USULAN PENYESUAIAN HARGA STANDAR BUPATI 2014

PROVINSI
KABUPATEN

No

: BALI
: BULELENG

UPAH / BAHAN

SATUAN

HARGA

HARGA

HARGA

HARGA

HARGA

HARGA

UD. Haryona

Toko

UD. Karya

Toko

Toko

Toko

Putra

Mutiara

Murni

Bambu Sari

Adi Karya

Sinar Alam

Putra

Putra

Putra

Patas

Rengdikit

Busung Biu

Singaraja

Singaraja

Serirt

Serirt

Serirt

( Rp.)

( Rp.)

( Rp.)

( Rp.)

( Rp.)

( Rp.)

( Rp.)

( Rp.)

( Rp.)

HARGA

HARGA

HARGA

UD. Haryona UD. Haryona UD. Haryona

HARGA
Survey
Rata-rata
( Rp.)
5

UPAH

Pekerja

OH

48,800

48,800

48,800

48,800

48,800

48,800

48,800

48,800

48,800

48,800

Mandor

OH

82,800

82,800

82,800

82,800

82,800

82,800

82,800

82,800

82,800

82,800

Kepala Tukang Kayu

OH

83,700

83,700

83,700

83,700

83,700

83,700

83,700

83,700

83,700

83,700

Kepala Tukang Batu

OH

81,800

81,800

81,800

81,800

81,800

81,800

81,800

81,800

81,800

81,800

Kepala Tukang Besi

OH

78,900

78,900

78,900

78,900

78,900

78,900

78,900

78,900

78,900

78,900

Kepala Tukang Cat

OH

70,500

70,500

70,500

70,500

70,500

70,500

70,500

70,500

70,500

70,500

Kepala Tukang Style Bali

OH

90,100

90,100

90,100

90,100

90,100

90,100

90,100

90,100

90,100

90,100

Kepala Tukang Pipa

OH

77,800

77,800

77,800

77,800

77,800

77,800

77,800

77,800

77,800

77,800

Kepala Tukang Listrik

OH

80,300

80,300

80,300

80,300

80,300

80,300

80,300

80,300

80,300

80,300

10

Kepala Tukang Paras

OH

88,600

88,600

88,600

88,600

88,600

88,600

88,600

88,600

88,600

88,600

11

Tukang Kayu

OH

81,400

81,400

81,400

81,400

81,400

81,400

81,400

81,400

81,400

81,400

12

Tukang Batu

OH

74,500

74,500

74,500

74,500

74,500

74,500

74,500

74,500

74,500

74,500

13

Tukang Besi

OH

72,100

72,100

72,100

72,100

72,100

72,100

72,100

72,100

72,100

72,100

14

Tukang Cat

OH

57,400

57,400

57,400

57,400

57,400

57,400

57,400

57,400

57,400

57,400

15

Tukang Politur

OH

66,700

66,700

66,700

66,700

66,700

66,700

66,700

66,700

66,700

66,700

16

Tukang Style Bali

OH

79,400

79,400

79,400

79,400

79,400

79,400

79,400

79,400

79,400

79,400

17

Tukang Pipa

OH

71,500

71,500

71,500

71,500

71,500

71,500

71,500

71,500

71,500

71,500

18

Tukang Listrik

OH

73,000

73,000

73,000

73,000

73,000

73,000

73,000

73,000

73,000

73,000

19

Tukang Gali

OH

56,900

56,900

56,900

56,900

56,900

56,900

56,900

56,900

56,900

56,900

20

Tukang Ukir Kayu

OH

86,600

86,600

86,600

86,600

86,600

86,600

86,600

86,600

86,600

86,600

21

Tukang Ukir Paras

OH

82,700

82,700

82,700

82,700

82,700

82,700

82,700

82,700

82,700

82,700

22

Tukang masak aspal

OH

77,800

77,800

77,800

77,800

77,800

77,800

77,800

77,800

77,800

77,800

23

Tukang Bangunan

OH

88,700

88,700

88,700

88,700

88,700

88,700

88,700

88,700

88,700

88,700

24

Pengayah Tukang Bangunan

OH

54,200

54,200

54,200

54,200

54,200

54,200

54,200

54,200

54,200

54,200

25

Masinis

OH

115,200

115,200

115,200

115,200

115,200

115,200

115,200

115,200

115,200

115,200

26

Kernet

OH

115,100

115,100

115,100

115,100

115,100

115,100

115,100

115,100

115,100

115,100

27

Sopir

OH

96,000

96,000

96,000

96,000

96,000

96,000

96,000

96,000

96,000

96,000

B.

Bahan bangunan

BAHAN PASANGAN

Batu Pecah Besar

m3

Batu Pecah 5 - 7 cm

m3

Batu Pecah 2 - 3 cm

m3

275,000

175,000

200,000

Batu Pecah 3 - 4 / 3-5 cm

m3

250,000

175,000

Batu Pecah 1 - 2 cm

m3

285,500

175,000

Batu Pecah 10-15

m3

175,000

290,000

Batu Pecah 0,5 - 1 cm

m3

175,000

Batu Seplit Halus ( 0,5 - 1 ) cm

m3

200,000

Batu Seplit Jagung (1 - 2) cm/ kasar

m3

200,000

10

Pasir Batu (Sirtu)

m3

11

Batu Besar W 50 Kg

m3

12

Batu Besar W 500 Kg

m3

13

Batu Besar W 1000 Kg

m3

14

Batu Besar 15/ 20

m3

15

Batu 5 - 7 cm

m3

16

Batu 2 - 3 cm

m3

17

Batu 3 - 5 cm

m3

18

Batu ( 0,5 - 1 ) cm

m3

19

Batu (1 - 2) cm

m3

20

Batu Pasang

m3

21

Abu Batu

m3

BATU KARANG

115,000

175,000

200,000

175,000

55,000

175,000

175,000

73,889

195,000

175,000

60,556

200,000

175,000

113,889

250,000

175,000

94,444

250,000

175,000

98,389
51,667
19,444

250,000

50,000
22,222

200,000

47,778

200,000

22,222
200,000

22,222

215,000

23,889

180,000

200,000

200,000

195,000

175,000

105,556
-

Lime Stone

m3

KERIKIL (KORAL)

Kerikil Biasa/ timbun

m3

Kerikil Beton

m3

Kerikil Halus

m3

Kerikil Sungai (tidak disaring)

m3

PASIR

Pasir Urug

m3

Pasir Beton

m3

200,000
200,000

22,222
250,000

200,000

175,000

91,667
-

250,000

27,778
-

200,000
140,000

200,000

250,000

165,000

125,000

36,111

125,000

97,778

No

UPAH / BAHAN

SATUAN

3
m3

HARGA

HARGA

HARGA

HARGA

HARGA

HARGA

UD. Haryona

Toko

UD. Karya

Toko

Toko

Toko

Putra

Mutiara

Murni

Bambu Sari

Adi Karya

Sinar Alam

Putra

Putra

Putra

Patas

Rengdikit

Busung Biu

Singaraja

Singaraja

Serirt

Serirt

Serirt

( Rp.)

( Rp.)

( Rp.)

( Rp.)

( Rp.)

( Rp.)

( Rp.)

( Rp.)

( Rp.)

4
150,000

HARGA

HARGA

HARGA

UD. Haryona UD. Haryona UD. Haryona

HARGA
Survey
Rata-rata
( Rp.)
5

170,000

250,000

250,000

185,000

125,000

125,556

Pasir Pasang

TANAH

Tanah Urug

BATU BATA

Bata Gosok klas I

bj

5,000

3,000

Bata Gosok klas II

bj

2,500

2,500

Bata Pasang klas I

bj

1,250

2,000

Bata Pasang klas II

bj

Batu Lahar Merah Singaraja

m3

Batu Pipih Singaraja

m3

Loster Terawang PC

bj

Roster Terawang Keramik

bj

PARAS/PADAS

Paras Malam 50 x 20 x 12 cm

bj

Paras Ukir Selekarang 30x15x3cm

bj

Paras Batik

bh

Paras Kerobokan 50 x 20 x 12 cm

bh

Serbuk Bata Merah

Kg

PORTLAND CEMENT

Semen Gresik ( 50 kg )

zak

Semen Tiga Roda (50 kg)

zak

Semen Bosowa (50 kg)

zak

Semen Gresik Putih (40 kg)

zak

Semen Tiga Roda Putih (40 kg)

zak

Semen Warna

kg

BAHAN ATAP

Sirap

Genteng biasa

bj

1,400

1,350

1,500

2,500

Bubungan genteng biasa

bj

3,000

3,500

5,000

4,500

Genteng Kecil

bj

1,100

1,000

1,200

1,700

556

Bubungan genteng kecil

bj

1,500

2,000

3,500

3,500

1,167

Genteng Kodok

bj

2,000

5,000

4,500

1,278

Bubungan Genteng Kodok

bj

5,000

20,000

23,000

5,333

Genteng Plentong

bj

1,700

2,500

2,500

744

Bubungan genteng plentong

bj

3,500

5,000

4,500

1,444

10

Genteng Kaca 3 mm

bj

12,000

15,000

12,000

5,667

11

Ijuk

Kg

12

Alang-alang

Lbr

13

Tali Pengikat

Gulung

14

Zincalume / spandeck 0,25 mm

m2

#DIV/0!

#DIV/0!

15

Zincalume / spandeck 0,35 mm

m2

#DIV/0!

#DIV/0!

m3

50,000

60,000

175,000

45,000

75,000

45,000
889
556

1,200
1,000

250,000

250,000

111
55,556

500,000
50,000

494

55,556

35,000

10,000

5,000

50,000

45,000

60,000

48,000

5,000

6,111

50,000

33,667
-

8,000

7,500

1,722
-

62,000

61,000

62,000

62,000

62,000

62,000

60,000

55,000

63,000

65,000

21,000

64,000

41,556
12,778
-

#DIV/0!
10,500

95,000

110,000

110,000

12,000

8,000

12,000

#DIV/0!
10,000

5,833
-

ikat

12,000

750
1,778

SENG

Gelombang BJLS 0,18 mm

lbr

Gelombang BJLS 0,20 mm

lbr

Gelombang BJLS 0,28 mm

lbr

40,000

Datar BJLS 0,28 mm

lbr

40,000

Seng Talang 30 cm

ASBES PC (DJABESMEN)

Asbes Gel. 1,8 m` x 1,05 m`/4 mm

Nok Asbes

Rata/Djabesmen 2m x 1m x 4mm

lbr

Rata/Djabesmen 1m x 1m x 6mm

lbr

Bubungan

BAHAN KAYU

Kayu Jati Papan

m3

Kayu Jati Balok

m3

Kayu Jati Bali Papan

m3

Kayu Jati Bali Balok

m3

Kayu Kamper Papan 3/20

m3

Kayu Kamper Balok 8/12

m3

Kayu Kamper Balok 6/12

m3

40,000
37,000

11,000

13,000

40,000

10,000

11,000

38,000
42,000

8,667
13,222
4,444
4,444

12,000

10,000

7,444
-

33,000

lbr
30,000

28,000

33,000

35,000

35,000

18,222

29,000

6,556

29,000

3,222

8,500,000

944,444

8,750,000

8,500,000

1,916,667

8,750,000

8,000,000

1,861,111

No

UPAH / BAHAN

SATUAN

HARGA

HARGA

HARGA

HARGA

HARGA

HARGA

UD. Haryona

Toko

UD. Karya

Toko

Toko

Toko

Putra

Mutiara

Murni

Bambu Sari

Adi Karya

Sinar Alam

Putra

Putra

Putra

Patas

Rengdikit

Busung Biu

Singaraja

Singaraja

Serirt

Serirt

Serirt

( Rp.)

( Rp.)

( Rp.)

( Rp.)

( Rp.)

( Rp.)

( Rp.)

( Rp.)

( Rp.)

HARGA

HARGA

HARGA

UD. Haryona UD. Haryona UD. Haryona

HARGA
Survey
Rata-rata
( Rp.)
5

Kayu Kamper Usuk 4/6

m3

8,750,000

7,000,000

1,750,000

Kayu Kamper Usuk 5/7

m3

9,000,000

7,000,000

1,777,778

10

Kayu Kamper Reng

m3

10,000,000

6,000,000

1,777,778

11

Kayu Meranti Papan

m3

7,200,000

4,500,000

1,300,000

12

Kayu Meranti Balok 8/12

m3

5,250,000

4,500,000

1,083,333

13

Kayu Meranti Balok 6/12

m3

6,000,000

4,000,000

1,111,111

14

Kayu Meranti Usuk 5/7

m3

5,200,000

4,000,000

1,022,222

15

Kayu Meranti Usuk 4/6

m3

5,200,000

4,000,000

1,022,222

16

Kayu Meranti Reng

m3

4,250,000

3,500,000

861,111

17

Kayu Kruing Papan

m3

7,750,000

7,000,000

1,638,889

18

Kayu Kruing Balok 8/12

m3

6,475,000

7,000,000

1,497,222

19

Kayu Kruing Balok 6/12

m3

5,500,000

6,475,000

6,000,000

1,997,222

20

Kayu Kruing Usuk 5/7

m3

5,500,000

6,475,000

6,000,000

1,997,222

21

Kayu Kruing Usuk 4/6

m3

5,500,000

6,300,000

5,500,000

1,922,222

22

Reng Kruing

m3

5,525,000

5,500,000

1,225,000

23

Seseh Balok

m3

3,000,000

2,500,000

888,889

24

Papan begesting

m3

1,100,000

122,222

25

Balok bingkirai

m3

26

Papan bingkirai

m3

27

Plywood 9 mm

lbr

28

Seseh Dolken

m3

29

Multipleks

2,500,000

200,000

125,000

36,111
-

- 6 mm

lbr

- 9 mm

lbr

- 12 mm

lbr

- 18 mm

lbr

30

Dolken kayu 8-10/4m

btg

31

List Kayu 2/4 - 4 m

btg

32

Kayu profil

btg

33

Kayu Perancah

m3

BAHAN BAMBU

Bambu Besar

btg

Bambu Sedang

Bambu Kecil

75,000

75,000

90,000

85,000

36,111

105,000

135,000

125,000

40,556

165,000

185,000

38,889

235,000

250,000

53,889

20,000
20,000

2,222
20,000

25,000

7,222

75,000

8,333
3,000,000

333,333
-

7,000

10,000

10,000

10,000

15,000

5,778

btg

7,500

btg

6,000

8,000

12,000

3,056

6,000

10,000

Gedeg Kelas I

m2

40,000

30,000

Gedeg Kelas II

m2

30,000

25,000

BETON CETAK

Kerawang PC

bj

90,000

5,000

10,556

Buis Beton 50/1 m`

bj

95,000

75,000

18,889

Buis Beton 30/1 m`

bj

70,000

35,000

11,667

Buis Beton 25/1 m`

bj

60,000

30,000

10,000

Buis Beton 20/1 m`

bj

45,000

30,000

Buis Beton 50/0,75 m`

bj

95,000

75,000

125,000

32,778

Buis Beton 30/0,75 m`

bj

70,000

40,000

75,000

20,556

Buis Beton 25/0,75 m`

bj

60,000

30,000

Buis Beton 20/0,75 m`

bj

45,000

30,000

10

Batako Cetak Lubang KW I

bj

11

Paving Blok / 6 cm

m2

12

Paving Blok / 8 cm

m2

13

Paving Blok K-300 / 8 cm

m2

KERAMIK

Keramik KW I 10/20 cm

m2

Keramik KW I 20/25 cm

m2

60,000

Keramik KW I 20/20 cm

m2

60,000

Keramik KW I 30/30 cm

m2

Keramik KW I 40/40 cm

m2

Keramik KW II 20/25 cm

32,000

2,444
11,333
6,111
-

2,200

2,500

8,333

10,000
8,333
2,200

2,250

1,017

75,000

65,000

60,000

22,222

125,000

75,000

85,000

31,667
-

65,000

55,000

13,333

52,000

75,000

55,000

53,000

65,000

55,000

50,000

47,000

55,000

65,000

65,000

51,000

65,000

65,000

m2

55,000

45,000

Keramik KW II 20/20 cm

m2

55,000

45,000

11,111

Keramik KW II 30/30 cm

m2

45,000

50,000

50,000

16,111

Keramik KW II 40/40 cm

m2

55,000

55,000

55,000

BAHAN BESI

Besi Beton Polos

50,000

55,000

38,556

55,000

32,000

48,000

47,500

34,722

52,000

50,000

38,667
11,111

55,000

24,444
-

- besi 4 mm

ljr

15,000

7,000

17,000

5,000

18,000

16,000

8,667

- besi 6 mm

ljr

30,000

20,000

20,000

20,000

33,000

30,000

17,000

- besi 8 mm

ljr

50,000

40,000

27,500

42,000

47,000

50,000

28,500

No

UPAH / BAHAN

SATUAN

HARGA

HARGA

HARGA

HARGA

HARGA

HARGA

UD. Haryona

Toko

UD. Karya

Toko

Toko

Toko

Putra

Mutiara

Murni

Bambu Sari

Adi Karya

Sinar Alam

Putra

Putra

Putra

Patas

Rengdikit

Busung Biu

Singaraja

Singaraja

Serirt

Serirt

Serirt

( Rp.)

( Rp.)

( Rp.)

( Rp.)

( Rp.)

( Rp.)

( Rp.)

( Rp.)

( Rp.)

HARGA

HARGA

HARGA

UD. Haryona UD. Haryona UD. Haryona

HARGA
Survey
Rata-rata
( Rp.)
5

- besi 10 mm

ljr

70,000

49,000

40,000

65,000

75,000

70,000

41,000

- besi 12 mm

ljr

110,000

86,000

65,000

75,000

95,000

100,000

59,000

- besi 16 mm

ljr

155,000

- besi 18 mm

ljr

- besi 22 mm

ljr

#DIV/0!

#DIV/0!

- besi 24 mm

ljr

#DIV/0!

#DIV/0!

115,000

30,000

145,000

16,111

Besi Beton ulir


- besi D 13 mm

ljr

115,000

125,000

115,000

120,000

52,778

- besi D 16 mm

ljr

165,000

180,000

165,000

180,000

76,667

- besi D 19 mm

ljr

225,000

25,000
-

KAWAT

Kawat Ikat Beton

kg

15,000

18,000

17,500

25,000

Kawat nyamuk 1 x 2 m

m2

15,000

12,000

15,000

18,000

15,000

8,333

Kawat Harmonika 5 x 5 cm

m2

18,000

20,000

20,000

25,000

20,000

11,444

Kawat Harmonika 4 x 4 cm

m2

20,000

20,000

20,000

6,667

Kawat Harmonika 3 x 3 cm

m2

20,000

20,000

20,000

6,667

Kawat 4 mm

kg

Besi Strip

kg

Besi Profil WF

kg

BAHAN PLAFON

Eternit Klas I (1/1) M

lbr

Eternit Klas II (1/1) M

lbr

Triplek 3 mm

lbr

Teak Wood 4 mm

lbr

Teak Wood 3 mm

lbr

Ceilingteak

lbr

Aluminium Foil

lbr

Kalsiboard

lbr

Gypsum

lbr

10

List Gypsum

m'

hollow

m'

18,000

18,000

25,000

12,389

2,778
20,000

2,222
-

BAHAN PIPA

Pipa Galvanis

17,000

15,000

#DIV/0!

17,500

20,000

23,000

55,000

60,000

15,000
55,000

55,000

#DIV/0!

110,000
65,000
80,000
60,000

10,278

100,000

80,000
53,000

55,000

31,111

110,000

24,444

75,000

26,667

70,000
55,000

25,556
60,000

350,000

38,889

65,000

32,556

15,000

3,889

20,000

#DIV/0!

#DIV/0!

- 2"

btg

- 1,5"

btg

- 1,25"

btg

- 1"

btg

- 0,75"

btg

- 0,5"

btg

- 2" / 6 m

btg

- 2" / 4 m

btg

25,000

2,778

Pipa PVC AW
- 4"

btg

280,000

175,000

260,000

300,000

- 3"

btg

192,000

155,000

165,000

200,000

79,111

- 2,5"

btg

135,000

145,000

135,000

175,000

65,556

- 2"

btg

105,000

135,000

100,000

100,000

60,556

- 1,5"

btg

70,000

40,000

75,000

50,000

26,111

- 1"

btg

39,000

35,000

40,000

40,000

17,111

- 0,75"

btg

30,000

32,000

30,000

10,222

- 0,5"

btg

25,000

25,000

25,000

11,000

105,000

24,000

112,778

Pipa PVC C
- 4"

btg

80,000

70,000

55,000

80,000

70,000

39,444

- 3"

btg

62,000

55,000

50,000

65,000

60,000

32,444

- 2,5"

btg

53,000

50,000

35,000

55,000

40,000

25,889

- 2"

btg

42,000

40,000

25,000

45,000

30,000

20,222

- 1,5"

btg

26,000

30,000

25,000

9,000

- 1"

btg

17,500

25,000

20,000

6,944

- 0,75"

btg

16,000

15,000

3,444

- 0,5"

btg

10,000

1,111
-

Pipa PVC D
- 4"

btg

151,000

145,000

150,000

49,556

- 3"

btg

108,000

105,000

100,000

34,778

- 2,5"

btg

75,000

75,000

75,000

25,000

No

UPAH / BAHAN

SATUAN

HARGA

HARGA

HARGA

HARGA

HARGA

HARGA

UD. Haryona

Toko

UD. Karya

Toko

Toko

Toko

Putra

Mutiara

Murni

Bambu Sari

Adi Karya

Sinar Alam

Putra

Putra

Putra

Patas

Rengdikit

Busung Biu

Singaraja

Singaraja

Serirt

Serirt

Serirt

( Rp.)

( Rp.)

( Rp.)

( Rp.)

( Rp.)

( Rp.)

( Rp.)

( Rp.)

( Rp.)

HARGA

HARGA

HARGA

UD. Haryona UD. Haryona UD. Haryona

HARGA
Survey
Rata-rata
( Rp.)
5

- 2"

btg

56,000

53,000

50,000

17,667

- 1,5"

btg

38,000

40,000

45,000

13,667

- 1"

btg

30,000

3,333

- 0,75"

btg

25,000

2,778

- 0,5"

btg

17,500

1,944

Pipa listrik

btg

Pipa Besi 5/8 "

btg

Pipa Paralon 5/8 "

btg

Pipa PVC S - 10

5,000
7,000

6,000

7,000

125,000

125,000

8,000

7,000

3,667
27,778

7,000

1,556
-

- Pipa PVC 32 mm (MOF)

btg

#DIV/0!

#DIV/0!

- Pipa PVC 40 mm (MOF)

btg

#DIV/0!

#DIV/0!

- Pipa PVC 50 mm (MOF)

btg

#DIV/0!

#DIV/0!

- Pipa PVC 20 mm (SCJ) 6m

btg

- Pipa PVC 25 mm (SCJ) 6m

btg

- Pipa PVC 32 mm (SCJ) 6m

btg

- Pipa PVC 40 mm (SCJ) 6m

btg

- Pipa PVC 50 mm (SCJ) 6m

btg

- Pipa PVC 63 mm (SCJ) 6m

btg

- Pipa PVC 75 mm (SCJ) 6m

btg

- Pipa PVC 90 mm (SCJ) 6m

btg

- Pipa PVC 110 mm (SCJ) 6m

btg

- Pipa PVC 160 mm (SCJ) 6m

btg

- Pipa PVC 200 mm (SCJ) 6m

btg

- Pipa PVC 250 mm (SCJ) 6m

btg

- Pipa PVC 280 mm (SCJ) 6m

btg

- Pipa PVC 315 mm (SCJ) 6m

btg

- Pipa PVC 63 mm (RRJ) 6m

btg

- Pipa PVC 75 mm (RRJ) 6m

btg

- Pipa PVC 90 mm (RRJ) 6m

btg

- Pipa PVC 110 mm (RRJ) 6m

btg

- Pipa PVC 160 mm (RRJ) 6m

btg

- Pipa PVC 200 mm (RRJ) 6m

btg

- Pipa PVC 250 mm (RRJ) 6m

btg

- Pipa PVC 280 mm (RRJ) 6m

btg

- Pipa PVC 315 mm (RRJ) 6m

btg

- Pipa PVC 355 mm (RRJ) 6m

btg

- Pipa PVC 400 mm (RRJ) 6m

btg

- Pipa PVC 500 mm (RRJ) 6m

btg

- Pipa PVC 630 mm (RRJ) 6m

btg

Pipa PVC S - 12,5


- Pipa PVC 32 mm (MOF) 6m

btg

- Pipa PVC 40 mm (MOF) 6m

btg

- Pipa PVC 50 mm (MOF) 6m

btg

- Pipa PVC 20 mm (SCJ) 6m

btg

- Pipa PVC 25 mm (SCJ) 6m

btg

- Pipa PVC 32 mm (SCJ) 6m

btg

- Pipa PVC 40 mm (SCJ) 6m

btg

- Pipa PVC 50 mm (SCJ) 6m

btg

- Pipa PVC 63 mm (SCJ) 6m

btg

- Pipa PVC 75 mm (SCJ) 6m

btg

- Pipa PVC 90 mm (SCJ) 6m

btg

- Pipa PVC 110 mm (SCJ) 6m

btg

- Pipa PVC 160 mm (SCJ) 6m

btg

- Pipa PVC 200 mm (SCJ) 6m

btg

- Pipa PVC 250 mm (SCJ) 6m

btg

- Pipa PVC 280 mm (SCJ) 6m

btg

- Pipa PVC 315 mm (SCJ) 6m

btg

- Pipa PVC 63 mm (RRJ) 6m

btg

- Pipa PVC 75 mm (RRJ) 6m

btg

- Pipa PVC 90 mm (RRJ) 6m

btg

- Pipa PVC 110 mm (RRJ) 6m

btg

- Pipa PVC 160 mm (RRJ) 6m

btg

- Pipa PVC 200 mm (RRJ) 6m

btg

- Pipa PVC 250 mm (RRJ) 6m

btg

- Pipa PVC 280 mm (RRJ) 6m

btg

- Pipa PVC 315 mm (RRJ) 6m

btg

- Pipa PVC 355 mm (RRJ) 6m

btg

- Pipa PVC 400 mm (RRJ) 6m

btg

No

UPAH / BAHAN

SATUAN

HARGA

HARGA

HARGA

HARGA

HARGA

HARGA

UD. Haryona

Toko

UD. Karya

Toko

Toko

Toko

Putra

Mutiara

Murni

Bambu Sari

Adi Karya

Sinar Alam

Putra

Putra

Putra

Patas

Rengdikit

Busung Biu

Singaraja

Singaraja

Serirt

Serirt

Serirt

( Rp.)

( Rp.)

( Rp.)

( Rp.)

( Rp.)

( Rp.)

( Rp.)

( Rp.)

( Rp.)

HARGA

HARGA

HARGA

UD. Haryona UD. Haryona UD. Haryona

HARGA
Survey
Rata-rata
( Rp.)
5

- Pipa PVC 500 mm (RRJ) 6m

btg

- Pipa PVC 630 mm (RRJ) 6m

btg

10

Pipa PVC S - 16
- Pipa PVC 32 mm (SCJ) 6m

btg

- Pipa PVC 50 mm (SCJ) 6m

btg

- Pipa PVC 63 mm (SCJ) 6m

btg

- Pipa PVC 75 mm (SCJ) 6m

btg

- Pipa PVC 90 mm (SCJ) 6m

btg

- Pipa PVC 110 mm (SCJ) 6m

btg

- Pipa PVC 160 mm (SCJ) 6m

btg

- Pipa PVC 63 mm (RRJ) 6m

btg

- Pipa PVC 75 mm (RRJ) 6m

btg

- Pipa PVC 90 mm (RRJ) 6m

btg

- Pipa PVC 110 mm (RRJ) 6m

btg

- Pipa PVC 160 mm (RRJ) 6m

btg

11

Pipa HDPE S 8 SDR 17 PN 10

Diameter Luar (mm)


- 20

- 25

- 32

- 40

- 50

- 63

- 75

- 90

- 110

- 125

- 140

- 160

- 180

- 200

- 225

- 250

- 280

- 315

- 355

- 400

- 450

- 500

- 560

- 630

12

Pipa HDPE S 6,3 SDR 13,6 PN 12,5

Diameter Luar (mm)


- 20

- 25

- 32

- 40

- 50

- 63

- 75

- 90

- 110

- 125

- 140

- 160

- 180

- 200

- 225

- 250

- 280

- 315

- 355

- 400

- 450

- 500

- 560

No

UPAH / BAHAN

2
- 630

SATUAN

HARGA

HARGA

HARGA

HARGA

HARGA

HARGA

UD. Haryona

Toko

UD. Karya

Toko

Toko

Toko

Putra

Mutiara

Murni

Bambu Sari

Adi Karya

Sinar Alam

Putra

Putra

Putra

Patas

Rengdikit

Busung Biu

Singaraja

Singaraja

Serirt

Serirt

Serirt

( Rp.)

( Rp.)

( Rp.)

( Rp.)

( Rp.)

( Rp.)

( Rp.)

( Rp.)

( Rp.)

HARGA

HARGA

HARGA

UD. Haryona UD. Haryona UD. Haryona

HARGA
Survey
Rata-rata
( Rp.)
5
-

BAHAN FINISHING

Amplas

Minyak Cat

ltr

Meni kayu

kg

Plamir kayu

3,000

4,000

4,000

4,000

1,667

22,000

24,000

30,000

23,000

15,000

12,667

22,000

26,000

25,000

26,000

25,000

13,778

kg

22,000

26,000

25,000

26,000

25,000

13,778

Cat Dasar Kayu

kg

22,000

24,000

60,000

26,000

25,000

17,444

Cat Kayu

kg

60,000

50,000

60,000

63,000

55,000

32,000

Plamir Tembok

kg

6,000

15,000

15,000

13,000

15,000

7,111

Cat Dasar Tembok

kg

15,000

4,444

lbr

25,000

Cat Tembok

kg

12,000

19,000

25,000

13,000

25,000

10,444

10

Meni Besi

kg

22,000

26,000

25,000

26,000

25,000

13,778

11

Dempul

kg

26,000

25,000

12

Cat Besi

kg

60,000

55,000

60,000

13

Politur

ltr

55,000

44,000

14

Politur jadi ( Ultran )

ltr

53,000

55,000

15

Teak Oil

ltr

16

Spritus

ltr

17

Sirlak

kg

18

Oker

kg

19

Lem Kayu

kg

12,000

12,000

15,000

13,000

15,000

7,444

20

Impra

kg

30,000

32,500

45,000

31,000

30,000

18,722

BAHAN KACA

Kaca Bening 5 mm

m2

93,000

Kaca Bening 3 mm

m2

65,000

7,222

Kaca Ray-Ban 5 mm

m2

95,000

10,556

Nako + Tralis

m2

ALAT PENGUNCI

Kunci 2 Slaag

bh

120,000

140,000

150,000

45,556

Kunci 1 Slaag

bh

75,000

65,000

75,000

23,889

Kunci KM/ WC

bh

45,000

40,000

50,000

15,000

Kunci Gembok

bh

20,000

20,000

55,000

25,000

13,333

Grendel

bh

5,000

5,000

7,000

10,000

3,000

ALAT PENGGANTUNG

Kait Angin

psg

15,000

15,000

15,000

15,000

25,000

9,444

Engsel kupu-kupu

psg

20,000

12,000

25,000

25,000

10,000

10,222

Engsel Nilon

psg

10,000

7,000

17,000

15,000

5,444

Espanolet

bh

75,000

8,333

BAHAN SANITAIR

Washtafel

bh

Urinoir

bh

Closet Jongkok

25,000

8,444

63,000

55,000

32,556

60,000

43,000

55,000

28,556

60,000

52,000

55,000

30,556

55,000
15,000

20,000

40,000

10,556

15,000

5,556

75,000

14,444

55,000

10,333

165,000

230,000

350,000

200,000

bh

125,000

140,000

160,000

135,000

150,000

78,889

Closet Duduk

bh

400,000

375,000

1,600,000

1,800,000

1,500,000

630,556

Bak Mandi Fiber

bh

200,000

250,000

250,000

250,000

300,000

138,889

Bak Mandi Keramik

bh

225,000

250,000

80,556

Floordrain

bh

Shower

bh

150,000

85,000

15,000

25,000

250,000
30,000

750,000

188,333

750,000

83,333

7,000

25,000

6,889

55,000

60,000

75,000

47,222

35,000

20,000

35,000

14,444

Kran Air

bh

10

Pompa air 150 watt

bh

11

Pompa air 250 watt

bh

12

Selang Air 1/2'

5,000

13

Selang Air 3/4'

8,000

BAHAN PAKU

Paku Lis

kg

16,000

18,000

20,000

20,000

15,000

9,889

Paku Reng

kg

13,000

18,000

20,000

15,000

13,000

8,778

Paku Usuk

kg

13,000

18,000

20,000

15,000

13,000

8,778

Paku Seng

kg

22,000

24,000

30,000

25,000

13,000

12,667

Paku Sekrup 1/2"

ktk

6,000

20,000

7,000

15,000

5,333

Paku Sekrup

ktk

8,000

20,000

15,000

15,000

6,444

Paku gypsum

kg

30,000

25,000

30,000

25,000

20,000

14,444

Paku beton 5 cm

ktk

13,000

15,000

45,000

15,000

15,000

11,444

Paku beton 3"

ktk

10,000

14,000

45,000

12,000

15,000

10,667

10

Paku pancing

ktk

450,000

50,000

7,000

7,000

5,000

1,889

10,000

7,000

3,556
-

2"

No

UPAH / BAHAN

SATUAN

HARGA

HARGA

HARGA

HARGA

HARGA

HARGA

UD. Haryona

Toko

UD. Karya

Toko

Toko

Toko

Putra

Mutiara

Murni

Bambu Sari

Adi Karya

Sinar Alam

Putra

Putra

Putra

Patas

Rengdikit

Busung Biu

Singaraja

Singaraja

Serirt

Serirt

Serirt

( Rp.)

( Rp.)

( Rp.)

( Rp.)

( Rp.)

( Rp.)

( Rp.)

( Rp.)

( Rp.)

HARGA

HARGA

HARGA

UD. Haryona UD. Haryona UD. Haryona

HARGA
Survey
Rata-rata
( Rp.)
5
-

BAHAN LISTRIK

Sakelar

bj

Stop Kontak

bj

Fitting

bj

Steker

bj

Kabel NYM 2x1,5 mm

Kabel NYM 2x2,5 mm

Lampu Pijar 10 Watt

bj

Lampu Pijar 15 Watt

bj

Lampu Pijar 25 Watt

bj

10

Lampu TL 10 Watt

bj

11

Lampu TL 20 Watt

bj

12

Lampu TL 40 Watt

bj

AA

LAIN-LAIN

Aspal
- Aspal Emulsi

kg

- Aspal Cutback

kg

- Aspal Bitumen

kg

- Aspal Curah

kg

Solar

ltr

Oli

ltr

Sikat Baja

Bh

Alumnium Kulit Jeruk

lbr

Baut Kodok

kg

8,000

25,000

15,000

5,333

125,000

100,000

25,000
-

REKAPITULASI DAFTAR ANALISA


DINAS PEKERJAAN UMUM KABUPATEN BULELENG
TAHUN ANGG.

: 2013

NO

JENIS PEKERJAAN

1
2
3
4
5
6
7
8
9
10
11

BONGKARAN BETON BERTULANG


MEMBONGKAR USUK/RENG
MENGUPAS PLESTERAN
MEMBONGKAR TEMBOK
MEMBONGKAR LANTAI
MENURUNKAN ATAP GENTENG
MENURUNKAN ATAP SENG
PENGUKURAN & PASANG PAPAN BOUWPLANK
GALIAN TANAH SEDALAM 2 M
GALIAN TANAH BIASA DLM TEROWONGAN (5X)
GALIAN TANAH LUMPUR/SEDIMEN UNTUK
- SALURAN TERTUTUP
- SALURAN TERBUKA
GALIAN TANAH LUMPUR SEDALAM 1 M
GALIAN TANAH KERAS SEDALAM 1 METER
GALIAN TANAH KERAS DLM TEROWONGAN (5X)
GALIAN TANAH BERBATU BUNDAR( 3X )
URUGAN TANAH DIPADATKAN
URUGAN KEMBALI
MEMBUANG SISA GALIAN / LUMPUR / SAMPAH
KELUAR LOKASI SEJAUH 30 M'
MEMBUANG SISA GALIAN / LUMPUR / SAMPAH
KELUAR LOKASI DG. KEND. SEJAUH 30-100 M'
URUGAN PASIR DENGAN PENYIRAMAN
PASANGAN BATU KOSONG
PASANGAN BATU KALI 1 : 5
PASANG BATACO
PASANGAN BATA MERAH 1 : 2
(Kw 2)
(Kw 1)
PASANGAN BATA MERAH 1 : 5
(Kw 2)
(Kw 1)
PLESTERAN PC 1 : 2 TEBAL 20 mm
PLESTERAN PC 1:3 TEBAL 20 mm
PLESTERAN PC 1:5 TEBAL 20 mm
PLESTERAN PC 1 : 6 TEBAL 15 mm
PEKERJAAN ACIAN 1:2
PEKERJAAN SIARAN 1 : 2
PASANG PARAS/BATA GOSOK
(Kw 1)
(Kw 2)
PEKERJAAN BATA GOSOK STYLE BALI
(Kw 1)
(Kw 2)
PARAS BATU KALIASEM 50/50
PALIMANAN TEPI KOLAM & T.DUDUK 30/30
PALIMANAN LANTAI KOLAM 30/30
PEKERJAAN PAVING STONE
Tb. 6 Cm
Tb. 8 Cm
PEKERJAAN DINDING ROSTER KERAWANG
1 M2 PASANGAN KERAMIK KW I 20 x 20
Keramik KW II 20/20 cm
1 M2 PASANGAN KERAMIK KW I 30 x 30
Keramik KW II 30/30 cm
1 M2 PASANGAN KERAMIK KW I 30 x 30
Keramik KW II 40/40 cm
PEKERJAAN PLINT KERAMIK 10 x 30 (1:2)
PAS. LANTAI TEGEL PC :
- Tegel PC Polos 20/20 cm

12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44

45
46

SATUAN
PEKERJAAN
M3
M2
M2
M3
M2
M2
M2
M'
M3
M3

HARGA PEKERJAAN
(Rp)
354,355.30
2,252.50
2,372.50
294,423.60
9,490.00
7,930.00
7,685.00
120,848.50
26,834.80
134,174.00

M3
M3
M3
M3
M3
M3
M3
M3
M3

78,475.00
65,335.00
42,106.40
31,901.00
127,177.50
69,350.00
171,670.00
9,796.60
15,184.00

M3

35,184.00

M3
M3
M3
M2
M3
M3
M3
M3
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M'
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2

207,310.00
321,581.10
624,698.70
59,764.40
116,239.10
123,239.10
105,565.98
112,565.98
57,188.85
47,426.55
49,973.33
48,834.77
21,528.50
36,316.34
696,703.60
674,703.60
883,590.00
833,590.00
101,614.50
277,387.22
299,974.50
99,416.00
106,316.00
97,452.50
154,521.40
151,821.40
148,955.00
145,655.00
156,855.00
154,955.00
65,612.47

M2

91,216.70

KETERANGAN

Hal : 9

NO

47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70

71
72
73
74

75

76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96

JENIS PEKERJAAN
- Tegel PC Polos 30/30 cm
- Tegel Warna 30/30 cm
PEKERJAAN BETON COR 1 : 3 : 5
PEKERJAAN BETON COR 1 : 2 : 3
PEKERJAAN PAPAN BEGISTING
PEKERJAAN BESI BETON
PEKERJAAN BETON BERTULANG Fe 80
PEKERJAAN BETON BERTULANG Fe 100
PEKERJAAN BETON BERTULANG Fe 150
PEKERJAAN BETON BERTULANG Fe 160
PEKERJAAN BETON BERTULANG Fe 175
PEKERJAAN BETON BERTULANG Fe 185
PEKERJAAN BETON BERTULANG Fe 200
PEKERJAAN BETON BERTULANG Fe 225
PEKERJAAN BETON BERTULANG Fe 250
PEKERJAAN BETON BERTULANG Fe 275
PEKERJAAN BETON BERTULANG Fe 300
PEKERJAAN BETON PLAT PONDASI Fe 160
BETON CYCLOOF 40% BATU KALI
PEKERJAAN CYKLOP 1:3:5 DIAMETER 100 CM
PEKERJAAN PLAFOND CEILLING TEAK
PEKERJAAN GERANTANGAN CEILLING TEAK
PLAPOND GYPSUM
PLAPOND ETERNIT
TADIR GEDEG KLAS I
PEK. PLAPOND RANGKA KRUING & PENUTUP :
- Plywood
- Triplek 3 mm
- Teak Wood
DINDING PARTISI TEAKWOOD RANGKAP (KAMPER)
PEKERJAAN KUSEN PINTU DAN JENDELA JATI
PEKERJAAN KUSEN PINTU DAN JENDELA KAMPER
DAUN JENDELA KACA :
- Kayu Kamper + Kaca polos 3 mm
- Kayu Kamper + Kaca polos 5 mm
- Kayu Kamper + Kaca rayben 5 mm
- Kayu Jati + Kaca polos 3 mm
- Kayu Jati + Kaca polos 5 mm
- Kayu Jati + Kaca rayben 5 mm
PEKERJAAN KACA MATI :
- Kaca polos 5 mm
- Kaca polos 3 mm
- Kaca RAYBEN 5 mm
DAUN PINTU PANEL KAYU JATI
DAUN PINTU PANEL KAYU KAMPER
DAUN PINTU DOUBLE PLYWOOD
DAUN PINTU DOUBLE TEAKWOOD
PEK. DAUN PINTU LAPIS TEAKWOOD/ALUMINIUM
PEK. DAUN PINTU LAPIS PLYWOOD/ALUMINIUM
KUDA-KUDA KAYU KRUING
KUDA-KUDA KAYU SESEH
KUDA-KUDA KAYU KAMPER
KUDA-KUDA KAYU MERANTI
KUDA-KUDA KAYU BENGKIRAI
PEKERJAAN USUK KAMPER + RENG KAMPER
PEKERJAAN USUK KRUING + RENG KAMPER
PEKERJAAN USUK MERANTI + RENG KAMPER
PEK. USUK KAMPER + RENG KAMPER (EKSPOSE)
GERANTANGAN (USUK KRUING/RENG KAMPER)
PASANG USUK (KRUING)
PASANG RENG (KAMPER)
PEKERJAAN PAPAN LISTPLANK ( 3/20 ) KAMPER
PEKERJAAN PAPAN LISTPLANK ( 3/20 ) KRUING
PEKERJAAN PAPAN LISTPLANK ( 3/20 ) MERANTI

SATUAN
PEKERJAAN
M2
M2
M3
M3
M2
Kg
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M2
M2
M2
M2
M2

HARGA PEKERJAAN
(Rp)
#REF!
#REF!
647,747.50
881,616.50
120,370.00
990,841.16
2,877,989.43
3,076,157.66
3,571,578.24
3,670,662.36
3,819,288.53
3,918,372.65
4,066,998.82
4,314,709.11
4,562,419.40
4,810,129.69
5,057,839.98
2,466,962.36
611,193.90
787,676.00
343,247.00
242,391.00
168,713.00
164,997.00
175,697.00

M2
M2
M2
M2
M3
M3

220,594.90
221,725.90
232,606.90
250,290.60
14,122,230.00
12,097,000.00

M2
M2
M2
M2
M2
M2

544,289.60
557,089.60
574,209.60
612,096.80
624,896.80
642,016.80

M2
M2
M2
M2
M2
M2
M2
M2
M2
M3
M3
M3
M3
M3
M2
M2
M2
M2
M2
M2
M2
M'
M'
M'

119,073.75
101,473.75
142,613.75
815,748.00
697,086.00
549,433.44
580,233.44
607,430.00
588,180.00
8,886,000.00
4,939,860.00
10,947,400.00
7,119,070.00
12,714,220.00
121,455.40
108,605.80
95,755.40
206,384.60
211,015.60
77,493.60
86,030.10
131,829.92
101,625.56
90,059.84

KETERANGAN

Hal : 10

NO
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127

JENIS PEKERJAAN
PEKERJAAN TALANG (PAPAN TALANG & SENG)
PASANG GENTENG KODOK
PASANG GENTENG BIASA/PEJATEN
PASANG GENTENG BUBUNGAN
PASANG ATAP SENG GELOMBANG
PASANG ATAP ASBES GELOMBANG
BUBUNGAN ATAP SENG
PASANGAN ATAP SENG LAMA
PASANG ATAP SIRAP
PEKERJAAN MENGECAT TEMBOK
PEKERJAAN MENGECAT TEMBOK LAMA
PEKERJAAN CAT MENI
PEKERJAAN MENGECAT KAYU ULANG
PEKERJAAN MENGECAT KAYU
PEKERJAAN POLITUR
PEMBUATAN SALURAN TERTUTUP
SALURAN / GOT
PEKERJAAN WATER PROFING
MENYIAPKAN SUB GRADE
TIMBUNAN SIRTU (Tb. 20 CM)
PASANGAN GLADAK (BATU PECAH 10/15)
PASANG BATU KANCING 15/20 CM
MENGHAMPAR BATU PECAH 5/7 CM
MENGHAMPAR LAPEN BATU PECAH 2/3+3/4+ASPAL
MENGASPAL 200 KG
MENGASPAL 125 KG
PEKERJAAN LAPEN ASPAL 4 KG
PAS. PIPA PVC TIPE AW DIA 1/2" s/d. 1 1/2"
PAS. PIPA GALVANIS DIA 1/2" s/d. 3/4"
PEKERJAAN BRONJONG
PEKERJAAN CAT RESIDU/TEER

SATUAN
PEKERJAAN
M'
M2
M2
M'
M2
M2
M'
M2
M2
M2
M2
M2
M2
M2
M2
M'
M'
M2
M2
M2
M2
M'
M2
M2
M2
M2
M2
M'
M'
M3
M2

HARGA PEKERJAAN
(Rp)
234,554.50
93,409.90
60,909.90
88,235.60
37,370.80
34,150.80
34,014.75
50,419.00
132,479.60
11,965.86
8,675.14
11,036.60
24,264.50
35,072.30
37,100.10
187,308.71
135,860.73
111,400.00
2,830.34
61,877.60
69,737.60
7,358.94
25,504.00
30,506.17
32,568.21
22,880.18
85,954.56
12,977.42
40,504.30
523,950.00
3,851.00

KETERANGAN

Edisi : Februari 2009.

Hal : 11

DAFTAR ANALISA
DINAS PEKERJAAN UMUM KABUPATEN BULELENG
TAHUN ANGGARAN

: 2014

NO

URAIAN

HARGA
SATUAN
Rp.
3

326,683.00
27,672.30
354,355.30

326,683.00
27,672.30
354,355.30

10 M2 MEMBONGKAR USUK/RENG
0.250 OH
Tukang Kayu
0.025 OH
Kepala Tukang Kayu

81,700.00
84,000.00

20,425.00
2,100.00
22,525.00
2,252.50

20,425.00
2,100.00
22,525.00
2,252.50

24,500.00
2,077.50
26,577.50
2,657.75

24,500.00
2,077.50
26,577.50
2,657.75

10 M2 MENGUPAS PLESTERAN
0.500 OH
Pekerja
0.025 OH
Mandor

49,000.00
83,100.00

1 M3 MEMBONGKAR TEMBOK
6.667 OH
Pekerja
0.033 OH
Mandor

49,000.00
83,100.00

326,683.00
2,742.30
329,425.30

326,683.00
2,742.30
329,425.30

10 M2 MEMBONGKAR LANTAI
2.000 OH
Pekerja
0.100 OH
Mandor

49,000.00
83,100.00

98,000.00
8,310.00
106,310.00
10,631.00

98,000.00
8,310.00
106,310.00
10,631.00

37,350.00
49,000.00
86,350.00
8,635.00

37,350.00
49,000.00
86,350.00
8,635.00

36,200.00
49,000.00
85,200.00
8,520.00

36,200.00
49,000.00
85,200.00
8,520.00

Untuk 1 M2
6

10 M2 MENURUNKAN ATAP GENTENG


0.500 OH
Tukang Batu
1.000 OH
Pekerja

74,700.00
49,000.00
Untuk 1 M2

10 M2 MENURUNKAN ATAP SENG


0.500 OH
Tukang Besi
1.000 OH
Pekerja

72,400.00
49,000.00
Untuk 1 M2

1 M' PENGUKURAN & PASANG PAPAN BOUWPLANK


0.012 M3
Seseh Balok
0.007 M3
Papan begesting
papan 3/20
0.020 Kg
Paku Usuk
0.100 OH
Tukang Kayu
0.010 OH
Kepala Tukang Kayu
0.100 OH
Pekerja
0.005 OH
Mandor

3,052,100.00
1,380,400.00
18,100.00
81,700.00
84,000.00
49,000.00
83,100.00

8,170.00
840.00
4,900.00
415.50
14,325.50

36,625.20
9,662.80
362.00
46,650.00

36,625.20
9,662.80
362.00
8,170.00
840.00
4,900.00
415.50
60,975.50

25 M' PENGUKURAN & PASANGAN BOUWPLANK


JALAN / RABAT BETON
0.048 M3
Seseh Balok
0.020 Kg
Paku Usuk
0.050 OH
Tukang Kayu
0.005 OH
Kepala Tukang Kayu
0.050 OH
Pekerja
0.005 OH
Mandor

3,052,100.00
18,100.00
81,700.00
84,000.00
49,000.00
83,100.00

4,085.00
420.00
2,450.00
415.50
7,370.50
294.82

146,500.80
362.00
146,862.80
5,874.51

146,500.80
362.00
4,085.00
420.00
2,450.00
415.50
154,233.30
6,169.33

4,141.20
3,250.68
362.00

4,141.20
3,250.68
362.00

Untuk 1 M'
10

KET.

49,000.00
83,100.00

Untuk 1 M2
4

JUMLAH
HARGA
Rp.
6

1 M3 BONGKARAN BETON BERTULANG


6.667 OH
Pekerja
0.333 OH
Mandor

Untuk 1 M2
3

JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5

1 M' PASANGAN BEGESTING BETON RABAT


0.003 M3
Papan begesting
0.001 M3
Reng Meranti
0.020 Kg
Paku Usuk

1,380,400.00
5,417,800.00
18,100.00
Page 12

Analisa-17'Jan 14

NO

URAIAN

1
0.020
0.005
0.050
0.005

OH
OH
OH
OH

2
Tukang Kayu
Kepala Tukang Kayu
Pekerja
Mandor

HARGA
SATUAN
Rp.
3
81,700.00
84,000.00
49,000.00
83,100.00
5x pakai

11

1 M3 GALIAN TANAH SEDALAM 1 METER


0.750 OH
Pekerja
0.003 OH
Mandor

49,000.00
83,100.00

1M3 GALIAN TANAH BIASA DLM TEROWONGAN (5X)

Page 13

JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
1,634.00
420.00
2,450.00
415.50
4,919.50
7,753.88
983.90
1,550.78

36,750.00
207.75
36,957.75
184,788.75

JUMLAH
HARGA
Rp.
6
1,634.00
420.00
2,450.00
415.50
12,673.38
2,534.68

36,750.00
207.75
36,957.75
184,788.75

KET.

26,834.80
(10,122.95)

Analisa-17'Jan 14

NO

URAIAN

1
12

2
1 M3 GALIAN TANAH SEDALAM 2 METER
0.900 OH
Pekerja
0.045 OH
Mandor

HARGA
SATUAN
Rp.
3
49,000.00
83,100.00

1M3 GALIAN TANAH BIASA DLM TEROWONGAN (5X)


13

14

15

17

18

19

20

21

22

23

JUMLAH
HARGA
Rp.
6

KET.

44,100.00
3,739.50
47,839.50
239,197.50

44,100.00
3,739.50
47,839.50
239,197.50

1 M3 GALIAN TANAH LUMPUR/SEDIMEN SEDALAM 1 METER


SALURAN TERTUTUP
1.200 OH
Pekerja
0.045 OH
Mandor

49,000.00
83,100.00

58,800.00
3,739.50
62,539.50

58,800.00
3,739.50
62,539.50

SALURAN TERBUKA
0.750 OH
Pekerja
0.025 OH
Mandor

49,000.00
83,100.00

36,750.00
2,077.50
38,827.50

36,750.00
2,077.50
38,827.50

49,000.00
83,100.00

58,800.00
3,739.50
62,539.50

58,800.00
3,739.50
62,539.50

49,000.00
2,659.20
51,659.20
127,177.50

49,000.00
2,659.20
51,659.20
127,177.50

1 M3 GALIAN TANAH LUMPUR SEDALAM 1 M


1.200 OH
Pekerja
0.045 OH
Mandor
1 M3 GALIAN TANAH KERAS SEDALAM 1 METER
1.000 OH
Pekerja
0.032 OH
Mandor

49,000.00
83,100.00

1 M3 GALIAN TANAH KERAS DLM TEROWONGAN (5X)


16

JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5

1 M3 GALIAN TANAH BERBATU BUNDAR( 3X )


1.500 OH
Pekerja
0.050 OH
Mandor

49,000.00
83,100.00

73,500.00
4,155.00
77,655.00

73,500.00
4,155.00
77,655.00

MENGERJAKAN 1 M2 STRIPPING TEBING SETINGGI 1 M


0.050 OH
Pekerja
0.005 OH
Mandor

49,000.00
83,100.00

2,450.00
415.50
2,865.50

2,450.00
415.50
2,865.50

1 M3 URUGAN TANAH + DIPADATKAN


1.200 M3
Tanah urug
0.800 OH
Pekerja
0.018 OH
Mandor
1.000 Ls
Stamper

60,000.00
49,000.00
83,100.00
25,000.00

39,200.00
1,520.73
25,000.00
65,720.73

72,000.00
72,000.00

72,000.00
39,200.00
1,520.73
25,000.00
137,720.73

1 M3 URUGAN KEMBALI SEDALAM 2 METER


0.300 OH
Pekerja
0.015 OH
Mandor

49,000.00
83,100.00

14,700.00
1,246.50
15,946.50

14,700.00
1,246.50
15,946.50

1 M3 MEMBUANG SISA GALIAN / LUMPUR /


SAMPAH KELUAR LOKASI SEJAUH 30 M'
0.330 OH
Pekerja
0.010 OH
Mandor

49,000.00
83,100.00

16,170.00
831.00
17,001.00

16,170.00
831.00
17,001.00

1 M3 MEMBUANG SISA GALIAN / LUMPUR /


SAMPAH KELUAR LOKASI DENGAN KENDARAAN
SEJAUH 30 M' S/D 100 M'
0.330 OH
Pekerja
0.010 OH
Mandor
1.000 Ls
Ongkos Angkut Kendaraan

49,000.00
83,100.00
50,000.00

16,170.00
831.00
50,000.00
67,001.00

16,170.00
831.00
50,000.00
67,001.00

1 M3 URUGAN PASIR DENGAN PENYIRAMAN


1.200 M3
Pasir Urug
0.300 OH
Pekerja
0.010 OH
Mandor

158,200.00
49,000.00
83,100.00

14,700.00
831.00
15,531.00

189,840.00
189,840.00

189,840.00
14,700.00
831.00
205,371.00

1 M3 PASANGAN BATU KOSONG


1.200 M3
Batu Pasang
0.432 M3
Pasir Urug

196,000.00
158,200.00

235,200.00
68,342.40

235,200.00
68,342.40

Page 14

26,834.80
(21,004.70)

42,106.40
(20,433.10)

31,901.00
(19,758.20)

Analisa-17'Jan 14

NO

URAIAN

1
0.780
0.039
0.390
0.039

OH
OH
OH
OH

2
Pekerja
Mandor
Tukang Batu
Kepala Tukang Batu

HARGA
SATUAN
Rp.
3
49,000.00
83,100.00
74,700.00
82,100.00

Page 15

JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
38,220.00
3,240.90
29,133.00
3,201.90
73,795.80
303,542.40

JUMLAH
HARGA
Rp.
6
38,220.00
3,240.90
29,133.00
3,201.90
377,338.20

KET.

321,581.10
(55,757.10)

Analisa-17'Jan 14

NO
1
24

25

26

27

URAIAN
2
1 M3 PASANGAN BATU KALI 1 : 5
1.200 M3
Batu Pasang
136.000 Kg
Semen Gresik ( 50 kg )
0.544 M3
Pasir Pasang
0.600 OH
Tukang Batu
0.060 OH
Kepala Tukang Batu
1.500 OH
Pekerja
0.075 OH
Mandor

29

30

31

196,000.00
1,364.00
164,200.00
74,700.00
82,100.00
49,000.00
83,100.00

1 M2 PASANG BATACO
12.500 Bj
Batako Cetak Lubang KW.II
7.500 Kg
Semen Gresik ( 50 kg )
0.027 M3
Pasir Pasang
0.100 OH
Tukang Batu
0.010 OH
Kepala Tukang Batu
0.320 OH
Pekerja
0.015 OH
Mandor

2,200.00
1,364.00
164,200.00
74,700.00
82,100.00
49,000.00
83,100.00

Batako Cetak Lubang KW.I

2,400.00

1 M2 PASANGAN BATA MERAH 1 : 2


70.000 Bj
Bata Pasang klas 2
18.950 kg
Semen Gresik ( 50 kg )
0.038 M3
Pasir Pasang
0.100 OH
Tukang Batu
0.010 OH
Kepala Tukang Batu
0.300 OH
Pekerja
0.015 OH
Mandor
Bata Pasang klas 1
1 M2 PASANGAN BATA MERAH 1 : 5
70.000 Bj
Bata Pasang klas 2
9.680 kg
Semen Gresik ( 50 kg )
0.045 M3
Pasir Pasang
0.100 OH
Tukang Batu
0.010 OH
Kepala Tukang Batu
0.300 OH
Pekerja
0.015 OH
Mandor
Bata Pasang klas 1

28

HARGA
SATUAN
Rp.
3

900.00
1,364.00
164,200.00
74,700.00
82,100.00
49,000.00
83,100.00
1,100.00
900.00
1,364.00
164,200.00
74,700.00
82,100.00
49,000.00
83,100.00
1,100.00

JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5

JUMLAH
HARGA
Rp.
6

KET.

44,820.00
4,926.00
73,500.00
6,232.50
129,478.50

235,200.00
185,504.00
89,324.80
510,028.80

235,200.00
185,504.00
89,324.80
44,820.00
4,926.00
73,500.00
6,232.50
639,507.30

7,470.00
821.00
15,680.00
1,246.50
25,217.50
25,217.50

27,500.00
10,230.00
4,433.40
42,163.40
44,663.40

27,500.00
10,230.00
4,433.40
7,470.00
821.00
15,680.00
1,246.50
67,380.90
69,880.90

7,470.00
821.00
14,700.00
1,246.50
24,237.50
24,237.50

63,000.00
25,847.80
6,239.60
95,087.40
109,087.40

63,000.00
25,847.80
6,239.60
7,470.00
821.00
14,700.00
1,246.50
119,324.90
133,324.90

7,470.00
821.00
14,700.00
1,246.50
24,237.50
24,237.50

63,000.00
13,203.52
7,389.00
83,592.52
97,592.52

63,000.00
13,203.52
7,389.00
7,470.00
821.00
14,700.00
1,246.50
107,830.02
121,830.02

1 M2 PLESTERAN PC 1 : 2 TEBAL 20 mm
13.632 Kg
Semen Gresik ( 50 kg )
0.027 M3
Pasir Pasang
0.200 OH
Tukang Batu
0.020 OH
Kepala Tukang Batu
0.270 OH
Pekerja
0.013 OH
Mandor

1,364.00
164,200.00
74,700.00
82,100.00
49,000.00
83,100.00

14,940.00
1,642.00
13,230.00
1,080.30
30,892.30

18,594.05
4,433.40
23,027.45

18,594.05
4,433.40
14,940.00
1,642.00
13,230.00
1,080.30
53,919.75

1 M2 PLESTERAN PC 1:3 TEBAL 20 mm


10.368 Kg
Semen Gresik ( 50 kg )
0.031 M3
Pasir Pasang
0.200 OH
Tukang Batu
0.020 OH
Kepala Tukang Batu
0.260 OH
Pekerja
0.013 OH
Mandor

1,364.00
164,200.00
74,700.00
82,100.00
49,000.00
83,100.00

14,940.00
1,642.00
12,740.00
1,080.30
30,402.30

14,141.95
5,090.20
19,232.15

14,141.95
5,090.20
14,940.00
1,642.00
12,740.00
1,080.30
49,634.45

1 M2 PLESTERAN PC 1:5 TEBAL 20 mm


6.912 Kg
Semen Gresik ( 50 kg )
0.035 M3
Pasir Pasang
0.200 OH
Tukang Batu
0.020 OH
Kepala Tukang Batu
0.270 OH
Pekerja
0.013 OH
Mandor

1,364.00
164,200.00
74,700.00
82,100.00
49,000.00
83,100.00

14,940.00
1,642.00
13,230.00
1,080.30
30,892.30

9,427.97
5,747.00
15,174.97

9,427.97
5,747.00
14,940.00
1,642.00
13,230.00
1,080.30
46,067.27

1 M2 PLESTERAN PC 1 : 6 TEBAL 20 mm
5.888 Kg
Semen Gresik ( 50 kg )

1,364.00

8,031.23

8,031.23

Page 16

624,698.70
(14,808.60)

47,426.55
(2,207.90)

Analisa-17'Jan 14

NO

URAIAN

1
0.036
0.200
0.020
0.270
0.013

M3
OH
OH
OH
OH

2
Pasir Pasang
Tukang Batu
Kepala Tukang Batu
Pekerja
Mandor

HARGA
SATUAN
Rp.
3
164,200.00
74,700.00
82,100.00
49,000.00
83,100.00

Page 17

JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
5,911.20
14,940.00
1,642.00
13,230.00
1,080.30
30,892.30
13,942.43

JUMLAH
HARGA
Rp.
6
5,911.20
14,940.00
1,642.00
13,230.00
1,080.30
44,834.73

KET.

Analisa-17'Jan 14

NO

URAIAN

1
32

2
1 M2 PEKERJAAN ACIAN 1:2
2.080 Kg
Semen Gresik ( 50 kg )
0.250 OH
Tukang Batu
0.025 OH
Kepala Tukang Batu
0.200 OH
Pekerja
0.003 OH
Mandor

33

34

1 M2 PEKERJAAN SIARAN 1 : 2
6.340 Kg
Semen Gresik ( 50 kg )
0.012 M3
Pasir Pasang
0.150 OH
Tukang Batu
0.015 OH
Kepala Tukang Batu
0.300 OH
Pekerja
0.015 OH
Mandor

1 M2 PASANG PARAS/BATA GOSOK


6.656 Bj
Paras Ukir Selekarang 30 x 15 x 3 cm
44.000 Bj
Bata Gosok klas I
0.600 Zak
Semen Gresik ( 50 kg )
3.500 OH
Tukang Ukir paras
0.350 OH
Kepala Tukang Ukir Style Bali
2.000 OH
Pekerja
0.100 OH
Mandor
Bata Gosok klas II

35

1 M2 PEK. BATA GOSOK STYLE BALI


100.000 Bj
Bata Gosok klas I
30.000 Kg
Semen Gresik ( 50 kg )
3.500 OH
Tukang Ukir paras
0.350 OH
Kepala Tukang Ukir Style Bali
2.000 OH
Pekerja
0.100 OH
Mandor
Bata Gosok klas II

36

37

38

39

HARGA
SATUAN
Rp.
3

JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5

JUMLAH
HARGA
Rp.
6

KET.

1,364.00
74,700.00
82,100.00
49,000.00
83,100.00

18,675.00
2,052.50
9,800.00
249.30
30,776.80

2,837.12
2,837.12

2,837.12
18,675.00
2,052.50
9,800.00
249.30
33,613.92

1,364.00
164,200.00
74,700.00
82,100.00
49,000.00
83,100.00

11,205.00
1,231.50
14,700.00
1,246.50
28,383.00

8,647.76
1,970.40
10,618.16

8,647.76
1,970.40
11,205.00
1,231.50
14,700.00
1,246.50
39,001.16

8,800.00
4,800.00
1,364.00
83,000.00
90,400.00
49,000.00
83,100.00

290,500.00
31,640.00
98,000.00
8,310.00
428,450.00
428,450.00

58,572.80
211,200.00
818.40
270,591.20
244,191.20

58,572.80
211,200.00
818.40
290,500.00
31,640.00
98,000.00
8,310.00
699,041.20
672,641.20

290,500.00
31,640.00
98,000.00
8,310.00
428,450.00
428,450.00

480,000.00
40,920.00
520,920.00
460,920.00

480,000.00
40,920.00
290,500.00
31,640.00
98,000.00
8,310.00
949,370.00
889,370.00

4,200.00

4,800.00
1,364.00
83,000.00
90,400.00
49,000.00
83,100.00
4,200.00

1 M2 PARAS BATU KALIASEM


1.200 Bj
Paras Malam 50 x 20 x 12 cm
7.000 Kg
Semen Gresik ( 50 kg )
0.025 M3
Pasir Pasang
0.250 OH
Tukang Ukir paras
0.025 OH
Kepala Tukang Paras
0.500 OH
Pekerja
0.025 OH
Mandor

37,800.00
1,364.00
164,200.00
83,000.00
88,900.00
49,000.00
83,100.00

20,750.00
2,222.50
24,500.00
2,077.50
49,550.00

45,360.00
9,548.00
4,105.00
59,013.00

45,360.00
9,548.00
4,105.00
20,750.00
2,222.50
24,500.00
2,077.50
108,563.00

1 M' PALIMANAN TEPI KOLAM & T.DUDUK


1.200 M3
Palimanan 30/30 T. 2,00 cm
2.100 Kg
Semen Gresik ( 50 kg )
0.011 M3
Pasir Pasang
0.150 OH
Tukang Ukir paras
0.015 OH
Kepala Tukang Paras
0.400 OH
Pekerja
0.020 OH
Mandor

90,000.00
1,364.00
164,200.00
83,000.00
88,900.00
49,000.00
83,100.00

12,450.00
1,333.50
19,600.00
1,662.00
35,045.50

108,000.00
2,864.40
1,871.88
112,736.28

108,000.00
2,864.40
1,871.88
12,450.00
1,333.50
19,600.00
1,662.00
147,781.78

1 M2 PALIMANAN LANTAI KOLAM


1.200 M3
Palimanan 30/30 T. 2,00 cm
7.000 Kg
Semen Gresik ( 50 kg )
0.025 M3
Pasir Pasang
0.250 OH
Tukang Ukir paras
0.025 OH
Kepala Tukang Paras
0.500 OH
Pekerja
0.025 OH
Mandor

90,000.00
1,364.00
164,200.00
83,000.00
88,900.00
49,000.00
83,100.00

20,750.00
2,222.50
24,500.00
2,077.50
49,550.00

108,000.00
9,548.00
4,105.00
121,653.00

108,000.00
9,548.00
4,105.00
20,750.00
2,222.50
24,500.00
2,077.50
171,203.00

1 M2 PEKERJAAN PAVING STONE


1.000 M2
Paving Blok / 6 cm
0.100 M3
Pasir Pasang

72,600.00
164,200.00

72,600.00
16,420.00

72,600.00
16,420.00

Page 18

Analisa-17'Jan 14

NO

URAIAN

1
0.266 OH

2
Tukang Batu
Paving Blok / 8 cm

HARGA
SATUAN
Rp.
3
74,700.00
81,500.00

Page 19

JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
19,870.20
19,870.20
89,020.00
19,870.20
97,920.00

JUMLAH
HARGA
Rp.
6
19,870.20
108,890.20
117,790.20

KET.

Analisa-17'Jan 14

NO

URAIAN

1
40

2
1 M2 PEK. DINDING ROSTER TERAWANG
1.000 Bj
Loster Terawang PC
13.000 Kg
Semen Gresik ( 50 kg )
0.035 M3
Pasir Pasang
0.100 OH
Tukang Batu
0.010 OH
Kepala Tukang Batu
0.300 OH
Pekerja
0.015 OH
Mandor

41

42

43

44

45

46

HARGA
SATUAN
Rp.
3

JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5

JUMLAH
HARGA
Rp.
6

KET.

13,100.00
1,364.00
164,200.00
74,700.00
82,100.00
49,000.00
83,100.00

7,470.00
821.00
14,700.00
1,246.50
24,237.50

13,100.00
17,732.00
5,747.00
36,579.00

13,100.00
17,732.00
5,747.00
7,470.00
821.00
14,700.00
1,246.50
60,816.50

1 M2 PASANGAN KERAMIK KW I 20 x 20
1.000 M2
Keramik KW I 20/20 cm
10.400 Kg
Semen Gresik ( 50 kg )
0.045 M3
Pasir Pasang
1.620 Kg
Semen warna
0.350 OH
Tukang Batu
0.035 OH
Kepala Tukang Batu
0.700 OH
Pekerja
0.035 OH
Mandor

56,700.00
1,364.00
164,200.00
23,500.00
74,700.00
82,100.00
49,000.00
83,100.00

Keramik KW II 20/20 cm

53,600.00

26,145.00
2,873.50
34,300.00
2,908.50
66,227.00
66,227.00

56,700.00
14,185.60
7,389.00
38,070.00
116,344.60
113,244.60

56,700.00
14,185.60
7,389.00
38,070.00
26,145.00
2,873.50
34,300.00
2,908.50
182,571.60
179,471.60

1 M2 PASANGAN KERAMIK KW I 30 x 30
1.000 M2
Keramik KW I 30/30 cm
10.000 Kg
Semen Gresik ( 50 kg )
0.045 M3
Pasir Pasang
1.500 Kg
Semen warna
0.350 OH
Tukang Batu
0.035 OH
Kepala Tukang Batu
0.700 OH
Pekerja
0.035 OH
Mandor

54,600.00
1,364.00
164,200.00
23,500.00
74,700.00
82,100.00
49,000.00
83,100.00

Keramik KW II 30/30 cm

50,900.00

26,145.00
2,873.50
34,300.00
2,908.50
66,227.00
66,227.00

54,600.00
13,640.00
7,389.00
35,250.00
110,879.00
107,179.00

54,600.00
13,640.00
7,389.00
35,250.00
26,145.00
2,873.50
34,300.00
2,908.50
177,106.00
173,406.00

1 M2 PASANGAN KERAMIK KW I 40 x 40
1.000 M2
Keramik KW I 40/40 cm
10.000 Kg
Semen Gresik ( 50 kg )
0.045 M3
Pasir Pasang
1.500 Kg
Semen warna
0.350 OH
Tukang Batu
0.035 OH
Kepala Tukang Batu
0.700 OH
Pekerja
0.035 OH
Mandor

57,600.00
1,364.00
164,200.00
23,500.00
74,700.00
82,100.00
49,000.00
83,100.00

26,145.00
2,873.50
34,300.00
2,908.50
66,227.00
66,227.00

57,600.00
13,640.00
7,389.00
35,250.00
113,879.00
113,279.00

57,600.00
13,640.00
7,389.00
35,250.00
26,145.00
2,873.50
34,300.00
2,908.50
180,106.00
179,506.00

6,723.00
738.90
4,410.00
415.50
12,287.40
12,287.40
12,287.40

5,514.60
1,561.78
492.60
5,875.00
13,443.98
13,656.08
27,190.96

5,514.60
1,561.78
492.60
5,875.00
6,723.00
738.90
4,410.00
415.50
25,731.38
25,943.48
39,478.36

10,084.50
1,149.40
13,230.00
1,121.85
25,585.75

30,000.00
14,185.60
7,389.00
38,070.00
89,644.60

30,000.00
14,185.60
7,389.00
38,070.00
10,084.50
1,149.40
13,230.00
1,121.85
115,230.35

129,381.00

129,381.00

57,000.00

Keramik KW II 40/40 cm
1 M' PEK. PLINT KERAMIK 10 x 30 (1:2)
0.101 M2
Keramik KW I 30/30 cm
1.145 Kg
Semen Gresik ( 50 kg )
0.003 M3
Pasir Pasang
0.250 Kg
Semen warna
0.090 OH
Tukang Batu
0.009 OH
Kepala Tukang Batu
0.090 OH
Pekerja
0.005 OH
Mandor

54,600.00
1,364.00
164,200.00
23,500.00
74,700.00
82,100.00
49,000.00
83,100.00

Keramik KW I 20/20 cm
Keramik KW I 40/40 cm

56,700.00
57,600.00

1 M2 PAS. TEGEL WARNA 20/20


1.000 M2
Tegel Warna 20/20 cm
10.400 Kg
Semen Gresik ( 50 kg )
0.045 M3
Pasir Pasang
1.620 Kg
Semen warna
0.135 OH
Tukang Batu
0.014 OH
Kepala Tukang Batu
0.270 OH
Pekerja
0.014 OH
Mandor

1 M3 BETON COR 1:3:5


0.610 M3
Kerikil / Koral Beton

30,000.00
1,364.00
164,200.00
23,500.00
74,700.00
82,100.00
49,000.00
83,100.00

212,100.00
Page 20

91,216.70
(24,013.65)

Analisa-17'Jan 14

NO

URAIAN

1
0.760
230.000
0.200
0.020
1.650
0.060

M3
Kg
OH
OH
OH
OH

2
Pasir Beton
Semen Gresik ( 50 kg )
Tukang Batu
Kepala Tukang Batu
Pekerja
Mandor

HARGA
SATUAN
Rp.
3
167,800.00
1,364.00
74,700.00
82,100.00
49,000.00
83,100.00

Page 21

JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
127,528.00
313,720.00
14,940.00
1,642.00
80,850.00
4,986.00
102,418.00
570,629.00

JUMLAH
HARGA
Rp.
6
127,528.00
313,720.00
14,940.00
1,642.00
80,850.00
4,986.00
673,047.00

KET.

Analisa-17'Jan 14

NO

URAIAN

1
47
a

2
BETON BERTULANG
1 M3 Beton Cor 1:2:3
0.810 M3
Kerikil / Koral Beton
0.540 M3
Pasir Beton
336.000 Kg
Semen Gresik ( 50 kg )
0.350 OH
Tukang Batu
0.035 OH
Kepala Tukang Batu
2.000 OH
Pekerja
1.000 OH
Mandor

HARGA
SATUAN
Rp.
3

48

49

50

JUMLAH
HARGA
Rp.
6

KET.

212,100.00
167,800.00
1,364.00
74,700.00
82,100.00
49,000.00
83,100.00
(A)

26,145.00
2,873.50
98,000.00
83,100.00
210,118.50

171,801.00
90,612.00
458,304.00
720,717.00

171,801.00
90,612.00
458,304.00
26,145.00
2,873.50
98,000.00
83,100.00
930,835.50

1,380,400.00
18,100.00
81,700.00
84,000.00
49,000.00
83,100.00
(B)

40,850.00
4,200.00
19,600.00
831.00
65,481.00
654,810.00

55,216.00
7,240.00
62,456.00
624,560.00

55,216.00
7,240.00
40,850.00
4,200.00
19,600.00
831.00
127,937.00
1,279,370.00

9,900.00
20,700.00
72,400.00
79,200.00
49,000.00
83,100.00
(C)

50,680.00
5,544.00
14,700.00
3,324.00
74,248.00

1,039,500.00
31,050.00
1,070,550.00

1,039,500.00
31,050.00
50,680.00
5,544.00
14,700.00
3,324.00
1,144,798.00

(A+B+0,8*C)
(A+B+C)
(A+B+1,5*C)
(A+B+1,6*C)
(A+B+1,75*C)
(A+B+1,85*C)
(A+B+2*C)
(A+B+2,25*C)
(A+B+2,5*C)
(A+B+2,75*C)
(A+B+3*C)
(A+1,6*C)

924,326.90
939,176.50
976,300.50
983,725.30
994,862.50
1,002,287.30
1,013,424.50
1,031,986.50
1,050,548.50
1,069,110.50
1,087,672.50
983,725.30

2,201,717.00
2,415,827.00
2,951,102.00
3,058,157.00
3,218,739.50
3,325,794.50
3,486,377.00
3,754,014.50
4,021,652.00
4,289,289.50
4,556,927.00
3,058,157.00

3,126,043.90
3,355,003.50
3,927,402.50
4,041,882.30
4,213,602.00
4,328,081.80
4,499,801.50
4,786,001.00
5,072,200.50
5,358,400.00
5,644,599.50
2,762,512.30

930,835.50
196,000.00

126,071.10
126,071.10

432,430.20
94,080.00
526,510.20

558,501.30
94,080.00
652,581.30

M3 PEK. CYKLOP 1:3:5 DIAMETER 100 CM


0.450 M3
Batu Pasang
0.670 M3
Kerikil / Koral Beton
0.450 M3
Pasir Beton
280.000 Kg
Semen Gresik ( 50 kg )
0.300 OH
Tukang Batu
0.030 OH
Kepala Tukang Batu
2.380 OH
Pekerja
0.080 OH
Mandor

196,000.00
212,100.00
167,800.00
1,364.00
74,700.00
82,100.00
49,000.00
83,100.00

22,410.00
2,463.00
116,620.00
6,648.00
148,141.00

88,200.00
142,107.00
75,510.00
381,920.00
687,737.00

88,200.00
142,107.00
75,510.00
381,920.00
22,410.00
2,463.00
116,620.00
6,648.00
835,878.00

1 M2 PEK. PLAFOND CEILLING TEAK


0.690 Lbr
Ceilingteak
0.015 M3
Kayu Kruing Balok 8/12
0.020 Kg
Paku Usuk
0.200 Kg
Paku Reng
2.000 OH
Tukang Kayu
0.020 OH
Kepala Tukang Kayu
0.500 OH
Pekerja
0.025 OH
Mandor

91,000.00
6,604,000.00
18,100.00
17,100.00
81,700.00
84,000.00
49,000.00
83,100.00

163,400.00
1,680.00
24,500.00
2,077.50
191,657.50
191,657.50

62,790.00
99,060.00
362.00
3,420.00
165,632.00
66,210.00

62,790.00
99,060.00
362.00
3,420.00
163,400.00
1,680.00
24,500.00
2,077.50
357,289.50
257,867.50

1 M2 Begesting
0.040 M3
0.400 Kg
0.500 OH
0.050 OH
0.400 OH
0.010 OH

Papan begesting
Paku Usuk
Tukang Kayu
Kepala Tukang Kayu
Pekerja
Mandor
10 M2 Begesting

JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5

100 Kg Pek. Besi


105.000 Kg
1.500 Kg
0.700 OH
0.070 OH
0.300 OH
0.040 OH

Beton ( Dgn Besi Polos/Ulir )


Besi Beton Polos 10mm
Kawat Ikat Beton
Tukang Besi
Kepala Tukang Besi
Pekerja
Mandor

1 M3 BETON BERTULANG Fe 80
1 M3 BETON BERTULANG Fe 100
1 M3 BETON BERTULANG Fe 150
1 M3 BETON BERTULANG Fe 160
1 M3 BETON BERTULANG Fe 175
1 M3 BETON BERTULANG Fe 185
1 M3 BETON BERTULANG Fe 200
1 M3 BETON BERTULANG Fe 225
1 M3 BETON BERTULANG Fe 250
1 M3 BETON BERTULANG Fe 275
1 M3 BETON BERTULANG Fe 300
1 M3 BETON PLAT PONDASI Fe 160
1 M3 BETON CYCLOOF 40% BATU KALI
0.600 M3
Beton cor 1 : 2 : 3
0.480 M3
Batu Pasang

Untuk gerantangan Ceilingteak

Page 22

990,841.16
(153,956.84)
(248,054.47)
(278,845.84)
(355,824.26)
(371,219.94)
(394,313.47)
(409,709.15)
(432,802.68)
(471,291.89)
(509,781.10)
(548,270.31)
(586,759.52)
(295,549.94)

Analisa-17'Jan 14

NO

URAIAN

1
51

2
1 M2 PLAPOND GYPSUM
0.380 Lbr
Gypsum (1,2 x 2,4)
0.015 M3
Kayu Kruing Balok 8/12
0.220 Kg
Paku Lis
0.200 OH
Tukang Kayu
0.020 OH
Kepala Tukang Kayu
0.500 OH
Pekerja
0.025 OH
Mandor

HARGA
SATUAN
Rp.
3
81,700.00
6,604,000.00
21,200.00
81,700.00
84,000.00
49,000.00
83,100.00

Page 23

JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
16,340.00
1,680.00
24,500.00
2,077.50
44,597.50

31,046.00
99,060.00
4,664.00
134,770.00

JUMLAH
HARGA
Rp.
6

KET.

31,046.00
99,060.00
4,664.00
16,340.00
1,680.00
24,500.00
2,077.50
179,367.50

Analisa-17'Jan 14

NO

URAIAN

1
52

2
1 M2 PLAPOND ETERNIT
1.000 Lbr
Eternit Klas I (1/1) M
0.015 M3
Kayu Kruing Balok 8/12
0.220 Kg
Paku Usuk
0.200 OH
Tukang Kayu
0.020 OH
Kepala Tukang Kayu
0.500 OH
Pekerja
0.025 OH
Mandor
Tadir Gedeg Kelas I

53

1 M2 PLAPOND PLYWOOD 4 MM +RANGKA KRUING


0.390 Lbr
Plywood
0.023 M3
Kayu Kruing Balok 8/12
0.060 Kg
Paku Usuk
0.400 OH
Tukang Kayu
0.040 OH
Kepala Tukang Kayu
0.270 OH
Pekerja
0.014 OH
Mandor
Triplek 3 mm
Teak Wood 4 mm

54

IX

1 M2 PLAPOND GYPSUM+RANGKA HOLLOW


0.347 Lbr
Gypsum (1,2 x 2,4)
3.600 m'
Hollow
0.150 Kg
Kawat D4mm
1.050 Bh
Ramset
0.250 OH
Tukang Kayu
0.025 OH
Kepala Tukang Kayu
0.150 OH
Pekerja
0.075 OH
Mandor

21,500.00
6,604,000.00
18,100.00
81,700.00
84,000.00
49,000.00
83,100.00
35,300.00

104,100.00
6,604,000.00
18,100.00
81,700.00
84,000.00
49,000.00
83,100.00
56,900.00
107,200.00

81,700.00
5,000.00
20,700.00
2,000.00
81,700.00
84,000.00
49,000.00
83,100.00

JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5

JUMLAH
HARGA
Rp.
6

KET.

16,340.00
1,680.00
24,500.00
2,077.50
44,597.50
44,597.50

21,500.00
99,060.00
3,982.00
124,542.00
138,342.00

21,500.00
99,060.00
3,982.00
16,340.00
1,680.00
24,500.00
2,077.50
169,139.50
182,939.50

32,680.00
3,360.00
13,230.00
1,121.85
50,391.85
50,391.85
50,391.85

40,599.00
151,892.00
1,086.00
193,577.00
175,169.00
194,786.00

40,599.00
151,892.00
1,086.00
32,680.00
3,360.00
13,230.00
1,121.85
243,968.85
225,560.85
245,177.85

20,425.00
2,100.00
7,350.00
6,232.50
36,107.50

28,300.00
18,000.00
3,105.00
2,100.00
51,505.00

28,300.00
18,000.00
3,105.00
2,100.00
20,425.00
2,100.00
7,350.00
6,232.50
87,612.50

22,500.00
513.00

22,500.00
513.00
4,900.00
8,170.00
4,200.00
290.85
40,573.85

PEKERJAAN LANGIT - LANGIT

1 1 M2 Pasang langit - langit Plywood 120 x 240 cm/4mm


0.375 Lbr
Plywood 4 mm
0.030 Kg
Paku biasa 1/2" - 1"
0.100 Oh
Pekerja
0.100 Oh
Tukang kayu
0.050 Oh
Kepala Tukang
0.004 Oh
Mandor
2

HARGA
SATUAN
Rp.
3

1 M2 Pasang langit - langit Teakwood 30 x 60 cm/ 4 mm


0.375 Lbr
Teakwood 4 mm
0.030 Kg
Paku biasa 1/2" - 1"
0.100 Oh
Pekerja
0.100 Oh
Tukang kayu
0.050 Oh
Kepala Tukang
0.004 Oh
Mandor
1 M' Pasang list langit - langit kayu profil
1.050 M'
List kayu 2/4
0.010 Kg
Paku list
0.050 Oh
Pekerja
0.050 Oh
Tukang kayu
0.005 Oh
Kepala Tukang
0.003 Oh
Mandor
1 M2 Pasang langit - langit Plywood 4 mm + rangka
0.0230
M3 Kamper Usuk 4/6 cm
0.0600
Kg Paku biasa 2" - 5"
0.9000
Lbr Plywood 4 mm
0.2700
Oh Pekerja
0.4000
Oh Tukang kayu
0.0400
Oh Kepala Tukang
0.0135
Oh Mandor
1 M2 Pasang langit - langit Lambrisiring Kayu 9 cm
0.0150
m3 Kayu Papan Kamfer
0.0100
Kg Paku biasa 1/2" - 1"
0.8000
Hr Tukang kayu

60,000.00
17,100.00
49,000.00
81,700.00
84,000.00
83,100.00

107,200.00
17,100.00
49,000.00
81,700.00
84,000.00
83,100.00

12,525.00
21,200.00
49,000.00
81,700.00
84,000.00
83,100.00

8,639,100.00
21,200.00
60,000.00
49,000.00
81,700.00
84,000.00
83,100.00

8,943,400.00
17,100.00
81,700.00
Page 24

4,900.00
8,170.00
4,200.00
290.85
17,560.85

23,013.00
40,200.00
513.00

4,900.00
8,170.00
4,200.00
290.85
17,560.85

40,713.00
13,151.25
212.00

2,450.00
4,085.00
420.00
249.30
7,204.30

13,363.25
198,699.30
1,272.00
54,000.00

13,230.00
32,680.00
3,360.00
1,121.85
50,391.85

110,091.54
22,479.04

40,200.00
513.00
4,900.00
8,170.00
4,200.00
290.85
58,273.85
13,151.25
212.00
2,450.00
4,085.00
420.00
249.30
20,567.55

253,971.30

198,699.30
1,272.00
54,000.00
13,230.00
32,680.00
3,360.00
1,121.85
304,363.15

134,151.00
171.00
65,360.00

134,151.00
171.00
65,360.00
Analisa-17'Jan 14

NO

URAIAN

1
0.0800
0.8000
0.0400

Hr
Hr
Hr

2
Kepala tukang kayu
Pekerja
Mandor

HARGA
SATUAN
Rp.
3
84,000.00
49,000.00
83,100.00

Page 25

JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
6,720.00
39,200.00
3,324.00
49,244.00
199,682.00

JUMLAH
HARGA
Rp.
6
6,720.00
39,200.00
3,324.00
248,926.00

KET.

Analisa-17'Jan 14

NO
1
55

56

57

58

59

URAIAN
2
1 M2 PEK. DINDING PARTISI TEAKWOOD RANGKAP
RANGKA KAYU KAMPER
0.020 M3
Kayu Kamper Balok 6/12
0.390 Lbr
Teak Wood 4 mm
0.100 Kg
Paku Lis
0.450 OH
Tukang Kayu
0.045 OH
Kepala Tukang Kayu
0.150 OH
Pekerja
0.075 OH
Mandor

1 M3 PEK. KUSEN PINTU DAN JENDELA JATI


1.100 M3
Kayu Jati Balok
1.250 Kg
Paku 10cm
1.000 Kg
Lem Kayu
21.000 OH
Tukang Kayu
2.100 OH
Kepala Tukang Kayu
7.000 OH
Pekerja
0.350 OH
Mandor

1 M3 PEK. KUSEN PINTU DAN JENDELA KAMPER


1.200 M3
Kayu Kamper Balok 6/12
1.250 Kg
Paku 10cm
1.000 Kg
Lem Kayu
18.000 OH
Tukang Kayu
1.800 OH
Kepala Tukang Kayu
6.000 OH
Pekerja
0.300 OH
Mandor

1 M2 DAUN JENDELA KACA 3 MM


0.024 M3
Kayu Kamper Papan 3/20
0.800 M2
Kaca Bening 3 mm
0.100 Kg
Paku Lis
2.400 OH
Tukang Kayu
0.240 OH
Kepala Tukang Kayu
0.800 OH
Pekerja
0.040 OH
Mandor
Kaca Bening 5 mm
Kaca Ray-Ban 5 mm
Kayu Jati Papan ,3 mm polos
Kayu Jati Papan ,5 mm polos
Kayu Jati Papan ,5 mm rayben
kayu meranti papan, 3 mm polos
1 M2 PEK. KACA 5 MM
1.100 M2
Kaca Bening 5 mm
0.150 OH
Tukang Kayu
0.015 OH
Kepala Tukang Kayu
0.015 OH
Pekerja
0.001 OH
Mandor
Kaca Bening 3 mm
Kaca Ray-Ban 5 mm

60

61

1 M2 DAUN PINTU PANEL JATI


0.040 M3
Kayu Jati Papan
0.500 Kg
Lem Kayu
3.000 OH
Tukang Kayu
0.300 OH
Kepala Tukang Kayu
1.000 OH
Pekerja
0.050 OH
Mandor
Kayu Kamper Papan 3/20
kayu meranti papan
1 M2 DAUN PINTU DOUBLE PLYWOOD
0.025 M3
Kayu Kamper Papan 3/20
1.000 Lbr
Plywood
0.030 Kg
Paku Lis
0.500 Kg
Lem kayu fox

HARGA
SATUAN
Rp.
3

JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5

JUMLAH
HARGA
Rp.
6

KET.

9,280,800.00
107,200.00
21,200.00
81,700.00
84,000.00
49,000.00
83,100.00

36,765.00
3,780.00
7,350.00
6,232.50
54,127.50

180,975.60
41,808.00
2,120.00
224,903.60

180,975.60
41,808.00
2,120.00
36,765.00
3,780.00
7,350.00
6,232.50
279,031.10

11,275,800.00
18,100.00
14,000.00
81,700.00
84,000.00
49,000.00
83,100.00

1,715,700.00
176,400.00
343,000.00
29,085.00
2,264,185.00

12,403,380.00
22,625.00
14,000.00
12,440,005.00

12,403,380.00
22,625.00
14,000.00
1,715,700.00
176,400.00
343,000.00
29,085.00
14,704,190.00

9,280,800.00
18,100.00
14,000.00
81,700.00
84,000.00
49,000.00
83,100.00

1,470,600.00
151,200.00
294,000.00
24,930.00
1,940,730.00

11,136,960.00
22,625.00
14,000.00
11,173,585.00

11,136,960.00
22,625.00
14,000.00
1,470,600.00
151,200.00
294,000.00
24,930.00
13,114,315.00

10,536,100.00
87,300.00
21,200.00
81,700.00
84,000.00
49,000.00
83,100.00

196,080.00
20,160.00
39,200.00
3,324.00
258,764.00
258,764.00
258,764.00
258,764.00
258,764.00
258,764.00

252,866.40
69,840.00
2,120.00
324,826.40
343,946.40
357,386.40
380,364.80
399,484.80
412,924.80
71,960.00

252,866.40
69,840.00
2,120.00
196,080.00
20,160.00
39,200.00
3,324.00
583,590.40
602,710.40
616,150.40
639,128.80
658,248.80
671,688.80
330,724.00

12,255.00
1,260.00
735.00
62.33
14,312.33
14,312.33
14,312.33

122,320.00
122,320.00
96,030.00
140,800.00

122,320.00
12,255.00
1,260.00
735.00
62.33
136,632.33
110,342.33
155,112.33

10,536,100.00

245,100.00
25,200.00
49,000.00
4,155.00
323,455.00
323,455.00

541,236.00
7,000.00
548,236.00
421,444.00
-

541,236.00
7,000.00
245,100.00
25,200.00
49,000.00
4,155.00
871,691.00
744,899.00
323,455.00

###
104,100.00
21,200.00
14,000.00

263,402.50
104,100.00
636.00
7,000.00

263,402.50
104,100.00
636.00
7,000.00

111,200.00
128,000.00
87,300.00
111,200.00
128,000.00

111,200.00
81,700.00
84,000.00
49,000.00
83,100.00
87,300.00
128,000.00

13,530,900.00
14,000.00
81,700.00
84,000.00
49,000.00
83,100.00

Page 26

12,850,200

Analisa-17'Jan 14

NO

2
Tukang Kayu
Kepala Tukang Kayu
Pekerja
Mandor

HARGA
SATUAN
Rp.
3
81,700.00
84,000.00
49,000.00
83,100.00

Teak Wood 4 mm

107,200.00

URAIAN

1
2.100
0.210
0.800
0.040

OH
OH
OH
OH

Page 27

JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
171,570.00
17,640.00
39,200.00
3,324.00
231,734.00
375,138.50
231,734.00
378,238.50

JUMLAH
HARGA
Rp.
6
171,570.00
17,640.00
39,200.00
3,324.00
606,872.50
609,972.50

KET.

549,433.44
(57,439.06)

Analisa-17'Jan 14

NO
1
62

URAIAN
2
1 M2 PEK.DAUN PINTU LAPIS ALUMINIUM
0.015 M3
Kayu Kamper Papan 3/20
0.625 Lbr
Teak Wood 4 mm
1.000 Lbr
Alumnium Kulit Jeruk
0.100 Kg
Paku Lis
3.000 OH
Tukang Kayu
0.300 OH
Kepala Tukang Kayu
1.250 OH
Pekerja
0.063 OH
Mandor

66

67

68

KET.

158,041.50
67,000.00
105,700.00
2,120.00
245,100.00
25,200.00
61,250.00
5,235.30
669,646.80
667,709.30

980,400.00
100,800.00
196,000.00
16,620.00
1,293,820.00
1,293,820.00
1,293,820.00
1,293,820.00
1,293,820.00

7,264,400.00
276,000.00
101,360.00
7,641,760.00
3,734,670.00
10,985,540.00
6,002,210.00
13,657,990.00

7,264,400.00
276,000.00
101,360.00
980,400.00
100,800.00
196,000.00
16,620.00
8,935,580.00
5,028,490.00
12,279,360.00
7,296,030.00
14,951,810.00

8,170.00
840.00
4,900.00
415.50
14,325.50
14,325.50
14,325.50

69,112.80
35,773.60
2,715.00
107,601.40
91,320.60
81,148.60

69,112.80
35,773.60
2,715.00
8,170.00
840.00
4,900.00
415.50
121,926.90
105,646.10
95,474.10

8,639,100.00
8,943,400.00
18,100.00
81,700.00
84,000.00
49,000.00
83,100.00

23,202.80
2,352.00
24,500.00
2,077.50
52,132.30

103,669.20
53,660.40
1,357.50
158,687.10

103,669.20
53,660.40
1,357.50
23,202.80
2,352.00
24,500.00
2,077.50
210,819.40

6,168,500.00
10,536,100.00
18,100.00
81,700.00
84,000.00
49,000.00
83,100.00

18,791.00
1,932.00
11,270.00
1,911.30
33,904.30

135,707.00
42,144.40
3,620.00
181,471.40

135,707.00
42,144.40
3,620.00
18,791.00
1,932.00
11,270.00
1,911.30
215,375.70

1 M2 PASANG USUK (KRUING)


0.011 M3
Usuk Kruing 5/7
0.100 Kg
Paku Usuk
0.057 OH
Tukang Kayu
0.003 OH
Kepala Tukang Kayu
0.057 OH
Pekerja
0.006 OH
Mandor

6,168,500.00
18,100.00
81,700.00
84,000.00
49,000.00
83,100.00

4,656.90
252.00
2,793.00
498.60
8,200.50

67,853.50
1,810.00
69,663.50

67,853.50
1,810.00
4,656.90
252.00
2,793.00
498.60
77,864.00

1 M2 PASANG RENG (KAMPER)


0.008 M3
Kayu Kamper Reng
0.150 Kg
Paku Reng
0.043 OH
Pekerja
0.002 OH
Mandor

8,943,400.00
17,100.00
49,000.00
83,100.00

2,107.00
166.20

71,547.20
2,565.00
-

71,547.20
2,565.00
2,107.00
166.20

1 M3 KUDA-KUDA KAYU KRUING


1.100 M3
Kayu Kruing Balok 8/12
15.000 Kg
Besi Strip
5.600 Kg
Paku Usuk
12.000 OH
Tukang Kayu
1.200 OH
Kepala Tukang Kayu
4.000 OH
Pekerja
0.200 OH
Mandor

1 M2 USUK + RENG KAMPER


0.008 M3
Kayu Kamper Usuk 5/7
0.004 M3
Kayu Kamper Reng
0.150 Kg
Paku Usuk
0.100 OH
Tukang Kayu
0.010 OH
Kepala Tukang Kayu
0.100 OH
Pekerja
0.005 OH
Mandor
Kayu Kruing Balok 8/12
Kayu Meranti Balok 6/12

65

JUMLAH
HARGA
Rp.
6

158,041.50
67,000.00
105,700.00
2,120.00
332,861.50
330,924.00

Seseh Balok
Kayu Kamper Balok 8/12
Kayu Meranti Balok 8/12
Balok Bengkirai
64

###
107,200.00
105,700.00
21,200.00
81,700.00
84,000.00
49,000.00
83,100.00

JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
245,100.00
25,200.00
61,250.00
5,235.30
336,785.30
336,785.30

Plywood
63

HARGA
SATUAN
Rp.
3

1 M2 PEK. USUK EKPOSE + RENG KAMPER


0.012 M3
Kayu Kamper Usuk 5/7
0.006 M3
Kayu Kamper Reng
0.075 Kg
Paku Usuk
0.284 OH
Tukang Kayu
0.028 OH
Kepala Tukang Kayu
0.500 OH
Pekerja
0.025 OH
Mandor

1 M2 USUK GERANTANGAN
0.022 M3
Usuk Kruing 5/7
0.004 M3
Kayu Kamper Papan 3/20
0.200 Kg
Paku Usuk
0.230 OH
Tukang Kayu
0.023 OH
Kepala Tukang Kayu
0.230 OH
Pekerja
0.023 OH
Mandor

104,100.00

6,604,000.00
18,400.00
18,100.00
81,700.00
84,000.00
49,000.00
83,100.00
3,052,100.00
9,643,800.00
5,113,500.00
###

8,639,100.00
8,943,400.00
18,100.00
81,700.00
84,000.00
49,000.00
83,100.00
6,604,000.00
5,332,500.00

Page 28

###
###

Analisa-17'Jan 14

NO

URAIAN

1
0.043 OH
0.004 OH

2
Tukang Kayu
Kepala Tukang Kayu

HARGA
SATUAN
Rp.
3
81,700.00
84,000.00

Page 29

JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
3,513.10
336.00
6,122.30
74,112.20

JUMLAH
HARGA
Rp.
6
3,513.10
336.00
80,234.50

KET.

Analisa-17'Jan 14

NO
1
X
1

69

70

71

72

URAIAN
2
PEKERJAAN BESI DAN ALUMUNIUM
1 M2 PEK. KAP BAJA RINGAN BENTANG < 9 M'
1.120 M'
UK. 75. 0,85
2.210 M'
UK. 75. 0,55
6.600 M'
GD.B. 0,43
1.000 M2
Plat - Plat Penyambung
1.000 M2
Ongkos Pasang

1 M' PEK. LISTPLANK ( 3/20 ) KAMPER


0.007 M3
Kayu Kamper Papan 3/20
0.050 Kg
Paku Reng
0.200 OH
Tukang Kayu
0.020 OH
Kepala Tukang Kayu
0.100 OH
Pekerja
0.005 OH
Mandor

10,536,100.00
17,100.00
81,700.00
84,000.00
49,000.00
83,100.00

22,400.00
39,780.00
132,000.00
20,000.00

JUMLAH
HARGA
Rp.
6

KET.

30,000.00
30,000.00

214,180.00

22,400.00
39,780.00
132,000.00
20,000.00
30,000.00
244,180.00

16,340.00
1,680.00
4,900.00
415.50
23,335.50
23,335.50
23,335.50

75,859.92
855.00
76,714.92
55,029.96
41,776.20

75,859.92
855.00
16,340.00
1,680.00
4,900.00
415.50
100,050.42
78,365.46
65,111.70

188,107.50
3,620.00
65,360.00
6,720.00
12,250.00
1,163.40
85,493.40
191,727.50
Untuk 0,5 M2 = 1 M'

188,107.50
3,620.00
65,360.00
6,720.00
12,250.00
1,163.40
277,220.90
138,610.45

7,524,300.00
5,683,500.00

1 M2 PEK. PAPAN TALANG


0.025 M3
Kayu Kruing Papan
0.200 Kg
Paku Usuk
0.800 OH
Tukang Kayu
0.080 OH
Kepala Tukang Kayu
0.250 OH
Pekerja
0.014 OH
Mandor

7,524,300.00
18,100.00
81,700.00
84,000.00
49,000.00
83,100.00

10 M' PEK. SENG TALANG


5.500 m
Seng Talang 30 cm
8.000 OH
Tukang Kayu
0.800 OH
Kepala Tukang Kayu
5.000 OH
Pekerja
0.500 OH
Mandor

15,800.00
81,700.00
84,000.00
49,000.00
83,100.00

653,600.00
67,200.00
245,000.00
41,550.00
1,007,350.00
Untuk 1 M' = 0,5 M2

86,900.00
86,900.00

86,900.00
653,600.00
67,200.00
245,000.00
41,550.00
1,094,250.00
109,425.00

1 M2 GENTENG PRES
25.000 Bj
Genteng Kodok
0.075 OH
Tukang Kayu
0.008 OH
Kepala Tukang Kayu
0.150 OH
Pekerja
0.008 OH
Mandor

2,800.00
81,700.00
84,000.00
49,000.00
83,100.00

6,127.50
672.00
7,350.00
664.80
14,814.30
14,814.30
14,814.30
14,814.30

70,000.00
70,000.00
57,500.00
57,500.00
107,500.00

70,000.00
6,127.50
672.00
7,350.00
664.80
84,814.30
72,314.30
72,314.30
122,314.30

16,340.00
1,680.00
19,600.00
166.20
37,786.20
37,786.20
37,786.20
37,786.20

35,000.00
218.24
5,254.40
40,472.64
37,972.64
59,472.64
140,472.64

35,000.00
218.24
5,254.40
16,340.00
1,680.00
19,600.00
166.20
78,258.84
75,758.84
97,258.84
178,258.84

4,902.00
504.00
5,880.00
498.60
11,784.60
11,784.60

28,560.00
528.00
29,088.00
24,678.00

28,560.00
528.00
4,902.00
504.00
5,880.00
498.60
40,872.60
36,462.60

1 M' PASANG GENTENG BUBUNGAN


5.000 Bj
Bubungan Genteng Biasa
0.160 Zak
Semen Gresik ( 50 kg )
0.032 M3
Pasir Pasang
0.200 OH
Tukang Kayu
0.020 OH
Kepala Tukang Kayu
0.400 OH
Pekerja
0.002 OH
Mandor
Bubungan Genteng Plentong
Bubungan Genteng Kodok
Bubungan Karang Pilang

74

20,000.00
18,000.00
20,000.00
20,000.00
30,000.00

JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5

Kayu Kruing Papan


Kayu Meranti Papan

Genteng Plentong
Genteng Biasa
Genteng Karang Pilang
73

HARGA
SATUAN
Rp.
3

1 M2 PASANG SENG GELOMBANG


0.700 Lbr
BJLS 0,18 mm
0.020 Kg
Paku Seng
0.060 OH
Tukang Kayu
0.006 OH
Kepala Tukang Kayu
0.120 OH
Pekerja
0.006 OH
Mandor
Asbes Gel. 1,8 m' x 1,05 m'/4 mm

2,300.00
2,300.00
4,300.00

7,000.00
1,364.00
164,200.00
81,700.00
84,000.00
49,000.00
83,100.00
6,500.00
10,800.00
27,000.00

40,800.00
26,400.00
81,700.00
84,000.00
49,000.00
83,100.00
34,500.00
Page 30

Analisa-17'Jan 14

NO

URAIAN

75

10 M BUBUNGAN ATAP SENG


6.000 m
Seng Talang 30 cm
12.000 Ktk
Paku Sekrup 1/2"
0.250 OH
Tukang Besi
0.025 OH
Kepala Tukang Besi
0.250 OH
Pekerja

HARGA
SATUAN
Rp.
3

15,800.00
19,200.00
72,400.00
79,200.00
49,000.00
Untuk 1 M'

Page 31

JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5

18,100.00
1,980.00
12,250.00
32,330.00
3,233.00

94,800.00
230,400.00
325,200.00
32,520.00

JUMLAH
HARGA
Rp.
6

KET.

94,800.00
230,400.00
18,100.00
1,980.00
12,250.00
357,530.00
35,753.00

Analisa-17'Jan 14

NO
1
76

77

78

79

80

81

URAIAN
2
1 M2 PASANGAN ATAP SENG LAMA
0.750 Lbr
BJLS 0,18 mm
0.040 Kg
Paku Seng
0.200 OH
Tukang Kayu
0.020 OH
Kepala Tukang Kayu
0.100 OH
Pekerja
0.005 OH
Mandor

JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5

JUMLAH
HARGA
Rp.
6

KET.

40,800.00
26,400.00
81,700.00
84,000.00
49,000.00
83,100.00

16,340.00
1,680.00
4,900.00
415.50
23,335.50

30,600.00
1,056.00
31,656.00

30,600.00
1,056.00
16,340.00
1,680.00
4,900.00
415.50
54,991.50

122,200.00
18,100.00
81,700.00
84,000.00
49,000.00
83,100.00

9,804.00
1,008.00
5,880.00
498.60
17,190.60

122,200.00
3,620.00
125,820.00

122,200.00
3,620.00
9,804.00
1,008.00
5,880.00
498.60
143,010.60

1 M2 PEK. MENGECAT TEMBOK


1X PLAMIR, 1X CAT DASAR, 2X CAT PENUTUP
0.100 Kg
Cat Dasar Tembok
0.260 Kg
Cat Tembok
0.100 Kg
Plamir Tembok
0.063 OH
Tukang Cat
0.006 OH
Kepala Tukang Cat
0.020 OH
Pekerja
0.003 OH
Mandor

18,900.00
23,400.00
15,900.00
57,600.00
70,700.00
49,000.00
83,100.00

3,628.80
445.41
980.00
207.75
5,261.96

1,890.00
6,084.00
1,590.00
9,564.00

1,890.00
6,084.00
1,590.00
3,628.80
445.41
980.00
207.75
14,825.96

1 M2 PEK. CAT TEMBOK LAMA


1X CAT DASAR, 2X CAT PENUTUP
0.120 Kg
Cat Dasar Tembok
0.180 Kg
Cat Tembok
0.042 OH
Tukang Cat
0.004 OH
Kepala Tukang Cat
0.028 OH
Pekerja
0.003 OH
Mandor

18,900.00
23,400.00
57,600.00
70,700.00
49,000.00
83,100.00

2,419.20
296.94
1,372.00
207.75
4,295.89

2,268.00
4,212.00
6,480.00

2,268.00
4,212.00
2,419.20
296.94
1,372.00
207.75
10,775.89

1 M2 PEKERJAAN CAT MENI


0.120 Kg
Meni Kayu
0.050 Ltr
Minyak Cat
0.075 OH
Tukang Cat
0.008 OH
Kepala Tukang Cat
0.050 OH
Pekerja
0.003 OH
Mandor

26,700.00
24,700.00
57,600.00
70,700.00
49,000.00
83,100.00

4,320.00
565.60
2,450.00
249.30
7,584.90

3,204.00
1,235.00
4,439.00

3,204.00
1,235.00
4,320.00
565.60
2,450.00
249.30
12,023.90

1 M2 PEK. CAT KAYU ULANG


0.189 Kg
Cat Kayu
0.150 OH
Tukang Cat
0.015 OH
Kepala Tukang Cat
0.100 OH
Pekerja
0.005 OH
Mandor

53,700.00
57,600.00
70,700.00
49,000.00
83,100.00

8,640.00
1,060.50
4,900.00
415.50
15,016.00

10,149.30
10,149.30

10,149.30
8,640.00
1,060.50
4,900.00
415.50
25,165.30

53,700.00
24,700.00
57,600.00
70,700.00
49,000.00
83,100.00

1,728.00
212.10
7,350.00
249.30
9,539.40

15,250.80
1,753.70
17,004.50

15,250.80
1,753.70
1,728.00
212.10
7,350.00
249.30
26,543.90

26,700.00
28,500.00
48,500.00
53,700.00
57,600.00
70,700.00

518.40
424.20

5,340.00
4,275.00
8,245.00
13,962.00
-

5,340.00
4,275.00
8,245.00
13,962.00
518.40
424.20

1 M2 PAS. ATAP SIRAP


1.000 Ikat
Sirap
0.200 Kg
Paku Usuk
0.120 OH
Tukang Kayu
0.012 OH
Kepala Tukang Kayu
0.120 OH
Pekerja
0.006 OH
Mandor

82 1 M2 PENGECATAN KANSTIN
0.284 Kg Cat Kayu
0.071 Kg Minyak cat
0.030 OH Tukang cat
0.003 OH Kepala tukang cat
0.150 OH Pekerja
0.003 OH Mandor

83

HARGA
SATUAN
Rp.
3

1 M2 PEK. MENGECAT KAYU


1X PLAMIR, 1X CAT DASAR, 2X CAT PENUTUP
0.200 Kg
Meni Kayu
0.150 Kg
Dempul
0.170 Kg
Cat Dasar Kayu
0.260 Kg
Cat Kayu
0.009 OH
Tukang Cat
0.006 OH
Kepala Tukang Cat

Page 32

Analisa-17'Jan 14

NO

URAIAN

1
0.070 OH
0.003 OH

84

2
Pekerja
Mandor

1 M2 PEKERJAAN POLITUR
0.150 Ltr
Politur
0.372 Ltr
Politur jadi ( Ultran )
2.000 Lbr
Amplas
0.060 OH
Tukang Cat
0.016 OH
Kepala Tukang Cat
0.008 OH
Mandor

HARGA
SATUAN
Rp.
3
49,000.00
83,100.00

44,300.00
56,800.00
3,700.00
57,600.00
70,700.00
83,100.00

Page 33

JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
3,430.00
207.75
4,580.35
31,822.00

3,456.00
1,131.20
623.25
5,210.45

6,645.00
21,129.60
7,400.00
35,174.60

JUMLAH
HARGA
Rp.
6
3,430.00
207.75
36,402.35

KET.

6,645.00
21,129.60
7,400.00
3,456.00
1,131.20
623.25
40,385.05

Analisa-17'Jan 14

NO

URAIAN

HARGA
SATUAN
Rp.
3

85

1 M' PEMBUATAN SALURAN TERTUTUP


0.260 M3
Galian tanah
0.130 M3
Pas. Batu bata 1 : 5
0.850 M2
Plesteran 1 : 2
0.041 M3
Beton bertulang Fe.80

47,839.50
107,830.02
53,919.75
3,126,043.90

86

87

88

89

91

92

KET.

12,438.27
3,150.88
26,258.46
37,897.40
79,745.00

10,867.03
19,573.33
90,270.40
120,710.76

12,438.27
14,017.90
45,831.79
128,167.80
200,455.76

9,000.00
57,600.00

57,600.00
57,600.00

9,000.00
9,000.00

9,000.00
57,600.00
66,600.00

BIAYA MENGGILAS PERBULAN


30.000 OH
Masinis
30.000 OH
Kernet
30.000 Ltr
Oli
600.000 Ltr
Solar
30.000 Hari
Sewa Wales

115,600.00
115,500.00
30,000.00
6,100.00
170,000.00

3,468,000.00
3,465,000.00
5,100,000.00
12,033,000.00

900,000.00
3,660,000.00
4,560,000.00

3,468,000.00
3,465,000.00
900,000.00
3,660,000.00
5,100,000.00
16,593,000.00

1 M2 MENYIAPKAN SUB GRADE


0.0003 OH
Pekerja
0.0002 OH
Mandor
0.0002
Biaya menggilas sebulan

49,000.00
83,100.00
16,593,000.00

14.70
16.62
2,406.60
2,437.92

912.00
912.00

14.70
16.62
3,318.60
3,349.92

1 M3 TIMBUNAN SIRTU
1.200 M3
Pasir Batu (Sirtu)
0.250 OH
Pekerja
0.025 OH
Mandor
0.001
Biaya menggilas sebulan

220,600.00
49,000.00
83,100.00
16,593,000.00

12,250.00
2,077.50
12,033.00
26,360.50
5,272.10
2,636.05
1,318.03

264,720.00
4,560.00
269,280.00
53,856.00
26,928.00
13,464.00

264,720.00
12,250.00
2,077.50
16,593.00
295,640.50
59,128.10
29,564.05
14,782.03

251,900.00
49,000.00
83,100.00
16,593,000.00

22,981.00
1,911.30
3,609.90
28,502.20

41,563.50
1,368.00
42,931.50

41,563.50
22,981.00
1,911.30
4,977.90
71,433.70

196,000.00
47,839.50
17,001.00

1,243.83
170.01
1,413.84

7,448.00
7,448.00

7,448.00
1,243.83
170.01
8,861.84

247,700.00
49,000.00
83,100.00
16,593,000.00

257,250.00
21,855.30
448,011.00
727,116.30
7,271.16

1,733,900.00
1,733,900.00
17,339.00

1,733,900.00
257,250.00
21,855.30
448,011.00
2,461,016.30
24,610.16

11,715.00
343,000.00
29,085.00
448,011.00
831,811.00
8,318.11

871,200.00
653,400.00
907,500.00
32,834.78
2,464,934.78
24,649.35

871,200.00
653,400.00
907,500.00
32,834.78
11,715.00
343,000.00
29,085.00
448,011.00
3,296,745.78
32,967.46

1 M2 PASANGAN GLADAK (BATU PECAH 10/15)


0.165 M3
Batu Pecah 10/15
0.469 OH
Pekerja
0.023 OH
Mandor
0.0003
Biaya menggilas sebulan

1 M' PAS. BATU KANCING 15/20 CM


0.038 M3
Batu Pasang
0.026 M3
Galian tanah
0.010 M3
Buangan tanah

100 M2 DIHAMPAR BATU PECAH 5/7 CM


DIATAS LPB GLADAK BATU PECAH
7.000 M3
Batu Pecah 5 - 7 cm
5.250 OH
Pekerja
0.263 OH
Mandor
0.027
Biaya menggilas sebulan

1 M2 ...........
93

JUMLAH
HARGA
Rp.
6

1 M2 PEK. WATER PROFING


1.000 Ltr
Waterproff
1.000 Ls
Ongkos Kerja

1 M2 Timbunan Sirtu tebal 20 Cm


1 M2 Timbunan Sirtu tebal 10 Cm
1 M2 Timbunan Sirtu tebal 5 Cm
90

JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5

100 M2 DIHAMPAR LAPEN BATU PECAH


2/3 CM + 3/4 CM + ASPAL
4.000 M3
Batu Pecah 3 - 5 cm
3.000 M3
Batu Pecah 2 - 3 cm
75.000 Kg
Aspal
5.383 Ltr
Solar
0.150 OH
Tukang masak aspal
7.000 OH
Pekerja
0.350 OH
Mandor
0.027
Biaya menggilas sebulan

217,800.00
217,800.00
12,100.00
6,100.00
78,100.00
49,000.00
83,100.00
16,593,000.00
1 M2 ...........
Page 34

187,308.71
#VALUE!

Analisa-17'Jan 14

NO
1
94

URAIAN

HARGA
SATUAN
Rp.
3

2
100 M2 MENGASPAL DENGAN ASPAL 200 KG
200.000 Kg
12,100.00
Aspal
1.200 M3
273,400.00
Batu Seplit Halus ( 0,5 - 1 ) cm / Penutup
14.354 Ltr
6,100.00
Solar
0.400 OH
78,100.00
Tukang masak aspal
9.000 OH
49,000.00
Pekerja
0.450 OH
83,100.00
Mandor
0.013
16,593,000.00
Biaya menggilas sebulan
1 M2 ...........

Page 35

JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
31,240.00
441,000.00
37,395.00
215,709.00
725,344.00
7,253.44

2,420,000.00
328,080.00
87,559.40
2,835,639.40
28,356.39

JUMLAH
HARGA
Rp.
6

KET.

2,420,000.00
328,080.00
87,559.40
31,240.00
441,000.00
37,395.00
215,709.00
3,560,983.40
35,609.83

Analisa-17'Jan 14

NO
1
95

URAIAN
2
100 M2 MENGASPAL DENGAN ASPAL 125 KG
125.000 Kg
Aspal
1.200 M3
Batu Seplit Jagung ( 1 - 2 ) cm/ Kasar
8.971 Ltr
Solar
0.250 OH
Tukang masak aspal
7.500 OH
Pekerja
0.375 OH
Mandor
0.400 Bh
Sikat Ijuk
0.040 Bh
Sikat Baja
0.013
Biaya menggilas sebulan

HARGA
SATUAN
Rp.
3
12,100.00
252,400.00
6,100.00
78,100.00
49,000.00
83,100.00
7,000.00
18,900.00
16,593,000.00
1 M2 ...........

1 M2 PEKERJAAN LAPEN 89+90+91

96

97

100 M2 DIHAMPAR LAPEN BATU PECAH


2/3 CM + 3/4 CM + ASPAL
3.000 M3
Batu Pecah 2 - 3 cm
1.200 M3
Batu Seplit Jagung ( 1 - 2 ) cm/ Kasar
125.000 Kg
Aspal
8.971 Ltr
Solar
0.250 OH
Tukang masak aspal
7.500 OH
Pekerja
0.375 OH
Mandor
0.400 Bh
Sikat Ijuk
0.040 Bh
Sikat Baja
0.013
Biaya menggilas sebulan

217,800.00
252,400.00
12,100.00
6,100.00
78,100.00
49,000.00
83,100.00
7,000.00
18,900.00
16,593,000.00

1 M2 ...........
100 M2 MENGASPAL DENGAN ASPAL 175 KG
175.000 Kg
12,100.00
Aspal
1.200 M3
273,400.00
Batu Seplit Halus ( 0,5 - 1 ) cm / Penutup
12.560 Ltr
6,100.00
Solar
0.400 OH
78,100.00
Tukang masak aspal
9.000 OH
49,000.00
Pekerja
0.450 OH
83,100.00
Mandor
0.013
16,593,000.00
Biaya menggilas sebulan
1 M2 ...........
1 M2 PEKERJAAN BURDA 92+93

98 100 M2 MENGASPAL DENGAN ASPAL 100 KG


100.000 Kg
Aspal
1.200 M3
Batu Seplit Jagung ( 1 - 2 ) cm/ Kasar
7.177 Ltr
Solar
0.250 OH
Tukang masak aspal
6.000 OH
Pekerja
0.350 OH
Mandor
0.013
Biaya menggilas sebulan

12,100.00
252,400.00
6,100.00
78,100.00
49,000.00
83,100.00
16,593,000.00
1 M2 ...........

99

100 M2 MENGASPAL DENGAN ASPAL 100 KG


100.000 Kg
12,100.00
Aspal
1.200 M3
273,400.00
Batu Seplit Halus ( 0,5 - 1 ) cm / Penutup
7.177 Ltr
6,100.00
Solar
0.250 OH
78,100.00
Tukang masak aspal
6.000 OH
49,000.00
Pekerja
0.350 OH
83,100.00
Mandor
0.300 Bh
7,000.00
Sikat Ijuk
0.030 Bh
18,900.00
Sikat Baja
0.012
16,593,000.00
Biaya menggilas sebulan
1 M2 ...........
1 M2 PEKERJAAN BURTU 94+95

100

100 M2 MENGASPAL DENGAN ASPAL 120.8 KG


120.800 Kg
Aspal

12,100.00
Page 36

JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5

JUMLAH
HARGA
Rp.
6

KET.

19,525.00
367,500.00
31,162.50
215,709.00
633,896.50
6,338.97

1,512,500.00
302,880.00
54,724.63
2,800.00
756.00
1,873,660.63
18,736.61

1,512,500.00
302,880.00
54,724.63
19,525.00
367,500.00
31,162.50
2,800.00
756.00
215,709.00
2,507,557.13
25,075.57

21,910.52

71,742.35

93,652.86

19,525.00
367,500.00
31,162.50
215,709.00
633,896.50
6,338.97

653,400.00
302,880.00
1,512,500.00
54,724.63
2,800.00
756.00
2,527,060.63
25,270.61

653,400.00
302,880.00
1,512,500.00
54,724.63
19,525.00
367,500.00
31,162.50
2,800.00
756.00
215,709.00
3,160,957.13
31,609.57

31,240.00
441,000.00
37,395.00
215,709.00
725,344.00
7,253.44

2,117,500.00
328,080.00
76,614.48
2,522,194.48
25,221.94

2,117,500.00
328,080.00
76,614.48
31,240.00
441,000.00
37,395.00
215,709.00
3,247,538.48
32,475.38

13,592.41

50,492.55

64,084.96

19,525.00
294,000.00
29,085.00
215,709.00
558,319.00
5,583.19

1,210,000.00
302,880.00
43,779.70
1,556,659.70
15,566.60

1,210,000.00
302,880.00
43,779.70
19,525.00
294,000.00
29,085.00
215,709.00
2,114,978.70
21,149.79

19,525.00
294,000.00
29,085.00
199,116.00
541,726.00
5,417.26

1,210,000.00
328,080.00
43,779.70
2,100.00
567.00
1,584,526.70
15,845.27

1,210,000.00
328,080.00
43,779.70
19,525.00
294,000.00
29,085.00
2,100.00
567.00
199,116.00
2,126,252.70
21,262.53

11,000.45

31,411.86

42,412.31

1,461,680.00

1,461,680.00
Analisa-17'Jan 14

NO

HARGA
SATUAN
Rp.
2
3
273,400.00
Batu Seplit Halus ( 0,5 - 1 ) cm / Penutup
6,100.00
Solar
78,100.00
Tukang masak aspal
49,000.00
Pekerja
83,100.00
Mandor
16,593,000.00
Biaya menggilas sebulan

URAIAN

1
1.200
8.670
2.000
2.000
1.000
0.013

M3
Ltr
OH
OH
OH

1 M2 ...........

JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
328,080.00
52,885.88
156,200.00
98,000.00
83,100.00
215,709.00
553,009.00
1,842,645.88
5,530.09
18,426.46
5,530.09

1 M2 PEKERJAAN BURAS 96

Page 37

18,426.46

JUMLAH
HARGA
Rp.
6
328,080.00
52,885.88
156,200.00
98,000.00
83,100.00
215,709.00
2,395,654.88
23,956.55

KET.

23,956.55

Analisa-17'Jan 14

NO

URAIAN

HARGA
SATUAN
Rp.
3

101 1500 M2 ASPAL GORENG


36.000 M3
Agregat Halus
9,300.000 Kg
Aspal
450.000 Lt
Minyak Tanah
9.000 Jam
Pneumatic Roller 8-15 Ton
12.000 OH
Sopir Material
1.000 OH
Operator Terlatih
23.000 OH
Pekerja
1.000 OH
Mandor

367,200.00
12,100.00
13,000.00
276,800.00
100,000.00
115,000.00
49,000.00
83,100.00

Pipa Diameter
Pipa Diameter
Pipa Diameter
Pipa Diameter
Pipa Diameter
Pipa Diameter
Pipa Diameter

0,75 ..
1" ..
1,5" ..
2" ..
2,5" ..
3" ..
4" ..

103 1 M' PAS. PIPA GALVANIS


1.200 M'
0,5"
0.350 harga PVC ( perlengkapan )
0.090 OH
Tukang Batu
0.009 OH
Kepala Tukang Batu
0.054 OH
Pekerja
0.027 OH
Mandor
Pipa Diameter
Pipa Diameter
Pipa Diameter
Pipa Diameter
Pipa Diameter

0,75 ..
1" ..
1,25" ..
1,5" ..
2"
..

104 3 M3 BRONJONG KAWAT 4 MM UNTUK DIISI BATU KALI


45.000 Kg
Kawat 4 mm
3.000 M3
Batu Pasang
2.200 OH
Tukang Besi
Penganyam
1.800 OH
Pekerja
Penganyam
0.080 OH
Mandor
4.500 OH
Pekerja
0.750 OH
Mandor

134,090,400.00
89,393.60

4,482.00
492.60
1,764.00
132.96
6,871.56
6,871.56
6,871.56
6,871.56
6,871.56
6,871.56
6,871.56
6,871.56

5,580.00
1,627.50
7,207.50
8,990.00
10,798.33
20,020.83
29,320.83
38,078.33
53,190.83
84,113.33

5,580.00
1,627.50
4,482.00
492.60
1,764.00
132.96
14,079.06
15,861.56
17,669.89
26,892.39
36,192.39
44,949.89
60,062.39
90,984.89

(1,101.64)
(2,178.81)
(2,510.35)
(4,481.14)
(6,044.51)
(5,235.93)
(7,520.18)
(19,112.14)

6,723.00
738.90
2,646.00
2,243.70
12,351.60
12,351.60
12,351.60
12,351.60
12,351.60
12,351.60

24,480.00
7,140.00
31,620.00
45,570.00
42,780.00
93,258.33
107,130.83
101,938.33

24,480.00
7,140.00
6,723.00
738.90
2,646.00
2,243.70
43,971.60
57,921.60
55,131.60
105,609.93
119,482.43
114,289.93

(3,467.30)
(2,693.47)
(7,155.17)
(50,381.80)
(12,919.25)
(21,987.71)

14,000.00
196,000.00
72,400.00
49,000.00
83,100.00
49,000.00
83,100.00

159,280.00
88,200.00
6,648.00
220,500.00
62,325.00
536,953.00
178,984.33

630,000.00
588,000.00
1,218,000.00
406,000.00

630,000.00
588,000.00
159,280.00
88,200.00
6,648.00
220,500.00
62,325.00
1,754,953.00
584,984.33

4,000.00
49,000.00
83,100.00

490.00
498.60
988.60

1,400.00
1,400.00

1,400.00
490.00
498.60
2,388.60

5,800.00
6,966.67
12,916.67
18,916.67
24,566.67
34,316.67
54,266.67

20,400.00
20,400.00
74,700.00
82,100.00
49,000.00
83,100.00
29,400.00
27,600.00
60,166.67
69,116.67
65,766.67

1 M3 PEKERJAAN BRONJONG .....................


105

1 M2 CAT RESIDU/TEER
0.350 Ltr
Residu / Teer
0.010 OH
Pekerja
0.006 OH
Mandor

KET.

13,219,200.00
112,530,000.00
5,850,000.00
2,491,200.00
1,200,000.00
115,000.00
1,127,000.00
83,100.00
136,615,500.00
91,077.00

4,650.00
4,650.00
74,700.00
82,100.00
49,000.00
83,100.00

13,219,200.00
112,530,000.00
5,850,000.00
2,491,200.00

JUMLAH
HARGA
Rp.
6

1,200,000.00
115,000.00
1,127,000.00
83,100.00
2,525,100.00
1,683.40

1 M2 ...........
102 1 M' PAS. PIPA PVC TIPE AW
1.200 M'
0,5"
0.350 harga PVC ( perlengkapan )
0.060 OH
Tukang Batu
0.006 OH
Kepala Tukang Batu
0.036 OH
Pekerja
0.002 OH
Mandor

JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5

Singaraja,
Januari 2014
Kepala Bidang Cipta Karya
Dinas Pekerjaan Umum
Kabupaten Buleleng,

Page 38

Analisa-17'Jan 14

NO

URAIAN

HARGA
SATUAN
Rp.
3

Page 39

JUMLAH HARGA
JUMLAH
UPAH
BAHAN
HARGA
Rp.
Rp.
Rp.
4
5
6
NI NYOMAN SURATTINI, ST
NIP. 19670102 199803 2 003

KET.

Analisa-17'Jan 14

DAFTAR HARGA SATUAN BAHAN DAN UPAH


DINAS PEKERJAAN UMUM KABUPATEN BULELNG
TAHUN ANGG.

: 2014
HARGA SATUAN
Rp.
4

NO.

URAIAN

SATUAN

I.

UPAH KERJA
Pekerja
Tukang Batu
Kepala Tukang Batu
Tukang Kayu
Kepala Tukang Kayu
Tukang Cat
Kepala Tukang Cat
Tukang Besi
Kepala Tukang Besi
Tukang Gali
Tukang Ukir kayu
Tukang Ukir paras
Masinis
Kernet
Sopir
Sopir Material
Tukang masak aspal
Mandor
Tukang Politur
Tukang Pipa
Kepala Tukang Pipa
Tukang Listrik
Kepala Tukang Listrik
Tukang Style bali
Kepala Tukang Ukir Style Bali
Kepala Tukang Paras
Operator Terlatih

OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH

49,000.00
74,700.00
82,100.00
81,700.00
84,000.00
57,600.00
70,700.00
72,400.00
79,200.00
57,100.00
86,900.00
83,000.00
115,600.00
115,500.00
96,300.00
100,000.00
78,100.00
83,100.00
66,900.00
71,800.00
78,100.00
73,200.00
80,600.00
79,700.00
90,400.00
88,900.00
115,000.00

BAHAN BANGUNAN
Bahan Pasangan :
Batu Pasang
Batu Pecah 5 - 7 cm
Batu Pecah 2 - 3 cm
Batu Pecah 2 - 3 cm/mesin
Batu Pecah 3 - 5 cm
Batu Pecah 3 - 5 cm/mesin
Batu Pecah 10/15
Agregat Halus
Batu Seplit Halus ( 0,5 - 1 ) cm / Penutup
Batu Seplit Jagung ( 1 - 2 ) cm/ Kasar
Pasir Batu (Sirtu)

M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3

196,000.00
247,700.00
217,800.00
236,900.00
217,800.00
236,900.00
251,900.00
367,200.00
273,400.00
252,400.00
220,600.00

Kerikil (Koral) :
1 Kerikil / Koral Beton

M3

212,100.00

Pasir :
1 Pasir Urug
2 Pasir Pasang
3 Pasir Beton

M3
M3
M3

158,200.00
164,200.00
167,800.00

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
II.
A
1
2
3
4
5
6
7
8
9
10
11
B

Page 40

KETERANGAN
5

Harga Satuan 14

NO.
1
D
1
2
3
4
5
6
7
8
9
10

URAIAN

SATUAN

2
Batu Bata :
Bata Gosok klas I
Bata Gosok klas II
Bata Pasang klas 1
Bata Pasang klas 2
Batu lahar merah Buleleng
Batu pipih Buleleng
Loster Terawang PC
Loster Terawang Keramik
Loster Terawang ( 30x30 ) cm
Loster Terawang ( 40x40 ) cm

3
Bj
Bj
Bj
Bj
M3
M3
Bj
Bj
Bj
Bj

Page 41

HARGA SATUAN
Rp.
4

KETERANGAN
5

4,800.00
4,200.00
1,100.00
900.00
209,800.00
1,010,700.00
13,100.00
60,300.00
40,000.00
45,000.00

Harga Satuan 14

NO.
1
E
1
2
3
4
5
6
7
F

SATUAN

2
Paras / Padas :
Paras Malam 50 x 20 x 12 cm
Paras Ukir Selekarang 30 x 15 x 3 cm
Paras Batik
Paras Kerobokan 50 x 20 x 12 cm
Paras Putih Bukit
Serbuk Bata Merah
Palimanan 30/30 T. 2,00 cm

Portland Cement :
1 Semen Gresik ( 50 kg )
2 Semen warna

G
1
2
3
4
5
6
7
8
9
10
11
12
H

URAIAN

Bahan Atap :
Sirap
Genteng Biasa
Bubungan Genteng Biasa
Genteng Karang Pilang (Goodyear)
Bubungan Karang Pilang
Genteng Kecil
Bubungan Genteng Kecil
Genteng Kodok
Bubungan Genteng Kodok
Genteng Kaca 3 mm
Genteng Plentong
Bubungan Genteng Plentong

Seng Gelombang :
1 BJLS 0,18 mm
2 BJLS 0,20 mm
3 Seng Talang 30 cm

HARGA SATUAN
Rp.
4

Bj
Bj
Bh
Bh
Bh
M3
M3

37,800.00
8,800.00
12,800.00
25,200.00
13,100.00
90,000.00

Zak
Kg

68,200.00
23,500.00

Ikat
Bj
Bj
Bj
Bj
Bj
Bj
Bj
Bj
Bj
Bj
Bj

122,200.00
2,300.00
7,000.00
4,300.00
27,000.00
1,700.00
5,200.00
2,800.00
10,800.00
15,100.00
2,300.00
6,500.00

Lbr
Lbr
m

40,800.00
42,900.00
15,800.00

1
2
3
4

Asbes PC (DJABESMEN) :
Asbes Gel. 1,8 m' x 1,05 m'/4 mm
Nok Asbes/Djabesmen
Rata/Djabesmen (2 m x 1m x 4mm)
Rata/Djabesmen (1 m x 1m x 6mm)

Lbr
M'
Lbr
Lbr

34,500.00
25,900.00
25,400.00
18,600.00

1
2
3
4
5
6
7
8

Bahan Baja dan Alumunium :


C. 75 - 0,75
C. 75 - 0,65
U. 100 - 0,55
UK. 75. 0,85
UK. 75. 0,55
UK. 75. 0,53
GD.B. 0,43
Plat - Plat Penyambung

M'
M'
M'
M'
M'
M'
M'
M2

20,000.00
18,000.00
20,000.00
20,000.00

1
2
3
4
5
6
7
8

Bahan Kayu :
Kayu Jati Papan
Kayu Jati Balok
Kayu Jati Bali Papan
Kayu Jati Bali Balok
Kayu Kamper Papan 3/20
Kayu Kamper Balok 8/12
Kayu Kamper Balok 6/12
Kayu Kamper Reng

M3
M3
M3
M3
M3
M3
M3
M3

13,530,900.00
11,275,800.00
13,453,800.00
12,363,000.00
10,536,100.00
9,643,800.00
9,280,800.00
8,943,400.00

Page 42

KETERANGAN
5

Harga Satuan 14

NO.

URAIAN

SATUAN

3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
IKAT

1
9
10
11
12
13
14
15
16
17
18
19
20

Kayu Kamper Usuk 4/6


Kayu Kamper Usuk 5/7
Kayu Meranti Papan
Kayu Meranti Balok 8/12
Kayu Meranti Balok 6/12
Reng Meranti
Usuk Meranti 4/6
Usuk Meranti 5/7
Kayu Kruing Papan
Kayu Kruing Balok 8/12
Kayu Kruing Balok 6/12
Reng Kruing

Page 43

HARGA SATUAN
Rp.
4
8,639,100.00
8,639,100.00
5,683,500.00
5,113,500.00
5,332,500.00
5,417,800.00
5,210,600.00
5,210,600.00
7,524,300.00
6,604,000.00
6,377,400.00
313,200.00

KETERANGAN
5

Harga Satuan 14

NO.
1
21
22
23
24
25
26
27
28
29
30
L
1
2
3
4
5
6
M
1
2
3
4
5
6
7
8
9
10
11
12
N

URAIAN

SATUAN

3
M3
M3
Btg
M3
M3
M3
M3
M3
Lbr
Lbr

HARGA SATUAN
Rp.
4
6,168,500.00
6,168,500.00
50,100.00
3,052,100.00
1,380,400.00
12,073,300.00
13,745,300.00
60,000.00
104,100.00

Btg
Btg
Btg
M2
M2
M2

12,600.00
11,000.00
9,300.00
35,300.00
28,100.00
-

Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bj
Bj
M2
M2

120,400.00
85,500.00
64,700.00
38,800.00
113,500.00
76,600.00
50,000.00
42,900.00
2,400.00
2,200.00
72,600.00
81,500.00

M2

30,000.00

M2
M2
M2
M2
M2
M2
M2
M2

56,700.00
56,800.00
54,600.00
57,600.00
53,600.00
53,300.00
50,900.00
57,000.00

Kg
Kg
Kg
Kg
Kg

12,500.00
10,800.00
9,900.00
9,200.00
11,400.00

Kg
Kg
Kg
Kg
Btg

12,200.00
11,700.00
11,400.00
18,400.00
-

Usuk Kruing 5/7


Usuk Kruing 4/6
List Kayu 2/4 - 4 m
Seseh Balok
Papan begesting
Balok Bengkirai
Papan bingkirai
Kayu api
Plywood 4 mm
Plywood 9 mm
Bahan Bambu :
Bambu Besar
Bambu Sedang
Bambu Kecil
Tadir Gedeg Kelas I
Tadir Gedeg Kelas II
Gedeg Glodog
Beton Cetak :
Buis Beton 50/1 m'
Buis Beton 30/1 m'
Buis Beton 25/1 m'
Buis Beton 20"/1 m`
Buis Beton 50/0,75 m'
Buis Beton 30/0,75 m'
Buis Beton 25/0,75 m'
Buis Beton 20"/0,75 m`
Batako Cetak Lubang KW.I
Batako Cetak Lubang KW.II
Paving Blok / 6 cm
Paving Blok / 8 cm

Bahan Lantai :
1 Tegel Warna 20/20 cm
Keramik
1 Keramik KW I 20/20 cm
2 Keramik KW I 20/25 cm
3 Keramik KW I 30/30 cm
4 Keramik KW I 40/40 cm
5 Keramik KW II 20/20 cm
6 Keramik KW II 20/25 cm
7 Keramik KW II 30/30 cm
8 Keramik KW II 40/40 cm

O
1
2
3
4
5
1
2
3
4
5

Bahan Besi :
Besi Beton Polos
Besi Beton Polos 6mm
Besi Beton Polos 8mm
Besi Beton Polos 10mm
Besi Beton Polos 12mm
Besi Beton Polos 16mm
Besi Beton ulir
Besi Beton ulir 13mm
Besi Beton ulir 16mm
Besi Beton ulir 19mm
Besi Strip
Besi Siku 50/50 x 5
Page 44

KETERANGAN
5

Harga Satuan 14

NO.

URAIAN

SATUAN

P
1
2
3
4
5
6
Q
1
2

HARGA SATUAN
Rp.
4

KETERANGAN
5

Kawat
Kawat Ikat Beton
Kawat nyamuk 1x2 m
Kawat Harmonika 5 x 5 cm
Kawat Harmonika 4 x 4 cm
Kawat Harmonika 3 x 3 cm
Kawat 4 mm

Kg
M2
M2
M2
M2
Kg

20,700.00
14,700.00
28,700.00
29,300.00
34,000.00
14,000.00

Bahan Rangka Plafond :


Rangka Primer (C Chanel)
Rangka Skundair (M. Furring)

Btg
Btg

Page 45

Harga Satuan 14

NO.

SATUAN

2
Paku Peluru
Siku Gantung (Angel Clip)
Rod
Suspension Rod Clip
Conector (Chanel Clamp)
Flushing

3
Bh
Bh
Btg
Bh
Bh
Btg

Bahan Plafond :
Eternit Klas I (1/1) M
Eternit Klas II (1/1) M
Triplek 3 mm
Plywood
9 mm
Teak Wood 4 mm
Ceilingteak
Gypsum
Gypsum (1,2 x 2,4)
List Gypsum
Multipleks ( 6 MM )
Multipleks (9 MM )
Multipleks ( 12 MM )
Aluminium foil
Kalsiboard
Hollow
Ramset

Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
M'
Lbr
Lbr
Lbr
Lbr
Lbr
m'
Bh

21,500.00
17,400.00
56,900.00
104,100.00
107,200.00
91,000.00
81,700.00
20,900.00
82,600.00
118,700.00
174,400.00
421,900.00
61,600.00
5,000.00
2,000.00

Bahan Pipa :
1 Pipa Galvanis
2"
1,5"
1,25"
1"
0,75"
0,5"

Btg
Btg
Btg
Btg
Btg
Btg

394,600.00
414,700.00
361,000.00
165,600.00
176,400.00
122,400.00

2 Pipa PVC AW
4"
3"
2,5"
2"
1,5"
1"
0,75"
0,5"

Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg

325,600.00
205,900.00
147,400.00
113,500.00
77,500.00
41,800.00
34,800.00
27,900.00

3 Pipa PVC C
4"
3"
2,5"
2"
1,5"
1"
0,75"
0,5"

Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg

70,200.00
58,000.00
49,800.00
39,600.00
28,800.00
23,400.00
20,000.00
14,800.00

4 Pipa PVC D
4"
3"

Btg
Btg

126,200.00
101,700.00

1
3
4
5
6
7
8
R
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
S

HARGA SATUAN
Rp.
4

URAIAN

Page 46

KETERANGAN
5
-

Harga Satuan 14

NO.
1

URAIAN

SATUAN

3
Btg
Btg
Btg
Btg
Btg
Btg

HARGA SATUAN
Rp.
4
83,000.00
51,100.00
41,900.00
38,100.00
32,400.00
25,200.00

(MOF)
(MOF)
(MOF)
(RRJ)
(RRJ)

Btg
Btg
Btg
Btg
Btg

46,440.00
68,940.00
108,900.00
185,850.00
264,780.00

2,5"
2"
1,5"
1"
0,75"
0,5"

5 Pipa PVC S
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC

- 10
32
40
50
63
75

mm
mm
mm
mm
mm

6m
6m

Page 47

KETERANGAN
5

Harga Satuan 14

6m
6m

3
Btg
Btg

HARGA SATUAN
Rp.
4
372,150.00
556,700.00

6m
6m
6m
6m
6m
6m
6m

Btg
Btg
Btg
Btg
Btg
Btg
Btg

39,700.00
60,900.00
93,600.00
154,400.00
220,300.00
295,300.00
405,000.00

Btg
Btg

7,600.00
6,900.00

Lbr
Kg
Kg
Kg
Kg
Kg
Ltr
Ltr
Ltr
Ltr
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Ltr
Ltr
Kg
Kg

3,700.00
26,700.00
27,700.00
18,900.00
23,400.00
28,500.00
44,300.00
56,800.00
71,100.00
19,400.00
51,300.00
50,900.00
48,500.00
53,700.00
23,400.00
15,900.00
53,900.00
25,800.00
24,700.00
4,000.00
14,000.00
35,000.00

Bahan Kaca :
1 Kaca Bening 5 mm
2 Kaca Bening 3 mm
3 Kaca Ray-Ban 5 mm

M2
M2
M2

111,200.00
87,300.00
128,000.00

Alat Pengunci :
1 Kunci 2 slaag
2 Kunci 1 slaag
3 Kunci KM / WC

Bh
Bh
Bh

135,900.00
75,800.00
58,200.00

Psg
Bh
Psg
Psg
Bh

16,300.00
17,800.00
28,200.00
16,500.00
87,800.00

NO.
1

URAIAN
2
Pipa PVC 90 mm (RRJ)
Pipa PVC 110 mm (RRJ)

6 Pipa PVC S
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC

- 12,5
32 mm (MOF)
40 mm (MOF)
50 mm (MOF)
63 mm (RRJ)
75 mm (RRJ)
90 mm (RRJ)
110 mm (RRJ)

SATUAN

7 Pipa Listrik
8 Pipa Paralon 5/8"
S
Bahan Finishing :
1 Amplas
2 Meni Kayu
3 Plamir Kayu
4 Cat Dasar Tembok
5 Cat Tembok
6 Dempul
7 Politur
8 Politur jadi ( Ultran )
9 Teak Oil
10 Spritus
11 Sirlak
12 Oker
13 Cat Dasar Kayu
14 Cat Kayu
15 Cat Tembok
16 Plamir Tembok
17 ICI
18 Cat Besi
19 Cat Meni Besi
20 Minyak Cat
21 Residu / Teer
22 Lem kayu
23 Impra
T

V
1
2
3
4
5
W

Alat Penggantung :
Kait Angin
Grendel
Engsel kupu-kupu
Engsel Nilon
Espanolet

KETERANGAN
5

Bahan Sanitair :
Page 48

Harga Satuan 14

NO.
1
1
2
3
4
5
6
7
8
9

URAIAN

SATUAN

3
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh

Wastafel
Urinoir
Closet Jongkok
Closet Duduk
Bak Mandi Fiber
Bak Mandi Keramik
Floordrain
Shower
Kran Air

Page 49

HARGA SATUAN
Rp.
4
514,800.00
843,700.00
168,600.00
1,487,900.00
289,400.00
294,300.00
27,200.00
79,900.00
32,000.00

KETERANGAN
5

Harga Satuan 14

NO.

URAIAN

SATUAN

X
1
2
3
4
5
6
7
8
9
10
Y
1
2
3
4
5
6
7
8
9
10
11
12
13
14

HARGA SATUAN
Rp.
4

Bahan Paku :
Paku Lis
Paku Reng
Paku Usuk
Paku Seng
Paku Sekrup 3/8"
Paku Sekrup 1/2"
Paku Sekrup 2"
Paku gypsum
Paku beton 5 cm
Paku beton 3"

Kg
Kg
Kg
Kg
Ktk
Ktk
Ktk
Kg
kg
Ktk

21,200.00
17,100.00
18,100.00
26,400.00
19,200.00
21,300.00
25,100.00
31,500.00
22,500.00

Lain - Lain :
Tanah urug
Aspal
Solar
Oli
Waterproff
Sikat Ijuk
Sikat Baja
Alumnium Kulit Jeruk
Ongkos Angkut Kendaraan
Stamper
Pneumatic Roller 8-5 Ton
Sewa Wales 2,5 Ton
Sewa Wales 6,0 Ton
Sewa Wales 12,0 Ton

M3
Kg
Ltr
Ltr
Ltr
Bh
Bh
Lbr
Ls
Ls
Jam
Hari
Hari
Hari

60,000.00
12,100.00
6,100.00
30,000.00
9,000.00
7,000.00
18,900.00
105,700.00
50,000.00
25,000.00
276,800.00
100,000.00
150,000.00
170,000.00

KETERANGAN
5

Singaraja,
Januari 2014
Kepala Bidang Cipta Karya
Dinas Pekerjaan Umum
Kabupaten Buleleng,

NI NYOMAN SURATTINI, ST
NIP. 19670102 199803 2 003

Page 50

Harga Satuan 14

DAFTAR ANALISA
DINAS PEKERJAAN UMUM KABUPATEN BULELENG
TAHUN ANGGARAN

: 2013

NO

URAIAN

HARGA
SATUAN
Rp.
3

43,800.00
73,000.00

292,014.60
24,309.00
316,323.60

292,014.60
24,309.00
316,323.60

10 M2 MEMBONGKAR USUK/RENG
0.250 OH
Tukang Kayu
0.025 OH
Kepala Tukang Kayu

74,900.00
79,800.00

18,725.00
1,995.00
20,720.00
2,072.00

18,725.00
1,995.00
20,720.00
2,072.00

21,900.00
1,825.00
23,725.00
2,372.50

21,900.00
1,825.00
23,725.00
2,372.50

10 M2 MENGUPAS PLESTERAN
0.500 OH
Pekerja
0.025 OH
Mandor

43,800.00
73,000.00

1 M3 MEMBONGKAR TEMBOK
6.667 OH
Pekerja
0.033 OH
Mandor

43,800.00
73,000.00

292,014.60
2,409.00
294,423.60

292,014.60
2,409.00
294,423.60

10 M2 MEMBONGKAR LANTAI
2.000 OH
Pekerja
0.100 OH
Mandor

43,800.00
73,000.00

87,600.00
7,300.00
94,900.00
9,490.00

87,600.00
7,300.00
94,900.00
9,490.00

35,500.00
43,800.00
79,300.00
7,930.00

35,500.00
43,800.00
79,300.00
7,930.00

33,050.00
43,800.00
76,850.00
7,685.00

33,050.00
43,800.00
76,850.00
7,685.00

5,354,200.00
6,157,300.00
23,200.00
74,900.00
79,800.00
43,800.00
73,000.00

7,490.00
798.00
4,380.00
365.00
13,033.00

64,250.40
43,101.10
464.00
107,815.50

43,800.00
73,000.00

39,420.00
3,285.00
42,705.00
213,525.00

39,420.00
3,285.00
42,705.00
213,525.00

76,650.00
1,825.00
78,475.00

76,650.00
1,825.00
78,475.00

Untuk 1 M2
6

10 M2 MENURUNKAN ATAP GENTENG


0.500 OH
Tukang Batu
1.000 OH
Pekerja

SNI 2001
71,000.00
43,800.00
Untuk 1 M2

10 M2 MENURUNKAN ATAP SENG


0.500 OH
Tukang Besi
1.000 OH
Pekerja

66,100.00
43,800.00
Untuk 1 M2

1 M' PENGUKURAN & PASANG PAPAN BOUWPLANK


0.012 M3
Usuk Meranti 5/7
0.007 M3
Kayu Meranti Papan
papan 3/20
0.020 Kg
Paku Usuk
0.100 OH
Tukang Kayu
0.010 OH
Kepala Tukang Kayu
0.100 OH
Pekerja
0.005 OH
Mandor

1 M3 GALIAN TANAH SEDALAM 2 METER


0.900 OH
Pekerja
0.045 OH
Mandor
1M3 GALIAN TANAH BIASA DLM TEROWONGAN (5X)

10

1 M3 GALIAN TANAH LUMPUR/SEDIMEN


SALURAN TERTUTUP
1.750 OH
Pekerja
0.025 OH
Mandor

KET.

SNI 2001

Untuk 1 M2
4

JUMLAH
HARGA
Rp.
6

1 M3 BONGKARAN BETON BERTULANG


6.667 OH
Pekerja
0.333 OH
Mandor

Untuk 1 M2
3

JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5

43,800.00
73,000.00

Page 51

64,250.40 SNI 2001


43,101.10
464.00
7,490.00
798.00
4,380.00
365.00
120,848.50

26,834.80
(15,870.20)

Analisa-7'OKT

NO
1

URAIAN
2
SALURAN TERBUKA
1.450 OH
Pekerja
0.025 OH
Mandor

HARGA
SATUAN
Rp.
3
43,800.00
73,000.00

Page 52

JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
63,510.00
1,825.00
65,335.00

JUMLAH
HARGA
Rp.
6
-

KET.

63,510.00
1,825.00
65,335.00

Analisa-7'OKT

NO

URAIAN

11

12

1 M3 GALIAN TANAH LUMPUR SEDALAM 1 M


1.200 OH
Pekerja
0.045 OH
Mandor

HARGA
SATUAN
Rp.
3

52,560.00
3,285.00
55,845.00

43,800.00
2,336.00
46,136.00
127,177.50

43,800.00
2,336.00
46,136.00
127,177.50

43,800.00
73,000.00

65,700.00
3,650.00
69,350.00

65,700.00
3,650.00
69,350.00

105,100.00
43,800.00
73,000.00
20,000.00

21,900.00
3,650.00
20,000.00
45,550.00

126,120.00
126,120.00

126,120.00
21,900.00
3,650.00
20,000.00
171,670.00

1 M3 URUGAN KEMBALI
0.192 OH
Pekerja
0.019 OH
Mandor

43,800.00
73,000.00

8,409.60
1,387.00
9,796.60

8,409.60
1,387.00
9,796.60

1 M3 MEMBUANG SISA GALIAN / LUMPUR /


SAMPAH KELUAR LOKASI SEJAUH 30 M'
0.330 OH
Pekerja
0.010 OH
Mandor

43,800.00
73,000.00

14,454.00
730.00
15,184.00

14,454.00
730.00
15,184.00

1 M3 MEMBUANG SISA GALIAN / LUMPUR /


SAMPAH KELUAR LOKASI DENGAN KENDARAAN
SEJAUH 30 M' S/D 100 M'
0.330 OH
Pekerja
0.010 OH
Mandor
1.000 Ls
Ongkos Angkut Kendaraan

43,800.00
73,000.00
20,000.00

14,454.00
730.00
20,000.00
35,184.00

14,454.00
730.00
20,000.00
35,184.00

1 M3 URUGAN PASIR DENGAN PENYIRAMAN


1.200 M3
Pasir Urug
0.300 OH
Pekerja
0.010 OH
Mandor

161,200.00
43,800.00
73,000.00

13,140.00
730.00
13,870.00

193,440.00
193,440.00

193,440.00
13,140.00
730.00
207,310.00

1 M3 PASANGAN BATU KOSONG


1.200 M3
Batu Pasang
0.432 M3
Pasir Urug
0.780 OH
Pekerja
0.039 OH
Mandor
0.390 OH
Tukang Batu
0.039 OH
Kepala Tukang Batu

171,300.00
161,200.00
43,800.00
73,000.00
71,000.00
75,900.00

34,164.00
2,847.00
27,690.00
2,960.10
67,661.10

205,560.00
69,638.40
275,198.40

205,560.00
69,638.40
34,164.00
2,847.00
27,690.00
2,960.10
342,859.50

53,250.00
5,692.50
65,700.00
5,475.00
130,117.50

205,560.00
174,896.00
96,995.20
477,451.20

205,560.00
174,896.00
96,995.20
53,250.00
5,692.50
65,700.00
5,475.00
607,568.70

43,800.00
73,000.00

1 M3 GALIAN TANAH KERAS DLM TEROWONGAN (5X)


13

14

15

16

17

18

19

20

21

JUMLAH
HARGA
Rp.
6

52,560.00
3,285.00
55,845.00

1 M3 GALIAN TANAH KERAS SEDALAM 1 METER


1.000 OH
Pekerja
0.032 OH
Mandor

43,800.00
73,000.00

JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5

1 M3 GALIAN TANAH BERBATU BUNDAR( 3X )


1.500 OH
Pekerja
0.050 OH
Mandor

1 M3 URUGAN TANAH DIPADATKAN


1.200 M3
Tanah urug
0.500 OH
Pekerja
0.050 OH
Mandor
1.000 Ls
Stamper

1 M3 PASANGAN BATU KALI 1 : 5


1.200 M3
Batu Pasang
136.000 Kg
Semen Gresik ( 50 kg )
0.544 M3
Pasir Pasang
0.750 OH
Tukang Batu
0.075 OH
Kepala Tukang Batu
1.500 OH
Pekerja
0.075 OH
Mandor

KET.

42,106.40
(13,738.60)

31,901.00
(14,235.00)

SNI 2001

SNI 2001

171,300.00
1,286.00
178,300.00
71,000.00
75,900.00
43,800.00
73,000.00

321,581.10
(21,278.40)

624,698.70
17,130.00

1 M2 PASANG BATACO
Page 53

Analisa-7'OKT

NO

2
Batako Cetak Lubang KW.II
Semen Gresik ( 50 kg )
Pasir Pasang
Tukang Batu
Kepala Tukang Batu
Pekerja
Mandor

HARGA
SATUAN
Rp.
3
1,700.00
1,286.00
178,300.00
71,000.00
75,900.00
43,800.00
73,000.00

Batako Cetak Lubang KW.I

2,200.00

URAIAN

1
12.500
7.500
0.038
0.100
0.010
0.300
0.015

Bj
Kg
M3
OH
OH
OH
OH

Page 54

JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
21,250.00
9,645.00
6,775.40
7,100.00
759.00
13,140.00
1,095.00
22,094.00
37,670.40
22,094.00
43,920.40

JUMLAH
HARGA
Rp.
6
21,250.00
9,645.00
6,775.40
7,100.00
759.00
13,140.00
1,095.00
59,764.40
66,014.40

KET.

Analisa-7'OKT

NO

URAIAN

22

1 M2 PASANGAN BATA MERAH 1 : 2


70.000 Bj
Bata Pasang klas 2
18.950 kg
Semen Gresik ( 50 kg )
0.038 M3
Pasir Pasang
0.100 OH
Tukang Batu
0.010 OH
Kepala Tukang Batu
0.300 OH
Pekerja
0.015 OH
Mandor

23

Bata Pasang klas 1


1 M2 PASANGAN BATA MERAH 1 : 5
70.000 Bj
Bata Pasang klas 2
9.680 kg
Semen Gresik ( 50 kg )
0.045 M3
Pasir Pasang
0.100 OH
Tukang Batu
0.010 OH
Kepala Tukang Batu
0.300 OH
Pekerja
0.015 OH
Mandor
Bata Pasang klas 1

24

25

26

27

28

29

HARGA
SATUAN
Rp.
3

900.00
1,286.00
178,300.00
71,000.00
75,900.00
43,800.00
73,000.00
1,000.00
900.00
1,286.00
178,300.00
71,000.00
75,900.00
43,800.00
73,000.00
1,000.00

JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5

JUMLAH
HARGA
Rp.
6

7,100.00
759.00
13,140.00
1,095.00
22,094.00
22,094.00

63,000.00
24,369.70
6,775.40
94,145.10
101,145.10

63,000.00
24,369.70
6,775.40
7,100.00
759.00
13,140.00
1,095.00
116,239.10
123,239.10

7,100.00
759.00
13,140.00
1,095.00
22,094.00
22,094.00

63,000.00
12,448.48
8,023.50
83,471.98
90,471.98

63,000.00
12,448.48
8,023.50
7,100.00
759.00
13,140.00
1,095.00
105,565.98
112,565.98

1 M2 PLESTERAN PC 1 : 2 TEBAL 20 mm
13.632 Kg
Semen Gresik ( 50 kg )
0.027 M3
Pasir Pasang
0.200 OH
Tukang Batu
0.020 OH
Kepala Tukang Batu
0.400 OH
Pekerja
0.022 OH
Mandor

1,286.00
178,300.00
71,000.00
75,900.00
43,800.00
73,000.00

14,200.00
1,518.00
17,520.00
1,606.00
34,844.00

17,530.75
4,814.10
22,344.85

17,530.75
4,814.10
14,200.00
1,518.00
17,520.00
1,606.00
57,188.85

1 M2 PLESTERAN PC 1:3 TEBAL 20 mm


10.368 Kg
Semen Gresik ( 50 kg )
0.031 M3
Pasir Pasang
0.200 OH
Tukang Batu
0.020 OH
Kepala Tukang Batu
0.260 OH
Pekerja
0.013 OH
Mandor

1,286.00
178,300.00
71,000.00
75,900.00
43,800.00
73,000.00

14,200.00
1,518.00
11,388.00
949.00
28,055.00

13,333.25
5,527.30
18,860.55

13,333.25
5,527.30
14,200.00
1,518.00
11,388.00
949.00
46,915.55

1 M2 PLESTERAN PC 1:5 TEBAL 20 mm


6.912 Kg
Semen Gresik ( 50 kg )
0.035 M3
Pasir Pasang
0.200 OH
Tukang Batu
0.020 OH
Kepala Tukang Batu
0.400 OH
Pekerja
0.022 OH
Mandor

1,286.00
178,300.00
71,000.00
75,900.00
43,800.00
73,000.00

14,200.00
1,518.00
17,520.00
1,606.00
34,844.00

8,888.83
6,240.50
15,129.33

8,888.83
6,240.50
14,200.00
1,518.00
17,520.00
1,606.00
49,973.33

1 M2 PLESTERAN PC 1 : 6 TEBAL 15 mm
5.888 Kg
Semen Gresik ( 50 kg )
0.036 M3
Pasir Pasang
0.200 OH
Tukang Batu
0.020 OH
Kepala Tukang Batu
0.400 OH
Pekerja
0.022 OH
Mandor

1,286.00
178,300.00
71,000.00
75,900.00
43,800.00
73,000.00

14,200.00
1,518.00
17,520.00
1,606.00
34,844.00

7,571.97
6,418.80
13,990.77

7,571.97
6,418.80
14,200.00
1,518.00
17,520.00
1,606.00
48,834.77

1 M2 PEKERJAAN ACIAN 1:2


3.250 Kg
Semen Gresik ( 50 kg )
0.100 OH
Tukang Batu
0.010 OH
Kepala Tukang Batu
0.200 OH
Pekerja
0.010 OH
Mandor

1,286.00
71,000.00
75,900.00
43,800.00
73,000.00

7,100.00
759.00
8,760.00
730.00
17,349.00

4,179.50
4,179.50

4,179.50
7,100.00
759.00
8,760.00
730.00
21,528.50

1 M2 PEKERJAAN SIARAN 1 : 2
6.340 Kg
Semen Gresik ( 50 kg )

1,286.00

8,153.24

8,153.24

Page 55

KET.

47,426.55
511.00

Analisa-7'OKT

NO

URAIAN

1
0.012
0.150
0.015
0.300
0.015

M3
OH
OH
OH
OH

2
Pasir Pasang
Tukang Batu
Kepala Tukang Batu
Pekerja
Mandor

HARGA
SATUAN
Rp.
3
178,300.00
71,000.00
75,900.00
43,800.00
73,000.00

Page 56

JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
2,139.60
10,650.00
1,138.50
13,140.00
1,095.00
26,023.50
10,292.84

JUMLAH
HARGA
Rp.
6
2,139.60
10,650.00
1,138.50
13,140.00
1,095.00
36,316.34

KET.

Analisa-7'OKT

NO

URAIAN

30

1 M2 PASANG PARAS/BATA GOSOK


6.656 Bj
Paras Ukir Selekarang 30 x 15 x 3 cm
44.000 Bj
Bata Gosok klas I
0.600 Zak
Semen Gresik ( 50 kg )
3.500 OH
Tukang Ukir paras
0.350 OH
Kepala Tukang Ukir Style Bali
2.000 OH
Pekerja
0.100 OH
Mandor
Bata Gosok klas II

31

1 M2 PEK. BATA GOSOK STYLE BALI


100.000 Bj
Bata Gosok klas I
30.000 Kg
Semen Gresik ( 50 kg )
3.500 OH
Tukang Ukir paras
0.350 OH
Kepala Tukang Ukir Style Bali
2.000 OH
Pekerja
0.100 OH
Mandor
Bata Gosok klas II

32

33

34

35

36

HARGA
SATUAN
Rp.
3

8,100.00
4,300.00
64,300.00
82,700.00
87,600.00
43,800.00
73,000.00
3,800.00

4,300.00
1,286.00
82,700.00
87,600.00
43,800.00
73,000.00
3,800.00

JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5

JUMLAH
HARGA
Rp.
6

289,450.00
30,660.00
87,600.00
7,300.00
415,010.00
415,010.00

53,913.60
189,200.00
38,580.00
281,693.60
259,693.60

53,913.60
189,200.00
38,580.00
289,450.00
30,660.00
87,600.00
7,300.00
696,703.60
674,703.60

289,450.00
30,660.00
87,600.00
7,300.00
415,010.00
415,010.00

430,000.00
38,580.00
468,580.00
418,580.00

430,000.00
38,580.00
289,450.00
30,660.00
87,600.00
7,300.00
883,590.00
833,590.00

1 M2 PARAS BATU KALIASEM


1.200 Bj
Paras Malam 50 x 20 x 12 cm
7.000 Kg
Semen Gresik ( 50 kg )
0.025 M3
Pasir Pasang
0.250 OH
Tukang Ukir paras
0.025 OH
Kepala Tukang Paras
0.500 OH
Pekerja
0.025 OH
Mandor

34,700.00
1,286.00
178,300.00
82,700.00
84,600.00
43,800.00
73,000.00

20,675.00
2,115.00
21,900.00
1,825.00
46,515.00

41,640.00
9,002.00
4,457.50
55,099.50

41,640.00
9,002.00
4,457.50
20,675.00
2,115.00
21,900.00
1,825.00
101,614.50

1 M' PALIMANAN TEPI KOLAM & T.DUDUK


1.200 M3
Palimanan 30/30 T. 2,5 cm
2.100 Kg
Semen Gresik ( 50 kg )
0.011 M3
Pasir Pasang
0.150 OH
Tukang Ukir paras
0.015 OH
Kepala Tukang Paras
0.400 OH
Pekerja
0.020 OH
Mandor

200,000.00
1,286.00
178,300.00
82,700.00
84,600.00
43,800.00
73,000.00

12,405.00
1,269.00
17,520.00
1,460.00
32,654.00

240,000.00
2,700.60
2,032.62
244,733.22

240,000.00
2,700.60
2,032.62
12,405.00
1,269.00
17,520.00
1,460.00
277,387.22

1 M2 PALIMANAN LANTAI KOLAM


1.200 M3
Palimanan 30/30 T. 2,5 cm
7.000 Kg
Semen Gresik ( 50 kg )
0.025 M3
Pasir Pasang
0.250 OH
Tukang Ukir paras
0.025 OH
Kepala Tukang Paras
0.500 OH
Pekerja
0.025 OH
Mandor

200,000.00
1,286.00
178,300.00
82,700.00
84,600.00
43,800.00
73,000.00

20,675.00
2,115.00
21,900.00
1,825.00
46,515.00

240,000.00
9,002.00
4,457.50
253,459.50

240,000.00
9,002.00
4,457.50
20,675.00
2,115.00
21,900.00
1,825.00
299,974.50

1 M2 PEKERJAAN PAVING STONE


1.000 M2
Paving Blok / 6 cm
0.100 M3
Pasir Pasang
0.266 OH
Tukang Batu

62,700.00
178,300.00
71,000.00

Paving Blok / 8 cm

69,600.00

18,886.00
18,886.00
18,886.00

62,700.00
17,830.00
80,530.00
87,430.00

62,700.00
17,830.00
18,886.00
99,416.00
106,316.00

7,100.00
759.00
13,140.00
1,095.00
22,094.00

52,400.00
16,718.00
6,240.50
75,358.50

52,400.00
16,718.00
6,240.50
7,100.00
759.00
13,140.00
1,095.00
97,452.50

1 M2 PEK. DINDING ROSTER TERAWANG


1.000 Bj
Loster Terawang PC
13.000 Kg
Semen Gresik ( 50 kg )
0.035 M3
Pasir Pasang
0.100 OH
Tukang Batu
0.010 OH
Kepala Tukang Batu
0.300 OH
Pekerja
0.015 OH
Mandor

52,400.00
1,286.00
178,300.00
71,000.00
75,900.00
43,800.00
73,000.00

Page 57

KET.

Analisa-7'OKT

NO

URAIAN

1
37

2
1 M2 PASANGAN KERAMIK KW I 20 x 20
1.000 M2
Keramik KW I 20/20 cm
10.400 Kg
Semen Gresik ( 50 kg )
0.045 M3
Pasir Pasang
1.620 Kg
Semen warna
0.350 OH
Tukang Batu
0.035 OH
Kepala Tukang Batu
0.700 OH
Pekerja
0.035 OH
Mandor
Keramik KW II 20/20 cm

HARGA
SATUAN
Rp.
3
52,800.00
1,286.00
178,300.00
12,100.00
71,000.00
75,900.00
43,800.00
73,000.00
50,100.00

Page 58

JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
24,850.00
2,656.50
30,660.00
2,555.00
60,721.50
60,721.50

52,800.00
13,374.40
8,023.50
19,602.00
93,799.90
91,099.90

JUMLAH
HARGA
Rp.
6

KET.

52,800.00
13,374.40
8,023.50
19,602.00
24,850.00
2,656.50
30,660.00
2,555.00
154,521.40
151,821.40

Analisa-7'OKT

HARGA
SATUAN
Rp.
3

NO

URAIAN

38

1 M2 PASANGAN KERAMIK KW I 30 x 30
1.000 M2
Keramik KW I 30/30 cm
10.000 Kg
Semen Gresik ( 50 kg )
0.045 M3
Pasir Pasang
1.500 Kg
Semen warna
0.350 OH
Tukang Batu
0.035 OH
Kepala Tukang Batu
0.700 OH
Pekerja
0.035 OH
Mandor

49,200.00
1,286.00
178,300.00
12,100.00
71,000.00
75,900.00
43,800.00
73,000.00

Keramik KW II 30/30 cm

45,900.00

1 M2 PASANGAN KERAMIK KW I 40 x 40
1.000 M2
Keramik KW I 40/40 cm
10.000 Kg
Semen Gresik ( 50 kg )
0.045 M3
Pasir Pasang
1.500 Kg
Semen warna
0.350 OH
Tukang Batu
0.035 OH
Kepala Tukang Batu
0.700 OH
Pekerja
0.035 OH
Mandor

57,100.00
1,286.00
178,300.00
12,100.00
71,000.00
75,900.00
43,800.00
73,000.00

39

40

41

42

43
a

49,200.00
12,860.00
8,023.50
18,150.00
88,233.50
84,933.50

49,200.00
12,860.00
8,023.50
18,150.00
24,850.00
2,656.50
30,660.00
2,555.00
148,955.00
145,655.00

24,850.00
2,656.50
30,660.00
2,555.00
60,721.50
60,721.50

57,100.00
12,860.00
8,023.50
18,150.00
96,133.50
94,233.50

57,100.00
12,860.00
8,023.50
18,150.00
24,850.00
2,656.50
30,660.00
2,555.00
156,855.00
154,955.00

6,390.00
683.10
3,942.00
365.00
11,380.10
11,380.10
11,380.10

49,200.00
1,472.47
534.90
3,025.00
54,232.37
57,832.37
116,364.74

49,200.00
1,472.47
534.90
3,025.00
6,390.00
683.10
3,942.00
365.00
65,612.47
69,212.47
127,744.84

8,023.50
19,602.00
9,585.00
1,062.60
11,826.00
985.50
51,084.60

50,000.00
13,374.40
8,023.50
19,602.00
90,999.90

50,000.00
13,374.40
16,047.00
39,204.00
9,585.00
1,062.60
11,826.00
985.50
142,084.50

199,000.00
185,600.00
1,286.00
71,000.00
75,900.00
43,800.00
73,000.00

17,750.00
1,897.50
72,270.00
5,840.00
97,757.50

173,130.00
96,512.00
280,348.00
549,990.00

173,130.00
96,512.00
280,348.00
17,750.00
1,897.50
72,270.00
5,840.00
647,747.50

199,000.00
185,600.00
1,286.00
71,000.00
75,900.00
43,800.00
73,000.00
(A)

24,850.00
2,656.50
87,600.00
73,000.00
188,106.50

161,190.00
100,224.00
432,096.00
693,510.00

161,190.00
100,224.00
432,096.00
24,850.00
2,656.50
87,600.00
73,000.00
881,616.50

55,200.00
49,200.00
1,286.00
178,300.00
12,100.00
71,000.00
75,900.00
43,800.00
73,000.00

Keramik KW I 20/20 cm
Keramik KW I 40/40 cm

52,800.00
57,100.00

1 M3 BETON COR 1:3:5


0.870 M3
Kerikil / Koral Beton
0.520 M3
Pasir Beton
218.000 Kg
Semen Gresik ( 50 kg )
0.250 OH
Tukang Batu
0.025 OH
Kepala Tukang Batu
1.650 OH
Pekerja
0.080 OH
Mandor

BETON BERTULANG
1 M3 Beton Cor 1:2:3
0.810 M3
Kerikil / Koral Beton
0.540 M3
Pasir Beton
336.000 Kg
Semen Gresik ( 50 kg )
0.350 OH
Tukang Batu
0.035 OH
Kepala Tukang Batu
2.000 OH
Pekerja
1.000 OH
Mandor

JUMLAH
HARGA
Rp.
6

24,850.00
2,656.50
30,660.00
2,555.00
60,721.50
60,721.50

Keramik KW II 40/40 cm
1 M2 PEK. PLINT KERAMIK 10 x 30 (1:2)
1.000 M2
Keramik KW I 30/30 cm
1.145 Kg
Semen Gresik ( 50 kg )
0.003 M3
Pasir Pasang
0.250 Kg
Semen warna
0.090 OH
Tukang Batu
0.009 OH
Kepala Tukang Batu
0.090 OH
Pekerja
0.005 OH
Mandor

1 M2 PAS. TEGEL WARNA 20/20


1.000 M2
Tegel Warna 20/20 cm
10.400 Kg
Semen Gresik ( 50 kg )
0.045 M3
Pasir Pasang
1.620 Kg
Semen warna
0.135 OH
Tukang Batu
0.014 OH
Kepala Tukang Batu
0.270 OH
Pekerja
0.014 OH
Mandor

JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5

50,000.00
1,286.00
178,300.00
12,100.00
71,000.00
75,900.00
43,800.00
73,000.00

Page 59

KET.

91,216.70
(50,867.80)

Analisa-7'OKT

NO

URAIAN

1 M2 Begesting
0.040 M3
0.400 Kg
0.500 OH
0.050 OH
0.400 OH
0.010 OH

Papan begesting
Paku Usuk
Tukang Kayu
Kepala Tukang Kayu
Pekerja
Mandor

HARGA
SATUAN
Rp.
3

JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5

1,285,000.00
23,200.00
74,900.00
79,800.00
43,800.00
73,000.00
(B)

37,450.00
3,990.00
17,520.00
730.00
59,690.00
596,900.00

10 M2 Begesting

Page 60

51,400.00
9,280.00
60,680.00
606,800.00

JUMLAH
HARGA
Rp.
6

KET.

51,400.00
9,280.00
37,450.00
3,990.00
17,520.00
730.00
120,370.00
1,203,700.00

Analisa-7'OKT

NO

URAIAN

44

45

46

100 Kg Pek. Besi


105.000 Kg
1.500 Kg
0.700 OH
0.070 OH
0.300 OH
0.040 OH

Beton ( Dgn Besi Polos/Ulir )


Besi Beton Polos 10mm
Kawat Ikat Beton
Tukang Besi
Kepala Tukang Besi
Pekerja
Mandor

HARGA
SATUAN
Rp.
3

48

JUMLAH
HARGA
Rp.
6

8,961.88
20,000.00
66,100.00
74,900.00
43,800.00
73,000.00
(C)

46,270.00
5,243.00
13,140.00
2,920.00
67,573.00

940,997.57
30,000.00
970,997.57

940,997.57
30,000.00
46,270.00
5,243.00
13,140.00
2,920.00
1,035,650.57

(A+B+0,8*C)
(A+B+C)
(A+B+1,5*C)
(A+B+1,6*C)
(A+B+1,75*C)
(A+B+1,85*C)
(A+B+2*C)
(A+B+2,25*C)
(A+B+2,5*C)
(A+B+2,75*C)
(A+B+3*C)
(A+1,6*C)

839,064.90
852,579.50
886,366.00
893,123.30
903,259.25
910,016.55
920,152.50
937,045.75
953,939.00
970,832.25
987,725.50
893,123.30

2,077,108.06
2,271,307.57
2,756,806.36
2,853,906.11
2,999,555.75
3,096,655.50
3,242,305.14
3,485,054.53
3,727,803.93
3,970,553.32
4,213,302.71
2,853,906.11

2,913,836.96
3,120,967.07
3,638,792.36
3,742,357.41
3,897,705.00
4,001,270.05
4,156,617.64
4,415,530.28
4,674,442.93
4,933,355.57
5,192,268.21
2,538,657.41

881,616.50
171,300.00

112,863.90
112,863.90

416,106.00
82,224.00
498,330.00

528,969.90
82,224.00
611,193.90

M3 PEK. CYKLOP 1:3:5 DIAMETER 100 CM


0.450 M3
Batu Pasang
0.670 M3
Kerikil / Koral Beton
0.450 M3
Pasir Beton
280.000 Kg
Semen Gresik ( 50 kg )
0.300 OH
Tukang Batu
0.030 OH
Kepala Tukang Batu
2.380 OH
Pekerja
0.080 OH
Mandor

171,300.00
199,000.00
185,600.00
1,286.00
71,000.00
75,900.00
43,800.00
73,000.00

21,300.00
2,277.00
104,244.00
5,840.00
133,661.00

77,085.00
133,330.00
83,520.00
360,080.00
654,015.00

77,085.00
133,330.00
83,520.00
360,080.00
21,300.00
2,277.00
104,244.00
5,840.00
787,676.00

1 M2 PEK. PLAFOND CEILLING TEAK


0.690 Lbr
Ceilingteak
0.015 M3
Kayu Kruing Balok 8/12
0.020 Kg
Paku Usuk
0.200 Kg
Paku Reng
2.000 OH
Tukang Kayu
0.020 OH
Kepala Tukang Kayu
0.500 OH
Pekerja
0.025 OH
Mandor

91,000.00
6,692,800.00
23,200.00
22,400.00
74,900.00
79,800.00
43,800.00
73,000.00

149,800.00
1,596.00
21,900.00
1,825.00
175,121.00
175,121.00

62,790.00
100,392.00
464.00
4,480.00
168,126.00
67,270.00

62,790.00
100,392.00
464.00
4,480.00
149,800.00
1,596.00
21,900.00
1,825.00
343,247.00
242,391.00

1 M2 PLAPOND GYPSUM
0.380 Lbr
Gypsum (1,2 x 2,4)
0.015 M3
Kayu Kruing Balok 8/12
0.220 Kg
Paku Lis
0.200 OH
Tukang Kayu
0.020 OH
Kepala Tukang Kayu
0.500 OH
Pekerja
0.025 OH
Mandor

58,800.00
6,692,800.00
25,800.00
74,900.00
79,800.00
43,800.00
73,000.00

14,980.00
1,596.00
21,900.00
1,825.00
40,301.00

22,344.00
100,392.00
5,676.00
128,412.00

22,344.00
100,392.00
5,676.00
14,980.00
1,596.00
21,900.00
1,825.00
168,713.00

1 M2 PLAPOND ETERNIT
1.000 Lbr
Eternit Klas I (1/1) M
0.015 M3
Kayu Kruing Balok 8/12
0.220 Kg
Paku Usuk
0.200 OH
Tukang Kayu
0.020 OH
Kepala Tukang Kayu
0.500 OH
Pekerja

19,200.00
6,692,800.00
23,200.00
74,900.00
79,800.00
43,800.00

14,980.00
1,596.00
21,900.00

19,200.00
100,392.00
5,104.00
-

19,200.00
100,392.00
5,104.00
14,980.00
1,596.00
21,900.00

1 M3 BETON BERTULANG Fe 80
1 M3 BETON BERTULANG Fe 100
1 M3 BETON BERTULANG Fe 150
1 M3 BETON BERTULANG Fe 160
1 M3 BETON BERTULANG Fe 175
1 M3 BETON BERTULANG Fe 185
1 M3 BETON BERTULANG Fe 200
1 M3 BETON BERTULANG Fe 225
1 M3 BETON BERTULANG Fe 250
1 M3 BETON BERTULANG Fe 275
1 M3 BETON BERTULANG Fe 300
1 M3 BETON PLAT PONDASI Fe 160
1 M3 BETON CYCLOOF 40% BATU KALI
0.600 M3
Beton cor 1 : 2 : 3
0.480 M3
Batu Pasang

Untuk gerantangan Ceilingteak


47

JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5

Page 61

KET.

990,841.16
(44,809.41)
(35,847.53)
(44,809.41)
(67,214.11)
(71,695.05)
(78,416.47)
(82,897.40)
(89,618.82)
(100,821.17)
(112,023.53)
(123,225.88)
(134,428.23)
(71,695.05)

Analisa-7'OKT

NO

URAIAN

1
0.025 OH

2
Mandor
Tadir Gedeg Kelas I

49

1 M2 PLAPOND PLYWOOD 4 MM +RANGKA KRUING


0.390 Lbr
Plywood
0.023 M3
Kayu Kruing Balok 8/12
0.060 Kg
Paku Usuk
0.400 OH
Tukang Kayu
0.040 OH
Kepala Tukang Kayu
0.270 OH
Pekerja
0.014 OH
Mandor
Triplek 3 mm
Teak Wood 4 mm

HARGA
SATUAN
Rp.
3
73,000.00
29,900.00

49,500.00
6,692,800.00
23,200.00
74,900.00
79,800.00
43,800.00
73,000.00
52,400.00
80,300.00

Page 62

JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
1,825.00
40,301.00
124,696.00
40,301.00
135,396.00

29,960.00
3,192.00
11,826.00
985.50
45,963.50
45,963.50
45,963.50

19,305.00
153,934.40
1,392.00
174,631.40
175,762.40
186,643.40

JUMLAH
HARGA
Rp.
6
1,825.00
164,997.00
175,697.00

KET.

19,305.00
153,934.40
1,392.00
29,960.00
3,192.00
11,826.00
985.50
220,594.90
221,725.90
232,606.90

Analisa-7'OKT

NO

URAIAN

50

1 M2 PLAPOND GYPSUM+RANGKA HOLLOW


0.347 Lbr
Gypsum (1,2 x 2,4)
3.600 m'
Hollow
0.150 Kg
Kawat D4mm
1.050 Bh
Ramset
0.250 OH
Tukang Kayu
0.025 OH
Kepala Tukang Kayu
0.150 OH
Pekerja
0.075 OH
Mandor

HARGA
SATUAN
Rp.
3

58,800.00
10,600.00
20,000.00
15,000.00
74,900.00
79,800.00
43,800.00
73,000.00

JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5

18,725.00
1,995.00
6,570.00
5,475.00
32,765.00

JUMLAH
HARGA
Rp.
6

20,403.60
38,160.00
3,000.00
15,750.00
77,313.60

20,403.60
38,160.00
3,000.00
15,750.00
18,725.00
1,995.00
6,570.00
5,475.00
110,078.60

31,875.00
672.00

31,875.00
672.00
4,380.00
7,490.00
3,990.00
255.50
48,662.50

PEKERJAAN LANGIT - LANGIT


1 1 M2 Pasang langit - langit Plywood 120 x 240 cm/4mm

IX

0.375
0.030
0.100
0.100
0.050
0.004
2

Lbr
Kg
Oh
Oh
Oh
Oh

Plywood 4 mm
Paku biasa 1/2" - 1"
Pekerja
Tukang kayu
Kepala Tukang
Mandor

1 M2 Pasang langit - langit Teakwood 30 x 60 cm/ 4 mm


0.375 Lbr
Teakwood 4 mm
0.030 Kg
Paku biasa 1/2" - 1"
0.100 Oh
Pekerja
0.100 Oh
Tukang kayu
0.050 Oh
Kepala Tukang
0.004 Oh
Mandor
1 M' Pasang list langit - langit kayu profil
1.050 M'
List kayu 2/4
0.010 Kg
Paku list
0.050 Oh
Pekerja
0.050 Oh
Tukang kayu
0.005 Oh
Kepala Tukang
0.003 Oh
Mandor
1 M2 Pasang langit - langit Plywood 4 mm + rangka
0.0230
M3 Kamper Usuk 4/6 cm
0.0600
Kg Paku biasa 2" - 5"
0.9000 Lbr Plywood 4 mm
0.2700
Oh Pekerja
0.4000
Oh Tukang kayu
0.0400
Oh Kepala Tukang
0.0135
Oh Mandor
1 M2 Pasang Rangka Plafond Hollow
0.3000 Btg Rangka Primer
0.5000 Btg Rangka Skundair
1.0000
Bh Paku Peluru
1.0000
Bh Siku Gantung (Angel Clip)
1.0000 Btg Rod
1.0000
Bh Suspension Rod Clip
2.0000
Bh Conector (Chanel Clamp)
0.4000 Btg Flushing
1.0000
Bh Paku Skrup 3/8
5.0000
Bh Paku Beton
1.0000
M2 Ongkos Pasang
1 M2 Pasang langit - langit Gypsum
0.1100
Kg Paku sekrup
0.3750 Lbr Gypsum (120x240x4)
0.9300
Kg Cornice adhesive
0.1000 Rol Textile Tape
0.1000
Oh Pekerja
0.1000
Oh Tukang kayu
0.0100
Oh Kepala Tukang
0.0050
Oh Mandor

85,000.00
22,400.00
43,800.00
74,900.00
79,800.00
73,000.00

80,300.00
22,400.00
43,800.00
74,900.00
79,800.00
73,000.00

12,025.00
25,800.00
43,800.00
74,900.00
79,800.00
73,000.00

8,299,000.00
25,800.00
85,000.00
43,800.00
74,900.00
79,800.00
73,000.00

50,000.00
40,000.00
2,000.00
1,000.00
2,500.00
2,500.00
1,500.00
17,500.00
150.00
234.00
3,500.00

19,700.00
58,800.00
5,000.00
12,000.00
43,800.00
74,900.00
79,800.00
73,000.00
Page 63

4,380.00
7,490.00
3,990.00
255.50
16,115.50

32,547.00
30,112.50
672.00

4,380.00
7,490.00
3,990.00
255.50
16,115.50

30,784.50
12,626.25
258.00

2,190.00
3,745.00
399.00
219.00
6,553.00

12,884.25
190,877.00
1,548.00
76,500.00

11,826.00
29,960.00
3,192.00
985.50
45,963.50

268,925.00
15,000.00
20,000.00
2,000.00
1,000.00
2,500.00
2,500.00
3,000.00
7,000.00
150.00
1,170.00

3,500.00
3,500.00

54,320.00
2,167.00
22,050.00
4,650.00
1,200.00

4,380.00
7,490.00
798.00
365.00

KET.

110,091.54
12.94

30,112.50
672.00
4,380.00
7,490.00
3,990.00
255.50
46,900.00
12,626.25
258.00
2,190.00
3,745.00
399.00
219.00
19,437.25
190,877.00
1,548.00
76,500.00
11,826.00
29,960.00
3,192.00
985.50
314,888.50
15,000.00
20,000.00
2,000.00
1,000.00
2,500.00
2,500.00
3,000.00
7,000.00
150.00
1,170.00
3,500.00
57,820.00
2,167.00
22,050.00
4,650.00
1,200.00
4,380.00
7,490.00
798.00
365.00
Analisa-7'OKT

NO

URAIAN

1 M2 Pas Rangka Plafond Hollow + Gypsum


1 M2 Pasang langit - langit Lambrisiring Kayu 9 cm
0.0150
m3 Kayu Papan Kamfer
0.0100
Kg Paku biasa 1/2" - 1"
0.8000
Hr Tukang kayu
0.0800
Hr Kepala tukang kayu
0.8000
Hr Pekerja
0.0400
Hr Mandor

HARGA
SATUAN
Rp.
3

JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
13,033.00
30,067.00
16,533.00

9,637,600.00
22,400.00
74,900.00
79,800.00
43,800.00
73,000.00

Page 64

6,384.00
35,040.00
2,920.00
44,344.00

JUMLAH
HARGA
Rp.
6
43,100.00

84,387.00

100,920.00

144,564.00
224.00
59,920.00

144,564.00
224.00
59,920.00
6,384.00
35,040.00
2,920.00
249,052.00

204,708.00

KET.

Analisa-7'OKT

NO

URAIAN

51

52

53

54

55

56

57

1 M2 PEK. DINDING PARTISI TEAKWOOD RANGKAP


RANGKA KAYU KAMPER
0.020 M3
Kayu Kamper Balok 6/12
0.390 Lbr
Teak Wood 4 mm
0.100 Kg
Paku Lis
0.450 OH
Tukang Kayu
0.045 OH
Kepala Tukang Kayu
0.150 OH
Pekerja
0.075 OH
Mandor

1 M3 PEK. KUSEN PINTU DAN JENDELA JATI


1.100 M3
Kayu Jati Balok
1.250 Kg
Paku 10cm
1.000 Kg
Lem Kayu
21.000 OH
Tukang Kayu
2.100 OH
Kepala Tukang Kayu
7.000 OH
Pekerja
3.500 OH
Mandor

1 M3 PEK. KUSEN PINTU DAN JENDELA KAMPER


1.200 M3
Kayu Kamper Balok 6/12
1.250 Kg
Paku 10cm
1.000 Kg
Lem Kayu
18.000 OH
Tukang Kayu
1.800 OH
Kepala Tukang Kayu
6.000 OH
Pekerja
0.300 OH
Mandor

1 M2 DAUN JENDELA KACA 3 MM


0.024 M3
Kayu Kamper Papan 3/20
0.800 M2
Kaca Bening 3 mm
0.100 Kg
Paku Lis
2.400 OH
Tukang Kayu
0.240 OH
Kepala Tukang Kayu
0.800 OH
Pekerja
0.040 OH
Mandor
Kaca Bening 5 mm
Kaca Ray-Ban 5 mm
Kayu Jati Papan ,3 mm polos
Kayu Jati Papan ,5 mm polos
Kayu Jati Papan ,5 mm rayben
kayu meranti papan, 3 mm polos
1 M2 PEK. KACA 5 MM
1.100 M2
Kaca Bening 5 mm
0.150 OH
Tukang Kayu
0.015 OH
Kepala Tukang Kayu
0.015 OH
Pekerja
0.001 OH
Mandor

HARGA
SATUAN
Rp.
3

JUMLAH
HARGA
Rp.
6

8,566,800.00
80,300.00
25,800.00
74,900.00
79,800.00
43,800.00
73,000.00

33,705.00
3,591.00
6,570.00
5,475.00
49,341.00

167,052.60
31,317.00
2,580.00
200,949.60

167,052.60
31,317.00
2,580.00
33,705.00
3,591.00
6,570.00
5,475.00
250,290.60

10,708,500.00
23,200.00
11,300.00
74,900.00
79,800.00
43,800.00
73,000.00

1,572,900.00
167,580.00
306,600.00
255,500.00
2,302,580.00

11,779,350.00
29,000.00
11,300.00
11,819,650.00

11,779,350.00
29,000.00
11,300.00
1,572,900.00
167,580.00
306,600.00
255,500.00
14,122,230.00

8,566,800.00
23,200.00
11,300.00
74,900.00
79,800.00
43,800.00
73,000.00

1,348,200.00
143,640.00
262,800.00
21,900.00
1,776,540.00

10,280,160.00
29,000.00
11,300.00
10,320,460.00

10,280,160.00
29,000.00
11,300.00
1,348,200.00
143,640.00
262,800.00
21,900.00
12,097,000.00

10,024,900.00
80,300.00
25,800.00
74,900.00
79,800.00
43,800.00
73,000.00

179,760.00
19,152.00
35,040.00
2,920.00
236,872.00
236,872.00
236,872.00
236,872.00
236,872.00
236,872.00

240,597.60
64,240.00
2,580.00
307,417.60
320,217.60
337,337.60
375,224.80
388,024.80
405,144.80
66,820.00

240,597.60
64,240.00
2,580.00
179,760.00
19,152.00
35,040.00
2,920.00
544,289.60
557,089.60
574,209.60
612,096.80
624,896.80
642,016.80
303,692.00

11,235.00
1,197.00
657.00
54.75
13,143.75
13,143.75
13,143.75

105,930.00
105,930.00
88,330.00
129,470.00

105,930.00
11,235.00
1,197.00
657.00
54.75
119,073.75
101,473.75
142,613.75

224,700.00
23,940.00
43,800.00
3,650.00
296,090.00
296,090.00

514,008.00
5,650.00
519,658.00
400,996.00
-

514,008.00
5,650.00
224,700.00
23,940.00
43,800.00
3,650.00
815,748.00
697,086.00
296,090.00

96,300.00
117,700.00
80,300.00
96,300.00
117,700.00

96,300.00
74,900.00
79,800.00
43,800.00
73,000.00

Kaca Bening 3 mm
Kaca Ray-Ban 5 mm

80,300.00
117,700.00

1 M2 DAUN PINTU PANEL JATI


0.040 M3
Kayu Jati Papan
0.500 Kg
Lem Kayu
3.000 OH
Tukang Kayu
0.300 OH
Kepala Tukang Kayu
1.000 OH
Pekerja
0.050 OH
Mandor

12,850,200.00
11,300.00
74,900.00
79,800.00
43,800.00
73,000.00

Kayu Kamper Papan 3/20


kayu meranti papan
1 M2 DAUN PINTU DOUBLE PLYWOOD

JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5

10,024,900.00

Page 65

KET.

12,850,200

Analisa-7'OKT

NO

URAIAN

1
0.025
1.000
0.030
0.500
2.100
0.210
0.800
0.040

M3
Lbr
Kg
Kg
OH
OH
OH
OH

2
Kayu Kamper Papan 3/20
Plywood
Paku Lis
Lem kayu fox
Tukang Kayu
Kepala Tukang Kayu
Pekerja
Mandor
Teak Wood 4 mm

HARGA
SATUAN
Rp.
3
###
49,500.00
25,800.00
11,300.00
74,900.00
79,800.00
43,800.00
73,000.00
80,300.00

Page 66

JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
250,622.50
49,500.00
774.00
5,650.00
157,290.00
16,758.00
35,040.00
2,920.00
212,008.00
306,546.50
212,008.00
337,346.50

JUMLAH
HARGA
Rp.
6
250,622.50
49,500.00
774.00
5,650.00
157,290.00
16,758.00
35,040.00
2,920.00
518,554.50
549,354.50

KET.

549,433.44
30,878.94

Analisa-7'OKT

NO

URAIAN

58

1 M2 PEK.DAUN PINTU LAPIS ALUMINIUM


0.015 M3
Kayu Kamper Papan 3/20
0.625 Lbr
Teak Wood 4 mm
1.000 Lbr
Alumnium Kulit Jeruk
0.100 Kg
Paku Lis
3.000 OH
Tukang Kayu
0.300 OH
Kepala Tukang Kayu
1.250 OH
Pekerja
0.063 OH
Mandor
Plywood

59

1 M3 KUDA-KUDA KAYU KRUING


1.100 M3
Kayu Kruing Balok 8/12
15.000 Kg
Besi Strip
5.600 Kg
Paku Usuk
12.000 OH
Tukang Kayu
1.200 OH
Kepala Tukang Kayu
4.000 OH
Pekerja
0.200 OH
Mandor
Seseh Balok
Kayu Kamper Balok 8/12
Kayu Meranti Balok 8/12
Balok Bengkirai

60

1 M2 USUK + RENG KAMPER


0.008 M3
Kayu Kamper Usuk 5/7
0.004 M3
Kayu Kamper Reng
0.150 Kg
Paku Usuk
0.100 OH
Tukang Kayu
0.010 OH
Kepala Tukang Kayu
0.100 OH
Pekerja
0.005 OH
Mandor
Kayu Kruing Balok 8/12
Kayu Meranti Balok 6/12

61

62

63

64

1 M2 PEK. USUK EKPOSE + RENG KAMPER


0.012 M3
Kayu Kamper Usuk 5/7
0.006 M3
Kayu Kamper Reng
0.075 Kg
Paku Usuk
0.284 OH
Tukang Kayu
0.028 OH
Kepala Tukang Kayu
0.500 OH
Pekerja
0.025 OH
Mandor

1 M2 USUK GERANTANGAN
0.022 M3
Usuk Kruing 5/7
0.004 M3
Kayu Kamper Papan 3/20
0.200 Kg
Paku Usuk
0.230 OH
Tukang Kayu
0.023 OH
Kepala Tukang Kayu
0.230 OH
Pekerja
0.023 OH
Mandor

1 M2 PASANG USUK (KRUING)


0.011 M3
Usuk Kruing 5/7
0.100 Kg
Paku Usuk
0.057 OH
Tukang Kayu
0.003 OH
Kepala Tukang Kayu
0.057 OH
Pekerja
0.006 OH
Mandor

HARGA
SATUAN
Rp.
3

10,024,900.00
80,300.00
96,300.00
25,800.00
74,900.00
79,800.00
43,800.00
73,000.00

JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5

JUMLAH
HARGA
Rp.
6

224,700.00
23,940.00
54,750.00
4,599.00
307,989.00
307,989.00

150,373.50
50,187.50
96,300.00
2,580.00
299,441.00
280,191.00

150,373.50
50,187.50
96,300.00
2,580.00
224,700.00
23,940.00
54,750.00
4,599.00
607,430.00
588,180.00

898,800.00
95,760.00
175,200.00
14,600.00
1,184,360.00
1,184,360.00
1,184,360.00
1,184,360.00
1,184,360.00

7,362,080.00
321,000.00
129,920.00
7,813,000.00
3,866,860.00
9,874,400.00
6,046,070.00
11,641,220.00

7,362,080.00
321,000.00
129,920.00
898,800.00
95,760.00
175,200.00
14,600.00
8,997,360.00
5,051,220.00
11,058,760.00
7,230,430.00
12,825,580.00

7,490.00
798.00
4,380.00
365.00
13,033.00
13,033.00
13,033.00

66,392.00
38,550.40
3,480.00
108,422.40
95,572.80
82,722.40

66,392.00
38,550.40
3,480.00
7,490.00
798.00
4,380.00
365.00
121,455.40
108,605.80
95,755.40

8,299,000.00
9,637,600.00
23,200.00
74,900.00
79,800.00
43,800.00
73,000.00

21,271.60
2,234.40
21,900.00
1,825.00
47,231.00

99,588.00
57,825.60
1,740.00
159,153.60

99,588.00
57,825.60
1,740.00
21,271.60
2,234.40
21,900.00
1,825.00
206,384.60

6,157,300.00
10,024,900.00
23,200.00
74,900.00
79,800.00
43,800.00
73,000.00

17,227.00
1,835.40
10,074.00
1,679.00
30,815.40

135,460.60
40,099.60
4,640.00
180,200.20

135,460.60
40,099.60
4,640.00
17,227.00
1,835.40
10,074.00
1,679.00
211,015.60

6,157,300.00
23,200.00
74,900.00
79,800.00
43,800.00
73,000.00

4,269.30
239.40
2,496.60
438.00
7,443.30

67,730.30
2,320.00
70,050.30

67,730.30
2,320.00
4,269.30
239.40
2,496.60
438.00
77,493.60

49,500.00

6,692,800.00
21,400.00
23,200.00
74,900.00
79,800.00
43,800.00
73,000.00
3,105,400.00
8,566,800.00
5,086,500.00
###

8,299,000.00
9,637,600.00
23,200.00
74,900.00
79,800.00
43,800.00
73,000.00
6,692,800.00
5,086,500.00

KET.

12,714,220.00
(111,360.00)

1 M2 PASANG RENG (KAMPER)


Page 67

Analisa-7'OKT

NO

URAIAN

1
0.008
0.150
0.043
0.002
0.043
0.004

M3
Kg
OH
OH
OH
OH

2
Kayu Kamper Reng
Paku Reng
Pekerja
Mandor
Tukang Kayu
Kepala Tukang Kayu

HARGA
SATUAN
Rp.
3
9,637,600.00
22,400.00
43,800.00
73,000.00
74,900.00
79,800.00

Page 68

JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
77,100.80
3,360.00
1,883.40
146.00
3,220.70
319.20
5,569.30
80,460.80

JUMLAH
HARGA
Rp.
6
77,100.80
3,360.00
1,883.40
146.00
3,220.70
319.20
86,030.10

KET.

Analisa-7'OKT

NO

URAIAN

PEKERJAAN BESI DAN ALUMUNIUM


1 1 M2 PEK. KAP BAJA RINGAN BENTANG < 5 M'
1.120 M'
UK. 75. 0,85
2.210 M'
UK. 75. 0,53
6.600 M'
GD.B. 0,43
1.000 M2
Plat - Plat Penyambung
1.000 M2
Ongkos Pasang

65

66

67

68

1 M' PEK. LISTPLANK ( 3/20 ) KAMPER


0.011 M3
Kayu Kamper Papan 3/20
0.100 Kg
Paku Reng
0.200 OH
Tukang Kayu
0.020 OH
Kepala Tukang Kayu
0.100 OH
Pekerja
0.005 OH
Mandor

10,024,900.00
22,400.00
74,900.00
79,800.00
43,800.00
73,000.00

33,600.00
55,250.00
99,000.00
15,000.00

JUMLAH
HARGA
Rp.
6

25,000.00
25,000.00

202,850.00

33,600.00
55,250.00
99,000.00
15,000.00
25,000.00
227,850.00

14,980.00
1,596.00
4,380.00
365.00
21,321.00
21,321.00
21,321.00

108,268.92
2,240.00
110,508.92
80,304.56
68,738.84

108,268.92
2,240.00
14,980.00
1,596.00
4,380.00
365.00
131,829.92
101,625.56
90,059.84

7,228,200.00
6,157,300.00

1 M2 PEK. PAPAN TALANG


0.025 M3
Kayu Kruing Papan
0.200 Kg
Paku Usuk
0.800 OH
Tukang Kayu
0.080 OH
Kepala Tukang Kayu
0.250 OH
Pekerja
0.014 OH
Mandor

7,228,200.00
23,200.00
74,900.00
79,800.00
43,800.00
73,000.00

59,920.00
6,384.00
10,950.00
1,022.00
78,276.00
Untuk 0,5 M2 = 1 M'

180,705.00
4,640.00
185,345.00

180,705.00
4,640.00
59,920.00
6,384.00
10,950.00
1,022.00
263,621.00
131,810.50

10 M' PEK. SENG TALANG


5.500 m
Seng Talang 30 cm
8.000 OH
Tukang Kayu
0.800 OH
Kepala Tukang Kayu
5.000 OH
Pekerja
0.500 OH
Mandor

19,800.00
74,900.00
79,800.00
43,800.00
73,000.00

599,200.00
63,840.00
219,000.00
36,500.00
918,540.00
Untuk 1 M' = 0,5 M2

108,900.00
108,900.00

108,900.00
599,200.00
63,840.00
219,000.00
36,500.00
1,027,440.00
102,744.00

1 M2 GENTENG PRES
25.000 Bj
Genteng Kodok
0.075 OH
Tukang Kayu
0.008 OH
Kepala Tukang Kayu
0.150 OH
Pekerja
0.008 OH
Mandor

3,200.00
74,900.00
79,800.00
43,800.00
73,000.00

5,617.50
638.40
6,570.00
584.00
13,409.90
13,409.90
13,409.90
13,409.90

80,000.00
80,000.00
47,500.00
52,500.00
57,500.00

80,000.00
5,617.50
638.40
6,570.00
584.00
93,409.90
60,909.90
65,909.90
70,909.90

6,400.00
12,100.00
7,400.00

14,980.00
1,596.00
17,520.00
146.00
34,242.00
34,242.00
34,242.00
34,242.00

38,000.00
10,288.00
5,705.60
53,993.60
47,993.60
76,493.60
52,993.60

38,000.00
10,288.00
5,705.60
14,980.00
1,596.00
17,520.00
146.00
88,235.60
82,235.60
110,735.60
87,235.60

37,400.00
26,200.00
74,900.00
79,800.00

4,494.00
478.80

26,180.00
524.00
-

26,180.00
524.00
4,494.00
478.80

1 M' PASANG GENTENG BUBUNGAN


5.000 Bj
Bubungan Genteng Biasa
0.160 Zak
Semen Gresik ( 50 kg )
0.032 M3
Pasir Pasang
0.200 OH
Tukang Kayu
0.020 OH
Kepala Tukang Kayu
0.400 OH
Pekerja
0.002 OH
Mandor
Bubungan Genteng Plentong
Bubungan Genteng Kodok
Bubungan Karang Pilang

70

30,000.00
25,000.00
15,000.00
15,000.00
25,000.00

JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5

Kayu Kruing Papan


Kayu Meranti Papan

Genteng Plentong
Genteng Biasa
Genteng Karang Pilang
69

HARGA
SATUAN
Rp.
3

1 M2 PASANG SENG GELOMBANG


0.700 Lbr
BJLS 0,18 mm
0.020 Kg
Paku Seng
0.060 OH
Tukang Kayu
0.006 OH
Kepala Tukang Kayu

1,900.00
2,100.00
2,300.00

7,600.00
64,300.00
178,300.00
74,900.00
79,800.00
43,800.00
73,000.00

Page 69

KET.

Analisa-7'OKT

NO

URAIAN

1
0.120 OH
0.006 OH

2
Pekerja
Mandor
Asbes Gel. 1,8 m' x 1,05 m'/4 mm

71

10 M BUBUNGAN ATAP SENG


6.000 m
Seng Talang 30 cm
12.000 Ktk
Paku Sekrup 1/2"
0.250 OH
Tukang Besi
0.025 OH
Kepala Tukang Besi
0.250 OH
Pekerja

HARGA
SATUAN
Rp.
3
43,800.00
73,000.00
32,800.00

19,800.00
16,000.00
66,100.00
74,900.00
43,800.00
Untuk 1 M'

Page 70

JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
5,256.00
438.00
10,666.80
26,704.00
10,666.80
23,484.00

16,525.00
1,872.50
10,950.00
29,347.50
2,934.75

118,800.00
192,000.00
310,800.00
31,080.00

JUMLAH
HARGA
Rp.
6
5,256.00
438.00
37,370.80
34,150.80

KET.

118,800.00
192,000.00
16,525.00
1,872.50
10,950.00
340,147.50
34,014.75

Analisa-7'OKT

NO
1
72

73

74

75

76

77

URAIAN
2
1 M2 PASANGAN ATAP SENG LAMA
0.750 Lbr
BJLS 0,18 mm
0.040 Kg
Paku Seng
0.200 OH
Tukang Kayu
0.020 OH
Kepala Tukang Kayu
0.100 OH
Pekerja
0.005 OH
Mandor

JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5

JUMLAH
HARGA
Rp.
6

37,400.00
26,200.00
74,900.00
79,800.00
43,800.00
73,000.00

14,980.00
1,596.00
4,380.00
365.00
21,321.00

28,050.00
1,048.00
29,098.00

28,050.00
1,048.00
14,980.00
1,596.00
4,380.00
365.00
50,419.00

112,200.00
23,200.00
74,900.00
79,800.00
43,800.00
73,000.00

8,988.00
957.60
5,256.00
438.00
15,639.60

112,200.00
4,640.00
116,840.00

112,200.00
4,640.00
8,988.00
957.60
5,256.00
438.00
132,479.60

1 M2 PEK. MENGECAT TEMBOK


1X PLAMIR, 1X CAT DASAR, 2X CAT PENUTUP
0.100 Kg
Cat Dasar Tembok
0.260 Kg
Vinilek
0.100 Kg
Plamir Tembok
0.063 OH
Tukang Cat
0.006 OH
Kepala Tukang Cat
0.020 OH
Pekerja
0.003 OH
Mandor

18,200.00
13,600.00
16,000.00
56,400.00
63,200.00
43,800.00
73,000.00

3,553.20
398.16
876.00
182.50
5,009.86

1,820.00
3,536.00
1,600.00
6,956.00

1,820.00
3,536.00
1,600.00
3,553.20
398.16
876.00
182.50
11,965.86

1 M2 PEK. CAT TEMBOK LAMA


1X CAT DASAR, 2X CAT PENUTUP
0.120 Kg
Cat Dasar Tembok
0.180 Kg
Vinilek
0.042 OH
Tukang Cat
0.004 OH
Kepala Tukang Cat
0.028 OH
Pekerja
0.003 OH
Mandor

18,200.00
13,600.00
56,400.00
63,200.00
43,800.00
73,000.00

2,368.80
265.44
1,226.40
182.50
4,043.14

2,184.00
2,448.00
4,632.00

2,184.00
2,448.00
2,368.80
265.44
1,226.40
182.50
8,675.14

1 M2 PEKERJAAN CAT MENI


0.120 Kg
Meni Kayu
0.050 Ltr
Minyak Cat
0.075 OH
Tukang Cat
0.008 OH
Kepala Tukang Cat
0.050 OH
Pekerja
0.003 OH
Mandor

24,600.00
18,800.00
56,400.00
63,200.00
43,800.00
73,000.00

4,230.00
505.60
2,190.00
219.00
7,144.60

2,952.00
940.00
3,892.00

2,952.00
940.00
4,230.00
505.60
2,190.00
219.00
11,036.60

1 M2 PEK. CAT KAYU ULANG


0.189 Kg
Cat Kayu
0.150 OH
Tukang Cat
0.015 OH
Kepala Tukang Cat
0.100 OH
Pekerja
0.005 OH
Mandor

53,500.00
56,400.00
63,200.00
43,800.00
73,000.00

8,460.00
948.00
4,380.00
365.00
14,153.00

10,111.50
10,111.50

10,111.50
8,460.00
948.00
4,380.00
365.00
24,264.50

53,500.00
18,800.00
56,400.00
63,200.00
43,800.00
73,000.00

1,692.00
189.60
6,570.00
219.00
8,670.60

15,194.00
1,334.80
16,528.80

15,194.00
1,334.80
1,692.00
189.60
6,570.00
219.00
25,199.40

24,600.00
26,200.00
48,100.00

4,920.00
3,930.00
8,177.00

4,920.00
3,930.00
8,177.00

1 M2 PAS. ATAP SIRAP


1.000 Ikat
Sirap
0.200 Kg
Paku Usuk
0.120 OH
Tukang Kayu
0.012 OH
Kepala Tukang Kayu
0.120 OH
Pekerja
0.006 OH
Mandor

78 1 M2 PENGECATAN KANSTIN
0.284 Kg Cat Kayu
0.071 Kg Minyak cat
0.030 OH Tukang cat
0.003 OH Kepala tukang cat
0.150 OH Pekerja
0.003 OH Mandor

79

HARGA
SATUAN
Rp.
3

1 M2 PEK. MENGECAT KAYU


1X PLAMIR, 1X CAT DASAR, 2X CAT PENUTUP
0.200 Kg
Meni Kayu
0.150 Kg
Dempul
0.170 Kg
Cat Dasar Kayu

Page 71

KET.

Analisa-7'OKT

NO

URAIAN

1
0.260
0.009
0.006
0.070
0.003

80

Kg
OH
OH
OH
OH

2
Cat Kayu
Tukang Cat
Kepala Tukang Cat
Pekerja
Mandor

1 M2 PEKERJAAN POLITUR
0.150 Ltr
Politur
0.372 Ltr
Politur jadi ( Ultran )
2.000 Lbr
Amplas
0.060 OH
Tukang Cat
0.016 OH
Kepala Tukang Cat
0.008 OH
Mandor

HARGA
SATUAN
Rp.
3
53,500.00
56,400.00
63,200.00
43,800.00
73,000.00

43,500.00
51,700.00
3,200.00
56,400.00
63,200.00
73,000.00

Page 72

JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
13,910.00
507.60
379.20
3,066.00
182.50
4,135.30
30,937.00

3,384.00
1,011.20
547.50
4,942.70

6,525.00
19,232.40
6,400.00
32,157.40

JUMLAH
HARGA
Rp.
6
13,910.00
507.60
379.20
3,066.00
182.50
35,072.30

KET.

6,525.00
19,232.40
6,400.00
3,384.00
1,011.20
547.50
37,100.10

Analisa-7'OKT

NO

URAIAN

HARGA
SATUAN
Rp.
3

81

1 M' PEMBUATAN SALURAN TERTUTUP


0.260 M3
Galian tanah
0.130 M3
Pas. Batu bata 1 : 5
0.850 M2
Plesteran 1 : 2
0.041 M3
Beton bertulang Fe.80

42,705.00
105,565.98
57,188.85
2,913,836.96

82

83

84

85

86

1 M' SALURAN / GOT


0.150 M3
Galian tanah
0.105 M3
Bata merah 1:5
0.800 M2
Plesteran 1:2
1.000 Btg
Besi Siku 50/50 x 5

42,705.00
105,565.98
57,188.85
75,000.00

88

89

11,103.30
2,872.22
29,617.40
34,401.66
77,994.58

10,851.36
18,993.12
85,161.43
115,005.91

11,103.30
13,723.58
48,610.52
119,467.32
192,904.72

6,405.75
2,319.87
27,875.20
36,600.82

8,764.56
17,875.88
75,000.00
101,640.44

6,405.75
11,084.43
45,751.08
75,000.00
138,241.26

55,000.00
56,400.00

56,400.00
56,400.00

55,000.00
55,000.00

55,000.00
56,400.00
111,400.00

BIAYA MENGGILAS PERBULAN


30.000 OH
Masinis
30.000 OH
Kernet
30.000 Ltr
Oli
600.000 Ltr
Solar
30.000 Hari
Sewa Wales

116,800.00
116,800.00
27,500.00
4,300.00
120,000.00

3,504,000.00
3,504,000.00
3,600,000.00
10,608,000.00

825,000.00
2,580,000.00
3,405,000.00

3,504,000.00
3,504,000.00
825,000.00
2,580,000.00
3,600,000.00
14,013,000.00

1 M2 MENYIAPKAN SUB GRADE


0.0003 OH
Pekerja
0.0002 OH
Mandor
0.0002
Biaya menggilas sebulan

43,800.00
73,000.00
14,013,000.00

13.14
14.60
2,121.60
2,149.34

681.00
681.00

13.14
14.60
2,802.60
2,830.34

1 M3 TIMBUNAN SIRTU
1.200 M3
Pasir Batu (Sirtu)
0.250 OH
Pekerja
0.025 OH
Mandor
0.001
Biaya menggilas sebulan

235,500.00
43,800.00
73,000.00
14,013,000.00

10,950.00
1,825.00
10,608.00
23,383.00
4,676.60
2,338.30
1,169.15

282,600.00
3,405.00
286,005.00
57,201.00
28,600.50
14,300.25

282,600.00
10,950.00
1,825.00
14,013.00
309,388.00
61,877.60
30,938.80
15,469.40

262,500.00
43,800.00
73,000.00
14,013,000.00

20,542.20
1,679.00
3,182.40
25,403.60

43,312.50
1,021.50
44,334.00

43,312.50
20,542.20
1,679.00
4,203.90
69,737.60

171,300.00
42,705.00
15,184.00

1,110.33
151.84
1,262.17

6,509.40
6,509.40

6,509.40
1,110.33
151.84
7,771.57

274,700.00
43,800.00
73,000.00
14,013,000.00

229,950.00
19,199.00
378,351.00
627,500.00
6,275.00

1,922,900.00
1,922,900.00
19,229.00

1,922,900.00
229,950.00
19,199.00
378,351.00
2,550,400.00
25,504.00

850,000.00

850,000.00

1 M2 PASANGAN GLADAK (BATU PECAH 10/15)


0.165 M3
Batu Pecah 10/15
0.469 OH
Pekerja
0.023 OH
Mandor
0.0003
Biaya menggilas sebulan

1 M' PAS. BATU KANCING 15/20 CM


0.038 M3
Batu Pasang
0.026 M3
Galian tanah
0.010 M3
Buangan tanah

100 M2 MENGHAMPAR BATU PECAH 5/7 CM


DIATAS LPB GLADAK BATU PECAH
7.000 M3
Batu Pecah 5 - 7 cm
5.250 OH
Pekerja
0.263 OH
Mandor
0.027
Biaya menggilas sebulan

1 M2 ...........
90

JUMLAH
HARGA
Rp.
6

1 M2 PEK. WATER PROFING


1.000 Ltr
Waterproff
1.000 Ls
Ongkos Kerja

1 M2 Timbunan Sirtu tebal 20 Cm


1 M2 Timbunan Sirtu tebal 10 Cm
1 M2 Timbunan Sirtu tebal 5 Cm
87

JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5

100 M2 MENGHAMPAR LAPEN BATU PECAH


2/3 CM + 3/4 CM + ASPAL
4.000 M3
Batu Pecah 3 - 5 cm

212,500.00
Page 73

KET.

187,308.71
(5,596.01)

135,860.73
(2,380.53)

Analisa-7'OKT

NO

URAIAN

1
3.000
75.000
5.383
0.150
7.000
0.350
0.027

M3
Kg
Ltr
OH
OH
OH

2
Batu Pecah 2 - 3 cm
Aspal
Solar
Tukang masak aspal
Pekerja
Mandor
Biaya menggilas sebulan

HARGA
SATUAN
Rp.
3
205,100.00
11,200.00
4,300.00
77,800.00
43,800.00
73,000.00
14,013,000.00
1 M2 ...........

Page 74

JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
615,300.00
840,000.00
23,145.83
11,670.00
306,600.00
25,550.00
378,351.00
722,171.00
2,328,445.83
7,221.71
23,284.46

JUMLAH
HARGA
Rp.
6
615,300.00
840,000.00
23,145.83
11,670.00
306,600.00
25,550.00
378,351.00
3,050,616.83
30,506.17

KET.

Analisa-7'OKT

NO
1
91

URAIAN
2
100 M2 MENGASPAL 200 KG
200.000 Kg
Aspal
1.200 M3
Batu Seplit Halus ( 0,5 - 1 ) cm / Penutup
14.354 Ltr
Solar
0.400 OH
Tukang masak aspal
9.000 OH
Pekerja
0.450 OH
Mandor
0.013
Biaya menggilas sebulan

HARGA
SATUAN
Rp.
3
11,200.00
262,300.00
4,300.00
77,800.00
43,800.00
73,000.00
14,013,000.00
1 M2 ...........

92

100 M2 MENGASPAL 125 KG


125.000 Kg
Aspal
1.200 M3
Batu Seplit Jagung ( 1 - 2 ) cm/ Kasar
8.971 Ltr
Solar
0.250 OH
Tukang masak aspal
7.500 OH
Pekerja
0.375 OH
Mandor
0.400 Bh
Sikat Ijuk
0.040 Bh
Sikat Baja
0.013
Biaya menggilas sebulan

11,200.00
240,900.00
4,300.00
77,800.00
43,800.00
73,000.00
6,000.00
11,700.00
14,013,000.00
1 M2 ...........

1 M2 PEKERJAAN LAPEN 88+89+90

93

100 M2 MENGHAMPAR LAPEN BATU PECAH


2/3 CM + 3/4 CM + ASPAL
3.000 M3
Batu Pecah 2 - 3 cm
1.200 M3
Batu Seplit Jagung ( 1 - 2 ) cm/ Kasar
125.000 Kg
Aspal
8.971 Ltr
Solar
0.250 OH
Tukang masak aspal
7.500 OH
Pekerja
0.375 OH
Mandor
0.400 Bh
Sikat Ijuk
0.040 Bh
Sikat Baja
0.013
Biaya menggilas sebulan

205,100.00
240,900.00
11,200.00
4,300.00
77,800.00
43,800.00
73,000.00
6,000.00
11,700.00
14,013,000.00
1 M2 ...........

94

100 M2 MENGASPAL 175 KG


175.000 Kg
Aspal
1.200 M3
Batu Seplit Halus ( 0,5 - 1 ) cm / Penutup
12.560 Ltr
Solar
0.400 OH
Tukang masak aspal
9.000 OH
Pekerja
0.450 OH
Mandor
0.013
Biaya menggilas sebulan

11,200.00
262,300.00
4,300.00
77,800.00
43,800.00
73,000.00
14,013,000.00
1 M2 ...........

1 M2 PEKERJAAN BURDA 91+92


95 100 M2 MENGASPAL 100 KG
100.000 Kg
Aspal
1.200 M3
Batu Seplit Jagung ( 1 - 2 ) cm/ Kasar
7.177 Ltr
Solar
0.250 OH
Tukang masak aspal
6.000 OH
Pekerja
0.350 OH
Mandor
0.013
Biaya menggilas sebulan

11,200.00
240,900.00
4,300.00
77,800.00
43,800.00
73,000.00
14,013,000.00
1 M2 ...........

96

100 M2 MENGASPAL 100 KG


100.000 Kg
Aspal

11,200.00
Page 75

JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5

JUMLAH
HARGA
Rp.
6

31,120.00
394,200.00
32,850.00
182,169.00
640,339.00
6,403.39

2,240,000.00
314,760.00
61,722.20
2,616,482.20
26,164.82

2,240,000.00
314,760.00
61,722.20
31,120.00
394,200.00
32,850.00
182,169.00
3,256,821.20
32,568.21

19,450.00
328,500.00
27,375.00
182,169.00
557,494.00
5,574.94

1,400,000.00
289,080.00
38,576.38
2,400.00
468.00
1,730,524.38
17,305.24

1,400,000.00
289,080.00
38,576.38
19,450.00
328,500.00
27,375.00
2,400.00
468.00
182,169.00
2,288,018.38
22,880.18

19,200.04

66,754.52

85,954.56

19,450.00
328,500.00
27,375.00
182,169.00
557,494.00
5,574.94

615,300.00
289,080.00
1,400,000.00
38,576.38
2,400.00
468.00
2,345,824.38
23,458.24

615,300.00
289,080.00
1,400,000.00
38,576.38
19,450.00
328,500.00
27,375.00
2,400.00
468.00
182,169.00
2,903,318.38
29,033.18

31,120.00
394,200.00
32,850.00
182,169.00
640,339.00
6,403.39

1,960,000.00
314,760.00
54,006.93
2,328,766.93
23,287.67

1,960,000.00
314,760.00
54,006.93
31,120.00
394,200.00
32,850.00
182,169.00
2,969,105.93
29,691.06

11,978.33

46,745.91

58,724.24

19,450.00
262,800.00
25,550.00
182,169.00
489,969.00
4,899.69

1,120,000.00
289,080.00
30,861.10
1,439,941.10
14,399.41

1,120,000.00
289,080.00
30,861.10
19,450.00
262,800.00
25,550.00
182,169.00
1,929,910.10
19,299.10

1,120,000.00

1,120,000.00

KET.

Analisa-7'OKT

NO

URAIAN

1
1.200
7.177
0.250
6.000
0.350
0.300
0.030
0.012

M3
Ltr
OH
OH
OH
Bh
Bh

2
Batu Seplit Jagung ( 1 - 2 ) cm/ Kasar
Solar
Tukang masak aspal
Pekerja
Mandor
Sikat Ijuk
Sikat Baja
Biaya menggilas sebulan

HARGA
SATUAN
Rp.
3
240,900.00
4,300.00
77,800.00
43,800.00
73,000.00
6,000.00
11,700.00
14,013,000.00
1 M2 ...........

JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
289,080.00
30,861.10
19,450.00
262,800.00
25,550.00
1,800.00
351.00
168,156.00
475,956.00
1,442,092.10
4,759.56
14,420.92
9,659.25

1 M2 PEKERJAAN BURTU 93+94

Page 76

28,820.33

JUMLAH
HARGA
Rp.
6
289,080.00
30,861.10
19,450.00
262,800.00
25,550.00
1,800.00
351.00
168,156.00
1,918,048.10
19,180.48

KET.

38,479.58

Analisa-7'OKT

NO

URAIAN

97

HARGA
SATUAN
Rp.
3

100 M2 MENGASPAL 120.8 KG


120.800 Kg
Aspal
1.200 M3
Batu Seplit Halus ( 0,5 - 1 ) cm / Penutup
8.670 Ltr
Solar
2.000 OH
Tukang masak aspal
2.000 OH
Pekerja
1.000 OH
Mandor
0.013
Biaya menggilas sebulan

11,200.00
262,300.00
4,300.00
77,800.00
43,800.00
73,000.00
14,013,000.00

Pipa Diameter
Pipa Diameter
Pipa Diameter
Pipa Diameter
Pipa Diameter
Pipa Diameter
Pipa Diameter

0,75 ..
1" ..
1,5" ..
2" ..
2,5" ..
3" ..
4" ..

99 1 M' PAS. PIPA GALVANIS


1.200 M'
0,5"
0.350 harga PVC ( perlengkapan )
0.090 OH
Tukang Batu
0.009 OH
Kepala Tukang Batu
0.054 OH
Pekerja
0.027 OH
Mandor
Pipa Diameter
Pipa Diameter
Pipa Diameter
Pipa Diameter
Pipa Diameter

0,75 ..
1" ..
1,25" ..
1,5" ..
2"
..

100 3 M3 BRONJONG KAWAT 4 MM UNTUK DIISI BATU KALI


45.000 Kg
Kawat 4 mm
3.000 M3
Batu Pasang
2.200 OH
Tukang Besi
Penganyam
1.800 OH
Pekerja
Penganyam
0.080 OH
Mandor
4.500 OH
Pekerja
0.750 OH
Mandor

1,352,960.00
314,760.00
37,280.21
155,600.00
87,600.00
73,000.00
182,169.00
2,203,369.21
22,033.69

4,983.69

17,050.00

22,033.69

4,260.00
455.40
1,576.80
116.80
6,409.00
6,409.00
6,409.00
6,409.00
6,409.00
6,409.00
6,409.00
6,409.00

5,960.00
1,738.33
7,698.33
8,525.00
10,255.83
18,755.00
27,822.50
39,034.17
54,069.17
76,725.00

5,960.00
1,738.33
4,260.00
455.40
1,576.80
116.80
14,107.33
14,934.00
16,664.83
25,164.00
34,231.50
45,443.17
60,478.17
83,134.00

(1,129.91)
(1,251.25)
(1,505.29)
(2,752.75)
(4,083.62)
(5,729.21)
(7,935.96)
(11,261.25)

6,390.00
683.10
2,365.20
1,971.00
11,409.30
11,409.30
11,409.30
11,409.30
11,409.30
11,409.30

26,400.00
7,700.00
34,100.00
51,356.67
42,857.50
93,775.00
111,522.50
94,808.33

26,400.00
7,700.00
6,390.00
683.10
2,365.20
1,971.00
45,509.30
62,765.97
54,266.80
105,184.30
122,931.80
106,217.63

(5,005.00)
(7,537.84)
(6,290.37)
(49,956.17)
(16,368.62)
(13,915.41)

12,800.00
171,300.00
66,100.00
43,800.00
73,000.00
43,800.00
73,000.00

145,420.00
78,840.00
5,840.00
197,100.00
54,750.00
481,950.00
160,650.00

576,000.00
513,900.00
1,089,900.00
363,300.00

576,000.00
513,900.00
145,420.00
78,840.00
5,840.00
197,100.00
54,750.00
1,571,850.00
523,950.00

8,500.00
43,800.00
73,000.00

438.00
438.00
876.00

2,975.00
2,975.00

2,975.00
438.00
438.00
3,851.00

660.00
75,000.00
43,800.00
73,000.00

131,400.00
730.00
132,130.00

660.00
75,000.00
75,660.00

660.00
75,000.00
131,400.00
730.00
207,790.00

4,966.67
4,966.67
71,000.00
75,900.00
43,800.00
73,000.00
5,500.00
6,616.67
12,100.00
17,950.00
25,183.33
34,883.33
49,500.00

22,000.00
22,000.00
71,000.00
75,900.00
43,800.00
73,000.00
33,133.33
27,650.00
60,500.00
71,950.00
61,166.67

1 M3 PEKERJAAN BRONJONG .....................


101

1 M2 CAT RESIDU/TEER
0.350 Ltr
Residu / Teer
0.010 OH
Pekerja
0.006 OH
Mandor

102 1 M3 Pek. Pracetak beton, Pengangkutan dan Pemasangan


1.000 Ls Alat Pracetak Beton
1.000 Ls Biaya Pengangkutan
3.000 OH Pekerja
0.010 OH Mandor

KET.

1,352,960.00
314,760.00
37,280.21
1,705,000.21
17,050.00

1 M2 PEKERJAAN BURAS 95
1 M' PAS. PIPA PVC TIPE AW
1.200 M'
0,5"
0.350 harga PVC ( perlengkapan )
0.060 OH
Tukang Batu
0.006 OH
Kepala Tukang Batu
0.036 OH
Pekerja
0.002 OH
Mandor

JUMLAH
HARGA
Rp.
6

155,600.00
87,600.00
73,000.00
182,169.00
498,369.00
4,983.69

1 M2 ...........

98

JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5

Page 77

Analisa-7'OKT

NO

URAIAN

HARGA
SATUAN
Rp.
3

JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5

JUMLAH
HARGA
Rp.
6

KET.

Singaraja, April 2013


Kepala Bidang Cipta Karya
Dinas Pekerjaan Umum
Kabupaten Buleleng,

NI NYOMAN SURATTINI, ST
NIP. 19670102 199803 2 003

Page 78

Analisa-7'OKT

DAFTAR ANALISA
DINAS PEKERJAAN UMUM KABUPATEN BULELENG
TAHUN ANGGARAN

: 2013

NO

URAIAN

HARGA
SATUAN
Rp.
3

43,800.00
73,000.00

292,014.60
24,309.00
316,323.60

292,014.60
24,309.00
316,323.60

10 M2 MEMBONGKAR USUK/RENG
0.250 OH
Tukang Kayu
0.025 OH
Kepala Tukang Kayu

74,900.00
79,800.00

18,725.00
1,995.00
20,720.00
2,072.00

18,725.00
1,995.00
20,720.00
2,072.00

21,900.00
1,825.00
23,725.00
2,372.50

21,900.00
1,825.00
23,725.00
2,372.50

10 M2 MENGUPAS PLESTERAN
0.500 OH
Pekerja
0.025 OH
Mandor

43,800.00
73,000.00
Untuk 1 M2

1 M3 MEMBONGKAR TEMBOK
6.667 OH
Pekerja
0.033 OH
Mandor

43,800.00
73,000.00

292,014.60
2,409.00
294,423.60

292,014.60
2,409.00
294,423.60

10 M2 MEMBONGKAR LANTAI
2.000 OH
Pekerja
0.100 OH
Mandor

43,800.00
73,000.00

87,600.00
7,300.00
94,900.00
9,490.00

87,600.00
7,300.00
94,900.00
9,490.00

35,500.00
43,800.00
79,300.00
7,930.00

35,500.00
43,800.00
79,300.00
7,930.00

33,050.00
43,800.00
76,850.00
7,685.00

33,050.00
43,800.00
76,850.00
7,685.00

5,354,200.00
6,157,300.00
23,200.00
74,900.00
79,800.00
43,800.00
73,000.00

7,490.00
798.00
4,380.00
365.00
13,033.00

64,250.40
43,101.10
464.00
107,815.50

64,250.40
43,101.10
464.00
7,490.00
798.00
4,380.00
365.00
120,848.50

43,800.00
73,000.00

23,038.80
3,796.00
26,834.80
134,174.00

23,038.80
3,796.00
26,834.80
134,174.00

43,800.00

76,650.00

76,650.00

Untuk 1 M2
6

10 M2 MENURUNKAN ATAP GENTENG


0.500 OH
Tukang Batu
1.000 OH
Pekerja

71,000.00
43,800.00
Untuk 1 M2

10 M2 MENURUNKAN ATAP SENG


0.500 OH
Tukang Besi
1.000 OH
Pekerja

66,100.00
43,800.00
Untuk 1 M2

1 M' PENGUKURAN & PASANG PAPAN BOUWPLANK


0.012 M3
Usuk Meranti 5/7
0.007 M3
Kayu Meranti Papan
0.020 Kg
Paku Usuk
0.100 OH
Tukang Kayu
0.010 OH
Kepala Tukang Kayu
0.100 OH
Pekerja
0.005 OH
Mandor

1 M3 GALIAN TANAH SEDALAM 2 METER


0.526 OH
Pekerja
0.052 OH
Mandor
1M3 GALIAN TANAH BIASA DLM TEROWONGAN (5X)

10

JUMLAH
HARGA
Rp.
6

1 M3 BONGKARAN BETON BERTULANG


6.667 OH
Pekerja
0.333 OH
Mandor

Untuk 1 M2
3

JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5

1 M3 GALIAN TANAH LUMPUR/SEDIMEN


SALURAN TERTUTUP
1.750 OH
Pekerja
Page 79

Analisa-13

2
Mandor

HARGA
SATUAN
Rp.
3
73,000.00

SALURAN TERBUKA
1.450 OH
Pekerja
0.025 OH
Mandor

43,800.00
73,000.00

NO

URAIAN

1
0.025 OH

Page 80

JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
1,825.00
78,475.00

JUMLAH
HARGA
Rp.
6
1,825.00
78,475.00

63,510.00
1,825.00
65,335.00

63,510.00
1,825.00
65,335.00

Analisa-13

HARGA
SATUAN
Rp.
3

JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5

JUMLAH
HARGA
Rp.
6

NO

URAIAN

11

1 M3 GALIAN TANAH LUMPUR SEDALAM 1 M


0.823 OH
Pekerja
0.083 OH
Mandor

43,800.00
73,000.00

36,047.40
6,059.00
42,106.40

36,047.40
6,059.00
42,106.40

1 M3 GALIAN TANAH KERAS SEDALAM 1 METER


0.625 OH
Pekerja
0.062 OH
Mandor

43,800.00
73,000.00

27,375.00
4,526.00
31,901.00
127,177.50

27,375.00
4,526.00
31,901.00
127,177.50

43,800.00
73,000.00

65,700.00
3,650.00
69,350.00

65,700.00
3,650.00
69,350.00

105,100.00
43,800.00
73,000.00
20,000.00

21,900.00
3,650.00
20,000.00
45,550.00

126,120.00
126,120.00

126,120.00
21,900.00
3,650.00
20,000.00
171,670.00

1 M3 URUGAN KEMBALI
0.192 OH
Pekerja
0.019 OH
Mandor

43,800.00
73,000.00

8,409.60
1,387.00
9,796.60

8,409.60
1,387.00
9,796.60

1 M3 MEMBUANG SISA GALIAN / LUMPUR /


SAMPAH KELUAR LOKASI SEJAUH 30 M'
0.330 OH
Pekerja
0.010 OH
Mandor

43,800.00
73,000.00

14,454.00
730.00
15,184.00

14,454.00
730.00
15,184.00

1 M3 MEMBUANG SISA GALIAN / LUMPUR /


SAMPAH KELUAR LOKASI DENGAN KENDARAAN
SEJAUH 30 M' S/D 100 M'
0.330 OH
Pekerja
0.010 OH
Mandor
1.000 Ls
Ongkos Angkut Kendaraan

43,800.00
73,000.00
20,000.00

14,454.00
730.00
20,000.00
35,184.00

14,454.00
730.00
20,000.00
35,184.00

1 M3 URUGAN PASIR DENGAN PENYIRAMAN


1.200 M3
Pasir Urug
0.300 OH
Pekerja
0.010 OH
Mandor

161,200.00
43,800.00
73,000.00

13,140.00
730.00
13,870.00

193,440.00
193,440.00

193,440.00
13,140.00
730.00
207,310.00

1 M3 PASANGAN BATU KOSONG


1.200 M3
Batu Pasang
0.300 M3
Pasir Urug
0.780 OH
Pekerja
0.039 OH
Mandor
0.390 OH
Tukang Batu
0.039 OH
Kepala Tukang Batu

171,300.00
161,200.00
43,800.00
73,000.00
71,000.00
75,900.00

34,164.00
2,847.00
27,690.00
2,960.10
67,661.10

205,560.00
48,360.00
253,920.00

205,560.00
48,360.00
34,164.00
2,847.00
27,690.00
2,960.10
321,581.10

1 M3 PASANGAN BATU KALI 1 : 5


1.300 M3
Batu Pasang
136.000 Kg
Semen Gresik ( 50 kg )
0.544 M3
Pasir Pasang
0.750 OH
Tukang Batu
0.075 OH
Kepala Tukang Batu
1.500 OH
Pekerja
0.075 OH
Mandor

171,300.00
1,286.00
178,300.00
71,000.00
75,900.00
43,800.00
73,000.00

53,250.00
5,692.50
65,700.00
5,475.00
130,117.50

222,690.00
174,896.00
96,995.20
494,581.20

222,690.00
174,896.00
96,995.20
53,250.00
5,692.50
65,700.00
5,475.00
624,698.70

12

1 M3 GALIAN TANAH KERAS DLM TEROWONGAN (5X)


13

14

15

16

17

18

19

20

1 M3 GALIAN TANAH BERBATU BUNDAR( 3X )


1.500 OH
Pekerja
0.050 OH
Mandor

1 M3 URUGAN TANAH DIPADATKAN


1.200 M3
Tanah urug
0.500 OH
Pekerja
0.050 OH
Mandor
1.000 Ls
Stamper

Page 81

Analisa-13

HARGA
SATUAN
Rp.
3

NO

URAIAN

21

1 M2 PASANG BATACO
12.500 Bj
Batako Cetak Lubang KW.II
7.500 Kg
Semen Gresik ( 50 kg )
0.038 M3
Pasir Pasang
0.100 OH
Tukang Batu
0.010 OH
Kepala Tukang Batu
0.300 OH
Pekerja
0.015 OH
Mandor

1,700.00
1,286.00
178,300.00
71,000.00
75,900.00
43,800.00
73,000.00

Batako Cetak Lubang KW.I

2,200.00

Page 82

JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5

7,100.00
759.00
13,140.00
1,095.00
22,094.00
22,094.00

21,250.00
9,645.00
6,775.40
37,670.40
43,920.40

JUMLAH
HARGA
Rp.
6

21,250.00
9,645.00
6,775.40
7,100.00
759.00
13,140.00
1,095.00
59,764.40
66,014.40

Analisa-13

NO

URAIAN

22

23

HARGA
SATUAN
Rp.
3

1 M2 PASANGAN BATA MERAH 1 : 2


70.000 Bj
Bata Pasang klas 2
18.950 kg
Semen Gresik ( 50 kg )
0.038 M3
Pasir Pasang
0.100 OH
Tukang Batu
0.010 OH
Kepala Tukang Batu
0.300 OH
Pekerja
0.015 OH
Mandor

900.00
1,286.00
178,300.00
71,000.00
75,900.00
43,800.00
73,000.00
1,000.00

Bata Pasang klas 1


1 M2 PASANGAN BATA MERAH 1 : 5
70.000 Bj
Bata Pasang klas 2
9.680 kg
Semen Gresik ( 50 kg )
0.045 M3
Pasir Pasang
0.100 OH
Tukang Batu
0.010 OH
Kepala Tukang Batu
0.300 OH
Pekerja
0.015 OH
Mandor

900.00
1,286.00
178,300.00
71,000.00
75,900.00
43,800.00
73,000.00
1,000.00

Bata Pasang klas 1


24

25

26

27

28

JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5

JUMLAH
HARGA
Rp.
6

7,100.00
759.00
13,140.00
1,095.00
22,094.00
22,094.00

63,000.00
24,369.70
6,775.40
94,145.10
101,145.10

63,000.00
24,369.70
6,775.40
7,100.00
759.00
13,140.00
1,095.00
116,239.10
123,239.10

7,100.00
759.00
13,140.00
1,095.00
22,094.00
22,094.00

63,000.00
12,448.48
8,023.50
83,471.98
90,471.98

63,000.00
12,448.48
8,023.50
7,100.00
759.00
13,140.00
1,095.00
105,565.98
112,565.98

1 M2 PLESTERAN PC 1 : 2 TEBAL 20 mm
13.632 Kg
Semen Gresik ( 50 kg )
0.027 M3
Pasir Pasang
0.200 OH
Tukang Batu
0.020 OH
Kepala Tukang Batu
0.400 OH
Pekerja
0.022 OH
Mandor

1,286.00
178,300.00
71,000.00
75,900.00
43,800.00
73,000.00

14,200.00
1,518.00
17,520.00
1,606.00
34,844.00

17,530.75
4,814.10
22,344.85

17,530.75
4,814.10
14,200.00
1,518.00
17,520.00
1,606.00
57,188.85

1 M2 PLESTERAN PC 1:3 TEBAL 20 mm


10.368 Kg
Semen Gresik ( 50 kg )
0.031 M3
Pasir Pasang
0.200 OH
Tukang Batu
0.020 OH
Kepala Tukang Batu
0.260 OH
Pekerja
0.020 OH
Mandor

1,286.00
178,300.00
71,000.00
75,900.00
43,800.00
73,000.00

14,200.00
1,518.00
11,388.00
1,460.00
28,566.00

13,333.25
5,527.30
18,860.55

13,333.25
5,527.30
14,200.00
1,518.00
11,388.00
1,460.00
47,426.55

1 M2 PLESTERAN PC 1:5 TEBAL 20 mm


6.912 Kg
Semen Gresik ( 50 kg )
0.035 M3
Pasir Pasang
0.200 OH
Tukang Batu
0.020 OH
Kepala Tukang Batu
0.400 OH
Pekerja
0.022 OH
Mandor

1,286.00
178,300.00
71,000.00
75,900.00
43,800.00
73,000.00

14,200.00
1,518.00
17,520.00
1,606.00
34,844.00

8,888.83
6,240.50
15,129.33

8,888.83
6,240.50
14,200.00
1,518.00
17,520.00
1,606.00
49,973.33

1 M2 PLESTERAN PC 1 : 6 TEBAL 15 mm
5.888 Kg
Semen Gresik ( 50 kg )
0.036 M3
Pasir Pasang
0.200 OH
Tukang Batu
0.020 OH
Kepala Tukang Batu
0.400 OH
Pekerja
0.022 OH
Mandor

1,286.00
178,300.00
71,000.00
75,900.00
43,800.00
73,000.00

14,200.00
1,518.00
17,520.00
1,606.00
34,844.00

7,571.97
6,418.80
13,990.77

7,571.97
6,418.80
14,200.00
1,518.00
17,520.00
1,606.00
48,834.77

1 M2 PEKERJAAN ACIAN 1:2


3.250 Kg
Semen Gresik ( 50 kg )
0.100 OH
Tukang Batu
0.010 OH
Kepala Tukang Batu
0.200 OH
Pekerja
0.010 OH
Mandor

1,286.00
71,000.00
75,900.00
43,800.00
73,000.00

7,100.00
759.00
8,760.00
730.00
17,349.00

4,179.50
4,179.50

4,179.50
7,100.00
759.00
8,760.00
730.00
21,528.50

Page 83

Analisa-13

NO
1
29

HARGA
SATUAN
Rp.
3

URAIAN
2
1 M2 PEKERJAAN SIARAN 1 : 2
6.340 Kg
Semen Gresik ( 50 kg )
0.012 M3
Pasir Pasang
0.150 OH
Tukang Batu
0.015 OH
Kepala Tukang Batu
0.300 OH
Pekerja
0.015 OH
Mandor

1,286.00
178,300.00
71,000.00
75,900.00
43,800.00
73,000.00

Page 84

JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
10,650.00
1,138.50
13,140.00
1,095.00
26,023.50

8,153.24
2,139.60
10,292.84

JUMLAH
HARGA
Rp.
6
8,153.24
2,139.60
10,650.00
1,138.50
13,140.00
1,095.00
36,316.34

Analisa-13

NO

URAIAN

30

31

HARGA
SATUAN
Rp.
3

1 M2 PASANG PARAS/BATA GOSOK


6.656 Bj
Paras Ukir Selekarang 30 x 15 x 3 cm
44.000 Bj
Bata Gosok klas I
0.600 Zak
Semen Gresik ( 50 kg )
3.500 OH
Tukang Ukir paras
0.350 OH
Kepala Tukang Ukir Style Bali
2.000 OH
Pekerja
0.100 OH
Mandor

8,100.00
4,300.00
64,300.00
82,700.00
87,600.00
43,800.00
73,000.00

Bata Gosok klas II

3,800.00

1 M2 PEK. BATA GOSOK STYLE BALI


100.000 Bj
Bata Gosok klas I
30.000 Kg
Semen Gresik ( 50 kg )
3.500 OH
Tukang Ukir paras
0.350 OH
Kepala Tukang Ukir Style Bali
2.000 OH
Pekerja
0.100 OH
Mandor

4,300.00
1,286.00
82,700.00
87,600.00
43,800.00
73,000.00
3,800.00

Bata Gosok klas II


32

33

34

35

36

JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5

JUMLAH
HARGA
Rp.
6

289,450.00
30,660.00
87,600.00
7,300.00
415,010.00
415,010.00

53,913.60
189,200.00
38,580.00
281,693.60
259,693.60

53,913.60
189,200.00
38,580.00
289,450.00
30,660.00
87,600.00
7,300.00
696,703.60
674,703.60

289,450.00
30,660.00
87,600.00
7,300.00
415,010.00
415,010.00

430,000.00
38,580.00
468,580.00
418,580.00

430,000.00
38,580.00
289,450.00
30,660.00
87,600.00
7,300.00
883,590.00
833,590.00

1 M2 PARAS BATU KALIASEM


1.200 Bj
Paras Malam 50 x 20 x 12 cm
7.000 Kg
Semen Gresik ( 50 kg )
0.025 M3
Pasir Pasang
0.250 OH
Tukang Ukir paras
0.025 OH
Kepala Tukang Paras
0.500 OH
Pekerja
0.025 OH
Mandor

34,700.00
1,286.00
178,300.00
82,700.00
84,600.00
43,800.00
73,000.00

20,675.00
2,115.00
21,900.00
1,825.00
46,515.00

41,640.00
9,002.00
4,457.50
55,099.50

41,640.00
9,002.00
4,457.50
20,675.00
2,115.00
21,900.00
1,825.00
101,614.50

1 M' PALIMANAN TEPI KOLAM & T.DUDUK


1.200 M3
Palimanan 30/30 T. 2,5 cm
2.100 Kg
Semen Gresik ( 50 kg )
0.011 M3
Pasir Pasang
0.150 OH
Tukang Ukir paras
0.015 OH
Kepala Tukang Paras
0.400 OH
Pekerja
0.020 OH
Mandor

200,000.00
1,286.00
178,300.00
82,700.00
84,600.00
43,800.00
73,000.00

12,405.00
1,269.00
17,520.00
1,460.00
32,654.00

240,000.00
2,700.60
2,032.62
244,733.22

240,000.00
2,700.60
2,032.62
12,405.00
1,269.00
17,520.00
1,460.00
277,387.22

1 M2 PALIMANAN LANTAI KOLAM


1.200 M3
Palimanan 30/30 T. 2,5 cm
7.000 Kg
Semen Gresik ( 50 kg )
0.025 M3
Pasir Pasang
0.250 OH
Tukang Ukir paras
0.025 OH
Kepala Tukang Paras
0.500 OH
Pekerja
0.025 OH
Mandor

200,000.00
1,286.00
178,300.00
82,700.00
84,600.00
43,800.00
73,000.00

20,675.00
2,115.00
21,900.00
1,825.00
46,515.00

240,000.00
9,002.00
4,457.50
253,459.50

240,000.00
9,002.00
4,457.50
20,675.00
2,115.00
21,900.00
1,825.00
299,974.50

1 M2 PEKERJAAN PAVING STONE


1.000 M2
Paving Blok / 6 cm
0.100 M3
Pasir Pasang
0.266 OH
Tukang Batu

62,700.00
178,300.00
71,000.00

Paving Blok / 8 cm

69,600.00

18,886.00
18,886.00
18,886.00

62,700.00
17,830.00
80,530.00
87,430.00

62,700.00
17,830.00
18,886.00
99,416.00
106,316.00

52,400.00
1,286.00
178,300.00
71,000.00
75,900.00
43,800.00
73,000.00

7,100.00
759.00
13,140.00
1,095.00

52,400.00
16,718.00
6,240.50
-

52,400.00
16,718.00
6,240.50
7,100.00
759.00
13,140.00
1,095.00

1 M2 PEK. DINDING ROSTER TERAWANG


1.000 Bj
Loster Terawang PC
13.000 Kg
Semen Gresik ( 50 kg )
0.035 M3
Pasir Pasang
0.100 OH
Tukang Batu
0.010 OH
Kepala Tukang Batu
0.300 OH
Pekerja
0.015 OH
Mandor
Page 85

Analisa-13

NO

URAIAN

37

HARGA
SATUAN
Rp.
3

1 M2 PASANGAN KERAMIK KW I 20 x 20
1.000 M2
Keramik KW I 20/20 cm
10.400 Kg
Semen Gresik ( 50 kg )
0.045 M3
Pasir Pasang
1.620 Kg
Semen warna
0.350 OH
Tukang Batu
0.035 OH
Kepala Tukang Batu
0.700 OH
Pekerja
0.035 OH
Mandor

52,800.00
1,286.00
178,300.00
12,100.00
71,000.00
75,900.00
43,800.00
73,000.00

Keramik KW II 20/20 cm

50,100.00

Page 86

JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
22,094.00
75,358.50

24,850.00
2,656.50
30,660.00
2,555.00
60,721.50
60,721.50

52,800.00
13,374.40
8,023.50
19,602.00
93,799.90
91,099.90

JUMLAH
HARGA
Rp.
6
97,452.50

52,800.00
13,374.40
8,023.50
19,602.00
24,850.00
2,656.50
30,660.00
2,555.00
154,521.40
151,821.40

Analisa-13

NO

URAIAN

38

39

38

39

1 M2 PASANGAN KERAMIK KW I 30 x 30
1.000 M2
Keramik KW I 30/30 cm
10.000 Kg
Semen Gresik ( 50 kg )
0.045 M3
Pasir Pasang
1.500 Kg
Semen warna
0.350 OH
Tukang Batu
0.035 OH
Kepala Tukang Batu
0.700 OH
Pekerja
0.035 OH
Mandor

49,200.00
1,286.00
178,300.00
12,100.00
71,000.00
75,900.00
43,800.00
73,000.00

Keramik KW II 30/30 cm

45,900.00

1 M2 PASANGAN KERAMIK KW I 40 x 40
1.000 M2
Keramik KW I 40/40 cm
10.000 Kg
Semen Gresik ( 50 kg )
0.045 M3
Pasir Pasang
1.500 Kg
Semen warna
0.350 OH
Tukang Batu
0.035 OH
Kepala Tukang Batu
0.700 OH
Pekerja
0.035 OH
Mandor

57,100.00
1,286.00
178,300.00
12,100.00
71,000.00
75,900.00
43,800.00
73,000.00

41
a

55,200.00

JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5

JUMLAH
HARGA
Rp.
6

24,850.00
2,656.50
30,660.00
2,555.00
60,721.50
60,721.50

49,200.00
12,860.00
8,023.50
18,150.00
88,233.50
84,933.50

49,200.00
12,860.00
8,023.50
18,150.00
24,850.00
2,656.50
30,660.00
2,555.00
148,955.00
145,655.00

24,850.00
2,656.50
30,660.00
2,555.00
60,721.50
60,721.50

57,100.00
12,860.00
8,023.50
18,150.00
96,133.50
94,233.50

57,100.00
12,860.00
8,023.50
18,150.00
24,850.00
2,656.50
30,660.00
2,555.00
156,855.00
154,955.00

49,200.00
1,472.47
534.90
3,025.00
54,232.37
57,832.37
116,364.74

49,200.00
1,472.47
534.90
3,025.00
6,390.00
683.10
3,942.00
365.00
65,612.47
69,212.47
127,744.84

Keramik KW II 40/40 cm
1 M2 PEK. PLINT KERAMIK 10 x 30 (1:2)
1.000 M2
Keramik KW I 30/30 cm
1.145 Kg
Semen Gresik ( 50 kg )
0.003 M3
Pasir Pasang
0.250 Kg
Semen warna
0.090 OH
Tukang Batu
0.009 OH
Kepala Tukang Batu
0.090 OH
Pekerja
0.005 OH
Mandor

49,200.00
1,286.00
178,300.00
12,100.00
71,000.00
75,900.00
43,800.00
73,000.00

Keramik KW I 20/20 cm
Keramik KW I 40/40 cm

52,800.00
57,100.00

6,390.00
683.10
3,942.00
365.00
11,380.10
11,380.10
11,380.10

1 M2 PAS. TEGEL WARNA 20/20


1.000 M2
Tegel Warna 20/20 cm
10.400 Kg
Semen Gresik ( 50 kg )
0.014 M3
Pasir Pasang
0.130 OH
Tukang Batu
0.013 OH
Kepala Tukang Batu

50,000.00
1,286.00
178,300.00
71,000.00
75,900.00

2,407.05
9,230.00
986.70

50,000.00
13,374.40
2,407.05
-

50,000.00
13,374.40
4,814.10
9,230.00
986.70

43,800.00
73,000.00

11,826.00
985.50
12,811.50

65,781.45

11,826.00
985.50
91,216.70

1 M3 BETON COR 1:3:5


0.870 M3
Kerikil / Koral Beton
0.520 M3
Pasir Beton
218.000 Kg
Semen Gresik ( 50 kg )
0.250 OH
Tukang Batu
0.025 OH
Kepala Tukang Batu
1.650 OH
Pekerja
0.080 OH
Mandor

199,000.00
185,600.00
1,286.00
71,000.00
75,900.00
43,800.00
73,000.00

17,750.00
1,897.50
72,270.00
5,840.00
97,757.50

173,130.00
96,512.00
280,348.00
549,990.00

173,130.00
96,512.00
280,348.00
17,750.00
1,897.50
72,270.00
5,840.00
647,747.50

BETON BERTULANG
1 M3 Beton Cor 1:2:3
0.810 M3
Kerikil / Koral Beton
0.540 M3
Pasir Beton
336.000 Kg
Semen Gresik ( 50 kg )
0.350 OH
Tukang Batu
0.035 OH
Kepala Tukang Batu

199,000.00
185,600.00
1,286.00
71,000.00
75,900.00

24,850.00
2,656.50

161,190.00
100,224.00
432,096.00
-

161,190.00
100,224.00
432,096.00
24,850.00
2,656.50

0.270 OH
0.014 OH

40

HARGA
SATUAN
Rp.
3

Pekerja
Mandor

Page 87

Analisa-13

NO
1
2.000 OH
1.000 OH

HARGA
SATUAN
Rp.
3
43,800.00
73,000.00
(A)

URAIAN

1 M2 Begesting
0.040 M3
0.400 Kg
0.500 OH
0.050 OH
0.400 OH
0.010 OH

2
Pekerja
Mandor

1,285,000.00
23,200.00
74,900.00
79,800.00
43,800.00
73,000.00
(B)

Papan begesting
Paku Usuk
Tukang Kayu
Kepala Tukang Kayu
Pekerja
Mandor
10 M2 Begesting

Page 88

JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
87,600.00
73,000.00
188,106.50
693,510.00

JUMLAH
HARGA
Rp.
6
87,600.00
73,000.00
881,616.50

37,450.00
3,990.00
17,520.00
730.00
59,690.00
596,900.00

51,400.00
9,280.00
37,450.00
3,990.00
17,520.00
730.00
120,370.00
1,203,700.00

51,400.00
9,280.00
60,680.00
606,800.00

Analisa-13

NO

URAIAN

42

43

44

HARGA
SATUAN
Rp.
3

100 Kg Pek. Besi Beton ( Dgn Besi Polos/Ulir )


100.000 Kg
Besi Beton Polos 10mm
1.500 Kg
Kawat Ikat Beton
0.700 OH
Tukang Besi
0.070 OH
Kepala Tukang Besi
0.300 OH
Pekerja

46

JUMLAH
HARGA
Rp.
6

8,961.88
20,000.00
66,100.00
74,900.00
43,800.00
(C)

46,270.00
5,243.00
13,140.00
64,653.00

896,188.16
30,000.00
926,188.16

896,188.16
30,000.00
46,270.00
5,243.00
13,140.00
990,841.16

(A+B+0,8*C)
(A+B+C)
(A+B+1,5*C)
(A+B+1,6*C)
(A+B+1,75*C)
(A+B+1,85*C)
(A+B+2*C)
(A+B+2,25*C)
(A+B+2,5*C)
(A+B+2,75*C)
(A+B+3*C)
(A+1,6*C)

836,728.90
849,659.50
881,986.00
888,451.30
898,149.25
904,614.55
914,312.50
930,475.75
946,639.00
962,802.25
978,965.50
888,451.30

2,041,260.53
2,226,498.16
2,689,592.24
2,782,211.06
2,921,139.28
3,013,758.10
3,152,686.32
3,384,233.36
3,615,780.40
3,847,327.44
4,078,874.48
2,782,211.06

2,877,989.43
3,076,157.66
3,571,578.24
3,670,662.36
3,819,288.53
3,918,372.65
4,066,998.82
4,314,709.11
4,562,419.40
4,810,129.69
5,057,839.98
2,466,962.36

881,616.50
171,300.00

112,863.90
112,863.90

416,106.00
82,224.00
498,330.00

528,969.90
82,224.00
611,193.90

171,300.00
199,000.00
185,600.00
1,286.00
71,000.00
75,900.00
43,800.00
73,000.00

21,300.00
2,277.00
104,244.00
5,840.00
133,661.00

77,085.00
133,330.00
83,520.00
360,080.00
654,015.00

77,085.00
133,330.00
83,520.00
360,080.00
21,300.00
2,277.00
104,244.00
5,840.00
787,676.00

91,000.00
6,692,800.00
23,200.00
22,400.00
74,900.00
79,800.00
43,800.00
73,000.00

149,800.00
1,596.00
21,900.00
1,825.00
175,121.00
175,121.00

62,790.00
100,392.00
464.00
4,480.00
168,126.00
67,270.00

62,790.00
100,392.00
464.00
4,480.00
149,800.00
1,596.00
21,900.00
1,825.00
343,247.00
242,391.00

1 M2 PLAPOND GYPSUM
0.380 Lbr
Gypsum (1,2 x 2,4)
0.015 M3
Kayu Kruing Balok 8/12
0.220 Kg
Paku Lis
0.200 OH
Tukang Kayu
0.020 OH
Kepala Tukang Kayu
0.500 OH
Pekerja
0.025 OH
Mandor

58,800.00
6,692,800.00
25,800.00
74,900.00
79,800.00
43,800.00
73,000.00

14,980.00
1,596.00
21,900.00
1,825.00
40,301.00

22,344.00
100,392.00
5,676.00
128,412.00

22,344.00
100,392.00
5,676.00
14,980.00
1,596.00
21,900.00
1,825.00
168,713.00

1 M2 PLAPOND ETERNIT
1.000 Lbr
Eternit Klas I (1/1) M
0.015 M3
Kayu Kruing Balok 8/12
0.220 Kg
Paku Usuk
0.200 OH
Tukang Kayu
0.020 OH
Kepala Tukang Kayu
0.500 OH
Pekerja

19,200.00
6,692,800.00
23,200.00
74,900.00
79,800.00
43,800.00

14,980.00
1,596.00
21,900.00

19,200.00
100,392.00
5,104.00
-

19,200.00
100,392.00
5,104.00
14,980.00
1,596.00
21,900.00

1 M3 BETON BERTULANG Fe 80
1 M3 BETON BERTULANG Fe 100
1 M3 BETON BERTULANG Fe 150
1 M3 BETON BERTULANG Fe 160
1 M3 BETON BERTULANG Fe 175
1 M3 BETON BERTULANG Fe 185
1 M3 BETON BERTULANG Fe 200
1 M3 BETON BERTULANG Fe 225
1 M3 BETON BERTULANG Fe 250
1 M3 BETON BERTULANG Fe 275
1 M3 BETON BERTULANG Fe 300
1 M3 BETON PLAT PONDASI Fe 160
1 M3 BETON CYCLOOF 40% BATU KALI
0.600 M3
Beton cor 1 : 2 : 3
0.480 M3
Batu Pasang

M3 PEK. CYKLOP 1:3:5 DIAMETER 100 CM


0.450 M3
Batu Pasang
0.670 M3
Kerikil / Koral Beton
0.450 M3
Pasir Beton
280.000 Kg
Semen Gresik ( 50 kg )
0.300 OH
Tukang Batu
0.030 OH
Kepala Tukang Batu
2.380 OH
Pekerja
0.080 OH
Mandor

1 M2 PEK. PLAFOND CEILLING TEAK


0.690 Lbr
Ceilingteak
0.015 M3
Kayu Kruing Balok 8/12
0.020 Kg
Paku Usuk
0.200 Kg
Paku Reng
2.000 OH
Tukang Kayu
0.020 OH
Kepala Tukang Kayu
0.500 OH
Pekerja
0.025 OH
Mandor
Untuk gerantangan Ceilingteak

45

JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5

Page 89

Analisa-13

NO

HARGA
SATUAN
Rp.
3
73,000.00

URAIAN

1
0.025 OH

2
Mandor

29,900.00

Tadir Gedeg Kelas I


47

1 M2 PLAPOND PLYWOOD 4 MM +RANGKA KRUING


0.390 Lbr
Plywood
0.023 M3
Kayu Kruing Balok 8/12
0.060 Kg
Paku Usuk
0.400 OH
Tukang Kayu
0.040 OH
Kepala Tukang Kayu
0.270 OH
Pekerja
0.014 OH
Mandor

49,500.00
6,692,800.00
23,200.00
74,900.00
79,800.00
43,800.00
73,000.00
52,400.00
80,300.00

Triplek 3 mm
Teak Wood 4 mm

Page 90

JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
1,825.00
40,301.00
124,696.00
40,301.00
135,396.00

29,960.00
3,192.00
11,826.00
985.50
45,963.50
45,963.50
45,963.50

19,305.00
153,934.40
1,392.00
174,631.40
175,762.40
186,643.40

JUMLAH
HARGA
Rp.
6
1,825.00
164,997.00
175,697.00

19,305.00
153,934.40
1,392.00
29,960.00
3,192.00
11,826.00
985.50
220,594.90
221,725.90
232,606.90

Analisa-13

NO

URAIAN

48

IX

HARGA
SATUAN
Rp.
3

1 M2 PLAPOND GYPSUM+RANGKA HOLLOW


0.347 Lbr
Gypsum (1,2 x 2,4)
3.600 m'
Hollow
0.150 Kg
Kawat D4mm
1.050 Bh
Ramset
0.250 OH
Tukang Kayu
0.025 OH
Kepala Tukang Kayu
0.150 OH
Pekerja
0.075 OH
Mandor

58,800.00
10,600.00
20,000.00
15,000.00
74,900.00
79,800.00
43,800.00
73,000.00

1 M2 Pasang langit - langit Teakwood 30 x 60 cm/ 4 mm


0.375 Lbr
Teakwood 4 mm
0.030 Kg
Paku biasa 1/2" - 1"
0.100 Oh
Pekerja
0.100 Oh
Tukang kayu
0.050 Oh
Kepala Tukang
0.004 Oh
Mandor

85,000.00
22,400.00
43,800.00
74,900.00
79,800.00
73,000.00

80,300.00
22,400.00
43,800.00
74,900.00
79,800.00
73,000.00

1 M' Pasang list langit - langit kayu profil


1.050 M'
List kayu 2/4
0.010 Kg
Paku list
0.050 Oh
Pekerja
0.050 Oh
Tukang kayu
0.005 Oh
Kepala Tukang
0.003 Oh
Mandor

20,416.54
38,160.00
3,000.00
15,750.00
77,326.54

20,416.54
38,160.00
3,000.00
15,750.00
18,725.00
1,995.00
6,570.00
5,475.00
110,091.54

31,875.00
672.00

31,875.00
672.00
4,380.00
7,490.00
3,990.00
255.50
48,662.50

12,025.00
25,800.00
43,800.00
74,900.00
79,800.00
73,000.00

4,380.00
7,490.00
3,990.00
255.50
16,115.50

32,547.00
30,112.50
672.00

4,380.00
7,490.00
3,990.00
255.50
16,115.50

30,784.50
12,626.25
258.00

2,190.00
3,745.00
399.00
219.00
6,553.00

12,884.25

30,112.50
672.00
4,380.00
7,490.00
3,990.00
255.50
46,900.00
12,626.25
258.00
2,190.00
3,745.00
399.00
219.00
19,437.25

1 M2 Pasang langit - langit Plywood 4 mm + rangka


0.0230
0.0600
0.9000
0.2700
0.4000
0.0400
0.0135

18,725.00
1,995.00
6,570.00
5,475.00
32,765.00

JUMLAH
HARGA
Rp.
6

PEKERJAAN LANGIT - LANGIT

1 1 M2 Pasang langit - langit Plywood 120 x 240 cm/4mm


0.375 Lbr
Plywood 4 mm
0.030 Kg
Paku biasa 1/2" - 1"
0.100 Oh
Pekerja
0.100 Oh
Tukang kayu
0.050 Oh
Kepala Tukang
0.004 Oh
Mandor
2

JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5

M3
Kg
Lbr
Oh
Oh
Oh
Oh

Kamper Usuk 4/6 cm


Paku biasa 2" - 5"
Plywood 4 mm
Pekerja
Tukang kayu
Kepala Tukang
Mandor

8,299,000.00
25,800.00
85,000.00
43,800.00
74,900.00
79,800.00
73,000.00

1 M2 Pasang Rangka Plafond Hollow


0.3000 Btg Rangka Primer
0.5000 Btg Rangka Skundair
1.0000
Bh Paku Peluru
1.0000
Bh Siku Gantung (Angel Clip)
1.0000 Btg Rod
1.0000
Bh Suspension Rod Clip
2.0000
Bh Conector (Chanel Clamp)
0.4000 Btg Flushing
1.0000
Bh Paku Skrup 3/8
5.0000
Bh Paku Beton
1.0000
M2 Ongkos Pasang

50,000.00
40,000.00
2,000.00
1,000.00
2,500.00
2,500.00
1,500.00
17,500.00
150.00
234.00
3,500.00

1 M2 Pasang langit - langit Gypsum


0.1100
Kg Paku sekrup
0.3750
Lbr Gypsum (120x240x4)
0.9300
Kg Cornice adhesive
0.1000 Rol Textile Tape
0.1000
Oh Pekerja
0.1000
Oh Tukang kayu

19,700.00
58,800.00
5,000.00
12,000.00
43,800.00
74,900.00
Page 91

190,877.00
1,548.00
76,500.00
11,826.00
29,960.00
3,192.00
985.50
45,963.50

268,925.00
15,000.00
20,000.00
2,000.00
1,000.00
2,500.00
2,500.00
3,000.00
7,000.00
150.00
1,170.00

3,500.00
3,500.00

54,320.00
2,167.00
22,050.00
4,650.00
1,200.00

4,380.00
7,490.00

190,877.00
1,548.00
76,500.00
11,826.00
29,960.00
3,192.00
985.50
314,888.50
15,000.00
20,000.00
2,000.00
1,000.00
2,500.00
2,500.00
3,000.00
7,000.00
150.00
1,170.00
3,500.00
57,820.00
2,167.00
22,050.00
4,650.00
1,200.00
4,380.00
7,490.00
Analisa-13

NO
1
0.0100
0.0050

HARGA
SATUAN
Rp.
3
79,800.00
73,000.00

URAIAN

Oh
Oh

2
Kepala Tukang
Mandor

1 M2 Pas Rangka Plafond Hollow + Gypsum


1 M2 Pasang langit - langit Lambrisiring Kayu 9 cm
0.0150
m3 Kayu Papan Kamfer
0.0100
Kg Paku biasa 1/2" - 1"
0.8000
Hr Tukang kayu
0.0800
Hr Kepala tukang kayu
0.8000
Hr Pekerja
0.0400
Hr Mandor

JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
798.00
365.00
13,033.00
30,067.00
16,533.00

9,637,600.00
22,400.00
74,900.00
79,800.00
43,800.00
73,000.00

Page 92

6,384.00
35,040.00
2,920.00
44,344.00

JUMLAH
HARGA
Rp.
6
798.00
365.00
43,100.00

84,387.00

100,920.00

144,564.00
224.00
59,920.00

144,564.00
224.00
59,920.00
6,384.00
35,040.00
2,920.00
249,052.00

204,708.00

Analisa-13

NO

URAIAN

49

50

51

52

53

54

HARGA
SATUAN
Rp.
3

1 M2 PEK. DINDING PARTISI TEAKWOOD RANGKAP


RANGKA KAYU KAMPER
0.020 M3
Kayu Kamper Balok 6/12
0.390 Lbr
Teak Wood 4 mm
0.100 Kg
Paku Lis
0.450 OH
Tukang Kayu
0.045 OH
Kepala Tukang Kayu
0.150 OH
Pekerja
0.075 OH
Mandor

1 M3 PEK. KUSEN PINTU DAN JENDELA JATI


1.100 M3
Kayu Jati Balok
1.250 Kg
Paku 10cm
1.000 Kg
Lem Kayu
21.000 OH
Tukang Kayu
2.100 OH
Kepala Tukang Kayu
7.000 OH
Pekerja
3.500 OH
Mandor

33,705.00
3,591.00
6,570.00
5,475.00
49,341.00

167,052.60
31,317.00
2,580.00
200,949.60

167,052.60
31,317.00
2,580.00
33,705.00
3,591.00
6,570.00
5,475.00
250,290.60

10,708,500.00
23,200.00
11,300.00
74,900.00
79,800.00
43,800.00
73,000.00

1,572,900.00
167,580.00
306,600.00
255,500.00
2,302,580.00

11,779,350.00
29,000.00
11,300.00
11,819,650.00

11,779,350.00
29,000.00
11,300.00
1,572,900.00
167,580.00
306,600.00
255,500.00
14,122,230.00

8,566,800.00
23,200.00
11,300.00
74,900.00
79,800.00
43,800.00
73,000.00

1,348,200.00
143,640.00
262,800.00
21,900.00
1,776,540.00

10,280,160.00
29,000.00
11,300.00
10,320,460.00

10,280,160.00
29,000.00
11,300.00
1,348,200.00
143,640.00
262,800.00
21,900.00
12,097,000.00

10,024,900.00
80,300.00
25,800.00
74,900.00
79,800.00
43,800.00
73,000.00

179,760.00
19,152.00
35,040.00
2,920.00
236,872.00
236,872.00
236,872.00
236,872.00
236,872.00
236,872.00

240,597.60
64,240.00
2,580.00
307,417.60
320,217.60
337,337.60
375,224.80
388,024.80
405,144.80
66,820.00

240,597.60
64,240.00
2,580.00
179,760.00
19,152.00
35,040.00
2,920.00
544,289.60
557,089.60
574,209.60
612,096.80
624,896.80
642,016.80
303,692.00

11,235.00
1,197.00
657.00
54.75
13,143.75
13,143.75
13,143.75

105,930.00
105,930.00
88,330.00
129,470.00

105,930.00
11,235.00
1,197.00
657.00
54.75
119,073.75
101,473.75
142,613.75

224,700.00
23,940.00
43,800.00
3,650.00
296,090.00
296,090.00

514,008.00
5,650.00
519,658.00
400,996.00

514,008.00
5,650.00
224,700.00
23,940.00
43,800.00
3,650.00
815,748.00
697,086.00

96,300.00
117,700.00
80,300.00
96,300.00
117,700.00

Kaca Bening 5 mm
Kaca Ray-Ban 5 mm
Kayu Jati Papan ,3 mm polos
Kayu Jati Papan ,5 mm polos
Kayu Jati Papan ,5 mm rayben
kayu meranti papan, 3 mm polos
1 M2 PEK. KACA 5 MM
1.100 M2
Kaca Bening 5 mm
0.150 OH
Tukang Kayu
0.015 OH
Kepala Tukang Kayu
0.015 OH
Pekerja
0.001 OH
Mandor

96,300.00
74,900.00
79,800.00
43,800.00
73,000.00

Kaca Bening 3 mm
Kaca Ray-Ban 5 mm

80,300.00
117,700.00

1 M2 DAUN PINTU PANEL JATI


0.040 M3
Kayu Jati Papan
0.500 Kg
Lem Kayu
3.000 OH
Tukang Kayu
0.300 OH
Kepala Tukang Kayu
1.000 OH
Pekerja
0.050 OH
Mandor

12,850,200.00
11,300.00
74,900.00
79,800.00
43,800.00
73,000.00

Kayu Kamper Papan 3/20

JUMLAH
HARGA
Rp.
6

8,566,800.00
80,300.00
25,800.00
74,900.00
79,800.00
43,800.00
73,000.00

1 M3 PEK. KUSEN PINTU DAN JENDELA KAMPER


1.200 M3
Kayu Kamper Balok 6/12
1.250 Kg
Paku 10cm
1.000 Kg
Lem Kayu
18.000 OH
Tukang Kayu
1.800 OH
Kepala Tukang Kayu
6.000 OH
Pekerja
0.300 OH
Mandor

1 M2 DAUN JENDELA KACA 3 MM


0.024 M3
Kayu Kamper Papan 3/20
0.800 M2
Kaca Bening 3 mm
0.100 Kg
Paku Lis
2.400 OH
Tukang Kayu
0.240 OH
Kepala Tukang Kayu
0.800 OH
Pekerja
0.040 OH
Mandor

JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5

10,024,900.00
Page 93

Analisa-13

NO

URAIAN

2
kayu meranti papan
1 M2 DAUN PINTU DOUBLE PLYWOOD
0.026 M3
Kayu Kamper Papan 3/20
1.000 Lbr
Plywood
0.030 Kg
Paku Lis
0.500 Kg
Lem kayu fox
2.400 OH
Tukang Kayu
0.240 OH
Kepala Tukang Kayu
0.800 OH
Pekerja
0.040 OH
Mandor

55

HARGA
SATUAN
Rp.
3

10,024,900.00
49,500.00
25,800.00
11,300.00
74,900.00
79,800.00
43,800.00
73,000.00
80,300.00

Teak Wood 4 mm

Page 94

JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5

179,760.00
19,152.00
35,040.00
2,920.00
236,872.00
236,872.00

JUMLAH
HARGA
Rp.
6
296,090.00

256,637.44
49,500.00
774.00
5,650.00
312,561.44
343,361.44

256,637.44
49,500.00
774.00
5,650.00
179,760.00
19,152.00
35,040.00
2,920.00
549,433.44
580,233.44

Analisa-13

NO

URAIAN

HARGA
SATUAN
Rp.
3

1 M2 PEK.DAUN PINTU LAPIS ALUMINIUM


0.015 M3
Kayu Kamper Papan 3/20
0.625 Lbr
Teak Wood 4 mm
1.000 Lbr
Alumnium Kulit Jeruk
0.100 Kg
Paku Lis
3.000 OH
Tukang Kayu
0.300 OH
Kepala Tukang Kayu
1.250 OH
Pekerja
0.063 OH
Mandor

10,024,900.00
80,300.00
96,300.00
25,800.00
74,900.00
79,800.00
43,800.00
73,000.00

56

49,500.00

Plywood
57

1 M3 KUDA-KUDA KAYU KRUING


1.100 M3
Kayu Kruing Balok 8/12
15.000 Kg
Besi Strip
0.800 Kg
Paku Usuk
12.000 OH
Tukang Kayu
1.200 OH
Kepala Tukang Kayu
4.000 OH
Pekerja
0.200 OH
Mandor
Seseh Balok
Kayu Kamper Balok 8/12
Kayu Meranti Balok 8/12
Balok Bengkirai

58

6,692,800.00
21,400.00
23,200.00
74,900.00
79,800.00
43,800.00
73,000.00
3,105,400.00
8,566,800.00
5,086,500.00
10,173,000.00

1 M2 USUK + RENG KAMPER


0.008 M3
Kayu Kamper Usuk 5/7
0.004 M3
Kayu Kamper Reng
0.150 Kg
Paku Usuk
0.100 OH
Tukang Kayu
0.010 OH
Kepala Tukang Kayu
0.100 OH
Pekerja
0.005 OH
Mandor

8,299,000.00
9,637,600.00
23,200.00
74,900.00
79,800.00
43,800.00
73,000.00
6,692,800.00
5,086,500.00

Kayu Kruing Balok 8/12


Kayu Meranti Balok 6/12
59

60

61

JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5

JUMLAH
HARGA
Rp.
6

224,700.00
23,940.00
54,750.00
4,599.00
307,989.00
307,989.00

150,373.50
50,187.50
96,300.00
2,580.00
299,441.00
280,191.00

150,373.50
50,187.50
96,300.00
2,580.00
224,700.00
23,940.00
54,750.00
4,599.00
607,430.00
588,180.00

898,800.00
95,760.00
175,200.00
14,600.00
1,184,360.00
1,184,360.00
1,184,360.00
1,184,360.00
1,184,360.00

7,362,080.00
321,000.00
18,560.00
7,701,640.00
3,755,500.00
9,763,040.00
5,934,710.00
11,529,860.00

7,362,080.00
321,000.00
18,560.00
898,800.00
95,760.00
175,200.00
14,600.00
8,886,000.00
4,939,860.00
10,947,400.00
7,119,070.00
12,714,220.00

7,490.00
798.00
4,380.00
365.00
13,033.00
13,033.00
13,033.00

66,392.00
38,550.40
3,480.00
108,422.40
95,572.80
82,722.40

66,392.00
38,550.40
3,480.00
7,490.00
798.00
4,380.00
365.00
121,455.40
108,605.80
95,755.40

1 M2 PEK. USUK EKPOSE + RENG KAMPER


0.012 M3
Kayu Kamper Usuk 5/7
0.006 M3
Kayu Kamper Reng
0.075 Kg
Paku Usuk
0.284 OH
Tukang Kayu
0.028 OH
Kepala Tukang Kayu
0.500 OH
Pekerja
0.025 OH
Mandor

8,299,000.00
9,637,600.00
23,200.00
74,900.00
79,800.00
43,800.00
73,000.00

21,271.60
2,234.40
21,900.00
1,825.00
47,231.00

99,588.00
57,825.60
1,740.00
159,153.60

99,588.00
57,825.60
1,740.00
21,271.60
2,234.40
21,900.00
1,825.00
206,384.60

1 M2 USUK GERANTANGAN
0.022 M3
Usuk Kruing 5/7
0.004 M3
Kayu Kamper Papan 3/20
0.200 Kg
Paku Usuk
0.230 OH
Tukang Kayu
0.023 OH
Kepala Tukang Kayu
0.230 OH
Pekerja
0.023 OH
Mandor

6,157,300.00
10,024,900.00
23,200.00
74,900.00
79,800.00
43,800.00
73,000.00

17,227.00
1,835.40
10,074.00
1,679.00
30,815.40

135,460.60
40,099.60
4,640.00
180,200.20

135,460.60
40,099.60
4,640.00
17,227.00
1,835.40
10,074.00
1,679.00
211,015.60

6,157,300.00
23,200.00
74,900.00
79,800.00
43,800.00
73,000.00

4,269.30
239.40
2,496.60
438.00

67,730.30
2,320.00
-

67,730.30
2,320.00
4,269.30
239.40
2,496.60
438.00

1 M2 PASANG USUK (KRUING)


0.011 M3
Usuk Kruing 5/7
0.100 Kg
Paku Usuk
0.057 OH
Tukang Kayu
0.003 OH
Kepala Tukang Kayu
0.057 OH
Pekerja
0.006 OH
Mandor
Page 95

Analisa-13

NO

URAIAN

62

HARGA
SATUAN
Rp.
3

1 M2 PASANG RENG (KAMPER)


0.008 M3
Kayu Kamper Reng
0.150 Kg
Paku Reng
0.043 OH
Pekerja
0.002 OH
Mandor
0.043 OH
Tukang Kayu

9,637,600.00
22,400.00
43,800.00
73,000.00
74,900.00

Page 96

JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
7,443.30
70,050.30
1,883.40
146.00
3,220.70

77,100.80
3,360.00
-

JUMLAH
HARGA
Rp.
6
77,493.60
77,100.80
3,360.00
1,883.40
146.00
3,220.70

Analisa-13

NO

URAIAN

1
0.004 OH
X
1

63

64

65

66

2
Kepala Tukang Kayu

PEKERJAAN BESI DAN ALUMUNIUM


1 M2 PEK. KAP BAJA RINGAN BENTANG < 5 M'
1.120 M'
UK. 75. 0,85
2.210 M'
UK. 75. 0,53
6.600 M'
GD.B. 0,43
1.000 M2
Plat - Plat Penyambung
1.000 M2
Ongkos Pasang

1 M' PEK. LISTPLANK ( 3/20 ) KAMPER


0.011 M3
Kayu Kamper Papan 3/20
0.100 Kg
Paku Reng
0.200 OH
Tukang Kayu
0.020 OH
Kepala Tukang Kayu
0.100 OH
Pekerja
0.005 OH
Mandor

JUMLAH
HARGA
Rp.
6
319.20
86,030.10

30,000.00
25,000.00
15,000.00
15,000.00
25,000.00

33,600.00
55,250.00
99,000.00
15,000.00
25,000.00
25,000.00

202,850.00

33,600.00
55,250.00
99,000.00
15,000.00
25,000.00
227,850.00

14,980.00
1,596.00
4,380.00
365.00
21,321.00
21,321.00
21,321.00

108,268.92
2,240.00
110,508.92
80,304.56
68,738.84

108,268.92
2,240.00
14,980.00
1,596.00
4,380.00
365.00
131,829.92
101,625.56
90,059.84

Kayu Kruing Papan


Kayu Meranti Papan

7,228,200.00
6,157,300.00

1 M2 PEK. PAPAN TALANG


0.025 M3
Kayu Kruing Papan
0.200 Kg
Paku Usuk
0.800 OH
Tukang Kayu
0.080 OH
Kepala Tukang Kayu
0.250 OH
Pekerja
0.014 OH
Mandor

7,228,200.00
23,200.00
74,900.00
79,800.00
43,800.00
73,000.00

180,705.00
4,640.00
59,920.00
6,384.00
10,950.00
1,022.00
78,276.00
185,345.00
Untuk 0,5 M2 = 1 M'

180,705.00
4,640.00
59,920.00
6,384.00
10,950.00
1,022.00
263,621.00
131,810.50

10 M' PEK. SENG TALANG


5.500 m
Seng Talang 30 cm
8.000 OH
Tukang Kayu
0.800 OH
Kepala Tukang Kayu
5.000 OH
Pekerja
0.500 OH
Mandor

19,800.00
74,900.00
79,800.00
43,800.00
73,000.00

108,900.00
599,200.00
63,840.00
219,000.00
36,500.00
918,540.00
108,900.00
Untuk 1 M' = 0,5 M2

108,900.00
599,200.00
63,840.00
219,000.00
36,500.00
1,027,440.00
102,744.00

1 M2 GENTENG PRES
25.000 Bj
Genteng Kodok
0.075 OH
Tukang Kayu
0.008 OH
Kepala Tukang Kayu
0.150 OH
Pekerja
0.008 OH
Mandor

3,200.00
74,900.00
79,800.00
43,800.00
73,000.00

5,617.50
638.40
6,570.00
584.00
13,409.90
13,409.90
13,409.90
13,409.90

80,000.00
80,000.00
47,500.00
52,500.00
57,500.00

80,000.00
5,617.50
638.40
6,570.00
584.00
93,409.90
60,909.90
65,909.90
70,909.90

6,400.00
12,100.00
7,400.00

14,980.00
1,596.00
17,520.00
146.00
34,242.00
34,242.00
34,242.00
34,242.00

38,000.00
10,288.00
5,705.60
53,993.60
47,993.60
76,493.60
52,993.60

38,000.00
10,288.00
5,705.60
14,980.00
1,596.00
17,520.00
146.00
88,235.60
82,235.60
110,735.60
87,235.60

37,400.00

26,180.00

26,180.00

1,900.00
2,100.00
2,300.00

1 M' PASANG GENTENG BUBUNGAN


5.000 Bj
Bubungan Genteng Biasa
0.160 Zak
Semen Gresik ( 50 kg )
0.032 M3
Pasir Pasang
0.200 OH
Tukang Kayu
0.020 OH
Kepala Tukang Kayu
0.400 OH
Pekerja
0.002 OH
Mandor

7,600.00
64,300.00
178,300.00
74,900.00
79,800.00
43,800.00
73,000.00

Bubungan Genteng Plentong


Bubungan Genteng Kodok
Bubungan Karang Pilang

68

JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
319.20
5,569.30
80,460.80

10,024,900.00
22,400.00
74,900.00
79,800.00
43,800.00
73,000.00

Genteng Plentong
Genteng Biasa
Genteng Karang Pilang
67

HARGA
SATUAN
Rp.
3
79,800.00

1 M2 PASANG SENG GELOMBANG


0.700 Lbr
BJLS 0,18 mm
Page 97

Analisa-13

NO

HARGA
SATUAN
Rp.
3
26,200.00
74,900.00
79,800.00
43,800.00
73,000.00

URAIAN

1
0.020
0.060
0.006
0.120
0.006

Kg
OH
OH
OH
OH

2
Paku Seng
Tukang Kayu
Kepala Tukang Kayu
Pekerja
Mandor

32,800.00

Asbes Gel. 1,8 m' x 1,05 m'/4 mm


69

10 M BUBUNGAN ATAP SENG


6.000 m
Seng Talang 30 cm
12.000 Ktk
Paku Sekrup 1/2"
0.250 OH
Tukang Besi
0.025 OH
Kepala Tukang Besi
0.250 OH
Pekerja

19,800.00
16,000.00
66,100.00
74,900.00
43,800.00
Untuk 1 M'

Page 98

JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
524.00
4,494.00
478.80
5,256.00
438.00
10,666.80
26,704.00
10,666.80
23,484.00

16,525.00
1,872.50
10,950.00
29,347.50
2,934.75

118,800.00
192,000.00
310,800.00
31,080.00

JUMLAH
HARGA
Rp.
6
524.00
4,494.00
478.80
5,256.00
438.00
37,370.80
34,150.80

118,800.00
192,000.00
16,525.00
1,872.50
10,950.00
340,147.50
34,014.75

Analisa-13

NO
1
70

71

72

73

74

75

HARGA
SATUAN
Rp.
3

URAIAN
2
1 M2 PASANGAN ATAP SENG LAMA
0.750 Lbr
BJLS 0,18 mm
0.040 Kg
Paku Seng
0.200 OH
Tukang Kayu
0.020 OH
Kepala Tukang Kayu
0.100 OH
Pekerja
0.005 OH
Mandor

JUMLAH
HARGA
Rp.
6

37,400.00
26,200.00
74,900.00
79,800.00
43,800.00
73,000.00

14,980.00
1,596.00
4,380.00
365.00
21,321.00

28,050.00
1,048.00
29,098.00

28,050.00
1,048.00
14,980.00
1,596.00
4,380.00
365.00
50,419.00

112,200.00
23,200.00
74,900.00
79,800.00
43,800.00
73,000.00

8,988.00
957.60
5,256.00
438.00
15,639.60

112,200.00
4,640.00
116,840.00

112,200.00
4,640.00
8,988.00
957.60
5,256.00
438.00
132,479.60

1 M2 PEK. MENGECAT TEMBOK


1X PLAMIR, 1X CAT DASAR, 2X CAT PENUTUP
0.100 Kg
Cat Dasar Tembok
0.260 Kg
Vinilek
0.100 Kg
Plamir Tembok
0.063 OH
Tukang Cat
0.006 OH
Kepala Tukang Cat
0.020 OH
Pekerja
0.003 OH
Mandor

18,200.00
13,600.00
16,000.00
56,400.00
63,200.00
43,800.00
73,000.00

3,553.20
398.16
876.00
182.50
5,009.86

1,820.00
3,536.00
1,600.00
6,956.00

1,820.00
3,536.00
1,600.00
3,553.20
398.16
876.00
182.50
11,965.86

1 M2 PEK. CAT TEMBOK LAMA


1X CAT DASAR, 2X CAT PENUTUP
0.120 Kg
Cat Dasar Tembok
0.180 Kg
Vinilek
0.042 OH
Tukang Cat
0.004 OH
Kepala Tukang Cat
0.028 OH
Pekerja
0.003 OH
Mandor

18,200.00
13,600.00
56,400.00
63,200.00
43,800.00
73,000.00

2,368.80
265.44
1,226.40
182.50
4,043.14

2,184.00
2,448.00
4,632.00

2,184.00
2,448.00
2,368.80
265.44
1,226.40
182.50
8,675.14

1 M2 PEKERJAAN CAT MENI


0.120 Kg
Meni Kayu
0.050 Ltr
Minyak Cat
0.075 OH
Tukang Cat
0.008 OH
Kepala Tukang Cat
0.050 OH
Pekerja
0.003 OH
Mandor

24,600.00
18,800.00
56,400.00
63,200.00
43,800.00
73,000.00

4,230.00
505.60
2,190.00
219.00
7,144.60

2,952.00
940.00
3,892.00

2,952.00
940.00
4,230.00
505.60
2,190.00
219.00
11,036.60

1 M2 PEK. CAT KAYU ULANG


0.189 Kg
Cat Kayu
0.150 OH
Tukang Cat
0.015 OH
Kepala Tukang Cat
0.100 OH
Pekerja
0.005 OH
Mandor

53,500.00
56,400.00
63,200.00
43,800.00
73,000.00

8,460.00
948.00
4,380.00
365.00
14,153.00

10,111.50
10,111.50

10,111.50
8,460.00
948.00
4,380.00
365.00
24,264.50

53,500.00
18,800.00
56,400.00
63,200.00
43,800.00
73,000.00

1,692.00
189.60
6,570.00
219.00
8,670.60

15,194.00
1,334.80
16,528.80

15,194.00
1,334.80
1,692.00
189.60
6,570.00
219.00
25,199.40

24,600.00

4,920.00

4,920.00

1 M2 PAS. ATAP SIRAP


1.000 Ikat
Sirap
0.200 Kg
Paku Usuk
0.120 OH
Tukang Kayu
0.012 OH
Kepala Tukang Kayu
0.120 OH
Pekerja
0.006 OH
Mandor

76 1 M2 PENGECATAN KANSTIN
0.284 Kg Cat Kayu
0.071 Kg Minyak cat
0.030 OH Tukang cat
0.003 OH Kepala tukang cat
0.150 OH Pekerja
0.003 OH Mandor

77

JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5

1 M2 PEK. MENGECAT KAYU


1X PLAMIR, 1X CAT DASAR, 2X CAT PENUTUP
0.200 Kg
Meni Kayu
Page 99

Analisa-13

NO
1
0.150
0.170
0.260
0.009
0.006
0.070
0.003

78

HARGA
SATUAN
Rp.
3
26,200.00
48,100.00
53,500.00
56,400.00
63,200.00
43,800.00
73,000.00

URAIAN

Kg
Kg
Kg
OH
OH
OH
OH

2
Dempul
Cat Dasar Kayu
Cat Kayu
Tukang Cat
Kepala Tukang Cat
Pekerja
Mandor

1 M2 PEKERJAAN POLITUR
0.150 Ltr
Politur
0.372 Ltr
Politur jadi ( Ultran )
2.000 Lbr
Amplas
0.060 OH
Tukang Cat
0.016 OH
Kepala Tukang Cat
0.008 OH
Mandor

43,500.00
51,700.00
3,200.00
56,400.00
63,200.00
73,000.00

Page 100

JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
3,930.00
8,177.00
13,910.00
507.60
379.20
3,066.00
182.50
4,135.30
30,937.00

3,384.00
1,011.20
547.50
4,942.70

6,525.00
19,232.40
6,400.00
32,157.40

JUMLAH
HARGA
Rp.
6
3,930.00
8,177.00
13,910.00
507.60
379.20
3,066.00
182.50
35,072.30

6,525.00
19,232.40
6,400.00
3,384.00
1,011.20
547.50
37,100.10

Analisa-13

NO

URAIAN

79

80

81

82

83

84

HARGA
SATUAN
Rp.
3

1 M' PEMBUATAN SALURAN TERTUTUP


0.260 M3
Galian tanah
0.130 M3
Pas. Batu bata 1 : 5
0.850 M2
Plesteran 1 : 2
0.041 M3
Beton bertulang Fe.80

86

87

6,977.05
2,872.22
29,617.40
34,305.88
73,772.55

10,851.36
18,993.12
83,691.68
113,536.16

6,977.05
13,723.58
48,610.52
117,997.57
187,308.71

26,834.80
105,565.98
57,188.85
75,000.00

4,025.22
2,319.87
27,875.20
34,220.29

8,764.56
17,875.88
75,000.00
101,640.44

4,025.22
11,084.43
45,751.08
75,000.00
135,860.73

1 M2 PEK. WATER PROFING


1.000 Ltr
Waterproff
1.000 Ls
Ongkos Kerja

55,000.00
56,400.00

56,400.00
56,400.00

55,000.00
55,000.00

55,000.00
56,400.00
111,400.00

BIAYA MENGGILAS PERBULAN


30.000 OH
Masinis
30.000 OH
Kernet
30.000 Ltr
Oli
600.000 Ltr
Solar
30.000 Hari
Sewa Wales

116,800.00
116,800.00
27,500.00
4,300.00
120,000.00

3,504,000.00
3,504,000.00
3,600,000.00
10,608,000.00

825,000.00
2,580,000.00
3,405,000.00

3,504,000.00
3,504,000.00
825,000.00
2,580,000.00
3,600,000.00
14,013,000.00

1 M2 MENYIAPKAN SUB GRADE


0.0003 OH
Pekerja
0.0002 OH
Mandor
0.0002
Biaya menggilas sebulan

43,800.00
73,000.00
14,013,000.00

13.14
14.60
2,121.60
2,149.34

681.00
681.00

13.14
14.60
2,802.60
2,830.34

1 M3 TIMBUNAN SIRTU
1.200 M3
Pasir Batu (Sirtu)
0.250 OH
Pekerja
0.025 OH
Mandor
0.001
Biaya menggilas sebulan

235,500.00
43,800.00
73,000.00
14,013,000.00

10,950.00
1,825.00
10,608.00
23,383.00
4,676.60
2,338.30
1,169.15

282,600.00
3,405.00
286,005.00
57,201.00
28,600.50
14,300.25

282,600.00
10,950.00
1,825.00
14,013.00
309,388.00
61,877.60
30,938.80
15,469.40

262,500.00
43,800.00
73,000.00
14,013,000.00

20,542.20
1,679.00
3,182.40
25,403.60

43,312.50
1,021.50
44,334.00

43,312.50
20,542.20
1,679.00
4,203.90
69,737.60

171,300.00
26,834.80
15,184.00

697.70
151.84
849.54

6,509.40
6,509.40

6,509.40
697.70
151.84
7,358.94

274,700.00
43,800.00
73,000.00
14,013,000.00

229,950.00
19,199.00
378,351.00
627,500.00
6,275.00

1,922,900.00
1,922,900.00
19,229.00

1,922,900.00
229,950.00
19,199.00
378,351.00
2,550,400.00
25,504.00

1 M' SALURAN / GOT


0.150 M3
Galian tanah
0.105 M3
Bata merah 1:5
0.800 M2
Plesteran 1:2
1.000 Btg
Besi Siku 50/50 x 5

1 M2 PASANGAN GLADAK (BATU PECAH 10/15)


0.165 M3
Batu Pecah 10/15
0.469 OH
Pekerja
0.023 OH
Mandor
0.0003
Biaya menggilas sebulan

1 M' PAS. BATU KANCING 15/20 CM


0.038 M3
Batu Pasang
0.026 M3
Galian tanah
0.010 M3
Buangan tanah

100 M2 MENGHAMPAR BATU PECAH 5/7 CM


DIATAS LPB GLADAK BATU PECAH
7.000 M3
Batu Pecah 5 - 7 cm
5.250 OH
Pekerja
0.263 OH
Mandor
0.027
Biaya menggilas sebulan

1 M2 ...........
88

JUMLAH
HARGA
Rp.
6

26,834.80
105,565.98
57,188.85
2,877,989.43

1 M2 Timbunan Sirtu tebal 20 Cm


1 M2 Timbunan Sirtu tebal 10 Cm
1 M2 Timbunan Sirtu tebal 5 Cm
85

JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5

100 M2 MENGHAMPAR LAPEN BATU PECAH


Page 101

Analisa-13

NO
1

HARGA
SATUAN
Rp.
3

URAIAN
2
2/3 CM + 3/4 CM + ASPAL
4.000 M3
Batu Pecah 3 - 5 cm
3.000 M3
Batu Pecah 2 - 3 cm
75.000 Kg
Aspal
5.383 Ltr
Solar
0.150 OH
Tukang masak aspal
7.000 OH
Pekerja
0.350 OH
Mandor
0.027
Biaya menggilas sebulan

212,500.00
205,100.00
11,200.00
4,300.00
77,800.00
43,800.00
73,000.00
14,013,000.00
1 M2 ...........

89

100 M2 MENGASPAL 200 KG


200.000 Kg
Aspal
1.200 M3
Batu Seplit Halus ( 0,5 - 1 ) cm / Penutup
14.354 Ltr
Solar

Page 102

11,200.00
262,300.00
4,300.00

JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5

JUMLAH
HARGA
Rp.
6

11,670.00
306,600.00
25,550.00
378,351.00
722,171.00
7,221.71

850,000.00
615,300.00
840,000.00
23,145.83
2,328,445.83
23,284.46

850,000.00
615,300.00
840,000.00
23,145.83
11,670.00
306,600.00
25,550.00
378,351.00
3,050,616.83
30,506.17

2,240,000.00
314,760.00
61,722.20

2,240,000.00
314,760.00
61,722.20

Analisa-13

NO

HARGA
SATUAN
Rp.
3
77,800.00
43,800.00
73,000.00
14,013,000.00

URAIAN

1
0.400 OH
9.000 OH
0.450 OH
0.013

2
Tukang masak aspal
Pekerja
Mandor
Biaya menggilas sebulan

1 M2 ...........
90

100 M2 MENGASPAL 125 KG


125.000 Kg
Aspal
1.200 M3
Batu Seplit Jagung ( 1 - 2 ) cm/ Kasar
8.971 Ltr
Solar
0.250 OH
Tukang masak aspal
7.500 OH
Pekerja
0.375 OH
Mandor
0.400 Bh
Sikat Ijuk
0.040 Bh
Sikat Baja
0.013
Biaya menggilas sebulan

11,200.00
240,900.00
4,300.00
77,800.00
43,800.00
73,000.00
6,000.00
11,700.00
14,013,000.00
1 M2 ...........

1 M2 PEKERJAAN LAPEN 88+89+90

91

92

100 M2 MENGHAMPAR LAPEN BATU PECAH


2/3 CM + 3/4 CM + ASPAL
3.000 M3
Batu Pecah 2 - 3 cm
1.200 M3
Batu Seplit Jagung ( 1 - 2 ) cm/ Kasar
125.000 Kg
Aspal
8.971 Ltr
Solar
0.250 OH
Tukang masak aspal
7.500 OH
Pekerja
0.375 OH
Mandor
0.400 Bh
Sikat Ijuk
0.040 Bh
Sikat Baja
0.013
Biaya menggilas sebulan

205,100.00
240,900.00
11,200.00
4,300.00
77,800.00
43,800.00
73,000.00
6,000.00
11,700.00
14,013,000.00

1 M2 ...........
100 M2 MENGASPAL 175 KG
175.000 Kg
11,200.00
Aspal
1.200 M3
262,300.00
Batu Seplit Halus ( 0,5 - 1 ) cm / Penutup
12.560 Ltr
4,300.00
Solar
0.400 OH
77,800.00
Tukang masak aspal
9.000 OH
43,800.00
Pekerja
0.450 OH
73,000.00
Mandor
0.013
14,013,000.00
Biaya menggilas sebulan
1 M2 ...........
1 M2 PEKERJAAN BURDA 91+92

93 100 M2 MENGASPAL 100 KG


100.000 Kg
Aspal
1.200 M3
Batu Seplit Jagung ( 1 - 2 ) cm/ Kasar
7.177 Ltr
Solar
0.250 OH
Tukang masak aspal
6.000 OH
Pekerja
0.350 OH
Mandor
0.013
Biaya menggilas sebulan

11,200.00
240,900.00
4,300.00
77,800.00
43,800.00
73,000.00
14,013,000.00
1 M2 ...........

94

100 M2 MENGASPAL 100 KG


100.000 Kg
Aspal
1.200 M3
Batu Seplit Jagung ( 1 - 2 ) cm/ Kasar
7.177 Ltr
Solar
Page 103

11,200.00
240,900.00
4,300.00

JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
31,120.00
394,200.00
32,850.00
182,169.00
640,339.00
2,616,482.20
6,403.39
26,164.82

JUMLAH
HARGA
Rp.
6
31,120.00
394,200.00
32,850.00
182,169.00
3,256,821.20
32,568.21

19,450.00
328,500.00
27,375.00
182,169.00
557,494.00
5,574.94

1,400,000.00
289,080.00
38,576.38
2,400.00
468.00
1,730,524.38
17,305.24

1,400,000.00
289,080.00
38,576.38
19,450.00
328,500.00
27,375.00
2,400.00
468.00
182,169.00
2,288,018.38
22,880.18

19,200.04

66,754.52

85,954.56

19,450.00
328,500.00
27,375.00
182,169.00
557,494.00
5,574.94

615,300.00
289,080.00
1,400,000.00
38,576.38
2,400.00
468.00
2,345,824.38
23,458.24

615,300.00
289,080.00
1,400,000.00
38,576.38
19,450.00
328,500.00
27,375.00
2,400.00
468.00
182,169.00
2,903,318.38
29,033.18

31,120.00
394,200.00
32,850.00
182,169.00
640,339.00
6,403.39

1,960,000.00
314,760.00
54,006.93
2,328,766.93
23,287.67

1,960,000.00
314,760.00
54,006.93
31,120.00
394,200.00
32,850.00
182,169.00
2,969,105.93
29,691.06

11,978.33

46,745.91

58,724.24

19,450.00
262,800.00
25,550.00
182,169.00
489,969.00
4,899.69

1,120,000.00
289,080.00
30,861.10
1,439,941.10
14,399.41

1,120,000.00
289,080.00
30,861.10
19,450.00
262,800.00
25,550.00
182,169.00
1,929,910.10
19,299.10

1,120,000.00
289,080.00
30,861.10

1,120,000.00
289,080.00
30,861.10
Analisa-13

NO

URAIAN

1
0.250
6.000
0.350
0.300
0.030
0.012

OH
OH
OH
Bh
Bh

2
Tukang masak aspal
Pekerja
Mandor
Sikat Ijuk
Sikat Baja
Biaya menggilas sebulan

HARGA
SATUAN
Rp.
3
77,800.00
43,800.00
73,000.00
6,000.00
11,700.00
14,013,000.00
1 M2 ...........

JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
19,450.00
262,800.00
25,550.00
1,800.00
351.00
168,156.00
475,956.00
1,442,092.10
4,759.56
14,420.92
9,659.25

1 M2 PEKERJAAN BURTU 93+94

Page 104

28,820.33

JUMLAH
HARGA
Rp.
6
19,450.00
262,800.00
25,550.00
1,800.00
351.00
168,156.00
1,918,048.10
19,180.48
38,479.58

Analisa-13

NO

URAIAN

95

HARGA
SATUAN
Rp.
3

100 M2 MENGASPAL 120.8 KG


120.800 Kg
11,200.00
Aspal
1.200 M3
262,300.00
Batu Seplit Halus ( 0,5 - 1 ) cm / Penutup
8.670 Ltr
4,300.00
Solar
2.000 OH
77,800.00
Tukang masak aspal
2.000 OH
43,800.00
Pekerja
1.000 OH
73,000.00
Mandor
0.013
14,013,000.00
Biaya menggilas sebulan

1,352,960.00
314,760.00
37,280.21
1,705,000.21
17,050.00

1,352,960.00
314,760.00
37,280.21
155,600.00
87,600.00
73,000.00
182,169.00
2,203,369.21
22,033.69

4,983.69

17,050.00

22,033.69

4,260.00
455.40
1,576.80
116.80
6,409.00
6,409.00
6,409.00
6,409.00
6,409.00
6,409.00
6,409.00
6,409.00

5,960.00
608.42
6,568.42
7,273.75
8,750.54
16,002.25
23,738.88
33,304.96
46,133.21
65,463.75

5,960.00
608.42
4,260.00
455.40
1,576.80
116.80
12,977.42
13,682.75
15,159.54
22,411.25
30,147.88
39,713.96
52,542.21
71,872.75

6,390.00
683.10
2,365.20
1,971.00
11,409.30
11,409.30
11,409.30
11,409.30
11,409.30
11,409.30

26,400.00
2,695.00
29,095.00
43,818.83
36,567.13
43,818.83
95,153.88
80,892.92

26,400.00
2,695.00
6,390.00
683.10
2,365.20
1,971.00
40,504.30
55,228.13
47,976.43
55,228.13
106,563.18
92,302.22

12,800.00
171,300.00
66,100.00
43,800.00
73,000.00
43,800.00
73,000.00

145,420.00
78,840.00
5,840.00
197,100.00
54,750.00
481,950.00
160,650.00

576,000.00
513,900.00
1,089,900.00
363,300.00

576,000.00
513,900.00
145,420.00
78,840.00
5,840.00
197,100.00
54,750.00
1,571,850.00
523,950.00

8,500.00
43,800.00
73,000.00

438.00
438.00
876.00

2,975.00
2,975.00

2,975.00
438.00
438.00
3,851.00

660.00
75,000.00
43,800.00
73,000.00

131,400.00
730.00

660.00
75,000.00
-

660.00
75,000.00
131,400.00
730.00

1 M2 PEKERJAAN BURAS 95
1 M' PAS. PIPA PVC TIPE AW
1.200 M'
0,5"
0.350 harga PVC ( perlengkapan )
0.060 OH
Tukang Batu
0.006 OH
Kepala Tukang Batu
0.036 OH
Pekerja
0.002 OH
Mandor
Pipa Diameter
Pipa Diameter
Pipa Diameter
Pipa Diameter
Pipa Diameter
Pipa Diameter
Pipa Diameter

0,75"
1"
1,5"
2"
2,5"
3"
4"

4,966.67
1,738.33
71,000.00
75,900.00
43,800.00
73,000.00
5,500.00
6,616.67
12,100.00
17,950.00
25,183.33
34,883.33
49,500.00

..
..
..
..
..
..
..

97 1 M' PAS. PIPA GALVANIS


1.200 M'
0,5"
0.350 harga PVC ( perlengkapan )
0.090 OH
Tukang Batu
0.009 OH
Kepala Tukang Batu
0.054 OH
Pekerja
0.027 OH
Mandor
Pipa Diameter
Pipa Diameter
Pipa Diameter
Pipa Diameter
Pipa Diameter

0,75"
1"
1,25"
1,5"
2"

22,000.00
7,700.00
71,000.00
75,900.00
43,800.00
73,000.00
..
..
..
..
..

33,133.33
27,650.00
33,133.33
71,950.00
61,166.67

98 3 M3 BRONJONG KAWAT 4 MM UNTUK DIISI BATU KALI


45.000 Kg
Kawat 4 mm
3.000 M3
Batu Pasang
2.200 OH
Tukang Besi
Penganyam
1.800 OH
Pekerja
Penganyam
0.080 OH
Mandor
4.500 OH
Pekerja
0.750 OH
Mandor
1 M3 PEKERJAAN BRONJONG .....................
99

1 M2 CAT RESIDU/TEER
0.350 Ltr
Residu / Teer
0.010 OH
Pekerja
0.006 OH
Mandor

100 1 M3 Pek. Pracetak beton, Pengangkutan dan Pemasangan


1.000 Ls Alat Pracetak Beton
1.000 Ls Biaya Pengangkutan
3.000 OH Pekerja
0.010 OH Mandor
Page 105

JUMLAH
HARGA
Rp.
6

155,600.00
87,600.00
73,000.00
182,169.00
498,369.00
4,983.69

1 M2 ...........

96

JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5

Analisa-13

NO

URAIAN

HARGA
SATUAN
Rp.
3

JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
132,130.00
75,660.00

JUMLAH
HARGA
Rp.
6
207,790.00

Singaraja, April 2013


Kepala Bidang Cipta Karya
Dinas Pekerjaan Umum
Kabupaten Buleleng,

NI NYOMAN SURATTINI, ST
NIP. 19670102 199803 2 003

Page 106

Analisa-13

DAFTAR HARGA SATUAN BAHAN DAN UPAH


DINAS PEKERJAAN UMUM KABUPATEN BULELNG
TAHUN ANGG.

: 2013
HARGA SATUAN
Rp.
4

NO.

URAIAN

SATUAN

I.

UPAH KERJA
Pekerja
Tukang Batu
Kepala Tukang Batu
Tukang Kayu
Kepala Tukang Kayu
Tukang Cat
Kepala Tukang Cat
Tukang Besi
Kepala Tukang Besi
Tukang Gali
Tukang Ukir kayu
Tukang Ukir paras
Masinis
Kernet
Sopir
Tukang masak aspal
Mandor
Tukang Politur
Tukang Pipa
Kepala Tukang Pipa
Tukang Listrik
Kepala Tukang Listrik
Tukang Style bali
Kepala Tukang Ukir Style Bali
Kepala Tukang Paras

OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH

43,800.00
71,000.00
75,900.00
74,900.00
79,800.00
56,400.00
63,200.00
66,100.00
74,900.00
55,400.00
85,600.00
82,700.00
116,800.00
116,800.00
97,300.00
77,800.00
73,000.00
65,200.00
70,000.00
77,800.00
73,000.00
82,700.00
75,900.00
87,600.00
84,600.00

BAHAN BANGUNAN
Bahan Pasangan :
Batu Pasang
Batu Pecah 5 - 7 cm
Batu Pecah 2 - 3 cm
Batu Pecah 2 - 3 cm/mesin
Batu Pecah 3 - 5 cm
Batu Pecah 3 - 5 cm/mesin
Batu Pecah 10/15
Batu Seplit Halus ( 0,5 - 1 ) cm / Penutup
Batu Seplit Jagung ( 1 - 2 ) cm/ Kasar
Pasir Batu (Sirtu)

M3
M3
M3
M3
M3
M3
M3
M3
M3
M3

171,300.00
274,700.00
205,100.00
291,600.00
212,500.00
285,700.00
262,500.00
262,300.00
240,900.00
235,500.00

Kerikil (Koral) :
1 Kerikil / Koral Beton

M3

199,000.00

Pasir :
1 Pasir Urug
2 Pasir Pasang
3 Pasir Beton

M3
M3
M3

161,200.00
178,300.00
185,600.00

Batu Bata :
1 Bata Gosok klas I
2 Bata Gosok klas II

Bj
Bj

4,300.00
3,800.00

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
II.
A
1
2
3
4
5
6
7
8
9
10
B

Page 107

KETERANGAN
5

Harga Satuan 13

NO.
1
3
4
5
6
7
8
9
10

URAIAN

SATUAN

2
Bata Pasang klas 1
Bata Pasang klas 2
Batu lahar merah Buleleng
Batu pipih Buleleng
Loster Terawang PC
Loster Terawang Keramik
Loster Terawang ( 30x30 ) cm
Loster Terawang ( 40x40 ) cm

3
Bj
Bj
M3
M3
Bj
Bj
Bj
Bj

Page 108

HARGA SATUAN
Rp.
4
1,000.00
900.00
192,700.00
928,100.00
52,400.00
66,400.00
50,000.00
65,000.00

KETERANGAN
5

Harga Satuan 13

NO.
1
E
1
2
3
4
5
6
7
F

SATUAN

2
Paras / Padas :
Paras Malam 50 x 20 x 12 cm
Paras Ukir Selekarang 30 x 15 x 3 cm
Paras Batik
Paras Kerobokan 50 x 20 x 12 cm
Paras Putih Bukit
Serbuk Bata Merah
Palimanan 30/30 T. 2,5 cm

Portland Cement :
1 Semen Gresik ( 50 kg )
2 Semen warna

G
1
2
3
4
5
6
7
8
9
10
11
12
H

URAIAN

Bahan Atap :
Sirap
Genteng Biasa
Bubungan Genteng Biasa
Genteng Karang Pilang
Bubungan Karang Pilang
Genteng Kecil
Bubungan Genteng Kecil
Genteng Kodok
Bubungan Genteng Kodok
Genteng Kaca 3 mm
Genteng Plentong
Bubungan Genteng Plentong

Seng Gelombang :
1 BJLS 0,18 mm
2 BJLS 0,20 mm
3 Seng Talang 30 cm

HARGA SATUAN
Rp.
4

Bj
Bj
Bh
M3
Bh
M3
M3

34,700.00
8,100.00
11,800.00
23,100.00
20,000.00
34,100.00
200,000.00

Zak
Kg

64,300.00
12,100.00

Ikat
Bj
Bj
Bj
Bj
Bj
Bj
Bj
Bj
Bj
Bj
Bj

112,200.00
2,100.00
7,600.00
2,300.00
7,400.00
1,500.00
4,500.00
3,200.00
12,100.00
13,400.00
1,900.00
6,400.00

Lbr
Lbr
m

37,400.00
41,000.00
19,800.00

1
2
3
4

Asbes PC (DJABESMEN) :
Asbes Gel. 1,8 m' x 1,05 m'/4 mm
Nok Asbes/Djabesmen
Rata/Djabesmen (2 m x 1m x 4mm)
Rata/Djabesmen (1 m x 1m x 6mm)

Lbr
M'
Lbr
Lbr

32,800.00
23,500.00
27,800.00
17,100.00

1
2
3
4
5
6

Bahan Baja dan Alumunium :


UK. 75. 0,85
UK. 75. 0,53
UK. 75. 0,85
UK. 75. 0,53
GD.B. 0,43
Plat - Plat Penyambung

M'
M'
M'
M'
M'
M2

30,000.00
25,000.00

Bahan Kayu :
Kayu Jati Papan
Kayu Jati Balok
Kayu Jati Bali Papan
Kayu Jati Bali Balok
Kayu Kamper Papan 3/20
Kayu Kamper Balok 8/12
Kayu Kamper Balok 6/12
Kayu Kamper Reng
Kayu Kamper Usuk 4/6
Kayu Kamper Usuk 5/7
Kayu Meranti Papan

M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3

12,850,200.00
10,708,500.00
10,708,500.00
10,708,500.00
10,024,900.00
8,566,800.00
8,566,800.00
9,637,600.00
8,299,000.00
8,299,000.00
6,157,300.00

K
1
2
3
4
5
6
7
8
9
10
11

Page 109

KETERANGAN
5

15,000.00
15,000.00

Harga Satuan 13

NO.
1
12
13
14
15
16
17
18
19
20
21
22
23

URAIAN

SATUAN

3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
Btg

Kayu Meranti Balok 8/12


Kayu Meranti Balok 6/12
Reng Meranti
Usuk Meranti 4/6
Usuk Meranti 5/7
Kayu Kruing Papan
Kayu Kruing Balok 8/12
Kayu Kruing Balok 6/12
Reng Kruing
Usuk Kruing 5/7
Usuk Kruing 4/6
List Kayu 2/4 - 4 m

Page 110

HARGA SATUAN
Rp.
4
5,086,500.00
5,086,500.00
6,425,100.00
5,354,200.00
5,354,200.00
7,228,200.00
6,692,800.00
6,425,100.00
5,532,600.00
6,157,300.00
6,157,300.00
48,100.00

KETERANGAN
5

Harga Satuan 13

NO.
1
24
25
26
27
28
29
30
L
1
2
3
4
5
6
M
1
2
3
4
5
6
7
8
9
10
11
12
N

SATUAN

3
M3
M3
M3
M3
M3
Lbr
Lbr

HARGA SATUAN
Rp.
4
3,105,400.00
1,285,000.00
10,173,000.00
11,243,900.00
800,000.00
85,000.00
91,000.00

Btg
Btg
Btg
M2
M2
M2

11,700.00
10,200.00
9,600.00
29,900.00
26,700.00
5,000.00

Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bj
Bj
M2
M2

110,500.00
78,500.00
59,400.00
35,600.00
98,500.00
65,700.00
45,900.00
39,400.00
2,200.00
1,700.00
62,700.00
69,600.00

M2

50,000.00

M2
M2
M2
M2
M2
M2
M2
M2

52,800.00
59,100.00
49,200.00
57,100.00
50,100.00
49,900.00
45,900.00
55,200.00

Kg
Kg
Kg
Kg
Kg

10,025.23
9,271.93
8,961.88
8,288.65
10,174.84

Kg
Kg
Kg
Kg
Btg

9,637.98
9,609.86
10,158.47
21,400.00
75,000.00

Kg
M2

20,000.00
15,600.00

Seseh Balok
Papan begesting
Balok Bengkirai
Papan bingkirai
Kayu api
Plywood 4 mm
Plywood 9 mm
Bahan Bambu :
Bambu Besar
Bambu Sedang
Bambu Kecil
Tadir Gedeg Kelas I
Tadir Gedeg Kelas II
Gedeg Glodog
Beton Cetak :
Buis Beton 50/1 m'
Buis Beton 30/1 m'
Buis Beton 25/1 m'
Buis Beton 20"/1 m`
Buis Beton 50/0,75 m'
Buis Beton 30/0,75 m'
Buis Beton 25/0,75 m'
Buis Beton 20"/0,75 m`
Batako Cetak Lubang KW.I
Batako Cetak Lubang KW.II
Paving Blok / 6 cm
Paving Blok / 8 cm

Bahan Lantai :
1 Tegel Warna 20/20 cm
Keramik
1 Keramik KW I 20/20 cm
2 Keramik KW I 20/25 cm
3 Keramik KW I 30/30 cm
4 Keramik KW I 40/40 cm
5 Keramik KW II 20/20 cm
6 Keramik KW II 20/25 cm
7 Keramik KW II 30/30 cm
8 Keramik KW II 40/40 cm

O
1
2
3
4
5
1
2
3
4
5
P

URAIAN

Bahan Besi :
Besi Beton Polos
Besi Beton Polos 6mm
Besi Beton Polos 8mm
Besi Beton Polos 10mm
Besi Beton Polos 12mm
Besi Beton Polos 16mm
Besi Beton ulir
Besi Beton ulir 13mm
Besi Beton ulir 16mm
Besi Beton ulir 19mm
Besi Strip
Besi Siku 50/50 x 5

Kawat
1 Kawat Ikat Beton
2 Kawat nyamuk 1x2 m
Page 111

KETERANGAN
5

Harga Satuan 13

NO.

URAIAN

SATUAN

2
Kawat Harmonika 5 x 5 cm
Kawat Harmonika 4 x 4 cm
Kawat Harmonika 3 x 3 cm
Kawat 4 mm

3
M2
M2
M2
Kg

HARGA SATUAN
Rp.
4
26,000.00
30,500.00
34,800.00
12,800.00

Bahan Rangka Plafond :


Rangka Primer (C Chanel)
Rangka Skundair (M. Furring)

Btg
Btg

50,000.00
40,000.00

1
3
4
5
6
Q
1
2

Page 112

KETERANGAN
5

Harga Satuan 13

URAIAN

SATUAN

2
Paku Peluru
Siku Gantung (Angel Clip)
Rod
Suspension Rod Clip
Conector (Chanel Clamp)
Flushing

3
Bh
Bh
Btg
Bh
Bh
Btg

HARGA SATUAN
Rp.
4
2,000.00
1,000.00
2,500.00
2,500.00
1,500.00
17,500.00

Bahan Plafond :
Eternit Klas I (1/1) M
Eternit Klas II (1/1) M
Triplek 3 mm
Plywood
Teak Wood 4 mm
Ceilingteak
Gypsum (1,2 x 2,4)
List Gypsum
Multipleks ( 6 MM )
Multipleks (9 MM )
Multipleks ( 12 MM )
Aluminium foil
Kalsiboard
Hollow

Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
M'
Lbr
Lbr
Lbr
Lbr
Lbr
m'

19,200.00
16,000.00
52,400.00
49,500.00
80,300.00
91,000.00
58,800.00
19,200.00
80,300.00
112,400.00
187,300.00
374,700.00
59,900.00
10,600.00

Bahan Pipa :
1 Pipa Galvanis
2"
1,5"
1,25"
1"
0,75"
0,5"

Btg
Btg
Btg
Btg
Btg
Btg

367,000.00
431,700.00
363,000.00
165,900.00
198,800.00
132,000.00

2 Pipa PVC AW
4"
3"
2,5"
2"
1,5"
1"
0,75"
0,5"

Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg

297,000.00
209,300.00
151,100.00
107,700.00
72,600.00
39,700.00
33,000.00
29,800.00

3 Pipa PVC C
4"
3"
2,5"
2"
1,5"
1"
0,75"
0,5"

Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg

62,400.00
53,500.00
44,500.00
33,800.00
25,700.00
20,300.00
18,200.00
13,900.00

4 Pipa PVC D
4"
3"
2,5"
2"

Btg
Btg
Btg
Btg

141,900.00
101,700.00
72,300.00
45,500.00

NO.
1
3
4
5
6
7
8
R
1
2
3
4
5
6
7
8
9
10
11
12
13
14
S

Page 113

KETERANGAN
5

Harga Satuan 13

NO.
1

URAIAN

SATUAN

3
Btg
Btg
Btg
Btg

HARGA SATUAN
Rp.
4
38,500.00
32,100.00
27,800.00
21,400.00

(MOF)
(MOF)
(MOF)
(RRJ)

Btg
Btg
Btg
Btg

34,700.00
51,800.00
81,600.00
144,500.00

1,5"
1"
0,75"
0,5"

5 Pipa PVC S
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC

- 10
32
40
50
63

mm
mm
mm
mm

Page 114

KETERANGAN
5

Harga Satuan 13

3
Btg
Btg
Btg

HARGA SATUAN
Rp.
4
205,800.00
289,900.00
431,600.00

Btg
Btg
Btg
Btg
Btg
Btg
Btg

29,900.00
46,000.00
70,500.00
120,100.00
171,300.00
242,400.00
349,900.00

Btg
Btg

7,000.00
14,400.00

Lbr
Kg
Kg
Kg
Kg
Kg
Ltr
Ltr
Ltr
Ltr
Kg
Kg
Kg
Kg

3,200.00
24,600.00
25,300.00
18,200.00
19,200.00
26,200.00
43,500.00
51,700.00
58,800.00
21,400.00
47,100.00
46,600.00
48,100.00
53,500.00

Kg
Kg
Kg
Kg
Kg
Kg
Kg
Ltr
Ltr
Kg
Kg

13,600.00
15,000.00
15,000.00
16,000.00
48,000.00
53,500.00
24,600.00
18,800.00
8,500.00
11,300.00
38,500.00

Bahan Kaca :
1 Kaca Bening 5 mm
2 Kaca Bening 3 mm
3 Kaca Ray-Ban 5 mm

M2
M2
M2

96,300.00
80,300.00
117,700.00

Alat Pengunci :
1 Kunci 2 slaag
2 Kunci 1 slaag
3 Kunci KM / WC

Bh
Bh
Bh

99,100.00
64,200.00
62,400.00

Alat Penggantung :
1 Kait Angin
2 Grendel
3 Engsel kupu-kupu

Psg
Bh
Psg

19,900.00
18,000.00
46,400.00

NO.
1

URAIAN

SATUAN

2
Pipa PVC 75 mm (RRJ)
Pipa PVC 90 mm (RRJ)
Pipa PVC 110 mm (RRJ)
6 Pipa PVC S
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC

- 12,5
32 mm (MOF)
40 mm (MOF)
50 mm (MOF)
63 mm (RRJ)
75 mm (RRJ)
90 mm (RRJ)
110 mm (RRJ)

7 Pipa Listrik
8 Pipa Paralon 5/8"
S
Bahan Finishing :
1 Amplas
2 Meni Kayu
3 Plamir Kayu
4 Cat Dasar Tembok
5 Cat Tembok
6 Dempul
7 Politur
8 Politur jadi ( Ultran )
9 Teak Oil
10 Spritus
11 Sirlak
12 Oker
13 Cat Dasar Kayu
14 Cat Kayu
15 Cat Tembok
16 Vinilek
17 Decolit
18 Paragon
19 Plamir Tembok
20 ICI
21 Cat Besi
22 Cat Meni Besi
23 Minyak Cat
24 Residu / Teer
25 Lem kayu fox
26 Impra
T

Page 115

KETERANGAN
5

Harga Satuan 13

NO.

URAIAN

SATUAN

3
Psg
Bh

HARGA SATUAN
Rp.
4
22,000.00
66,900.00

Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh

490,800.00
749,500.00
164,200.00
1,499,100.00
273,000.00
295,700.00
27,100.00
78,500.00
38,900.00

4 Engsel Nilon
5 Espanolet
W
1
2
3
4
5
6
7
8
9

Bahan Sanitair :
Wastafel
Urinoir
Closet Jongkok
Closet Duduk
Bak Mandi Fiber
Bak Mandi Keramik
Floordrain
Shower
Kran Air

Page 116

KETERANGAN
5

Harga Satuan 13

NO.

URAIAN

SATUAN

X
1
2
3
4
5
6
7
8
9
10
Y
1
2
3
4
5
6
7
8
9
10
11

HARGA SATUAN
Rp.
4

Bahan Paku :
Paku Lis
Paku Reng
Paku Usuk
Paku Seng
Paku Sekrup 3/8"
Paku Sekrup 1/2"
Paku Sekrup 2"
Paku gypsum
Paku beton 5 cm
Paku beton 3"

Kg
Kg
Kg
Kg
Ktk
Ktk
Ktk
Kg
kg
Ktk

25,800.00
22,400.00
23,200.00
26,200.00
15,000.00
16,000.00
19,700.00
24,100.00
33,700.00
23,400.00

Lain - Lain :
Tanah urug
Aspal
Solar
Oli
Waterproff
Sikat Ijuk
Sikat Baja
Alumnium Kulit Jeruk
Ongkos Angkut Kendaraan
Stamper
Sewa Wales

M3
Kg
Ltr
Ltr
Ltr
Bh
Bh
Lbr
Ls
Ls
Hari

105,100.00
11,200.00
4,300.00
27,500.00
55,000.00
6,000.00
11,700.00
96,300.00
20,000.00
20,000.00
120,000.00

KETERANGAN
5

Singaraja, April 2013


Kepala Bidang Cipta Karya
Dinas Pekerjaan Umum
Kabupaten Buleleng,

NI NYOMAN SURATTINI, ST
NIP. 19670102 199803 2 003

Page 117

Harga Satuan 13

USULAN PENYESUAIAN HARGA STANDAR BUPATI 2014


PROVINSI
KABUPATEN

: BALI
: BULELENG
HARGA

No

UPAH / BAHAN

HARGA

HARGA

STD BUPATI
STD BUPATI

SURVEY

SURVEY

SATUAN### 2013-PAJAK
( Rp.)
( Rp.)

JAN 2014

JAN 2013

(Rp.)

(Rp.)

###

HARGA

Pakai

UPAH

Pekerja

OH

###

45,000

45,000

43,800

Mandor

OH

###

75,000

75,000

73,000

Kepala Tukang Kayu

OH

###

81,700

82,000

79,800

Kepala Tukang Batu

OH

###

78,300

78,000

75,900

Kepala Tukang Besi

OH

###

76,700

77,000

74,900

Kepala Tukang Cat

OH

###

65,000

65,000

63,200

Kepala Tukang Style Bali

OH

###

90,000

90,000

87,600

Kepala Tukang Pipa

OH

###

80,000

80,000

77,800

Kepala Tukang Listrik

OH

###

85,000

85,000

82,700

10

Kepala Tukang Paras

OH

###

86,700

87,000

84,600

11

Tukang Kayu

OH

###

76,700

77,000

74,900

12

Tukang Batu

OH

###

73,300

73,000

71,000

13

Tukang Besi

OH

###

68,300

68,000

66,100

14

Tukang Cat

OH

###

58,300

58,000

56,400

15

Tukang Politur

OH

###

66,700

67,000

65,200

16

Tukang Style Bali

OH

###

78,300

78,000

75,900

17

Tukang Pipa

OH

###

71,700

72,000

70,000

18

Tukang Listrik

OH

###

75,000

75,000

73,000

19

Tukang Gali

OH

###

56,700

57,000

55,400

20

Tukang Ukir Kayu

OH

###

87,500

88,000

85,600

21

Tukang Ukir Paras

OH

###

85,000

85,000

82,700

22

Tukang masak aspal

OH

###

80,000

80,000

77,800

23

Tukang Bangunan

OH

###

80,000

80,000

77,800

24

Pengayah Tukang Bangunan

OH

###

55,000

55,000

53,500

25

Masinis

OH

###

120,000

120,000

116,800

26

Kernet

OH

###

120,000

120,000

116,800

27

Sopir

OH

###

100,000

100,000

97,300

B.

Bahan bangunan

BAHAN PASANGAN

Batu Pecah Besar

m3

###

160,920

259,636

259,900

###

252,700

Batu Pecah 5 - 7 cm

m3

###

183,150

282,218

282,300

###

274,700

Batu Pecah 2 - 3 cm

m3

###

178,200

299,564

299,200

###

291,600

Batu Pecah 3 - 4 / 3-5 cm

m3

###

174,510

293,564

293,700

###

285,700

Batu Pecah 1 - 2 cm

m3

###

192,060

308,618

309,100

###

300,400

Batu Pecah 10-15

m3

269,673

269,500

###

262,500

Batu Pecah 0,5 - 1 cm

m3

###

205,920

318,655

318,300

###

310,200

Batu Seplit Halus ( 0,5 - 1 ) cm

m3

###

123,750

269,500

269,500

###

262,300

Batu Seplit Jagung (1 - 2) cm/ kasar

m3

###

118,800

247,500

247,500

###

240,900

10

Pasir Batu (Sirtu)

m3

###

217,800

168,109

170,500

###

235,500

11

Batu Besar W 50 Kg

m3

183,164

187,000

###

178,300

12

Batu Besar W 500 Kg

m3

#DIV/0!

13

Batu Besar W 1000 Kg

m3

#DIV/0!

14

Batu Besar 15/ 20

m3

218,291

220,000

###

212,500

15

Batu 5 - 7 cm

m3

###

198,000

219,491

220,000

###

213,600

16

Batu 2 - 3 cm

m3

###

198,000

210,764

220,000

###

205,100

118

210,000
245,400

HARGA
No

UPAH / BAHAN

HARGA

HARGA

STD BUPATI
STD BUPATI

SURVEY

SURVEY

SATUAN### 2013-PAJAK
( Rp.)
( Rp.)

JAN 2014

JAN 2013

(Rp.)

(Rp.)

###
###

17

Batu 3 - 5 cm

m3

18

Batu ( 0,5 - 1 ) cm

m3

19

Batu (1 - 2) cm

m3

20

Batu Pasang

m3

21

Abu Batu

m3

BATU KARANG

HARGA

Pakai

8
198,000

218,291

220,000

###

212,500

214,473

220,000

###

208,700

###

198,000

215,782

220,000

###

210,000

###

74,250

175,000

176,000

###

171,300

308,000

308,000

###

299,800
-

Lime Stone

m3

###

305,532

#DIV/0!

330,400
-

KERIKIL (KORAL)

Kerikil Biasa/ timbun

m3

###

154,710

198,218

198,000

###

192,900

Kerikil Beton

m3

###

168,300

204,436

205,300

###

199,000

Kerikil Halus

m3

###

185,670

211,964

212,700

###

206,300

Kerikil Sungai (tidak disaring)

m3

###

29,700

192,500

187,300

PASIR

Pasir Urug

m3

###

123,750

165,600

165,000

###

161,200

Pasir Beton

m3

###

134,910

190,691

191,100

###

185,600

Pasir Pasang

m3

###

136,170

183,164

182,900

###

178,300

TANAH

Tanah Urug

BATU BATA

Bata Gosok klas I

bj

###

2,070

4,473

4,400

###

4,300

Bata Gosok klas II

bj

###

2,970

3,927

3,900

###

3,800

Bata Pasang klas I

bj

###

810

1,091

1,100

###

1,000

Bata Pasang klas II

bj

###

720

982

1,000

###

900

Batu Lahar Merah Singaraja

m3

###

178,200

150,545

#DIV/0!

###

192,700

Batu Pipih Singaraja

m3

953,455

#DIV/0!

###

928,100

Loster Terawang PC

bj

###

9,450

53,891

53,900

###

52,400

Roster Terawang Keramik

bj

###

45,810

68,291

68,800

###

66,400

m3

###

61,920

108,000

108,200

###

PARAS/PADAS

Paras Malam 50 x 20 x 12 cm

bj

Paras Ukir Selekarang 30x15x3cm

bj

Paras Batik

bh

Paras Kerobokan 50 x 20 x 12 cm

bh

Serbuk Bata Merah

m3

###

105,100

35,673

#DIV/0!

###

8,400

#DIV/0!

###

8,100

12,218

#DIV/0!

###

11,800

23,782

#DIV/0!

###

23,100

11,880

35,127

#DIV/0!

###

34,100

34,700

PORTLAND CEMENT

Semen Gresik ( 50 kg )

zak

###

57,960

66,109

68,100

###

64,300

Semen Tiga Roda (50 kg)

zak

###

57,240

64,800

65,900

###

63,000

Semen Bosowa (50 kg)

zak

###

53,460

55,211

63,800

###

53,700

Semen Gresik Putih (40 kg)

zak

###

74,790

55,000

Semen Tiga Roda Putih (40 kg)

zak

###

Semen Warna

kg

###

BAHAN ATAP

Sirap

Genteng biasa

#DIV/0!

11,250

10,124

80,800

#DIV/0!
12,500

###

12,100
-

ikat
bj

###

119

1,440

#DIV/0!
2,200

112,200
2,100

HARGA
No

UPAH / BAHAN

HARGA

HARGA

STD BUPATI
STD BUPATI

SURVEY

SURVEY

SATUAN### 2013-PAJAK
( Rp.)
( Rp.)

JAN 2014

JAN 2013

(Rp.)

(Rp.)

###

HARGA

Pakai

Bubungan genteng biasa

bj

###

4,500

7,900

7,600

Genteng Kecil

bj

###

1,170

1,600

1,500

Bubungan genteng kecil

bj

###

3,510

4,700

4,500

Genteng Kodok

bj

###

2,070

3,300

3,200

Bubungan Genteng Kodok

bj

###

8,550

12,500

12,100

Genteng Plentong

bj

###

1,530

2,000

1,900

Bubungan genteng plentong

bj

###

4,500

6,600

6,400

10

Genteng Kaca 3 mm

bj

###

12,600

13,800

13,400

11

Ijuk

Kg

#DIV/0!

#DIV/0!

12

Alang-alang

Lbr

#DIV/0!

#DIV/0!

13

Tali Pengikat

Gulung

#DIV/0!

#DIV/0!

14

Zincalume / spandeck 0,25 mm

m2

###

#DIV/0!

#DIV/0!

#DIV/0!

15

Zincalume / spandeck 0,35 mm

m2

###

#DIV/0!

#DIV/0!

#DIV/0!
-

SENG

Gelombang BJLS 0,18 mm

lbr

###

37,170

Gelombang BJLS 0,20 mm

lbr

###

39,150

Gelombang BJLS 0,28 mm

lbr

###

49,500

#DIV/0!

53,500

Datar BJLS 0,28 mm

lbr

###

11,880

#DIV/0!

12,800

Seng Talang 30 cm

###

18,360

ASBES PC (DJABESMEN)

Asbes Gel. 1,8 m` x 1,05 m`/4 mm

2
3

38,500

37,400

42,200

41,000

10,500

19,800
-

lbr

###

28,710

33,700

32,800

Nok Asbes

###

21,780

#DIV/0!

Rata/Djabesmen 2m x 1m x 4mm

lbr

#DIV/0!

Rata/Djabesmen 1m x 1m x 6mm

lbr

###

15,840

#DIV/0!

17,100

Bubungan

###

21,780

#DIV/0!

35,400

BAHAN KAYU

Kayu Jati Papan

m3

###

11,880,000

13,200,000

12,850,200

Kayu Jati Balok

m3

###

9,900,000

11,000,000

10,708,500

Kayu Jati Bali Papan

m3

###

9,900,000

#DIV/0!

10,708,500

Kayu Jati Bali Balok

m3

###

8,910,000

11,000,000

10,708,500

Kayu Kamper Papan 3/20

m3

###

9,268,020

9,350,000

10,024,900

Kayu Kamper Balok 8/12

m3

###

8,617,950

8,800,000

8,566,800

Kayu Kamper Balok 6/12

m3

###

8,646,030

8,800,000

8,566,800

m3

###

8,202,150

8,525,000

8,299,000

m3

###

7,920,000

8,525,000

8,299,000

5,014,350

9,900,000

9,637,600

23,500
#DIV/0!

8
9

Kayu Kamper Usuk 4/6


Kayu Kamper Usuk 5/7

10

Kayu Kamper Reng

m3

###

11

Kayu Meranti Papan

m3

###

5,692,500

5,500,000

6,157,300

12

Kayu Meranti Balok 8/12

m3

###

4,950,000

5,225,000

5,086,500

13

Kayu Meranti Balok 6/12

m3

###

4,950,000

5,225,000

5,086,500

14

Kayu Meranti Usuk 5/7

m3

###

4,950,000

5,500,000

5,354,200

15

Kayu Meranti Usuk 4/6

m3

###

4,587,030

5,500,000

5,354,200

16

Kayu Meranti Reng

m3

###

3,960,000

6,600,000

6,425,100

17

Kayu Kruing Papan

m3

###

5,775,030

7,425,000

7,228,200

18

Kayu Kruing Balok 8/12

m3

###

6,288,120

6,875,000

6,692,800

19

Kayu Kruing Balok 6/12

m3

###

5,808,870

6,600,000

6,425,100

20

Kayu Kruing Usuk 5/7

m3

###

4,950,000

6,325,000

6,157,300

21

Kayu Kruing Usuk 4/6

m3

###

5,872,320

6,325,000

6,157,300

22

Reng Kruing

m3

###

5,247,000

5,683,300

5,532,600

120

HARGA
No

UPAH / BAHAN

HARGA

HARGA

STD BUPATI
STD BUPATI

HARGA

SURVEY

SURVEY

SATUAN### 2013-PAJAK
( Rp.)
( Rp.)

JAN 2014

JAN 2013

(Rp.)

(Rp.)

###

Pakai

23

Seseh Balok

m3

###

2,871,000

#DIV/0!

24

Papan begesting

m3

###

1,089,000

1,320,000

1,285,000

25

Balok bingkirai

m3

###

9,405,000

10,450,000

10,173,000

26

Papan bingkirai

m3

###

10,890,000

11,550,000

11,243,900

27

Plywood 9 mm

lbr

###

81,720

93,500

28

Seseh Dolken

m3

29

Multipleks

3,105,400

91,000

#DIV/0!

#DIV/0!
-

- 6 mm

lbr

###

76,770

82,500

80,300

- 9 mm

lbr

###

105,570

115,500

112,400

- 12 mm

lbr

###

151,020

192,500

187,300

###

211,230

253,000

246,200

- 18 mm

lbr

30

Dolken kayu 8-10/4m

btg

31

List Kayu 2/4 - 4 m

btg

###

41,220

32

Kayu profil

btg

###

30,330

#DIV/0!

33

Kayu Perancah

m3

#DIV/0!

BAHAN BAMBU

Bambu Besar

btg

###

10,530

12,100

11,700

Bambu Sedang

btg

###

9,450

9,400

10,200

Bambu Kecil

btg

###

8,910

7,700

9,600

Gedeg Kelas I

m2

###

21,330

30,800

29,900

Gedeg Kelas II

m2

###

18,810

27,500

26,700

BETON CETAK

Kerawang PC

bj

Buis Beton 50/1 m`

Buis Beton 30/1 m`

#DIV/0!

#DIV/0!

49,500

48,100
63,300
#DIV/0!
-

3,960

6,785

bj

113,520

bj

80,640

80,600

###

78,500

Buis Beton 25/1 m`

bj

61,025

61,100

###

59,400

Buis Beton 20/1 m`

bj

36,578

36,600

###

35,600

Buis Beton 50/0,75 m`

bj

101,247

101,500

###

98,500

Buis Beton 30/0,75 m`

bj

67,505

67,100

###

65,700

Buis Beton 25/0,75 m`

bj

47,247

47,300

###

45,900

Buis Beton 20/0,75 m`

bj

40,505

40,700

###

39,400

10

Batako Cetak Lubang KW I

bj

###

2,250

2,291

2,200

###

2,200

11

Paving Blok / 6 cm

m2

###

44,550

64,407

64,400

###

62,700

12

Paving Blok / 8 cm

m2

###

52,020

71,509

72,200

###

69,600

m2

###

52,020

90,000

101,800

###

99,100

13

Paving Blok K-300 / 8 cm

###

6,900

###

6,600

113,600 ###

110,500

KERAMIK

Keramik KW I 10/20 cm

m2

###

47,520

54,000

54,500

###

52,500

Keramik KW I 20/25 cm

m2

###

46,080

60,753

61,200

###

59,100

Keramik KW I 20/20 cm

m2

###

47,070

54,240

53,900

###

52,800

Keramik KW I 30/30 cm

m2

###

44,280

50,629

51,300

###

49,200

Keramik KW I 40/40 cm

m2

###

49,050

58,724

58,700

###

57,100

Keramik KW II 20/25 cm

m2

###

47,070

51,305

51,200

###

49,900

Keramik KW II 20/20 cm

m2

###

47,070

51,524

51,700

###

50,100

Keramik KW II 30/30 cm

m2

###

47,070

47,247

47,900

###

45,900

Keramik KW II 40/40 cm

m2

###

49,500

56,705

56,700

###

55,200

BAHAN BESI

Besi Beton Polos

121

HARGA
No

UPAH / BAHAN

HARGA

HARGA

STD BUPATI
STD BUPATI

HARGA

SURVEY

SURVEY

SATUAN### 2013-PAJAK
( Rp.)
( Rp.)

JAN 2014

JAN 2013

(Rp.)

(Rp.)

Pakai

###

- besi 4 mm

ljr

###

13,590

13,900

13,500

- besi 6 mm

ljr

###

24,390

27,500

26,700

- besi 8 mm

ljr

###

40,590

40,700

43,900

- besi 10 mm

ljr

###

61,380

60,500

66,300

- besi 12 mm

ljr

###

89,010

90,800

88,300

- besi 16 mm

ljr

###

178,200

137,500

192,700

- besi 18 mm

ljr

###

- besi 22 mm

ljr

###

#DIV/0!

#DIV/0!

- besi 24 mm

ljr

###

#DIV/0!

#DIV/0!

- besi D 13 mm

ljr

###

111,420

104,500

120,500

- besi D 16 mm

ljr

###

183,150

187,000

182,000

- besi D 19 mm

ljr

###

250,830

247,500

271,300

215,370

#DIV/0!

232,900

Besi Beton ulir

KAWAT

Kawat Ikat Beton

kg

###

18,000

20,600

20,000

Kawat nyamuk 1 x 2 m

m2

###

14,490

14,300

15,600

Kawat Harmonika 5 x 5 cm

m2

###

18,450

26,800

26,000

Kawat Harmonika 4 x 4 cm

m2

###

21,780

31,400

30,500

Kawat Harmonika 3 x 3 cm

m2

###

23,760

35,800

34,800

Kawat 4 mm

kg

13,200

12,800

Besi Strip

kg

17,820

22,000

21,400

Besi Profil WF

kg

BAHAN PLAFON

Eternit Klas I (1/1) M

lbr

###

Eternit Klas II (1/1) M

lbr

###

Triplek 3 mm

lbr

###

Teak Wood 4 mm

lbr

###

Teak Wood 3 mm

lbr

Ceilingteak

lbr

Aluminium Foil

8
9
10

###

#DIV/0!

19,800

19,200

16,500

16,000

48,330

53,900

52,400

74,250

82,500

80,300

60,500

58,800

###

76,770

93,500

lbr

###

346,500

Kalsiboard

lbr

###

50,760

61,600

59,900

Gypsum

lbr

###

79,200

60,500

58,800

List Gypsum

m'

###

19,800

19,800

19,200

hollow

m'

BAHAN PIPA

Pipa Galvanis

16,830
#DIV/0!

91,000

#DIV/0!

374,700

10,600
-

- 2"

btg

###

#DIV/0!

#DIV/0!

- 1,5"

btg

###

237,600

443,520

- 1,25"

btg

###

193,050

372,905

- 1"

btg

###

153,450

- 0,75"

btg

###

123,750

204,305

204,100

###

198,800

- 0,5"

btg

###

99,000

135,600

135,900

###

132,000

- 2" / 6 m

btg

###

316,800

634,505

634,200

###

617,600

- 2" / 4 m

btg

478,669

479,100

###

465,900

443,900

###

431,700

372,900

###

363,000

#DIV/0!

165,900

Pipa PVC AW
- 4"

btg

###

272,250

305,105

305,300

###

297,000

- 3"

btg

###

196,380

215,040

217,300

###

209,300

122

HARGA
No

UPAH / BAHAN

HARGA

HARGA

STD BUPATI
STD BUPATI

HARGA

SURVEY

SURVEY

SATUAN### 2013-PAJAK
( Rp.)
( Rp.)

JAN 2014

JAN 2013

(Rp.)

(Rp.)

Pakai

###

- 2,5"

btg

###

115,470

155,247

155,100

###

151,100

- 2"

btg

###

82,530

110,705

110,000 ###

107,700

- 1,5"

btg

###

57,780

74,585

74,800

###

72,600

- 1"

btg

###

34,920

40,833

40,700

###

39,700

- 0,75"

btg

###

30,240

33,905

34,100

###

33,000

- 0,5"

btg

###

20,070

30,644

30,800

###

29,800
-

Pipa PVC C
- 4"

btg

###

60,660

64,200

62,400

- 3"

btg

###

50,490

55,000

53,500

- 2,5"

btg

###

43,560

45,800

44,500

- 2"

btg

###

34,200

34,800

33,800

- 1,5"

btg

###

24,750

26,400

25,700

- 1"

btg

###

18,810

18,300

20,300

- 0,75"

btg

###

16,830

13,800

18,200

- 0,5"

btg

###

12,870

11,000

13,900
-

Pipa PVC D
- 4"

btg

###

126,270

145,800

141,900

- 3"

btg

###

88,380

104,500

101,700

- 2,5"

btg

###

65,610

74,300

72,300

- 2"

btg

###

44,280

46,800

45,500

- 1,5"

btg

###

34,290

39,600

38,500

- 1"

btg

###

26,280

#DIV/0!

32,100

- 0,75"

btg

###

22,770

#DIV/0!

27,800

- 0,5"

btg

###

14,850

5,500

Pipa listrik

btg

###

5,670

7,200

Pipa Besi 5/8 "

btg

Pipa Paralon 5/8 "

btg

###

Pipa PVC S - 10
- Pipa PVC 32 mm (MOF)

btg

###

#DIV/0!

#DIV/0!

#DIV/0!

- Pipa PVC 40 mm (MOF)

btg

###

#DIV/0!

#DIV/0!

#DIV/0!

- Pipa PVC 50 mm (MOF)

btg

###

#DIV/0!

#DIV/0!

#DIV/0!

- Pipa PVC 20 mm (SCJ) 6m

btg

###

14,040

15,600

15,100

- Pipa PVC 25 mm (SCJ) 6m

btg

###

20,790

23,100

22,400

- Pipa PVC 32 mm (SCJ) 6m

btg

###

34,290

38,100

37,000

btg

###

50,760

56,400

54,900

btg

###

80,370

89,300

86,900

- Pipa PVC 63 mm (SCJ) 6m

btg

###

123,300

137,000

133,300

- Pipa PVC 75 mm (SCJ) 6m

btg

###

175,950

195,500

190,300

- Pipa PVC 90 mm (SCJ) 6m

btg

###

251,370

279,300

271,800

- Pipa PVC 110 mm (SCJ) 6m

btg

###

380,250

422,500

411,300

- Pipa PVC 160 mm (SCJ) 6m

btg

###

803,250

892,500

868,800

- Pipa PVC 200 mm (SCJ) 6m

btg

###

1,311,570

1,457,300

1,418,600

- Pipa PVC 250 mm (SCJ) 6m

btg

###

2,049,840

2,277,600

2,217,200

- Pipa PVC 280 mm (SCJ) 6m

btg

###

2,588,670

2,876,300

2,800,000

- Pipa PVC 315 mm (SCJ) 6m

btg

###

3,262,230

3,624,700

3,528,600

- Pipa PVC 63 mm (RRJ) 6m

btg

###

133,650

148,500

144,500

- Pipa PVC 75 mm (RRJ) 6m

btg

###

190,350

211,500

205,800

- Pipa PVC 90 mm (RRJ) 6m

btg

###

267,210

296,900

289,000

- Pipa PVC 110 mm (RRJ) 6m

btg

###

399,060

443,400

431,600

- Pipa PVC 40 mm (SCJ) 6m


- Pipa PVC 50 mm (SCJ) 6m

4,950

#DIV/0!
6,600

21,400
7,000
14,400
14,400
-

123

HARGA
No

UPAH / BAHAN

HARGA

HARGA

STD BUPATI
STD BUPATI

HARGA

SURVEY

SURVEY

SATUAN### 2013-PAJAK
( Rp.)
( Rp.)

JAN 2014

JAN 2013

(Rp.)

(Rp.)

Pakai

###

- Pipa PVC 160 mm (RRJ) 6m

btg

###

830,880

923,200

898,700

- Pipa PVC 200 mm (RRJ) 6m

btg

###

1,348,200

1,498,000

1,458,300

- Pipa PVC 250 mm (RRJ) 6m

btg

###

2,098,440

2,331,600

2,269,800

- Pipa PVC 280 mm (RRJ) 6m

btg

###

2,651,760

2,946,400

2,868,300

- Pipa PVC 315 mm (RRJ) 6m

btg

###

3,329,730

3,699,700

3,601,600

- Pipa PVC 355 mm (RRJ) 6m

btg

###

4,282,470

4,758,300

4,632,200

- Pipa PVC 400 mm (RRJ) 6m

btg

###

5,543,010

6,158,900

5,995,600

- Pipa PVC 500 mm (RRJ) 6m

btg

###

8,686,530

9,651,700

9,395,900

- Pipa PVC 630 mm (RRJ) 6m

btg

###

14,217,210

15,796,900

15,378,200
-

Pipa PVC S - 12,5


- Pipa PVC 32 mm (MOF) 6m

btg

- Pipa PVC 40 mm (MOF) 6m

btg

- Pipa PVC 50 mm (MOF) 6m

btg

- Pipa PVC 20 mm (SCJ) 6m

btg

###

12,240

13,600

13,200

- Pipa PVC 25 mm (SCJ) 6m

btg

###

18,360

20,400

19,800

- Pipa PVC 32 mm (SCJ) 6m

btg

###

29,160

32,400

31,500

- Pipa PVC 40 mm (SCJ) 6m

btg

###

44,730

49,700

48,300

- Pipa PVC 50 mm (SCJ) 6m

btg

###

68,760

76,400

74,300

- Pipa PVC 63 mm (SCJ) 6m

btg

###

100,980

112,200

109,200

- Pipa PVC 75 mm (SCJ) 6m

btg

###

144,360

160,400

156,100

- Pipa PVC 90 mm (SCJ) 6m

btg

###

208,620

231,800

225,600

- Pipa PVC 110 mm (SCJ) 6m

btg

###

305,280

339,200

330,200

- Pipa PVC 160 mm (SCJ) 6m

btg

###

653,310

725,900

706,600

- Pipa PVC 200 mm (SCJ) 6m

btg

###

1,066,680

1,185,200

1,153,700

- Pipa PVC 250 mm (SCJ) 6m

btg

###

1,677,330

1,863,700

1,814,300

- Pipa PVC 280 mm (SCJ) 6m

btg

###

2,102,130

2,335,700

2,273,800

- Pipa PVC 315 mm (SCJ) 6m

btg

###

2,673,540

2,970,600

2,891,800

- Pipa PVC 63 mm (RRJ) 6m

btg

###

111,060

123,400

120,100

- Pipa PVC 75 mm (RRJ) 6m

btg

###

158,400

176,000

171,300

- Pipa PVC 90 mm (RRJ) 6m

btg

###

224,100

249,000

242,400

- Pipa PVC 110 mm (RRJ) 6m

btg

###

323,550

359,500

349,900

- Pipa PVC 160 mm (RRJ) 6m

btg

###

680,130

755,700

735,600

- Pipa PVC 200 mm (RRJ) 6m

btg

###

1,101,780

1,224,200

1,191,700

- Pipa PVC 250 mm (RRJ) 6m

btg

###

1,723,500

1,915,700

1,864,900

- Pipa PVC 280 mm (RRJ) 6m

btg

###

2,162,700

2,403,100

2,339,400

btg

###

2,738,430

3,042,700

2,962,000

btg

###

3,585,690

3,984,100

3,878,500

- Pipa PVC 400 mm (RRJ) 6m

btg

###

4,523,760

5,026,400

4,893,200

- Pipa PVC 500 mm (RRJ) 6m

btg

###

7,185,960

7,984,400

7,772,800

- Pipa PVC 630 mm (RRJ) 6m

btg

###

11,659,230

12,954,700

12,611,400

- Pipa PVC 315 mm (RRJ) 6m


- Pipa PVC 355 mm (RRJ) 6m

10

Pipa PVC S - 16
- Pipa PVC 32 mm (SCJ) 6m

btg

#DIV/0!

#DIV/0!

- Pipa PVC 50 mm (SCJ) 6m

btg

#DIV/0!

#DIV/0!

- Pipa PVC 63 mm (SCJ) 6m

btg

#DIV/0!

#DIV/0!

- Pipa PVC 75 mm (SCJ) 6m

btg

#DIV/0!

#DIV/0!

- Pipa PVC 90 mm (SCJ) 6m

btg

#DIV/0!

#DIV/0!

- Pipa PVC 110 mm (SCJ) 6m

btg

#DIV/0!

#DIV/0!

- Pipa PVC 160 mm (SCJ) 6m

btg

#DIV/0!

#DIV/0!

- Pipa PVC 63 mm (RRJ) 6m

btg

#DIV/0!

#DIV/0!

124

HARGA
No

UPAH / BAHAN

HARGA

HARGA

STD BUPATI
STD BUPATI

SURVEY

SURVEY

SATUAN### 2013-PAJAK
( Rp.)
( Rp.)

JAN 2014

JAN 2013

(Rp.)

(Rp.)

###

HARGA

Pakai

- Pipa PVC 75 mm (RRJ) 6m

btg

#DIV/0!

#DIV/0!

- Pipa PVC 90 mm (RRJ) 6m

btg

#DIV/0!

#DIV/0!

- Pipa PVC 110 mm (RRJ) 6m

btg

#DIV/0!

#DIV/0!

- Pipa PVC 160 mm (RRJ) 6m

btg

#DIV/0!

#DIV/0!
-

11

Pipa HDPE S 8 SDR 17 PN 10

Diameter Luar (mm)


- 20

3,600

- 25

4,700

- 32

8,400

- 40

11,000

- 50

17,500

- 63

28,000

- 75

38,500

- 90

55,500

- 110

82,900

- 125

105,700

- 140

132,800

- 160

173,600

- 180

220,000

- 200

271,900

- 225

344,400

- 250

422,800

- 280

531,100

- 315

673,000

- 355

855,700

- 400

1,083,200

- 450

1,428,300

- 500

1,756,800

- 560

2,213,200

- 630

2,789,400
-

12

Pipa HDPE S 6,3 SDR 13,6 PN 12,5

Diameter Luar (mm)


- 20

3,600

- 25

5,400

- 32

8,700

- 40

13,600

- 50

21,000

- 63

33,300

- 75

47,200

- 90

67,800

- 110

100,200

- 125

129,400

- 140

162,200

- 160

212,400

- 180

269,300

- 200

330,800

- 225

420,200

- 250

517,600

- 280

649,000

125

HARGA
No

UPAH / BAHAN

HARGA

HARGA

STD BUPATI
STD BUPATI

SURVEY

SURVEY

SATUAN### 2013-PAJAK
( Rp.)
( Rp.)

JAN 2014

JAN 2013

(Rp.)

(Rp.)

###

HARGA

Pakai

- 315

822,300

- 355

1,042,700

- 400

1,323,400

- 450

1,741,800

- 500

2,150,800

- 560

2,699,800

- 630

3,409,900
-

BAHAN FINISHING

Amplas

2
3

lbr

###

3,060

3,300

3,200

Minyak Cat

ltr

###

14,040

19,400

18,800

Meni kayu

kg

###

21,780

25,300

24,600

Plamir kayu

kg

###

22,590

26,000

25,300

Cat Dasar Kayu

kg

###

44,550

25,300

48,100

Cat Kayu

kg

###

36,630

55,000

53,500

Plamir Tembok

kg

###

10,440

16,500

16,000

Cat Dasar Tembok

kg

###

16,830

16,500

18,200

Cat Tembok

kg

###

16,830

19,800

19,200

10

Meni Besi

kg

###

22,500

25,300

24,600

11

Dempul

kg

###

24,750

27,000

26,200

12

Cat Besi

kg

###

44,550

55,000

53,500

13

Politur

ltr

###

39,420

44,700

43,500

14

Politur jadi ( Ultran )

ltr

###

45,090

53,200

51,700

15

Teak Oil

ltr

###

54,450

55,000

58,800

16

Spritus

ltr

###

15,840

22,000

21,400

17

Sirlak

kg

###

43,560

18,700

47,100

18

Oker

kg

###

43,110

19

Lem Kayu

kg

###

11,070

11,700

11,300

20

Impra

kg

###

27,360

39,600

38,500

BAHAN KACA

Kaca Bening 5 mm

m2

###

89,100

Kaca Bening 3 mm

m2

###

74,250

82,500

80,300

Kaca Ray-Ban 5 mm

m2

###

99,000

121,000

117,700

Nako + Tralis

m2

###

247,500

#DIV/0!

46,600

99,000

96,300

#DIV/0!

267,700
-

ALAT PENGUNCI

Kunci 2 Slaag

bh

###

94,050

101,800

99,100

Kunci 1 Slaag

bh

###

61,920

66,000

64,200

Kunci KM/ WC

bh

###

35,640

64,200

62,400

Kunci Gembok

bh

###

22,410

38,500

37,400

Grendel

bh

###

16,650

11,700

18,000

ALAT PENGGANTUNG

Kait Angin

psg

###

9,270

20,433

20,500

###

19,900

Engsel kupu-kupu

psg

###

13,140

47,465

47,700

###

46,400

Engsel Nilon

psg

###

11,250

22,700

22,000

Espanolet

bh

###

59,400

68,800

66,900

BAHAN SANITAIR

Washtafel

bh

###

126

365,040

504,200

490,800

HARGA
No

UPAH / BAHAN

HARGA

HARGA

STD BUPATI
STD BUPATI

SURVEY

SURVEY

SATUAN### 2013-PAJAK
( Rp.)
( Rp.)

JAN 2014

JAN 2013

(Rp.)

(Rp.)

###

HARGA

Pakai

Urinoir

bh

###

693,000

507,818

508,800

###

Closet Jongkok

bh

###

115,110

170,247

168,700

###

749,500
164,200

Closet Duduk

bh

###

1,386,000

1,008,000

1,026,700

###

1,499,100

Bak Mandi Fiber

bh

###

267,300

280,500

Bak Mandi Keramik

bh

###

237,600

303,753

305,800

Floordrain

bh

###

17,820

27,900

Shower

bh

###

72,630

73,300

Kran Air

bh

###

30,240

39,960

41,100

###

38,900

10

Pompa air 150 watt

bh

940,800

940,500

###

915,800
1,971,300

273,000
###

295,700
27,100
78,500

11

Pompa air 250 watt

bh

2,025,000

2,029,500

###

12

Selang Air 1/2'

###

4,500

6,807

6,900

###

6,600

13

Selang Air 3/4'

###

6,480

10,800

10,900

###

10,500

BAHAN PAKU

Paku Lis

kg

###

17,190

26,564

27,100

###

25,800

Paku Reng

kg

###

13,860

23,051

22,700

###

22,400

Paku Usuk

kg

###

13,860

23,836

23,800

###

23,200

Paku Seng

kg

###

20,790

27,000

27,100

###

26,200

Paku Sekrup 1/2"

ktk

###

630

16,500

Paku Sekrup

ktk

###

810

20,247

20,400

Paku gypsum

kg

###

23,760

24,800

24,100

Paku beton 5 cm

kg

###

31,230

16,500

33,700

Paku beton 3"

ktk

###

21,690

17,600

23,400

10

Paku pancing

ktk

19,800

19,200

BAHAN LISTRIK

Sakelar

bj

###

12,600

24,196

24,200

###

23,500

Stop Kontak

bj

###

14,400

33,905

34,100

###

33,000

Fitting

bj

###

12,240

20,247

20,500

###

19,700

Steker

bj

###

8,910

20,160

20,400

###

19,600

Kabel NYM 2x1,5 mm

###

7,650

10,844

11,000 ###

10,500

Kabel NYM 2x2,5 mm

###

11,430

13,625

13,600

13,200

Lampu Pijar 10 Watt

bj

###

4,950

7,700

6,600

Lampu Pijar 15 Watt

bj

###

5,940

8,300

7,200

Lampu Pijar 25 Watt

bj

###

7,200

8,800

7,900

10

Lampu TL 10 Watt

bj

###

23,310

60,500

19,700

11

Lampu TL 20 Watt

bj

###

28,710

61,600

59,900

bj

###

41,580

63,300

61,600

2"

16,000
###

19,700

12

Lampu TL 40 Watt

AA

LAIN-LAIN

###

Aspal
8,280

11,575

11,600 ###

kg

10,124

10,100

###

9,800

kg

9,400

9,400

###

9,100

###

7,470

8,636

8,600

###

8,300

###

4,050

###

10,890

5,500

11,700

###

89,100

46,800

96,300

- Aspal Emulsi

kg

- Aspal Cutback
- Aspal Bitumen
- Aspal Curah

kg

Solar

ltr

Oli

ltr

Sikat Baja

Bh

Alumnium Kulit Jeruk

lbr

Baut Kodok

kg

###

127

11,200

4,300

HARGA
No

UPAH / BAHAN

HARGA

HARGA

STD BUPATI
STD BUPATI

SURVEY

SURVEY

SATUAN### 2013-PAJAK
( Rp.)
( Rp.)

JAN 2014

JAN 2013

(Rp.)

(Rp.)

###

HARGA

KETERANGAN :
- Harga Pakai (untuk satuan upah) tidak termasuk pajak dan keuntungan.
- Harga Pakai (untuk satuan bahan bangunan) belum termasuk pajak, sudah termasuk keuntungan.

Pakai

Singaraja, 14 Ja
Kepala Dinas Pek
Kabupaten B

I Ketut Ya
NIP. 19601231 1

128

ATI 2014

PENYESUAIAN
HARGA
STD BUPATI

KET.

2014
(Rp.)
5

49,500

STD BUPATI 2013 + PPN

82,500

STD BUPATI 2013 + PPN

90,200

STD BUPATI 2013 + PPN

85,800

STD BUPATI 2013 + PPN

84,700

STD BUPATI 2013 + PPN

71,500

STD BUPATI 2013 + PPN

99,000

STD BUPATI 2013 + PPN

88,000

STD BUPATI 2013 + PPN

93,500

STD BUPATI 2013 + PPN

95,700

STD BUPATI 2013 + PPN

84,700

STD BUPATI 2013 + PPN

80,300

STD BUPATI 2013 + PPN

74,800

STD BUPATI 2013 + PPN

63,800

STD BUPATI 2013 + PPN

73,700

STD BUPATI 2013 + PPN

85,800

STD BUPATI 2013 + PPN

79,200

STD BUPATI 2013 + PPN

82,500

STD BUPATI 2013 + PPN

62,700

STD BUPATI 2013 + PPN

96,800

STD BUPATI 2013 + PPN

93,500

STD BUPATI 2013 + PPN

88,000

STD BUPATI 2013 + PPN

88,000

STD BUPATI 2013 + PPN

60,500

STD BUPATI 2013 + PPN

132,000

STD BUPATI 2013 + PPN

132,000

STD BUPATI 2013 + PPN

110,000

STD BUPATI 2013 + PPN

285,600

STD BUPATI 2012

310,440

STD BUPATI 2012

329,520

STD BUPATI 2012

322,920

STD BUPATI 2012

339,480

STD BUPATI 2012

296,640

STD BUPATI 2012

350,520

STD BUPATI 2012

296,450

STD PU 2012

272,250

STD PU 2012

266,200

STD BUPATI 2013 + PPN

201,480

STD BUPATI 2012

237,360

STD BUPATI 2012

277,320

STD BUPATI 2012

240,120

STD BUPATI 2012

241,440

STD BUPATI 2012

231,840

STD BUPATI 2012

129

PENYESUAIAN
HARGA
STD BUPATI

KET.

2014
(Rp.)
5

240,120

STD BUPATI 2012

235,920

STD BUPATI 2012

237,360

STD BUPATI 2012

193,600

SURVEY JAN 2013

338,800

SURVEY JAN 2013

373,428

STD BUPATI 2013 + PPN

218,040

STD BUPATI 2012

224,880

STD BUPATI 2012

233,160

STD BUPATI 2012

211,750

SURVEY JAN 2013

182,160

STD BUPATI 2012

209,760

STD BUPATI 2012

201,480

STD BUPATI 2012

118,800

STD BUPATI 2012

4,920

STD BUPATI 2012

4,320

STD BUPATI 2012

1,200

STD BUPATI 2012

1,080
217,800

STD BUPATI 2012


STD BUPATI 2013 + PPN

1,048,800

STD BUPATI 2012

59,280

STD BUPATI 2012

75,120

STD BUPATI 2012


-

39,240

STD BUPATI 2012

9,240

STD BUPATI 2012

13,440

STD BUPATI 2012

26,160

STD BUPATI 2012

38,640

STD BUPATI 2012

72,720

STD BUPATI 2012

71,280

STD BUPATI 2012

60,732

STD BUPATI 2012

91,410

STD BUPATI 2013 + PPN

13,750

STD BUPATI 2013 + PPN

126,792

STD BUPATI 2012

2,420

SURVEY JAN 2013

130

PENYESUAIAN
HARGA
STD BUPATI

KET.

2014
(Rp.)
5

6
8,690

SURVEY JAN 2013

1,760

SURVEY JAN 2013

5,170

SURVEY JAN 2013

3,630

SURVEY JAN 2013

13,750

SURVEY JAN 2013

2,200

SURVEY JAN 2013

7,260

SURVEY JAN 2013

15,180

SURVEY JAN 2013

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

42,350

SURVEY JAN 2013

46,420

SURVEY JAN 2013

60,500

STD BUPATI 2013 + PPN

14,520

STD BUPATI 2013 + PPN

22,440

STD BUPATI 2013 + PPN

37,070

SURVEY JAN 2013

26,620

STD BUPATI 2013 + PPN

#DIV/0!
19,360

STD BUPATI 2013 + PPN

40,092

STD BUPATI 2012

14,520,000

SURVEY JAN 2013

12,100,000

SURVEY JAN 2013

12,100,000

STD BUPATI 2013 + PPN

12,100,000

SURVEY JAN 2013

11,327,580

STD BUPATI 2013 + PPN

9,680,000

SURVEY JAN 2013

9,680,000

SURVEY JAN 2013

9,377,500

SURVEY JAN 2013

9,377,500

SURVEY JAN 2013

10,890,000

SURVEY JAN 2013

6,957,500

STD BUPATI 2013 + PPN

5,747,500

SURVEY JAN 2013

5,747,500

SURVEY JAN 2013

6,050,000

SURVEY JAN 2013

6,050,000

SURVEY JAN 2013

7,260,000

SURVEY JAN 2013

8,167,500

SURVEY JAN 2013

7,562,500

SURVEY JAN 2013

7,260,000

SURVEY JAN 2013

6,957,500

SURVEY JAN 2013

6,957,500

SURVEY JAN 2013

6,251,630

SURVEY JAN 2013

131

PENYESUAIAN
HARGA
STD BUPATI

KET.

2014
(Rp.)
5

3,509,000

STD BUPATI 2013 + PPN

1,452,000

SURVEY JAN 2013

11,495,000

SURVEY JAN 2013

12,705,000

SURVEY JAN 2013

102,850

SURVEY JAN 2013

#DIV/0!
90,750

SURVEY JAN 2013

127,050

SURVEY JAN 2013

211,750

SURVEY JAN 2013

278,300

SURVEY JAN 2013

#DIV/0!
54,450

SURVEY JAN 2013

71,592

STD BUPATI 2012

#DIV/0!

13,310

SURVEY JAN 2013

11,550

STD BUPATI 2013 + PPN

10,890

STD BUPATI 2013 + PPN

33,880

SURVEY JAN 2013

30,250

SURVEY JAN 2013

7,464

STD BUPATI 2012

124,872

STD BUPATI 2012

88,704

STD BUPATI 2012

67,128

STD BUPATI 2012

40,236

STD BUPATI 2012

111,372

STD BUPATI 2012

74,256

STD BUPATI 2012

51,972

STD BUPATI 2012

44,556

STD BUPATI 2012

2,520

STD BUPATI 2012

70,848

STD BUPATI 2012

78,660

STD BUPATI 2012

111,980

SURVEY JAN 2013

59,400

STD BUPATI 2012

66,828

STD BUPATI 2012

59,664

STD BUPATI 2012

55,692

STD BUPATI 2012

64,596

STD BUPATI 2012

56,436

STD BUPATI 2012

56,676

STD BUPATI 2012

51,972

STD BUPATI 2012

62,376

STD BUPATI 2012

132

PENYESUAIAN
HARGA
STD BUPATI

KET.

2014
(Rp.)
5

6
15,290

SURVEY JAN 2013

30,250

SURVEY JAN 2013

49,610

STD BUPATI 2013 + PPN

75,020

STD BUPATI 2013 + PPN

99,880

SURVEY JAN 2013

217,800

STD BUPATI 2013 + PPN

263,230

STD BUPATI 2013 + PPN

#DIV/0!
#DIV/0!

136,180

STD BUPATI 2013 + PPN

205,700

SURVEY JAN 2013

306,570

STD BUPATI 2013 + PPN

22,660

SURVEY JAN 2013

17,710

STD BUPATI 2013 + PPN

29,480

SURVEY JAN 2013

34,540

SURVEY JAN 2013

39,380

SURVEY JAN 2013

14,520

SURVEY JAN 2013

24,200

SURVEY JAN 2013

#DIV/0!

21,780

SURVEY JAN 2013

18,150

SURVEY JAN 2013

59,290

SURVEY JAN 2013

90,750

SURVEY JAN 2013

66,550

SURVEY JAN 2013

102,850

SURVEY JAN 2013

423,500

STD BUPATI 2013 + PPN

67,760

SURVEY JAN 2013

66,550

SURVEY JAN 2013

21,780

SURVEY JAN 2013

12,000

487,872

STD BUPATI 2012

410,196

STD BUPATI 2012

187,550

STD BUPATI 2013 + PPN

224,736

STD BUPATI 2012

149,160

STD BUPATI 2012

697,956

STD BUPATI 2012

526,536

STD BUPATI 2012

335,616

STD BUPATI 2012

236,544

STD BUPATI 2012

133

PENYESUAIAN
HARGA
STD BUPATI

KET.

2014
(Rp.)
5

170,772

STD BUPATI 2012

121,776

STD BUPATI 2012

82,044

STD BUPATI 2012

44,916

STD BUPATI 2012

37,296

STD BUPATI 2012

33,708

STD BUPATI 2012

70,620

SURVEY JAN 2013

60,500

SURVEY JAN 2013

50,380

SURVEY JAN 2013

38,280

SURVEY JAN 2013

29,040

SURVEY JAN 2013

22,990

STD BUPATI 2013 + PPN

20,570

STD BUPATI 2013 + PPN

15,730

STD BUPATI 2013 + PPN

160,380

SURVEY JAN 2013

114,950

SURVEY JAN 2013

81,730

SURVEY JAN 2013

51,480

SURVEY JAN 2013

43,560

SURVEY JAN 2013

36,300

SURVEY JAN 2013

31,460

SURVEY JAN 2013

24,200

SURVEY JAN 2013

7,920

SURVEY JAN 2013

16,320

STD BUPATI 2012

16,320

STD BUPATI 2012

#DIV/0!
#DIV/0!
#DIV/0!
17,160

STD BUPATI 2013 + PPN

25,410

STD BUPATI 2013 + PPN

41,910

STD BUPATI 2013 + PPN

62,040

STD BUPATI 2013 + PPN

98,230

STD BUPATI 2013 + PPN

150,700

STD BUPATI 2013 + PPN

215,050

STD BUPATI 2013 + PPN

307,230

STD BUPATI 2013 + PPN

464,750

STD BUPATI 2013 + PPN

981,750

STD BUPATI 2013 + PPN

1,603,030

STD BUPATI 2013 + PPN

2,505,360

STD BUPATI 2013 + PPN

3,163,930

STD BUPATI 2013 + PPN

3,987,170

STD BUPATI 2013 + PPN

163,350

STD BUPATI 2013 + PPN

232,650

STD BUPATI 2013 + PPN

326,590

STD BUPATI 2013 + PPN

487,740

STD BUPATI 2013 + PPN

134

PENYESUAIAN
HARGA

KET.

STD BUPATI
2014
(Rp.)
5

1,015,520

STD BUPATI 2013 + PPN

1,647,800

STD BUPATI 2013 + PPN

2,564,760

STD BUPATI 2013 + PPN

3,241,040

STD BUPATI 2013 + PPN

4,069,670

STD BUPATI 2013 + PPN

5,234,130

STD BUPATI 2013 + PPN

6,774,790

STD BUPATI 2013 + PPN

10,616,870

STD BUPATI 2013 + PPN

17,376,590

STD BUPATI 2013 + PPN

14,960

STD BUPATI 2013 + PPN

22,440

STD BUPATI 2013 + PPN

35,640

STD BUPATI 2013 + PPN

54,670

STD BUPATI 2013 + PPN

84,040

STD BUPATI 2013 + PPN

123,420

STD BUPATI 2013 + PPN

176,440

STD BUPATI 2013 + PPN

254,980

STD BUPATI 2013 + PPN

373,120

STD BUPATI 2013 + PPN

798,490

STD BUPATI 2013 + PPN

1,303,720

STD BUPATI 2013 + PPN

2,050,070

STD BUPATI 2013 + PPN

2,569,270

STD BUPATI 2013 + PPN

3,267,660

STD BUPATI 2013 + PPN

135,740

STD BUPATI 2013 + PPN

193,600

STD BUPATI 2013 + PPN

273,900

STD BUPATI 2013 + PPN

395,450

STD BUPATI 2013 + PPN

831,270

STD BUPATI 2013 + PPN

1,346,620

STD BUPATI 2013 + PPN

2,107,270

STD BUPATI 2013 + PPN

2,643,410

STD BUPATI 2013 + PPN

3,346,970

STD BUPATI 2013 + PPN

4,382,510

STD BUPATI 2013 + PPN

5,529,040

STD BUPATI 2013 + PPN

8,782,840

STD BUPATI 2013 + PPN

14,250,170

STD BUPATI 2013 + PPN

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

135

PENYESUAIAN
HARGA
STD BUPATI

KET.

2014
(Rp.)
5

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

4,150

SURVEY JAN 2013

5,312

SURVEY JAN 2013

9,511

SURVEY JAN 2013

12,536

SURVEY JAN 2013

19,820

SURVEY JAN 2013

31,690

SURVEY JAN 2013

43,572

SURVEY JAN 2013

62,726

SURVEY JAN 2013

93,690

SURVEY JAN 2013

119,463

SURVEY JAN 2013

150,064

SURVEY JAN 2013

196,262

SURVEY JAN 2013

248,655

SURVEY JAN 2013

307,243

SURVEY JAN 2013

389,184

SURVEY JAN 2013

477,781

SURVEY JAN 2013

600,136

SURVEY JAN 2013

760,509

SURVEY JAN 2013

966,996

SURVEY JAN 2013

1,224,060

SURVEY JAN 2013

1,613,971

SURVEY JAN 2013

1,985,090

SURVEY JAN 2013

2,500,889

SURVEY JAN 2013

3,151,977

SURVEY JAN 2013

4,150

SURVEY JAN 2013

6,171

SURVEY JAN 2013

9,874

SURVEY JAN 2013

15,428

SURVEY JAN 2013

23,801

SURVEY JAN 2013

37,631

SURVEY JAN 2013

53,349

SURVEY JAN 2013

76,629

SURVEY JAN 2013

113,304

SURVEY JAN 2013

146,253

SURVEY JAN 2013

183,376

SURVEY JAN 2013

240,040

SURVEY JAN 2013

304,315

SURVEY JAN 2013

373,878

SURVEY JAN 2013

474,828

SURVEY JAN 2013

584,914

SURVEY JAN 2013

733,429

SURVEY JAN 2013

136

PENYESUAIAN
HARGA
STD BUPATI

KET.

2014
(Rp.)
5

929,171

SURVEY JAN 2013

1,178,201

SURVEY JAN 2013

1,495,451

SURVEY JAN 2013

1,968,247

SURVEY JAN 2013

2,430,285

SURVEY JAN 2013

3,050,725

SURVEY JAN 2013

3,853,100

SURVEY JAN 2013

3,630

SURVEY JAN 2013

21,340

SURVEY JAN 2013

27,830

SURVEY JAN 2013

28,600

SURVEY JAN 2013

54,450

STD BUPATI 2013 + PPN

60,500

SURVEY JAN 2013

18,150

SURVEY JAN 2013

20,570

STD BUPATI 2013 + PPN

21,780

SURVEY JAN 2013

27,830

SURVEY JAN 2013

29,700

SURVEY JAN 2013

60,500

SURVEY JAN 2013

49,170

SURVEY JAN 2013

58,520

SURVEY JAN 2013

66,550

STD BUPATI 2013 + PPN

24,200

SURVEY JAN 2013

53,240

STD BUPATI 2013 + PPN

52,690

STD BUPATI 2013 + PPN

12,870

SURVEY JAN 2013

43,560

SURVEY JAN 2013

108,900

SURVEY JAN 2013

90,750

SURVEY JAN 2013

133,100

SURVEY JAN 2013

302,500

STD BUPATI 2013 + PPN

111,980

SURVEY JAN 2013

72,600

SURVEY JAN 2013

70,620

SURVEY JAN 2013

42,350

SURVEY JAN 2013

20,350

STD BUPATI 2013 + PPN

22,550

STD BUPATI 2012

52,470

STD BUPATI 2012

24,970

SURVEY JAN 2013

75,680

SURVEY JAN 2013

554,620

SURVEY JAN 2013

137

PENYESUAIAN
HARGA

KET.

STD BUPATI
2014
(Rp.)
5

847,000
185,570
1,694,000
308,550

STD BUPATI 2013 + PPN


SURVEY JAN 2013
STD BUPATI 2013 + PPN
SURVEY JAN 2013

334,128

STD BUPATI 2012

30,690

SURVEY JAN 2013

88,770

STD BUPATI 2013 + PPN

43,956

STD BUPATI 2012

1,034,880

STD BUPATI 2012

2,227,500

STD BUPATI 2012

7,488

STD BUPATI 2012

11,880

STD BUPATI 2012

29,220

STD BUPATI 2012

25,356

STD BUPATI 2012

26,220

STD BUPATI 2012

29,700

STD BUPATI 2012

18,150

SURVEY JAN 2013

22,272

STD BUPATI 2012

27,280

SURVEY JAN 2013

38,170

STD BUPATI 2013 + PPN

26,510

STD BUPATI 2013 + PPN

21,780

SURVEY JAN 2013

26,616

STD BUPATI 2012

37,296

STD BUPATI 2012

22,272

STD BUPATI 2012

22,176

STD BUPATI 2012

11,928

STD BUPATI 2012

14,988

STD BUPATI 2012

7,464

STD BUPATI 2012

8,244

STD BUPATI 2012

8,952

STD BUPATI 2012

22,272

STD BUPATI 2012

67,760

SURVEY JAN 2013

69,630

SURVEY JAN 2013

12,732

STD BUPATI 2012

11,136

STD BUPATI 2012

10,340

SURVEY JAN 2013

9,460

SURVEY JAN 2013

4,950

STD BUPATI 2013 + PPN

13,310

STD BUPATI 2013 + PPN

108,900

STD BUPATI 2013 + PPN

138

PENYESUAIAN
HARGA
STD BUPATI

KET.

2014
(Rp.)
5

Singaraja, 14 Januari 2013


Kepala Dinas Pekerjaan Umum
Kabupaten Buleleng

I Ketut Yasa, ST
NIP. 19601231 198103 1 170

139

430
XXVI. BAHAN BANGUNAN

SATUAN

HARGA
STANDAR
BUPATI (Rp.)

HARGA SBLM
PAJAK (Rp.)

HARGA PAKAI
RKA (Rp.)

(3)

(4)

(5)

(6)

- Batu Bulat

M3

274,560

249,600.0

274,560.00

- Batu Pecah Besar 15/20

M3

285,600

259,600.0

285,560.00

- Batu Pecah 5 - 7 Cm

M3

310,440

282,200.0

310,420.00

- Batu Pecah 3 - 5 Cm

M3

322,920

293,550.0

322,905.00

- Batu Pecah 2 - 3 Cm

M3

329,520

299,550.0

329,505.00

- Batu Pecah 10/15

M3

296,640

269,650.0

296,615.00

- Batu Pecah ( 0,5-1 ) Cm

M3

350,520

318,650.0

350,515.00

- Batu Pecah ( 1-2 ) Cm

M3

339,480

308,600.0

339,460.00

- Pasir Batu (Sirtu)

M3

184,920

168,100.0

184,910.00

- Batu Besar W 50 Kg

M3

201,480

183,150.0

201,465.00

- Batu Besar W 500 Kg

M3

237,360

215,750.0

237,325.00

- Batu Besar W 1000 Kg

M3

277,320

252,100.0

277,310.00

- Batu Besar 15/20

M3

240,120

218,250.0

240,075.00

- Batu 5-7 cm

M3

241,440

219,450.0

241,395.00

- Batu 2-3 cm

M3

231,840

210,750.0

231,825.00

- Batu 3-5 cm

M3

240,120

218,250.0

240,075.00

- Batu ( 0,5 - 1 ) cm

M3

235,920

214,450.0

235,895.00

- Batu ( 1 - 2 ) cm

M3

237,360

215,750.0

237,325.00

NO

NAMA BARANG

(1)
1

(2)
Bahan Pasangan

Batu Karang
- Lime Stone

M3

339,480

Kerikil/Koral

308,600.0
-

339,460.00
-

- Biasa/Timbun

M3

218,040

198,200.0

218,020.00

- Beton

M3

224,880

204,400.0

224,840.00

- Halus

M3

233,160

211,950.0

233,145.00

Tanah Urug

M3

118,800

108,000.0

118,800.00

Pasir

- Tibunan/Urug

M3

182,160

165,600.0

182,160.00

- Beton

M3

209,760

190,650.0

209,715.00

- Pasangan

M3

201,480

183,150.0

201,465.00

Batu Bata

- Bata Gosok Klas I

Biji

4,920

4,450.0

4,895.00

- Bata Gosok Klas II

Biji

4,320

3,900.0

4,290.00

- Batu Pasang Klas I

Biji

1,200

1,050.0

1,155.00

- Batu Pasang Klas II

Biji

1,080

950.0

1,045.00

- Batu Merah Buleleng

M3

165,600

150,500.0

165,550.00

- Batu Pipih Buleleng

M3

1,048,800

953,450.0

1,048,795.00

- Loster Terawang PC

Biji

59,280

53,850.0

59,235.00

75,120

68,250.0

75,075.00

- Loster Terawang Keramik

431
NO

NAMA BARANG

(1)
7

(2)

SATUAN

HARGA
STANDAR
BUPATI (Rp.)

HARGA SBLM
PAJAK (Rp.)

HARGA PAKAI
RKA (Rp.)

(3)

(4)

(5)

(6)

Paras/Padas

- Paras Malam 50 x 20 x 12 cm

Biji

39,240

35,650.0

39,215.00

- Paras Ukir Silakarang 30 x 15 x 3 cm

Biji

9,240

8,400.0

9,240.00

- Paras Batik

Biji

13,440

12,200.0

13,420.00

- Paras Kerobokan 50 x 20 x 12 cm

Biji

26,160

23,750.0

26,125.00

- Serbuk Bata Merah

kg

38,640

35,100.0

38,610.00

Port. Cement (50 Kg)

- Gresik

Zak

72,720

66,100.0

72,710.00

- Tiga Roda

Zak

71,280

64,800.0

71,280.00

- Bosowa

Zak

60,732

55,200.0

60,720.00

- Tiga roda putih

Zak

40,000

36,350.0

39,985.00

- Padang

Zak

37,500

34,050.0

37,455.00

- Tonasa

Zak

39,000

35,450.0

38,995.00

- Semen Warna

Kg

11,136

10,100.0

11,110.00

BAHAN ATAP

Genteng Biasa

Biji

1,860

1,650.0

1,815.00

Bubungan Biasa

Biji

5,988

5,400.0

5,940.00

Plentong Besar

Biji

2,364

2,100.0

2,310.00

Bubungan Plentong Besar

Biji

8,916

8,100.0

8,910.00

Sirap

Ikat

126,792

115,250.0

126,775.00

Ijuk

Kg

37,128

33,750.0

37,125.00

Alang-Alang

Lembar

25,128

22,800.0

25,080.00

- Tali Pengikat

Gulung

22,476

20,400.0

22,440.00

Abses Cement
- Gel. 1,8 M' x 0,80 M'/4 mm
- Bubungan
- Rata. 1' x 1' M'/6 mm

Lembar

41,988

38,150.0

41,965.00

40,092

36,400.0

40,040.00

Lembar

22,272

20,200.0

22,220.00

Seng

- Gel. (BJLS 20)

Lembar

71,160

64,650.0

71,115.00

- Gel. (BJLS 28)

Lembar

59,400

54,000.0

59,400.00

- Datar. (BJLS 28)

Lembar

61,812

56,150.0

61,765.00

BAHAN ASBES

Asbes Gelombang 1,8 m x 1,05m/4 mm

lbr

26,000

23,600.0

25,960.00

Nok asbes/Djabesmen

lbr

25,000

22,700.0

24,970.00

Rata/ Djabesmenn

lbr

15,000

13,600.0

14,960.00

BAHAN KAYU

Kayu Kamper Papan 3/20

M3

11,827,200

10,752,000.0

11,827,200.00

- Kayu Kamper Balok 8/12

M3

11,827,200

10,752,000.0

11,827,200.00

- Kayu Kamper Balok 6/12

M3

11,880,000

10,800,000.0

11,880,000.00

- Kayu Kamper Usuk 5/7

M3

8,613,000

7,830,000.0

8,613,000.00

432
NO

NAMA BARANG

(1)

(2)

SATUAN

HARGA
STANDAR
BUPATI (Rp.)

HARGA SBLM
PAJAK (Rp.)

HARGA PAKAI
RKA (Rp.)

(3)

(4)

(5)

(6)

- Kayu Kamper Usuk 4/6

M3

8,316,000

7,560,000.0

8,316,000.00

- Kayu Kamper Reng

Ikat

480,156

436,500.0

480,150.00

- Kayu Kruing Papan

M3

8,131,200

7,392,000.0

8,131,200.00

- Kayu Kruing Balok 8/12

M3

7,341,180

6,673,800.0

7,341,180.00

- Kayu Kruing Balok 6/12

M3

7,308,840

6,644,400.0

7,308,840.00

- Kayu Kruing Usuk 5/7

M3

6,168,528

5,607,750.0

6,168,525.00

- Kayu Kruing Usuk 4/6

M3

6,712,200

6,102,000.0

6,712,200.00

- Kayu Kruing Reng

Ikat

408,372

371,200.0

408,320.00

- Kayu Meranti Papan

M3

7,425,000

6,750,000.0

7,425,000.00

- Kayu Meranti Balok 8/12

M3

7,350,756

6,682,500.0

7,350,750.00

- Kayu Meranti Balok 6/12

M3

7,383,420

6,712,200.0

7,383,420.00

- Kayu Meranti Usuk 5/7

M3

7,350,756

6,682,500.0

7,350,750.00

- Kayu Meranti Usuk 4/6

M3

7,383,420

6,712,200.0

7,383,420.00

- Kayu Meranti Reng

Ikat

371,256

337,500.0

371,250.00

- Seseh Dolken

M3

48,264

43,850.0

48,235.00

- Seseh Balok

M3

2,932,872

2,666,200.0

2,932,820.00

Multipeks

- 9 mm

Lembar

178,992

162,700.0

178,970.00

- 12 mm

Lembar

114,120

103,700.0

114,070.00

- 18 mm

Lembar

282,156

256,500.0

282,150.00

- Dolken Kayu 8-10/4m

Batang

37,296

33,900.0

37,290.00

10,348,800

9,408,000.0

10,348,800.00

71,592

65,050.0

71,555.00

- List Kayu 2/4


- Kayu Profil

M3
Batang

BAHAN BAMBU
1

- Bambu Besar

Batang

20,052

18,200.0

20,020.00

- Bambu Sedang

Batang

18,732

17,000.0

18,700.00

- Bambu Kecil

Batang

14,916

13,550.0

14,905.00

- Gedeg Kelas I

M2

32,820

29,800.0

32,780.00

- Gedeg Kelas II

M2

29,964

27,200.0

29,920.00

BETON CETAK
1

Kerawang

Buis Beton

Biji

7,464

6,750.0
-

7,425.00
-

- "50/1 m'

Biji

124,872

113,500.0

124,850.00

- "30/1 m'

Biji

88,704

80,600.0

88,660.00

- "25/1 m'

Biji

67,128

61,000.0

67,100.00

- "20/1 m'

Biji

40,236

36,550.0

40,205.00

- "50/0.75 m'

Biji

111,372

101,200.0

111,320.00

- "30/0.75 m'

Biji

74,256

67,500.0

74,250.00

433
NO

NAMA BARANG

(1)

(2)

SATUAN

HARGA
STANDAR
BUPATI (Rp.)

HARGA SBLM
PAJAK (Rp.)

HARGA PAKAI
RKA (Rp.)

(3)

(4)

(5)

(6)

- "25/0.75 m'

Biji

51,972

47,200.0

51,920.00

- "20/0.75 m'

Biji

44,556

40,500.0

44,550.00

Batako Cetak

Biji

2,520

2,250.0

2,475.00

- Paving Blok / 6 Cm

M2

70,848

64,400.0

70,840.00

- Paving Blok / 8 Cm

M2

78,660

71,500.0

78,650.00

BAHAN LANTAI

Keramik Kw. I

- 10 x 20 Cm

M2

59,400

54,000.0

59,400.00

- 20 x 20 Cm

M2

59,664

54,200.0

59,620.00

- 20 x 25 Cm

M2

66,828

60,750.0

66,825.00

- 30 x 30 Cm

M2

55,692

50,600.0

55,660.00

- 40 x 40 Cm

M2

64,596

58,700.0

64,570.00

Keramik Kw. II

- 10 x 20 Cm

M2

- 20 x 20 Cm

M2

56,676

51,500.0

56,650.00

- 20 x 25 Cm

M2

56,436

51,300.0

56,430.00

- 30 x 30 Cm

M2

51,972

47,200.0

51,920.00

- 40 x 40 Cm

M2

62,376

56,700.0

62,370.00

- Ubin PC Abu-abu 15 x 20 cm

M2

38,952

35,400.0

38,940.00

- Ubin PC Abu-abu 20 x 20 cm

M2

38,208

34,700.0

38,170.00

BAHAN BESI

Besi Beton

- 4 mm

Batang

16,404

14,900.0

16,390.00

- 6 mm

Batang

40,092

36,400.0

40,040.00

- 8 mm

Batang

57,912

52,600.0

57,860.00

- 10 mm

Batang

68,004

61,800.0

67,980.00

- 12 mm

Batang

96,528

87,750.0

96,525.00

- 16 mm

Batang

216,288

196,600.0

216,260.00

- 18 mm

Batang

372,900

339,000.0

372,900.00

BESI BETON ULIR

- 13 mm

ljr

90,000

81,800.0

89,980.00

- 16 mm

ljr

135,000

122,700.0

134,970.00

- 19 mm

ljr

200,000

181,800.0

199,980.00

KAWAT

- Kawat ikat Beton

kg

13,700

12,450.0

13,695.00

- Kawat Nyamuk 1 x 2 cm

M2

10,000

9,050.0

9,955.00

- Kawat Harmonika 5 x 5cm

M2

25,000

22,700.0

24,970.00

- Kawat Harmonika 4 x 4 cm

M2

28,000

25,450.0

27,995.00

- Kawat Harmonika 3 x 3 cm

M2

30,000

27,250.0

29,975.00

434
NO

NAMA BARANG

(1)

(2)
- Kawat 4 mm

SATUAN

HARGA
STANDAR
BUPATI (Rp.)

HARGA SBLM
PAJAK (Rp.)

HARGA PAKAI
RKA (Rp.)

(3)

(4)

(5)

(6)

15,000

13,600.0

14,960.00

15,000

13,600.0

14,960.00

kg

BAHAN PLAFON
1

Eternit (1 x 1)

Lembar

20,796

18,900.0

20,790.00

Triplek 4 mm

Lembar

82,044

74,550.0

82,005.00

Triplek 3 mm (jati)

Lembar

116,340

105,750.0

116,325.00

Triplek 6 mm

Lembar

96,492

87,700.0

96,470.00

Ply wood

Lembar

65,000

59,050.0

64,955.00

Teak wood

Lembar

71,800

65,250.0

71,775.00

Ceiling teak

Lembar

70,000

63,600.0

69,960.00

Alumunium Foil

Lembar

190,000

172,700.0

189,970.00

BAHAN PIPA

Galvanis

- 2" / 6m

Batang

697,956

634,500.0

697,950.00

- 2" / 4m

Batang

526,536

478,650.0

526,515.00

- 1,5"

Batang

487,872

443,500.0

487,850.00

- 1,25"

Batang

410,196

372,900.0

410,190.00

- 0,75"

Batang

224,736

204,300.0

224,730.00

- 0,50"

Batang

149,160

135,600.0

149,160.00

Pipa PVC AW/4 m'

- 1/2"

Batang

33,708

30,600.0

33,660.00

- 3/4"

Batang

37,296

33,900.0

37,290.00

- 1"

Batang

44,916

40,800.0

44,880.00

- 1,5"

Batang

82,044

74,550.0

82,005.00

- 2"

Batang

121,776

110,700.0

121,770.00

- 2,5"

Batang

170,772

155,200.0

170,720.00

- 3"

Batang

236,544

215,000.0

236,500.00

- 4"

Batang

335,616

305,100.0

335,610.00

Pipa Listrik

- Besi 5/8"

Batang

16,320

14,800.0

16,280.00

- Paralon 5/8"

Batang

16,320

14,800.0

16,280.00

- Kran Air 1/2"

BH

43,956

39,950.0

43,945.00

BAHAN FINISHING

- Amplas

lbr

2,600

2,350.0

2,585.00

- Meni

kg

15,300

13,900.0

15,290.00

- Cat dasar Tembok

kg

8,100

7,350.0

8,085.00

- Cat Dasar Kayu

kg

17,300

15,700.0

17,270.00

- Dempul

kg

16,500

15,000.0

16,500.00

- Politur

ltr

29,300

26,600.0

29,260.00

- Politur Jadi

ltr

43,200

39,250.0

43,175.00

- Teak Oil

ltr

27,500

25,000.0

27,500.00

435
NO

NAMA BARANG

(1)

(2)

SATUAN

HARGA
STANDAR
BUPATI (Rp.)

HARGA SBLM
PAJAK (Rp.)

HARGA PAKAI
RKA (Rp.)

(3)

(4)

(5)

(6)

- Spiritus

ltr

15,000

13,600.0

14,960.00

- sirlak

ltr

75,000

68,150.0

74,965.00

- Oker

ltr

50,000

45,450.0

49,995.00

- Cat Kayum Emco

kg

40,600

36,900.0

40,590.00

- Plamur Tembok

kg

8,300

7,500.0

8,250.00

- Cat Besi

kg

33,800

30,700.0

33,770.00

- Cat Meni Besi

kg

16,500

15,000.0

16,500.00

- Minyak Cat

ltr

13,000

11,800.0

12,980.00

- Lem Kayu Fok

ltr

10,000

9,050.0

9,955.00

- Impra

kg

25,700

23,350.0

25,685.00

BAHAN KACA

Bening 5 mm

M2

104,952

95,400.0

104,940.00

Es/Kapur 3 mm

M2

231,204

210,150.0

231,165.00

Rayben 5 mm

M2

119,856

108,950.0

119,845.00

Nako + Tralis

M2

144,972

131,750.0

144,925.00

BAHAN LISTRIK
1

- Sakelar

Biji

26,616

24,150.0

26,565.00

- Stop Kontak

Biji

37,296

33,900.0

37,290.00

- Fitting

Biji

22,272

20,200.0

22,220.00

- Steker

Biji

22,176

20,150.0

22,165.00

Kabel

- NYM 2 mm

M'

11,928

10,800.0

11,880.00

- NYM 3 mm

M'

14,988

13,600.0

14,960.00

Bola lampu

- Pijar 10 Watt

Biji

7,464

6,750.0

7,425.00

- Pijar 15 Watt

Biji

8,244

7,450.0

8,195.00

- Pijar 25 Watt

Biji

8,952

8,100.0

8,910.00

- TL 10 Watt

Biji

22,272

20,200.0

22,220.00

- TL 20 Watt

Biji

55,440

50,400.0

55,440.00

- TL 25 Watt

Biji

41,760

37,950.0

41,745.00

ALAT PENGUNCI

- Kunci Gembok

Biji

52,212

47,450.0

52,195.00

- Grendel

Biji

22,176

20,150.0

22,165.00

- Kunci Slot

Biji

44,748

40,650.0

44,715.00

ALAT PENGGANTUNG

- Engsel Kupu-kupu

Set

52,212

47,450.0

52,195.00

- Engsel Nilon

Set

22,176

20,150.0

22,165.00

- Espagnolet

Set

41,016

37,250.0

40,975.00

- Kait Angin

Set

22,476

20,400.0

22,440.00

436
NO

NAMA BARANG

(1)

(2)

SATUAN

HARGA
STANDAR
BUPATI (Rp.)

HARGA SBLM
PAJAK (Rp.)

HARGA PAKAI
RKA (Rp.)

(3)

(4)

(5)

(6)
-

BAHAN SANITAIR

Wastel

- Putih KIA/SUSAN

- Warna KIA?SUSAN

- Toto Type L 850 Warna muda

- Toto Type L 850 Warna tua

- Urinoir Toto U 57 M standar

- Urinoir Toto U 57 M spesil

- Traso lokal/INA

- Warna KIA/INA

CLOSET DUDUK

URINOiR

CLOSET JONGKOK

- Putih KIA

Buah

187,272

187,220.00

- Warna KIA

- Mono blok CW 4203/S 516 STD Muda

- Mono blok CW 4203/S 516 STD Tua

BAK MANDI

170,200.0

Bak Mandi (Fiber) 70 x 70 x 66 Cm

Buah

290,868

264,400.0

290,840.00

Bak Mandi (Keramik)

Buah

334,128

303,750.0

334,125.00

Pompa Air

- 150 Watt

Buah

1,034,880

940,800.0

1,034,880.00

- 250 Watt

Buah

2,227,500

2,025,000.0

2,227,500.00

- Selang Air 1/2'

M'

7,488

6,800.0

7,480.00

- Selang Air 3/4'

M'

11,880

10,800.0

11,880.00

BAHAN PAKU

- Paku Lis

Kg

29,220

26,550.0

29,205.00

- Paku Reng

Kg

25,356

23,000.0

25,300.00

- Paku Usuk

Kg

26,220

23,800.0

26,180.00

- Paku Seng

Kg

29,700

27,000.0

29,700.00

- Paku Beton 5 cm

Kg

17,820

16,200.0

17,820.00

- Paku Skrup 1/2"

biji

4,500

4,050.0

4,455.00

- Paku Skrup 2"

biji

6,500

5,900.0

6,490.00

- Paku Gypsum

kg

22,300

20,250.0

22,275.00

- Paku Pancing

Biji

1,788

1,600.0

1,760.00

Aspal Emulsi

Kg

12,732

11,550.0

12,705.00

10

Aspal Cut Black

Kg

11,136

10,100.0

11,110.00

RENCANA ANGGARAN BIAYA


Rencana : Rehabilitasi Rumah Tinggal
Lokasi
: Denpasar - Bali
Tahun
: 2015
NO

ITEM PEKERJAAN

VOL

SAT

HARGA SATUAN

JUMLAH HARGA

PEKERJAAN LANTAI 1
0
1
2
3
4
5
6
8
I

PEKERJAAN PEMBONGKARAN
Penurunan Atap Genteng
Membongkar Usuk/Reng
Bongkaran Beton Bertulang
Pembongkaran plafon
Membongkar Tembok
Membongkar Lantai Untuk Pondasi
pembongkaran Pasangan Cakar ayam

156.50
156.50
4.50
151.50
87.50
53.00
58.32

m2
ls
m3
m2
m3
m2
m2

Rp
Rp
Rp
Rp
Rp
Rp
Rp

15,860.00
4,000,000.00
632,647.20
6,569.99
38,085.00
90,000.00
125,000.00

Rp
2,482,090.00
Rp
4,000,000.00
Rp
2,846,912.40
Rp
995,353.49
Rp
3,332,437.50
Rp
4,770,000.00
Rp
7,290,000.00
Rp25,716,793.39

156.50
35.00

m1
m1

Rp
Rp

10,000.00
60,975.50

Rp
1,565,000.00
Rp
2,134,142.50
Rp 3,699,142.50

250.00
62.50
31.80
12.50
15.50

m3
m3
m3
m3
m3

Rp
Rp
Rp
Rp
Rp

62,539.50
15,946.50
137,720.73
207,310.00
207,310.00

Rp 15,634,875.00
Rp
996,656.25
Rp
4,379,519.21
Rp
2,591,375.00
Rp
3,213,305.00
Rp26,815,730.46

50.00
125.00

m3
m3

Rp
Rp

377,338.20
639,507.30

Rp 18,866,910.00
Rp 79,938,412.50
Rp98,805,322.50

20.00
50.00

m2
m2

Rp
Rp

133,324.90
121,830.02

Rp
2,666,498.00
Rp
6,091,501.00
Rp 8,757,999.00

140.00
###

m2
m2

Rp
Rp

57,188.85
33,613.92

Rp
8,006,439.00
Rp 58,824,360.00
Rp66,830,799.00

PEKERJAAN BETON
Pek.Beton Rabat 1:3:5 Tebal 5cm
Pek.Beton Pondasi Plat
Pek.Sloof 25/35
Pek.Kolom Beton 25/25
Pek.Kolom Beton 15/15
Pek.Balok 25/35
Pek.Plat Beton Tebal 12 cm
Pek.Beton Plat Tangga
Pek.Balok Tangga
Plesteran Bawah Tangga

7.75
8.10
21.00
5.91
0.32
21.00
18.60
1.83
0.35
5.60

m3
m3
m3
m3
m3
m3
m3
m3
m3
m2

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

673,047.00
4,786,001.00
4,786,001.00
4,786,001.00
4,786,001.00
4,786,001.00
4,786,001.00
4,786,001.00
4,786,001.00
57,188.85

PEKERJAAN PINTU DAN JENDELA


Pek.Kusen Pintu Dan Jendela Jati
Pek.Daun Pintu dan jendela + Kaca Polos 5mm
Pek.Daun Jendela Kaca J2 Kayu Jati + Kaca Polos
Pek.Daun Pintu P1 Panel Kayu Jati
Pek.Daun Pintu P2 Panel Kayu Jati
Pek.Daun Pintu P3 Panel Kayu Jati ( Garase )

0.92
20.40
2.13
7.04
6.16
6.05

m3
m2
m2
m2
m2
m2

Rp
Rp
Rp
Rp
Rp
Rp

14,704,190.00
658,248.80
658,248.80
871,691.00
871,691.00
871,691.00

PEKERJAAN PEMBERSIHAN
1 pekerjaan pembersihan lapangan
1 pekerjaan pasangan bowplank

II
1
2
3
4
5
III

IV

PEKERJAAN TANAH
Pek.Galian Tanah Menerus
Pek.Urugan Kembali
Pek.Urugan Tanah peninggian lantai
Pek.Urugan Pasir Dibawah Pondasi
Pek.Urugan Pasir Dibawah Lantai

PEKERJAAN PONDASI
1 Pek.Pasangan Batu Kosong
2 Pek.Pasangan Batu Kali
PEKERJAAN DINDING
1 Pek.Pasangan Dinding Bata 1:2
2 Pek.Pasangan Dinding Bata 1:5

PEKERJAAN PLESTERAN
1 Plesteran PC 1:2 Tebal 20mm
2 Pek.Acian 1:2

VI
1
2
3
4
5
6
7
8
9
10
VII
1
2
3
5
6
7

Rp
5,216,114.25
Rp 38,766,608.10
Rp 100,506,021.00
Rp 28,267,318.41
Rp
1,507,590.32
Rp 100,506,021.00
Rp 89,019,618.60
Rp
8,758,381.83
Rp
1,675,100.35
Rp
320,257.56
###
Rp
Rp
Rp
Rp
Rp
Rp

13,498,446.42
13,428,275.52
1,403,386.44
6,136,704.64
5,369,616.56
5,273,730.55

8
9
10
11
12
13

Asesoris Pintu Dorong


Engsel Jendela
Engsel Pintu
Grendel Jendela
Hendel Pintu
Kait Angin

VIII
1
2
3
4
5
6
7

PEKERJAAN LANTAI DAN PLAFON


Pek. Keramik 40/40
Pek.Tegel Plin 10/40
Pek.Keramik 30/30 anti slip
Pek.Keramik 20/20 anti slip
Pek.Keramik Dinding 20/30
Pek.Plafon Gypsum Rangka Hollow
Pek.Lis Plafon Gypsum

IX

PEKERJAAN INSTALASI LISTRIK DAN SANITASI


Pek.Titik Lampu
Stop Kontak
Lampu Direx Light
Lampu Down Light
Saklar Tunggal
Saklar Ganda
Kloset Duduk
Floordrain
Shower
Wastafel
Pas.Pipa Air Bersih 1/2
Pas.Pipa Air Bekas 3
Pas.Pipa Air Kotor 4
Pek.Septictank

1
2
3
3
4
5
6
7
8
9
10
11
12
13
X

PEKERJAAN FINISING
1 Finising tembok
2 Finising Kusen
3 Finising daun Pintu Dan Jendela

XI
1
2
3
4
5
6
7

PEKERJAAN PAGAR DAN PAVING


Pek.Galian Tanah Menerus
Pek.Urugan Kembali
Pek.Urugan Pasir Dibawah Pondasi
Pek.Pasangan Batu Kali
Pek.Pasangan Dinding Pagar Bata
Pas.Batu Alam
Pas.Paving

2.00
30.00
13.00
15.00
15.00
15.00

unit
bh
bh
bh
bh
psg

Rp
Rp
Rp
Rp
Rp
Rp

1,500,000.00
28,200.00
28,200.00
17,800.00
87,800.00
16,300.00

Rp
3,000,000.00
Rp
846,000.00
Rp
366,600.00
Rp
267,000.00
Rp
1,317,000.00
Rp
244,500.00
Rp51,151,260.13

125.63
50.00
23.76
5.62
25.60
155.00
500.00

m2
m2
m2
m2
m2
m2
m1

Rp
Rp
Rp
Rp
Rp
Rp
Rp

210,106.00
210,106.00
177,106.00
182,571.60
182,571.60
87,612.50
30,000.00

Rp 26,394,566.25
Rp 10,505,300.00
Rp
4,208,038.56
Rp
1,025,139.53
Rp
4,673,832.96
Rp 13,579,937.50
Rp 15,000,000.00
Rp75,386,814.80

15.00
5.00
15.00
2.00
9.00
3.00
2.00
2.00
2.00
1.00
22.00
12.00
12.00
1.00

titik
titik
bh
bh
bh
bh
bh
bh
bh
bh
m1
m1
m1
unit

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

150,000.00
30,000.00
60,000.00
40,000.00
20,000.00
40,000.00
1,487,900.00
27,200.00
79,900.00
514,800.00
58,000.00
88,000.00
112,000.00
2,000,000.00

Rp
2,250,000.00
Rp
150,000.00
Rp
900,000.00
Rp
80,000.00
Rp
180,000.00
Rp
120,000.00
Rp
2,975,800.00
Rp
54,400.00
Rp
159,800.00
Rp
514,800.00
Rp
1,276,000.00
Rp
1,056,000.00
Rp
1,344,000.00
Rp
2,000,000.00
Rp13,060,800.00

###
24.48
41.78

m2
m2
m2

Rp
Rp
Rp

35,000.00
40,385.05
40,385.05

Rp 61,250,000.00
Rp
988,626.02
Rp
1,687,368.16
Rp63,925,994.18

8.05
2.01
0.58
8.05
34.50
34.50
26.00

m3
m3
m3
m3
m2
m2
m2

Rp
Rp
Rp
Rp
Rp
Rp
Rp

62,539.50
15,946.50
207,310.00
639,507.30
121,830.02
350,000.00
90,000.00

Rp
503,442.98
Rp
32,092.33
Rp
119,203.25
Rp
5,148,033.77
Rp
4,203,135.69
Rp 12,075,000.00
Rp
2,340,000.00
Rp24,420,908.01

TOTAL LANTAI 1

###

PEKERJAAN LANTAI 2
XII

PEKERJAAN DINDING
1 Pek.Pasangan Dinding Bata 1:2
2 Pek.Pasangan Dinding Bata 1:5
3 Pek.Pasangan Reiling

XIII PEKERJAAN PLESTERAN


1 Plesteran PC 1:2 Tebal 20mm
2 Pek.Acian 1:2
XIV PEKERJAAN BETON
1 Pek.Kolom Beton Praktis 15/15

52.36
811.45
16.00

m2
m2
m2

Rp
Rp
Rp

133,324.90
121,830.02
400,000.00

Rp
Rp
Rp

6,980,891.76
98,858,726.07
6,400,000.00
###

###
###

m2
m2

Rp
Rp

57,188.85
33,613.92

Rp
Rp

98,800,372.28
58,071,946.01
###

m3

Rp

4,786,001.00

Rp

13,019,119.22

2.72

2 Pek. Ring Balok 15/20


3 Pek.Plat Beton tebal 10 cm

7.65
10.00

m3
m3

Rp
Rp

4,786,001.00
4,786,001.00

Rp 36,612,907.65
Rp 47,860,010.00
Rp97,492,036.87

XV
1
2
3
4
5
6
7
8
9
10
11

PEKERJAAN PINTU DAN JENDELA


Pek.Kusen Pintu Dan Jendela Jati
Pek.Daun Jendela Kaca J2 Kayu Jati + Kaca Polos
Pek.Daun Pintu P1 Panel Kayu Jati
Pek.Daun Pintu P2 Panel Kayu Jati
Pek.Daun Pintu dan Jendela PJ2+ Kaca Polos 5mm
Asesoris Pintu Dorong
Engsel Jendela
Engsel Pintu
Grendel Jendela
Hendel Pintu
Kait Angin

1.10
20.40
2.13
7.04
6.16
2.00
30.00
13.00
15.00
15.00
15.00

m3
m2
m2
m2
m2
unit
bh
bh
bh
bh
psg

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

14,704,190.00
658,248.80
871,691.00
871,691.00
658,248.80
1,500,000.00
28,200.00
28,200.00
17,800.00
87,800.00
16,300.00

Rp 16,145,200.62
Rp 13,428,275.52
Rp
1,858,445.21
Rp
6,136,704.64
Rp
4,054,812.61
Rp
3,000,000.00
Rp
846,000.00
Rp
366,600.00
Rp
267,000.00
Rp
1,317,000.00
Rp
244,500.00
Rp47,664,538.60

XVI
1
2
3
4
5
6

PEKERJAAN LANTAI DAN PLAFON


Pek. Keramik 40/40
Pek.Tegel Plin 10/40
Pek.Keramik 20/20 anti slip
Pek.Keramik Dinding 20/30
Pek.Plafon Gypsum Rangka Hollow
Pek.Lis Plafon Gypsum

155.00
51.00
5.61
22.85
175.00
125.58

m2
m2
m2
m2
m2
m1

Rp
Rp
Rp
Rp
Rp
Rp

210,106.00
210,106.00
182,571.60
182,571.60
168,713.00
30,000.00

Rp 32,566,430.00
Rp 10,715,406.00
Rp
1,024,226.68
Rp
4,171,395.92
Rp 29,524,775.00
Rp
3,767,400.00
Rp81,769,633.59

XVII
1
2
3
4
5
6
7
8
9
10
11
12

PEKERJAAN INSTALASI LISTRIK DAN SANITASI


Pek.Titik Lampu
15.00
Stop Kontak
5.00
Lampu Down Light. 20 Watt + rumah
15.00
Saklar Tunggal
9.00
Saklar Ganda
3.00
Pas.Penangkal Petir 1 Tongkat
1.00
Kloset Duduk
3.00
Floordrain
3.00
Shower
3.00
Pas.Pipa Air Bersih 1/2
20.00
Pas.Pipa Air Bekas 3
20.00
Pas.Pipa Air Kotor 4
20.00

titik
titik
bh
bh
bh
bh
bh
bh
bh
m1
m1
m1

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

150,000.00
30,000.00
40,000.00
20,000.00
40,000.00
5,000,000.00
1,487,900.00
27,200.00
79,900.00
58,000.00
88,000.00
112,000.00

Rp
2,250,000.00
Rp
150,000.00
Rp
600,000.00
Rp
180,000.00
Rp
120,000.00
Rp
5,000,000.00
Rp
4,463,700.00
Rp
81,600.00
Rp
239,700.00
Rp
1,160,000.00
Rp
1,760,000.00
Rp
2,240,000.00
Rp18,245,000.00

XVIIIPEKERJAAN ATAP
1 Pek.Rangka baja
2 Pas.Genteng Karang Pilang
3 Pas.Genteng Bubungan
4 Pek.Papan Lisplank (3/25) Kamper

150.00
155.00
60.00
100.00

m2
m2
m1
m1

Rp
Rp
Rp
Rp

150,000.00
180,255.00
97,258.84
131,829.92

Rp 22,500,000.00
Rp 27,939,525.00
Rp
5,835,530.40
Rp 13,182,992.00
Rp69,458,047.40

XIX
1
2
3
4
5
6

###
24.48
35.73
175.00
52.00
2.00

m2
m2
m2
m2
m2
unit

Rp
Rp
Rp
Rp
Rp
Rp

35,000.00
40,385.05
40,385.05
35,000.00
350,000.00
2,000,000.00

Rp 60,466,560.00
Rp
988,626.02
Rp
1,443,038.61
Rp
6,125,000.00
Rp 18,200,000.00
Rp
4,000,000.00
Rp91,223,224.63

PEKERJAAN FINISING
Finising tembok
Finising Kusen
Finising daun Pintu Dan Jendela
Finising Plafon
Pas. Batu Alam
Pas. Ukiran Paras

TOTAL LANTAI 2
COST
PEMBULATAN

###
Rp 1,508,079,012.61
Rp 1,508,079,000.00

TERBILANG
Satu Milyar Lima Ratus Delapan Juta Tujuh Puluh Sembilan Ribu Rupiah

RENCANA ANGGARAN BIAYA


Rencana : Rehabilitasi Rumah Tinggal
Lokasi
: Denpasar - Bali
Tahun
: 2014
NO
I
1
2
3
4
5

ITEM PEKERJAAN

VOL

PEKERJAAN PEMBONGKARAN
Penurunan Atap Genteng
Membongkar Usuk/Reng
Bongkaran Beton Bertulang
Membongkar Tembok
Membongkar Lantai

273.44
273.44
4.50
8.14
91.30

SAT
m2
m2
m3
m3
m2

HARGA SATUAN
Rp
Rp
Rp
Rp
Rp

7,930.00
2,072.00
316,323.60
294,423.60
9,490.00

TOTAL
PEMBULATAN
TERBILANG
Tujuh Juta Empat Ratus Dua Puluh Ribu Rupiah

AYA

JUMLAH HARGA
Rp
Rp
Rp
Rp
Rp

2,168,379.20
566,567.68
1,423,456.20
2,396,608.10
866,437.00

###
Rp

7,420,000.00