Tenaga
x
x
Rp.
Rp.
Jumlah (1)
105,000
150,000
1 M
Pasang pondasi batu kali, Pc : 8 Ps
Bahan
Batu belah 15/20 cm
1.100
M
Semen porland
91.000
Kg
Pasir Pasang
0.561
M
x
x
x
Rp.
Rp.
Rp.
Jumlah (1)
300,000.00
1,300.00
285,000.00
Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Jumlah (2)
Jumlah (1) +(2)
105,000.00
125,000.00
140,000.00
150,000.00
x
x
x
Rp.
Rp.
Rp.
600
1,300
285,000
Jumlah (1)
Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
105,000.00
125,000.00
140,000.00
150,000.00
Jumlah (2)
Jumlah (1) + (2)
Kg
M
x
x
Rp.
Rp.
1,300
285,000
Jumlah (1)
Tenaga
Pekerja
Tukang batu
Kepala tukang
Oh
Oh
Oh
x
x
x
Rp.
Rp.
Rp.
105,000.00
125,000.00
140,000.00
Pekerja
Mandor
0.400
0.040
Oh
Oh
159,885.00
1.500
0.600
0.060
0.075
0.650
0.200
0.020
0.030
0.250
0.200
0.020
Oh
Oh
Oh
Oh
Mandor
0.0125
Oh
Rp.
150,000.00
Jumlah (2)
Jumlah (1) + (2)
12.920
0.013
Kg
M
x
x
Rp.
Rp.
1,300
285,000
Jumlah (1)
0.200
0.150
0.015
0.010
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
105,000.00
125,000.00
140,000.00
150,000.00
Semen portland
Pasir pasang
Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor
Jumlah (2)
Jumlah (1) + (2)
1 M' Membuat ring balok beton bertulang (10 x 15) cm
Bahan
Kayu Sembarang
Paku biasa 2" - 5 "
Besi beton polos
Kawat beton
Semen portland
Pasir beton
Koral beton
0.003
0.020
3.600
0.050
5.500
0.009
0.015
M
Kg
Kg
Kg
Kg
M
M
x
x
x
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
44,575,000
21,000
13,000
20,000
1,300
280,000
270,000
Jumlah (1)
0.100
0.033
0.033
0.033
0.010
0.005
Oh
Oh
Oh
Oh
Oh
Oh
x
x
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
105,000.00
125,000.00
125,000.00
125,000.00
140,000.00
150,000.00
Tenaga
Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala tukang
Mandor
Plamir
Cat dasar
Cat tembok 2 x
0.120
0.120
0.260
Kg
Kg
Kg
x
x
x
Rp.
Rp.
Rp.
Jumlah (1)
11,000
20,400
20,400
Tenaga
Pekerja
Tukang cat
Kepala tukang
Mandor
0.040
0.120
0.0120
0.002
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
105,000.00
Rp.
125,000.00
Rp.
140,000.00
Rp.
150,000.00
Jumlah (2)
Jumlah (1) + (2)
Kg
M
M
x
x
x
Rp.
Rp.
Rp.
1,300
280,000
280,000
Jumlah (1)
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
105,000.00
125,000.00
140,000.00
150,000.00
1 M Membuat beton 1 Pc : 2 Ps : 3 Kr
Bahan
Semen portland
336.000
Pasir beton
0.540
Koral beton/batu peca 0.810
Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor
2.000
0.350
0.035
1.000
Jumlah (2)
Jumlah (1) + (2)
1 M Pasang lantai keramik 30 x 30 cm
Bahan
Ubin keramik 30 x 30
Semen portland
Pasir pasang
Semen warna
11.120
11.380
0.042
1.500
Bh
Kg
M
Kg
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Jumlah (1)
0.620
0.350
0.035
0.030
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Jumlah (2)
Jumlah (1) +
110,000
1,340
285,000
2,250
Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor
105,000.00
125,000.00
140,000.00
150,000.00
(2)
=
=
=
Rp.
Rp.
Rp.
42,000.00
6,000.00
48,000.00
=
=
=
=
Rp.
Rp.
Rp.
Rp.
330,000.00
118,300.00
159,885.00
608,185.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
157,500.00
75,000.00
8,400.00
11,250.00
252,150.00
860,335.00
=
=
=
=
Rp
Rp
Rp
Rp
84,000.00
28,860.00
29,070.00
141,930.00
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
68,250.00
25,000.00
2,800.00
4,500.00
100,550.00
242,480.00
=
=
=
Rp.
Rp.
Rp.
9,477.00
7,980.00
17,457.00
=
=
=
Rp.
Rp.
Rp.
26,250.00
25,000.00
2,800.00
=
=
=
Rp.
Rp.
Rp.
1,875.00
55,925.00
73,382.00
=
=
=
Rp.
Rp.
Rp.
16,796.00
3,705.00
20,501.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
21,000.00
18,750.00
2,100.00
1,500.00
43,350.00
63,851.00
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
133,725.00
420.00
46,800.00
1,000.00
7,150.00
2,520.00
4,050.00
195,665.00
=
=
=
=
=
=
Jumlah (2)
Jumlah (1) + (2)
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
10,500.00
4,125.00
4,125.00
4,125.00
1,400.00
750.00
25,025.00
220,690.00
=
=
=
=
Rp.
Rp.
Rp.
Rp.
1,320.00
2,448.00
5,304.00
9,072.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
4,200.00
15,000.00
1,680.00
300.00
21,180.00
30,252.00
=
=
=
=
Rp.
Rp.
Rp.
Rp.
436,800.00
151,200.00
226,800.00
814,800.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
210,000.00
43,750.00
4,900.00
150,000.00
408,650.00
1,223,450.00
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
1,223,200.00
15,249.20
11,970.00
3,375.00
1,253,794.20
65,100.00
43,750.00
4,900.00
4,500.00
118,250.00
1,372,044.20
KETERANGAN
Galian Tanah
Pondasi Batu Kali
Sloof Beton
Cor Lantai
Pasangan Lantai
Pasangan Bata
Plester
Aci
Cat
VOLUME
SATUAN HARGA SATUAN
7
m3
48,000.00
5
m3
860,335.00
10
m3
220,690.00
0.625
m3
1,223,450.00
12.5
m2
1,372,044.20
19.9
m2
242,480.00
19.9
m2
73,382.00
19.9
m2
63,851.00
19.9
m2
30,252.00
GRAND TOTAL
OVERHEAD 15%
HARGA TOTAL
336,000
4,301,675
2,206,900
764,656
17,150,553
4,825,352
1,460,302
1,270,635
602,015
32,918,087
37,855,800.34