Tyre Roller Combinasi 6-8 Ton
Alat Bantu

KOEFISIEN SATUAN

HARGA
SATUAN (Rp.)

JUMLAH
HARGA (Rp.)

0,0960

Ton

0,0217
0,0022

Jam
Jam

0,0023
Jam
1,0000
Ls
JUMLAH
KEUNTUNGAN MAX. 10%
TOTAL
DIBULATKAN

H.

1 M3 PASANGAN BATU KALI 1 PC : 4 PP

No.
1

KOMPONEN
BAHAN
Batu Belah/ Batu Kali
Semen PC 50 Kg
Pasir Pasang
TENAGA KERJA
Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
PERALATAN
Molen

I.

1 M2 PLESTERAN 1 PC : 4 PP, T = 15 MM TIPE N

No.

KOMPONEN

J.

BAHAN
Semen PC 50 Kg
Pasir Pasang
TENAGA KERJA
Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor

K.

2,703
0,900
0,090
0,135

m3
kg
m3

Org/Hr
Org/Hr
Org/Hr
Org/Hr

0,167 Sewa/Hari
TOTAL
KEUNTUNGAN MAX. 10%
TOTAL HARGA
DIBULATKAN

KOEFISIEN SATUAN

6,2800
0,0240

JUMLAH
HARGA (Rp.)
-

HARGA
SATUAN (Rp.)

kg
m3

0,3840 Org/Hr
0,1900 Org/Hr
0,0190 Org/Hr
0,0190 Org/Hr
TOTAL
KEUNTUNGAN MAX. 10%
TOTAL HARGA
DIBULATKAN

KOMPONEN
TENAGA KERJA
Pekerja
Mandor

JUMLAH
HARGA (Rp.)
-

KOEFISIEN SATUAN

HARGA
SATUAN (Rp.)

0,5630 Org/Hr
0,0190 Org/Hr
JUMLAH
KEUNTUNGAN MAX. 10 %
TOTAL
DIBULATKAN

0,00
0,00

JUMLAH
HARGA (Rp.)
-

1 M' PEK. PEMASANGAN PIPA SULINGAN DIA 1 "

No.
1

1,20
163,00
0,52

HARGA
SATUAN (Rp.)

1 M3 GALIAN TANAH BIASA SEDALAM 1 M (MANUAL)

No.
1

KOEFISIEN SATUAN

KOMPONEN
BAHAN
Pipa PVC 1"
TENAGA KERJA
Pekerja
Mandor
PERALATAN
Alat Bantu

KOEFISIEN SATUAN

HARGA
SATUAN
(Rp.)

JUMLAH
HARGA
(Rp.)

1,0100

M'

0,0640
0,0320

Jam
Jam

0,0100
Ls
JUMLAH
KEUNTUNGAN MAX. 10 %
TOTAL
DIBULATKAN

L.

1 M3 MENGURUG DENGAN URUGAN PASIR

No.
1
2

KOMPONEN
BAHAN
Pasir Urug
TENAGA KERJA
Pekerja
Mandor

KOEFISIEN SATUAN

1,2000

HARGA
SATUAN (Rp.)

M3

0,3000
Org/Hr
0,0100
Org/Hr
JUMLAH
KEUNTUNGAN MAX. 10 %
TOTAL
DIBULATKAN

JUMLAH
HARGA (Rp.)

RENCANA ANGGARAN BIAYA


DAFTAR KUANTITAS DAN HARGA SATUAN

Nama Satuan Kerja


:
Nama Pelaksana Kegiatan :
Pekerjaan
:
Lokasi
:

Tahun Anggaran

Pengembangan Kawasan Permukiman Provinsi Banten


Pengembangan Kawasan Permukiman 2
Pembangunan Infrastruktur Pisew Kawasan Kecamatan Koroncong, Kabupaten Pandeglang
Desa Pasir Karag - Bangkonol, Kec. Koroncong, Kab. Pandeglang
- Konstruksi Hotmix Manual, Panjang = 1.963 m; Lebar = 2.5 m
- Pembuatan Drainase,(P = 288 m'; L = 0.3 m ; T = 0.8 m)
: 2016

No

URAIAN PEKERJAAN

SATUAN VOLUME
3

HARGA SATUAN

JUMLAH HARGA

( Rp. )

( Rp. )

A.

PEK. JALAN POROS LAPIS HOTMIX MANUAL

Pembuatan Los Kerja/Gudang

m2

12,00

Mobilisasi/Demobilisasi

Ls

1,00

Pekerjaan Pembersihan Lokasi / Perataan Tanah

m2

4.907,50

Pek. Pengukuran dan Pematokan

m'

196,30

Leveling Agregat Klas. A t = 5 cm

m3

241,63

Leveling Agregat Klas. B t = 10 cm

m3

44,81

Lapis Resap Pengikat (Prime Coat) 1 l / m2

m2

4.907,50

Lapis Hotmix AC-WC, t : 4 cm (Digelar Manual)

m2

4.907,50

SUB TOTAL A

PEKERJAAN PEMBUATAN DRAINASE

Pek. Pengukuran dan Pematokan

m'

28,80

Galian Tanah Biasa 0 - 1 Meter

m3

138,24

Pek. Pasangan Batu Kali 1PC : 4PP

m3

138,24

Pek. Plesteran Dinding 1PC : 4PP t = 15 mm

m2

230,40

SUB TOTAL C

Jumlah Sub Total A+B+C

PPN 10 %

Total

Total Dibulatkan

Terbilang :

REKAPITULASI
DAFTAR KUANTITAS DAN HARGA SATUAN
( OWNER ESTIMATE )
Nama Satuan Kerja
Nama Pelaksana Kegiatan
Pekerjaan
Lokasi

Tahun Anggaran

NO

:
:
:
:

Pengembangan Kawasan Permukiman Provinsi Banten


Pengembangan Kawasan Permukiman 2
Pembangunan Infrastruktur Pisew Kawasan Kecamatan Koroncong, Kabupaten Pandeglang
Desa Pasir Karag - Bangkonol, Kec. Koroncong, Kab. Pandeglang
- Konstruksi Hotmix Manual, Panjang = 1.963 m; Lebar = 2.5 m
- Pembuatan Drainase,(P = 288 m'; L = 0.3 m ; T = 0.8 m)
: 2016

URAIAN PEKERJAAN

JUMLAH HARGA

PEK. JALAN POROS LAPIS HOTMIX MANUAL

PEKERJAAN PEMBUATAN DRAINASE

Sub Total A

PPN 10 %

Total

Total Dibulatkan

Terbilang :

, . 2016
CV

..
DIREKTUR