PROVINSI
KABUPATEN
No
: BALI
: BULELENG
UPAH / BAHAN
SATUAN
HARGA
HARGA
HARGA
HARGA
HARGA
HARGA
UD. Haryona
Toko
UD. Karya
Toko
Toko
Toko
Putra
Mutiara
Murni
Bambu Sari
Adi Karya
Sinar Alam
Putra
Putra
Putra
Patas
Rengdikit
Busung Biu
Singaraja
Singaraja
Serirt
Serirt
Serirt
( Rp.)
( Rp.)
( Rp.)
( Rp.)
( Rp.)
( Rp.)
( Rp.)
( Rp.)
( Rp.)
HARGA
HARGA
HARGA
HARGA
Survey
Rata-rata
( Rp.)
5
UPAH
Pekerja
OH
48,800
48,800
48,800
48,800
48,800
48,800
48,800
48,800
48,800
48,800
Mandor
OH
82,800
82,800
82,800
82,800
82,800
82,800
82,800
82,800
82,800
82,800
OH
83,700
83,700
83,700
83,700
83,700
83,700
83,700
83,700
83,700
83,700
OH
81,800
81,800
81,800
81,800
81,800
81,800
81,800
81,800
81,800
81,800
OH
78,900
78,900
78,900
78,900
78,900
78,900
78,900
78,900
78,900
78,900
OH
70,500
70,500
70,500
70,500
70,500
70,500
70,500
70,500
70,500
70,500
OH
90,100
90,100
90,100
90,100
90,100
90,100
90,100
90,100
90,100
90,100
OH
77,800
77,800
77,800
77,800
77,800
77,800
77,800
77,800
77,800
77,800
OH
80,300
80,300
80,300
80,300
80,300
80,300
80,300
80,300
80,300
80,300
10
OH
88,600
88,600
88,600
88,600
88,600
88,600
88,600
88,600
88,600
88,600
11
Tukang Kayu
OH
81,400
81,400
81,400
81,400
81,400
81,400
81,400
81,400
81,400
81,400
12
Tukang Batu
OH
74,500
74,500
74,500
74,500
74,500
74,500
74,500
74,500
74,500
74,500
13
Tukang Besi
OH
72,100
72,100
72,100
72,100
72,100
72,100
72,100
72,100
72,100
72,100
14
Tukang Cat
OH
57,400
57,400
57,400
57,400
57,400
57,400
57,400
57,400
57,400
57,400
15
Tukang Politur
OH
66,700
66,700
66,700
66,700
66,700
66,700
66,700
66,700
66,700
66,700
16
OH
79,400
79,400
79,400
79,400
79,400
79,400
79,400
79,400
79,400
79,400
17
Tukang Pipa
OH
71,500
71,500
71,500
71,500
71,500
71,500
71,500
71,500
71,500
71,500
18
Tukang Listrik
OH
73,000
73,000
73,000
73,000
73,000
73,000
73,000
73,000
73,000
73,000
19
Tukang Gali
OH
56,900
56,900
56,900
56,900
56,900
56,900
56,900
56,900
56,900
56,900
20
OH
86,600
86,600
86,600
86,600
86,600
86,600
86,600
86,600
86,600
86,600
21
OH
82,700
82,700
82,700
82,700
82,700
82,700
82,700
82,700
82,700
82,700
22
OH
77,800
77,800
77,800
77,800
77,800
77,800
77,800
77,800
77,800
77,800
23
Tukang Bangunan
OH
88,700
88,700
88,700
88,700
88,700
88,700
88,700
88,700
88,700
88,700
24
OH
54,200
54,200
54,200
54,200
54,200
54,200
54,200
54,200
54,200
54,200
25
Masinis
OH
115,200
115,200
115,200
115,200
115,200
115,200
115,200
115,200
115,200
115,200
26
Kernet
OH
115,100
115,100
115,100
115,100
115,100
115,100
115,100
115,100
115,100
115,100
27
Sopir
OH
96,000
96,000
96,000
96,000
96,000
96,000
96,000
96,000
96,000
96,000
B.
Bahan bangunan
BAHAN PASANGAN
m3
Batu Pecah 5 - 7 cm
m3
Batu Pecah 2 - 3 cm
m3
275,000
175,000
200,000
m3
250,000
175,000
Batu Pecah 1 - 2 cm
m3
285,500
175,000
m3
175,000
290,000
m3
175,000
m3
200,000
m3
200,000
10
m3
11
Batu Besar W 50 Kg
m3
12
m3
13
m3
14
m3
15
Batu 5 - 7 cm
m3
16
Batu 2 - 3 cm
m3
17
Batu 3 - 5 cm
m3
18
Batu ( 0,5 - 1 ) cm
m3
19
Batu (1 - 2) cm
m3
20
Batu Pasang
m3
21
Abu Batu
m3
BATU KARANG
115,000
175,000
200,000
175,000
55,000
175,000
175,000
73,889
195,000
175,000
60,556
200,000
175,000
113,889
250,000
175,000
94,444
250,000
175,000
98,389
51,667
19,444
250,000
50,000
22,222
200,000
47,778
200,000
22,222
200,000
22,222
215,000
23,889
180,000
200,000
200,000
195,000
175,000
105,556
-
Lime Stone
m3
KERIKIL (KORAL)
m3
Kerikil Beton
m3
Kerikil Halus
m3
m3
PASIR
Pasir Urug
m3
Pasir Beton
m3
200,000
200,000
22,222
250,000
200,000
175,000
91,667
-
250,000
27,778
-
200,000
140,000
200,000
250,000
165,000
125,000
36,111
125,000
97,778
No
UPAH / BAHAN
SATUAN
3
m3
HARGA
HARGA
HARGA
HARGA
HARGA
HARGA
UD. Haryona
Toko
UD. Karya
Toko
Toko
Toko
Putra
Mutiara
Murni
Bambu Sari
Adi Karya
Sinar Alam
Putra
Putra
Putra
Patas
Rengdikit
Busung Biu
Singaraja
Singaraja
Serirt
Serirt
Serirt
( Rp.)
( Rp.)
( Rp.)
( Rp.)
( Rp.)
( Rp.)
( Rp.)
( Rp.)
( Rp.)
4
150,000
HARGA
HARGA
HARGA
HARGA
Survey
Rata-rata
( Rp.)
5
170,000
250,000
250,000
185,000
125,000
125,556
Pasir Pasang
TANAH
Tanah Urug
BATU BATA
bj
5,000
3,000
bj
2,500
2,500
bj
1,250
2,000
bj
m3
m3
Loster Terawang PC
bj
bj
PARAS/PADAS
Paras Malam 50 x 20 x 12 cm
bj
bj
Paras Batik
bh
Paras Kerobokan 50 x 20 x 12 cm
bh
Kg
PORTLAND CEMENT
Semen Gresik ( 50 kg )
zak
zak
zak
zak
zak
Semen Warna
kg
BAHAN ATAP
Sirap
Genteng biasa
bj
1,400
1,350
1,500
2,500
bj
3,000
3,500
5,000
4,500
Genteng Kecil
bj
1,100
1,000
1,200
1,700
556
bj
1,500
2,000
3,500
3,500
1,167
Genteng Kodok
bj
2,000
5,000
4,500
1,278
bj
5,000
20,000
23,000
5,333
Genteng Plentong
bj
1,700
2,500
2,500
744
bj
3,500
5,000
4,500
1,444
10
Genteng Kaca 3 mm
bj
12,000
15,000
12,000
5,667
11
Ijuk
Kg
12
Alang-alang
Lbr
13
Tali Pengikat
Gulung
14
m2
#DIV/0!
#DIV/0!
15
m2
#DIV/0!
#DIV/0!
m3
50,000
60,000
175,000
45,000
75,000
45,000
889
556
1,200
1,000
250,000
250,000
111
55,556
500,000
50,000
494
55,556
35,000
10,000
5,000
50,000
45,000
60,000
48,000
5,000
6,111
50,000
33,667
-
8,000
7,500
1,722
-
62,000
61,000
62,000
62,000
62,000
62,000
60,000
55,000
63,000
65,000
21,000
64,000
41,556
12,778
-
#DIV/0!
10,500
95,000
110,000
110,000
12,000
8,000
12,000
#DIV/0!
10,000
5,833
-
ikat
12,000
750
1,778
SENG
lbr
lbr
lbr
40,000
lbr
40,000
Seng Talang 30 cm
ASBES PC (DJABESMEN)
Nok Asbes
Rata/Djabesmen 2m x 1m x 4mm
lbr
Rata/Djabesmen 1m x 1m x 6mm
lbr
Bubungan
BAHAN KAYU
m3
m3
m3
m3
m3
m3
m3
40,000
37,000
11,000
13,000
40,000
10,000
11,000
38,000
42,000
8,667
13,222
4,444
4,444
12,000
10,000
7,444
-
33,000
lbr
30,000
28,000
33,000
35,000
35,000
18,222
29,000
6,556
29,000
3,222
8,500,000
944,444
8,750,000
8,500,000
1,916,667
8,750,000
8,000,000
1,861,111
No
UPAH / BAHAN
SATUAN
HARGA
HARGA
HARGA
HARGA
HARGA
HARGA
UD. Haryona
Toko
UD. Karya
Toko
Toko
Toko
Putra
Mutiara
Murni
Bambu Sari
Adi Karya
Sinar Alam
Putra
Putra
Putra
Patas
Rengdikit
Busung Biu
Singaraja
Singaraja
Serirt
Serirt
Serirt
( Rp.)
( Rp.)
( Rp.)
( Rp.)
( Rp.)
( Rp.)
( Rp.)
( Rp.)
( Rp.)
HARGA
HARGA
HARGA
HARGA
Survey
Rata-rata
( Rp.)
5
m3
8,750,000
7,000,000
1,750,000
m3
9,000,000
7,000,000
1,777,778
10
m3
10,000,000
6,000,000
1,777,778
11
m3
7,200,000
4,500,000
1,300,000
12
m3
5,250,000
4,500,000
1,083,333
13
m3
6,000,000
4,000,000
1,111,111
14
m3
5,200,000
4,000,000
1,022,222
15
m3
5,200,000
4,000,000
1,022,222
16
m3
4,250,000
3,500,000
861,111
17
m3
7,750,000
7,000,000
1,638,889
18
m3
6,475,000
7,000,000
1,497,222
19
m3
5,500,000
6,475,000
6,000,000
1,997,222
20
m3
5,500,000
6,475,000
6,000,000
1,997,222
21
m3
5,500,000
6,300,000
5,500,000
1,922,222
22
Reng Kruing
m3
5,525,000
5,500,000
1,225,000
23
Seseh Balok
m3
3,000,000
2,500,000
888,889
24
Papan begesting
m3
1,100,000
122,222
25
Balok bingkirai
m3
26
Papan bingkirai
m3
27
Plywood 9 mm
lbr
28
Seseh Dolken
m3
29
Multipleks
2,500,000
200,000
125,000
36,111
-
- 6 mm
lbr
- 9 mm
lbr
- 12 mm
lbr
- 18 mm
lbr
30
btg
31
btg
32
Kayu profil
btg
33
Kayu Perancah
m3
BAHAN BAMBU
Bambu Besar
btg
Bambu Sedang
Bambu Kecil
75,000
75,000
90,000
85,000
36,111
105,000
135,000
125,000
40,556
165,000
185,000
38,889
235,000
250,000
53,889
20,000
20,000
2,222
20,000
25,000
7,222
75,000
8,333
3,000,000
333,333
-
7,000
10,000
10,000
10,000
15,000
5,778
btg
7,500
btg
6,000
8,000
12,000
3,056
6,000
10,000
Gedeg Kelas I
m2
40,000
30,000
Gedeg Kelas II
m2
30,000
25,000
BETON CETAK
Kerawang PC
bj
90,000
5,000
10,556
bj
95,000
75,000
18,889
bj
70,000
35,000
11,667
bj
60,000
30,000
10,000
bj
45,000
30,000
bj
95,000
75,000
125,000
32,778
bj
70,000
40,000
75,000
20,556
bj
60,000
30,000
bj
45,000
30,000
10
bj
11
Paving Blok / 6 cm
m2
12
Paving Blok / 8 cm
m2
13
m2
KERAMIK
Keramik KW I 10/20 cm
m2
Keramik KW I 20/25 cm
m2
60,000
Keramik KW I 20/20 cm
m2
60,000
Keramik KW I 30/30 cm
m2
Keramik KW I 40/40 cm
m2
Keramik KW II 20/25 cm
32,000
2,444
11,333
6,111
-
2,200
2,500
8,333
10,000
8,333
2,200
2,250
1,017
75,000
65,000
60,000
22,222
125,000
75,000
85,000
31,667
-
65,000
55,000
13,333
52,000
75,000
55,000
53,000
65,000
55,000
50,000
47,000
55,000
65,000
65,000
51,000
65,000
65,000
m2
55,000
45,000
Keramik KW II 20/20 cm
m2
55,000
45,000
11,111
Keramik KW II 30/30 cm
m2
45,000
50,000
50,000
16,111
Keramik KW II 40/40 cm
m2
55,000
55,000
55,000
BAHAN BESI
50,000
55,000
38,556
55,000
32,000
48,000
47,500
34,722
52,000
50,000
38,667
11,111
55,000
24,444
-
- besi 4 mm
ljr
15,000
7,000
17,000
5,000
18,000
16,000
8,667
- besi 6 mm
ljr
30,000
20,000
20,000
20,000
33,000
30,000
17,000
- besi 8 mm
ljr
50,000
40,000
27,500
42,000
47,000
50,000
28,500
No
UPAH / BAHAN
SATUAN
HARGA
HARGA
HARGA
HARGA
HARGA
HARGA
UD. Haryona
Toko
UD. Karya
Toko
Toko
Toko
Putra
Mutiara
Murni
Bambu Sari
Adi Karya
Sinar Alam
Putra
Putra
Putra
Patas
Rengdikit
Busung Biu
Singaraja
Singaraja
Serirt
Serirt
Serirt
( Rp.)
( Rp.)
( Rp.)
( Rp.)
( Rp.)
( Rp.)
( Rp.)
( Rp.)
( Rp.)
HARGA
HARGA
HARGA
HARGA
Survey
Rata-rata
( Rp.)
5
- besi 10 mm
ljr
70,000
49,000
40,000
65,000
75,000
70,000
41,000
- besi 12 mm
ljr
110,000
86,000
65,000
75,000
95,000
100,000
59,000
- besi 16 mm
ljr
155,000
- besi 18 mm
ljr
- besi 22 mm
ljr
#DIV/0!
#DIV/0!
- besi 24 mm
ljr
#DIV/0!
#DIV/0!
115,000
30,000
145,000
16,111
ljr
115,000
125,000
115,000
120,000
52,778
- besi D 16 mm
ljr
165,000
180,000
165,000
180,000
76,667
- besi D 19 mm
ljr
225,000
25,000
-
KAWAT
kg
15,000
18,000
17,500
25,000
Kawat nyamuk 1 x 2 m
m2
15,000
12,000
15,000
18,000
15,000
8,333
Kawat Harmonika 5 x 5 cm
m2
18,000
20,000
20,000
25,000
20,000
11,444
Kawat Harmonika 4 x 4 cm
m2
20,000
20,000
20,000
6,667
Kawat Harmonika 3 x 3 cm
m2
20,000
20,000
20,000
6,667
Kawat 4 mm
kg
Besi Strip
kg
Besi Profil WF
kg
BAHAN PLAFON
lbr
lbr
Triplek 3 mm
lbr
Teak Wood 4 mm
lbr
Teak Wood 3 mm
lbr
Ceilingteak
lbr
Aluminium Foil
lbr
Kalsiboard
lbr
Gypsum
lbr
10
List Gypsum
m'
hollow
m'
18,000
18,000
25,000
12,389
2,778
20,000
2,222
-
BAHAN PIPA
Pipa Galvanis
17,000
15,000
#DIV/0!
17,500
20,000
23,000
55,000
60,000
15,000
55,000
55,000
#DIV/0!
110,000
65,000
80,000
60,000
10,278
100,000
80,000
53,000
55,000
31,111
110,000
24,444
75,000
26,667
70,000
55,000
25,556
60,000
350,000
38,889
65,000
32,556
15,000
3,889
20,000
#DIV/0!
#DIV/0!
- 2"
btg
- 1,5"
btg
- 1,25"
btg
- 1"
btg
- 0,75"
btg
- 0,5"
btg
- 2" / 6 m
btg
- 2" / 4 m
btg
25,000
2,778
Pipa PVC AW
- 4"
btg
280,000
175,000
260,000
300,000
- 3"
btg
192,000
155,000
165,000
200,000
79,111
- 2,5"
btg
135,000
145,000
135,000
175,000
65,556
- 2"
btg
105,000
135,000
100,000
100,000
60,556
- 1,5"
btg
70,000
40,000
75,000
50,000
26,111
- 1"
btg
39,000
35,000
40,000
40,000
17,111
- 0,75"
btg
30,000
32,000
30,000
10,222
- 0,5"
btg
25,000
25,000
25,000
11,000
105,000
24,000
112,778
Pipa PVC C
- 4"
btg
80,000
70,000
55,000
80,000
70,000
39,444
- 3"
btg
62,000
55,000
50,000
65,000
60,000
32,444
- 2,5"
btg
53,000
50,000
35,000
55,000
40,000
25,889
- 2"
btg
42,000
40,000
25,000
45,000
30,000
20,222
- 1,5"
btg
26,000
30,000
25,000
9,000
- 1"
btg
17,500
25,000
20,000
6,944
- 0,75"
btg
16,000
15,000
3,444
- 0,5"
btg
10,000
1,111
-
Pipa PVC D
- 4"
btg
151,000
145,000
150,000
49,556
- 3"
btg
108,000
105,000
100,000
34,778
- 2,5"
btg
75,000
75,000
75,000
25,000
No
UPAH / BAHAN
SATUAN
HARGA
HARGA
HARGA
HARGA
HARGA
HARGA
UD. Haryona
Toko
UD. Karya
Toko
Toko
Toko
Putra
Mutiara
Murni
Bambu Sari
Adi Karya
Sinar Alam
Putra
Putra
Putra
Patas
Rengdikit
Busung Biu
Singaraja
Singaraja
Serirt
Serirt
Serirt
( Rp.)
( Rp.)
( Rp.)
( Rp.)
( Rp.)
( Rp.)
( Rp.)
( Rp.)
( Rp.)
HARGA
HARGA
HARGA
HARGA
Survey
Rata-rata
( Rp.)
5
- 2"
btg
56,000
53,000
50,000
17,667
- 1,5"
btg
38,000
40,000
45,000
13,667
- 1"
btg
30,000
3,333
- 0,75"
btg
25,000
2,778
- 0,5"
btg
17,500
1,944
Pipa listrik
btg
btg
btg
Pipa PVC S - 10
5,000
7,000
6,000
7,000
125,000
125,000
8,000
7,000
3,667
27,778
7,000
1,556
-
btg
#DIV/0!
#DIV/0!
btg
#DIV/0!
#DIV/0!
btg
#DIV/0!
#DIV/0!
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
No
UPAH / BAHAN
SATUAN
HARGA
HARGA
HARGA
HARGA
HARGA
HARGA
UD. Haryona
Toko
UD. Karya
Toko
Toko
Toko
Putra
Mutiara
Murni
Bambu Sari
Adi Karya
Sinar Alam
Putra
Putra
Putra
Patas
Rengdikit
Busung Biu
Singaraja
Singaraja
Serirt
Serirt
Serirt
( Rp.)
( Rp.)
( Rp.)
( Rp.)
( Rp.)
( Rp.)
( Rp.)
( Rp.)
( Rp.)
HARGA
HARGA
HARGA
HARGA
Survey
Rata-rata
( Rp.)
5
btg
btg
10
Pipa PVC S - 16
- Pipa PVC 32 mm (SCJ) 6m
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
11
- 25
- 32
- 40
- 50
- 63
- 75
- 90
- 110
- 125
- 140
- 160
- 180
- 200
- 225
- 250
- 280
- 315
- 355
- 400
- 450
- 500
- 560
- 630
12
- 25
- 32
- 40
- 50
- 63
- 75
- 90
- 110
- 125
- 140
- 160
- 180
- 200
- 225
- 250
- 280
- 315
- 355
- 400
- 450
- 500
- 560
No
UPAH / BAHAN
2
- 630
SATUAN
HARGA
HARGA
HARGA
HARGA
HARGA
HARGA
UD. Haryona
Toko
UD. Karya
Toko
Toko
Toko
Putra
Mutiara
Murni
Bambu Sari
Adi Karya
Sinar Alam
Putra
Putra
Putra
Patas
Rengdikit
Busung Biu
Singaraja
Singaraja
Serirt
Serirt
Serirt
( Rp.)
( Rp.)
( Rp.)
( Rp.)
( Rp.)
( Rp.)
( Rp.)
( Rp.)
( Rp.)
HARGA
HARGA
HARGA
HARGA
Survey
Rata-rata
( Rp.)
5
-
BAHAN FINISHING
Amplas
Minyak Cat
ltr
Meni kayu
kg
Plamir kayu
3,000
4,000
4,000
4,000
1,667
22,000
24,000
30,000
23,000
15,000
12,667
22,000
26,000
25,000
26,000
25,000
13,778
kg
22,000
26,000
25,000
26,000
25,000
13,778
kg
22,000
24,000
60,000
26,000
25,000
17,444
Cat Kayu
kg
60,000
50,000
60,000
63,000
55,000
32,000
Plamir Tembok
kg
6,000
15,000
15,000
13,000
15,000
7,111
kg
15,000
4,444
lbr
25,000
Cat Tembok
kg
12,000
19,000
25,000
13,000
25,000
10,444
10
Meni Besi
kg
22,000
26,000
25,000
26,000
25,000
13,778
11
Dempul
kg
26,000
25,000
12
Cat Besi
kg
60,000
55,000
60,000
13
Politur
ltr
55,000
44,000
14
ltr
53,000
55,000
15
Teak Oil
ltr
16
Spritus
ltr
17
Sirlak
kg
18
Oker
kg
19
Lem Kayu
kg
12,000
12,000
15,000
13,000
15,000
7,444
20
Impra
kg
30,000
32,500
45,000
31,000
30,000
18,722
BAHAN KACA
Kaca Bening 5 mm
m2
93,000
Kaca Bening 3 mm
m2
65,000
7,222
Kaca Ray-Ban 5 mm
m2
95,000
10,556
Nako + Tralis
m2
ALAT PENGUNCI
Kunci 2 Slaag
bh
120,000
140,000
150,000
45,556
Kunci 1 Slaag
bh
75,000
65,000
75,000
23,889
Kunci KM/ WC
bh
45,000
40,000
50,000
15,000
Kunci Gembok
bh
20,000
20,000
55,000
25,000
13,333
Grendel
bh
5,000
5,000
7,000
10,000
3,000
ALAT PENGGANTUNG
Kait Angin
psg
15,000
15,000
15,000
15,000
25,000
9,444
Engsel kupu-kupu
psg
20,000
12,000
25,000
25,000
10,000
10,222
Engsel Nilon
psg
10,000
7,000
17,000
15,000
5,444
Espanolet
bh
75,000
8,333
BAHAN SANITAIR
Washtafel
bh
Urinoir
bh
Closet Jongkok
25,000
8,444
63,000
55,000
32,556
60,000
43,000
55,000
28,556
60,000
52,000
55,000
30,556
55,000
15,000
20,000
40,000
10,556
15,000
5,556
75,000
14,444
55,000
10,333
165,000
230,000
350,000
200,000
bh
125,000
140,000
160,000
135,000
150,000
78,889
Closet Duduk
bh
400,000
375,000
1,600,000
1,800,000
1,500,000
630,556
bh
200,000
250,000
250,000
250,000
300,000
138,889
bh
225,000
250,000
80,556
Floordrain
bh
Shower
bh
150,000
85,000
15,000
25,000
250,000
30,000
750,000
188,333
750,000
83,333
7,000
25,000
6,889
55,000
60,000
75,000
47,222
35,000
20,000
35,000
14,444
Kran Air
bh
10
bh
11
bh
12
5,000
13
8,000
BAHAN PAKU
Paku Lis
kg
16,000
18,000
20,000
20,000
15,000
9,889
Paku Reng
kg
13,000
18,000
20,000
15,000
13,000
8,778
Paku Usuk
kg
13,000
18,000
20,000
15,000
13,000
8,778
Paku Seng
kg
22,000
24,000
30,000
25,000
13,000
12,667
ktk
6,000
20,000
7,000
15,000
5,333
Paku Sekrup
ktk
8,000
20,000
15,000
15,000
6,444
Paku gypsum
kg
30,000
25,000
30,000
25,000
20,000
14,444
Paku beton 5 cm
ktk
13,000
15,000
45,000
15,000
15,000
11,444
ktk
10,000
14,000
45,000
12,000
15,000
10,667
10
Paku pancing
ktk
450,000
50,000
7,000
7,000
5,000
1,889
10,000
7,000
3,556
-
2"
No
UPAH / BAHAN
SATUAN
HARGA
HARGA
HARGA
HARGA
HARGA
HARGA
UD. Haryona
Toko
UD. Karya
Toko
Toko
Toko
Putra
Mutiara
Murni
Bambu Sari
Adi Karya
Sinar Alam
Putra
Putra
Putra
Patas
Rengdikit
Busung Biu
Singaraja
Singaraja
Serirt
Serirt
Serirt
( Rp.)
( Rp.)
( Rp.)
( Rp.)
( Rp.)
( Rp.)
( Rp.)
( Rp.)
( Rp.)
HARGA
HARGA
HARGA
HARGA
Survey
Rata-rata
( Rp.)
5
-
BAHAN LISTRIK
Sakelar
bj
Stop Kontak
bj
Fitting
bj
Steker
bj
bj
bj
bj
10
Lampu TL 10 Watt
bj
11
Lampu TL 20 Watt
bj
12
Lampu TL 40 Watt
bj
AA
LAIN-LAIN
Aspal
- Aspal Emulsi
kg
- Aspal Cutback
kg
- Aspal Bitumen
kg
- Aspal Curah
kg
Solar
ltr
Oli
ltr
Sikat Baja
Bh
lbr
Baut Kodok
kg
8,000
25,000
15,000
5,333
125,000
100,000
25,000
-
: 2013
NO
JENIS PEKERJAAN
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
SATUAN
PEKERJAAN
M3
M2
M2
M3
M2
M2
M2
M'
M3
M3
HARGA PEKERJAAN
(Rp)
354,355.30
2,252.50
2,372.50
294,423.60
9,490.00
7,930.00
7,685.00
120,848.50
26,834.80
134,174.00
M3
M3
M3
M3
M3
M3
M3
M3
M3
78,475.00
65,335.00
42,106.40
31,901.00
127,177.50
69,350.00
171,670.00
9,796.60
15,184.00
M3
35,184.00
M3
M3
M3
M2
M3
M3
M3
M3
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M'
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
207,310.00
321,581.10
624,698.70
59,764.40
116,239.10
123,239.10
105,565.98
112,565.98
57,188.85
47,426.55
49,973.33
48,834.77
21,528.50
36,316.34
696,703.60
674,703.60
883,590.00
833,590.00
101,614.50
277,387.22
299,974.50
99,416.00
106,316.00
97,452.50
154,521.40
151,821.40
148,955.00
145,655.00
156,855.00
154,955.00
65,612.47
M2
91,216.70
KETERANGAN
Hal : 9
NO
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
JENIS PEKERJAAN
- Tegel PC Polos 30/30 cm
- Tegel Warna 30/30 cm
PEKERJAAN BETON COR 1 : 3 : 5
PEKERJAAN BETON COR 1 : 2 : 3
PEKERJAAN PAPAN BEGISTING
PEKERJAAN BESI BETON
PEKERJAAN BETON BERTULANG Fe 80
PEKERJAAN BETON BERTULANG Fe 100
PEKERJAAN BETON BERTULANG Fe 150
PEKERJAAN BETON BERTULANG Fe 160
PEKERJAAN BETON BERTULANG Fe 175
PEKERJAAN BETON BERTULANG Fe 185
PEKERJAAN BETON BERTULANG Fe 200
PEKERJAAN BETON BERTULANG Fe 225
PEKERJAAN BETON BERTULANG Fe 250
PEKERJAAN BETON BERTULANG Fe 275
PEKERJAAN BETON BERTULANG Fe 300
PEKERJAAN BETON PLAT PONDASI Fe 160
BETON CYCLOOF 40% BATU KALI
PEKERJAAN CYKLOP 1:3:5 DIAMETER 100 CM
PEKERJAAN PLAFOND CEILLING TEAK
PEKERJAAN GERANTANGAN CEILLING TEAK
PLAPOND GYPSUM
PLAPOND ETERNIT
TADIR GEDEG KLAS I
PEK. PLAPOND RANGKA KRUING & PENUTUP :
- Plywood
- Triplek 3 mm
- Teak Wood
DINDING PARTISI TEAKWOOD RANGKAP (KAMPER)
PEKERJAAN KUSEN PINTU DAN JENDELA JATI
PEKERJAAN KUSEN PINTU DAN JENDELA KAMPER
DAUN JENDELA KACA :
- Kayu Kamper + Kaca polos 3 mm
- Kayu Kamper + Kaca polos 5 mm
- Kayu Kamper + Kaca rayben 5 mm
- Kayu Jati + Kaca polos 3 mm
- Kayu Jati + Kaca polos 5 mm
- Kayu Jati + Kaca rayben 5 mm
PEKERJAAN KACA MATI :
- Kaca polos 5 mm
- Kaca polos 3 mm
- Kaca RAYBEN 5 mm
DAUN PINTU PANEL KAYU JATI
DAUN PINTU PANEL KAYU KAMPER
DAUN PINTU DOUBLE PLYWOOD
DAUN PINTU DOUBLE TEAKWOOD
PEK. DAUN PINTU LAPIS TEAKWOOD/ALUMINIUM
PEK. DAUN PINTU LAPIS PLYWOOD/ALUMINIUM
KUDA-KUDA KAYU KRUING
KUDA-KUDA KAYU SESEH
KUDA-KUDA KAYU KAMPER
KUDA-KUDA KAYU MERANTI
KUDA-KUDA KAYU BENGKIRAI
PEKERJAAN USUK KAMPER + RENG KAMPER
PEKERJAAN USUK KRUING + RENG KAMPER
PEKERJAAN USUK MERANTI + RENG KAMPER
PEK. USUK KAMPER + RENG KAMPER (EKSPOSE)
GERANTANGAN (USUK KRUING/RENG KAMPER)
PASANG USUK (KRUING)
PASANG RENG (KAMPER)
PEKERJAAN PAPAN LISTPLANK ( 3/20 ) KAMPER
PEKERJAAN PAPAN LISTPLANK ( 3/20 ) KRUING
PEKERJAAN PAPAN LISTPLANK ( 3/20 ) MERANTI
SATUAN
PEKERJAAN
M2
M2
M3
M3
M2
Kg
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M2
M2
M2
M2
M2
HARGA PEKERJAAN
(Rp)
#REF!
#REF!
647,747.50
881,616.50
120,370.00
990,841.16
2,877,989.43
3,076,157.66
3,571,578.24
3,670,662.36
3,819,288.53
3,918,372.65
4,066,998.82
4,314,709.11
4,562,419.40
4,810,129.69
5,057,839.98
2,466,962.36
611,193.90
787,676.00
343,247.00
242,391.00
168,713.00
164,997.00
175,697.00
M2
M2
M2
M2
M3
M3
220,594.90
221,725.90
232,606.90
250,290.60
14,122,230.00
12,097,000.00
M2
M2
M2
M2
M2
M2
544,289.60
557,089.60
574,209.60
612,096.80
624,896.80
642,016.80
M2
M2
M2
M2
M2
M2
M2
M2
M2
M3
M3
M3
M3
M3
M2
M2
M2
M2
M2
M2
M2
M'
M'
M'
119,073.75
101,473.75
142,613.75
815,748.00
697,086.00
549,433.44
580,233.44
607,430.00
588,180.00
8,886,000.00
4,939,860.00
10,947,400.00
7,119,070.00
12,714,220.00
121,455.40
108,605.80
95,755.40
206,384.60
211,015.60
77,493.60
86,030.10
131,829.92
101,625.56
90,059.84
KETERANGAN
Hal : 10
NO
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
JENIS PEKERJAAN
PEKERJAAN TALANG (PAPAN TALANG & SENG)
PASANG GENTENG KODOK
PASANG GENTENG BIASA/PEJATEN
PASANG GENTENG BUBUNGAN
PASANG ATAP SENG GELOMBANG
PASANG ATAP ASBES GELOMBANG
BUBUNGAN ATAP SENG
PASANGAN ATAP SENG LAMA
PASANG ATAP SIRAP
PEKERJAAN MENGECAT TEMBOK
PEKERJAAN MENGECAT TEMBOK LAMA
PEKERJAAN CAT MENI
PEKERJAAN MENGECAT KAYU ULANG
PEKERJAAN MENGECAT KAYU
PEKERJAAN POLITUR
PEMBUATAN SALURAN TERTUTUP
SALURAN / GOT
PEKERJAAN WATER PROFING
MENYIAPKAN SUB GRADE
TIMBUNAN SIRTU (Tb. 20 CM)
PASANGAN GLADAK (BATU PECAH 10/15)
PASANG BATU KANCING 15/20 CM
MENGHAMPAR BATU PECAH 5/7 CM
MENGHAMPAR LAPEN BATU PECAH 2/3+3/4+ASPAL
MENGASPAL 200 KG
MENGASPAL 125 KG
PEKERJAAN LAPEN ASPAL 4 KG
PAS. PIPA PVC TIPE AW DIA 1/2" s/d. 1 1/2"
PAS. PIPA GALVANIS DIA 1/2" s/d. 3/4"
PEKERJAAN BRONJONG
PEKERJAAN CAT RESIDU/TEER
SATUAN
PEKERJAAN
M'
M2
M2
M'
M2
M2
M'
M2
M2
M2
M2
M2
M2
M2
M2
M'
M'
M2
M2
M2
M2
M'
M2
M2
M2
M2
M2
M'
M'
M3
M2
HARGA PEKERJAAN
(Rp)
234,554.50
93,409.90
60,909.90
88,235.60
37,370.80
34,150.80
34,014.75
50,419.00
132,479.60
11,965.86
8,675.14
11,036.60
24,264.50
35,072.30
37,100.10
187,308.71
135,860.73
111,400.00
2,830.34
61,877.60
69,737.60
7,358.94
25,504.00
30,506.17
32,568.21
22,880.18
85,954.56
12,977.42
40,504.30
523,950.00
3,851.00
KETERANGAN
Hal : 11
DAFTAR ANALISA
DINAS PEKERJAAN UMUM KABUPATEN BULELENG
TAHUN ANGGARAN
: 2014
NO
URAIAN
HARGA
SATUAN
Rp.
3
326,683.00
27,672.30
354,355.30
326,683.00
27,672.30
354,355.30
10 M2 MEMBONGKAR USUK/RENG
0.250 OH
Tukang Kayu
0.025 OH
Kepala Tukang Kayu
81,700.00
84,000.00
20,425.00
2,100.00
22,525.00
2,252.50
20,425.00
2,100.00
22,525.00
2,252.50
24,500.00
2,077.50
26,577.50
2,657.75
24,500.00
2,077.50
26,577.50
2,657.75
10 M2 MENGUPAS PLESTERAN
0.500 OH
Pekerja
0.025 OH
Mandor
49,000.00
83,100.00
1 M3 MEMBONGKAR TEMBOK
6.667 OH
Pekerja
0.033 OH
Mandor
49,000.00
83,100.00
326,683.00
2,742.30
329,425.30
326,683.00
2,742.30
329,425.30
10 M2 MEMBONGKAR LANTAI
2.000 OH
Pekerja
0.100 OH
Mandor
49,000.00
83,100.00
98,000.00
8,310.00
106,310.00
10,631.00
98,000.00
8,310.00
106,310.00
10,631.00
37,350.00
49,000.00
86,350.00
8,635.00
37,350.00
49,000.00
86,350.00
8,635.00
36,200.00
49,000.00
85,200.00
8,520.00
36,200.00
49,000.00
85,200.00
8,520.00
Untuk 1 M2
6
74,700.00
49,000.00
Untuk 1 M2
72,400.00
49,000.00
Untuk 1 M2
3,052,100.00
1,380,400.00
18,100.00
81,700.00
84,000.00
49,000.00
83,100.00
8,170.00
840.00
4,900.00
415.50
14,325.50
36,625.20
9,662.80
362.00
46,650.00
36,625.20
9,662.80
362.00
8,170.00
840.00
4,900.00
415.50
60,975.50
3,052,100.00
18,100.00
81,700.00
84,000.00
49,000.00
83,100.00
4,085.00
420.00
2,450.00
415.50
7,370.50
294.82
146,500.80
362.00
146,862.80
5,874.51
146,500.80
362.00
4,085.00
420.00
2,450.00
415.50
154,233.30
6,169.33
4,141.20
3,250.68
362.00
4,141.20
3,250.68
362.00
Untuk 1 M'
10
KET.
49,000.00
83,100.00
Untuk 1 M2
4
JUMLAH
HARGA
Rp.
6
Untuk 1 M2
3
JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
1,380,400.00
5,417,800.00
18,100.00
Page 12
Analisa-17'Jan 14
NO
URAIAN
1
0.020
0.005
0.050
0.005
OH
OH
OH
OH
2
Tukang Kayu
Kepala Tukang Kayu
Pekerja
Mandor
HARGA
SATUAN
Rp.
3
81,700.00
84,000.00
49,000.00
83,100.00
5x pakai
11
49,000.00
83,100.00
Page 13
JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
1,634.00
420.00
2,450.00
415.50
4,919.50
7,753.88
983.90
1,550.78
36,750.00
207.75
36,957.75
184,788.75
JUMLAH
HARGA
Rp.
6
1,634.00
420.00
2,450.00
415.50
12,673.38
2,534.68
36,750.00
207.75
36,957.75
184,788.75
KET.
26,834.80
(10,122.95)
Analisa-17'Jan 14
NO
URAIAN
1
12
2
1 M3 GALIAN TANAH SEDALAM 2 METER
0.900 OH
Pekerja
0.045 OH
Mandor
HARGA
SATUAN
Rp.
3
49,000.00
83,100.00
14
15
17
18
19
20
21
22
23
JUMLAH
HARGA
Rp.
6
KET.
44,100.00
3,739.50
47,839.50
239,197.50
44,100.00
3,739.50
47,839.50
239,197.50
49,000.00
83,100.00
58,800.00
3,739.50
62,539.50
58,800.00
3,739.50
62,539.50
SALURAN TERBUKA
0.750 OH
Pekerja
0.025 OH
Mandor
49,000.00
83,100.00
36,750.00
2,077.50
38,827.50
36,750.00
2,077.50
38,827.50
49,000.00
83,100.00
58,800.00
3,739.50
62,539.50
58,800.00
3,739.50
62,539.50
49,000.00
2,659.20
51,659.20
127,177.50
49,000.00
2,659.20
51,659.20
127,177.50
49,000.00
83,100.00
JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
49,000.00
83,100.00
73,500.00
4,155.00
77,655.00
73,500.00
4,155.00
77,655.00
49,000.00
83,100.00
2,450.00
415.50
2,865.50
2,450.00
415.50
2,865.50
60,000.00
49,000.00
83,100.00
25,000.00
39,200.00
1,520.73
25,000.00
65,720.73
72,000.00
72,000.00
72,000.00
39,200.00
1,520.73
25,000.00
137,720.73
49,000.00
83,100.00
14,700.00
1,246.50
15,946.50
14,700.00
1,246.50
15,946.50
49,000.00
83,100.00
16,170.00
831.00
17,001.00
16,170.00
831.00
17,001.00
49,000.00
83,100.00
50,000.00
16,170.00
831.00
50,000.00
67,001.00
16,170.00
831.00
50,000.00
67,001.00
158,200.00
49,000.00
83,100.00
14,700.00
831.00
15,531.00
189,840.00
189,840.00
189,840.00
14,700.00
831.00
205,371.00
196,000.00
158,200.00
235,200.00
68,342.40
235,200.00
68,342.40
Page 14
26,834.80
(21,004.70)
42,106.40
(20,433.10)
31,901.00
(19,758.20)
Analisa-17'Jan 14
NO
URAIAN
1
0.780
0.039
0.390
0.039
OH
OH
OH
OH
2
Pekerja
Mandor
Tukang Batu
Kepala Tukang Batu
HARGA
SATUAN
Rp.
3
49,000.00
83,100.00
74,700.00
82,100.00
Page 15
JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
38,220.00
3,240.90
29,133.00
3,201.90
73,795.80
303,542.40
JUMLAH
HARGA
Rp.
6
38,220.00
3,240.90
29,133.00
3,201.90
377,338.20
KET.
321,581.10
(55,757.10)
Analisa-17'Jan 14
NO
1
24
25
26
27
URAIAN
2
1 M3 PASANGAN BATU KALI 1 : 5
1.200 M3
Batu Pasang
136.000 Kg
Semen Gresik ( 50 kg )
0.544 M3
Pasir Pasang
0.600 OH
Tukang Batu
0.060 OH
Kepala Tukang Batu
1.500 OH
Pekerja
0.075 OH
Mandor
29
30
31
196,000.00
1,364.00
164,200.00
74,700.00
82,100.00
49,000.00
83,100.00
1 M2 PASANG BATACO
12.500 Bj
Batako Cetak Lubang KW.II
7.500 Kg
Semen Gresik ( 50 kg )
0.027 M3
Pasir Pasang
0.100 OH
Tukang Batu
0.010 OH
Kepala Tukang Batu
0.320 OH
Pekerja
0.015 OH
Mandor
2,200.00
1,364.00
164,200.00
74,700.00
82,100.00
49,000.00
83,100.00
2,400.00
28
HARGA
SATUAN
Rp.
3
900.00
1,364.00
164,200.00
74,700.00
82,100.00
49,000.00
83,100.00
1,100.00
900.00
1,364.00
164,200.00
74,700.00
82,100.00
49,000.00
83,100.00
1,100.00
JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
JUMLAH
HARGA
Rp.
6
KET.
44,820.00
4,926.00
73,500.00
6,232.50
129,478.50
235,200.00
185,504.00
89,324.80
510,028.80
235,200.00
185,504.00
89,324.80
44,820.00
4,926.00
73,500.00
6,232.50
639,507.30
7,470.00
821.00
15,680.00
1,246.50
25,217.50
25,217.50
27,500.00
10,230.00
4,433.40
42,163.40
44,663.40
27,500.00
10,230.00
4,433.40
7,470.00
821.00
15,680.00
1,246.50
67,380.90
69,880.90
7,470.00
821.00
14,700.00
1,246.50
24,237.50
24,237.50
63,000.00
25,847.80
6,239.60
95,087.40
109,087.40
63,000.00
25,847.80
6,239.60
7,470.00
821.00
14,700.00
1,246.50
119,324.90
133,324.90
7,470.00
821.00
14,700.00
1,246.50
24,237.50
24,237.50
63,000.00
13,203.52
7,389.00
83,592.52
97,592.52
63,000.00
13,203.52
7,389.00
7,470.00
821.00
14,700.00
1,246.50
107,830.02
121,830.02
1 M2 PLESTERAN PC 1 : 2 TEBAL 20 mm
13.632 Kg
Semen Gresik ( 50 kg )
0.027 M3
Pasir Pasang
0.200 OH
Tukang Batu
0.020 OH
Kepala Tukang Batu
0.270 OH
Pekerja
0.013 OH
Mandor
1,364.00
164,200.00
74,700.00
82,100.00
49,000.00
83,100.00
14,940.00
1,642.00
13,230.00
1,080.30
30,892.30
18,594.05
4,433.40
23,027.45
18,594.05
4,433.40
14,940.00
1,642.00
13,230.00
1,080.30
53,919.75
1,364.00
164,200.00
74,700.00
82,100.00
49,000.00
83,100.00
14,940.00
1,642.00
12,740.00
1,080.30
30,402.30
14,141.95
5,090.20
19,232.15
14,141.95
5,090.20
14,940.00
1,642.00
12,740.00
1,080.30
49,634.45
1,364.00
164,200.00
74,700.00
82,100.00
49,000.00
83,100.00
14,940.00
1,642.00
13,230.00
1,080.30
30,892.30
9,427.97
5,747.00
15,174.97
9,427.97
5,747.00
14,940.00
1,642.00
13,230.00
1,080.30
46,067.27
1 M2 PLESTERAN PC 1 : 6 TEBAL 20 mm
5.888 Kg
Semen Gresik ( 50 kg )
1,364.00
8,031.23
8,031.23
Page 16
624,698.70
(14,808.60)
47,426.55
(2,207.90)
Analisa-17'Jan 14
NO
URAIAN
1
0.036
0.200
0.020
0.270
0.013
M3
OH
OH
OH
OH
2
Pasir Pasang
Tukang Batu
Kepala Tukang Batu
Pekerja
Mandor
HARGA
SATUAN
Rp.
3
164,200.00
74,700.00
82,100.00
49,000.00
83,100.00
Page 17
JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
5,911.20
14,940.00
1,642.00
13,230.00
1,080.30
30,892.30
13,942.43
JUMLAH
HARGA
Rp.
6
5,911.20
14,940.00
1,642.00
13,230.00
1,080.30
44,834.73
KET.
Analisa-17'Jan 14
NO
URAIAN
1
32
2
1 M2 PEKERJAAN ACIAN 1:2
2.080 Kg
Semen Gresik ( 50 kg )
0.250 OH
Tukang Batu
0.025 OH
Kepala Tukang Batu
0.200 OH
Pekerja
0.003 OH
Mandor
33
34
1 M2 PEKERJAAN SIARAN 1 : 2
6.340 Kg
Semen Gresik ( 50 kg )
0.012 M3
Pasir Pasang
0.150 OH
Tukang Batu
0.015 OH
Kepala Tukang Batu
0.300 OH
Pekerja
0.015 OH
Mandor
35
36
37
38
39
HARGA
SATUAN
Rp.
3
JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
JUMLAH
HARGA
Rp.
6
KET.
1,364.00
74,700.00
82,100.00
49,000.00
83,100.00
18,675.00
2,052.50
9,800.00
249.30
30,776.80
2,837.12
2,837.12
2,837.12
18,675.00
2,052.50
9,800.00
249.30
33,613.92
1,364.00
164,200.00
74,700.00
82,100.00
49,000.00
83,100.00
11,205.00
1,231.50
14,700.00
1,246.50
28,383.00
8,647.76
1,970.40
10,618.16
8,647.76
1,970.40
11,205.00
1,231.50
14,700.00
1,246.50
39,001.16
8,800.00
4,800.00
1,364.00
83,000.00
90,400.00
49,000.00
83,100.00
290,500.00
31,640.00
98,000.00
8,310.00
428,450.00
428,450.00
58,572.80
211,200.00
818.40
270,591.20
244,191.20
58,572.80
211,200.00
818.40
290,500.00
31,640.00
98,000.00
8,310.00
699,041.20
672,641.20
290,500.00
31,640.00
98,000.00
8,310.00
428,450.00
428,450.00
480,000.00
40,920.00
520,920.00
460,920.00
480,000.00
40,920.00
290,500.00
31,640.00
98,000.00
8,310.00
949,370.00
889,370.00
4,200.00
4,800.00
1,364.00
83,000.00
90,400.00
49,000.00
83,100.00
4,200.00
37,800.00
1,364.00
164,200.00
83,000.00
88,900.00
49,000.00
83,100.00
20,750.00
2,222.50
24,500.00
2,077.50
49,550.00
45,360.00
9,548.00
4,105.00
59,013.00
45,360.00
9,548.00
4,105.00
20,750.00
2,222.50
24,500.00
2,077.50
108,563.00
90,000.00
1,364.00
164,200.00
83,000.00
88,900.00
49,000.00
83,100.00
12,450.00
1,333.50
19,600.00
1,662.00
35,045.50
108,000.00
2,864.40
1,871.88
112,736.28
108,000.00
2,864.40
1,871.88
12,450.00
1,333.50
19,600.00
1,662.00
147,781.78
90,000.00
1,364.00
164,200.00
83,000.00
88,900.00
49,000.00
83,100.00
20,750.00
2,222.50
24,500.00
2,077.50
49,550.00
108,000.00
9,548.00
4,105.00
121,653.00
108,000.00
9,548.00
4,105.00
20,750.00
2,222.50
24,500.00
2,077.50
171,203.00
72,600.00
164,200.00
72,600.00
16,420.00
72,600.00
16,420.00
Page 18
Analisa-17'Jan 14
NO
URAIAN
1
0.266 OH
2
Tukang Batu
Paving Blok / 8 cm
HARGA
SATUAN
Rp.
3
74,700.00
81,500.00
Page 19
JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
19,870.20
19,870.20
89,020.00
19,870.20
97,920.00
JUMLAH
HARGA
Rp.
6
19,870.20
108,890.20
117,790.20
KET.
Analisa-17'Jan 14
NO
URAIAN
1
40
2
1 M2 PEK. DINDING ROSTER TERAWANG
1.000 Bj
Loster Terawang PC
13.000 Kg
Semen Gresik ( 50 kg )
0.035 M3
Pasir Pasang
0.100 OH
Tukang Batu
0.010 OH
Kepala Tukang Batu
0.300 OH
Pekerja
0.015 OH
Mandor
41
42
43
44
45
46
HARGA
SATUAN
Rp.
3
JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
JUMLAH
HARGA
Rp.
6
KET.
13,100.00
1,364.00
164,200.00
74,700.00
82,100.00
49,000.00
83,100.00
7,470.00
821.00
14,700.00
1,246.50
24,237.50
13,100.00
17,732.00
5,747.00
36,579.00
13,100.00
17,732.00
5,747.00
7,470.00
821.00
14,700.00
1,246.50
60,816.50
1 M2 PASANGAN KERAMIK KW I 20 x 20
1.000 M2
Keramik KW I 20/20 cm
10.400 Kg
Semen Gresik ( 50 kg )
0.045 M3
Pasir Pasang
1.620 Kg
Semen warna
0.350 OH
Tukang Batu
0.035 OH
Kepala Tukang Batu
0.700 OH
Pekerja
0.035 OH
Mandor
56,700.00
1,364.00
164,200.00
23,500.00
74,700.00
82,100.00
49,000.00
83,100.00
Keramik KW II 20/20 cm
53,600.00
26,145.00
2,873.50
34,300.00
2,908.50
66,227.00
66,227.00
56,700.00
14,185.60
7,389.00
38,070.00
116,344.60
113,244.60
56,700.00
14,185.60
7,389.00
38,070.00
26,145.00
2,873.50
34,300.00
2,908.50
182,571.60
179,471.60
1 M2 PASANGAN KERAMIK KW I 30 x 30
1.000 M2
Keramik KW I 30/30 cm
10.000 Kg
Semen Gresik ( 50 kg )
0.045 M3
Pasir Pasang
1.500 Kg
Semen warna
0.350 OH
Tukang Batu
0.035 OH
Kepala Tukang Batu
0.700 OH
Pekerja
0.035 OH
Mandor
54,600.00
1,364.00
164,200.00
23,500.00
74,700.00
82,100.00
49,000.00
83,100.00
Keramik KW II 30/30 cm
50,900.00
26,145.00
2,873.50
34,300.00
2,908.50
66,227.00
66,227.00
54,600.00
13,640.00
7,389.00
35,250.00
110,879.00
107,179.00
54,600.00
13,640.00
7,389.00
35,250.00
26,145.00
2,873.50
34,300.00
2,908.50
177,106.00
173,406.00
1 M2 PASANGAN KERAMIK KW I 40 x 40
1.000 M2
Keramik KW I 40/40 cm
10.000 Kg
Semen Gresik ( 50 kg )
0.045 M3
Pasir Pasang
1.500 Kg
Semen warna
0.350 OH
Tukang Batu
0.035 OH
Kepala Tukang Batu
0.700 OH
Pekerja
0.035 OH
Mandor
57,600.00
1,364.00
164,200.00
23,500.00
74,700.00
82,100.00
49,000.00
83,100.00
26,145.00
2,873.50
34,300.00
2,908.50
66,227.00
66,227.00
57,600.00
13,640.00
7,389.00
35,250.00
113,879.00
113,279.00
57,600.00
13,640.00
7,389.00
35,250.00
26,145.00
2,873.50
34,300.00
2,908.50
180,106.00
179,506.00
6,723.00
738.90
4,410.00
415.50
12,287.40
12,287.40
12,287.40
5,514.60
1,561.78
492.60
5,875.00
13,443.98
13,656.08
27,190.96
5,514.60
1,561.78
492.60
5,875.00
6,723.00
738.90
4,410.00
415.50
25,731.38
25,943.48
39,478.36
10,084.50
1,149.40
13,230.00
1,121.85
25,585.75
30,000.00
14,185.60
7,389.00
38,070.00
89,644.60
30,000.00
14,185.60
7,389.00
38,070.00
10,084.50
1,149.40
13,230.00
1,121.85
115,230.35
129,381.00
129,381.00
57,000.00
Keramik KW II 40/40 cm
1 M' PEK. PLINT KERAMIK 10 x 30 (1:2)
0.101 M2
Keramik KW I 30/30 cm
1.145 Kg
Semen Gresik ( 50 kg )
0.003 M3
Pasir Pasang
0.250 Kg
Semen warna
0.090 OH
Tukang Batu
0.009 OH
Kepala Tukang Batu
0.090 OH
Pekerja
0.005 OH
Mandor
54,600.00
1,364.00
164,200.00
23,500.00
74,700.00
82,100.00
49,000.00
83,100.00
Keramik KW I 20/20 cm
Keramik KW I 40/40 cm
56,700.00
57,600.00
30,000.00
1,364.00
164,200.00
23,500.00
74,700.00
82,100.00
49,000.00
83,100.00
212,100.00
Page 20
91,216.70
(24,013.65)
Analisa-17'Jan 14
NO
URAIAN
1
0.760
230.000
0.200
0.020
1.650
0.060
M3
Kg
OH
OH
OH
OH
2
Pasir Beton
Semen Gresik ( 50 kg )
Tukang Batu
Kepala Tukang Batu
Pekerja
Mandor
HARGA
SATUAN
Rp.
3
167,800.00
1,364.00
74,700.00
82,100.00
49,000.00
83,100.00
Page 21
JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
127,528.00
313,720.00
14,940.00
1,642.00
80,850.00
4,986.00
102,418.00
570,629.00
JUMLAH
HARGA
Rp.
6
127,528.00
313,720.00
14,940.00
1,642.00
80,850.00
4,986.00
673,047.00
KET.
Analisa-17'Jan 14
NO
URAIAN
1
47
a
2
BETON BERTULANG
1 M3 Beton Cor 1:2:3
0.810 M3
Kerikil / Koral Beton
0.540 M3
Pasir Beton
336.000 Kg
Semen Gresik ( 50 kg )
0.350 OH
Tukang Batu
0.035 OH
Kepala Tukang Batu
2.000 OH
Pekerja
1.000 OH
Mandor
HARGA
SATUAN
Rp.
3
48
49
50
JUMLAH
HARGA
Rp.
6
KET.
212,100.00
167,800.00
1,364.00
74,700.00
82,100.00
49,000.00
83,100.00
(A)
26,145.00
2,873.50
98,000.00
83,100.00
210,118.50
171,801.00
90,612.00
458,304.00
720,717.00
171,801.00
90,612.00
458,304.00
26,145.00
2,873.50
98,000.00
83,100.00
930,835.50
1,380,400.00
18,100.00
81,700.00
84,000.00
49,000.00
83,100.00
(B)
40,850.00
4,200.00
19,600.00
831.00
65,481.00
654,810.00
55,216.00
7,240.00
62,456.00
624,560.00
55,216.00
7,240.00
40,850.00
4,200.00
19,600.00
831.00
127,937.00
1,279,370.00
9,900.00
20,700.00
72,400.00
79,200.00
49,000.00
83,100.00
(C)
50,680.00
5,544.00
14,700.00
3,324.00
74,248.00
1,039,500.00
31,050.00
1,070,550.00
1,039,500.00
31,050.00
50,680.00
5,544.00
14,700.00
3,324.00
1,144,798.00
(A+B+0,8*C)
(A+B+C)
(A+B+1,5*C)
(A+B+1,6*C)
(A+B+1,75*C)
(A+B+1,85*C)
(A+B+2*C)
(A+B+2,25*C)
(A+B+2,5*C)
(A+B+2,75*C)
(A+B+3*C)
(A+1,6*C)
924,326.90
939,176.50
976,300.50
983,725.30
994,862.50
1,002,287.30
1,013,424.50
1,031,986.50
1,050,548.50
1,069,110.50
1,087,672.50
983,725.30
2,201,717.00
2,415,827.00
2,951,102.00
3,058,157.00
3,218,739.50
3,325,794.50
3,486,377.00
3,754,014.50
4,021,652.00
4,289,289.50
4,556,927.00
3,058,157.00
3,126,043.90
3,355,003.50
3,927,402.50
4,041,882.30
4,213,602.00
4,328,081.80
4,499,801.50
4,786,001.00
5,072,200.50
5,358,400.00
5,644,599.50
2,762,512.30
930,835.50
196,000.00
126,071.10
126,071.10
432,430.20
94,080.00
526,510.20
558,501.30
94,080.00
652,581.30
196,000.00
212,100.00
167,800.00
1,364.00
74,700.00
82,100.00
49,000.00
83,100.00
22,410.00
2,463.00
116,620.00
6,648.00
148,141.00
88,200.00
142,107.00
75,510.00
381,920.00
687,737.00
88,200.00
142,107.00
75,510.00
381,920.00
22,410.00
2,463.00
116,620.00
6,648.00
835,878.00
91,000.00
6,604,000.00
18,100.00
17,100.00
81,700.00
84,000.00
49,000.00
83,100.00
163,400.00
1,680.00
24,500.00
2,077.50
191,657.50
191,657.50
62,790.00
99,060.00
362.00
3,420.00
165,632.00
66,210.00
62,790.00
99,060.00
362.00
3,420.00
163,400.00
1,680.00
24,500.00
2,077.50
357,289.50
257,867.50
1 M2 Begesting
0.040 M3
0.400 Kg
0.500 OH
0.050 OH
0.400 OH
0.010 OH
Papan begesting
Paku Usuk
Tukang Kayu
Kepala Tukang Kayu
Pekerja
Mandor
10 M2 Begesting
JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
1 M3 BETON BERTULANG Fe 80
1 M3 BETON BERTULANG Fe 100
1 M3 BETON BERTULANG Fe 150
1 M3 BETON BERTULANG Fe 160
1 M3 BETON BERTULANG Fe 175
1 M3 BETON BERTULANG Fe 185
1 M3 BETON BERTULANG Fe 200
1 M3 BETON BERTULANG Fe 225
1 M3 BETON BERTULANG Fe 250
1 M3 BETON BERTULANG Fe 275
1 M3 BETON BERTULANG Fe 300
1 M3 BETON PLAT PONDASI Fe 160
1 M3 BETON CYCLOOF 40% BATU KALI
0.600 M3
Beton cor 1 : 2 : 3
0.480 M3
Batu Pasang
Page 22
990,841.16
(153,956.84)
(248,054.47)
(278,845.84)
(355,824.26)
(371,219.94)
(394,313.47)
(409,709.15)
(432,802.68)
(471,291.89)
(509,781.10)
(548,270.31)
(586,759.52)
(295,549.94)
Analisa-17'Jan 14
NO
URAIAN
1
51
2
1 M2 PLAPOND GYPSUM
0.380 Lbr
Gypsum (1,2 x 2,4)
0.015 M3
Kayu Kruing Balok 8/12
0.220 Kg
Paku Lis
0.200 OH
Tukang Kayu
0.020 OH
Kepala Tukang Kayu
0.500 OH
Pekerja
0.025 OH
Mandor
HARGA
SATUAN
Rp.
3
81,700.00
6,604,000.00
21,200.00
81,700.00
84,000.00
49,000.00
83,100.00
Page 23
JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
16,340.00
1,680.00
24,500.00
2,077.50
44,597.50
31,046.00
99,060.00
4,664.00
134,770.00
JUMLAH
HARGA
Rp.
6
KET.
31,046.00
99,060.00
4,664.00
16,340.00
1,680.00
24,500.00
2,077.50
179,367.50
Analisa-17'Jan 14
NO
URAIAN
1
52
2
1 M2 PLAPOND ETERNIT
1.000 Lbr
Eternit Klas I (1/1) M
0.015 M3
Kayu Kruing Balok 8/12
0.220 Kg
Paku Usuk
0.200 OH
Tukang Kayu
0.020 OH
Kepala Tukang Kayu
0.500 OH
Pekerja
0.025 OH
Mandor
Tadir Gedeg Kelas I
53
54
IX
21,500.00
6,604,000.00
18,100.00
81,700.00
84,000.00
49,000.00
83,100.00
35,300.00
104,100.00
6,604,000.00
18,100.00
81,700.00
84,000.00
49,000.00
83,100.00
56,900.00
107,200.00
81,700.00
5,000.00
20,700.00
2,000.00
81,700.00
84,000.00
49,000.00
83,100.00
JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
JUMLAH
HARGA
Rp.
6
KET.
16,340.00
1,680.00
24,500.00
2,077.50
44,597.50
44,597.50
21,500.00
99,060.00
3,982.00
124,542.00
138,342.00
21,500.00
99,060.00
3,982.00
16,340.00
1,680.00
24,500.00
2,077.50
169,139.50
182,939.50
32,680.00
3,360.00
13,230.00
1,121.85
50,391.85
50,391.85
50,391.85
40,599.00
151,892.00
1,086.00
193,577.00
175,169.00
194,786.00
40,599.00
151,892.00
1,086.00
32,680.00
3,360.00
13,230.00
1,121.85
243,968.85
225,560.85
245,177.85
20,425.00
2,100.00
7,350.00
6,232.50
36,107.50
28,300.00
18,000.00
3,105.00
2,100.00
51,505.00
28,300.00
18,000.00
3,105.00
2,100.00
20,425.00
2,100.00
7,350.00
6,232.50
87,612.50
22,500.00
513.00
22,500.00
513.00
4,900.00
8,170.00
4,200.00
290.85
40,573.85
HARGA
SATUAN
Rp.
3
60,000.00
17,100.00
49,000.00
81,700.00
84,000.00
83,100.00
107,200.00
17,100.00
49,000.00
81,700.00
84,000.00
83,100.00
12,525.00
21,200.00
49,000.00
81,700.00
84,000.00
83,100.00
8,639,100.00
21,200.00
60,000.00
49,000.00
81,700.00
84,000.00
83,100.00
8,943,400.00
17,100.00
81,700.00
Page 24
4,900.00
8,170.00
4,200.00
290.85
17,560.85
23,013.00
40,200.00
513.00
4,900.00
8,170.00
4,200.00
290.85
17,560.85
40,713.00
13,151.25
212.00
2,450.00
4,085.00
420.00
249.30
7,204.30
13,363.25
198,699.30
1,272.00
54,000.00
13,230.00
32,680.00
3,360.00
1,121.85
50,391.85
110,091.54
22,479.04
40,200.00
513.00
4,900.00
8,170.00
4,200.00
290.85
58,273.85
13,151.25
212.00
2,450.00
4,085.00
420.00
249.30
20,567.55
253,971.30
198,699.30
1,272.00
54,000.00
13,230.00
32,680.00
3,360.00
1,121.85
304,363.15
134,151.00
171.00
65,360.00
134,151.00
171.00
65,360.00
Analisa-17'Jan 14
NO
URAIAN
1
0.0800
0.8000
0.0400
Hr
Hr
Hr
2
Kepala tukang kayu
Pekerja
Mandor
HARGA
SATUAN
Rp.
3
84,000.00
49,000.00
83,100.00
Page 25
JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
6,720.00
39,200.00
3,324.00
49,244.00
199,682.00
JUMLAH
HARGA
Rp.
6
6,720.00
39,200.00
3,324.00
248,926.00
KET.
Analisa-17'Jan 14
NO
1
55
56
57
58
59
URAIAN
2
1 M2 PEK. DINDING PARTISI TEAKWOOD RANGKAP
RANGKA KAYU KAMPER
0.020 M3
Kayu Kamper Balok 6/12
0.390 Lbr
Teak Wood 4 mm
0.100 Kg
Paku Lis
0.450 OH
Tukang Kayu
0.045 OH
Kepala Tukang Kayu
0.150 OH
Pekerja
0.075 OH
Mandor
60
61
HARGA
SATUAN
Rp.
3
JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
JUMLAH
HARGA
Rp.
6
KET.
9,280,800.00
107,200.00
21,200.00
81,700.00
84,000.00
49,000.00
83,100.00
36,765.00
3,780.00
7,350.00
6,232.50
54,127.50
180,975.60
41,808.00
2,120.00
224,903.60
180,975.60
41,808.00
2,120.00
36,765.00
3,780.00
7,350.00
6,232.50
279,031.10
11,275,800.00
18,100.00
14,000.00
81,700.00
84,000.00
49,000.00
83,100.00
1,715,700.00
176,400.00
343,000.00
29,085.00
2,264,185.00
12,403,380.00
22,625.00
14,000.00
12,440,005.00
12,403,380.00
22,625.00
14,000.00
1,715,700.00
176,400.00
343,000.00
29,085.00
14,704,190.00
9,280,800.00
18,100.00
14,000.00
81,700.00
84,000.00
49,000.00
83,100.00
1,470,600.00
151,200.00
294,000.00
24,930.00
1,940,730.00
11,136,960.00
22,625.00
14,000.00
11,173,585.00
11,136,960.00
22,625.00
14,000.00
1,470,600.00
151,200.00
294,000.00
24,930.00
13,114,315.00
10,536,100.00
87,300.00
21,200.00
81,700.00
84,000.00
49,000.00
83,100.00
196,080.00
20,160.00
39,200.00
3,324.00
258,764.00
258,764.00
258,764.00
258,764.00
258,764.00
258,764.00
252,866.40
69,840.00
2,120.00
324,826.40
343,946.40
357,386.40
380,364.80
399,484.80
412,924.80
71,960.00
252,866.40
69,840.00
2,120.00
196,080.00
20,160.00
39,200.00
3,324.00
583,590.40
602,710.40
616,150.40
639,128.80
658,248.80
671,688.80
330,724.00
12,255.00
1,260.00
735.00
62.33
14,312.33
14,312.33
14,312.33
122,320.00
122,320.00
96,030.00
140,800.00
122,320.00
12,255.00
1,260.00
735.00
62.33
136,632.33
110,342.33
155,112.33
10,536,100.00
245,100.00
25,200.00
49,000.00
4,155.00
323,455.00
323,455.00
541,236.00
7,000.00
548,236.00
421,444.00
-
541,236.00
7,000.00
245,100.00
25,200.00
49,000.00
4,155.00
871,691.00
744,899.00
323,455.00
###
104,100.00
21,200.00
14,000.00
263,402.50
104,100.00
636.00
7,000.00
263,402.50
104,100.00
636.00
7,000.00
111,200.00
128,000.00
87,300.00
111,200.00
128,000.00
111,200.00
81,700.00
84,000.00
49,000.00
83,100.00
87,300.00
128,000.00
13,530,900.00
14,000.00
81,700.00
84,000.00
49,000.00
83,100.00
Page 26
12,850,200
Analisa-17'Jan 14
NO
2
Tukang Kayu
Kepala Tukang Kayu
Pekerja
Mandor
HARGA
SATUAN
Rp.
3
81,700.00
84,000.00
49,000.00
83,100.00
Teak Wood 4 mm
107,200.00
URAIAN
1
2.100
0.210
0.800
0.040
OH
OH
OH
OH
Page 27
JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
171,570.00
17,640.00
39,200.00
3,324.00
231,734.00
375,138.50
231,734.00
378,238.50
JUMLAH
HARGA
Rp.
6
171,570.00
17,640.00
39,200.00
3,324.00
606,872.50
609,972.50
KET.
549,433.44
(57,439.06)
Analisa-17'Jan 14
NO
1
62
URAIAN
2
1 M2 PEK.DAUN PINTU LAPIS ALUMINIUM
0.015 M3
Kayu Kamper Papan 3/20
0.625 Lbr
Teak Wood 4 mm
1.000 Lbr
Alumnium Kulit Jeruk
0.100 Kg
Paku Lis
3.000 OH
Tukang Kayu
0.300 OH
Kepala Tukang Kayu
1.250 OH
Pekerja
0.063 OH
Mandor
66
67
68
KET.
158,041.50
67,000.00
105,700.00
2,120.00
245,100.00
25,200.00
61,250.00
5,235.30
669,646.80
667,709.30
980,400.00
100,800.00
196,000.00
16,620.00
1,293,820.00
1,293,820.00
1,293,820.00
1,293,820.00
1,293,820.00
7,264,400.00
276,000.00
101,360.00
7,641,760.00
3,734,670.00
10,985,540.00
6,002,210.00
13,657,990.00
7,264,400.00
276,000.00
101,360.00
980,400.00
100,800.00
196,000.00
16,620.00
8,935,580.00
5,028,490.00
12,279,360.00
7,296,030.00
14,951,810.00
8,170.00
840.00
4,900.00
415.50
14,325.50
14,325.50
14,325.50
69,112.80
35,773.60
2,715.00
107,601.40
91,320.60
81,148.60
69,112.80
35,773.60
2,715.00
8,170.00
840.00
4,900.00
415.50
121,926.90
105,646.10
95,474.10
8,639,100.00
8,943,400.00
18,100.00
81,700.00
84,000.00
49,000.00
83,100.00
23,202.80
2,352.00
24,500.00
2,077.50
52,132.30
103,669.20
53,660.40
1,357.50
158,687.10
103,669.20
53,660.40
1,357.50
23,202.80
2,352.00
24,500.00
2,077.50
210,819.40
6,168,500.00
10,536,100.00
18,100.00
81,700.00
84,000.00
49,000.00
83,100.00
18,791.00
1,932.00
11,270.00
1,911.30
33,904.30
135,707.00
42,144.40
3,620.00
181,471.40
135,707.00
42,144.40
3,620.00
18,791.00
1,932.00
11,270.00
1,911.30
215,375.70
6,168,500.00
18,100.00
81,700.00
84,000.00
49,000.00
83,100.00
4,656.90
252.00
2,793.00
498.60
8,200.50
67,853.50
1,810.00
69,663.50
67,853.50
1,810.00
4,656.90
252.00
2,793.00
498.60
77,864.00
8,943,400.00
17,100.00
49,000.00
83,100.00
2,107.00
166.20
71,547.20
2,565.00
-
71,547.20
2,565.00
2,107.00
166.20
65
JUMLAH
HARGA
Rp.
6
158,041.50
67,000.00
105,700.00
2,120.00
332,861.50
330,924.00
Seseh Balok
Kayu Kamper Balok 8/12
Kayu Meranti Balok 8/12
Balok Bengkirai
64
###
107,200.00
105,700.00
21,200.00
81,700.00
84,000.00
49,000.00
83,100.00
JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
245,100.00
25,200.00
61,250.00
5,235.30
336,785.30
336,785.30
Plywood
63
HARGA
SATUAN
Rp.
3
1 M2 USUK GERANTANGAN
0.022 M3
Usuk Kruing 5/7
0.004 M3
Kayu Kamper Papan 3/20
0.200 Kg
Paku Usuk
0.230 OH
Tukang Kayu
0.023 OH
Kepala Tukang Kayu
0.230 OH
Pekerja
0.023 OH
Mandor
104,100.00
6,604,000.00
18,400.00
18,100.00
81,700.00
84,000.00
49,000.00
83,100.00
3,052,100.00
9,643,800.00
5,113,500.00
###
8,639,100.00
8,943,400.00
18,100.00
81,700.00
84,000.00
49,000.00
83,100.00
6,604,000.00
5,332,500.00
Page 28
###
###
Analisa-17'Jan 14
NO
URAIAN
1
0.043 OH
0.004 OH
2
Tukang Kayu
Kepala Tukang Kayu
HARGA
SATUAN
Rp.
3
81,700.00
84,000.00
Page 29
JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
3,513.10
336.00
6,122.30
74,112.20
JUMLAH
HARGA
Rp.
6
3,513.10
336.00
80,234.50
KET.
Analisa-17'Jan 14
NO
1
X
1
69
70
71
72
URAIAN
2
PEKERJAAN BESI DAN ALUMUNIUM
1 M2 PEK. KAP BAJA RINGAN BENTANG < 9 M'
1.120 M'
UK. 75. 0,85
2.210 M'
UK. 75. 0,55
6.600 M'
GD.B. 0,43
1.000 M2
Plat - Plat Penyambung
1.000 M2
Ongkos Pasang
10,536,100.00
17,100.00
81,700.00
84,000.00
49,000.00
83,100.00
22,400.00
39,780.00
132,000.00
20,000.00
JUMLAH
HARGA
Rp.
6
KET.
30,000.00
30,000.00
214,180.00
22,400.00
39,780.00
132,000.00
20,000.00
30,000.00
244,180.00
16,340.00
1,680.00
4,900.00
415.50
23,335.50
23,335.50
23,335.50
75,859.92
855.00
76,714.92
55,029.96
41,776.20
75,859.92
855.00
16,340.00
1,680.00
4,900.00
415.50
100,050.42
78,365.46
65,111.70
188,107.50
3,620.00
65,360.00
6,720.00
12,250.00
1,163.40
85,493.40
191,727.50
Untuk 0,5 M2 = 1 M'
188,107.50
3,620.00
65,360.00
6,720.00
12,250.00
1,163.40
277,220.90
138,610.45
7,524,300.00
5,683,500.00
7,524,300.00
18,100.00
81,700.00
84,000.00
49,000.00
83,100.00
15,800.00
81,700.00
84,000.00
49,000.00
83,100.00
653,600.00
67,200.00
245,000.00
41,550.00
1,007,350.00
Untuk 1 M' = 0,5 M2
86,900.00
86,900.00
86,900.00
653,600.00
67,200.00
245,000.00
41,550.00
1,094,250.00
109,425.00
1 M2 GENTENG PRES
25.000 Bj
Genteng Kodok
0.075 OH
Tukang Kayu
0.008 OH
Kepala Tukang Kayu
0.150 OH
Pekerja
0.008 OH
Mandor
2,800.00
81,700.00
84,000.00
49,000.00
83,100.00
6,127.50
672.00
7,350.00
664.80
14,814.30
14,814.30
14,814.30
14,814.30
70,000.00
70,000.00
57,500.00
57,500.00
107,500.00
70,000.00
6,127.50
672.00
7,350.00
664.80
84,814.30
72,314.30
72,314.30
122,314.30
16,340.00
1,680.00
19,600.00
166.20
37,786.20
37,786.20
37,786.20
37,786.20
35,000.00
218.24
5,254.40
40,472.64
37,972.64
59,472.64
140,472.64
35,000.00
218.24
5,254.40
16,340.00
1,680.00
19,600.00
166.20
78,258.84
75,758.84
97,258.84
178,258.84
4,902.00
504.00
5,880.00
498.60
11,784.60
11,784.60
28,560.00
528.00
29,088.00
24,678.00
28,560.00
528.00
4,902.00
504.00
5,880.00
498.60
40,872.60
36,462.60
74
20,000.00
18,000.00
20,000.00
20,000.00
30,000.00
JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
Genteng Plentong
Genteng Biasa
Genteng Karang Pilang
73
HARGA
SATUAN
Rp.
3
2,300.00
2,300.00
4,300.00
7,000.00
1,364.00
164,200.00
81,700.00
84,000.00
49,000.00
83,100.00
6,500.00
10,800.00
27,000.00
40,800.00
26,400.00
81,700.00
84,000.00
49,000.00
83,100.00
34,500.00
Page 30
Analisa-17'Jan 14
NO
URAIAN
75
HARGA
SATUAN
Rp.
3
15,800.00
19,200.00
72,400.00
79,200.00
49,000.00
Untuk 1 M'
Page 31
JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
18,100.00
1,980.00
12,250.00
32,330.00
3,233.00
94,800.00
230,400.00
325,200.00
32,520.00
JUMLAH
HARGA
Rp.
6
KET.
94,800.00
230,400.00
18,100.00
1,980.00
12,250.00
357,530.00
35,753.00
Analisa-17'Jan 14
NO
1
76
77
78
79
80
81
URAIAN
2
1 M2 PASANGAN ATAP SENG LAMA
0.750 Lbr
BJLS 0,18 mm
0.040 Kg
Paku Seng
0.200 OH
Tukang Kayu
0.020 OH
Kepala Tukang Kayu
0.100 OH
Pekerja
0.005 OH
Mandor
JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
JUMLAH
HARGA
Rp.
6
KET.
40,800.00
26,400.00
81,700.00
84,000.00
49,000.00
83,100.00
16,340.00
1,680.00
4,900.00
415.50
23,335.50
30,600.00
1,056.00
31,656.00
30,600.00
1,056.00
16,340.00
1,680.00
4,900.00
415.50
54,991.50
122,200.00
18,100.00
81,700.00
84,000.00
49,000.00
83,100.00
9,804.00
1,008.00
5,880.00
498.60
17,190.60
122,200.00
3,620.00
125,820.00
122,200.00
3,620.00
9,804.00
1,008.00
5,880.00
498.60
143,010.60
18,900.00
23,400.00
15,900.00
57,600.00
70,700.00
49,000.00
83,100.00
3,628.80
445.41
980.00
207.75
5,261.96
1,890.00
6,084.00
1,590.00
9,564.00
1,890.00
6,084.00
1,590.00
3,628.80
445.41
980.00
207.75
14,825.96
18,900.00
23,400.00
57,600.00
70,700.00
49,000.00
83,100.00
2,419.20
296.94
1,372.00
207.75
4,295.89
2,268.00
4,212.00
6,480.00
2,268.00
4,212.00
2,419.20
296.94
1,372.00
207.75
10,775.89
26,700.00
24,700.00
57,600.00
70,700.00
49,000.00
83,100.00
4,320.00
565.60
2,450.00
249.30
7,584.90
3,204.00
1,235.00
4,439.00
3,204.00
1,235.00
4,320.00
565.60
2,450.00
249.30
12,023.90
53,700.00
57,600.00
70,700.00
49,000.00
83,100.00
8,640.00
1,060.50
4,900.00
415.50
15,016.00
10,149.30
10,149.30
10,149.30
8,640.00
1,060.50
4,900.00
415.50
25,165.30
53,700.00
24,700.00
57,600.00
70,700.00
49,000.00
83,100.00
1,728.00
212.10
7,350.00
249.30
9,539.40
15,250.80
1,753.70
17,004.50
15,250.80
1,753.70
1,728.00
212.10
7,350.00
249.30
26,543.90
26,700.00
28,500.00
48,500.00
53,700.00
57,600.00
70,700.00
518.40
424.20
5,340.00
4,275.00
8,245.00
13,962.00
-
5,340.00
4,275.00
8,245.00
13,962.00
518.40
424.20
82 1 M2 PENGECATAN KANSTIN
0.284 Kg Cat Kayu
0.071 Kg Minyak cat
0.030 OH Tukang cat
0.003 OH Kepala tukang cat
0.150 OH Pekerja
0.003 OH Mandor
83
HARGA
SATUAN
Rp.
3
Page 32
Analisa-17'Jan 14
NO
URAIAN
1
0.070 OH
0.003 OH
84
2
Pekerja
Mandor
1 M2 PEKERJAAN POLITUR
0.150 Ltr
Politur
0.372 Ltr
Politur jadi ( Ultran )
2.000 Lbr
Amplas
0.060 OH
Tukang Cat
0.016 OH
Kepala Tukang Cat
0.008 OH
Mandor
HARGA
SATUAN
Rp.
3
49,000.00
83,100.00
44,300.00
56,800.00
3,700.00
57,600.00
70,700.00
83,100.00
Page 33
JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
3,430.00
207.75
4,580.35
31,822.00
3,456.00
1,131.20
623.25
5,210.45
6,645.00
21,129.60
7,400.00
35,174.60
JUMLAH
HARGA
Rp.
6
3,430.00
207.75
36,402.35
KET.
6,645.00
21,129.60
7,400.00
3,456.00
1,131.20
623.25
40,385.05
Analisa-17'Jan 14
NO
URAIAN
HARGA
SATUAN
Rp.
3
85
47,839.50
107,830.02
53,919.75
3,126,043.90
86
87
88
89
91
92
KET.
12,438.27
3,150.88
26,258.46
37,897.40
79,745.00
10,867.03
19,573.33
90,270.40
120,710.76
12,438.27
14,017.90
45,831.79
128,167.80
200,455.76
9,000.00
57,600.00
57,600.00
57,600.00
9,000.00
9,000.00
9,000.00
57,600.00
66,600.00
115,600.00
115,500.00
30,000.00
6,100.00
170,000.00
3,468,000.00
3,465,000.00
5,100,000.00
12,033,000.00
900,000.00
3,660,000.00
4,560,000.00
3,468,000.00
3,465,000.00
900,000.00
3,660,000.00
5,100,000.00
16,593,000.00
49,000.00
83,100.00
16,593,000.00
14.70
16.62
2,406.60
2,437.92
912.00
912.00
14.70
16.62
3,318.60
3,349.92
1 M3 TIMBUNAN SIRTU
1.200 M3
Pasir Batu (Sirtu)
0.250 OH
Pekerja
0.025 OH
Mandor
0.001
Biaya menggilas sebulan
220,600.00
49,000.00
83,100.00
16,593,000.00
12,250.00
2,077.50
12,033.00
26,360.50
5,272.10
2,636.05
1,318.03
264,720.00
4,560.00
269,280.00
53,856.00
26,928.00
13,464.00
264,720.00
12,250.00
2,077.50
16,593.00
295,640.50
59,128.10
29,564.05
14,782.03
251,900.00
49,000.00
83,100.00
16,593,000.00
22,981.00
1,911.30
3,609.90
28,502.20
41,563.50
1,368.00
42,931.50
41,563.50
22,981.00
1,911.30
4,977.90
71,433.70
196,000.00
47,839.50
17,001.00
1,243.83
170.01
1,413.84
7,448.00
7,448.00
7,448.00
1,243.83
170.01
8,861.84
247,700.00
49,000.00
83,100.00
16,593,000.00
257,250.00
21,855.30
448,011.00
727,116.30
7,271.16
1,733,900.00
1,733,900.00
17,339.00
1,733,900.00
257,250.00
21,855.30
448,011.00
2,461,016.30
24,610.16
11,715.00
343,000.00
29,085.00
448,011.00
831,811.00
8,318.11
871,200.00
653,400.00
907,500.00
32,834.78
2,464,934.78
24,649.35
871,200.00
653,400.00
907,500.00
32,834.78
11,715.00
343,000.00
29,085.00
448,011.00
3,296,745.78
32,967.46
1 M2 ...........
93
JUMLAH
HARGA
Rp.
6
JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
217,800.00
217,800.00
12,100.00
6,100.00
78,100.00
49,000.00
83,100.00
16,593,000.00
1 M2 ...........
Page 34
187,308.71
#VALUE!
Analisa-17'Jan 14
NO
1
94
URAIAN
HARGA
SATUAN
Rp.
3
2
100 M2 MENGASPAL DENGAN ASPAL 200 KG
200.000 Kg
12,100.00
Aspal
1.200 M3
273,400.00
Batu Seplit Halus ( 0,5 - 1 ) cm / Penutup
14.354 Ltr
6,100.00
Solar
0.400 OH
78,100.00
Tukang masak aspal
9.000 OH
49,000.00
Pekerja
0.450 OH
83,100.00
Mandor
0.013
16,593,000.00
Biaya menggilas sebulan
1 M2 ...........
Page 35
JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
31,240.00
441,000.00
37,395.00
215,709.00
725,344.00
7,253.44
2,420,000.00
328,080.00
87,559.40
2,835,639.40
28,356.39
JUMLAH
HARGA
Rp.
6
KET.
2,420,000.00
328,080.00
87,559.40
31,240.00
441,000.00
37,395.00
215,709.00
3,560,983.40
35,609.83
Analisa-17'Jan 14
NO
1
95
URAIAN
2
100 M2 MENGASPAL DENGAN ASPAL 125 KG
125.000 Kg
Aspal
1.200 M3
Batu Seplit Jagung ( 1 - 2 ) cm/ Kasar
8.971 Ltr
Solar
0.250 OH
Tukang masak aspal
7.500 OH
Pekerja
0.375 OH
Mandor
0.400 Bh
Sikat Ijuk
0.040 Bh
Sikat Baja
0.013
Biaya menggilas sebulan
HARGA
SATUAN
Rp.
3
12,100.00
252,400.00
6,100.00
78,100.00
49,000.00
83,100.00
7,000.00
18,900.00
16,593,000.00
1 M2 ...........
96
97
217,800.00
252,400.00
12,100.00
6,100.00
78,100.00
49,000.00
83,100.00
7,000.00
18,900.00
16,593,000.00
1 M2 ...........
100 M2 MENGASPAL DENGAN ASPAL 175 KG
175.000 Kg
12,100.00
Aspal
1.200 M3
273,400.00
Batu Seplit Halus ( 0,5 - 1 ) cm / Penutup
12.560 Ltr
6,100.00
Solar
0.400 OH
78,100.00
Tukang masak aspal
9.000 OH
49,000.00
Pekerja
0.450 OH
83,100.00
Mandor
0.013
16,593,000.00
Biaya menggilas sebulan
1 M2 ...........
1 M2 PEKERJAAN BURDA 92+93
12,100.00
252,400.00
6,100.00
78,100.00
49,000.00
83,100.00
16,593,000.00
1 M2 ...........
99
100
12,100.00
Page 36
JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
JUMLAH
HARGA
Rp.
6
KET.
19,525.00
367,500.00
31,162.50
215,709.00
633,896.50
6,338.97
1,512,500.00
302,880.00
54,724.63
2,800.00
756.00
1,873,660.63
18,736.61
1,512,500.00
302,880.00
54,724.63
19,525.00
367,500.00
31,162.50
2,800.00
756.00
215,709.00
2,507,557.13
25,075.57
21,910.52
71,742.35
93,652.86
19,525.00
367,500.00
31,162.50
215,709.00
633,896.50
6,338.97
653,400.00
302,880.00
1,512,500.00
54,724.63
2,800.00
756.00
2,527,060.63
25,270.61
653,400.00
302,880.00
1,512,500.00
54,724.63
19,525.00
367,500.00
31,162.50
2,800.00
756.00
215,709.00
3,160,957.13
31,609.57
31,240.00
441,000.00
37,395.00
215,709.00
725,344.00
7,253.44
2,117,500.00
328,080.00
76,614.48
2,522,194.48
25,221.94
2,117,500.00
328,080.00
76,614.48
31,240.00
441,000.00
37,395.00
215,709.00
3,247,538.48
32,475.38
13,592.41
50,492.55
64,084.96
19,525.00
294,000.00
29,085.00
215,709.00
558,319.00
5,583.19
1,210,000.00
302,880.00
43,779.70
1,556,659.70
15,566.60
1,210,000.00
302,880.00
43,779.70
19,525.00
294,000.00
29,085.00
215,709.00
2,114,978.70
21,149.79
19,525.00
294,000.00
29,085.00
199,116.00
541,726.00
5,417.26
1,210,000.00
328,080.00
43,779.70
2,100.00
567.00
1,584,526.70
15,845.27
1,210,000.00
328,080.00
43,779.70
19,525.00
294,000.00
29,085.00
2,100.00
567.00
199,116.00
2,126,252.70
21,262.53
11,000.45
31,411.86
42,412.31
1,461,680.00
1,461,680.00
Analisa-17'Jan 14
NO
HARGA
SATUAN
Rp.
2
3
273,400.00
Batu Seplit Halus ( 0,5 - 1 ) cm / Penutup
6,100.00
Solar
78,100.00
Tukang masak aspal
49,000.00
Pekerja
83,100.00
Mandor
16,593,000.00
Biaya menggilas sebulan
URAIAN
1
1.200
8.670
2.000
2.000
1.000
0.013
M3
Ltr
OH
OH
OH
1 M2 ...........
JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
328,080.00
52,885.88
156,200.00
98,000.00
83,100.00
215,709.00
553,009.00
1,842,645.88
5,530.09
18,426.46
5,530.09
1 M2 PEKERJAAN BURAS 96
Page 37
18,426.46
JUMLAH
HARGA
Rp.
6
328,080.00
52,885.88
156,200.00
98,000.00
83,100.00
215,709.00
2,395,654.88
23,956.55
KET.
23,956.55
Analisa-17'Jan 14
NO
URAIAN
HARGA
SATUAN
Rp.
3
367,200.00
12,100.00
13,000.00
276,800.00
100,000.00
115,000.00
49,000.00
83,100.00
Pipa Diameter
Pipa Diameter
Pipa Diameter
Pipa Diameter
Pipa Diameter
Pipa Diameter
Pipa Diameter
0,75 ..
1" ..
1,5" ..
2" ..
2,5" ..
3" ..
4" ..
0,75 ..
1" ..
1,25" ..
1,5" ..
2"
..
134,090,400.00
89,393.60
4,482.00
492.60
1,764.00
132.96
6,871.56
6,871.56
6,871.56
6,871.56
6,871.56
6,871.56
6,871.56
6,871.56
5,580.00
1,627.50
7,207.50
8,990.00
10,798.33
20,020.83
29,320.83
38,078.33
53,190.83
84,113.33
5,580.00
1,627.50
4,482.00
492.60
1,764.00
132.96
14,079.06
15,861.56
17,669.89
26,892.39
36,192.39
44,949.89
60,062.39
90,984.89
(1,101.64)
(2,178.81)
(2,510.35)
(4,481.14)
(6,044.51)
(5,235.93)
(7,520.18)
(19,112.14)
6,723.00
738.90
2,646.00
2,243.70
12,351.60
12,351.60
12,351.60
12,351.60
12,351.60
12,351.60
24,480.00
7,140.00
31,620.00
45,570.00
42,780.00
93,258.33
107,130.83
101,938.33
24,480.00
7,140.00
6,723.00
738.90
2,646.00
2,243.70
43,971.60
57,921.60
55,131.60
105,609.93
119,482.43
114,289.93
(3,467.30)
(2,693.47)
(7,155.17)
(50,381.80)
(12,919.25)
(21,987.71)
14,000.00
196,000.00
72,400.00
49,000.00
83,100.00
49,000.00
83,100.00
159,280.00
88,200.00
6,648.00
220,500.00
62,325.00
536,953.00
178,984.33
630,000.00
588,000.00
1,218,000.00
406,000.00
630,000.00
588,000.00
159,280.00
88,200.00
6,648.00
220,500.00
62,325.00
1,754,953.00
584,984.33
4,000.00
49,000.00
83,100.00
490.00
498.60
988.60
1,400.00
1,400.00
1,400.00
490.00
498.60
2,388.60
5,800.00
6,966.67
12,916.67
18,916.67
24,566.67
34,316.67
54,266.67
20,400.00
20,400.00
74,700.00
82,100.00
49,000.00
83,100.00
29,400.00
27,600.00
60,166.67
69,116.67
65,766.67
1 M2 CAT RESIDU/TEER
0.350 Ltr
Residu / Teer
0.010 OH
Pekerja
0.006 OH
Mandor
KET.
13,219,200.00
112,530,000.00
5,850,000.00
2,491,200.00
1,200,000.00
115,000.00
1,127,000.00
83,100.00
136,615,500.00
91,077.00
4,650.00
4,650.00
74,700.00
82,100.00
49,000.00
83,100.00
13,219,200.00
112,530,000.00
5,850,000.00
2,491,200.00
JUMLAH
HARGA
Rp.
6
1,200,000.00
115,000.00
1,127,000.00
83,100.00
2,525,100.00
1,683.40
1 M2 ...........
102 1 M' PAS. PIPA PVC TIPE AW
1.200 M'
0,5"
0.350 harga PVC ( perlengkapan )
0.060 OH
Tukang Batu
0.006 OH
Kepala Tukang Batu
0.036 OH
Pekerja
0.002 OH
Mandor
JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
Singaraja,
Januari 2014
Kepala Bidang Cipta Karya
Dinas Pekerjaan Umum
Kabupaten Buleleng,
Page 38
Analisa-17'Jan 14
NO
URAIAN
HARGA
SATUAN
Rp.
3
Page 39
JUMLAH HARGA
JUMLAH
UPAH
BAHAN
HARGA
Rp.
Rp.
Rp.
4
5
6
NI NYOMAN SURATTINI, ST
NIP. 19670102 199803 2 003
KET.
Analisa-17'Jan 14
: 2014
HARGA SATUAN
Rp.
4
NO.
URAIAN
SATUAN
I.
UPAH KERJA
Pekerja
Tukang Batu
Kepala Tukang Batu
Tukang Kayu
Kepala Tukang Kayu
Tukang Cat
Kepala Tukang Cat
Tukang Besi
Kepala Tukang Besi
Tukang Gali
Tukang Ukir kayu
Tukang Ukir paras
Masinis
Kernet
Sopir
Sopir Material
Tukang masak aspal
Mandor
Tukang Politur
Tukang Pipa
Kepala Tukang Pipa
Tukang Listrik
Kepala Tukang Listrik
Tukang Style bali
Kepala Tukang Ukir Style Bali
Kepala Tukang Paras
Operator Terlatih
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
49,000.00
74,700.00
82,100.00
81,700.00
84,000.00
57,600.00
70,700.00
72,400.00
79,200.00
57,100.00
86,900.00
83,000.00
115,600.00
115,500.00
96,300.00
100,000.00
78,100.00
83,100.00
66,900.00
71,800.00
78,100.00
73,200.00
80,600.00
79,700.00
90,400.00
88,900.00
115,000.00
BAHAN BANGUNAN
Bahan Pasangan :
Batu Pasang
Batu Pecah 5 - 7 cm
Batu Pecah 2 - 3 cm
Batu Pecah 2 - 3 cm/mesin
Batu Pecah 3 - 5 cm
Batu Pecah 3 - 5 cm/mesin
Batu Pecah 10/15
Agregat Halus
Batu Seplit Halus ( 0,5 - 1 ) cm / Penutup
Batu Seplit Jagung ( 1 - 2 ) cm/ Kasar
Pasir Batu (Sirtu)
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
196,000.00
247,700.00
217,800.00
236,900.00
217,800.00
236,900.00
251,900.00
367,200.00
273,400.00
252,400.00
220,600.00
Kerikil (Koral) :
1 Kerikil / Koral Beton
M3
212,100.00
Pasir :
1 Pasir Urug
2 Pasir Pasang
3 Pasir Beton
M3
M3
M3
158,200.00
164,200.00
167,800.00
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
II.
A
1
2
3
4
5
6
7
8
9
10
11
B
Page 40
KETERANGAN
5
Harga Satuan 14
NO.
1
D
1
2
3
4
5
6
7
8
9
10
URAIAN
SATUAN
2
Batu Bata :
Bata Gosok klas I
Bata Gosok klas II
Bata Pasang klas 1
Bata Pasang klas 2
Batu lahar merah Buleleng
Batu pipih Buleleng
Loster Terawang PC
Loster Terawang Keramik
Loster Terawang ( 30x30 ) cm
Loster Terawang ( 40x40 ) cm
3
Bj
Bj
Bj
Bj
M3
M3
Bj
Bj
Bj
Bj
Page 41
HARGA SATUAN
Rp.
4
KETERANGAN
5
4,800.00
4,200.00
1,100.00
900.00
209,800.00
1,010,700.00
13,100.00
60,300.00
40,000.00
45,000.00
Harga Satuan 14
NO.
1
E
1
2
3
4
5
6
7
F
SATUAN
2
Paras / Padas :
Paras Malam 50 x 20 x 12 cm
Paras Ukir Selekarang 30 x 15 x 3 cm
Paras Batik
Paras Kerobokan 50 x 20 x 12 cm
Paras Putih Bukit
Serbuk Bata Merah
Palimanan 30/30 T. 2,00 cm
Portland Cement :
1 Semen Gresik ( 50 kg )
2 Semen warna
G
1
2
3
4
5
6
7
8
9
10
11
12
H
URAIAN
Bahan Atap :
Sirap
Genteng Biasa
Bubungan Genteng Biasa
Genteng Karang Pilang (Goodyear)
Bubungan Karang Pilang
Genteng Kecil
Bubungan Genteng Kecil
Genteng Kodok
Bubungan Genteng Kodok
Genteng Kaca 3 mm
Genteng Plentong
Bubungan Genteng Plentong
Seng Gelombang :
1 BJLS 0,18 mm
2 BJLS 0,20 mm
3 Seng Talang 30 cm
HARGA SATUAN
Rp.
4
Bj
Bj
Bh
Bh
Bh
M3
M3
37,800.00
8,800.00
12,800.00
25,200.00
13,100.00
90,000.00
Zak
Kg
68,200.00
23,500.00
Ikat
Bj
Bj
Bj
Bj
Bj
Bj
Bj
Bj
Bj
Bj
Bj
122,200.00
2,300.00
7,000.00
4,300.00
27,000.00
1,700.00
5,200.00
2,800.00
10,800.00
15,100.00
2,300.00
6,500.00
Lbr
Lbr
m
40,800.00
42,900.00
15,800.00
1
2
3
4
Asbes PC (DJABESMEN) :
Asbes Gel. 1,8 m' x 1,05 m'/4 mm
Nok Asbes/Djabesmen
Rata/Djabesmen (2 m x 1m x 4mm)
Rata/Djabesmen (1 m x 1m x 6mm)
Lbr
M'
Lbr
Lbr
34,500.00
25,900.00
25,400.00
18,600.00
1
2
3
4
5
6
7
8
M'
M'
M'
M'
M'
M'
M'
M2
20,000.00
18,000.00
20,000.00
20,000.00
1
2
3
4
5
6
7
8
Bahan Kayu :
Kayu Jati Papan
Kayu Jati Balok
Kayu Jati Bali Papan
Kayu Jati Bali Balok
Kayu Kamper Papan 3/20
Kayu Kamper Balok 8/12
Kayu Kamper Balok 6/12
Kayu Kamper Reng
M3
M3
M3
M3
M3
M3
M3
M3
13,530,900.00
11,275,800.00
13,453,800.00
12,363,000.00
10,536,100.00
9,643,800.00
9,280,800.00
8,943,400.00
Page 42
KETERANGAN
5
Harga Satuan 14
NO.
URAIAN
SATUAN
3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
IKAT
1
9
10
11
12
13
14
15
16
17
18
19
20
Page 43
HARGA SATUAN
Rp.
4
8,639,100.00
8,639,100.00
5,683,500.00
5,113,500.00
5,332,500.00
5,417,800.00
5,210,600.00
5,210,600.00
7,524,300.00
6,604,000.00
6,377,400.00
313,200.00
KETERANGAN
5
Harga Satuan 14
NO.
1
21
22
23
24
25
26
27
28
29
30
L
1
2
3
4
5
6
M
1
2
3
4
5
6
7
8
9
10
11
12
N
URAIAN
SATUAN
3
M3
M3
Btg
M3
M3
M3
M3
M3
Lbr
Lbr
HARGA SATUAN
Rp.
4
6,168,500.00
6,168,500.00
50,100.00
3,052,100.00
1,380,400.00
12,073,300.00
13,745,300.00
60,000.00
104,100.00
Btg
Btg
Btg
M2
M2
M2
12,600.00
11,000.00
9,300.00
35,300.00
28,100.00
-
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bj
Bj
M2
M2
120,400.00
85,500.00
64,700.00
38,800.00
113,500.00
76,600.00
50,000.00
42,900.00
2,400.00
2,200.00
72,600.00
81,500.00
M2
30,000.00
M2
M2
M2
M2
M2
M2
M2
M2
56,700.00
56,800.00
54,600.00
57,600.00
53,600.00
53,300.00
50,900.00
57,000.00
Kg
Kg
Kg
Kg
Kg
12,500.00
10,800.00
9,900.00
9,200.00
11,400.00
Kg
Kg
Kg
Kg
Btg
12,200.00
11,700.00
11,400.00
18,400.00
-
Bahan Lantai :
1 Tegel Warna 20/20 cm
Keramik
1 Keramik KW I 20/20 cm
2 Keramik KW I 20/25 cm
3 Keramik KW I 30/30 cm
4 Keramik KW I 40/40 cm
5 Keramik KW II 20/20 cm
6 Keramik KW II 20/25 cm
7 Keramik KW II 30/30 cm
8 Keramik KW II 40/40 cm
O
1
2
3
4
5
1
2
3
4
5
Bahan Besi :
Besi Beton Polos
Besi Beton Polos 6mm
Besi Beton Polos 8mm
Besi Beton Polos 10mm
Besi Beton Polos 12mm
Besi Beton Polos 16mm
Besi Beton ulir
Besi Beton ulir 13mm
Besi Beton ulir 16mm
Besi Beton ulir 19mm
Besi Strip
Besi Siku 50/50 x 5
Page 44
KETERANGAN
5
Harga Satuan 14
NO.
URAIAN
SATUAN
P
1
2
3
4
5
6
Q
1
2
HARGA SATUAN
Rp.
4
KETERANGAN
5
Kawat
Kawat Ikat Beton
Kawat nyamuk 1x2 m
Kawat Harmonika 5 x 5 cm
Kawat Harmonika 4 x 4 cm
Kawat Harmonika 3 x 3 cm
Kawat 4 mm
Kg
M2
M2
M2
M2
Kg
20,700.00
14,700.00
28,700.00
29,300.00
34,000.00
14,000.00
Btg
Btg
Page 45
Harga Satuan 14
NO.
SATUAN
2
Paku Peluru
Siku Gantung (Angel Clip)
Rod
Suspension Rod Clip
Conector (Chanel Clamp)
Flushing
3
Bh
Bh
Btg
Bh
Bh
Btg
Bahan Plafond :
Eternit Klas I (1/1) M
Eternit Klas II (1/1) M
Triplek 3 mm
Plywood
9 mm
Teak Wood 4 mm
Ceilingteak
Gypsum
Gypsum (1,2 x 2,4)
List Gypsum
Multipleks ( 6 MM )
Multipleks (9 MM )
Multipleks ( 12 MM )
Aluminium foil
Kalsiboard
Hollow
Ramset
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
M'
Lbr
Lbr
Lbr
Lbr
Lbr
m'
Bh
21,500.00
17,400.00
56,900.00
104,100.00
107,200.00
91,000.00
81,700.00
20,900.00
82,600.00
118,700.00
174,400.00
421,900.00
61,600.00
5,000.00
2,000.00
Bahan Pipa :
1 Pipa Galvanis
2"
1,5"
1,25"
1"
0,75"
0,5"
Btg
Btg
Btg
Btg
Btg
Btg
394,600.00
414,700.00
361,000.00
165,600.00
176,400.00
122,400.00
2 Pipa PVC AW
4"
3"
2,5"
2"
1,5"
1"
0,75"
0,5"
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
325,600.00
205,900.00
147,400.00
113,500.00
77,500.00
41,800.00
34,800.00
27,900.00
3 Pipa PVC C
4"
3"
2,5"
2"
1,5"
1"
0,75"
0,5"
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
70,200.00
58,000.00
49,800.00
39,600.00
28,800.00
23,400.00
20,000.00
14,800.00
4 Pipa PVC D
4"
3"
Btg
Btg
126,200.00
101,700.00
1
3
4
5
6
7
8
R
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
S
HARGA SATUAN
Rp.
4
URAIAN
Page 46
KETERANGAN
5
-
Harga Satuan 14
NO.
1
URAIAN
SATUAN
3
Btg
Btg
Btg
Btg
Btg
Btg
HARGA SATUAN
Rp.
4
83,000.00
51,100.00
41,900.00
38,100.00
32,400.00
25,200.00
(MOF)
(MOF)
(MOF)
(RRJ)
(RRJ)
Btg
Btg
Btg
Btg
Btg
46,440.00
68,940.00
108,900.00
185,850.00
264,780.00
2,5"
2"
1,5"
1"
0,75"
0,5"
5 Pipa PVC S
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
- 10
32
40
50
63
75
mm
mm
mm
mm
mm
6m
6m
Page 47
KETERANGAN
5
Harga Satuan 14
6m
6m
3
Btg
Btg
HARGA SATUAN
Rp.
4
372,150.00
556,700.00
6m
6m
6m
6m
6m
6m
6m
Btg
Btg
Btg
Btg
Btg
Btg
Btg
39,700.00
60,900.00
93,600.00
154,400.00
220,300.00
295,300.00
405,000.00
Btg
Btg
7,600.00
6,900.00
Lbr
Kg
Kg
Kg
Kg
Kg
Ltr
Ltr
Ltr
Ltr
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Ltr
Ltr
Kg
Kg
3,700.00
26,700.00
27,700.00
18,900.00
23,400.00
28,500.00
44,300.00
56,800.00
71,100.00
19,400.00
51,300.00
50,900.00
48,500.00
53,700.00
23,400.00
15,900.00
53,900.00
25,800.00
24,700.00
4,000.00
14,000.00
35,000.00
Bahan Kaca :
1 Kaca Bening 5 mm
2 Kaca Bening 3 mm
3 Kaca Ray-Ban 5 mm
M2
M2
M2
111,200.00
87,300.00
128,000.00
Alat Pengunci :
1 Kunci 2 slaag
2 Kunci 1 slaag
3 Kunci KM / WC
Bh
Bh
Bh
135,900.00
75,800.00
58,200.00
Psg
Bh
Psg
Psg
Bh
16,300.00
17,800.00
28,200.00
16,500.00
87,800.00
NO.
1
URAIAN
2
Pipa PVC 90 mm (RRJ)
Pipa PVC 110 mm (RRJ)
6 Pipa PVC S
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
- 12,5
32 mm (MOF)
40 mm (MOF)
50 mm (MOF)
63 mm (RRJ)
75 mm (RRJ)
90 mm (RRJ)
110 mm (RRJ)
SATUAN
7 Pipa Listrik
8 Pipa Paralon 5/8"
S
Bahan Finishing :
1 Amplas
2 Meni Kayu
3 Plamir Kayu
4 Cat Dasar Tembok
5 Cat Tembok
6 Dempul
7 Politur
8 Politur jadi ( Ultran )
9 Teak Oil
10 Spritus
11 Sirlak
12 Oker
13 Cat Dasar Kayu
14 Cat Kayu
15 Cat Tembok
16 Plamir Tembok
17 ICI
18 Cat Besi
19 Cat Meni Besi
20 Minyak Cat
21 Residu / Teer
22 Lem kayu
23 Impra
T
V
1
2
3
4
5
W
Alat Penggantung :
Kait Angin
Grendel
Engsel kupu-kupu
Engsel Nilon
Espanolet
KETERANGAN
5
Bahan Sanitair :
Page 48
Harga Satuan 14
NO.
1
1
2
3
4
5
6
7
8
9
URAIAN
SATUAN
3
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Wastafel
Urinoir
Closet Jongkok
Closet Duduk
Bak Mandi Fiber
Bak Mandi Keramik
Floordrain
Shower
Kran Air
Page 49
HARGA SATUAN
Rp.
4
514,800.00
843,700.00
168,600.00
1,487,900.00
289,400.00
294,300.00
27,200.00
79,900.00
32,000.00
KETERANGAN
5
Harga Satuan 14
NO.
URAIAN
SATUAN
X
1
2
3
4
5
6
7
8
9
10
Y
1
2
3
4
5
6
7
8
9
10
11
12
13
14
HARGA SATUAN
Rp.
4
Bahan Paku :
Paku Lis
Paku Reng
Paku Usuk
Paku Seng
Paku Sekrup 3/8"
Paku Sekrup 1/2"
Paku Sekrup 2"
Paku gypsum
Paku beton 5 cm
Paku beton 3"
Kg
Kg
Kg
Kg
Ktk
Ktk
Ktk
Kg
kg
Ktk
21,200.00
17,100.00
18,100.00
26,400.00
19,200.00
21,300.00
25,100.00
31,500.00
22,500.00
Lain - Lain :
Tanah urug
Aspal
Solar
Oli
Waterproff
Sikat Ijuk
Sikat Baja
Alumnium Kulit Jeruk
Ongkos Angkut Kendaraan
Stamper
Pneumatic Roller 8-5 Ton
Sewa Wales 2,5 Ton
Sewa Wales 6,0 Ton
Sewa Wales 12,0 Ton
M3
Kg
Ltr
Ltr
Ltr
Bh
Bh
Lbr
Ls
Ls
Jam
Hari
Hari
Hari
60,000.00
12,100.00
6,100.00
30,000.00
9,000.00
7,000.00
18,900.00
105,700.00
50,000.00
25,000.00
276,800.00
100,000.00
150,000.00
170,000.00
KETERANGAN
5
Singaraja,
Januari 2014
Kepala Bidang Cipta Karya
Dinas Pekerjaan Umum
Kabupaten Buleleng,
NI NYOMAN SURATTINI, ST
NIP. 19670102 199803 2 003
Page 50
Harga Satuan 14
DAFTAR ANALISA
DINAS PEKERJAAN UMUM KABUPATEN BULELENG
TAHUN ANGGARAN
: 2013
NO
URAIAN
HARGA
SATUAN
Rp.
3
43,800.00
73,000.00
292,014.60
24,309.00
316,323.60
292,014.60
24,309.00
316,323.60
10 M2 MEMBONGKAR USUK/RENG
0.250 OH
Tukang Kayu
0.025 OH
Kepala Tukang Kayu
74,900.00
79,800.00
18,725.00
1,995.00
20,720.00
2,072.00
18,725.00
1,995.00
20,720.00
2,072.00
21,900.00
1,825.00
23,725.00
2,372.50
21,900.00
1,825.00
23,725.00
2,372.50
10 M2 MENGUPAS PLESTERAN
0.500 OH
Pekerja
0.025 OH
Mandor
43,800.00
73,000.00
1 M3 MEMBONGKAR TEMBOK
6.667 OH
Pekerja
0.033 OH
Mandor
43,800.00
73,000.00
292,014.60
2,409.00
294,423.60
292,014.60
2,409.00
294,423.60
10 M2 MEMBONGKAR LANTAI
2.000 OH
Pekerja
0.100 OH
Mandor
43,800.00
73,000.00
87,600.00
7,300.00
94,900.00
9,490.00
87,600.00
7,300.00
94,900.00
9,490.00
35,500.00
43,800.00
79,300.00
7,930.00
35,500.00
43,800.00
79,300.00
7,930.00
33,050.00
43,800.00
76,850.00
7,685.00
33,050.00
43,800.00
76,850.00
7,685.00
5,354,200.00
6,157,300.00
23,200.00
74,900.00
79,800.00
43,800.00
73,000.00
7,490.00
798.00
4,380.00
365.00
13,033.00
64,250.40
43,101.10
464.00
107,815.50
43,800.00
73,000.00
39,420.00
3,285.00
42,705.00
213,525.00
39,420.00
3,285.00
42,705.00
213,525.00
76,650.00
1,825.00
78,475.00
76,650.00
1,825.00
78,475.00
Untuk 1 M2
6
SNI 2001
71,000.00
43,800.00
Untuk 1 M2
66,100.00
43,800.00
Untuk 1 M2
10
KET.
SNI 2001
Untuk 1 M2
4
JUMLAH
HARGA
Rp.
6
Untuk 1 M2
3
JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
43,800.00
73,000.00
Page 51
26,834.80
(15,870.20)
Analisa-7'OKT
NO
1
URAIAN
2
SALURAN TERBUKA
1.450 OH
Pekerja
0.025 OH
Mandor
HARGA
SATUAN
Rp.
3
43,800.00
73,000.00
Page 52
JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
63,510.00
1,825.00
65,335.00
JUMLAH
HARGA
Rp.
6
-
KET.
63,510.00
1,825.00
65,335.00
Analisa-7'OKT
NO
URAIAN
11
12
HARGA
SATUAN
Rp.
3
52,560.00
3,285.00
55,845.00
43,800.00
2,336.00
46,136.00
127,177.50
43,800.00
2,336.00
46,136.00
127,177.50
43,800.00
73,000.00
65,700.00
3,650.00
69,350.00
65,700.00
3,650.00
69,350.00
105,100.00
43,800.00
73,000.00
20,000.00
21,900.00
3,650.00
20,000.00
45,550.00
126,120.00
126,120.00
126,120.00
21,900.00
3,650.00
20,000.00
171,670.00
1 M3 URUGAN KEMBALI
0.192 OH
Pekerja
0.019 OH
Mandor
43,800.00
73,000.00
8,409.60
1,387.00
9,796.60
8,409.60
1,387.00
9,796.60
43,800.00
73,000.00
14,454.00
730.00
15,184.00
14,454.00
730.00
15,184.00
43,800.00
73,000.00
20,000.00
14,454.00
730.00
20,000.00
35,184.00
14,454.00
730.00
20,000.00
35,184.00
161,200.00
43,800.00
73,000.00
13,140.00
730.00
13,870.00
193,440.00
193,440.00
193,440.00
13,140.00
730.00
207,310.00
171,300.00
161,200.00
43,800.00
73,000.00
71,000.00
75,900.00
34,164.00
2,847.00
27,690.00
2,960.10
67,661.10
205,560.00
69,638.40
275,198.40
205,560.00
69,638.40
34,164.00
2,847.00
27,690.00
2,960.10
342,859.50
53,250.00
5,692.50
65,700.00
5,475.00
130,117.50
205,560.00
174,896.00
96,995.20
477,451.20
205,560.00
174,896.00
96,995.20
53,250.00
5,692.50
65,700.00
5,475.00
607,568.70
43,800.00
73,000.00
14
15
16
17
18
19
20
21
JUMLAH
HARGA
Rp.
6
52,560.00
3,285.00
55,845.00
43,800.00
73,000.00
JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
KET.
42,106.40
(13,738.60)
31,901.00
(14,235.00)
SNI 2001
SNI 2001
171,300.00
1,286.00
178,300.00
71,000.00
75,900.00
43,800.00
73,000.00
321,581.10
(21,278.40)
624,698.70
17,130.00
1 M2 PASANG BATACO
Page 53
Analisa-7'OKT
NO
2
Batako Cetak Lubang KW.II
Semen Gresik ( 50 kg )
Pasir Pasang
Tukang Batu
Kepala Tukang Batu
Pekerja
Mandor
HARGA
SATUAN
Rp.
3
1,700.00
1,286.00
178,300.00
71,000.00
75,900.00
43,800.00
73,000.00
2,200.00
URAIAN
1
12.500
7.500
0.038
0.100
0.010
0.300
0.015
Bj
Kg
M3
OH
OH
OH
OH
Page 54
JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
21,250.00
9,645.00
6,775.40
7,100.00
759.00
13,140.00
1,095.00
22,094.00
37,670.40
22,094.00
43,920.40
JUMLAH
HARGA
Rp.
6
21,250.00
9,645.00
6,775.40
7,100.00
759.00
13,140.00
1,095.00
59,764.40
66,014.40
KET.
Analisa-7'OKT
NO
URAIAN
22
23
24
25
26
27
28
29
HARGA
SATUAN
Rp.
3
900.00
1,286.00
178,300.00
71,000.00
75,900.00
43,800.00
73,000.00
1,000.00
900.00
1,286.00
178,300.00
71,000.00
75,900.00
43,800.00
73,000.00
1,000.00
JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
JUMLAH
HARGA
Rp.
6
7,100.00
759.00
13,140.00
1,095.00
22,094.00
22,094.00
63,000.00
24,369.70
6,775.40
94,145.10
101,145.10
63,000.00
24,369.70
6,775.40
7,100.00
759.00
13,140.00
1,095.00
116,239.10
123,239.10
7,100.00
759.00
13,140.00
1,095.00
22,094.00
22,094.00
63,000.00
12,448.48
8,023.50
83,471.98
90,471.98
63,000.00
12,448.48
8,023.50
7,100.00
759.00
13,140.00
1,095.00
105,565.98
112,565.98
1 M2 PLESTERAN PC 1 : 2 TEBAL 20 mm
13.632 Kg
Semen Gresik ( 50 kg )
0.027 M3
Pasir Pasang
0.200 OH
Tukang Batu
0.020 OH
Kepala Tukang Batu
0.400 OH
Pekerja
0.022 OH
Mandor
1,286.00
178,300.00
71,000.00
75,900.00
43,800.00
73,000.00
14,200.00
1,518.00
17,520.00
1,606.00
34,844.00
17,530.75
4,814.10
22,344.85
17,530.75
4,814.10
14,200.00
1,518.00
17,520.00
1,606.00
57,188.85
1,286.00
178,300.00
71,000.00
75,900.00
43,800.00
73,000.00
14,200.00
1,518.00
11,388.00
949.00
28,055.00
13,333.25
5,527.30
18,860.55
13,333.25
5,527.30
14,200.00
1,518.00
11,388.00
949.00
46,915.55
1,286.00
178,300.00
71,000.00
75,900.00
43,800.00
73,000.00
14,200.00
1,518.00
17,520.00
1,606.00
34,844.00
8,888.83
6,240.50
15,129.33
8,888.83
6,240.50
14,200.00
1,518.00
17,520.00
1,606.00
49,973.33
1 M2 PLESTERAN PC 1 : 6 TEBAL 15 mm
5.888 Kg
Semen Gresik ( 50 kg )
0.036 M3
Pasir Pasang
0.200 OH
Tukang Batu
0.020 OH
Kepala Tukang Batu
0.400 OH
Pekerja
0.022 OH
Mandor
1,286.00
178,300.00
71,000.00
75,900.00
43,800.00
73,000.00
14,200.00
1,518.00
17,520.00
1,606.00
34,844.00
7,571.97
6,418.80
13,990.77
7,571.97
6,418.80
14,200.00
1,518.00
17,520.00
1,606.00
48,834.77
1,286.00
71,000.00
75,900.00
43,800.00
73,000.00
7,100.00
759.00
8,760.00
730.00
17,349.00
4,179.50
4,179.50
4,179.50
7,100.00
759.00
8,760.00
730.00
21,528.50
1 M2 PEKERJAAN SIARAN 1 : 2
6.340 Kg
Semen Gresik ( 50 kg )
1,286.00
8,153.24
8,153.24
Page 55
KET.
47,426.55
511.00
Analisa-7'OKT
NO
URAIAN
1
0.012
0.150
0.015
0.300
0.015
M3
OH
OH
OH
OH
2
Pasir Pasang
Tukang Batu
Kepala Tukang Batu
Pekerja
Mandor
HARGA
SATUAN
Rp.
3
178,300.00
71,000.00
75,900.00
43,800.00
73,000.00
Page 56
JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
2,139.60
10,650.00
1,138.50
13,140.00
1,095.00
26,023.50
10,292.84
JUMLAH
HARGA
Rp.
6
2,139.60
10,650.00
1,138.50
13,140.00
1,095.00
36,316.34
KET.
Analisa-7'OKT
NO
URAIAN
30
31
32
33
34
35
36
HARGA
SATUAN
Rp.
3
8,100.00
4,300.00
64,300.00
82,700.00
87,600.00
43,800.00
73,000.00
3,800.00
4,300.00
1,286.00
82,700.00
87,600.00
43,800.00
73,000.00
3,800.00
JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
JUMLAH
HARGA
Rp.
6
289,450.00
30,660.00
87,600.00
7,300.00
415,010.00
415,010.00
53,913.60
189,200.00
38,580.00
281,693.60
259,693.60
53,913.60
189,200.00
38,580.00
289,450.00
30,660.00
87,600.00
7,300.00
696,703.60
674,703.60
289,450.00
30,660.00
87,600.00
7,300.00
415,010.00
415,010.00
430,000.00
38,580.00
468,580.00
418,580.00
430,000.00
38,580.00
289,450.00
30,660.00
87,600.00
7,300.00
883,590.00
833,590.00
34,700.00
1,286.00
178,300.00
82,700.00
84,600.00
43,800.00
73,000.00
20,675.00
2,115.00
21,900.00
1,825.00
46,515.00
41,640.00
9,002.00
4,457.50
55,099.50
41,640.00
9,002.00
4,457.50
20,675.00
2,115.00
21,900.00
1,825.00
101,614.50
200,000.00
1,286.00
178,300.00
82,700.00
84,600.00
43,800.00
73,000.00
12,405.00
1,269.00
17,520.00
1,460.00
32,654.00
240,000.00
2,700.60
2,032.62
244,733.22
240,000.00
2,700.60
2,032.62
12,405.00
1,269.00
17,520.00
1,460.00
277,387.22
200,000.00
1,286.00
178,300.00
82,700.00
84,600.00
43,800.00
73,000.00
20,675.00
2,115.00
21,900.00
1,825.00
46,515.00
240,000.00
9,002.00
4,457.50
253,459.50
240,000.00
9,002.00
4,457.50
20,675.00
2,115.00
21,900.00
1,825.00
299,974.50
62,700.00
178,300.00
71,000.00
Paving Blok / 8 cm
69,600.00
18,886.00
18,886.00
18,886.00
62,700.00
17,830.00
80,530.00
87,430.00
62,700.00
17,830.00
18,886.00
99,416.00
106,316.00
7,100.00
759.00
13,140.00
1,095.00
22,094.00
52,400.00
16,718.00
6,240.50
75,358.50
52,400.00
16,718.00
6,240.50
7,100.00
759.00
13,140.00
1,095.00
97,452.50
52,400.00
1,286.00
178,300.00
71,000.00
75,900.00
43,800.00
73,000.00
Page 57
KET.
Analisa-7'OKT
NO
URAIAN
1
37
2
1 M2 PASANGAN KERAMIK KW I 20 x 20
1.000 M2
Keramik KW I 20/20 cm
10.400 Kg
Semen Gresik ( 50 kg )
0.045 M3
Pasir Pasang
1.620 Kg
Semen warna
0.350 OH
Tukang Batu
0.035 OH
Kepala Tukang Batu
0.700 OH
Pekerja
0.035 OH
Mandor
Keramik KW II 20/20 cm
HARGA
SATUAN
Rp.
3
52,800.00
1,286.00
178,300.00
12,100.00
71,000.00
75,900.00
43,800.00
73,000.00
50,100.00
Page 58
JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
24,850.00
2,656.50
30,660.00
2,555.00
60,721.50
60,721.50
52,800.00
13,374.40
8,023.50
19,602.00
93,799.90
91,099.90
JUMLAH
HARGA
Rp.
6
KET.
52,800.00
13,374.40
8,023.50
19,602.00
24,850.00
2,656.50
30,660.00
2,555.00
154,521.40
151,821.40
Analisa-7'OKT
HARGA
SATUAN
Rp.
3
NO
URAIAN
38
1 M2 PASANGAN KERAMIK KW I 30 x 30
1.000 M2
Keramik KW I 30/30 cm
10.000 Kg
Semen Gresik ( 50 kg )
0.045 M3
Pasir Pasang
1.500 Kg
Semen warna
0.350 OH
Tukang Batu
0.035 OH
Kepala Tukang Batu
0.700 OH
Pekerja
0.035 OH
Mandor
49,200.00
1,286.00
178,300.00
12,100.00
71,000.00
75,900.00
43,800.00
73,000.00
Keramik KW II 30/30 cm
45,900.00
1 M2 PASANGAN KERAMIK KW I 40 x 40
1.000 M2
Keramik KW I 40/40 cm
10.000 Kg
Semen Gresik ( 50 kg )
0.045 M3
Pasir Pasang
1.500 Kg
Semen warna
0.350 OH
Tukang Batu
0.035 OH
Kepala Tukang Batu
0.700 OH
Pekerja
0.035 OH
Mandor
57,100.00
1,286.00
178,300.00
12,100.00
71,000.00
75,900.00
43,800.00
73,000.00
39
40
41
42
43
a
49,200.00
12,860.00
8,023.50
18,150.00
88,233.50
84,933.50
49,200.00
12,860.00
8,023.50
18,150.00
24,850.00
2,656.50
30,660.00
2,555.00
148,955.00
145,655.00
24,850.00
2,656.50
30,660.00
2,555.00
60,721.50
60,721.50
57,100.00
12,860.00
8,023.50
18,150.00
96,133.50
94,233.50
57,100.00
12,860.00
8,023.50
18,150.00
24,850.00
2,656.50
30,660.00
2,555.00
156,855.00
154,955.00
6,390.00
683.10
3,942.00
365.00
11,380.10
11,380.10
11,380.10
49,200.00
1,472.47
534.90
3,025.00
54,232.37
57,832.37
116,364.74
49,200.00
1,472.47
534.90
3,025.00
6,390.00
683.10
3,942.00
365.00
65,612.47
69,212.47
127,744.84
8,023.50
19,602.00
9,585.00
1,062.60
11,826.00
985.50
51,084.60
50,000.00
13,374.40
8,023.50
19,602.00
90,999.90
50,000.00
13,374.40
16,047.00
39,204.00
9,585.00
1,062.60
11,826.00
985.50
142,084.50
199,000.00
185,600.00
1,286.00
71,000.00
75,900.00
43,800.00
73,000.00
17,750.00
1,897.50
72,270.00
5,840.00
97,757.50
173,130.00
96,512.00
280,348.00
549,990.00
173,130.00
96,512.00
280,348.00
17,750.00
1,897.50
72,270.00
5,840.00
647,747.50
199,000.00
185,600.00
1,286.00
71,000.00
75,900.00
43,800.00
73,000.00
(A)
24,850.00
2,656.50
87,600.00
73,000.00
188,106.50
161,190.00
100,224.00
432,096.00
693,510.00
161,190.00
100,224.00
432,096.00
24,850.00
2,656.50
87,600.00
73,000.00
881,616.50
55,200.00
49,200.00
1,286.00
178,300.00
12,100.00
71,000.00
75,900.00
43,800.00
73,000.00
Keramik KW I 20/20 cm
Keramik KW I 40/40 cm
52,800.00
57,100.00
BETON BERTULANG
1 M3 Beton Cor 1:2:3
0.810 M3
Kerikil / Koral Beton
0.540 M3
Pasir Beton
336.000 Kg
Semen Gresik ( 50 kg )
0.350 OH
Tukang Batu
0.035 OH
Kepala Tukang Batu
2.000 OH
Pekerja
1.000 OH
Mandor
JUMLAH
HARGA
Rp.
6
24,850.00
2,656.50
30,660.00
2,555.00
60,721.50
60,721.50
Keramik KW II 40/40 cm
1 M2 PEK. PLINT KERAMIK 10 x 30 (1:2)
1.000 M2
Keramik KW I 30/30 cm
1.145 Kg
Semen Gresik ( 50 kg )
0.003 M3
Pasir Pasang
0.250 Kg
Semen warna
0.090 OH
Tukang Batu
0.009 OH
Kepala Tukang Batu
0.090 OH
Pekerja
0.005 OH
Mandor
JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
50,000.00
1,286.00
178,300.00
12,100.00
71,000.00
75,900.00
43,800.00
73,000.00
Page 59
KET.
91,216.70
(50,867.80)
Analisa-7'OKT
NO
URAIAN
1 M2 Begesting
0.040 M3
0.400 Kg
0.500 OH
0.050 OH
0.400 OH
0.010 OH
Papan begesting
Paku Usuk
Tukang Kayu
Kepala Tukang Kayu
Pekerja
Mandor
HARGA
SATUAN
Rp.
3
JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
1,285,000.00
23,200.00
74,900.00
79,800.00
43,800.00
73,000.00
(B)
37,450.00
3,990.00
17,520.00
730.00
59,690.00
596,900.00
10 M2 Begesting
Page 60
51,400.00
9,280.00
60,680.00
606,800.00
JUMLAH
HARGA
Rp.
6
KET.
51,400.00
9,280.00
37,450.00
3,990.00
17,520.00
730.00
120,370.00
1,203,700.00
Analisa-7'OKT
NO
URAIAN
44
45
46
HARGA
SATUAN
Rp.
3
48
JUMLAH
HARGA
Rp.
6
8,961.88
20,000.00
66,100.00
74,900.00
43,800.00
73,000.00
(C)
46,270.00
5,243.00
13,140.00
2,920.00
67,573.00
940,997.57
30,000.00
970,997.57
940,997.57
30,000.00
46,270.00
5,243.00
13,140.00
2,920.00
1,035,650.57
(A+B+0,8*C)
(A+B+C)
(A+B+1,5*C)
(A+B+1,6*C)
(A+B+1,75*C)
(A+B+1,85*C)
(A+B+2*C)
(A+B+2,25*C)
(A+B+2,5*C)
(A+B+2,75*C)
(A+B+3*C)
(A+1,6*C)
839,064.90
852,579.50
886,366.00
893,123.30
903,259.25
910,016.55
920,152.50
937,045.75
953,939.00
970,832.25
987,725.50
893,123.30
2,077,108.06
2,271,307.57
2,756,806.36
2,853,906.11
2,999,555.75
3,096,655.50
3,242,305.14
3,485,054.53
3,727,803.93
3,970,553.32
4,213,302.71
2,853,906.11
2,913,836.96
3,120,967.07
3,638,792.36
3,742,357.41
3,897,705.00
4,001,270.05
4,156,617.64
4,415,530.28
4,674,442.93
4,933,355.57
5,192,268.21
2,538,657.41
881,616.50
171,300.00
112,863.90
112,863.90
416,106.00
82,224.00
498,330.00
528,969.90
82,224.00
611,193.90
171,300.00
199,000.00
185,600.00
1,286.00
71,000.00
75,900.00
43,800.00
73,000.00
21,300.00
2,277.00
104,244.00
5,840.00
133,661.00
77,085.00
133,330.00
83,520.00
360,080.00
654,015.00
77,085.00
133,330.00
83,520.00
360,080.00
21,300.00
2,277.00
104,244.00
5,840.00
787,676.00
91,000.00
6,692,800.00
23,200.00
22,400.00
74,900.00
79,800.00
43,800.00
73,000.00
149,800.00
1,596.00
21,900.00
1,825.00
175,121.00
175,121.00
62,790.00
100,392.00
464.00
4,480.00
168,126.00
67,270.00
62,790.00
100,392.00
464.00
4,480.00
149,800.00
1,596.00
21,900.00
1,825.00
343,247.00
242,391.00
1 M2 PLAPOND GYPSUM
0.380 Lbr
Gypsum (1,2 x 2,4)
0.015 M3
Kayu Kruing Balok 8/12
0.220 Kg
Paku Lis
0.200 OH
Tukang Kayu
0.020 OH
Kepala Tukang Kayu
0.500 OH
Pekerja
0.025 OH
Mandor
58,800.00
6,692,800.00
25,800.00
74,900.00
79,800.00
43,800.00
73,000.00
14,980.00
1,596.00
21,900.00
1,825.00
40,301.00
22,344.00
100,392.00
5,676.00
128,412.00
22,344.00
100,392.00
5,676.00
14,980.00
1,596.00
21,900.00
1,825.00
168,713.00
1 M2 PLAPOND ETERNIT
1.000 Lbr
Eternit Klas I (1/1) M
0.015 M3
Kayu Kruing Balok 8/12
0.220 Kg
Paku Usuk
0.200 OH
Tukang Kayu
0.020 OH
Kepala Tukang Kayu
0.500 OH
Pekerja
19,200.00
6,692,800.00
23,200.00
74,900.00
79,800.00
43,800.00
14,980.00
1,596.00
21,900.00
19,200.00
100,392.00
5,104.00
-
19,200.00
100,392.00
5,104.00
14,980.00
1,596.00
21,900.00
1 M3 BETON BERTULANG Fe 80
1 M3 BETON BERTULANG Fe 100
1 M3 BETON BERTULANG Fe 150
1 M3 BETON BERTULANG Fe 160
1 M3 BETON BERTULANG Fe 175
1 M3 BETON BERTULANG Fe 185
1 M3 BETON BERTULANG Fe 200
1 M3 BETON BERTULANG Fe 225
1 M3 BETON BERTULANG Fe 250
1 M3 BETON BERTULANG Fe 275
1 M3 BETON BERTULANG Fe 300
1 M3 BETON PLAT PONDASI Fe 160
1 M3 BETON CYCLOOF 40% BATU KALI
0.600 M3
Beton cor 1 : 2 : 3
0.480 M3
Batu Pasang
JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
Page 61
KET.
990,841.16
(44,809.41)
(35,847.53)
(44,809.41)
(67,214.11)
(71,695.05)
(78,416.47)
(82,897.40)
(89,618.82)
(100,821.17)
(112,023.53)
(123,225.88)
(134,428.23)
(71,695.05)
Analisa-7'OKT
NO
URAIAN
1
0.025 OH
2
Mandor
Tadir Gedeg Kelas I
49
HARGA
SATUAN
Rp.
3
73,000.00
29,900.00
49,500.00
6,692,800.00
23,200.00
74,900.00
79,800.00
43,800.00
73,000.00
52,400.00
80,300.00
Page 62
JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
1,825.00
40,301.00
124,696.00
40,301.00
135,396.00
29,960.00
3,192.00
11,826.00
985.50
45,963.50
45,963.50
45,963.50
19,305.00
153,934.40
1,392.00
174,631.40
175,762.40
186,643.40
JUMLAH
HARGA
Rp.
6
1,825.00
164,997.00
175,697.00
KET.
19,305.00
153,934.40
1,392.00
29,960.00
3,192.00
11,826.00
985.50
220,594.90
221,725.90
232,606.90
Analisa-7'OKT
NO
URAIAN
50
HARGA
SATUAN
Rp.
3
58,800.00
10,600.00
20,000.00
15,000.00
74,900.00
79,800.00
43,800.00
73,000.00
JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
18,725.00
1,995.00
6,570.00
5,475.00
32,765.00
JUMLAH
HARGA
Rp.
6
20,403.60
38,160.00
3,000.00
15,750.00
77,313.60
20,403.60
38,160.00
3,000.00
15,750.00
18,725.00
1,995.00
6,570.00
5,475.00
110,078.60
31,875.00
672.00
31,875.00
672.00
4,380.00
7,490.00
3,990.00
255.50
48,662.50
IX
0.375
0.030
0.100
0.100
0.050
0.004
2
Lbr
Kg
Oh
Oh
Oh
Oh
Plywood 4 mm
Paku biasa 1/2" - 1"
Pekerja
Tukang kayu
Kepala Tukang
Mandor
85,000.00
22,400.00
43,800.00
74,900.00
79,800.00
73,000.00
80,300.00
22,400.00
43,800.00
74,900.00
79,800.00
73,000.00
12,025.00
25,800.00
43,800.00
74,900.00
79,800.00
73,000.00
8,299,000.00
25,800.00
85,000.00
43,800.00
74,900.00
79,800.00
73,000.00
50,000.00
40,000.00
2,000.00
1,000.00
2,500.00
2,500.00
1,500.00
17,500.00
150.00
234.00
3,500.00
19,700.00
58,800.00
5,000.00
12,000.00
43,800.00
74,900.00
79,800.00
73,000.00
Page 63
4,380.00
7,490.00
3,990.00
255.50
16,115.50
32,547.00
30,112.50
672.00
4,380.00
7,490.00
3,990.00
255.50
16,115.50
30,784.50
12,626.25
258.00
2,190.00
3,745.00
399.00
219.00
6,553.00
12,884.25
190,877.00
1,548.00
76,500.00
11,826.00
29,960.00
3,192.00
985.50
45,963.50
268,925.00
15,000.00
20,000.00
2,000.00
1,000.00
2,500.00
2,500.00
3,000.00
7,000.00
150.00
1,170.00
3,500.00
3,500.00
54,320.00
2,167.00
22,050.00
4,650.00
1,200.00
4,380.00
7,490.00
798.00
365.00
KET.
110,091.54
12.94
30,112.50
672.00
4,380.00
7,490.00
3,990.00
255.50
46,900.00
12,626.25
258.00
2,190.00
3,745.00
399.00
219.00
19,437.25
190,877.00
1,548.00
76,500.00
11,826.00
29,960.00
3,192.00
985.50
314,888.50
15,000.00
20,000.00
2,000.00
1,000.00
2,500.00
2,500.00
3,000.00
7,000.00
150.00
1,170.00
3,500.00
57,820.00
2,167.00
22,050.00
4,650.00
1,200.00
4,380.00
7,490.00
798.00
365.00
Analisa-7'OKT
NO
URAIAN
HARGA
SATUAN
Rp.
3
JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
13,033.00
30,067.00
16,533.00
9,637,600.00
22,400.00
74,900.00
79,800.00
43,800.00
73,000.00
Page 64
6,384.00
35,040.00
2,920.00
44,344.00
JUMLAH
HARGA
Rp.
6
43,100.00
84,387.00
100,920.00
144,564.00
224.00
59,920.00
144,564.00
224.00
59,920.00
6,384.00
35,040.00
2,920.00
249,052.00
204,708.00
KET.
Analisa-7'OKT
NO
URAIAN
51
52
53
54
55
56
57
HARGA
SATUAN
Rp.
3
JUMLAH
HARGA
Rp.
6
8,566,800.00
80,300.00
25,800.00
74,900.00
79,800.00
43,800.00
73,000.00
33,705.00
3,591.00
6,570.00
5,475.00
49,341.00
167,052.60
31,317.00
2,580.00
200,949.60
167,052.60
31,317.00
2,580.00
33,705.00
3,591.00
6,570.00
5,475.00
250,290.60
10,708,500.00
23,200.00
11,300.00
74,900.00
79,800.00
43,800.00
73,000.00
1,572,900.00
167,580.00
306,600.00
255,500.00
2,302,580.00
11,779,350.00
29,000.00
11,300.00
11,819,650.00
11,779,350.00
29,000.00
11,300.00
1,572,900.00
167,580.00
306,600.00
255,500.00
14,122,230.00
8,566,800.00
23,200.00
11,300.00
74,900.00
79,800.00
43,800.00
73,000.00
1,348,200.00
143,640.00
262,800.00
21,900.00
1,776,540.00
10,280,160.00
29,000.00
11,300.00
10,320,460.00
10,280,160.00
29,000.00
11,300.00
1,348,200.00
143,640.00
262,800.00
21,900.00
12,097,000.00
10,024,900.00
80,300.00
25,800.00
74,900.00
79,800.00
43,800.00
73,000.00
179,760.00
19,152.00
35,040.00
2,920.00
236,872.00
236,872.00
236,872.00
236,872.00
236,872.00
236,872.00
240,597.60
64,240.00
2,580.00
307,417.60
320,217.60
337,337.60
375,224.80
388,024.80
405,144.80
66,820.00
240,597.60
64,240.00
2,580.00
179,760.00
19,152.00
35,040.00
2,920.00
544,289.60
557,089.60
574,209.60
612,096.80
624,896.80
642,016.80
303,692.00
11,235.00
1,197.00
657.00
54.75
13,143.75
13,143.75
13,143.75
105,930.00
105,930.00
88,330.00
129,470.00
105,930.00
11,235.00
1,197.00
657.00
54.75
119,073.75
101,473.75
142,613.75
224,700.00
23,940.00
43,800.00
3,650.00
296,090.00
296,090.00
514,008.00
5,650.00
519,658.00
400,996.00
-
514,008.00
5,650.00
224,700.00
23,940.00
43,800.00
3,650.00
815,748.00
697,086.00
296,090.00
96,300.00
117,700.00
80,300.00
96,300.00
117,700.00
96,300.00
74,900.00
79,800.00
43,800.00
73,000.00
Kaca Bening 3 mm
Kaca Ray-Ban 5 mm
80,300.00
117,700.00
12,850,200.00
11,300.00
74,900.00
79,800.00
43,800.00
73,000.00
JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
10,024,900.00
Page 65
KET.
12,850,200
Analisa-7'OKT
NO
URAIAN
1
0.025
1.000
0.030
0.500
2.100
0.210
0.800
0.040
M3
Lbr
Kg
Kg
OH
OH
OH
OH
2
Kayu Kamper Papan 3/20
Plywood
Paku Lis
Lem kayu fox
Tukang Kayu
Kepala Tukang Kayu
Pekerja
Mandor
Teak Wood 4 mm
HARGA
SATUAN
Rp.
3
###
49,500.00
25,800.00
11,300.00
74,900.00
79,800.00
43,800.00
73,000.00
80,300.00
Page 66
JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
250,622.50
49,500.00
774.00
5,650.00
157,290.00
16,758.00
35,040.00
2,920.00
212,008.00
306,546.50
212,008.00
337,346.50
JUMLAH
HARGA
Rp.
6
250,622.50
49,500.00
774.00
5,650.00
157,290.00
16,758.00
35,040.00
2,920.00
518,554.50
549,354.50
KET.
549,433.44
30,878.94
Analisa-7'OKT
NO
URAIAN
58
59
60
61
62
63
64
1 M2 USUK GERANTANGAN
0.022 M3
Usuk Kruing 5/7
0.004 M3
Kayu Kamper Papan 3/20
0.200 Kg
Paku Usuk
0.230 OH
Tukang Kayu
0.023 OH
Kepala Tukang Kayu
0.230 OH
Pekerja
0.023 OH
Mandor
HARGA
SATUAN
Rp.
3
10,024,900.00
80,300.00
96,300.00
25,800.00
74,900.00
79,800.00
43,800.00
73,000.00
JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
JUMLAH
HARGA
Rp.
6
224,700.00
23,940.00
54,750.00
4,599.00
307,989.00
307,989.00
150,373.50
50,187.50
96,300.00
2,580.00
299,441.00
280,191.00
150,373.50
50,187.50
96,300.00
2,580.00
224,700.00
23,940.00
54,750.00
4,599.00
607,430.00
588,180.00
898,800.00
95,760.00
175,200.00
14,600.00
1,184,360.00
1,184,360.00
1,184,360.00
1,184,360.00
1,184,360.00
7,362,080.00
321,000.00
129,920.00
7,813,000.00
3,866,860.00
9,874,400.00
6,046,070.00
11,641,220.00
7,362,080.00
321,000.00
129,920.00
898,800.00
95,760.00
175,200.00
14,600.00
8,997,360.00
5,051,220.00
11,058,760.00
7,230,430.00
12,825,580.00
7,490.00
798.00
4,380.00
365.00
13,033.00
13,033.00
13,033.00
66,392.00
38,550.40
3,480.00
108,422.40
95,572.80
82,722.40
66,392.00
38,550.40
3,480.00
7,490.00
798.00
4,380.00
365.00
121,455.40
108,605.80
95,755.40
8,299,000.00
9,637,600.00
23,200.00
74,900.00
79,800.00
43,800.00
73,000.00
21,271.60
2,234.40
21,900.00
1,825.00
47,231.00
99,588.00
57,825.60
1,740.00
159,153.60
99,588.00
57,825.60
1,740.00
21,271.60
2,234.40
21,900.00
1,825.00
206,384.60
6,157,300.00
10,024,900.00
23,200.00
74,900.00
79,800.00
43,800.00
73,000.00
17,227.00
1,835.40
10,074.00
1,679.00
30,815.40
135,460.60
40,099.60
4,640.00
180,200.20
135,460.60
40,099.60
4,640.00
17,227.00
1,835.40
10,074.00
1,679.00
211,015.60
6,157,300.00
23,200.00
74,900.00
79,800.00
43,800.00
73,000.00
4,269.30
239.40
2,496.60
438.00
7,443.30
67,730.30
2,320.00
70,050.30
67,730.30
2,320.00
4,269.30
239.40
2,496.60
438.00
77,493.60
49,500.00
6,692,800.00
21,400.00
23,200.00
74,900.00
79,800.00
43,800.00
73,000.00
3,105,400.00
8,566,800.00
5,086,500.00
###
8,299,000.00
9,637,600.00
23,200.00
74,900.00
79,800.00
43,800.00
73,000.00
6,692,800.00
5,086,500.00
KET.
12,714,220.00
(111,360.00)
Analisa-7'OKT
NO
URAIAN
1
0.008
0.150
0.043
0.002
0.043
0.004
M3
Kg
OH
OH
OH
OH
2
Kayu Kamper Reng
Paku Reng
Pekerja
Mandor
Tukang Kayu
Kepala Tukang Kayu
HARGA
SATUAN
Rp.
3
9,637,600.00
22,400.00
43,800.00
73,000.00
74,900.00
79,800.00
Page 68
JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
77,100.80
3,360.00
1,883.40
146.00
3,220.70
319.20
5,569.30
80,460.80
JUMLAH
HARGA
Rp.
6
77,100.80
3,360.00
1,883.40
146.00
3,220.70
319.20
86,030.10
KET.
Analisa-7'OKT
NO
URAIAN
65
66
67
68
10,024,900.00
22,400.00
74,900.00
79,800.00
43,800.00
73,000.00
33,600.00
55,250.00
99,000.00
15,000.00
JUMLAH
HARGA
Rp.
6
25,000.00
25,000.00
202,850.00
33,600.00
55,250.00
99,000.00
15,000.00
25,000.00
227,850.00
14,980.00
1,596.00
4,380.00
365.00
21,321.00
21,321.00
21,321.00
108,268.92
2,240.00
110,508.92
80,304.56
68,738.84
108,268.92
2,240.00
14,980.00
1,596.00
4,380.00
365.00
131,829.92
101,625.56
90,059.84
7,228,200.00
6,157,300.00
7,228,200.00
23,200.00
74,900.00
79,800.00
43,800.00
73,000.00
59,920.00
6,384.00
10,950.00
1,022.00
78,276.00
Untuk 0,5 M2 = 1 M'
180,705.00
4,640.00
185,345.00
180,705.00
4,640.00
59,920.00
6,384.00
10,950.00
1,022.00
263,621.00
131,810.50
19,800.00
74,900.00
79,800.00
43,800.00
73,000.00
599,200.00
63,840.00
219,000.00
36,500.00
918,540.00
Untuk 1 M' = 0,5 M2
108,900.00
108,900.00
108,900.00
599,200.00
63,840.00
219,000.00
36,500.00
1,027,440.00
102,744.00
1 M2 GENTENG PRES
25.000 Bj
Genteng Kodok
0.075 OH
Tukang Kayu
0.008 OH
Kepala Tukang Kayu
0.150 OH
Pekerja
0.008 OH
Mandor
3,200.00
74,900.00
79,800.00
43,800.00
73,000.00
5,617.50
638.40
6,570.00
584.00
13,409.90
13,409.90
13,409.90
13,409.90
80,000.00
80,000.00
47,500.00
52,500.00
57,500.00
80,000.00
5,617.50
638.40
6,570.00
584.00
93,409.90
60,909.90
65,909.90
70,909.90
6,400.00
12,100.00
7,400.00
14,980.00
1,596.00
17,520.00
146.00
34,242.00
34,242.00
34,242.00
34,242.00
38,000.00
10,288.00
5,705.60
53,993.60
47,993.60
76,493.60
52,993.60
38,000.00
10,288.00
5,705.60
14,980.00
1,596.00
17,520.00
146.00
88,235.60
82,235.60
110,735.60
87,235.60
37,400.00
26,200.00
74,900.00
79,800.00
4,494.00
478.80
26,180.00
524.00
-
26,180.00
524.00
4,494.00
478.80
70
30,000.00
25,000.00
15,000.00
15,000.00
25,000.00
JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
Genteng Plentong
Genteng Biasa
Genteng Karang Pilang
69
HARGA
SATUAN
Rp.
3
1,900.00
2,100.00
2,300.00
7,600.00
64,300.00
178,300.00
74,900.00
79,800.00
43,800.00
73,000.00
Page 69
KET.
Analisa-7'OKT
NO
URAIAN
1
0.120 OH
0.006 OH
2
Pekerja
Mandor
Asbes Gel. 1,8 m' x 1,05 m'/4 mm
71
HARGA
SATUAN
Rp.
3
43,800.00
73,000.00
32,800.00
19,800.00
16,000.00
66,100.00
74,900.00
43,800.00
Untuk 1 M'
Page 70
JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
5,256.00
438.00
10,666.80
26,704.00
10,666.80
23,484.00
16,525.00
1,872.50
10,950.00
29,347.50
2,934.75
118,800.00
192,000.00
310,800.00
31,080.00
JUMLAH
HARGA
Rp.
6
5,256.00
438.00
37,370.80
34,150.80
KET.
118,800.00
192,000.00
16,525.00
1,872.50
10,950.00
340,147.50
34,014.75
Analisa-7'OKT
NO
1
72
73
74
75
76
77
URAIAN
2
1 M2 PASANGAN ATAP SENG LAMA
0.750 Lbr
BJLS 0,18 mm
0.040 Kg
Paku Seng
0.200 OH
Tukang Kayu
0.020 OH
Kepala Tukang Kayu
0.100 OH
Pekerja
0.005 OH
Mandor
JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
JUMLAH
HARGA
Rp.
6
37,400.00
26,200.00
74,900.00
79,800.00
43,800.00
73,000.00
14,980.00
1,596.00
4,380.00
365.00
21,321.00
28,050.00
1,048.00
29,098.00
28,050.00
1,048.00
14,980.00
1,596.00
4,380.00
365.00
50,419.00
112,200.00
23,200.00
74,900.00
79,800.00
43,800.00
73,000.00
8,988.00
957.60
5,256.00
438.00
15,639.60
112,200.00
4,640.00
116,840.00
112,200.00
4,640.00
8,988.00
957.60
5,256.00
438.00
132,479.60
18,200.00
13,600.00
16,000.00
56,400.00
63,200.00
43,800.00
73,000.00
3,553.20
398.16
876.00
182.50
5,009.86
1,820.00
3,536.00
1,600.00
6,956.00
1,820.00
3,536.00
1,600.00
3,553.20
398.16
876.00
182.50
11,965.86
18,200.00
13,600.00
56,400.00
63,200.00
43,800.00
73,000.00
2,368.80
265.44
1,226.40
182.50
4,043.14
2,184.00
2,448.00
4,632.00
2,184.00
2,448.00
2,368.80
265.44
1,226.40
182.50
8,675.14
24,600.00
18,800.00
56,400.00
63,200.00
43,800.00
73,000.00
4,230.00
505.60
2,190.00
219.00
7,144.60
2,952.00
940.00
3,892.00
2,952.00
940.00
4,230.00
505.60
2,190.00
219.00
11,036.60
53,500.00
56,400.00
63,200.00
43,800.00
73,000.00
8,460.00
948.00
4,380.00
365.00
14,153.00
10,111.50
10,111.50
10,111.50
8,460.00
948.00
4,380.00
365.00
24,264.50
53,500.00
18,800.00
56,400.00
63,200.00
43,800.00
73,000.00
1,692.00
189.60
6,570.00
219.00
8,670.60
15,194.00
1,334.80
16,528.80
15,194.00
1,334.80
1,692.00
189.60
6,570.00
219.00
25,199.40
24,600.00
26,200.00
48,100.00
4,920.00
3,930.00
8,177.00
4,920.00
3,930.00
8,177.00
78 1 M2 PENGECATAN KANSTIN
0.284 Kg Cat Kayu
0.071 Kg Minyak cat
0.030 OH Tukang cat
0.003 OH Kepala tukang cat
0.150 OH Pekerja
0.003 OH Mandor
79
HARGA
SATUAN
Rp.
3
Page 71
KET.
Analisa-7'OKT
NO
URAIAN
1
0.260
0.009
0.006
0.070
0.003
80
Kg
OH
OH
OH
OH
2
Cat Kayu
Tukang Cat
Kepala Tukang Cat
Pekerja
Mandor
1 M2 PEKERJAAN POLITUR
0.150 Ltr
Politur
0.372 Ltr
Politur jadi ( Ultran )
2.000 Lbr
Amplas
0.060 OH
Tukang Cat
0.016 OH
Kepala Tukang Cat
0.008 OH
Mandor
HARGA
SATUAN
Rp.
3
53,500.00
56,400.00
63,200.00
43,800.00
73,000.00
43,500.00
51,700.00
3,200.00
56,400.00
63,200.00
73,000.00
Page 72
JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
13,910.00
507.60
379.20
3,066.00
182.50
4,135.30
30,937.00
3,384.00
1,011.20
547.50
4,942.70
6,525.00
19,232.40
6,400.00
32,157.40
JUMLAH
HARGA
Rp.
6
13,910.00
507.60
379.20
3,066.00
182.50
35,072.30
KET.
6,525.00
19,232.40
6,400.00
3,384.00
1,011.20
547.50
37,100.10
Analisa-7'OKT
NO
URAIAN
HARGA
SATUAN
Rp.
3
81
42,705.00
105,565.98
57,188.85
2,913,836.96
82
83
84
85
86
42,705.00
105,565.98
57,188.85
75,000.00
88
89
11,103.30
2,872.22
29,617.40
34,401.66
77,994.58
10,851.36
18,993.12
85,161.43
115,005.91
11,103.30
13,723.58
48,610.52
119,467.32
192,904.72
6,405.75
2,319.87
27,875.20
36,600.82
8,764.56
17,875.88
75,000.00
101,640.44
6,405.75
11,084.43
45,751.08
75,000.00
138,241.26
55,000.00
56,400.00
56,400.00
56,400.00
55,000.00
55,000.00
55,000.00
56,400.00
111,400.00
116,800.00
116,800.00
27,500.00
4,300.00
120,000.00
3,504,000.00
3,504,000.00
3,600,000.00
10,608,000.00
825,000.00
2,580,000.00
3,405,000.00
3,504,000.00
3,504,000.00
825,000.00
2,580,000.00
3,600,000.00
14,013,000.00
43,800.00
73,000.00
14,013,000.00
13.14
14.60
2,121.60
2,149.34
681.00
681.00
13.14
14.60
2,802.60
2,830.34
1 M3 TIMBUNAN SIRTU
1.200 M3
Pasir Batu (Sirtu)
0.250 OH
Pekerja
0.025 OH
Mandor
0.001
Biaya menggilas sebulan
235,500.00
43,800.00
73,000.00
14,013,000.00
10,950.00
1,825.00
10,608.00
23,383.00
4,676.60
2,338.30
1,169.15
282,600.00
3,405.00
286,005.00
57,201.00
28,600.50
14,300.25
282,600.00
10,950.00
1,825.00
14,013.00
309,388.00
61,877.60
30,938.80
15,469.40
262,500.00
43,800.00
73,000.00
14,013,000.00
20,542.20
1,679.00
3,182.40
25,403.60
43,312.50
1,021.50
44,334.00
43,312.50
20,542.20
1,679.00
4,203.90
69,737.60
171,300.00
42,705.00
15,184.00
1,110.33
151.84
1,262.17
6,509.40
6,509.40
6,509.40
1,110.33
151.84
7,771.57
274,700.00
43,800.00
73,000.00
14,013,000.00
229,950.00
19,199.00
378,351.00
627,500.00
6,275.00
1,922,900.00
1,922,900.00
19,229.00
1,922,900.00
229,950.00
19,199.00
378,351.00
2,550,400.00
25,504.00
850,000.00
850,000.00
1 M2 ...........
90
JUMLAH
HARGA
Rp.
6
JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
212,500.00
Page 73
KET.
187,308.71
(5,596.01)
135,860.73
(2,380.53)
Analisa-7'OKT
NO
URAIAN
1
3.000
75.000
5.383
0.150
7.000
0.350
0.027
M3
Kg
Ltr
OH
OH
OH
2
Batu Pecah 2 - 3 cm
Aspal
Solar
Tukang masak aspal
Pekerja
Mandor
Biaya menggilas sebulan
HARGA
SATUAN
Rp.
3
205,100.00
11,200.00
4,300.00
77,800.00
43,800.00
73,000.00
14,013,000.00
1 M2 ...........
Page 74
JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
615,300.00
840,000.00
23,145.83
11,670.00
306,600.00
25,550.00
378,351.00
722,171.00
2,328,445.83
7,221.71
23,284.46
JUMLAH
HARGA
Rp.
6
615,300.00
840,000.00
23,145.83
11,670.00
306,600.00
25,550.00
378,351.00
3,050,616.83
30,506.17
KET.
Analisa-7'OKT
NO
1
91
URAIAN
2
100 M2 MENGASPAL 200 KG
200.000 Kg
Aspal
1.200 M3
Batu Seplit Halus ( 0,5 - 1 ) cm / Penutup
14.354 Ltr
Solar
0.400 OH
Tukang masak aspal
9.000 OH
Pekerja
0.450 OH
Mandor
0.013
Biaya menggilas sebulan
HARGA
SATUAN
Rp.
3
11,200.00
262,300.00
4,300.00
77,800.00
43,800.00
73,000.00
14,013,000.00
1 M2 ...........
92
11,200.00
240,900.00
4,300.00
77,800.00
43,800.00
73,000.00
6,000.00
11,700.00
14,013,000.00
1 M2 ...........
93
205,100.00
240,900.00
11,200.00
4,300.00
77,800.00
43,800.00
73,000.00
6,000.00
11,700.00
14,013,000.00
1 M2 ...........
94
11,200.00
262,300.00
4,300.00
77,800.00
43,800.00
73,000.00
14,013,000.00
1 M2 ...........
11,200.00
240,900.00
4,300.00
77,800.00
43,800.00
73,000.00
14,013,000.00
1 M2 ...........
96
11,200.00
Page 75
JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
JUMLAH
HARGA
Rp.
6
31,120.00
394,200.00
32,850.00
182,169.00
640,339.00
6,403.39
2,240,000.00
314,760.00
61,722.20
2,616,482.20
26,164.82
2,240,000.00
314,760.00
61,722.20
31,120.00
394,200.00
32,850.00
182,169.00
3,256,821.20
32,568.21
19,450.00
328,500.00
27,375.00
182,169.00
557,494.00
5,574.94
1,400,000.00
289,080.00
38,576.38
2,400.00
468.00
1,730,524.38
17,305.24
1,400,000.00
289,080.00
38,576.38
19,450.00
328,500.00
27,375.00
2,400.00
468.00
182,169.00
2,288,018.38
22,880.18
19,200.04
66,754.52
85,954.56
19,450.00
328,500.00
27,375.00
182,169.00
557,494.00
5,574.94
615,300.00
289,080.00
1,400,000.00
38,576.38
2,400.00
468.00
2,345,824.38
23,458.24
615,300.00
289,080.00
1,400,000.00
38,576.38
19,450.00
328,500.00
27,375.00
2,400.00
468.00
182,169.00
2,903,318.38
29,033.18
31,120.00
394,200.00
32,850.00
182,169.00
640,339.00
6,403.39
1,960,000.00
314,760.00
54,006.93
2,328,766.93
23,287.67
1,960,000.00
314,760.00
54,006.93
31,120.00
394,200.00
32,850.00
182,169.00
2,969,105.93
29,691.06
11,978.33
46,745.91
58,724.24
19,450.00
262,800.00
25,550.00
182,169.00
489,969.00
4,899.69
1,120,000.00
289,080.00
30,861.10
1,439,941.10
14,399.41
1,120,000.00
289,080.00
30,861.10
19,450.00
262,800.00
25,550.00
182,169.00
1,929,910.10
19,299.10
1,120,000.00
1,120,000.00
KET.
Analisa-7'OKT
NO
URAIAN
1
1.200
7.177
0.250
6.000
0.350
0.300
0.030
0.012
M3
Ltr
OH
OH
OH
Bh
Bh
2
Batu Seplit Jagung ( 1 - 2 ) cm/ Kasar
Solar
Tukang masak aspal
Pekerja
Mandor
Sikat Ijuk
Sikat Baja
Biaya menggilas sebulan
HARGA
SATUAN
Rp.
3
240,900.00
4,300.00
77,800.00
43,800.00
73,000.00
6,000.00
11,700.00
14,013,000.00
1 M2 ...........
JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
289,080.00
30,861.10
19,450.00
262,800.00
25,550.00
1,800.00
351.00
168,156.00
475,956.00
1,442,092.10
4,759.56
14,420.92
9,659.25
Page 76
28,820.33
JUMLAH
HARGA
Rp.
6
289,080.00
30,861.10
19,450.00
262,800.00
25,550.00
1,800.00
351.00
168,156.00
1,918,048.10
19,180.48
KET.
38,479.58
Analisa-7'OKT
NO
URAIAN
97
HARGA
SATUAN
Rp.
3
11,200.00
262,300.00
4,300.00
77,800.00
43,800.00
73,000.00
14,013,000.00
Pipa Diameter
Pipa Diameter
Pipa Diameter
Pipa Diameter
Pipa Diameter
Pipa Diameter
Pipa Diameter
0,75 ..
1" ..
1,5" ..
2" ..
2,5" ..
3" ..
4" ..
0,75 ..
1" ..
1,25" ..
1,5" ..
2"
..
1,352,960.00
314,760.00
37,280.21
155,600.00
87,600.00
73,000.00
182,169.00
2,203,369.21
22,033.69
4,983.69
17,050.00
22,033.69
4,260.00
455.40
1,576.80
116.80
6,409.00
6,409.00
6,409.00
6,409.00
6,409.00
6,409.00
6,409.00
6,409.00
5,960.00
1,738.33
7,698.33
8,525.00
10,255.83
18,755.00
27,822.50
39,034.17
54,069.17
76,725.00
5,960.00
1,738.33
4,260.00
455.40
1,576.80
116.80
14,107.33
14,934.00
16,664.83
25,164.00
34,231.50
45,443.17
60,478.17
83,134.00
(1,129.91)
(1,251.25)
(1,505.29)
(2,752.75)
(4,083.62)
(5,729.21)
(7,935.96)
(11,261.25)
6,390.00
683.10
2,365.20
1,971.00
11,409.30
11,409.30
11,409.30
11,409.30
11,409.30
11,409.30
26,400.00
7,700.00
34,100.00
51,356.67
42,857.50
93,775.00
111,522.50
94,808.33
26,400.00
7,700.00
6,390.00
683.10
2,365.20
1,971.00
45,509.30
62,765.97
54,266.80
105,184.30
122,931.80
106,217.63
(5,005.00)
(7,537.84)
(6,290.37)
(49,956.17)
(16,368.62)
(13,915.41)
12,800.00
171,300.00
66,100.00
43,800.00
73,000.00
43,800.00
73,000.00
145,420.00
78,840.00
5,840.00
197,100.00
54,750.00
481,950.00
160,650.00
576,000.00
513,900.00
1,089,900.00
363,300.00
576,000.00
513,900.00
145,420.00
78,840.00
5,840.00
197,100.00
54,750.00
1,571,850.00
523,950.00
8,500.00
43,800.00
73,000.00
438.00
438.00
876.00
2,975.00
2,975.00
2,975.00
438.00
438.00
3,851.00
660.00
75,000.00
43,800.00
73,000.00
131,400.00
730.00
132,130.00
660.00
75,000.00
75,660.00
660.00
75,000.00
131,400.00
730.00
207,790.00
4,966.67
4,966.67
71,000.00
75,900.00
43,800.00
73,000.00
5,500.00
6,616.67
12,100.00
17,950.00
25,183.33
34,883.33
49,500.00
22,000.00
22,000.00
71,000.00
75,900.00
43,800.00
73,000.00
33,133.33
27,650.00
60,500.00
71,950.00
61,166.67
1 M2 CAT RESIDU/TEER
0.350 Ltr
Residu / Teer
0.010 OH
Pekerja
0.006 OH
Mandor
KET.
1,352,960.00
314,760.00
37,280.21
1,705,000.21
17,050.00
1 M2 PEKERJAAN BURAS 95
1 M' PAS. PIPA PVC TIPE AW
1.200 M'
0,5"
0.350 harga PVC ( perlengkapan )
0.060 OH
Tukang Batu
0.006 OH
Kepala Tukang Batu
0.036 OH
Pekerja
0.002 OH
Mandor
JUMLAH
HARGA
Rp.
6
155,600.00
87,600.00
73,000.00
182,169.00
498,369.00
4,983.69
1 M2 ...........
98
JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
Page 77
Analisa-7'OKT
NO
URAIAN
HARGA
SATUAN
Rp.
3
JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
JUMLAH
HARGA
Rp.
6
KET.
NI NYOMAN SURATTINI, ST
NIP. 19670102 199803 2 003
Page 78
Analisa-7'OKT
DAFTAR ANALISA
DINAS PEKERJAAN UMUM KABUPATEN BULELENG
TAHUN ANGGARAN
: 2013
NO
URAIAN
HARGA
SATUAN
Rp.
3
43,800.00
73,000.00
292,014.60
24,309.00
316,323.60
292,014.60
24,309.00
316,323.60
10 M2 MEMBONGKAR USUK/RENG
0.250 OH
Tukang Kayu
0.025 OH
Kepala Tukang Kayu
74,900.00
79,800.00
18,725.00
1,995.00
20,720.00
2,072.00
18,725.00
1,995.00
20,720.00
2,072.00
21,900.00
1,825.00
23,725.00
2,372.50
21,900.00
1,825.00
23,725.00
2,372.50
10 M2 MENGUPAS PLESTERAN
0.500 OH
Pekerja
0.025 OH
Mandor
43,800.00
73,000.00
Untuk 1 M2
1 M3 MEMBONGKAR TEMBOK
6.667 OH
Pekerja
0.033 OH
Mandor
43,800.00
73,000.00
292,014.60
2,409.00
294,423.60
292,014.60
2,409.00
294,423.60
10 M2 MEMBONGKAR LANTAI
2.000 OH
Pekerja
0.100 OH
Mandor
43,800.00
73,000.00
87,600.00
7,300.00
94,900.00
9,490.00
87,600.00
7,300.00
94,900.00
9,490.00
35,500.00
43,800.00
79,300.00
7,930.00
35,500.00
43,800.00
79,300.00
7,930.00
33,050.00
43,800.00
76,850.00
7,685.00
33,050.00
43,800.00
76,850.00
7,685.00
5,354,200.00
6,157,300.00
23,200.00
74,900.00
79,800.00
43,800.00
73,000.00
7,490.00
798.00
4,380.00
365.00
13,033.00
64,250.40
43,101.10
464.00
107,815.50
64,250.40
43,101.10
464.00
7,490.00
798.00
4,380.00
365.00
120,848.50
43,800.00
73,000.00
23,038.80
3,796.00
26,834.80
134,174.00
23,038.80
3,796.00
26,834.80
134,174.00
43,800.00
76,650.00
76,650.00
Untuk 1 M2
6
71,000.00
43,800.00
Untuk 1 M2
66,100.00
43,800.00
Untuk 1 M2
10
JUMLAH
HARGA
Rp.
6
Untuk 1 M2
3
JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
Analisa-13
2
Mandor
HARGA
SATUAN
Rp.
3
73,000.00
SALURAN TERBUKA
1.450 OH
Pekerja
0.025 OH
Mandor
43,800.00
73,000.00
NO
URAIAN
1
0.025 OH
Page 80
JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
1,825.00
78,475.00
JUMLAH
HARGA
Rp.
6
1,825.00
78,475.00
63,510.00
1,825.00
65,335.00
63,510.00
1,825.00
65,335.00
Analisa-13
HARGA
SATUAN
Rp.
3
JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
JUMLAH
HARGA
Rp.
6
NO
URAIAN
11
43,800.00
73,000.00
36,047.40
6,059.00
42,106.40
36,047.40
6,059.00
42,106.40
43,800.00
73,000.00
27,375.00
4,526.00
31,901.00
127,177.50
27,375.00
4,526.00
31,901.00
127,177.50
43,800.00
73,000.00
65,700.00
3,650.00
69,350.00
65,700.00
3,650.00
69,350.00
105,100.00
43,800.00
73,000.00
20,000.00
21,900.00
3,650.00
20,000.00
45,550.00
126,120.00
126,120.00
126,120.00
21,900.00
3,650.00
20,000.00
171,670.00
1 M3 URUGAN KEMBALI
0.192 OH
Pekerja
0.019 OH
Mandor
43,800.00
73,000.00
8,409.60
1,387.00
9,796.60
8,409.60
1,387.00
9,796.60
43,800.00
73,000.00
14,454.00
730.00
15,184.00
14,454.00
730.00
15,184.00
43,800.00
73,000.00
20,000.00
14,454.00
730.00
20,000.00
35,184.00
14,454.00
730.00
20,000.00
35,184.00
161,200.00
43,800.00
73,000.00
13,140.00
730.00
13,870.00
193,440.00
193,440.00
193,440.00
13,140.00
730.00
207,310.00
171,300.00
161,200.00
43,800.00
73,000.00
71,000.00
75,900.00
34,164.00
2,847.00
27,690.00
2,960.10
67,661.10
205,560.00
48,360.00
253,920.00
205,560.00
48,360.00
34,164.00
2,847.00
27,690.00
2,960.10
321,581.10
171,300.00
1,286.00
178,300.00
71,000.00
75,900.00
43,800.00
73,000.00
53,250.00
5,692.50
65,700.00
5,475.00
130,117.50
222,690.00
174,896.00
96,995.20
494,581.20
222,690.00
174,896.00
96,995.20
53,250.00
5,692.50
65,700.00
5,475.00
624,698.70
12
14
15
16
17
18
19
20
Page 81
Analisa-13
HARGA
SATUAN
Rp.
3
NO
URAIAN
21
1 M2 PASANG BATACO
12.500 Bj
Batako Cetak Lubang KW.II
7.500 Kg
Semen Gresik ( 50 kg )
0.038 M3
Pasir Pasang
0.100 OH
Tukang Batu
0.010 OH
Kepala Tukang Batu
0.300 OH
Pekerja
0.015 OH
Mandor
1,700.00
1,286.00
178,300.00
71,000.00
75,900.00
43,800.00
73,000.00
2,200.00
Page 82
JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
7,100.00
759.00
13,140.00
1,095.00
22,094.00
22,094.00
21,250.00
9,645.00
6,775.40
37,670.40
43,920.40
JUMLAH
HARGA
Rp.
6
21,250.00
9,645.00
6,775.40
7,100.00
759.00
13,140.00
1,095.00
59,764.40
66,014.40
Analisa-13
NO
URAIAN
22
23
HARGA
SATUAN
Rp.
3
900.00
1,286.00
178,300.00
71,000.00
75,900.00
43,800.00
73,000.00
1,000.00
900.00
1,286.00
178,300.00
71,000.00
75,900.00
43,800.00
73,000.00
1,000.00
25
26
27
28
JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
JUMLAH
HARGA
Rp.
6
7,100.00
759.00
13,140.00
1,095.00
22,094.00
22,094.00
63,000.00
24,369.70
6,775.40
94,145.10
101,145.10
63,000.00
24,369.70
6,775.40
7,100.00
759.00
13,140.00
1,095.00
116,239.10
123,239.10
7,100.00
759.00
13,140.00
1,095.00
22,094.00
22,094.00
63,000.00
12,448.48
8,023.50
83,471.98
90,471.98
63,000.00
12,448.48
8,023.50
7,100.00
759.00
13,140.00
1,095.00
105,565.98
112,565.98
1 M2 PLESTERAN PC 1 : 2 TEBAL 20 mm
13.632 Kg
Semen Gresik ( 50 kg )
0.027 M3
Pasir Pasang
0.200 OH
Tukang Batu
0.020 OH
Kepala Tukang Batu
0.400 OH
Pekerja
0.022 OH
Mandor
1,286.00
178,300.00
71,000.00
75,900.00
43,800.00
73,000.00
14,200.00
1,518.00
17,520.00
1,606.00
34,844.00
17,530.75
4,814.10
22,344.85
17,530.75
4,814.10
14,200.00
1,518.00
17,520.00
1,606.00
57,188.85
1,286.00
178,300.00
71,000.00
75,900.00
43,800.00
73,000.00
14,200.00
1,518.00
11,388.00
1,460.00
28,566.00
13,333.25
5,527.30
18,860.55
13,333.25
5,527.30
14,200.00
1,518.00
11,388.00
1,460.00
47,426.55
1,286.00
178,300.00
71,000.00
75,900.00
43,800.00
73,000.00
14,200.00
1,518.00
17,520.00
1,606.00
34,844.00
8,888.83
6,240.50
15,129.33
8,888.83
6,240.50
14,200.00
1,518.00
17,520.00
1,606.00
49,973.33
1 M2 PLESTERAN PC 1 : 6 TEBAL 15 mm
5.888 Kg
Semen Gresik ( 50 kg )
0.036 M3
Pasir Pasang
0.200 OH
Tukang Batu
0.020 OH
Kepala Tukang Batu
0.400 OH
Pekerja
0.022 OH
Mandor
1,286.00
178,300.00
71,000.00
75,900.00
43,800.00
73,000.00
14,200.00
1,518.00
17,520.00
1,606.00
34,844.00
7,571.97
6,418.80
13,990.77
7,571.97
6,418.80
14,200.00
1,518.00
17,520.00
1,606.00
48,834.77
1,286.00
71,000.00
75,900.00
43,800.00
73,000.00
7,100.00
759.00
8,760.00
730.00
17,349.00
4,179.50
4,179.50
4,179.50
7,100.00
759.00
8,760.00
730.00
21,528.50
Page 83
Analisa-13
NO
1
29
HARGA
SATUAN
Rp.
3
URAIAN
2
1 M2 PEKERJAAN SIARAN 1 : 2
6.340 Kg
Semen Gresik ( 50 kg )
0.012 M3
Pasir Pasang
0.150 OH
Tukang Batu
0.015 OH
Kepala Tukang Batu
0.300 OH
Pekerja
0.015 OH
Mandor
1,286.00
178,300.00
71,000.00
75,900.00
43,800.00
73,000.00
Page 84
JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
10,650.00
1,138.50
13,140.00
1,095.00
26,023.50
8,153.24
2,139.60
10,292.84
JUMLAH
HARGA
Rp.
6
8,153.24
2,139.60
10,650.00
1,138.50
13,140.00
1,095.00
36,316.34
Analisa-13
NO
URAIAN
30
31
HARGA
SATUAN
Rp.
3
8,100.00
4,300.00
64,300.00
82,700.00
87,600.00
43,800.00
73,000.00
3,800.00
4,300.00
1,286.00
82,700.00
87,600.00
43,800.00
73,000.00
3,800.00
33
34
35
36
JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
JUMLAH
HARGA
Rp.
6
289,450.00
30,660.00
87,600.00
7,300.00
415,010.00
415,010.00
53,913.60
189,200.00
38,580.00
281,693.60
259,693.60
53,913.60
189,200.00
38,580.00
289,450.00
30,660.00
87,600.00
7,300.00
696,703.60
674,703.60
289,450.00
30,660.00
87,600.00
7,300.00
415,010.00
415,010.00
430,000.00
38,580.00
468,580.00
418,580.00
430,000.00
38,580.00
289,450.00
30,660.00
87,600.00
7,300.00
883,590.00
833,590.00
34,700.00
1,286.00
178,300.00
82,700.00
84,600.00
43,800.00
73,000.00
20,675.00
2,115.00
21,900.00
1,825.00
46,515.00
41,640.00
9,002.00
4,457.50
55,099.50
41,640.00
9,002.00
4,457.50
20,675.00
2,115.00
21,900.00
1,825.00
101,614.50
200,000.00
1,286.00
178,300.00
82,700.00
84,600.00
43,800.00
73,000.00
12,405.00
1,269.00
17,520.00
1,460.00
32,654.00
240,000.00
2,700.60
2,032.62
244,733.22
240,000.00
2,700.60
2,032.62
12,405.00
1,269.00
17,520.00
1,460.00
277,387.22
200,000.00
1,286.00
178,300.00
82,700.00
84,600.00
43,800.00
73,000.00
20,675.00
2,115.00
21,900.00
1,825.00
46,515.00
240,000.00
9,002.00
4,457.50
253,459.50
240,000.00
9,002.00
4,457.50
20,675.00
2,115.00
21,900.00
1,825.00
299,974.50
62,700.00
178,300.00
71,000.00
Paving Blok / 8 cm
69,600.00
18,886.00
18,886.00
18,886.00
62,700.00
17,830.00
80,530.00
87,430.00
62,700.00
17,830.00
18,886.00
99,416.00
106,316.00
52,400.00
1,286.00
178,300.00
71,000.00
75,900.00
43,800.00
73,000.00
7,100.00
759.00
13,140.00
1,095.00
52,400.00
16,718.00
6,240.50
-
52,400.00
16,718.00
6,240.50
7,100.00
759.00
13,140.00
1,095.00
Analisa-13
NO
URAIAN
37
HARGA
SATUAN
Rp.
3
1 M2 PASANGAN KERAMIK KW I 20 x 20
1.000 M2
Keramik KW I 20/20 cm
10.400 Kg
Semen Gresik ( 50 kg )
0.045 M3
Pasir Pasang
1.620 Kg
Semen warna
0.350 OH
Tukang Batu
0.035 OH
Kepala Tukang Batu
0.700 OH
Pekerja
0.035 OH
Mandor
52,800.00
1,286.00
178,300.00
12,100.00
71,000.00
75,900.00
43,800.00
73,000.00
Keramik KW II 20/20 cm
50,100.00
Page 86
JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
22,094.00
75,358.50
24,850.00
2,656.50
30,660.00
2,555.00
60,721.50
60,721.50
52,800.00
13,374.40
8,023.50
19,602.00
93,799.90
91,099.90
JUMLAH
HARGA
Rp.
6
97,452.50
52,800.00
13,374.40
8,023.50
19,602.00
24,850.00
2,656.50
30,660.00
2,555.00
154,521.40
151,821.40
Analisa-13
NO
URAIAN
38
39
38
39
1 M2 PASANGAN KERAMIK KW I 30 x 30
1.000 M2
Keramik KW I 30/30 cm
10.000 Kg
Semen Gresik ( 50 kg )
0.045 M3
Pasir Pasang
1.500 Kg
Semen warna
0.350 OH
Tukang Batu
0.035 OH
Kepala Tukang Batu
0.700 OH
Pekerja
0.035 OH
Mandor
49,200.00
1,286.00
178,300.00
12,100.00
71,000.00
75,900.00
43,800.00
73,000.00
Keramik KW II 30/30 cm
45,900.00
1 M2 PASANGAN KERAMIK KW I 40 x 40
1.000 M2
Keramik KW I 40/40 cm
10.000 Kg
Semen Gresik ( 50 kg )
0.045 M3
Pasir Pasang
1.500 Kg
Semen warna
0.350 OH
Tukang Batu
0.035 OH
Kepala Tukang Batu
0.700 OH
Pekerja
0.035 OH
Mandor
57,100.00
1,286.00
178,300.00
12,100.00
71,000.00
75,900.00
43,800.00
73,000.00
41
a
55,200.00
JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
JUMLAH
HARGA
Rp.
6
24,850.00
2,656.50
30,660.00
2,555.00
60,721.50
60,721.50
49,200.00
12,860.00
8,023.50
18,150.00
88,233.50
84,933.50
49,200.00
12,860.00
8,023.50
18,150.00
24,850.00
2,656.50
30,660.00
2,555.00
148,955.00
145,655.00
24,850.00
2,656.50
30,660.00
2,555.00
60,721.50
60,721.50
57,100.00
12,860.00
8,023.50
18,150.00
96,133.50
94,233.50
57,100.00
12,860.00
8,023.50
18,150.00
24,850.00
2,656.50
30,660.00
2,555.00
156,855.00
154,955.00
49,200.00
1,472.47
534.90
3,025.00
54,232.37
57,832.37
116,364.74
49,200.00
1,472.47
534.90
3,025.00
6,390.00
683.10
3,942.00
365.00
65,612.47
69,212.47
127,744.84
Keramik KW II 40/40 cm
1 M2 PEK. PLINT KERAMIK 10 x 30 (1:2)
1.000 M2
Keramik KW I 30/30 cm
1.145 Kg
Semen Gresik ( 50 kg )
0.003 M3
Pasir Pasang
0.250 Kg
Semen warna
0.090 OH
Tukang Batu
0.009 OH
Kepala Tukang Batu
0.090 OH
Pekerja
0.005 OH
Mandor
49,200.00
1,286.00
178,300.00
12,100.00
71,000.00
75,900.00
43,800.00
73,000.00
Keramik KW I 20/20 cm
Keramik KW I 40/40 cm
52,800.00
57,100.00
6,390.00
683.10
3,942.00
365.00
11,380.10
11,380.10
11,380.10
50,000.00
1,286.00
178,300.00
71,000.00
75,900.00
2,407.05
9,230.00
986.70
50,000.00
13,374.40
2,407.05
-
50,000.00
13,374.40
4,814.10
9,230.00
986.70
43,800.00
73,000.00
11,826.00
985.50
12,811.50
65,781.45
11,826.00
985.50
91,216.70
199,000.00
185,600.00
1,286.00
71,000.00
75,900.00
43,800.00
73,000.00
17,750.00
1,897.50
72,270.00
5,840.00
97,757.50
173,130.00
96,512.00
280,348.00
549,990.00
173,130.00
96,512.00
280,348.00
17,750.00
1,897.50
72,270.00
5,840.00
647,747.50
BETON BERTULANG
1 M3 Beton Cor 1:2:3
0.810 M3
Kerikil / Koral Beton
0.540 M3
Pasir Beton
336.000 Kg
Semen Gresik ( 50 kg )
0.350 OH
Tukang Batu
0.035 OH
Kepala Tukang Batu
199,000.00
185,600.00
1,286.00
71,000.00
75,900.00
24,850.00
2,656.50
161,190.00
100,224.00
432,096.00
-
161,190.00
100,224.00
432,096.00
24,850.00
2,656.50
0.270 OH
0.014 OH
40
HARGA
SATUAN
Rp.
3
Pekerja
Mandor
Page 87
Analisa-13
NO
1
2.000 OH
1.000 OH
HARGA
SATUAN
Rp.
3
43,800.00
73,000.00
(A)
URAIAN
1 M2 Begesting
0.040 M3
0.400 Kg
0.500 OH
0.050 OH
0.400 OH
0.010 OH
2
Pekerja
Mandor
1,285,000.00
23,200.00
74,900.00
79,800.00
43,800.00
73,000.00
(B)
Papan begesting
Paku Usuk
Tukang Kayu
Kepala Tukang Kayu
Pekerja
Mandor
10 M2 Begesting
Page 88
JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
87,600.00
73,000.00
188,106.50
693,510.00
JUMLAH
HARGA
Rp.
6
87,600.00
73,000.00
881,616.50
37,450.00
3,990.00
17,520.00
730.00
59,690.00
596,900.00
51,400.00
9,280.00
37,450.00
3,990.00
17,520.00
730.00
120,370.00
1,203,700.00
51,400.00
9,280.00
60,680.00
606,800.00
Analisa-13
NO
URAIAN
42
43
44
HARGA
SATUAN
Rp.
3
46
JUMLAH
HARGA
Rp.
6
8,961.88
20,000.00
66,100.00
74,900.00
43,800.00
(C)
46,270.00
5,243.00
13,140.00
64,653.00
896,188.16
30,000.00
926,188.16
896,188.16
30,000.00
46,270.00
5,243.00
13,140.00
990,841.16
(A+B+0,8*C)
(A+B+C)
(A+B+1,5*C)
(A+B+1,6*C)
(A+B+1,75*C)
(A+B+1,85*C)
(A+B+2*C)
(A+B+2,25*C)
(A+B+2,5*C)
(A+B+2,75*C)
(A+B+3*C)
(A+1,6*C)
836,728.90
849,659.50
881,986.00
888,451.30
898,149.25
904,614.55
914,312.50
930,475.75
946,639.00
962,802.25
978,965.50
888,451.30
2,041,260.53
2,226,498.16
2,689,592.24
2,782,211.06
2,921,139.28
3,013,758.10
3,152,686.32
3,384,233.36
3,615,780.40
3,847,327.44
4,078,874.48
2,782,211.06
2,877,989.43
3,076,157.66
3,571,578.24
3,670,662.36
3,819,288.53
3,918,372.65
4,066,998.82
4,314,709.11
4,562,419.40
4,810,129.69
5,057,839.98
2,466,962.36
881,616.50
171,300.00
112,863.90
112,863.90
416,106.00
82,224.00
498,330.00
528,969.90
82,224.00
611,193.90
171,300.00
199,000.00
185,600.00
1,286.00
71,000.00
75,900.00
43,800.00
73,000.00
21,300.00
2,277.00
104,244.00
5,840.00
133,661.00
77,085.00
133,330.00
83,520.00
360,080.00
654,015.00
77,085.00
133,330.00
83,520.00
360,080.00
21,300.00
2,277.00
104,244.00
5,840.00
787,676.00
91,000.00
6,692,800.00
23,200.00
22,400.00
74,900.00
79,800.00
43,800.00
73,000.00
149,800.00
1,596.00
21,900.00
1,825.00
175,121.00
175,121.00
62,790.00
100,392.00
464.00
4,480.00
168,126.00
67,270.00
62,790.00
100,392.00
464.00
4,480.00
149,800.00
1,596.00
21,900.00
1,825.00
343,247.00
242,391.00
1 M2 PLAPOND GYPSUM
0.380 Lbr
Gypsum (1,2 x 2,4)
0.015 M3
Kayu Kruing Balok 8/12
0.220 Kg
Paku Lis
0.200 OH
Tukang Kayu
0.020 OH
Kepala Tukang Kayu
0.500 OH
Pekerja
0.025 OH
Mandor
58,800.00
6,692,800.00
25,800.00
74,900.00
79,800.00
43,800.00
73,000.00
14,980.00
1,596.00
21,900.00
1,825.00
40,301.00
22,344.00
100,392.00
5,676.00
128,412.00
22,344.00
100,392.00
5,676.00
14,980.00
1,596.00
21,900.00
1,825.00
168,713.00
1 M2 PLAPOND ETERNIT
1.000 Lbr
Eternit Klas I (1/1) M
0.015 M3
Kayu Kruing Balok 8/12
0.220 Kg
Paku Usuk
0.200 OH
Tukang Kayu
0.020 OH
Kepala Tukang Kayu
0.500 OH
Pekerja
19,200.00
6,692,800.00
23,200.00
74,900.00
79,800.00
43,800.00
14,980.00
1,596.00
21,900.00
19,200.00
100,392.00
5,104.00
-
19,200.00
100,392.00
5,104.00
14,980.00
1,596.00
21,900.00
1 M3 BETON BERTULANG Fe 80
1 M3 BETON BERTULANG Fe 100
1 M3 BETON BERTULANG Fe 150
1 M3 BETON BERTULANG Fe 160
1 M3 BETON BERTULANG Fe 175
1 M3 BETON BERTULANG Fe 185
1 M3 BETON BERTULANG Fe 200
1 M3 BETON BERTULANG Fe 225
1 M3 BETON BERTULANG Fe 250
1 M3 BETON BERTULANG Fe 275
1 M3 BETON BERTULANG Fe 300
1 M3 BETON PLAT PONDASI Fe 160
1 M3 BETON CYCLOOF 40% BATU KALI
0.600 M3
Beton cor 1 : 2 : 3
0.480 M3
Batu Pasang
45
JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
Page 89
Analisa-13
NO
HARGA
SATUAN
Rp.
3
73,000.00
URAIAN
1
0.025 OH
2
Mandor
29,900.00
49,500.00
6,692,800.00
23,200.00
74,900.00
79,800.00
43,800.00
73,000.00
52,400.00
80,300.00
Triplek 3 mm
Teak Wood 4 mm
Page 90
JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
1,825.00
40,301.00
124,696.00
40,301.00
135,396.00
29,960.00
3,192.00
11,826.00
985.50
45,963.50
45,963.50
45,963.50
19,305.00
153,934.40
1,392.00
174,631.40
175,762.40
186,643.40
JUMLAH
HARGA
Rp.
6
1,825.00
164,997.00
175,697.00
19,305.00
153,934.40
1,392.00
29,960.00
3,192.00
11,826.00
985.50
220,594.90
221,725.90
232,606.90
Analisa-13
NO
URAIAN
48
IX
HARGA
SATUAN
Rp.
3
58,800.00
10,600.00
20,000.00
15,000.00
74,900.00
79,800.00
43,800.00
73,000.00
85,000.00
22,400.00
43,800.00
74,900.00
79,800.00
73,000.00
80,300.00
22,400.00
43,800.00
74,900.00
79,800.00
73,000.00
20,416.54
38,160.00
3,000.00
15,750.00
77,326.54
20,416.54
38,160.00
3,000.00
15,750.00
18,725.00
1,995.00
6,570.00
5,475.00
110,091.54
31,875.00
672.00
31,875.00
672.00
4,380.00
7,490.00
3,990.00
255.50
48,662.50
12,025.00
25,800.00
43,800.00
74,900.00
79,800.00
73,000.00
4,380.00
7,490.00
3,990.00
255.50
16,115.50
32,547.00
30,112.50
672.00
4,380.00
7,490.00
3,990.00
255.50
16,115.50
30,784.50
12,626.25
258.00
2,190.00
3,745.00
399.00
219.00
6,553.00
12,884.25
30,112.50
672.00
4,380.00
7,490.00
3,990.00
255.50
46,900.00
12,626.25
258.00
2,190.00
3,745.00
399.00
219.00
19,437.25
18,725.00
1,995.00
6,570.00
5,475.00
32,765.00
JUMLAH
HARGA
Rp.
6
JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
M3
Kg
Lbr
Oh
Oh
Oh
Oh
8,299,000.00
25,800.00
85,000.00
43,800.00
74,900.00
79,800.00
73,000.00
50,000.00
40,000.00
2,000.00
1,000.00
2,500.00
2,500.00
1,500.00
17,500.00
150.00
234.00
3,500.00
19,700.00
58,800.00
5,000.00
12,000.00
43,800.00
74,900.00
Page 91
190,877.00
1,548.00
76,500.00
11,826.00
29,960.00
3,192.00
985.50
45,963.50
268,925.00
15,000.00
20,000.00
2,000.00
1,000.00
2,500.00
2,500.00
3,000.00
7,000.00
150.00
1,170.00
3,500.00
3,500.00
54,320.00
2,167.00
22,050.00
4,650.00
1,200.00
4,380.00
7,490.00
190,877.00
1,548.00
76,500.00
11,826.00
29,960.00
3,192.00
985.50
314,888.50
15,000.00
20,000.00
2,000.00
1,000.00
2,500.00
2,500.00
3,000.00
7,000.00
150.00
1,170.00
3,500.00
57,820.00
2,167.00
22,050.00
4,650.00
1,200.00
4,380.00
7,490.00
Analisa-13
NO
1
0.0100
0.0050
HARGA
SATUAN
Rp.
3
79,800.00
73,000.00
URAIAN
Oh
Oh
2
Kepala Tukang
Mandor
JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
798.00
365.00
13,033.00
30,067.00
16,533.00
9,637,600.00
22,400.00
74,900.00
79,800.00
43,800.00
73,000.00
Page 92
6,384.00
35,040.00
2,920.00
44,344.00
JUMLAH
HARGA
Rp.
6
798.00
365.00
43,100.00
84,387.00
100,920.00
144,564.00
224.00
59,920.00
144,564.00
224.00
59,920.00
6,384.00
35,040.00
2,920.00
249,052.00
204,708.00
Analisa-13
NO
URAIAN
49
50
51
52
53
54
HARGA
SATUAN
Rp.
3
33,705.00
3,591.00
6,570.00
5,475.00
49,341.00
167,052.60
31,317.00
2,580.00
200,949.60
167,052.60
31,317.00
2,580.00
33,705.00
3,591.00
6,570.00
5,475.00
250,290.60
10,708,500.00
23,200.00
11,300.00
74,900.00
79,800.00
43,800.00
73,000.00
1,572,900.00
167,580.00
306,600.00
255,500.00
2,302,580.00
11,779,350.00
29,000.00
11,300.00
11,819,650.00
11,779,350.00
29,000.00
11,300.00
1,572,900.00
167,580.00
306,600.00
255,500.00
14,122,230.00
8,566,800.00
23,200.00
11,300.00
74,900.00
79,800.00
43,800.00
73,000.00
1,348,200.00
143,640.00
262,800.00
21,900.00
1,776,540.00
10,280,160.00
29,000.00
11,300.00
10,320,460.00
10,280,160.00
29,000.00
11,300.00
1,348,200.00
143,640.00
262,800.00
21,900.00
12,097,000.00
10,024,900.00
80,300.00
25,800.00
74,900.00
79,800.00
43,800.00
73,000.00
179,760.00
19,152.00
35,040.00
2,920.00
236,872.00
236,872.00
236,872.00
236,872.00
236,872.00
236,872.00
240,597.60
64,240.00
2,580.00
307,417.60
320,217.60
337,337.60
375,224.80
388,024.80
405,144.80
66,820.00
240,597.60
64,240.00
2,580.00
179,760.00
19,152.00
35,040.00
2,920.00
544,289.60
557,089.60
574,209.60
612,096.80
624,896.80
642,016.80
303,692.00
11,235.00
1,197.00
657.00
54.75
13,143.75
13,143.75
13,143.75
105,930.00
105,930.00
88,330.00
129,470.00
105,930.00
11,235.00
1,197.00
657.00
54.75
119,073.75
101,473.75
142,613.75
224,700.00
23,940.00
43,800.00
3,650.00
296,090.00
296,090.00
514,008.00
5,650.00
519,658.00
400,996.00
514,008.00
5,650.00
224,700.00
23,940.00
43,800.00
3,650.00
815,748.00
697,086.00
96,300.00
117,700.00
80,300.00
96,300.00
117,700.00
Kaca Bening 5 mm
Kaca Ray-Ban 5 mm
Kayu Jati Papan ,3 mm polos
Kayu Jati Papan ,5 mm polos
Kayu Jati Papan ,5 mm rayben
kayu meranti papan, 3 mm polos
1 M2 PEK. KACA 5 MM
1.100 M2
Kaca Bening 5 mm
0.150 OH
Tukang Kayu
0.015 OH
Kepala Tukang Kayu
0.015 OH
Pekerja
0.001 OH
Mandor
96,300.00
74,900.00
79,800.00
43,800.00
73,000.00
Kaca Bening 3 mm
Kaca Ray-Ban 5 mm
80,300.00
117,700.00
12,850,200.00
11,300.00
74,900.00
79,800.00
43,800.00
73,000.00
JUMLAH
HARGA
Rp.
6
8,566,800.00
80,300.00
25,800.00
74,900.00
79,800.00
43,800.00
73,000.00
JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
10,024,900.00
Page 93
Analisa-13
NO
URAIAN
2
kayu meranti papan
1 M2 DAUN PINTU DOUBLE PLYWOOD
0.026 M3
Kayu Kamper Papan 3/20
1.000 Lbr
Plywood
0.030 Kg
Paku Lis
0.500 Kg
Lem kayu fox
2.400 OH
Tukang Kayu
0.240 OH
Kepala Tukang Kayu
0.800 OH
Pekerja
0.040 OH
Mandor
55
HARGA
SATUAN
Rp.
3
10,024,900.00
49,500.00
25,800.00
11,300.00
74,900.00
79,800.00
43,800.00
73,000.00
80,300.00
Teak Wood 4 mm
Page 94
JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
179,760.00
19,152.00
35,040.00
2,920.00
236,872.00
236,872.00
JUMLAH
HARGA
Rp.
6
296,090.00
256,637.44
49,500.00
774.00
5,650.00
312,561.44
343,361.44
256,637.44
49,500.00
774.00
5,650.00
179,760.00
19,152.00
35,040.00
2,920.00
549,433.44
580,233.44
Analisa-13
NO
URAIAN
HARGA
SATUAN
Rp.
3
10,024,900.00
80,300.00
96,300.00
25,800.00
74,900.00
79,800.00
43,800.00
73,000.00
56
49,500.00
Plywood
57
58
6,692,800.00
21,400.00
23,200.00
74,900.00
79,800.00
43,800.00
73,000.00
3,105,400.00
8,566,800.00
5,086,500.00
10,173,000.00
8,299,000.00
9,637,600.00
23,200.00
74,900.00
79,800.00
43,800.00
73,000.00
6,692,800.00
5,086,500.00
60
61
JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
JUMLAH
HARGA
Rp.
6
224,700.00
23,940.00
54,750.00
4,599.00
307,989.00
307,989.00
150,373.50
50,187.50
96,300.00
2,580.00
299,441.00
280,191.00
150,373.50
50,187.50
96,300.00
2,580.00
224,700.00
23,940.00
54,750.00
4,599.00
607,430.00
588,180.00
898,800.00
95,760.00
175,200.00
14,600.00
1,184,360.00
1,184,360.00
1,184,360.00
1,184,360.00
1,184,360.00
7,362,080.00
321,000.00
18,560.00
7,701,640.00
3,755,500.00
9,763,040.00
5,934,710.00
11,529,860.00
7,362,080.00
321,000.00
18,560.00
898,800.00
95,760.00
175,200.00
14,600.00
8,886,000.00
4,939,860.00
10,947,400.00
7,119,070.00
12,714,220.00
7,490.00
798.00
4,380.00
365.00
13,033.00
13,033.00
13,033.00
66,392.00
38,550.40
3,480.00
108,422.40
95,572.80
82,722.40
66,392.00
38,550.40
3,480.00
7,490.00
798.00
4,380.00
365.00
121,455.40
108,605.80
95,755.40
8,299,000.00
9,637,600.00
23,200.00
74,900.00
79,800.00
43,800.00
73,000.00
21,271.60
2,234.40
21,900.00
1,825.00
47,231.00
99,588.00
57,825.60
1,740.00
159,153.60
99,588.00
57,825.60
1,740.00
21,271.60
2,234.40
21,900.00
1,825.00
206,384.60
1 M2 USUK GERANTANGAN
0.022 M3
Usuk Kruing 5/7
0.004 M3
Kayu Kamper Papan 3/20
0.200 Kg
Paku Usuk
0.230 OH
Tukang Kayu
0.023 OH
Kepala Tukang Kayu
0.230 OH
Pekerja
0.023 OH
Mandor
6,157,300.00
10,024,900.00
23,200.00
74,900.00
79,800.00
43,800.00
73,000.00
17,227.00
1,835.40
10,074.00
1,679.00
30,815.40
135,460.60
40,099.60
4,640.00
180,200.20
135,460.60
40,099.60
4,640.00
17,227.00
1,835.40
10,074.00
1,679.00
211,015.60
6,157,300.00
23,200.00
74,900.00
79,800.00
43,800.00
73,000.00
4,269.30
239.40
2,496.60
438.00
67,730.30
2,320.00
-
67,730.30
2,320.00
4,269.30
239.40
2,496.60
438.00
Analisa-13
NO
URAIAN
62
HARGA
SATUAN
Rp.
3
9,637,600.00
22,400.00
43,800.00
73,000.00
74,900.00
Page 96
JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
7,443.30
70,050.30
1,883.40
146.00
3,220.70
77,100.80
3,360.00
-
JUMLAH
HARGA
Rp.
6
77,493.60
77,100.80
3,360.00
1,883.40
146.00
3,220.70
Analisa-13
NO
URAIAN
1
0.004 OH
X
1
63
64
65
66
2
Kepala Tukang Kayu
JUMLAH
HARGA
Rp.
6
319.20
86,030.10
30,000.00
25,000.00
15,000.00
15,000.00
25,000.00
33,600.00
55,250.00
99,000.00
15,000.00
25,000.00
25,000.00
202,850.00
33,600.00
55,250.00
99,000.00
15,000.00
25,000.00
227,850.00
14,980.00
1,596.00
4,380.00
365.00
21,321.00
21,321.00
21,321.00
108,268.92
2,240.00
110,508.92
80,304.56
68,738.84
108,268.92
2,240.00
14,980.00
1,596.00
4,380.00
365.00
131,829.92
101,625.56
90,059.84
7,228,200.00
6,157,300.00
7,228,200.00
23,200.00
74,900.00
79,800.00
43,800.00
73,000.00
180,705.00
4,640.00
59,920.00
6,384.00
10,950.00
1,022.00
78,276.00
185,345.00
Untuk 0,5 M2 = 1 M'
180,705.00
4,640.00
59,920.00
6,384.00
10,950.00
1,022.00
263,621.00
131,810.50
19,800.00
74,900.00
79,800.00
43,800.00
73,000.00
108,900.00
599,200.00
63,840.00
219,000.00
36,500.00
918,540.00
108,900.00
Untuk 1 M' = 0,5 M2
108,900.00
599,200.00
63,840.00
219,000.00
36,500.00
1,027,440.00
102,744.00
1 M2 GENTENG PRES
25.000 Bj
Genteng Kodok
0.075 OH
Tukang Kayu
0.008 OH
Kepala Tukang Kayu
0.150 OH
Pekerja
0.008 OH
Mandor
3,200.00
74,900.00
79,800.00
43,800.00
73,000.00
5,617.50
638.40
6,570.00
584.00
13,409.90
13,409.90
13,409.90
13,409.90
80,000.00
80,000.00
47,500.00
52,500.00
57,500.00
80,000.00
5,617.50
638.40
6,570.00
584.00
93,409.90
60,909.90
65,909.90
70,909.90
6,400.00
12,100.00
7,400.00
14,980.00
1,596.00
17,520.00
146.00
34,242.00
34,242.00
34,242.00
34,242.00
38,000.00
10,288.00
5,705.60
53,993.60
47,993.60
76,493.60
52,993.60
38,000.00
10,288.00
5,705.60
14,980.00
1,596.00
17,520.00
146.00
88,235.60
82,235.60
110,735.60
87,235.60
37,400.00
26,180.00
26,180.00
1,900.00
2,100.00
2,300.00
7,600.00
64,300.00
178,300.00
74,900.00
79,800.00
43,800.00
73,000.00
68
JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
319.20
5,569.30
80,460.80
10,024,900.00
22,400.00
74,900.00
79,800.00
43,800.00
73,000.00
Genteng Plentong
Genteng Biasa
Genteng Karang Pilang
67
HARGA
SATUAN
Rp.
3
79,800.00
Analisa-13
NO
HARGA
SATUAN
Rp.
3
26,200.00
74,900.00
79,800.00
43,800.00
73,000.00
URAIAN
1
0.020
0.060
0.006
0.120
0.006
Kg
OH
OH
OH
OH
2
Paku Seng
Tukang Kayu
Kepala Tukang Kayu
Pekerja
Mandor
32,800.00
19,800.00
16,000.00
66,100.00
74,900.00
43,800.00
Untuk 1 M'
Page 98
JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
524.00
4,494.00
478.80
5,256.00
438.00
10,666.80
26,704.00
10,666.80
23,484.00
16,525.00
1,872.50
10,950.00
29,347.50
2,934.75
118,800.00
192,000.00
310,800.00
31,080.00
JUMLAH
HARGA
Rp.
6
524.00
4,494.00
478.80
5,256.00
438.00
37,370.80
34,150.80
118,800.00
192,000.00
16,525.00
1,872.50
10,950.00
340,147.50
34,014.75
Analisa-13
NO
1
70
71
72
73
74
75
HARGA
SATUAN
Rp.
3
URAIAN
2
1 M2 PASANGAN ATAP SENG LAMA
0.750 Lbr
BJLS 0,18 mm
0.040 Kg
Paku Seng
0.200 OH
Tukang Kayu
0.020 OH
Kepala Tukang Kayu
0.100 OH
Pekerja
0.005 OH
Mandor
JUMLAH
HARGA
Rp.
6
37,400.00
26,200.00
74,900.00
79,800.00
43,800.00
73,000.00
14,980.00
1,596.00
4,380.00
365.00
21,321.00
28,050.00
1,048.00
29,098.00
28,050.00
1,048.00
14,980.00
1,596.00
4,380.00
365.00
50,419.00
112,200.00
23,200.00
74,900.00
79,800.00
43,800.00
73,000.00
8,988.00
957.60
5,256.00
438.00
15,639.60
112,200.00
4,640.00
116,840.00
112,200.00
4,640.00
8,988.00
957.60
5,256.00
438.00
132,479.60
18,200.00
13,600.00
16,000.00
56,400.00
63,200.00
43,800.00
73,000.00
3,553.20
398.16
876.00
182.50
5,009.86
1,820.00
3,536.00
1,600.00
6,956.00
1,820.00
3,536.00
1,600.00
3,553.20
398.16
876.00
182.50
11,965.86
18,200.00
13,600.00
56,400.00
63,200.00
43,800.00
73,000.00
2,368.80
265.44
1,226.40
182.50
4,043.14
2,184.00
2,448.00
4,632.00
2,184.00
2,448.00
2,368.80
265.44
1,226.40
182.50
8,675.14
24,600.00
18,800.00
56,400.00
63,200.00
43,800.00
73,000.00
4,230.00
505.60
2,190.00
219.00
7,144.60
2,952.00
940.00
3,892.00
2,952.00
940.00
4,230.00
505.60
2,190.00
219.00
11,036.60
53,500.00
56,400.00
63,200.00
43,800.00
73,000.00
8,460.00
948.00
4,380.00
365.00
14,153.00
10,111.50
10,111.50
10,111.50
8,460.00
948.00
4,380.00
365.00
24,264.50
53,500.00
18,800.00
56,400.00
63,200.00
43,800.00
73,000.00
1,692.00
189.60
6,570.00
219.00
8,670.60
15,194.00
1,334.80
16,528.80
15,194.00
1,334.80
1,692.00
189.60
6,570.00
219.00
25,199.40
24,600.00
4,920.00
4,920.00
76 1 M2 PENGECATAN KANSTIN
0.284 Kg Cat Kayu
0.071 Kg Minyak cat
0.030 OH Tukang cat
0.003 OH Kepala tukang cat
0.150 OH Pekerja
0.003 OH Mandor
77
JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
Analisa-13
NO
1
0.150
0.170
0.260
0.009
0.006
0.070
0.003
78
HARGA
SATUAN
Rp.
3
26,200.00
48,100.00
53,500.00
56,400.00
63,200.00
43,800.00
73,000.00
URAIAN
Kg
Kg
Kg
OH
OH
OH
OH
2
Dempul
Cat Dasar Kayu
Cat Kayu
Tukang Cat
Kepala Tukang Cat
Pekerja
Mandor
1 M2 PEKERJAAN POLITUR
0.150 Ltr
Politur
0.372 Ltr
Politur jadi ( Ultran )
2.000 Lbr
Amplas
0.060 OH
Tukang Cat
0.016 OH
Kepala Tukang Cat
0.008 OH
Mandor
43,500.00
51,700.00
3,200.00
56,400.00
63,200.00
73,000.00
Page 100
JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
3,930.00
8,177.00
13,910.00
507.60
379.20
3,066.00
182.50
4,135.30
30,937.00
3,384.00
1,011.20
547.50
4,942.70
6,525.00
19,232.40
6,400.00
32,157.40
JUMLAH
HARGA
Rp.
6
3,930.00
8,177.00
13,910.00
507.60
379.20
3,066.00
182.50
35,072.30
6,525.00
19,232.40
6,400.00
3,384.00
1,011.20
547.50
37,100.10
Analisa-13
NO
URAIAN
79
80
81
82
83
84
HARGA
SATUAN
Rp.
3
86
87
6,977.05
2,872.22
29,617.40
34,305.88
73,772.55
10,851.36
18,993.12
83,691.68
113,536.16
6,977.05
13,723.58
48,610.52
117,997.57
187,308.71
26,834.80
105,565.98
57,188.85
75,000.00
4,025.22
2,319.87
27,875.20
34,220.29
8,764.56
17,875.88
75,000.00
101,640.44
4,025.22
11,084.43
45,751.08
75,000.00
135,860.73
55,000.00
56,400.00
56,400.00
56,400.00
55,000.00
55,000.00
55,000.00
56,400.00
111,400.00
116,800.00
116,800.00
27,500.00
4,300.00
120,000.00
3,504,000.00
3,504,000.00
3,600,000.00
10,608,000.00
825,000.00
2,580,000.00
3,405,000.00
3,504,000.00
3,504,000.00
825,000.00
2,580,000.00
3,600,000.00
14,013,000.00
43,800.00
73,000.00
14,013,000.00
13.14
14.60
2,121.60
2,149.34
681.00
681.00
13.14
14.60
2,802.60
2,830.34
1 M3 TIMBUNAN SIRTU
1.200 M3
Pasir Batu (Sirtu)
0.250 OH
Pekerja
0.025 OH
Mandor
0.001
Biaya menggilas sebulan
235,500.00
43,800.00
73,000.00
14,013,000.00
10,950.00
1,825.00
10,608.00
23,383.00
4,676.60
2,338.30
1,169.15
282,600.00
3,405.00
286,005.00
57,201.00
28,600.50
14,300.25
282,600.00
10,950.00
1,825.00
14,013.00
309,388.00
61,877.60
30,938.80
15,469.40
262,500.00
43,800.00
73,000.00
14,013,000.00
20,542.20
1,679.00
3,182.40
25,403.60
43,312.50
1,021.50
44,334.00
43,312.50
20,542.20
1,679.00
4,203.90
69,737.60
171,300.00
26,834.80
15,184.00
697.70
151.84
849.54
6,509.40
6,509.40
6,509.40
697.70
151.84
7,358.94
274,700.00
43,800.00
73,000.00
14,013,000.00
229,950.00
19,199.00
378,351.00
627,500.00
6,275.00
1,922,900.00
1,922,900.00
19,229.00
1,922,900.00
229,950.00
19,199.00
378,351.00
2,550,400.00
25,504.00
1 M2 ...........
88
JUMLAH
HARGA
Rp.
6
26,834.80
105,565.98
57,188.85
2,877,989.43
JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
Analisa-13
NO
1
HARGA
SATUAN
Rp.
3
URAIAN
2
2/3 CM + 3/4 CM + ASPAL
4.000 M3
Batu Pecah 3 - 5 cm
3.000 M3
Batu Pecah 2 - 3 cm
75.000 Kg
Aspal
5.383 Ltr
Solar
0.150 OH
Tukang masak aspal
7.000 OH
Pekerja
0.350 OH
Mandor
0.027
Biaya menggilas sebulan
212,500.00
205,100.00
11,200.00
4,300.00
77,800.00
43,800.00
73,000.00
14,013,000.00
1 M2 ...........
89
Page 102
11,200.00
262,300.00
4,300.00
JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
JUMLAH
HARGA
Rp.
6
11,670.00
306,600.00
25,550.00
378,351.00
722,171.00
7,221.71
850,000.00
615,300.00
840,000.00
23,145.83
2,328,445.83
23,284.46
850,000.00
615,300.00
840,000.00
23,145.83
11,670.00
306,600.00
25,550.00
378,351.00
3,050,616.83
30,506.17
2,240,000.00
314,760.00
61,722.20
2,240,000.00
314,760.00
61,722.20
Analisa-13
NO
HARGA
SATUAN
Rp.
3
77,800.00
43,800.00
73,000.00
14,013,000.00
URAIAN
1
0.400 OH
9.000 OH
0.450 OH
0.013
2
Tukang masak aspal
Pekerja
Mandor
Biaya menggilas sebulan
1 M2 ...........
90
11,200.00
240,900.00
4,300.00
77,800.00
43,800.00
73,000.00
6,000.00
11,700.00
14,013,000.00
1 M2 ...........
91
92
205,100.00
240,900.00
11,200.00
4,300.00
77,800.00
43,800.00
73,000.00
6,000.00
11,700.00
14,013,000.00
1 M2 ...........
100 M2 MENGASPAL 175 KG
175.000 Kg
11,200.00
Aspal
1.200 M3
262,300.00
Batu Seplit Halus ( 0,5 - 1 ) cm / Penutup
12.560 Ltr
4,300.00
Solar
0.400 OH
77,800.00
Tukang masak aspal
9.000 OH
43,800.00
Pekerja
0.450 OH
73,000.00
Mandor
0.013
14,013,000.00
Biaya menggilas sebulan
1 M2 ...........
1 M2 PEKERJAAN BURDA 91+92
11,200.00
240,900.00
4,300.00
77,800.00
43,800.00
73,000.00
14,013,000.00
1 M2 ...........
94
11,200.00
240,900.00
4,300.00
JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
31,120.00
394,200.00
32,850.00
182,169.00
640,339.00
2,616,482.20
6,403.39
26,164.82
JUMLAH
HARGA
Rp.
6
31,120.00
394,200.00
32,850.00
182,169.00
3,256,821.20
32,568.21
19,450.00
328,500.00
27,375.00
182,169.00
557,494.00
5,574.94
1,400,000.00
289,080.00
38,576.38
2,400.00
468.00
1,730,524.38
17,305.24
1,400,000.00
289,080.00
38,576.38
19,450.00
328,500.00
27,375.00
2,400.00
468.00
182,169.00
2,288,018.38
22,880.18
19,200.04
66,754.52
85,954.56
19,450.00
328,500.00
27,375.00
182,169.00
557,494.00
5,574.94
615,300.00
289,080.00
1,400,000.00
38,576.38
2,400.00
468.00
2,345,824.38
23,458.24
615,300.00
289,080.00
1,400,000.00
38,576.38
19,450.00
328,500.00
27,375.00
2,400.00
468.00
182,169.00
2,903,318.38
29,033.18
31,120.00
394,200.00
32,850.00
182,169.00
640,339.00
6,403.39
1,960,000.00
314,760.00
54,006.93
2,328,766.93
23,287.67
1,960,000.00
314,760.00
54,006.93
31,120.00
394,200.00
32,850.00
182,169.00
2,969,105.93
29,691.06
11,978.33
46,745.91
58,724.24
19,450.00
262,800.00
25,550.00
182,169.00
489,969.00
4,899.69
1,120,000.00
289,080.00
30,861.10
1,439,941.10
14,399.41
1,120,000.00
289,080.00
30,861.10
19,450.00
262,800.00
25,550.00
182,169.00
1,929,910.10
19,299.10
1,120,000.00
289,080.00
30,861.10
1,120,000.00
289,080.00
30,861.10
Analisa-13
NO
URAIAN
1
0.250
6.000
0.350
0.300
0.030
0.012
OH
OH
OH
Bh
Bh
2
Tukang masak aspal
Pekerja
Mandor
Sikat Ijuk
Sikat Baja
Biaya menggilas sebulan
HARGA
SATUAN
Rp.
3
77,800.00
43,800.00
73,000.00
6,000.00
11,700.00
14,013,000.00
1 M2 ...........
JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
19,450.00
262,800.00
25,550.00
1,800.00
351.00
168,156.00
475,956.00
1,442,092.10
4,759.56
14,420.92
9,659.25
Page 104
28,820.33
JUMLAH
HARGA
Rp.
6
19,450.00
262,800.00
25,550.00
1,800.00
351.00
168,156.00
1,918,048.10
19,180.48
38,479.58
Analisa-13
NO
URAIAN
95
HARGA
SATUAN
Rp.
3
1,352,960.00
314,760.00
37,280.21
1,705,000.21
17,050.00
1,352,960.00
314,760.00
37,280.21
155,600.00
87,600.00
73,000.00
182,169.00
2,203,369.21
22,033.69
4,983.69
17,050.00
22,033.69
4,260.00
455.40
1,576.80
116.80
6,409.00
6,409.00
6,409.00
6,409.00
6,409.00
6,409.00
6,409.00
6,409.00
5,960.00
608.42
6,568.42
7,273.75
8,750.54
16,002.25
23,738.88
33,304.96
46,133.21
65,463.75
5,960.00
608.42
4,260.00
455.40
1,576.80
116.80
12,977.42
13,682.75
15,159.54
22,411.25
30,147.88
39,713.96
52,542.21
71,872.75
6,390.00
683.10
2,365.20
1,971.00
11,409.30
11,409.30
11,409.30
11,409.30
11,409.30
11,409.30
26,400.00
2,695.00
29,095.00
43,818.83
36,567.13
43,818.83
95,153.88
80,892.92
26,400.00
2,695.00
6,390.00
683.10
2,365.20
1,971.00
40,504.30
55,228.13
47,976.43
55,228.13
106,563.18
92,302.22
12,800.00
171,300.00
66,100.00
43,800.00
73,000.00
43,800.00
73,000.00
145,420.00
78,840.00
5,840.00
197,100.00
54,750.00
481,950.00
160,650.00
576,000.00
513,900.00
1,089,900.00
363,300.00
576,000.00
513,900.00
145,420.00
78,840.00
5,840.00
197,100.00
54,750.00
1,571,850.00
523,950.00
8,500.00
43,800.00
73,000.00
438.00
438.00
876.00
2,975.00
2,975.00
2,975.00
438.00
438.00
3,851.00
660.00
75,000.00
43,800.00
73,000.00
131,400.00
730.00
660.00
75,000.00
-
660.00
75,000.00
131,400.00
730.00
1 M2 PEKERJAAN BURAS 95
1 M' PAS. PIPA PVC TIPE AW
1.200 M'
0,5"
0.350 harga PVC ( perlengkapan )
0.060 OH
Tukang Batu
0.006 OH
Kepala Tukang Batu
0.036 OH
Pekerja
0.002 OH
Mandor
Pipa Diameter
Pipa Diameter
Pipa Diameter
Pipa Diameter
Pipa Diameter
Pipa Diameter
Pipa Diameter
0,75"
1"
1,5"
2"
2,5"
3"
4"
4,966.67
1,738.33
71,000.00
75,900.00
43,800.00
73,000.00
5,500.00
6,616.67
12,100.00
17,950.00
25,183.33
34,883.33
49,500.00
..
..
..
..
..
..
..
0,75"
1"
1,25"
1,5"
2"
22,000.00
7,700.00
71,000.00
75,900.00
43,800.00
73,000.00
..
..
..
..
..
33,133.33
27,650.00
33,133.33
71,950.00
61,166.67
1 M2 CAT RESIDU/TEER
0.350 Ltr
Residu / Teer
0.010 OH
Pekerja
0.006 OH
Mandor
JUMLAH
HARGA
Rp.
6
155,600.00
87,600.00
73,000.00
182,169.00
498,369.00
4,983.69
1 M2 ...........
96
JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
Analisa-13
NO
URAIAN
HARGA
SATUAN
Rp.
3
JUMLAH HARGA
UPAH
BAHAN
Rp.
Rp.
4
5
132,130.00
75,660.00
JUMLAH
HARGA
Rp.
6
207,790.00
NI NYOMAN SURATTINI, ST
NIP. 19670102 199803 2 003
Page 106
Analisa-13
: 2013
HARGA SATUAN
Rp.
4
NO.
URAIAN
SATUAN
I.
UPAH KERJA
Pekerja
Tukang Batu
Kepala Tukang Batu
Tukang Kayu
Kepala Tukang Kayu
Tukang Cat
Kepala Tukang Cat
Tukang Besi
Kepala Tukang Besi
Tukang Gali
Tukang Ukir kayu
Tukang Ukir paras
Masinis
Kernet
Sopir
Tukang masak aspal
Mandor
Tukang Politur
Tukang Pipa
Kepala Tukang Pipa
Tukang Listrik
Kepala Tukang Listrik
Tukang Style bali
Kepala Tukang Ukir Style Bali
Kepala Tukang Paras
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
43,800.00
71,000.00
75,900.00
74,900.00
79,800.00
56,400.00
63,200.00
66,100.00
74,900.00
55,400.00
85,600.00
82,700.00
116,800.00
116,800.00
97,300.00
77,800.00
73,000.00
65,200.00
70,000.00
77,800.00
73,000.00
82,700.00
75,900.00
87,600.00
84,600.00
BAHAN BANGUNAN
Bahan Pasangan :
Batu Pasang
Batu Pecah 5 - 7 cm
Batu Pecah 2 - 3 cm
Batu Pecah 2 - 3 cm/mesin
Batu Pecah 3 - 5 cm
Batu Pecah 3 - 5 cm/mesin
Batu Pecah 10/15
Batu Seplit Halus ( 0,5 - 1 ) cm / Penutup
Batu Seplit Jagung ( 1 - 2 ) cm/ Kasar
Pasir Batu (Sirtu)
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
171,300.00
274,700.00
205,100.00
291,600.00
212,500.00
285,700.00
262,500.00
262,300.00
240,900.00
235,500.00
Kerikil (Koral) :
1 Kerikil / Koral Beton
M3
199,000.00
Pasir :
1 Pasir Urug
2 Pasir Pasang
3 Pasir Beton
M3
M3
M3
161,200.00
178,300.00
185,600.00
Batu Bata :
1 Bata Gosok klas I
2 Bata Gosok klas II
Bj
Bj
4,300.00
3,800.00
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
II.
A
1
2
3
4
5
6
7
8
9
10
B
Page 107
KETERANGAN
5
Harga Satuan 13
NO.
1
3
4
5
6
7
8
9
10
URAIAN
SATUAN
2
Bata Pasang klas 1
Bata Pasang klas 2
Batu lahar merah Buleleng
Batu pipih Buleleng
Loster Terawang PC
Loster Terawang Keramik
Loster Terawang ( 30x30 ) cm
Loster Terawang ( 40x40 ) cm
3
Bj
Bj
M3
M3
Bj
Bj
Bj
Bj
Page 108
HARGA SATUAN
Rp.
4
1,000.00
900.00
192,700.00
928,100.00
52,400.00
66,400.00
50,000.00
65,000.00
KETERANGAN
5
Harga Satuan 13
NO.
1
E
1
2
3
4
5
6
7
F
SATUAN
2
Paras / Padas :
Paras Malam 50 x 20 x 12 cm
Paras Ukir Selekarang 30 x 15 x 3 cm
Paras Batik
Paras Kerobokan 50 x 20 x 12 cm
Paras Putih Bukit
Serbuk Bata Merah
Palimanan 30/30 T. 2,5 cm
Portland Cement :
1 Semen Gresik ( 50 kg )
2 Semen warna
G
1
2
3
4
5
6
7
8
9
10
11
12
H
URAIAN
Bahan Atap :
Sirap
Genteng Biasa
Bubungan Genteng Biasa
Genteng Karang Pilang
Bubungan Karang Pilang
Genteng Kecil
Bubungan Genteng Kecil
Genteng Kodok
Bubungan Genteng Kodok
Genteng Kaca 3 mm
Genteng Plentong
Bubungan Genteng Plentong
Seng Gelombang :
1 BJLS 0,18 mm
2 BJLS 0,20 mm
3 Seng Talang 30 cm
HARGA SATUAN
Rp.
4
Bj
Bj
Bh
M3
Bh
M3
M3
34,700.00
8,100.00
11,800.00
23,100.00
20,000.00
34,100.00
200,000.00
Zak
Kg
64,300.00
12,100.00
Ikat
Bj
Bj
Bj
Bj
Bj
Bj
Bj
Bj
Bj
Bj
Bj
112,200.00
2,100.00
7,600.00
2,300.00
7,400.00
1,500.00
4,500.00
3,200.00
12,100.00
13,400.00
1,900.00
6,400.00
Lbr
Lbr
m
37,400.00
41,000.00
19,800.00
1
2
3
4
Asbes PC (DJABESMEN) :
Asbes Gel. 1,8 m' x 1,05 m'/4 mm
Nok Asbes/Djabesmen
Rata/Djabesmen (2 m x 1m x 4mm)
Rata/Djabesmen (1 m x 1m x 6mm)
Lbr
M'
Lbr
Lbr
32,800.00
23,500.00
27,800.00
17,100.00
1
2
3
4
5
6
M'
M'
M'
M'
M'
M2
30,000.00
25,000.00
Bahan Kayu :
Kayu Jati Papan
Kayu Jati Balok
Kayu Jati Bali Papan
Kayu Jati Bali Balok
Kayu Kamper Papan 3/20
Kayu Kamper Balok 8/12
Kayu Kamper Balok 6/12
Kayu Kamper Reng
Kayu Kamper Usuk 4/6
Kayu Kamper Usuk 5/7
Kayu Meranti Papan
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
12,850,200.00
10,708,500.00
10,708,500.00
10,708,500.00
10,024,900.00
8,566,800.00
8,566,800.00
9,637,600.00
8,299,000.00
8,299,000.00
6,157,300.00
K
1
2
3
4
5
6
7
8
9
10
11
Page 109
KETERANGAN
5
15,000.00
15,000.00
Harga Satuan 13
NO.
1
12
13
14
15
16
17
18
19
20
21
22
23
URAIAN
SATUAN
3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
Btg
Page 110
HARGA SATUAN
Rp.
4
5,086,500.00
5,086,500.00
6,425,100.00
5,354,200.00
5,354,200.00
7,228,200.00
6,692,800.00
6,425,100.00
5,532,600.00
6,157,300.00
6,157,300.00
48,100.00
KETERANGAN
5
Harga Satuan 13
NO.
1
24
25
26
27
28
29
30
L
1
2
3
4
5
6
M
1
2
3
4
5
6
7
8
9
10
11
12
N
SATUAN
3
M3
M3
M3
M3
M3
Lbr
Lbr
HARGA SATUAN
Rp.
4
3,105,400.00
1,285,000.00
10,173,000.00
11,243,900.00
800,000.00
85,000.00
91,000.00
Btg
Btg
Btg
M2
M2
M2
11,700.00
10,200.00
9,600.00
29,900.00
26,700.00
5,000.00
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bj
Bj
M2
M2
110,500.00
78,500.00
59,400.00
35,600.00
98,500.00
65,700.00
45,900.00
39,400.00
2,200.00
1,700.00
62,700.00
69,600.00
M2
50,000.00
M2
M2
M2
M2
M2
M2
M2
M2
52,800.00
59,100.00
49,200.00
57,100.00
50,100.00
49,900.00
45,900.00
55,200.00
Kg
Kg
Kg
Kg
Kg
10,025.23
9,271.93
8,961.88
8,288.65
10,174.84
Kg
Kg
Kg
Kg
Btg
9,637.98
9,609.86
10,158.47
21,400.00
75,000.00
Kg
M2
20,000.00
15,600.00
Seseh Balok
Papan begesting
Balok Bengkirai
Papan bingkirai
Kayu api
Plywood 4 mm
Plywood 9 mm
Bahan Bambu :
Bambu Besar
Bambu Sedang
Bambu Kecil
Tadir Gedeg Kelas I
Tadir Gedeg Kelas II
Gedeg Glodog
Beton Cetak :
Buis Beton 50/1 m'
Buis Beton 30/1 m'
Buis Beton 25/1 m'
Buis Beton 20"/1 m`
Buis Beton 50/0,75 m'
Buis Beton 30/0,75 m'
Buis Beton 25/0,75 m'
Buis Beton 20"/0,75 m`
Batako Cetak Lubang KW.I
Batako Cetak Lubang KW.II
Paving Blok / 6 cm
Paving Blok / 8 cm
Bahan Lantai :
1 Tegel Warna 20/20 cm
Keramik
1 Keramik KW I 20/20 cm
2 Keramik KW I 20/25 cm
3 Keramik KW I 30/30 cm
4 Keramik KW I 40/40 cm
5 Keramik KW II 20/20 cm
6 Keramik KW II 20/25 cm
7 Keramik KW II 30/30 cm
8 Keramik KW II 40/40 cm
O
1
2
3
4
5
1
2
3
4
5
P
URAIAN
Bahan Besi :
Besi Beton Polos
Besi Beton Polos 6mm
Besi Beton Polos 8mm
Besi Beton Polos 10mm
Besi Beton Polos 12mm
Besi Beton Polos 16mm
Besi Beton ulir
Besi Beton ulir 13mm
Besi Beton ulir 16mm
Besi Beton ulir 19mm
Besi Strip
Besi Siku 50/50 x 5
Kawat
1 Kawat Ikat Beton
2 Kawat nyamuk 1x2 m
Page 111
KETERANGAN
5
Harga Satuan 13
NO.
URAIAN
SATUAN
2
Kawat Harmonika 5 x 5 cm
Kawat Harmonika 4 x 4 cm
Kawat Harmonika 3 x 3 cm
Kawat 4 mm
3
M2
M2
M2
Kg
HARGA SATUAN
Rp.
4
26,000.00
30,500.00
34,800.00
12,800.00
Btg
Btg
50,000.00
40,000.00
1
3
4
5
6
Q
1
2
Page 112
KETERANGAN
5
Harga Satuan 13
URAIAN
SATUAN
2
Paku Peluru
Siku Gantung (Angel Clip)
Rod
Suspension Rod Clip
Conector (Chanel Clamp)
Flushing
3
Bh
Bh
Btg
Bh
Bh
Btg
HARGA SATUAN
Rp.
4
2,000.00
1,000.00
2,500.00
2,500.00
1,500.00
17,500.00
Bahan Plafond :
Eternit Klas I (1/1) M
Eternit Klas II (1/1) M
Triplek 3 mm
Plywood
Teak Wood 4 mm
Ceilingteak
Gypsum (1,2 x 2,4)
List Gypsum
Multipleks ( 6 MM )
Multipleks (9 MM )
Multipleks ( 12 MM )
Aluminium foil
Kalsiboard
Hollow
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
M'
Lbr
Lbr
Lbr
Lbr
Lbr
m'
19,200.00
16,000.00
52,400.00
49,500.00
80,300.00
91,000.00
58,800.00
19,200.00
80,300.00
112,400.00
187,300.00
374,700.00
59,900.00
10,600.00
Bahan Pipa :
1 Pipa Galvanis
2"
1,5"
1,25"
1"
0,75"
0,5"
Btg
Btg
Btg
Btg
Btg
Btg
367,000.00
431,700.00
363,000.00
165,900.00
198,800.00
132,000.00
2 Pipa PVC AW
4"
3"
2,5"
2"
1,5"
1"
0,75"
0,5"
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
297,000.00
209,300.00
151,100.00
107,700.00
72,600.00
39,700.00
33,000.00
29,800.00
3 Pipa PVC C
4"
3"
2,5"
2"
1,5"
1"
0,75"
0,5"
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
62,400.00
53,500.00
44,500.00
33,800.00
25,700.00
20,300.00
18,200.00
13,900.00
4 Pipa PVC D
4"
3"
2,5"
2"
Btg
Btg
Btg
Btg
141,900.00
101,700.00
72,300.00
45,500.00
NO.
1
3
4
5
6
7
8
R
1
2
3
4
5
6
7
8
9
10
11
12
13
14
S
Page 113
KETERANGAN
5
Harga Satuan 13
NO.
1
URAIAN
SATUAN
3
Btg
Btg
Btg
Btg
HARGA SATUAN
Rp.
4
38,500.00
32,100.00
27,800.00
21,400.00
(MOF)
(MOF)
(MOF)
(RRJ)
Btg
Btg
Btg
Btg
34,700.00
51,800.00
81,600.00
144,500.00
1,5"
1"
0,75"
0,5"
5 Pipa PVC S
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
- 10
32
40
50
63
mm
mm
mm
mm
Page 114
KETERANGAN
5
Harga Satuan 13
3
Btg
Btg
Btg
HARGA SATUAN
Rp.
4
205,800.00
289,900.00
431,600.00
Btg
Btg
Btg
Btg
Btg
Btg
Btg
29,900.00
46,000.00
70,500.00
120,100.00
171,300.00
242,400.00
349,900.00
Btg
Btg
7,000.00
14,400.00
Lbr
Kg
Kg
Kg
Kg
Kg
Ltr
Ltr
Ltr
Ltr
Kg
Kg
Kg
Kg
3,200.00
24,600.00
25,300.00
18,200.00
19,200.00
26,200.00
43,500.00
51,700.00
58,800.00
21,400.00
47,100.00
46,600.00
48,100.00
53,500.00
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Ltr
Ltr
Kg
Kg
13,600.00
15,000.00
15,000.00
16,000.00
48,000.00
53,500.00
24,600.00
18,800.00
8,500.00
11,300.00
38,500.00
Bahan Kaca :
1 Kaca Bening 5 mm
2 Kaca Bening 3 mm
3 Kaca Ray-Ban 5 mm
M2
M2
M2
96,300.00
80,300.00
117,700.00
Alat Pengunci :
1 Kunci 2 slaag
2 Kunci 1 slaag
3 Kunci KM / WC
Bh
Bh
Bh
99,100.00
64,200.00
62,400.00
Alat Penggantung :
1 Kait Angin
2 Grendel
3 Engsel kupu-kupu
Psg
Bh
Psg
19,900.00
18,000.00
46,400.00
NO.
1
URAIAN
SATUAN
2
Pipa PVC 75 mm (RRJ)
Pipa PVC 90 mm (RRJ)
Pipa PVC 110 mm (RRJ)
6 Pipa PVC S
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
- 12,5
32 mm (MOF)
40 mm (MOF)
50 mm (MOF)
63 mm (RRJ)
75 mm (RRJ)
90 mm (RRJ)
110 mm (RRJ)
7 Pipa Listrik
8 Pipa Paralon 5/8"
S
Bahan Finishing :
1 Amplas
2 Meni Kayu
3 Plamir Kayu
4 Cat Dasar Tembok
5 Cat Tembok
6 Dempul
7 Politur
8 Politur jadi ( Ultran )
9 Teak Oil
10 Spritus
11 Sirlak
12 Oker
13 Cat Dasar Kayu
14 Cat Kayu
15 Cat Tembok
16 Vinilek
17 Decolit
18 Paragon
19 Plamir Tembok
20 ICI
21 Cat Besi
22 Cat Meni Besi
23 Minyak Cat
24 Residu / Teer
25 Lem kayu fox
26 Impra
T
Page 115
KETERANGAN
5
Harga Satuan 13
NO.
URAIAN
SATUAN
3
Psg
Bh
HARGA SATUAN
Rp.
4
22,000.00
66,900.00
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
490,800.00
749,500.00
164,200.00
1,499,100.00
273,000.00
295,700.00
27,100.00
78,500.00
38,900.00
4 Engsel Nilon
5 Espanolet
W
1
2
3
4
5
6
7
8
9
Bahan Sanitair :
Wastafel
Urinoir
Closet Jongkok
Closet Duduk
Bak Mandi Fiber
Bak Mandi Keramik
Floordrain
Shower
Kran Air
Page 116
KETERANGAN
5
Harga Satuan 13
NO.
URAIAN
SATUAN
X
1
2
3
4
5
6
7
8
9
10
Y
1
2
3
4
5
6
7
8
9
10
11
HARGA SATUAN
Rp.
4
Bahan Paku :
Paku Lis
Paku Reng
Paku Usuk
Paku Seng
Paku Sekrup 3/8"
Paku Sekrup 1/2"
Paku Sekrup 2"
Paku gypsum
Paku beton 5 cm
Paku beton 3"
Kg
Kg
Kg
Kg
Ktk
Ktk
Ktk
Kg
kg
Ktk
25,800.00
22,400.00
23,200.00
26,200.00
15,000.00
16,000.00
19,700.00
24,100.00
33,700.00
23,400.00
Lain - Lain :
Tanah urug
Aspal
Solar
Oli
Waterproff
Sikat Ijuk
Sikat Baja
Alumnium Kulit Jeruk
Ongkos Angkut Kendaraan
Stamper
Sewa Wales
M3
Kg
Ltr
Ltr
Ltr
Bh
Bh
Lbr
Ls
Ls
Hari
105,100.00
11,200.00
4,300.00
27,500.00
55,000.00
6,000.00
11,700.00
96,300.00
20,000.00
20,000.00
120,000.00
KETERANGAN
5
NI NYOMAN SURATTINI, ST
NIP. 19670102 199803 2 003
Page 117
Harga Satuan 13
: BALI
: BULELENG
HARGA
No
UPAH / BAHAN
HARGA
HARGA
STD BUPATI
STD BUPATI
SURVEY
SURVEY
SATUAN### 2013-PAJAK
( Rp.)
( Rp.)
JAN 2014
JAN 2013
(Rp.)
(Rp.)
###
HARGA
Pakai
UPAH
Pekerja
OH
###
45,000
45,000
43,800
Mandor
OH
###
75,000
75,000
73,000
OH
###
81,700
82,000
79,800
OH
###
78,300
78,000
75,900
OH
###
76,700
77,000
74,900
OH
###
65,000
65,000
63,200
OH
###
90,000
90,000
87,600
OH
###
80,000
80,000
77,800
OH
###
85,000
85,000
82,700
10
OH
###
86,700
87,000
84,600
11
Tukang Kayu
OH
###
76,700
77,000
74,900
12
Tukang Batu
OH
###
73,300
73,000
71,000
13
Tukang Besi
OH
###
68,300
68,000
66,100
14
Tukang Cat
OH
###
58,300
58,000
56,400
15
Tukang Politur
OH
###
66,700
67,000
65,200
16
OH
###
78,300
78,000
75,900
17
Tukang Pipa
OH
###
71,700
72,000
70,000
18
Tukang Listrik
OH
###
75,000
75,000
73,000
19
Tukang Gali
OH
###
56,700
57,000
55,400
20
OH
###
87,500
88,000
85,600
21
OH
###
85,000
85,000
82,700
22
OH
###
80,000
80,000
77,800
23
Tukang Bangunan
OH
###
80,000
80,000
77,800
24
OH
###
55,000
55,000
53,500
25
Masinis
OH
###
120,000
120,000
116,800
26
Kernet
OH
###
120,000
120,000
116,800
27
Sopir
OH
###
100,000
100,000
97,300
B.
Bahan bangunan
BAHAN PASANGAN
m3
###
160,920
259,636
259,900
###
252,700
Batu Pecah 5 - 7 cm
m3
###
183,150
282,218
282,300
###
274,700
Batu Pecah 2 - 3 cm
m3
###
178,200
299,564
299,200
###
291,600
m3
###
174,510
293,564
293,700
###
285,700
Batu Pecah 1 - 2 cm
m3
###
192,060
308,618
309,100
###
300,400
m3
269,673
269,500
###
262,500
m3
###
205,920
318,655
318,300
###
310,200
m3
###
123,750
269,500
269,500
###
262,300
m3
###
118,800
247,500
247,500
###
240,900
10
m3
###
217,800
168,109
170,500
###
235,500
11
Batu Besar W 50 Kg
m3
183,164
187,000
###
178,300
12
m3
#DIV/0!
13
m3
#DIV/0!
14
m3
218,291
220,000
###
212,500
15
Batu 5 - 7 cm
m3
###
198,000
219,491
220,000
###
213,600
16
Batu 2 - 3 cm
m3
###
198,000
210,764
220,000
###
205,100
118
210,000
245,400
HARGA
No
UPAH / BAHAN
HARGA
HARGA
STD BUPATI
STD BUPATI
SURVEY
SURVEY
SATUAN### 2013-PAJAK
( Rp.)
( Rp.)
JAN 2014
JAN 2013
(Rp.)
(Rp.)
###
###
17
Batu 3 - 5 cm
m3
18
Batu ( 0,5 - 1 ) cm
m3
19
Batu (1 - 2) cm
m3
20
Batu Pasang
m3
21
Abu Batu
m3
BATU KARANG
HARGA
Pakai
8
198,000
218,291
220,000
###
212,500
214,473
220,000
###
208,700
###
198,000
215,782
220,000
###
210,000
###
74,250
175,000
176,000
###
171,300
308,000
308,000
###
299,800
-
Lime Stone
m3
###
305,532
#DIV/0!
330,400
-
KERIKIL (KORAL)
m3
###
154,710
198,218
198,000
###
192,900
Kerikil Beton
m3
###
168,300
204,436
205,300
###
199,000
Kerikil Halus
m3
###
185,670
211,964
212,700
###
206,300
m3
###
29,700
192,500
187,300
PASIR
Pasir Urug
m3
###
123,750
165,600
165,000
###
161,200
Pasir Beton
m3
###
134,910
190,691
191,100
###
185,600
Pasir Pasang
m3
###
136,170
183,164
182,900
###
178,300
TANAH
Tanah Urug
BATU BATA
bj
###
2,070
4,473
4,400
###
4,300
bj
###
2,970
3,927
3,900
###
3,800
bj
###
810
1,091
1,100
###
1,000
bj
###
720
982
1,000
###
900
m3
###
178,200
150,545
#DIV/0!
###
192,700
m3
953,455
#DIV/0!
###
928,100
Loster Terawang PC
bj
###
9,450
53,891
53,900
###
52,400
bj
###
45,810
68,291
68,800
###
66,400
m3
###
61,920
108,000
108,200
###
PARAS/PADAS
Paras Malam 50 x 20 x 12 cm
bj
bj
Paras Batik
bh
Paras Kerobokan 50 x 20 x 12 cm
bh
m3
###
105,100
35,673
#DIV/0!
###
8,400
#DIV/0!
###
8,100
12,218
#DIV/0!
###
11,800
23,782
#DIV/0!
###
23,100
11,880
35,127
#DIV/0!
###
34,100
34,700
PORTLAND CEMENT
Semen Gresik ( 50 kg )
zak
###
57,960
66,109
68,100
###
64,300
zak
###
57,240
64,800
65,900
###
63,000
zak
###
53,460
55,211
63,800
###
53,700
zak
###
74,790
55,000
zak
###
Semen Warna
kg
###
BAHAN ATAP
Sirap
Genteng biasa
#DIV/0!
11,250
10,124
80,800
#DIV/0!
12,500
###
12,100
-
ikat
bj
###
119
1,440
#DIV/0!
2,200
112,200
2,100
HARGA
No
UPAH / BAHAN
HARGA
HARGA
STD BUPATI
STD BUPATI
SURVEY
SURVEY
SATUAN### 2013-PAJAK
( Rp.)
( Rp.)
JAN 2014
JAN 2013
(Rp.)
(Rp.)
###
HARGA
Pakai
bj
###
4,500
7,900
7,600
Genteng Kecil
bj
###
1,170
1,600
1,500
bj
###
3,510
4,700
4,500
Genteng Kodok
bj
###
2,070
3,300
3,200
bj
###
8,550
12,500
12,100
Genteng Plentong
bj
###
1,530
2,000
1,900
bj
###
4,500
6,600
6,400
10
Genteng Kaca 3 mm
bj
###
12,600
13,800
13,400
11
Ijuk
Kg
#DIV/0!
#DIV/0!
12
Alang-alang
Lbr
#DIV/0!
#DIV/0!
13
Tali Pengikat
Gulung
#DIV/0!
#DIV/0!
14
m2
###
#DIV/0!
#DIV/0!
#DIV/0!
15
m2
###
#DIV/0!
#DIV/0!
#DIV/0!
-
SENG
lbr
###
37,170
lbr
###
39,150
lbr
###
49,500
#DIV/0!
53,500
lbr
###
11,880
#DIV/0!
12,800
Seng Talang 30 cm
###
18,360
ASBES PC (DJABESMEN)
2
3
38,500
37,400
42,200
41,000
10,500
19,800
-
lbr
###
28,710
33,700
32,800
Nok Asbes
###
21,780
#DIV/0!
Rata/Djabesmen 2m x 1m x 4mm
lbr
#DIV/0!
Rata/Djabesmen 1m x 1m x 6mm
lbr
###
15,840
#DIV/0!
17,100
Bubungan
###
21,780
#DIV/0!
35,400
BAHAN KAYU
m3
###
11,880,000
13,200,000
12,850,200
m3
###
9,900,000
11,000,000
10,708,500
m3
###
9,900,000
#DIV/0!
10,708,500
m3
###
8,910,000
11,000,000
10,708,500
m3
###
9,268,020
9,350,000
10,024,900
m3
###
8,617,950
8,800,000
8,566,800
m3
###
8,646,030
8,800,000
8,566,800
m3
###
8,202,150
8,525,000
8,299,000
m3
###
7,920,000
8,525,000
8,299,000
5,014,350
9,900,000
9,637,600
23,500
#DIV/0!
8
9
10
m3
###
11
m3
###
5,692,500
5,500,000
6,157,300
12
m3
###
4,950,000
5,225,000
5,086,500
13
m3
###
4,950,000
5,225,000
5,086,500
14
m3
###
4,950,000
5,500,000
5,354,200
15
m3
###
4,587,030
5,500,000
5,354,200
16
m3
###
3,960,000
6,600,000
6,425,100
17
m3
###
5,775,030
7,425,000
7,228,200
18
m3
###
6,288,120
6,875,000
6,692,800
19
m3
###
5,808,870
6,600,000
6,425,100
20
m3
###
4,950,000
6,325,000
6,157,300
21
m3
###
5,872,320
6,325,000
6,157,300
22
Reng Kruing
m3
###
5,247,000
5,683,300
5,532,600
120
HARGA
No
UPAH / BAHAN
HARGA
HARGA
STD BUPATI
STD BUPATI
HARGA
SURVEY
SURVEY
SATUAN### 2013-PAJAK
( Rp.)
( Rp.)
JAN 2014
JAN 2013
(Rp.)
(Rp.)
###
Pakai
23
Seseh Balok
m3
###
2,871,000
#DIV/0!
24
Papan begesting
m3
###
1,089,000
1,320,000
1,285,000
25
Balok bingkirai
m3
###
9,405,000
10,450,000
10,173,000
26
Papan bingkirai
m3
###
10,890,000
11,550,000
11,243,900
27
Plywood 9 mm
lbr
###
81,720
93,500
28
Seseh Dolken
m3
29
Multipleks
3,105,400
91,000
#DIV/0!
#DIV/0!
-
- 6 mm
lbr
###
76,770
82,500
80,300
- 9 mm
lbr
###
105,570
115,500
112,400
- 12 mm
lbr
###
151,020
192,500
187,300
###
211,230
253,000
246,200
- 18 mm
lbr
30
btg
31
btg
###
41,220
32
Kayu profil
btg
###
30,330
#DIV/0!
33
Kayu Perancah
m3
#DIV/0!
BAHAN BAMBU
Bambu Besar
btg
###
10,530
12,100
11,700
Bambu Sedang
btg
###
9,450
9,400
10,200
Bambu Kecil
btg
###
8,910
7,700
9,600
Gedeg Kelas I
m2
###
21,330
30,800
29,900
Gedeg Kelas II
m2
###
18,810
27,500
26,700
BETON CETAK
Kerawang PC
bj
#DIV/0!
#DIV/0!
49,500
48,100
63,300
#DIV/0!
-
3,960
6,785
bj
113,520
bj
80,640
80,600
###
78,500
bj
61,025
61,100
###
59,400
bj
36,578
36,600
###
35,600
bj
101,247
101,500
###
98,500
bj
67,505
67,100
###
65,700
bj
47,247
47,300
###
45,900
bj
40,505
40,700
###
39,400
10
bj
###
2,250
2,291
2,200
###
2,200
11
Paving Blok / 6 cm
m2
###
44,550
64,407
64,400
###
62,700
12
Paving Blok / 8 cm
m2
###
52,020
71,509
72,200
###
69,600
m2
###
52,020
90,000
101,800
###
99,100
13
###
6,900
###
6,600
113,600 ###
110,500
KERAMIK
Keramik KW I 10/20 cm
m2
###
47,520
54,000
54,500
###
52,500
Keramik KW I 20/25 cm
m2
###
46,080
60,753
61,200
###
59,100
Keramik KW I 20/20 cm
m2
###
47,070
54,240
53,900
###
52,800
Keramik KW I 30/30 cm
m2
###
44,280
50,629
51,300
###
49,200
Keramik KW I 40/40 cm
m2
###
49,050
58,724
58,700
###
57,100
Keramik KW II 20/25 cm
m2
###
47,070
51,305
51,200
###
49,900
Keramik KW II 20/20 cm
m2
###
47,070
51,524
51,700
###
50,100
Keramik KW II 30/30 cm
m2
###
47,070
47,247
47,900
###
45,900
Keramik KW II 40/40 cm
m2
###
49,500
56,705
56,700
###
55,200
BAHAN BESI
121
HARGA
No
UPAH / BAHAN
HARGA
HARGA
STD BUPATI
STD BUPATI
HARGA
SURVEY
SURVEY
SATUAN### 2013-PAJAK
( Rp.)
( Rp.)
JAN 2014
JAN 2013
(Rp.)
(Rp.)
Pakai
###
- besi 4 mm
ljr
###
13,590
13,900
13,500
- besi 6 mm
ljr
###
24,390
27,500
26,700
- besi 8 mm
ljr
###
40,590
40,700
43,900
- besi 10 mm
ljr
###
61,380
60,500
66,300
- besi 12 mm
ljr
###
89,010
90,800
88,300
- besi 16 mm
ljr
###
178,200
137,500
192,700
- besi 18 mm
ljr
###
- besi 22 mm
ljr
###
#DIV/0!
#DIV/0!
- besi 24 mm
ljr
###
#DIV/0!
#DIV/0!
- besi D 13 mm
ljr
###
111,420
104,500
120,500
- besi D 16 mm
ljr
###
183,150
187,000
182,000
- besi D 19 mm
ljr
###
250,830
247,500
271,300
215,370
#DIV/0!
232,900
KAWAT
kg
###
18,000
20,600
20,000
Kawat nyamuk 1 x 2 m
m2
###
14,490
14,300
15,600
Kawat Harmonika 5 x 5 cm
m2
###
18,450
26,800
26,000
Kawat Harmonika 4 x 4 cm
m2
###
21,780
31,400
30,500
Kawat Harmonika 3 x 3 cm
m2
###
23,760
35,800
34,800
Kawat 4 mm
kg
13,200
12,800
Besi Strip
kg
17,820
22,000
21,400
Besi Profil WF
kg
BAHAN PLAFON
lbr
###
lbr
###
Triplek 3 mm
lbr
###
Teak Wood 4 mm
lbr
###
Teak Wood 3 mm
lbr
Ceilingteak
lbr
Aluminium Foil
8
9
10
###
#DIV/0!
19,800
19,200
16,500
16,000
48,330
53,900
52,400
74,250
82,500
80,300
60,500
58,800
###
76,770
93,500
lbr
###
346,500
Kalsiboard
lbr
###
50,760
61,600
59,900
Gypsum
lbr
###
79,200
60,500
58,800
List Gypsum
m'
###
19,800
19,800
19,200
hollow
m'
BAHAN PIPA
Pipa Galvanis
16,830
#DIV/0!
91,000
#DIV/0!
374,700
10,600
-
- 2"
btg
###
#DIV/0!
#DIV/0!
- 1,5"
btg
###
237,600
443,520
- 1,25"
btg
###
193,050
372,905
- 1"
btg
###
153,450
- 0,75"
btg
###
123,750
204,305
204,100
###
198,800
- 0,5"
btg
###
99,000
135,600
135,900
###
132,000
- 2" / 6 m
btg
###
316,800
634,505
634,200
###
617,600
- 2" / 4 m
btg
478,669
479,100
###
465,900
443,900
###
431,700
372,900
###
363,000
#DIV/0!
165,900
Pipa PVC AW
- 4"
btg
###
272,250
305,105
305,300
###
297,000
- 3"
btg
###
196,380
215,040
217,300
###
209,300
122
HARGA
No
UPAH / BAHAN
HARGA
HARGA
STD BUPATI
STD BUPATI
HARGA
SURVEY
SURVEY
SATUAN### 2013-PAJAK
( Rp.)
( Rp.)
JAN 2014
JAN 2013
(Rp.)
(Rp.)
Pakai
###
- 2,5"
btg
###
115,470
155,247
155,100
###
151,100
- 2"
btg
###
82,530
110,705
110,000 ###
107,700
- 1,5"
btg
###
57,780
74,585
74,800
###
72,600
- 1"
btg
###
34,920
40,833
40,700
###
39,700
- 0,75"
btg
###
30,240
33,905
34,100
###
33,000
- 0,5"
btg
###
20,070
30,644
30,800
###
29,800
-
Pipa PVC C
- 4"
btg
###
60,660
64,200
62,400
- 3"
btg
###
50,490
55,000
53,500
- 2,5"
btg
###
43,560
45,800
44,500
- 2"
btg
###
34,200
34,800
33,800
- 1,5"
btg
###
24,750
26,400
25,700
- 1"
btg
###
18,810
18,300
20,300
- 0,75"
btg
###
16,830
13,800
18,200
- 0,5"
btg
###
12,870
11,000
13,900
-
Pipa PVC D
- 4"
btg
###
126,270
145,800
141,900
- 3"
btg
###
88,380
104,500
101,700
- 2,5"
btg
###
65,610
74,300
72,300
- 2"
btg
###
44,280
46,800
45,500
- 1,5"
btg
###
34,290
39,600
38,500
- 1"
btg
###
26,280
#DIV/0!
32,100
- 0,75"
btg
###
22,770
#DIV/0!
27,800
- 0,5"
btg
###
14,850
5,500
Pipa listrik
btg
###
5,670
7,200
btg
btg
###
Pipa PVC S - 10
- Pipa PVC 32 mm (MOF)
btg
###
#DIV/0!
#DIV/0!
#DIV/0!
btg
###
#DIV/0!
#DIV/0!
#DIV/0!
btg
###
#DIV/0!
#DIV/0!
#DIV/0!
btg
###
14,040
15,600
15,100
btg
###
20,790
23,100
22,400
btg
###
34,290
38,100
37,000
btg
###
50,760
56,400
54,900
btg
###
80,370
89,300
86,900
btg
###
123,300
137,000
133,300
btg
###
175,950
195,500
190,300
btg
###
251,370
279,300
271,800
btg
###
380,250
422,500
411,300
btg
###
803,250
892,500
868,800
btg
###
1,311,570
1,457,300
1,418,600
btg
###
2,049,840
2,277,600
2,217,200
btg
###
2,588,670
2,876,300
2,800,000
btg
###
3,262,230
3,624,700
3,528,600
btg
###
133,650
148,500
144,500
btg
###
190,350
211,500
205,800
btg
###
267,210
296,900
289,000
btg
###
399,060
443,400
431,600
4,950
#DIV/0!
6,600
21,400
7,000
14,400
14,400
-
123
HARGA
No
UPAH / BAHAN
HARGA
HARGA
STD BUPATI
STD BUPATI
HARGA
SURVEY
SURVEY
SATUAN### 2013-PAJAK
( Rp.)
( Rp.)
JAN 2014
JAN 2013
(Rp.)
(Rp.)
Pakai
###
btg
###
830,880
923,200
898,700
btg
###
1,348,200
1,498,000
1,458,300
btg
###
2,098,440
2,331,600
2,269,800
btg
###
2,651,760
2,946,400
2,868,300
btg
###
3,329,730
3,699,700
3,601,600
btg
###
4,282,470
4,758,300
4,632,200
btg
###
5,543,010
6,158,900
5,995,600
btg
###
8,686,530
9,651,700
9,395,900
btg
###
14,217,210
15,796,900
15,378,200
-
btg
btg
btg
btg
###
12,240
13,600
13,200
btg
###
18,360
20,400
19,800
btg
###
29,160
32,400
31,500
btg
###
44,730
49,700
48,300
btg
###
68,760
76,400
74,300
btg
###
100,980
112,200
109,200
btg
###
144,360
160,400
156,100
btg
###
208,620
231,800
225,600
btg
###
305,280
339,200
330,200
btg
###
653,310
725,900
706,600
btg
###
1,066,680
1,185,200
1,153,700
btg
###
1,677,330
1,863,700
1,814,300
btg
###
2,102,130
2,335,700
2,273,800
btg
###
2,673,540
2,970,600
2,891,800
btg
###
111,060
123,400
120,100
btg
###
158,400
176,000
171,300
btg
###
224,100
249,000
242,400
btg
###
323,550
359,500
349,900
btg
###
680,130
755,700
735,600
btg
###
1,101,780
1,224,200
1,191,700
btg
###
1,723,500
1,915,700
1,864,900
btg
###
2,162,700
2,403,100
2,339,400
btg
###
2,738,430
3,042,700
2,962,000
btg
###
3,585,690
3,984,100
3,878,500
btg
###
4,523,760
5,026,400
4,893,200
btg
###
7,185,960
7,984,400
7,772,800
btg
###
11,659,230
12,954,700
12,611,400
10
Pipa PVC S - 16
- Pipa PVC 32 mm (SCJ) 6m
btg
#DIV/0!
#DIV/0!
btg
#DIV/0!
#DIV/0!
btg
#DIV/0!
#DIV/0!
btg
#DIV/0!
#DIV/0!
btg
#DIV/0!
#DIV/0!
btg
#DIV/0!
#DIV/0!
btg
#DIV/0!
#DIV/0!
btg
#DIV/0!
#DIV/0!
124
HARGA
No
UPAH / BAHAN
HARGA
HARGA
STD BUPATI
STD BUPATI
SURVEY
SURVEY
SATUAN### 2013-PAJAK
( Rp.)
( Rp.)
JAN 2014
JAN 2013
(Rp.)
(Rp.)
###
HARGA
Pakai
btg
#DIV/0!
#DIV/0!
btg
#DIV/0!
#DIV/0!
btg
#DIV/0!
#DIV/0!
btg
#DIV/0!
#DIV/0!
-
11
3,600
- 25
4,700
- 32
8,400
- 40
11,000
- 50
17,500
- 63
28,000
- 75
38,500
- 90
55,500
- 110
82,900
- 125
105,700
- 140
132,800
- 160
173,600
- 180
220,000
- 200
271,900
- 225
344,400
- 250
422,800
- 280
531,100
- 315
673,000
- 355
855,700
- 400
1,083,200
- 450
1,428,300
- 500
1,756,800
- 560
2,213,200
- 630
2,789,400
-
12
3,600
- 25
5,400
- 32
8,700
- 40
13,600
- 50
21,000
- 63
33,300
- 75
47,200
- 90
67,800
- 110
100,200
- 125
129,400
- 140
162,200
- 160
212,400
- 180
269,300
- 200
330,800
- 225
420,200
- 250
517,600
- 280
649,000
125
HARGA
No
UPAH / BAHAN
HARGA
HARGA
STD BUPATI
STD BUPATI
SURVEY
SURVEY
SATUAN### 2013-PAJAK
( Rp.)
( Rp.)
JAN 2014
JAN 2013
(Rp.)
(Rp.)
###
HARGA
Pakai
- 315
822,300
- 355
1,042,700
- 400
1,323,400
- 450
1,741,800
- 500
2,150,800
- 560
2,699,800
- 630
3,409,900
-
BAHAN FINISHING
Amplas
2
3
lbr
###
3,060
3,300
3,200
Minyak Cat
ltr
###
14,040
19,400
18,800
Meni kayu
kg
###
21,780
25,300
24,600
Plamir kayu
kg
###
22,590
26,000
25,300
kg
###
44,550
25,300
48,100
Cat Kayu
kg
###
36,630
55,000
53,500
Plamir Tembok
kg
###
10,440
16,500
16,000
kg
###
16,830
16,500
18,200
Cat Tembok
kg
###
16,830
19,800
19,200
10
Meni Besi
kg
###
22,500
25,300
24,600
11
Dempul
kg
###
24,750
27,000
26,200
12
Cat Besi
kg
###
44,550
55,000
53,500
13
Politur
ltr
###
39,420
44,700
43,500
14
ltr
###
45,090
53,200
51,700
15
Teak Oil
ltr
###
54,450
55,000
58,800
16
Spritus
ltr
###
15,840
22,000
21,400
17
Sirlak
kg
###
43,560
18,700
47,100
18
Oker
kg
###
43,110
19
Lem Kayu
kg
###
11,070
11,700
11,300
20
Impra
kg
###
27,360
39,600
38,500
BAHAN KACA
Kaca Bening 5 mm
m2
###
89,100
Kaca Bening 3 mm
m2
###
74,250
82,500
80,300
Kaca Ray-Ban 5 mm
m2
###
99,000
121,000
117,700
Nako + Tralis
m2
###
247,500
#DIV/0!
46,600
99,000
96,300
#DIV/0!
267,700
-
ALAT PENGUNCI
Kunci 2 Slaag
bh
###
94,050
101,800
99,100
Kunci 1 Slaag
bh
###
61,920
66,000
64,200
Kunci KM/ WC
bh
###
35,640
64,200
62,400
Kunci Gembok
bh
###
22,410
38,500
37,400
Grendel
bh
###
16,650
11,700
18,000
ALAT PENGGANTUNG
Kait Angin
psg
###
9,270
20,433
20,500
###
19,900
Engsel kupu-kupu
psg
###
13,140
47,465
47,700
###
46,400
Engsel Nilon
psg
###
11,250
22,700
22,000
Espanolet
bh
###
59,400
68,800
66,900
BAHAN SANITAIR
Washtafel
bh
###
126
365,040
504,200
490,800
HARGA
No
UPAH / BAHAN
HARGA
HARGA
STD BUPATI
STD BUPATI
SURVEY
SURVEY
SATUAN### 2013-PAJAK
( Rp.)
( Rp.)
JAN 2014
JAN 2013
(Rp.)
(Rp.)
###
HARGA
Pakai
Urinoir
bh
###
693,000
507,818
508,800
###
Closet Jongkok
bh
###
115,110
170,247
168,700
###
749,500
164,200
Closet Duduk
bh
###
1,386,000
1,008,000
1,026,700
###
1,499,100
bh
###
267,300
280,500
bh
###
237,600
303,753
305,800
Floordrain
bh
###
17,820
27,900
Shower
bh
###
72,630
73,300
Kran Air
bh
###
30,240
39,960
41,100
###
38,900
10
bh
940,800
940,500
###
915,800
1,971,300
273,000
###
295,700
27,100
78,500
11
bh
2,025,000
2,029,500
###
12
###
4,500
6,807
6,900
###
6,600
13
###
6,480
10,800
10,900
###
10,500
BAHAN PAKU
Paku Lis
kg
###
17,190
26,564
27,100
###
25,800
Paku Reng
kg
###
13,860
23,051
22,700
###
22,400
Paku Usuk
kg
###
13,860
23,836
23,800
###
23,200
Paku Seng
kg
###
20,790
27,000
27,100
###
26,200
ktk
###
630
16,500
Paku Sekrup
ktk
###
810
20,247
20,400
Paku gypsum
kg
###
23,760
24,800
24,100
Paku beton 5 cm
kg
###
31,230
16,500
33,700
ktk
###
21,690
17,600
23,400
10
Paku pancing
ktk
19,800
19,200
BAHAN LISTRIK
Sakelar
bj
###
12,600
24,196
24,200
###
23,500
Stop Kontak
bj
###
14,400
33,905
34,100
###
33,000
Fitting
bj
###
12,240
20,247
20,500
###
19,700
Steker
bj
###
8,910
20,160
20,400
###
19,600
###
7,650
10,844
11,000 ###
10,500
###
11,430
13,625
13,600
13,200
bj
###
4,950
7,700
6,600
bj
###
5,940
8,300
7,200
bj
###
7,200
8,800
7,900
10
Lampu TL 10 Watt
bj
###
23,310
60,500
19,700
11
Lampu TL 20 Watt
bj
###
28,710
61,600
59,900
bj
###
41,580
63,300
61,600
2"
16,000
###
19,700
12
Lampu TL 40 Watt
AA
LAIN-LAIN
###
Aspal
8,280
11,575
11,600 ###
kg
10,124
10,100
###
9,800
kg
9,400
9,400
###
9,100
###
7,470
8,636
8,600
###
8,300
###
4,050
###
10,890
5,500
11,700
###
89,100
46,800
96,300
- Aspal Emulsi
kg
- Aspal Cutback
- Aspal Bitumen
- Aspal Curah
kg
Solar
ltr
Oli
ltr
Sikat Baja
Bh
lbr
Baut Kodok
kg
###
127
11,200
4,300
HARGA
No
UPAH / BAHAN
HARGA
HARGA
STD BUPATI
STD BUPATI
SURVEY
SURVEY
SATUAN### 2013-PAJAK
( Rp.)
( Rp.)
JAN 2014
JAN 2013
(Rp.)
(Rp.)
###
HARGA
KETERANGAN :
- Harga Pakai (untuk satuan upah) tidak termasuk pajak dan keuntungan.
- Harga Pakai (untuk satuan bahan bangunan) belum termasuk pajak, sudah termasuk keuntungan.
Pakai
Singaraja, 14 Ja
Kepala Dinas Pek
Kabupaten B
I Ketut Ya
NIP. 19601231 1
128
ATI 2014
PENYESUAIAN
HARGA
STD BUPATI
KET.
2014
(Rp.)
5
49,500
82,500
90,200
85,800
84,700
71,500
99,000
88,000
93,500
95,700
84,700
80,300
74,800
63,800
73,700
85,800
79,200
82,500
62,700
96,800
93,500
88,000
88,000
60,500
132,000
132,000
110,000
285,600
310,440
329,520
322,920
339,480
296,640
350,520
296,450
STD PU 2012
272,250
STD PU 2012
266,200
201,480
237,360
277,320
240,120
241,440
231,840
129
PENYESUAIAN
HARGA
STD BUPATI
KET.
2014
(Rp.)
5
240,120
235,920
237,360
193,600
338,800
373,428
218,040
224,880
233,160
211,750
182,160
209,760
201,480
118,800
4,920
4,320
1,200
1,080
217,800
1,048,800
59,280
75,120
39,240
9,240
13,440
26,160
38,640
72,720
71,280
60,732
91,410
13,750
126,792
2,420
130
PENYESUAIAN
HARGA
STD BUPATI
KET.
2014
(Rp.)
5
6
8,690
1,760
5,170
3,630
13,750
2,200
7,260
15,180
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
42,350
46,420
60,500
14,520
22,440
37,070
26,620
#DIV/0!
19,360
40,092
14,520,000
12,100,000
12,100,000
12,100,000
11,327,580
9,680,000
9,680,000
9,377,500
9,377,500
10,890,000
6,957,500
5,747,500
5,747,500
6,050,000
6,050,000
7,260,000
8,167,500
7,562,500
7,260,000
6,957,500
6,957,500
6,251,630
131
PENYESUAIAN
HARGA
STD BUPATI
KET.
2014
(Rp.)
5
3,509,000
1,452,000
11,495,000
12,705,000
102,850
#DIV/0!
90,750
127,050
211,750
278,300
#DIV/0!
54,450
71,592
#DIV/0!
13,310
11,550
10,890
33,880
30,250
7,464
124,872
88,704
67,128
40,236
111,372
74,256
51,972
44,556
2,520
70,848
78,660
111,980
59,400
66,828
59,664
55,692
64,596
56,436
56,676
51,972
62,376
132
PENYESUAIAN
HARGA
STD BUPATI
KET.
2014
(Rp.)
5
6
15,290
30,250
49,610
75,020
99,880
217,800
263,230
#DIV/0!
#DIV/0!
136,180
205,700
306,570
22,660
17,710
29,480
34,540
39,380
14,520
24,200
#DIV/0!
21,780
18,150
59,290
90,750
66,550
102,850
423,500
67,760
66,550
21,780
12,000
487,872
410,196
187,550
224,736
149,160
697,956
526,536
335,616
236,544
133
PENYESUAIAN
HARGA
STD BUPATI
KET.
2014
(Rp.)
5
170,772
121,776
82,044
44,916
37,296
33,708
70,620
60,500
50,380
38,280
29,040
22,990
20,570
15,730
160,380
114,950
81,730
51,480
43,560
36,300
31,460
24,200
7,920
16,320
16,320
#DIV/0!
#DIV/0!
#DIV/0!
17,160
25,410
41,910
62,040
98,230
150,700
215,050
307,230
464,750
981,750
1,603,030
2,505,360
3,163,930
3,987,170
163,350
232,650
326,590
487,740
134
PENYESUAIAN
HARGA
KET.
STD BUPATI
2014
(Rp.)
5
1,015,520
1,647,800
2,564,760
3,241,040
4,069,670
5,234,130
6,774,790
10,616,870
17,376,590
14,960
22,440
35,640
54,670
84,040
123,420
176,440
254,980
373,120
798,490
1,303,720
2,050,070
2,569,270
3,267,660
135,740
193,600
273,900
395,450
831,270
1,346,620
2,107,270
2,643,410
3,346,970
4,382,510
5,529,040
8,782,840
14,250,170
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
135
PENYESUAIAN
HARGA
STD BUPATI
KET.
2014
(Rp.)
5
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
4,150
5,312
9,511
12,536
19,820
31,690
43,572
62,726
93,690
119,463
150,064
196,262
248,655
307,243
389,184
477,781
600,136
760,509
966,996
1,224,060
1,613,971
1,985,090
2,500,889
3,151,977
4,150
6,171
9,874
15,428
23,801
37,631
53,349
76,629
113,304
146,253
183,376
240,040
304,315
373,878
474,828
584,914
733,429
136
PENYESUAIAN
HARGA
STD BUPATI
KET.
2014
(Rp.)
5
929,171
1,178,201
1,495,451
1,968,247
2,430,285
3,050,725
3,853,100
3,630
21,340
27,830
28,600
54,450
60,500
18,150
20,570
21,780
27,830
29,700
60,500
49,170
58,520
66,550
24,200
53,240
52,690
12,870
43,560
108,900
90,750
133,100
302,500
111,980
72,600
70,620
42,350
20,350
22,550
52,470
24,970
75,680
554,620
137
PENYESUAIAN
HARGA
KET.
STD BUPATI
2014
(Rp.)
5
847,000
185,570
1,694,000
308,550
334,128
30,690
88,770
43,956
1,034,880
2,227,500
7,488
11,880
29,220
25,356
26,220
29,700
18,150
22,272
27,280
38,170
26,510
21,780
26,616
37,296
22,272
22,176
11,928
14,988
7,464
8,244
8,952
22,272
67,760
69,630
12,732
11,136
10,340
9,460
4,950
13,310
108,900
138
PENYESUAIAN
HARGA
STD BUPATI
KET.
2014
(Rp.)
5
I Ketut Yasa, ST
NIP. 19601231 198103 1 170
139
430
XXVI. BAHAN BANGUNAN
SATUAN
HARGA
STANDAR
BUPATI (Rp.)
HARGA SBLM
PAJAK (Rp.)
HARGA PAKAI
RKA (Rp.)
(3)
(4)
(5)
(6)
- Batu Bulat
M3
274,560
249,600.0
274,560.00
M3
285,600
259,600.0
285,560.00
- Batu Pecah 5 - 7 Cm
M3
310,440
282,200.0
310,420.00
- Batu Pecah 3 - 5 Cm
M3
322,920
293,550.0
322,905.00
- Batu Pecah 2 - 3 Cm
M3
329,520
299,550.0
329,505.00
M3
296,640
269,650.0
296,615.00
M3
350,520
318,650.0
350,515.00
M3
339,480
308,600.0
339,460.00
M3
184,920
168,100.0
184,910.00
- Batu Besar W 50 Kg
M3
201,480
183,150.0
201,465.00
M3
237,360
215,750.0
237,325.00
M3
277,320
252,100.0
277,310.00
M3
240,120
218,250.0
240,075.00
- Batu 5-7 cm
M3
241,440
219,450.0
241,395.00
- Batu 2-3 cm
M3
231,840
210,750.0
231,825.00
- Batu 3-5 cm
M3
240,120
218,250.0
240,075.00
- Batu ( 0,5 - 1 ) cm
M3
235,920
214,450.0
235,895.00
- Batu ( 1 - 2 ) cm
M3
237,360
215,750.0
237,325.00
NO
NAMA BARANG
(1)
1
(2)
Bahan Pasangan
Batu Karang
- Lime Stone
M3
339,480
Kerikil/Koral
308,600.0
-
339,460.00
-
- Biasa/Timbun
M3
218,040
198,200.0
218,020.00
- Beton
M3
224,880
204,400.0
224,840.00
- Halus
M3
233,160
211,950.0
233,145.00
Tanah Urug
M3
118,800
108,000.0
118,800.00
Pasir
- Tibunan/Urug
M3
182,160
165,600.0
182,160.00
- Beton
M3
209,760
190,650.0
209,715.00
- Pasangan
M3
201,480
183,150.0
201,465.00
Batu Bata
Biji
4,920
4,450.0
4,895.00
Biji
4,320
3,900.0
4,290.00
Biji
1,200
1,050.0
1,155.00
Biji
1,080
950.0
1,045.00
M3
165,600
150,500.0
165,550.00
M3
1,048,800
953,450.0
1,048,795.00
- Loster Terawang PC
Biji
59,280
53,850.0
59,235.00
75,120
68,250.0
75,075.00
431
NO
NAMA BARANG
(1)
7
(2)
SATUAN
HARGA
STANDAR
BUPATI (Rp.)
HARGA SBLM
PAJAK (Rp.)
HARGA PAKAI
RKA (Rp.)
(3)
(4)
(5)
(6)
Paras/Padas
- Paras Malam 50 x 20 x 12 cm
Biji
39,240
35,650.0
39,215.00
Biji
9,240
8,400.0
9,240.00
- Paras Batik
Biji
13,440
12,200.0
13,420.00
- Paras Kerobokan 50 x 20 x 12 cm
Biji
26,160
23,750.0
26,125.00
kg
38,640
35,100.0
38,610.00
- Gresik
Zak
72,720
66,100.0
72,710.00
- Tiga Roda
Zak
71,280
64,800.0
71,280.00
- Bosowa
Zak
60,732
55,200.0
60,720.00
Zak
40,000
36,350.0
39,985.00
- Padang
Zak
37,500
34,050.0
37,455.00
- Tonasa
Zak
39,000
35,450.0
38,995.00
- Semen Warna
Kg
11,136
10,100.0
11,110.00
BAHAN ATAP
Genteng Biasa
Biji
1,860
1,650.0
1,815.00
Bubungan Biasa
Biji
5,988
5,400.0
5,940.00
Plentong Besar
Biji
2,364
2,100.0
2,310.00
Biji
8,916
8,100.0
8,910.00
Sirap
Ikat
126,792
115,250.0
126,775.00
Ijuk
Kg
37,128
33,750.0
37,125.00
Alang-Alang
Lembar
25,128
22,800.0
25,080.00
- Tali Pengikat
Gulung
22,476
20,400.0
22,440.00
Abses Cement
- Gel. 1,8 M' x 0,80 M'/4 mm
- Bubungan
- Rata. 1' x 1' M'/6 mm
Lembar
41,988
38,150.0
41,965.00
40,092
36,400.0
40,040.00
Lembar
22,272
20,200.0
22,220.00
Seng
Lembar
71,160
64,650.0
71,115.00
Lembar
59,400
54,000.0
59,400.00
Lembar
61,812
56,150.0
61,765.00
BAHAN ASBES
lbr
26,000
23,600.0
25,960.00
Nok asbes/Djabesmen
lbr
25,000
22,700.0
24,970.00
Rata/ Djabesmenn
lbr
15,000
13,600.0
14,960.00
BAHAN KAYU
M3
11,827,200
10,752,000.0
11,827,200.00
M3
11,827,200
10,752,000.0
11,827,200.00
M3
11,880,000
10,800,000.0
11,880,000.00
M3
8,613,000
7,830,000.0
8,613,000.00
432
NO
NAMA BARANG
(1)
(2)
SATUAN
HARGA
STANDAR
BUPATI (Rp.)
HARGA SBLM
PAJAK (Rp.)
HARGA PAKAI
RKA (Rp.)
(3)
(4)
(5)
(6)
M3
8,316,000
7,560,000.0
8,316,000.00
Ikat
480,156
436,500.0
480,150.00
M3
8,131,200
7,392,000.0
8,131,200.00
M3
7,341,180
6,673,800.0
7,341,180.00
M3
7,308,840
6,644,400.0
7,308,840.00
M3
6,168,528
5,607,750.0
6,168,525.00
M3
6,712,200
6,102,000.0
6,712,200.00
Ikat
408,372
371,200.0
408,320.00
M3
7,425,000
6,750,000.0
7,425,000.00
M3
7,350,756
6,682,500.0
7,350,750.00
M3
7,383,420
6,712,200.0
7,383,420.00
M3
7,350,756
6,682,500.0
7,350,750.00
M3
7,383,420
6,712,200.0
7,383,420.00
Ikat
371,256
337,500.0
371,250.00
- Seseh Dolken
M3
48,264
43,850.0
48,235.00
- Seseh Balok
M3
2,932,872
2,666,200.0
2,932,820.00
Multipeks
- 9 mm
Lembar
178,992
162,700.0
178,970.00
- 12 mm
Lembar
114,120
103,700.0
114,070.00
- 18 mm
Lembar
282,156
256,500.0
282,150.00
Batang
37,296
33,900.0
37,290.00
10,348,800
9,408,000.0
10,348,800.00
71,592
65,050.0
71,555.00
M3
Batang
BAHAN BAMBU
1
- Bambu Besar
Batang
20,052
18,200.0
20,020.00
- Bambu Sedang
Batang
18,732
17,000.0
18,700.00
- Bambu Kecil
Batang
14,916
13,550.0
14,905.00
- Gedeg Kelas I
M2
32,820
29,800.0
32,780.00
- Gedeg Kelas II
M2
29,964
27,200.0
29,920.00
BETON CETAK
1
Kerawang
Buis Beton
Biji
7,464
6,750.0
-
7,425.00
-
- "50/1 m'
Biji
124,872
113,500.0
124,850.00
- "30/1 m'
Biji
88,704
80,600.0
88,660.00
- "25/1 m'
Biji
67,128
61,000.0
67,100.00
- "20/1 m'
Biji
40,236
36,550.0
40,205.00
- "50/0.75 m'
Biji
111,372
101,200.0
111,320.00
- "30/0.75 m'
Biji
74,256
67,500.0
74,250.00
433
NO
NAMA BARANG
(1)
(2)
SATUAN
HARGA
STANDAR
BUPATI (Rp.)
HARGA SBLM
PAJAK (Rp.)
HARGA PAKAI
RKA (Rp.)
(3)
(4)
(5)
(6)
- "25/0.75 m'
Biji
51,972
47,200.0
51,920.00
- "20/0.75 m'
Biji
44,556
40,500.0
44,550.00
Batako Cetak
Biji
2,520
2,250.0
2,475.00
- Paving Blok / 6 Cm
M2
70,848
64,400.0
70,840.00
- Paving Blok / 8 Cm
M2
78,660
71,500.0
78,650.00
BAHAN LANTAI
Keramik Kw. I
- 10 x 20 Cm
M2
59,400
54,000.0
59,400.00
- 20 x 20 Cm
M2
59,664
54,200.0
59,620.00
- 20 x 25 Cm
M2
66,828
60,750.0
66,825.00
- 30 x 30 Cm
M2
55,692
50,600.0
55,660.00
- 40 x 40 Cm
M2
64,596
58,700.0
64,570.00
Keramik Kw. II
- 10 x 20 Cm
M2
- 20 x 20 Cm
M2
56,676
51,500.0
56,650.00
- 20 x 25 Cm
M2
56,436
51,300.0
56,430.00
- 30 x 30 Cm
M2
51,972
47,200.0
51,920.00
- 40 x 40 Cm
M2
62,376
56,700.0
62,370.00
- Ubin PC Abu-abu 15 x 20 cm
M2
38,952
35,400.0
38,940.00
- Ubin PC Abu-abu 20 x 20 cm
M2
38,208
34,700.0
38,170.00
BAHAN BESI
Besi Beton
- 4 mm
Batang
16,404
14,900.0
16,390.00
- 6 mm
Batang
40,092
36,400.0
40,040.00
- 8 mm
Batang
57,912
52,600.0
57,860.00
- 10 mm
Batang
68,004
61,800.0
67,980.00
- 12 mm
Batang
96,528
87,750.0
96,525.00
- 16 mm
Batang
216,288
196,600.0
216,260.00
- 18 mm
Batang
372,900
339,000.0
372,900.00
- 13 mm
ljr
90,000
81,800.0
89,980.00
- 16 mm
ljr
135,000
122,700.0
134,970.00
- 19 mm
ljr
200,000
181,800.0
199,980.00
KAWAT
kg
13,700
12,450.0
13,695.00
- Kawat Nyamuk 1 x 2 cm
M2
10,000
9,050.0
9,955.00
M2
25,000
22,700.0
24,970.00
- Kawat Harmonika 4 x 4 cm
M2
28,000
25,450.0
27,995.00
- Kawat Harmonika 3 x 3 cm
M2
30,000
27,250.0
29,975.00
434
NO
NAMA BARANG
(1)
(2)
- Kawat 4 mm
SATUAN
HARGA
STANDAR
BUPATI (Rp.)
HARGA SBLM
PAJAK (Rp.)
HARGA PAKAI
RKA (Rp.)
(3)
(4)
(5)
(6)
15,000
13,600.0
14,960.00
15,000
13,600.0
14,960.00
kg
BAHAN PLAFON
1
Eternit (1 x 1)
Lembar
20,796
18,900.0
20,790.00
Triplek 4 mm
Lembar
82,044
74,550.0
82,005.00
Triplek 3 mm (jati)
Lembar
116,340
105,750.0
116,325.00
Triplek 6 mm
Lembar
96,492
87,700.0
96,470.00
Ply wood
Lembar
65,000
59,050.0
64,955.00
Teak wood
Lembar
71,800
65,250.0
71,775.00
Ceiling teak
Lembar
70,000
63,600.0
69,960.00
Alumunium Foil
Lembar
190,000
172,700.0
189,970.00
BAHAN PIPA
Galvanis
- 2" / 6m
Batang
697,956
634,500.0
697,950.00
- 2" / 4m
Batang
526,536
478,650.0
526,515.00
- 1,5"
Batang
487,872
443,500.0
487,850.00
- 1,25"
Batang
410,196
372,900.0
410,190.00
- 0,75"
Batang
224,736
204,300.0
224,730.00
- 0,50"
Batang
149,160
135,600.0
149,160.00
- 1/2"
Batang
33,708
30,600.0
33,660.00
- 3/4"
Batang
37,296
33,900.0
37,290.00
- 1"
Batang
44,916
40,800.0
44,880.00
- 1,5"
Batang
82,044
74,550.0
82,005.00
- 2"
Batang
121,776
110,700.0
121,770.00
- 2,5"
Batang
170,772
155,200.0
170,720.00
- 3"
Batang
236,544
215,000.0
236,500.00
- 4"
Batang
335,616
305,100.0
335,610.00
Pipa Listrik
- Besi 5/8"
Batang
16,320
14,800.0
16,280.00
- Paralon 5/8"
Batang
16,320
14,800.0
16,280.00
BH
43,956
39,950.0
43,945.00
BAHAN FINISHING
- Amplas
lbr
2,600
2,350.0
2,585.00
- Meni
kg
15,300
13,900.0
15,290.00
kg
8,100
7,350.0
8,085.00
kg
17,300
15,700.0
17,270.00
- Dempul
kg
16,500
15,000.0
16,500.00
- Politur
ltr
29,300
26,600.0
29,260.00
- Politur Jadi
ltr
43,200
39,250.0
43,175.00
- Teak Oil
ltr
27,500
25,000.0
27,500.00
435
NO
NAMA BARANG
(1)
(2)
SATUAN
HARGA
STANDAR
BUPATI (Rp.)
HARGA SBLM
PAJAK (Rp.)
HARGA PAKAI
RKA (Rp.)
(3)
(4)
(5)
(6)
- Spiritus
ltr
15,000
13,600.0
14,960.00
- sirlak
ltr
75,000
68,150.0
74,965.00
- Oker
ltr
50,000
45,450.0
49,995.00
kg
40,600
36,900.0
40,590.00
- Plamur Tembok
kg
8,300
7,500.0
8,250.00
- Cat Besi
kg
33,800
30,700.0
33,770.00
kg
16,500
15,000.0
16,500.00
- Minyak Cat
ltr
13,000
11,800.0
12,980.00
ltr
10,000
9,050.0
9,955.00
- Impra
kg
25,700
23,350.0
25,685.00
BAHAN KACA
Bening 5 mm
M2
104,952
95,400.0
104,940.00
Es/Kapur 3 mm
M2
231,204
210,150.0
231,165.00
Rayben 5 mm
M2
119,856
108,950.0
119,845.00
Nako + Tralis
M2
144,972
131,750.0
144,925.00
BAHAN LISTRIK
1
- Sakelar
Biji
26,616
24,150.0
26,565.00
- Stop Kontak
Biji
37,296
33,900.0
37,290.00
- Fitting
Biji
22,272
20,200.0
22,220.00
- Steker
Biji
22,176
20,150.0
22,165.00
Kabel
- NYM 2 mm
M'
11,928
10,800.0
11,880.00
- NYM 3 mm
M'
14,988
13,600.0
14,960.00
Bola lampu
- Pijar 10 Watt
Biji
7,464
6,750.0
7,425.00
- Pijar 15 Watt
Biji
8,244
7,450.0
8,195.00
- Pijar 25 Watt
Biji
8,952
8,100.0
8,910.00
- TL 10 Watt
Biji
22,272
20,200.0
22,220.00
- TL 20 Watt
Biji
55,440
50,400.0
55,440.00
- TL 25 Watt
Biji
41,760
37,950.0
41,745.00
ALAT PENGUNCI
- Kunci Gembok
Biji
52,212
47,450.0
52,195.00
- Grendel
Biji
22,176
20,150.0
22,165.00
- Kunci Slot
Biji
44,748
40,650.0
44,715.00
ALAT PENGGANTUNG
- Engsel Kupu-kupu
Set
52,212
47,450.0
52,195.00
- Engsel Nilon
Set
22,176
20,150.0
22,165.00
- Espagnolet
Set
41,016
37,250.0
40,975.00
- Kait Angin
Set
22,476
20,400.0
22,440.00
436
NO
NAMA BARANG
(1)
(2)
SATUAN
HARGA
STANDAR
BUPATI (Rp.)
HARGA SBLM
PAJAK (Rp.)
HARGA PAKAI
RKA (Rp.)
(3)
(4)
(5)
(6)
-
BAHAN SANITAIR
Wastel
- Putih KIA/SUSAN
- Warna KIA?SUSAN
- Traso lokal/INA
- Warna KIA/INA
CLOSET DUDUK
URINOiR
CLOSET JONGKOK
- Putih KIA
Buah
187,272
187,220.00
- Warna KIA
BAK MANDI
170,200.0
Buah
290,868
264,400.0
290,840.00
Buah
334,128
303,750.0
334,125.00
Pompa Air
- 150 Watt
Buah
1,034,880
940,800.0
1,034,880.00
- 250 Watt
Buah
2,227,500
2,025,000.0
2,227,500.00
M'
7,488
6,800.0
7,480.00
M'
11,880
10,800.0
11,880.00
BAHAN PAKU
- Paku Lis
Kg
29,220
26,550.0
29,205.00
- Paku Reng
Kg
25,356
23,000.0
25,300.00
- Paku Usuk
Kg
26,220
23,800.0
26,180.00
- Paku Seng
Kg
29,700
27,000.0
29,700.00
- Paku Beton 5 cm
Kg
17,820
16,200.0
17,820.00
biji
4,500
4,050.0
4,455.00
biji
6,500
5,900.0
6,490.00
- Paku Gypsum
kg
22,300
20,250.0
22,275.00
- Paku Pancing
Biji
1,788
1,600.0
1,760.00
Aspal Emulsi
Kg
12,732
11,550.0
12,705.00
10
Kg
11,136
10,100.0
11,110.00
ITEM PEKERJAAN
VOL
SAT
HARGA SATUAN
JUMLAH HARGA
PEKERJAAN LANTAI 1
0
1
2
3
4
5
6
8
I
PEKERJAAN PEMBONGKARAN
Penurunan Atap Genteng
Membongkar Usuk/Reng
Bongkaran Beton Bertulang
Pembongkaran plafon
Membongkar Tembok
Membongkar Lantai Untuk Pondasi
pembongkaran Pasangan Cakar ayam
156.50
156.50
4.50
151.50
87.50
53.00
58.32
m2
ls
m3
m2
m3
m2
m2
Rp
Rp
Rp
Rp
Rp
Rp
Rp
15,860.00
4,000,000.00
632,647.20
6,569.99
38,085.00
90,000.00
125,000.00
Rp
2,482,090.00
Rp
4,000,000.00
Rp
2,846,912.40
Rp
995,353.49
Rp
3,332,437.50
Rp
4,770,000.00
Rp
7,290,000.00
Rp25,716,793.39
156.50
35.00
m1
m1
Rp
Rp
10,000.00
60,975.50
Rp
1,565,000.00
Rp
2,134,142.50
Rp 3,699,142.50
250.00
62.50
31.80
12.50
15.50
m3
m3
m3
m3
m3
Rp
Rp
Rp
Rp
Rp
62,539.50
15,946.50
137,720.73
207,310.00
207,310.00
Rp 15,634,875.00
Rp
996,656.25
Rp
4,379,519.21
Rp
2,591,375.00
Rp
3,213,305.00
Rp26,815,730.46
50.00
125.00
m3
m3
Rp
Rp
377,338.20
639,507.30
Rp 18,866,910.00
Rp 79,938,412.50
Rp98,805,322.50
20.00
50.00
m2
m2
Rp
Rp
133,324.90
121,830.02
Rp
2,666,498.00
Rp
6,091,501.00
Rp 8,757,999.00
140.00
###
m2
m2
Rp
Rp
57,188.85
33,613.92
Rp
8,006,439.00
Rp 58,824,360.00
Rp66,830,799.00
PEKERJAAN BETON
Pek.Beton Rabat 1:3:5 Tebal 5cm
Pek.Beton Pondasi Plat
Pek.Sloof 25/35
Pek.Kolom Beton 25/25
Pek.Kolom Beton 15/15
Pek.Balok 25/35
Pek.Plat Beton Tebal 12 cm
Pek.Beton Plat Tangga
Pek.Balok Tangga
Plesteran Bawah Tangga
7.75
8.10
21.00
5.91
0.32
21.00
18.60
1.83
0.35
5.60
m3
m3
m3
m3
m3
m3
m3
m3
m3
m2
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
673,047.00
4,786,001.00
4,786,001.00
4,786,001.00
4,786,001.00
4,786,001.00
4,786,001.00
4,786,001.00
4,786,001.00
57,188.85
0.92
20.40
2.13
7.04
6.16
6.05
m3
m2
m2
m2
m2
m2
Rp
Rp
Rp
Rp
Rp
Rp
14,704,190.00
658,248.80
658,248.80
871,691.00
871,691.00
871,691.00
PEKERJAAN PEMBERSIHAN
1 pekerjaan pembersihan lapangan
1 pekerjaan pasangan bowplank
II
1
2
3
4
5
III
IV
PEKERJAAN TANAH
Pek.Galian Tanah Menerus
Pek.Urugan Kembali
Pek.Urugan Tanah peninggian lantai
Pek.Urugan Pasir Dibawah Pondasi
Pek.Urugan Pasir Dibawah Lantai
PEKERJAAN PONDASI
1 Pek.Pasangan Batu Kosong
2 Pek.Pasangan Batu Kali
PEKERJAAN DINDING
1 Pek.Pasangan Dinding Bata 1:2
2 Pek.Pasangan Dinding Bata 1:5
PEKERJAAN PLESTERAN
1 Plesteran PC 1:2 Tebal 20mm
2 Pek.Acian 1:2
VI
1
2
3
4
5
6
7
8
9
10
VII
1
2
3
5
6
7
Rp
5,216,114.25
Rp 38,766,608.10
Rp 100,506,021.00
Rp 28,267,318.41
Rp
1,507,590.32
Rp 100,506,021.00
Rp 89,019,618.60
Rp
8,758,381.83
Rp
1,675,100.35
Rp
320,257.56
###
Rp
Rp
Rp
Rp
Rp
Rp
13,498,446.42
13,428,275.52
1,403,386.44
6,136,704.64
5,369,616.56
5,273,730.55
8
9
10
11
12
13
VIII
1
2
3
4
5
6
7
IX
1
2
3
3
4
5
6
7
8
9
10
11
12
13
X
PEKERJAAN FINISING
1 Finising tembok
2 Finising Kusen
3 Finising daun Pintu Dan Jendela
XI
1
2
3
4
5
6
7
2.00
30.00
13.00
15.00
15.00
15.00
unit
bh
bh
bh
bh
psg
Rp
Rp
Rp
Rp
Rp
Rp
1,500,000.00
28,200.00
28,200.00
17,800.00
87,800.00
16,300.00
Rp
3,000,000.00
Rp
846,000.00
Rp
366,600.00
Rp
267,000.00
Rp
1,317,000.00
Rp
244,500.00
Rp51,151,260.13
125.63
50.00
23.76
5.62
25.60
155.00
500.00
m2
m2
m2
m2
m2
m2
m1
Rp
Rp
Rp
Rp
Rp
Rp
Rp
210,106.00
210,106.00
177,106.00
182,571.60
182,571.60
87,612.50
30,000.00
Rp 26,394,566.25
Rp 10,505,300.00
Rp
4,208,038.56
Rp
1,025,139.53
Rp
4,673,832.96
Rp 13,579,937.50
Rp 15,000,000.00
Rp75,386,814.80
15.00
5.00
15.00
2.00
9.00
3.00
2.00
2.00
2.00
1.00
22.00
12.00
12.00
1.00
titik
titik
bh
bh
bh
bh
bh
bh
bh
bh
m1
m1
m1
unit
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
150,000.00
30,000.00
60,000.00
40,000.00
20,000.00
40,000.00
1,487,900.00
27,200.00
79,900.00
514,800.00
58,000.00
88,000.00
112,000.00
2,000,000.00
Rp
2,250,000.00
Rp
150,000.00
Rp
900,000.00
Rp
80,000.00
Rp
180,000.00
Rp
120,000.00
Rp
2,975,800.00
Rp
54,400.00
Rp
159,800.00
Rp
514,800.00
Rp
1,276,000.00
Rp
1,056,000.00
Rp
1,344,000.00
Rp
2,000,000.00
Rp13,060,800.00
###
24.48
41.78
m2
m2
m2
Rp
Rp
Rp
35,000.00
40,385.05
40,385.05
Rp 61,250,000.00
Rp
988,626.02
Rp
1,687,368.16
Rp63,925,994.18
8.05
2.01
0.58
8.05
34.50
34.50
26.00
m3
m3
m3
m3
m2
m2
m2
Rp
Rp
Rp
Rp
Rp
Rp
Rp
62,539.50
15,946.50
207,310.00
639,507.30
121,830.02
350,000.00
90,000.00
Rp
503,442.98
Rp
32,092.33
Rp
119,203.25
Rp
5,148,033.77
Rp
4,203,135.69
Rp 12,075,000.00
Rp
2,340,000.00
Rp24,420,908.01
TOTAL LANTAI 1
###
PEKERJAAN LANTAI 2
XII
PEKERJAAN DINDING
1 Pek.Pasangan Dinding Bata 1:2
2 Pek.Pasangan Dinding Bata 1:5
3 Pek.Pasangan Reiling
52.36
811.45
16.00
m2
m2
m2
Rp
Rp
Rp
133,324.90
121,830.02
400,000.00
Rp
Rp
Rp
6,980,891.76
98,858,726.07
6,400,000.00
###
###
###
m2
m2
Rp
Rp
57,188.85
33,613.92
Rp
Rp
98,800,372.28
58,071,946.01
###
m3
Rp
4,786,001.00
Rp
13,019,119.22
2.72
7.65
10.00
m3
m3
Rp
Rp
4,786,001.00
4,786,001.00
Rp 36,612,907.65
Rp 47,860,010.00
Rp97,492,036.87
XV
1
2
3
4
5
6
7
8
9
10
11
1.10
20.40
2.13
7.04
6.16
2.00
30.00
13.00
15.00
15.00
15.00
m3
m2
m2
m2
m2
unit
bh
bh
bh
bh
psg
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
14,704,190.00
658,248.80
871,691.00
871,691.00
658,248.80
1,500,000.00
28,200.00
28,200.00
17,800.00
87,800.00
16,300.00
Rp 16,145,200.62
Rp 13,428,275.52
Rp
1,858,445.21
Rp
6,136,704.64
Rp
4,054,812.61
Rp
3,000,000.00
Rp
846,000.00
Rp
366,600.00
Rp
267,000.00
Rp
1,317,000.00
Rp
244,500.00
Rp47,664,538.60
XVI
1
2
3
4
5
6
155.00
51.00
5.61
22.85
175.00
125.58
m2
m2
m2
m2
m2
m1
Rp
Rp
Rp
Rp
Rp
Rp
210,106.00
210,106.00
182,571.60
182,571.60
168,713.00
30,000.00
Rp 32,566,430.00
Rp 10,715,406.00
Rp
1,024,226.68
Rp
4,171,395.92
Rp 29,524,775.00
Rp
3,767,400.00
Rp81,769,633.59
XVII
1
2
3
4
5
6
7
8
9
10
11
12
titik
titik
bh
bh
bh
bh
bh
bh
bh
m1
m1
m1
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
150,000.00
30,000.00
40,000.00
20,000.00
40,000.00
5,000,000.00
1,487,900.00
27,200.00
79,900.00
58,000.00
88,000.00
112,000.00
Rp
2,250,000.00
Rp
150,000.00
Rp
600,000.00
Rp
180,000.00
Rp
120,000.00
Rp
5,000,000.00
Rp
4,463,700.00
Rp
81,600.00
Rp
239,700.00
Rp
1,160,000.00
Rp
1,760,000.00
Rp
2,240,000.00
Rp18,245,000.00
XVIIIPEKERJAAN ATAP
1 Pek.Rangka baja
2 Pas.Genteng Karang Pilang
3 Pas.Genteng Bubungan
4 Pek.Papan Lisplank (3/25) Kamper
150.00
155.00
60.00
100.00
m2
m2
m1
m1
Rp
Rp
Rp
Rp
150,000.00
180,255.00
97,258.84
131,829.92
Rp 22,500,000.00
Rp 27,939,525.00
Rp
5,835,530.40
Rp 13,182,992.00
Rp69,458,047.40
XIX
1
2
3
4
5
6
###
24.48
35.73
175.00
52.00
2.00
m2
m2
m2
m2
m2
unit
Rp
Rp
Rp
Rp
Rp
Rp
35,000.00
40,385.05
40,385.05
35,000.00
350,000.00
2,000,000.00
Rp 60,466,560.00
Rp
988,626.02
Rp
1,443,038.61
Rp
6,125,000.00
Rp 18,200,000.00
Rp
4,000,000.00
Rp91,223,224.63
PEKERJAAN FINISING
Finising tembok
Finising Kusen
Finising daun Pintu Dan Jendela
Finising Plafon
Pas. Batu Alam
Pas. Ukiran Paras
TOTAL LANTAI 2
COST
PEMBULATAN
###
Rp 1,508,079,012.61
Rp 1,508,079,000.00
TERBILANG
Satu Milyar Lima Ratus Delapan Juta Tujuh Puluh Sembilan Ribu Rupiah
ITEM PEKERJAAN
VOL
PEKERJAAN PEMBONGKARAN
Penurunan Atap Genteng
Membongkar Usuk/Reng
Bongkaran Beton Bertulang
Membongkar Tembok
Membongkar Lantai
273.44
273.44
4.50
8.14
91.30
SAT
m2
m2
m3
m3
m2
HARGA SATUAN
Rp
Rp
Rp
Rp
Rp
7,930.00
2,072.00
316,323.60
294,423.60
9,490.00
TOTAL
PEMBULATAN
TERBILANG
Tujuh Juta Empat Ratus Dua Puluh Ribu Rupiah
AYA
JUMLAH HARGA
Rp
Rp
Rp
Rp
Rp
2,168,379.20
566,567.68
1,423,456.20
2,396,608.10
866,437.00
###
Rp
7,420,000.00