JENIS PEKERJAAN
: 1.2
: MOBILISASI
No.
URAIAN
A.
Sewa Tanah
B.
PERALATAN
Periksa lembar 1.2-2
SATUAN
9.050.000
....
D.
1
M2
Set
Set
Set
Set
Set
Set
Set
Bln
Bituminous Testing
Marshall Asphalt Test
Extraction Test, Centrifuge/Refflux Method
Specific Gravity for Coarse Aggregate
Specific Gravity for Fine Aggregate
Mix Air Viod Content (Accurate Method)
Core Drill
Metal Thermometer
Accessories and Tolls
Penetration Test
Softening Point
Refusal Density Compactor
Set
Set
Set
Set
Set
Set
Set
Set
Bln
Set
Set
Concrete Testing
Slump Cone
Cylinder/Cube Mould for Compressive Strength
Beam Mould for Flexural Strength (RIGID)
Crushing Machine
Set
Set
Set
Set
Lembar 1.2-1
JUMLAH
HARGA
(Rp.)
M2
C.
1
2
3
4
5
6
VOL.
HARGA
SATUAN
(Rp.)
Pendukung
Operasional
1.500.000
1.500.000
E.
E.I.
1
2
3
4
5
6
MOBILISASI LAINNYA
PEKERJAAN DARURAT
Perkuatan Jembatan Lama
Pemeliharaan Jalan Kerja / Samping
Pemindahan Utilitas Bawah tanah
Pemindahan Tiang listrik PLN
......................
......................
LS
LS
LS
LS
LS
....
....
E.II.
1
2
3
4
5
6
LAIN-LAIN
Komunikasi Lapangan Lengkap
Papan Nama Proyek
As Build Drawing
Administrasi dan Dokumentasi
......................
......................
Set
Ls
Set
Ls
....
....
F.
LS
G.
DEMOBILISASI
LS
1
1
2
1.000.000
500.000
750.000
1.000.000
500.000
1.500.000
8.000.000
8.000.000
21.550.000
No.
B.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
: 1.2
: MOBILISASI
JENIS ALAT
KODE
ALAT
SATUAN
E01
E02
E03
E04
E05
E06
E07
E08
E09
E10
E11
E12
E13
E14
E15
E16
E17
E18
E19
E20
E21
E22
E23
E24
E25
E26
E27
E28
E29
E30
E31
E32
E33
E34
E35
E37
E36
E38
E39
E40
E41
E42
E43
E44
E45
E46
E47
E48
E49
E50
E51
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
VOL.
Lembar 1.2-2
JUMLAH
HARGA
(Rp.)
HARGA
SATUAN
(Rp.)
PERALATAN
ASPHALT MIXING PLANT
ASPHALT FINISHER
ASPHALT SPRAYER
BULLDOZER 100-150 HP
COMPRESSOR 4000-6500 L\M
CONCRETE MIXER 0.3-0.6 M3
CRANE 10-15 TON
DUMP TRUCK 3.5 TON
DUMP TRUCK 10 TON
EXCAVATOR 80-140 HP
FLAT BED TRUCK 3-4 M3
GENERATOR SET
MOTOR GRADER >100 HP
TRACK LOADER 75-100 HP
WHEEL LOADER 1.0-1.6 M3
THREE WHEEL ROLLER 6-8 T
TANDEM ROLLER 6-8 T.
TIRE ROLLER 8-10 T.
VIBRATORY ROLLER 5-8 T.
CONCRETE VIBRATOR
STONE CRUSHER
WATER PUMP 70-100 mm
WATER TANKER 3000-4500 L.
PEDESTRIAN ROLLER
TAMPER
JACK HAMMER
FULVI MIXER
CONCRETE PUMP
TRAILER 20 TON
PILE DRIVER + HAMMER
CRANE ON TRACK 35 TON
WELDING SET
BORE PILE MACHINE
ASPHALT LIQUID MIXER
TRONTON
COLD MILLING MACHINE
ROCK DRILL BREAKER
COLD RECYCLER
HOT RECYCLER
AGGREGAT (CHIP) SPREADER
ASPHALT DISTRIBUTOR
SLIP FORM PAVER
CONCRETE PAN MIXER
CONCRETE BREAKER
ASPAHLT TANKER
CEMENT TANKER
CONDRETE MIXER (350)
VIBRATING RAMMER
TRUK MIXER (AGITATOR)
BORE PILE MACHINE
CRANE ON TRACK 75-100 TON
200.000.000
0
1
250.000
0
0
250.000
2
1
150.000
250.000
0
300.000
250.000
4.000.000
4.000.000
4.000.000
4.000.000
250.000
250.000
500.000
500.000
1.000.000
1.000.000
1.000.000
200.000
500.000
300.000
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
9.050.000
Analisa El - 121
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
: 1.21.
: Manajemen Mutu
: Lump Sum
No.
URAIAN
A.
1
2
3
4
B.
1
2
3
4
C.
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
JUMLAH
HARGA
(Rp.)
URUTAN KERJA
Penyedia setelah menerima SPMK mengusulkan personil
Tenaga Ahli Mutu Pekerjaan sbg Manajer Kendali Mutu
Tenaga Ahli dibantu oleh Asisten Kendali Mutu yang
berpengalaman dibidangnya dan tenaga pendukung
Membuat RMK dan laporan mutu yg disetujui PPK
Melakukan pengendalian mutu semua pekerjaan dan
membuat laporan secara berkala
TENAGA / PERSONIL
Bulan
OB
1,00
OB
500.000,00
OB
2,00
750.000,00
1.500.000,00
Bulan
1,00
500.000,00
500.000,00
Catatan : 1. Harga Satuan Personil tersebut sudah termasuk seluruh pajak dan bea (kecuali PPN),
Asuransi Tenaga Kerja dan pengeluaran lainnya.
2. Biaya tersebut sudah termasuk biaya pembuatan laporan yang terkait dengan mutu pekerjaan
3. Biaya satuan tersebut sudah termasuk kebutuhan perlengkapan dan peralatan pendukung yang
diperlukan pembuatan laporan mutu seperti komputer, printer, kertas dan sebagainya.
1.000.000,00
1.000.000,00
-
3.000.000,00
Analisa EI-211
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
Peningkatan Jalan Desa Rimbo Besar - Desa Talang Beringin Kec. SAM
: Bengkulu / Kabupaten Seluma
: 2.1.(1)
: Galian untuk Selokan Drainase dan Saluran Air
: M3
NO.
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
A.
TENAGA
1.
2.
Pekerja
Mandor
B.
(L01)
(L03)
jam
jam
4,6500
0,1550
HARGA
SATUAN
(Rp.)
10.375,00
18.125,00
JUMLAH
HARGA
(Rp.)
48.243,75
2.809,38
51.053,13
0,00
BAHAN
C.
PERALATAN
1.
2.
3.
Excavator
Dump Truck
Alat Bantu
(E10)
(E08)
jam
jam
Ls
0,0000
0,0000
1,0000
723.303,58
402.013,69
1.500,00
3
4
0,00
0,00
1.500,00
1.500,00
Analisa EI-221
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
Peningkatan Jalan Desa Rimbo Besar - Desa Talang Beringin Kec. SAM
: Bengkulu / Kabupaten Seluma
: 2.2.(1)
: Pasangan Batu dengan Mortar
: M3
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
A.
TENAGA
1.
2.
3.
Pekerja
Tukang Batu
Mandor
(L01)
(L02)
(L03)
jam
jam
jam
27,9000
13,9500
1,3950
HARGA
SATUAN
(Rp.)
10.375,00
11.750,00
18.125,00
BAHAN
1.
2.
3.
Batu
Semen (PC)
Pasir
(M02)
(M12)
(M01)
M3
zak
M3
1,0800
161,0000
0,4829
192.000,00
1.520,00
180.000,00
PERALATAN
1.
2.
Conc. Mixer
Alat Bantu
(E06)
jam
Ls
0,0000
1,0000
116.705,71
3.000,00
3
4
JUMLAH
HARGA
(Rp.)
289.462,50
163.912,50
25.284,38
478.659,38
207.360,00
244.720,00
86.917,37
538.997,37
0,00
3.000,00
3.000,00
No.
I.
1
2
3
4
5
6
II.
1
2
3
4
: 2.1.(1)
: Galian untuk Selokan Drainase dan Saluran Air
: M3
URAIAN
KODE
ASUMSI
Menggunakan Tenaga Manusia (Manual)
Lokasi pekerjaan : sepanjang jalan
Kondisi Jalan : baik
Jam kerja efektif per-hari
Faktor pengembangan bahan
Berat volume bahan
URUTAN KERJA
Penggalian dilakukan dengan menggunakan Excavator
Selanjutnya Excavator menuangkan material hasil
galian kedalam Dump Truck
Dump Truck membuang material hasil galian keluar
lokasi jalan sejauh
Sekelompok pekerja akan merapikan hasil galian
III.
1.
BAHAN
Tidak ada bahan yang diperlukan
2.
2.a.
ALAT
EXCAVATOR
Kapasitas Bucket
Faktor Bucket
Faktor Efisiensi alat
Waktu siklus = T1 + T2
- Menggali, memuat dan berputar
- Lain lain
Kap. Prod. / jam =
V x Fb x Fa x 60 x Fk
Ts1
Koefisien Alat / M3
2.b.
= 1 : Q1
DUMP TRUCK
Kaasitas bak
Faktor efisiensi alat
Kecepatan rata-rata bermuatan
Kecepatan rata-rata kosong
Waktu siklus :
- Muat
= (V x 60)/ D x Q1
- Waktu tempuh isi
= (L : v1) x 60
- Waktu tempuh kosong
= (L : v2) x 60
- Lain-lain
Koefisien Alat / M3
= 1 : Q2
V x Fa x 60
D x Fk x Ts2
Analisa EI-211
URAIAN ANALISA HARGA SATUAN
KOEF.
SATUAN
Tk
Fk
D
8,00
jam
1,20
1,60 Ton/M3
2,00
Km
(E10)
V
Fb
Fa
0,93
1,00
0,83
M3
-
Ts1
T1
T2
Q1
0,42
0,32
0,10
132,33
menit
menit
menit
M3
0,0076
Jam
5,00
0,83
20,00
30,00
ton
Km/Jam
Km/Jam
1,42
6,00
4,00
1,00
12,42
menit
menit
menit
menit
menit
Q2
10,44
M3
0,0957
Jam
(E08)
V
Fa
v1
v2
Ts2
T1
T2
T3
T4
KETERANGAN
Faktor Konversi
masuk dalam
waktu siklus
disesuaikan dgn
lapangan
: 2.1.(1)
: Galian untuk Selokan Drainase dan Saluran Air
: M3
Analisa EI-211
URAIAN ANALISA HARGA SATUAN
Lanjutan
No.
URAIAN
2.d.
ALAT BANTU
Diperlukan alat-alat bantu kecil
- Sekop
- Keranjang + Sapu
3.
TENAGA
Produksi menentukan : MANUAL
Produksi Galian / hari = Tk x Q manual
Kebutuhan tenaga :
- Pekerja
- Mandor
Koefisien tenaga / M3 :
- Pekerja
- Mandor
KODE
= (Tk x P) : Qt
= (Tk x M) : Qt
4.
5.
57.808,44 / M3
6.
7.
KOEF.
SATUAN
Q man
Qt
1,29
10,32
M3/Jam
M3
P
M
6,00
0,20
orang
orang
4,6500
0,1550
Jam
Jam
(L01)
(L03)
KETERANGAN
: 2.2.(1)
: Pasangan Batu dengan Mortar
: M3
No.
I.
1
2
3
4
5
6
7
II.
1
2
3
URAIAN
ASUMSI
Menggunakan tenaga manusia (manual)
Lokasi pekerjaan : sepanjang jalan
Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
Jarak rata-rata Base camp ke lokasi pekerjaan
Jam kerja efektif per-hari
Perbandingan Pasir & Semen
: - Volume Semen
: - Volume Pasir
Perbandingan Batu & Mortar :
- Batu
- Mortar (campuran semen & pasir)
Berat Jenis Bahan :
- Pasangan Batu Dengan Mortar
- Batu
- Adukan (mortar)
- Pasir
- Semen Portland
KODE
KOEF.
L
Tk
Sm
Ps
30,0
8,00
20
80
Bt
Mr
60
40
D1
D2
D3
D4
D5
2,40
1,60
1,80
1,67
1,44
SATUAN
KM
jam
%
%
KETERANGAN
%
%
ton/M3
ton/M3
ton/M3
ton/M3
ton/M3
URUTAN KERJA
Semen, pasir dan air dicampur dan diaduk menjadi
mortar dengan menggunakan alat bantu
Batu dibersihkan dan dibasahi seluruh permukaannya
sebelum dipasang
Penyelesaian dan perapihan setelah pemasangan
III.
1.
1.a.
1.b.
BAHAN
Batu ----->
Semen ---->
1.c.
Pasir
2.
2.a.
ALAT
CONCRETE MIXER
Kapasitas Alat
Faktor Efisiensi Alat
Waktu siklus :
(T1 + T2 + T3 + T4)
- Memuat
- Mengaduk
- Menuang
- Menunggu, dll.
----->
Koefisien Alat / M3
2.a.
Analisa EI-221
ALAT BANTU
Diperlukan :
- Sekop
- Pacul
- Sendok Semen
- Ember Cor
- Gerobak Dorong
V x Fa x 60
1000 x Ts1
= 1 : Q1
M3
(M12)
(M01)
1,1
0,1120
161
0,4829
(E06)
V
Fa
500,00
0,83
Liter
-
T1
T2
T3
T4
Ts1
8,00
3,00
1,00
5,00
17,00
menit
menit
menit
menit
menit
Q1
1,465
M3
(E06)
0,6827
jam
(M02)
Lepas
Kg
M3
Lump Sum
=
=
=
=
=
4
4
4
8
3
buah
buah
buah
buah
buah
: 2.2.(1)
: Pasangan Batu dengan Mortar
: M3
Analisa EI-221
URAIAN ANALISA HARGA SATUAN
Lanjutan
No.
3.
URAIAN
KODE
TENAGA
Produksi Pas. Batu yang menentukan (manual)
Produksi Pasangan Batu dalam 1 hari = Tk x Q manual
Kebutuhan tenaga :
- Mandor
- Tukang Batu
- Pekerja
Koefisien Tenaga / M3 :
- Mandor
- Tukang
- Pekerja
= (Tk x M) : Qt
= (Tk x Tb) : Qt
= (Tk x P) : Qt
4.
5.
1.122.722,41 / M3
6.
7.
KOEF.
SATUAN
Q man
Qt
0,43
3,44
M3/Jam
M3
M
Tb
P
0,60
6,00
12,00
orang
orang
orang
(L03)
(L02)
(L01)
1,3950
13,9500
27,9000
jam
jam
jam
KETERANGAN
Analisa EI-323
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
Peningkatan Jalan Desa Rimbo Besar - Desa Talang Beringin Kec. SAM
: Bengkulu / Kabupaten Seluma
: 3.3.(1)
: Penyiapan Badan Jalan
: M2
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
A.
TENAGA
1.
2.
Pekerja
Mandor
B.
(L01)
(L02)
jam
jam
0,0078
0,0020
HARGA
SATUAN
(Rp.)
10.375,00
18.125,00
JUMLAH
HARGA
(Rp.)
81,16
35,45
116,61
0,00
BAHAN
C.
1.
2.
3
PERALATAN
Motor Grader
Vibro Roller
Alat Bantu
D.
E.
F.
Note: 1
2
3
4
(E13)
(E19)
jam
jam
Ls
0,0020
0,0005
1,0000
275.000,00
286.953,39
500,00
537,84
135,05
500,00
1.172,89
No.
I.
1
2
3
4
5
II.
1
2
3
: 3.3.(1)
: Penyiapan Badan Jalan
: M2
URAIAN
2.
2.a.
ALAT
MOTOR GRADER
Panjang operasi grader sekali jalan
Lebar Efektif kerja Blade
Lebae overlap
Faktor Efisiensi Alat
Kecepatan rata-rata alat
Jumlah lintasan
Jumlah lajur lintasan
Waktu siklus
- Perataan 1 kali lintasan = Lh : (v x 1000) x 60
- Lain-lain
Koefisien Alat / m2
(E13)
Lh
b
bo
Fa
v
n
N
Ts1
T1
T2
Ts1
Lh x (N(b-bo)+bo) x Fa x 60
n x Ts1
= 1 : Q1
VIBRATOR ROLLER
Kecepatan rata-rata alat
Lebar efektif pemadatan
Jumlah lintasan
Lajur lintasan
Lebar Overlap
Faktor efisiensi alat
Kapasitas Produksi / Jam =
3.
Tk
KOEF.
SATUAN
8,00
Jam
50,00
2,60
0,30
0,80
4,00
4,00
2,00
M
M
Km / Jam
lintasan
lajur
0,75
5,00
5,75
menit
menit
menit
KETERANGAN
URUTAN KERJA
Motor Grader meratakan permukaan hasil galian
Vibro Roller memadatkan permukaan yang telah
dipotong/diratakan oleh Motor Grader
Sekelompok pekerja akan membantu meratakan
badan jalan dengan alat bantu
PEMAKAIAN BAHAN, ALAT DAN TENAGA
BAHAN
Tidak diperlukan bahan / material
2.d.
KODE
ASUMSI
Pekerjaan dilaksanakan hanya pada tanah galian
Pekerjaan dilakukan secara mekanis
Lokasi pekerjaan : sepanjang jalan
Kondisi Jalan : jelek / belum padat
Jam kerja efektif per-hari
III.
1.
2.b.
Analisa EI-323
(v x 1000) x (N(b-bo)+bo) x Fa
n
Koefisien Alat / m2
= 1 : Q2
ALAT BANTU
Diperlukan alat-alat bantu kecil
- Sekop =
3 buah
Q1
511,30
M2
(E13)
0,0020
Jam
(E19)
v
b
n
N
bo
Fa
4,00
1,48
6,00
3,00
0,30
0,83
Q2
(E19)
Km / jam
M
lintasan
M
-
2.124,80
M2
0,0005
Jam
Lump Sum
TENAGA
Produksi menentukan : MOTOR GRADER
Produksi Pekerjaan / hari = Tk x Q1
Kebutuhan tenaga :
- Pekerja
- Mandor
Q1
Qt
511,30
4.090,43
P
M
4,00
1,00
M2/Jam
M2
orang
orang
Koefisien tenaga / M2
- Pekerja
- Mandor
= (Tk x P) : Qt
= (Tk x M) : Qt
(L01)
(L02)
0,0078
0,0020
Jam
Jam
Berlanjut ke halaman berikut
: 3.3.(1)
: Penyiapan Badan Jalan
: M2
Analisa EI-323
URAIAN ANALISA HARGA SATUAN
Lanjutan
No.
URAIAN
4.
5.
1.418,45 / M2
6.
7.
KODE
KOEF.
SATUAN
KETERANGAN
Analisa EI-322
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
Peningkatan Jalan Desa Rimbo Besar - Desa Talang Beringin Kec. SAM
: Bengkulu / Kabupaten Seluma
: 3.2.(2a)
: Timbunan Pilihan Dari Sumber Galian
: M3
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
A.
TENAGA
1.
2.
Pekerja
Mandor
(L01)
(L03)
Jam
Jam
1,4861
0,3715
HARGA
SATUAN
(Rp.)
10.375,00
18.125,00
BAHAN
1.
(M09)
M3
1,1100
168.000,00
PERALATAN
Wheel Loader
Dump Truck
Motor Grader
Tandem
Water Tanker
Alat Bantu
D.
E.
F.
Note: 1
2
3
4
(E15)
(E08)
(E13)
(E17)
(E23)
Jam
Jam
Jam
Jam
Jam
Ls
0,0000
0,3715
0,0024
0,0097
0,0070
1,0000
JUMLAH
HARGA
(Rp.)
15.418,56
6.734,01
22.152,57
186.480,00
186.480,00
393.847,41
310.640,00
275.000,00
300.795,57
338.701,35
3.000,00
0,00
115.412,58
654,76
2.906,50
2.380,43
3.000,00
124.354,28
: 3.2.(2a)
: Timbunan Pilihan Dari Sumber Galian
: M3
No.
I.
1
2
3
4
5
6
7
8
II.
1
2
3
4
URAIAN
URUTAN KERJA
Whell Loader memuat ke dalam Dump Truck
Dump Truck mengangkut ke lapangan dengan jarak
sumber galian ke lapangan
Material dihampar dengan menggunakan Motor Grader
Hamparan material disiram air dengan Watertank Truck
(sebelum pelaksanaan pemadatan) dan dipadatkan
dengan menggunakan Tandem Roller
Selama pemadatan sekelompok pekerja akan
merapikan tepi hamparan dan level permukaan
dengan menggunakan alat bantu
PEMAKAIAN BAHAN, ALAT DAN TENAGA
BAHAN
Bahan pilihan
= 1 x Fv
2.
2.a.
ALAT
WHEEL LOADER
Kapasitas Bucket
Faktor Bucket
Faktor Efisiensi Alat
Waktu sklus
- Muat
2.b.
V x Fb x Fa x 60
Fk x Ts1
1/=
Q11 : Q1
DUMP TRUCK
Kapasitas bak
Faktor efisiensi alat
Faktor Konversi asli ke lepas
Kecepatan rata-rata bermuatan
Kecepatan rata-rata kosong
Waktusiklus :
- Waktu muat =
= (V x 60)/(D x Fk x Q1)
- Waktu tempuh isi = (L : v1) x 60
- Waktu tempuh kosong = (L : v2) x 60
- Lain-lain
Koefisien Alat / m3
= 1 : Q2
SATUAN
8,00
1,20
1,11
0,25
1,60
Jam
M
Ton/M3
25,00
Km
(M09)
1,11
M3
1,50
0,85
0,83
M3
-
0,45
0,45
menit
menit
Q1
117,58
M3
(E15)
0,0085
Jam
6,00
0,90
0,90
30,00
50,00
M3
Km / Jam
Km / Jam
1,59
50,00
30,00
2,00
83,59
menit
menit
menit
menit
menit
2,69
M3
0,3715
Jam
(E08)
V
Fa
Fv2
v1
v2
Ts2
T1
T2
T3
T4
Ts2
V x Fa x 60
D x Fv2 x Ts2
KOEF.
Tk
Fk
Fv
t
D
(E15)
V
Fb
Fa
Ts1
T1
Ts1
Koefisienalat / M3 =
KODE
ASUMSI
Pekerjaan dilakukan secara mekanis
Lokasi pekerjaan : sepanjang jalan
Kondisi Jalan : baik
Jam kerja efektif per-hari
Faktor pengembangan bahan
Faktor pengembangan bahan (padat ke asli)
Tebal hamparan padat
Berat volume bahan (lepas)
III.
1.
1.a.
Analisa EI-322
Q2
(E08)
KETERANGAN
: 3.2.(2a)
: Timbunan Pilihan Dari Sumber Galian
: M3
Analisa EI-322
URAIAN ANALISA HARGA SATUAN
Lanjutan
No.
2.c.
URAIAN
MOTOR GRADER
Panjang hamparan
Lebar Efektif kerja Blade
Lebar overlap
Faktor Efisiensi Alat
Kecepatan rata-rata alat
Jumlah lintasan
Jumlah lajur lintasan
Waktu siklus
- Perataan 1 kali lintasan
- Lain-lain
Koefisien Alat / m3
Lh x (N(b-bo)+bo) x t x Fa x 60
Ts3 x n
= 1 : Q3
TANDEM
Kecepatan rata-rata alat
Lebar efektif pemadatan
Jumlah lintasan
Jumlah lajur lintasan
Lebar overlap
Waktu siklus
Faktor efisiensi alat
Kapasitas Prod./Jam =
Koefisien Alat / m3
2.e.
(v x 1000) x (N(b-bo)+bo) x t x Fa
n
= 1 : Q4
Koefisien Alat / m3
2.f.
3.
(E13)
Lh
b
bo
Fa
v
n
N
Ts3
T1
T2
Ts3
= Lh : (v x 1000) x 60
Kapasitas Produksi/Jam =
2.d.
KODE
pa x Fa x 60
1000 x Wc
= 1 : Q5
KOEF.
SATUAN
50,00
2,60
0,30
0,80
4,00
4,00
2,00
0,75
1,00
1,75
m
m
m
Panduan
Km / Jam
lintasan
menit
menit
menit
Q3
420,00
M3
(E13)
0,0024
Jam
(E17)
v
b
n
N
bo
Ts3
Fa
Q4
0,83
103,49
M3
(E17)
0,0097
Jam
(E23)
V
Wc
pa
Fa
4,00
0,07
200,00
0,83
M3
M3
liter/menit
-
Q5
142,29
M3
(E23)
0,0070
Jam
1,50
1,48
8,00
2,00
0,30
KETERANGAN
Km / jam
M
lintasan
m
ALAT BANTU
Diperlukan alat-alat bantu kecil
- Sekop =
3 buah
Lump Sump
TENAGA
Produksi menentukan : DUMP TRUCK
Produksi Timbunan / hari = Tk x Q1
Kebutuhan tenaga :
- Pekerja
- Mandor
Q1
Qt
2,69
21,53
M3/Jam
M3
P
M
4,00
1,00
orang
orang
Koefisien tenaga / M3 :
- Pekerja
- Mandor
4.
= (Tk x P) : Qt
= (Tk x M) : Qt
(L01)
(L03)
1,4861
0,3715
Jam
Jam
: 3.2.(2a)
: Timbunan Pilihan Dari Sumber Galian
: M3
Analisa EI-322
URAIAN ANALISA HARGA SATUAN
Lanjutan
No.
5.
URAIAN
366.285,53 / M3.
6.
7.
KODE
KOEF.
SATUAN
KETERANGAN
Analisa EI-611a
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
Peningkatan Jalan Desa Rimbo Besar - Desa Talang Beringin Kec. SAM
: Bengkulu / Kabupaten Seluma
: 6.1 (1)(a)
: Lapis Resap Pengikat - Aspal Cair
: Liter
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
A.
TENAGA
1.
2.
Pekerja
Mandor
(L01)
(L03)
Jam
Jam
0,0021
0,0004
HARGA
SATUAN
(Rp.)
10.375,00
18.125,00
BAHAN
1.
2.
Aspal
Kerosene
(M10)
(M11)
Kg
liter
0,6790
0,3708
12.903,23
13.000,00
PERALATAN
1.
2.
3
Asp. Distributor
Compressor
Alat Bantu
E41
E05
Set
Jam
Jam
Jam
0,0000
0,0002
1,0000
467.995,54
225.383,56
5.000,00
3
4
JUMLAH
HARGA
(Rp.)
21,61
7,55
29,17
8.760,98
4.820,40
13.581,38
0,00
46,95
5.000,00
5.046,95
: 6.1 (1)(a)
: Lapis Resap Pengikat - Aspal Cair
: Liter
No.
I.
1
2
3
4
5
6
II.
1
2
3
URAIAN
ASUMSI
Menggunakan alat berat (cara mekanik)
Lokasi pekerjaan : sepanjang jalan
Jarak rata-rata Base Camp ke lokasi pekerjaan
Jam kerja efektif per-hari
Faktor kehilangan bahan
Komposisi campuran :
- Aspal Pen 60 atau Pen 80
- Kerosene
Berat isi bahan :
- Aspal Pen 60 atau Pen 80
2
- Kerosene
Bahan dasar (aspal & minyak pencair) semuanya
diterima di lokasi pekerjaan
1.
BAHAN
Untuk mendapatkan 1 liter Lapis Resap Pengikat
diperlukan :
( 1 liter x Fh )
1.a.
1.b.
Aspal
Kerosene
2.
2.a.
ALAT
ASPHALT DISTRIBUTOR
Lebar penyemprotan
Kecepatan penyemprotan
Kapasitas pompa aspal
Faktor effisiensi kerja
= As x PC x D1
= K x PC
pas x Fa x 60
= 1 : Q1
AIR COMPRESSOR
KODE
KOEF.
SATUAN
L
Tk
Fh
30,00
8,00
1,03
As
K
64
36
D1
D2
1,03
0,80
Kg / liter
Kg / liter
PC
1,03
liter
(M10)
(M11)
0,6790
0,3708
Kg.
Liter
(E41)
b
V
pas
Fa
3,00
30,00
100
0,80
KETERANGAN
KM
Jam
%
%
terhadap volume
terhadap volume
Q1
M
m/menit Asumsi
liter/menit Panduan
Sedang
4.800,00
liter
0,0002
Jam
4.800,00
liter
0,0002
Jam
Q4
Qt
4.800,00
38.400,00
liter
liter
P
M
10,00
2,00
(E41)
(E05)
3.
URUTAN KERJA
Aspal dan Minyak Flux dicampur dan dipanaskan
sehingga menjadi campuran aspal cair
Permukaan yang akan dilapis dibersihkan dari debu
dan kotoran dengan Air Compressor
Campuran aspal cair disemprotkan dengan Asphalt
Distributor ke atas permukaan yang akan dilapis.
III.
2.b.
Analisa EI-611a
= 1 : Q2
TENAGA
Produksi menentukan : ASPHALT DISTRIBUTOR
Produksi Lapis Resap Pengikat / hari = Tk x Q4
Kebutuhan tenaga :
- Pekerja
- Mandor
Q2
(E05)
orang
orang
: 6.1 (1)(a)
: Lapis Resap Pengikat - Aspal Cair
: Liter
Analisa EI-611a
URAIAN ANALISA HARGA SATUAN
Lanjutan
No.
URAIAN
= (Tk x P) : Qt
= (Tk x M) : Qt
4.
5.
20.523,25 / liter.
6.
7.
KODE
(L01)
(L03)
KOEF.
0,0021
0,0004
SATUAN
Jam
Jam
KETERANGAN
Analisa EI-661
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
Peningkatan Jalan Desa Rimbo Besar - Desa Talang Beringin Kec. SAM
: Bengkulu / Kabupaten Seluma
: 6.6.(1)
: Lapis Permukaan Penetrasi Macadam
: M3
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
A.
TENAGA
1.
2.
Pekerja
Mandor
(L01)
(L03)
Jam
Jam
0,1417
0,0142
HARGA
SATUAN
(Rp.)
10.375,00
18.125,00
BAHAN
1.
2.
3
Agregat Kasar
Agregat Halus
Aspal
(M03)
(M04)
(M10)
M3
M3
Kg
1,6690
0,1479
98,5857
368.000,00
441.000,00
12.903,23
PERALATAN
1.
2.
3.
4.
5.
Wheel Loader
Dump Truck
3-Wheel Roller
Asp. Sprayer
Alat bantu
E15
E09
E16
E03
Jam
Jam
Jam
Jam
Ls
0,0000
0,4230
0,0435
0,0000
1,0000
519.700,04
700.009,57
349.048,26
85.409,86
5.000,00
3
4
JUMLAH
HARGA
(Rp.)
1.470,59
256,91
1.727,50
614.197,18
65.218,31
1.272.073,73
1.951.489,23
0,00
296.121,99
15.177,39
0,00
5.000,00
316.299,38
: 6.6.(1)
: Lapis Permukaan Penetrasi Macadam
: M3
No.
I.
1
2
3
4
5
6
7
8
II.
1
2
3
4
5
III.
URAIAN
ASUMSI
Menggunakan alat berat (cara mekanik)
Lokasi pekerjaan : sepanjang jalan
Kondisi existing jalan : sedang
Jarak rata-rata Base Camp ke lokasi pekerjaan
Tebal rata2 Lapen
Jam kerja efektif per-hari
Faktor kehilangan
- Agregat
Fator kehilangan
- Aspal
Komposisi campuran Lapen (spesifikasi) :
- Agregat Pokok
- Agregat Pengunci
- Agregat Penutup
- Aspal
:
- Paska Agregat Pokok
- Paska Agregat Pengunci
Berat isi bahan :
- Agregat
- Aspal
Analisa EI-661
URAIAN ANALISA HARGA SATUAN
KODE
KOEF.
SATUAN
L
t
Tk
Fh1
Fh2
25,00
0,070
8,00
1,05
1,03
KM
M
Jam
-
Ak
Ap1
Ap2
As1
As2
As
133,00
25,00
14,00
5,20
1,50
95,71
Kg/M2
Kg/M2
Kg/M2
Kg/M2
Kg/M2
Kg/M3
D1
D2
1,42
1,03
ton / M3
ton / M3
KETERANGAN
Tabel 6.6.3.
Tabel 6.6.3.
Tabel 6.6.3.
Tabel 6.6.3.
Tabel 6.6.3.
URUTAN KERJA
Permukaan dasar dibersihkan dan disemprot aspal cair
bilamana diperlukan
Agregat kasar dimuat ke dalam Dump Truck
menggunakan Wheel Loader (di Base Camp)
Agregat Kasar ditebarkan (manual) sesuai tebal yang
diperlukan dan dipadatkan dengan Three Wheel
Roller (6-8 Ton) minimum 6 lintasan
Aspal disemprotkan di atas agregat kasar yang telah
diratakan menggunakan Aspal Sprayer (merata)
Agregat Pengunci ditebarkan dan dipadatkan dengan
cara yang sama dengan pemadatan agregat kasar
disusul dengan penebaran agregat penutup.
PEMAKAIAN BAHAN, ALAT DAN TENAGA
1.
1.a.
1.b.
1.c.
1.d.
BAHAN
Agregat Kasar
Agregat Pengunci
Agregat Penutup
Aspal
2.
2.a.
ALAT
WHEEL LOADER
Kapasitas bucket
Faktor bucket
Faktor efisiensi alat
Waktu Siklus
=
=
=
=
Koefisien Alat/M3
V x Fb x Fa x 60
Ts1
= 1 : Q1
(M03)
(M04)
(M04)
(M10)
1,4049
0,2641
0,1479
98,59
M3
M3
M3
Kg
(E15)
V
Fb
Fa
Ts1
1,50
0,85
0,83
0,45
M3
-
Q1
141,10
M3
(E15)
0,0071
Jam
1,8169
lihat tabel
V - Loading
: 6.6.(1)
: Lapis Permukaan Penetrasi Macadam
: M3
Analisa EI-661
URAIAN ANALISA HARGA SATUAN
Lanjutan
No.
2.b.
URAIAN
Kap.Prod. / jam =
2.c.
10,00
0,80
20,00
30,00
ton
KM / Jam
KM / Jam
2,99
75,00
15,00
50,00
142,99
menit
menit
menit
menit
menit
2,36
M3
0,4230
Jam
(E16)
v
b
n
N
bo
Fa
2,50
1,90
12,00
1,00
0,30
0,83
Km / Jam
M
lintasan
(v x 1000) x b x t x Fa
n
Q3
22,99791667
(v x 1000) x (N(b-bo)+bo) x t x Fa x D1
n
Q3
0,0000
= 1 : Q3
ASPHALT SPRAYER
Kapasitas tangki
Faktor efisiensi kerja
Kapasitas pompa Aspal
Pa x Fa x 60
1000
Koefisien Alat / M3
= 1 : Q4
ALAT BANTU
diperlukan setiap :
- Kereta dorong
- Sekop
- Sapu
- Sikat
- Karung
- Cerek Aspal
- Kaleng Aspal
=
=
=
=
=
=
=
3
5
5
3
5
3
3
75,00
buah
buah
buah
buah
buah
buah
buah
:
- Pekerja
- Mandor
Jam
(E03)
V
Fa
Pa
850,00
0,80
55
liter
liter/menit
2,64
liter
0,3788
Jam
Lump Sum
M3 pekerjaan
= (Tk x P) / Qt
= (Tk x M) / Qt
2 fase @ 6 lintas
M3
0,0435
Q1
KETERANGAN
M
-
(E16)
(E03)
TENAGA
Produksi menentukan (Produksi Wheel Loader)
Produksi Lapen / hari = Q1 x Tk
Kebutuhan tenaga :
- Pekerja
- Mandor
Koefisien Tenaga / M3
4.
SATUAN
(E09)
3.
Q2
KOEF.
Koefisien Alat / M3
2.e.
(E09)
V
Fa
v1
v2
Ts2
T1
T2
T3
T4
Ts2
V x Fa x 60
Ts2 x D1
Apabila N > 1
Kap. Prod. / jam =
2.d.
KODE
Q1
Qt
141,10
1.128,80
M3/Jam
M3
P
M
20,00
2,00
orang
orang
(L01)
(L03)
0,1417
0,0142
Jam
Jam
: 6.6.(1)
: Lapis Permukaan Penetrasi Macadam
: M3
Analisa EI-661
URAIAN ANALISA HARGA SATUAN
Lanjutan
No.
5.
URAIAN
2.496.467,71
/ M3.
6.
7.
KODE
KOEF.
SATUAN
KETERANGAN
:7.1 (8)
:Beton mutu rendah fc= 15 MPa
:M3
No.
I.
URAIAN
4
5
6
ASUMSI
Menggunakan alat (cara mekanik)
Lokasi pekerjaan : sepanjang jalan
Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
Jarak rata-rata Base camp ke lokasi pekerjaan
Jam kerja efektif per-hari
Kadar Semen Minimum
7
8
Berat Isi :
- Beton
- Semen
- Pasir
- Agregat Kasar
1
2
3
II.
1
2
3
III.
: Semen
: Pasir
: Agregat Kasar
KODE
L
Tk
Ks
KOEF.
SATUAN
28,50
8,00
300
KM
jam
Kg/M3
Wcr
Sm
Ps
Kr
0,57
318,0
622,0
1.207,0
Kg/M3
Kg/M3
Kg/M3
D1
D2
D3
D4
2,40
1,25
1,30
1,40
KETERANGAN
Berdasarkan
JMF dari EE
T/M3
T/M3
T/M3
T/M3
URUTAN KERJA
Semen, pasir, batu kerikil dan air dicampur dan diaduk
menjadi beton dengan menggunakan Concrete Mixer
Beton di-cor ke dalam bekisting yang telah disiapkan
Penyelesaian dan perapihan setelah pemasangan
PEMAKAIAN BAHAN, ALAT DAN TENAGA
1.
1.a.
1.b.
1.c.
1.d.
1.e.
BAHAN
Semen (PC)
=
Sm x 1.03
Pasir Beton
=
(Ps/1000 : D3) x 1.05
Agregat Kasar =
(Kr/1000 : D4) x 1.05
Kayu Perancah dan/atau Bekisting
Paku
2.
2.a.
ALAT
CONCRETE MIXER
Kapasitas Alat
Faktor Efisiensi Alat
Waktu siklus :
- Memuat
- Mengaduk
- Menuang
- Tunggu, dll.
Koefisien Alat / M3
V x Fa x 60
1000 x Ts
= 1 : Q1
Koefisien Alat / M3
pa x Fa x 60
1000 x Wc
= 1 : Q2
(M12)
(M01a)
(M03)
(M19)
(M18)
327,540
0,5024
0,9053
0,1000
0,8000
Kg
M3
M3
M3
Kg
500,00
0,83
liter
-
8,00
4,00
2,00
3,00
17,00
menit
menit
menit
menit
menit
Q1
1,465
M3/jam
(E06)
0,6827
jam
(E23)
V
Wc
Fa
Pa
4,00
0,19
0,83
100,00
M3
M3
liter/menit
Q2
26,21
M3
(E23)
0,0382
jam
(E06)
V
Fa
Ts
T1
T2
T3
T4
Ts
(T1 + T2 + T3 + T4)
2.b.
Analisa EI-718
653,10
1.267,35
:7.1 (8)
:Beton mutu rendah fc= 15 MPa
:M3
Analisa EI-718
URAIAN ANALISA HARGA SATUAN
Lanjutan
No.
2.c.
3.
URAIAN
KODE
KOEF.
SATUAN
KETERANGAN
ALAT BANTU
Alat bantu
TENAGA
Produksi Beton dalam 1 hari
Kebutuhan tenaga :
= Tk x Q1
- Mandor
- Tukang
- Tk Batu =
- Tk Kayu =
- Pekerja
Koefisien Tenaga / M3 :
- Mandor
- Tukang
- Pekerja
M3
M
Tb
1,00
2,00
orang
orang
1 Tk = 20 m3 btn
1 Tk = 2 m3 kayu
= (Tk x M) : Qt
= (Tk x Tb) : Qt
= (Tk x P) : Qt
5.
11,72
1
1
4.
Rp.
Qt
/ M3
6.
7.
(L03)
(L02)
(L01)
2,00
0,6827
1,3655
1,3655
orang
jam
jam
jam
Analisa EI-718
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
:
Peningkatan Jalan Desa Rimbo Besar - Desa Talang Beringin Kec. SAM
0
: Bengkulu / Kabupaten Seluma
:7.1 (8)
PERKIRAAN VOL. PEK.
:Beton mutu rendah fc= 15 MPa
TOTAL HARGA (Rp.)
:M3
% THD. BIAYA PROYEK
NO.
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
A.
TENAGA
1.
2.
3.
Pekerja
Tukang
Mandor
B.
BAHAN
1.
2.
3.
4.
5.
Semen
Pasir beton
Agregat Kasar
Kayu Perancah
Paku
C.
PERALATAN
1.
2.
3.
Conc. Mixer
Water Tanker
Alat Bantu
D.
E.
F.
Note: 1
2
3
4
(L01)
(L02)
(L03)
(M12)
(M01a)
(M03)
(M19)
(M18)
E06
E23
jam
jam
jam
Kg
M3
M3
M3
Kg
jam
jam
Ls
1,3655
1,3655
0,6827
HARGA
SATUAN
(Rp.)
:
:
:
0,00
0,00
0,00
JUMLAH
HARGA
(Rp.)
10.375,00
11.750,00
18.125,00
14.166,67
16.044,18
12.374,50
42.585,34
327,5400
0,5024
0,9053
0,1000
0,8000
1.520,00
180.000,00
368.000,00
2.100.000,00
17.000,00
497.860,80
90.429,23
333.132,00
210.000,00
13.600,00
1.145.022,03
0,0000
0,0382
1,0000
116.705,71
380.547,60
30.000,00
0,00
14.518,88
30.000,00
44.518,88
1.232.126,26
123.212,63
1.355.338,88
: 7.3 (1)
:Baja Tulangan U 24 Polos
: Kg
No.
I.
1
2
3
4
5
6
II.
1
2
III.
URAIAN
ASUMSI
Pekerjaan dilakukan secara manual
Lokasi pekerjaan : sepanjang jalan
Bahan dasar (besi dan kawat) diterima seluruhnya
di lokasi pekerjaan
Jarak rata-rata Base camp ke lokasi pekerjaan
Jam kerja efektif per-hari
Faktor Kehilangan Besi Tulangan
KODE
KOEF.
SATUAN
L
Tk
Fh
28,50
8,00
1,10
KM
jam
-
(M39a)
(M14)
1,1000
0,0025
Kg
Kg
URUTAN KERJA
Besi tulangan dipotong dan dibengkokkan sesuai
dengan yang diperlukan
Batang tulangan dipasang / disusun sesuai dengan
Gambar Pelaksanaan dan persilangannya diikat kawat
PEMAKAIAN BAHAN, ALAT DAN TENAGA
1.
1.a.
1.b.
BAHAN
Baja Tulangan (Polos) U24
Kawat beton
2.
2.a.
ALAT
ALAT BANTU
Diperlukan :
- Gunting Potong Baja
- Kunci Pembengkok Tulangan
- Alat lainnya
3.
Analisa EI-731
Ls
= 2 buah
= 2 buah
TENAGA
Produksi kerja satu hari
dibutuhkan tenaga :
- Mandor
- Tukang
- Pekerja
Koefisien Tenaga / Kg :
- Mandor
- Tukang
- Pekerja
= ( M x Tk ) : Qt
= ( Tb x Tk ) : Qt
= ( P x Tk ) : Qt
4.
5.
24.414,50
/ Kg
6.
7.
Qt
M
Tb
P
200,00
1,00
1,00
3,00
Kg
orang
orang
orang
(L03)
(L02)
(L01)
0,0400
0,0400
0,1200
jam
jam
jam
KETERANGAN
Analisa EI-731
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
:
Peningkatan Jalan Desa Rimbo Besar - Desa Talang Beringin Kec. SAM
0
: Bengkulu / Kabupaten Seluma
: 7.3 (1)
PERKIRAAN VOL. PEK.
:Baja Tulangan U 24 Polos
TOTAL HARGA (Rp.)
: Kg
% THD. BIAYA PROYEK
NO.
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
A.
TENAGA
1.
2.
3.
Pekerja Biasa
Tukang
Mandor
B.
BAHAN
1.
2.
C.
PERALATAN
1.
Alat Bantu
D.
E.
F.
Note: 1
2
3
4
(L01)
(L02)
(L03)
(M39a)
(M14)
jam
jam
jam
Kg
Kg
Ls
0,1200
0,0400
0,0400
HARGA
SATUAN
(Rp.)
:
:
:
0,00
0,00
0,00
JUMLAH
HARGA
(Rp.)
10.375,00
11.750,00
18.125,00
1.245,00
470,00
725,00
2.440,00
1,1000
0,0025
17.000,00
22.000,00
18.700,00
55,00
18.755,00
1,0000
1.000,00
1.000,00
1.000,00
22.195,00
2.219,50
24.414,50
: 7.9.(1)
: Pasangan Batu
: M3
No.
I.
1
2
3
4
5
6
7
II.
1
2
3
Analisa EI-791
URAIAN ANALISA HARGA SATUAN
URAIAN
ASUMSI
Menggunakan alat (cara mekanik)
Lokasi pekerjaan : sepanjang jalan
Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
Jarak rata-rata Base camp ke lokasi pekerjaan
Jam kerja efektif per-hari
Perbandingan Pasir & Semen
: - Volume Semen
: - Volume Pasir
Perbandingan Batu & Mortar :
- Batu
- Mortar (campuran semen & pasir)
Berat Jenis Bahan :
- Pasangan Batu Dengan Mortar
- Batu
- Adukan (mortar)
- Pasir
- Semen Portland
KOEF.
SATUAN
L
Tk
Sm
Ps
28,50
8,00
25
75
Bt
Mr
65
35
D1
D2
D3
D4
D5
2,40
1,60
1,80
1,30
1,44
KM
jam
%
%
KETERANGAN
Spec.
Spec.
%
%
ton/M3
ton/M3
ton/M3
ton/M3
ton/M3
URUTAN KERJA
Semen, pasir dan air dicampur dan diaduk menjadi
mortar dengan menggunakan Concrete Mixer
Batu dibersihkan dan dibasahi seluruh permukaannya
sebelum dipasang
Penyelesaian dan perapihan setelah pemasangan
III.
1.
1.a.
1.b.
BAHAN
Batu ----->
Semen ---->
1.c.
Pasir
2.
2.a.
ALAT
CONCRETE MIXER
Kapasitas Alat
Faktor Efisiensi Alat
Waktu siklus :
- Memuat
- Mengaduk
- Menuang
- Tunggu, dll.
----->
(T1 + T2 + T3 + T4)
Koefisien Alat / M3
2.b.
KODE
V x Fa x 60
1000 x Ts
= 1 : Q1
Koefisien Alat / M3
pa x Fa x 60
1000 x Wc
= 1 : Q2
1,1700
0,1225
176,00
0,5088
M3
M3
Kg
M3
500,00
0,83
liter
-
8,00
4,00
3,00
2,00
17,00
menit
menit
menit
menit
menit
Q1
1,465
M3
(E06)
0,6827
jam
(E23)
V
Wc
Fa
Pa
4,00
0,007
0,83
100,00
M3
M3
liter/menit
Q2
711,43
M3
(E23)
0,0014
jam
(M02)
(M12)
(M12)
(M01)
(E06)
V
Fa
Ts
T1
T2
T3
T4
Ts
Lepas
PROYEK
JENIS PEKERJAAN
SATUAN PEMBAYARAN
: 7.9.(1)
: Pasangan Batu
: M3
Analisa EI-791
URAIAN ANALISA HARGA SATUAN
Lanjutan
No.
2.c.
3.
URAIAN
ALAT BANTU
Diperlukan :
- Sekop
- Pacul
- Sendok Semen
- Ember Cor
- Gerobak Dorong
=
=
=
=
=
2
2
2
2
1
KOEF.
SATUAN
buah
buah
buah
buah
buah
TENAGA
Produksi menetukan : Produksi Secara MANUAL
Produksi Pasangan Batu dengan Mortar / hari = Tk x Q1
Kebutuhan tenaga :
- Mandor
- Tukang Batu
- Pekerja
Koefisien Tenaga / M3 :
- Mandor
- Tukang
- Pekerja
= (Tk x M) : Qt
= (Tk x Tb) : Qt
= (Tk x P) : Qt
4.
5.
KODE
800.476,48
/ M3
6.
7.
Q1
Qt
M
Tb
P
1,465
11,72
1,00
2,00
12,00
M3/Jam
M3
orang
orang
orang
(L03)
(L02)
(L01)
0,6827
1,3655
8,1928
jam
jam
jam
KETERANGAN
Analisa EI-791
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
:
Peningkatan Jalan Desa Rimbo Besar - Desa Talang Beringin Kec. SAM
0
: Bengkulu / Kabupaten Seluma
: 7.9.(1)
PERKIRAAN VOL. PEK.
:
: Pasangan Batu
TOTAL HARGA (Rp.)
:
: M3
% THD. BIAYA PROYEK
:
NO.
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
A.
TENAGA
1.
2.
3.
Pekerja Biasa
Tukang
Mandor
(L01)
(L02)
(L03)
jam
jam
jam
8,1928
1,3655
0,6827
HARGA
SATUAN
(Rp.)
10.375,00
11.750,00
18.125,00
BAHAN
1.
2.
3.
Batu Kali
Semen (PC)
Pasir
(M02)
(M12)
(M01)
M3
Kg
M3
1,1700
176,0000
0,5088
192.000,00
1.520,00
180.000,00
PERALATAN
1.
2.
3.
Conc. Mixer
Water Tanker
Alat Bantu
(E06)
(E23)
jam
jam
Ls
0,0000
0,0014
1,0000
116.705,71
380.547,60
30.000,00
3
4
0,00
0,00
0,00
JUMLAH
HARGA
(Rp.)
85.000,00
16.044,18
12.374,50
113.418,67
224.640,00
267.520,00
91.592,31
583.752,31
0,00
534,91
30.000,00
30.534,91
727.705,89
72.770,59
800.476,48
REKAPITULASI
BILL OF QUANTITY (BOQ)
Pekerjaan
Nama Paket
Prop / Kab
No. Divisi
Jumlah Harga
Pekerjaan
(Rupiah)
Uraian
Umum
24.550.000,00
Drainase
11.009.333,90
Pekerjaan Tanah
11.414.102,05
0,00
Pekerasan Berbutir
0,00
Perkerasan Aspal
Struktur
253.223.849,53
5.257.292,08
(A)
(B)
(C)
336.000.035,33
(D)
336.000.000,00
Terbilang :
305.454.577,57
30.545.457,76
Tais,
April 2016
Penawar :
PT/CV..
NAMA JELAS
Jabatan
Nama Paket
Prop / Kab
No. Mata
Pembayaran
Uraian
Satuan
Perkiraan
Kuantitas
430,00
3,00
0,07
100,00
3,00
0,10
1,00
34,00
48,95
M
M
M
M
M
M
Unit
M
M
Harga
Satuan
(Rupiah)
e
Jumlah
Harga-Harga
(Rupiah)
f = (d x e)
DIVISI 1. UMUM
1.2
LS
1,00
Rp
21.550.000
Rp
21.550.000
1,21
Manajemen mutu
LS
1,00
Rp
3.000.000
Rp
3.000.000
Rp
24.550.000,00
Jumlah Harga Pekerjaan DIVISI 1 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
DIVISI 2. DRAINASE
2.1.(1)
2.2.(1)
20,41
Rp
57.808,44
Rp
1.179.899,16
8,76
Rp
1.122.722,41
Rp
9.829.434,74
Rp
11.009.333,90
366.285,53 Rp
10.988.565,98
M
M
Jumlah Harga Pekerjaan DIVISI 2 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
30,00
Rp
300,00
Rp
3.2.(2a)
3.3.(1)
1.418,45
Jumlah Harga Pekerjaan DIVISI 3 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
Rp
425.536,08
Rp
11.414.102,05
Liter
3
1.354,21
Rp
20.523,25
Rp
27.792.815,03
90,30
Rp
2.496.467,71
Rp
225.431.034,50
Jumlah Harga Pekerjaan DIVISI 6 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
7.1 (8)
7.3 (1)
7.9.(1)
DIVISI 7. STRUKTUR
Beton mutu rendah fc15 MPa
Baja Tulangan U 24 Polos
Pasangan Batu (Plat Deuker)
M
Kg
M3
0,70
112,21
1,96
Jumlah Harga Pekerjaan DIVISI 7 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
Rp 253.223.849,53
1.355.338,88
24.414,50
800.476,48
948.737,22
2.739.620,97
1.568.933,90
5.257.292,08