NO
JENIS
SATUAN
HARGA
(Rp)
I
1
HARGA UPAH
Pekerja
OH
70,000.00
Tukang Kayu
OH
90,000.00
3
4
Tukang Batu
Tukang Besi
OH
OH
90,000.00
90,000.00
5
6
Tukang Listrik
Tukang Cat
OH
OH
90,000.00
90,000.00
Tukang Aluminium
OH
90,000.00
8
9
Kepala Tukang
Mandor
OH
OH
100,000.00
100,000.00
SATUAN
Mengetahui,
Direktur
Rumah Sakit Jiwa Sambang Lihum
HARGA
(Rp)
JENIS
SATUAN
HARGA
(Rp)
SATUAN
HARGA
(Rp)
II
HARGA BAHAN
m3
1,400,000.00
2
3
m3
m3
1,760,000.00
54,000.00
4
5
Pasir Pasang
Pasir Beton
m3
m3
91,200.00
160,000.00
kg
114.29
m3
224,000.00
kg
165.93
7
8
Semen Portlan
Besi beton (polos/ulir)
zak
kg
52,000.00
8,800.00
kg
1,040.00
kg
liter
12,000.00
20.00
9 Kawat bindrat
10 Air
11 Paku 5 cm 12 cm
kg
13,600.00
12 Minyak bekisting
13 Galam dolken P 4 M
liter
batang
3,600.00
4,000.00
m1
1,000.00
14 Galam pancangan P 4 M
15 Rangka metal hollow 4 x 4
batang
bt
12,000.00
13,600.00
m1
m1
4,000.00
3,400.00
bt
9,600.00
m1
2,400.00
17 Bata merah
18 Keramik 40 x 40 (polish)
bh
m2
440.00
48,000.00
bh
4,320.43
kg
lembar
5,200.00
56,000.00
m2
19,444.44
kotak
m1
bt
56,000.00
20,000.00
12,000.00
bj
56.00
m1
3,000.00
m1
2,960.00
m1
1,600.00
19 Semen Warna
20 Gypsum board 9 mm
21 Paku skrup
22 List gypsum
23 Lis kayu meranti
24 Paku ulin
25 Kayu Kelas I (Ulin)
26 Kunci tanam 2 slak
kg
m3
bh
16,000.00
4,000,000.00
144,000.00
27
28
29
30
31
Engsel pintu
Engsel kupu-kupu
Kait angin
Kunci slot Pintu
Kunci slot Jendela
bh
bh
bh
bh
bh
12,000.00
8,000.00
9,600.00
12,000.00
8,000.00
32
33
34
35
36
Sealant
Cat menie
Plamuur
Cat kayu dasar
Cat kayu penutup
kg
kg
kg
kg
kg
28,000.00
20,800.00
17,600.00
22,400.00
36,000.00
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
Kuas
Minyak Cat
Ampelas
Cat tembok dasar
Cat tembok penutup interior
Cat tembok penutup eksterior
Kabel NYA 2,5 mm
Lampu 14 watt
Viting
MCB 6A
Bok MCB
Inbow dos
T dos
Stop Kontak
Saklar ganda
Pipa listrik
Keni listrik
Plester listrik
Kaca Bening Tebal 5 mm
bh
liter
lembar
kg
kg
kg
roll
bh
bh
bh
bh
bh
bh
bh
bh
bt
bh
bh
m1
12,000.00
17,600.00
4,800.00
15,040.00
13,600.00
14,400.00
148,000.00
27,200.00
12,000.00
48,000.00
40,000.00
960.00
960.00
8,000.00
12,000.00
6,400.00
400.00
4,800.00
100,000.00
JENIS
SATUAN
HARGA
(Rp)
SATUAN
HARGA
(Rp)
56 Hendel jendela
bh
8,000.00
57 Kalsiboard
lbr
48,000.00
m2
16,666.67
58 Kalsiplang 8 x 20
59 Kalsiplang 8 x 10
lbr
lbr
48,000.00
32,000.00
m1
m1
12,000.00
8,000.00
60 Lem Kayu
61 Pintu panil kayu kelas I (Ulin) pabrikasi ukuran 5 x 70 x 210
kg
bh
10,000.00
600,000.00
bh
148,000.00
bh
bh
74,000.00
5,600.00
65 Andang / skalfolding
66 Pas. Rangka kap atap Zincalum/Baja ringan + Atap genteng metal + Pemuung
m2
m2
38,800.00
160,000.00
m2
6,000.00
68 Pemasangan Bouwplank
69 Papan Informasi Kegiatan
m1
ls
20,000.00
120,000.00
Mengetahui,
Direktur
Rumah Sakit Jiwa Sambang Lihum
No
A
Uraian
TENAGA
Pekerja
Mandor
Jumlah (A+B+C)
Overhead & Profit (8%)
Harga Satuan Pekerjaan (D+E)
A.R.23
Pemasangan 1 Bt galam P 4 M
No
L.01
L.04
OH
OH
Koefisien
Harga Satuan
(Rp)
0.7500
70,000.00
0.0250
100,000.00
JUMLAH TENAGA KERJA
Jumlah Harga
(Rp)
52,500.00
2,500.00
55,000.00
PERALATAN
E
F
Satuan
BAHAN
Kode
55,000.00
Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
5% x D
Harga Satuan
(Rp)
Jumlah Harga
(Rp)
Kode
Satuan
L.01
L.02
L.03
L.04
OH
OH
OH
OH
0.0429
70,000.00
0.0214
90,000.00
0.0021
100,000.00
0.0021
100,000.00
JUMLAH TENAGA KERJA
3,000.00
1,928.57
214.29
214.29
5,357.14
Batang
1.0000
12,000.00
JUMLAH HARGA BAHAN
12,000.00
12,000.00
BAHAN
Galam P 4 meter
Koefisien
2,750.00
57,750.00
PERALATAN
-
Jumlah (A+B+C)
E
F
A.2.3.1.11.
867.86
18,225.00
No
A
17,357.14
5% x D
Uraian
TENAGA
Pekerja
Mandor
BAHAN
Pasir urug
Koefisien
Harga Satuan
(Rp)
Jumlah Harga
(Rp)
Kode
Satuan
L.01
L.04
OH
OH
0.3000
70,000.00
0.0100
100,000.00
JUMLAH TENAGA KERJA
21,000.00
1,000.00
22,000.00
M3
1.2000
54,000.00
JUMLAH HARGA BAHAN
64,800.00
64,800.00
PERALATAN
JUMLAH HARGA ALAT
Jumlah (A+B+C)
E
F
86,800.00
5% x D
4,340.00
91,140.00
Membuat 1 M3 lantai kerja beton mutu fc = 7,4 MPa (K 100), slump (3-6) cm, w/c = 0,87
No
A
Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Jumlah Harga
(Rp)
Satuan
L.01
L.02
L.03
L.04
OH
OH
OH
OH
1.2000
70,000.00
0.2000
90,000.00
0.0200
100,000.00
0.0600
100,000.00
JUMLAH TENAGA KERJA
84,000.00
18,000.00
2,000.00
6,000.00
110,000.00
Kg
Kg
Kg
Liter
230.0000
1,040.00
893.0000
114.29
1,027.0000
165.93
200.0000
20.00
JUMLAH HARGA BAHAN
239,200.00
102,057.14
170,405.93
4,000.00
515,663.07
BAHAN
Semen Portland
Pasir Beton
Kerikil (Maks 30mm)
Air
Koefisien
Harga Satuan
(Rp)
Kode
PERALATAN
-
Jumlah (A+B+C)
E
F
A.4.1.1.7.
31,283.15
656,946.22
Membuat 1 M3 beton mutu fc = 19,3 MPa (K 225), slump (12 2) cm, w/c = 0,58
No
A
625,663.07
5% x D
Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Jumlah Harga
(Rp)
Satuan
L.01
L.02
L.03
L.04
OH
OH
OH
OH
1.6500
70,000.00
0.2750
90,000.00
0.0280
100,000.00
0.0830
100,000.00
JUMLAH TENAGA KERJA
115,500.00
24,750.00
2,800.00
8,300.00
151,350.00
Kg
Kg
Kg
Liter
371.0000
1,040.00
698.0000
114.29
1,047.0000
165.93
215.0000
20.00
JUMLAH HARGA BAHAN
385,840.00
79,771.43
173,724.44
4,300.00
643,635.87
BAHAN
Semen Portland
Pasir Beton
Kerikil (Maks 30mm)
Air
Koefisien
Harga Satuan
(Rp)
Kode
PERALATAN
-
Jumlah (A+B+C)
E
F
A.4.1.1.17.
39,749.29
834,735.17
No
A
794,985.87
5% x D
Uraian
TENAGA
Pekerja
Tukang Besi
Kepala Tukang
Mandor
BAHAN
Besi beton (polos/ulir)
Kawat beton
Koefisien
Harga Satuan
(Rp)
Jumlah Harga
(Rp)
Kode
Satuan
L.01
L.02
L.03
L.04
OH
OH
OH
OH
0.0700
70,000.00
0.0700
90,000.00
0.0070
100,000.00
0.0040
100,000.00
JUMLAH TENAGA KERJA
4,900.00
6,300.00
700.00
400.00
12,300.00
Kg
Kg
10.5000
8,800.00
0.1500
12,000.00
JUMLAH HARGA BAHAN
92,400.00
1,800.00
94,200.00
PERALATAN
JUMLAH HARGA ALAT
Jumlah (A+B+C) / 10
E
F
10,650.00
5% x D
532.50
11,182.50
No
A
Uraian
Kode
Satuan
Pekerja
Tukang Kayu
L.01
L.02
OH
OH
Kepala Tukang
Mandor
L.03
L.04
OH
OH
Koefisien
Harga Satuan
Jumlah Harga
(Rp)
(Rp)
TENAGA
BAHAN
Kayu kelas III
Paku 5 10 cm
Minyak bekisting
0.2600
0.1300
70,000.00
90,000.00
18,200.00
11,700.00
0.0130
100,000.00
0.0130
100,000.00
JUMLAH TENAGA KERJA
1,300.00
1,300.00
32,500.00
M3
0.0200
1,400,000.00
28,000.00
Kg
Liter
0.3000
0.1000
13,600.00
3,600.00
4,080.00
360.00
32,440.00
PERALATAN
-
Jumlah (A+B+C)
E
F
A.R.19
3,247.00
68,187.00
No
A
64,940.00
5% x D
Uraian
Harga Satuan
(Rp)
Koefisien
Satuan
TENAGA
Pekerja
Tukang Kayu
L.01
L.02
OH
OH
0.2600
0.1300
70,000.00
90,000.00
18,200.00
11,700.00
Kepala Tukang
Mandor
L.03
L.04
OH
OH
0.0130
0.0130
100,000.00
100,000.00
1,300.00
1,300.00
32,500.00
BAHAN
Kayu kelas III
Paku 5 cm 10 cm
M3
Kg
Minyak bekisting
C
Jumlah Harga
(Rp)
Kode
Liter
0.0225
0.3000
1,400,000.00
13,600.00
31,500.00
4,080.00
0.1000
3,600.00
JUMLAH HARGA BAHAN
360.00
35,940.00
PERALATAN
JUMLAH HARGA ALAT
Jumlah (A+B+C)
A.R.20
5% x D
Uraian
Harga Satuan
(Rp)
Satuan
TENAGA
Pekerja
L.01
OH
0.3300
70,000.00
23,100.00
Tukang Kayu
Kepala Tukang
L.02
L.03
OH
OH
0.1650
0.0165
90,000.00
100,000.00
14,850.00
1,650.00
Mandor
L.04
OH
0.0165
100,000.00
JUMLAH TENAGA KERJA
1,650.00
41,250.00
BAHAN
Kayu kelas III
Koefisien
Jumlah Harga
(Rp)
Kode
Paku 5 cm 12 cm
Minyak bekisting
Balok kayu kelas II
3,422.00
71,862.00
No
A
68,440.00
M3
0.0301
1,400,000.00
42,112.00
Kg
Liter
M3
0.4000
0.2000
0.0075
13,600.00
3,600.00
1,760,000.00
5,440.00
720.00
13,200.00
2.0000
4,000.00
JUMLAH HARGA BAHAN
8,000.00
69,472.00
Batang
PERALATAN
JUMLAH HARGA ALAT
Jumlah (A+B+C)
E
F
110,722.00
5% x D
5,536.10
116,258.10
No
A
Uraian
Kode
Satuan
Pekerja
Tukang Kayu
L.01
L.02
OH
OH
Kepala Tukang
Mandor
L.03
L.04
OH
OH
Koefisien
Harga Satuan
Jumlah Harga
(Rp)
(Rp)
TENAGA
BAHAN
Kayu kelas III
Paku 5 cm 12 cm
Minyak bekisting
Balok kayu kelas II
Dolken kayu 8 - 10cm panjang 4 m
0.3300
0.1650
70,000.00
90,000.00
23,100.00
14,850.00
0.0165
100,000.00
0.0165
100,000.00
JUMLAH TENAGA KERJA
1,650.00
1,650.00
41,250.00
M3
0.0301
1,400,000.00
42,112.00
Kg
Liter
0.4000
0.2000
13,600.00
3,600.00
5,440.00
720.00
M3
Batang
0.0090
2.0000
1,760,000.00
4,000.00
15,840.00
8,000.00
72,112.00
PERALATAN
-
Jumlah (A+B+C)
E
F
A.R.22
5,668.10
119,030.10
No
A
113,362.00
5% x D
Uraian
Harga Satuan
(Rp)
Koefisien
Satuan
Pekerja
Tukang Kayu
L.01
L.02
OH
OH
0.3300
0.1650
70,000.00
90,000.00
23,100.00
14,850.00
Kepala Tukang
Mandor
L.03
L.04
OH
OH
0.0165
0.0165
100,000.00
100,000.00
1,650.00
1,650.00
TENAGA
41,250.00
BAHAN
M2
Aluminium Poil
Perekat
Minyak bekisting
Balok kayu kelas II
Dolken kayu 8 - 10cm panjang 4 m
C
Jumlah Harga
(Rp)
Kode
kg
0.0301
0.4000
1,400,000.00
13,600.00
42,112.00
5,440.00
Liter
M3
0.2000
0.0075
3,600.00
1,760,000.00
720.00
13,200.00
6.0000
4,000.00
JUMLAH HARGA BAHAN
24,000.00
85,472.00
Batang
PERALATAN
-
Jumlah (A+B+C)
A.R.6
Uraian
Harga Satuan
(Rp)
Koefisien
Jumlah Harga
(Rp)
Kode
Satuan
TENAGA
Pekerja
L.01
OH
0.3500
70,000.00
24,500.00
Tukang kayu
Kepala Tukang
L.02
L.03
OH
OH
0.3500
0.0350
90,000.00
100,000.00
31,500.00
3,500.00
Mandor
L.04
OH
0.0180
100,000.00
JUMLAH TENAGA KERJA
1,800.00
61,300.00
M2
1.2000
3,400.00
JUMLAH HARGA BAHAN
4,080.00
4,080.00
BAHAN
Aluminium Foil
6,336.10
133,058.10
No
A
126,722.00
5% x D
PERALATAN
JUMLAH HARGA ALAT
Jumlah (A+B+C)
E
F
65,380.00
5% x D
3,269.00
68,649.00
No
A
Uraian
TENAGA
Pekerja
Tukang kayu
Kepala Tukang
Mandor
Jumlah Harga
(Rp)
Satuan
L.01
L.02
L.03
L.04
OH
OH
OH
OH
0.3500
70,000.00
0.3500
90,000.00
0.0350
100,000.00
0.0180
100,000.00
JUMLAH TENAGA KERJA
24,500.00
31,500.00
3,500.00
1,800.00
61,300.00
M1
M1
BJ
M2
M2
2.6000
3,400.00
3.8000
2,400.00
25.0000
56.00
1.1000
16,666.67
1.0000
38,800.00
JUMLAH HARGA BAHAN
8,840.00
9,120.00
1,400.00
18,333.33
38,800.00
76,493.33
BAHAN
Aluminium Foil
Rangka metal hollow 2 x 4
Paku skurup
Kalsiboard
Andang / skalfolding
Koefisien
Harga Satuan
(Rp)
Kode
PERALATAN
-
Jumlah (A+B+C)
E
F
A.4.4.1.10.
6,889.67
144,683.00
Pemasangan 1 M2 dinding bata merah (5x11x22)cm tebal 1 batu campuran 1SP : 5PP
No
A
137,793.33
5% x D
Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Jumlah Harga
(Rp)
Satuan
L.01
L.02
L.03
L.04
OH
OH
OH
OH
0.3000
70,000.00
0.1000
90,000.00
0.0100
100,000.00
0.0150
100,000.00
JUMLAH TENAGA KERJA
21,000.00
9,000.00
1,000.00
1,500.00
32,500.00
BH
Kg
M3
145.0000
440.00
9.6800
1,040.00
0.0450
91,200.00
JUMLAH HARGA BAHAN
63,800.00
10,067.20
4,104.00
77,971.20
BAHAN
Bata merah
Semen Portlan
Pasir Pasang
Koefisien
Harga Satuan
(Rp)
Kode
PERALATAN
-
Jumlah (A+B+C)
E
F
A.4.4.2.16.
5,523.56
115,994.76
No
A
110,471.20
5% x D
Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
PC
PP
Koefisien
Harga Satuan
(Rp)
Jumlah Harga
(Rp)
Kode
Satuan
L.01
L.03
L.03
L.04
OH
OH
OH
OH
0.4000
70,000.00
0.2000
90,000.00
0.0200
100,000.00
0.0220
100,000.00
JUMLAH TENAGA KERJA
28,000.00
18,000.00
2,000.00
2,200.00
50,200.00
Kg
M3
6.9120
1,040.00
0.0350
91,200.00
JUMLAH HARGA BAHAN
7,188.48
3,192.00
10,380.48
PERALATAN
JUMLAH HARGA ALAT
Jumlah (A+B+C)
E
F
60,580.48
5% x D
3,029.02
63,609.50
Pemasangan 1 M2 acian
No
A
Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Jumlah Harga
(Rp)
Satuan
L.01
L.03
L.03
L.04
OH
OH
OH
OH
0.2000
70,000.00
0.1000
90,000.00
0.0100
100,000.00
0.0100
100,000.00
JUMLAH TENAGA KERJA
14,000.00
9,000.00
1,000.00
1,000.00
25,000.00
Kg
3.2500
1,040.00
JUMLAH HARGA BAHAN
3,380.00
3,380.00
BAHAN
Semen PC
Koefisien
Harga Satuan
(Rp)
Kode
PERALATAN
-
Jumlah (A+B+C)
E
F
A.4.4.3.35.1.
1,419.00
29,799.00
No
A
28,380.00
5% x D
Uraian
TENAGA
Pekerja
Tukang Batu
Kepala tukang
Mandor
Jumlah Harga
(Rp)
Satuan
L.01
L.02
L.03
L.04
OH
OH
OH
OH
0.3500
70,000.00
0.1750
90,000.00
0.0175
100,000.00
0.0175
100,000.00
JUMLAH TENAGA KERJA
24,500.00
15,750.00
1,750.00
1,750.00
43,750.00
BH
Kg
M3
Kg
11.8700
4,320.43
10.0000
1,040.00
0.0450
91,200.00
1.5000
5,200.00
JUMLAH HARGA BAHAN
51,283.53
10,400.00
4,104.00
7,800.00
73,587.53
BAHAN
Ubin keramik
Semen Portland
Pasir pasang
Semen warna
Koefisien
Harga Satuan
(Rp)
Kode
PERALATAN
-
Jumlah (A+B+C)
E
F
A.4.5.1.10.
5,866.88
123,204.40
No
A
117,337.53
5% x D
Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala tukang
Mandor
BAHAN
List gypsum
Paku skrup
Koefisien
Harga Satuan
(Rp)
Jumlah Harga
(Rp)
Kode
Satuan
L.01
L.02
L.03
L.04
OH
OH
OH
OH
0.0500
70,000.00
0.0500
90,000.00
0.0050
100,000.00
0.0030
100,000.00
JUMLAH TENAGA KERJA
3,500.00
4,500.00
500.00
300.00
8,800.00
M1
BJ
1.0500
20,000.00
4.0000
56.00
JUMLAH HARGA BAHAN
21,000.00
224.00
21,224.00
PERALATAN
JUMLAH HARGA ALAT
Jumlah (A+B+C)
E
F
30,024.00
5% x D
1,501.20
31,525.20
No
A
Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala tukang
Mandor
Jumlah Harga
(Rp)
Satuan
L.01
L.02
L.03
L.04
OH
OH
OH
OH
0.0500
70,000.00
0.0500
90,000.00
0.0050
100,000.00
0.0030
100,000.00
JUMLAH TENAGA KERJA
3,500.00
4,500.00
500.00
300.00
8,800.00
M1
BJ
1.0500
3,000.00
4.0000
56.00
JUMLAH HARGA BAHAN
3,150.00
224.00
3,374.00
BAHAN
List kayu meranti
Paku skrup
Koefisien
Harga Satuan
(Rp)
Kode
PERALATAN
-
Jumlah (A+B+C)
E
F
A.4.6.1.1.
608.70
12,782.70
Pembuatan dan pemasangan 1 M1 kusen pintu dan kusen jendela, kayu kelas I (ulin 5/10)
No
A
12,174.00
5% x D
Uraian
TENAGA
Pekerja
Tukang kayu
Kepala tukang
Mandor
Jumlah Harga
(Rp)
Satuan
L.01
L.03
L.03
L.04
OH
OH
OH
OH
0.0500
70,000.00
0.1000
90,000.00
0.0200
100,000.00
0.0200
100,000.00
JUMLAH TENAGA KERJA
3,500.00
9,000.00
2,000.00
2,000.00
16,500.00
M3
Kg
Kg
0.0110
4,000,000.00
0.2100
16,000.00
0.3000
10,000.00
JUMLAH HARGA BAHAN
44,000.00
3,360.00
3,000.00
50,360.00
BAHAN
Kayu Kelas I (Ulin)
Paku 10 cm
Lem kayu
Koefisien
Harga Satuan
(Rp)
Kode
PERALATAN
-
Jumlah (A+B+C)
E
F
A.R.1
3,343.00
70,203.00
No
A
66,860.00
5% x D
Uraian
TENAGA
Pekerja
Tukang kayu
Kepala tukang
Mandor
BAHAN
Pintu panil kayu kelas I (Ulin) pabrikasi
Lem kayu
Koefisien
Harga Satuan
(Rp)
Jumlah Harga
(Rp)
Kode
Satuan
L.01
L.03
L.03
L.04
OH
OH
OH
OH
0.3000
70,000.00
0.6000
90,000.00
0.0200
100,000.00
0.0300
100,000.00
JUMLAH TENAGA KERJA
21,000.00
54,000.00
2,000.00
3,000.00
80,000.00
BH
Kg
1.0000
600,000.00
0.1000
10,000.00
JUMLAH HARGA BAHAN
600,000.00
1,000.00
601,000.00
PERALATAN
JUMLAH HARGA ALAT
Jumlah (A+B+C)
E
F
681,000.00
5% x D
34,050.00
715,050.00
No
A
Uraian
TENAGA
Pekerja
Tukang kayu
Kepala tukang
Mandor
Jumlah Harga
(Rp)
Satuan
L.01
L.03
L.03
L.04
OH
OH
OH
OH
0.2000
70,000.00
0.4000
90,000.00
0.0200
100,000.00
0.0300
100,000.00
JUMLAH TENAGA KERJA
14,000.00
36,000.00
2,000.00
3,000.00
55,000.00
BH
Kg
1.0000
148,000.00
0.1000
10,000.00
JUMLAH HARGA BAHAN
148,000.00
1,000.00
149,000.00
BAHAN
Jendela kayu kelas I (Ulin) pabrikasi
Lem kayu
Koefisien
Harga Satuan
(Rp)
Kode
PERALATAN
-
Jumlah (A+B+C)
E
F
A.R.4
10,200.00
214,200.00
No
A
204,000.00
5% x D
Uraian
TENAGA
Pekerja
Tukang kayu
Kepala tukang
Mandor
Jumlah Harga
(Rp)
Satuan
L.01
L.03
L.03
L.04
OH
OH
OH
OH
0.2000
70,000.00
0.4000
90,000.00
0.0200
100,000.00
0.0300
100,000.00
JUMLAH TENAGA KERJA
14,000.00
36,000.00
2,000.00
3,000.00
55,000.00
BH
Kg
1.0000
74,000.00
0.1000
10,000.00
JUMLAH HARGA BAHAN
74,000.00
1,000.00
75,000.00
BAHAN
Jendela kayu kelas I (Ulin) pabrikasi
Lem kayu
Koefisien
Harga Satuan
(Rp)
Kode
PERALATAN
-
Jumlah (A+B+C)
E
F
130,000.00
A.R.5
No
Uraian
TENAGA
Pekerja
Tukang kayu
Kepala tukang
Mandor
BAHAN
Jendela kayu kelas I (Ulin) pabrikasi
Lem kayu
5% x D
Koefisien
Harga Satuan
(Rp)
6,500.00
136,500.00
Jumlah Harga
(Rp)
Kode
Satuan
L.01
L.03
L.03
L.04
OH
OH
OH
OH
0.0020
70,000.00
0.0100
90,000.00
0.0020
100,000.00
0.0030
100,000.00
JUMLAH TENAGA KERJA
140.00
900.00
200.00
300.00
1,540.00
BH
Kg
1.0000
5,600.00
0.0500
10,000.00
JUMLAH HARGA BAHAN
5,600.00
500.00
6,100.00
PERALATAN
JUMLAH HARGA ALAT
Jumlah (A+B+C)
E
F
7,640.00
5% x D
382.00
8,022.00
No
A
Uraian
TENAGA
Pekerja
Tukang kayu
Kepala tukang
Mandor
Jumlah Harga
(Rp)
Satuan
L.01
L.03
L.03
L.04
OH
OH
OH
OH
0.0500
70,000.00
0.1000
90,000.00
0.0100
100,000.00
0.0025
100,000.00
JUMLAH TENAGA KERJA
3,500.00
9,000.00
1,000.00
250.00
13,750.00
M1
M1
BJ
1.0000
12,000.00
1.0000
8,000.00
4.0000
56.00
JUMLAH HARGA BAHAN
12,000.00
8,000.00
224.00
20,224.00
BAHAN
Kalsiplang 8 x 20
Kalsiplang 8 x 10
Skrup
Koefisien
Harga Satuan
(Rp)
Kode
PERALATAN
-
Jumlah (A+B+C)
E
F
A.R.9
1,698.70
35,672.70
No
A
33,974.00
5% x D
Uraian
TENAGA
Pekerja
Tukang kayu
Kepala tukang
Mandor
Jumlah Harga
(Rp)
Satuan
L.01
L.03
L.03
L.04
OH
OH
OH
OH
0.0333
70,000.00
0.0667
90,000.00
0.0067
100,000.00
0.0017
100,000.00
JUMLAH TENAGA KERJA
2,333.33
6,000.00
666.67
166.67
9,166.67
M1
BJ
1.0000
8,000.00
4.0000
56.00
JUMLAH HARGA BAHAN
8,000.00
224.00
8,224.00
BAHAN
Kalsiplang 8 x 10
Skrup
Koefisien
Harga Satuan
(Rp)
Kode
PERALATAN
-
Jumlah (A+B+C)
E
F
A.4.6.2.2.
869.53
18,260.20
No
A
17,390.67
5% x D
Uraian
TENAGA
Pekerja
Tukang kayu
BAHAN
Kunci tanam 2 slak
Koefisien
Harga Satuan
(Rp)
Jumlah Harga
(Rp)
Kode
Satuan
L.01
L.02
OH
OH
0.0100
70,000.00
0.5000
90,000.00
JUMLAH TENAGA KERJA
700.00
45,000.00
45,700.00
BH
1.0000
144,000.00
JUMLAH HARGA BAHAN
144,000.00
144,000.00
PERALATAN
JUMLAH HARGA ALAT
Jumlah (A+B+C)
E
F
189,700.00
5% x D
9,485.00
199,185.00
No
A
Uraian
TENAGA
Pekerja
Tukang kayu
Jumlah Harga
(Rp)
Satuan
L.01
L.02
OH
OH
0.0100
70,000.00
0.0500
90,000.00
JUMLAH TENAGA KERJA
700.00
4,500.00
5,200.00
BH
1.0000
12,000.00
JUMLAH HARGA BAHAN
12,000.00
12,000.00
BAHAN
Engsel pintu
Koefisien
Harga Satuan
(Rp)
Kode
PERALATAN
-
Jumlah (A+B+C)
E
F
A.4.6.2.6.
860.00
18,060.00
No
A
17,200.00
5% x D
Uraian
TENAGA
Pekerja
Tukang kayu
Jumlah Harga
(Rp)
Satuan
L.01
L.02
OH
OH
0.0100
70,000.00
0.0500
90,000.00
JUMLAH TENAGA KERJA
700.00
4,500.00
5,200.00
BH
1.0000
8,000.00
JUMLAH HARGA BAHAN
8,000.00
8,000.00
BAHAN
Engsel kupu-kupu
Koefisien
Harga Satuan
(Rp)
Kode
PERALATAN
-
Jumlah (A+B+C)
E
F
A.4.6.2.9.
No
A
13,200.00
Uraian
TENAGA
Pekerja
Tukang kayu
BAHAN
Kait angin
5% x D
Koefisien
Harga Satuan
(Rp)
660.00
13,860.00
Jumlah Harga
(Rp)
Kode
Satuan
L.01
L.02
OH
OH
0.0100
70,000.00
0.0500
90,000.00
JUMLAH TENAGA KERJA
700.00
4,500.00
5,200.00
BH
1.0000
9,600.00
JUMLAH HARGA BAHAN
9,600.00
9,600.00
PERALATAN
JUMLAH HARGA ALAT
Jumlah (A+B+C)
E
F
14,800.00
5% x D
740.00
15,540.00
No
A
Uraian
TENAGA
Pekerja
Tukang kayu
Jumlah Harga
(Rp)
Satuan
L.01
L.02
OH
OH
0.0100
70,000.00
0.0500
90,000.00
JUMLAH TENAGA KERJA
700.00
4,500.00
5,200.00
BH
1.0000
12,000.00
JUMLAH HARGA BAHAN
12,000.00
12,000.00
BAHAN
Kunci slot
Koefisien
Harga Satuan
(Rp)
Kode
PERALATAN
-
Jumlah (A+B+C)
E
F
A.4.6.2.11.2.
860.00
18,060.00
No
A
17,200.00
5% x D
Uraian
TENAGA
Pekerja
Tukang kayu
Jumlah Harga
(Rp)
Satuan
L.01
L.02
OH
OH
0.0100
70,000.00
0.0500
90,000.00
JUMLAH TENAGA KERJA
700.00
4,500.00
5,200.00
BH
1.0000
8,000.00
JUMLAH HARGA BAHAN
8,000.00
8,000.00
BAHAN
Kunci slot
Koefisien
Harga Satuan
(Rp)
Kode
PERALATAN
-
Jumlah (A+B+C)
E
F
A.4.6.2.12.
660.00
13,860.00
No
A
13,200.00
5% x D
Uraian
TENAGA
Pekerja
Tukang kayu
BAHAN
Hendel jendela
Koefisien
Harga Satuan
(Rp)
Jumlah Harga
(Rp)
Kode
Satuan
L.01
L.02
OH
OH
0.0100
70,000.00
0.0500
90,000.00
JUMLAH TENAGA KERJA
700.00
4,500.00
5,200.00
BH
1.0000
8,000.00
JUMLAH HARGA BAHAN
8,000.00
8,000.00
PERALATAN
JUMLAH HARGA ALAT
Jumlah (A+B+C)
E
F
13,200.00
5% x D
660.00
13,860.00
No
A
Uraian
Kode
Satuan
Pekerja
L.01
OH
Tukang kayu
Kepala tukang
L.02
L.03
Mandor
L.04
Koefisien
Harga Satuan
Jumlah Harga
(Rp)
(Rp)
TENAGA
OH
0.0150
70,000.00
1,050.00
0.1500
0.0150
90,000.00
100,000.00
13,500.00
1,500.00
0.0008
100,000.00
JUMLAH TENAGA KERJA
80.00
16,130.00
BAHAN
Kaca tebal 5mm
Sealant
M2
Kg
1.1000
0.0500
100,000.00
28,000.00
110,000.00
1,400.00
111,400.00
PERALATAN
JUMLAH HARGA ALAT
Jumlah (A+B+C)
E
F
A.4.7.1.4.
Uraian
6,376.50
133,906.50
Kode
Satuan
L.01
L.02
L.03
L.04
OH
OH
OH
OH
Koefisien
Harga Satuan
Jumlah Harga
(Rp)
(Rp)
TENAGA
Pekerja
Tukang cat
Kepala tukang
Mandor
5% x D
Pengecatan 1 M2 bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
No
A
127,530.00
BAHAN
Cat menie
Plamuur
Cat dasar
Cat penutup
Kg
Kg
Kg
Kg
Kuas
Pengencer
Ampelas
BH
Ltr
Lbr
0.0700
70,000.00
0.0090
90,000.00
0.0060
100,000.00
0.0030
100,000.00
JUMLAH TENAGA KERJA
0.2000
0.1500
0.1700
0.2600
4,900.00
810.00
600.00
300.00
6,610.00
20,800.00
17,600.00
22,400.00
36,000.00
4,160.00
2,640.00
3,808.00
9,360.00
0.0100
12,000.00
0.0300
17,600.00
0.2000
4,800.00
JUMLAH HARGA BAHAN
120.00
528.00
960.00
21,576.00
PERALATAN
-
Jumlah (A+B+C)
E
F
A.4.7.1.10.1.
1,409.30
29,595.30
Pengecatan 1 M2 tembok baru (1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) interior
No
A
28,186.00
5% x D
Uraian
TENAGA
Pekerja
Tukang cat
Kepala tukang
Mandor
BAHAN
Plamuur
Cat dasar
Cat penutup
Koefisien
Harga Satuan
(Rp)
Jumlah Harga
(Rp)
Kode
Satuan
L.01
L.02
L.03
L.04
OH
OH
OH
OH
0.0200
70,000.00
0.0630
90,000.00
0.0063
100,000.00
0.0030
100,000.00
JUMLAH TENAGA KERJA
1,400.00
5,670.00
630.00
300.00
8,000.00
Kg
Kg
Kg
0.1000
17,600.00
0.1000
15,040.00
0.2600
13,600.00
JUMLAH HARGA BAHAN
1,760.00
1,504.00
3,536.00
6,800.00
PERALATAN
JUMLAH HARGA ALAT
Jumlah (A+B+C)
E
F
14,800.00
5% x D
740.00
15,540.00
Pengecatan 1 M2 tembok baru (1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) eksterior
No
A
Uraian
TENAGA
Pekerja
Tukang cat
Kepala tukang
Mandor
Jumlah Harga
(Rp)
Satuan
L.01
L.02
L.03
L.04
OH
OH
OH
OH
0.0200
70,000.00
0.0630
90,000.00
0.0063
100,000.00
0.0030
100,000.00
JUMLAH TENAGA KERJA
1,400.00
5,670.00
630.00
300.00
8,000.00
Kg
Kg
Kg
0.1000
17,600.00
0.1000
15,040.00
0.2600
14,400.00
JUMLAH HARGA BAHAN
1,760.00
1,504.00
3,744.00
7,008.00
BAHAN
Plamuur
Cat dasar
Cat penutup
Koefisien
Harga Satuan
(Rp)
Kode
PERALATAN
-
Jumlah (A+B+C)
E
F
A.R.11
750.40
15,758.40
No
A
15,008.00
5% x D
Uraian
TENAGA
Pekerja
Tukang cat
Kepala tukang
Mandor
Jumlah Harga
(Rp)
Satuan
L.01
L.02
L.03
L.04
OH
OH
OH
OH
0.0020
70,000.00
0.0063
90,000.00
0.0006
100,000.00
0.0003
100,000.00
JUMLAH TENAGA KERJA
140.00
567.00
63.00
30.00
800.00
Kg
Kg
Kg
Kg
0.0200
20,800.00
0.0150
17,600.00
0.0170
22,400.00
0.0260
36,000.00
0.0010
12,000.00
0.0030
17,600.00
0.0200
4,800.00
JUMLAH HARGA BAHAN
416.00
264.00
380.80
936.00
12.00
52.80
96.00
2,157.60
BAHAN
Cat menie
Plamuur
Cat dasar
Cat penutup
Kuas
Pengencer
Ampelas
BH
Ltr
Lbr
Koefisien
Harga Satuan
(Rp)
Kode
PERALATAN
-
Jumlah (A+B+C)
E
F
A.R.12
Uraian
TENAGA
Pekerja
Tukang Listrik
Koefisien
Harga Satuan
(Rp)
Jumlah Harga
(Rp)
Kode
Satuan
L.01
L.02
OH
OH
0.2000
70,000.00
0.3750
90,000.00
JUMLAH TENAGA KERJA
14,000.00
33,750.00
47,750.00
BH
BH
1.0000
960.00
1.0000
8,000.00
JUMLAH HARGA BAHAN
960.00
8,000.00
8,960.00
BAHAN
Inbow dos
Stop Kontak
147.88
3,105.48
No
A
2,957.60
5% x D
PERALATAN
JUMLAH HARGA ALAT
Jumlah (A+B+C)
E
F
56,710.00
5% x D
2,835.50
59,545.50
No
A
Uraian
TENAGA
Pekerja
Tukang Listrik
Jumlah Harga
(Rp)
Satuan
L.01
L.02
OH
OH
0.2000
70,000.00
0.3750
90,000.00
JUMLAH TENAGA KERJA
14,000.00
33,750.00
47,750.00
BH
BH
1.0000
960.00
1.0000
12,000.00
JUMLAH HARGA BAHAN
960.00
12,000.00
12,960.00
BAHAN
Inbow dos
Saklar ganda
Koefisien
Harga Satuan
(Rp)
Kode
PERALATAN
-
Jumlah (A+B+C)
E
F
A.R.15
Uraian
TENAGA
Pekerja
Tukang Listrik
Koefisien
Harga Satuan
(Rp)
Jumlah Harga
(Rp)
Kode
Satuan
L.01
L.02
OH
OH
0.2000
70,000.00
0.3750
90,000.00
JUMLAH TENAGA KERJA
14,000.00
33,750.00
47,750.00
BH
BH
1.0000
48,000.00
1.0000
40,000.00
JUMLAH HARGA BAHAN
48,000.00
40,000.00
88,000.00
BAHAN
Bok MCB
MCB 6A
3,035.50
63,745.50
Pemasangan 1 Bh MCB
No
A
60,710.00
5% x D
PERALATAN
-
Jumlah (A+B+C)
E
F
A.R.16
Uraian
TENAGA
Pekerja
Tukang Listrik
Koefisien
Harga Satuan
(Rp)
Jumlah Harga
(Rp)
Kode
Satuan
L.01
L.02
OH
OH
0.2000
70,000.00
0.3750
90,000.00
JUMLAH TENAGA KERJA
14,000.00
33,750.00
47,750.00
BH
BH
1.0000
27,200.00
1.0000
12,000.00
JUMLAH HARGA BAHAN
27,200.00
12,000.00
39,200.00
BAHAN
Lampu 14 watt
Viting
6,787.50
142,537.50
No
A
135,750.00
5% x D
PERALATAN
JUMLAH HARGA ALAT
Jumlah (A+B+C)
E
F
86,950.00
5% x D
4,347.50
91,297.50
No
A
Uraian
TENAGA
Pekerja
Tukang Listrik
Jumlah Harga
(Rp)
Satuan
L.01
L.02
OH
OH
0.0200
70,000.00
0.0375
90,000.00
JUMLAH TENAGA KERJA
1,400.00
3,375.00
4,775.00
M1
M1
BH
BH
BH
1.0000
2,960.00
1.0000
1,600.00
0.3000
400.00
0.3000
960.00
0.1000
4,800.00
JUMLAH HARGA BAHAN
2,960.00
1,600.00
120.00
288.00
480.00
5,448.00
BAHAN
Kabel NYA 2.5mm
Pipa Listrk
Keni Listrik
T dos
Plester
Koefisien
Harga Satuan
(Rp)
Kode
PERALATAN
-
Jumlah (A+B+C)
E
F
A.3.2.1.3.
Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Batu gunug
Semen Portlan
Pasir Pasang
Koefisien
Harga Satuan
(Rp)
Jumlah Harga
(Rp)
Kode
Satuan
L.01
L.02
L.03
L.04
OH
OH
OH
OH
1.5000
70,000.00
0.7500
90,000.00
0.0750
100,000.00
0.0750
100,000.00
JUMLAH TENAGA KERJA
105,000.00
67,500.00
7,500.00
7,500.00
187,500.00
m3
Kg
m3
1.2000
212,500.00
136.0000
1,300.00
0.8440
114,000.00
JUMLAH HARGA BAHAN
255,000.00
176,800.00
96,216.00
528,016.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
511.15
10,734.15
No
A
10,223.00
5% x D
Jumlah (A+B+C)
Overhead & Profit (8%)
Harga Satuan Pekerjaan (D+E)
5% x D
715,516.00
35,775.80
751,291.80
ANALISA
.
PEMBANGUNAN LAHAN PERIKANAN & PERTANIAN
RSJ SAMBANG LIHUM ( BANJARBARU )
2016
JENIS PEKERJAAN
A.2.3.1.1.
A.R.23
A.2.3.1.11.
A.4.1.1.4.
A.4.1.1.7.
A.4.1.1.17.
A.R.18
A.R.19
A.R.20
A.R.21
A.R.22
A.4.4.1.10.
A.4.4.2.16.
A.4.4.2.27.
A.4.4.3.35.1.
A.R.7
A.R.6
A.4.5.1.10.
A.R.10
A.4.6.1.1.
A.R.1
A.R.3
A.R.4
A.R.5
A.R.8
A.R.9
A.4.6.2.2.
A.4.6.2.5.
A.4.6.2.6.
A.4.6.2.9.
A.4.6.2.11.1.
A.4.6.2.11.2.
A.4.6.2.12.
A.4.6.2.16.1.
A.4.7.1.4.
A.4.7.1.10.1.
A.4.7.1.10.2.
A.R.11
A.R.12
A.R.14
A.R.15
A.R.16
A.R.17
A.LS.1
A.LS.2
A.LS.3
A.LS.4
A.3.2.1.3.
SATUAN
m
Bt
m3
m3
m3
kg
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m1
m1
m1
bh
bh
bh
bh
m1
m1
bh
bh
bh
bh
bh
bh
bh
m2
m2
m2
m2
m1
bh
bh
bh
bh
m1
m2
m2
m1
ls
m3
3
HARGA
(Rp)
55,000.00
17,357.14
86,800.00
625,663.07
794,985.87
10,650.00
64,940.00
68,440.00
110,722.00
113,362.00
126,722.00
110,471.20
60,580.48
28,380.00
117,337.53
137,793.33
65,380.00
30,024.00
12,174.00
66,860.00
681,000.00
204,000.00
130,000.00
7,640.00
33,974.00
17,390.67
189,700.00
17,200.00
13,200.00
14,800.00
17,200.00
13,200.00
13,200.00
127,530.00
28,186.00
14,800.00
15,008.00
2,957.60
56,710.00
60,710.00
135,750.00
86,950.00
10,223.00
160,000.00
6,000.00
20,000.00
120,000.00
715,516.00
Mengetahui,
Direktur
Rumah Sakit Jiwa Sambang Lihum
:
:
:
:
.
PEMBANGUNAN LAHAN PERIKANAN & PERTANIAN
RSJ SAMBANG LIHUM ( BANJARBARU )
2016
NO
URAIAN PEKERJAAN
HARGA SATUAN
I
II
III
IV
V
VI
VII
PEKERJAAN
PEKERJAAN
PEKERJAAN
PEKERJAAN
PEKERJAAN
PEKERJAAN
PEKERJAAN
PERSIAPAN
TANAH dan PASIR
BETON (MUTU K100 & K225)
PEMBESIAN
BEKISTING
BATU GUNUNG, BATA & TANAH PUPUK
CAT-CATAN
Rp
Rp
Rp
Rp
Rp
Rp
Rp
JUMLAH
PPN
JUMLAH TERMASUK PPN
DIBULATKAN
Rp
Rp
Rp
Rp
Catatan :
Jumlah harga di atas sudah termasuk biaya persiapan,mobilisasi, demobilisasi,keuntungan, pajakpajak, PPN dan biaya pungutan resmi lainnya.
Mengetahui,
Direktur
Rumah Sakit Jiwa Sambang Lihum
17,440,000.00
94,970,046.00
329,989,312.13
319,615,502.49
255,961,986.64
539,974,317.20
44,322,376.00
1,602,273,540.46
160,227,354.05
1,762,500,894.51
1,762,500,000.00
:
:
:
:
.
PEMBANGUNAN LAHAN PERIKANAN & PERTANIAN
RSJ SAMBANG LIHUM ( BANJARBARU )
2016
beto
Siring
86.00
No.
Uraian Pekerjaan
No.
Analisa
Panjang
85.00
Harga
Satuan (Rp)
255.00
Jumlah
Harga (Rp)
Sat.
Volume
Ls
Ls
Ls
1.00
1.00
1.00
15,630,000.00
1,754,000.00
56,000.00
SUB-TOTAL I
15,630,000.00
1,754,000.00
56,000.00
17,440,000.00
A.2.3.1.1.
A.R.23
A.R.23
A.R.23
A.2.3.1.11.
M3
Bt
Bt
Bt
M3
356.25
680.00
2064.00
1190.00
81.72
55,000.00
17,357.14
17,357.14
17,357.14
86,800.00
SUB-TOTAL II
19,593,750.00
11,802,857.14
35,825,142.86
20,655,000.00
7,093,296.00
94,970,046.00
g=exf
I
1
2
3
PEKERJAAN PERSIAPAN
Pembersihan Lapangan + pembesihan akhir
Pemasangan Bouwplank
Papan Informasi Kegiatan
II
1
2
3
4
5
III
1
A.4.1.1.4.
M3
46.02
625,663.07
28,793,014.43
A.4.1.1.7.
M3
51.60
794,985.87
41,021,271.05
A.4.1.1.7.
M3
11.48
794,985.87
9,122,462.89
A.4.1.1.7.
M3
13.55
794,985.87
10,768,083.65
A.4.1.1.7.
M3
22.35
794,985.87
17,767,934.26
A.4.1.1.7.
M3
38.25
794,985.87
30,408,209.64
A.4.1.1.7.
M3
191.25
794,985.87
152,041,048.21
11
A.4.1.1.7.
M3
50.40
IV
1
2
3
4
5
5
10
PEKERJAAN PEMBESIAN
Pekejaan Pondasi puor T. 25 cm (besi diameter 16)
Pekerjaan sloof bawah / pengikat pondasi 15/15 (besi diameter 12 & diameter 6)
Pekerjaan kolom niut 15/30 (besi diameter 16 & diameter 6)
Pekerjaan sloof atas 15/25 (besi diameter 16 & diameter 6)
Pekerjaan lantai pedestrian T. 15 cm (besi diameter 10)
Pekerjaan lantai kolam T. 15 cm (besi diameter 10)
Pekerjaan tangga (besi diameter 12 & diameter 10)
A.4.1.1.17.
A.4.1.1.17.
A.4.1.1.17.
A.4.1.1.17.
A.4.1.1.17.
A.4.1.1.17.
A.4.1.1.17.
Kg
Kg
Kg
Kg
Kg
Kg
Kg
V
1
PEKERJAAN BEKISTING
Pekejaan Pondasi puor T. 25 cm
A.R.18
M2
227.04
64,940.00
14,743,977.60
A.R.19
M2
229.50
68,440.00
15,706,980.00
A.R.20
M2
270.90
110,722.00
29,994,589.80
A.R.21
M2
166.40
113,362.00
18,863,436.80
A.R.22
M2
357.00
126,722.00
45,239,754.00
A.R.22
M2
885.00
126,722.00
112,148,970.00
Pekerjaan tangga
A.R.22
M2
152.02
126,722.00
SUB-TOTAL V
6,364.00
2,525.93
3,251.13
2,517.79
2,409.75
11,870.25
1,072.00
794,985.87
SUB-TOTAL III
40,067,288.00
329,989,312.13
10,650.00
10,650.00
10,650.00
10,650.00
10,650.00
10,650.00
10,650.00
SUB-TOTAL IV
67,776,600.00
26,901,177.50
34,624,482.10
26,814,442.88
25,663,837.50
126,418,162.50
11,416,800.00
319,615,502.49
19,264,278.44
255,961,986.64
No.
Uraian Pekerjaan
VI
1
VII
1
PEKERJAAN CAT-CATAN
Cat air untuk luar (siring batu gunung, tangga, pedestrian, Lantai kolam & dinding lahan petanian)
No.
Analisa
c
A.4.4.1.10.
Sat.
Volume
Harga
Satuan (Rp)
Jumlah
Harga (Rp)
g=exf
M2
112.50
110,471.20
A.4.4.2.16.
M2
225.00
60,580.48
12,428,010.00
13,630,608.00
A.3.2.1.3.
M3
635.00
715,516.00
454,352,660.00
A.4.4.2.16.
446.25
60,580.48
27,034,039.20
M3
210.00
154,900.00
SUB-TOTAL VI
32,529,000.00
539,974,317.20
A.4.7.1.10.2.
M2
2953.25
15,008.00
SUB-TOTAL VII
44,322,376.00
44,322,376.00
JADWAL
Kegiatan
Pekerjaan
Lokasi
Tahun Anggaran
No.
PELAKSA
.
PEMBANGUNAN LAHAN PERIKANAN & PERTANIAN
RSJ SAMBANG LIHUM ( BANJARBARU )
2016
Uraian Pekerjaan
Jumlah Harga
Bobot
Kontrak
Kontrak
%
I
PEKERJAAN
II
PEKERJAAN
III
PEKERJAAN
IV
PEKERJAAN
V
PEKERJAAN
VI
PEKERJAAN
Err:509Err:509
Err:509Err:509
Err:509Err:509
Err:509Err:509
VII PEKERJAAN
PERSIAPAN
TANAH dan PASIR
BETON (MUTU K100 & K225)
PEMBESIAN
BEKISTING
BATU GUNUNG, BATA & TANAH PUPUK
CAT-CATAN
#REF!
17,440,000.00
94,970,046.00
329,989,312.13
319,615,502.49
255,961,986.64
539,974,317.20
Err:509
Err:509
Err:509
Err:509
44,322,376.00
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Rencana
Rencana Kumulatif Fisik
Realisasi Kumulatif Fisik
PELAKSANAAN
PEKERJAAN
EE
Tahap Pelaksanaan
Bulan I
1
Err:509
Err:509
Err:509
Bulan II
3
Err:509
Err:509
Err:509
Err:509
Bulan III
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
0.00
0.00
Bul
3
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
0.00
0.00
0.00
Ket.
Bulan IV
2
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509