Anda di halaman 1dari 40

Rincian Biaya Pekerjaa

PROYEK
Item
No.
1
1.1
1.2
1.3
1.4
1.5

1.5
1.6.1
1.6.2
1.6.3
1.6.4
1.6.5
1.6.6
1.6.7

1.6.8
1.6

2
2.1

2.2
2.2.1

2.2.2
2.2.3
2.2.4
2.2.5
2.2.6
2.2.7
2.2.8
2.2.9
2.2.10
2.2.11
2.2.12
2.2.13
2.2.14
2.2.15
2.2.16
2.2.17
2.2.18
2.2.19
2.2.20

2.3
2.3.1
2.3.2
2.3.3
2.3.5
2.3.6
2.3.7
2.3.8
2.3.9
2.3.10
2.3.11
2.3.12

2.4

2.4.1
2.4.1.1
2.4.1.2
2.4.1.3
2.4.1.4
2.4.1.5
2.4.1.6
2.4.1.7
2.4.1.8
2.4.1.9
2.4.1.10
2.4.1.11
2.4.1.12
2.4.1.13
2.4.1.14

2.4.2
2.4.1
2.4.2
2.4.3
2.4.4
2.4.5
2.4.6
2.4.7
2.4.8
2.4.9
2.4.10
2.4.11

2.5
2.5.1
2.5.2
2.5.3
2.5.4
2.5.5
2.5.6
2.5.7
2.5.8
2.5.9
2.5.10
2.5.11
2.5.12
2.5.13
2.5.14

2.6
2.6.1
2.6.2
2.6.3
2.6.4

2.7
2.7.1
2.7.2
2.7.3
2.7.4
2.7.5

2.7.6

2.7;7

2.7.8

2.8
2.8.1
2.8.1.1
2.8.1.2
2.8.1.3
2.8.1.4
2.8.1.5
2.8.1.6

2.8.2
2.8.2.1
2.8.2.2
2.8.2.3
2.8.2.4
2.8.2.5
2.8.2.7

2.8.2.8

2.8.3
2.8.4
A

2.8.5
2.8.6

2.9
2.9.1
2.9.2
2.9.3
2.9.4
2.9.5
2.9.6
2.9.7
2.9.8
2.9.9
2.9.10
2.9.11
2.9.12
2.9.13

2.10

2.10.1
2.10.2
2.10.3
2.10.4
2.10.5

2.10.6
2.10.7
2.10.8
2.10.9
2.10.10
2.10.11

2.10.12
2.10.13
2.10.14

Rincian Biaya Pekerjaan Persiapan


PROYEK PLTM LAHA
Jenis Pekerjaan
PEKERJAAN PERSIAPAN
Mobilisasi & Demobilisasi Peralatan
Access Road, bendung dan power house: (Galian tanah), L = 4.6 km
Access Road, bendung dan power house: (Galian berbatu), L = 4.6 km
Access Road, bendung dan power house: (Galian batu), L = 4.6 km
Perkerasan Access Road L= 1.5 km
Macadam
Lapisan Sirtu untuk perawatan
Bangunan fasilitas & sarana lainnya (200 m2)
Bangunan
Fasilitas Kantor ( furniture, komp dll.)
Fasilitas Laboratorium
Fasilitas Komunikasi
Dokumentasi dan Laporan
Pembongkaran Fasilitas Kontraktor dll.
Pengadaan Listrik dan Air Bersih
- Peralatan Pompa
- Instalasi
- Drilling
- Konstruksi & material
- Sistem Pipa
Pemasangan pagar sementara
Pembebasan Lahan
TOTAL 1
PEKERJAAN UTAMA
Sistem Pengelak / Coffering & dewatering
TOTAL 2.1
Pekerjaan Bendung, Intake & Saluran Transisi (L = 180.5 m)
Pembersihan lahan / tebas tebang&cabut tunggul

Galian tanah / Excavation,common soil


Galian berbatu / Excavation,weathered rock
Galian batu / Excavation,rock
Urugan kembali / Backfill selected random material
Timbunan tanah dipadatkan/Embankment
Pengupasan tanah/Stripping
Timbunan batu/rock fill
Pasangan batu kali / Stone Masonry (1Pc : 4Sand )
Beton / Concrete, fck=22 Mpa =K225 incl. formwork
Beton cyclope ( 60% batu kali, 40% mortar ) tubuh bendung
Beton / Concrete, fck=10 Mpa =K100
Baja tulangan / Reinforcement (deform bar )
Waterstop, PVC type D, W:320 mm
Bronjong / Gabion
Gebalan rumput / Sodding / Sod Facing
Pipa drainase / Drain Hole, dia.2", L = 1.00 m
Handrail ( 2 x dia.2", H:0,90m )
Joint Filler & Sealent
Rumah jaga bendung (L = 25 m2)
TOTAL 2.2
Kantong Lumpur/Sandtrap
Pembersihan lahan / tebas tebang&cabut tunggul
Galian tanah / Excavation,common soil
Galian berbatu / Excavation,weathered rock
Beton / Concrete, fck=22 Mpa =K225 incl. formwork
Beton / Concrete, fck=10 Mpa =K100
Baja tulangan / Reinforcement (deform bar )
Urugan kembali / Backfill selected ramdom material
Timbunan tanah dipadatkan/Embankment
Pengupasan tanah/Stripping
Waterstop,PVC type D, W:320 mm
Joint Filler & Sealent
TOTAL 2.3

SALURAN PENGHANTAR/ WATERWAY

Saluran Pembawa, L = 3,472 m


Pembersihan lahan / tebas tebang&cabut tunggul
Galian tanah / Excavation,common soil
Galian berbatu / Excavation,weathered rock
Galian batu / Excavation,rock
Urugan kembali / Backfill selected ramdom material
Timbunan tanah dipadatkan/Embankment
Pengupasan tanah/Stripping
Beton / Concrete, fck=22 Mpa =K225 incl. formwork
Beton / Concrete, fck=10 Mpa =K100
Baja tulangan / Reinforcement (deform bar )
Pasangan batu kali / Stone Masonry (1Pc : 4Sand )
Pekerjaan Plastering (1Pc : 3Sand)
Waterstop,PVC type D, W:320 mm
Pekerjaan Plastering (1Pc : 3Sand)
TOTAL 2.4.1
Bangunan Drainase/ Cross Drain (10 buah)
Galian tanah / Excavation,common soil
Galian berbatu / Excavation,weathered rock
Galian batu / Excavation,rock
Gebalan rumput / Sodding / Sod Facing
Urugan kembali / Backfill selected ramdom material
Pipa Beton Bertulang dia. 100 cm, t min = 12 cm
Beton / Concrete, fck=22 Mpa =K225 incl. formwork
Pasangan batu kali / Stone Masonry (1Pc : 4Sand )
Pekerjaan siaran / Pointing / Siaran (1Pc : 2Sand)
Pekerjaan Plastering (1Pc : 3Sand)
Pipa drainase / Drain Hole, dia.2", L = 1.00 m

TOTAL 2.4.2
TOTAL 2.4
Bak Penenang / Head Pond & Emergency spillway
Pembersihan lahan / tebas tebang&cabut tunggul
Galian tanah / Excavation,common soil
Galian berbatu / Excavation,weathered rock
Galian batu / Excavation,rock
Urugan kembali / Backfill selected ramdom material
Timbunan tanah dipadatkan/Embankment
Pengupasan tanah/Stripping
Beton / Concrete, fck=22 Mpa =K225 incl. formwork
Beton / Concrete, fck=10 Mpa =K100
Baja tulangan / Reinforcement (deform bar )
Waterstop,PVC type D, W:320 mm
Pekerjaan Plastering (1Pc : 3Sand)
Joint Filler & Sealent
Handrail (2 x dia.2", H:0,90m)
TOTAL 2.5
Inspection Road & side ditch, L = 4,700 m
Pekerjaan Surface Coarse / Lapen, t = 5 cm
Pek. Base Coarse, Agregat Class "B" t = 20 cm incl batu kancing,termasuk jln
Side ditch, concrete lining U type, (40 x 40 cm)
Patok "Hekto, dia15cm, H = 1,00 m"
TOTAL 2.6
Civil Work / Saddle support, anchor block for Penstock
Pembersihan lahan / tebas tebang & cabut tunggul
Galian tanah / Excavation,common soil
Galian berbatu / Excavation,weathered rock
Galian batu / Excavation,rock
Urugan kembali / Backfill selected ramdom material

Beton / Concrete, fck=22 Mpa =K225 incl. formwork

Beton / Concrete, fck=10 Mpa =K100

Baja tulangan / Reinforcement (deform bar )


TOTAL 2.7
Gedung Pembangkit / Power House dan Tailrace
Earth Works
Pembersihan lahan / tebas tebang & cabut tunggul
Galian tanah / Excavation,common soil
Galian berbatu / Excavation,weathered rock
Galian batu / Excavation,rock
Urugan kembali / Backfill selected ramdom material
Pekerjaan Plastering (1Pc : 3Sand)
TOTAL 2.8.1
Foundation Work incl Tail Race
Beton / Concrete, fck=22 Mpa =K225
Baja tulangan / Reinforcement (deform bar )
Beton / Concrete, fck=10 Mpa =K100
Pasangan Batu Pengaman Powerhouse
Pekerjaan Plastering (1Pc : 3Sand)
Waterstop,PVC type

Pek. Batu kosong / rip-rap (dia. Min 0,50 m)


TOTAL 2.8.2
Covering & Dewatering untuk Galian Pondasi Power House
Bangunan Gedung / Building Structure for Power House
Pekerjaan Atap
Rangka Baja incl. Gording

Atap seng Multiroof, t = 0,40 mm

Tembok Dinding

Pas Batu bata

Plesteran & Acian dll

Kaca tebal = 5 mm (tempered)

Pagar pengaman kawat harmonika

Pasangan batu dinding " batu palimanan/batu candi"


Pekerjaan Lantai
Lantai Keramik 40 x 40 cm
Lantai Keramik 40 x 40 cm (anti licin)
Lantai Keramik 20 x 20 cm
Pekerjaan Pintu dan Jendela Aluminium
Kusen Pintu ( 0,80 x 2,10 ) incl. daun pintu
Kusen Jendela ( 1,40 x 1,80 ) incl. daun jendela
Pintu besi Harmonika ( 7,00 x 4,50 m)
Pekerjaan Plumbing
Kloset Jongkok
Urinoir
Instalasi pipa air bersih, PVC dia. 1"

Instalasi pipa air kotor, PVC dia.4"

Pompa air
Tandon Air 1 m3

Septic Tank ( 1 x 2 x 1,5m ) & peresapan

Pekerjaan Listrik

Titik Lampu

Penangkal Petir & grounding


Pekerjaan lain-lain

Perkerasan/Pavment halaman Power House & sekitarnya

Cat dinding tembok

Pagar pengaman (wire fence,H:3.00 m)

Lampu penerangan

TOTAL 2.8.4
Rumah Jaga (3 x 3 m)
Rumah Genset (2.5 x 3 m)
TOTAL 2.8
Metal Work Gates
( desain, pabrikasi installation dan pintu dioperasikan manual dan motor listrik)
Flushing gate for Main Dam, B = 2.00 m x H= 4.0 m
Trash-rack Intake, B=2.25 x H=3.50 m
Intake Gates, B= 2.25 x H= 2.6 m
Intake on Sandtrap u/s, B= 2.0 x H= 2.45 m
Intake on Sandtrap d/s, B= 2.10 x H= 2.65 m
Pintu Intake Penstock, B=2.40 x H=2.80 m
Trash-rack Head Pond, B= 2.40 m x H= 9.0 m
Sandtrap Flushing valve dia 0.35 m
Head Pond Flushing gate
Stoplog Head Pond, B=2.40 m x H=9.0 m
Hydraulic Butterfly Valve Type DN, dia 1.00 m
Stoplog Tailrace, B=5.95 x H=1.00 m
Kelistrikan untuk pintu
TOTAL 2.9
Metal Work ( Penstock Mechanical works )
(Design by pabrikan, Pabrication, Furnishing & installation)

Penstock Pipe dia 2.40 m, t= 14 mm


Penstock Pipe dia 1.40 m, t= 16 mm
Penstock Pipe dia 1.00 m, t= 16 mm
Bifurcation Pipe dia 2.40 m - 2@1.75 m, t = 16 mm
Reducer Pipe dia 1.25 m - 1.00 m, t= 16 mm
Reducer Pipe dia 2.40 m - 1.40 m, t= 16 mm
Reducer Pipe dia 1.40 m - 1.00 m, t= 16 mm
Ring Girder, Bearing shoes & steel supporting plate, t= 20 mm
Expansion Joint Penstock, dia 2.40 m
Manhole Penstock, dia 0,80 m
Steel pipe for Headpond flushing dia. 40 cm
Dismantling joint, dia inner 2.40 mm
Dismantling joint, dia inner 1.75 mm
Dismantling joint, dia inner 2.40 mm
Dismantling joint, dia inner 1.40 mm
Dismantling joint, dia inner 1.00 mm
Painting Epoxy Corrosive protection
Air vent pipe for Headpond dia. 40 cm
Overhead traveling crane, capacity 15 ton
TOTAL 2.10
TOTAL
PAJAK PERTAMBAHAN NILAI 10 %

TOTAL HARGA

TOTAL HARGA ( PEMBULATAN )

aan Persiapan, Sipil dan Metal


EK PLTM LAHAT
Volume

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
2.00
2.00
20.00
20.00
2.00
500.00

Satuan

Harga Satuan

LS
m3
m3
m3

549,080,743.00
23,107.06
50,564.62
181,161.31

m2
m2
Ls
LS
LS
LS
LS
LS
LS
LS
Ins.unit
ls
m
m
ls
m

99,382.49
43,875.81
272,796,351.55
100,000,000.00
29,175,000.00
39,800,000.00
17,500,000.00
13,000,000.00
5,500,000.00
19,348,910.66
13,200,000.00
550,000.00
55,000.00
55,000.00
1,100,000.00
22,000.00

43.00

ha

1.00

LS

2,040,082,005.71

13,200.00

m2

1,329.85

25,558.14
4,720.81
30.31
5,393.18
5,892.58
3,733.18
2,147.28
2,991.69
6,378.98
3,620.55
180.10
649.68
647.18
4,288.83
2,187.91
222.00
441.78
1,553.47
1.00

m3
m3
m3
m3
m3
m2
m3
m3
m3
m3
m3
ton
m
m3
m2
nos
m
m
ls

23,107.06
50,564.62
181,161.31
109,936.93
107,034.95
12,831.94
161,561.21
558,082.93
1,071,639.63
405,862.70
718,825.17
13,353,548.73
330,976.80
370,113.52
23,889.58
76,150.88
271,599.31
60,012.24
75,000,000.00

3,400.00
5,047.10
286.29
886.97
59.24
134.41
781.54
1,573.32
520.85
237.01
1,301.58

m2
m3
m3
m3
m3
ton
m3
m3
m2
m
m

1,329.85
23,107.06
50,564.62
1,164,250.72
718,825.17
13,353,548.73
107,034.95
107,034.95
12,831.94
330,976.80
60,012.24

1.00
42,946.05
44,766.25
21,590.35
384.23
4,709.26
7,403.40
180.55
11.55
31.01
15,171.93
5,167.62
42.00
75,127

m2
m3
m3
m3
m3
m3
m3
m3
m3
ton
m3
m2
m
m2

1,329.85
23,107.06
50,564.62
181,161.31
109,936.93
107,034.95
12,831.94
1,322,763.22
718,825.17
13,353,548.73
558,082.93
68,769.17
330,976.80
68,769

1,335.01
628.61
672.20
256.22
1,673.17
244.68
48.69
351.20
328.47
182.57
100.00

m3
m3
m3
m2
m3
m
m3
m3
m2
m2
nos

23,107.06
50,564.62
181,161.31
23,889.58
109,936.93
917,209.90
1,159,188.22
558,082.93
25,857.02
68,769.17
76,150.88

1,899.00
7,872.51
3,037.18
1,167.68
1,916.31
380.36
154.60
2,131.51
103.77
297.92
507.98
1,495.70
471.03
222.94

m2
m3
m3
m3
m3
m3
m2
m3
m3
ton
m
m2
m
m

1,329.85
23,107.06
50,564.62
181,161.31
109,936.93
107,034.95
12,831.94
1,159,188.22
718,825.17
13,353,548.73
330,976.80
68,769.17
60,012.24
271,599.31

18,800.00
3,760.00
5,200.00
95.00

m2
m3
m
nos

41,078.32
353,893.98
430,701.02
328,562.03

4,038.00
19,625.29
5,256.85
3,754.55
2,516.72

m2
m3
m3
m3
m3

1,329.85
23,107.06
50,564.62
181,161.31
109,936.93

1,140.72

m3

1,159,188.22

354.42

m3

718,825.17

97.07

ton

13,353,548.73

26,199.00
27,585.56
9,065.87
6,314.31
859.38
904.50

m2
m3
m3
m3
m3
m2

1,329.85
23,107.06
50,564.62
181,161.31
109,936.93
68,769.17

1,185.01
122.75
65.51
1,372.80
234.44
138.92

m3
ton
m3
m3
m2
m'

1,159,188.22
13,353,548.73
718,825.17
558,082.93
68,769.17
330,976.80

135.00

m3

161,561.21

1.00

ls

589,838,564.13

9.07

ton

16,500,000.00

1,038.02

m2

192,500.00

912.62

m2

137,500.00

1,825.25

m2

55,000.00

53.76

m2

880,000.00

30.75

m2

650,507.25

139.80

m2

275,000.00

228.82
360.00
3.91

m2
m2
m2

165,000.00
165,000.00
165,000.00

5.00
9.00
31.50

buah
buah
m2

5,500,000.00
2,860,000.00
550,000.00

1.00
1.00
30.00

buah
buah
m

440,000.00
1,925,000.00
23,100.00

30.00

141,350.00

1.00

set

4,950,000.00

1.00

unit

3,850,000.00

1.00

unit

5,500,000.00

50.00

titik

596,200.00

1.00

Ls

38,500,000.00

1.00

Ls

151,746,723.26

912.62

m2

16,500.00

235.60

450,007.03

1.00

Ls

93,500,000.00

1.00

Ls

29,700,000.00

1.00

Ls

24,750,000.00

2.00
2.00
2.00
2.00
2.00
1.00
2.00
125.00
1.00
1.00
2.00
2.00
1.00

set
set
set
set
set
set
set
m
set
set
set
set
Ls

179,378,100.00
91,632,200.00
139,214,900.00
128,803,400.00
122,015,300.00
150,271,000.00
226,552,700.00
884,576.00
110,572,000.00
278,811,500.00
178,750,000.00
128,669,200.00
398,750,000.00

otor listrik)

216.00
50.00
28.50
1.00
3.00
3.00
3.00
15.00
3.00
6.00
2.10
1.00
1.00
3.00
3.00
3.00
2,220.53
8.00
1.00

m'
m'
m'
bh
bh
bh
bh
set
bh
bh
m'
set
set
set
set
set
m2
m'
Ls

17,491,719.30
11,661,146.20
8,329,390.30
104,950,314.70
53,974,448.00
20,990,062.50
10,411,737.60
62,167,875.00
27,500,000.00
8,250,000.00
41,445,250.00
21,414,800.00
9,336,250.00
165,000.00
3,644,108.60
385,000,000.00

Jumlah

549,080,743.00
23,107.06
50,564.62
181,161.31
267,223,910.66
100,000,000.00
29,175,000.00
39,800,000.00
17,500,000.00
13,000,000.00
5,500,000.00
19,348,910.66
26,400,000.00
1,100,000.00
1,100,000.00
1,100,000.00
2,200,000.00
11,000,000.00
816,559,486.64

2,040,082,005.71
2,040,082,005.71

17,554,074.06

590,573,583.17
238,705,943.67
5,490,999.22
592,909,641.02
630,711,998.44
47,903,952.16
346,917,161.71
1,669,611,124.14
6,835,967,764.52
1,469,446,194.97
129,460,413.78
8,675,514,707.15
214,201,565.42
1,587,354,394.87
52,268,247.27
16,905,494.46
119,987,141.53
93,227,213.90
75,000,000.00
23,409,711,615.46
4,521,503.92
116,623,756.88
14,476,204.52
1,032,653,790.80
42,583,731.63
1,794,805,455.16
83,651,566.72
168,399,692.57
6,683,501.23
78,445,936.69
78,110,880.47
3,420,956,020.58

1,329.85
992,357,113.66
2,263,588,381.40
3,911,336,205.83
42,241,447.30
504,055,001.48
95,000,021.24
238,824,898.74
8,302,430.76
414,141,557.85
8,467,193,067.21
355,372,811.75
13,901,025.60
5,166,436,795.02
22,472,752,087.69

30,848,219.15
31,785,241.07
121,776,340.71
6,120,987.75
183,942,721.18
224,422,917.45
56,435,194.24
195,997,057.85
8,493,204.20
12,554,955.61
7,615,087.59

879,991,926.82
23,352,744,014.51

2,525,392.93
181,910,515.19
153,574,006.37
211,538,125.18
210,673,096.52
40,711,851.11
1,983,872.44
2,470,820,204.25
74,594,218.48
3,978,280,372.89
168,128,270.96
102,858,357.14
28,267,325.18
60,550,349.34
7,686,415,957.98

772,272,472.85
1,330,641,371.74
2,239,645,278.15
31,213,392.64
4,373,772,515.39

5,369,950.84
453,482,844.29
265,810,725.19
680,179,365.47
276,680,168.14

1,322,304,215.97

254,764,803.24

1,296,288,893.68
4,554,880,966.80

34,840,847.44
637,421,244.78
458,412,364.49
1,143,909,029.70
94,477,674.11
62,201,710.17
2,431,262,870.69

1,373,650,764.43
1,639,083,602.99
47,089,299.06
766,136,247.81
16,122,380.69
45,978,803.24

21,810,763.77
3,909,871,862.00
589,838,564.13

149,720,849.60

199,818,338.07

125,485,593.75

100,388,475.00

47,308,800.00

20,003,098.08

38,445,000.00

37,754,970.00
59,400,000.00
645,150.00

27,500,000.00
25,740,000.00
17,325,000.00

440,000.00
1,925,000.00
693,000.00

4,240,500.00

4,950,000.00
3,850,000.00

5,500,000.00

29,810,000.00

38,500,000.00

151,746,723.26

15,058,271.25

106,021,657.04

93,500,000.00

1,305,770,426.05
29,700,000.00
24,750,000.00
8,291,193,722.87

358,756,200.00
183,264,400.00
278,429,800.00
257,606,800.00
244,030,600.00
150,271,000.00
453,105,400.00
110,572,000.00
110,572,000.00
278,811,500.00
357,500,000.00
257,338,400.00
398,750,000.00
3,439,008,100.00

3,778,211,368.80
583,057,310.00
237,387,623.55
104,950,314.70
161,923,344.00
62,970,187.50
156,176,064.00
186,503,625.00
165,000,000.00
17,325,000.00
124,335,750.00
64,244,400.00
28,008,750.00
366,387,450.00
29,152,868.80
385,000,000.00
6,450,634,056.35
87,835,958,462.29
8,783,595,846.23

96,619,554,308.51

96,619,554,000.00