/ Perancangan dan Perbaikan Dokumen Mutu Departemen PPIC di PT Astra Otoparts Divisi Adiwira Plastik / Jurnal Titra,
Vol. 1, No. 2, Juli 2013, pp. 1722
Abstract: Quality Document for PPIC Department (business process, standard operating
procedure, work instruction and supporting document) was last updated in 2003, so it does not
fit anymore. This condition causes high variation of work, obtructs the application of Toyota
Production Sustem and ISO 9001. This problem can be solved by designing the new quality
document. Results obtained 17 existing WI deleted, 6 existing SOP revised, 31 existing WI
revised, 2 proposed SOP and 130 proposed WI added. Business process, supporting documents
(form and standard) and tools are also improved in order to support the new quality document.
Lastly, controlling system is designed to ensure that quality document always fits with actual
condition.
Keywords: Business Process, Standard Operating Procedure, Work Instruction and Quality
Document.
Pendahuluan
Metode Penelitian
Industri,
Universitas Kristen Petra. Jl. Siwalankerto 121-131, Surabaya
60236. Email: mrtn.immanuel@gmail.com, tanti@peter.petra.ac.id
17
Agusta., et al. / Perancangan dan Perbaikan Dokumen Mutu Departemen PPIC di PT Astra Otoparts Divisi Adiwira Plastik / Jurnal Titra,
Vol. 1, No. 2, Juli 2013, pp. 1722
PRENGG-01
Pembuatan &
Pengiriman PO
Pembuatan
Jadwal Proyek
PRENGG-01
PRENGG-01
Pelajari
Permintaan
Penerimaan Order
Produk Baru
PRPURC-01
PR-PURC-02
Penentuan
Supplier
Supplier
Pengajuan
Permintaan
Pembelian
Pembuatan
Jadwal & Trial
PRMKTG-02
PRMKTG-02
Pelajari
Kesanggupan
Delivery
Penerimaan Order
Regular
Customer
PRPPCT-01
PR-PPCT-02
PRPURC-01
PRPURC-03
Evaluasi Supplier
PRWRHS-01
PR-QCRL-02
Penerimaan
Barang Masuk
PRPROD-01
PR-QCRL-01
PR-QCRL-03
PR-QCRL-04
PRWRHS-01
PR-WRHS-02
PR-WRHS-04
Penyimpanan dan
Pengiriman
Barang
Proses Produksi
PRPURC-01
PR-QCRL-02
PRWRHS-03
Pengecekan u/
Pengiriman
PRMKTG-01
Klaim ke Supplier
Pembuatan PICA
Klaim
Keterangan:
Aliran Informasi/Dokumen Produk Baru
Aliran Informasi/Dokumen
Aliran Barang
Aliran Informasi Klaim dari Customer
Aliran Informasi Klaim ke Supplier
Supporting Process :
1. Human Resources Development
2. Equipment & Tooling Maintenance
3. Audit Internal
4. Tinjauan Manajemen
5. Tindakan Koreksi
6. Tindakan Pencegahan
7. Komunikasi
Pengiriman
PRMKTG-01
Penerimaan Klaim
SOP PPIC
No
Nama
Pembuatan
Jadwal &
Trial
PR-PPCT01
PR-PPCT02
Penerimaan
Barang
Masuk
PRWRHS-01
Perencanaan dan
Evaluasi Produksi
Pengendalian Barang di
Subkontrak
Penerimaan dan
Penyimpanan Barang
Eksternal
Penerimaan dan
Penyimpanan Barang
Eksternal
Penerimaan Barang
Internal
Pengiriman Barang
Internal
Pengemasan dan
Pengiriman Barang
Penyimpanan
& Pengiriman
Barang
Pengiriman
PRWRHS-01
PRWRHS-02
PRWRHS-04
PRWRHS-03
18
Agusta., et al. / Perancangan dan Perbaikan Dokumen Mutu Departemen PPIC di PT Astra Otoparts Divisi Adiwira Plastik / Jurnal Titra,
Vol. 1, No. 2, Juli 2013, pp. 1722
Perbaikan Pendukung
Perbaikan pendukung terdiri dari evaluasi dan
perbaikan dokumen pendukung (form dan standar)
dan perbaikan tools kerja. Form dan standar yang
digunakan dalam SOP maupun WI akan
distandarisasi dan didaftarkan sebagai dokumen
resmi Departemen PPIC. Perbaikan tools dilakukan
untuk mempermudah pekerjaan petugas yang juga
telah diatur pada WI baru.
Sebelum
Sesudah
19
Agusta., et al. / Perancangan dan Perbaikan Dokumen Mutu Departemen PPIC di PT Astra Otoparts Divisi Adiwira Plastik / Jurnal Titra,
Vol. 1, No. 2, Juli 2013, pp. 1722
Sebelum
Sebelum
Sesudah
Sesudah
Sebelum
Sesudah
Sebelum
Sesudah
Sebelum
Sesudah
Sebelum
Sesudah
Nama
Proses
Pembuatan
Jadwal &
Trial
No
Nama
PR-PPCT01
Perencanaan dan
Evaluasi Produksi
Perencanaan dan
Pengelolaan Barang di
Subkontrak
Perencanaan dan
Pemesanan
Material/Komponen
Penerimaan dan
Penyimpanan Barang
Eksternal
Penerimaan dan
Penyimpanan Barang
Eksternal
Penerimaan Barang
Internal
Pengiriman Barang
Internal
PR-PPCT02
PR-PPCT03
Sebelum
SOP PPIC
Penerimaan
Barang
Masuk
Sesudah
Penyimpanan
& Pengiriman
Barang
20
PRWRHS-01
PRWRHS-01
PRWRHS-02
PRWRHS-04
PRWRHS-03
PRWRHS-05
Pengiriman Barang
Pengelolaan DN
Agusta., et al. / Perancangan dan Perbaikan Dokumen Mutu Departemen PPIC di PT Astra Otoparts Divisi Adiwira Plastik / Jurnal Titra,
Vol. 1, No. 2, Juli 2013, pp. 1722
PRPURC-01
PRENGG-01
PRENGG-01
Pembuatan &
Pengiriman PO
Pembuatan
Jadwal Proyek
PRENGG-01
Pelajari
Permintaan
Penerimaan Order
Produk Baru
PRPURC-01
PR-PURC-02
No
Penentuan
Supplier
Supplier
Pengajuan
Permintaan
Pembelian
PRMKTG-02
PRMKTG-02
Pelajari
Kesanggupan
Delivery
Pembuatan
Jadwal & Trial
Penerimaan Order
Regular
PRPURC-03
Evaluasi Supplier
PRPROD-01
PR-QCRL-01
PR-QCRL-03
PR-QCRL-04
PRWRHS-01
PR-WRHS-02
PR-WRHS-04
PRWRHS-01
PR-QCRL-02
Penerimaan
Barang Masuk
Penyimpanan dan
Pengiriman
Barang
PRPURC-01
Pengecekan u/
Pengiriman
PRMKTG-01
Klaim ke Supplier
Supporting Process :
1. Human Resources Development
2. Equipment & Tooling Maintenance
3. Audit Internal
4. Tinjauan Manajemen
5. Tindakan Koreksi
6. Tindakan Pencegahan
7. Komunikasi
Pengiriman
PRMKTG-01
Pembuatan PICA
Klaim
Keterangan:
Aliran
Aliran
Aliran
Aliran
Aliran
PRWRHS-03
PRWRHS-05
PR-QCRL-02
Proses Produksi
Penerimaan Klaim
SOP
Mulai
Audit
Kesesuaian
WI dan
Dokumen
Pendukung
WI Baru,
Dokumen
Pendukung Baru
Pembuatan/
Perbaikan
Pemeriksa
Evaluasi
Leader
Langkah kerja
Tata bahasa,
eliminasi WI
SWS level 3
Foreman
Kepala Seksi
SOP
Business
Process
Tidak
Kepala Seksi
2
Ya
OK?
Persiapan Audit
Kesesuaian
Check sheet
Audit, dan
dokumen lainnya
No
Penanggung
Jawab
Persyaratan
Customer
PRPPCT-01
PR-PPCT-02
PR-PPCT-03
PRPURC-01
Jenis
Dokumen
Kepala
Departemen
Kepala
Departemen
Kepala Pabrik
Pengecekan
OK?
Tidak
Ya
Daftar Induk
Dokumen-Form
5
Validasi
OK?
Tidak
Ya
Perubahan proses
dan memperjelas
uraian
Eliminasi dan
penambahan SOP
6
Pengarsipan
7
Sosialisasi dan
Implemetasi
Ya
Deadline?
Ok
8
Follow Up
Foreman Terkait
Tidak
Selesai
Ok
21
Agusta., et al. / Perancangan dan Perbaikan Dokumen Mutu Departemen PPIC di PT Astra Otoparts Divisi Adiwira Plastik / Jurnal Titra,
Vol. 1, No. 2, Juli 2013, pp. 1722
Simpulan
Dokumen mutu Departemen PPIC yang juga
merupakan standar kerja tidak sesuai dengan
keadaan aktual lapangan. Hal ini disebabkan
perkembangan bisnis PT AO AWP dan dokumen
mutu belum dikelola dengan baik.
Enam SOP Departemen PPIC yang terbagi dalam
empat proses di business process perusahaan direvisi
kontennya dan dua diantaranya berganti judul. Dua
SOP ditambahkan untuk dapat menggambarkan
keseluruhan proses Departemen PPIC. Perubahan
SOP disertai dengan perubahan business process,
yaitu pencantuman nomor SOP dan menambahkan
garis aliran informasi/dokumen.
Jumlah WI Departemen PPIC lama adalah 48 buah
(64,58% direvisi dan 35,24% dihapus). Hasil
perancangan dan perbaikan WI adalah 161 buah
yang tersebar pada delapan SOP baru. Perbaikan
WI dilakukan beserta dengan perbaikan tools kerja,
evaluasi dan perbaikan dokumen pendukung.
Jumlah dokumen pendukung lama dalah 8 buah
(25% direvisi dan 75% dihapus). Hasil perbaikan
dokumen pendukung adalah 24 buah dokumen
pendukung. Seluruh hasil perancangan dan
perbaikan dokumen mutu telah disetujui dan
disahkan oleh perusahaan. Sistem kontrol WI dan
dokumen pendukung merupakan skenario dan
check sheet.
Daftar Pustaka
22